Text

APPLICABILITY SURVEILLANCE REQUIREMENTS 4.0.1 Surveillance Requirements shall be met during the OPERATIONAL MODES or other conditions specified for individual Limiting Conditions for Operation unless otherwise stated in an individual Surveillance Requirement.

4.0.2 Each Surveillance Requirement shall be performed within the specified surveillance interval with a maximum allowable extension not to exceed 25% of the specified surveillance interval.

4.0.3 If it is discovered that a surveillance was not performed within its specified surveillance 'interval, then compliance with the requirement to declare the LCO not met may be delayed, from the time of discovery, up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or up to the limit of the specified surveillance interval, whichever is less. This delay period is permitted to allow performance of the surveillance.

If the surveillance is not performed within the delay period, the LCO must immediately be declared not met, and the applicable ACTION requirements must be met.

When the surveillance is performed within the delay period and the surveillance criteria are not met, the LCO must immediately be declared not met, and the applicable ACTION requirements must be met.

Surveillance Requirements do not have to be performed on inoperable equipment.

4.0.4 Entry into an OPERATIONAL MODE or other specified condition shall not be made unless the Surveillance Requirement(s) associated with the Limiting Condition for Operation has been performed within the stated surveillance interval or as otherwise specified. This provision shall not prevent passage through or to OPERATIONAL MODES as required to comply with ACTION requirements.

4.0.5 DELETED SHEARON HARRIS - UNIT 1 3/4 0-2 Amendment No.127

APPLICABILITY SURVEILLANCE REQUIREMENTS (Continued)

Page 3/4 0-3 has been deleted by Amendment No.

SHEARON HARRIS - UNIT 1 3/4 0-3 Amendment No.127

REACTIVITY CONTROL SYSTEMS CHARGING PUMP - SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.2.3 One charging/safety injection pump in the boron injection flow path required by Specification 3.1.2.1 shall be OPERABLE and capable of being powered from an OPERABLE emergency power source.

APPLICABILITY: MODES 4', 5"#, and 6".

ACTION:

With no charging/safety injection pump OPERABLE or capable of being powered from an OPERABLE emergency power source, suspend all operations involving CORE ALTERATIONS or positive reactivity changes.

SURVEILLANCE REQUIREMENTS 4.1.2.3.1 The above required charging/safety injection pump shall be demonstrated OPERABLE by verifying, on recirculation flow or in service supplying flow to the reactor coolant system and reactor coolant pump seals.,

that a differential pressure across the pump of greater than or equal to 2446 psid is developed when tested pursuant to the Inservice Testing Program.

4.1.2.3.2 All charging/safety injection pumps, excluding the above required OPERABLE pump, shall be demonstrated inoperable" by verifying that each pump".s motor circuit breaker is secured in the open position prior to the temperature of one or more of the RCS cold legs decreasing below 325°F and at least once per 31 days thereafter, except when the reactor vessel head is removed.

A maximum of one charging/safety injection pump shall be OPERABLE whenever the temperature of one or more of the RCS cold legs is less than or equal to 325 0 F and the reactor vessel head is in place.

An inoperable pump may be energized for testing provided the discharge of the pump has been isolated from the.RCS by a closed isolation valve with power removed from the valve operator or by a manual isolation valve secured in the closed position.

For periods of no more than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, when swapping pumps, it is permitted that there be no OPERABLE charging/safety injection pump. No CORE ALTERATIONS or positive reactivity changes are permitted during this time.

SHEARON HARRIS - UNIT 1 3/4 1-9 Amendment No. 127

REACTIVITY CONTROL SYSTEMS CHARGING PUMPS - OPERATING LIMITING CONDITION FOR OPERATION 3.1.2.4 At least two charging/safety injection pumps shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTION:

With only one charging/safety injection pump OPERABLE, restore at least two charging/safety injection pumps to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY and borated to a SHUTDOWN MARGIN as specified in the CORE OPERATING LIMITS REPORT (COLR), plant procedure PLP-106 at 200°F within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; restore at least two charging/safety injection pumps to OPERABLE status within the next 7 days or be in HOT SHUTDOWN within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.1.2.4 At least two charging/safety injection pumps shall be demonstrated OPERABLE by verifying, on recirculation flow or in service supplying flow to the Reactor Coolant System and reactor coolant pump seals, that a differential pressure across each pump of greater than or equal to 2446 psid is developed when tested pursuant to the Inservice Testing Program. I SHEARON HARRIS - UNIT 1 3/4 1-10 Amendment No. 127

REACTOR COOLANT SYSTEM 3/4.4.2 SAFETY VALVES SHUTDOWN LIMITING CONDITION FOR OPERATION 3.4.2.1 A minimum of one pressurizer Code safety valve shall be OPERABLE with a lift setting of 2485 psig +/- 1%."

APPLICABILITY: MODES 4 and 5.

ACTION:

With no pressurizer Code safety valve OPERABLE, immediately suspend all operations involving positive reactivity changes and place an OPERABLE RHR loop into operation in the shutdown cooling mode.

SURVEILLANCE REQUIREMENTS 4.4.2.1 No additional requirements other than those required by the Inservice I Testing Program.

The lift setting pressure shall correspond to ambient conditions of the valve at nominal operating temperature and pressure.

SHEARON HARRIS - UNIT 1 3/4 4-8 Amendment No. 127

REACTOR COOLANT SYSTEM OPERATING LIMITING CONDITION FOR OPERATION 3.4.2.2 All pressurizer Code safety valves shall be OPERABLE with a lift setting of 2485 psig +/- 1%.'

APPLICABILITY: MODES 1, 2, and 3.

ACTION:

With one pressurizer Code safety valve inoperable, either restore the inoperable valve to OPERABLE status within 15 minutes or be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in at least HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.4.2.2 No additional requirements other than those required by the Inservice I Testing Program. I

  • The lift setting pressure shall correspond to ambient conditions of the valve at nominal operating temperature and pressure.

SHEARON HARRIS - UNIT 1 3/4 4-9 Amendment No. 127

REACTOR COOLANT SYSTEM RELIEF VALVES SURVEILLANCE REQUIREMENTS 4.4.4.1 In addition to the requirements of the Inservice Testing Program, each PORV shall be demonstrated OPERABLE at least once per 18 months by:

a. Performing a CHANNEL CALIBRATION of the actuation instrumentation, and
b. Operating the valve through one complete cycle of full travel during MODES 3 or 4, prior to going to 325 0 F.

4.4.4.2 Each block valve shall be demonstrated OPERABLE at least once per 92 days by operating the valve through one complete cycle of full travel unless the block valve is closed with power removed in order to meet the requirements of ACTION b. or c. in Specification 3.4.4.

4.4.4.3 The accumulator for the safety-related PORVs shall be demonstrated OPERABLE at least once per 18 months by isolating the normal air and nitrogen supplies and operating the valves through a complete cycle of full travel.

SHEARON HARRIS - UNIT I 3/4 4-12 Amendment No. 127

EMERGENCY CORE COOLING SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)

d. At least once per 18 months by:
1. Verifying automatic interlock action of the RHR system from the Reactor Coolant System by ensuring that with a simulated or actual Reactor Coolant System pressure signal greater than or equal to 425 psig the interlocks prevent the valves from being opened.
2. A visual inspection of the containment sump and verifying that the subsystem suction inlets are not restricted by debris and that the sump components (trash racks, screens, etc.) show no evidence of structural distress or abnormal corrosion.
e. At least once per 18 months by:
1. Verifying that each automatic valve in the flow path actuates to its correct position on safety injection actuation test signal and on safety injection switchover to containment sump from an RWST Lo-Lo level test signal, and
2. Verifying that each of the following pumps start automatically upon receipt of a safety injection actuation test signal:

a) Charging/safety injection pump, b) RHR pump.

f. By verifying that each of the following pumps develops the required differential pressure when tested pursuant to the Inservice Testing Program:
1. Charging/safety injection pump (Refer to Specification 4.1.2.4)
2. RHR pump Ž 100 psid at a flow rate of at least 3663 gpm.
g. By verifying that the locking mechanism is in place and locked for the following High Head ECCS throttle valves:
1. Within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> following completion of each valve stroking operation or maintenance on the valve when the ECCS subsystems are required to be OPERABLE, and
2. At least once per 18 months.

SHEARON HARRIS - UNIT 1 3/4 5-5 Amendment No. 127

CONTAINMENT SYSTEMS 3/4'6.2 DEPRESSURIZATION AND COOLING SYSTEMS CONTAINMENT SPRAY SYSTEM LIMITING CONDITION FOR OPERATION 3.6.2.1 Two independent Containment Spray Systems shall be OPERABLE with each Spray System capable of taking suction from the RWST and transferring suction to the containment sump.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTION:

With one Containment Spray System inoperable, restore the inoperable Spray System to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; restore the inoperable Spray System to OPERABLE status within the next 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

Refer also to Specification 3.6.2.3 Action.

SURVEILLANCE REQUIREMENTS 4.6.2.1 Each Containment Spray System shall be demonstrated OPERABLE:

a. At least once per 31 days by verifying that each valve (manual, power-operated, or automatic) in the flow path that is not locked, sealed, or otherwise secured in position, is in its correct position;
b. By verifying that, on an indicated recirculation flow of at least 1832 gpm, each pump develops a differential pressure of greater than or equal to 186 psi when tested pursuant to the Inservice Testing*Program:
c. At least once per 18 months by:
1. Verifying that each automatic valve in the flow path actuates to its correct position on a containment spray actuation test signal and
2. Verifying that each spray pump starts automatically on a containment spray actuation test signal.
3. Verifying that, coincident with an indication of containment spray pump running, each automatic valve from the sump and RWST actuates to its appropriate position following an RWST Lo-Lo test signal.
d. At least once per 10 years by performing an air or smoke flow test through each spray header and verifying each spray nozzle is unobstructed.

SHEARON HARRIS - UNIT 1 3/4 6-11 Amendment No. 127

. . . a.

CONTAINMENT SYSTEMS CONTAINMENT ISOLATION VALVES SURVEILLANCE REQUIREMENTS (Continued) 4.6.3.2 Each isolation valve shall be demonstrated OPERABLE at least onceper 18 months by:

a. Verifying that on a Phase "A" Isolation test signal, each Phase "A" isolation valve actuates to its isolation position;
b. Verifying that on a Phase "B" Isolation test signal, each Phase "B" isolation valve actuates to its isolation position; and
c. Verifying that on a Containment Ventilation Isolation test signal, each normal, preentry purge makeup and exhaust, and containment vacuum relief valve actuates to its isolation position, and
d. Verifying that, on a Safety Injection "S" test signal, each containment isolation valve receiving an "S" signal actuates to its isolation position, and
e. Verifying that, on a Main Steam Isolation test signal, each main steam isolation valve actuates to its isolation position, and
f. Verifying that, on a Main Feedwater Isolation test signal, each feedwater isolation valve actuates to its isolation position.

4.6.3.3 The isolation time of each power-operated or automatic valve shall be determined to be within its limit specified in the Technical Specification Equipment List Program, plant procedure PLP-106, when tested pursuant to the Inservice Testing Program.

SHEARON HARRIS - UNIT 1 3/4 6-15 Amendment No. 127

o.* ,'

CONTAINMENT SYSTEMS 3/4.6.5 VACUUM RELIEF SYSTEM LIMITING CONDITION FOR OPERATION 3.6.5 The containment vacuum relief system shall be OPERABLE with an Actuation Setpoint of equal to or less negative than -2.5 inches water gauge differential pressure (containment pressure less atmospheric pressure)

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTION:

With one containment vacuum relief system inoperable, restore the system to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREMENTS 4.6.5 No additional requirements other than those required by the Inservice Testing Program.

SHEARON HARRIS - UNIT 1 3/4 6-32 Amendment No. 127

3/4.7 PLANT SYSTEMS 3/'4.7.1 TURBINE CYCLE SAFETY VALVES LIMITING CONDITION FOR OPERATION 3.7.1.1 All main steam line Code safety valves associated'with each steam generator shall be OPERABLE with lift settings as specified in Table 3.7-2.

APPLICABILITY: MODES 1, 2, and 3.

ACTION:

a. With one or more main steam line Code safety valves inoperable, operation may proceed provided, that within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, either the inoperable valve is restored to OPERABLE status or the Power Range Neutron Flux High Trip Setpoint is reduced per Table 3.7-1; otherwise, be in at least HOT STANDBY-within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.7*1.1 No additional requirements other than those required by the Inservice I Testing Program.

SHEARON HARRIS - UNIT 1 3/4 7-1I Amendment No. 127

m.'.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTION:

MODE 1:

With one MSIV inoperable but open, POWER OPERATION may continue provided the inoperable valve is restored to OPERABLE status within 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />s:

otherwise be in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

MODES 2, 3, and 4:

With one MSIV inoperable, subsequent operation in MODE 2, 3, or 4 may proceed provided the isolation valve is maintained closed. Otherwise, be in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.7.1.5 Each MSIV shall be demonstrated OPERABLE by verifying full closure

'within 5 seconds when tested pursuant to the Inservice Testing Program. The provisions of Specification 4.0.4 are not applicable for entry into MODES 3 or 4.

SHEARON HARRIS - UNIT 1 3/4 7-9 Amendment No. 127

PLANT SYSTEMS 3/4.7.13 ESSENTIAL SERVICES CHILLED WATER SYSTEM LIMITING CONDITION FOR OPERATION 3.7.13 At least two independent Essential Services Chilled Water System loops shall be OPERABLE.

APPLICABILITY: MODES 1, 2. 3, and 4.

ACTION:

With only one Essential Services Chilled Water System loop OPERABLE, restore at least two loops to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREMENTS 4.7.13 The Essential Services Chilled Water System shall be demonstrated OPERABLE by:

a. Performance of surveillances as required by the Inservice Testing Program, and
b. At least once per 18 months by demonstrating that:
1. Non-essential portions ofthe systemare automatically isolated upon receipt of a Safety Injection actuation signal, and
2. The system starts automatically on a Safety Injection actuation signal.

SHEARON HARRIS - UNIT 1 3/4 7-30 Amendment No.127

m. InserviceTestina Proaram This program provides controls for inservice testing of ASME Code Class 1, 2, and 3 components. The program shall include the following:
1. Testing frequencies specified in the ASME Code for Operation and Maintenance of Nuclear Power Plants and applicable Addenda as follows:

ASME Code for Operation and Maintenance of Nuclear Power Plants and applicable Addenda Required Frequencies for terminology for inservice testing' performing inservice testing activities activities Weekly At least once per 7 days Monthly At least once per 31 days Quarterly or every 3 months At least once per 92 days Semiannually or every 6 months At least once per 184 days Every 9 months At least once per 276 days Yearly or annually At least once per 366 days Biennially or every 2 years At least once per 731 days

2. The provisions of SR 4.0.2 are applicable to the above required Frequencies and to other normal and accelerated Frequencies specified as 2 years or less in the Inservice Testing Program for performing inservice testing activities,
3. The provisions of SR 4.0.3 are applicable to inservice testing activities, and
4. Nothing in the ASME Code for Operation and Maintenance of Nuclear Power Plants shall be construed to supersede the requirements of any Technical Specification.

SHEARON HARRIS - UNIT 1 6-19g Amendment No. 1271

n. Technical Specifications (TS) Bases Control Program This program provides a means for processing changes to the Bases of these Technical Specifications:
1. Changes to the Bases of the TS shall be made under appropriate administrative controls and reviews.
2. Licensees may make changes to Bases without prior NRC approval provided the changes do not require either of the following:
a. A change in the TS incorporated in the license, or
b. A change to the FSAR or Bases that requires NRC approval pursuant to 10 CFR 50.59.
3. The Bases Control Program shall contain provisions to ensure that the Bases are maintained consistent with the FSAR.
4. Proposed changes that meet the criteria of Specification 6.8.4.n.2 above shall be reviewed and approved by the NRC prior to implementation. Changes to the Bases implemented without prior NRC approval shall be provided to the NRC on a frequency consistent with 10 CFR 50.71 (e).

SHEARON HARRIS - UNIT 1 6-19h Amendment No. 1271