Letter & Technical Specifications - Corrections to Technical Specification Pages Issued with Amendment No. 128 Issued on January 29, 2009
ML092310286
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 08/20/2009
From: Vaaler M
Plant Licensing Branch II
To: Burton C
Carolina Power & Light Co
Vaaler, Marlayna, NRR/DORL 415-1998
References
TAC MD7792
Download: ML092310286 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 20, 2009 Chris L. Burton, Vice President Shearon Harris Nuclear Power Plant Carolina Power & Light Company Post Office Box 165, Mail Code: Zone 1 New Hill, North Carolina 27562-0165

SUBJECT:

SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 - CORRECTIONS TO TECHNICAL SPECIFICATION PAGES ISSUED WITH AMENDMENT NO. 128 ISSUED ON JANUARY 29,2009 (TAC NO. MD7792)

Dear Mr. Burton:

On January 29,2009, the U.S. Nuclear Regulatory Commission issued Amendment No. 128 to Renewed Facility Operating License No. NPF-63 for the Shearon Harris Nuclear Power Plant (HNP), Unit No.1, in response to your request dated January 4, 2008.

This amendment modifies HNP's Technical Specification (TS) requirements related to control room envelope habitability in accordance with the Technical Specification Task Force (TSTF)

Standard TS Change Traveler, TSTF-448, Revision 3, "Control Room Habitability." The revisions establish more effective and appropriate action, surveillance, and administrative requirements related to ensuring the habitability of the control room envelope in accordance with the NRC-approved TSTF-448, Revision 3. This TS improvement was made available in the Federal Register by the NRC on January 17, 2007 (72 FR 2022).

An error was found on one of the camera-ready TS pages issued with the amendment, in that on retyped Page 3/47-14, in Section 3.7.6.a.2.a, the word "in" was inadvertently excluded between "be" and "at" in the sentence: "Initiate action to implement mitigating actions immediately or be at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />... " In addition, retyped Page 3/4 7-16 included revision bars for sections d.1 and e; however, the amendment made no changes to these sections, but rather to section d.3, which was deleted.

- 2 These corrections were previously discussed with your staff prior to implementation of this amendment. Revised license amendment pages are enclosed; please replace the incorrect TS pages with these updated versions. We regret any inconvenience this may have caused. If you have any questions regarding this matter, please call me at (301) 415-3178.

Marlayna Vaaler, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-400

Enclosures:

As stated cc: Distribution via ListServ

e!chliI..~IlI1.MS.

1/4.7.j) CONTROl ROm1 EJ~EI~~iEJ[!..LUJ.JBATION SYSTEM liMITING CONDITION FOR OPFRATION 3.7.6 Two 1ndependenL Control Room Emergency Filtrat10n System (CREFS) trains I shall be OPERABI E.*

fiPPUCABII lTY:

a.

MODES 1. 2, 3. and 4

b.

MODES 5 and 6

c.

During movement of irradiated fuel assemblies dnd movement of loads over spent fuel pools ACTION:

a.

MODFS 1. 2. 3 and 4:

- * -- - _... -- - - - -- - _.- - -NOTE -- - - - - - - - - - - - _. - --..... -- - - - - - -- -

In addiLlOr1 to the Actions belOl'l!, perform Action c.if applicable.

Wlth one CREES traln inoperable for reasons other than an inoper'able Control. Room Envelope (CRU boundary, restore the lnoperdble CREFS Lraln to OPERABLE status within 7 days or be in at least !IDT STMIDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COlD SIIUTDOWN wlthin the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

2.

'.~Jith one or more CREES traIns lnoporable due to lnoperable CRE boulleJary:

a. Initiate action to 11T1plement mitigallng actions immedlately or' be in at 1east IIOT STANDBY Wl thi n 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and 1n COLD SHUTDOAN

\\'I!1Lhin U,e folloltJing 30 hour3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />s:

b. ~Jlthin 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. verify rniLigatlng actlOns ensure CRt occupant radiologlcal exposures wi 11 not exceed limits and Lhat CR~

occupants dre protected from hdl.ardous chemicals and smoke or De in at least IIOT STANDBY wlLh1n Lhe next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COW SHUTDOlm vIlUl1n the following 30 hour3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />s:

c. Res [on:' CRF boundary to OPFRABI E ',",1 UIHI 90 days or be Hl at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the follow1ng 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
b.

!"10DES 5 and 6

- -- -.. - -- - - -. -- - -NOTl:.- - -- - - -- - - -- - -.

In addit10n to the Act10ns below, perform Act10n c. If applicable.

1.

With one CR~ES tralrl noperable for reasons other than an i noperatd e CRF boundar.y. restore the moperab1e CREFS trai n to OPfRABi.E status within 7 days or immed1ately initiate and maintain operation of the rema1n1ng OPERASI F CREFS t.rain 1n the recircul~Ll0n mode

  • The conLrol room envelope (CRE) boundary may be opened inLernLtenl.ly under adrnimstrative oJntl'Ols.

SHFARON Hf\\RRIS UNIT:

3/4 7-14

.A.mendncnL ND 128

PLANT SYSTEMS CONTROL ROOM EMERGENCY FILTRATION SYSTEM SURVEILLANCE REQUIREMENTS (Continued)

2.

Verifying. within 31 days after removal. that a laboratory analysis of a representative carbon sample obtained in accordance with Regulatory Position C.6.b of Regulatory Guide 1.52, Revision 2, March 1978, has a methyl iodide penetration of ~0.5% when tested at a temperature of 30 De and at a relative humidity of 70% in accordance with ASTM 03803-1989.

c.

After every 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br /> of charcoal adsorber operation, by verifying, within 31 days after removal. that a laboratory analysis of a representative carbon sample obtained in accordance with Regulatory Position C.6.b of Regulatory Guide 1.52.

Revision 2. March 1978. has a methyl iodide penetration of ~0.5%

when tested at a temperature of 30 DC and at a relative humidity of 70% in accordance with ASTM 03803-1989.

d.

At least once per 18 months by:

1.

Verifying that the pressure drop across the combined HEPA filters and charcoal adsorber banks is less than 5.1 inches water gauge wh'lle operating the system at a flow rate of 4000 cfm +/- 10%:

2.

Verifying that, on either a Safety Injection or a High Radiation test signal, the system automatically switches into an isolation with recirculation mode of operation with fl ow through the HEPA fllters and charcoal adsorber banks;

3.

De1eted.

4.

Verifying that the heaters dissipate 14 +/- 1.4 kW when tested in accordance with ANSI N510-19BO; and

5.

Del eted.

e.

After each complete or partial replacement of a HEPA filter bank.

by verifying that the unit satisfies the in-place penetration and bypass leakage testing acceptance criteria of less than 0.05% in accordance with ANSI N510-1980 for a OOP test aerosol while operating the system at a flow rate of 4000 cfm +/- 10%: and

f.

After each complete or partial replacement of a charcoal adsorber bank. by verifying that the cleanup system satisfies the in-place penetration leakage testing acceptance criteria of less than 0.05%

in accordance with ANSI N510-1980 for a halogenated hydrocarbon refrigerant test gas while operating the system at a flow rate of 4000 cfm +/- 10%.

g.

Perform required CRE unfiltered air inleakage testing in accordance with the Control Room Envelope Habitability Program.

SHEARON HARRIS - L1NIT 1 3/4 7-16 Amendment No. 1 28

- 2 These corrections were previously discussed with your staff prior to implementation of this amendment. Revised license amendment pages are enclosed; please replace the incorrect TS pages with these updated versions. We regret any inconvenience this may have caused. If you have any questions regarding this matter, please call me at (301) 415-3178.

Sincerely, IRA!

Marlayna Vaaler, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-400

Enclosures:

As stated cc: Distribution via ListServ DISTRIBUTION:

PUBLIC LPL2-2 RlF RidsOgcRp RidsNrrPMHarris RidsAcrsAcnw_MailCTR RidsNrrDorlLPL2-2 RidsNrrLACSola RidsRgn2MailCenter ADAMS Accession Number: ML092310286 Revised Pages: ML092310296 k

Pac aoe: ML092310308 NRR 106 OFFICE LPL2-2/PM LPL2-2/LA LPL2-2/BC NAME MVaaler CSoia TBoyce DATE 08/20/09 08/20/09 08/20/09 OFFICIAL RECORD COpy