ML17324B129
| ML17324B129 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 12/06/2017 |
| From: | Division of Operating Reactor Licensing |
| To: | |
| Galvin D | |
| References | |
| CAC MD5802 | |
| Download: ML17324B129 (2) | |
Text
SHEARON HARRIS - UNIT 1 6-19g Amendment No. 127 ADMINISTRATIVE CONTROLS PROCEDURES AND PROGRAMS (Continued) m.
Inservice Testing Program This program provides controls for inservice testing of ASME Code Class 1, 2, and 3 components. The program shall include the following:
1.
Testing frequencies specified in the ASME Code for Operation and Maintenance of Nuclear Power Plants and applicable Addenda as follows:
ASME Code for Operation and Maintenance of Nuclear Power Plants and applicable Addenda terminology for inservice testing activities Required Frequencies for performing inservice testing activities Weekly Monthly Quarterly or every 3 months Semiannually or every 6 months Every 9 months Yearly or annually Biennially or every 2 years At least once per 7 days At least once per 31 days At least once per 92 days At least once per 184 days At least once per 276 days At least once per 366 days At least once per 731 days 2.
The provisions of SR 4.0.2 are applicable to the above required Frequencies and to other normal and accelerated Frequencies specified as 2 years or less in the Inservice Testing Program for performing inservice testing activities, 3.
The provisions of SR 4.0.3 are applicable to inservice testing activities, and 4.
Nothing in the ASME Code for Operation and Maintenance of Nuclear Power Plants shall be construed to supersede the requirements of any Technical Specification.
SHEARON HARRIS - UNIT 1 6-19h Amendment No. 127 ADMINISTRATIVE CONTROLS PROCEDURES AND PROGRAMS (Continued) n.
Technical Specifications (TS) Bases Control Program This program provides a means for processing changes to the Bases of these Technical Specifications.
1.
Changes to the Bases of the TS shall be made under appropriate administrative controls and reviews.
2.
Licensees may make changes to Bases without prior NRC approval provided the changes do not require either of the following:
a.
A change in the TS incorporated in the license, or b.
A change to the FSAR or Bases that requires NRC approval pursuant to 10 CFR 50.59.
3.
The Bases Control Program shall contain provisions to ensure that the Bases are maintained consistent with the FSAR.
4.
Proposed changes that meet the criteria of Specification 6.8.4.n.2 above shall be reviewed and approved by the NRC prior to implementation. Changes to the Bases implemented without prior NRC approval shall be provided to the NRC on a frequency consistent with 10 CFR 50.71(e).