Correction to License Amendment No. 127 Regarding Changes to the Inservice Inspection and Testing Requirements and Establishment of a TS Bases Control Program (CAC No. MD5802) - Corrected TS Pages
ML17324B129
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 12/06/2017
From:
Division of Operating Reactor Licensing
To:
Galvin D
References
CAC MD5802
Download: ML17324B129 (2)


Text

ADMINISTRATIVE CONTROLS PROCEDURES AND PROGRAMS (Continued)

m. Inservice Testing Program This program provides controls for inservice testing of ASME Code Class 1, 2, and 3 components. The program shall include the following:
1. Testing frequencies specified in the ASME Code for Operation and Maintenance of Nuclear Power Plants and applicable Addenda as follows:

ASME Code for Operation and Maintenance of Nuclear Power Plants and applicable Addenda Required Frequencies for terminology for inservice testing performing inservice testing activities activities Weekly At least once per 7 days Monthly At least once per 31 days Quarterly or every 3 months At least once per 92 days Semiannually or every 6 months At least once per 184 days Every 9 months At least once per 276 days Yearly or annually At least once per 366 days Biennially or every 2 years At least once per 731 days

2. The provisions of SR 4.0.2 are applicable to the above required Frequencies and to other normal and accelerated Frequencies specified as 2 years or less in the Inservice Testing Program for performing inservice testing activities,
3. The provisions of SR 4.0.3 are applicable to inservice testing activities, and
4. Nothing in the ASME Code for Operation and Maintenance of Nuclear Power Plants shall be construed to supersede the requirements of any Technical Specification.

SHEARON HARRIS - UNIT 1 6-19g Amendment No. 127

ADMINISTRATIVE CONTROLS PROCEDURES AND PROGRAMS (Continued)

n. Technical Specifications (TS) Bases Control Program This program provides a means for processing changes to the Bases of these Technical Specifications.
1. Changes to the Bases of the TS shall be made under appropriate administrative controls and reviews.
2. Licensees may make changes to Bases without prior NRC approval provided the changes do not require either of the following:
a. A change in the TS incorporated in the license, or
b. A change to the FSAR or Bases that requires NRC approval pursuant to 10 CFR 50.59.
3. The Bases Control Program shall contain provisions to ensure that the Bases are maintained consistent with the FSAR.
4. Proposed changes that meet the criteria of Specification 6.8.4.n.2 above shall be reviewed and approved by the NRC prior to implementation. Changes to the Bases implemented without prior NRC approval shall be provided to the NRC on a frequency consistent with 10 CFR 50.71(e).

SHEARON HARRIS - UNIT 1 6-19h Amendment No. 127