{{#Wiki_filter:Alicia Williamson - Fwd: Entergy.Nuclear Cultural Resources Protection Plan             Page.1 j From:           Jennifer Davis To:             Alicia Williamson Date:           11/06/2006 7:50:19 AM
{{#Wiki_filter:Alicia Williamson - Fwd: Entergy.Nuclear Cultural Resources Protection Plan Page.1 j From:
Jennifer Davis To:
Alicia Williamson Date:
11/06/2006 7:50:19 AM


==Subject:==
==Subject:==
Fwd: Entergy Nuclear Cultural Resources Protection Plan See attached email for procedure.
Fwd: Entergy Nuclear Cultural Resources Protection Plan See attached email for procedure.


c:.\temp\ywvuuufl. I MH                                                                         Page 1 i Mail Envelope Properties       (454F2F84.7DF: 6: 44096)
c:.\\temp\\ywvuuufl. I MH Mail Envelope Properties (454F2F84.7DF: 6: 44096)
Page 1 i


==Subject:==
==Subject:==
Fwd: Entergy Nuclear Cultural Resources Protection Plan Creation Date            11/06/2006 7:50:12 AM From:                    Jennifer Davis Created By:              JXD1O@nrc.gov Recipients nrc.gov TWGWPO04.HQGWDOO1 ARWI (Alicia Williamson)
Creation Date From:
Post Office                                                               Route TWGWPO04.HQGWDO01                                                         nrc.gov Files                             Size              Date & Time MESSAGE                           340                11/06/2006 7:50:12 AM Mail Options Expiration Date:                 None Priority:                         Standard ReplyRequested:                   No Return Notification:             None Concealed  
Created By:
Fwd: Entergy Nuclear Cultural Resources Protection Plan 11/06/2006 7:50:12 AM Jennifer Davis JXD1O@nrc.gov Recipients nrc.gov TWGWPO04.HQGWDOO1 ARWI (Alicia Williamson)
Post Office TWGWPO04.HQGWDO01 Route nrc.gov Files MESSAGE Mail Options Expiration Date:
Priority:
ReplyRequested:
Return Notification:
Concealed  


==Subject:==
==Subject:==
No Security:                         Standard Junk Mail Handling Evaluation Results Message is not eligible for Junk Mail handling Message is from an internal sender Junk Mail settings when this message was delivered Junk Mail handling disabled by User Junk Mail handling disabled by Administrator Junk List is not enabled Junk Mail using personal address books is not enabled Block List is not enabled
Security:
Size 340 Date & Time 11/06/2006 7:50:12 AM None Standard No None No Standard Junk Mail Handling Evaluation Results Message is not eligible for Junk Mail handling Message is from an internal sender Junk Mail settings when this message was delivered Junk Mail handling disabled by User Junk Mail handling disabled by Administrator Junk List is not enabled Junk Mail using personal address books is not enabled Block List is not enabled


SAlicia Williamson - EN-EV-121,_Cultural Resources_.pdf                   dPage
SAlicia Williamson - EN-EV-121,_Cultural Resources_.pdf dPage


==Title:==
==Title:==
Cultural Resources Protection Plan Procedure Owner:                         Rick N. Buckley / Corporate Environmental Chairman (Print Name /_Title)
Cultural Resources Protection Plan Procedure Owner:
Approved:             I'J.                   "                                                ,11/01/06 1 (Procedure Owner Signature)                                             (Date)
Rick N. Buckley / Corporate Environmental Chairman (Print Name /_Title)
EN Common             11/03/06                   ANO       01/01/07       PNPS ENN                                 Effective     ECH                       VY Effective   ENS                                   Date     [   G9                       VY Date                                         Exception     IPEC                       W3 JAF                       WPO Procedure Contains NMM REFLIB Forms: YES [           NO'-
Approved:
Basis Statement This procedure provides a mechanism for protecting historical and archaeological     areas located on Entergy's nuclear site properties.
I'J.  
,11/01/06 1 (Procedure Owner Signature)
(Date)
EN Common 11/03/06 ANO 01/01/07 PNPS ENN Effective ECH VY Effective ENS Date
[
G9 VY Date Exception IPEC W3 JAF WPO Procedure Contains NMM REFLIB Forms: YES [
NO'-
Basis Statement This procedure provides a mechanism for protecting historical and archaeological areas located on Entergy's nuclear site properties.
Site and NMM Procedures Cancelled or Superseded ByThis Revision ANO Procedure 1000.167, ANO Historical and Archaeological Preservation Prograim will be cancelled.
Site and NMM Procedures Cancelled or Superseded ByThis Revision ANO Procedure 1000.167, ANO Historical and Archaeological Preservation Prograim will be cancelled.
Process Apolicahility Exclusion (ENN-LI-100Q) / Programmatic Exclusion (ENS-LI- 101i All Sites: Z Specific Sites: ANO El GGNS El IPECQI JAF [I PNPSE] RBS E-vY [I W3 El
Process Apolicahility Exclusion (ENN-LI-100Q)  
/ Programmatic Exclusion (ENS-LI-101i All Sites: Z Specific Sites: ANO El GGNS El IPECQI JAF [I PNPSE] RBS E-vY [I W3 El


Alicia Williamson - EN-EV-121 Cultural Resources_.pdt                                                                                                 Page21 NUCLEAR                       NON-QUALITY RELATED                       EN-EV-121               REV. 0 E,nfero         MANAGEMENT MANUAL                           INFORMATIONAL       WSE                           PAGE 2 OF 12 Cultural Resources Protection Plan TABLE OF CONTENTS Section Title                                                                                           PaQe 1.0         PURPOSE ......................................................................... 3
Alicia Williamson - EN-EV-121 Cultural Resources_.pdt Page21 NUCLEAR NON-QUALITY RELATED EN-EV-121 REV. 0 E, nfero MANAGEMENT MANUAL INFORMATIONAL WSE PAGE 2 OF 12 Cultural Resources Protection Plan TABLE OF CONTENTS Section Title PaQe 1.0 PURPOSE......................................................................... 3


==2.0         REFERENCES==
==2.0 REFERENCES==
................................................................                  3 3.0         DEFINITIONS .................................................................... 4 4.0         RESPONSIBILITIES .........................................................                   5 5.0         DETAILS .........................................................................           5 5.1     Precautions and Umitations ..................................... 5 5.2     Land Disturbance of Undisturbed Areas ................... 5 5.3     Modificatiorn/Rem odeling of Cultural Resource Structures ............................................................ 6 5.4     Routine Surveillances ..........................                                   7 5.5     Special Protection Measures .................................. 8 5.6     R ecords ..............................................................             8 6.0         INTERFACES ...................................................................               9 7.0         RECORDS ......................................................................               9 8.0         OBLIGATION AND REGULATORY COMMITMENT CROSS-REFERENCES               ........................................................      9 9.0         ATTACHMENTS ..............................................................                   9 ATTACHMENT 9.1 LAND DISTURBANCE ENVIRONMENTAL REvIEw FORM (TYPICAL) ............................................................           . 10 ATTACHMENT 9.2 CULTURAL RESOURCE STRUCTURE MODIFICATION/
3 3.0 DEFINITIONS.................................................................... 4 4.0 RESPONSIBILITIES.........................................................
REMODELING REvIEw FORM (TYPICAL) ......................... 12
5 5.0 DETAILS.........................................................................
5 5.1 Precautions and Umitations..................................... 5 5.2 Land Disturbance of Undisturbed Areas................... 5 5.3 Modificatiorn/Rem odeling of Cultural Resource Structures............................................................
6 5.4 Routine Surveillances..........................
7 5.5 Special Protection Measures.................................. 8 5.6 R ecords..............................................................
8 6.0 INTERFACES...................................................................
9 7.0 RECORDS......................................................................
9 8.0 OBLIGATION AND REGULATORY COMMITMENT CROSS-REFERENCES 9
9.0 ATTACHMENTS.............................................................. 9 ATTACHMENT 9.1 LAND DISTURBANCE ENVIRONMENTAL REvIEw FORM (TYPICAL)............................................................
10 ATTACHMENT 9.2 CULTURAL RESOURCE STRUCTURE MODIFICATION/
REMODELING REvIEw FORM (TYPICAL)......................... 12


Alicia Williamson - EN-EV-1 21 -Cultural Resources-.pdf                                                                   Page 3 ýj EN --E --2 -- -eorepfPg Alicia Williamson~~~~~-      u-----a~~~~
Alicia Williamson - EN-EV-1 21 -Cultural Resources-.pdf Page 3 ýj Alicia Williamson~~~~~-
1.0     PURPOSE
EN -E --2 -- u----- a~~~~  
[1] Provides a mechanism to protect either existing or potentially existing cultural resources located at the Entergy Nuclear sites.
-eorepfPg 1.0 PURPOSE
[1]
Provides a mechanism to protect either existing or potentially existing cultural resources located at the Entergy Nuclear sites.


==2.0   REFERENCES==
==2.0 REFERENCES==
[1]
Regulatory References (a)
National Historic Preservation Act (and amendments)
[2]
Company References (a)
NMM Procedure EN-EV-115. Environmental Reviews and Evaluations (b)
NMM Procedure EN-IS-112, Trenching, Excavation and Ground Penetrating Activities
[3]
ANO References (a)
FTN Letter No. 6045-061, "Cultural Resources Issues,.ANO (b)
Commitment 1CAN090005, Reference P-17051, "Develop an administrative level enviironmental procedure to provide additional control over future land disturbances atANO site"
[4]
JAF References (a)
Letter from Nancy Herter, New York State Office of Parks, Recreation and Historic Preservation, to T. A. Sullivan, James A, Fitzpatrick, dated April 27, 2006 (refer to Attachment C of License Renewal Environmental Report)
[5]
PNPS References (a)
Letter from Eric S. Johnson, Massachusetts Historical Commission, to Stephen Bethay, Pilgrim Nuclear Power Station, dated March 14, 2005 (refer to Attachment C of License Renewal Environmental Report)
[6]
VYN PS References (a) 30 V.S.A. § 248, New Gas and Electric Purchases, Investments and Facilities; Certificate of Public Good


[1]  Regulatory References (a)    National Historic Preservation Act (and amendments)
Alca Williamson - EN-EV-121 _Cultural Resources_.pdf Page4p NUCLEAR NON-QUALITY RELATED EN-EV-121 REV. 0 SEntergy MANAGEMENT MANUAL INFORMATIONAL USE PAGE 4 OF 12 Cultural Resources Protection Plan
[2]  Company References (a)    NMM Procedure EN-EV-115. Environmental Reviews and Evaluations (b)    NMM Procedure EN-IS-112, Trenching, Excavation and Ground Penetrating Activities
: 2. 0 cont (b)
[3]  ANO References (a)    FTN Letter No. 6045-061,      "Cultural Resources Issues,.ANO (b)     Commitment 1CAN090005, Reference P-17051, "Develop an administrative level enviironmental procedure to provide additional control over future land disturbances atANO site"
Letter from Jane Lendway, Vermont Division for Historic Preservation, to Gary Tucker, FTN Associates, LTD., dated October 17, 2005 (refer to Attachment C of License Renewal Environmental Report)
[4]  JAF References (a)    Letter from Nancy Herter, New York State Office of Parks, Recreation and Historic Preservation, to T. A. Sullivan, James A, Fitzpatrick, dated April 27, 2006 (refer to Attachment C of License Renewal Environmental Report)
[7]
[5]   PNPS References (a)     Letter from Eric S. Johnson, Massachusetts Historical Commission, to Stephen Bethay, Pilgrim Nuclear Power Station, dated March 14, 2005 (refer to Attachment C of License Renewal Environmental Report)
W3 References (a)
[6]  VYN PS References (a)     30 V.S.A. § 248, New Gas and Electric Purchases, Investments and Facilities; Certificate of Public Good
W3 Cultural Resources Protection Plan 3.0 DEFINITIONS
[1]
Disturbed Land Areas - Surface and/or subsurface land areas that were significantly disturbed during the construction phase of the site (i.e., plant's protected area).
[21 Cultural Resources - Resources that include but are not limited to:
(a)
Cemeteries, burial sites, funeral monuments, or other sites with human remains (b)
Historic buildings, structures, or building remains (c)
Ancient sites containing cultural artifacts such as pottery, tools, weaponry, and other implements (d)
Ritual artifacts (e)
Discarded materials (i.e. Indian mounds with shells and animal bones)
(f)
Sites of historical significance to the community, state, or nation, such as battlegrounds, encampments, villages, etc.
(g)
Traditional cultural properties.
[3]
Land-Disturbing Activities-Activities that involve grading, construction of buildings, excavations, reforestation, landscaping, placement of any fill or spoil or other terrestrial impact.
[4]
Undisturbed Land Areas - Surface and/or subsurface land areas that have not been disturbed either during the construction phase of the site orduring current operations, or if there is uncertainty atthe site about the degree ofdisturbance.


Alca Williamson - EN-EV-121 _Cultural Resources_.pdf                                                                  Page4p NUCLEAR                NON-QUALITY RELATED  EN-EV-121         REV. 0 SEntergy            MANAGEMENT MANUAL                  INFORMATIONALUSE            PAGE 4 OF 12 Cultural Resources Protection Plan 2.0 cont (b)    Letter from Jane Lendway, Vermont Division for Historic Preservation, to Gary Tucker, FTN Associates, LTD., dated October 17, 2005 (refer to Attachment C of License Renewal Environmental Report)
ý Alicia Williamson - EN-,EV-121 -Cultural Resources-pcif Page 5 11 LAlicia Williamson - EN-EV-121 _Cultural Resources_.pdf Page 5~
[7]    W3 References (a)    W3 Cultural Resources Protection Plan 3.0     DEFINITIONS
4.0 RESPONSIBILITIES
[1]     Disturbed Land Areas - Surface and/or subsurface land areas that were significantly disturbed during the construction phase of the site (i.e., plant's protected area).
[1]
[21    Cultural Resources    - Resources that include but are not limited to:
Enterov Nuclear Environmental Focus Group - is responsible for maintaining, reviewing and interpreting this procedure.
(a)     Cemeteries, burial sites, funeral monuments, or other sites with human remains (b)     Historic buildings, structures, or building remains (c)     Ancient sites containing cultural artifacts such as pottery, tools, weaponry, and other implements (d)    Ritual artifacts (e)    Discarded materials (i.e. Indian mounds with shells and animal bones)
[2]
(f)    Sites of historical significance to the community, state, or nation, such as battlegrounds, encampments, villages, etc.
Site Environmental Representatives -are responsible for:
(g)    Traditional cultural properties.
(a)
[3]     Land-Disturbing Activities- Activities that involve grading, construction of buildings, excavations, reforestation, landscaping, placement of any fill or spoil or other terrestrial impact.
Conducting environmental reviews of land disturbance activities in accordance with this procedure to ensure either existing or potentially existing cultural resources are protected to the maximum extent practicable.
[4]     Undisturbed Land Areas - Surface and/or subsurface land areas that have not been disturbed either during the construction phase of the site orduring current operations, or if there is uncertainty atthe site about the degree ofdisturbance.
(b)
Ensuring that the State Historic Preservation Office (SHPO) is notified for activities that may affect existing or potentially existing cultural resources, if required by specific state laws, SH PO, operating license conditions or site reporting procedures.;
[3]
Site Departments - are responsible for complying with Sections 5.1 through 5.3 of this procedure.
[4]
Contract Managers and Contractors -are responsible for complying with Sections 5.1 through 5.3 of this procedure.
5.0 DETAILS 5.1 PRECAUTIONS AND LIMITATIONS
[1]
Land disturbing activities must be stopped immediately in the event that there is evidence of a historical or archaeologica I artifact and the SH PO notified for guidance prior to re-commencing land disturbing activities.
5.2 LAND DISTURBANCE OF UNDISTURBED AREAS NOTE If the land disturbance activity is occurring within the Protected Area Fence that encloses the power block area, then no further actions are required regarding this procedure.
[1]
Site Departments, Contract Managers and Contractors, for activities involving land disturbance in undisturbed areas are to:


ý Alicia Williamson - EN-,EV-121 -Cultural Resources-pcif                                                                    Page 5 11 LAlicia Williamson  - EN-EV-121 _Cultural Resources_.pdf                                                                     Page 5~
I' Alicia Williamson - EN-EV-121 _Cultural Resources_.pdf Page 6 il 5.2 cont (a)
4.0    RESPONSIBILITIES
Complete Section A of Attachment 9.1 to this procedure (Land Disturbance Environmental Review Form) and forward to the Site Environmental Representative for review.
[1]  Enterov Nuclear Environmental Focus Group - is responsible for maintaining, reviewing and interpreting this procedure.
(b)
[2]  Site Environmental Representatives -are responsible for:
Obtain approval from the Site Environmental Representative prior to the activity commencing.
(a)     Conducting environmental reviews of land disturbance activities in accordance with this procedure to ensure either existing or potentially existing cultural resources are protected to the maximum extent practicable.
(c)
(b)     Ensuring that the State Historic Preservation Office (SHPO) is notified for activities that may affect existing or potentially existing cultural resources, if required by specific state laws, SH PO, operating license conditions or site reporting procedures.;
Adhere to the management requirements identified in Section C of.1 (Land Disturbance Environmental Review Form), as applicable to the land disturbance activity.
[3]  Site Departments - are responsible for complying with Sections 5.1 through 5.3 of this procedure.
[2]
[4]  Contract Managers and Contractors        -are  responsible for complying with Sections 5.1 through 5.3 of this procedure.
Site Environmental Representative, upon receipt of Attachment 9.1 (Land Disturbance Environmental Review Form), is to:
5.0    DETAILS 5.1    PRECAUTIONS AND LIMITATIONS
(a)
[1]  Land disturbing activities must be stopped immediately in the event that there is evidence of a historical or archaeologica I artifact and the SH PO notified for guidance prior to re-commencing land disturbing activities.
Contact SH PO for activities that may affect existing or potentially existing cultural resources.
5.2    LAND DISTURBANCE OF UNDISTURBED                  AREAS NOTE Ifthe land disturbance activity is occurring within the Protected Area Fence that encloses the power block area, then no further actions are required regarding this procedure.
(b)
[1]   Site Departments, Contract Managers and Contractors, for activities involving land disturbance in undisturbed areas are to:
Complete Section B of the Form and if applicable Section C.
(c)
If approved, return a copy of the completed Form to the requester.
(d)
If not approved, notify the requestor of the reasons for denying the approval.
(e)
Maintain copies of the required documents on file.
(f)
Conduct periodic visual observations of the area to ensure that any management requirements identified in Section C of Attachment 9.1 (Land Disturbance Environmental Review Form) are followed.
(g)
Ensure that mitigation measures are implemented as appropriate.
5,3 MODFICATION/REMO DELING OF CULTURAL RESOURCE STRUCTURES
[1]
Site Departments, Contract Managers and Contractors, for activities involving modifications/re modeling to cultural resource structures are to:
(a)
Complete Section A of Attachment 9.2 to this procedure (Cultural Resource Structure Modification/Rem odeling Review Form) and forward to the Site Environmental Representative for review.


I'Alicia Williamson - EN-EV-121 _Cultural Resources_.pdf                                                                 Page 6 il 5.2 cont (a)   Complete Section A of Attachment 9.1 to this procedure (Land Disturbance Environmental Review Form) and forward to the Site Environmental Representative for review.
ý Alicia Williamson - EN-EV-121 Cultural Resources_.pdf Page 7j']
(b)    Obtain approval from the Site Environmental Representative       prior to the activity commencing.
L.A~cia Williamson - EN-EV-i 21 _Cultural Resources_.pdf Page 7 I
(c)   Adhere to the management requirements identified in Section C of Attachment 9.1 (Land Disturbance Environmental Review Form), as applicable to the land disturbance activity.
5.3 cont (b)
[2]     Site Environmental Representative, upon receipt of Attachment 9.1 (Land Disturbance Environmental Review Form), is to:
Obtain approval from the Site Environmental Representative prior to the activity commencing.
(a)   Contact SH PO for activities that may affect existing or potentially existing cultural resources.
(c)
(b)   Complete Section B of the Form and if applicable Section C.
If applicable, adhere to the management requirements identified in Section C of Attachment 9.2 (Cultural Resource Structure Modification/Rem odeling Review Form).
(c)   If approved, return a copy of the completed Form to the requester.
[2]
(d)   If not approved, notify the requestor of the reasons for denying the approval.
Site Environmental Representative, upon receipt of Attachment 9.2 (Cultural Resource Structure Modification/Rem odeling Review Form) is to:
(e)   Maintain copies of the required documents on file.
(a)
(f)   Conduct periodic visual observations of the area to ensure that any management requirements identified in Section C of Attachment 9.1 (Land Disturbance Environmental Review Form) are followed.
Contact SH PO to inform them of the activity.
(g)   Ensure that mitigation measures are implemented as appropriate.
(b)
5,3      MODFICATION/REMO DELING OF CULTURAL                RESOURCE STRUCTURES
Complete Section B of the Form and if applicable Section C.
[1]     Site Departments, Contract Managers and Contractors, for activities involving modifications/re modeling to cultural resource structures are to:
(c)
(a)     Complete Section A of Attachment 9.2 to this procedure (Cultural Resource Structure Modification/Rem odeling Review Form) and forward to the Site Environmental Representative for review.
If approved, return a copy of the completed Form to the requester.
(d)
If not approved, notify the requestor of the reasons for denying the approval.
(e)
Maintain copies of the required documents on file.
(f)
Conduct periodic visual observations of the area to ensure that any management requirements imposed by SH PO are followed.
(g)
Ensure that mitigation measures are implemented as appropriate.
5.4 ROUTINE SURVEILLANCES
[1]
The Site Environmental Representative should:
(a)
Conduct periodic environmental rounds to ensure that no unauthorized activities occur that could damage existing or potentially existing culturally protected resources.
(b)
Notify the SHPOand the NRC ifground disturbing activities are discovered within an existing or potentially existing culturally protected resource area, if required by operating license conditions, SH PO or site reporting requirements.
(c)
Obtain a certified archaeologist to conduct a damage assessment of the affected area, if deemed necessary.


ýAlicia Williamson - EN-EV-121 Cultural Resources_.pdf                                                                     Page 7j']
Alicia Williamson - EN-EV-1 21 -Cultural Resources-.pdf
L.A~cia Williamson EN-EV-i 21 _Cultural Resources_.pdf Page 7    I 5.3 cont (b)    Obtain approval from the Site Environmental Representative         prior to the activity commencing.
-Vaq-6411
(c)    If applicable, adhere to the management requirements identified in Section C of Attachment 9.2 (Cultural Resource Structure Modification/Rem odeling Review Form).
[Alicia Williamson - EN-EV-121 _Cultural Resources_.pdf Page 81 5.5 SPECIAL PROTECTION PROCEDURES
[2]      Site Environmental Representative, upon receipt of Attachment 9.2 (Cultural Resource Structure Modification/Rem odeling Review Form) is to:
[1]
(a)    Contact SH PO to inform them of the activity.
Should the site find it necessary to conduct any activities within a culturally protected area and if required by operating license conditions, SHPOorsite procedures, the Environmental Site Representative should notify the SHPO and NRC in writing of the proposed activity. The notification should include, but not limited to:
(b)    Complete Section B of the Form and if applicable Section C.
Adescription of the proposed activity.
(c)    If approved, return a copy of the completed Form to the requester.
° Description for the need for the activity.
(d)    If not approved, notify the requestor of the reasons for denying the approval.
A map showing the location of the planned activity in relation the culturally protected areas.
(e)    Maintain copies of the required documents on file.
A demonstration for the need to perform the activity within the culturally protected area.
(f)    Conduct periodic visual observations of the area to ensure that any management requirements imposed by SH PO are followed.
[2]
(g)    Ensure that mitigation measures are implemented as appropriate.
The NRC, after consultation with the SHPO, will advise the site whether or not a mitigation plan is required.
5.4      ROUTINE SURVEILLANCES
5.6 RECORDS NOTE If the cultural resources review is performed as a result of an EN-EV-115 review, then the forms generated via this procedure should be filed with the EN-EV-15 screening paperwork.
[1]     The Site Environmental Representative       should:
[1]
(a)   Conduct periodic environmental rounds to ensure that no          unauthorized activities occur that could damage existing or potentially existing culturally protected resources.
Site Environmental Representative should maintain the following documents on file:
(b)   Notify the SHPOand the NRC ifground disturbing activities are discovered within an existing or potentially existing culturally protected resource area, if required by operating license conditions, SH PO or site reporting requirements.
(a)
(c)     Obtain a certified archaeologist to conduct a damage assessment of the affected area, if deemed necessary.
Completed Land Disturbance Environmental Review Forms (Attachment 9.1 to this procedure).
(b)
Completed Cultural Resource Structure Modification/Rem odeling Review Forms (Attachment 9.2 to this procedure).
(c)
Conversation and correspondence records involving the State Historic Preservation Office and/or NRC.
(d)
Records of modification/rem odeling activities associated with cultural resource structures.


Alicia Williamson - EN-EV-1 21 -Cultural Resources-.pdf                                                               -Vaq-6411
Alicia Williamson - EN-EV-1 21 -Cultural Resources-.pdf Page 9 11
[Alicia Williamson EN-EV-121 _Cultural Resources_.pdf Page 81 5.5    SPECIAL PROTECTION PROCEDURES
[Alicia Williamson - EN-EV-121 _Cultural Resources_.pdf Page 9~I L 6.0
[1]   Should the site find it necessary to conduct any activities within a culturally protected area and if required by operating license conditions, SHPOorsite procedures, the Environmental Site Representative should notify the SHPO and NRC in writing of the proposed activity. The notification should include, but not limited to:
[1]
                                ,    Adescription of the proposed activity.
[21 7.0 INTERFACES NMM Procedure EN-IS-112, Trenching, Excavation and Ground Penetrating Activities NMM Procedure EN-EV-115, Environmental Reviews and Evaluations RECORDS None 8.0 OBLIGATION AND REGULATORY COMMITMENT CROSS-REFERENCES 8.1 OBLIGATIONS AND COMMITMENTS IMPLEMENTED OVERALL None 8.2 SECTION SPECIFIC OBLIGATIONS AND COMMITMENTS None 8.3 SITE SPECIFIC COMMITMENTS I Step elsite IDocument ICommitment Number or Reference
                                °    Description for the need for the activity.
[1]
                                ,     A map showing the location of the planned activity in relation the culturally protected areas.
ANO 1CAN090005 P-1 7051 9.0 ATTACHMENTS 9.1 Land Disturbance Environmental Review Form (Typical) 9.2 Cultural Resource Structure Modification/Rem odeling Review Form (Typical)
                                ,     A demonstration    for the need to perform the activity within the culturally protected area.
[2]    The NRC, after consultation with the SHPO, will advise the site whether or not a mitigation plan is required.
5.6    RECORDS NOTE Ifthe cultural resources review is performed as a result of an EN-EV-115 review, then the forms generated via this procedure should be filed with the EN-EV-15 screening paperwork.
[1]   Site Environmental Representative        should maintain the following documents on file:
(a)      Completed Land Disturbance Environmental Review Forms (Attachment 9.1 to this procedure).
(b)      Completed Cultural Resource Structure Modification/Rem odeling Review Forms (Attachment 9.2 to this procedure).
(c)      Conversation and correspondence        records involving the State Historic Preservation Office and/or NRC.
(d)      Records of modification/rem odeling activities associated with cultural resource structures.


Alicia Williamson - EN-EV-1 21 -Cultural Resources-.pdf                                                            Page 9 11
Alicia Williamson EN-EV-121 _Cultural Resources_.pdf NUCLEAR NON-QUALITY RELATED EN-EV-121 REV. 0 ntergy MANAGEMENT MANUAL INFORMATIONAL USE PAGE 10 OF 12 Cultural Resources Protection Plan ATTACHMENT 9.1 LAND DISTURBANCE ENVIRONMENTAL REVIEW FORM (TYPICAL)
[Alicia Williamson EN-EV-121 _Cultural Resources_.pdf Page 9~I L 6.0        INTERFACES
SHEET 1 of 2 A.
[1]      NMM Procedure EN-IS-112, Trenching, Excavation and Ground Penetrating Activities
Land Disturbance Activity
[21      NMM Procedure EN-EV-115, Environmental Reviews and Evaluations 7.0      RECORDS None 8.0      OBLIGATION AND REGULATORY COMMITMENT CROSS-REFERENCES 8.1      OBLIGATIONS AND COMMITMENTS IMPLEMENTED OVERALL None 8.2      SECTION SPECIFIC OBLIGATIONS AND COMMITMENTS None 8.3      SITE SPECIFIC COMMITMENTS I Stepelsite              IDocument                    ICommitment Number or Reference
: 1.
[1]    ANO            1CAN090005                  P-1 7051 9.0      ATTACHMENTS 9.1      Land Disturbance Environmental Review Form (Typical) 9.2      Cultural Resource Structure Modification/Rem odeling Review Form (Typical)
Brief Description of Activity:
 
: 2.
Alicia Williamson EN-EV-121
Amount of Land Involved:
                  .          _Cultural Resources_.pdf NUCLEAR                 NON-QUALITY RELATED     EN-EV-121           REV. 0 ntergy           MANAGEMENT MANUAL                   INFORMATIONAL USE             PAGE 10 OF 12 Cultural Resources Protection Plan ATTACHMENT 9.1                       LAND DISTURBANCE     ENVIRONMENTAL REVIEW FORM (TYPICAL)
SHEET 1 of 2 A.     Land Disturbance Activity
: 1. Brief Description of Activity:
: 2. Amount of Land Involved:
1 Acre 1 - 5 Acres
1 Acre 1 - 5 Acres
                                    >5 Acres
>5 Acres
: 3. Location of Affected Land Area (attach map also):
: 3.
4.. Expected Duration of Activity:
Location of Affected Land Area (attach map also):
B. Environmental Review
4..
: 1. Consultation with the State Historic Preservation Office Required:     El Yes   [] No
Expected Duration of Activity:
: 2. SHPO Protection Measures Imposed:       Li   Yes E]   No   E] Not Applicable
B.
: 3. Existing historical or archaeological sites:   LI Yes       -- No
Environmental Review
: 4. Visual Walk-down of Land Area Required:         LI Yes     LI No
: 1.
: 5. Date(s) of Visual Walk-down:
Consultation with the State Historic Preservation Office Required: El Yes
: 6. Potential historical or archaeological site(s) Identified during Walk-down:
[] No
E] Yes     E] No     [] Not Applicable
: 2.
SHPO Protection Measures Imposed: Li Yes E] No E] Not Applicable
: 3.
Existing historical or archaeological sites:
LI Yes  
-- No
: 4.
Visual Walk-down of Land Area Required:
LI Yes LI No
: 5.
Date(s) of Visual Walk-down:
: 6.
Potential historical or archaeological site(s) Identified during Walk-down:
E] Yes E] No [] Not Applicable


[Alicia Williamson - EN-EV-121 _Cultural Resources_.pdf                                                                                                     oP.a~ge 11 '
[Alicia Williamson - EN-EV-121 _Cultural Resources_.pdf oP.a~ge 11 '
ATTACHMENT 9.1                                   LAND DISTURBANCE           ENVIRONMENTAL REVIEW FORM (TYPICAL)
ATTACHMENT 9.1 LAND DISTURBANCE ENVIRONMENTAL REVIEW FORM (TYPICAL)
SHEET 2 of 2 C. Required Management Practices Management Practice(s)                                             Yes             No           NA Stop the activity if a potential historical or archaeologica I                                           E               -
SHEET 2 of 2 C. Required Management Practices Management Practice(s)
Yes No NA Stop the activity if a potential historical or archaeologica I E
site is discovered or if an existing site is damaged.
site is discovered or if an existing site is damaged.
Notify     the       Site           Environmental           Representative                 LI           LI             [L immediately in the event that a potential                     historical or archaeological       site is discovered               during the land disturbance activity.
Notify the Site Environmental Representative LI LI
In the event that a potential historical or archaeologica I                               El           E]             El artifact is discovered, do not resume the land disturbance activity until the Site Environmental Representative has performed an evaluation.
[L immediately in the event that a potential historical or archaeological site is discovered during the land disturbance activity.
Place a protective             barrier around         existing   historic   or           El           El             El archaeological site(s).
In the event that a potential historical or archaeologica I El E]
Notify     the       Site           Environmental           Representative                   1           El             El]
El artifact is discovered, do not resume the land disturbance activity until the Site Environmental Representative has performed an evaluation.
immediately in the event that an existing                     historical or archaeological site is damaged during the land disturbance activity.
Place a protective barrier around existing historic or El El El archaeological site(s).
Measures:
Notify the Site Environmental Representative 1
0       11   D +
El El]
0  -Ja
immediately in the event that an existing historical or archaeological site is damaged during the land disturbance activity.
                                                +; 1 I.a    avIa
0 11 D +  
                                                          ;14
+; 1  
                                                                    +k LIa
;14  
                                                                        +
+k  
a I,; + ; I IorJ I.ca   or 11 al 1.4 ar      e 1  ;    I  ;+
+
caULJ.II, s   eII may   ex2 SAL VVUUU 1A k e
I,; +
L e presence     of pottery, glass, arrowhead, bones, tools, weaponry, wooden or metal Protective                                                                                                  structures, flakes. brick, mortar or olaster.
I 11 1
SHPO SHPO Protective Measures: __________________________
I
Approved By:                                                                   I Signature                                                   Date
;+
1A k
SHPO Protective Measures:
0
-Ja I.a avIa LIa a
s IorJ I.ca or ar al e
1.4 caULJ.II, s
eII may ex2 SAL VVUUU e L e presence of pottery, glass, arrowhead, bones, tools, weaponry, wooden or metal structures, flakes. brick, mortar or olaster.
SHPO Protective Measures: __________________________
Approved By:
I Signature Date


Alicia Williamson - EN-EV-1 21 -Cultural Resources-.pdt                                                                                                   Page 12 :ý I..... ....
Alicia Williamson - EN-EV-1 21 -Cultural Resources-.pdt Page 12 :ý I.........c a...................am.................................................
c a...................am.............
ultu ra l...............Re so u rc e s_.p d.....
                . . . ..                                   ultura
f P a ge....
                                                ..................                 sou rce s_.p d.....
ATTACHMENT 9.2 C ULTURALRESOURCE STRUCTUREMODIFICATION/REMODELING REVIEW FORM (TYPICAL)
                                                                    .. ..l...............Re
SHEET 1 of 1 A.
                                                                            ..............        f             ...        . .......... ................... P age.... ...
Modification/Remodeling Activity
ATTACHMENT             9.2 C           ULTURALRESOURCE STRUCTUREMODIFICATION/REMODELING REVIEW FORM (TYPICAL)
: 1.
SHEET 1 of 1 A.           Modification/Remodeling Activity
Description of Activity:
: 1.     Description of Activity:
: 2.
: 2.       Expected Duration of Activity:
Expected Duration of Activity:
B.           Environmental Review
B.
: 1. SHPO Contacted:                       L] Yes [-   No
Environmental Review
: 2.     Date SHPO Contacted:
: 1.
: 3.     SHPO Protective Measures Imposed:                       ED Yes     LI No C.           SHPO Protective Measures (if applicable)
SHPO Contacted: L] Yes
Aporoved I I              By:
[-
J                                                         /
No
Signature                                             Date}}
: 2.
Date SHPO Contacted:
: 3.
SHPO Protective Measures Imposed: ED Yes LI No C.
SHPO Protective Measures (if applicable)
Aporoved By:  
/
I I J
Signature Date}}

Latest revision as of 04:43, 15 January 2025

E-MAIL: (PD) Fwd: Entergy Nuclear Cultural Resources Protection Plan
ML063480402
Person / Time
Site: Pilgrim
Issue date: 11/06/2006
From: Jennifer Davis
NRC/NMSS/DHLWRS/TRD
To: Williamson A
Office of New Reactors
References
%dam200612, TAC 3698
Download: ML063480402 (14)


Text

Alicia Williamson - Fwd: Entergy.Nuclear Cultural Resources Protection Plan Page.1 j From:

Jennifer Davis To:

Alicia Williamson Date:

11/06/2006 7:50:19 AM

Subject:

Fwd: Entergy Nuclear Cultural Resources Protection Plan See attached email for procedure.

c:.\\temp\\ywvuuufl. I MH Mail Envelope Properties (454F2F84.7DF: 6: 44096)

Page 1 i

Subject:

Creation Date From:

Created By:

Fwd: Entergy Nuclear Cultural Resources Protection Plan 11/06/2006 7:50:12 AM Jennifer Davis JXD1O@nrc.gov Recipients nrc.gov TWGWPO04.HQGWDOO1 ARWI (Alicia Williamson)

Post Office TWGWPO04.HQGWDO01 Route nrc.gov Files MESSAGE Mail Options Expiration Date:

Priority:

ReplyRequested:

Return Notification:

Concealed

Subject:

Security:

Size 340 Date & Time 11/06/2006 7:50:12 AM None Standard No None No Standard Junk Mail Handling Evaluation Results Message is not eligible for Junk Mail handling Message is from an internal sender Junk Mail settings when this message was delivered Junk Mail handling disabled by User Junk Mail handling disabled by Administrator Junk List is not enabled Junk Mail using personal address books is not enabled Block List is not enabled

SAlicia Williamson - EN-EV-121,_Cultural Resources_.pdf dPage

Title:

Cultural Resources Protection Plan Procedure Owner:

Rick N. Buckley / Corporate Environmental Chairman (Print Name /_Title)

Approved:

I'J.

,11/01/06 1 (Procedure Owner Signature)

(Date)

EN Common 11/03/06 ANO 01/01/07 PNPS ENN Effective ECH VY Effective ENS Date

[

G9 VY Date Exception IPEC W3 JAF WPO Procedure Contains NMM REFLIB Forms: YES [

NO'-

Basis Statement This procedure provides a mechanism for protecting historical and archaeological areas located on Entergy's nuclear site properties.

Site and NMM Procedures Cancelled or Superseded ByThis Revision ANO Procedure 1000.167, ANO Historical and Archaeological Preservation Prograim will be cancelled.

Process Apolicahility Exclusion (ENN-LI-100Q)

/ Programmatic Exclusion (ENS-LI-101i All Sites: Z Specific Sites: ANO El GGNS El IPECQI JAF [I PNPSE] RBS E-vY [I W3 El

Alicia Williamson - EN-EV-121 Cultural Resources_.pdt Page21 NUCLEAR NON-QUALITY RELATED EN-EV-121 REV. 0 E, nfero MANAGEMENT MANUAL INFORMATIONAL WSE PAGE 2 OF 12 Cultural Resources Protection Plan TABLE OF CONTENTS Section Title PaQe 1.0 PURPOSE......................................................................... 3

2.0 REFERENCES

3 3.0 DEFINITIONS.................................................................... 4 4.0 RESPONSIBILITIES.........................................................

5 5.0 DETAILS.........................................................................

5 5.1 Precautions and Umitations..................................... 5 5.2 Land Disturbance of Undisturbed Areas................... 5 5.3 Modificatiorn/Rem odeling of Cultural Resource Structures............................................................

6 5.4 Routine Surveillances..........................

7 5.5 Special Protection Measures.................................. 8 5.6 R ecords..............................................................

8 6.0 INTERFACES...................................................................

9 7.0 RECORDS......................................................................

9 8.0 OBLIGATION AND REGULATORY COMMITMENT CROSS-REFERENCES 9

9.0 ATTACHMENTS.............................................................. 9 ATTACHMENT 9.1 LAND DISTURBANCE ENVIRONMENTAL REvIEw FORM (TYPICAL)............................................................

10 ATTACHMENT 9.2 CULTURAL RESOURCE STRUCTURE MODIFICATION/

REMODELING REvIEw FORM (TYPICAL)......................... 12

Alicia Williamson - EN-EV-1 21 -Cultural Resources-.pdf Page 3 ýj Alicia Williamson~~~~~-

EN -E --2 -- u----- a~~~~

-eorepfPg 1.0 PURPOSE

[1]

Provides a mechanism to protect either existing or potentially existing cultural resources located at the Entergy Nuclear sites.

2.0 REFERENCES

[1]

Regulatory References (a)

National Historic Preservation Act (and amendments)

[2]

Company References (a)

NMM Procedure EN-EV-115. Environmental Reviews and Evaluations (b)

NMM Procedure EN-IS-112, Trenching, Excavation and Ground Penetrating Activities

[3]

ANO References (a)

FTN Letter No. 6045-061, "Cultural Resources Issues,.ANO (b)

Commitment 1CAN090005, Reference P-17051, "Develop an administrative level enviironmental procedure to provide additional control over future land disturbances atANO site"

[4]

JAF References (a)

Letter from Nancy Herter, New York State Office of Parks, Recreation and Historic Preservation, to T. A. Sullivan, James A, Fitzpatrick, dated April 27, 2006 (refer to Attachment C of License Renewal Environmental Report)

[5]

PNPS References (a)

Letter from Eric S. Johnson, Massachusetts Historical Commission, to Stephen Bethay, Pilgrim Nuclear Power Station, dated March 14, 2005 (refer to Attachment C of License Renewal Environmental Report)

[6]

VYN PS References (a) 30 V.S.A. § 248, New Gas and Electric Purchases, Investments and Facilities; Certificate of Public Good

Alca Williamson - EN-EV-121 _Cultural Resources_.pdf Page4p NUCLEAR NON-QUALITY RELATED EN-EV-121 REV. 0 SEntergy MANAGEMENT MANUAL INFORMATIONAL USE PAGE 4 OF 12 Cultural Resources Protection Plan

2. 0 cont (b)

Letter from Jane Lendway, Vermont Division for Historic Preservation, to Gary Tucker, FTN Associates, LTD., dated October 17, 2005 (refer to Attachment C of License Renewal Environmental Report)

[7]

W3 References (a)

W3 Cultural Resources Protection Plan 3.0 DEFINITIONS

[1]

Disturbed Land Areas - Surface and/or subsurface land areas that were significantly disturbed during the construction phase of the site (i.e., plant's protected area).

[21 Cultural Resources - Resources that include but are not limited to:

(a)

Cemeteries, burial sites, funeral monuments, or other sites with human remains (b)

Historic buildings, structures, or building remains (c)

Ancient sites containing cultural artifacts such as pottery, tools, weaponry, and other implements (d)

Ritual artifacts (e)

Discarded materials (i.e. Indian mounds with shells and animal bones)

(f)

Sites of historical significance to the community, state, or nation, such as battlegrounds, encampments, villages, etc.

(g)

Traditional cultural properties.

[3]

Land-Disturbing Activities-Activities that involve grading, construction of buildings, excavations, reforestation, landscaping, placement of any fill or spoil or other terrestrial impact.

[4]

Undisturbed Land Areas - Surface and/or subsurface land areas that have not been disturbed either during the construction phase of the site orduring current operations, or if there is uncertainty atthe site about the degree ofdisturbance.

ý Alicia Williamson - EN-,EV-121 -Cultural Resources-pcif Page 5 11 LAlicia Williamson - EN-EV-121 _Cultural Resources_.pdf Page 5~

4.0 RESPONSIBILITIES

[1]

Enterov Nuclear Environmental Focus Group - is responsible for maintaining, reviewing and interpreting this procedure.

[2]

Site Environmental Representatives -are responsible for:

(a)

Conducting environmental reviews of land disturbance activities in accordance with this procedure to ensure either existing or potentially existing cultural resources are protected to the maximum extent practicable.

(b)

Ensuring that the State Historic Preservation Office (SHPO) is notified for activities that may affect existing or potentially existing cultural resources, if required by specific state laws, SH PO, operating license conditions or site reporting procedures.;

[3]

Site Departments - are responsible for complying with Sections 5.1 through 5.3 of this procedure.

[4]

Contract Managers and Contractors -are responsible for complying with Sections 5.1 through 5.3 of this procedure.

5.0 DETAILS 5.1 PRECAUTIONS AND LIMITATIONS

[1]

Land disturbing activities must be stopped immediately in the event that there is evidence of a historical or archaeologica I artifact and the SH PO notified for guidance prior to re-commencing land disturbing activities.

5.2 LAND DISTURBANCE OF UNDISTURBED AREAS NOTE If the land disturbance activity is occurring within the Protected Area Fence that encloses the power block area, then no further actions are required regarding this procedure.

[1]

Site Departments, Contract Managers and Contractors, for activities involving land disturbance in undisturbed areas are to:

I' Alicia Williamson - EN-EV-121 _Cultural Resources_.pdf Page 6 il 5.2 cont (a)

Complete Section A of Attachment 9.1 to this procedure (Land Disturbance Environmental Review Form) and forward to the Site Environmental Representative for review.

(b)

Obtain approval from the Site Environmental Representative prior to the activity commencing.

(c)

Adhere to the management requirements identified in Section C of.1 (Land Disturbance Environmental Review Form), as applicable to the land disturbance activity.

[2]

Site Environmental Representative, upon receipt of Attachment 9.1 (Land Disturbance Environmental Review Form), is to:

(a)

Contact SH PO for activities that may affect existing or potentially existing cultural resources.

(b)

Complete Section B of the Form and if applicable Section C.

(c)

If approved, return a copy of the completed Form to the requester.

(d)

If not approved, notify the requestor of the reasons for denying the approval.

(e)

Maintain copies of the required documents on file.

(f)

Conduct periodic visual observations of the area to ensure that any management requirements identified in Section C of Attachment 9.1 (Land Disturbance Environmental Review Form) are followed.

(g)

Ensure that mitigation measures are implemented as appropriate.

5,3 MODFICATION/REMO DELING OF CULTURAL RESOURCE STRUCTURES

[1]

Site Departments, Contract Managers and Contractors, for activities involving modifications/re modeling to cultural resource structures are to:

(a)

Complete Section A of Attachment 9.2 to this procedure (Cultural Resource Structure Modification/Rem odeling Review Form) and forward to the Site Environmental Representative for review.

ý Alicia Williamson - EN-EV-121 Cultural Resources_.pdf Page 7j']

L.A~cia Williamson - EN-EV-i 21 _Cultural Resources_.pdf Page 7 I

5.3 cont (b)

Obtain approval from the Site Environmental Representative prior to the activity commencing.

(c)

If applicable, adhere to the management requirements identified in Section C of Attachment 9.2 (Cultural Resource Structure Modification/Rem odeling Review Form).

[2]

Site Environmental Representative, upon receipt of Attachment 9.2 (Cultural Resource Structure Modification/Rem odeling Review Form) is to:

(a)

Contact SH PO to inform them of the activity.

(b)

Complete Section B of the Form and if applicable Section C.

(c)

If approved, return a copy of the completed Form to the requester.

(d)

If not approved, notify the requestor of the reasons for denying the approval.

(e)

Maintain copies of the required documents on file.

(f)

Conduct periodic visual observations of the area to ensure that any management requirements imposed by SH PO are followed.

(g)

Ensure that mitigation measures are implemented as appropriate.

5.4 ROUTINE SURVEILLANCES

[1]

The Site Environmental Representative should:

(a)

Conduct periodic environmental rounds to ensure that no unauthorized activities occur that could damage existing or potentially existing culturally protected resources.

(b)

Notify the SHPOand the NRC ifground disturbing activities are discovered within an existing or potentially existing culturally protected resource area, if required by operating license conditions, SH PO or site reporting requirements.

(c)

Obtain a certified archaeologist to conduct a damage assessment of the affected area, if deemed necessary.

Alicia Williamson - EN-EV-1 21 -Cultural Resources-.pdf

-Vaq-6411

[Alicia Williamson - EN-EV-121 _Cultural Resources_.pdf Page 81 5.5 SPECIAL PROTECTION PROCEDURES

[1]

Should the site find it necessary to conduct any activities within a culturally protected area and if required by operating license conditions, SHPOorsite procedures, the Environmental Site Representative should notify the SHPO and NRC in writing of the proposed activity. The notification should include, but not limited to:

Adescription of the proposed activity.

° Description for the need for the activity.

A map showing the location of the planned activity in relation the culturally protected areas.

A demonstration for the need to perform the activity within the culturally protected area.

[2]

The NRC, after consultation with the SHPO, will advise the site whether or not a mitigation plan is required.

5.6 RECORDS NOTE If the cultural resources review is performed as a result of an EN-EV-115 review, then the forms generated via this procedure should be filed with the EN-EV-15 screening paperwork.

[1]

Site Environmental Representative should maintain the following documents on file:

(a)

Completed Land Disturbance Environmental Review Forms (Attachment 9.1 to this procedure).

(b)

Completed Cultural Resource Structure Modification/Rem odeling Review Forms (Attachment 9.2 to this procedure).

(c)

Conversation and correspondence records involving the State Historic Preservation Office and/or NRC.

(d)

Records of modification/rem odeling activities associated with cultural resource structures.

Alicia Williamson - EN-EV-1 21 -Cultural Resources-.pdf Page 9 11

[Alicia Williamson - EN-EV-121 _Cultural Resources_.pdf Page 9~I L 6.0

[1]

[21 7.0 INTERFACES NMM Procedure EN-IS-112, Trenching, Excavation and Ground Penetrating Activities NMM Procedure EN-EV-115, Environmental Reviews and Evaluations RECORDS None 8.0 OBLIGATION AND REGULATORY COMMITMENT CROSS-REFERENCES 8.1 OBLIGATIONS AND COMMITMENTS IMPLEMENTED OVERALL None 8.2 SECTION SPECIFIC OBLIGATIONS AND COMMITMENTS None 8.3 SITE SPECIFIC COMMITMENTS I Step elsite IDocument ICommitment Number or Reference

[1]

ANO 1CAN090005 P-1 7051 9.0 ATTACHMENTS 9.1 Land Disturbance Environmental Review Form (Typical) 9.2 Cultural Resource Structure Modification/Rem odeling Review Form (Typical)

Alicia Williamson EN-EV-121 _Cultural Resources_.pdf NUCLEAR NON-QUALITY RELATED EN-EV-121 REV. 0 ntergy MANAGEMENT MANUAL INFORMATIONAL USE PAGE 10 OF 12 Cultural Resources Protection Plan ATTACHMENT 9.1 LAND DISTURBANCE ENVIRONMENTAL REVIEW FORM (TYPICAL)

SHEET 1 of 2 A.

Land Disturbance Activity

1.

Brief Description of Activity:

2.

Amount of Land Involved:

1 Acre 1 - 5 Acres

>5 Acres

3.

Location of Affected Land Area (attach map also):

4..

Expected Duration of Activity:

B.

Environmental Review

1.

Consultation with the State Historic Preservation Office Required: El Yes

[] No

2.

SHPO Protection Measures Imposed: Li Yes E] No E] Not Applicable

3.

Existing historical or archaeological sites:

LI Yes

-- No

4.

Visual Walk-down of Land Area Required:

LI Yes LI No

5.

Date(s) of Visual Walk-down:

6.

Potential historical or archaeological site(s) Identified during Walk-down:

E] Yes E] No [] Not Applicable

[Alicia Williamson - EN-EV-121 _Cultural Resources_.pdf oP.a~ge 11 '

ATTACHMENT 9.1 LAND DISTURBANCE ENVIRONMENTAL REVIEW FORM (TYPICAL)

SHEET 2 of 2 C. Required Management Practices Management Practice(s)

Yes No NA Stop the activity if a potential historical or archaeologica I E

site is discovered or if an existing site is damaged.

Notify the Site Environmental Representative LI LI

[L immediately in the event that a potential historical or archaeological site is discovered during the land disturbance activity.

In the event that a potential historical or archaeologica I El E]

El artifact is discovered, do not resume the land disturbance activity until the Site Environmental Representative has performed an evaluation.

Place a protective barrier around existing historic or El El El archaeological site(s).

Notify the Site Environmental Representative 1

El El]

immediately in the event that an existing historical or archaeological site is damaged during the land disturbance activity.

0 11 D +

+; 1

14

+k

+

I,; +

I 11 1

I

+

1A k

SHPO Protective Measures:

0

-Ja I.a avIa LIa a

s IorJ I.ca or ar al e

1.4 caULJ.II, s

eII may ex2 SAL VVUUU e L e presence of pottery, glass, arrowhead, bones, tools, weaponry, wooden or metal structures, flakes. brick, mortar or olaster.

SHPO Protective Measures: __________________________

Approved By:

I Signature Date

Alicia Williamson - EN-EV-1 21 -Cultural Resources-.pdt Page 12 :ý I.........c a...................am.................................................

ultu ra l...............Re so u rc e s_.p d.....

f P a ge....

ATTACHMENT 9.2 C ULTURALRESOURCE STRUCTUREMODIFICATION/REMODELING REVIEW FORM (TYPICAL)

SHEET 1 of 1 A.

Modification/Remodeling Activity

1.

Description of Activity:

2.

Expected Duration of Activity:

B.

Environmental Review

1.

SHPO Contacted: L] Yes

[-

No

2.

Date SHPO Contacted:

3.

SHPO Protective Measures Imposed: ED Yes LI No C.

SHPO Protective Measures (if applicable)

Aporoved By:

/

I I J

Signature Date