Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML19056A19317 August 2017Attachment 2 Design Input Record
ML14294A5914 November 2014Final ASP Analysis - Pilgrim Nuclear Power Station (LER 293-13-009)Fitness for Duty
Significance Determination Process
ML14176A96124 June 2014Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014Fire Barrier
Coatings
Foreign Material Exclusion
ML14324A04017 April 2014HI-2104715, Seismic Analysis of the Loaded HI-TRAC in the SFP and SFP Slab Qualification.Safe Shutdown Earthquake
Hydrostatic
Earthquake
ML14092A02331 March 2014Entergy'S Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima...Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Fukushima Dai-Ichi
Earthquake
ML13338A6679 December 2013Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Pilgrim Nuclear Power Station, TAC No.: MF0777Safe Shutdown
High winds
Ultimate heat sink
Tornado Missile
Safe Shutdown Earthquake
Post Accident Monitoring
Internal Flooding
Emergency Lighting
FLEX
Fukushima Dai-Ichi
Seismically rugged
Frazil ice
Battery sizing
B.5.b Mitigating Strategies
Earthquake
ML13232A13417 June 2013PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment C, Page C174 of C413 Through Page C250 of C413Scaffolding
ML13232A12817 June 2013PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Cover Through Page 37 of 37Safe Shutdown
Unanalyzed Condition
Safe Shutdown Earthquake
Post Accident Monitoring
Fukushima Dai-Ichi
Seismically rugged
License Renewal
Earthquake
GOTHIC
Power Uprate
Seismic Walkdown Report
ML13232A12917 June 2013PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment J, Page J78 of J134 Through EndScaffolding
ML13232A13017 June 2013PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment a Through Attachment BPost Accident Monitoring
ML13232A13117 June 2013PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment C, Page C1 of C413 Through Page C84 of C413Scaffolding
ML13232A13217 June 2013PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment C, Page C85 of C413 Through Page C173 of C413
ML13232A13517 June 2013PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment C, Page C251 of C413 Through Page C331 of C413Post Accident Monitoring
ML13232A13717 June 2013PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment C, Page C332 of C413 Through Page C413 of C413
ML13232A13817 June 2013PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment D, Page D1 of D127 Through Page D73 of D127Scaffolding
ML13232A14017 June 2013PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment D, Page D74 of D127 Through Attachment H, Page H12 of H12Safe Shutdown
Fukushima Dai-Ichi
Scaffolding
ML13232A14117 June 2013PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment I, Page I1 of I9 Through Attachment J, Page J77 of J134Scaffolding
ML13196A23612 April 2012Email from M. Smith, OGC to S. Uttal OGC Et Al., on Additional Pilgrim ExhibitsInternal Flooding
Probabilistic Risk Assessment
Incorporated by reference
License Renewal
Earthquake
Chernobyl
Fuel cladding
Stolen
Affidavit
ML12047A11929 February 2012Request to Include Atlantic Sturgeon in Ongoing Informal Section 7 Consultation for Pilgrim Nuclear Power StationLicense Renewal
ML12044035127 February 2012Acknowledgement of Withdrawal and Results of Acceptance Review Proposed License Amendment Request for Rod Withdrawal Minimizer Bypass Allowance to Allow Reactor Startup
ML14086A50213 June 2011Enclosure 1 to PNPS Letter 2.14.027 - Entergy Nuclear Engineering Report No. PNPS-RPT-11-00001, Re-assessment of Pilgrim Seismic Core Damage FrequencyMission time
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Earthquake
Generic Issues Program
ML11042030631 January 2011GE Hitachi Nuclear Energy Report, NEDC-33532, Revision 2, Pilgrim Nuclear Power Station Safety Valve Setpoint Increase, Enclosure 4 to 2.11.007Reactor Vessel Water Level
Stroke time
Anticipated operational occurrence
Feedwater Controller Failure
MELLLA
Fuel cladding
Power change
ML10077045131 March 2010NEDO-33532, Rev 0, Pilgrim Nuclear Power Station Safety Valve Setpoint Increase.Reactor Vessel Water Level
Stroke time
Anticipated operational occurrence
Feedwater Controller Failure
MELLLA
Fuel cladding
Power change
ML0821900137 August 2008Monthly Operating Reports Second Quarter 2008Reserve Station Service Transformer
Power change
ML07108022210 April 2007Repair of the Core Shroud Stabilizer Assemblies - Torsion Arm Clamp Stress Evaluation Report
ML07113038410 April 2007GE-NE-0000-0066-0380-R1-NP, Pilgrim Nuclear Power Station, Torsion Arm Clamp Stress Evaluation Report.
ML07087013222 March 2007Request for Authorization Under the Provision of 10 CFR 50.55a(a)(3)(i) for Modification of the Core Shroud Stabilizer AssembliesFinite Element Analysis
Aging Management
EVT-1
Flow Induced Vibration
ML07087013421 March 2007GE-NE-000-0064-9392-R2-NP, Pilgrim Unit 1, IGSCC Assessment of Shroud Repair X-750 Component Other than the Replacement Upper Support Assembly and Tie Rod Nut.
ML07093031314 March 2007GE-NE-0000-0061-6306-R4-NP, Pilgrim Nuclear Power Station, Shroud Repair Replacement Upper Support Assembly-Stress Analysis Report.Finite Element Analysis
ML0634804026 November 2006E-MAIL: (PD) Fwd: Entergy Nuclear Cultural Resources Protection Plan
ML07079017426 July 2006CR-PNP-2006-02799, Fair Amount of Water in Torus Room Floor
ML06122063026 April 2006License Renewal Audit and Review Plan for Plant Aging Management Review and Programs for the Pilgrim Nuclear Power Plant, Docket Number 50-293Incorporated by reference
Aging Management
Fire Protection Program
Backfit
ML06030002825 January 20062006/01/25-Pilgrim Nuclear Power Station License Renewal Application
ML0707906471 November 2005Procedure No. 2.1.8.7. Rev. 4, ASME Code Visual Examination of Primary Containment (Rtype H6.02)
BVY 04-088, Fitness-for-Duty Program Performance Report for the Period January - June 200430 August 2004Fitness-for-Duty Program Performance Report for the Period January - June 2004Fitness for Duty
ML0411704729 March 2004Engineering Report No. PNPS-RPT-04-00001, Rev. 0, Risk Impact Assessment of Extending Containment Type a Test Interval.Safe Shutdown
High winds
Fire Barrier
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Coatings
Nondestructive Examination
VT-2
Large early release frequency
Moisture barrier
Earthquake
Dissimilar Metal Weld
ML08029023112 February 2004Westinghouse Technical Bulletin: Information Regarding Recent Crossflow Ultrasonic Flow Measurement System Performance Observations, TB-04-4Power change
ML03052026915 February 2003Follow-up Report, Reference Event #39516
ML02123029925 March 2002Transmittal of Written Summary of Recent Reactor Water Level Indication Issues at Pilgrim Nuclear Power StationReactor Vessel Water Level
NRC Generic Letter 1979-4525 September 1979NRC Generic Letter 1979-045: Transmittal of Reports Regarding Foreign Reactor Operation ExperiencesBoric Acid