Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML19056A193 | 17 August 2017 | Attachment 2 Design Input Record | |
ML14294A591 | 4 November 2014 | Final ASP Analysis - Pilgrim Nuclear Power Station (LER 293-13-009) | Fitness for Duty Significance Determination Process |
ML14176A961 | 24 June 2014 | Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 | Fire Barrier Coatings Foreign Material Exclusion |
ML14324A040 | 17 April 2014 | HI-2104715, Seismic Analysis of the Loaded HI-TRAC in the SFP and SFP Slab Qualification. | Safe Shutdown Earthquake Hydrostatic Earthquake |
ML14092A023 | 31 March 2014 | Entergy'S Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima... | Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Fukushima Dai-Ichi Earthquake |
ML13338A667 | 9 December 2013 | Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Pilgrim Nuclear Power Station, TAC No.: MF0777 | Safe Shutdown High winds Ultimate heat sink Tornado Missile Safe Shutdown Earthquake Post Accident Monitoring Internal Flooding Emergency Lighting FLEX Fukushima Dai-Ichi Seismically rugged Frazil ice Battery sizing B.5.b Mitigating Strategies Earthquake |
ML13232A134 | 17 June 2013 | PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment C, Page C174 of C413 Through Page C250 of C413 | Scaffolding |
ML13232A128 | 17 June 2013 | PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Cover Through Page 37 of 37 | Safe Shutdown Unanalyzed Condition Safe Shutdown Earthquake Post Accident Monitoring Fukushima Dai-Ichi Seismically rugged License Renewal Earthquake GOTHIC Power Uprate Seismic Walkdown Report |
ML13232A129 | 17 June 2013 | PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment J, Page J78 of J134 Through End | Scaffolding |
ML13232A130 | 17 June 2013 | PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment a Through Attachment B | Post Accident Monitoring |
ML13232A131 | 17 June 2013 | PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment C, Page C1 of C413 Through Page C84 of C413 | Scaffolding |
ML13232A132 | 17 June 2013 | PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment C, Page C85 of C413 Through Page C173 of C413 | |
ML13232A135 | 17 June 2013 | PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment C, Page C251 of C413 Through Page C331 of C413 | Post Accident Monitoring |
ML13232A137 | 17 June 2013 | PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment C, Page C332 of C413 Through Page C413 of C413 | |
ML13232A138 | 17 June 2013 | PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment D, Page D1 of D127 Through Page D73 of D127 | Scaffolding |
ML13232A140 | 17 June 2013 | PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment D, Page D74 of D127 Through Attachment H, Page H12 of H12 | Safe Shutdown Fukushima Dai-Ichi Scaffolding |
ML13232A141 | 17 June 2013 | PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment I, Page I1 of I9 Through Attachment J, Page J77 of J134 | Scaffolding |
ML13196A236 | 12 April 2012 | Email from M. Smith, OGC to S. Uttal OGC Et Al., on Additional Pilgrim Exhibits | Internal Flooding Probabilistic Risk Assessment Incorporated by reference License Renewal Earthquake Chernobyl Fuel cladding Stolen Affidavit |
ML12047A119 | 29 February 2012 | Request to Include Atlantic Sturgeon in Ongoing Informal Section 7 Consultation for Pilgrim Nuclear Power Station | License Renewal |
ML120440351 | 27 February 2012 | Acknowledgement of Withdrawal and Results of Acceptance Review Proposed License Amendment Request for Rod Withdrawal Minimizer Bypass Allowance to Allow Reactor Startup | |
ML14086A502 | 13 June 2011 | Enclosure 1 to PNPS Letter 2.14.027 - Entergy Nuclear Engineering Report No. PNPS-RPT-11-00001, Re-assessment of Pilgrim Seismic Core Damage Frequency | Mission time Safe Shutdown Earthquake Probabilistic Risk Assessment Earthquake Generic Issues Program |
ML110420306 | 31 January 2011 | GE Hitachi Nuclear Energy Report, NEDC-33532, Revision 2, Pilgrim Nuclear Power Station Safety Valve Setpoint Increase, Enclosure 4 to 2.11.007 | Reactor Vessel Water Level Stroke time Anticipated operational occurrence Feedwater Controller Failure MELLLA Fuel cladding Power change |
ML100770451 | 31 March 2010 | NEDO-33532, Rev 0, Pilgrim Nuclear Power Station Safety Valve Setpoint Increase. | Reactor Vessel Water Level Stroke time Anticipated operational occurrence Feedwater Controller Failure MELLLA Fuel cladding Power change |
ML082190013 | 7 August 2008 | Monthly Operating Reports Second Quarter 2008 | Reserve Station Service Transformer Power change |
ML071080222 | 10 April 2007 | Repair of the Core Shroud Stabilizer Assemblies - Torsion Arm Clamp Stress Evaluation Report | |
ML071130384 | 10 April 2007 | GE-NE-0000-0066-0380-R1-NP, Pilgrim Nuclear Power Station, Torsion Arm Clamp Stress Evaluation Report. | |
ML070870132 | 22 March 2007 | Request for Authorization Under the Provision of 10 CFR 50.55a(a)(3)(i) for Modification of the Core Shroud Stabilizer Assemblies | Finite Element Analysis Aging Management EVT-1 Flow Induced Vibration |
ML070870134 | 21 March 2007 | GE-NE-000-0064-9392-R2-NP, Pilgrim Unit 1, IGSCC Assessment of Shroud Repair X-750 Component Other than the Replacement Upper Support Assembly and Tie Rod Nut. | |
ML070930313 | 14 March 2007 | GE-NE-0000-0061-6306-R4-NP, Pilgrim Nuclear Power Station, Shroud Repair Replacement Upper Support Assembly-Stress Analysis Report. | Finite Element Analysis |
ML063480402 | 6 November 2006 | E-MAIL: (PD) Fwd: Entergy Nuclear Cultural Resources Protection Plan | |
ML070790174 | 26 July 2006 | CR-PNP-2006-02799, Fair Amount of Water in Torus Room Floor | |
ML061220630 | 26 April 2006 | License Renewal Audit and Review Plan for Plant Aging Management Review and Programs for the Pilgrim Nuclear Power Plant, Docket Number 50-293 | Incorporated by reference Aging Management Fire Protection Program Backfit |
ML060300028 | 25 January 2006 | 2006/01/25-Pilgrim Nuclear Power Station License Renewal Application | |
ML070790647 | 1 November 2005 | Procedure No. 2.1.8.7. Rev. 4, ASME Code Visual Examination of Primary Containment (Rtype H6.02) | |
BVY 04-088, Fitness-for-Duty Program Performance Report for the Period January - June 2004 | 30 August 2004 | Fitness-for-Duty Program Performance Report for the Period January - June 2004 | Fitness for Duty |
ML041170472 | 9 March 2004 | Engineering Report No. PNPS-RPT-04-00001, Rev. 0, Risk Impact Assessment of Extending Containment Type a Test Interval. | Safe Shutdown High winds Fire Barrier Safe Shutdown Earthquake Probabilistic Risk Assessment Coatings Nondestructive Examination VT-2 Large early release frequency Moisture barrier Earthquake Dissimilar Metal Weld |
ML080290231 | 12 February 2004 | Westinghouse Technical Bulletin: Information Regarding Recent Crossflow Ultrasonic Flow Measurement System Performance Observations, TB-04-4 | Power change |
ML030520269 | 15 February 2003 | Follow-up Report, Reference Event #39516 | |
ML021230299 | 25 March 2002 | Transmittal of Written Summary of Recent Reactor Water Level Indication Issues at Pilgrim Nuclear Power Station | Reactor Vessel Water Level |
NRC Generic Letter 1979-45 | 25 September 1979 | NRC Generic Letter 1979-045: Transmittal of Reports Regarding Foreign Reactor Operation Experiences | Boric Acid |