ML063460517

From kanterella
Jump to navigation Jump to search
Email: (PD) Conference Call Request
ML063460517
Person / Time
Site: Pilgrim
Issue date: 12/04/2006
From: Perry Buckberg
NRC/NRR/ADRO/DLR
To: Ellis D
Entergy Nuclear
References
%dam200612, %dam200701, TAC 3698
Download: ML063460517 (3)


Text

Rodrigo De La Garza - Conference Call Request From: Perry Buckberg To: Doug Ellis Date: 12/4/2006 2:25 PM

Subject:

Conference Call Request CC: Bryan Ford; Fred Mogolesko; Rajender Auluck; Rodrigo De La Garza Doug, As we have discussed recently, there are several subjects the NRC staff requests you and your staff address. Please review the following 8 issues and let me know when your staff can discuss, via a conference call, these issues with NRC staff.

1) RAI 2.3.3.9 was discussed during the 10/10/2006 conference call. A 3/9/1977 letter (listed in 11/2/2006 e-mail from Doug Ellis) addresses commitment to satisfy Appendix A to BTP APCSB 9.5-1. Address this letter or addition to LRA adequately committing Pilgrim to satisfy Appendix A to BTP APCSB 9.5-1.
2) RAI 2.4.3-1 NRC staff considers Trash rack and traveling screens in scope for license renewal and requests descriptions of the monitoring programs for these components.
3) RAT 2.4.5 In Amendment 8 to the LRA it was stated that 'Transmission Towers" are in LRA Table 2.4-1. It appears Transmission Towers are in LRA Table 2.4-5. Please confirm the location within the LRA.
4) RAI 2.4.3 Amendment 8 includes 'The jib crane does not require aging management review because it does not perform a license renewal intended function." NRC staff requests the applicant clarify and provide additional justification for the above statement that the crane is does not perform a license renewal intended function.
5) BWRVIP 94 - Address Pilgrim commitment to this document or provide procedure demonstrating it is in scope (Pete Oskas

(?)provided such a procedure for VY or Fitz).

6) Address Pilgrim commitment to abide by BWRVIP 76 requirements.
7) The core shroud tie rod repair upper bracket is made of Alloy X750. SIL from GE addressed issues with this component at Pilgrim. Please address Pilgrims plans to inspect, replace or repair this component.
8) CASS main steam flow restrictor, RCS pump casings and valve bodies, and piping - address Pilgrim testing for Reduction of Fracture Toughness
Thanks, Perry Buckberg Project Manager - Division of License Renewal phone: (301)415-1383 fax: (301)415-3031 phbl5nrc.gov

c:\temp\GW)00005.TMP Page 1 Mail Envelope Properties (4574760C.E36: 9: 8248)

Subject:

Conference Call Request Creation Date 12/4/2006 2:25:00 PM From: Perry Buckberg Created By: PHBB1I@nrc.gov Recipients entergy.com bford CC (Bryan Ford) dellisl (Doug Ellis) fmogole CC (Fred Mogolesko) nrc.gov OWGWPO01.HQGWDO01 RCA CC (Rajender Auluck) nrc.gov OWGWPO03.HQGWDO01 RXD3 CC (Rodrigo De La Garza)

Post Office Route entergy.com OWGWPO01 .HQGWDO01 nrc.gov OWGWPOO3.HQGWDOO1 nrc.gov Files Size Date & Time MESSAGE 3120 12/4/2006 2:25:00 PM TEXT.htm 2841 Options Expiration Date: None Priority: Standard ReplyRequested: No Return Notification: None Concealed

Subject:

No Security: Standard Junk Mail Handling Evaluation Results Message is not eligible for Junk Mail handling Message is from an internal sender

c:\temp\GW)OOQQ5.TMP Pg2 Junk Mail settings when this message was delivered Junk Mail handling disabled by User Junk Mail handling disabled by Administrator Junk List is not enabled Junk Mail using personal address books is not enabled Block List is not enabled