E-mail: (PD) Conference Call Request - from Perry Buckberg to Doug Ellis 12/04/06 2:25:00 PM
ML070100094
Person / Time
Site: Pilgrim
Issue date: 12/04/2006
From: Perry Buckberg
NRC/NRR/ADRO/DLR
To: Ellis D
Office of Nuclear Reactor Regulation
References
%dam200701, TAC 3698
Download: ML070100094 (3)


Text

Page I ot 1 Perry Buckberg - Conference Call Request From:

Perry Buckberg To:

Doug Ellis Date:

12/4/2006 2:25:00 PM

Subject:

Conference Call Request CC:

Bryan Ford; Fred Mogolesko; Rajender Auluck; Rodrigo De La Garza

Doug, As we have discussed recently, there are several subjects the NRC staff requests you and your staff address.

Please review the following 8 issues and let me know when your staff can discuss, via a conference call, these issues with NRC staff.

1) RAI 2.3.3.9 was discussed during the 10/10/2006 conference call. A 3/9/1977 letter (listed in 11/2/2006 e-mail from Doug Ellis) addresses commitment to satisfy Appendix A to BTP APCSB 9.5-1. Address this letter or addition to LRA adequately committing Pilgrim to satisfy Appendix A to BTP APCSB 9.5-1.
2) RAI 2.4.3-1 NRC staff considers Trash rack and traveling screens in scope for license renewal and requests descriptions of the monitoring programs for these components.
3) RAI 2.4.5 In Amendment 8 to the LRA it was stated that "Transmission Towers" are in LRA Table 2.4-1.

It appears Transmission Towers are in LRA Table 2.4-5. Please confirm the location within the LRA.

4) RAI 2.4.3 Amendment 8 includes "The jib crane does not require aging management review because it does not perform a license renewal intended function." NRC staff requests the applicant clarify and provide additional justification for the above statement that the crane is does not perform a license renewal intended function.
5) BWRVIP 94 - Address Pilgrim commitment to this document or provide procedure demonstrating it is iW.

scope (Pete Oskas (?) provided such a procedure for VY or Fitz).

6) Address Pilgrim commitment to abide by BWRVIP 76 requirements.
7) The core shroud tie rod repair upper bracket is made of Alloy X750. SIL from GE addressed issues with this component at Pilgrim. Please address Pilgrims plans to inspect, replace or repair this component.
8) CASS main steam flow restrictor, RCS pump casings and valve bodies, and piping - address Pilgrim testihg for Reduction of Fracture Toughness
Thanks, Perry Buckberg Project Manager - Division of License Renewal phone: (301)415-1383 fax:

(301)415-3031 phbl@nrc.gov file://C:\\temp\\GW }00001.HTM 12/29/2006

c:\\100p\\GW}OOOO1.TM-P f4oyi Mail Envelope Properties (4574760C.E36: 9: 8248)

Subject:

Creation Date From:

Created By:

Conference Call Request 12/4/2006 2:25:00 PM Perry Buckberg PtIB 1 @nrc.gov Recipients entergy.com PM bford CC (Bryan Ford) dellisl (Doug Ellis) fmogole CC (Fred Mogolesko) nrc.gov OWGWPO01.HQGWDO01 PM RCA CC (Rajender Auluck)

Action Transferred Date & Time 12/4/2006 2:25:22 Delivered 12/4/2006 2:25:00 nrc.gov OWGWPOO3.HQGWDOO1 PM RXD3 CC (Rodrigo De La Garza)

Post Office OWGWPO01.HQGWDOO1 OWGWPOO3.HQGWDO01 Delivered 12/4/2006 2:25:07 Delivered Route entergy.comn 12/4/2006 2:25:00 PM nrc-gov 12/4/2006 2:25:07 PM nrc'gov Date & Time 12/4/2006 2:25:00 PM Files MESSAGE TEXT.htm Options Auto Delete:

Expiration Date:

Notify Recipients:

Priority:

ReplyRequested:

Return Notification:

Concealed

Subject:

Security:

Size 3120 2841 No None Yes Standard No None No Standard

[ &\\temp\\GW}OOO06'i.'TMP"-

Page 2l To Be Delivered:

Status Tracking:

Immediate Delivered

  • -." *:*'. '.{'L.' I,.*-*:,

'