{{#Wiki_filter:WBN2Public Resource From:                 Boyd, Desiree L [dlboyd@tva.gov]
{{#Wiki_filter:1 WBN2Public Resource From:
Sent:                 Monday, September 12, 2011 9:38 AM To:                   Poole, Justin; Milano, Patrick; Campbell, Stephen; Epperson, Dan Cc:                   Arent, Gordon; Smith, James D; Bryan, Robert H Jr; Smith, James D; Crouch, William D
Boyd, Desiree L [dlboyd@tva.gov]
Sent:
Monday, September 12, 2011 9:38 AM To:
Poole, Justin; Milano, Patrick; Campbell, Stephen; Epperson, Dan Cc:
Arent, Gordon; Smith, James D; Bryan, Robert H Jr; Smith, James D; Crouch, William D


==Subject:==
==Subject:==
NRC PM Open Items List 9-13-11.docx Attachments:           NRC PM Open Items List 9-13-11.docx For next phone call.
NRC PM Open Items List 9-13-11.docx Attachments:
Thank You,
NRC PM Open Items List 9-13-11.docx For next phone call.
Thank You,  
~*~*~*~*~*~*~*~*~*~*~*~
~*~*~*~*~*~*~*~*~*~*~*~
Désireé L. Boyd WBN 2 Licensing Support Sun Technical Services dlboyd@tva.gov 423-365-8764 1
Désireé L. Boyd WBN 2 Licensing Support Sun Technical Services dlboyd@tva.gov 423-365-8764  


Hearing Identifier:     Watts_Bar_2_Operating_LA_Public Email Number:           522 Mail Envelope Properties       (7AB41F650F76BD44B5BCAB7C0CCABFAF22E7E58D)
Hearing Identifier:
Watts_Bar_2_Operating_LA_Public Email Number:
522 Mail Envelope Properties (7AB41F650F76BD44B5BCAB7C0CCABFAF22E7E58D)  


==Subject:==
==Subject:==
NRC PM Open Items List 9-13-11.docx Sent Date:               9/12/2011 9:38:18 AM Received Date:           9/12/2011 9:38:24 AM From:                   Boyd, Desiree L Created By:             dlboyd@tva.gov Recipients:
NRC PM Open Items List 9-13-11.docx Sent Date:
9/12/2011 9:38:18 AM Received Date:
9/12/2011 9:38:24 AM From:
Boyd, Desiree L Created By:
dlboyd@tva.gov Recipients:  
"Arent, Gordon" <garent@tva.gov>
"Arent, Gordon" <garent@tva.gov>
Tracking Status: None "Smith, James D" <jdsmith@tva.gov>
Tracking Status: None "Smith, James D" <jdsmith@tva.gov>
Line 37: Line 48:
Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov>
Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov>
Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov>
Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov>
Tracking Status: None Post Office:             TVANUCXVS2.main.tva.gov Files                           Size                   Date & Time MESSAGE                         244                   9/12/2011 9:38:24 AM NRC PM Open Items List 9-13-11.docx                   31574 Options Priority:                       Standard Return Notification:             No Reply Requested:                 No Sensitivity:                     Normal Expiration Date:
Tracking Status: None Post Office:
Recipients Received:
TVANUCXVS2.main.tva.gov Files Size Date & Time MESSAGE 244 9/12/2011 9:38:24 AM NRC PM Open Items List 9-13-11.docx 31574 Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received:  


Page 1 of 3 NRC PM Open Items List 9/13/11 (423) 751-7777 ID 4233652004#
Page 1 of 3 NRC PM Open Items List 9/13/11 (423) 751-7777 ID 4233652004#
No.               Description                   Status                   Additional Comments                       Resp Org/Person
No.
: 1. Cyber Security Plan/Controls and         NRC TI issued NRC Inspection in 2011                             Heinrich/Snyder Implementation                            TBD                                                                (Bryan)
Description Status Additional Comments Resp Org/Person
To be discussed at the next ACRS meeting (October NRC Table      5th - closed portion).
: 1.
Top/Pilot Oct 2011      Set up follow-up meeting 9/20 or 9/21 Procedures complete 9/30/11 Pre-inspection TBD Inspection Dec 2011
Cyber Security Plan/Controls and Implementation NRC TI issued TBD NRC Table Top/Pilot Oct 2011 Procedures complete 9/30/11 Pre-inspection TBD Inspection Dec 2011 NRC Inspection in 2011 To be discussed at the next ACRS meeting (October 5th - closed portion).
: 2. Instrumentation RAI List (Knuettel)       1. 9/23/11    RAI Responses                                      Eng/Hilmes
Set up follow-up meeting 9/20 or 9/21 Heinrich/Snyder (Bryan)
: 1. Item 3 for GA-ESI RM-1000 RAD         2. Various -
: 2.
* Item 1 GA/ESI is preparing a report to document (Smith)
Instrumentation RAI List (Knuettel)
Monitors.                                 see status    the conformance of their CGD program to NRC
: 1. Item 3 for GA-ESI RM-1000 RAD Monitors.
: 2. GA proprietary, non-proprietary and   3. 9/26/11        requirements based on NRC telecom on 8/30/11.
: 2. GA proprietary, non-proprietary and affidavits for withholding submittals
affidavits for withholding submittals 4. 10/1/11
(~12 documents.)
* Item 2 - 04038903-1SP - Prop due 9/30/11
: 3. NRC comments on procedures to GA-ESI
(~12 documents.)                     5. 11/30/11        04038903-2SP - Prop due 10/6/11
: 3. NRC comments on procedures to                             04038903-4SP - Prop due 10/21/11 GA-ESI                                                   04038903-QSR - Prop due 9/30/11
: 4. RM1000 EMI/RFI questions
: 4. RM1000 EMI/RFI questions
* Item 3 OP-7.3-240 - Prop due 9/26/11
: 5. Submit non-prop/affidavits
: 5. Submit non-prop/affidavits
* Item 4 Create new bridge document 04038800-1SP - Prop due 10/1/11
: 1. 9/23/11
: 3. Verify MACCs values for SAMA Cost         1. 9/8/11A     1. Non-conservatisms in some values identified. ENG/Koontz Benefit Evaluation                        2. 9/13/11        Discuss updated results with NRC
: 2. Various -
: 3. 9/20/11    2. Submitted revised tables
see status
: 3. Submit revised RAI responses
: 3. 9/26/11
: 4. 10/1/11
: 5. 11/30/11 RAI Responses
* Item 1 GA/ESI is preparing a report to document the conformance of their CGD program to NRC requirements based on NRC telecom on 8/30/11.
Item 2 - 04038903-1SP - Prop due 9/30/11 04038903-2SP - Prop due 10/6/11 04038903-4SP - Prop due 10/21/11 04038903-QSR - Prop due 9/30/11 Item 3 OP-7.3-240 - Prop due 9/26/11
* Item 4 Create new bridge document 04038800-1SP - Prop due 10/1/11 Eng/Hilmes (Smith)
: 3.
Verify MACCs values for SAMA Cost Benefit Evaluation
: 1. 9/8/11A
: 2. 9/13/11
: 3. 9/20/11
: 1. Non-conservatisms in some values identified.
Discuss updated results with NRC
: 2. Submitted revised tables
: 3. Submit revised RAI responses ENG/Koontz


Page 2 of 3 No.               Description               Status                     Additional Comments                       Resp Org/Person
Page 2 of 3 No.
: 4. Exemption to 10CFR50.49 for some       9/23/11                                                         Hilmes Category II cables                                                                                      (Stockton)
Description Status Additional Comments Resp Org/Person
: 5. Complete Implementation (Hemmer)     Pump         Additional clarification to Phase I actions will be   Hemmer Relocation    needed. Fleet wide issue.                             (Smith) 5/30/12        Substantial building to complete and equipment in May.
: 4.
Bldg Plan      Provide document of mitigating equipment and 9/23/11        location for unit 2.
Exemption to 10CFR50.49 for some Category II cables 9/23/11 Hilmes (Stockton)
Inspection -
: 5.
June 2012 Phase I commitments 10/1/11
Complete Implementation (Hemmer)
: 6. Chapter 15.5 RAIs                   9/21/11       Includes FHA calc. X/Q discussion for each accident, Wastrack corrections to previously submitted dose calcs, and a (Bryan) complete 15.5 markup. Potential meeting following submittal. Look at splitting submittal up.
Pump Relocation 5/30/12 Bldg Plan 9/23/11 Inspection -
: 7. Fire Protection Report Questions   1. 10/24-28/11 1. Audit                                              ENG/Hilmes regarding OMA                      2.9/30/11     2. Group 7 RAI response                              (Crouch) 3.10/1/11     3. Receive Group 8 RAIs
June 2012 Phase I commitments 10/1/11 Additional clarification to Phase I actions will be needed. Fleet wide issue.
: 4. 11/4/11     4. Response to Group 8
Substantial building to complete and equipment in May.
: 5. 11/30/11   5. Submit As-designed U1/U2 FPR
Provide document of mitigating equipment and location for unit 2.
: 8. Tech Spec Revisions from latest T/S 1. Oct, 2011   1. CSST A & B - discretionary                         Licensing/Elton markup and NRC Review comments      2. Sept, 2011  2. I-131 DEI                                         (Bryan)
Hemmer (Smith)
: 3. Oct, 2011  3. Diesel Generator Frequency
: 6.
: 4. TBD        4. Unit 1 AST FHA
Chapter 15.5 RAIs 9/21/11 Includes FHA calc. X/Q discussion for each accident, corrections to previously submitted dose calcs, and a complete 15.5 markup. Potential meeting following submittal. Look at splitting submittal up.
: 9. ACRS Topics                         10/5/11       Cyber, Chapter 15 except dose, Chapter 4 (Fuels),     Gordon WINCISE, Hydrology, process for FSAR drawing documentation update,
Wastrack (Bryan)
: 10. SSER 22/23/24 Open Items Response   9/16/11       9/16 is the target date for the next SSER update. The Licensing expanded HH list and status is covered periodically.
: 7.
: 11. Transient Analysis issues           9/16/11       Question on RG revision and modes 3, 4, & 5. TVA to   ENG/Koontz provide write up explaining NRC acceptance (CLB) of   WEC/Morgan Boron dilution RAI response                        unit1 for modes 3, 4, & 5.
Fire Protection Report Questions regarding OMA
: 1. 10/24-28/11 2.9/30/11 3.10/1/11
: 4. 11/4/11
: 5. 11/30/11
: 1. Audit
: 2. Group 7 RAI response
: 3. Receive Group 8 RAIs
: 4. Response to Group 8
: 5. Submit As-designed U1/U2 FPR ENG/Hilmes (Crouch)
: 8.
Tech Spec Revisions from latest T/S markup and NRC Review comments
: 1. Oct, 2011
: 2. Sept, 2011
: 3. Oct, 2011
: 4. TBD
: 1. CSST A & B - discretionary
: 2. I-131 DEI
: 3. Diesel Generator Frequency
: 4. Unit 1 AST FHA Licensing/Elton (Bryan)
: 9.
ACRS Topics 10/5/11 Cyber, Chapter 15 except dose, Chapter 4 (Fuels),
WINCISE, Hydrology, process for FSAR drawing documentation update, Gordon
: 10.
SSER 22/23/24 Open Items Response 9/16/11 9/16 is the target date for the next SSER update. The expanded HH list and status is covered periodically.
Licensing
: 11.
Transient Analysis issues Boron dilution RAI response 9/16/11 Question on RG revision and modes 3, 4, & 5. TVA to provide write up explaining NRC acceptance (CLB) of unit1 for modes 3, 4, & 5.
ENG/Koontz WEC/Morgan


Page 3 of 3 No.               Description                 Status                     Additional Comments                           Resp Org/Person
Page 3 of 3 No.
: 12. FSAR A106                               9/16/11       Target date. Correction - change note 17 of Table       Lic/Stockton 7.1.1 to Reg Guide 1.152 R 3 instead of R 2
Description Status Additional Comments Resp Org/Person
: 13. Develop list of planned License             1. 11/1/11     1. Review Unit 1 SER for exemptions. Sand         NRR/TVA Conditions, Exemptions and Relief          2. TBD            baskets, cyber security, physical security, PAD (Bryan)
: 12.
Requests (Crouch)                                              4.0
FSAR A106 9/16/11 Target date. Correction - change note 17 of Table 7.1.1 to Reg Guide 1.152 R 3 instead of R 2 Lic/Stockton
: 2. NRR to review current exemptions
: 13.
: 14. Verify Tech Spec Setpoints match calcs 1. 10/4/11     1. 6 SSDs remaining to be issued. Possible submittal   Eng/Hilmes if any number changes.                                 (Bryan)
Develop list of planned License Conditions, Exemptions and Relief Requests (Crouch)
TS certification                        2. TBD        2. TS certification
: 1. 11/1/11
: 15. Issue two Unit Offsite Dose Calculation 3/1/12         Determine actual need date                             Chemistry/
: 2. TBD
Manual (Beach) Review TS Chapter 5                                                                            Woods programs also                                                                                                  (Bryan)
: 1. Review Unit 1 SER for exemptions. Sand baskets, cyber security, physical security, PAD 4.0
: 16. Issue Unit 2 Completion Letter (Crouch) 8/1/12                                                                 Licensing
: 2. NRR to review current exemptions NRR/TVA (Bryan)
: 17. Submit final as-constructed FSAR       7/1/12                                                                 Licensing/
: 14.
figures                                                                                                        Stockton
Verify Tech Spec Setpoints match calcs TS certification
: 18. TMI action items                       7/1/12         TVA to provide letter when TMI actions are field       Licensing complete.                                               (Gordon)
: 1. 10/4/11
: 19. ASME N-801 & N-802 code cases           March 2012`   NRC response to relief request submitted 9/1/11.       NRR
: 2. TBD
: 0. Discretionary Actions
: 1. 6 SSDs remaining to be issued. Possible submittal if any number changes.
: 1. Letter to terminate Part 30/40 License 4/1/12                                                                 Licensing after receipt of Part 50 License                                                                              (Crouch)
: 2. TS certification Eng/Hilmes (Bryan)
: 2. Combined U1/U2 FSAR (Stockton)         3/1/13                                                                 Licensing
: 15.
: 3. Status of GSI 199 Eastern Seismicity   Fall 2011     No action pending upcoming Generic Letter               TVA/NRR (Crouch)                                              Related information on GSI 194 may need input
Issue two Unit Offsite Dose Calculation Manual (Beach) Review TS Chapter 5 programs also 3/1/12 Determine actual need date Chemistry/
: 4. Letter to notify NRC when Vital Area   12/1/11       Security Plan Update - Boundary to be restored by       Lic/Crouch Boundary returned to original location                9/30/11
Woods (Bryan)
: 5. IEB 88-02 SG Tube Cracking             TBD           Tubes are assumed locked in the WEC analysis.           Corp SG/
: 16.
Waiting for NRC concurrence.                           Webber ISI/Tinley}}
Issue Unit 2 Completion Letter (Crouch) 8/1/12 Licensing
: 17.
Submit final as-constructed FSAR figures 7/1/12 Licensing/
Stockton
: 18.
TMI action items 7/1/12 TVA to provide letter when TMI actions are field complete.
Licensing (Gordon)
: 19.
ASME N-801 & N-802 code cases March 2012`
NRC response to relief request submitted 9/1/11.
NRR
: 0.
Discretionary Actions
: 1.
Letter to terminate Part 30/40 License after receipt of Part 50 License 4/1/12 Licensing (Crouch)
: 2.
Combined U1/U2 FSAR (Stockton) 3/1/13 Licensing
: 3.
Status of GSI 199 Eastern Seismicity (Crouch)
Fall 2011 No action pending upcoming Generic Letter Related information on GSI 194 may need input TVA/NRR
: 4.
Letter to notify NRC when Vital Area Boundary returned to original location 12/1/11 Security Plan Update - Boundary to be restored by 9/30/11 Lic/Crouch
: 5.
IEB 88-02 SG Tube Cracking TBD Tubes are assumed locked in the WEC analysis.
Waiting for NRC concurrence.
Corp SG/
Webber ISI/Tinley}}

Latest revision as of 01:38, 13 January 2025

OL - NRC PM Open Items List 9-13-11.docx
ML11285A477
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 09/12/2011
From:
- No Known Affiliation
To:
Division of Operating Reactor Licensing
References
Download: ML11285A477 (5)


Text

1 WBN2Public Resource From:

Boyd, Desiree L [dlboyd@tva.gov]

Sent:

Monday, September 12, 2011 9:38 AM To:

Poole, Justin; Milano, Patrick; Campbell, Stephen; Epperson, Dan Cc:

Arent, Gordon; Smith, James D; Bryan, Robert H Jr; Smith, James D; Crouch, William D

Subject:

NRC PM Open Items List 9-13-11.docx Attachments:

NRC PM Open Items List 9-13-11.docx For next phone call.

Thank You,

~*~*~*~*~*~*~*~*~*~*~*~

Désireé L. Boyd WBN 2 Licensing Support Sun Technical Services dlboyd@tva.gov 423-365-8764

Hearing Identifier:

Watts_Bar_2_Operating_LA_Public Email Number:

522 Mail Envelope Properties (7AB41F650F76BD44B5BCAB7C0CCABFAF22E7E58D)

Subject:

NRC PM Open Items List 9-13-11.docx Sent Date:

9/12/2011 9:38:18 AM Received Date:

9/12/2011 9:38:24 AM From:

Boyd, Desiree L Created By:

dlboyd@tva.gov Recipients:

"Arent, Gordon" <garent@tva.gov>

Tracking Status: None "Smith, James D" <jdsmith@tva.gov>

Tracking Status: None "Bryan, Robert H Jr" <rhbryan@tva.gov>

Tracking Status: None "Smith, James D" <smith1jd@westinghouse.com>

Tracking Status: None "Crouch, William D" <wdcrouch@tva.gov>

Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov>

Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov>

Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov>

Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov>

Tracking Status: None Post Office:

TVANUCXVS2.main.tva.gov Files Size Date & Time MESSAGE 244 9/12/2011 9:38:24 AM NRC PM Open Items List 9-13-11.docx 31574 Options Priority:

Standard Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Recipients Received:

Page 1 of 3 NRC PM Open Items List 9/13/11 (423) 751-7777 ID 4233652004#

No.

Description Status Additional Comments Resp Org/Person

1.

Cyber Security Plan/Controls and Implementation NRC TI issued TBD NRC Table Top/Pilot Oct 2011 Procedures complete 9/30/11 Pre-inspection TBD Inspection Dec 2011 NRC Inspection in 2011 To be discussed at the next ACRS meeting (October 5th - closed portion).

Set up follow-up meeting 9/20 or 9/21 Heinrich/Snyder (Bryan)

2.

Instrumentation RAI List (Knuettel)

1. Item 3 for GA-ESI RM-1000 RAD Monitors.
2. GA proprietary, non-proprietary and affidavits for withholding submittals

(~12 documents.)

3. NRC comments on procedures to GA-ESI
4. RM1000 EMI/RFI questions
5. Submit non-prop/affidavits
1. 9/23/11
2. Various -

see status

3. 9/26/11
4. 10/1/11
5. 11/30/11 RAI Responses
  • Item 1 GA/ESI is preparing a report to document the conformance of their CGD program to NRC requirements based on NRC telecom on 8/30/11.

Item 2 - 04038903-1SP - Prop due 9/30/11 04038903-2SP - Prop due 10/6/11 04038903-4SP - Prop due 10/21/11 04038903-QSR - Prop due 9/30/11 Item 3 OP-7.3-240 - Prop due 9/26/11

  • Item 4 Create new bridge document 04038800-1SP - Prop due 10/1/11 Eng/Hilmes (Smith)
3.

Verify MACCs values for SAMA Cost Benefit Evaluation

1. 9/8/11A
2. 9/13/11
3. 9/20/11
1. Non-conservatisms in some values identified.

Discuss updated results with NRC

2. Submitted revised tables
3. Submit revised RAI responses ENG/Koontz

Page 2 of 3 No.

Description Status Additional Comments Resp Org/Person

4.

Exemption to 10CFR50.49 for some Category II cables 9/23/11 Hilmes (Stockton)

5.

Complete Implementation (Hemmer)

Pump Relocation 5/30/12 Bldg Plan 9/23/11 Inspection -

June 2012 Phase I commitments 10/1/11 Additional clarification to Phase I actions will be needed. Fleet wide issue.

Substantial building to complete and equipment in May.

Provide document of mitigating equipment and location for unit 2.

Hemmer (Smith)

6.

Chapter 15.5 RAIs 9/21/11 Includes FHA calc. X/Q discussion for each accident, corrections to previously submitted dose calcs, and a complete 15.5 markup. Potential meeting following submittal. Look at splitting submittal up.

Wastrack (Bryan)

7.

Fire Protection Report Questions regarding OMA

1. 10/24-28/11 2.9/30/11 3.10/1/11
4. 11/4/11
5. 11/30/11
1. Audit
2. Group 7 RAI response
3. Receive Group 8 RAIs
4. Response to Group 8
5. Submit As-designed U1/U2 FPR ENG/Hilmes (Crouch)
8.

Tech Spec Revisions from latest T/S markup and NRC Review comments

1. Oct, 2011
2. Sept, 2011
3. Oct, 2011
4. TBD
1. CSST A & B - discretionary
2. I-131 DEI
3. Diesel Generator Frequency
4. Unit 1 AST FHA Licensing/Elton (Bryan)
9.

ACRS Topics 10/5/11 Cyber, Chapter 15 except dose, Chapter 4 (Fuels),

WINCISE, Hydrology, process for FSAR drawing documentation update, Gordon

10.

SSER 22/23/24 Open Items Response 9/16/11 9/16 is the target date for the next SSER update. The expanded HH list and status is covered periodically.

Licensing

11.

Transient Analysis issues Boron dilution RAI response 9/16/11 Question on RG revision and modes 3, 4, & 5. TVA to provide write up explaining NRC acceptance (CLB) of unit1 for modes 3, 4, & 5.

ENG/Koontz WEC/Morgan

Page 3 of 3 No.

Description Status Additional Comments Resp Org/Person

12.

FSAR A106 9/16/11 Target date. Correction - change note 17 of Table 7.1.1 to Reg Guide 1.152 R 3 instead of R 2 Lic/Stockton

13.

Develop list of planned License Conditions, Exemptions and Relief Requests (Crouch)

1. 11/1/11
2. TBD
1. Review Unit 1 SER for exemptions. Sand baskets, cyber security, physical security, PAD 4.0
2. NRR to review current exemptions NRR/TVA (Bryan)
14.

Verify Tech Spec Setpoints match calcs TS certification

1. 10/4/11
2. TBD
1. 6 SSDs remaining to be issued. Possible submittal if any number changes.
2. TS certification Eng/Hilmes (Bryan)
15.

Issue two Unit Offsite Dose Calculation Manual (Beach) Review TS Chapter 5 programs also 3/1/12 Determine actual need date Chemistry/

Woods (Bryan)

16.

Issue Unit 2 Completion Letter (Crouch) 8/1/12 Licensing

17.

Submit final as-constructed FSAR figures 7/1/12 Licensing/

Stockton

18.

TMI action items 7/1/12 TVA to provide letter when TMI actions are field complete.

Licensing (Gordon)

19.

ASME N-801 & N-802 code cases March 2012`

NRC response to relief request submitted 9/1/11.

NRR

0.

Discretionary Actions

1.

Letter to terminate Part 30/40 License after receipt of Part 50 License 4/1/12 Licensing (Crouch)

2.

Combined U1/U2 FSAR (Stockton) 3/1/13 Licensing

3.

Status of GSI 199 Eastern Seismicity (Crouch)

Fall 2011 No action pending upcoming Generic Letter Related information on GSI 194 may need input TVA/NRR

4.

Letter to notify NRC when Vital Area Boundary returned to original location 12/1/11 Security Plan Update - Boundary to be restored by 9/30/11 Lic/Crouch

5.

IEB 88-02 SG Tube Cracking TBD Tubes are assumed locked in the WEC analysis.

Waiting for NRC concurrence.

Corp SG/

Webber ISI/Tinley