ML11285A477: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML11285A477 | | number = ML11285A477 | ||
| issue date = 09/12/2011 | | issue date = 09/12/2011 | ||
| title = | | title = OL - NRC PM Open Items List 9-13-11.docx | ||
| author name = | | author name = | ||
| author affiliation = - No Known Affiliation | | author affiliation = - No Known Affiliation | ||
| Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:WBN2Public Resource From: | {{#Wiki_filter:1 WBN2Public Resource From: | ||
Sent: | Boyd, Desiree L [dlboyd@tva.gov] | ||
Sent: | |||
Monday, September 12, 2011 9:38 AM To: | |||
Poole, Justin; Milano, Patrick; Campbell, Stephen; Epperson, Dan Cc: | |||
Arent, Gordon; Smith, James D; Bryan, Robert H Jr; Smith, James D; Crouch, William D | |||
==Subject:== | ==Subject:== | ||
NRC PM Open Items List 9-13-11.docx Attachments: | NRC PM Open Items List 9-13-11.docx Attachments: | ||
Thank You, | NRC PM Open Items List 9-13-11.docx For next phone call. | ||
Thank You, | |||
~*~*~*~*~*~*~*~*~*~*~*~ | ~*~*~*~*~*~*~*~*~*~*~*~ | ||
Désireé L. Boyd WBN 2 Licensing Support Sun Technical Services dlboyd@tva.gov 423-365-8764 | Désireé L. Boyd WBN 2 Licensing Support Sun Technical Services dlboyd@tva.gov 423-365-8764 | ||
Hearing Identifier: | Hearing Identifier: | ||
Watts_Bar_2_Operating_LA_Public Email Number: | |||
522 Mail Envelope Properties (7AB41F650F76BD44B5BCAB7C0CCABFAF22E7E58D) | |||
==Subject:== | ==Subject:== | ||
NRC PM Open Items List 9-13-11.docx Sent Date: | NRC PM Open Items List 9-13-11.docx Sent Date: | ||
9/12/2011 9:38:18 AM Received Date: | |||
9/12/2011 9:38:24 AM From: | |||
Boyd, Desiree L Created By: | |||
dlboyd@tva.gov Recipients: | |||
"Arent, Gordon" <garent@tva.gov> | "Arent, Gordon" <garent@tva.gov> | ||
Tracking Status: None "Smith, James D" <jdsmith@tva.gov> | Tracking Status: None "Smith, James D" <jdsmith@tva.gov> | ||
| Line 37: | Line 48: | ||
Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov> | Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov> | ||
Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov> | Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov> | ||
Tracking Status: None Post Office: | Tracking Status: None Post Office: | ||
Recipients Received: | TVANUCXVS2.main.tva.gov Files Size Date & Time MESSAGE 244 9/12/2011 9:38:24 AM NRC PM Open Items List 9-13-11.docx 31574 Options Priority: | ||
Standard Return Notification: | |||
No Reply Requested: | |||
No Sensitivity: | |||
Normal Expiration Date: | |||
Recipients Received: | |||
Page 1 of 3 NRC PM Open Items List 9/13/11 (423) 751-7777 ID 4233652004# | Page 1 of 3 NRC PM Open Items List 9/13/11 (423) 751-7777 ID 4233652004# | ||
No. | No. | ||
: 1. Cyber Security Plan/Controls and | Description Status Additional Comments Resp Org/Person | ||
To be discussed at the next ACRS meeting (October | : 1. | ||
Cyber Security Plan/Controls and Implementation NRC TI issued TBD NRC Table Top/Pilot Oct 2011 Procedures complete 9/30/11 Pre-inspection TBD Inspection Dec 2011 NRC Inspection in 2011 To be discussed at the next ACRS meeting (October 5th - closed portion). | |||
: 2. Instrumentation RAI List (Knuettel) | Set up follow-up meeting 9/20 or 9/21 Heinrich/Snyder (Bryan) | ||
: 1. Item 3 for GA-ESI RM-1000 RAD | : 2. | ||
Instrumentation RAI List (Knuettel) | |||
Monitors. | : 1. Item 3 for GA-ESI RM-1000 RAD Monitors. | ||
: 2. GA proprietary, non-proprietary and | : 2. GA proprietary, non-proprietary and affidavits for withholding submittals | ||
affidavits for withholding submittals | (~12 documents.) | ||
: 3. NRC comments on procedures to GA-ESI | |||
(~12 documents.) | |||
: 3. NRC comments on procedures to | |||
: 4. RM1000 EMI/RFI questions | : 4. RM1000 EMI/RFI questions | ||
: 5. Submit non-prop/affidavits | : 5. Submit non-prop/affidavits | ||
* Item 4 Create new bridge document 04038800-1SP - Prop due 10/1/11 | : 1. 9/23/11 | ||
: 3. Verify MACCs values for SAMA Cost | : 2. Various - | ||
: | see status | ||
: 3. Submit revised RAI responses | : 3. 9/26/11 | ||
: 4. 10/1/11 | |||
: 5. 11/30/11 RAI Responses | |||
* Item 1 GA/ESI is preparing a report to document the conformance of their CGD program to NRC requirements based on NRC telecom on 8/30/11. | |||
Item 2 - 04038903-1SP - Prop due 9/30/11 04038903-2SP - Prop due 10/6/11 04038903-4SP - Prop due 10/21/11 04038903-QSR - Prop due 9/30/11 Item 3 OP-7.3-240 - Prop due 9/26/11 | |||
* Item 4 Create new bridge document 04038800-1SP - Prop due 10/1/11 Eng/Hilmes (Smith) | |||
: 3. | |||
Verify MACCs values for SAMA Cost Benefit Evaluation | |||
: 1. 9/8/11A | |||
: 2. 9/13/11 | |||
: 3. 9/20/11 | |||
: 1. Non-conservatisms in some values identified. | |||
Discuss updated results with NRC | |||
: 2. Submitted revised tables | |||
: 3. Submit revised RAI responses ENG/Koontz | |||
Page 2 of 3 No. | Page 2 of 3 No. | ||
: 4. Exemption to 10CFR50.49 for some | Description Status Additional Comments Resp Org/Person | ||
: 5. Complete Implementation (Hemmer) | : 4. | ||
Exemption to 10CFR50.49 for some Category II cables 9/23/11 Hilmes (Stockton) | |||
: 5. | |||
Complete Implementation (Hemmer) | |||
: 6. Chapter 15.5 RAIs | Pump Relocation 5/30/12 Bldg Plan 9/23/11 Inspection - | ||
: 7. Fire Protection Report Questions | June 2012 Phase I commitments 10/1/11 Additional clarification to Phase I actions will be needed. Fleet wide issue. | ||
: 4. 11/4/11 | Substantial building to complete and equipment in May. | ||
: 5. 11/30/11 | Provide document of mitigating equipment and location for unit 2. | ||
: 8. Tech Spec Revisions from latest T/S 1. Oct, 2011 | Hemmer (Smith) | ||
: | : 6. | ||
: | Chapter 15.5 RAIs 9/21/11 Includes FHA calc. X/Q discussion for each accident, corrections to previously submitted dose calcs, and a complete 15.5 markup. Potential meeting following submittal. Look at splitting submittal up. | ||
: 9. ACRS Topics | Wastrack (Bryan) | ||
: 10. SSER 22/23/24 Open Items Response | : 7. | ||
: 11. Transient Analysis issues | Fire Protection Report Questions regarding OMA | ||
: 1. 10/24-28/11 2.9/30/11 3.10/1/11 | |||
: 4. 11/4/11 | |||
: 5. 11/30/11 | |||
: 1. Audit | |||
: 2. Group 7 RAI response | |||
: 3. Receive Group 8 RAIs | |||
: 4. Response to Group 8 | |||
: 5. Submit As-designed U1/U2 FPR ENG/Hilmes (Crouch) | |||
: 8. | |||
Tech Spec Revisions from latest T/S markup and NRC Review comments | |||
: 1. Oct, 2011 | |||
: 2. Sept, 2011 | |||
: 3. Oct, 2011 | |||
: 4. TBD | |||
: 1. CSST A & B - discretionary | |||
: 2. I-131 DEI | |||
: 3. Diesel Generator Frequency | |||
: 4. Unit 1 AST FHA Licensing/Elton (Bryan) | |||
: 9. | |||
ACRS Topics 10/5/11 Cyber, Chapter 15 except dose, Chapter 4 (Fuels), | |||
WINCISE, Hydrology, process for FSAR drawing documentation update, Gordon | |||
: 10. | |||
SSER 22/23/24 Open Items Response 9/16/11 9/16 is the target date for the next SSER update. The expanded HH list and status is covered periodically. | |||
Licensing | |||
: 11. | |||
Transient Analysis issues Boron dilution RAI response 9/16/11 Question on RG revision and modes 3, 4, & 5. TVA to provide write up explaining NRC acceptance (CLB) of unit1 for modes 3, 4, & 5. | |||
ENG/Koontz WEC/Morgan | |||
Page 3 of 3 No. | Page 3 of 3 No. | ||
: 12. FSAR A106 | Description Status Additional Comments Resp Org/Person | ||
: 13. Develop list of planned License | : 12. | ||
FSAR A106 9/16/11 Target date. Correction - change note 17 of Table 7.1.1 to Reg Guide 1.152 R 3 instead of R 2 Lic/Stockton | |||
: 2. NRR to review current exemptions | : 13. | ||
: 14. Verify Tech Spec Setpoints match calcs | Develop list of planned License Conditions, Exemptions and Relief Requests (Crouch) | ||
: 1. 11/1/11 | |||
: 15. Issue two Unit Offsite Dose Calculation 3/1/12 | : 2. TBD | ||
: 1. Review Unit 1 SER for exemptions. Sand baskets, cyber security, physical security, PAD 4.0 | |||
: 16. Issue Unit 2 Completion Letter (Crouch) 8/1/12 | : 2. NRR to review current exemptions NRR/TVA (Bryan) | ||
: 17. Submit final as-constructed FSAR | : 14. | ||
Verify Tech Spec Setpoints match calcs TS certification | |||
: 18. TMI action items | : 1. 10/4/11 | ||
: 19. ASME N-801 & N-802 code cases | : 2. TBD | ||
: 0. Discretionary Actions | : 1. 6 SSDs remaining to be issued. Possible submittal if any number changes. | ||
: 1. Letter to terminate Part 30/40 License | : 2. TS certification Eng/Hilmes (Bryan) | ||
: 2. Combined U1/U2 FSAR (Stockton) | : 15. | ||
: 3. Status of GSI 199 Eastern Seismicity | Issue two Unit Offsite Dose Calculation Manual (Beach) Review TS Chapter 5 programs also 3/1/12 Determine actual need date Chemistry/ | ||
: 4. Letter to notify NRC when Vital Area | Woods (Bryan) | ||
: 5. IEB 88-02 SG Tube Cracking | : 16. | ||
Waiting for NRC concurrence. | Issue Unit 2 Completion Letter (Crouch) 8/1/12 Licensing | ||
: 17. | |||
Submit final as-constructed FSAR figures 7/1/12 Licensing/ | |||
Stockton | |||
: 18. | |||
TMI action items 7/1/12 TVA to provide letter when TMI actions are field complete. | |||
Licensing (Gordon) | |||
: 19. | |||
ASME N-801 & N-802 code cases March 2012` | |||
NRC response to relief request submitted 9/1/11. | |||
NRR | |||
: 0. | |||
Discretionary Actions | |||
: 1. | |||
Letter to terminate Part 30/40 License after receipt of Part 50 License 4/1/12 Licensing (Crouch) | |||
: 2. | |||
Combined U1/U2 FSAR (Stockton) 3/1/13 Licensing | |||
: 3. | |||
Status of GSI 199 Eastern Seismicity (Crouch) | |||
Fall 2011 No action pending upcoming Generic Letter Related information on GSI 194 may need input TVA/NRR | |||
: 4. | |||
Letter to notify NRC when Vital Area Boundary returned to original location 12/1/11 Security Plan Update - Boundary to be restored by 9/30/11 Lic/Crouch | |||
: 5. | |||
IEB 88-02 SG Tube Cracking TBD Tubes are assumed locked in the WEC analysis. | |||
Waiting for NRC concurrence. | |||
Corp SG/ | |||
Webber ISI/Tinley}} | |||
Latest revision as of 01:38, 13 January 2025
| ML11285A477 | |
| Person / Time | |
|---|---|
| Site: | Watts Bar |
| Issue date: | 09/12/2011 |
| From: | - No Known Affiliation |
| To: | Division of Operating Reactor Licensing |
| References | |
| Download: ML11285A477 (5) | |
Text
1 WBN2Public Resource From:
Boyd, Desiree L [dlboyd@tva.gov]
Sent:
Monday, September 12, 2011 9:38 AM To:
Poole, Justin; Milano, Patrick; Campbell, Stephen; Epperson, Dan Cc:
Arent, Gordon; Smith, James D; Bryan, Robert H Jr; Smith, James D; Crouch, William D
Subject:
NRC PM Open Items List 9-13-11.docx Attachments:
NRC PM Open Items List 9-13-11.docx For next phone call.
Thank You,
~*~*~*~*~*~*~*~*~*~*~*~
Désireé L. Boyd WBN 2 Licensing Support Sun Technical Services dlboyd@tva.gov 423-365-8764
Hearing Identifier:
Watts_Bar_2_Operating_LA_Public Email Number:
522 Mail Envelope Properties (7AB41F650F76BD44B5BCAB7C0CCABFAF22E7E58D)
Subject:
NRC PM Open Items List 9-13-11.docx Sent Date:
9/12/2011 9:38:18 AM Received Date:
9/12/2011 9:38:24 AM From:
Boyd, Desiree L Created By:
dlboyd@tva.gov Recipients:
"Arent, Gordon" <garent@tva.gov>
Tracking Status: None "Smith, James D" <jdsmith@tva.gov>
Tracking Status: None "Bryan, Robert H Jr" <rhbryan@tva.gov>
Tracking Status: None "Smith, James D" <smith1jd@westinghouse.com>
Tracking Status: None "Crouch, William D" <wdcrouch@tva.gov>
Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov>
Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov>
Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov>
Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov>
Tracking Status: None Post Office:
TVANUCXVS2.main.tva.gov Files Size Date & Time MESSAGE 244 9/12/2011 9:38:24 AM NRC PM Open Items List 9-13-11.docx 31574 Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received:
Page 1 of 3 NRC PM Open Items List 9/13/11 (423) 751-7777 ID 4233652004#
No.
Description Status Additional Comments Resp Org/Person
- 1.
Cyber Security Plan/Controls and Implementation NRC TI issued TBD NRC Table Top/Pilot Oct 2011 Procedures complete 9/30/11 Pre-inspection TBD Inspection Dec 2011 NRC Inspection in 2011 To be discussed at the next ACRS meeting (October 5th - closed portion).
Set up follow-up meeting 9/20 or 9/21 Heinrich/Snyder (Bryan)
- 2.
Instrumentation RAI List (Knuettel)
- 1. Item 3 for GA-ESI RM-1000 RAD Monitors.
- 2. GA proprietary, non-proprietary and affidavits for withholding submittals
(~12 documents.)
- 3. NRC comments on procedures to GA-ESI
- 4. RM1000 EMI/RFI questions
- 5. Submit non-prop/affidavits
- 1. 9/23/11
- 2. Various -
see status
- 3. 9/26/11
- 4. 10/1/11
- 5. 11/30/11 RAI Responses
- Item 1 GA/ESI is preparing a report to document the conformance of their CGD program to NRC requirements based on NRC telecom on 8/30/11.
Item 2 - 04038903-1SP - Prop due 9/30/11 04038903-2SP - Prop due 10/6/11 04038903-4SP - Prop due 10/21/11 04038903-QSR - Prop due 9/30/11 Item 3 OP-7.3-240 - Prop due 9/26/11
- Item 4 Create new bridge document 04038800-1SP - Prop due 10/1/11 Eng/Hilmes (Smith)
- 3.
Verify MACCs values for SAMA Cost Benefit Evaluation
- 1. 9/8/11A
- 2. 9/13/11
- 3. 9/20/11
- 1. Non-conservatisms in some values identified.
Discuss updated results with NRC
- 2. Submitted revised tables
- 3. Submit revised RAI responses ENG/Koontz
Page 2 of 3 No.
Description Status Additional Comments Resp Org/Person
- 4.
Exemption to 10CFR50.49 for some Category II cables 9/23/11 Hilmes (Stockton)
- 5.
Complete Implementation (Hemmer)
Pump Relocation 5/30/12 Bldg Plan 9/23/11 Inspection -
June 2012 Phase I commitments 10/1/11 Additional clarification to Phase I actions will be needed. Fleet wide issue.
Substantial building to complete and equipment in May.
Provide document of mitigating equipment and location for unit 2.
Hemmer (Smith)
- 6.
Chapter 15.5 RAIs 9/21/11 Includes FHA calc. X/Q discussion for each accident, corrections to previously submitted dose calcs, and a complete 15.5 markup. Potential meeting following submittal. Look at splitting submittal up.
Wastrack (Bryan)
- 7.
Fire Protection Report Questions regarding OMA
- 1. 10/24-28/11 2.9/30/11 3.10/1/11
- 4. 11/4/11
- 5. 11/30/11
- 1. Audit
- 2. Group 7 RAI response
- 3. Receive Group 8 RAIs
- 4. Response to Group 8
- 5. Submit As-designed U1/U2 FPR ENG/Hilmes (Crouch)
- 8.
Tech Spec Revisions from latest T/S markup and NRC Review comments
- 1. Oct, 2011
- 2. Sept, 2011
- 3. Oct, 2011
- 4. TBD
- 1. CSST A & B - discretionary
- 2. I-131 DEI
- 3. Diesel Generator Frequency
- 9.
ACRS Topics 10/5/11 Cyber, Chapter 15 except dose, Chapter 4 (Fuels),
WINCISE, Hydrology, process for FSAR drawing documentation update, Gordon
- 10.
SSER 22/23/24 Open Items Response 9/16/11 9/16 is the target date for the next SSER update. The expanded HH list and status is covered periodically.
Licensing
- 11.
Transient Analysis issues Boron dilution RAI response 9/16/11 Question on RG revision and modes 3, 4, & 5. TVA to provide write up explaining NRC acceptance (CLB) of unit1 for modes 3, 4, & 5.
ENG/Koontz WEC/Morgan
Page 3 of 3 No.
Description Status Additional Comments Resp Org/Person
- 12.
FSAR A106 9/16/11 Target date. Correction - change note 17 of Table 7.1.1 to Reg Guide 1.152 R 3 instead of R 2 Lic/Stockton
- 13.
Develop list of planned License Conditions, Exemptions and Relief Requests (Crouch)
- 1. 11/1/11
- 2. TBD
- 1. Review Unit 1 SER for exemptions. Sand baskets, cyber security, physical security, PAD 4.0
- 2. NRR to review current exemptions NRR/TVA (Bryan)
- 14.
Verify Tech Spec Setpoints match calcs TS certification
- 1. 10/4/11
- 2. TBD
- 1. 6 SSDs remaining to be issued. Possible submittal if any number changes.
- 2. TS certification Eng/Hilmes (Bryan)
- 15.
Issue two Unit Offsite Dose Calculation Manual (Beach) Review TS Chapter 5 programs also 3/1/12 Determine actual need date Chemistry/
Woods (Bryan)
- 16.
Issue Unit 2 Completion Letter (Crouch) 8/1/12 Licensing
- 17.
Submit final as-constructed FSAR figures 7/1/12 Licensing/
Stockton
- 18.
TMI action items 7/1/12 TVA to provide letter when TMI actions are field complete.
Licensing (Gordon)
- 19.
ASME N-801 & N-802 code cases March 2012`
NRC response to relief request submitted 9/1/11.
- 0.
Discretionary Actions
- 1.
Letter to terminate Part 30/40 License after receipt of Part 50 License 4/1/12 Licensing (Crouch)
- 2.
Combined U1/U2 FSAR (Stockton) 3/1/13 Licensing
- 3.
Status of GSI 199 Eastern Seismicity (Crouch)
Fall 2011 No action pending upcoming Generic Letter Related information on GSI 194 may need input TVA/NRR
- 4.
Letter to notify NRC when Vital Area Boundary returned to original location 12/1/11 Security Plan Update - Boundary to be restored by 9/30/11 Lic/Crouch
- 5.
IEB 88-02 SG Tube Cracking TBD Tubes are assumed locked in the WEC analysis.
Waiting for NRC concurrence.
Corp SG/
Webber ISI/Tinley