ML16117A182: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML16117A182
| number = ML16117A182
| issue date = 04/22/2016
| issue date = 04/22/2016
| title = Davis-Besse Nuclear Power Station, Unit 1 - Industry Slides for the Spring 2016 Conference Call Regarding the Steam Generator Tube Inservice Inspections (CAC No. Mf7398)
| title = Davis-Besse Nuclear Power Station, Unit 1 - Industry Slides for the Spring 2016 Conference Call Regarding the Steam Generator Tube Inservice Inspections (CAC No. MF7398)
| author name = Huynh A
| author name = Huynh A
| author affiliation = NRC/NRR/DE/ESGB
| author affiliation = NRC/NRR/DE/ESGB
Line 13: Line 13:
| document type = Slides and Viewgraphs
| document type = Slides and Viewgraphs
| page count = 8
| page count = 8
| revision = 0
}}
}}

Revision as of 07:23, 27 February 2018

Davis-Besse Nuclear Power Station, Unit 1 - Industry Slides for the Spring 2016 Conference Call Regarding the Steam Generator Tube Inservice Inspections (CAC No. MF7398)
ML16117A182
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 04/22/2016
From: Alan Huynh
Steam Generator Tube Integrity and Chemical Engineering Branch
To:
AHuynh, NRR/DE/ESGB, 415-1137
References
CAC MF7398
Download: ML16117A182 (8)