IR 05000321/2021402: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 24: Line 24:


==Dear Mr. McGavin:==
==Dear Mr. McGavin:==
On November 18, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Edwin I. Hatch Nuclear Plant Units 1 and 2. On November 19, 2021, the NRC inspectors discussed the results of this inspection with you and other members of your staff.
On November 18, 2021, the U.S. Nuclear Regulatory Commission (N RC) completed an inspection at Edwin I. Hatch Nuclear Plant Units 1 and 2. On No vember 19, 2021, the NRC inspectors discussed the results of this inspection with you an d other members of your staff.


The results of this inspection are documented in the enclosed report.
The results of this inspection are documented in the enclosed r eport.


No findings or violations of more than minor significance were identified during this inspection.
No findings or violations of more than minor significance were identified during this inspection.
Line 34: Line 34:
Sincerely,
Sincerely,
/RA/
/RA/
Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 05000321 and 05000366 License Nos. DPR-57 and NPF-5
 
Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety
 
Docket Nos. 05000321 and 05000366 License Nos. DPR-57 and NPF-5


===Enclosure:===
===Enclosure:===
Line 40: Line 43:


==Inspection Report==
==Inspection Report==
Docket Numbers: 05000321 and 05000366 License Numbers: DPR-57 and NPF-5 Report Numbers: 05000321/2021402 and 05000366/2021402 Enterprise Identifier: I-2021-402-0021 Licensee:  Southern Nuclear Operating Company, Inc.
Docket Numbers: 05000321 and 05000366


Facility: Edwin I. Hatch Nuclear Plant Units 1 and 2 Location: Baxley, GA Inspection Dates: August 23-26, 2021 (Southern Company Corporate Office)
License Numbers: DPR-57 and NPF-5
 
Report Numbers: 05000321/2021402 and 05000366/2021402
 
Enterprise Identifier: I-2021-402-0021
 
Licensee: Southern Nuclear Operating Company, Inc.
 
Facility: Edwin I. Hatch Nuclear Plant Units 1 and 2
 
Location: Baxley, GA
 
Inspection Dates: August 23-26, 2021 (Southern Company Corporat e Office)
November 15-18, 2021 (Hatch Nuclear Plant)
November 15-18, 2021 (Hatch Nuclear Plant)
Inspectors: R. Patterson, Physical Security Inspector A. Richardson, Physical Security Inspector Approved By: Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety Enclosure
 
Inspectors: R. Patterson, Physical Security Inspector A. Richardson, Physical Security Inspector
 
Approved By: Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety
 
Enclosure


=SUMMARY=
=SUMMARY=
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at EDWIN I. HATCH NUCLEAR PLANT UNITS 1 AND 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
The U.S. Nuclear Regulatory Commission (NRC) continued monitori ng the licensees performance by conducting a security baseline inspection at EDW IN I. HATCH NUCLEAR PLANT UNITS 1 AND 2, in accordance with the Reactor Oversight P rocess. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.


===List of Findings and Violations===
===List of Findings and Violations===
No findings or violations of more than minor significance were identified.
No findings or violations of more than minor significance were identified.


Line 58: Line 77:
=INSPECTION SCOPES=
=INSPECTION SCOPES=


Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
Inspections were conducted using the appropriate portions of th e inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise note d. Currently approved IPs with their attached revision histories are located on the public web site at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspe ction activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed sel ected procedures and records, observed activities, and interviewed personnel to asse ss licensee performance and compliance with Commission rules and regulations, license condi tions, site procedures, and standards.


==SAFEGUARDS==
==SAFEGUARDS==
==71130.01 - Access Authorization==
==71130.01 - Access Authorization==
The inspectors evaluated the access authorization program. The following elements were


The inspectors evaluated the access authorization program. The following elements were evaluated:
===evaluated:
 
Access Authorization===
===Access Authorization===
{{IP sample|IP=IP 71130.01|count=1}}
{{IP sample|IP=IP 71130.01|count=1}}
: (1) Tier I: All Requirements Tier II: ( 02.05 a, b, 02.07 a, b, 02.08 a, c)
: (1) Tier I: All Requirements Tier II: ( 02.05 a, b, 02.07 a, b, 02.08 a, c)
Tier III: ( 02.09, 02.10 a-c)
Tier III: ( 02.09, 02.10 a-c)
==71130.08 - Fitness For Duty Program==
==71130.08 - Fitness For Duty Program==
The inspectors evaluated the fitness for duty program by comple ting the following inspection


The inspectors evaluated the fitness for duty program by completing the following inspection
===elements:
 
Fitness For Duty Program===
===elements: Fitness For Duty Program===
{{IP sample|IP=IP 71130.08|count=1}}
{{IP sample|IP=IP 71130.08|count=1}}


    (1)
(1)
* Tier I: All Requirements
* Tier I: All Requirements
* Tier II: ( 02.05 a-h, 02.06 a-g, 02.07 a-e, 02.08 a, b, 02.09 a-e)
* Tier II: ( 02.05 a-h, 02.06 a-g, 02.07 a-e, 02.08 a, b, 02.09 a-e)
Line 86: Line 106:
==EXIT MEETINGS AND DEBRIEFS==
==EXIT MEETINGS AND DEBRIEFS==
The inspectors verified no proprietary information was retained or documented in this report.
The inspectors verified no proprietary information was retained or documented in this report.
* On November 19, 2021, the inspectors presented the security baseline inspection results to Steven McGavin and other members of the licensee staff.
* On November 19, 2021, the inspectors presented the security ba seline inspection results to Steven McGavin and other members of the licensee sta ff.


=DOCUMENTS REVIEWED=
=DOCUMENTS REVIEWED=


Inspection Type           Designation Description or Title             Revision
Inspection Type Designation Description or Title Revision
Procedure                                                               or Date
Procedure or Date
71130.01   Corrective     10606809
71130.01 Corrective 10606809
Action         10640289
Action 10640289
Documents     21-50083075
Documents 21-50083075
Corrective     10822941
Corrective 10822941
Action
Action
Documents
Documents
Resulting from
Resulting from
Inspection
Inspection
Procedures     AA-002       Access Authorization Program     Version
Procedures AA-002 Access Authorization Program Version
8.0
8.0
AA-003       Adjudication of Derogatory       Version
AA-003 Adjudication of Derogatory Version
Information and Appeal Process   4.2
Information and Appeal Process 4.2
AA-006       Access Authorization Confidential Version
AA-006 Access Authorization Confidential Version
Information Processing           3.1
Information Processing 3.1
Procedure
Procedure
AA-008       Access Authorization Personnel   Version
AA-008 Access Authorization Personnel Version
Access Data System (PADs)         2.1
Access Data System (PADs) 2.1
Procedure
Procedure
NMP-AD-005   Insider Mitigation Program (IMP) Version
NMP-AD-005 Insider Mitigation Program (IMP) Version
Access Authorization             9.2
Access Authorization 9.2
NMP-AD-016   Fatigue Management Program       Version
NMP-AD-016 Fatigue Management Program Version
10.2
10.2
NMP-SE-023   Personnel Authorization an       Version
NMP-SE-023 Personnel Authorization an Version
Badging Program                   4.0
Badging Program 4.0
Self-         NMP-GM-     Check-In Self-Assessment (CISA)   Version
Self-NMP-GM-Check-In Self-Assessment (CISA) Version
Assessments   003-F18     Plan and Report                   3.0
Assessments 003-F18 Plan and Report 3.0
71130.08   Corrective     15-10593933
71130.08 Corrective 15-10593933
Action         15-10594136
Action 15-10594136
Documents     15-10594140
Documents 15-10594140
15-10594144
15-10594144
15-10594148
15-10594148
Line 136: Line 156:
21-50092463
21-50092463
21-50101177
21-50101177
Procedures     720-001     SNC Corporate Policy- Fitness-   January
Procedures 720-001 SNC Corporate Policy-Fitness-January
Inspection Type       Designation Description or Title               Revision
 
Procedure                                                               or Date
Inspection Type Designation Description or Title Revision
For-Duty                           24, 2017
Procedure or Date
MS-FFD-001   Fitness-for-Duty Standard           Version 8
For-Duty 24, 2017
MS-FFD-001 Fitness-for-Duty Standard Version 8
Operating and Collection
Operating and Collection
Procedure
Procedure
MS-FFD-003   Intoxilyzer Operations             Version
MS-FFD-003 Intoxilyzer Operations Version
3.1
3.1
MS-FFD-004   Random Selection and               Version
MS-FFD-004 Random Selection and Version
Verification Procedure             4.0
Verification Procedure 4.0
MS-FFD-005   Medical Review Officer             Version
MS-FFD-005 Medical Review Officer Version
7.0
7.0
MS-FFD-006   Follow-up Testing                   Version
MS-FFD-006 Follow-up Testing Version
4.1
4.1
MS-FFD-007   Blind Performance Test/Quality     Version
MS-FFD-007 Blind Performance Test/Quality Version
Control                             5.0
Control 5.0
MS-FFD-008   FFD Records                         Version
MS-FFD-008 FFD Records Version
3.2
3.2
MS-FFD-009   Contractor Review and Screening     Version
MS-FFD-009 Contractor Review and Screening Version
Procedure                           2.0
Procedure 2.0
MS-FFD-010   Interface and Reporting             Version
MS-FFD-010 Interface and Reporting Version
4.1
4.1
MS-FFD-011   Training and Qualification of       Version
MS-FFD-011 Training and Qualification of Version
Fitness for Duty Personnel         6.0
Fitness for Duty Personnel 6.0
MS-FFD-012   Testing for Other Legal and Illegal Vesrion
MS-FFD-012 Testing for Other Legal and Illegal Vesrion
Substances                         3.1
Substances 3.1
MS-FFD-013   Security of FFD Centers and         Version
MS-FFD-013 Security of FFD Centers and Version
Medical Facilities                 3.2
Medical Facilities 3.2
MS-FFD-014   Call-ins to Perform Unscheduled     Version
MS-FFD-014 Call-ins to Perform Unscheduled Version
Work                               2.1
Work 2.1
MS-FFD-015   Determination of Fitness           Version
MS-FFD-015 Determination of Fitness Version
Evaluation and Process             4.4
Evaluation and Process 4.4
Self-                   Fleet MF/MRO 2019 Nuclear           April 9,
Self-Fleet MF/MRO 2019 Nuclear April 9,
Assessments             Oversight (NOS) Managing           2019
Assessments Oversight (NOS) Managing 2019
Fatigue/Medical Review Officer
Fatigue/Medical Review Officer
Audit
Audit
5
5
}}
}}

Latest revision as of 03:41, 19 November 2024

Security Baseline Inspection Report 05000321/2021402 and 05000366/2021402
ML21341A614
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 12/06/2021
From: Jannette Worosilo
Division of Reactor Safety II
To: Mcgavin S
Southern Nuclear Operating Co
References
IR 2021402
Download: ML21341A614 (7)


Text

December 6, 2021

SUBJECT:

EDWIN I. HATCH NUCLEAR PLANT UNITS 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000321/2021402 AND 05000366/2021402

Dear Mr. McGavin:

On November 18, 2021, the U.S. Nuclear Regulatory Commission (N RC) completed an inspection at Edwin I. Hatch Nuclear Plant Units 1 and 2. On No vember 19, 2021, the NRC inspectors discussed the results of this inspection with you an d other members of your staff.

The results of this inspection are documented in the enclosed r eport.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety

Docket Nos. 05000321 and 05000366 License Nos. DPR-57 and NPF-5

Enclosure:

As stated

Inspection Report

Docket Numbers: 05000321 and 05000366

License Numbers: DPR-57 and NPF-5

Report Numbers: 05000321/2021402 and 05000366/2021402

Enterprise Identifier: I-2021-402-0021

Licensee: Southern Nuclear Operating Company, Inc.

Facility: Edwin I. Hatch Nuclear Plant Units 1 and 2

Location: Baxley, GA

Inspection Dates: August 23-26, 2021 (Southern Company Corporat e Office)

November 15-18, 2021 (Hatch Nuclear Plant)

Inspectors: R. Patterson, Physical Security Inspector A. Richardson, Physical Security Inspector

Approved By: Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety

Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitori ng the licensees performance by conducting a security baseline inspection at EDW IN I. HATCH NUCLEAR PLANT UNITS 1 AND 2, in accordance with the Reactor Oversight P rocess. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of th e inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise note d. Currently approved IPs with their attached revision histories are located on the public web site at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspe ction activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed sel ected procedures and records, observed activities, and interviewed personnel to asse ss licensee performance and compliance with Commission rules and regulations, license condi tions, site procedures, and standards.

SAFEGUARDS

71130.01 - Access Authorization

The inspectors evaluated the access authorization program. The following elements were

===evaluated:

Access Authorization===

(1) Tier I: All Requirements Tier II: ( 02.05 a, b, 02.07 a, b, 02.08 a, c)

Tier III: ( 02.09, 02.10 a-c)

71130.08 - Fitness For Duty Program

The inspectors evaluated the fitness for duty program by comple ting the following inspection

===elements:

Fitness For Duty Program===

(1)

  • Tier I: All Requirements
  • Tier II: ( 02.05 a-h, 02.06 a-g, 02.07 a-e, 02.08 a, b, 02.09 a-e)
  • Tier III: ( 02.10, 02.11 a, 02.12 a, 02.13 a-d, 02.14 a-c)

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On November 19, 2021, the inspectors presented the security ba seline inspection results to Steven McGavin and other members of the licensee sta ff.

DOCUMENTS REVIEWED

Inspection Type Designation Description or Title Revision

Procedure or Date

71130.01 Corrective 10606809

Action 10640289

Documents 21-50083075

Corrective 10822941

Action

Documents

Resulting from

Inspection

Procedures AA-002 Access Authorization Program Version

8.0

AA-003 Adjudication of Derogatory Version

Information and Appeal Process 4.2

AA-006 Access Authorization Confidential Version

Information Processing 3.1

Procedure

AA-008 Access Authorization Personnel Version

Access Data System (PADs) 2.1

Procedure

NMP-AD-005 Insider Mitigation Program (IMP) Version

Access Authorization 9.2

NMP-AD-016 Fatigue Management Program Version

10.2

NMP-SE-023 Personnel Authorization an Version

Badging Program 4.0

Self-NMP-GM-Check-In Self-Assessment (CISA) Version

Assessments 003-F18 Plan and Report 3.0

71130.08 Corrective 15-10593933

Action 15-10594136

Documents 15-10594140

15-10594144

15-10594148

19-10591520

19-10593807

19-10595571

19-10599479

19-10599486

21-10784272

21-10789235

21-50063923

21-50063927

21-50063933

21-50063935

21-50092463

21-50101177

Procedures 720-001 SNC Corporate Policy-Fitness-January

Inspection Type Designation Description or Title Revision

Procedure or Date

For-Duty 24, 2017

MS-FFD-001 Fitness-for-Duty Standard Version 8

Operating and Collection

Procedure

MS-FFD-003 Intoxilyzer Operations Version

3.1

MS-FFD-004 Random Selection and Version

Verification Procedure 4.0

MS-FFD-005 Medical Review Officer Version

7.0

MS-FFD-006 Follow-up Testing Version

4.1

MS-FFD-007 Blind Performance Test/Quality Version

Control 5.0

MS-FFD-008 FFD Records Version

3.2

MS-FFD-009 Contractor Review and Screening Version

Procedure 2.0

MS-FFD-010 Interface and Reporting Version

4.1

MS-FFD-011 Training and Qualification of Version

Fitness for Duty Personnel 6.0

MS-FFD-012 Testing for Other Legal and Illegal Vesrion

Substances 3.1

MS-FFD-013 Security of FFD Centers and Version

Medical Facilities 3.2

MS-FFD-014 Call-ins to Perform Unscheduled Version

Work 2.1

MS-FFD-015 Determination of Fitness Version

Evaluation and Process 4.4

Self-Fleet MF/MRO 2019 Nuclear April 9,

Assessments Oversight (NOS) Managing 2019

Fatigue/Medical Review Officer

Audit

5