{{#Wiki_filter:Watts Bar Nuclear Plant Watts Bar Nuclear Plant (WBN)
{{#Wiki_filter:Watts Bar Nuclear Plant
Pre-submittal Meeting for Expedited License Amendment Request Main Control Room (MCR) Chiller Completion Time Extension February 15, 2023


Agenda
Watts Bar Nuclear Plant (WBN)
Pre-submittal Meeting for Expedited License Amendment Request Main Control Room (MCR) Chiller Completion Time Extension
 
February 15, 2023 Agenda
* Introduction
* Introduction
* Background
* Background
Line 28: Line 30:
* Revised MCR Chiller Replacement Schedule
* Revised MCR Chiller Replacement Schedule
* Proposed Technical Specification Changes
* Proposed Technical Specification Changes
* Changes to MCR Temporary Chilled Water Equipment Description
* Changes to MCR TDescription emporary Chilled Water Equipment
* Schedule Milestones
* Schedule Milestones
* Closing Remarks 2
* Closing Remarks


Introduction
2 Introduction
* The purpose of this meeting is to discuss a proposed expedited license amendment request (LAR) for WBN Units 1 and 2.
* The purpose of this meeting is to discuss a proposed expedited license amendment request (LAR) for WBN Units 1 and 2.
* TVA is requesting an expedited license amendment for a revision to the one-time footnotes to WBN Units 1 and 2 Technical Specification (TS) 3.7.11, Control Room Emergency Air Temperature Control System (CREATCS), Required Actions A.1 and E.1 to reflect a change in the scheduling dates for the CREATCS chillers [main control room chillers (MCR) A and B].
* TVA is requesting an expedited license amendment for a revision to the one-time footnotes to WBN Units 1 and 2 Technical Specification (TS) 3.7.11, Control Room Emergency Air Temperature Control System (CREATCS), Required Actions A.1 and E.1 to reflect a change in the scheduling dates for the CREATCS chillers [main control room chillers (MCR) A and B].
* There are no technical changes or changes to the TS compensatory measures associated with the proposed amendment.
* There are no technical changes or changes to the TS compensatory measures associated with the proposed amendment.
* The proposed change is due to delays in the vendor delivery of the MCR CREATCS chillers, which were beyond the control of TVA.
* The proposed change is due to delays in the vendor delivery of the MCR CREATCS chillers, which were beyond the control of TVA.
l 3
l 3


===Background===
===Background===
* 5/19/2020 - TVA submits the LAR to modify the WBN Units 1 and TS for MCR completion time extension (ML20140A342). LAR includes technical information on the MCR CREATCS replacement project including the temporary chilled water system to be utilized during the MCR CREATCS replacement project.
* 5/19/2020 - TVA submits the LAR to modify the WBN Units 1 and TS for MCR completion time extension (ML20140A342). LAR includes technical information on the MCR CREATCS replacement project including the temporary chilled water system to be utilized during the MCR CREATCS replacement project.
* 9/2/2020-10/1/2020 - NRC conducts an audit of the LAR (ML21012A084)
* 9/2/2020- 10/1/2020 - NRC conducts an audit of the LAR (ML21012A084)
* 12/16/2020 - TVA responds to NRC RAI (ML20351A424)
* 12/16/2020 - TVA responds to NRC RAI (ML20351A424)
* 5/5/2021 - NRC approves the LAR (ML21078A484) l 4
* 5/5/2021 - NRC approves the LAR (ML21078A484)


Current TS Requirements Units 1 and 2 - TS 3.7.11 Footnote for Action A.1 l 5
l 4 Current TS Requirements Units 1 and 2 - TS 3.7.11 Footnote for Action A.1


Current TS Requirements Units 1 and 2 - TS 3.7.11 Footnote for Action E.1 l 6
l 5 Current TS Requirements Units 1 and 2 - TS 3.7.11 Footnote for Action E.1


Reason for the Proposed Change
l 6 Reason for the Proposed Change
* Due to unforeseen supplier chain issues, TVA is unable to meet the current TS date range of May 1, 2022, to May 1, 2023, for the MCR chiller replacement as required by the existing footnotes to the Completion Time for WBN Units 1 and 2 TS 3.7.11, Required Actions A.1 and E.1.
* Due to unforeseen supplier chain issues, TVA is unable to meet the current TS date range of May 1, 2022, to May 1, 2023, for the MCR chiller replacement as required by the existing footnotes to the Completion Time for WBN Units 1 and 2 TS 3.7.11, Required Actions A.1 and E.1.
* As shown in Table 1, the new MCR chillers have not yet been received and are not scheduled to commence installation until the third quarter 2023.
* As shown in Table 1, the new MCR chillers have not yet been received and are not scheduled to commence installation until the third quarter 2023.
* TVA has received confirmation from the supplier vendor that they can currently meet the delivery dates for the MCR chillers.
* TVA has received confirmation from the supplier vendor that they can currently meet the delivery dates for the MCR chillers.
l 7


Revised MCR Chiller Replacement Schedule Table 1 Revised WBN MCR Chiller Replacement Timeline Activity                                          Date U1R18 Outage                                                    4/14/2023-5/13/2023 Qualification of MCR Chillers                                        4/28/2023 New MCR B Chiller at WBN                                              5/3/2023 New MCR A Chiller at WBN                                              5/9/2023 Replace existing MCR B chiller                                7/17/2023 - 8/24/2023 U2R5 Outage                                                  11/03/2023 - 12/02/2023 Replace existing MCR A chiller                                1/29/2024 - 3/24/2024 U1R19 Outage                                                  11/1/2024-12/13/2024 l 8
l 7 Revised MCR Chiller Replacement Schedule
 
Table 1 Revised WBN MCR Chiller Replacement Timeline


Proposed TS Changes
Activity Date U1R18 Outage 4/14/2023-5/13/2023 Qualification of MCR Chillers 4/28/2023 New MCR B Chiller at WBN 5/3/2023 New MCR A Chiller at WBN 5/9/2023 Replace existing MCR B chiller 7/17/2023 - 8/24/2023 U2R5 Outage 11/03/2023 - 12/02/2023 Replace existing MCR A chiller 1/29/2024 - 3/24/2024 U1R19 Outage 11/1/2024-12/13/2024
 
l 8 Proposed TS Changes
* Revise the current start and end dates in the footnotes to TS 3.7.11, Required Actions A.1 and E.1 to July 1, 2023, to December 31, 2024, respectively (provides a margin for any potential further schedule delays).
* Revise the current start and end dates in the footnotes to TS 3.7.11, Required Actions A.1 and E.1 to July 1, 2023, to December 31, 2024, respectively (provides a margin for any potential further schedule delays).
Reflects the current MCR replacement schedule (allowing for margin for any potential further schedule delays).
Reflects the current MCR replacement schedule (allowing for margin for any potential further schedule delays).
Requires expedited NRC review and approval of the LAR because NRC approval would be required no later than June 15, 2023 (allowing 15 days for implementation).
Requires expedited NRC review and approval of the LAR because NRC approval would be required no later than June 15, 2023 (allowing 15 days for implementation).
l 9


Proposed Technical Specification Change Units 1 and 2 - TS 3.7.11 Footnote for Action A.1 l 10 PLACE THE TITLE OF THE PRESENTATION HERE
l 9 Proposed Technical Specification Change


Proposed Technical Specification Change Units 1 and 2 - TS 3.7.11 Footnote for Action E.1 l 11 PLACE THE TITLE OF THE PRESENTATION HERE
Units 1 and 2 - TS 3.7.11 Footnote for Action A.1


Changes to MCR Temporary Chilled Water Equipment Description
l 10 PLACE THE TITLE OF THE PRESENTATION HERE Proposed Technical Specification Change
 
Units 1 and 2 - TS 3.7.11 Footnote for Action E.1
 
l 11 PLACE THE TITLE OF THE PRESENTATION HERE Changes to MCR Temporary Chilled Water Equipment Description
* There are no technical changes to the replacement planned MCR CREATCS chillers as described in the previous LAR (ML20140A342) and the NRC safety Evaluation (SE) (ML21078A484).
* There are no technical changes to the replacement planned MCR CREATCS chillers as described in the previous LAR (ML20140A342) and the NRC safety Evaluation (SE) (ML21078A484).
* Differences between the currently planned MCR temporary chiller equipment description and the MCR temporary chiller equipment description in Section 3.1 to the previous LAR and the NRC Regulatory Audit Summary (ML21012A084) are provided in Tables 2 and 3, respectively. There are no changes to the MCR temporary chiller equipment description in the previous TVA RAI response (ML20351A424).
* Differences between the currently planned MCR temporary chiller equipment description and the MCR temporary chiller equipment description in Section 3.1 to the previous LAR and the NRC Regulatory Audit Summary (ML21012A084) are provided in Tables 2 and 3, respectively. There are no changes to the MCR temporary chiller equipment description in the previous TVA RAI response (ML20351A424).
* The compensatory measures listed in the previous LAR and the NRC SE remain unchanged.
* The compensatory measures listed in the previous LAR and the NRC SE remain unchanged.
l 12


Table 2 Item No.             Description in LAR         Currently Planned Installation     Reason for Change         Significance 1 Page E6 of 24, paragraph 1 describes, The inlet and outlet piping will To allow more efficient This new configuration The chilled water piping inlet and   no longer be removed.           (less time) transition is functionally outlet to the AHUs is removed and     Permanent branch connections     between the temporary   equivalent to the replaced with temporary piping for the with isolation valves are being and permanent chillers configuration described temporary chiller system.             added via permanent             which will be           in the LAR and is modification to the inlet and   advantageous during     expected to benefit the outlet piping to the AHUs to     the post modification   project by reducing the allow connection of the         test (PMT) window and   time in the TS Required temporary chiller without       should reduce time in   Action Completion removal of piping.               the TS Required Action Time.
l 12 Table 2 Item No. Description in LAR Currently Planned Installation Reason for Change Significance 1 Page E6 of 24, paragraph 1 describes, The inlet and outlet piping will To allow more efficient This new configuration The chilled water piping inlet and no longer be removed. (less time) transition is functionally outlet to the AHUs is removed and Permanent branch connections between the temporary equivalent to the replaced with temporary piping for the with isolation valves are being and permanent chillers configuration described temporary chiller system. added via permanent which will be in the LAR and is modification to the inlet and advantageous during expected to benefit the outlet piping to the AHUs to the post modification project by reducing the allow connection of the test (PMT) window and time in the TS Required temporary chiller without should reduce time in Action Completion removal of piping. the TS Required Action Time.
Completion Time.
Completion Time.
2 Page E6 of 24, Section 3.2 describes   The temporary chiller           The temporary chiller   These items were major equipment and includes Chilled installation may have as many   installation includes   included for water Pump.                           as three pumps. Additionally,   multiple pumps to meet completeness of one major equipment item       necessary hydraulic     information.
2 Page E6 of 24, Section 3.2 describes The temporary chiller The temporary chiller These items were major equipment and includes Chilled installation may have as many installation includes included for water Pump. as three pumps. Additionally, multiple pumps to meet com pleteness of one major equipment item necessary hydraulic information.
that was not included in the     conditions. The LAR description is a transfer   temporary chiller switch, to allow transfer       installation includes a between plant power and the     transfer switch.
that was not included in the conditions. The LAR description is a transfer temporary chiller switch, to allow transfer installation includes a between plant power and the transfer switch.
diesel generator (DG) for the temporary chiller.
diesel generator (DG) for the temporary chiller.
l 13


Table 2 Item No.         Description in LAR             Currently Planned Installation       Reason for Change         Significance 3 Page E6 of 24, Section 3.2.1     The DG referred to in the LAR (a       Clarification on the   Both the rented refers to a 320kW DG. Section     rented Aggreko chiller) is rated at     rating of the Aggreko   Aggreko equipment 3.2.4 also refers to the 320kW   320kW at 50Hz. The rating of this       DG and to include       and the Carrier/CAT DG.                               DG is 300kW at 60Hz, which is           reference to the CAT   equipment have adequate for the temporary/rented       generator which the     adequate electrical and Aggreko chiller equipment. A           site has purchased,     cooling capacity to Caterpillar (CAT) generator and         along with a Carrier   meet the requirements Carrier chiller have also been         chiller.               for the temporary chiller purchased by the site to reduce                                 system.
l 13 Table 2 Item No. Description in LAR Currently Planned Installation Reason for Change Significance 3 Page E6 of 24, Section 3.2.1 The DG referred to in the LAR (a Clarification on the Both the rented refers to a 320kW DG. Section rented Aggreko chiller) is rated at rating of the Aggreko Aggreko equipment 3.2.4 also refers to the 320kW 320kW at 50Hz. The rating of this DG and to include and the Carrier/CAT DG. DG is 300kW at 60Hz, which is reference to the CAT equipment have adequate for the temporary/rented generator which the adequate electrical and Aggreko chiller equipment. A site has purchased, cooling capacity to Caterpillar (CAT) generator and along with a Carrier meet the requirements Carrier chiller have also been chiller. for the temporary chiller purchased by the site to reduce system.
reliance on rented equipment. The ratings (tons and kW) of the CAT/Carrier equipment exceed the ratings of the rented Aggreko equipment.
reliance on rented equipment. The ratings (tons and kW ) of the CAT/Carrier equipment exceed the ratings of the rented Aggreko equipment.
4 Page E6 of 24, Section 3.2.1,     Permanent branch connections have       To allow more efficient This new configuration second paragraph states,         been added to the AHU piping,           (less time) transition is functionally Connection to the AHU coils will Therefore, it is more accurate to state between the temporary   equivalent to the be made by isolating the chilled "Connection to the AHU coils is made   and permanent chillers configuration described water piping, removing the flex   via permanent flanged branch           which will be           in the LAR and is hoses between the AHU coils       connections with an isolation valve,   advantageous during     expected to benefit the and the chilled water piping and which were added as part of the         the PMT window and     project by reducing the then reconnecting the temporary   chiller replacement project             should reduce time in   time in the TS Required chilled water supply and return   subsequent to the submittal of the     the TS Required Action Action Completion hoses to the AHU coils using     LAR."                                   Completion Time.       Time.
4 Page E6 of 24, Section 3.2.1, Permanent branch connections have To allow more efficient This new configuration second paragraph states, been added to the AHU piping, (less time) transition is functionally Connection to the AHU coils will Therefore, it is more accurate to state between the temporary equivalent to the be made by isolating the chilled "Connection to the AHU coils is made and permanent chillers configuration described water piping, removing the flex via permanent flanged branch which will be in the LAR and is hoses between the AHU coils connections with an isolation valve, advantageous during expected to benefit the and the chilled water piping and which were added as part of the the PMT window and project by reducing the then reconnecting the temporary chiller replacement project should reduce time in time in the TS Required chilled water supply and return subsequent to the submittal of the the TS Required Action Action Completion hoses to the AHU coils using LAR." Completion Time. Time.
l 14 existing flange connections.
l 14 existing flange connections.
Table 2 Item No. Description in LAR Currently Planned Installation Reason for Change Significance 5 Page E7 of 24, Section 3.2.2 Hose sizes used in the temporary Final configuration to Larger hose sizes meet refers to 2.5 inch() diameter chilled water system are of various meet hydraulic hydraulic requirements supply and return hoses. sizes (3, 4 and 6) requirements. and offer less resistance compared to smaller hose sizes.


Table 2 Item No.          Description in LAR            Currently Planned Installation      Reason for Change          Significance 5 Page E7 of 24, Section 3.2.2      Hose sizes used in the temporary      Final configuration to Larger hose sizes meet refers to 2.5 inch() diameter    chilled water system are of various    meet hydraulic        hydraulic requirements supply and return hoses.          sizes (3, 4 and 6)                  requirements.          and offer less resistance compared to smaller hose sizes.
6 Page E7 of 24, Section 3.2.3 As noted in the NRC audit summary, Provide flexibility in Both locations are a states, The equipment "The two potential locations with chiller locations. similar distance (hose associated with the temporary respect to assumed plant north are run). Both locations chiller system will be located in (a) due west of the Auxiliary Building are also sufficiently the yard west of the Auxiliary or (b) northwest of the Unit 1 distant from the plant Building and in the Control Containment." air intakes.
6 Page E7 of 24, Section 3.2.3     As noted in the NRC audit summary,     Provide flexibility in Both locations are a states, The equipment           "The two potential locations with     chiller locations. similar distance (hose associated with the temporary     respect to assumed plant north are                           run). Both locations chiller system will be located in (a) due west of the Auxiliary Building                       are also sufficiently the yard west of the Auxiliary   or (b) northwest of the Unit 1                               distant from the plant Building and in the Control       Containment."                                                 air intakes.
Building (Elevation 729.0 feet).
Building (Elevation 729.0 feet).
l 15


Table 2 Item No.         Description in LAR         Currently Planned Installation     Reason for Change       Significance 7 Page E7 of 24, Section 3.2.3   This statement is intended to mean     Clarification.     Clarification.
l 15 Table 2 Item No. Description in LAR Currently Planned Installation Reason for Change Significance 7 Page E7 of 24, Section 3.2.3 This statement is intended to mean Clarification. Clarification.
states, the temporary chiller as required. The design package system will be protected from states that if the chiller is deployed freezing.                     during winter months, steps should be taken to avoid freezing (e.g.,
states, the temporary chiller as required. The design package system will be protected from states that if the chiller is deployed freezing. during winter months, steps should be taken to avoid freezing (e.g.,
draining lines when not in use, use of heat tape and insulation).
draining lines when not in use, use of heat tape and insulation).
l 16


Table 3 Item No. Description in NRC Audit Report       Currently Planned Installation     Reason for Change         Significance 1 Page 4 of 7 of the Audit Report   Permanent branch connections have   To allow more efficient This new configuration states, Connection to the AHU   been added to the AHU piping;       (less time) transition is functionally coils will be made by isolating   therefore, a current statement would between the temporary   equivalent to the the chilled water piping,         be, "Connection to the AHU coils is and permanent chillers configuration described removing the flex hoses between   made via permanent flanged branch   which will be           in the LAR and is the AHU coils and the chilled     connections with an isolation valve, advantageous during     expected to benefit the water piping and then             which were added as part of the     the PMT window and     project by reducing the reconnecting the temporary       chiller replacement project         should reduce time in   time in the TS Required chilled water supply and return   subsequent to the submittal of the   the TS Required Action Action Completion hoses to the AHU coils using     LAR."                               Completion Time.       Time.
l 16 Table 3 Item No. Description in NRC Audit Report Currently Planned Installation Reason for Change Significance 1 Page 4 of 7 of the Audit Report Permanent branch connections have To allow more efficient This new configuration states, Connection to the AHU been added to the AHU piping; (less time) transition is functionally coils will be made by isolating therefore, a current statement would between the temporary equivalent to the the chilled water piping, be, "Connection to the AHU coils is and permanent chillers configuration described removing the flex hoses between made via permanent flanged branch which will be in the LAR and is the AHU coils and the chilled connections with an isolation valve, advantageous during expected to benefit the water piping and then which were added as part of the the PMT window and project by reducing the reconnecting the temporary chiller replacement project should reduce time in time in the TS Required chilled water supply and return subsequent to the submittal of the the TS Required Action Action Completion hoses to the AHU coils using LAR." Completion Time. Time.
existing flange connections.
existing flange connections.
2 Page 5 of 7 of the Audit Report   The CAT DG has a 300 gallon tank,   To reflect the capacity The run time for the states, The temporary chiller   which provides a 24-hour run time   of the CAT DG which     CAT DG is longer than skid DG fuel oil tanks capacity which is conservative compared to   would be used with the the run time for the provides a 12-hour run time for   the value cited here.               Carrier chiller.       Aggreko DG, which is the chiller skid without fuel oil                                                             conservative to what is replenishment, which allows the                                                               described in the Audit licensee time for replenishing                                                                 Report.
2 Page 5 of 7 of the Audit Report The CAT DG has a 300 gallon tank, To reflect the capacity The run time for the states, The temporary chiller which provides a 24-hour run time of the CAT DG which CAT DG is longer than skid DG fuel oil tanks capacity which is conservative compared to would be used with the the run time for the provides a 12-hour run time for the value cited here.Carrier chiller.Aggreko DG, which is the chiller skid without fuel oil conservative to what is replenishment, which allows the described in the Audit licensee time for replenishing Report.
measures.
measures.
l 17


Schedule Milestones
l 17 Schedule Milestones
* TVA to submit LAR to NRC by February 28, 2023.
* TVA to submit LAR to NRC by February 28, 2023.
* Request expedited NRC approval by June 15, 2023.
* Request expedited NRC approval by June 15, 2023.
* 15-day implementation following NRC approval.
* 15-day implementation following NRC approval.
l 18}}
l 18}}

Latest revision as of 08:28, 15 November 2024

February 15, 2023 Pre-submittal Meeting for Expedited License Amendment Request Main Control Room (MCR) Chiller Completion Time Extension (EPID L-2022-LRM-0098) (Slides)
ML23041A356
Person / Time
Site: Watts Bar  Tennessee Valley Authority icon.png
Issue date: 02/15/2023
From:
Tennessee Valley Authority
To: Kimberly Green
NRC/NRR/DORL/LPL2-2
Green K
References
EPID L-2022-LRM-0098
Download: ML23041A356 (1)


Text

Watts Bar Nuclear Plant

Watts Bar Nuclear Plant (WBN)

Pre-submittal Meeting for Expedited License Amendment Request Main Control Room (MCR) Chiller Completion Time Extension

February 15, 2023 Agenda

  • Introduction
  • Background
  • Current Technical Specification (TS) Requirements
  • Reason for the Proposed Change
  • Revised MCR Chiller Replacement Schedule
  • Proposed Technical Specification Changes
  • Changes to MCR TDescription emporary Chilled Water Equipment
  • Schedule Milestones
  • Closing Remarks

2 Introduction

  • The purpose of this meeting is to discuss a proposed expedited license amendment request (LAR) for WBN Units 1 and 2.
  • There are no technical changes or changes to the TS compensatory measures associated with the proposed amendment.
  • The proposed change is due to delays in the vendor delivery of the MCR CREATCS chillers, which were beyond the control of TVA.

l 3

Background

  • 5/19/2020 - TVA submits the LAR to modify the WBN Units 1 and TS for MCR completion time extension (ML20140A342). LAR includes technical information on the MCR CREATCS replacement project including the temporary chilled water system to be utilized during the MCR CREATCS replacement project.

l 4 Current TS Requirements Units 1 and 2 - TS 3.7.11 Footnote for Action A.1

l 5 Current TS Requirements Units 1 and 2 - TS 3.7.11 Footnote for Action E.1

l 6 Reason for the Proposed Change

  • Due to unforeseen supplier chain issues, TVA is unable to meet the current TS date range of May 1, 2022, to May 1, 2023, for the MCR chiller replacement as required by the existing footnotes to the Completion Time for WBN Units 1 and 2 TS 3.7.11, Required Actions A.1 and E.1.
  • As shown in Table 1, the new MCR chillers have not yet been received and are not scheduled to commence installation until the third quarter 2023.
  • TVA has received confirmation from the supplier vendor that they can currently meet the delivery dates for the MCR chillers.

l 7 Revised MCR Chiller Replacement Schedule

Table 1 Revised WBN MCR Chiller Replacement Timeline

Activity Date U1R18 Outage 4/14/2023-5/13/2023 Qualification of MCR Chillers 4/28/2023 New MCR B Chiller at WBN 5/3/2023 New MCR A Chiller at WBN 5/9/2023 Replace existing MCR B chiller 7/17/2023 - 8/24/2023 U2R5 Outage 11/03/2023 - 12/02/2023 Replace existing MCR A chiller 1/29/2024 - 3/24/2024 U1R19 Outage 11/1/2024-12/13/2024

l 8 Proposed TS Changes

  • Revise the current start and end dates in the footnotes to TS 3.7.11, Required Actions A.1 and E.1 to July 1, 2023, to December 31, 2024, respectively (provides a margin for any potential further schedule delays).

Reflects the current MCR replacement schedule (allowing for margin for any potential further schedule delays).

Requires expedited NRC review and approval of the LAR because NRC approval would be required no later than June 15, 2023 (allowing 15 days for implementation).

l 9 Proposed Technical Specification Change

Units 1 and 2 - TS 3.7.11 Footnote for Action A.1

l 10 PLACE THE TITLE OF THE PRESENTATION HERE Proposed Technical Specification Change

Units 1 and 2 - TS 3.7.11 Footnote for Action E.1

l 11 PLACE THE TITLE OF THE PRESENTATION HERE Changes to MCR Temporary Chilled Water Equipment Description

  • Differences between the currently planned MCR temporary chiller equipment description and the MCR temporary chiller equipment description in Section 3.1 to the previous LAR and the NRC Regulatory Audit Summary (ML21012A084) are provided in Tables 2 and 3, respectively. There are no changes to the MCR temporary chiller equipment description in the previous TVA RAI response (ML20351A424).
  • The compensatory measures listed in the previous LAR and the NRC SE remain unchanged.

l 12 Table 2 Item No. Description in LAR Currently Planned Installation Reason for Change Significance 1 Page E6 of 24, paragraph 1 describes, The inlet and outlet piping will To allow more efficient This new configuration The chilled water piping inlet and no longer be removed. (less time) transition is functionally outlet to the AHUs is removed and Permanent branch connections between the temporary equivalent to the replaced with temporary piping for the with isolation valves are being and permanent chillers configuration described temporary chiller system. added via permanent which will be in the LAR and is modification to the inlet and advantageous during expected to benefit the outlet piping to the AHUs to the post modification project by reducing the allow connection of the test (PMT) window and time in the TS Required temporary chiller without should reduce time in Action Completion removal of piping. the TS Required Action Time.

Completion Time.

2 Page E6 of 24, Section 3.2 describes The temporary chiller The temporary chiller These items were major equipment and includes Chilled installation may have as many installation includes included for water Pump. as three pumps. Additionally, multiple pumps to meet com pleteness of one major equipment item necessary hydraulic information.

that was not included in the conditions. The LAR description is a transfer temporary chiller switch, to allow transfer installation includes a between plant power and the transfer switch.

diesel generator (DG) for the temporary chiller.

l 13 Table 2 Item No. Description in LAR Currently Planned Installation Reason for Change Significance 3 Page E6 of 24, Section 3.2.1 The DG referred to in the LAR (a Clarification on the Both the rented refers to a 320kW DG. Section rented Aggreko chiller) is rated at rating of the Aggreko Aggreko equipment 3.2.4 also refers to the 320kW 320kW at 50Hz. The rating of this DG and to include and the Carrier/CAT DG. DG is 300kW at 60Hz, which is reference to the CAT equipment have adequate for the temporary/rented generator which the adequate electrical and Aggreko chiller equipment. A site has purchased, cooling capacity to Caterpillar (CAT) generator and along with a Carrier meet the requirements Carrier chiller have also been chiller. for the temporary chiller purchased by the site to reduce system.

reliance on rented equipment. The ratings (tons and kW ) of the CAT/Carrier equipment exceed the ratings of the rented Aggreko equipment.

4 Page E6 of 24, Section 3.2.1, Permanent branch connections have To allow more efficient This new configuration second paragraph states, been added to the AHU piping, (less time) transition is functionally Connection to the AHU coils will Therefore, it is more accurate to state between the temporary equivalent to the be made by isolating the chilled "Connection to the AHU coils is made and permanent chillers configuration described water piping, removing the flex via permanent flanged branch which will be in the LAR and is hoses between the AHU coils connections with an isolation valve, advantageous during expected to benefit the and the chilled water piping and which were added as part of the the PMT window and project by reducing the then reconnecting the temporary chiller replacement project should reduce time in time in the TS Required chilled water supply and return subsequent to the submittal of the the TS Required Action Action Completion hoses to the AHU coils using LAR." Completion Time. Time.

l 14 existing flange connections.

Table 2 Item No. Description in LAR Currently Planned Installation Reason for Change Significance 5 Page E7 of 24, Section 3.2.2 Hose sizes used in the temporary Final configuration to Larger hose sizes meet refers to 2.5 inch() diameter chilled water system are of various meet hydraulic hydraulic requirements supply and return hoses. sizes (3, 4 and 6) requirements. and offer less resistance compared to smaller hose sizes.

6 Page E7 of 24, Section 3.2.3 As noted in the NRC audit summary, Provide flexibility in Both locations are a states, The equipment "The two potential locations with chiller locations. similar distance (hose associated with the temporary respect to assumed plant north are run). Both locations chiller system will be located in (a) due west of the Auxiliary Building are also sufficiently the yard west of the Auxiliary or (b) northwest of the Unit 1 distant from the plant Building and in the Control Containment." air intakes.

Building (Elevation 729.0 feet).

l 15 Table 2 Item No. Description in LAR Currently Planned Installation Reason for Change Significance 7 Page E7 of 24, Section 3.2.3 This statement is intended to mean Clarification. Clarification.

states, the temporary chiller as required. The design package system will be protected from states that if the chiller is deployed freezing. during winter months, steps should be taken to avoid freezing (e.g.,

draining lines when not in use, use of heat tape and insulation).

l 16 Table 3 Item No. Description in NRC Audit Report Currently Planned Installation Reason for Change Significance 1 Page 4 of 7 of the Audit Report Permanent branch connections have To allow more efficient This new configuration states, Connection to the AHU been added to the AHU piping; (less time) transition is functionally coils will be made by isolating therefore, a current statement would between the temporary equivalent to the the chilled water piping, be, "Connection to the AHU coils is and permanent chillers configuration described removing the flex hoses between made via permanent flanged branch which will be in the LAR and is the AHU coils and the chilled connections with an isolation valve, advantageous during expected to benefit the water piping and then which were added as part of the the PMT window and project by reducing the reconnecting the temporary chiller replacement project should reduce time in time in the TS Required chilled water supply and return subsequent to the submittal of the the TS Required Action Action Completion hoses to the AHU coils using LAR." Completion Time. Time.

existing flange connections.

2 Page 5 of 7 of the Audit Report The CAT DG has a 300 gallon tank, To reflect the capacity The run time for the states, The temporary chiller which provides a 24-hour run time of the CAT DG which CAT DG is longer than skid DG fuel oil tanks capacity which is conservative compared to would be used with the the run time for the provides a 12-hour run time for the value cited here.Carrier chiller.Aggreko DG, which is the chiller skid without fuel oil conservative to what is replenishment, which allows the described in the Audit licensee time for replenishing Report.

measures.

l 17 Schedule Milestones

  • TVA to submit LAR to NRC by February 28, 2023.
  • Request expedited NRC approval by June 15, 2023.
  • 15-day implementation following NRC approval.

l 18