Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23291A156 | 18 October 2023 | NRC Pre-Submittal Meeting Watts Bar & Sequoyah LAR, TVA Presentation Slides | |
ML23264A041 | 27 September 2023 | NRC Pre-Submittal Meeting WBN Rebaseline LAR, TVA Presentation Slides | Shutdown Margin |
ML23251A121 | 12 September 2023 | RHR Flow Rate Reduction During Mode 6 Operation at 23 Ft. Refueling Water Level Technical Specification Change NON-PROPRIETARY Slides | |
ML23251A125 | 12 September 2023 | Pre-submittal Meeting for License Amendment Request, Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specification Surveillance Requirement 3.9.5.1 | |
ML23178A083 | 10 July 2023 | Pre-submittal Meeting Slides for License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs | Incorporated by reference Pressure and Temperature Limits Report |
ML23128A288 | 8 May 2023 | TVA Nuclear Plants -2022 EOC Media Slides | Open House |
ML23052A036 | 22 February 2023 | February 22, 2023, Pre-Submittal Meeting for the License Amendment Request for Increased Tritium Production at Watts Bar (EPID L-2023-LRM-0010) - Meeting Slides | Ultimate heat sink Pressure and Temperature Limits Report |
ML23044A518 | 15 February 2023 | Pre-Submittal Meeting Slides for Expedited License Amendment Request Re Main Control Room Chiller Completion Time Extension | |
ML23041A356 | 15 February 2023 | February 15, 2023 Pre-submittal Meeting for Expedited License Amendment Request Main Control Room (MCR) Chiller Completion Time Extension (EPID L-2022-LRM-0098) (Slides) | |
ML22318A104 | 14 November 2022 | Pre-submittal Meeting for American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative WBN-2-ISI-01 Slide Presentation | Dissimilar Metal Weld |
ML22157A413 | 6 June 2022 | Plants - Pre-Submittal Teleconference for Proposed Amendment Request Regarding the Change for the Sequoyah and Watts Bar Nuclear Plants Technical Specification 3.4.12 Meeting Slides | |
ML22102A303 | 12 April 2022 | Pre-submittal Meeting for Request for Exemption from Requirements of 10 CFR 26.205(d)(4) and 10 CFR 26.205(d)(6) Slide Presentation | Safe Shutdown Exemption Request |
ML22080A166 | 21 March 2022 | TVA Nuclear Plants -2021 EOC Media Loop Slides for Automatic Play | COVID-19 |
ML21343A028 | 14 December 2021 | TVA Slide Presentation Regarding Pre-Submittal Meeting for Proposed Revision to Capsule Withdrawal Schedule | |
ML21281A228 | 13 October 2021 | Tennessee Valley Authority Fleet Pre-Submittal Meeting for License Amendment Request to Change Emergency Action Level Scheme Presentation - October 13, 2021 (EPID L-2021-LRM-0096) (Slides) | Operating Basis Earthquake Earthquake |
ML21250A365 | 8 September 2021 | Meeting Slides - Watts Bar Nuclear Plant Unit 2, Presubmittal Teleconference for Proposed License Amendment to Revise the Updated Final Safety Analyses Report (UFSAR) to Use a Tube Support Plate Locking/Displacement Analysis | |
ML21217A287 | 19 August 2021 | TVA Slides - Pre-Submittal Meeting for Proposed License Amendment Request Re Application to Modify Technical Specification 3.7.8 Essential Raw Cooling Water (ERCW) System, to Support Permanent Shutdown Board | Ultimate heat sink |
ML21229A199 | 19 August 2021 | Mid-Cycle SG Outage Strategy (EPID L-2021-LRM-0067) (Slides) | |
ML21231A097 | 18 August 2021 | TVA Slides - Pre-Submittal Meeting for Proposed LAR Regarding Application to Modify Watts Bar Units 1 and 2 Technical Specification 3.7.8, Essential Raw Cooling Water (ERCW) System, to Support Permanent Shutdown Board Cleaning | Ultimate heat sink |
ML21117A072 | 27 April 2021 | Meeting Slides for April 28, 2021 Meeting with TVA | |
ML21096A131 | 7 April 2021 | Pre-submittal Meeting for Inservice Testing (IST) Program Request for One-Time Extension of Test Frequency of WBN Unit 1 Group 6 Relief Valves | Pandemic Coronavirus Grace period |
ML21041A155 | 11 February 2021 | Meeting Slides for February 11, 2021 Meeting with TVA | |
ML20345A026 | 10 December 2020 | Replacement Steam Generator Project Planned License Amendment Request (Lars). LAR Descriptions and Submittal Schedule Meeting Slides | |
ML20329A372 | 24 November 2020 | Pre-Submittal Teleconference for Proposed License Amendment Request Regarding Technical Specification 5.9.9, Steam Generator Tube Inspection Report, to Use Popcd Methodology | |
ML20302A123 | 28 October 2020 | Pre-Submittal Meeting Slides Non-Voluntary Application to Modify WBN Unit 1 and Unit 2 TS Surveillance Requirement 3.6.15.4, Shield Building | Surveillance Frequency Control Program |
ML20239A867 | 27 August 2020 | Pre-Submittal Meeting Slides License Amendment Request for Technical Specification 5.7.2.19 | Large early release frequency Moisture barrier |
ML20175A055 | 23 June 2020 | TVA Slides for June 23, 2020, Emergency Plan Change Presubmittal Meeting | |
ML20125A324 | 5 May 2020 | Pre-Submittal Meeting Slides for License Amendment Request - Main Control Room Chiller Completion Time Extension | Temporary Modification |
ML20049G182 | 18 February 2020 | February 20, 2020 - Pre-submittal Meeting Presentation - Transition to Westinghouse Fuel | Exemption Request |
ML20009C396 | 8 January 2020 | Pre-Submittal Telecon for Expedited License Amendment Request to Revise Technical Specification 3.3.5, LOP DG Start Instrumentation | Open Phase Condition |
ML19347B072 | 12 December 2019 | TVA and Xcel Energy Slides for Joint Presubmittal Meeting to License Amendment Requests to Adopt WCAP-17661, Revision 1 | |
ML19282A008 | 9 October 2019 | TVA Slides for Pre-Submittal Meeting for License Amendment Request to Correct Unbalanced Voltage Relay Instrumentation Values | |
ML19255H552 | 12 September 2019 | August 27, 2019, Summary of Public Meeting - Tennessee Valley Safety Conscious Work Environment Update at Watts Bar, Docket 50-390 and 50-391 | |
ML19298A004 | 12 September 2019 | Presentation Slides for 9/12/19 Public Meeting | Qualified Offsite Circuit Offsite Circuit |
ML19252A053 | 9 September 2019 | TVA Presentation Slides: Watts Bar Nuclear Plant Pre-Submittal Meeting for License Amendment Request Revised Offsite Electrical Power Sources | |
ML19235A288 | 23 August 2019 | 2019 WBN SCWE Public Meeting Slides 8-27-2019 (NRC Slides) | |
ML19235A271 | 23 August 2019 | 2019 TVA Watts Bar Nuclear Plant Public Meeting Slides 08-27-2019 (TVA Slides) | |
ML19178A246 | 1 July 2019 | Presentation Material for July 1, 2019 Pre-submittal Meeting with TVA on Full Spectrum LOCA Methodology for Watts Bar, Units 1 and 2 | |
ML19161A241 | 11 June 2019 | Pre-Application Meeting for Proposed License Amendment Request (LAR) Regarding Change to the WBN Unit 2 Technical Specifications (TS) 3.4.17, Steam Generator Tube Integrity and 5.7.2.12 Steam Generator Program | Nondestructive Examination Finite Element Analysis |
ML19161A239 | 10 June 2019 | Plants Pre-Submittal Meeting for Proposed License Amendments Hydrological Analysis Updates June 10, 2019 | |
ML19142A360 | 21 May 2019 | May 9, 2019 Summary of Public Meeting; Watts Bar Nuclear Plant | |
ML19018A007 | 18 January 2019 | (WBN)Pre-Submittal Meeting for Proposed License Amendment Request Regarding a One-Time Change for the WBN Unit 2 Technical Specification (TS) 3.7.8, Essential Raw Cooling Water (ERCW) System. | Ultimate heat sink |
ML18291A573 | 18 October 2018 | Chilled Work Environment | |
ML18291A563 | 18 October 2018 | Chilled Worked Environment Update | |
ML18248A105 | 5 September 2018 | Presentation Slides - Watts Bar Nuclear Plant Units 1 and 2 Adoption of TSTF-425 Initiative 5b - Surveillance Frequency Control Program - September 6, 2018 | Internal Flooding Probabilistic Risk Assessment Surveillance Frequency Control Program Large early release frequency Offsite Circuit |
ML18248A102 | 5 September 2018 | Presentation Slides - Watts Bar Nuclear Plant (WBN) Pre-Submittal Meeting for Proposed License Amendment Request Regarding Shutdown Board Cleaning - September 6, 2018 | Offsite Circuit |
ML18248A101 | 5 September 2018 | Bar Nuclear Plant (WBN) Pre-Submittal Meeting for Proposed License Amendment Adoption of TSTF-500 | |
ML18248A107 | 5 September 2018 | Presentation Slides - Watts Bar Nuclear Plant Units 1 and 2 Adoption of 10 CFR 50.69 - September 6, 2018 | Safe Shutdown High winds Internal Flooding Fire Protection Program |
ML18164A319 | 18 June 2018 | Presentation Material for 6/19/18 Pre-submittal Meeting | Exemption Request |
ML18024A793 | 25 January 2018 | Presentation Slides - Watts Bar Nuclear Plant Unit 2 Pre-Submittal Meeting for Proposed License Amendment Request Regarding the Use of PAD4TCD in the Large Break Loss of Coolant Accident Analysis |