Category:Meeting Briefing Package/Handouts
MONTHYEARML24284A0042024-10-16016 October 2024 Application to Use Online Monitoring Methodology for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant Session Slides ML24228A2312024-08-15015 August 2024 TVA Meeting Slides for August 19 Public Meeting Re QAPD Supplement ML24225A2542024-08-14014 August 2024 August 14, 2024 - TVA Pre-Sub Meeting Presentation - Sequoyah, Units 1 and 2; Watts Bar, Units 1 and 2 - License Amendment Request to Revise TS 3.5.2 ECCS - Operating ML24137A2872024-05-16016 May 2024 Pre-Submittal Meetingfor Proposed License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources - Operating to Clarify Requirements for Diesel Generator Testing ML24127A0412024-05-0606 May 2024 May 6, 2024 Meeting Slides ML24067A2832024-03-27027 March 2024 2023 Browns Ferry, Sequoyah and Watts Bar Annual Assessment Public Meeting Presentation Slides ML24044A0872024-02-14014 February 2024 TVA Slides - Watts Bar Nuclear Plant Pre-Submittal Meeting for License Amendment Request to Revise TS 3.7.11, Main Control Room Area Chilled Water System ML23291A1562023-10-18018 October 2023 NRC Pre-Submittal Meeting Watts Bar & Sequoyah LAR, TVA Presentation Slides ML23264A0412023-09-27027 September 2023 NRC Pre-Submittal Meeting WBN Rebaseline LAR, TVA Presentation Slides ML23251A1212023-09-12012 September 2023 RHR Flow Rate Reduction During Mode 6 Operation at 23 Ft. Refueling Water Level Technical Specification Change NON-PROPRIETARY Slides ML23251A1252023-09-12012 September 2023 Pre-submittal Meeting for License Amendment Request, Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specification Surveillance Requirement 3.9.5.1 ML23178A0832023-07-10010 July 2023 Pre-submittal Meeting Slides for License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs ML23128A2882023-05-0808 May 2023 TVA Nuclear Plants -2022 EOC Media Slides ML23052A0362023-02-22022 February 2023 February 22, 2023, Pre-Submittal Meeting for the License Amendment Request for Increased Tritium Production at Watts Bar (EPID L-2023-LRM-0010) - Meeting Slides ML23041A3562023-02-15015 February 2023 February 15, 2023 Pre-submittal Meeting for Expedited License Amendment Request Main Control Room (MCR) Chiller Completion Time Extension (EPID L-2022-LRM-0098) (Slides) ML23044A5182023-02-15015 February 2023 Pre-Submittal Meeting Slides for Expedited License Amendment Request Re Main Control Room Chiller Completion Time Extension ML22318A1042022-11-14014 November 2022 Pre-submittal Meeting for American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative WBN-2-ISI-01 Slide Presentation ML22157A4132022-06-0606 June 2022 Plants - Pre-Submittal Teleconference for Proposed Amendment Request Regarding the Change for the Sequoyah and Watts Bar Nuclear Plants Technical Specification 3.4.12 Meeting Slides ML22102A3032022-04-12012 April 2022 Pre-submittal Meeting for Request for Exemption from Requirements of 10 CFR 26.205(d)(4) and 10 CFR 26.205(d)(6) Slide Presentation ML22080A1662022-03-21021 March 2022 TVA Nuclear Plants -2021 EOC Media Loop Slides for Automatic Play ML21343A0282021-12-14014 December 2021 TVA Slide Presentation Regarding Pre-Submittal Meeting for Proposed Revision to Capsule Withdrawal Schedule ML21281A2282021-10-13013 October 2021 Tennessee Valley Authority Fleet Pre-Submittal Meeting for License Amendment Request to Change Emergency Action Level Scheme Presentation - October 13, 2021 (EPID L-2021-LRM-0096) (Slides) ML21250A3652021-09-0808 September 2021 Meeting Slides - Watts Bar Nuclear Plant Unit 2, Presubmittal Teleconference for Proposed License Amendment to Revise the Updated Final Safety Analyses Report (UFSAR) to Use a Tube Support Plate Locking/Displacement Analysis ML21229A1992021-08-19019 August 2021 Mid-Cycle SG Outage Strategy (EPID L-2021-LRM-0067) (Slides) ML21217A2872021-08-19019 August 2021 TVA Slides - Pre-Submittal Meeting for Proposed License Amendment Request Re Application to Modify Technical Specification 3.7.8 Essential Raw Cooling Water (ERCW) System, to Support Permanent Shutdown Board ML21231A0972021-08-18018 August 2021 TVA Slides - Pre-Submittal Meeting for Proposed LAR Regarding Application to Modify Watts Bar Units 1 and 2 Technical Specification 3.7.8, Essential Raw Cooling Water (ERCW) System, to Support Permanent Shutdown Board Cleaning ML21117A0722021-04-27027 April 2021 Meeting Slides for April 28, 2021 Meeting with TVA ML21096A1312021-04-0707 April 2021 Pre-submittal Meeting for Inservice Testing (IST) Program Request for One-Time Extension of Test Frequency of WBN Unit 1 Group 6 Relief Valves ML21041A1552021-02-11011 February 2021 Meeting Slides for February 11, 2021 Meeting with TVA ML20345A0262020-12-10010 December 2020 Replacement Steam Generator Project Planned License Amendment Request (Lars). LAR Descriptions and Submittal Schedule Meeting Slides ML20329A3722020-11-24024 November 2020 Pre-Submittal Teleconference for Proposed License Amendment Request Regarding Technical Specification 5.9.9, Steam Generator Tube Inspection Report, to Use Popcd Methodology ML20302A1232020-10-28028 October 2020 Pre-Submittal Meeting Slides Non-Voluntary Application to Modify WBN Unit 1 and Unit 2 TS Surveillance Requirement 3.6.15.4, Shield Building ML20239A8672020-08-27027 August 2020 Pre-Submittal Meeting Slides License Amendment Request for Technical Specification 5.7.2.19 ML20175A0552020-06-23023 June 2020 TVA Slides for June 23, 2020, Emergency Plan Change Presubmittal Meeting ML20125A3242020-05-0505 May 2020 Pre-Submittal Meeting Slides for License Amendment Request - Main Control Room Chiller Completion Time Extension ML20049G1822020-02-18018 February 2020 February 20, 2020 - Pre-submittal Meeting Presentation - Transition to Westinghouse Fuel ML20009C3962020-01-0808 January 2020 Pre-Submittal Telecon for Expedited License Amendment Request to Revise Technical Specification 3.3.5, LOP DG Start Instrumentation ML19347B0722019-12-12012 December 2019 TVA and Xcel Energy Slides for Joint Presubmittal Meeting to License Amendment Requests to Adopt WCAP-17661, Revision 1 ML19282A0082019-10-0909 October 2019 TVA Slides for Pre-Submittal Meeting for License Amendment Request to Correct Unbalanced Voltage Relay Instrumentation Values ML19255H5522019-09-12012 September 2019 August 27, 2019, Summary of Public Meeting - Tennessee Valley Safety Conscious Work Environment Update at Watts Bar, Docket 50-390 and 50-391 ML19298A0042019-09-12012 September 2019 Presentation Slides for 9/12/19 Public Meeting ML19252A0532019-09-0909 September 2019 TVA Presentation Slides: Watts Bar Nuclear Plant Pre-Submittal Meeting for License Amendment Request Revised Offsite Electrical Power Sources ML19235A2712019-08-23023 August 2019 2019 TVA Watts Bar Nuclear Plant Public Meeting Slides 08-27-2019 (TVA Slides) ML19235A2882019-08-23023 August 2019 2019 WBN SCWE Public Meeting Slides 8-27-2019 (NRC Slides) ML19178A2462019-07-0101 July 2019 Presentation Material for July 1, 2019 Pre-submittal Meeting with TVA on Full Spectrum LOCA Methodology for Watts Bar, Units 1 and 2 ML19161A2412019-06-11011 June 2019 Pre-Application Meeting for Proposed License Amendment Request (LAR) Regarding Change to the WBN Unit 2 Technical Specifications (TS) 3.4.17, Steam Generator Tube Integrity and 5.7.2.12 Steam Generator Program ML19161A2392019-06-10010 June 2019 Plants Pre-Submittal Meeting for Proposed License Amendments Hydrological Analysis Updates June 10, 2019 ML19142A3602019-05-21021 May 2019 May 9, 2019 Summary of Public Meeting; Watts Bar Nuclear Plant ML19018A0072019-01-18018 January 2019 (WBN)Pre-Submittal Meeting for Proposed License Amendment Request Regarding a One-Time Change for the WBN Unit 2 Technical Specification (TS) 3.7.8, Essential Raw Cooling Water (ERCW) System. ML18291A5732018-10-18018 October 2018 Chilled Work Environment 2024-08-15
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24284A0042024-10-16016 October 2024 Application to Use Online Monitoring Methodology for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant Session Slides ML24228A2312024-08-15015 August 2024 TVA Meeting Slides for August 19 Public Meeting Re QAPD Supplement ML24225A2542024-08-14014 August 2024 August 14, 2024 - TVA Pre-Sub Meeting Presentation - Sequoyah, Units 1 and 2; Watts Bar, Units 1 and 2 - License Amendment Request to Revise TS 3.5.2 ECCS - Operating ML24184B9162024-07-10010 July 2024 U.S. NRC Meeting Slides for Meeting with Tennessee Valley Authority Regarding NRC Questions Regarding Scope of Nuclear Quality Assurance Program ML24137A2872024-05-16016 May 2024 Pre-Submittal Meetingfor Proposed License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources - Operating to Clarify Requirements for Diesel Generator Testing ML24127A0412024-05-0606 May 2024 May 6, 2024 Meeting Slides ML24067A2832024-03-27027 March 2024 2023 Browns Ferry, Sequoyah and Watts Bar Annual Assessment Public Meeting Presentation Slides ML23291A1562023-10-18018 October 2023 NRC Pre-Submittal Meeting Watts Bar & Sequoyah LAR, TVA Presentation Slides ML23264A0412023-09-27027 September 2023 NRC Pre-Submittal Meeting WBN Rebaseline LAR, TVA Presentation Slides ML23251A1212023-09-12012 September 2023 RHR Flow Rate Reduction During Mode 6 Operation at 23 Ft. Refueling Water Level Technical Specification Change NON-PROPRIETARY Slides ML23251A1252023-09-12012 September 2023 Pre-submittal Meeting for License Amendment Request, Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specification Surveillance Requirement 3.9.5.1 ML23178A0832023-07-10010 July 2023 Pre-submittal Meeting Slides for License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs ML23128A2882023-05-0808 May 2023 TVA Nuclear Plants -2022 EOC Media Slides ML23052A0362023-02-22022 February 2023 February 22, 2023, Pre-Submittal Meeting for the License Amendment Request for Increased Tritium Production at Watts Bar (EPID L-2023-LRM-0010) - Meeting Slides ML23041A3562023-02-15015 February 2023 February 15, 2023 Pre-submittal Meeting for Expedited License Amendment Request Main Control Room (MCR) Chiller Completion Time Extension (EPID L-2022-LRM-0098) (Slides) ML23044A5182023-02-15015 February 2023 Pre-Submittal Meeting Slides for Expedited License Amendment Request Re Main Control Room Chiller Completion Time Extension ML23010A2542023-01-12012 January 2023 Pre-submittal Meeting for Expedited License Amendment Request Main Control Room (MCR) Chiller Completion Time Extension -- Meeting Slides ML22318A1042022-11-14014 November 2022 Pre-submittal Meeting for American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative WBN-2-ISI-01 Slide Presentation ML22157A4132022-06-0606 June 2022 Plants - Pre-Submittal Teleconference for Proposed Amendment Request Regarding the Change for the Sequoyah and Watts Bar Nuclear Plants Technical Specification 3.4.12 Meeting Slides ML22103A0852022-04-14014 April 2022 and Watts Bar Plant Pre-submittal Meeting for Inservice Testing (IST) Program Request for Alternative for the Motor Driven Auxiliary Feedwater Pump Testing Following Maintenance During an Outage Per ISTB-3310 ML22102A3032022-04-12012 April 2022 Pre-submittal Meeting for Request for Exemption from Requirements of 10 CFR 26.205(d)(4) and 10 CFR 26.205(d)(6) Slide Presentation ML22080A1662022-03-21021 March 2022 TVA Nuclear Plants -2021 EOC Media Loop Slides for Automatic Play ML22035A0002022-02-0404 February 2022 February 8, 2022, Pre-Submittal Meeting Slides Regarding Proposed Change to Modify the Allowable Value for Technical Specification Table 3.3.2-1, Function 6.e(1) ML22013A6432022-01-19019 January 2022 TVA Slides - Watts Bar Nuclear Plant (WBN) Schedule for the Development of a License Amendment Request (LAR) for Increased Tritium Production at WBN ML21343A0282021-12-14014 December 2021 TVA Slide Presentation Regarding Pre-Submittal Meeting for Proposed Revision to Capsule Withdrawal Schedule ML21281A2282021-10-13013 October 2021 Tennessee Valley Authority Fleet Pre-Submittal Meeting for License Amendment Request to Change Emergency Action Level Scheme Presentation - October 13, 2021 (EPID L-2021-LRM-0096) (Slides) ML21250A3652021-09-0808 September 2021 Meeting Slides - Watts Bar Nuclear Plant Unit 2, Presubmittal Teleconference for Proposed License Amendment to Revise the Updated Final Safety Analyses Report (UFSAR) to Use a Tube Support Plate Locking/Displacement Analysis ML21229A1992021-08-19019 August 2021 Mid-Cycle SG Outage Strategy (EPID L-2021-LRM-0067) (Slides) ML21217A2872021-08-19019 August 2021 TVA Slides - Pre-Submittal Meeting for Proposed License Amendment Request Re Application to Modify Technical Specification 3.7.8 Essential Raw Cooling Water (ERCW) System, to Support Permanent Shutdown Board ML21231A0972021-08-18018 August 2021 TVA Slides - Pre-Submittal Meeting for Proposed LAR Regarding Application to Modify Watts Bar Units 1 and 2 Technical Specification 3.7.8, Essential Raw Cooling Water (ERCW) System, to Support Permanent Shutdown Board Cleaning ML21096A1312021-04-0707 April 2021 Pre-submittal Meeting for Inservice Testing (IST) Program Request for One-Time Extension of Test Frequency of WBN Unit 1 Group 6 Relief Valves ML21096A1002021-04-0606 April 2021 Annual Assessments ML21041A1552021-02-11011 February 2021 Meeting Slides for February 11, 2021 Meeting with TVA ML21019A5692021-01-19019 January 2021 Pre-Submittal Teleconference for Proposed License Amendment Requests (Lars) for the WBN Unit 2 Replacement Steam Generator (RSG) Project ML20352A0362020-12-17017 December 2020 Pre-Submittal Teleconference for Proposed License Amendment to Revise the Updated Final Safety Analysis Report (UFSAR) to Use an Alternate Probability of Detection (POD) ML20329A3722020-11-24024 November 2020 Pre-Submittal Teleconference for Proposed License Amendment Request Regarding Technical Specification 5.9.9, Steam Generator Tube Inspection Report, to Use Popcd Methodology ML21050A1562020-10-21021 October 2020 Graizer - Presentation - Analysis of Tva'S Watts Bar Nuclear Power Plant Strong-Motion Records of the M 4.4 December 12, 2018 Decatur Tennessee Earthquake ML20239A8672020-08-27027 August 2020 Pre-Submittal Meeting Slides License Amendment Request for Technical Specification 5.7.2.19 ML20220A2022020-08-0707 August 2020 Pre-Submittal Meeting Slides - Proposed License Approach Regarding a Change for Watts Bar Nuclear Plant Units 1 & 2 Technical Specification 3.3.2 Table 1 Function 6.e Auxiliary Feedwater Auto-Start from Loss of Main Feedwater Pumps(Epid L-2 ML20209A0702020-07-27027 July 2020 Pre-submittal Meeting for Inservice Testing (IST) Program Request for Relief from Increased Frequency Testing of Residual Heat Removal (RHR) Pump 1B-B Meeting Slides ML20169A5222020-06-25025 June 2020 Pre-Submittal Meeting for License Amendment Request (LAR) Revised Steam Generator (SG) Inspection Intervals and TSTF-510 ML20175A0552020-06-23023 June 2020 TVA Slides for June 23, 2020, Emergency Plan Change Presubmittal Meeting ML20148M1452020-05-27027 May 2020 (Wbn)Proposed License Approach Regarding a Change for the WBN Units 1& 2 Technical Specification (TS) 3.3.2 Table 1 Function 6.e Auxiliary Feedwater Auto-Start from Loss of Main Feedwater Pumps ML20147A0132020-05-26026 May 2020 NRC Slides Final WBN-1 TS 3.3.3 LAR ML20134J0102020-05-14014 May 2020 Pre-Submittal Meeting for License Amendment Request Technical Specification 5.9.6 Add NRC-approved Neutron Fluence Calculational Methodology ML20125A3242020-05-0505 May 2020 Pre-Submittal Meeting Slides for License Amendment Request - Main Control Room Chiller Completion Time Extension ML20112F5302020-04-21021 April 2020 TVA Nuclear Plants -2019 EOC Media Loop Slides for Automatic Play (Final) ML20049G1822020-02-18018 February 2020 February 20, 2020 - Pre-submittal Meeting Presentation - Transition to Westinghouse Fuel ML20009C3962020-01-0808 January 2020 Pre-Submittal Telecon for Expedited License Amendment Request to Revise Technical Specification 3.3.5, LOP DG Start Instrumentation ML19282A0082019-10-0909 October 2019 TVA Slides for Pre-Submittal Meeting for License Amendment Request to Correct Unbalanced Voltage Relay Instrumentation Values 2024-08-15
[Table view] |
Text
Watts Bar Nuclear Plant Unit 2 Pre-Submittal Teleconference for Proposed License Amendment to Revise the Updated Final Safety Analysis Report (UFSAR) to use a Temperature Adjustment Growth Rate Methodology in the Generic Letter 95-05 Analysis February 11, 2021
Agenda
- Opening Remarks and Purpose of the Proposed License Amendment Request (LAR)
- Watts Bar Nuclear Plant (WBN) Unit 2 Temperature Adjusted Growth Rate Methodology Technical Discussion
- Estimated Operating Interval Extension with Temperature Adjustment
- Steam Generator 3 Temperature Adjusted Limiting Voltage Growth Distribution
- Preliminary Operational Assessment (OA) Sensitivity Case Results
- Proposed UFSAR Section 5.5.2.4 Change
Opening Remarks and Purpose of the Proposed LAR
- The proposed LAR revises the WBN dual-unit UFSAR Section 5.5.2.4 to allow the use of a temperature adjustment growth rate calculation for GL 95-05 OAs.
Implementation will use the Arrhenius equation described in Section 5.2 of EPRI Report 3002007571, Steam Generator Management Program: Steam Generator Integrity Assessment Guidelines Revision 4, applying the adjustment of voltage growth described in Section 10.5.6.1.6 of EPRI Report 1018047 (Addendum 7 to NP-7480-L),
Steam Generator Tubing Outside Diameter Stress Corrosion Cracking at Tube Support Plates Database for Alternate Repair Limits.
- Use of the proposed temperature adjusted growth rate calculation represents an adverse change to an element of an evaluation methodology in GL 95-05 as margin is gained to conditional burst probability.
Permits an extension to the operating interval when Thot reduction is considered Used in concert with the alternate probability of detection (POD) values as approved by the Nuclear Regulatory Commission (NRC).
Allows WBN Unit 2 to operate until a planned mid-cycle inspection in mid-September 2021 after peak electrical demand .
- Proposed temperature adjusted growth rate (and alternate POD) will only be used until the WBN Unit 2 steam generators (SGs) are replaced.
3
Introduction
- The WBN Unit 2 Cycle 3 refueling outage (U2R3) was the third in-service inspection (ISI) for the Unit 2 Model D3 SGs (Alloy 600MA).
- This was the first outage to implement GL 95-05 voltage-based repair criteria (ARC).
- Significant in-service inspection scope was performed.
4
GL 95-05 Alternate POD and Temperature Adjustment Growth Rate
- The NRC approved Alternate POD supports ~285 calendar days operation until mid-cycle inspection is required.
Results in mid-cycle inspection near peak electrical demand in August 2021.
- Implementation of the temperature adjustment growth rate calculation methodology permits an approximate 27-day extension in operating interval above the operating interval calculated for the recently approved alternate POD.
5
WBN Unit 2 Temperature Adjusted Growth Rate Methodology Technical Discussion
- Temperature adjustment growth rate methodology based on the Arrhenius equation.
The Arrhenius equation describes the relation between the rate of reaction and temperature for many physical and chemical reactions 6
WBN Unit 2 Temperature Adjusted Growth Rate Methodology Technical Discussion (Contd)
- The Arrhenius equation is written in general terms as:
- Rate = A exp (-H/RT) where A is a constant, H is the activation energy, R is the ideal gas constant and T is the absolute temperature. If H is expressed in units of cal/mol then R is 1.985 cal/(mol K) and T is the absolute temperature in Kelvin.
- For outside diameter stress corrosion cracking (ODSCC) an activation energy of 30 kcal/mole for combined initiation and propagation is used for A600MA tubes.
7
WBN Unit 2 Temperature Adjusted Growth Rate Methodology Technical Discussion (Contd)
- As described in Section 10.5.6.1.6 of Addendum 7 of EPRI Report 1018047, the growth of the indications is taken to be a linear function of the length of the operating cycle per the ODSCC ARC references.
Temperature adjustment of the voltage-based growth data is discussed in Addendum 7 of EPRI Report 1018047.
This same temperature adjustment methodology will be used to modify the average growth rate used to determine the upper voltage repair limits.
8
Estimated Operating Interval Extension with Temperature Adjustment
- Using the Arrhenius correlation discussed previously, an adjustment factor is applied to the growth to account for a lower hot leg temperature.
For example, WBN Unit 2 is currently operating at an approximate 4°F reduction in Thot as compared to Cycle 3.
An adjustment factor of 0.91 is applied to the Cycle 3 growth to account for a 4°F reduction.
- This results in an overall shift of the growth distribution function that is supplied as input to the GL 95-05 OA calculations.
Figure 1 displays the limiting voltage growth distribution for WBN Unit 2 Cycle 3, which is exhibited by SG-3 compared against the same voltage distribution when adjusted for a Cycle 4 Thot reduction of 4°F.
- Because the Arrhenius correlation provides a linear correction factor to the indication growth, the effect is greater in the regions of larger growth.
9
Steam Generator 3 Temperature Adjusted Limiting Voltage Growth Distribution Note: adjusted for a Cycle 4 Thot reduction of 4°F.
10
Preliminary OA Sensitivity Case Results POD Approximate Case Description Duration Temperature Function OA Duration No Change in Thot 0.9 at 3.2V Note 1 Same as Cycle 3 285 days
/Alternate POD 0.95 at 6V Thot Change/Alternate Thot reduction of 4°F 0.9 at 3.2V 312 days Note 2 POD from Cycle 3 0.95 at 6V (Note 3)
Thot Change/Alternate From Mid-cycle Thot reduction no 0.9 at 3.2V To be POD outage to greater than 9°F from 0.95 at 6V evaluated U2R4 Cycle 3 (Note 4)
Notes:
- 1. Will result in a mid-cycle outage to perform the next SG inspection in August 2021 (not desirable due to high peak demands).
- 2. Will result in a mid-cycle outage to perform the next SG inspection in September 2021 (more desirable).
- 3. The operating interval is reduced from approximately 27 days if a Thot reduction of less than 4°F is used.
11
- 4. Maximum reduction in Thot to ensure margins exist with no safety analysis impact.
Proposed WBN Unit 2 UFSAR Section 5.5.2.4 Change Unit 2 Only Steam Generator Tubing voltage-based Alternate Repair Criteria (ARC) for Axial Outside Diameter Stress Corrosion Cracking (ODSCC) at tube support plate intersections was approved by NRC (23). Implementation of ODSCC ARC using GL 95-05 (24) as guidance is in accordance with Technical Specification inservice examination requirements and Reference 25. [(recently approved by NRC) As an alternative to the probability of detection of 0.6 required by GL 95-05, a probability of detection (POD) of 0.9 will be applied to indications of axial ODSCC at tube support plates with bobbin voltage amplitudes of greater than or equal to 3.2 volts, but less than 6.0 volts, and a POD of 0.95 will be applied to indications of axial ODSCC at tube support plates with bobbin voltage amplitudes of greater than or equal to 6.0 volts until the Unit 2 Steam Generators are replaced(26).
A POD of 0.6 in accordance with GL 95-05, will be used for indications less than 3.2 volts.] Also, when operating temperature differences exist from cycle-to-cycle, an exception to the GL 95-05 analysis in the form of a temperature adjustment to the growth rate calculation in accordance with Section 10.5.6.1.6 of Reference 27 will be applied. The temperature adjustment methodology will be used to determine the End of Cycle voltage distribution of axial indications for comparison to the conditional probability of tube burst of less than or equal to 1 x 10-2 and to determine the total primary-to-secondary leak rate from an affected SG during a postulated main steam line break event. This same temperature adjustment methodology will be used to modify the average growth rate used to determine the upper voltage repair limits. This exception applies until the Unit 2 Steam Generators are replaced (28).
12
Proposed WBN, Unit 2 UFSAR Section 5.5.2.4 Change
- Additionally, the Reference Section in UFSAR Section 5.5 will be revised to add new Reference 27 for EPRI Report 1018047 and new Reference 28 to reflect the NRC approval of this LAR.
- There are no corresponding TS changes required to apply the proposed temperature adjustment to the voltage growth rates, as the associated requirements are only discussed in GL 95-05, and because WBN Unit 2 TS 5.7.2.12 and TS 5.9.9 do not contain a description of the growth rate calculation methodology to be used.
13
Regulatory Precedent
- No known requests to apply the proposed temperature adjustment growth rate methodology as described in this LAR.
- However, the practice to adjust growth rates for temperature using the Arrhenius equation for data for operating at a lower or higher Thot is discussed in Section 5 of the EPRI Report 3002007571, Steam Generator Management Program (SGMP): Steam Generator Integrity Assessment Guidelines, Revision 4.
14
Schedule for Submittal
- February 28, 2021 - Submit LAR to NRC
- Request NRC approval by April 30, 2021, in support of mid-cycle outage planning.
15
Path Forward
- Revised OA to be submitted to NRC to reflect use of the proposed temperature adjusted growth rate methodology.
- Following the WBN Unit 2 mid-cycle outage, continued operation until the U2R4 outage (March 2022) will be assessed based on the alternate POD values and the proposed temperature adjusted growth rate methodology.
- WBN Unit 2 SGs are scheduled to be replaced during U2R4.
16