Watts Bar Nuclear Plant Unit 2 Pre-Submittal Teleconference for Proposed License Amendment Request Regarding Technical Specification 5.9.9, Steam Generator Tube Inspection Report, to use POPCD Methodology

Agenda

  • Opening Remarks and Purpose of the Proposed LAR
  • Introduction
  • Existing SG Tube Degradation Mechanisms post U2R3 Inspection
  • Preliminary GL95-05 Operational Assessment (OA) Predictions
  • Probability of Detection (POD)
  • Purpose of WBN 2 POPCD
  • Regulatory Precedent
  • Schedule for Submittal
  • Summary and Closing Remarks l 2

Opening Remarks and Purpose of the Proposed LAR

  • The proposed Technical Specification (TS) amendment revises the Watts Bar Nuclear Plant (WBN) Units 2 TS 5.9.9, Steam Generator Tube Inspection Report to add reporting requirement for the Probability of Prior Cycle Detection (POPCD) methodology.
  • Use of POPCD requires NRC approval.

l 3

Proposed WBN 2 TS 5.9.9 Change l 4

Introduction

  • WBN U2R3 is the 3rd ISI for the Unit 2 Model D3 SGs (Alloy 600MA).
  • This was the first outage to implement GL95-05 Voltage Based Repair Criteria (ARC).
  • Significant Inspection scope was performed.
  • SG-3 did not pass GL95-05 criteria for conditional probability of burst.

l 5

Existing SG Tube Degradation Mechanisms post U2R3 Inspection

- Volumetric Indications due to Tube Fabrication and Installation

- Mechanical Wear at Anti-Vibration Bars

- Mechanical Wear at Tube Support Plates

- Circumferential ODSCC at the Hot Leg Top of Tubesheet

- Axial ODSCC at the Hot Leg Top of Tubesheet (New)

- Axial PWSCC at the Hot Leg Top of Tubesheet (New)

- Circumferential ODSCC at Freespan Dings (New)

- Axial ODSCC at Freespan Dings (New)

- Axial ODSCC at TSPs - GL 95-05

- Axial ODSCC at the FDB - GL 95-05 (New)

  • Condition Monitoring requirements met for all degradation mechanisms except for GL 95-05 conditional burst probability in SG3 (WBN 2 TS 5.9.9 Item 5) l 6

U2R3 SG Bobbin DSI Voltage CDF l 7

Probability of Detection (POD)

- Requires BOC distribution of bobbin DSIs to be scaled upward by factor of 1/POD

- Conservatively accounts for non-detected crack indications that are assumed to be returned to service.

- POD should be assumed to have a value of 0.6, or as an alternative, an NRC approved POD function can be used, if such a function becomes available.

- Substantial industry data shows a POD of 1.0 in the range of 3-4 volts.

- No undetected indication has exceeded 3.2v (EPRI NP-7490, Add 7) l 8

Preliminary GL95-05 Operational Assessment (OA) Predictions

  • Using the POD value of 0.6 is limiting for WBN 2.
  • Short Term-POD of 1.0 is used to support operation for select flaws.
  • Longer Term-POPCD
  • POPCD precedent - Sequoyah Nuclear Plant (SQN) Unit 2, Diablo Canyon Units 1 and 2.

l 9

Preliminary GL95-05 Operational Assessment (OA) Predictions Effective Full Power Days POD (EFPD)

SG 1 503.9 0.6 SG 2 503.9 0.6 up to 3.2v 1.03.2v 270 POPCD Preliminary SG 3 240 0.6 up to 3.2v 1.03.2v 180 0.6 up to 8v 1.08v 0.6 up to 3.2v 1.03.2v SG 4 503.9 l 10

Purpose of WBN 2 POPCD

  • WBN U2R3 inspection results didnt support a cycle length of 90 days due to POD of 0.6.
  • POPCD will allow a more realistic POD.

l 11

POPCD Definition

  • POPCD is calculated as the ratio of indications reported at the prior inspection to the total indications found at the subsequent inspection.

l 12

POPCD Definition

  • Premise-all indications that can contribute significantly to burst and leakage for GL95-05 can be confirmed with RPC or equivalent.
  • Treats all new indications at an inspection as having been undetected at the prior inspection.
  • Supported by industry POPCD database of 42 inspections.
  • Industry data includes 9 inspections of high noise plant data. No undetected indications exceeded 3.2 volts.

l 13

Voltage Bin Example from SQN 2 (Cycle

12) Reference ML070250031, Table 4
  • Voltage Bins Range for each 0.1v
  • Voltage Bin (0.91v-1.00v)

- Determine the total for Detection at EOCn-These are from previous cycle. (58 indications)

- Determine at No Detection at EOCn (New Indications)-

These are from the subsequent cycle. (9)

- POPCD for Voltage Bin 0.866.

  • Build table for each voltage bin using number of indications for each category and calculate POPCD. l 14

Noise Considerations

  • TSP ODSCC indications are dominantly located near the center of the TSP.
  • WBN 2 has relatively low bobbin noise measurements at the TSP center.
  • Preliminary POPCD indicated potential improved detection of axial ODSCC at TSP center for large voltage indications.
  • Noise Monitoring performed during U2R3.

l 15

Conclusion

  • Short term use of 1.0 POD factor for DSIs > 8 Volts
  • Short term use of 1.0 POD factor for DSIs > 3.2 Volts
  • LAR for application of POPCD method
  • Evaluating the use of WBN 1 data to support WBN 2 specific POPCD l 16

Regulatory Precedent

  • On March 24, 2008, NRC issued a license amendment for SQN Unit 2, which revised approved the use of the POPCD methodology and revised the SG TS reporting requirement to reflect the use of POPCD (ML080710575).
  • On October 28, 2004, NRC issued a license amendment for Diablo Canyon Power Plant (DCPP), Unit Nos. 1 and 2, which also approved the use of the POPCD methodology and revised the SG TS reporting requirement to reflect the use of POPCD (ML043140456).
  • The proposed LAR mimics the TS changes for the SQN Unit 2 and DCCP LARs.
  • TVA has reviewed the LARs and RAI responses for each of the below precedents and have addressed them, as applicable, in this enclosure. l 17

Schedule for Submittal

  • November 17, 2020 - Pre-submittal teleconference with NRC
  • December 18, 2020 - Submit LAR to NRC (attempting to improve this date)
  • Request NRC approval by February 8, 2021 with implementation by February 14, 2021 (i.e., 90 days from WBN 2 entering Mode 4 on November 16, 2020) to comply with the proposed 90-day reporting requirement for POPCD.

l 18