MONTHYEARML20209A0702020-07-27027 July 2020 Pre-submittal Meeting for Inservice Testing (IST) Program Request for Relief from Increased Frequency Testing of Residual Heat Removal (RHR) Pump 1B-B Meeting Slides Project stage: Request ML20213C7112020-08-25025 August 2020 Summary of July 28, 2020, Teleconference Call with Tennessee Valley Authority Regarding a Planned Alternative Request for Watts Bar Nuclear Plant, Unit 1 Project stage: Meeting 2020-07-27
[Table View] |
|
---|
Category:Slides and Viewgraphs
MONTHYEARML23291A1562023-10-18018 October 2023 NRC Pre-Submittal Meeting Watts Bar & Sequoyah LAR, TVA Presentation Slides ML23264A0412023-09-27027 September 2023 NRC Pre-Submittal Meeting WBN Rebaseline LAR, TVA Presentation Slides ML23251A1212023-09-12012 September 2023 RHR Flow Rate Reduction During Mode 6 Operation at 23 Ft. Refueling Water Level Technical Specification Change NON-PROPRIETARY Slides ML23251A1252023-09-12012 September 2023 Pre-submittal Meeting for License Amendment Request, Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specification Surveillance Requirement 3.9.5.1 ML23178A0832023-07-10010 July 2023 Pre-submittal Meeting Slides for License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs ML23128A2882023-05-0808 May 2023 TVA Nuclear Plants -2022 EOC Media Slides ML23052A0362023-02-22022 February 2023 February 22, 2023, Pre-Submittal Meeting for the License Amendment Request for Increased Tritium Production at Watts Bar (EPID L-2023-LRM-0010) - Meeting Slides ML23044A5182023-02-15015 February 2023 Pre-Submittal Meeting Slides for Expedited License Amendment Request Re Main Control Room Chiller Completion Time Extension ML23041A3562023-02-15015 February 2023 February 15, 2023 Pre-submittal Meeting for Expedited License Amendment Request Main Control Room (MCR) Chiller Completion Time Extension (EPID L-2022-LRM-0098) (Slides) ML23010A2542023-01-12012 January 2023 Pre-submittal Meeting for Expedited License Amendment Request Main Control Room (MCR) Chiller Completion Time Extension -- Meeting Slides ML22318A1042022-11-14014 November 2022 Pre-submittal Meeting for American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative WBN-2-ISI-01 Slide Presentation ML22157A4132022-06-0606 June 2022 Plants - Pre-Submittal Teleconference for Proposed Amendment Request Regarding the Change for the Sequoyah and Watts Bar Nuclear Plants Technical Specification 3.4.12 Meeting Slides ML22103A0852022-04-14014 April 2022 and Watts Bar Plant Pre-submittal Meeting for Inservice Testing (IST) Program Request for Alternative for the Motor Driven Auxiliary Feedwater Pump Testing Following Maintenance During an Outage Per ISTB-3310 ML22102A3032022-04-12012 April 2022 Pre-submittal Meeting for Request for Exemption from Requirements of 10 CFR 26.205(d)(4) and 10 CFR 26.205(d)(6) Slide Presentation ML22080A1662022-03-21021 March 2022 TVA Nuclear Plants -2021 EOC Media Loop Slides for Automatic Play ML22035A0002022-02-0404 February 2022 February 8, 2022, Pre-Submittal Meeting Slides Regarding Proposed Change to Modify the Allowable Value for Technical Specification Table 3.3.2-1, Function 6.e(1) ML22013A6432022-01-19019 January 2022 TVA Slides - Watts Bar Nuclear Plant (WBN) Schedule for the Development of a License Amendment Request (LAR) for Increased Tritium Production at WBN ML21343A0282021-12-14014 December 2021 TVA Slide Presentation Regarding Pre-Submittal Meeting for Proposed Revision to Capsule Withdrawal Schedule ML21281A2282021-10-13013 October 2021 Tennessee Valley Authority Fleet Pre-Submittal Meeting for License Amendment Request to Change Emergency Action Level Scheme Presentation - October 13, 2021 (EPID L-2021-LRM-0096) (Slides) ML21250A3652021-09-0808 September 2021 Meeting Slides - Watts Bar Nuclear Plant Unit 2, Presubmittal Teleconference for Proposed License Amendment to Revise the Updated Final Safety Analyses Report (UFSAR) to Use a Tube Support Plate Locking/Displacement Analysis ML21229A1992021-08-19019 August 2021 Mid-Cycle SG Outage Strategy (EPID L-2021-LRM-0067) (Slides) ML21217A2872021-08-19019 August 2021 TVA Slides - Pre-Submittal Meeting for Proposed License Amendment Request Re Application to Modify Technical Specification 3.7.8 Essential Raw Cooling Water (ERCW) System, to Support Permanent Shutdown Board ML21231A0972021-08-18018 August 2021 TVA Slides - Pre-Submittal Meeting for Proposed LAR Regarding Application to Modify Watts Bar Units 1 and 2 Technical Specification 3.7.8, Essential Raw Cooling Water (ERCW) System, to Support Permanent Shutdown Board Cleaning ML21096A1312021-04-0707 April 2021 Pre-submittal Meeting for Inservice Testing (IST) Program Request for One-Time Extension of Test Frequency of WBN Unit 1 Group 6 Relief Valves ML21096A1002021-04-0606 April 2021 Annual Assessments ML21041A1552021-02-11011 February 2021 Meeting Slides for February 11, 2021 Meeting with TVA ML21019A5692021-01-19019 January 2021 Pre-Submittal Teleconference for Proposed License Amendment Requests (Lars) for the WBN Unit 2 Replacement Steam Generator (RSG) Project ML20352A0362020-12-17017 December 2020 Pre-Submittal Teleconference for Proposed License Amendment to Revise the Updated Final Safety Analysis Report (UFSAR) to Use an Alternate Probability of Detection (POD) ML20329A3722020-11-24024 November 2020 Pre-Submittal Teleconference for Proposed License Amendment Request Regarding Technical Specification 5.9.9, Steam Generator Tube Inspection Report, to Use Popcd Methodology ML21050A1562020-10-21021 October 2020 Graizer - Presentation - Analysis of Tva'S Watts Bar Nuclear Power Plant Strong-Motion Records of the M 4.4 December 12, 2018 Decatur Tennessee Earthquake ML20239A8672020-08-27027 August 2020 Pre-Submittal Meeting Slides License Amendment Request for Technical Specification 5.7.2.19 ML20220A2022020-08-0707 August 2020 Pre-Submittal Meeting Slides - Proposed License Approach Regarding a Change for Watts Bar Nuclear Plant Units 1 & 2 Technical Specification 3.3.2 Table 1 Function 6.e Auxiliary Feedwater Auto-Start from Loss of Main Feedwater Pumps(Epid L-2 ML20209A0702020-07-27027 July 2020 Pre-submittal Meeting for Inservice Testing (IST) Program Request for Relief from Increased Frequency Testing of Residual Heat Removal (RHR) Pump 1B-B Meeting Slides ML20169A5222020-06-25025 June 2020 Pre-Submittal Meeting for License Amendment Request (LAR) Revised Steam Generator (SG) Inspection Intervals and TSTF-510 ML20175A0552020-06-23023 June 2020 TVA Slides for June 23, 2020, Emergency Plan Change Presubmittal Meeting ML20148M1452020-05-27027 May 2020 (Wbn)Proposed License Approach Regarding a Change for the WBN Units 1& 2 Technical Specification (TS) 3.3.2 Table 1 Function 6.e Auxiliary Feedwater Auto-Start from Loss of Main Feedwater Pumps ML20147A0132020-05-26026 May 2020 NRC Slides Final WBN-1 TS 3.3.3 LAR ML20134J0102020-05-14014 May 2020 Pre-Submittal Meeting for License Amendment Request Technical Specification 5.9.6 Add NRC-approved Neutron Fluence Calculational Methodology ML20125A3242020-05-0505 May 2020 Pre-Submittal Meeting Slides for License Amendment Request - Main Control Room Chiller Completion Time Extension ML20112F5302020-04-21021 April 2020 TVA Nuclear Plants -2019 EOC Media Loop Slides for Automatic Play (Final) ML20049G1822020-02-18018 February 2020 February 20, 2020 - Pre-submittal Meeting Presentation - Transition to Westinghouse Fuel ML20009C3962020-01-0808 January 2020 Pre-Submittal Telecon for Expedited License Amendment Request to Revise Technical Specification 3.3.5, LOP DG Start Instrumentation ML19282A0082019-10-0909 October 2019 TVA Slides for Pre-Submittal Meeting for License Amendment Request to Correct Unbalanced Voltage Relay Instrumentation Values ML19298A0042019-09-12012 September 2019 Presentation Slides for 9/12/19 Public Meeting ML19255H5522019-09-12012 September 2019 August 27, 2019, Summary of Public Meeting - Tennessee Valley Safety Conscious Work Environment Update at Watts Bar, Docket 50-390 and 50-391 ML19252A0532019-09-0909 September 2019 TVA Presentation Slides: Watts Bar Nuclear Plant Pre-Submittal Meeting for License Amendment Request Revised Offsite Electrical Power Sources ML19252A0522019-09-0909 September 2019 TVA Presentation Slides: Watts Bar Nuclear Plant (WBN) Application to Modify WBN Unit 1 and Unit 2 Technical Specification (TS) 3.6.15, Shield Building - September 11, 2019 ML19235A2712019-08-23023 August 2019 2019 TVA Watts Bar Nuclear Plant Public Meeting Slides 08-27-2019 (TVA Slides) ML19197A0932019-07-16016 July 2019 Presentation Slides - Watts Bar Nuclear Plant (WBN) Unit 2, Pre-Submittal Meeting for License Amendment Request Measurement Uncertainty Recapture (Mur) Power Update ML19178A2462019-07-0101 July 2019 Presentation Material for July 1, 2019 Pre-submittal Meeting with TVA on Full Spectrum LOCA Methodology for Watts Bar, Units 1 and 2 2023-09-27
[Table view] |
Text
Watts Bar Nuclear Plant (WBN)
Pre-submittal Meeting for Inservice Testing (IST) Program Request for Relief from Increased Frequency Testing of Residual Heat Removal (RHR) Pump 1B-B July 28, 2020
Agenda
- Pump Test History and Trends
- Assessment of Pump Condition
- Adequacy of Alternative Testing
- Schedule for Submittal l 2
Introduction
- Purpose of the meeting is to provide information for a planned request for relief due to hardship from the OM Code requirement to perform increased frequency testing of the WBN Unit 1 RHR 1B-B comprehensive pump test.
- This presentation summarizes the following:
- Pump design
- Pump test history and trends
- Assessment of pump condition
- Corrective actions
- Description of hardship
- Adequacy of alternative testing l 3
Pump Design
- RHR Pump 1B-B is a vertically mounted centrifugal pump with the pump impeller attached to the motor shaft.
- There are no bearings in the pump bowl area (only in the motor).
- The pump motor does not have its own support foundation or structure. The pump bowl is attached to a support table structure in three locations as shown in the following photos.
PLACE THE TITLE OF THE PRESENTATION HERE l 4
l 5 l 6 l 7 l 8 Pump Test History and Trends
- Group A test vibration reference values at 700 gpm are higher than the comprehensive pump test (CPT) vibration reference values at 4262 gpm.
- Pump hydraulic values for both Group A and CPT are in the acceptable range with no adverse trend.
- Slightly elevated vibration levels1 were first noticed in May 2018 during quarterly Group A pump testing.
- In October 2018 (U1R15 refueling outage), vibration levels were also slightly elevated during the CPT.
- 1. Vibration measurement locations are on the pump motor. Vibration locations beginning with A are outboard (upper portion) and those beginning with B or inboard (lower portion nearest pump). The locations are marked and some may be seen in the photos).
l 9
Pump Test History and Trends (continued)
- After the U1R15 refueling outage, vibration levels on the quarterly Group A test exhibited a step change and plateaued except location A-H which increased just prior to U1R16 (May 2020).
- During the U1R16 refueling outage, vibration levels during the CPT vibration levels at four of the five locations exhibited an increase in level from the U1R15 CPT with locations A-H and A-V both entering the alert range.
- The quarterly Group A test on June 8, 2020 showed one vibration location with a step increase in level, one location with marked decrease in level, and the other three locations with slight increase in levels.
l 10
Assessment of Pump Condition
- Troubleshooting of vibration levels of the pump/motor and associated support structure was performed during U1R16 refueling outage with the pump operating in RHR shutdown cooling mode at a flow rate near the CPT value.
- Identified some evidence of looseness in the support structure and indications were noted such as cracked and missing paint near certain mechanical fasteners on the northeast side of the support structure that indicated the framing had shifted.
l 11
l 12 Assessment of Pump Condition (continued)
- Spectral analysis of the vibration data did not identify any trend that points to a degrading bearing condition but the overall amplitude has experienced a slight increasing trend.
- No bearing fault frequencies are present
- No evidence of shaft rubbing
- Bearing oil analyses performed in December 2019 and May 2018 were compared.
- No moisture present.
- Viscosity, wear metals, and chemistry values were all within normal operating ranges.
- Iron content rose from 30 to 53 ppm, likely due legacy material or content drawn into sample via the sampling pathway.
l 13
Corrective Actions
- Another Group A test was performed on June 24, 2020, and the following actions were taken:
- While the pump was running at the Group A test flow rate.
- Vibration levels were monitored, and
- Bolting of the support structure was re-torqued in the area that had shown evidence looseness / slippage.
- There was no appreciable change in vibration level after re-torqueing of the support structure.
- Three of the five monitored bearing locations/directions (A-H, A-A, and B-H) exhibited an increase from the June 8, 2020, Group A test.
l 14
=
Applicable Code Requirement===
- WBN IST Program OM Code of record is the 2004 Edition through 2006 Addenda
- When a measured test parameter value falls within the alert range, ISTB-6200(a) requires the frequency of testing to be doubled until the cause of deviation is determined and the condition is corrected, or an analysis of the pump is performed in accordance with ISTB-6300(c).
- WBN RHR Pump 1B-B vibration levels entered the alert range of the CPT performed on May 2020 (U1R16 refueling outage) l 15
Description of Hardship
- Performance of the RHR 1B-B CPT requires the reactor vessel head to be removed in order to achieve the necessary flow rate.
- The alert frequency CPT (double the two year CPT frequency) is required to be performed in May 2021 per ISTB-6000(a).
- The next opportunity to perform the CPT during a scheduled refueling outage is U1R17 (October 2021).
l 16
Description of Hardship (continued)
- Shutting down the unit and removing the reactor vessel head to perform the CPT is a hardship.
- Performing the CPT two to three months earlier than the regularly scheduled refueling outage does not provide a compensating increase in the level of quality and safety.
l 17
Adequacy of Alternative Testing
- The Group A test vibration reference values are higher than the CPT vibration reference values
- Quarterly Group A testing has demonstrated capability to show the increasing trend in pump vibration levels in a similar manner as the CPT
- The corrective actions of ISTB-6200 will be followed if any of the Group A test measured values enter the alert or required action range.
l 18
Schedule for Submittal
- TVA to submit request for relief to NRC by August 14, 2020
- TVA requests NRC approval before the increased test frequency due date of May 20, 2021. This date is based on the last comprehensive pump test date plus 12 months, which is double the two year comprehensive test frequency as required by ISTB-6200(a).
l 19