Letter Sequence Meeting |
---|
|
|
MONTHYEARML19161A2412019-06-11011 June 2019 Pre-Application Meeting for Proposed License Amendment Request (LAR) Regarding Change to the WBN Unit 2 Technical Specifications (TS) 3.4.17, Steam Generator Tube Integrity and 5.7.2.12 Steam Generator Program Project stage: Meeting ML19204A0932019-08-0505 August 2019 Summary of Pre-Submittal Meeting with Tennessee Valley Authority Regarding Future License Amendment Request for Technical Specification Change for Steam Generator Tube Repair Project stage: Meeting 2019-06-11
[Table View] |
|
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML23291A1562023-10-18018 October 2023 NRC Pre-Submittal Meeting Watts Bar & Sequoyah LAR, TVA Presentation Slides ML23264A0412023-09-27027 September 2023 NRC Pre-Submittal Meeting WBN Rebaseline LAR, TVA Presentation Slides ML23251A1212023-09-12012 September 2023 RHR Flow Rate Reduction During Mode 6 Operation at 23 Ft. Refueling Water Level Technical Specification Change NON-PROPRIETARY Slides ML23251A1252023-09-12012 September 2023 Pre-submittal Meeting for License Amendment Request, Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specification Surveillance Requirement 3.9.5.1 ML23178A0832023-07-10010 July 2023 Pre-submittal Meeting Slides for License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs ML23128A2882023-05-0808 May 2023 TVA Nuclear Plants -2022 EOC Media Slides ML23052A0362023-02-22022 February 2023 February 22, 2023, Pre-Submittal Meeting for the License Amendment Request for Increased Tritium Production at Watts Bar (EPID L-2023-LRM-0010) - Meeting Slides ML23044A5182023-02-15015 February 2023 Pre-Submittal Meeting Slides for Expedited License Amendment Request Re Main Control Room Chiller Completion Time Extension ML23041A3562023-02-15015 February 2023 February 15, 2023 Pre-submittal Meeting for Expedited License Amendment Request Main Control Room (MCR) Chiller Completion Time Extension (EPID L-2022-LRM-0098) (Slides) ML22318A1042022-11-14014 November 2022 Pre-submittal Meeting for American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative WBN-2-ISI-01 Slide Presentation ML22157A4132022-06-0606 June 2022 Plants - Pre-Submittal Teleconference for Proposed Amendment Request Regarding the Change for the Sequoyah and Watts Bar Nuclear Plants Technical Specification 3.4.12 Meeting Slides ML22102A3032022-04-12012 April 2022 Pre-submittal Meeting for Request for Exemption from Requirements of 10 CFR 26.205(d)(4) and 10 CFR 26.205(d)(6) Slide Presentation ML22080A1662022-03-21021 March 2022 TVA Nuclear Plants -2021 EOC Media Loop Slides for Automatic Play ML21343A0282021-12-14014 December 2021 TVA Slide Presentation Regarding Pre-Submittal Meeting for Proposed Revision to Capsule Withdrawal Schedule ML21281A2282021-10-13013 October 2021 Tennessee Valley Authority Fleet Pre-Submittal Meeting for License Amendment Request to Change Emergency Action Level Scheme Presentation - October 13, 2021 (EPID L-2021-LRM-0096) (Slides) ML21250A3652021-09-0808 September 2021 Meeting Slides - Watts Bar Nuclear Plant Unit 2, Presubmittal Teleconference for Proposed License Amendment to Revise the Updated Final Safety Analyses Report (UFSAR) to Use a Tube Support Plate Locking/Displacement Analysis ML21217A2872021-08-19019 August 2021 TVA Slides - Pre-Submittal Meeting for Proposed License Amendment Request Re Application to Modify Technical Specification 3.7.8 Essential Raw Cooling Water (ERCW) System, to Support Permanent Shutdown Board ML21229A1992021-08-19019 August 2021 Mid-Cycle SG Outage Strategy (EPID L-2021-LRM-0067) (Slides) ML21231A0972021-08-18018 August 2021 TVA Slides - Pre-Submittal Meeting for Proposed LAR Regarding Application to Modify Watts Bar Units 1 and 2 Technical Specification 3.7.8, Essential Raw Cooling Water (ERCW) System, to Support Permanent Shutdown Board Cleaning ML21117A0722021-04-27027 April 2021 Meeting Slides for April 28, 2021 Meeting with TVA ML21096A1312021-04-0707 April 2021 Pre-submittal Meeting for Inservice Testing (IST) Program Request for One-Time Extension of Test Frequency of WBN Unit 1 Group 6 Relief Valves ML21041A1552021-02-11011 February 2021 Meeting Slides for February 11, 2021 Meeting with TVA ML20345A0262020-12-10010 December 2020 Replacement Steam Generator Project Planned License Amendment Request (Lars). LAR Descriptions and Submittal Schedule Meeting Slides ML20329A3722020-11-24024 November 2020 Pre-Submittal Teleconference for Proposed License Amendment Request Regarding Technical Specification 5.9.9, Steam Generator Tube Inspection Report, to Use Popcd Methodology ML20302A1232020-10-28028 October 2020 Pre-Submittal Meeting Slides Non-Voluntary Application to Modify WBN Unit 1 and Unit 2 TS Surveillance Requirement 3.6.15.4, Shield Building ML20239A8672020-08-27027 August 2020 Pre-Submittal Meeting Slides License Amendment Request for Technical Specification 5.7.2.19 ML20175A0552020-06-23023 June 2020 TVA Slides for June 23, 2020, Emergency Plan Change Presubmittal Meeting ML20125A3242020-05-0505 May 2020 Pre-Submittal Meeting Slides for License Amendment Request - Main Control Room Chiller Completion Time Extension ML20049G1822020-02-18018 February 2020 February 20, 2020 - Pre-submittal Meeting Presentation - Transition to Westinghouse Fuel ML20009C3962020-01-0808 January 2020 Pre-Submittal Telecon for Expedited License Amendment Request to Revise Technical Specification 3.3.5, LOP DG Start Instrumentation ML19347B0722019-12-12012 December 2019 TVA and Xcel Energy Slides for Joint Presubmittal Meeting to License Amendment Requests to Adopt WCAP-17661, Revision 1 ML19282A0082019-10-0909 October 2019 TVA Slides for Pre-Submittal Meeting for License Amendment Request to Correct Unbalanced Voltage Relay Instrumentation Values ML19255H5522019-09-12012 September 2019 August 27, 2019, Summary of Public Meeting - Tennessee Valley Safety Conscious Work Environment Update at Watts Bar, Docket 50-390 and 50-391 ML19298A0042019-09-12012 September 2019 Presentation Slides for 9/12/19 Public Meeting ML19252A0532019-09-0909 September 2019 TVA Presentation Slides: Watts Bar Nuclear Plant Pre-Submittal Meeting for License Amendment Request Revised Offsite Electrical Power Sources ML19235A2882019-08-23023 August 2019 2019 WBN SCWE Public Meeting Slides 8-27-2019 (NRC Slides) ML19235A2712019-08-23023 August 2019 2019 TVA Watts Bar Nuclear Plant Public Meeting Slides 08-27-2019 (TVA Slides) ML19178A2462019-07-0101 July 2019 Presentation Material for July 1, 2019 Pre-submittal Meeting with TVA on Full Spectrum LOCA Methodology for Watts Bar, Units 1 and 2 ML19161A2412019-06-11011 June 2019 Pre-Application Meeting for Proposed License Amendment Request (LAR) Regarding Change to the WBN Unit 2 Technical Specifications (TS) 3.4.17, Steam Generator Tube Integrity and 5.7.2.12 Steam Generator Program ML19161A2392019-06-10010 June 2019 Plants Pre-Submittal Meeting for Proposed License Amendments Hydrological Analysis Updates June 10, 2019 ML19142A3602019-05-21021 May 2019 May 9, 2019 Summary of Public Meeting; Watts Bar Nuclear Plant ML19018A0072019-01-18018 January 2019 (WBN)Pre-Submittal Meeting for Proposed License Amendment Request Regarding a One-Time Change for the WBN Unit 2 Technical Specification (TS) 3.7.8, Essential Raw Cooling Water (ERCW) System. ML18291A5732018-10-18018 October 2018 Chilled Work Environment ML18291A5632018-10-18018 October 2018 Chilled Worked Environment Update ML18248A1052018-09-0505 September 2018 Presentation Slides - Watts Bar Nuclear Plant Units 1 and 2 Adoption of TSTF-425 Initiative 5b - Surveillance Frequency Control Program - September 6, 2018 ML18248A1022018-09-0505 September 2018 Presentation Slides - Watts Bar Nuclear Plant (WBN) Pre-Submittal Meeting for Proposed License Amendment Request Regarding Shutdown Board Cleaning - September 6, 2018 ML18248A1012018-09-0505 September 2018 Bar Nuclear Plant (WBN) Pre-Submittal Meeting for Proposed License Amendment Adoption of TSTF-500 ML18248A1072018-09-0505 September 2018 Presentation Slides - Watts Bar Nuclear Plant Units 1 and 2 Adoption of 10 CFR 50.69 - September 6, 2018 ML18164A3192018-06-18018 June 2018 Presentation Material for 6/19/18 Pre-submittal Meeting ML18024A7932018-01-25025 January 2018 Presentation Slides - Watts Bar Nuclear Plant Unit 2 Pre-Submittal Meeting for Proposed License Amendment Request Regarding the Use of PAD4TCD in the Large Break Loss of Coolant Accident Analysis 2023-09-27
[Table view] Category:Slides and Viewgraphs
MONTHYEARML23291A1562023-10-18018 October 2023 NRC Pre-Submittal Meeting Watts Bar & Sequoyah LAR, TVA Presentation Slides ML23264A0412023-09-27027 September 2023 NRC Pre-Submittal Meeting WBN Rebaseline LAR, TVA Presentation Slides ML23251A1212023-09-12012 September 2023 RHR Flow Rate Reduction During Mode 6 Operation at 23 Ft. Refueling Water Level Technical Specification Change NON-PROPRIETARY Slides ML23251A1252023-09-12012 September 2023 Pre-submittal Meeting for License Amendment Request, Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specification Surveillance Requirement 3.9.5.1 ML23178A0832023-07-10010 July 2023 Pre-submittal Meeting Slides for License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs ML23128A2882023-05-0808 May 2023 TVA Nuclear Plants -2022 EOC Media Slides ML23052A0362023-02-22022 February 2023 February 22, 2023, Pre-Submittal Meeting for the License Amendment Request for Increased Tritium Production at Watts Bar (EPID L-2023-LRM-0010) - Meeting Slides ML23044A5182023-02-15015 February 2023 Pre-Submittal Meeting Slides for Expedited License Amendment Request Re Main Control Room Chiller Completion Time Extension ML23041A3562023-02-15015 February 2023 February 15, 2023 Pre-submittal Meeting for Expedited License Amendment Request Main Control Room (MCR) Chiller Completion Time Extension (EPID L-2022-LRM-0098) (Slides) ML23010A2542023-01-12012 January 2023 Pre-submittal Meeting for Expedited License Amendment Request Main Control Room (MCR) Chiller Completion Time Extension -- Meeting Slides ML22318A1042022-11-14014 November 2022 Pre-submittal Meeting for American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative WBN-2-ISI-01 Slide Presentation ML22157A4132022-06-0606 June 2022 Plants - Pre-Submittal Teleconference for Proposed Amendment Request Regarding the Change for the Sequoyah and Watts Bar Nuclear Plants Technical Specification 3.4.12 Meeting Slides ML22103A0852022-04-14014 April 2022 and Watts Bar Plant Pre-submittal Meeting for Inservice Testing (IST) Program Request for Alternative for the Motor Driven Auxiliary Feedwater Pump Testing Following Maintenance During an Outage Per ISTB-3310 ML22102A3032022-04-12012 April 2022 Pre-submittal Meeting for Request for Exemption from Requirements of 10 CFR 26.205(d)(4) and 10 CFR 26.205(d)(6) Slide Presentation ML22080A1662022-03-21021 March 2022 TVA Nuclear Plants -2021 EOC Media Loop Slides for Automatic Play ML22035A0002022-02-0404 February 2022 February 8, 2022, Pre-Submittal Meeting Slides Regarding Proposed Change to Modify the Allowable Value for Technical Specification Table 3.3.2-1, Function 6.e(1) ML22013A6432022-01-19019 January 2022 TVA Slides - Watts Bar Nuclear Plant (WBN) Schedule for the Development of a License Amendment Request (LAR) for Increased Tritium Production at WBN ML21343A0282021-12-14014 December 2021 TVA Slide Presentation Regarding Pre-Submittal Meeting for Proposed Revision to Capsule Withdrawal Schedule ML21281A2282021-10-13013 October 2021 Tennessee Valley Authority Fleet Pre-Submittal Meeting for License Amendment Request to Change Emergency Action Level Scheme Presentation - October 13, 2021 (EPID L-2021-LRM-0096) (Slides) ML21250A3652021-09-0808 September 2021 Meeting Slides - Watts Bar Nuclear Plant Unit 2, Presubmittal Teleconference for Proposed License Amendment to Revise the Updated Final Safety Analyses Report (UFSAR) to Use a Tube Support Plate Locking/Displacement Analysis ML21229A1992021-08-19019 August 2021 Mid-Cycle SG Outage Strategy (EPID L-2021-LRM-0067) (Slides) ML21217A2872021-08-19019 August 2021 TVA Slides - Pre-Submittal Meeting for Proposed License Amendment Request Re Application to Modify Technical Specification 3.7.8 Essential Raw Cooling Water (ERCW) System, to Support Permanent Shutdown Board ML21231A0972021-08-18018 August 2021 TVA Slides - Pre-Submittal Meeting for Proposed LAR Regarding Application to Modify Watts Bar Units 1 and 2 Technical Specification 3.7.8, Essential Raw Cooling Water (ERCW) System, to Support Permanent Shutdown Board Cleaning ML21096A1312021-04-0707 April 2021 Pre-submittal Meeting for Inservice Testing (IST) Program Request for One-Time Extension of Test Frequency of WBN Unit 1 Group 6 Relief Valves ML21096A1002021-04-0606 April 2021 Annual Assessments ML21041A1552021-02-11011 February 2021 Meeting Slides for February 11, 2021 Meeting with TVA ML21019A5692021-01-19019 January 2021 Pre-Submittal Teleconference for Proposed License Amendment Requests (Lars) for the WBN Unit 2 Replacement Steam Generator (RSG) Project ML20352A0362020-12-17017 December 2020 Pre-Submittal Teleconference for Proposed License Amendment to Revise the Updated Final Safety Analysis Report (UFSAR) to Use an Alternate Probability of Detection (POD) ML20329A3722020-11-24024 November 2020 Pre-Submittal Teleconference for Proposed License Amendment Request Regarding Technical Specification 5.9.9, Steam Generator Tube Inspection Report, to Use Popcd Methodology ML21050A1562020-10-21021 October 2020 Graizer - Presentation - Analysis of Tva'S Watts Bar Nuclear Power Plant Strong-Motion Records of the M 4.4 December 12, 2018 Decatur Tennessee Earthquake ML20239A8672020-08-27027 August 2020 Pre-Submittal Meeting Slides License Amendment Request for Technical Specification 5.7.2.19 ML20220A2022020-08-0707 August 2020 Pre-Submittal Meeting Slides - Proposed License Approach Regarding a Change for Watts Bar Nuclear Plant Units 1 & 2 Technical Specification 3.3.2 Table 1 Function 6.e Auxiliary Feedwater Auto-Start from Loss of Main Feedwater Pumps(Epid L-2 ML20209A0702020-07-27027 July 2020 Pre-submittal Meeting for Inservice Testing (IST) Program Request for Relief from Increased Frequency Testing of Residual Heat Removal (RHR) Pump 1B-B Meeting Slides ML20169A5222020-06-25025 June 2020 Pre-Submittal Meeting for License Amendment Request (LAR) Revised Steam Generator (SG) Inspection Intervals and TSTF-510 ML20175A0552020-06-23023 June 2020 TVA Slides for June 23, 2020, Emergency Plan Change Presubmittal Meeting ML20148M1452020-05-27027 May 2020 (Wbn)Proposed License Approach Regarding a Change for the WBN Units 1& 2 Technical Specification (TS) 3.3.2 Table 1 Function 6.e Auxiliary Feedwater Auto-Start from Loss of Main Feedwater Pumps ML20147A0132020-05-26026 May 2020 NRC Slides Final WBN-1 TS 3.3.3 LAR ML20134J0102020-05-14014 May 2020 Pre-Submittal Meeting for License Amendment Request Technical Specification 5.9.6 Add NRC-approved Neutron Fluence Calculational Methodology ML20125A3242020-05-0505 May 2020 Pre-Submittal Meeting Slides for License Amendment Request - Main Control Room Chiller Completion Time Extension ML20112F5302020-04-21021 April 2020 TVA Nuclear Plants -2019 EOC Media Loop Slides for Automatic Play (Final) ML20049G1822020-02-18018 February 2020 February 20, 2020 - Pre-submittal Meeting Presentation - Transition to Westinghouse Fuel ML20009C3962020-01-0808 January 2020 Pre-Submittal Telecon for Expedited License Amendment Request to Revise Technical Specification 3.3.5, LOP DG Start Instrumentation ML19282A0082019-10-0909 October 2019 TVA Slides for Pre-Submittal Meeting for License Amendment Request to Correct Unbalanced Voltage Relay Instrumentation Values ML19298A0042019-09-12012 September 2019 Presentation Slides for 9/12/19 Public Meeting ML19255H5522019-09-12012 September 2019 August 27, 2019, Summary of Public Meeting - Tennessee Valley Safety Conscious Work Environment Update at Watts Bar, Docket 50-390 and 50-391 ML19252A0532019-09-0909 September 2019 TVA Presentation Slides: Watts Bar Nuclear Plant Pre-Submittal Meeting for License Amendment Request Revised Offsite Electrical Power Sources ML19252A0522019-09-0909 September 2019 TVA Presentation Slides: Watts Bar Nuclear Plant (WBN) Application to Modify WBN Unit 1 and Unit 2 Technical Specification (TS) 3.6.15, Shield Building - September 11, 2019 ML19235A2712019-08-23023 August 2019 2019 TVA Watts Bar Nuclear Plant Public Meeting Slides 08-27-2019 (TVA Slides) ML19197A0932019-07-16016 July 2019 Presentation Slides - Watts Bar Nuclear Plant (WBN) Unit 2, Pre-Submittal Meeting for License Amendment Request Measurement Uncertainty Recapture (Mur) Power Update ML19178A2462019-07-0101 July 2019 Presentation Material for July 1, 2019 Pre-submittal Meeting with TVA on Full Spectrum LOCA Methodology for Watts Bar, Units 1 and 2 2023-09-27
[Table view] |
Text
Watts Bar Nuclear Plant (WBN)
Pre-Application Meeting for Proposed License Amendment Request (LAR) Regarding Change to the WBN Unit 2 Technical Specifications (TS) 3.4.17, Steam Generator Tube Integrity and 5.7.2.12 Steam Generator Program June 11, 2019
Agenda
- Opening Remarks (R. Wells)
- WBN Unit 2 SG Program (J. Mayo)
- WBN Unit 2 SG Operating and Maintenance Strategy (J. Mayo)
- Basis to Install Alloy 800 Non-Nickel Banded Leak-Limiting Sleeves (J. Smith)
- Operating Experience (J. Smith)
- Regulatory Precedent (R. Wells)
- Schedule for Submittal (R. Wells)
- Closing Remarks (R. Wells) l 2
Opening Remarks
- WBN Unit 2 is scheduled to perform the next steam generator (SG) tube inspections during the Fall 2020 outage (U2R3)
- Two leak-limiting Alloy 800 sleeve designs are proposed for use in repairing SG tubes: a transition zone (TZ) sleeve, and a tube support sleeve
- Currently, only nickel banded tube sleeves are licensed domestically to address top of the tubesheet cracks l 3
Opening Remarks (cont)
- Elimination of the nickel band from the lower joint of the TZ sleeve is proposed to address concerns related to eddy current inspection of the parent tube wall adjacent to the sleeve nickel band
- Nondestructive eddy current examination methods have been demonstrated to be effective in accordance with the requirements of the Electric Power Research Institute (EPRI) SG Examination Guidelines for the TZ and tube support sleeve l 4
WBN Unit 2 SG Design
- WBN Unit 2 commenced commercial operation in October 2016
- Westinghouse NSSS loop design
- Westinghouse Model D3 SGs
> Alloy 600 low temperature mill annealed tubes
> Proactive measures implemented prior to commercial operation to mitigate Primary Water Stress Corrosion Cracking (PWSCC) susceptibility include:
>> Row 1 and 2 U-bend in situ stress relieving
>> Tubesheet rotopeening
> Zinc Addition Program implemented l 5
WBN Unit 2 Steam Generator Program
- The SG Program establishes additional provisions for SG tube plugging or repair criteria, SG tube inspections, and SG tube repair methods l 6
WBN Unit 2 Steam Generator Operating and Maintenance Strategy
- SG replacement tentatively projected for WBN U2R5 (Fall 2023)
- LAR is needed to have the option to sleeve tubes (if needed) for U2R3 (Fall 2020) l 7
Basis to Install Alloy 800 Non-Nickel Banded Leak-Limiting Sleeves
- Qualification testing and structural analysis
- Improved inspection capabilities
Basis to Install Alloy 800 Non-Nickel Banded Leak-Limiting Sleeves
- Alloy 800 Non-Nickel Banded Leak-Limiting TZ Sleeve Design Description Hydraulic l 9
Basis to Install Alloy 800 Non-Nickel Banded Leak-Limiting Sleeves
- Alloy 800 Non-Nickel Banded Leak-Limiting TZ Sleeve Design Description 0.625 Diameter The thermally sprayed nickel alloy 0.040 Minimum band, (microlok) results in a rough surface which enhances the strength of the rolled mechanical joint.
Microlok Band l 10
Basis to Install Alloy 800 Non-Nickel Banded Leak-Limiting Sleeves
- Alloy 800 Leak-Limiting Tube Support Sleeve Design Description Hydraulic Expansion l 11
Basis to Install Alloy 800 Non-Nickel Banded Leak-Limiting Sleeves
- Alloy 800 non-nickel band leak-limiting sleeve design description
> Roll expanded joints are robust
>> Used in numerous power generator and other applications (SG tube plugs, sleeves, etc) because of their inherent characteristics
>> Provide the most load bearing capability and best leakage restriction performance compared to other expansion techniques
>> F* and L* Alternate Repair Criteria (ARC) address roll expanded joints Typical F* length ~ 1 inch from the top of tubesheet (TTS), 1.64 inch at WBN Unit 2 Shorter F* lengths can be used based on tubesheet elevation; consistent with sleeve roll joint elevation
> Limited or no potential of degradation of parent tube adjacent to TZ lower joint
>> Rotopeening greatly improves PWSCC resistance
>> Finite Element Analysis (FEA) modeling shows parent tube residual stresses are l 12 compressive
Basis to Install Alloy 800 Non-Nickel Banded Leak-Limiting Sleeves
- Previous qualification testing, corrosion testing, and structural analyses for nickel banded sleeve applies to non-nickel banded sleeve
- Previous mechanical load tests which included axial load, pressure, collapse and load cycling were performed on sleeve tube assemblies without the nickel band
- Previous leak tests were also performed for various temperatures and pressures under normal operating and main steam line break conditions without the nickel band
- Structural analyses of the sleeve-tube assembly do not model the presence of the nickel band
- NEI 97-06 structural and leakage performance criteria are demonstrated l 13
Basis to Install Alloy 800 Non-Nickel Banded Leak-Limiting Sleeves
- Improved sleeve inspection capability over nickel banded TZ sleeve
- The proposed TS amendment will include a requirement to perform an inspection of the parent tube in the area of the TZ and tube support sleeve expansion joints
> Sleeve installation will only proceed if these regions are free of service-induced indications
- With the elimination of the nickel band from the lower joint of the TZ sleeve, for both the TZ and tube support sleeves, nondestructive examination methods have been demonstrated to be in compliance with EPRI SG Tube Examination Guidelines
- Tubes found by inservice inspection that contain a flaw in a sleeve or sleeve to tube joint shall be plugged l 14
Basis to Install Alloy 800 Non-Nickel Banded Leak-Limiting Sleeves
- Roll expanded lower joint for the TZ sleeve is robust; upper joint is same hydraulic expansions which have been approved for nickel banded sleeves
- Parent tube residual stresses are compressive post sleeve rolling - one of the elements necessary for SCC initiation is eliminated
- NEI 97-06, Rev. 3 SG tube integrity performance criteria are met
- The non-nickel banded TZ sleeve is qualified to Appendix H of the EPRI SG Tube Examination Guidelines
- TVA will conservatively plug any tube with a flaw within TZ and tube support sleeves l 15
Operating Experience
- Alloy 800 Sleeve/Tube Operating Experience
- More than 14,000 leak-limiting Alloy 800 TZ sleeves without the nickel band have been installed worldwide with no reported parent tube/sleeve degradation
- Approximately 12,000 tube support sleeves have been installed with no reported parent tube/sleeve degradation
- Hundreds of SG tubes that contain leak-limiting Alloy 800 PLUSS (plug replacing sleeve which also stabilizes) sleeves installed have been in operation in international plants for over 12 effective full power years (EFPY) with no reports of sleeve/parent tube wall degradation
- Besides leak-limiting Alloy 800 sleeves, Alloy 800 tubing has been used in SG tube design in international plants with excellent results based on experience in over 200,000 tubes in service
> In-service inspection (ISI) data from Spanish RSGs with Alloy 800 tubing identified outer diameter (OD) circumferential cracking (~2009 timeframe)
>> Associated with denting at TTS resulting from poor chemistry control
>> Chemical cleaning applied to remove hardened deposits - no stress corrosion cracking (SCC) reports long term
> One German unit reported axial ODSCC in tubesheet (one tube)
>> No additional reports since initial identification l 16
Operating Experience
- An extensive history of Westinghouse Hybrid Expansion Joint (HEJ) and Laser Welded Sleeve (LWS) installations further supports the conclusion that degradation of the parent tube adjacent to the roll expansion at the lower joint is not anticipated
- No reports of parent tube SCC in the sleeve roll joint region for any Westinghouse sleeve design l 17
Operating Experience l 18
Regulatory Precedent
- Prior to SG replacement the NRC issued Amendment No. 44 for WBN Unit 1 allowing the use of leak-limiting Alloy 800 sleeves to repair defective SG tubes as an alternative to plugging a tube (ML032300143)
- Only difference in 2003 is the TZ sleeve had a nickel band at the lower joint in addition to a thermally sprayed nickel band (microlok band)
- Previous WCAP-15918, Revision 0, submitted in 2003, is primarily being revised to reflect changes in sleeve design description, sleeve operating experience, and eddy current inspection capability, with the removal of the nickel band in the lower joint of the TZ sleeve.
- TZ sleeve (with nickel band) and tube support sleeve approved in 2003 for installation
- Nickel band TZ and tube support sleeve (no nickel band) approved in 2019 at Beaver Valley Unit 2 (ML18348B206)
- Non-Nickel band sleeve TZ and tube support sleeve to be installed at WBN Unit 2 l 19
Regulatory Precedent
- As noted in the Beaver Valley Unit 2 NRC SE, The PLUSS sleeves are identical to the Alloy 800 leak-limiting sleeves at Beaver Valley, Unit 2, except that there is no nickel band on the PLUSS sleeves. The NRC staff found this information to be valuable because this international operating experience bounds the number of effective full power years that the Beaver Valley, Unit 2, sleeves will have at the end of the proposed sleeving extension.
l 20
Schedule for Submittal
- 6/11/19 - Pre-application meeting with the NRC
- Late August 2019 Pre-submittal meeting with NRC
- 9/30/19 - Submit LAR to NRC
- Request NRC approval within one year to support WBN U2R3 outage in Fall of 2020 to support next inspection l 21
Closing Remarks
- Proposed WBN Unit 2 TS changes are needed to address anticipated SG tube degradation.
- These changes are needed to support the WBN Unit 2 Cycle 3 Fall 2020 outage.
- SG tube integrity in accordance with NEI 97-06, Rev. 3 criteria is maintained with the installation of non-nickel banded TZ and tube support leak-limiting Alloy 800 sleeves for the repair of defective SG tubes at WBN Unit 2.
l 22