ML24101A062: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:GE   Hitachi Nuclear                     Energy
{{#Wiki_filter:GE Hitachi Nuclear Energy
* HITACHI Carlos   Martinez Site Manager,                   Vallecitos Nuclear         Center 6705   Vallecitos Road Sunol,                 CA 94586 M240069                                                                                                                         USA
* HITACHI Carlos Martinez Site Manager, Vallecitos Nuclear Center 6705 Vallecitos Road Sunol, CA 94586 M240069 USA


T 925-495-9173 April 9,     2024                                                                                                               Carlosl.Martinez@ge.com
T 925-495-9173 April 9, 2024 Carlosl.Martinez@ge.com


U.S.                     Nuclear             Regulatory                     Commission Office of Nuclear             Reactor                 Regulation Director, Division of Advanced                                       Reactors                 and Non-Power                                           Production                           Utilization Facilities Attn: Document                                               Control     Desk
U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Director, Division of Advanced Reactors and Non-Power Production Utilization Facilities Attn: Document Control Desk


==Subject:==
==Subject:==
GEH   VNC                     Notification of Change                               in   Operator Status
GEH VNC Notification of Change in Operator Status


==Reference:==
==Reference:==
: 1) Nuclear           Test Reactor                 (NTR),       NRC     License       R-33,       Docket       50-73
: 1) Nuclear Test Reactor (NTR), NRC License R-33, Docket 50-73


==Dear       Sir or       Madam:==
==Dear Sir or Madam:==
 
In accordance with 10 CFR 50.74, GE Hitachi Nuclear Energy Americas, LLC (GEH) hereby provides notification of changes in a licensed operator status for the NTR (Reference 1 ).
In               accordance                                                                 with 10 CFR     50   .74,     GE     Hitachi Nuclear             Energy                 Americas,               LLC   (GEH) hereby                   provides notification of changes                                     in   a             licensed operator             status for the NTR (Reference         1 ).
On December 21, 2023, NTR permanently ceased reactor operations in preparation for NRC license transfers. On February 28, 2024, the NRC issued Amendment 26 to Facility Operating License No R-33 authorizing possession-only of the reactor and fuel.
On                 December                             21,   2023,     NTR   permanently                               ceased                     reactor       operations                   in   preparation         for NRC     license transfers. On                 February                                       28,   2024,   the NRC     issued Amendment                                                 26   to Facility Operating License       No               R-33     authorizing   possession-only                                     of the reactor       and                         fuel.
The updated Technical Specifications replace the requirement for NRG-licensed reactor operators with certified fuel handlers. As a result, on March 28, 2024 the individuals holding the three current NTR reactor operator licenses listed below were permanently reassigned.
The   updated               Technical             Specifications replace the requirement for NRG-licensed reactor operators           with certified fuel handlers. As a             result, on                             March               28,   2024 the individuals holding the three current         NTR     reactor       operator             licenses listed below                     were       permanently reassigned.
License No. Docket Number SOP-70551-2 55-70888 SOP-502514 55-73531 SOP-502515 55-73532 If you have any questions regarding this matter, please contact me.
License       No.                         Docket         Number SOP- 70551-2                             55-70888 SOP-502514                               55-73531 SOP-502515                               55-73532 If you                                       have               any                                   questions         regarding this matter, please contact                                 me.


Sincerely, t~rn1~
Sincerely, t~rn1~
Carlos   Martinez, Site Manager Vallecitos Nuclear           Center
Carlos Martinez, Site Manager Vallecitos Nuclear Center


cc:                                                                                         T. Tate,     NRC     NRR/DANU/UNPO J.     Parrott, NRC     NMSS/DUWP/RDB
cc: T. Tate, NRC NRR/DANU/UNPO J. Parrott, NRC NMSS/DUWP/RDB


CM     24-002}}
CM 24-002}}

Latest revision as of 18:04, 4 October 2024

GEH Vnc Notification of Change in Operator Status
ML24101A062
Person / Time
Site: Vallecitos Nuclear Center, 05570888, 05573531, 05573532
Issue date: 04/09/2024
From: Martinez C
GE-Hitachi Nuclear Energy Americas
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
M240069
Download: ML24101A062 (1)


Text

GE Hitachi Nuclear Energy

  • HITACHI Carlos Martinez Site Manager, Vallecitos Nuclear Center 6705 Vallecitos Road Sunol, CA 94586 M240069 USA

T 925-495-9173 April 9, 2024 Carlosl.Martinez@ge.com

U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Director, Division of Advanced Reactors and Non-Power Production Utilization Facilities Attn: Document Control Desk

Subject:

GEH VNC Notification of Change in Operator Status

Reference:

1) Nuclear Test Reactor (NTR), NRC License R-33, Docket 50-73

Dear Sir or Madam:

In accordance with 10 CFR 50.74, GE Hitachi Nuclear Energy Americas, LLC (GEH) hereby provides notification of changes in a licensed operator status for the NTR (Reference 1 ).

On December 21, 2023, NTR permanently ceased reactor operations in preparation for NRC license transfers. On February 28, 2024, the NRC issued Amendment 26 to Facility Operating License No R-33 authorizing possession-only of the reactor and fuel.

The updated Technical Specifications replace the requirement for NRG-licensed reactor operators with certified fuel handlers. As a result, on March 28, 2024 the individuals holding the three current NTR reactor operator licenses listed below were permanently reassigned.

License No. Docket Number SOP-70551-2 55-70888 SOP-502514 55-73531 SOP-502515 55-73532 If you have any questions regarding this matter, please contact me.

Sincerely, t~rn1~

Carlos Martinez, Site Manager Vallecitos Nuclear Center

cc: T. Tate, NRC NRR/DANU/UNPO J. Parrott, NRC NMSS/DUWP/RDB

CM 24-002