ML24137A188: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 29: | Line 29: | ||
*Type in your question at any time using Microsoft Teams. | *Type in your question at any time using Microsoft Teams. | ||
- or - | |||
*You can wait until the question-and-answer session to ask your question orally. | *You can wait until the question-and-answer session to ask your question orally. | ||
Line 35: | Line 35: | ||
* Reactor Oversight Process (ROP) | * Reactor Oversight Process (ROP) | ||
* 2023 Safety Performance Overview | * 2023 Safety Performance Overview | ||
- FitzPatrick | |||
- Ginna | |||
- Nine Mile Point | |||
- Beaver Valley | |||
- Calvert Cliffs | |||
- Hope Creek | |||
- Salem | |||
- Limerick | |||
- Peach Bottom | |||
- Susquehanna | |||
* Question-and-Answer Session 4 | * Question-and-Answer Session 4 | ||
Our Mission | Our Mission | ||
Line 52: | Line 52: | ||
5 Action Matrix Concept | 5 Action Matrix Concept | ||
Licensee | Licensee Regulatory Degraded Multiple/Repetitive Unacceptable Response Response Performance Degraded Performance Cornerstone | ||
Increasing Safety Significance | Increasing Safety Significance | ||
Line 66: | Line 66: | ||
7 Types of Inspections | 7 Types of Inspections | ||
* Baseline Inspection Program | * Baseline Inspection Program | ||
- Minimum level of inspection conducted at all facilities regardless of their performance. | |||
* Reactive Inspections (e.g., Special Inspections) | * Reactive Inspections (e.g., Special Inspections) | ||
- Events involving reactor facilities are investigated in a timely, objective, systematic and technically sound manner. | |||
* Supplemental Inspections (e.g., IP 95001) | * Supplemental Inspections (e.g., IP 95001) | ||
- Applies NRC inspection resources in a graded manner when risk-significant performance issues are identified. | |||
8 Reactor Oversight Process | 8 Reactor Oversight Process | ||
Line 88: | Line 88: | ||
11 R.E. Ginna Resident Inspectors | 11 R.E. Ginna Resident Inspectors | ||
Jason Schussler | Jason Schussler Chris Swisher Senior Resident Inspector Resident Inspector | ||
Facility Information Finder R.E. Ginna Nuclear Power Plant, Unit 1 | Facility Information Finder R.E. Ginna Nuclear Power Plant, Unit 1 | ||
Line 101: | Line 101: | ||
13 James A. FitzPatrick Resident Inspectors | 13 James A. FitzPatrick Resident Inspectors | ||
Eric Miller | Eric Miller Veronica Fisher Senior Resident Inspector Resident Inspector | ||
Facility Information Finder James A. Fitzpatrick Nuclear Power Plant, Unit 1 | Facility Information Finder James A. Fitzpatrick Nuclear Power Plant, Unit 1 | ||
Line 114: | Line 114: | ||
15 Nine Mile Point Resident Inspectors | 15 Nine Mile Point Resident Inspectors | ||
Chris Kline | Chris Kline Beth Sienel Senior Resident Inspector Resident Inspector | ||
Facility Information Finder Nine Mile Point Nuclear Station, Unit 1 / Nine Mile Point Nuclear Station, Unit 2 | Facility Information Finder Nine Mile Point Nuclear Station, Unit 1 / Nine Mile Point Nuclear Station, Unit 2 | ||
Line 133: | Line 133: | ||
18 Beaver Valley Resident Inspectors | 18 Beaver Valley Resident Inspectors | ||
Neil Day | Neil Day Alex Nugent Senior Resident Inspector Resident Inspector | ||
Facility Information Finder Beaver Valley Power Station, Unit 1 / Beaver Valley Power Station, Unit 2 | Facility Information Finder Beaver Valley Power Station, Unit 1 / Beaver Valley Power Station, Unit 2 | ||
Line 152: | Line 152: | ||
21 Calvert Cliffs Resident Inspectors | 21 Calvert Cliffs Resident Inspectors | ||
Gene DiPaolo | Gene DiPaolo Anthony Tran Senior Resident Inspector Resident Inspector | ||
Facility Information Finder Calvert Cliffs Nuclear Power Plant, Unit 1 / Calvert Cliffs Nuclear Power Plant, Unit 2 | Facility Information Finder Calvert Cliffs Nuclear Power Plant, Unit 1 / Calvert Cliffs Nuclear Power Plant, Unit 2 | ||
Line 161: | Line 161: | ||
Unit 2-Licensee Response Column | Unit 2-Licensee Response Column | ||
* 8,200 hours of inspection and related activities | * 8,200 hours of inspection and related activities | ||
* Green Performance | * Green Performance Indicators | ||
* 10 Green & 1 White Findings | * 10 Green & 1 White Findings | ||
* 1 Severity Level IV Violation Calvert Cliffs Unit 1 Action Matrix | * 1 Severity Level IV Violation Calvert Cliffs Unit 1 Action Matrix - Regulatory Response | ||
Licensee Licensee Regulatory Degraded Multiple/Repetitive Unacceptable Response | Licensee Licensee Regulatory Degraded Multiple/Repetitive Unacceptable Response Degraded Response Response Performance Cornerstone Performance | ||
* A Special Inspection was conducted in May 2023 following a failure of the 1A emergency diesel generator in April 2023. | * A Special Inspection was conducted in May 2023 following a failure of the 1A emergency diesel generator in April 2023. | ||
* The Special Inspection team identified a White Finding (3Q23) related to inadequate maintenance practices for the1A emergency diesel generator. | * The Special Inspection team identified a White Finding (3Q23) related to inadequate maintenance practices for the1A emergency diesel generator. | ||
Line 172: | Line 172: | ||
24 Hope Creek Resident Inspectors | 24 Hope Creek Resident Inspectors | ||
Jigar Patel | Jigar Patel Justin Bresson Senior Resident Inspector Resident Inspector Facility Information Finder Hope Creek Generating Station, Unit 1 | ||
25 Hope Creek 2023 Assessment Summary | 25 Hope Creek 2023 Assessment Summary | ||
Line 183: | Line 183: | ||
26 Salem Resident Inspectors | 26 Salem Resident Inspectors | ||
Larry Grimes | Larry Grimes Eli Garcia Senior Resident Inspector Resident Inspector (acting) | ||
Facility Information Finder Salem Nuclear Generating Station, Unit 1 / Salem Nuclear Generating Station, Unit 2 | Facility Information Finder Salem Nuclear Generating Station, Unit 1 / Salem Nuclear Generating Station, Unit 2 | ||
Line 201: | Line 201: | ||
29 Limerick Resident Inspectors | 29 Limerick Resident Inspectors | ||
Adam Ziedonis | Adam Ziedonis Eric Miller Senior Resident Inspector Resident Inspector (acting) | ||
Facility Information Finder Limerick Generating Station, Unit 1 / Limerick Generating Station, Unit 2 | Facility Information Finder Limerick Generating Station, Unit 1 / Limerick Generating Station, Unit 2 | ||
Line 213: | Line 213: | ||
31 Peach Bottom Resident Inspectors | 31 Peach Bottom Resident Inspectors | ||
Scott Rutenkroger | Scott Rutenkroger Corey Dukehart Senior Resident Inspector Resident Inspector | ||
Facility Information Finder Peach Bottom Atomic Power Station, Unit 2 / Peach Bottom Atomic Power Station, Unit 3 | Facility Information Finder Peach Bottom Atomic Power Station, Unit 2 / Peach Bottom Atomic Power Station, Unit 3 | ||
Line 223: | Line 223: | ||
* 7,100 hours of inspection and related activities. | * 7,100 hours of inspection and related activities. | ||
* Green Performance Indicators | * Green Performance Indicators | ||
* 10 Green Findings and 1 Severity Level IV Violation 33 Peach Bottom | * 10 Green Findings and 1 Severity Level IV Violation 33 Peach Bottom Unit 2 Action Matrix Transition | ||
Licensee | Licensee Regulatory Degraded Multiple/Repetitive Unacceptable Response Response Performance Degraded Performance Cornerstone | ||
Supplemental inspection (IP 95001) was completed in response to a White Finding (3Q22) | Supplemental inspection (IP 95001) was completed in response to a White Finding (3Q22) related to use of aprocedure not appropriate for plant conditions that led to a reactor scram, or shutdown. The plant transitioned from the Regulatory Response to the Licensee Response Column effective June 8, 2023. | ||
34 Susquehanna Resident Inspectors | 34 Susquehanna Resident Inspectors | ||
Jennifer England | Jennifer England Erin Brady Senior Resident Inspector Resident Inspector | ||
Facility Information Finder Susquehanna Steam Electric Station, Unit 1 / Susquehanna Steam Electric Station, Unit 2 | Facility Information Finder Susquehanna Steam Electric Station, Unit 1 / Susquehanna Steam Electric Station, Unit 2 | ||
Line 252: | Line 252: | ||
37 NRC Social Media Channels | 37 NRC Social Media Channels | ||
* Facebook www.facebook.com/nrcgov | * Facebook www.facebook.com/nrcgov | ||
* Twitter | * Twitter twitter.com/nrcgov | ||
* YouTube | * YouTube www.youtube.com/user/NRCgov | ||
* Instagram | * Instagram www.instagram.com/nrcgov | ||
* Flickr www.flickr.com/photos/nrcgov/sets | * Flickr www.flickr.com/photos/nrcgov/sets | ||
* LinkedIn www.linkedin.com/company/u-s--nuclear-regulatory-commission/mycompany/ | * LinkedIn www.linkedin.com/company/u-s--nuclear-regulatory-commission/mycompany/ | ||
* GovDelivery | * GovDelivery service.govdelivery.com/accounts/USNRC/sub scriber/new | ||
38 More Information | 38 More Information | ||
* Inspection Reports | * Inspection Reports | ||
- https://www.nrc.gov/reactors/operating/oversight/listofrpts-body.html | |||
* Reactor Oversight Process | * Reactor Oversight Process | ||
- https://www.nrc.gov/reactors/operating/oversight.html | |||
* Fact Sheets and Brochures | * Fact Sheets and Brochures | ||
- https://www.nrc.gov/reading-rm/doc-collections/fact-sheets/ | |||
* NRC Information Digest | * NRC Information Digest | ||
- https://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr1350/ | |||
* Regulations | * Regulations | ||
- https://www.nrc.gov/reading-rm/doc-collections/cfr/ | |||
39 Supplemental Meeting Feedback | 39 Supplemental Meeting Feedback | ||
Revision as of 15:04, 4 October 2024
ML24137A188 | |
Person / Time | |
---|---|
Site: | Beaver Valley, Calvert Cliffs, Peach Bottom, Salem, Nine Mile Point, Hope Creek, Susquehanna, Limerick, Ginna, FitzPatrick |
Issue date: | 05/16/2024 |
From: | NRC/RGN-I/DORS |
To: | |
References | |
Download: ML24137A188 (1) | |
Text
2023 Annual Assessment Meeting
Region I King of Prussia, PA May22, 2024
1 Meeting Conduct
- All participants will be muted during presentations by NRC staff.
- The chat is enabled to allow you to ask questions during the meeting.
- We encourage mutual respect on the part of NRC staff and attendees.
2 How to Ask a Question
- Type in your question at any time using Microsoft Teams.
- or -
- You can wait until the question-and-answer session to ask your question orally.
3 Agenda
- Reactor Oversight Process (ROP)
- 2023 Safety Performance Overview
- FitzPatrick
- Ginna
- Nine Mile Point
- Beaver Valley
- Calvert Cliffs
- Hope Creek
- Salem
- Limerick
- Peach Bottom
- Susquehanna
- Question-and-Answer Session 4
Our Mission
To license and regulate the nations civilian use of radioactive materials to provide reasonable assurance of adequate protection of public health and safety and to promote the common defense and security and protect the environment.
5 Action Matrix Concept
Licensee Regulatory Degraded Multiple/Repetitive Unacceptable Response Response Performance Degraded Performance Cornerstone
Increasing Safety Significance
Increasing NRC Inspection Efforts
Increasing NRC/Licensee Management Involvement
Increasing Regulatory Actions
6 Reactor Oversight Process
7 Types of Inspections
- Baseline Inspection Program
- Minimum level of inspection conducted at all facilities regardless of their performance.
- Reactive Inspections (e.g., Special Inspections)
- Events involving reactor facilities are investigated in a timely, objective, systematic and technically sound manner.
- Supplemental Inspections (e.g., IP 95001)
- Applies NRC inspection resources in a graded manner when risk-significant performance issues are identified.
8 Reactor Oversight Process
9 Facility Information Finder
- Additional Plant Information
- Safety Performance Summary
- Inspection Reports
- NRC Points of Contact
10 Projects Branch 1
Erin Carfang Branch Chief
Ginna FitzPatrick Nine Mile Point
11 R.E. Ginna Resident Inspectors
Jason Schussler Chris Swisher Senior Resident Inspector Resident Inspector
Facility Information Finder R.E. Ginna Nuclear Power Plant, Unit 1
12 R.E. Ginna 2023 Assessment Summary
- Operated safely and in a manner that preserved the public health and safety and protected the environment
- Licensee Response Column
- 4,300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> of inspectionand related activities
- Green Performance Indicators
- 6 Green Findings
13 James A. FitzPatrick Resident Inspectors
Eric Miller Veronica Fisher Senior Resident Inspector Resident Inspector
Facility Information Finder James A. Fitzpatrick Nuclear Power Plant, Unit 1
14 James A. FitzPatrick 2023 Assessment Summary
- Operated safely and in a manner that preserved the public health and safety and protected the environment
- Licensee Response Column
- 6,500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> of inspection and related activities.
- Green Performance Indicators
- 11 Green Findings and 2 Severity Level IV Violations
15 Nine Mile Point Resident Inspectors
Chris Kline Beth Sienel Senior Resident Inspector Resident Inspector
Facility Information Finder Nine Mile Point Nuclear Station, Unit 1 / Nine Mile Point Nuclear Station, Unit 2
16 Nine Mile Point 2023 Assessment Summary
- Operated safely and in a manner that preserved the public health and safety and protected the environment
- Licensee Response Column
- 9,100hours of inspection and related activities
- Green Performance Indicators
- 1 Green Finding
17 Projects Branch 2
Matt Young Branch Chief
Beaver Valley
18 Beaver Valley Resident Inspectors
Neil Day Alex Nugent Senior Resident Inspector Resident Inspector
Facility Information Finder Beaver Valley Power Station, Unit 1 / Beaver Valley Power Station, Unit 2
19 Beaver Valley 2023 Assessment Summary
- Operated safely and in a manner that preserved the public health and safety and protected the environment
- Licensee Response Column
- 5,700hours of inspection and related activities
- Green Performance Indicators
- 12 Green Findings
20 Projects Branch 3
Brice Bickett Branch Chief
Calvert Cliffs Hope Creek Salem
21 Calvert Cliffs Resident Inspectors
Gene DiPaolo Anthony Tran Senior Resident Inspector Resident Inspector
Facility Information Finder Calvert Cliffs Nuclear Power Plant, Unit 1 / Calvert Cliffs Nuclear Power Plant, Unit 2
22 Calvert Cliffs 2023 Assessment Summary
- Operated safely and in a manner that preserved thepublic health and safety and protected theenvironment
- Unit 1 - Regulatory Response Column (Licensee Response Column as of March 21, 2024)
Unit 2-Licensee Response Column
- 8,200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> of inspection and related activities
- Green Performance Indicators
- 10 Green & 1 White Findings
- 1 Severity Level IV Violation Calvert Cliffs Unit 1 Action Matrix - Regulatory Response
Licensee Licensee Regulatory Degraded Multiple/Repetitive Unacceptable Response Degraded Response Response Performance Cornerstone Performance
- A Special Inspection was conducted in May 2023 following a failure of the 1A emergency diesel generator in April 2023.
- The Special Inspection team identified a White Finding (3Q23) related to inadequate maintenance practices for the1A emergency diesel generator.
- Supplemental Inspection (IP 95001) was recently completed, and the plant transitioned from the Regulatory Response to the Licensee Response Column effective March 21, 2024.
24 Hope Creek Resident Inspectors
Jigar Patel Justin Bresson Senior Resident Inspector Resident Inspector Facility Information Finder Hope Creek Generating Station, Unit 1
25 Hope Creek 2023 Assessment Summary
- Operatedsafely and in a manner thatpreservedthepublic health and safety and protectedtheenvironment
- Licensee Response Column
- 4,600 hours0.00694 days <br />0.167 hours <br />9.920635e-4 weeks <br />2.283e-4 months <br /> of inspection and related activities
- Green Performance Indicators
- 7 Green Findingsand 2 Severity Level IV Violations
26 Salem Resident Inspectors
Larry Grimes Eli Garcia Senior Resident Inspector Resident Inspector (acting)
Facility Information Finder Salem Nuclear Generating Station, Unit 1 / Salem Nuclear Generating Station, Unit 2
27 Salem 2023 Assessment Summary
- Operatedsafely and in a manner that preserved thepublic health and safety and protected theenvironment
- Licensee Response Column
- 6,900 hours0.0104 days <br />0.25 hours <br />0.00149 weeks <br />3.4245e-4 months <br /> of inspection andrelated activities
- Green Performance Indicators
- 12 Green Findings
28 Projects Branch 4
Jon Greives Branch Chief
Limerick Peach Bottom Susquehanna
29 Limerick Resident Inspectors
Adam Ziedonis Eric Miller Senior Resident Inspector Resident Inspector (acting)
Facility Information Finder Limerick Generating Station, Unit 1 / Limerick Generating Station, Unit 2
30 Limerick 2023 Assessment Summary
- Operated safely and in a manner that preserved the public health and safety and protected the environment
- Licensee Response Column
- 5,900 hours0.0104 days <br />0.25 hours <br />0.00149 weeks <br />3.4245e-4 months <br /> of inspection and related activities
- Green Performance Indicators
- 6 Green Findings
31 Peach Bottom Resident Inspectors
Scott Rutenkroger Corey Dukehart Senior Resident Inspector Resident Inspector
Facility Information Finder Peach Bottom Atomic Power Station, Unit 2 / Peach Bottom Atomic Power Station, Unit 3
32 Peach Bottom 2023 Assessment Summary
- Operated safely and in a manner that preserved the public health and safety and protected the environment
- Unit 2 - Licensee Response Column(June 8, 2023)
Unit 3-Licensee Response Column
- 7,100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> of inspection and related activities.
- Green Performance Indicators
- 10 Green Findings and 1 Severity Level IV Violation 33 Peach Bottom Unit 2 Action Matrix Transition
Licensee Regulatory Degraded Multiple/Repetitive Unacceptable Response Response Performance Degraded Performance Cornerstone
Supplemental inspection (IP 95001) was completed in response to a White Finding (3Q22) related to use of aprocedure not appropriate for plant conditions that led to a reactor scram, or shutdown. The plant transitioned from the Regulatory Response to the Licensee Response Column effective June 8, 2023.
34 Susquehanna Resident Inspectors
Jennifer England Erin Brady Senior Resident Inspector Resident Inspector
Facility Information Finder Susquehanna Steam Electric Station, Unit 1 / Susquehanna Steam Electric Station, Unit 2
35 Susquehanna 2023 Assessment Summary
- Operated safely and in a manner that preserved the public health and safety and protected the environment
- Licensee Response Column
- 5,800 hours0.00926 days <br />0.222 hours <br />0.00132 weeks <br />3.044e-4 months <br /> of inspection and related activities
- Green Performance Indicators
- 3 Green Findings
36 How to Ask a Question
- Type your question in the meeting chat
- Use the hand raise feature
- Phone only attendees will also be asked if they have any questions (*5 - hand raise,
- 6 - mute/unmute)
37 NRC Social Media Channels
- Facebook www.facebook.com/nrcgov
- Twitter twitter.com/nrcgov
- YouTube www.youtube.com/user/NRCgov
- Instagram www.instagram.com/nrcgov
- Flickr www.flickr.com/photos/nrcgov/sets
- LinkedIn www.linkedin.com/company/u-s--nuclear-regulatory-commission/mycompany/
- GovDelivery service.govdelivery.com/accounts/USNRC/sub scriber/new
38 More Information
- Inspection Reports
- https://www.nrc.gov/reactors/operating/oversight/listofrpts-body.html
- Reactor Oversight Process
- https://www.nrc.gov/reactors/operating/oversight.html
- Fact Sheets and Brochures
- https://www.nrc.gov/reading-rm/doc-collections/fact-sheets/
- NRC Information Digest
- https://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr1350/
- Regulations
- https://www.nrc.gov/reading-rm/doc-collections/cfr/
39 Supplemental Meeting Feedback
We are looking for specific feedback on the format and content of this meeting
https://feedback.nrc.gov/pmfs/feedback/form?meetingcode=20240563
40