ML24137A188: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 29: Line 29:
*Type in your question at any time using Microsoft Teams.
*Type in your question at any time using Microsoft Teams.


                - or -
- or -
*You can wait until the question-and-answer session to ask your question orally.
*You can wait until the question-and-answer session to ask your question orally.


Line 35: Line 35:
* Reactor Oversight Process (ROP)
* Reactor Oversight Process (ROP)
* 2023 Safety Performance Overview
* 2023 Safety Performance Overview
  - FitzPatrick
- FitzPatrick
  - Ginna
- Ginna
  - Nine Mile Point
- Nine Mile Point
  - Beaver Valley
- Beaver Valley
  - Calvert Cliffs
- Calvert Cliffs
  - Hope Creek
- Hope Creek
  - Salem
- Salem
  - Limerick
- Limerick
  - Peach Bottom
- Peach Bottom
  - Susquehanna
- Susquehanna
* Question-and-Answer Session 4
* Question-and-Answer Session 4
Our Mission
Our Mission
Line 52: Line 52:
5 Action Matrix Concept
5 Action Matrix Concept


Licensee   Regulatory Degraded Multiple/Repetitive Unacceptable Response   Response Performance   Degraded   Performance Cornerstone
Licensee Regulatory Degraded Multiple/Repetitive Unacceptable Response Response Performance Degraded Performance Cornerstone


Increasing Safety Significance
Increasing Safety Significance
Line 66: Line 66:
7 Types of Inspections
7 Types of Inspections
* Baseline Inspection Program
* Baseline Inspection Program
  - Minimum level of inspection conducted at all facilities regardless of their performance.
- Minimum level of inspection conducted at all facilities regardless of their performance.
* Reactive Inspections (e.g., Special Inspections)
* Reactive Inspections (e.g., Special Inspections)
  - Events involving reactor facilities are investigated in a timely, objective, systematic and technically sound manner.
- Events involving reactor facilities are investigated in a timely, objective, systematic and technically sound manner.
* Supplemental Inspections (e.g., IP 95001)
* Supplemental Inspections (e.g., IP 95001)
  - Applies NRC inspection resources in a graded manner when risk-significant performance issues are identified.
- Applies NRC inspection resources in a graded manner when risk-significant performance issues are identified.


8 Reactor Oversight Process
8 Reactor Oversight Process
Line 88: Line 88:
11 R.E. Ginna Resident Inspectors
11 R.E. Ginna Resident Inspectors


Jason Schussler               Chris Swisher Senior Resident Inspector       Resident Inspector
Jason Schussler Chris Swisher Senior Resident Inspector Resident Inspector


Facility Information Finder R.E. Ginna Nuclear Power Plant, Unit 1
Facility Information Finder R.E. Ginna Nuclear Power Plant, Unit 1
Line 101: Line 101:
13 James A. FitzPatrick Resident Inspectors
13 James A. FitzPatrick Resident Inspectors


Eric Miller               Veronica Fisher Senior Resident Inspector       Resident Inspector
Eric Miller Veronica Fisher Senior Resident Inspector Resident Inspector


Facility Information Finder James A. Fitzpatrick Nuclear Power Plant, Unit 1
Facility Information Finder James A. Fitzpatrick Nuclear Power Plant, Unit 1
Line 114: Line 114:
15 Nine Mile Point Resident Inspectors
15 Nine Mile Point Resident Inspectors


Chris Kline                   Beth Sienel Senior Resident Inspector         Resident Inspector
Chris Kline Beth Sienel Senior Resident Inspector Resident Inspector


Facility Information Finder Nine Mile Point Nuclear Station, Unit 1 / Nine Mile Point Nuclear Station, Unit 2
Facility Information Finder Nine Mile Point Nuclear Station, Unit 1 / Nine Mile Point Nuclear Station, Unit 2
Line 133: Line 133:
18 Beaver Valley Resident Inspectors
18 Beaver Valley Resident Inspectors


Neil Day                     Alex Nugent Senior Resident Inspector         Resident Inspector
Neil Day Alex Nugent Senior Resident Inspector Resident Inspector


Facility Information Finder Beaver Valley Power Station, Unit 1 / Beaver Valley Power Station, Unit 2
Facility Information Finder Beaver Valley Power Station, Unit 1 / Beaver Valley Power Station, Unit 2
Line 152: Line 152:
21 Calvert Cliffs Resident Inspectors
21 Calvert Cliffs Resident Inspectors


Gene DiPaolo                       Anthony Tran Senior Resident Inspector               Resident Inspector
Gene DiPaolo Anthony Tran Senior Resident Inspector Resident Inspector


Facility Information Finder Calvert Cliffs Nuclear Power Plant, Unit 1 / Calvert Cliffs Nuclear Power Plant, Unit 2
Facility Information Finder Calvert Cliffs Nuclear Power Plant, Unit 1 / Calvert Cliffs Nuclear Power Plant, Unit 2
Line 161: Line 161:
Unit 2-Licensee Response Column
Unit 2-Licensee Response Column
* 8,200 hours of inspection and related activities
* 8,200 hours of inspection and related activities
* Green Performance Indicators
* Green Performance Indicators
* 10 Green & 1 White Findings
* 10 Green & 1 White Findings
* 1 Severity Level IV Violation Calvert Cliffs Unit 1 Action Matrix     - Regulatory Response
* 1 Severity Level IV Violation Calvert Cliffs Unit 1 Action Matrix - Regulatory Response


Licensee Licensee Regulatory Degraded Multiple/Repetitive Unacceptable Response                               Degraded Response     Response   Performance   Cornerstone   Performance
Licensee Licensee Regulatory Degraded Multiple/Repetitive Unacceptable Response Degraded Response Response Performance Cornerstone Performance
* A Special Inspection was conducted in May 2023 following a failure of the 1A emergency diesel generator in April 2023.
* A Special Inspection was conducted in May 2023 following a failure of the 1A emergency diesel generator in April 2023.
* The Special Inspection team identified a White Finding (3Q23) related to inadequate maintenance practices for the1A emergency diesel generator.
* The Special Inspection team identified a White Finding (3Q23) related to inadequate maintenance practices for the1A emergency diesel generator.
Line 172: Line 172:
24 Hope Creek Resident Inspectors
24 Hope Creek Resident Inspectors


Jigar Patel               Justin Bresson Senior Resident Inspector     Resident Inspector Facility Information Finder Hope Creek Generating Station, Unit 1
Jigar Patel Justin Bresson Senior Resident Inspector Resident Inspector Facility Information Finder Hope Creek Generating Station, Unit 1


25 Hope Creek 2023 Assessment Summary
25 Hope Creek 2023 Assessment Summary
Line 183: Line 183:
26 Salem Resident Inspectors
26 Salem Resident Inspectors


Larry Grimes                     Eli Garcia Senior Resident Inspector         Resident Inspector (acting)
Larry Grimes Eli Garcia Senior Resident Inspector Resident Inspector (acting)
Facility Information Finder Salem Nuclear Generating Station, Unit 1 / Salem Nuclear Generating Station, Unit 2
Facility Information Finder Salem Nuclear Generating Station, Unit 1 / Salem Nuclear Generating Station, Unit 2


Line 201: Line 201:
29 Limerick Resident Inspectors
29 Limerick Resident Inspectors


Adam Ziedonis                     Eric Miller Senior Resident Inspector         Resident Inspector (acting)
Adam Ziedonis Eric Miller Senior Resident Inspector Resident Inspector (acting)
Facility Information Finder Limerick Generating Station, Unit 1 / Limerick Generating Station, Unit 2
Facility Information Finder Limerick Generating Station, Unit 1 / Limerick Generating Station, Unit 2


Line 213: Line 213:
31 Peach Bottom Resident Inspectors
31 Peach Bottom Resident Inspectors


Scott Rutenkroger             Corey Dukehart Senior Resident Inspector       Resident Inspector
Scott Rutenkroger Corey Dukehart Senior Resident Inspector Resident Inspector


Facility Information Finder Peach Bottom Atomic Power Station, Unit 2 / Peach Bottom Atomic Power Station, Unit 3
Facility Information Finder Peach Bottom Atomic Power Station, Unit 2 / Peach Bottom Atomic Power Station, Unit 3
Line 223: Line 223:
* 7,100 hours of inspection and related activities.
* 7,100 hours of inspection and related activities.
* Green Performance Indicators
* Green Performance Indicators
* 10 Green Findings and 1 Severity Level IV Violation 33 Peach Bottom           Unit 2 Action Matrix Transition
* 10 Green Findings and 1 Severity Level IV Violation 33 Peach Bottom Unit 2 Action Matrix Transition


Licensee   Regulatory Degraded Multiple/Repetitive Unacceptable Response   Response   Performance Degraded   Performance Cornerstone
Licensee Regulatory Degraded Multiple/Repetitive Unacceptable Response Response Performance Degraded Performance Cornerstone


Supplemental inspection (IP 95001) was completed in response to a White Finding (3Q22)   related to use of aprocedure not appropriate for plant conditions   that led to a reactor scram, or shutdown. The plant transitioned from the Regulatory Response to the Licensee Response Column effective June 8, 2023.
Supplemental inspection (IP 95001) was completed in response to a White Finding (3Q22) related to use of aprocedure not appropriate for plant conditions that led to a reactor scram, or shutdown. The plant transitioned from the Regulatory Response to the Licensee Response Column effective June 8, 2023.


34 Susquehanna Resident Inspectors
34 Susquehanna Resident Inspectors


Jennifer England                   Erin Brady Senior Resident Inspector         Resident Inspector
Jennifer England Erin Brady Senior Resident Inspector Resident Inspector


Facility Information Finder Susquehanna Steam Electric Station, Unit 1 / Susquehanna Steam Electric Station, Unit 2
Facility Information Finder Susquehanna Steam Electric Station, Unit 1 / Susquehanna Steam Electric Station, Unit 2
Line 252: Line 252:
37 NRC Social Media Channels
37 NRC Social Media Channels
* Facebook www.facebook.com/nrcgov
* Facebook www.facebook.com/nrcgov
* Twitter twitter.com/nrcgov
* Twitter twitter.com/nrcgov
* YouTube   www.youtube.com/user/NRCgov
* YouTube www.youtube.com/user/NRCgov
* Instagram   www.instagram.com/nrcgov
* Instagram www.instagram.com/nrcgov
* Flickr www.flickr.com/photos/nrcgov/sets
* Flickr www.flickr.com/photos/nrcgov/sets
* LinkedIn www.linkedin.com/company/u-s--nuclear-regulatory-commission/mycompany/
* LinkedIn www.linkedin.com/company/u-s--nuclear-regulatory-commission/mycompany/
* GovDelivery   service.govdelivery.com/accounts/USNRC/sub scriber/new
* GovDelivery service.govdelivery.com/accounts/USNRC/sub scriber/new


38 More Information
38 More Information
* Inspection Reports
* Inspection Reports
  - https://www.nrc.gov/reactors/operating/oversight/listofrpts-body.html
- https://www.nrc.gov/reactors/operating/oversight/listofrpts-body.html
* Reactor Oversight Process
* Reactor Oversight Process
  - https://www.nrc.gov/reactors/operating/oversight.html
- https://www.nrc.gov/reactors/operating/oversight.html
* Fact Sheets and Brochures
* Fact Sheets and Brochures
  - https://www.nrc.gov/reading-rm/doc-collections/fact-sheets/
- https://www.nrc.gov/reading-rm/doc-collections/fact-sheets/
* NRC Information Digest
* NRC Information Digest
  - https://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr1350/
- https://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr1350/
* Regulations
* Regulations
  - https://www.nrc.gov/reading-rm/doc-collections/cfr/
- https://www.nrc.gov/reading-rm/doc-collections/cfr/
39 Supplemental Meeting Feedback
39 Supplemental Meeting Feedback



Revision as of 15:04, 4 October 2024

Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides
ML24137A188
Person / Time
Site: Beaver Valley, Calvert Cliffs, Peach Bottom, Salem, Nine Mile Point, Hope Creek, Susquehanna, Limerick, Ginna, FitzPatrick  Constellation icon.png
Issue date: 05/16/2024
From:
NRC/RGN-I/DORS
To:
References
Download: ML24137A188 (1)


Text

2023 Annual Assessment Meeting

Region I King of Prussia, PA May22, 2024

1 Meeting Conduct

  • All participants will be muted during presentations by NRC staff.
  • The chat is enabled to allow you to ask questions during the meeting.
  • We encourage mutual respect on the part of NRC staff and attendees.

2 How to Ask a Question

  • Type in your question at any time using Microsoft Teams.

- or -

  • You can wait until the question-and-answer session to ask your question orally.

3 Agenda

  • Reactor Oversight Process (ROP)
  • 2023 Safety Performance Overview

- FitzPatrick

- Ginna

- Nine Mile Point

- Beaver Valley

- Calvert Cliffs

- Hope Creek

- Salem

- Limerick

- Peach Bottom

- Susquehanna

  • Question-and-Answer Session 4

Our Mission

To license and regulate the nations civilian use of radioactive materials to provide reasonable assurance of adequate protection of public health and safety and to promote the common defense and security and protect the environment.

5 Action Matrix Concept

Licensee Regulatory Degraded Multiple/Repetitive Unacceptable Response Response Performance Degraded Performance Cornerstone

Increasing Safety Significance

Increasing NRC Inspection Efforts

Increasing NRC/Licensee Management Involvement

Increasing Regulatory Actions

6 Reactor Oversight Process

7 Types of Inspections

  • Baseline Inspection Program

- Minimum level of inspection conducted at all facilities regardless of their performance.

- Events involving reactor facilities are investigated in a timely, objective, systematic and technically sound manner.

  • Supplemental Inspections (e.g., IP 95001)

- Applies NRC inspection resources in a graded manner when risk-significant performance issues are identified.

8 Reactor Oversight Process

9 Facility Information Finder

  • Additional Plant Information
  • Safety Performance Summary
  • Inspection Reports
  • NRC Points of Contact

10 Projects Branch 1

Erin Carfang Branch Chief

Ginna FitzPatrick Nine Mile Point

11 R.E. Ginna Resident Inspectors

Jason Schussler Chris Swisher Senior Resident Inspector Resident Inspector

Facility Information Finder R.E. Ginna Nuclear Power Plant, Unit 1

12 R.E. Ginna 2023 Assessment Summary

  • Operated safely and in a manner that preserved the public health and safety and protected the environment
  • Licensee Response Column
  • 4,300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> of inspectionand related activities
  • Green Performance Indicators
  • 6 Green Findings

13 James A. FitzPatrick Resident Inspectors

Eric Miller Veronica Fisher Senior Resident Inspector Resident Inspector

Facility Information Finder James A. Fitzpatrick Nuclear Power Plant, Unit 1

14 James A. FitzPatrick 2023 Assessment Summary

  • Operated safely and in a manner that preserved the public health and safety and protected the environment
  • Licensee Response Column
  • 6,500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> of inspection and related activities.
  • Green Performance Indicators

15 Nine Mile Point Resident Inspectors

Chris Kline Beth Sienel Senior Resident Inspector Resident Inspector

Facility Information Finder Nine Mile Point Nuclear Station, Unit 1 / Nine Mile Point Nuclear Station, Unit 2

16 Nine Mile Point 2023 Assessment Summary

  • Operated safely and in a manner that preserved the public health and safety and protected the environment
  • Licensee Response Column
  • 9,100hours of inspection and related activities
  • Green Performance Indicators
  • 1 Green Finding

17 Projects Branch 2

Matt Young Branch Chief

Beaver Valley

18 Beaver Valley Resident Inspectors

Neil Day Alex Nugent Senior Resident Inspector Resident Inspector

Facility Information Finder Beaver Valley Power Station, Unit 1 / Beaver Valley Power Station, Unit 2

19 Beaver Valley 2023 Assessment Summary

  • Operated safely and in a manner that preserved the public health and safety and protected the environment
  • Licensee Response Column
  • 5,700hours of inspection and related activities
  • Green Performance Indicators
  • 12 Green Findings

20 Projects Branch 3

Brice Bickett Branch Chief

Calvert Cliffs Hope Creek Salem

21 Calvert Cliffs Resident Inspectors

Gene DiPaolo Anthony Tran Senior Resident Inspector Resident Inspector

Facility Information Finder Calvert Cliffs Nuclear Power Plant, Unit 1 / Calvert Cliffs Nuclear Power Plant, Unit 2

22 Calvert Cliffs 2023 Assessment Summary

  • Operated safely and in a manner that preserved thepublic health and safety and protected theenvironment
  • Unit 1 - Regulatory Response Column (Licensee Response Column as of March 21, 2024)

Unit 2-Licensee Response Column

  • 8,200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> of inspection and related activities
  • Green Performance Indicators
  • 10 Green & 1 White Findings
  • 1 Severity Level IV Violation Calvert Cliffs Unit 1 Action Matrix - Regulatory Response

Licensee Licensee Regulatory Degraded Multiple/Repetitive Unacceptable Response Degraded Response Response Performance Cornerstone Performance

  • The Special Inspection team identified a White Finding (3Q23) related to inadequate maintenance practices for the1A emergency diesel generator.
  • Supplemental Inspection (IP 95001) was recently completed, and the plant transitioned from the Regulatory Response to the Licensee Response Column effective March 21, 2024.

24 Hope Creek Resident Inspectors

Jigar Patel Justin Bresson Senior Resident Inspector Resident Inspector Facility Information Finder Hope Creek Generating Station, Unit 1

25 Hope Creek 2023 Assessment Summary

  • Operatedsafely and in a manner thatpreservedthepublic health and safety and protectedtheenvironment
  • Licensee Response Column
  • 4,600 hours0.00694 days <br />0.167 hours <br />9.920635e-4 weeks <br />2.283e-4 months <br /> of inspection and related activities
  • Green Performance Indicators

26 Salem Resident Inspectors

Larry Grimes Eli Garcia Senior Resident Inspector Resident Inspector (acting)

Facility Information Finder Salem Nuclear Generating Station, Unit 1 / Salem Nuclear Generating Station, Unit 2

27 Salem 2023 Assessment Summary

  • Operatedsafely and in a manner that preserved thepublic health and safety and protected theenvironment
  • Licensee Response Column
  • 6,900 hours0.0104 days <br />0.25 hours <br />0.00149 weeks <br />3.4245e-4 months <br /> of inspection andrelated activities
  • Green Performance Indicators
  • 12 Green Findings

28 Projects Branch 4

Jon Greives Branch Chief

Limerick Peach Bottom Susquehanna

29 Limerick Resident Inspectors

Adam Ziedonis Eric Miller Senior Resident Inspector Resident Inspector (acting)

Facility Information Finder Limerick Generating Station, Unit 1 / Limerick Generating Station, Unit 2

30 Limerick 2023 Assessment Summary

  • Operated safely and in a manner that preserved the public health and safety and protected the environment
  • Licensee Response Column
  • 5,900 hours0.0104 days <br />0.25 hours <br />0.00149 weeks <br />3.4245e-4 months <br /> of inspection and related activities
  • Green Performance Indicators
  • 6 Green Findings

31 Peach Bottom Resident Inspectors

Scott Rutenkroger Corey Dukehart Senior Resident Inspector Resident Inspector

Facility Information Finder Peach Bottom Atomic Power Station, Unit 2 / Peach Bottom Atomic Power Station, Unit 3

32 Peach Bottom 2023 Assessment Summary

  • Operated safely and in a manner that preserved the public health and safety and protected the environment
  • Unit 2 - Licensee Response Column(June 8, 2023)

Unit 3-Licensee Response Column

  • 7,100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> of inspection and related activities.
  • Green Performance Indicators
  • 10 Green Findings and 1 Severity Level IV Violation 33 Peach Bottom Unit 2 Action Matrix Transition

Licensee Regulatory Degraded Multiple/Repetitive Unacceptable Response Response Performance Degraded Performance Cornerstone

Supplemental inspection (IP 95001) was completed in response to a White Finding (3Q22) related to use of aprocedure not appropriate for plant conditions that led to a reactor scram, or shutdown. The plant transitioned from the Regulatory Response to the Licensee Response Column effective June 8, 2023.

34 Susquehanna Resident Inspectors

Jennifer England Erin Brady Senior Resident Inspector Resident Inspector

Facility Information Finder Susquehanna Steam Electric Station, Unit 1 / Susquehanna Steam Electric Station, Unit 2

35 Susquehanna 2023 Assessment Summary

  • Operated safely and in a manner that preserved the public health and safety and protected the environment
  • Licensee Response Column
  • 5,800 hours0.00926 days <br />0.222 hours <br />0.00132 weeks <br />3.044e-4 months <br /> of inspection and related activities
  • Green Performance Indicators
  • 3 Green Findings

36 How to Ask a Question

  • Type your question in the meeting chat
  • Use the hand raise feature
  • Phone only attendees will also be asked if they have any questions (*5 - hand raise,
  • 6 - mute/unmute)

37 NRC Social Media Channels

  • Facebook www.facebook.com/nrcgov
  • Twitter twitter.com/nrcgov
  • YouTube www.youtube.com/user/NRCgov
  • Instagram www.instagram.com/nrcgov
  • Flickr www.flickr.com/photos/nrcgov/sets
  • LinkedIn www.linkedin.com/company/u-s--nuclear-regulatory-commission/mycompany/
  • GovDelivery service.govdelivery.com/accounts/USNRC/sub scriber/new

38 More Information

  • Inspection Reports

- https://www.nrc.gov/reactors/operating/oversight/listofrpts-body.html

  • Reactor Oversight Process

- https://www.nrc.gov/reactors/operating/oversight.html

  • Fact Sheets and Brochures

- https://www.nrc.gov/reading-rm/doc-collections/fact-sheets/

  • NRC Information Digest

- https://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr1350/

  • Regulations

- https://www.nrc.gov/reading-rm/doc-collections/cfr/

39 Supplemental Meeting Feedback

We are looking for specific feedback on the format and content of this meeting

https://feedback.nrc.gov/pmfs/feedback/form?meetingcode=20240563

40