| We are in receipt of Herzel H. E. Plaine's letter of July 26, 1984 (copy attached), responding to our request dated July 2, 1984, (copy also attached) for any notes or memoranda or transcripts which have been made, or are being made, of any'of the meetings between yourself and representa-tives of Alabama Power Company near the end of June, 1984, as referred to in Chairman Palladino's Memorandum For the Files dated June 26, 1984, and docketed June 28, 1984, in Docket Nos. 50-348A and 50-364A (Alabama Power Company: | | We are in receipt of Herzel H. E. Plaine's letter of July 26, 1984 (copy attached), responding to our request dated July 2, 1984, (copy also attached) for any notes or memoranda or transcripts which have been made, or are being made, of any'of the meetings between yourself and representa-tives of Alabama Power Company near the end of June, 1984, as referred to in Chairman Palladino's Memorandum For the Files dated June 26, 1984, and docketed June 28, 1984, in Docket Nos. 50-348A and 50-364A (Alabama Power Company: |
| Antitrust). | | Antitrust). |
| Mr. Plaine in his letter sdggests that "it may be best" if we make direct request to you for such notes, etc., of the meeting or meetings referred to in the Chairman's memo-randum. While we were under the impression that the c.opy of our July 2, 1984, letter which was sent to you was suffi-cient 'to constitute a request to you for such notes, etc., | | Mr. Plaine in his letter sdggests that "it may be best" if we make direct request to you for such notes, etc., of the meeting or meetings referred to in the Chairman's memo-randum. While we were under the impression that the c.opy of our {{letter dated|date=July 2, 1984|text=July 2, 1984, letter}} which was sent to you was suffi-cient 'to constitute a request to you for such notes, etc., |
| now, in view of what Mr. Plaine's letter states, we are separately requesting from you the same matters originally requested in our July 2, 1984, letter with respect to any meetings. | | now, in view of what Mr. Plaine's letter states, we are separately requesting from you the same matters originally requested in our {{letter dated|date=July 2, 1984|text=July 2, 1984, letter}} with respect to any meetings. |
| Without regard to whether the ex parte meetings did or did not comply with the letter and spirit of the NRC regula-tions, it still appears to us that elemental considerations of fairness call for such information to be furnished to AEC. | | Without regard to whether the ex parte meetings did or did not comply with the letter and spirit of the NRC regula-tions, it still appears to us that elemental considerations of fairness call for such information to be furnished to AEC. |
| As we have previously stated in a recent filing with the , | | As we have previously stated in a recent filing with the , |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARL-99-035, Forwards non-proprietary & Proprietary Versions of Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs, Used to Support SG Replacement Project.Proprietary Encl Withheld1999-10-18018 October 1999 Forwards non-proprietary & Proprietary Versions of Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs, Used to Support SG Replacement Project.Proprietary Encl Withheld ML20217G0801999-10-0707 October 1999 Informs That on 990930,staff Conducted mid-cycle PPR of Farley & Did Not Identify Any Areas in Which Performance Warranted More than Core Insp Program.Nrc Will Conduct Regional Insps Associated with SG Removal & Installation ML20217P0661999-10-0606 October 1999 Requests Withholding of Proprietary Rept NSD-SAE-ESI-99-389, Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs ML20217B1891999-10-0404 October 1999 Submits Clarification Re Development of Basis for Determining Limiting Internal Pressure Loads Re Review of NRC SE for Cycle 16 Extension Request.Util Intends to Use Guidelines When Evaluating SG Tube Structural Integrity ML20212J8391999-09-30030 September 1999 Forwards RAI Re Request for Amends to Ts.Addl Info Needed to Complete Review to Verify That Proposed TS Are Consistent with & Validate Design Basis Analysis.Request Discussed with H Mahan on 990930.Info Needed within 10 Days of This Ltr ML20212J8801999-09-30030 September 1999 Discusses GL 98-01,suppl 1, Y2K Readiness of Computer Sys at Npps. Util 980731,990607 & 03 Ltrs Provided Requested Info in Subj Gl.Nrc Considers Subj GL to Be Closed for Unit 1 L-99-032, Responds to NRC Re Adequacy of Kaowool Fire Retardant Fire Barriers in Use at Jfnp,Units 1 & 21999-09-23023 September 1999 Responds to NRC Re Adequacy of Kaowool Fire Retardant Fire Barriers in Use at Jfnp,Units 1 & 2 L-99-034, Forwards Comments on Draft Current Tech Specs Discussion of Change Tables for Jm Farley Nuclear Plant.Units 1 & 21999-09-23023 September 1999 Forwards Comments on Draft Current Tech Specs Discussion of Change Tables for Jm Farley Nuclear Plant.Units 1 & 2 ML20212F8861999-09-23023 September 1999 Forwards Revised Relief Request Number 32 for NRC Approval. Approval Requested by 991231 to Support Activities to Be Performed During Unit 1 Refueling Outage Scheduled for Spring of 2000 ML20212E7031999-09-23023 September 1999 Responds to GL 98-01, Year 2000 Readiness of Computer Sys at Npps. Util Requested to Submit Plans & Schedules for Resolving Y2K-related Issues ML20212F1111999-09-21021 September 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals ML20212C2351999-09-16016 September 1999 Submits Corrected Info Concerning Snoc Response to NRC GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal ML20212D0101999-09-15015 September 1999 Informs That Submittal of clean-typed Copy of ITS & ITS Bases Will Be Delayed.Delay Due to Need for Resolution of Two Issues Raised by NRC staff.Clean-typed Copy of ITS Will Be Submitted within 4 Wks Following Resolution of Issues ML20212C4641999-09-13013 September 1999 Forwards Info Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams L-99-031, Informs NRC That Review of MOV Testing Frequency & Changes Made to Frequency of MOV Testing Has Been Completed1999-09-13013 September 1999 Informs NRC That Review of MOV Testing Frequency & Changes Made to Frequency of MOV Testing Has Been Completed ML20212C8041999-09-10010 September 1999 Responds to to D Rathbun Requesting Review of J Sherman Re Y2K Compliance.Latest NRC Status Rept on Y2K Activities Encl ML20212D4581999-09-10010 September 1999 Responds to to D Rathbun,Requesting Review of J Sherman Expressing Concerns That Plant & Other Nuclear Plants Not Yet Y2K Compliant ML20212A6951999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20212A8341999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20211N8041999-09-0808 September 1999 Informs That on 990930 NRC Issued GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Condition, to Holders of Nuclear Plant Operating Licenses ML20211N4301999-09-0808 September 1999 Discusses Proposed Meeting to Discuss Kaowool Fire Barriers. Staff Requesting That Affected Licensees Take Issue on Voluntary Initative & Propose Approach for Resolving Issues ML20212C0071999-09-0202 September 1999 Forwards Insp Repts 50-348/99-05 & 50-364/99-05 on 990627- 0807.No Violations Noted.Licensee Conduct of Activities at Farley Plant Facilities Generally Characterized by safety-conscious Operations & Sound Engineering ML20211Q4801999-09-0101 September 1999 Informs That on 990812-13,Region II Hosted Training Managers Conference on Recent Changes to Operator Licensing Program. List of Attendees,Copy of Slide Presentations & List of Questions Received from Participants Encl ML20211K2131999-08-31031 August 1999 Informs That Snoc Has Conducted Review of Reactor Vessel Integrity Database,Version 2 (RVID2) & Conclude That Latest Data Submitted for Farley Units Has Not Been Incorporated Into RVID2 ML20211K4101999-08-31031 August 1999 Resubmits Relief Requests Q1P16-RR-V-5 & Q2P16-RR-V-5 That Seek to Group V661 Valves from Each Unit Into Sample Disassembly & Insp Group,Per 990525 Telcon with NRC L-99-030, Forwards SNC Review Comments on Draft SE & marked-up Copy of Draft SE Incorporating SNC Comments Re Proposed Conversion to ITS1999-08-30030 August 1999 Forwards SNC Review Comments on Draft SE & marked-up Copy of Draft SE Incorporating SNC Comments Re Proposed Conversion to ITS ML20211G6851999-08-26026 August 1999 Informs That During Insp,Technical Issues Associated with Design,Installation & fire-resistive Performance of Kaowool Raceway fire-barriers Installed at Farley Nuclear Plant Were Identified L-99-029, Forwards Revised Response to Chapter 3.1 RAI Requested in 990726 Conference Call,Rai Response Related to Beyond Scope Issue for Chapter 3.5 Requested by Conference Call on 990805 & RAI Response to Chapter 3.8 Requested on 990615 & 07271999-08-19019 August 1999 Forwards Revised Response to Chapter 3.1 RAI Requested in 990726 Conference Call,Rai Response Related to Beyond Scope Issue for Chapter 3.5 Requested by Conference Call on 990805 & RAI Response to Chapter 3.8 Requested on 990615 & 0727 ML20211B9431999-08-17017 August 1999 Forwards Fitness for Duty Performance Data for six-month Reporting Period 990101-990630,IAW 10CFR26.71(d).Rept Covers Employees at Jm Farley Nuclear Plant & Southern Nuclear Corporate Headquarters ML20211B9211999-08-17017 August 1999 Responds to NRC Re Violations Noted in Insp Rept 50-348/99-09 & 50-364/99-09.Corrective Actions:Security Response Plan Was Revised to Address Vulnerabilities Identified During NRC Insp ML20210R5101999-08-12012 August 1999 Forwards Revised Page 6 to 990430 LAR to Operate Farley Nuclear Plant,Unit 1,for Cycle 16 Only,Based on risk- Informed Approach for Evaluation of SG Tube Structural Integrity,As Result of Staff Comments ML20212C8141999-08-0909 August 1999 Forwards Correspondence Received from Jm Sherman.Requests Review of Info Re Established Policies & Procedures ML20210T2021999-08-0606 August 1999 Forwards Draft SE Accepting Licensee Proposed Conversion of Plant,Units 1 & 2 Current TSs to Its.Its Based on Listed Documents ML20210Q4641999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Authorized Representative of Facility Must Submit Ltr to La Reyes,As Listed,With List of Individuals to Take exam,30 Days Before Exam Date ML20210J8341999-07-30030 July 1999 Forwards Second Request for Addl Info Re Util 990430 Amend Request to Allow Util to Operate Unit 1,for Cycle 16 Based on risk-informed Probability of SG Tube Rupture & Nominal accident-induced primary-to-second Leakage ML20210G4901999-07-30030 July 1999 Responds to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, Issued 990603.Ltr Contains NRC License Commitment to Utilize ASTM D3803-1989 with Efficiency Acceptance Criteria Utilizing Safety Factor of 2 L-99-028, Responds to NRC 990730 RAI Re 990423 OL Change Request to Allow for Risk Informed Approach for Evaluation of SG Tube Structural Integrity as Described by NEI 97-06, SG Program Guidelines1999-07-30030 July 1999 Responds to NRC 990730 RAI Re 990423 OL Change Request to Allow for Risk Informed Approach for Evaluation of SG Tube Structural Integrity as Described by NEI 97-06, SG Program Guidelines L-99-027, Addresses Clarifications to Selected Responses to Chapter 3.8 RAI Requested in NRC Conference Call on 990624, Resolution of Open Issue Related to Containment Purge in Chapter 3.6 & Response Related to Chapter 3.51999-07-27027 July 1999 Addresses Clarifications to Selected Responses to Chapter 3.8 RAI Requested in NRC Conference Call on 990624, Resolution of Open Issue Related to Containment Purge in Chapter 3.6 & Response Related to Chapter 3.5 ML20210G8181999-07-26026 July 1999 Forwards Insp Repts 50-348/99-04 & 50-364/99-04 on 990516- 0626.One Violation Identified & Being Treated as Noncited Violation IR 05000348/19990091999-07-23023 July 1999 Discusses Insp Repts 50-348/99-09 & 50-364/99-09 on 990308- 10 & Forwards Notice of Violation Re Failure to Intercept Adversary During Drills,Contrary to 10CFR73 & Physical Security Plan Requirements ML20210E4071999-07-22022 July 1999 Responds to NRC 990702 RAI Re Change Request to Allow for Risk Informed Approach for Evaluation of SG Tube Structural Integrity as Described in NEI 97-06, SG Program Guidelines L-99-026, Forwards Response to NRC 990702 RAI Re SG Replacement Related TS Change Request Submitted 981201.Ltr Contains No New Commitments1999-07-19019 July 1999 Forwards Response to NRC 990702 RAI Re SG Replacement Related TS Change Request Submitted 981201.Ltr Contains No New Commitments L-99-264, Responds to NRC 990603 Administrative Ltr 99-02, Operating Licensing Action Estimates, for Fy 2000 & 20011999-07-13013 July 1999 Responds to NRC 990603 Administrative Ltr 99-02, Operating Licensing Action Estimates, for Fy 2000 & 2001 ML20209H4721999-07-13013 July 1999 Responds to NRC 990603 Administrative Ltr 99-02, Operating Licensing Action Estimates, for Fy 2000 & 2001 ML20196J6191999-07-0202 July 1999 Forwards Final Dam Audit Rept of 981008 of Category 1 Cooling Water Storage Pond Dam.Requests Response within 120 Days of Date of Ltr 05000364/LER-1999-001, Forwards LER 99-001-00 Re Reactor Trip Due to Loss of Condenser Vacuum Steam Dump Drain Line Failure.Commitments Made by Licensee,Listed1999-07-0202 July 1999 Forwards LER 99-001-00 Re Reactor Trip Due to Loss of Condenser Vacuum Steam Dump Drain Line Failure.Commitments Made by Licensee,Listed ML20196J7471999-07-0202 July 1999 Forwards RAI Re Cycle 16 Extension Request.Response Requested within 30 Days of Date of Ltr ML20196J5781999-07-0202 July 1999 Forwards RAI Re 981201 & s Requesting Amend to TS Associated with Replacing Existing Westinghouse Model 51 SG with Westinghouse Model 54F Generators.Respond within 30 Days of Ltr Date ML20196J6571999-07-0202 July 1999 Discusses Closure to TAC MA0543 & MA0544 Re GL 92-01 Rev 1, Suppl 1,RV Structural Integrity.Nrc Has Revised Rvid & Releasing It as Rvid,Version 2 as Result of Review of Responses ML20196J3591999-06-30030 June 1999 Forwards SE of TR WCAP-14750, RCS Flow Verification Using Elbow Taps at Westinghouse 3-Loop Pwrs 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARL-99-035, Forwards non-proprietary & Proprietary Versions of Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs, Used to Support SG Replacement Project.Proprietary Encl Withheld1999-10-18018 October 1999 Forwards non-proprietary & Proprietary Versions of Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs, Used to Support SG Replacement Project.Proprietary Encl Withheld ML20217P0661999-10-0606 October 1999 Requests Withholding of Proprietary Rept NSD-SAE-ESI-99-389, Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs ML20217B1891999-10-0404 October 1999 Submits Clarification Re Development of Basis for Determining Limiting Internal Pressure Loads Re Review of NRC SE for Cycle 16 Extension Request.Util Intends to Use Guidelines When Evaluating SG Tube Structural Integrity L-99-034, Forwards Comments on Draft Current Tech Specs Discussion of Change Tables for Jm Farley Nuclear Plant.Units 1 & 21999-09-23023 September 1999 Forwards Comments on Draft Current Tech Specs Discussion of Change Tables for Jm Farley Nuclear Plant.Units 1 & 2 L-99-032, Responds to NRC Re Adequacy of Kaowool Fire Retardant Fire Barriers in Use at Jfnp,Units 1 & 21999-09-23023 September 1999 Responds to NRC Re Adequacy of Kaowool Fire Retardant Fire Barriers in Use at Jfnp,Units 1 & 2 ML20212F8861999-09-23023 September 1999 Forwards Revised Relief Request Number 32 for NRC Approval. Approval Requested by 991231 to Support Activities to Be Performed During Unit 1 Refueling Outage Scheduled for Spring of 2000 ML20212C2351999-09-16016 September 1999 Submits Corrected Info Concerning Snoc Response to NRC GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal ML20212D0101999-09-15015 September 1999 Informs That Submittal of clean-typed Copy of ITS & ITS Bases Will Be Delayed.Delay Due to Need for Resolution of Two Issues Raised by NRC staff.Clean-typed Copy of ITS Will Be Submitted within 4 Wks Following Resolution of Issues L-99-031, Informs NRC That Review of MOV Testing Frequency & Changes Made to Frequency of MOV Testing Has Been Completed1999-09-13013 September 1999 Informs NRC That Review of MOV Testing Frequency & Changes Made to Frequency of MOV Testing Has Been Completed ML20212C4641999-09-13013 September 1999 Forwards Info Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams ML20211K2131999-08-31031 August 1999 Informs That Snoc Has Conducted Review of Reactor Vessel Integrity Database,Version 2 (RVID2) & Conclude That Latest Data Submitted for Farley Units Has Not Been Incorporated Into RVID2 ML20211K4101999-08-31031 August 1999 Resubmits Relief Requests Q1P16-RR-V-5 & Q2P16-RR-V-5 That Seek to Group V661 Valves from Each Unit Into Sample Disassembly & Insp Group,Per 990525 Telcon with NRC L-99-030, Forwards SNC Review Comments on Draft SE & marked-up Copy of Draft SE Incorporating SNC Comments Re Proposed Conversion to ITS1999-08-30030 August 1999 Forwards SNC Review Comments on Draft SE & marked-up Copy of Draft SE Incorporating SNC Comments Re Proposed Conversion to ITS L-99-029, Forwards Revised Response to Chapter 3.1 RAI Requested in 990726 Conference Call,Rai Response Related to Beyond Scope Issue for Chapter 3.5 Requested by Conference Call on 990805 & RAI Response to Chapter 3.8 Requested on 990615 & 07271999-08-19019 August 1999 Forwards Revised Response to Chapter 3.1 RAI Requested in 990726 Conference Call,Rai Response Related to Beyond Scope Issue for Chapter 3.5 Requested by Conference Call on 990805 & RAI Response to Chapter 3.8 Requested on 990615 & 0727 ML20211B9431999-08-17017 August 1999 Forwards Fitness for Duty Performance Data for six-month Reporting Period 990101-990630,IAW 10CFR26.71(d).Rept Covers Employees at Jm Farley Nuclear Plant & Southern Nuclear Corporate Headquarters ML20211B9211999-08-17017 August 1999 Responds to NRC Re Violations Noted in Insp Rept 50-348/99-09 & 50-364/99-09.Corrective Actions:Security Response Plan Was Revised to Address Vulnerabilities Identified During NRC Insp ML20210R5101999-08-12012 August 1999 Forwards Revised Page 6 to 990430 LAR to Operate Farley Nuclear Plant,Unit 1,for Cycle 16 Only,Based on risk- Informed Approach for Evaluation of SG Tube Structural Integrity,As Result of Staff Comments ML20212C8141999-08-0909 August 1999 Forwards Correspondence Received from Jm Sherman.Requests Review of Info Re Established Policies & Procedures ML20210G4901999-07-30030 July 1999 Responds to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, Issued 990603.Ltr Contains NRC License Commitment to Utilize ASTM D3803-1989 with Efficiency Acceptance Criteria Utilizing Safety Factor of 2 L-99-028, Responds to NRC 990730 RAI Re 990423 OL Change Request to Allow for Risk Informed Approach for Evaluation of SG Tube Structural Integrity as Described by NEI 97-06, SG Program Guidelines1999-07-30030 July 1999 Responds to NRC 990730 RAI Re 990423 OL Change Request to Allow for Risk Informed Approach for Evaluation of SG Tube Structural Integrity as Described by NEI 97-06, SG Program Guidelines L-99-027, Addresses Clarifications to Selected Responses to Chapter 3.8 RAI Requested in NRC Conference Call on 990624, Resolution of Open Issue Related to Containment Purge in Chapter 3.6 & Response Related to Chapter 3.51999-07-27027 July 1999 Addresses Clarifications to Selected Responses to Chapter 3.8 RAI Requested in NRC Conference Call on 990624, Resolution of Open Issue Related to Containment Purge in Chapter 3.6 & Response Related to Chapter 3.5 ML20210E4071999-07-22022 July 1999 Responds to NRC 990702 RAI Re Change Request to Allow for Risk Informed Approach for Evaluation of SG Tube Structural Integrity as Described in NEI 97-06, SG Program Guidelines L-99-026, Forwards Response to NRC 990702 RAI Re SG Replacement Related TS Change Request Submitted 981201.Ltr Contains No New Commitments1999-07-19019 July 1999 Forwards Response to NRC 990702 RAI Re SG Replacement Related TS Change Request Submitted 981201.Ltr Contains No New Commitments L-99-264, Responds to NRC 990603 Administrative Ltr 99-02, Operating Licensing Action Estimates, for Fy 2000 & 20011999-07-13013 July 1999 Responds to NRC 990603 Administrative Ltr 99-02, Operating Licensing Action Estimates, for Fy 2000 & 2001 ML20209H4721999-07-13013 July 1999 Responds to NRC 990603 Administrative Ltr 99-02, Operating Licensing Action Estimates, for Fy 2000 & 2001 05000364/LER-1999-001, Forwards LER 99-001-00 Re Reactor Trip Due to Loss of Condenser Vacuum Steam Dump Drain Line Failure.Commitments Made by Licensee,Listed1999-07-0202 July 1999 Forwards LER 99-001-00 Re Reactor Trip Due to Loss of Condenser Vacuum Steam Dump Drain Line Failure.Commitments Made by Licensee,Listed L-99-024, Responds to NRC RAI Re Conversion to ITS for Chapters 3.4, 3.5,3.6,3.7,3.9 & 5.0,per 990419-20 Meetings with NRC1999-06-30030 June 1999 Responds to NRC RAI Re Conversion to ITS for Chapters 3.4, 3.5,3.6,3.7,3.9 & 5.0,per 990419-20 Meetings with NRC L-99-025, Forwards Rev 2 to Jfnp Security plan,FNP-0-M-99,IAW 10CFR50.4(b)(4).Attachment 1 Contains Summary of Changes & Amended Security Plan Pages.Encl Withheld from Public Disclosure Per 10CFR73.211999-06-30030 June 1999 Forwards Rev 2 to Jfnp Security plan,FNP-0-M-99,IAW 10CFR50.4(b)(4).Attachment 1 Contains Summary of Changes & Amended Security Plan Pages.Encl Withheld from Public Disclosure Per 10CFR73.21 ML20196J8631999-06-30030 June 1999 Submits Correction to Errors Contained in to NRC Re TS Changes Re Control Room,Penetration Room & Containment Purge Filtration Systems & Radiation Monitoring Instrumentation.Errors Do Not Require Rev of SA L-99-249, Submits Correction to Errors Contained in to NRC Re TS Changes Re Control Room,Penetration Room & Containment Purge Filtration Systems & Radiation Monitoring Instrumentation.Errors Do Not Require Rev of SA1999-06-30030 June 1999 Submits Correction to Errors Contained in to NRC Re TS Changes Re Control Room,Penetration Room & Containment Purge Filtration Systems & Radiation Monitoring Instrumentation.Errors Do Not Require Rev of SA L-99-224, Submits Rev to Unit 2 SG Tube voltage-based Repair Criteria Data Rept.Ltr Contains No Commitments1999-06-0707 June 1999 Submits Rev to Unit 2 SG Tube voltage-based Repair Criteria Data Rept.Ltr Contains No Commitments ML20195F1731999-06-0707 June 1999 Forwards Proprietary & non-proprietary Responses to NRC RAIs Re W TR WCAP-14750, RCS Flow Verification Using Elbow Taps at W 3-Loop Pwrs. W Proprietary Notice,Affidavit & Copyright Notice,Encl.Proprietary Info Withheld L-99-217, Forwards Proprietary & non-proprietary Responses to NRC RAIs Re W TR WCAP-14750, RCS Flow Verification Using Elbow Taps at W 3-Loop Pwrs. W Proprietary Notice,Affidavit & Copyright Notice,Encl.Proprietary Info Withheld1999-06-0707 June 1999 Forwards Proprietary & non-proprietary Responses to NRC RAIs Re W TR WCAP-14750, RCS Flow Verification Using Elbow Taps at W 3-Loop Pwrs. W Proprietary Notice,Affidavit & Copyright Notice,Encl.Proprietary Info Withheld L-99-225, Responds to GL 98-01, Yr 2000 Readiness of Computer Sys at Nuclear Power Plants1999-06-0707 June 1999 Responds to GL 98-01, Yr 2000 Readiness of Computer Sys at Nuclear Power Plants ML20195F0621999-06-0707 June 1999 Submits Rev to Unit 2 SG Tube voltage-based Repair Criteria Data Rept.Ltr Contains No Commitments ML20195E9581999-06-0707 June 1999 Responds to GL 98-01, Yr 2000 Readiness of Computer Sys at Nuclear Power Plants ML20195C6941999-05-28028 May 1999 Forwards Response to NRC RAI Re GL 96-05 for Farley Nuclear Plant.Farley Is Committing to Implement Phase 3 of JOG Program L-99-021, Forwards Response to RAI Re Conversion to ITSs for Chapter 3.3.Attachment II Includes Proposed Revs to Previously Submitted LAR Re Rais,Grouped by RAI number.Clean-typed Copies of Affected ITS Pages Not Included1999-05-28028 May 1999 Forwards Response to RAI Re Conversion to ITSs for Chapter 3.3.Attachment II Includes Proposed Revs to Previously Submitted LAR Re Rais,Grouped by RAI number.Clean-typed Copies of Affected ITS Pages Not Included L-99-203, Forwards Response to NRC RAI Re GL 96-05 for Farley Nuclear Plant.Farley Is Committing to Implement Phase 3 of JOG Program1999-05-28028 May 1999 Forwards Response to NRC RAI Re GL 96-05 for Farley Nuclear Plant.Farley Is Committing to Implement Phase 3 of JOG Program ML20195F2101999-05-24024 May 1999 Requests That Farley Nuclear Plant Proprietary Responses to NRC RAI Re W WCAP-14750, RCS Flow Verification Using Elbow Taps at W 3-Loop Pwrs, Be Withheld from Public Disclosure Per 10CFR2.790 L-99-180, Forwards Responses to NRC RAI Questions for Chapter 3.8 of Ts.Proposed Revs to TS Previously Submitted with LAR Related to RAI1999-04-30030 April 1999 Forwards Responses to NRC RAI Questions for Chapter 3.8 of Ts.Proposed Revs to TS Previously Submitted with LAR Related to RAI ML20206F4321999-04-30030 April 1999 Forwards Responses to NRC RAI Questions for Chapter 3.8 of Ts.Proposed Revs to TS Previously Submitted with LAR Related to RAI L-99-017, Forwards Responses to NRC RAI Questions for Chapters 3.1, 3.2,3.5,3.7 & 3.9 of Ts.Attached Pages Include Proposed Revs Previously Submitted LAR to Rais,Grouped by Chapters & RAI Numbers1999-04-30030 April 1999 Forwards Responses to NRC RAI Questions for Chapters 3.1, 3.2,3.5,3.7 & 3.9 of Ts.Attached Pages Include Proposed Revs Previously Submitted LAR to Rais,Grouped by Chapters & RAI Numbers ML20206C8021999-04-26026 April 1999 Forwards 1998 Annual Rept, for Alabama Power Co.Encls Contain Financial Statements for 1998,unaudited Financial Statements for Quarter Ending 990331 & Cash Flow Projections for 990101-991231 05000348/LER-1998-007, Forwards SG-99-04-001, Farley-1:Final Cycle 16 Freespan ODSCC Operational Assessment, as Committed to in Licensee & LER 98-007-00.Util Is Revising Plant Administrative SG Operating Leakage Requirements as Listed1999-04-23023 April 1999 Forwards SG-99-04-001, Farley-1:Final Cycle 16 Freespan ODSCC Operational Assessment, as Committed to in Licensee & LER 98-007-00.Util Is Revising Plant Administrative SG Operating Leakage Requirements as Listed L-99-015, Forwards Rev 1 to Jfnp Security plan,FNP-O-M-99,resulting from Implementation of Biometrics Sys.Changes Incorporate Changes Previously Submitted to NRC as Rev 28 by Licensee .Encl Withheld,Per 10CFR73.211999-04-21021 April 1999 Forwards Rev 1 to Jfnp Security plan,FNP-O-M-99,resulting from Implementation of Biometrics Sys.Changes Incorporate Changes Previously Submitted to NRC as Rev 28 by Licensee .Encl Withheld,Per 10CFR73.21 ML20206B4391999-04-21021 April 1999 Forwards Corrected ITS Markup Pages to Replace Pages in 981201 License Amend Requests for SG Replacement L-99-172, Forwards FNP Annual Radioactive Effluent Release Rept for 1998, IAW TSs Sections 6.9.1.8 & 6.9.1.9.Changes to ODCM Revs 16,17 & 18 Are Encl,Iaw TS Section 6.14.21999-04-21021 April 1999 Forwards FNP Annual Radioactive Effluent Release Rept for 1998, IAW TSs Sections 6.9.1.8 & 6.9.1.9.Changes to ODCM Revs 16,17 & 18 Are Encl,Iaw TS Section 6.14.2 ML20205S9501999-04-21021 April 1999 Forwards FNP Annual Radioactive Effluent Release Rept for 1998, IAW TSs Sections 6.9.1.8 & 6.9.1.9.Changes to ODCM Revs 16,17 & 18 Are Encl,Iaw TS Section 6.14.2 ML20205R0431999-04-13013 April 1999 Forwards Correction to 960212 GL 95-07 180 Day Response. Level 3 Evaluation for Pressure Locking Utilized Analytical Models.Encl Page Has Been Amended to Correct Error 1999-09-23
[Table view] Category:LEGAL/LAW FIRM TO NRC
MONTHYEARML20055H1341990-07-24024 July 1990 Forwards Decommissioning Rept & Certificate of Financial Assurance ML20055D1651990-06-26026 June 1990 Forwards Endorsement 15 to Maelu Policy M-73 ML20247D7091989-05-0505 May 1989 Forwards Joint Stipulation Re NRC Enforcement of Condition 2 on Plant & Requests That Notice of Violation Be Withdrawn ML20244E0091989-04-0606 April 1989 Forwards Endorsements 69 & 81 to Maelu Policy MF-93 & Nelia Policy NF-238,respectively ML20245A5291989-03-0202 March 1989 Forwards Endorsement 67 to Maelu Policy MF-93 ML20151M8161988-07-27027 July 1988 Provides Update of Status on Settlement Negotiations Between Alabama Power Co & Alabama Electric Cooperative. Requests Addl Extension of Time to Facilitate Possible Fruition of Negotiations ML20151M4221988-07-27027 July 1988 Informs That Since 880617 Serious Settlement Negotiations Have Been Continuously in Progress.Parties Will Submit Further Rept to NRC by 880915 ML20195H1261988-06-17017 June 1988 Requests That Director Affirm Settlement Proposal Negotiated in Matter Re Util Financial Obligations & Bring Matter to Close.Pc Kron Affidavit Encl ML20195J1301988-06-15015 June 1988 Requests NRC to Institute Investigation of Southern Co & Operating & Svc Subsidiaries to Determine Whether Any License Conditions Being Violated.Supporting Documentation Encl ML20154L7231988-05-24024 May 1988 Responds to from Counsel of Alabama Electric Cooperative,Inc Objecting to Alabama Power Co 880125 Proposal to Resolve Issues Re Terms for Sale of Plant. Director Should Affirm Settlement Proposal ML17347A4841987-05-0707 May 1987 Forwards Endorsements 72,104,46,67,83,96 & 59 to Nelia Policies NF-238,NF-215,NF-252,NF-227,NF-185,NF-198 & NF-247 & Endorsements 60,86,27,54,70,82 & 51 to Maelu Policies MF-93,MF-78,MF-108,MF-88,MF-55,MF-66 & MF-102,respectively ML20214D0391986-11-18018 November 1986 Responds to Bouknight in Response to NRC Re Notice of Violation of Antitrust License Condition. Equity Component Rate for AFUDC in Bouknight Ltr Highly Ambiguous ML20215G6481986-10-17017 October 1986 Forwards Us District Court for Northern District of Georgia 860829 Order in Greensboro Lumber Co Vs Georgia Power Co, Contending That Decision Supports Argument Made in Util Response to Notice of Violation ML20211C1251986-10-17017 October 1986 Forwards Reply to Alabama Power Co Response to Notice of Violation of Antitrust License Condition ML20206S2701986-09-17017 September 1986 Notifies of Address Change Effective on 860927.Requests Address on Encl List of Dockets Be Changed ML20154L7501986-08-12012 August 1986 Responds to Matters Raised During Meeting Re Ownership of Plant,Including Wholesale Power Contracts Between Alabama Electric Cooperative (AEC) & Members & AEC Claim That Contracts Accepted by Private Lenders as AEC Loan Security ML20151Z6681986-07-10010 July 1986 Suppls Re Proposal of Terms & Conditions for Employee Interviews at Plant for NRC Investigation of Allegations ML20211C7541986-05-12012 May 1986 Forwards Endorsements,Including Endorsement 75 to Maelu Policy MF-66,Endorsement 88 to Nelia Policy NF-198, Endorsement 44 to Maelu Policy MF-102,Endorsement 51 to Nelia Policy NF-247 & Endorsement 70 to Maelu Policy MF-90 ML20151Z6561986-05-0606 May 1986 Advises That Encl List of Clients Willing to Cooperate W/Nrc Re Investigation of Plant ML20209F1251986-03-28028 March 1986 FOIA Request for Documents Re Jl Smith Complaints,Comments, Inquiries or Requests Concerning Plant & Health Physics Insp During Wk of 860324 ML20137Z5791986-03-11011 March 1986 Requests That Gf Trowbridge Be Replaced as Addressee for NRC Correspondence in Accordance W/Listed Client Facility & Designated Addressee ML17346B1681986-01-0606 January 1986 Forwards Endorsements to Nelia & Maelu Policies,Including Endorsement 22 to Nelia Policy NF-281,Endorsement 15 to Maelu Policy MF-112 & Endorsements 6 to Nelia & Maelu Certificates N-97 & M-97 ML20134M7541985-08-29029 August 1985 Forwards Endorsements 65 & 66 to Nelia Policy NF-238 & Endorsements 54 & 55 to Maelu Policy MF-93 ML20137A8031985-08-0505 August 1985 FOIA Request for Records of ST Doyle,Gap & Bp Garde Complaints,Inquiries & Requests for NRC Action Re Facility or Util ML20117A7331985-05-0101 May 1985 Forwards Endorsement 64 to Nelia Policy NF-238 & Endorsement 53 to Maelu Policy MF-93 ML20100F3821985-03-27027 March 1985 Forwards Endorsement 63 to Nelia Policy NF-238 ML20114B6121985-01-21021 January 1985 Forwards Endorsements 10,14 & 47 to Nelia Policy NF-238 ML20101H1721984-12-20020 December 1984 Forwards Endorsement 5 to Nelia Certificates N-62 & N-73 & Maelu Certificates M-62 & M-73 ML20101G9061984-12-20020 December 1984 Forwards Endorsement 62 to Nelia Policy NF-238 & Endorsement 52 to Maelu Policy MF-93 ML20106C2281984-10-23023 October 1984 Forwards Recent Correspondence Re Pricing of Alabama Electric Cooperative Proportionate Ownership Entitlement,To Assist Staff in Determinations on Cooperative Request for Antitrust Enforcement Action.W/Certificate of Svc ML20093K9811984-10-15015 October 1984 Forwards Memorandum of Alabama Power Co in Response to Request of Alabama Electric Cooperative,Inc for Enforcement Action & Petition of Alabama Power Co for Declaratory Order, Per Util 840629 Request for Enforcement Action ML20093H5281984-10-15015 October 1984 Forwards Memorandum in Response to Request of Alabama Electric Cooperative,Inc for Enforcement Action ML20094C9631984-08-0606 August 1984 Reiterates 840702 Request for Notes,Memoranda or Transcripts of Meetings Between NRC & Util as Referenced in Palladino 840626 Memo ML20094D0661984-08-0606 August 1984 Reiterates 840702 Request for Any Notes or Memoranda or Transcripts of Meetings W/Util Near End of June 1984. Certificate of Svc Encl ML20094C9511984-08-0606 August 1984 Reiterates 840702 Request for Notes,Memoranda or Transcripts of Meetings Between NRC & Util as Referenced in Palladino 840626 Memo ML20090H0901984-07-25025 July 1984 Forwards CR Lowman 840725 Response to Alabama Power Co Re Enforcement Proceeding.Certificate of Svc Encl ML20093H9311984-07-24024 July 1984 Forwards Reply to Alabama Electric Cooperative & DOJ Responses to Commission 840709 Order.Responses Raised New Matters Not Addressed by Util ML20090A7111984-07-10010 July 1984 Forwards to Chairman Palladino & 840629 Request. W/O Encls.Related Correspondence ML20093A5441984-07-0909 July 1984 Forwards 840703 Petition for Declaratory Order,Notices of Appearances & Affidavit of Svc.W/O Encls ML20093A2471984-07-0505 July 1984 Ack Receipt of B Boskey & DB Macguineas Re 840626 Meeting & Request for Enforcement Action.Alabama Electric Cooperative,Inc Ltr Should Be Disregarded & Maneuvers Should Not Be Permitted to Delay Action on 840703 Petition ML20093A3281984-07-0505 July 1984 Comments on Alabama Electric Cooperative,Inc 840629 Request for Enforcement Action on Allegations Re Violation of Antitrust License Condition 2.Request Should Be Held in Abeyance Until Commission Declaratory Order Issued ML20092N8711984-07-0303 July 1984 Forwards Petition for Declaratory Order to Institute Proceedings & Notice of Appearance ML20092N7131984-07-0202 July 1984 Ack Receipt of 840626 Memo Re Meeting W/Representatives of Alabama Power Co.Util 840629 Formal Request for Enforcement Petition Re Alabama Power Co Conduct Encl.Meeting Transcript Requested ML20091A0731984-05-21021 May 1984 Forwards Endorsement 4 to Maelu Policy M-73 ML20084J1871984-05-0202 May 1984 Forwards Endorsement 51 to Maelu Policy MF-93 & Endorsement 61 to Nelia Policy NF-238 ML20087L8341984-03-20020 March 1984 Forwards Endorsements 49 & 50 to Maelu Policy MF-93 & Endorsements 59 & 60 to Nelia Policy NF-238 ML20081C4181984-03-0505 March 1984 Forwards Endorsement 4 to Nelia Certificate N-13 Correcting Name of Insured on Endorsements 2 & 3 ML20086T5411984-02-28028 February 1984 Forwards Endorsement 58 to Nelia Policy NF-238 ML20083F1331983-12-23023 December 1983 Forwards Endorsements 56 & 57 to Nelia Policy NF-238, Endorsements 47 & 48 to Maelu Policy MF-93,Endorsement 4 to Nelia/Maelu Secondary Financial Certificates N-62 & M-62 & Endorsement 3 to Certificates N-73 & M-73 ML20078C8041983-09-22022 September 1983 Forwards Endorsements 45 & 46 to Maelu Policy MF-93 & Endorsements 54 & 55 to Nelia Policy NF-238 1990-07-24
[Table view] |
Text
-. . . _ _ _ . - _ _ _ _ _ _ _ _ _
VOLPE, BOSKEY AND LYC N S WORLD CENTER ButLDING 91816L" STRE CT, N. W.
l WASHIPGTON, D. C. 20006 l JOSEPH VOLPE, JR. C (202)737-65s0 CENNETT SOSMEY ELLis LYONS EDWARD A.GROOBERT C. SI ARO M ACGUIN EAS gg ,6- P 4 ;[} l EDWIN E. HUDDLESON,III August 6, 1984 I EVA F. S H ER M AN -
PATRICIA A.MAYER GffM ' [
OCCN j;i
=.,L.
Mr. James K. Asselstine ~~'*"** " ~~
Commissioner U.S. Nuclear Regulatory CDCKET Wim a Commission Washington, D.C. 20555 PROD. & UTIL r;c , , ,, , ,],,, , M((
Dear Mr. Asselstine:
We are in receipt of Herzel H. E. Plaine's letter of July 26, 1984 (copy attached), responding to our request dated July 2, 1984, (copy also attached) for any notes or memoranda or transcripts which have been made, or are being made, of any'of the meetings between yourself and representa-tives of Alabama Power Company near the end of June, 1984, as referred to in Chairman Palladino's Memorandum For the Files dated June 26, 1984, and docketed June 28, 1984, in Docket Nos. 50-348A and 50-364A (Alabama Power Company:
Antitrust).
Mr. Plaine in his letter sdggests that "it may be best" if we make direct request to you for such notes, etc., of the meeting or meetings referred to in the Chairman's memo-randum. While we were under the impression that the c.opy of our July 2, 1984, letter which was sent to you was suffi-cient 'to constitute a request to you for such notes, etc.,
now, in view of what Mr. Plaine's letter states, we are separately requesting from you the same matters originally requested in our July 2, 1984, letter with respect to any meetings.
Without regard to whether the ex parte meetings did or did not comply with the letter and spirit of the NRC regula-tions, it still appears to us that elemental considerations of fairness call for such information to be furnished to AEC.
As we have previously stated in a recent filing with the ,
Commission (July 18, 1984, p. 5), the fact that Alabama Power Sh3 ~
8408000241 840806 PDR ADOCK 05000348 M_ _ PDR_ _ _ ._ _
~~
l
. .. Ir. i r --
UDLPE. COCKEY AND LYoN G p0gD Two Company has been so eager to persuade the Commissioners not to make such disclosures to Alabama Electric Cooperative, Inc. regarding Alabama Power Company's ex parte efforts under-
-scores the reasons why, in the interests of fairness, such
' disclosures ought to be made.
Sincerely yours, I
I Benne t Boskey r
f o
) i D. Biard MacGuineas cc: As per attached Certificate of Service l
i
l.t
.VOLPE, BOS KEY AN D LYO N S womLD CCNTCR BUILCING 9 4 6 16L" ST R E CT N. W.
- WAS HINGTON, D. C. 2o 006 J2SEPM VO LPC, J R.
(2C2) 737 6580 C CN N CTT SOSMCY CouS 6v0NS M CCWARD A.ORCOS CRT July 2 # 1984 N g
D. SI ARD M ACGUIN CAS /
. CDwlN C. HUDOLESON,III CVAP.SHERMAN N FATRICIA A. M AYCR p -
d j$
6
\\
Mr. Nunzio J. Palladino 3 Chairman ! D \
D Nuclear Regulatory Commission .
washington, D.C. 20555 Dear Chairman Palladino In this morning'.s mail we received a copy of your three-page " Memorandum for Files," dated June 26, 1984, "
Subject:
Meeting with Representativ~es of Alabama Power Company," which had been mailed to us on June 28 by the Commission.
This is the first knowledge we have had of the apparently very extensive and well attended meeting which took place between you and representatives of Alabama Power Company on June 26, 1984. Naturally, as counsel to Alabama Electric Cooperative we are interested in learning from your Memoran-dum that such a meeting did take place and the substance of what was said.
We are, however, somewhat surprised to learn from your Memorandum that such an extensive meeting with Alabama .. Power company.was held on an.e_x x parte basis, without notice to Alabama Electric Cooperative or its counsel, and that the meeting was permitted to continue even after, according to what is indicated in your Memorandum, it was stated by Alabama Power Company rather early in the meeting that "AEC informed Alabama Power that AEC is contemplating an enforcement petition and may file a paper with NRC this week."
For your information, Alabama Electric Cooperative did on June 29, 1984, file with the Commission a formal request for enforcement, and mailed copies of it to Mr. Farley, President of Alabama Power Company, and to Mr. Buettner, one of its counsel. At that time, as indicated above, we were wholly unaware of the meeting which Alabama Power Company had had gj,A=s=*= 'd "
1 TY I P.)PT b 6 -
. x -
0 y
- VoLPE, Co3MEY ' AND LYoN S
, . Pcga Two e, .with you on June 26, and of'any representations which Alabama 4 Power' Company'may have made-to you in connection with this matter. . A copy of the Alabama -Electric Cooperative formal
' request (not including the various Tabs which are attached to
'the. copies filed on June 29),-together with a copy of our letter of ' transmittal, is enclosed herewith - for ~ your informa--
tion. As you will see from the Alabama Electric Cooperative request for enforcement, the manner in which Alabama Power
- Company has been. conducting itself since the date on which the-license conditions.became final has led Alabama Electric Cooperative to conclude that, prompt enforcement action should be sought from, and taken by,' the Commission at this time.
Your Memorandum does not indicate that in the meeting.of
' June 26, 1984, Alabama Power Company representatives even alluded to most of the specific items which form the basis of Alabama Electric Cooperative's request for enforcement.
In the event that anything of substance was said at the meeting on June 26,~1984, which is not' reflected in your Memorandum of that date, we request that such be communicated to us. If a transcript of the meeting was made or is being made, we likewise request that that be furnished to us.
We are furnishing copies of this letter to those persons to whom your Memorandum shows you sent copies of your Memo-randum (other than Commissioner Gilinsky whose term has mean-while expired), and also to Messrs. Farley and Buettner.
On page 1 of your Memorandum, at the top of paragraph 2, it is , stated that "At the meeting, Alabama Power representa-tives told me the following information: -- They met pre-viously.in separate meetings with Commissioners Asselstine and Bernthal and with Mr. Dircks to discuss the points presented to me." We hereby request that we be furnished with copies of any notes or memoranda or transcripts which have been made, or are being made, of any of those meetings.
Sincerely yours,
.hA%TT (
BennettBosk,h ey l Enclosures D.
kbL0%aad Biard MacGuineas -
cc: Commissioner Roberts Commissioner Asselstine Commissioner Bernthal Herzel H. E. Plaine l SECY Docketing & Service (Docket No.s 50-348A, 50-364A)
L Joseph M. Parley l
! Robert A. Buettner, Esq. l l
. :r-CERTIFICATE OF SERVICE It'is hereby. certified'that service of the attached document has been made by mailing or delivering
- copies to the following on the 6th day of August, 1984.
i :yr r..
3 ?r -
8ENNETT BOSKbk4 f@ _g ,
4
- Nunzio J. Palladino,- Chairman kh? ilce. -.. .
U.S. Nuclear Regulatory. Commission i .lyO5:~'
Washington, D.C. 20555
- Frederick M. Be'rnthal, Commissioner U.S. Nuclear Regulatory Commission Washington, D.C. 20555
- James K. Asselstine, Commissioner U.S. Nuclear Regulatory Commission Washington, D.C. 20555 '
- Thomas M. Roberts, Commissioner U.S. Nuclear Regulatory Commission Washington, D.C. 20555 .
- Lando W. Zech, Commissioner -
U.S. ; Nuclear Regulatory Comdission Washington, D.C. 20555
- Docketing and Service Section office of the Secretary U.S. Nuclear Regulatory Commission .
Washington, D.C. 20555
- Dr. Richard C. DeYoung, Direct'or Office of Inspection and Enforcement . . .
U.S. Nuclear Regulatory Commission Wachington, D.C. 20555
- William J. Dircks Executive Director for Operations U.S. Nuclear Regulatory Commission l
Washin'gton, D.C. 20555
- Herzel H. E. Plaine, Esquire General Counsel U.S. Nuclear Regulatory Commission Washington, D.C. 20555
- Guy H. Cunningham, III, Esquire Office of Executive Legal Director U.S. . Nuclear Regulatory Commission Washington, D.C. 20555
LM' !
l
- Joscph Rutbarg, Esquiro Of fice of . Executive Legal Director U.S. Nuclear Regulatory Commission Washington, D.C.-20555
- Martin G. Malsch, Esquire Office of General-Counsel U.S'.. Nuclear Regulatory Commission Washington, D.C. 20555
- Michael B. Blume, Esquire
. Office of General Counsel U.S. Nuclear Regulatory Commission Washington, D.C.,-20555 , ,
Harold F. Reis,- Esquire J. A. Bouknight, Jr., Esquire Newman - & Holtzinger, P.C.
1025. Connecticut Avenue, N.W.
-Washington, D.C. 20036 Joseph M. Farley, President' .
Alabama Power Company 600 North 18th Street P.O. Box 2641 Birmingham, Alabama 35291 Robert A. Buettner, Esquire -
Balch, Bingham, Baker, Ward, Smith, Bowman & Thagard P.O. Box 306 Birmingham, Alabama 35201 Melanie Stewart Cutler, Esquire ,
Chief, Energy Section Antitrust Division U.S. Department of Justice 9th & Pennsylvania Avenue, N.W. .. .
Washington, D.C. 20530 -
David W. Brown, Esquire Assistant Chief, Energy Section Antitrust Division U.S. Department of Justice
, 9th & Pennsylvania Avenue, N.W.
Washington, D.C. 20530 John D. Whitler, Esquire