Forwards Updated Status of 1984 Licensing Items Identified in
ML20090C014
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 07/02/1984
From: Mcdonald R
ALABAMA POWER CO.
To: Varga S
Office of Nuclear Reactor Regulation
References
NUDOCS 8407130122
Download: ML20090C014 (7)


Text

_-

M;Hing Adfress Alabama Power Company e

600 North 18*h Street Post Office Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6090 R. P. Mcdonald Senior Vice Fresident Fhntndge Building

/\\labama Power im.w ww +

Docket Nos. 50-348 50-364 Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Attention: Mr. S. A. Yarga j

Joseph M. Farley Nuclear Plant - Units 1 and 2 Licensing Items Requiring NRC Approval Gentlemen:

Attached for your infomation is an updated status of 1984 licensing items identified in Alabama Power Company's letter dated June 1,1984.

The format of the attachment is tabulated chronologically by Alabama Power Company' *, requested NRC approval date. Alabama Power Company is ready to discuss a modification of this licensb1g status which would address all licensing issues.

If you have any questions, please advise.

,/

Yours truly,

~ ~ -

R. P. Mcdonald RPM /CJS:ddb-016 Attachment cc:

Mr. L. B. Long Mr. J. P. O'Reilly Mr. E. A. Reeves

[

Mr. W. H. Bradford 06

[b iI 8407130122 840702

~

PDR ADOCK 05000348 P

PDR

ATTACHMENT PAGE 1 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC NRC SUBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S)

DATE DATE REMARKS 10-25-82 01-06-84 COMPLETE 1.

Emergency Preparedness Program Audit Once Per 12 Months, FNP-1 and 2

?.. Administrative 04-06-83 01-09-84 COMPLETE Change to

~ Footnote to T.S. Table 3.3-3, FNP-1 and 2 3.

Administrative 12-10-82 01-10-84 COMPLETE Change to T.S.

Table 3.7-4a, FNP-2 01-27-84 COMPLETE 10-08-82 4.

Change for Turoine Valve Testing, FNP-1 and 2 5.

Correct Fire 08-26-83 02-09-84 COMPLETE Protection Technical Specifications, FNP-1 and 2 05-27-84 02-29-84 COMPLETE 6.

Administrative Change to Table 3.7-4a, FNP-1 02-22-84 04-16-84 COMPLETE 7.

10CFR50.49 Environmental Qualification Schedule Extension Submi ttal,

FNP-1 8.

License 11-24-84 05-17-84 COMPLETE Condition 06-29-84 2.C(17) 03-23-84 Containment Mini-Purge, FNP-2 (T.S.3.6.1.7) 1

r ATTACHMENT PAGE 2 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC NRC SUBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S)

DATE DATE i

REMARKS 05-17-84 COMPLETE 11-24-82 9a. Mechanical Snubber Listing, FNP-2 (T.S. Table 3.7-4B) 11-24-82 05-17-84 COMPLETE 9b. Containment Penetration Overcurrent P rotection, FNP-2 (T.S.

Table 3.8-1) 03-04-83 07-15-83 06-06-84 54237 COMPLETE

10. Movable Control Rod Action 06-03-83 11-01-83 54238 Amendeent Statement, 07-28-83 05-25-84 Nos. 44 & 1 FNP-1 and 2 10-10-83 (T.S. 3/4.1.3) 02-17-84 05-03-84 12-30-82 07-01-83 06-07-84 49374 COMPLETE 11a. River Water System 06-20-83 05-18-84 49375 heendment Deletion, FNP-1 03-02-84 Nos. 45 & 1 and 2 (T.S.

03-27-84 3/4.7.5 and 3/4.7.6) 08-03-82 07-01-83 06-07-84 49374 COMPLETE lib. Diesel Generator 12-30-82 10-01-83 49375 Amendment Overload Test, 06-03-83 05-18-84 Nos. 45 81 FNP-1 and 2 01-31-84 (T.S.

03-02-84 4.8.1.1.2.c.5) 03-27-84 03-04-83 09-01-84 06-22-84 49953 COMPLETE

12. Charcoal Filter Surveillance, 03-01-84 06-22-84 49954 Amendment FNP-1 and 2 Nos. 46 & 3 (T.S. 4.7.7, 4.7.8 and 4.9.14) 54531 DUE FROM N:

12-12-83 07-01-84

13. Reactor Head Vent and Other 54532 0737 Items, G.L. 83-37, FNP-1 and 2 (Proposed T.S.

3/4.4.12 and existing T.S.

Tabl e 3.3-6, 3.3-11 and 3/4.6.4)

F ATTACHMENT PAGE 3 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC NRC SUBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S)

__pATE DATE REMARKS 03-02-84 07-08-84 54450

14. Meteorological Tower 54451 Instrument Surveillance, FNP-1 and 2 (T.S. Tables 3.3-8 and 4.3-5) 05-03-83 11-03-83 51629
15. Safety Related Battery 06-29-83 05-01-84 51631 Surveillance, 07-29-83 06-01-84 FNP-1 and 2 08-29-83 08-15-84 (T. S. 3 /4. 8. 2. 3, 09-23-83 3/4.8.2.4 and 01-27-84 3/4.8.2.5) 54235 02-03-84 09-01-84
16. Generic Letter 83-43, 54236 Reporting Requirements of 10CFR50.72 and 50.73, FHP-1 and 2 (T.S.

6.9.1.11,12,13) 05-27-83 02-29-84 COMPLETE i 17. Correct Snubber Listing, FNP-1 (FNP-1)

(FHP-1) l and 2 (T.S.

l Table 3.7-4) 12-08-83 09-01-84 53402 (FNP-2)

(FhP-2) l 54452 03-01-84 09-01-84 18a. Change Monthly l

Channel 54453 l

Calibration of l

Excore Neutron l

Detectors to Every 31 EFPD, FNP-1 and 2 (T.S. Table 4.3-1) 54452 03-01-84 09-01-84 18b. Correct Facility 54453 Organization i

Chart, FNP-1 and 2 (T.S.

Figure 6.2-2) t

r ATTACIMENT PAGE 4 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC NRC SUBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S)

DATE __

DATE

_f REMARKS 18c. Correct Valve 03-01-84 09-01-84 54452 Numbers Listed 54453 in T.S., FNP-1 and 2 (T.S.

Table 3.6-1) 01-13-84 02-12-84 53468

19. Respirator Iodine Filter 02-10-84 09-09-84 53469 Exemption 02-13-84 Request, FNP-1 03-05-84 and 2 05-08-84 03-30-84 10-01-84 20.

Increase Fuel Enrichment 05-29-84 Design Limit for Reload Fuel and New Fuel Racks, FNP-1 and 2 (T.S.

5.3.1 and 5.6.1.2) 21.

RCS Pressure 04-10-84 10-06-84 48714 Isolation Valve 48715 Surveillance, FNP-1 and 2 (T.S. 3/4.4.7.2 and 3/4.4.7.3)

22. Administrative 05-14-84 11-12-84 Change to Reflect Senior Vice President Change, FNP-1 and 2 (T.S.

l 6.1, 6.2, 6.5, 6.6, 6.7 and Figure 6.2.1) l l

r ATTACHMENT PAGE 5 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL PROPOSED ACTUAL REQUESTED ACTUAL APCo APCO NRC NRC NRC SUBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE(S)

DATE DATE f_

REMARKS DATE 06-01-84 12-01-84 23.

RWST and Accumulator IST Ju sti fication, FNP-1 and 2 (IST Program)

NEW ITEM 06-25-84 12-01-84

24. Administrative Change to Reflect 2 Assistant Plant tianagers, FNP 1 and 2 (T.S.

Figure 6.2-2) 01-07-85

25. Administrative 07-06-84 Change to Correct T.S.

Errors (e.g.

Room Air Temperature Requirements, FNP-2 T.S.

Table 3.7-8) and G.L. 84-13, FNP-1 and 2

.2-01-85

26. Chlorine 08-01-84 Detection Systens, FNP-1 and 2 (T.S.

3.3.3.6) 27.

RCP Breaker 09-01-84 03-01-85 Position Trip Deletion, FNP-1 and 2 (T.S.

Table 3.3-1) 03-01-85 28.

Special Test 09-01-84 Exception to Eliminate Excessive Flux Mapping During Startup After R.O., FNP-1 and 2 (T.S.

3/4.10.2)

ATTACIMENT PAGE 6 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NP.C NRC SUBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S)

DATE DATE i

REMARKS 04-20-84 03-01-85

29. Revised Heatup and Cooldown (FNP-1)

(FNP-1)

Curves Based on 02-10-84 02-10-85 54234 Reactor Vessel Material 06-18-84 (FNP-2)

Surveillance (FNP-2)

Program, FNP-1 To be

30. Technical 30 days Specification after deter-Optimization NRC mined Program, FNP-1 approval and 2 (T.S.

of 3/.t.3) generic changes

31. Schedular 06-18-82 To be Exemption to 07-27-82 deter-Appendix R 05-15-84 mined Al ternative Shutdown Requirement, FNP-1 and 2