Category:CORRESPONDENCE-LETTERS
MONTHYEARML20207B5311999-03-0202 March 1999 Forwards Insp Rept 50-297/99-201 on 990209-12.No Violations Noted.Insp Included Review of Activities Authorized for Facility.Emergency Procedures Were Also Examined ML20202G9971999-02-0202 February 1999 Forwards Response to Telcon Discussion Between NRC & Licensee,Correcting Typo in Proposed TS Definition 1.26 & Using Definition in Proposed TS 3.1(f) ML20199C8901999-01-0808 January 1999 Ack Receipt of Ltr Dtd 980823,which Transmitted Changes to North Carolina State Univ Pulstar Reactor Emergency Plan Submitted Under Provisions of 10CFR50.54(q).Plan Meets Requirements of App E to 10CFR50.NRC Approval Not Required ML20196D4711998-11-30030 November 1998 Forwards Response to NRC 980928 RAI Re Mod to Facility TS, Submitted 980507.Proposed TS Pages,Encl ML20153H2781998-09-28028 September 1998 Forwards RAI Re 980507 Request for License R-120 for North Carolina State Univ Pulstar Research Reactor.Response Requested within 60 Days of Date of Ltr ML20237E2541998-08-26026 August 1998 Informs NRC That Ma Fox Is New Chancellor of Nc State Univ, Effective 980801,per TS Requirement TS 6.7.2 IR 05000297/19982011998-05-0404 May 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-297/98-201.NRC Will Examine Implementation of Corrective Action During Future Insp ML20216F4281998-04-14014 April 1998 Responds to NRC Re Violations Noted in Insp Rept 50-297/98-201.Corrective Actions:Procedure HP 1 Has Been Revised to Address NOV ML20217C0351998-03-18018 March 1998 Forwards Insp Rept 50-297/98-201 on 980120-23 & Notice of Violation ML20203K1631997-12-18018 December 1997 Informs That North Carolina State University Pulstar Reactor Has Scheduled Annual Emergency Drill for 971230 ML20198R8051997-10-30030 October 1997 Forwards Amend 12 to License R-120 & Safety Evaluation.Amend Updates Figure 5.2-1 of Ts,Pulstar Reactor Site Map & Removes Ref to Region II in TS 3.7, Reporting Requirements ML20217B2001997-09-0909 September 1997 Forwards Insp Rept 50-297/97-201 on 970609-12.No Violations Noted ML20210Q7791997-08-27027 August 1997 Forwards Pulstar Reactor Annual Rept for Jul 1996 - June 1997 & Nc State Univ Dept of Environ Health & Safety Radiation Protection Div Environ Radiation Surveillance Rept for Jul 1996-June 1997 ML20198F7921997-08-0101 August 1997 Informs That on 970804,non-power Reactor Insp Program Will Be Transferred from Region II Ofc to NRR ML20148G2731997-05-27027 May 1997 Forwards Three Tables Which Correct Error in Counting Efficiency Determination,Resulting in under-estimating Actual Concentration & Activity of Tritium Released to Sanitary Sewer ML20137V3881997-03-25025 March 1997 Informs of Relocation of Region II Ofc to Atlanta Federal Ctr Complex on 970425.List of Telephone Numbers & Directions to New NRC Ofc Encl ML20134K8121997-02-11011 February 1997 Discusses Pulstar Nuclear Reactor Emergency Plan. Implementation of Changes Will Be Subj to Insp to Confirm That Changes Did Not Decrease Overall Effectiveness of Emergency Plan ML20134J8771997-02-10010 February 1997 Provides Nuclear Instrumentation Info Which May Be Useful to non-power Reactor Facilities ML20132B2611996-12-11011 December 1996 Provides Notification of Scram Logic Unit Condition Deviation from Intended Function Described in Ufsar.Caused by Mechanical Failure & Surveillance Procedure Deficiency. Connection re-soldered & Verified to Be Mechanically Sound ML20129B9181996-10-10010 October 1996 Notifies of Annual Training Managers Conference in Atlanta, Ga on 961120-21 to Inform Regional Operations & Training Mgt of Issues & Policies That Affect Licensing of Reactor Plant Operators.Map Encl ML20117M7461996-08-20020 August 1996 Notifies NRC of Licensee Identified Surveillance non-compliance Iaw/Pulstar Facility TS 6.7.2(c) ML20116B3601996-07-18018 July 1996 Submits Info Re Personnel Change.Effective 960801 Na Masnari Will Be Dean of Engineering ML20113D6951996-06-28028 June 1996 Forwards Response to NRC Ltr Re Violations Noted in Insp Rept 50-297/96-02 on 940701-31.C/A:provides Corrected Page 6 Concerning Tritium Levels Released in Liquid Effluent ML20100R3661996-02-19019 February 1996 Forwards Radionuclide Annual Emissions Rept for 1995, Including Output from Computer Code Comply Version 1.5d ML20100R6361996-02-19019 February 1996 Provides Comments on 1995 Pulstar Research Reactor Emergency Drill Critique ML20096E8171996-01-16016 January 1996 Advises Jg Gilligan Named Dean of Engineering (Interim) ML20197J9401996-01-16016 January 1996 Informs NRC of Changes Affecting Nc State Univ Psp,Which Were Completed in Oct 1995.Proprietary Rept Including Revised Plan (Rev 8) & Description of Changes Is Enclosed. Proprietary Rept Withheld ML20096H1501995-12-0404 December 1995 Requests Representative from NRC Organization to Participate & Observe/Comment on Annual Emergency Drill,Scheduled on 951221 ML20094R1351995-11-29029 November 1995 Discusses Procedural non-compliance & Administrative Controls Deviation in Accordance W/Nc State Univ Pulstar Facility TS 6.7.3 (D) ML20092G4001995-09-15015 September 1995 Forwards Rev 3 to Pulstar Nuclear Reactor Emergency Plan, Reflecting Revised 10CFR20 & Incorporating Nc State Univ Incident Command Sys.App B Also Revised to Facilitate off- Site Dose Rate Calculations ML20087H2761995-08-10010 August 1995 Requests Time Extension in Responding to RAI ML20083A4771995-05-0101 May 1995 Requests Addl 90 Days to Respond to NRC 950209 RAI ML20197J9831995-05-0101 May 1995 Forwards Rev 7 to Pulstar Physical Security Plan,Expanding CAA to Include Completed Vault,Per Discussion W/C Bassett. W/O Encl ML20078B3591994-09-14014 September 1994 Provides Status of North Caroline State Univ Pulstar RCS Water Leakage ML20072P2271994-08-24024 August 1994 Forwards, Pulstar Reactor Annual Rept for Period Jul 1993 - June 1994 & Environ Radiation Surveillance Rept for Period Jul 1993 - June 1994 ML20197J9641994-08-24024 August 1994 Forwards Rev 6 to Physical Security Plan,Addressing Physical Security During Interim Construction Period,Which Is Scheduled for Approx 20 Weeks,For Subterraneous Vault for Buried Primary Piping & N-16 Delay Tank.W/O Encl ML20072K0011994-08-23023 August 1994 Informs of Personnel Change in Position Identified by Section 6.1.4 & Figure 6.1-1 of TS (Amend 8).New Position Assignment W/Effective Date of 940816 Listed.Requests NRC Mailing List Be Updated to Reflect Subj Change ML20072E4261994-08-15015 August 1994 Responds to NRC Re Violation Noted in Insp Rept 50-297/94-01.Corrective Actions:Review of Continuous Air Monitor Filter change-out & Counting Results by Reactor HP Being Performed Each Wk ML20072E4111994-07-20020 July 1994 Advises of Listed Personnel Changes for License R-120 ML20064H0371994-03-15015 March 1994 Notifies of Observed Inadequacy in Implementation of Procedural Controls as Defined in Facility Tech Spec ML20063B5541994-01-24024 January 1994 Notifies of Observed Inadequacy in Implementation of Procedural Controls Re Failure to Inventory Facility dead-bolt Keys,Issued & Unissued.C/A:Corrected Date Entry in Master Surveillance Sys ML20059C9311993-12-0606 December 1993 Provides 1993 Annual Pulstar Emergency Drill Critique ML20058P5971993-11-24024 November 1993 Documents Understanding of Activities Associated W/Leakage of Water from Pulstar Reactor Coolant Sys,Based on Discussions W/Ej Mcalpine of NRC on 931123 ML20059M9021993-11-16016 November 1993 Forwards Administration of Requalification Exams,Nrc Rules & Guidance for Exams & Security Agreements for Written Exams to Be Administered at Facility on 940221 ML20058P3221993-10-18018 October 1993 Forwards Partially Withheld Insp Rept 50-297/93-02 on 930928-29.No Violations or Deviations Noted ML20059G6891993-09-22022 September 1993 Informs Staff of Pending 931002 Annual Emergency Drill Per Pulstar Reactor Emergency Plan Section 10.2 ML20057E8891993-08-31031 August 1993 Forwards Pulstar Reactor Annual for Period 920701-930630 & Environ Radiation Surveillance Rept for Period 920701- 930630 ML20045J0191993-07-19019 July 1993 Advises That Wl Meier,Dean of College of Engineering,Stepped Down on 930630.TH Glisson,Associate Dean of Engineering Appointed Interim Dean of College ML20198A5211993-06-15015 June 1993 Forwards Proprietary Noncompulsory Notification of Discovered Vulnerability in Pulstar Security Plan as Defined in 10CFR73 App G Ii(A).Encl Withheld ML20044C0311993-03-11011 March 1993 Forwards Response to NRC Ltr Re Violation & Deviation Noted in Insp Rept 50-297/93-01.Corrective Actions:New SR, PS-7-07-1:S1 Established & Emergency Plan Reviewed & Voted for Approval Pending Two Small Grammatical Changes 1999-03-02
[Table view] Category:NRC TO EDUCATIONAL INSTITUTION
MONTHYEARML20058P8411990-07-20020 July 1990 Informs That J Tedrow & M Shannon Assigned as Early Responders to Emergency or Event Involving NRC License. Advises of Plan to Have Individuals Accompany C Bassett on Familiarization Tour of Facility During Future Insp ML20055C6231990-05-18018 May 1990 Ack Receipt of Transmitting Rev 4 to North Carolina State Univ Security Plan.Rev 4 of Plan Transferred to NRR for Review & Disposition,Per 900511 Telcon ML20248D7961989-09-20020 September 1989 Forwards Request for Addl Info Re 880819 Application for Renewal of License R-120.Response Requested within 60 Days. Requested Info Includes Operator Training & Meteorological Data ML20248C6961989-09-14014 September 1989 Informs of Reactor Operator & Senior Reactor Operator Licensing Exams Scheduled for Wk of 891127.Listed Ref Matl (Encl 1) Requested by 890925 to Meet Exam Schedule IR 05000297/19890011989-09-12012 September 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-297/89-01 ML20245G2261989-08-0202 August 1989 Forwards Insp Rept 50-297/89-01 on 890628-30 & Notice of Violation ML20246C1171989-06-28028 June 1989 Advises That Site Visit Planned During Wk of 890731 to Discuss License Renewal Application & Increase NRC Familiarity W/Facility ML20245G8391989-04-25025 April 1989 Informs of Forthcoming Visit to Facility Re Application for Renewal of License.Forwards Preliminary Questions to Be Discussed During Visit ML20205Q9871988-11-0202 November 1988 Forwards Insp Rept 50-297/88-04 on 880926-29 & Notice of Violation ML20195J3251988-06-13013 June 1988 Discusses Insp Rept 50-297/88-03 on 880523-26 & Forwards Notice of Violation ML20154D2221988-05-0909 May 1988 Forwards Exam Rept 50-297/OL-88-02 Administered on 880426. Written Exam Questions & Answer Key Encl ML20151C2851988-04-0606 April 1988 Forwards Insp Rept 50-297/88-01 on 880301-04.No Violations or Deviations Noted ML20148F0561988-03-11011 March 1988 Informs of Reactor Operator & Senior Operator Licensing Exams Scheduled for Wk of 880425.Requirements for Adminstration of Written Exams,Guidelines for Exams & Requirements for Facility Review of Written Exam Encl ML20150B2271988-03-0404 March 1988 Forwards Exam Rept 50-297/OL-88-01 on 880202-03.W/o Exam Questions,Answer Key & Facility Comments ML20236U1371987-11-23023 November 1987 Requests Submittal of Addl Ref Matl Listed in Encl 1 by 871201 in Order to Meet Schedule for Operator Licensing Exams Scheduled for Wk of 880201.NRC Rules & Guidelines & Requirements for Administering Exams Also Encl IR 05000297/19870031987-11-17017 November 1987 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-297/87-03 ML20235W0681987-10-0909 October 1987 Forwards Insp Rept 50-297/87-03 on 870928-30 & Notice of Violation ML20238A7751987-09-0202 September 1987 Reminds That License R-120 for Univ Pulstar Reactor Scheduled to Expire on 881001.Univ Must Provide Guidance for Preparing Application for Renewal of License.Listed Documentation Should Be Included in Application ML20215A4101987-06-11011 June 1987 Informs of Recent Reorganization of Nrr.A Adams Designated as Project Manager ML20214A3991987-05-0101 May 1987 Forwards IE Info Notice 86-028, Telephone Numbers to NRC Operations Ctr & Regional Ofcs, Indicating Proper Points of Contact for Notifications & Current Telephone Numbers in Light of Questions Re Research Reactor Emergency Response ML20206D3611987-04-0202 April 1987 Forwards Insp Rept 50-297/87-01 on 870316-18 & Notice of Violation ML20212P1171986-08-11011 August 1986 Forwards Sections I & II of New Incident Response Plan, Incorporating Lessons Learned from 1984 Full Field Exercise. Section III Withheld.W/O Encls ML20211B9281986-06-0606 June 1986 Forwards Insp Rept 50-297/86-02 on 860521-22.No Violations or Deviations Noted ML20211A4011986-05-29029 May 1986 Forwards Exam Rept 50-297/OL-86-01 of Exam Administered on 860423-24.Table Summarizing Results & Written Exam Questions & Answer Key Encl.Table Withheld (Ref 10CFR2.790) ML20198K0261986-05-15015 May 1986 Forwards Insp Rept 50-297/86-01 on 860414-18.No Violation or Deviation Noted ML20140G6961986-03-26026 March 1986 Lists Change in Telephone Number for R Carter,Facility Project Manager,Due to NRR Reorganization.D Tondi New Nonpower Reactors & Safeguards Licensing Section Leader. Correspondence Should Be Sent to Listed Address ML20137T1541986-02-0707 February 1986 Requests Encl Ref Matls by 860223 for Reactor & Senior Reactor Operator Exams to Be Conducted During Wk of 860423. List of NRC Requirements Encl.All Operator & Senior License Applications Should Be Submitted 60 Days Prior to Exam ML20137W5991985-11-29029 November 1985 Ack Receipt of Response to 850927 Order to Show Cause. License R-120 Amended on 850909 to Delete Authorization to Possess High Enriched U.No Further Action Re Order Necessary ML20135D8211985-09-0909 September 1985 Forwards Amend 9 to License R-120.Amend Deletes Authorization to Possess High Enriched U Fuel in Connection W/Operation of Reactor ML20054H0731982-07-0303 July 1982 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-111/82-02 & 50-297/82-01.Violation a Withdrawn ML20054L3881982-06-16016 June 1982 Ltr to All Research & Test Reactor Licensees Requesting That Reg Guide 2.6 (for Comment) & ANSI/ANS-15.16 (Draft II Dtd 811129) Be Used to Meet Requirement of Final Amend to 10CFR50.54(r) Re Emergency Planning.Fr Notice Encl ML20054H0881982-04-21021 April 1982 Forwards IE Insp Repts 50-111/82-02 & 50-297/82-01 on 820315-19 & Notice of Violation ML20150A7001978-10-0202 October 1978 Forwards Inspec Rept 50-297/78-3 on 780817 During Which No Item of Noncompliance Was Noted ML20137G4721971-06-23023 June 1971 Advises That Presence & Irradiation of Explosives in Reactor Must Be Evaluated Due to Potential for Damage to Reactor. Evaluation Requested Establishing Operating Restrictions,Max Quantity of Explosives Allowed in Facility & Form 1990-07-20
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20207B5311999-03-0202 March 1999 Forwards Insp Rept 50-297/99-201 on 990209-12.No Violations Noted.Insp Included Review of Activities Authorized for Facility.Emergency Procedures Were Also Examined ML20199C8901999-01-0808 January 1999 Ack Receipt of Ltr Dtd 980823,which Transmitted Changes to North Carolina State Univ Pulstar Reactor Emergency Plan Submitted Under Provisions of 10CFR50.54(q).Plan Meets Requirements of App E to 10CFR50.NRC Approval Not Required ML20153H2781998-09-28028 September 1998 Forwards RAI Re 980507 Request for License R-120 for North Carolina State Univ Pulstar Research Reactor.Response Requested within 60 Days of Date of Ltr IR 05000297/19982011998-05-0404 May 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-297/98-201.NRC Will Examine Implementation of Corrective Action During Future Insp ML20217C0351998-03-18018 March 1998 Forwards Insp Rept 50-297/98-201 on 980120-23 & Notice of Violation ML20198R8051997-10-30030 October 1997 Forwards Amend 12 to License R-120 & Safety Evaluation.Amend Updates Figure 5.2-1 of Ts,Pulstar Reactor Site Map & Removes Ref to Region II in TS 3.7, Reporting Requirements ML20217B2001997-09-0909 September 1997 Forwards Insp Rept 50-297/97-201 on 970609-12.No Violations Noted ML20198F7921997-08-0101 August 1997 Informs That on 970804,non-power Reactor Insp Program Will Be Transferred from Region II Ofc to NRR ML20137V3881997-03-25025 March 1997 Informs of Relocation of Region II Ofc to Atlanta Federal Ctr Complex on 970425.List of Telephone Numbers & Directions to New NRC Ofc Encl ML20134K8121997-02-11011 February 1997 Discusses Pulstar Nuclear Reactor Emergency Plan. Implementation of Changes Will Be Subj to Insp to Confirm That Changes Did Not Decrease Overall Effectiveness of Emergency Plan ML20129B9181996-10-10010 October 1996 Notifies of Annual Training Managers Conference in Atlanta, Ga on 961120-21 to Inform Regional Operations & Training Mgt of Issues & Policies That Affect Licensing of Reactor Plant Operators.Map Encl ML20058P5971993-11-24024 November 1993 Documents Understanding of Activities Associated W/Leakage of Water from Pulstar Reactor Coolant Sys,Based on Discussions W/Ej Mcalpine of NRC on 931123 ML20059M9021993-11-16016 November 1993 Forwards Administration of Requalification Exams,Nrc Rules & Guidance for Exams & Security Agreements for Written Exams to Be Administered at Facility on 940221 ML20058P3221993-10-18018 October 1993 Forwards Partially Withheld Insp Rept 50-297/93-02 on 930928-29.No Violations or Deviations Noted ML20217C6591991-07-0808 July 1991 Forwards Exam Rept 50-297/OL-91-01 on 910603-04 ML20062F5731990-11-20020 November 1990 Forwards Insp Rept 50-297/90-02 on 901029-1101.No Violations or Deviations Noted ML20058P8411990-07-20020 July 1990 Informs That J Tedrow & M Shannon Assigned as Early Responders to Emergency or Event Involving NRC License. Advises of Plan to Have Individuals Accompany C Bassett on Familiarization Tour of Facility During Future Insp ML20055C6231990-05-18018 May 1990 Ack Receipt of Transmitting Rev 4 to North Carolina State Univ Security Plan.Rev 4 of Plan Transferred to NRR for Review & Disposition,Per 900511 Telcon ML20248D7961989-09-20020 September 1989 Forwards Request for Addl Info Re 880819 Application for Renewal of License R-120.Response Requested within 60 Days. Requested Info Includes Operator Training & Meteorological Data ML20248C6961989-09-14014 September 1989 Informs of Reactor Operator & Senior Reactor Operator Licensing Exams Scheduled for Wk of 891127.Listed Ref Matl (Encl 1) Requested by 890925 to Meet Exam Schedule IR 05000297/19890011989-09-12012 September 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-297/89-01 ML20245G2261989-08-0202 August 1989 Forwards Insp Rept 50-297/89-01 on 890628-30 & Notice of Violation ML20246C1171989-06-28028 June 1989 Advises That Site Visit Planned During Wk of 890731 to Discuss License Renewal Application & Increase NRC Familiarity W/Facility ML20245B4531989-06-0808 June 1989 Forwards Encl Listed Info on Decommissioned & Shutdown Reactors Requested During Discussions at Saxton on 890511 ML20245G8391989-04-25025 April 1989 Informs of Forthcoming Visit to Facility Re Application for Renewal of License.Forwards Preliminary Questions to Be Discussed During Visit ML20205Q9871988-11-0202 November 1988 Forwards Insp Rept 50-297/88-04 on 880926-29 & Notice of Violation ML20195J3251988-06-13013 June 1988 Discusses Insp Rept 50-297/88-03 on 880523-26 & Forwards Notice of Violation ML20154D2221988-05-0909 May 1988 Forwards Exam Rept 50-297/OL-88-02 Administered on 880426. Written Exam Questions & Answer Key Encl ML20151C2851988-04-0606 April 1988 Forwards Insp Rept 50-297/88-01 on 880301-04.No Violations or Deviations Noted ML20150D9721988-03-18018 March 1988 Informs of NRC Relocation to Stated Address.Mailing Address Unchanged.A Adams Project Manager & TS Michaels back-up Project Manager ML20148F0561988-03-11011 March 1988 Informs of Reactor Operator & Senior Operator Licensing Exams Scheduled for Wk of 880425.Requirements for Adminstration of Written Exams,Guidelines for Exams & Requirements for Facility Review of Written Exam Encl ML20150B2271988-03-0404 March 1988 Forwards Exam Rept 50-297/OL-88-01 on 880202-03.W/o Exam Questions,Answer Key & Facility Comments ML20236U1371987-11-23023 November 1987 Requests Submittal of Addl Ref Matl Listed in Encl 1 by 871201 in Order to Meet Schedule for Operator Licensing Exams Scheduled for Wk of 880201.NRC Rules & Guidelines & Requirements for Administering Exams Also Encl IR 05000297/19870031987-11-17017 November 1987 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-297/87-03 ML20235W0681987-10-0909 October 1987 Forwards Insp Rept 50-297/87-03 on 870928-30 & Notice of Violation ML20238A7751987-09-0202 September 1987 Reminds That License R-120 for Univ Pulstar Reactor Scheduled to Expire on 881001.Univ Must Provide Guidance for Preparing Application for Renewal of License.Listed Documentation Should Be Included in Application ML20215A4101987-06-11011 June 1987 Informs of Recent Reorganization of Nrr.A Adams Designated as Project Manager ML20214A3991987-05-0101 May 1987 Forwards IE Info Notice 86-028, Telephone Numbers to NRC Operations Ctr & Regional Ofcs, Indicating Proper Points of Contact for Notifications & Current Telephone Numbers in Light of Questions Re Research Reactor Emergency Response ML20206D3611987-04-0202 April 1987 Forwards Insp Rept 50-297/87-01 on 870316-18 & Notice of Violation ML20212P1171986-08-11011 August 1986 Forwards Sections I & II of New Incident Response Plan, Incorporating Lessons Learned from 1984 Full Field Exercise. Section III Withheld.W/O Encls ML20211B9281986-06-0606 June 1986 Forwards Insp Rept 50-297/86-02 on 860521-22.No Violations or Deviations Noted ML20211A4011986-05-29029 May 1986 Forwards Exam Rept 50-297/OL-86-01 of Exam Administered on 860423-24.Table Summarizing Results & Written Exam Questions & Answer Key Encl.Table Withheld (Ref 10CFR2.790) ML20198K0261986-05-15015 May 1986 Forwards Insp Rept 50-297/86-01 on 860414-18.No Violation or Deviation Noted ML20140G6961986-03-26026 March 1986 Lists Change in Telephone Number for R Carter,Facility Project Manager,Due to NRR Reorganization.D Tondi New Nonpower Reactors & Safeguards Licensing Section Leader. Correspondence Should Be Sent to Listed Address ML20137T1541986-02-0707 February 1986 Requests Encl Ref Matls by 860223 for Reactor & Senior Reactor Operator Exams to Be Conducted During Wk of 860423. List of NRC Requirements Encl.All Operator & Senior License Applications Should Be Submitted 60 Days Prior to Exam ML20137W5991985-11-29029 November 1985 Ack Receipt of Response to 850927 Order to Show Cause. License R-120 Amended on 850909 to Delete Authorization to Possess High Enriched U.No Further Action Re Order Necessary ML20135D8211985-09-0909 September 1985 Forwards Amend 9 to License R-120.Amend Deletes Authorization to Possess High Enriched U Fuel in Connection W/Operation of Reactor ML20054H0731982-07-0303 July 1982 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-111/82-02 & 50-297/82-01.Violation a Withdrawn ML20054L3881982-06-16016 June 1982 Ltr to All Research & Test Reactor Licensees Requesting That Reg Guide 2.6 (for Comment) & ANSI/ANS-15.16 (Draft II Dtd 811129) Be Used to Meet Requirement of Final Amend to 10CFR50.54(r) Re Emergency Planning.Fr Notice Encl ML20054H0881982-04-21021 April 1982 Forwards IE Insp Repts 50-111/82-02 & 50-297/82-01 on 820315-19 & Notice of Violation 1999-03-02
[Table view] |
Text
e .
February 7, 1986 SD - M7 North' Carolina State University ATTN: Dr. Paul J. Turinsky, Head Department of Nuclear Engineering Box 7909 Raleigh, NC 27695-7909 Gentlemen:
SUBJECT:
OPERATOR AND SENIOR OPERATOR LICENSING EXAMINATIONS In a telephone conversation between Mr. Tom Bray, Reactor Manager, and Mr. Jerry Douglas, Operator Licensing Section, arrangements were made for administration of the reactor operator and senior operator examinations at the North Carolina State University Pulstar reactor facility.
.The written and oral examinations are scheduled for the week of April 23, 1986.
In order for us to meet the above schedule, it will be necessary for the facility to furnish the selected reference material from the approved list in Enclosure 1
- by February 23, 1986. Any delay in receiving this material will result in a delay in administration of the examinations. Our examinations are scheduled far in advance with considerable planning to utilize our present limited examiner manpower and to meet the examination date requested by the various facilities.
Therefore, missing the February 23, 1986 deadline, even by a few days', will likely result in a long delay, since it would not be possible to reschedule examinations at other facilities. Mr. Bray has been advised of our selected reference material requirements, the number of reference material sets that are required, and the examiners' names and addresses where each . set is to be mailed.
This request for information was approved by the Office of Management and Budget under a blanket Clearance Number 3150-0101 which expires on. June 30, 1986.
Comments on burden and duplication may be directed to the Office of Management-and Budget, Reports Management, Room 3208, New Executive Office Building, Washington, DC 20503.
The facility management is responsible for providing adequate space and facilities in order to properly conduct the written examinations. . Enclosure 2,
" Administration of Operator Licensing Written Examinations," describes our requirements for conducting these examinations. Mr. Bray has also been informed of these requirements.
All operator and senior license applications should be submitted on Form NRC-398 at least 60 days prior to the first examination date so that we will be able to review the training and experience of the candidates, process the medical certifications, and prepare final examiner assignments after candidate eligi-bility has been determined.
8602180255 860207 PDR ADOCK 05000297 PDR V
Il
'/A
,1 -.
. North Carolina State University 2 February 7, 1986 Thank you for your consideration in this matter. If you have any questions regarding the examination procedures and requirements, please' contact-
' Mr. Bruce A. Wilson, 404/331-5542, or Mr. Jerry Douglas, 404/331-5483.
Sincerely..
(Original signed by S. Elrod, for)
Vincent W. Panciera,. Chief Reactor Projects Branch.2 Division of Reactor Projects i
Enclosures:
- 1. Reference Material Requirements
- 2. " Administration of Operator Licensing Written Examinations" cc w/encls:
Tom Bray, Reactor Manager
.bcc w/encls:
Document Control Desk State of North Carolina l
i
+,
RII RI RII RII RII WG00@ as BAplson CAJulian AFGibson DH"crrclli V Eunc.trs 2/$/86 2/5/86 2/ /86 2/ /86 2/ /86
't 6 ENCLOSURE 1 REFERENCE MATERIAL REQUIREMENTS FOR REACTOR / SENIOR-REACTOR OPERATOR LICENSING EXAMINATIONS
- 1. Procedure Index (alphabetical by subject)
- 2. All administrative procedures (as applicable to reactor operation or safety)
- 3. . All integrated plant procedures (normal or general operating procedures)
- 4. Emergency procedures (emergency instructions, abnormal or special procedures)
- 5. Standing orders (important orders that are safety-related and may supersede the regular procedures)
- 6. Fuel-handling and core-loading procedures (initial core-loading procedures whenappropriate)
- 7. Annunciator' procedures (alarm procedures, including set points)
- 8. Radiation protection manual-(radiation control manual or procedures)
- 9. Emergency plan implementing procedures
- 10. Technical Specifications
- 11. Lesson plans (training manuals, plant orientation manual, system descrip-tions, reactor theory, thermodynamics, etc.)
. 12. System operating procedures
- 13. Piping and instrumentation diagrams, electrical single-line diagrams, or flow diagrams
- 14. Technical Data Book and/or plant curve.information as used by operators
- 15. Any other material the examiner feels is necessary to adequately prepare a written examination, such as reactor traces of significant plant evolutions
- 16. Questions and answers that licensee has prepared (voluntary by~ licensee)
- 17. Malfunction and initial condition material for simulator (if applicable)
m
- e. .s.
i Enclosure 1 2.
All of the abeve reference material should be approved, final issues and should be so marked. . Uncontrolled, preliminary, or other such issues will not be acceptable except for cold-license examinations. If a cold-license plant has not finalized some of the material, the chief examiner is respon-sible for ensuring that the most complete, up-to-date material is available and that agreement has been reached with the licensee for limiting changes before the administration of the examination. All procedures and reference material should be bound or in the form used by the control room operators, with appropriate indexes or tables of contents so that they can be used efficiently.
ENCLOSURE 2 ADMINISTRATION OF OPERATOR .
LICENSING WRITTEN EXAMINATIONS NRC Requirements:
- 1. A single room should be provided by the facility for. completing the written examination. The location of this room and supporting restroom facilities should be such as to prevent contact with all other facility / contractor personnel for the duration of the written examination. If necessary, the facility should make. arrangements for the use of a suitable room at a local school, motel, or other building. Obtaining this room is the responsibility of the licensee.
- 2. Minimum spacing is one candidate per 5 X 21 ft., minimum size table with 3-feet spacing between tables. No wall charts, models, and/or other training materials may be present in the examining room.
-3. Suitable ' arrangements are to be made by the facility for the candidates to have lunch, coffee, etc. These arrangements will be reviewed by the examiner and/or proctor.
- 4. The facility shall arrange to review the examination questions and answer-
~ key. This review will begin after the completion of the written examination and written comments will normally be presented to the Chief Examiner-prior to his-departure from the site.
- 5. The facility will provide sealed pads of paper for each candidate's use in completing the examination. All reference material needed to complete the examination will be furnished by the examiner. Candidates may bring calcu-lators but no other equipment or reference material to the examination room.
- 6. Only black ink or dark pencil should be used for writing answers to questions.
- 7. Candidates will be asked to provide positive identification at the start of the written examination.