Letter Sequence Other |
---|
|
|
MONTHYEARML20140G0091984-12-0303 December 1984 Forwards marked-up Draft Containment Sys Branch Response to Items in Affidavit Attached to Citizens Against Nuclear Power 840605 Petition Re Integrated Leak Rate Testing at Facility.Containment Integrity Confirmed.Matter Closed Project stage: Draft Other ML20140E0411984-12-21021 December 1984 Forwards Containment Sys Branch Input for Response to Citizens Against Nuclear Power Petition for Emergency Relief Re Integrated Leak Rate Test.Containment Integrity Confirmed & Verified.Tac 55267 Closed Project stage: Other 1984-12-21
[Table View] |
Similar Documents at Zion |
---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20211K8611999-09-0101 September 1999 Informs That There Has Been Some Confusion Re Recently Issued ODCM Generic Section Rev Which Needs to Be Clarified. Clarifications Are Listed ML20210P1361999-08-0404 August 1999 Notification of 990817 Meeting with Util in Rockville, Maryland to Discuss Status of Licensing Actions Submitted by Comm Ed & Plan for Proposed Licensing Workshop ML20195G7771998-11-19019 November 1998 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Decision of Atomic Safety & Licensing Board (LBP-98-24) Expired.With Certificate of Svc.Served on 981120 ML20153G0061998-09-24024 September 1998 Informs That Office of Secretary Experienced Problems with Dedicated e-mail Address.In Effort to Maintain Electronic Mailbox for Parties Filing by e-mail,alternate Mailbox Created.With Certificate of Svc.Served on 980924 ML20153E4341998-09-24024 September 1998 Informs That Office of Secretary Experienced Problems with Dedicated e-mail Address.In Effort to Maintain Electronic Mailbox for Parties Filing by e-mail,alternate Mailbox Created.With Certificate of Svc.Served on 980924 ML20239A0451998-09-0404 September 1998 Informs That NRC Staff Has Prepared Answer to Petition to Intervene Filed by E Dienethal,R Robarge & Committee for Safety at Plant Zion on 980818 ML20237E3131998-08-26026 August 1998 Forwards for Public Release,Info Re NRC SMM Held on 980714-15.Summary of January 1998 NRC SMM & Watch List Removal Evaluation Factors Also Encl ML20237F1001998-08-26026 August 1998 Forwards Petition to Intervene,Dtd 980818,submitted by Committee for Safety at Plant Zion,R Robarge & ED Dienethal. Petition Filed in Response to Notice of Issuance of Amend to Commonwealth Edison Co for Zion Nuclear Power Station ML20154D1271998-07-22022 July 1998 Informs That Commission Has Not Objected to Proposed Licensing Actions Related to Zion That Restores Custom TS, Allows Use of Certified Fuel Handlers & Other Mods ML20236U5891998-07-13013 July 1998 Informs Commission That Final NSHC Determination & License Amend Will Be Issued on or About 980720 to Ceco in Response to Amend Application .Amends Restore Zion Custom TS That Had Been Replaced W/Improved TS by Previous Amend ML20248M0641998-06-10010 June 1998 Forwards Petition to Intervene, & Submitted by ED Dienethal.Petition Filed in Response to Notice of Proposed Determination That Issuance of License Amend Would Involve No Significant Hazards Considerations ML20247L9981998-05-18018 May 1998 Notification of 980601 Meeting W/Listed Participants in Zion,Il to Provide Opportunity for Interested Members of Public to Meet W/Staff on Planned Decommissioning of Plant ML20216H6971998-03-17017 March 1998 Notification of 980326 Meeting W/Commonwealth Edison Co in Lisle,Il to Discuss Comed Request to Consolidate near-site Emergency Operations Facility Into Single Central EOF ML20203M3791998-02-10010 February 1998 Comments on Draft FY99 Performance Plan Provided to Chairman in Memo from J Funches on 980202 & Circulated as Comsecy 98-003.Requests Verfication of Current Numbers & Explanation of Apparent Discrepancy ML20199H9681998-01-26026 January 1998 Forwards Page 14 Which Was Inadvertently Missing from Attachment to to O Kingsley Re Statistics on Allegations at Ceco Nuclear Plants ML20199A3551998-01-20020 January 1998 Notification of Meeting W/Ceco on 980203 in Rockville,Md to Discuss Preparations for Decommissioning of Plant ML20198A6271997-12-30030 December 1997 Notification of Meeting W/Util on 980113 in Zion,Il to Discuss Preparations to Implement Improved TSs ML20203C0851997-12-0404 December 1997 Notification of 971215 Meeting W/Commonwealth Edison Co in Rockville,Md to Discuss Zion Auxiliary Bldg Differential Pressure Requirements.Memo Reissued 971210 to Show Change of Room ML20202H9911997-12-0404 December 1997 Notification of 971215 Meeting W/Util in Rockville,Md to Discuss Plant Auxiliary Bldg Differential Pressure Requirements ML20199B2511997-11-0505 November 1997 Forwards Plant Calculations That Addresses Peak Main Steamline Break Pressure of 46.33 Psig & Max Strain in Containment Liner Due to Surface Temp of 273 F ML20236N5111997-10-22022 October 1997 Fowards Staff Response to 960912 TIA Re Containment Spray Additive Sys Conformance W/Design Basis & Tss.Analysis Concluded That 2,400-2,600 Ppm in RWST Acceptable ML20211N8651997-10-0707 October 1997 Responds to 970829 Memo Requesting write-ups for Events Which May Be Reportable as Abnormal Occurrences or Other Events of Interest for Fy 1997 Rept to Congress.Specifically Assessments for Two Oconee Events,One at Zion & Haddam Neck ML20217D4261997-09-30030 September 1997 Informs of Scheduled Visits W/Nuclear Services at Gpu on Nov 14th & Visit at Commonwealth Edison on Dec 3rd & Would Like to Receive Any Info Available.Supporting Documentation Encl ML20211B1161997-09-11011 September 1997 Forwards Plant Restart Action Plan,For Review & Approval. Restart Action Plan Status Will Be Updated on an as-required Basis.Minor Revs Will Be Made by Panel W/O Seeking Addl Formal Approval IA-97-178, Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission1997-04-18018 April 1997 Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission ML20217D5461997-04-18018 April 1997 Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission ML20147J2391997-04-0909 April 1997 Notification of Meeting on 970416 W/Util in Rockville,Md to Discuss Overall Response & Present Addl Details Re Performance Indicators Used to Monitor Performance Stations ML20136C1031997-03-0606 March 1997 Forwards Correspondence Transmitted Via Internet to J Zwolinski from P Blanch During 970102-31.Requests Correspondence Be Placed in PDR ML20137D6661997-02-25025 February 1997 Discusses 970221 Event Re Improper CR Movement During Shutdown at Plant.Ait Charter for Insp of Circumstances Associated W/Shutdown & Improper CR Movement Encl ML20138J7671997-02-0505 February 1997 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licenseing Exam on 970409. Ltr W/Copy to Chief,Operator Licensing Branch Must Be Submitted to Listed Address in Order to Register Personnel ML20134A3941997-01-23023 January 1997 Notification of Significant Licensee Meeting W/Util on 970103 to Discuss Findings from Licensee Contracted Independent Safety Assessment & Effects of Recently Identified Technical Issue Involving Degraded Containment ML20134E8811996-12-27027 December 1996 Submits Dates Requested Re Plants ML20210N4271996-12-0202 December 1996 Informs About Drop in Meeting on 961203 for Update on Industry Restructuring & Deregulation,Unicom Strategic Planning & Mixed Oxide Fuel ML20217D5421996-11-27027 November 1996 Forwards Partially Withheld Background Briefing Package in Preparation for 961203 Meeting Between Comed,Nuclear Strategic Services & Chairman Jackson ML20134J5621996-11-13013 November 1996 Notification of 961115 Meeting W/Commonwealth Edison Co in Rockville,Md to Discuss Zion Unit 2 SG Insp & Repair Results ML20210N3761996-08-12012 August 1996 Informs About Meeting on 960513 to Brief Chairman Jackson on Comed Response to Deregulation ML20217D4761996-07-31031 July 1996 Forwards Background Briefing Package in Prepartion of 960813 Meeting Between Commonwealth Edison Co & Chairman Jackson. Purpose of Visit to Discuss Recent Organizational Changes at Comed & Company Mgt Focus for Immediate Future ML20210N3381996-05-14014 May 1996 Discusses Courtesy Visit to Ceco on 960513 Re Listed Plants ML20129E6031996-03-0101 March 1996 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal) for Tests Administered on 960129-0202 ML20210N2681995-11-13013 November 1995 Discusses Paritially Withheld Chairman Briefing by Ceco on 951116 ML20217D5321995-11-0909 November 1995 Forwards Partially Withheld Background Briefing Package in Preparation for 951116 Meeting Between Commission & Senior Comed Mgt.Purpose of Visit to Discuss Performance at Each of Sites & Challenges & Issues Needed to Be Addressed ML20210N3971995-10-12012 October 1995 Informs of Courtesy Visit on 951011 to Util to Discuss Listed Topics.List of Attendees Encl ML20210N3701995-10-0505 October 1995 Forwards Background Briefing Package in Preparation for 951011 Meeting W/Company Executives & Chairmam Jackson ML20136A9101995-06-0505 June 1995 Partially Withheld Memo Discussing Director Decision 95-08, DD-95-09,DD-95-10 & DD-95-11 ML20062J4501993-10-27027 October 1993 Requests Addl Info Re Proposed EAL Changes in Util Generating Station Emergency Plan Annexes.Proposed EALs Reviewed Against Guidance in NUMARC/NESP-007,rev 2, Methodology for Development of Eals ML20059A7861993-10-21021 October 1993 Forwards from Sargent & Lardy to CE Re Control Room Habitability ML20059A4651993-10-20020 October 1993 Notification of Significant Licensee Meeting W/Util in Glen Ellyn,Il on 931104 to Review Status of Util Initiatives on QA & Corporate Engineering Support ML20058P0891993-10-20020 October 1993 Informs Permission Granted for Release of Encl Document from Confidential & Proprietary Restrictions & Processing Into Nudocs.After Authorization,Original Markings Were Removed & Replaced W/Unmarked Copy ML20057C9801993-09-27027 September 1993 Discusses 930927 Press Conference Re J O'Connor Announcement That Util Settled Six Rate Matters & Appeals Before Illinois Courts & Commerce Commission by Agreeing to Refund Listed Amount to Customers Over Next 12 Months ML20057A8041993-09-13013 September 1993 Notification of 930920 Meeting W/Util in Rockville,Md to Discuss Proposed Electronic Fire Detection Sys 1999-09-01
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20211K8611999-09-0101 September 1999 Informs That There Has Been Some Confusion Re Recently Issued ODCM Generic Section Rev Which Needs to Be Clarified. Clarifications Are Listed ML20210P1361999-08-0404 August 1999 Notification of 990817 Meeting with Util in Rockville, Maryland to Discuss Status of Licensing Actions Submitted by Comm Ed & Plan for Proposed Licensing Workshop ML20195G7771998-11-19019 November 1998 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Decision of Atomic Safety & Licensing Board (LBP-98-24) Expired.With Certificate of Svc.Served on 981120 ML20153G0061998-09-24024 September 1998 Informs That Office of Secretary Experienced Problems with Dedicated e-mail Address.In Effort to Maintain Electronic Mailbox for Parties Filing by e-mail,alternate Mailbox Created.With Certificate of Svc.Served on 980924 ML20153E4341998-09-24024 September 1998 Informs That Office of Secretary Experienced Problems with Dedicated e-mail Address.In Effort to Maintain Electronic Mailbox for Parties Filing by e-mail,alternate Mailbox Created.With Certificate of Svc.Served on 980924 ML20239A0451998-09-0404 September 1998 Informs That NRC Staff Has Prepared Answer to Petition to Intervene Filed by E Dienethal,R Robarge & Committee for Safety at Plant Zion on 980818 ML20237E3131998-08-26026 August 1998 Forwards for Public Release,Info Re NRC SMM Held on 980714-15.Summary of January 1998 NRC SMM & Watch List Removal Evaluation Factors Also Encl ML20237F1001998-08-26026 August 1998 Forwards Petition to Intervene,Dtd 980818,submitted by Committee for Safety at Plant Zion,R Robarge & ED Dienethal. Petition Filed in Response to Notice of Issuance of Amend to Commonwealth Edison Co for Zion Nuclear Power Station ML20236W5811998-08-0404 August 1998 Board Notification 98-001:submits Info Re Petition to Intervene Concerning Application of CE to Amend OL for Plant.Amend,Se & Notice of Significant Licensing Action Encl ML20154D1271998-07-22022 July 1998 Informs That Commission Has Not Objected to Proposed Licensing Actions Related to Zion That Restores Custom TS, Allows Use of Certified Fuel Handlers & Other Mods ML20236U5891998-07-13013 July 1998 Informs Commission That Final NSHC Determination & License Amend Will Be Issued on or About 980720 to Ceco in Response to Amend Application .Amends Restore Zion Custom TS That Had Been Replaced W/Improved TS by Previous Amend ML20248M0641998-06-10010 June 1998 Forwards Petition to Intervene, & Submitted by ED Dienethal.Petition Filed in Response to Notice of Proposed Determination That Issuance of License Amend Would Involve No Significant Hazards Considerations ML20247L9981998-05-18018 May 1998 Notification of 980601 Meeting W/Listed Participants in Zion,Il to Provide Opportunity for Interested Members of Public to Meet W/Staff on Planned Decommissioning of Plant ML20216H6971998-03-17017 March 1998 Notification of 980326 Meeting W/Commonwealth Edison Co in Lisle,Il to Discuss Comed Request to Consolidate near-site Emergency Operations Facility Into Single Central EOF ML20203M3791998-02-10010 February 1998 Comments on Draft FY99 Performance Plan Provided to Chairman in Memo from J Funches on 980202 & Circulated as Comsecy 98-003.Requests Verfication of Current Numbers & Explanation of Apparent Discrepancy ML20199H9681998-01-26026 January 1998 Forwards Page 14 Which Was Inadvertently Missing from Attachment to to O Kingsley Re Statistics on Allegations at Ceco Nuclear Plants ML20199A3551998-01-20020 January 1998 Notification of Meeting W/Ceco on 980203 in Rockville,Md to Discuss Preparations for Decommissioning of Plant ML20198A6271997-12-30030 December 1997 Notification of Meeting W/Util on 980113 in Zion,Il to Discuss Preparations to Implement Improved TSs ML20202H9911997-12-0404 December 1997 Notification of 971215 Meeting W/Util in Rockville,Md to Discuss Plant Auxiliary Bldg Differential Pressure Requirements ML20203C0851997-12-0404 December 1997 Notification of 971215 Meeting W/Commonwealth Edison Co in Rockville,Md to Discuss Zion Auxiliary Bldg Differential Pressure Requirements.Memo Reissued 971210 to Show Change of Room ML20199B2511997-11-0505 November 1997 Forwards Plant Calculations That Addresses Peak Main Steamline Break Pressure of 46.33 Psig & Max Strain in Containment Liner Due to Surface Temp of 273 F ML20236N5111997-10-22022 October 1997 Fowards Staff Response to 960912 TIA Re Containment Spray Additive Sys Conformance W/Design Basis & Tss.Analysis Concluded That 2,400-2,600 Ppm in RWST Acceptable ML20211N8651997-10-0707 October 1997 Responds to 970829 Memo Requesting write-ups for Events Which May Be Reportable as Abnormal Occurrences or Other Events of Interest for Fy 1997 Rept to Congress.Specifically Assessments for Two Oconee Events,One at Zion & Haddam Neck ML20217D4261997-09-30030 September 1997 Informs of Scheduled Visits W/Nuclear Services at Gpu on Nov 14th & Visit at Commonwealth Edison on Dec 3rd & Would Like to Receive Any Info Available.Supporting Documentation Encl ML20211B1161997-09-11011 September 1997 Forwards Plant Restart Action Plan,For Review & Approval. Restart Action Plan Status Will Be Updated on an as-required Basis.Minor Revs Will Be Made by Panel W/O Seeking Addl Formal Approval IA-97-178, Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission1997-04-18018 April 1997 Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission ML20217D5461997-04-18018 April 1997 Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission ML20147J2391997-04-0909 April 1997 Notification of Meeting on 970416 W/Util in Rockville,Md to Discuss Overall Response & Present Addl Details Re Performance Indicators Used to Monitor Performance Stations ML20136C1031997-03-0606 March 1997 Forwards Correspondence Transmitted Via Internet to J Zwolinski from P Blanch During 970102-31.Requests Correspondence Be Placed in PDR ML20137D6661997-02-25025 February 1997 Discusses 970221 Event Re Improper CR Movement During Shutdown at Plant.Ait Charter for Insp of Circumstances Associated W/Shutdown & Improper CR Movement Encl ML20138J7671997-02-0505 February 1997 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licenseing Exam on 970409. Ltr W/Copy to Chief,Operator Licensing Branch Must Be Submitted to Listed Address in Order to Register Personnel ML20134A3941997-01-23023 January 1997 Notification of Significant Licensee Meeting W/Util on 970103 to Discuss Findings from Licensee Contracted Independent Safety Assessment & Effects of Recently Identified Technical Issue Involving Degraded Containment ML20134E8811996-12-27027 December 1996 Submits Dates Requested Re Plants ML20210N4271996-12-0202 December 1996 Informs About Drop in Meeting on 961203 for Update on Industry Restructuring & Deregulation,Unicom Strategic Planning & Mixed Oxide Fuel ML20217D5421996-11-27027 November 1996 Forwards Partially Withheld Background Briefing Package in Preparation for 961203 Meeting Between Comed,Nuclear Strategic Services & Chairman Jackson ML20134J5621996-11-13013 November 1996 Notification of 961115 Meeting W/Commonwealth Edison Co in Rockville,Md to Discuss Zion Unit 2 SG Insp & Repair Results ML20210N3761996-08-12012 August 1996 Informs About Meeting on 960513 to Brief Chairman Jackson on Comed Response to Deregulation ML20217D4761996-07-31031 July 1996 Forwards Background Briefing Package in Prepartion of 960813 Meeting Between Commonwealth Edison Co & Chairman Jackson. Purpose of Visit to Discuss Recent Organizational Changes at Comed & Company Mgt Focus for Immediate Future ML20210N3381996-05-14014 May 1996 Discusses Courtesy Visit to Ceco on 960513 Re Listed Plants ML20129E6031996-03-0101 March 1996 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal) for Tests Administered on 960129-0202 ML20210N2681995-11-13013 November 1995 Discusses Paritially Withheld Chairman Briefing by Ceco on 951116 ML20217D5321995-11-0909 November 1995 Forwards Partially Withheld Background Briefing Package in Preparation for 951116 Meeting Between Commission & Senior Comed Mgt.Purpose of Visit to Discuss Performance at Each of Sites & Challenges & Issues Needed to Be Addressed ML20210N3971995-10-12012 October 1995 Informs of Courtesy Visit on 951011 to Util to Discuss Listed Topics.List of Attendees Encl ML20210N3701995-10-0505 October 1995 Forwards Background Briefing Package in Preparation for 951011 Meeting W/Company Executives & Chairmam Jackson ML20136A9101995-06-0505 June 1995 Partially Withheld Memo Discussing Director Decision 95-08, DD-95-09,DD-95-10 & DD-95-11 ML20062J4501993-10-27027 October 1993 Requests Addl Info Re Proposed EAL Changes in Util Generating Station Emergency Plan Annexes.Proposed EALs Reviewed Against Guidance in NUMARC/NESP-007,rev 2, Methodology for Development of Eals ML20059A7861993-10-21021 October 1993 Forwards from Sargent & Lardy to CE Re Control Room Habitability ML20059A4651993-10-20020 October 1993 Notification of Significant Licensee Meeting W/Util in Glen Ellyn,Il on 931104 to Review Status of Util Initiatives on QA & Corporate Engineering Support ML20058P0891993-10-20020 October 1993 Informs Permission Granted for Release of Encl Document from Confidential & Proprietary Restrictions & Processing Into Nudocs.After Authorization,Original Markings Were Removed & Replaced W/Unmarked Copy ML20057C9801993-09-27027 September 1993 Discusses 930927 Press Conference Re J O'Connor Announcement That Util Settled Six Rate Matters & Appeals Before Illinois Courts & Commerce Commission by Agreeing to Refund Listed Amount to Customers Over Next 12 Months 1999-09-01
[Table view] |
Text
, .._._ .. . ..
?
/po ucy#o -)
UNITED STATES E 'j 3, , f g NUCLEAR REGULATORY COMMISSION ,
- 'Qg Qfg gp# r WASHINGTON, D. C. 20555 December 21, 1984
/
f-
! Y MEMdRANDUMFOR: G. C. Lainas, Assistant Director for Operating Reactors, DL FROM: R. W. Houston, Assistant Director for Reactor Safety, DSI
SUBJECT:
INPUT FOR RESPONSE TO PETITION FOR EMERGENCY RELIEF RE: ILRT AT ZION, UNIT 1 (TACS 55267)
Reference:
- 1. Petition for Emergency Relief to the U.S. Nuclear Regulatory Comission, Re: Commonwealth Edison Company, Zion, Unit 1, dated June 5,1984, Submitted by Citizens Against Nuclear Power
- 2. Memorandum for D. G. Eisenhut (NRR), from R. L. Spessard (RIII),
dated September 7, 1984 In response to Technical Assistance TACS No. 5526.7, the Containment Systems Branch (CSB) has completed a review of the Petition (Reference 1) and its at-tached affidavit by Dr. Z. V. Reytblatt. In essence, the Petition questioned the validity of the containment integrated leak rate test performed on Zion,
~
Unit I during March, 1981. As a result, NRC Region III conducted an independ-ent investigation of the 1981 and 1983 test at Zion, Unit 1. The results of this investigation are documented in Reference 2. The CSB has reviewed the Region III report and concurs in its findings.
The Affidavit attached to the Petition is represented by the Petitioner as the technical support to the allegations contained in the Petition. Therefore, in responding to the Petition, the CSB has responded to the pertinent items (12 through 18) of the Affidavit. These responses are contained in the enclosure.
We concur with the general comment by Reytblatt that the containment leak rate as stated in the test report could not be verified by the 1981 and 1983 test results. As a result, we informed the licensee of our concern, and indicated that a demonstration of containment leak tightness was necessary for continued operation of Zion, Unit 1. On July 18, 1984, Comonwealth Edison Company, shut down Zion, Unit 1, and performed an integrated leak rate test during the CONTACT: J. Huang, CSB x29493 g>3pfffXb :or A l% 0# #
Y S (f
s.) -
G. Lainas period from July 27 to August 1, 1984, under close supervision of the NRC inspectors. The ILRT was found successful. Therefore, we conclude containment integrity has been confirmed and verified, and therefof(J,, hatconsider the,subfect matter closed.
A-I s-
- 'WE R. Wayne Houston, Assistant Director for Reactor Safety Division of Systems Integration
Enclosure:
As stated cc: R. M. Bernero D. G. Eisenhut R. L. Spessard, RIII F. Maura, RIII J. Norris G. Arndt -
l t
, -. . - . ~ , .u.._ . _ . _ _
CSB RESPONSES TO ITEMS 12 THROUGH 18 0F THE REYTBLATT AFFIDAVIT ON THE 1981 ZION, UNIT 1 CONTAINMENT INTEGRATED LEAK RATE TEST
- 12. Event logs of the 1981 Test, a summary of which is contained ) ihe Ceco av -
. Test Report, describe the following events on March 12, 1981:
- 1. From page 10:
"0300 Completed normal ILRT at data set #326."
"0429 Began induced leakrate test."
"1200 HUT recirc. pump stopped."
4-Reytblatt's Comment:
This quotation means that approximately ninety minutes after the completion of the Basic Test, a Verification Test (the " induced leakrate test") was performed, but it did not yield the expected results. The Verification Test did not validate the satisfactory performance and reliability of the Basic Test.
CSB Response:
A review of the 1981 Zion Test indicates the calculated leak rate from the Basic Test is 0.0158 w/o/ day, which is only a small fraction (20%) of the allowable leak rate for the Zion containment. A small leak rate is 4
. - - - . - - - - , - - r - - ~ ~
. . . m.. . ._._-_ ._ . . _ . . -
1 2
difficult to verify, especially when the imposed leak rate for the verification test is also small. This is what happened during the 1981 P
Test at Zion. From the available test data, the difference bet en the Basic Tot and the first Verification Test was as high as 0.72 L, ri er than within
~ the 0.25 L, limit. It can only be concluded that'it is not possible to quantify the leakage rate for the Zion, Unit 1, containment building from the overall test performance.
ii. From the same page:
"1400 Re-initialized imposed leak calculations from 369."
Reytblatt's Comment:
This quotation shows that eleven hours after the completion of the Basic Test, a second Verification Test was performed, and again failed to prove the validity of the Basic Test.
CSB Response:
After the licensee thought the problem with the "first" Verification Test had been corrected, a new " start" time was selected for a "second" Verification Test. (The start time selected was for data set #369. However, the "second" Verification Test gave a result within 0.34 L,, which again exceeded the required accuracy of 0.25 L,.
. 3 111. From the same page:
?
1700 Re-initialized from 367. .[
r f
~[
T 1745 Terminated imposed leak test at set 405."
Reyblatt's Comment:
This means that fourteen hours after the completion of the Basic Test, a third Verification Test was started. This Verification Test was completed in forty-five minutes, and was deemed to be a proof of validity of the Basic Test.
CSB Response:
Although it is the licensee's view that two verification tests were performed, the NRC considers it to have been one continuous verification test lasting for about twelve hours. However, three calculations were performed using three different sets of data from the same verification test. The third calculation produced a result that fell within the required accuracy of 0.25 L,.
It is acceptable to conduct several verification tests, if valid reasons are given for the unacceptability of previous verification tests. With respect to Zion, in order to obtain the required accuracy of 0.25 L3 , the licensee selected, toward the end of the 12-hour test, the desired data set. From a sti.tistical standpoint, this is not an acceptable practice. Consequently, the 1981 Zion Test result had not been verified.
9
. i. , . . _ c.- ...<~_.-_. . . . .~_m.- ^......_-.' - _ .z.._. _. .
4 iv. From page 15 of the CECO Test Report:
j$["IWTankVolumeChange
- T Date Level Volume Added inches inches gallons" "3-11-81 20.5 9.5 47.0 3-12-81 21.0" Reytblatt's Comment:
This quotation proves that on March 12, 1981 - during the same time '
period that these Verification Tests were carried out - a procedure known as IW (" Irrigation Water Injection") had been applied to the containment environment. A total of approximately 44 gallons of water was injected, which might have substantially changed the containment environment.
CSB Response:
Our review of the 1981 test indicates that water was found to be leaking from an engineered safeguards penetration seal water system into the containment 4
,,w-w,-- - -n- -- -s--, - - - - -
e -, ~ - - - - - - , - , . - , < - e y w , - - - - , - - . . - - --
^
.w . . - .-:. . -
.T
. . 5 during the second day of data taking, and that this continued until the end of the Verification Test. Therefore, we disagree that the containment environment was substantially changed during the Verification Test L
ince water fakage had. occurred for seven days prior to the start of thh VerifiAationTest,containmentconditionsshouldhavebeencomparableduring both the Basic Test and the Verification Test.
Reytblatt's Comment:
- 13. Failure of the first Verification Test proves that the Basic Test had been deficient.
CSB Response:
We acknowledge that the Verification Test result, based on the first data set, did not verify the leak rate of the Basic Test within the required accuracy (20.25 L,). We do not agree that this proves the Basic Test was deficient but rather that the Basic Test was not verified. Furthermore, failure to determine the cause of the verification test failure, to correct the problem, and to perform a successful verification test does invalidate any conclusion that may have been drawn regarding the success of the overall test.
Reytblatt's Comment:
14 Failure of the second Verification Test provides further confirming evidence that the Basic Test had been deficient.
_ _ , m-__ ., . ,..- -- - -- - , - . - , . - - . , - _ _ _ _ _ , , . - , , , , - - - , , , , . . - . . - - - - - - ,
. 6 CSB Response:
Again, the licensee did not perform a second verification test; ratt d r, a
- secondfilculation was done using a different data set from the saEC verifica- _
tion test. This calculation also did not verify the Basic Test result. Taken alone, it does not confirm that the containment integrity is unacceptable, only that the overall test was deficient.
Reytblatt's Comment:
- 15. The Verification Test shou'9,3 be conducted imediately upon conclusion of the Basic Test, so that there will be little risk of changes occurring in the containment environment. However, during the 1981 Test, in fourteen 4
hours since the completion of the Basic Test, two Verification Tests failed, and also, due to the IW application, significant alteration in the containment environment may have occurred. The third Verification
- Test therefore cannot be considered valid. .
CSB Response:
The IW application actually started very early in the test, and was not an event that suddenly occurred during the Verification Test. Therefore, it is
, not a question of whether the Verification Test should be considered valid, or the Basic Test deficient, but rather a question of whether the Verification Test had' verified the capability of the instrumentation to measure the small
- eakage rates that Zion was reporting.
. -- w.- . .. L .: - - ._
. . 7 Reytblatt's Comment:
d
- 16. By not analyzing the reasons why the Verification Tests faile and by
. repeating the Basic Test, which was certainly necessary under these circumstances, the testing organization violated the Standard.
CSB Response:
Appendix J to 10 CFR 50 requires that if the supplemental test result is not within 0.25 L,, the reason shall be determined, corrective action taken, and a successful supplemental test perfomed. Our review of the 1981 test indicates that the licensee did not establish a valid reason-for the inability to verify the Basic Test result after using two data sets from the supplemental test
.. (Verification Test), and failed to perform a subsequent, successful supplemen-tal test.- Instead, the licensee inappropriately made a post-test selection of data from the same Verification Test to establish the required accuracy of the Basic Test result. This "look-back" selection of data:is unacceptable to the NRC staff. Therefore, we conclude that the 1981 Zion Test did not comply with the requirements of Appendix J in that a successful supplemental test had not been performed.
I Reytblatt's Comment:
i
- . 17. In my opinion, it is inconceivable that the testing organization had no l knowledge of the unacceptability of repeated Verification Tests. More-i
{ over, out'of three Verification Test results, two of which showed the i
Basic Test to be deficient, the testing organization selected the third
7 . .. i . _.
. 8 Verification Test results, although these results were obtained after the containment environment may have significantly changed. In m opinion, such actions can only be described as fraud. -
CSB Response Our review of the 1981 test indicates that the testing organization misused the
- c. C Verification Test data; we can find no evidence of fraudul, ant conduct. k Reytblatt's Coment:
- 18. In summary, the 1981 test is invalid and provides no assurance whatever that the Zion, Unit I reactor containment leak rate is as stated in the Test Report.
CSB Response:
We agree, in principle, with the sumary statement. As a result, the NRC Region III conducted an independent review of both of the 1981 and 1983 Zion ILRT results and concluded that the Zion, Unit 1, reactor containment leak rates as stated in the test reports could not be verified. Consequently, the NRC Region III informed the licensee of their findings and indicated that a demonstration of containment integrity was necessary for continued operation of Zion, Unit 1. The licensee shut down the Zion plant in July 1984, and a satisfactory Type A test was performed. NRC inpsectors were present as
9 observers throughout the course of the test. (A detailed review of the Zion, Unit 1 Type A tests performed in 1981, 1983, and.1984 is presented. the staff report from R. L. Spessard, Division of Reactor Safety, Region III, o D. G.
Eisen . Division of Licensing, NRR, dated September 7, 1984.)