Text
l
+ gf g rerug'o UNITED STATES I
E o
NUCLEAR REGULATORY COMMISSION h!
WASHINGTON, D. C. 20555 APR 18 W Dr. Zinovy V. Reytblatt N
c/
Department of Mathematics and Computer Science Warren Wilson College IN RESPONSE REFER 701 Warren Wilson Road TO F01A-85-136 Swannanoa, NC 28778-2099
Dear Dr. Reytblatt:
This is in response to your letter of February 24, 1985, in which you requested, pursuant to the Freedom of Information Act (F0IA), records regarding the review of the most recent containment leak rate test at the Zion Nuclear Power Plant.
The documents identified on the enclosed Appendix A are subject to your request and are already available for public inspection and copying at the NRC Public Document Room (PDR).
The documents identified on the enclosed Appendix B are subject to your request and are available for public inspection and copying in the PDR in folder.F01A-85-136.
We are also enclosing a copy of a notice that explains the procedures and charges for obtaining records from the PDR.
This completes NRC's action on your F0IA request.
Sin erely, J. M. Felton, Director Division of Rules and Records Office of Administration
Enclosures:
As stated 8507120099 850412 PDR FOIA REYTDLA85-136 PDR
r 3
4 APPENDIX A RECORDS SUBJECT TO FOIA-85-136 ALREADY FILED IN PDR 1.
06/25/82 Letter to C. W. Fay, Wisconsin Electric Power Co.,
from Darrell G. Eisenhut, NRR, regarding Type A containment integrated leak rate test for Point Beach 1 and 2, PDR Accession No. 8207160102/PDR/
ADOCK/50-266/P.
2.
07/19/84 Letter to D. L. Farrar, Conrnonwealth Ediscn, regarding Zion integrated leak rate test, PDR Accession No.
8407250172/PDR/ADOCK/50-295/P.
3.
11/30/84 Letter to Harold R. Denton, NRR, from Robert N.
Cascarano, Commonwealth Edison, regarding Zion integrated leak rate test, PDR Accession No.
8412050393/PDR/ADOCK/50-295/P.
4.
01/09/85 Letter to Thomas A. Rehm, OEDO, from Zinovy V.
Reytblatt, requesting emergency relief regarding Zion Leak Rate Test, POR Accession No. 8501310461/
PDR/ADOCK/50-295/P.
5.
01/30/85 Letter to Harold R. Denton, NRR, from Robert N.
Cascarano, Commonwealth Edison, regarding amendment to Operating License DPR-39 and DPR-48, Appendix A, Sections 3.10 and 4.10 - Containment Structural Integrity, PDR Accession No. 8502110233/PDR/AD0CK/
50-295/P.
r APPENDIX B RECORDS FILED IN PDR FILE F0IA-85-136 1.
04/01/82 Mandatory In-Hand Procedure for Appendix B Test AreaListing(58pages).
2.
11/23/83 Memorandum to K. L. Graesser on Zion Onsite Review to verify proper operation of integrated Leak Rate Test (19pages).
3.
04/25/84 Significant Events Log (4 pages).
4.
06/05/84 Petition for Emergency Relief to the U.S. Nuclear Regulatory Commission from Citizens Against Nuclear Power (8pages).
6 5.
06/20/84 Memorandum for Harold R. Denton, NRR, from Stephen G. Burns, OELD, entitled " Petition of Citizens Against Nuclear Power for Emergency Relief Re Integrated l
Leak Rate Testing at Zion Nuclear Unit 1 of the Commonwealth Edison Company" (2 pages).
6.
07/19/84 Preliminary Notification PNO-III-84-58 (1 page).
7.
07/19/84 Letter to Reed from Keppler regarding ongoing investi-gationofcontainmentintegratedleakratetest(2pages).
8.
07/27/84 Letter to James G. Keppler, Region III, from Cascarano, Commonwealth Edison, on Leak Rate Test (2 pages).
9.
07/29/84 CECOZionStationIntegratedLeakRateTest(44pages).
1
- 10. 07/31/84 CECO Zion Station Integrated Leak Rate Test (5 pages).
i
- 11. 08/01/84 CEC 0 Zion Station Integrated Leak Rate Test (5 pages).
I
Request for Exemption from Appendix J; Zion Generating Station, Unit 1, (TACS 55439)"(3pages).
13.
08/29/84 Memorandum for Keppler from Spessard on Containment IntegratedLeakRateTestingatZion(7pages).
- 14. 08/29/84 Memorandum for Keppler from Spessard on Containment Integrated Leak Rate Testing at Zion (11 pages).
- 15. 09/07/84 Letter to Reed from Keppler on special Safety Inspection on 7/2 to 8/1 and 8/29. 1984 atZion(13pages).
i Re: F01A-85-136 APPENDIX B (Continued)
- 16. 09/10/84 Draft note for file by A. B. Davis on Zion Enforcement Board (9 pages).
17.
12/0W34 Draft memo for Gus Lainas, NRR, from R. Wayne Houston, NRR, entitled " Input for Re'sponse to Petition for Emergency Relief: Re ILRT at Zion, Unit 1 (TACS 55267)"
(11 pages).
- 18. 12/21/84 Memo for Gus Lainas, NRR, from R. Wayne Houston, NRR, entitled " Input for Response to Petition for Emergency Relief: Re ILRT at Zion, Unit 1 (TACS 55267)" (11 pages).
- 19. 01/15/85 Letter to Reed from Keppler on steps taken on noncompliance (8 oages).
- 20. undated Mandatory In-hand Procedure on Type A Containment Leak Rate Test (97 pages).
- 21. undated Handwritten notes on staff (1 page).
- 22. undated CECO, Byron graphs (4 pages).
- 23. undated Graph (4 pages).
- 24. undated Data sets (7 pages).
- 25. undated Temperature Stablization Notes with Datasets and Leak Rate Tests (39 pages).
- 26. undated Zero Pressure Test Handwritten Notes, Graphs, Leak Rate Tests (117 pages).