Rev. 6 MAJDATORY lHAVD ?30CEDURE
?
O e
APP 90IX B TEST AREA LISTING FOR UNIT 1 W
(
8507120122 850412 PDR FOIA REYTDLA85-136 PDR
~
0032T 11 0054A j
8 3n11U/l1U111.lli-HAlill PROCiDUR: AM P"'
APR 011982 s
TEST AREA 1 Valve to be tested:
IMOV-CS0003 Test Procedure: The test air connection is a capped end 1/2" diameter vertical pipe near the ceiling.
The volume being tested is sufflintly large that it must be pressurized directly with supply air.
It should be noted that an 8 key is required for entry into the pump room and that valvesf1CS0038, 1CS0037, and 1CS0039 are chained and locked. To adjust their position a 8 man with a padlock key will be required.
The valve alignment procedure is as follows. Have 1HOV-CS0003 and IMOV-CS0002 closed from control room then close ICS0037, and open valve 1CS0038.
Uncap test tap and sicwly open ICS0039 while watching out for any caustic liquid spray emerging from uncapped tap opening. Allow approximately 10 minutes for liquid to crain from line. Close 1CS0038 and proceed with standard C-type leak rate test as described in procedure.
When finished return all valves affected to positions found in, or as directed by shift engineer.
t
/
(.
0032T 12 0054A
~
iuP.I,unluid IR-tiAl;U FliUCEDUili
%"t1,m 3
VALVE POSITION TAB.E Valves Afrected Initial Valve Position Test Final Plant By Test Position Found In Position Position Location 1CS0039 Closed Open 560' Aux i
Cont Spray Pp Rm (1-A) r 560' Aux 1 ROV-CS0002 Closed Closed Cont Spray Pp Rm (1-A) 560' Aux 1MW-CS0003 Closed Closed Cont Spray Pp Rm (1-A) 560' Aux ICS0037 Closed Closed Cont Spray l
PD Rm (1-A) 560' Aux 1CS0038 Closed Closed Cont Spray Pp Rm (1-A)
Reference drawing M44 l
l l
l l
l l
t t
0032T 13 0054A I
=._.
TSS 15.6.10e Rev. 5 APR ! 7 tg(
I RESULTS DATE:
i Sys. tem test pressure:
psig
[
Inttial test tank pressure:
psig Initial test tank temperature:
'F REQUIRED ONLY IF CONTROL
' VOLUME METHOD IS USED.
Final test tank pressure:
psig Final test tank temperature:
'F
- Leak rate:
SCFH Duration of test:
min.
Initial:
[
(.
f e
4 e
i 0032T 14 0054A 2.
~
ISS 15.6.10s MMDAT01Y I4 LA!!D BOCED3E 4llJ1m TEST AREA 2 Valve to be tested: IMOV-CS0005 Test Procedure:
vertical pipe near the ceiling.The test air connection is a capped end 1/2" dia that it must be pressurized directly with supply air.The volume being test ICS0041, and ICS0042 are chained and locked.an R key is req with a padlock key will be required.
To adjust their position a 8 man The valve alignment procedure is as follows.
closed from control room then close ICS0040, a Have IMOV-CS0005 cnd IMOV-CS0004 Uncap spray emerging from uncapped tap opening.
u Allow approximately 10 minutes for lic;uid to drain from line.
leak rate test as described in proceeding.Close ICS0041 and proceed with s affected to positions found in or as directed by shift engineer.When finish
-(
O 0032T 0054A 15
Y w
h i
me y-=-h4h MAiDATORY l-HAiD P30CEDU3E Ar m mz VALVE FOSITION TABLE Valves Affected Valve Position Test Final Plant By Test Position Found In Position Position Location 560' Aux 1MOV-CS0005 Closed Closed
.i Cont Spray Pp Rm (1-A) 560' Aux 1CS0042 Closed Open Cont Spray Pp Rm (1-A) 560' Aux 1MOV-CS0004 Closed Closed cont' Spray)
Pp Rm (1-A 560' Aux 1CS0040 Closed Closed Cont Spray Pp Rm (1-A) 360' Aux ICS0041 Closed Closed Cont Spray Pp Rm (1-A)
Reference drawing M44
(
I
(
l l
0032T -
16 0054A l
a: c. -. -
TSS 15.6.10e Rev. 5 IJR 1 T ),e;.4
(
RESULTS DATE:
i System test pressure:
psig
- [
Inttial test tank pressure:
psig Inilial test tank temperature:
'F REQUIRED ONLY IF CONTROL VOLUME METHOD IS USED.
Final test tank pressure:
psig Final test tank temperature:
'F
- Leak rate:
SCFH Duration of test:
min.
- Initial:
{-
o 0032T 17 0054A
--~
i/MiE0ilY U-iAiD 3ROCU_ E "*"i d=
TEST AREA 3 Valve to be tested:
IMOV-CS0007 Test Procedure: The test air connection is a capped end 1/2" diameter vertical pipe near the ceiling.
The volume being tested is sufflently large that it must be pressurized directly with supply air.
It should:be noted that an3 key is required for entry into the pump room and that valves ICS0045, IC50043, and 1CS0044 are chained and locked. To adjust their position a B man wit'h a padlock key will be required.
The valve alignment procedure is as follows.
Have IMOV-CS0007 and IMOV-CS0006 closed from control room then close 1CS0043, and open valve ICSOO44. Uncap test tap and slowly open ICS0045 while watching for any caustic 11guld spray emerging from uncapped tap opening. Allow approximately 10 minutes for liquid to drain from line. Close 1CS0044 and proceed with standard C-type leak rate test as described in procedure. When finished return all valves affected to positions found in, or as directed by shift engineer.
e 0032T 18 0054A
~ ' ~
bilIhuitio
-i D
10051i
_ _.Rev. 2.
1 m n ne VALVE FOSITION TABLE Valves Affected initial Valve Position Test Final Plant By Test Position Found In Position Position Location 560' Aux 1MOV-CS0007 Closed Closed Cont Spray Pp Rm (1-A) 560' Aux r
ltS0045 Closed Open Cont Spray Pp Rm (1-A) '
560' Aux 1MOV-CS0006 Closed Closed Cont Spray Pp Rm (1-A) 560' Aux 1CS0043 Closed Closed Cont Spray Pp Rm (1-A) 560' Aux 1CS0044 Closed Closed Cont Spray Pp Rm (1-A)
Reference drawing M44
(
O O
0032T 19 0054A
.2.-..
.. - ~..... - -. -. - -
~
I I
TSS 15.6.10e Rev. 4 M R 1 ; g.;
RESULTS DATE:
i Sy; tem test pressure:
psig f
Initial test tank pressure:
psig Initial test tank temperature:
"F REQUIRED ONLY IF CONTROL VOLUME METHOD IS USED.
. Final test tank pressure:
psig Final test tank temperature:
'F
- Leak rate:
SCFH Duration of test:
min.
Initial:
(
d A
4 i
1
(
0032T 20 0054A
~~
~
~ hli!0uilVLii-liAID N10]DiHE ub m
I TEST AREA 4 a
Valve to be tested:
IPR 0030 Test Procedure:
I Prior to test, have mechnical maintenance block open check valve PROO29.
Nofify control room of test so that containment area sampling blower can be shdt down. Verify that blower is shut down and align valves as specificed in valve position table. Pressurize line through 1" thread end in containment right near P-44 and perform standard Type C leak rate test as specified in procedure. When finished, have mechanical maintenance restore check valve to working order, realign valves to the positions in which they were found and then have blower restarted, or as directed by shift engineer.
(
e i
\\
~
l 1
0032T 21 0054A
~
~
~ inlii;UniUiii liEITit,U l'iiUULUUlit Aph u 1 GBZ VALVE POSITION TABLE Valves Affected Initial Valve Position Test Final Plant By Test Position Found In Position Position Location Aux blog IPR 0030 Closed Closed vent pipe chase near P44 M 0029 Nomal Open Cont 598' by P.44 Reference drawing M70
(
4 I
i l
l I
(
0032T 22 0054A l
l
c 15S 15.6.10e Rev. 4 MP 1 Lt.:4
(
RESULTS DATE:
System test pressure:
psig h
Initial test tank pressure:
psig Initial test tank temperature:
- F REQUIRED ONLY IF CONTROL VOLUME METHOD IS USED.
Final test tank pressure:
psig Final test tank temperature:
'F'
- Leak rate:
SCFH i
Duration of test:
min.
Initial:
C i
l i
l 0032T 23 0054A
liA1DAT03Y 11
~ A1D 330CD. E E i a2 TEST AREA 5 Valve to be tested:
IPR 0029 Test Procedure:
Notify control room of test so that containment area sampling bibwer can be shut down. Verify that blower is shut down and align valves as specified in valve position table.
Pressurize line through'1" threaded end in containment right near P-44 and perform standard type C leak rate test as specified in ~
procedure. When finished, realign valves to the positions in which the found and then have blower restarted, or as directed by shift engineer.y were D
/
0032T 24 0054A i
s
1/iARDA10RY 1 - AO 3riOCiu. E
%2;,,z VALVE POSITION TABLE i
Valves Affected Initial Valve Position Test Final Plant By Test Position Found In Position Position Location IPR 0029 Normal Normal Con 98' 1PR0030 Closed Open Aux Bldg vert pipe chase 598' by P44
. Reference drawing M70 v
i 9
6 9
==
O 0032T 25 0054A
...J,,m/.
~-..m 155 15.6.10e Rev. 4 U T, 1 7 1:;4 I
RESULTS DATE:
i System test pressure:
psig h
Initial test tank pressure:
psig Initial test tank temperature:
'F REQUIRED ONLY IF CON 1ROL VOLUME METHOD IS USED, Final test tank pressure:
psig Final test tank temperature:
'F
- Leak rate:
SCFH Duration of test:
min.
Initial:
(
(
0032T 26 0054A
~--
laAI,'UAT0ft? fl-lglJ M0 CEDE SJ:
1-TEST AREA 6 Valves to be tested: 1A0V-RV0001 and 1A0V-RV0002 Test Procedure:
Have both 1A0V-RV0001 and 1A0V-RV0002 closed from the control room before starting this test. The test tap is a 3/8" threaded pipe end located in containment on the 617 level almost under the valve opening.
The test tap is located amongst a cluster of PP lines and valves.
Before opening the test tap valve, the line going between the two valves being tested must be isolated by closing the appropriate PP valves. This can be done visually.
Then open test tap valve, the volume may already be somewhat pressurized, this air can be used for the test.
Pressurize directly from a service air supply while monitoring volume pressure. When 47 psig is reached, perform standard C type leak rate test as described in procedure. At end of test, depressurize volume.
by having control room open A0V-RV0001 and 1A0V-RV0002.
Then return all PP valves and test tap valve to original positions or as directed by shift engineer.
(
O e
0032T 27 0054A
"~
FAAiDA"DIY i-iA1D' 3ROCE')JR:'
APR 01 1982 VALVE FOSITION TABLE
(
Valves Affected Initial Valve Position Test Final P1hnt By Test Position Found In Position Position Location lA0V-RV0002 Closed Closed Operator controlled 1A0V-RV0001 Closed Closed Operator controlled Test valve Closed Open Cont 617' Reference drawing M537 i
e e
I t
(
0032T 28 0054A
..~-.
-~
ISS IS.6.10e Rev. 4 APR 171;p I
RESULTS DATE:
System test pressure:
psig i
Initial test tank pressure:
psig Initial test tank temperature:
i
- F REQUIRED ONLY IF CONTROL VOLUME METHOD IS USED.
Final test tank pressure: _
psig Final test tank temperature:
'F
- Leak rate:
SCFH Duration of test:
min.
Initial:
(
e
'0032T 0054A 29
.. _ _.. _. ~ - - - _. _ _., -
~-
InANDATOTY 1 tiARD P1012DL3E E hm TEST AREA 7 Valves to be tested: 1A0V-RV0003 and 1A0V-RV0004 Test Procedure:
Have both 1A0V-RV0003 and 1AOV-RV0004 closed from the control room before starting this test.
The test tap is a 3/8" threaded pipe end located in coritainment on the 617 level-almost under the valve opening..The test tap is located amongst a cluster of PP lines and valves. Before opening the test tap val ~ve, the line going between the two valves being tested must be isolated by closing the appropriate PP valves.
This can be done visually.
Then open test tap valve, the volume may already be somewhat pressurized, this air can be used for the test.
Pressurize directly from a service air supply while monitoring volume pressure. When 47 psig is reached, perform standard C type leak rate. test.as described in procedure. At end of test, depressurize volume by having control room open A0V-RV0003 and 1A0V-RV0004. Then return all PP valves and test tap valve to original positions or as directed by shift engineer.
9 9
(
0032T 30 0054A
~
14hiWidORY ill-ilsi!!I fl0Cil E
,;l;/sez o -o e VALVE POSITION TABLE Valves Affected Initial Valve Position Test Final Plant By Test Position Found In Position Position Location lA0V-RV0004 Closed Closed i
Operator controlled 1A0V-RV0003 Closed Closed Operator controlled Cont 617' Test valve Closed Open near personnel hatch Reference drawing M537 l
t e
(
(
0032T 31 0054A l
....-..w._a..
..u....
155 15.6.10e Rev. 4 AFR 1 ? 13;:
e
(
RESULTS DATE:
Sys, tem test pressure:
psig Initial test tank pressure:
psig Initial test tank temperature:
"F REQUIRED ONLY IF CONTROL VOLUME METHOD IS USED.
Final test tank pressure:
psig Final test tank temperature:
'F
- Leak rate:
SCFH Duration of test:
min.
Initial:
(
e 00321 32 0054A n
w r-w, - -
..n
...~
TSS 15.6.10e MMDAT01Y IV-HMD ?ROCEDUREE 2" TEST AFEA 8 Valve to be tested: 1ADV-RC8033 Test procedure:
i Clo_se IRC8045 and INT 9333 vent system by opening 1RC0028 and IRC002h. Have 1A0V-RC8033 closed from control room. Using test tap off 1FC0027, do standard Typre C leak rate test as described in procedure. When finished, vent line through test tap and return all valves to initial condition or as directed by Shift Engineer. Replace all caps on vent & drains that were removed.
- Om.
G S
4 0032T 33 0054A "M
ee
ViA4DATORY li-HA4D 3ROCEDURE 1*!; f.
VALVE POSITION TA8_E
(
Valves Af fected Initial Valve Position Test Final Plant By Test Position Found In Position Position Location lA0V-RC8033 Open Closed 1708045 Open Closed 1NT9333 Opened Closed IRC0028 Closed Open 1FC0027 Closed Open i
Reference drawings K-53
(
O
{
l l
0032T 34 0054A l
TSS 15.6.10e Rev. 4
(
APR 1 7 3,y RESULTS DATE:
System test pressure:
psig i
Inttialtesttankpressure:
psig Initial test tank temperature: _
- F REQUIRED ONLY IF CONTROL Final test tank pressure:
VOLUME METHOD IS USED.
psig Final test tank tempera ~ture:
'F
- Leak rate:
SCFH Duration of test:
min.
Initial:
(
~
n.
0032T 35
'0054A
j5503f N-HAiD 3ROCEDUE Ealez TEST AREA 9 i
Valve to be tested: IDT9157
(
Test procedure:
Close INT 9335, IDT91608, IDT91604, IDT9107, break sensing line on valve INT 9320, and vent line. Then close INT 9320 and pressurize line through break on sensing line near valve INT 9320. Perform standard C type leak rate test as described in procedure. After test vent line, reconnect sensing line and reset all valves to their original positions, or return as directed by shift engineer.
s e g
0032T 36 0054A
TSS 15.6.10e 1
MDK 0M 1-El0,M. 0y-i s:
u :
apf,3, VALVE POSITION TAB.E Valves Affecteo Initial Valve Position Test Final Plant By Test Position Found In Position Position Location V rtical
[
IDT 9157 -
Closed Closed P-14 ertica ID'T 9160A Open Closed gpe ase P-14 Yfpe t
1DT 91608 Open Closed p
ase P-14 A
1NT 9320 Open Closed i
e e
N2 bottles
^[,
d9 INT 9335 Open Closed e
N2 bottles Reference drawings M86, M87
(.
e
(
0032T 37 005AA
15S 15.6.10e Rev. 4 M IIIM
(
RESULTS DATE:
Syst,em test pressure:
psig i
1nifial test tank pressure:
psig Initial test tank temperature:
'F REQUIRED ONLY IF CONTROL VOLUME METHOD IS USED.
Final test tank pressure:
psig Final test tank temperature:
'F
- Leak rate:
SCFH Duration of test:
min.
Initial:
{'.
9 l
(
0032T 38 l
0054A 1-
lithi;UKl0RY l-AliD ?ROCELRE
~
TEST AREA 10 Valves to be tested:
ISOV-m25A, ISOV-FR26A, ISOV-PR250, ISOV-PR26D, i
150V-PR258, ISOV-PR268, ISOV-PR25C, ISOV-PR26C Test procedure:
Align all valves for test as specified in valve position table.." Pressurize j
system through 1/2" open threaded end and perform standard type C leak rate l
test as specified in procedure. When test completed vent system though test I
tapi and realign valves to position found in, or as sp,ecified by shift engineer.
k
(
e m
0032T 39 0054A
w-
=eas MA1DATORY 14-HAiD ROCEDilF~
50 'E
FEB 1a1333 VALVE POSITION TAB.E For testing ISOV-PR25A
)
i I
Valves Affected Initial' Valve Position Test Final ~
Plant
- By Test Position Found In Position Positich Location ISOV-PR25A Closed Closed
,s ar P15 ISOV-PR26A Closed Open Vert pipe chase near P15 1PR0062 Open Closed 592' Aux 1PR0015 Closed Closed 592' Aux 1PR0017 Closed Open 592' Aux 1PP0086 Closed Closed
- P e ae l'
1PR0001 Closed Open 592' Aux 1PR0030 Open Open Vert pipe chase near P44 Reference drawings M70-1, M70-2 I
i 1
(
0032T 40 nnai.a
TSS 15.6.10e Rev. 4 APR 1 7 1;;;
(
RESUL1S DATE:
System test pressure:
psig i
Initial test tank pressure:
psig Initial test tank temperature:
'F REQUIRED ONLY IF CONTROL VOLUME METHOD IS USED.
Final' test tank pressure:
psig Final test tank temperature:
'F
- Leak rate:
SCFH Duration of test:
min.
Initial:
e 00321 41 0054A
155 D.6. luc MA1DATORY 11-HAND 3R00EDURE
/t8 ilmo VALVE POSITION TAB _E
(
For testing ISOV-PR26A Valves Affected Initial Valve Position Test Final -
Plant
. By Test Position Found In Position Position Location ISO /-PR26A Closed Closed ca near P15 ISOV-PR25A Close~d Open chase ear P15 1PR0062 Open Closed 592' Aux 1PR0015 Closed Closed 592' Aux 1PR0017 Closed Open 592' Aux P
1PP0086 Closed Closed e
l?ROOO1 Closed Open 592' Aux 1PR0030 Open Open chase P44 I,
s Reference drawings M70-1, M70-2 m.
0032T 42 0054A
. ~
.... u.
.u.
~
1SS 15.6.10e Rev. 4 Al'R 17 It'/,
RESULTS
-DATE:
1 System test pressure:
psig i
Init:ial test tank pressure:
psig Initial te!t tank temperature:
- F REQUIRED ONLY IF CONTROL VOLUME METHOD IS USED.
Final test tank pressure:
psig Final test tank temperature:
- F
- Leak rate:
SCFH Duration of test:
min.
Initial:
4 8
0032T 43 0054A 4,
y-F
~
'~
~
~ '
~
TSS 15.6.10e MA4DA"0RY 141A1D P10EDUE "7182=
~
VALVE POSITION TAELE For testing ISOV-PR25D Plant valves Affected Initial Valve Position Test Final,
Location By Test Position Found In Position Position.
P ISOV-PR25D Closed Closed n ar P15 150V-PR26D Closed Open chase ear P15 1PR0060 Open Closed 592' Aux 1PR0007 Closed Closed 592' Aux 1PR0009 Closed Open 592' Aux P e 1PPOO88 Closed Closed e
l' 1PR0001 Closed Open 592' Aux Vert pipe
{
1PR0030 Open Open chase near P44 Reference drawings M70-1, M70-2 S
/
0032T 44 nnRho
8 z.., :-. -.
~.-
- - - - ~~--
155 15.6.10e Rev. 4
- I 71S34 i
RESULTS DATE:
System test pressure:
psig 2
Inttial test tank pressure:
psig Initial test tank temperature:
'F REQUIRED ONLY IF CONTROL VOLUME METHOD IS USED.
Final test tank pressure:
psig Final' test tank temperature:
- F
- Leak rate:
SCFH Duration of test:
min.
Initial:
~ (
I a
0032T 45 0054A
,-es s
p w-wm---ww-----
ew--
-, + - -, -
w ee
ISS 15.6.10e EAfDATO:lY 11-HAND PROCEDUE Esfil=
VALVE POSITION TA8_E I
For testing ISOV-PR26D Valves Affected Initial Valve Position Test Final -
Plant By Test Position Found In Position Position Location ISOV-PR26D Closed Closed cha na P15 ISOV-PR250 Closed Open chase near P15 1PR0060 Open
. Closed 592' Aur IPR 0007 Closed Closed 592' Aux 1PR0009 Closed Open 592' Aux
- P e 1PP0088 Closed Closed ae l'
IPR 0001 Closed Open 592' Aux 1PR0030 Open Open -
ya P
PA4 Reference drawings M70-1, M70-2
)
k l
0032T 46 0054A
' ~ ~ ~ ~
155 15.6.1De Rev. 4 PR 171934
- (
RESULTS DATE:
System test pressure:
_ psig Initial test tank pressure:
psig Initial test tank temperature:
- F REQUIRED ONLY IF CONTROL Final test tank pressure:
VOLUME METHOD IS USED.
psig Final test tank temperature:
'F
- Leak rate:
SCFH Duration of test:
min.
Initial:
e 0032T 47 0054A
sOh k-HMD P30CN bhiiTA~
~
61 VALVE POSITION TAELE I
For testing ISOV-PR25B Valves Affected Initial Valve Position Test Final '
Plant By Test Position Found In Position Positio.i Location 8
P 1SCV-PR25B Closed Closed na P15 ISOV-PR26B Closed Open-chase ea P15 1FR0061 Open Cicsed 592' Aux 1PR0011 Closed Closed 592' Aux i
IPR 0013 Closed Open 592' Aux
[ase 1PP0087 Closed Closed 1PR0001 Closed Open 592' Aux 1PR0030 Open Open vert pipe
(
chase near PAA Reference drawings M70-1, M70-2 0032T 48 0054A i
_ _ _ _ _.. _. ~ -. _.. _.. _., _ _. _,, _
.--.__y.
ISS 15.6.10e Rev. 2 AIR I 71524 t
RESULTS DATE:
System test pressure:
psig Initial test tank pressure:
psig Initial tes' tank temperature:
'F REQUIRED ONLY IF CONTROL VOLUME METHOD IS USED.
Final test tank-pressure:
psig Final test tank temperature:
'F
- Leak rate:
SCFH Duration of test:
min.
Initial:
(
l l
l r
0032T a
49 0054A i
l i
TSS 15.6.10e Rev. 1 MABATORY li-HA1D PROJEDURE na 2 8 =
VALVE POSITION TAB _E
(
For testing ISOV-PR268 Valves Affected Initial Valve Position Test Final -
Plant By Test Position Found In Position Position Location ISOV-PR268 Closed Closed PP a
near PU 1SOV-PR258 Closed Open c ase near P15 1PR0061 Open Closed 592' Aux 1PR0011 Closed Closed 592' Aux 1PR0013 Closed Open 592' Aux 1PP0087 Closed Closed chase 1PR0001 Closed Open 592' Aux 1PR0030 Open Open vert pipe
(
chase near P44 Reference drawings M70-1, M70-2 I
O
(..
l 0032T 50 0054A
]
ISS 15.6.10e Rev. 2 AP?.1 T nu
'I RESULTS DATE:
System test pressure:
psig Initial test tank pressure:
psig Initial test tank temperature:
'F REQUIRE 0 ONLY IF CONTROL VOLUME METHOD IS USED.
Final test tank pr. essure:
psig Final test tank temperature:
- F
- Leak rate:
SCFH Duration of test:
min.
Initial:
(
I i
i
(
i l
l 0032T 51 0054A
i iA JA 03Y H-1 aid 310CEDUli 5,I(U,,#
- 1
,3 VALVE POSITION TAB.E l
i For testing ISOV-PR26C Valves Affected Initial Valve Position Test Final Plant By Test Position Found In Position Position Location ISOV-PR26C Closed Closed ase ar P15 ISOV-PR25C Closed Open chase ar P15 1PR0063 Open Closed 592' Aux 1PR0019 Closed Closed 592' Aux 1PR0021 Closed Open 592' Aux IPP0085 Closed Closed vert pipe chase 601' 1PR0001 Closed Open 592' Aux 1PR0030 Open Open vert pipe
(.
chase near P44 Reference drawings M70-1, M70-2 k
n 0032T 52 0054A
s
.. ~.... -.
TSS 15.6.10e Rev. 2
"' I 7 UM RESULTS DATE:
Systen, test pressure:
psig Initial test tank pressure:
psig Initial test tar.k temperature:
'F REQUIRED ONLY IF CONTROL VOLUME METHOD IS USED.
Final test tank pressure:
psig Final test tank temperature:
'F
- Leak rate:
SCFH Duration of test:
min.
4 Initial:
C 0032T 53 0054A
MA'DATOSli-HA1D PRO EDUE TSS 15.6.lCe 4;i,,3 VALVE POSITION TAB.E
(
For testing ISOV-PR25C Valves Affected Initial Valve Position Test Final Plant By Test Position Found In Position Position Location P*
ISO /-PR25C Closed Closed,
pg ISOV-PR26C Closed Open chase a P15 1PR0063 Open Closed 592' Aux 1PR0019 Closed Closed 592' Aux IPR 0021 Closed Open 592' Aux 1PP0085 Closed Closed P
se 1PR0001 Closed Open 592' Aux vert pipe 1P80030 Open Open chase near P44
(
Reference drawings M70-1, M70-2 t
0032T 54 0054A
155 15.6.10e Rev. 2 3" 17 !FA
(
RESULTS DATE:
System test pressure:
psig-In[tialtesttankpressure:
psig Initial test tank. temperature:
'F REQUIRED ONLY IF CONTROL VOLUME METHOD IS USED.
Final test tank pressure:
psig Final test tank temperature:
'F i
- Leak rate:
SCFH Duration of test:
min.
Initial:
(
00321 55 0054A
,_.A-
...,4
.%y4+,e w**
4AiDK'OlY 1-HAiD P30CEDuli 2521*
JUL 121983 TEST AREA 11 Valves to be tested: 1FCVIA01A and 1FCVIA018 Test procedure:
Close lIA0053, lIA0052, IPP0170, and IA to containment isolation valve. Open IPP0180 and vent line through test tap. Have 1FCVIA01A and 1FCVIA01B closed from control room. Pressurize system through 3/8" test tap. Perform standard type C leak rate test as specified in. procedure. hhen test complete, vent lines and realign valves to positions found in (or as specfied by Shift Enoineer), and reinstall blod<s in valves 1FCV-IA01A and 1FCV-IA018 (if required per Shift Engineer).
Notify Shift Engineer that blocks in 1FCV-IA01A and IFCV-IA018 are reinstalled (if required to be reinstalled).
Shift Engineer Date/ Time a m m ** m m *
- m u w*** m * *::::::: m ** **
- m m CAUTION The instrument Air containment isolation valves cat # JOT be blocked open if the lhit is above Cold Shutdown.
C
- m w.****** m
- m. m. m u m m m ** m ***
0032T 56 0054A I
TSS 15.6.10e MAiDATORY IN-HAND PROCED;RE a*h2.3 VALVE POSITION TAB.E j
For testing 1FCVIA01A and IFCVIA01B Valves Affected Initial Valve Position Test Final Plant By Test Position Found In Position Position Location IFCVIf01A Open Closed ch se ear P44 1FCVIA018 Open Closed cae ear P44 IIA 0053 Open Closed P
c t ar P4 IIA 0052 Open Closed c
n 1PP0170 Closed Closed dVtP[.
e W O180 Closed Open jVrjeP a
11/0 054 Open Closed 592' Aux
/
/_
IFCVIA01A Block Reinstalled (if required per Shift
('
Initial Oate Time Engineer)
/
/_
1FCVIS01B Block Reinstalled (if required per Shift Initial Oate Time Engineer)
Reference drawings M70-1, M70-2
(
s 0032T
~ 57 0054A
..c...._.
TSS 15.6.10e Rev. 2 f.Pk 1 ' 9,3
(
RESULTS DATE:
System test pressure:
psig
~
Initial test tank pressure:
psig Initial test tank temperature:
'F REQUIRED ONLY IF CONTROL VOLUME METHOD IS U3ED.
Final test tank pressure:
psig Final test tank temperature:
- F
- Leak rate:
SCFH Duration of test:
min.
Initial:
(
0032T 58 0054A
~
~
liihlWA10RY ~lR-HAiD~ 330CiDUli
,"ll; 1,,,,
~~
TEST AREA 12
(
Valves to be tested: IFCVPR24A and 1FCVFR248 Test Procedure:
Plug hole in line with 1/4" threaded screw. Close 1PP0089 and align rest of valves as specified in valve position table. Pressurize system through 1" test tap and perform standard type C leak rate test as specified in procedure. When test completed, remove 1/4" threaded screw e d realign valves to position found in or as directed by shift engineer.
(.
0032T 59 0054A
-J.,
.m
-s.
.w,.
Rev. 0 MAUDAT0lY IN-HAND 3 ROC DURE
n
VALVE POSITION TABLE For testin'g IFCVFH24A g
Valves Affected Initial Valve Position Test Final.
Plant By Test Position Found In Position Position Location 1FCVPR248 Open Open P1P ear PM 1FCVPR24A Open Closed Vert pipe chase near P44 1PP0189 Closed Closed Vert pipe chase 604' Hole in line Open Closed Near P44
_ Reference drawings M73-2, M70-1
(
0032T 60 0054A
155 15.6.10e Rev. 2 AFR 17 I,qi RESULTS DATE:
System test pressure:
psig Initial test tank pressure:
psig Initial test tank temperature:
'F REQUIRED ONLY IF CONTROL VOLUME METHOD IS USED.
Final test tank pressure:
psig Final test tank temperature:
'F
- Leak rate:
SCFH Duration of test:
min.
Initial:
(
e 00321 61 e
0054A
2:
.s.
. v. wu ViAiDAT03Y 1-HARD ?30CEDilli nea ui =
VALVE FOSITION TABLE
.(
For testing IFCVPR248 Valves Affected Initial Valve Position Test Final Plant By Test Position Found In Position Position
' Location IFCVPR248 Open Closed V
ga RPM 1FCVFR24A Open Open vert pipe chase near P44 IPPO189 Closed Closed Vert pipe chase 604' Hole in line Open Closed Near P44 i
Reference drawings M73-2, M70-2 s
e l
0032T 62 0054A
TSS 15.6.10e Rev. 2 AFR 17 En i
RESULTS DATE:
System test pressure:
psig.
Initial test tank pressure:
psig Initial test tank temperature:
'F REQUIRED ONLY IF CONTROL VOLUME METHOD IS USED.
Final test tank pressure:
psig Final test tank temperature:
'F
- Leak rate:
SCFH Duration of test:
min.
Initial:
(,
0 4
(
4 0032T 63 0054A
sdoiviu-wm m0CEDUR,E
$h TEST AEA 13 t
Valve to be tested: 1-5I8880 Test Procedure:
Close valves 1-S10007,1-SIB 965A and 1-S189658 manually and have valve 1-SIB 880 closed from control room. Uncap ends of pipe near valves 1-5I0008 and 1-SI0009, and open both valves to vent line. Pressurize line thru threaded end of pipe off of 1-5I0008 and do standard type C leak rate test as specified in procedure. When finished realigi valves to the positions in which they were found, or as directed by shift engineer.
(.
0032T 64 0054A
TSS 15'6'10e
' "~
MAiDATORY lH-U!iD P10CEDL li aev 3 JUN G 11983 VALVE POSITION TAB.E i
Valves Affected Initial Valve Position Test Final Plant By Test Position Found In Position Position Location 15I8880 Closed Closed chase r P76 15I0007 Open Closed c ase ar P76 15I0009 Closed Open ase r P76 V
P 1SI0008 Closed Open has PM 1SI8965A Closed Closed 560' H-29 15I8965B Closed Closed 560' H-29 Reference drawing M-65 C
- e
/
4
=
0 0032T 65 0054A
ISS 15.6.10e Rev. 3 APR ! i ly, I
RESULTS DATE:
System test pressure:
psig Initial test tank pressure:
psig Initial test tank temperature:
'F REQUIRED ONLY IF CONTROL VOLUME METHOD IS USED.
Final test tank pressure:
psig Final test tank temperature:
'F t
- Leak rate:
SCFH Duration of test:
-min.
Initial:
4
(
'l
~
k
(
0032T 66 4
i 0054A
o-m s.
^
TSS 15.6.10e Rev. 3 APR 171];;
i DATASHEET SUMMATION OF RESULTS FOR UNIT 1 INITIAL FINAL Time Test P1 T1 P2 T2 Of Test Pressure Test
- Leak Rate INITIALED Area Date (PSIG)
(PSIG)
(*F)
(PSIG)
(*F)
(MIN)
(SCFH) l
.I i
I 1
4 i
i l
l l
i i
Note:
P, T, P, T
. Required Only If Control Volume Method Is Used.
1 1
2 2
0032T 67 0054A
TSS 15.6.10e fj W D;C O M M - E D M E M E
'S"22'issa j.('
Evaluation of Test Results i
i tt 1
1 1
i i
!i 1
1 1,
=
4
.: t
.)
- {
Date reviewed by:
1-Test Engineer Date Tech Staff Supervisor Date
~.! (,
i 0032T 68
]