Similar Documents at Zion |
---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20211K8611999-09-0101 September 1999 Informs That There Has Been Some Confusion Re Recently Issued ODCM Generic Section Rev Which Needs to Be Clarified. Clarifications Are Listed ML20210P1361999-08-0404 August 1999 Notification of 990817 Meeting with Util in Rockville, Maryland to Discuss Status of Licensing Actions Submitted by Comm Ed & Plan for Proposed Licensing Workshop ML20195G7771998-11-19019 November 1998 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Decision of Atomic Safety & Licensing Board (LBP-98-24) Expired.With Certificate of Svc.Served on 981120 ML20153G0061998-09-24024 September 1998 Informs That Office of Secretary Experienced Problems with Dedicated e-mail Address.In Effort to Maintain Electronic Mailbox for Parties Filing by e-mail,alternate Mailbox Created.With Certificate of Svc.Served on 980924 ML20153E4341998-09-24024 September 1998 Informs That Office of Secretary Experienced Problems with Dedicated e-mail Address.In Effort to Maintain Electronic Mailbox for Parties Filing by e-mail,alternate Mailbox Created.With Certificate of Svc.Served on 980924 ML20239A0451998-09-0404 September 1998 Informs That NRC Staff Has Prepared Answer to Petition to Intervene Filed by E Dienethal,R Robarge & Committee for Safety at Plant Zion on 980818 ML20237E3131998-08-26026 August 1998 Forwards for Public Release,Info Re NRC SMM Held on 980714-15.Summary of January 1998 NRC SMM & Watch List Removal Evaluation Factors Also Encl ML20237F1001998-08-26026 August 1998 Forwards Petition to Intervene,Dtd 980818,submitted by Committee for Safety at Plant Zion,R Robarge & ED Dienethal. Petition Filed in Response to Notice of Issuance of Amend to Commonwealth Edison Co for Zion Nuclear Power Station ML20154D1271998-07-22022 July 1998 Informs That Commission Has Not Objected to Proposed Licensing Actions Related to Zion That Restores Custom TS, Allows Use of Certified Fuel Handlers & Other Mods ML20236U5891998-07-13013 July 1998 Informs Commission That Final NSHC Determination & License Amend Will Be Issued on or About 980720 to Ceco in Response to Amend Application .Amends Restore Zion Custom TS That Had Been Replaced W/Improved TS by Previous Amend ML20248M0641998-06-10010 June 1998 Forwards Petition to Intervene, & Submitted by ED Dienethal.Petition Filed in Response to Notice of Proposed Determination That Issuance of License Amend Would Involve No Significant Hazards Considerations ML20247L9981998-05-18018 May 1998 Notification of 980601 Meeting W/Listed Participants in Zion,Il to Provide Opportunity for Interested Members of Public to Meet W/Staff on Planned Decommissioning of Plant ML20216H6971998-03-17017 March 1998 Notification of 980326 Meeting W/Commonwealth Edison Co in Lisle,Il to Discuss Comed Request to Consolidate near-site Emergency Operations Facility Into Single Central EOF ML20203M3791998-02-10010 February 1998 Comments on Draft FY99 Performance Plan Provided to Chairman in Memo from J Funches on 980202 & Circulated as Comsecy 98-003.Requests Verfication of Current Numbers & Explanation of Apparent Discrepancy ML20199H9681998-01-26026 January 1998 Forwards Page 14 Which Was Inadvertently Missing from Attachment to to O Kingsley Re Statistics on Allegations at Ceco Nuclear Plants ML20199A3551998-01-20020 January 1998 Notification of Meeting W/Ceco on 980203 in Rockville,Md to Discuss Preparations for Decommissioning of Plant ML20198A6271997-12-30030 December 1997 Notification of Meeting W/Util on 980113 in Zion,Il to Discuss Preparations to Implement Improved TSs ML20203C0851997-12-0404 December 1997 Notification of 971215 Meeting W/Commonwealth Edison Co in Rockville,Md to Discuss Zion Auxiliary Bldg Differential Pressure Requirements.Memo Reissued 971210 to Show Change of Room ML20202H9911997-12-0404 December 1997 Notification of 971215 Meeting W/Util in Rockville,Md to Discuss Plant Auxiliary Bldg Differential Pressure Requirements ML20199B2511997-11-0505 November 1997 Forwards Plant Calculations That Addresses Peak Main Steamline Break Pressure of 46.33 Psig & Max Strain in Containment Liner Due to Surface Temp of 273 F ML20236N5111997-10-22022 October 1997 Fowards Staff Response to 960912 TIA Re Containment Spray Additive Sys Conformance W/Design Basis & Tss.Analysis Concluded That 2,400-2,600 Ppm in RWST Acceptable ML20211N8651997-10-0707 October 1997 Responds to 970829 Memo Requesting write-ups for Events Which May Be Reportable as Abnormal Occurrences or Other Events of Interest for Fy 1997 Rept to Congress.Specifically Assessments for Two Oconee Events,One at Zion & Haddam Neck ML20217D4261997-09-30030 September 1997 Informs of Scheduled Visits W/Nuclear Services at Gpu on Nov 14th & Visit at Commonwealth Edison on Dec 3rd & Would Like to Receive Any Info Available.Supporting Documentation Encl ML20211B1161997-09-11011 September 1997 Forwards Plant Restart Action Plan,For Review & Approval. Restart Action Plan Status Will Be Updated on an as-required Basis.Minor Revs Will Be Made by Panel W/O Seeking Addl Formal Approval IA-97-178, Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission1997-04-18018 April 1997 Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission ML20217D5461997-04-18018 April 1997 Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission ML20147J2391997-04-0909 April 1997 Notification of Meeting on 970416 W/Util in Rockville,Md to Discuss Overall Response & Present Addl Details Re Performance Indicators Used to Monitor Performance Stations ML20136C1031997-03-0606 March 1997 Forwards Correspondence Transmitted Via Internet to J Zwolinski from P Blanch During 970102-31.Requests Correspondence Be Placed in PDR ML20137D6661997-02-25025 February 1997 Discusses 970221 Event Re Improper CR Movement During Shutdown at Plant.Ait Charter for Insp of Circumstances Associated W/Shutdown & Improper CR Movement Encl ML20138J7671997-02-0505 February 1997 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licenseing Exam on 970409. Ltr W/Copy to Chief,Operator Licensing Branch Must Be Submitted to Listed Address in Order to Register Personnel ML20134A3941997-01-23023 January 1997 Notification of Significant Licensee Meeting W/Util on 970103 to Discuss Findings from Licensee Contracted Independent Safety Assessment & Effects of Recently Identified Technical Issue Involving Degraded Containment ML20134E8811996-12-27027 December 1996 Submits Dates Requested Re Plants ML20210N4271996-12-0202 December 1996 Informs About Drop in Meeting on 961203 for Update on Industry Restructuring & Deregulation,Unicom Strategic Planning & Mixed Oxide Fuel ML20217D5421996-11-27027 November 1996 Forwards Partially Withheld Background Briefing Package in Preparation for 961203 Meeting Between Comed,Nuclear Strategic Services & Chairman Jackson ML20134J5621996-11-13013 November 1996 Notification of 961115 Meeting W/Commonwealth Edison Co in Rockville,Md to Discuss Zion Unit 2 SG Insp & Repair Results ML20210N3761996-08-12012 August 1996 Informs About Meeting on 960513 to Brief Chairman Jackson on Comed Response to Deregulation ML20217D4761996-07-31031 July 1996 Forwards Background Briefing Package in Prepartion of 960813 Meeting Between Commonwealth Edison Co & Chairman Jackson. Purpose of Visit to Discuss Recent Organizational Changes at Comed & Company Mgt Focus for Immediate Future ML20210N3381996-05-14014 May 1996 Discusses Courtesy Visit to Ceco on 960513 Re Listed Plants ML20129E6031996-03-0101 March 1996 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal) for Tests Administered on 960129-0202 ML20210N2681995-11-13013 November 1995 Discusses Paritially Withheld Chairman Briefing by Ceco on 951116 ML20217D5321995-11-0909 November 1995 Forwards Partially Withheld Background Briefing Package in Preparation for 951116 Meeting Between Commission & Senior Comed Mgt.Purpose of Visit to Discuss Performance at Each of Sites & Challenges & Issues Needed to Be Addressed ML20210N3971995-10-12012 October 1995 Informs of Courtesy Visit on 951011 to Util to Discuss Listed Topics.List of Attendees Encl ML20210N3701995-10-0505 October 1995 Forwards Background Briefing Package in Preparation for 951011 Meeting W/Company Executives & Chairmam Jackson ML20136A9101995-06-0505 June 1995 Partially Withheld Memo Discussing Director Decision 95-08, DD-95-09,DD-95-10 & DD-95-11 ML20062J4501993-10-27027 October 1993 Requests Addl Info Re Proposed EAL Changes in Util Generating Station Emergency Plan Annexes.Proposed EALs Reviewed Against Guidance in NUMARC/NESP-007,rev 2, Methodology for Development of Eals ML20059A7861993-10-21021 October 1993 Forwards from Sargent & Lardy to CE Re Control Room Habitability ML20059A4651993-10-20020 October 1993 Notification of Significant Licensee Meeting W/Util in Glen Ellyn,Il on 931104 to Review Status of Util Initiatives on QA & Corporate Engineering Support ML20058P0891993-10-20020 October 1993 Informs Permission Granted for Release of Encl Document from Confidential & Proprietary Restrictions & Processing Into Nudocs.After Authorization,Original Markings Were Removed & Replaced W/Unmarked Copy ML20057C9801993-09-27027 September 1993 Discusses 930927 Press Conference Re J O'Connor Announcement That Util Settled Six Rate Matters & Appeals Before Illinois Courts & Commerce Commission by Agreeing to Refund Listed Amount to Customers Over Next 12 Months ML20057A8041993-09-13013 September 1993 Notification of 930920 Meeting W/Util in Rockville,Md to Discuss Proposed Electronic Fire Detection Sys 1999-09-01
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20211K8611999-09-0101 September 1999 Informs That There Has Been Some Confusion Re Recently Issued ODCM Generic Section Rev Which Needs to Be Clarified. Clarifications Are Listed ML20210P1361999-08-0404 August 1999 Notification of 990817 Meeting with Util in Rockville, Maryland to Discuss Status of Licensing Actions Submitted by Comm Ed & Plan for Proposed Licensing Workshop ML20195G7771998-11-19019 November 1998 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Decision of Atomic Safety & Licensing Board (LBP-98-24) Expired.With Certificate of Svc.Served on 981120 ML20153G0061998-09-24024 September 1998 Informs That Office of Secretary Experienced Problems with Dedicated e-mail Address.In Effort to Maintain Electronic Mailbox for Parties Filing by e-mail,alternate Mailbox Created.With Certificate of Svc.Served on 980924 ML20153E4341998-09-24024 September 1998 Informs That Office of Secretary Experienced Problems with Dedicated e-mail Address.In Effort to Maintain Electronic Mailbox for Parties Filing by e-mail,alternate Mailbox Created.With Certificate of Svc.Served on 980924 ML20239A0451998-09-0404 September 1998 Informs That NRC Staff Has Prepared Answer to Petition to Intervene Filed by E Dienethal,R Robarge & Committee for Safety at Plant Zion on 980818 ML20237E3131998-08-26026 August 1998 Forwards for Public Release,Info Re NRC SMM Held on 980714-15.Summary of January 1998 NRC SMM & Watch List Removal Evaluation Factors Also Encl ML20237F1001998-08-26026 August 1998 Forwards Petition to Intervene,Dtd 980818,submitted by Committee for Safety at Plant Zion,R Robarge & ED Dienethal. Petition Filed in Response to Notice of Issuance of Amend to Commonwealth Edison Co for Zion Nuclear Power Station ML20236W5811998-08-0404 August 1998 Board Notification 98-001:submits Info Re Petition to Intervene Concerning Application of CE to Amend OL for Plant.Amend,Se & Notice of Significant Licensing Action Encl ML20154D1271998-07-22022 July 1998 Informs That Commission Has Not Objected to Proposed Licensing Actions Related to Zion That Restores Custom TS, Allows Use of Certified Fuel Handlers & Other Mods ML20236U5891998-07-13013 July 1998 Informs Commission That Final NSHC Determination & License Amend Will Be Issued on or About 980720 to Ceco in Response to Amend Application .Amends Restore Zion Custom TS That Had Been Replaced W/Improved TS by Previous Amend ML20248M0641998-06-10010 June 1998 Forwards Petition to Intervene, & Submitted by ED Dienethal.Petition Filed in Response to Notice of Proposed Determination That Issuance of License Amend Would Involve No Significant Hazards Considerations ML20247L9981998-05-18018 May 1998 Notification of 980601 Meeting W/Listed Participants in Zion,Il to Provide Opportunity for Interested Members of Public to Meet W/Staff on Planned Decommissioning of Plant ML20216H6971998-03-17017 March 1998 Notification of 980326 Meeting W/Commonwealth Edison Co in Lisle,Il to Discuss Comed Request to Consolidate near-site Emergency Operations Facility Into Single Central EOF ML20203M3791998-02-10010 February 1998 Comments on Draft FY99 Performance Plan Provided to Chairman in Memo from J Funches on 980202 & Circulated as Comsecy 98-003.Requests Verfication of Current Numbers & Explanation of Apparent Discrepancy ML20199H9681998-01-26026 January 1998 Forwards Page 14 Which Was Inadvertently Missing from Attachment to to O Kingsley Re Statistics on Allegations at Ceco Nuclear Plants ML20199A3551998-01-20020 January 1998 Notification of Meeting W/Ceco on 980203 in Rockville,Md to Discuss Preparations for Decommissioning of Plant ML20198A6271997-12-30030 December 1997 Notification of Meeting W/Util on 980113 in Zion,Il to Discuss Preparations to Implement Improved TSs ML20202H9911997-12-0404 December 1997 Notification of 971215 Meeting W/Util in Rockville,Md to Discuss Plant Auxiliary Bldg Differential Pressure Requirements ML20203C0851997-12-0404 December 1997 Notification of 971215 Meeting W/Commonwealth Edison Co in Rockville,Md to Discuss Zion Auxiliary Bldg Differential Pressure Requirements.Memo Reissued 971210 to Show Change of Room ML20199B2511997-11-0505 November 1997 Forwards Plant Calculations That Addresses Peak Main Steamline Break Pressure of 46.33 Psig & Max Strain in Containment Liner Due to Surface Temp of 273 F ML20236N5111997-10-22022 October 1997 Fowards Staff Response to 960912 TIA Re Containment Spray Additive Sys Conformance W/Design Basis & Tss.Analysis Concluded That 2,400-2,600 Ppm in RWST Acceptable ML20211N8651997-10-0707 October 1997 Responds to 970829 Memo Requesting write-ups for Events Which May Be Reportable as Abnormal Occurrences or Other Events of Interest for Fy 1997 Rept to Congress.Specifically Assessments for Two Oconee Events,One at Zion & Haddam Neck ML20217D4261997-09-30030 September 1997 Informs of Scheduled Visits W/Nuclear Services at Gpu on Nov 14th & Visit at Commonwealth Edison on Dec 3rd & Would Like to Receive Any Info Available.Supporting Documentation Encl ML20211B1161997-09-11011 September 1997 Forwards Plant Restart Action Plan,For Review & Approval. Restart Action Plan Status Will Be Updated on an as-required Basis.Minor Revs Will Be Made by Panel W/O Seeking Addl Formal Approval IA-97-178, Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission1997-04-18018 April 1997 Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission ML20217D5461997-04-18018 April 1997 Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission ML20147J2391997-04-0909 April 1997 Notification of Meeting on 970416 W/Util in Rockville,Md to Discuss Overall Response & Present Addl Details Re Performance Indicators Used to Monitor Performance Stations ML20136C1031997-03-0606 March 1997 Forwards Correspondence Transmitted Via Internet to J Zwolinski from P Blanch During 970102-31.Requests Correspondence Be Placed in PDR ML20137D6661997-02-25025 February 1997 Discusses 970221 Event Re Improper CR Movement During Shutdown at Plant.Ait Charter for Insp of Circumstances Associated W/Shutdown & Improper CR Movement Encl ML20138J7671997-02-0505 February 1997 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licenseing Exam on 970409. Ltr W/Copy to Chief,Operator Licensing Branch Must Be Submitted to Listed Address in Order to Register Personnel ML20134A3941997-01-23023 January 1997 Notification of Significant Licensee Meeting W/Util on 970103 to Discuss Findings from Licensee Contracted Independent Safety Assessment & Effects of Recently Identified Technical Issue Involving Degraded Containment ML20134E8811996-12-27027 December 1996 Submits Dates Requested Re Plants ML20210N4271996-12-0202 December 1996 Informs About Drop in Meeting on 961203 for Update on Industry Restructuring & Deregulation,Unicom Strategic Planning & Mixed Oxide Fuel ML20217D5421996-11-27027 November 1996 Forwards Partially Withheld Background Briefing Package in Preparation for 961203 Meeting Between Comed,Nuclear Strategic Services & Chairman Jackson ML20134J5621996-11-13013 November 1996 Notification of 961115 Meeting W/Commonwealth Edison Co in Rockville,Md to Discuss Zion Unit 2 SG Insp & Repair Results ML20210N3761996-08-12012 August 1996 Informs About Meeting on 960513 to Brief Chairman Jackson on Comed Response to Deregulation ML20217D4761996-07-31031 July 1996 Forwards Background Briefing Package in Prepartion of 960813 Meeting Between Commonwealth Edison Co & Chairman Jackson. Purpose of Visit to Discuss Recent Organizational Changes at Comed & Company Mgt Focus for Immediate Future ML20210N3381996-05-14014 May 1996 Discusses Courtesy Visit to Ceco on 960513 Re Listed Plants ML20129E6031996-03-0101 March 1996 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal) for Tests Administered on 960129-0202 ML20210N2681995-11-13013 November 1995 Discusses Paritially Withheld Chairman Briefing by Ceco on 951116 ML20217D5321995-11-0909 November 1995 Forwards Partially Withheld Background Briefing Package in Preparation for 951116 Meeting Between Commission & Senior Comed Mgt.Purpose of Visit to Discuss Performance at Each of Sites & Challenges & Issues Needed to Be Addressed ML20210N3971995-10-12012 October 1995 Informs of Courtesy Visit on 951011 to Util to Discuss Listed Topics.List of Attendees Encl ML20210N3701995-10-0505 October 1995 Forwards Background Briefing Package in Preparation for 951011 Meeting W/Company Executives & Chairmam Jackson ML20136A9101995-06-0505 June 1995 Partially Withheld Memo Discussing Director Decision 95-08, DD-95-09,DD-95-10 & DD-95-11 ML20062J4501993-10-27027 October 1993 Requests Addl Info Re Proposed EAL Changes in Util Generating Station Emergency Plan Annexes.Proposed EALs Reviewed Against Guidance in NUMARC/NESP-007,rev 2, Methodology for Development of Eals ML20059A7861993-10-21021 October 1993 Forwards from Sargent & Lardy to CE Re Control Room Habitability ML20059A4651993-10-20020 October 1993 Notification of Significant Licensee Meeting W/Util in Glen Ellyn,Il on 931104 to Review Status of Util Initiatives on QA & Corporate Engineering Support ML20058P0891993-10-20020 October 1993 Informs Permission Granted for Release of Encl Document from Confidential & Proprietary Restrictions & Processing Into Nudocs.After Authorization,Original Markings Were Removed & Replaced W/Unmarked Copy ML20057C9801993-09-27027 September 1993 Discusses 930927 Press Conference Re J O'Connor Announcement That Util Settled Six Rate Matters & Appeals Before Illinois Courts & Commerce Commission by Agreeing to Refund Listed Amount to Customers Over Next 12 Months 1999-09-01
[Table view] |
Text
__
MEMORANDUM TO: Stu:rt A. Rich:rds, Dirccior '
Proj:ct Dir:ctorsta 111-2 Division of Rcactor Projsets lil/IV Office of Nuclear Reactor Regulation FROM: Ramin R. Assa, Project Manager ORIG. SIGNED BY S. BAILEY FOR Division of Reactor Projects Ill/lV Office of Nuclear Reactor Regulation
SUBJECT:
FORTHCOMING PUBLIC MEETING ON THE DECOMMISSIONING OF THE ZION NUCLEAR POWER STATION, UNITS 1 AND 2 DATE & TIME: Monday, June 1,1998 7:00 p.m. - 9:00 p.m.
LOCATION: Zion-Benton High School 390121st Street Zion, Illinois PURPOSE: The purpose of this meeting is to provide an opportunity for interested members of the public to meet with the NRC staff on the planned decommissioning of the Zion Nuclear Power Station. Commonwealth Edison Company (the licensee for the Zion facility) will discuss its decommissioning plans and the NRC staff will discuss the NRC regulatory programs applicable to decommissioning activities.
PARTICIPANTS:* MODERATOR NRC Comed D. Moon, Co-Chairman R. Canlano M. Wallace Citizen Advisory Panel M. Masnik K. Ainger, et. al and President, Shimer College B. Jorgensen A. Markley M. Zobier J. Shepherd R. Assa, et. al Docket Nos. 50-295, 50-304
Attachment:
Agenda y r,ro n y,
[fg g :
cc w/att: See next page CONTACT: Ramin R. Assa or Anthony W. Markley (301) 415-1391 (301) 415-3165
- Meetings between NRC technical staff and applicants or licensees are open for interested rnembers or the public, petitioners, interveners, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meetings Open to the Public" 59 Et;ht[BI Reaister 48340,9/20/94 DISTRIBUTION: See next page DOCUMENT NAME: G:\CMNTSP\ ZION \6 1mtg.not *SEE PREVIOUS CONCURRENCE TO RECEIVE A COPY OF THIS DOCUMENT, INDICATE IN THE box:"C" = COPY WITHOUT ENCLOSURES *E" = COPY WITH ENCLOSURES "N" OFFICE PM:PD32 6 LA:PD32 1 NRR:PDND NRR:PDND D:PD32 '
NAME 441ASSA kMOddl["I AMARKLEY* SWEISS* SRICHARDpp g DATE 5/ 17 /98 5/ / 8 /98 5/14/98 5/15/98 5/ /8 /98 OFFICIAL RECORD COPY C0 9805260138 980518 PDR ADOCK 05000295 PDR h
P
l
- MEMORANDUM TO: Stu:rt A. Richards, Direct::r Divisi:n cf Rxct:r Proj: cts lil/IV Office of Nucle:r Rxctor R:gul:ti:n FROM: Ramin R. Assa, Project Manager Division of Reactor Projects lil/IV Office of Nuclear Reactor Regulation
SUBJECT:
FORTHCOMING PUBLIC MEETING ON THE DECOMMISSIONING OF THE ZION NUCLEAR POWER STATION, UNITS 1 At)D 2 DATE & TIME: Monday, June 1,1998 7:00 p.m. - 9:00 p.m.
LOCATION: Zion-Benton High School 390121st Street Zion, Illinois PURPOSE: The purpose of this meeting is toprovide an opportunity for interested members of the public to meet th the NRC staff on the planned decommissioning of the Zion uclear Power Station. Commonwealth Edison Company (the lice;)see for the Zion facility) will discuss its decommissioning plans,and the NRC staff will discuss the NRC regulatory programs applicable to decommissioning activities.
PARTICIPANTS:* MQQERATOR / NRC Comed D. Moon, Co-Chairman R. Canlano M. Wallace Citizen Advis,oly Panel M. Masnik K. Ainger, et. al and President, Shimer College B. Jorgensen
/
/ A. Markley
^
Med;; der. M.2.ct&r
/ J. Shepherd
/ R. Assa, et. al
/
/
Docket Nos. 50-295/ 50-304
Attachment:
Agenda /
cc w/att: Se/ e next page
/
CONTACT: Ramin R. Assa or Anthony W. Markley (301) 415-1391 (301) 415-3165 ings between NRC technical stoff and opphcents or licensees are open for interested members of the public, petitioners.
Intervonors, or other parties to ottend as observers pursuont to *Commiselon Policy statement on stoff Meetings Open to the Public" 59 f.edstal Register 48340,9f20/94
/ DISTRIBUTION: See next page DOCUMENT NAME: G:\CMNTSPtZION\6_1mtg.not TO RECEfVE A COPY OF THis DOCUMENT, IND6CATE IN THE BOX: T" e COPY WITHOUT ENCLOSURES "E" = COPY WITH ENCLOSURES "N" OFFICE PM:PD32 8 L[:Pp}2 (,, NRR:PDND 4 NRR:PDND D:PD32 NAME RASSA [ [dhf06RE AMARKLEY[ SWEISS kh SRICHARDS DATE 5/ Id /98 5/ k /98 5/ // /98 5/l(/98 5/ /98 OFFICIAL RECORD COPY
1
,f* Co o I
p 41 UNITED STATES
< o NUCLEAR REGULATORY COMMISSION E
i! WASHINGTON, D.C. 30666 4 00)
% , ,, , , # May 18, 1998 MEMORANDUM TO: Stuart A. Richards, Director Project Directorate Ill-2 1 Division of Reactor Projects Ill/IV )
Office of Nuclear Reactor Regulation FROM: Ramin R. Assa, Project Manager Division of Reactor Projects lil/IV Office of Nuclear Reactor Regulation
SUBJECT:
FORTHCOMING PUBLIC MEETING ON THE DECOMMISSIONING OF THE ZION NUCLEAR POWER STATION, UNITS 1 AND 2 DATE & TIME: Monday, June 1,1998 7:00 p.m. - 9:00 p.m.
LOCATION: Zion-Denton High School 390121st Street Zion, Illinois PURPOSE: The purpose of this meeting is to provide an opportunity for interested members of the public to meet with the NRC staff on the planned decommissioning of the Zion Nuclear Power Station. Commonwealth Edison Company (the licensee for the Zion facility) will discuss its decommissioning plans and the NRC staff will discuss the NRC regulatory programs applicable to decommissioning activities.
I PARTICIPANTS:* MODERATOR NRC Comed D. Moon, Co-Chairman R. Caniano M. Wallace Citizen Advisory Panel M. Masnik K. Ainger, et. al and President, Shimer College B. Jorgensen A. Markley M. Zobler l J. Shepherd 1' R. Assa, et. al Docket Nos. 50-295, 50-304
Attachment:
Agenda cc w/att: See next page CONTACT: Ramin R. Assa or Anthony W. Markley (301) 415-1391 (301)415-3165
- Meetings between NRC technical stoff and oppucents or hoensees are open for interested members of the public, petttsoners, intenenors, or other porties to ottend as observers pursuant to *Commineion Potcy Statement on Staff Meetings open to the Public" 59 fadual Reaister 48340, Br20S4
L DISTRIBUTION:
i- E-Mail l
S. Collins /F. Miraglia (SJC1/FJM) ..
B. Boger (BAB2)
E. Adensam (EGA1)
S. Richards (SAR) .
i R. Assa (RRA) l C. Moore (ACM)
T. Martin (e-mail to SLM3)
OPA (e-mail to OPA)
D. Hills (DEH)
T. Hiltz (TGH)
J. Strasma (RJS2)
R. Caniano (RJC1)
M. Masnik (MTM2)
- 8. Jorgensen (BLG) l A. Markley (AWM)
A. Hodgden (APH)
J. Shepherd (JCS2)
PMNS (email PMNS)
Hard Coov Docket File -
! PUBLIC -
l PD3-2 r/f OGC
'ACRS l e' l
l l
l
l c -
Zion Nuclear Power Station .
Units 1 and 2 cc:
Mr. O. Kingsley, President Commonwealth Edison Company Nuclear Generation Group Zion Station Manager )
Commonwealth Edison Company 101 Shiloh Blvd.
Executive Towers West lli Zion, Illinois 60099-2797 1400 Opus Place, Suite 500 Downers Grove, Illinois 60515 Document Control Desk-Licensing Commonwealth Edison Company Michael 1. Miller, Esquire 1400 Opus Place, Suite 400 Sidley and Austin Downers Grove, Illinois 60515 One First National Plaza Chicago, Illinois 60603 Mr. David Helwig Senior Vice President Dr. Cecil Lue-Hing Commonwealth Edison Company Director of Research and Development Executive Towers West lli Metropolitan Sanitary District 1400 Opus Place, Suite 900 of Greater Chicago Downers Grove,IL 60515 100 E. Erie Street Chicago, Illinois 60611 Mr. Gene H. Stanley PWR's Vice President Phillip Steptoe, Esquire Commonwealth Edison Company Sidley and Austin . Executive Towers West til One First National Plaza 1400 Opus Place, Suite 900 Chicago, Illinois 60603 Downers Grove,-lL 60515 i
Mayor of Zion Mr. Steve Perry Zion, Illinois 60099 BWR's Vice President Commonwealth Edison Company Commonwealth Edison Company Executive Towers West til i Site Vice President- Zion 1400 Opus Place, Suite 900 l 101 Shiloh Blvd. Downers Grove,IL 60515 Zion, Illinois 60099-2797 Mr. Dennis Farrar 1 lilinois Department of Nuclear Safety Regulatory Services Manager l Office of Nuclear Facility Safety Commonwealth Edison Company
.1035 Outer Park Drive Executive Towers West til ,
Springfield, Illinois 62704 1400 Opus Place, Suite 500 Downers Grove,IL 60515 U.S. Nuclear Regulatory Commission Zion Resident inspectors Office Ms. Irene Johnson, Licensing Director 105 Shiloh Blvd. Nuclear Regulatory Services j Zion, Illinois 60099 Commonwealth Edison Company l Executive Towers West lli Regional Administrator 1400 Opus Place, Suite 500 ,
U.S. NRC, Region til Downers Grove, IL 60515 1 801 Warrenville Road Lisle, Illinois 60532-4351
. ~
Zion Nuclear Power Station .
Units 1 and 2 Commonwealth Edison Company Reg. Assurance Supervisor-Zion 101 Shiloh Blvd.
Zion, Illinois 60099-2797 Mr. Michael J. Wallace Senior Vice President Commonwealth Edison Company Executive Towers West lll 1400 Opus Place, Suite 900 h Downers Grove,IL 60515
AGENDA 1
PUBLIC MEETING REGULATORY PROCESS FOR THE DECOMMISSIONING OF A NUCLEAR POWER PLANT AND THE DECOMMISSIONING OF THE ZION NUCLEAR POWER STATION MONDAY, JUNE 1,1998 6:30 - 7:00 p.m. Sign-up list for members of the public desiring to comment or to obtain a transcript of the meeting. Each person who signs-up, depending on the number and time available, will be able to make comments during the public comment period. Persons wanting to comment who did not sign-up may be heard if time permits. ;
7:00 p.m. Dr. Don Moon, Co-Chairman, Citizens Advisory Panel and President, 1 Shimer College, opens the meeting, describes the purpose of meeting, and briefs attendees on the agenda.
l 7:10 p.m. The licensee describes the decommissioning program for the Zion Nuclear l Power Station.
7:40 p.m. The NRC discusses the regulatory process for the decommissioning of a nuclear power plant including the license termination process and future plant oversight.
8:10 p.m. Public question and answer period followed by public comment period.
9:00 p.m. Closing remarks by Dr. Moon and adjournment. NRC staff will remain after adjoumment if necessary.
1 l
4 l
l
[ i l
l Attachment t _ _ _ _ _ _ . _ _ _ _ ____ ___ _ ____ _ _ _ _ _ _