| SU!HARY OF MEETING HELD ON AUGUST 3,1977, FOR DISCUSSION OF SEISMIC REEVALUATION OF THE GETR I On August 3,1977, representatives of GE and its consultant, Engineering Decision Analysis Company (EDAC) met with the NRC staff to discuss matters relating to the seismic reevaluation of the GETR. | | SU!HARY OF MEETING HELD ON AUGUST 3,1977, FOR DISCUSSION OF SEISMIC REEVALUATION OF THE GETR I On August 3,1977, representatives of GE and its consultant, Engineering Decision Analysis Company (EDAC) met with the NRC staff to discuss matters relating to the seismic reevaluation of the GETR. |
| A list of attendees is attached. Important highlights of the discussions are summarized below. | | A list of attendees is attached. Important highlights of the discussions are summarized below. |
| As a matter of background, GE was required in part to perform a seismic reevaluation program in support of its application for renewal of the facility license for the GETR, currently pending before the NRC. By letter dated May 20, 1977, the staff requested GE's submittal of the full report of its investigative study of the ability of the GETR safety-related features to withstand earthquakes. On June 10, 1977, GE provided , | | As a matter of background, GE was required in part to perform a seismic reevaluation program in support of its application for renewal of the facility license for the GETR, currently pending before the NRC. By {{letter dated|date=May 20, 1977|text=letter dated May 20, 1977}}, the staff requested GE's submittal of the full report of its investigative study of the ability of the GETR safety-related features to withstand earthquakes. On June 10, 1977, GE provided , |
| the requested information in several reports which included the results of its seismic and geologic investigations of the GETR site in the Vallecitos Nuclear Center near Pleasanton, California. | | the requested information in several reports which included the results of its seismic and geologic investigations of the GETR site in the Vallecitos Nuclear Center near Pleasanton, California. |
| Comments made during the meeting are summarized below: | | Comments made during the meeting are summarized below: |
|
---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20210T6011986-02-12012 February 1986 Submits Daily Staff Notes.Region Iii,Nrr & Cleveland Electric Illuminating Co Will Meet on 860211 Onsite to Discuss Reviews Re 860131 Earthquake Near Site & Readiness of Plant for Fuel Loading ML20024D2031983-07-29029 July 1983 Advises That Time for Commission to Review ALAB-720 Expired. Commission Declined Review.Decision Became Final Agency Action on 830725 ML20050C6041982-04-0505 April 1982 Requests Copies of Licensee/Applicant Requests for Extension or Exemption Re Implementation of 10CFR73.21. Only Haddam Neck & Millstone Have Submitted Fees & Fee Forms ML20038A6221981-11-0606 November 1981 Releases Public Version of Radiological Emergency Plan ML20010F2951981-08-28028 August 1981 Advises That IE Info Notice 81-26, Compilation of Health Physics Related Info Items, Was Distributed to Listed Licensees ML20009G8941981-07-31031 July 1981 Advises That Encl IE Info Notice 81-22, Section 235 & 236 Amends to Atomic Energy Act of 1954, Was Sent to Listed Licensees on 810731 ML20009B2181981-07-0909 July 1981 Forwards NRC Exhibits Which Were Received Into Evidence During Getr 810527-0610 Show Cause Proceedings.W/O Encl ML20005A2821981-06-26026 June 1981 Forwards Proposed Corrections to 810527-0610 Hearing Transcript ML19347F7151981-05-22022 May 1981 Informs That Parties Stipulated That Four Listed Matters Are Not in Issue in Show Cause Proceeding.Issues Concern Hillside Deposits Stability,Landslide Repts,Slope Displacement & Ground Surface Displacements ML19347E8801981-05-12012 May 1981 Submits List of NRC Exhibits Per 810507 Stipulation.Prefiled 810501 Written Proposed Testimony Will Be Offered Into Evidence & Bound Into Record as Though Read,Rather than Treated as Exhibits ML20008F9261981-05-11011 May 1981 Forwards Signed Stipulation Re Prehearing Conference & Hearing Matters.Prehearing Conference Telephone Call Changed from 810512 to 0513 ML20003H3711981-05-0101 May 1981 Forwards NRC Witness Testimonies Re Safety Evaluation of Geology of Getr Per ASLB 810203 Memorandum & Order.Portions of SER Will Be Presented as Exhibits.Certificate of Svc Encl ML20003G3551981-04-27027 April 1981 Informs That NRC Will Not Submit Response to Licensee 810422 Motion to Compel Discovery ML20126H2591981-04-0606 April 1981 Forwards Addl Copies of NRC 810403 Response to Intervenor Dellums Request for Production of Documents.W/O Encl ML19341C0291981-02-11011 February 1981 Requests That J Burdoin Continue Participation in ASLB Hearing Re Facility Seismic Design ML19341C0011981-02-11011 February 1981 Requests That J Greeves Continue to Represent Technical Review Re Landslide & Soil Structure for Getr Hearing on Seismic Design Criteria ML20002E4931981-01-27027 January 1981 Requests Processing Licensee Forwarding Review Fee for Security Plan ML19353A4461980-12-22022 December 1980 Forwards Evaluation of Soil Properties & Subgrade Rupture Mechanism Analysis for App B to Encl to .Under Combined Vibration & Subgrade Rupture Offset,Potential Fault Plane Beneath Reactor Will Be Deflected from Base ML19343A6381980-11-12012 November 1980 Summarizes ACRS 801106-08 Review of GE Request for Facility Restart.Licensee Must Show Facility Can Sustain Ground Level Accelerations of 0.75 Gravity W/O Surface Offset & 0.6 Gravity W/Surface Displacement ML20151B3451980-10-0606 October 1980 Forwards Overview of Geosciences Branch Workload,W/Priority Indicated.Requests Assistance W/Scheduling ACRS & Hearings ML19330A6531980-07-23023 July 1980 Notification of 800730 Meeting W/Ge in Bethesda,Md for Licensee Presentation of Addl Getr Structural Evaluations ML19296B1421980-01-25025 January 1980 Discusses 800124 Northern CA Earthquake,Measuring 5.5 on Richter Scale.No Serious Damage Occurred at Getr.Slight Motion Was Felt at Rancho Seco.Minor Architectural Damage Experience at Lll ML19257D0131980-01-10010 January 1980 Notification of 800130 Meeting W/Vendor in Bethesda,Md Re Presentation of Licensee Probability Analysis.Meeting Originally Scheduled for 800129 ML20148B8491980-01-10010 January 1980 Notification of 800129 Meeting W/Ge & Consultants in Bethesda,Md to Discuss Presentation of Licensee Probability Analysis ML19254D8041979-10-18018 October 1979 Notifies Commission of Decision to Discontinue Review of Getr as Currently Designed & Analyzed by Ge.Seismology & Geology Evaluation Encl ML19256E4111979-10-17017 October 1979 Discusses Seismology/Geology Review of Facility.Forwards Safety Evaluation Input.Surface Offset of 2.5 Meters Could Occur Beneath Facility.Review Re Facility Will Be Discontinued.W/O Encl ML19246C3741979-05-30030 May 1979 Forwards Questions from Us Geological Survey Re Seismological Aspects of Site.Requests Review of Technical & Policy Issues ML19261C4791979-03-14014 March 1979 Notification of 790320 Meeting W/Ge in Bethesda,Md to Discuss Licensee Presentation Re Recent Geologic Investigations for Test Reactor Site ML19261C5881979-02-23023 February 1979 Informs of Status of Geology Review:Licensee Final Documentation of Geology Investigations Expected by 790228. NRC Review Will Take Several Months ML19261B2711979-01-22022 January 1979 Forwards 781212 Joint Ltr from Three Individuals Expressing Views Re Getr.Ltr Is Written Limited Appearance Statement Per 10CFR2.715 ML19263B6571979-01-10010 January 1979 Since Last Staff Status Rept,No Addl Discovery Requests Have Been Sent or Received ML20147C5581978-12-13013 December 1978 Forwards Status Rept of Dse Review of Geology as It Relates to Potential for Surface Faulting of Getr Site.Data Is Incomplete & Does Not Allow Final Conclusions.Encl Request for Addl Info ML20147H7361978-12-0505 December 1978 Corrects Error in NRC Staff Answer to Intervenors Request for Referral & Licensees Motion for Imposition of Sanctions, Dtd 781129.On p2 Denied Should Read Granted. Staff Supports Licensees Request to Impose Sanctions ML20147C4721978-11-27027 November 1978 Notice of 781205 Visit to Facil in Order to Inspect Trenches Completed in the Getr Site Fault Investigation ML19256A2301978-10-27027 October 1978 Rept on 781017 Site Visit to Make Preliminary Observations of Gen Elec-proposed Site Investigation.Believes That Until Main Scarp & Assoc Rupture Surface Are Located for Mapped Landslide Complex,The Stability Analysis Is Questionable ML20052A7461978-06-23023 June 1978 Ack Receipt of Congressman Dellum Re Allegations of Unsafe Conditions at GE Test Reactor.Forwards Insp Rept 50-070/78-02 on 780426-27 ML20052A7561978-06-19019 June 1978 Forwards Congressman Dellums Re Allegations of Unsafe Conditions at GE Test Reactor ML20147C8621978-02-0303 February 1978 Forwards 780201 USGS Review of Potential Faulting at Subj Site.Feels Staff Should Not Take Firm Position Until After Its Review.W/Encl ANO:7809250067 ML20147C8701978-01-0909 January 1978 Identifies Sys Which Are Req to Assure Adequate Core Cooling, & Specifies Operability Conditions That Must Be Met by Each Sys ML20147C9411977-12-14014 December 1977 Summary of 771202 Meeting Re Geological & Seismological Matters Relating to Seismic re-evaluation of Getr. Requests That Facility Provide Info Re Surface Faulting in Support of 771024 Show Cause Order.W/List of Attendees ML20147D3651977-11-30030 November 1977 Discusses Status of Trench Closing at Vallecitos & Examination of Trenches by NRC & Other Agencies.Recommends That GE Be Allowed to Backfill Trenches 1,2 & 3 & the Large Boreholes Now Dug,W/Encl Comments for 771202 Getr Meeting ML20052A8001977-11-14014 November 1977 Forwards Preliminary Safety Evaluations Re Geologic Environ at Vallecitos Nuclear Ctr ML20147D2141977-11-10010 November 1977 Requests Dor Provide Proposed Fed Register Notice Repting Shutdown of Getr as Abnormal Occurrence.W/Encl Copy of Previous FRN for Abnormal Occurrence for Info ML20147C5611977-10-28028 October 1977 Forwards Rept on Status of Assessment of Geology & Seismology at Getr Site, ML20147C7631977-10-27027 October 1977 Notice of Meeting W/Ge on 771029 to Provide Info to Justify Resuming Oper of Getr ML20052A7921977-10-26026 October 1977 Confirms 771021 & 25 Conversations W/Fj Coufal Re Order to Show Cause Issued by NRR on 771024 Suspending Operation of GE Test Reactor Effective Upon Completion of Present Cycle on 771027 ML20147D2111977-10-26026 October 1977 Notification of 771028 Meeting in Bethesda W/Ge to Allow GE to Give NRC Its Assessment of All NRC-lic Activities at Vallecitos,As Req by 771024 Show Cause Order ML20147D3441977-10-25025 October 1977 Summarizes 771024 Conversation W/Ge & Consultants to Determine GEs Plans for Further Investigations of Faulting Near Vallecitos Facil & Status of Investigations ML20147E5761977-10-0404 October 1977 Requests That Geology & Seismology Branch Provide Tech Assistance to Div of Operating Reactors in the Geology & Seismology Review of the Subj Facil as Discussed in Enclosed TAC 7062.W/o Encl ML20147C8061977-10-0404 October 1977 Discusses Rereview Re Ability to Cool Core Assuming Cooling Water Absence of Full Seismic Design Capability.Because of Various Assumptions,Staff Must Have Reasonable Assurance of Items Withstanding Seismic Forces 1986-02-12
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20210T6011986-02-12012 February 1986 Submits Daily Staff Notes.Region Iii,Nrr & Cleveland Electric Illuminating Co Will Meet on 860211 Onsite to Discuss Reviews Re 860131 Earthquake Near Site & Readiness of Plant for Fuel Loading ML20024D2031983-07-29029 July 1983 Advises That Time for Commission to Review ALAB-720 Expired. Commission Declined Review.Decision Became Final Agency Action on 830725 ML20050C6041982-04-0505 April 1982 Requests Copies of Licensee/Applicant Requests for Extension or Exemption Re Implementation of 10CFR73.21. Only Haddam Neck & Millstone Have Submitted Fees & Fee Forms ML20038A6221981-11-0606 November 1981 Releases Public Version of Radiological Emergency Plan ML20010F2951981-08-28028 August 1981 Advises That IE Info Notice 81-26, Compilation of Health Physics Related Info Items, Was Distributed to Listed Licensees ML20009G8941981-07-31031 July 1981 Advises That Encl IE Info Notice 81-22, Section 235 & 236 Amends to Atomic Energy Act of 1954, Was Sent to Listed Licensees on 810731 ML20009B2181981-07-0909 July 1981 Forwards NRC Exhibits Which Were Received Into Evidence During Getr 810527-0610 Show Cause Proceedings.W/O Encl ML20005A2821981-06-26026 June 1981 Forwards Proposed Corrections to 810527-0610 Hearing Transcript ML19347F7151981-05-22022 May 1981 Informs That Parties Stipulated That Four Listed Matters Are Not in Issue in Show Cause Proceeding.Issues Concern Hillside Deposits Stability,Landslide Repts,Slope Displacement & Ground Surface Displacements ML19347E8801981-05-12012 May 1981 Submits List of NRC Exhibits Per 810507 Stipulation.Prefiled 810501 Written Proposed Testimony Will Be Offered Into Evidence & Bound Into Record as Though Read,Rather than Treated as Exhibits ML20008F9261981-05-11011 May 1981 Forwards Signed Stipulation Re Prehearing Conference & Hearing Matters.Prehearing Conference Telephone Call Changed from 810512 to 0513 ML20003H3711981-05-0101 May 1981 Forwards NRC Witness Testimonies Re Safety Evaluation of Geology of Getr Per ASLB 810203 Memorandum & Order.Portions of SER Will Be Presented as Exhibits.Certificate of Svc Encl ML20003G3551981-04-27027 April 1981 Informs That NRC Will Not Submit Response to Licensee 810422 Motion to Compel Discovery ML20126H2591981-04-0606 April 1981 Forwards Addl Copies of NRC 810403 Response to Intervenor Dellums Request for Production of Documents.W/O Encl ML19341C0291981-02-11011 February 1981 Requests That J Burdoin Continue Participation in ASLB Hearing Re Facility Seismic Design ML19341C0011981-02-11011 February 1981 Requests That J Greeves Continue to Represent Technical Review Re Landslide & Soil Structure for Getr Hearing on Seismic Design Criteria ML20002E4931981-01-27027 January 1981 Requests Processing Licensee Forwarding Review Fee for Security Plan ML19353A4461980-12-22022 December 1980 Forwards Evaluation of Soil Properties & Subgrade Rupture Mechanism Analysis for App B to Encl to .Under Combined Vibration & Subgrade Rupture Offset,Potential Fault Plane Beneath Reactor Will Be Deflected from Base ML19343A6381980-11-12012 November 1980 Summarizes ACRS 801106-08 Review of GE Request for Facility Restart.Licensee Must Show Facility Can Sustain Ground Level Accelerations of 0.75 Gravity W/O Surface Offset & 0.6 Gravity W/Surface Displacement ML20151B3451980-10-0606 October 1980 Forwards Overview of Geosciences Branch Workload,W/Priority Indicated.Requests Assistance W/Scheduling ACRS & Hearings ML19330A6531980-07-23023 July 1980 Notification of 800730 Meeting W/Ge in Bethesda,Md for Licensee Presentation of Addl Getr Structural Evaluations ML19296B1421980-01-25025 January 1980 Discusses 800124 Northern CA Earthquake,Measuring 5.5 on Richter Scale.No Serious Damage Occurred at Getr.Slight Motion Was Felt at Rancho Seco.Minor Architectural Damage Experience at Lll ML19257D0131980-01-10010 January 1980 Notification of 800130 Meeting W/Vendor in Bethesda,Md Re Presentation of Licensee Probability Analysis.Meeting Originally Scheduled for 800129 ML20148B8491980-01-10010 January 1980 Notification of 800129 Meeting W/Ge & Consultants in Bethesda,Md to Discuss Presentation of Licensee Probability Analysis ML19254D8041979-10-18018 October 1979 Notifies Commission of Decision to Discontinue Review of Getr as Currently Designed & Analyzed by Ge.Seismology & Geology Evaluation Encl ML19256E4111979-10-17017 October 1979 Discusses Seismology/Geology Review of Facility.Forwards Safety Evaluation Input.Surface Offset of 2.5 Meters Could Occur Beneath Facility.Review Re Facility Will Be Discontinued.W/O Encl ML19246C3741979-05-30030 May 1979 Forwards Questions from Us Geological Survey Re Seismological Aspects of Site.Requests Review of Technical & Policy Issues ML19261C4791979-03-14014 March 1979 Notification of 790320 Meeting W/Ge in Bethesda,Md to Discuss Licensee Presentation Re Recent Geologic Investigations for Test Reactor Site ML19261C5881979-02-23023 February 1979 Informs of Status of Geology Review:Licensee Final Documentation of Geology Investigations Expected by 790228. NRC Review Will Take Several Months ML19261B2711979-01-22022 January 1979 Forwards 781212 Joint Ltr from Three Individuals Expressing Views Re Getr.Ltr Is Written Limited Appearance Statement Per 10CFR2.715 ML19263B6571979-01-10010 January 1979 Since Last Staff Status Rept,No Addl Discovery Requests Have Been Sent or Received ML20147C5581978-12-13013 December 1978 Forwards Status Rept of Dse Review of Geology as It Relates to Potential for Surface Faulting of Getr Site.Data Is Incomplete & Does Not Allow Final Conclusions.Encl Request for Addl Info ML20147H7361978-12-0505 December 1978 Corrects Error in NRC Staff Answer to Intervenors Request for Referral & Licensees Motion for Imposition of Sanctions, Dtd 781129.On p2 Denied Should Read Granted. Staff Supports Licensees Request to Impose Sanctions ML20147C4721978-11-27027 November 1978 Notice of 781205 Visit to Facil in Order to Inspect Trenches Completed in the Getr Site Fault Investigation ML19256A2301978-10-27027 October 1978 Rept on 781017 Site Visit to Make Preliminary Observations of Gen Elec-proposed Site Investigation.Believes That Until Main Scarp & Assoc Rupture Surface Are Located for Mapped Landslide Complex,The Stability Analysis Is Questionable ML20052A7461978-06-23023 June 1978 Ack Receipt of Congressman Dellum Re Allegations of Unsafe Conditions at GE Test Reactor.Forwards Insp Rept 50-070/78-02 on 780426-27 ML20052A7561978-06-19019 June 1978 Forwards Congressman Dellums Re Allegations of Unsafe Conditions at GE Test Reactor ML20147C8621978-02-0303 February 1978 Forwards 780201 USGS Review of Potential Faulting at Subj Site.Feels Staff Should Not Take Firm Position Until After Its Review.W/Encl ANO:7809250067 ML20147C8701978-01-0909 January 1978 Identifies Sys Which Are Req to Assure Adequate Core Cooling, & Specifies Operability Conditions That Must Be Met by Each Sys ML20147C9411977-12-14014 December 1977 Summary of 771202 Meeting Re Geological & Seismological Matters Relating to Seismic re-evaluation of Getr. Requests That Facility Provide Info Re Surface Faulting in Support of 771024 Show Cause Order.W/List of Attendees ML20147D3651977-11-30030 November 1977 Discusses Status of Trench Closing at Vallecitos & Examination of Trenches by NRC & Other Agencies.Recommends That GE Be Allowed to Backfill Trenches 1,2 & 3 & the Large Boreholes Now Dug,W/Encl Comments for 771202 Getr Meeting ML20052A8001977-11-14014 November 1977 Forwards Preliminary Safety Evaluations Re Geologic Environ at Vallecitos Nuclear Ctr ML20147D2141977-11-10010 November 1977 Requests Dor Provide Proposed Fed Register Notice Repting Shutdown of Getr as Abnormal Occurrence.W/Encl Copy of Previous FRN for Abnormal Occurrence for Info ML20147C5611977-10-28028 October 1977 Forwards Rept on Status of Assessment of Geology & Seismology at Getr Site, ML20147C7631977-10-27027 October 1977 Notice of Meeting W/Ge on 771029 to Provide Info to Justify Resuming Oper of Getr ML20052A7921977-10-26026 October 1977 Confirms 771021 & 25 Conversations W/Fj Coufal Re Order to Show Cause Issued by NRR on 771024 Suspending Operation of GE Test Reactor Effective Upon Completion of Present Cycle on 771027 ML20147D2111977-10-26026 October 1977 Notification of 771028 Meeting in Bethesda W/Ge to Allow GE to Give NRC Its Assessment of All NRC-lic Activities at Vallecitos,As Req by 771024 Show Cause Order ML20147D3441977-10-25025 October 1977 Summarizes 771024 Conversation W/Ge & Consultants to Determine GEs Plans for Further Investigations of Faulting Near Vallecitos Facil & Status of Investigations ML20147E5761977-10-0404 October 1977 Requests That Geology & Seismology Branch Provide Tech Assistance to Div of Operating Reactors in the Geology & Seismology Review of the Subj Facil as Discussed in Enclosed TAC 7062.W/o Encl ML20147C8061977-10-0404 October 1977 Discusses Rereview Re Ability to Cool Core Assuming Cooling Water Absence of Full Seismic Design Capability.Because of Various Assumptions,Staff Must Have Reasonable Assurance of Items Withstanding Seismic Forces 1986-02-12
[Table view] |
Text
'
. A . .
M S . UNITED STATES
[ k .'.UCLEAR REGULATORY COMMISSION I
~,
l SEP 151977
'+,.....
i DOCKET N0. : 50-70 LICENSEE: General Electric Company (GE)
FACILITY: General Electric Test Reactor (GETR)
SU!HARY OF MEETING HELD ON AUGUST 3,1977, FOR DISCUSSION OF SEISMIC REEVALUATION OF THE GETR I On August 3,1977, representatives of GE and its consultant, Engineering Decision Analysis Company (EDAC) met with the NRC staff to discuss matters relating to the seismic reevaluation of the GETR.
A list of attendees is attached. Important highlights of the discussions are summarized below.
As a matter of background, GE was required in part to perform a seismic reevaluation program in support of its application for renewal of the facility license for the GETR, currently pending before the NRC. By letter dated May 20, 1977, the staff requested GE's submittal of the full report of its investigative study of the ability of the GETR safety-related features to withstand earthquakes. On June 10, 1977, GE provided ,
the requested information in several reports which included the results of its seismic and geologic investigations of the GETR site in the Vallecitos Nuclear Center near Pleasanton, California.
Comments made during the meeting are summarized below:
. Because of the location of the GETR in a high seismic zone, the staff will initially focus its review of the GETR license renewal application on matters related to GE's seismic reevaluation of the facility.
. We indicated that, although the staff had not yet completed its review of the seismic and geological information submitted by GE on June 10, 1977, we had detennined that information submitted will not be sufficient to complete our evaluation.
i 7813166357
Sgp 3 5
- The staff stated that generally, in its evaluation of the scope and details of needed informatien, it would use the guidelines and criteria in Appendix A to 10 CFR 100, " Seismic and Geologic Siting Criteria for Nuclear Power Plants". We noted that the geologic structure of the GETR site and surrounding areas is, complex, that sufficient information must be available to define i the position of the site with respect to active faulting, and l that additional detailed seismic and geological information j must be developed to support an acceptable seismic ground i acceleration (for assessing the structural and mechanical J adequacy of safety related GETR features), f
- GE questioned the reasonableness of the staff's use of Appendix A to 10 CFR 100 which is explicitly applicable to power reactors, because: the GETR is a test reactor operating at a comparatively low power level (50 MWt); the operating temperature in the GETR is low; the GETR's ability to remove heat; the lower fission product inventory in the GETR core compared to power reactor cores; and the use of a fast acting seismic scram for shutting down and securing the reactor in a safe condition in the event of an earthquake.
- The staff indicated that the needed additional information should include: detailed geological information, generally as outlined in the Standard Format of SAR's; detailed infor-mation on lineations; investigation of all faults within five miles of the site, including lenght of fault, date of last movement, significance of fault to the GETR; geotechnical infomation on subsurface control of liquefaction of soils; cross sections through structures to foundation depth of structures; excavation, trenching and boring to provide geologic site specific evidence as needed. The staff also asked GE to provide copies of the aerial photographs mentioned in a report included in its June 10, 1977 submittal.
At the conclusion of the meeting the staff indicated that it will forward to GE formal requests for additional information as soon as it has com-pleted the review of the seismic and geologic information included in GE's June 10, 1977 submittal. GE agreed to proceed promptly with the preparation of a program for the purpose of developing the additional information needed by the staff.
b 74 Alfred Burger, Project Manager Operating Reactors Branch #1 Division of Operating Reactors
Enclosure:
List of Attendees
~~; _
MEETING 'WITH GENERAL ELECTRIC COMPANY AUGUST 3, 1977-General Electric Cornpany D. Gilliland l O. hoggatt Engineering Decision Analysis Company 1
I J. Reed (
NRC - Staff A. Burger l C. Stepp J. Kelleher.
A. Cardone W. Gammill A. Schwencer R. Kratzke X. Herring i G. Bagchi 1
i SU 15 y7
--w-
Meeting Summary for : 3- SEP 15 577 Genreal Electric Company Docket-NRC PDR -
. LOCAL PDR' ORB #1 Reading NRR Reading.
E.'G. Case V. Stello K. R. Goller D. Eisenhut A. Schwencer D. Davis G. Lear' '
R. Reid L. Shao B. Grimes W. Butler R. Baer l Project Manager l Attorney, OELD-OI&E (3)-
Licensing Assistant.
Each NRC partic'ipant T. B. Abernathy J. R. Buchanan .