Discusses Seismology/Geology Review of Facility.Forwards Safety Evaluation Input.Surface Offset of 2.5 Meters Could Occur Beneath Facility.Review Re Facility Will Be Discontinued.W/O Encl
ML19256E411
Person / Time
Site: Vallecitos File:GEH Hitachi icon.png
Issue date: 10/17/1979
From: Harold Denton
Office of Nuclear Reactor Regulation
To: Gilinsky V, Hendrie J, Kennedy R
NRC COMMISSION (OCM)
References
NUDOCS 7911050164
Download: ML19256E411 (2)


Text

  • See previous yellcw for Distribution

' Fi Dce 0-70 EDO OR3-4 Rdg-Rc320 R. Vol' NRR Rdg GL_fus:

r, NRCPDR EDO R/F Occket !!o. 50-70 LPDR r.emo file Rm. 330 D. Eisenhut MEMORANDUM FOR:

Chaiman Hendrie B. Grimes Comissioner Gilinsky T. J. Carter Comissioner Kennedy R. Reid Rm. 330 Comissioner Bradford C. Nelson Em. 330 Cocnissioner Ahearne R. Ingram Rm. 330 E. G. Case FROM:

Harold R. Denton, Director H. R. Denton Office of Nuclear Reactor Regulatira THRU:

Executive Director for Operations

SUBJECT:

IliF0PETION REPORT ON SEISMOLOGY / GEOLOGY REVIEW 0F THE GENERAL ELECTRIC TEST REACTOR (GETR)

On October 24, 1977, the NRC staff ordered General Electric to shut down the GETR due to evidence of faulting at the site. After extensive inves-tication by General. Electric and review of the results of this investigation by the NRC.taff and its consultants, the staff issued, by letter dated September 27, 1979, its evaluation of the seismology and geology of the GETR site. A copy of this evaluation is enclosed for your Information.

The staff hcs concluded that a surface offset of two and a half meters could occur beneath the GETR and therefore should be a design basis.

Because this is greater than the one meter offset proposed by General Electric, as a design basis, the staff does not intend to continue its review of the GETR as currently dsi.gned and analyzed by General Electric.

This position is presented in.the enclosed letter which transmitted the staff's evaluation to Ceneral Electric and other participants in the proceeding.

~

Dniini s? ped by E.G.Cne

- -... _ _. _ ~ ~ ' ~ ~

Ha ld R. Denton, Director Of ice of Nuclear Reactor

Enclosures:

Regulation 1.-Geoscr* 3(e Branch Safety Eval a,tjbn Report Input 2.

Lett o' General Electric n tes 5epler:er ci, 1979 g

4 4g w/cncicsures 7911050 / b OGC grty

- 5eg p ce. i c,;3 jei; a cr Gncu rences e

7E

'4 i n next p ie fn, 3

.CRE=4 E g.

OELD M c

p

'N Q.

. h tact:

C. Nel son,.';RR C T,'ei p n : k b M. //w EC e 492-7435 10/ 4/79 10/ L/79

' 10/( /79 m

., c =. _. w. ;
m.. -

s General Electric Com?any 1

Cc W/ enclosure (s)*

Caiifornia D'epartment of Health ATTN:

Chief; Environmental Radiation Dr. Harry Foreman, Member Controi Uni:

Atcmic Safety and Licensing Ecard

~

Radioiccic Health Section Ecx 395, Mayo 714 P Street, Room 495 Universi:y of Minneso a

_e acrarento, CaliTornia Minneapoils, t.,innesota

-:o
c Honcrable Ronald V. Dellums Ms. Barbara Shockley ATTN:

Ms. Nancy Snow 1890 5cckm2,n Road General Delivery, Civic Center San Loren:c, Califcrnia 94550 Station OEkland, California Sa504 Advisc / Ccmmittee on Reactor Safe :uards n

..:ne.ta rt n.

U. 5. nac.iear..egulatcry Commission rrienes o:

ATTN:

W. Andrew Ealdwin, 5scuire Wash:ncton, D. C.

20555 Lecal Director 124 Spear Street San Francisco, California 94105 Jed Scmit, Escuire 100 Eush Street Suite 304 dan trancisco, Cal 1Tornia 34,10s, Herbert Grcssman, Esc., Chai rman.

Atomic Safety and Licensing Board U. 5. Nuclear Regulatcry Commission Washington, D. C.

20555 Mr. Gustave A. Linenberger, Member Atcmic Safety and Licensing Board U. 5. Nuclear Reculatory Ccmmission Washington, D. C.

20555 George Edgar, Esquire Morgan, Lewis & Bockius iS^D M Stre.et, NW Washington,-D. C.

20026 1254 250