MONTHYEARML20210T6011986-02-12012 February 1986 Submits Daily Staff Notes.Region Iii,Nrr & Cleveland Electric Illuminating Co Will Meet on 860211 Onsite to Discuss Reviews Re 860131 Earthquake Near Site & Readiness of Plant for Fuel Loading ML20126H2591981-04-0606 April 1981 Forwards Addl Copies of NRC 810403 Response to Intervenor Dellums Request for Production of Documents.W/O Encl ML20151B3451980-10-0606 October 1980 Forwards Overview of Geosciences Branch Workload,W/Priority Indicated.Requests Assistance W/Scheduling ACRS & Hearings ML20148B8491980-01-10010 January 1980 Notification of 800129 Meeting W/Ge & Consultants in Bethesda,Md to Discuss Presentation of Licensee Probability Analysis ML20147C5581978-12-13013 December 1978 Forwards Status Rept of Dse Review of Geology as It Relates to Potential for Surface Faulting of Getr Site.Data Is Incomplete & Does Not Allow Final Conclusions.Encl Request for Addl Info ML20147H7361978-12-0505 December 1978 Corrects Error in NRC Staff Answer to Intervenors' Request for Referral & Licensee'S Motion for Imposition of Sanctions, Dtd 781129.On p2 Denied Should Read Granted. Staff Supports Licensee'S Request to Impose Sanctions ML20147C4721978-11-27027 November 1978 Notice of 781205 Visit to Facil in Order to Inspect Trenches Completed in the Getr Site Fault Investigation ML20147C8621978-02-0303 February 1978 Forwards 780201 USGS Review of Potential Faulting at Subj Site.Feels Staff Should Not Take Firm Position Until After Its Review.W/Encl ANO:7809250067 ML20147C8701978-01-0909 January 1978 Identifies Sys Which Are Req to Assure Adequate Core Cooling, & Specifies Operability Conditions That Must Be Met by Each Sys ML20147C9411977-12-14014 December 1977 Summary of 771202 Meeting Re Geological & Seismological Matters Relating to Seismic re-evaluation of Getr. Requests That Facility Provide Info Re Surface Faulting in Support of 771024 Show Cause Order.W/List of Attendees ML20147D3651977-11-30030 November 1977 Discusses Status of Trench Closing at Vallecitos & Examination of Trenches by NRC & Other Agencies.Recommends That GE Be Allowed to Backfill Trenches 1,2 & 3 & the Large Boreholes Now Dug,W/Encl Comments for 771202 Getr Meeting ML20147D2141977-11-10010 November 1977 Requests Dor Provide Proposed Fed Register Notice Repting Shutdown of Getr as Abnormal Occurrence.W/Encl Copy of Previous FRN for Abnormal Occurrence for Info ML20147C5611977-10-28028 October 1977 Forwards Rept on Status of Assessment of Geology & Seismology at Getr Site, ML20147C7631977-10-27027 October 1977 Notice of Meeting W/Ge on 771029 to Provide Info to Justify Resuming Oper of Getr ML20147D2111977-10-26026 October 1977 Notification of 771028 Meeting in Bethesda W/Ge to Allow GE to Give NRC Its Assessment of All NRC-lic Activities at Vallecitos,As Req by 771024 Show Cause Order ML20147D3441977-10-25025 October 1977 Summarizes 771024 Conversation W/Ge & Consultants to Determine Ge'S Plans for Further Investigations of Faulting Near Vallecitos Facil & Status of Investigations ML20147C8061977-10-0404 October 1977 Discusses Rereview Re Ability to Cool Core Assuming Cooling Water Absence of Full Seismic Design Capability.Because of Various Assumptions,Staff Must Have Reasonable Assurance of Items Withstanding Seismic Forces ML20147E5761977-10-0404 October 1977 Requests That Geology & Seismology Branch Provide Tech Assistance to Div of Operating Reactors in the Geology & Seismology Review of the Subj Facil as Discussed in Enclosed TAC 7062.W/o Encl ML20147C6211977-09-15015 September 1977 Summarizes 770803 Meeting Re Discussion of Seismic Reeval of Subj Facil.Concluded That Addl Info Re Site Seismic & Geologic Info Is Needed from Gen Elec ML20147C8161977-09-15015 September 1977 Summarizes 770831 Briefing on Gen Elec'S Phase I Geological Investigation Which Presented a New Map of Livermore Valley & Interpreted the Geology & Seismology of Area Around Greenville & Las Positas Faults ML20147C6111977-09-12012 September 1977 Reports on Briefing by D Herd Re Detailed Field Mapping That Has Identified a Number of Faults W/Relatively Young Geological Movement Near Subj Facil ML20147C7821977-05-0606 May 1977 Forwards Form Reply Sent in Response to Pub Inquiries Re Pending Lic Renewal Appls.Forwards Mailing List for Notices to Be Issued on Renewal Appls ML20147C7981977-05-0606 May 1977 Forwards Draft Ltr Outlining NRC Review Process as Background Info for Getr Review.Requests Comments 1986-02-12
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20210T6011986-02-12012 February 1986 Submits Daily Staff Notes.Region Iii,Nrr & Cleveland Electric Illuminating Co Will Meet on 860211 Onsite to Discuss Reviews Re 860131 Earthquake Near Site & Readiness of Plant for Fuel Loading ML20126H2591981-04-0606 April 1981 Forwards Addl Copies of NRC 810403 Response to Intervenor Dellums Request for Production of Documents.W/O Encl ML20151B3451980-10-0606 October 1980 Forwards Overview of Geosciences Branch Workload,W/Priority Indicated.Requests Assistance W/Scheduling ACRS & Hearings ML20148B8491980-01-10010 January 1980 Notification of 800129 Meeting W/Ge & Consultants in Bethesda,Md to Discuss Presentation of Licensee Probability Analysis ML20147C5581978-12-13013 December 1978 Forwards Status Rept of Dse Review of Geology as It Relates to Potential for Surface Faulting of Getr Site.Data Is Incomplete & Does Not Allow Final Conclusions.Encl Request for Addl Info ML20147H7361978-12-0505 December 1978 Corrects Error in NRC Staff Answer to Intervenors' Request for Referral & Licensee'S Motion for Imposition of Sanctions, Dtd 781129.On p2 Denied Should Read Granted. Staff Supports Licensee'S Request to Impose Sanctions ML20147C4721978-11-27027 November 1978 Notice of 781205 Visit to Facil in Order to Inspect Trenches Completed in the Getr Site Fault Investigation ML20147C8621978-02-0303 February 1978 Forwards 780201 USGS Review of Potential Faulting at Subj Site.Feels Staff Should Not Take Firm Position Until After Its Review.W/Encl ANO:7809250067 ML20147C8701978-01-0909 January 1978 Identifies Sys Which Are Req to Assure Adequate Core Cooling, & Specifies Operability Conditions That Must Be Met by Each Sys ML20147C9411977-12-14014 December 1977 Summary of 771202 Meeting Re Geological & Seismological Matters Relating to Seismic re-evaluation of Getr. Requests That Facility Provide Info Re Surface Faulting in Support of 771024 Show Cause Order.W/List of Attendees ML20147D3651977-11-30030 November 1977 Discusses Status of Trench Closing at Vallecitos & Examination of Trenches by NRC & Other Agencies.Recommends That GE Be Allowed to Backfill Trenches 1,2 & 3 & the Large Boreholes Now Dug,W/Encl Comments for 771202 Getr Meeting ML20147D2141977-11-10010 November 1977 Requests Dor Provide Proposed Fed Register Notice Repting Shutdown of Getr as Abnormal Occurrence.W/Encl Copy of Previous FRN for Abnormal Occurrence for Info ML20147C5611977-10-28028 October 1977 Forwards Rept on Status of Assessment of Geology & Seismology at Getr Site, ML20147C7631977-10-27027 October 1977 Notice of Meeting W/Ge on 771029 to Provide Info to Justify Resuming Oper of Getr ML20147D2111977-10-26026 October 1977 Notification of 771028 Meeting in Bethesda W/Ge to Allow GE to Give NRC Its Assessment of All NRC-lic Activities at Vallecitos,As Req by 771024 Show Cause Order ML20147D3441977-10-25025 October 1977 Summarizes 771024 Conversation W/Ge & Consultants to Determine Ge'S Plans for Further Investigations of Faulting Near Vallecitos Facil & Status of Investigations ML20147C8061977-10-0404 October 1977 Discusses Rereview Re Ability to Cool Core Assuming Cooling Water Absence of Full Seismic Design Capability.Because of Various Assumptions,Staff Must Have Reasonable Assurance of Items Withstanding Seismic Forces ML20147E5761977-10-0404 October 1977 Requests That Geology & Seismology Branch Provide Tech Assistance to Div of Operating Reactors in the Geology & Seismology Review of the Subj Facil as Discussed in Enclosed TAC 7062.W/o Encl ML20147C6211977-09-15015 September 1977 Summarizes 770803 Meeting Re Discussion of Seismic Reeval of Subj Facil.Concluded That Addl Info Re Site Seismic & Geologic Info Is Needed from Gen Elec ML20147C8161977-09-15015 September 1977 Summarizes 770831 Briefing on Gen Elec'S Phase I Geological Investigation Which Presented a New Map of Livermore Valley & Interpreted the Geology & Seismology of Area Around Greenville & Las Positas Faults ML20147C6111977-09-12012 September 1977 Reports on Briefing by D Herd Re Detailed Field Mapping That Has Identified a Number of Faults W/Relatively Young Geological Movement Near Subj Facil ML20147C7821977-05-0606 May 1977 Forwards Form Reply Sent in Response to Pub Inquiries Re Pending Lic Renewal Appls.Forwards Mailing List for Notices to Be Issued on Renewal Appls ML20147C7981977-05-0606 May 1977 Forwards Draft Ltr Outlining NRC Review Process as Background Info for Getr Review.Requests Comments 1986-02-12
[Table view] |
Text
'
. A . .
M S . UNITED STATES
[ k .'.UCLEAR REGULATORY COMMISSION I
~,
l SEP 151977
'+,.....
i DOCKET N0. : 50-70 LICENSEE: General Electric Company (GE)
FACILITY: General Electric Test Reactor (GETR)
SU!HARY OF MEETING HELD ON AUGUST 3,1977, FOR DISCUSSION OF SEISMIC REEVALUATION OF THE GETR I On August 3,1977, representatives of GE and its consultant, Engineering Decision Analysis Company (EDAC) met with the NRC staff to discuss matters relating to the seismic reevaluation of the GETR.
A list of attendees is attached. Important highlights of the discussions are summarized below.
As a matter of background, GE was required in part to perform a seismic reevaluation program in support of its application for renewal of the facility license for the GETR, currently pending before the NRC. By letter dated May 20, 1977, the staff requested GE's submittal of the full report of its investigative study of the ability of the GETR safety-related features to withstand earthquakes. On June 10, 1977, GE provided ,
the requested information in several reports which included the results of its seismic and geologic investigations of the GETR site in the Vallecitos Nuclear Center near Pleasanton, California.
Comments made during the meeting are summarized below:
. Because of the location of the GETR in a high seismic zone, the staff will initially focus its review of the GETR license renewal application on matters related to GE's seismic reevaluation of the facility.
. We indicated that, although the staff had not yet completed its review of the seismic and geological information submitted by GE on June 10, 1977, we had detennined that information submitted will not be sufficient to complete our evaluation.
i 7813166357
Sgp 3 5
- The staff stated that generally, in its evaluation of the scope and details of needed informatien, it would use the guidelines and criteria in Appendix A to 10 CFR 100, " Seismic and Geologic Siting Criteria for Nuclear Power Plants". We noted that the geologic structure of the GETR site and surrounding areas is, complex, that sufficient information must be available to define i the position of the site with respect to active faulting, and l that additional detailed seismic and geological information j must be developed to support an acceptable seismic ground i acceleration (for assessing the structural and mechanical J adequacy of safety related GETR features), f
- GE questioned the reasonableness of the staff's use of Appendix A to 10 CFR 100 which is explicitly applicable to power reactors, because: the GETR is a test reactor operating at a comparatively low power level (50 MWt); the operating temperature in the GETR is low; the GETR's ability to remove heat; the lower fission product inventory in the GETR core compared to power reactor cores; and the use of a fast acting seismic scram for shutting down and securing the reactor in a safe condition in the event of an earthquake.
- The staff indicated that the needed additional information should include: detailed geological information, generally as outlined in the Standard Format of SAR's; detailed infor-mation on lineations; investigation of all faults within five miles of the site, including lenght of fault, date of last movement, significance of fault to the GETR; geotechnical infomation on subsurface control of liquefaction of soils; cross sections through structures to foundation depth of structures; excavation, trenching and boring to provide geologic site specific evidence as needed. The staff also asked GE to provide copies of the aerial photographs mentioned in a report included in its June 10, 1977 submittal.
At the conclusion of the meeting the staff indicated that it will forward to GE formal requests for additional information as soon as it has com-pleted the review of the seismic and geologic information included in GE's June 10, 1977 submittal. GE agreed to proceed promptly with the preparation of a program for the purpose of developing the additional information needed by the staff.
b 74 Alfred Burger, Project Manager Operating Reactors Branch #1 Division of Operating Reactors
Enclosure:
List of Attendees
~~; _
MEETING 'WITH GENERAL ELECTRIC COMPANY AUGUST 3, 1977-General Electric Cornpany D. Gilliland l O. hoggatt Engineering Decision Analysis Company 1
I J. Reed (
NRC - Staff A. Burger l C. Stepp J. Kelleher.
A. Cardone W. Gammill A. Schwencer R. Kratzke X. Herring i G. Bagchi 1
i SU 15 y7
--w-
Meeting Summary for : 3- SEP 15 577 Genreal Electric Company Docket-NRC PDR -
. LOCAL PDR' ORB #1 Reading NRR Reading.
E.'G. Case V. Stello K. R. Goller D. Eisenhut A. Schwencer D. Davis G. Lear' '
R. Reid L. Shao B. Grimes W. Butler R. Baer l Project Manager l Attorney, OELD-OI&E (3)-