Category:CORRESPONDENCE-LETTERS
MONTHYEARIR 05000070/19993011999-07-0101 July 1999 Forwards Insp Repts 50-070/99-301,50-073/99-201 & 50-183/99-201 on 990607-10.No Safety Concern or Noncompliance to NRC Requirements Was Identified ML20206P6541999-01-0707 January 1999 Forwards Insp Rept 50-070/98-01 on 981116-19.No Violations Noted.Major Activities Reviewed as Part of Insp Focused on Program to Maintain Safstor Condition of General Electric Test Reactor IR 05000070/19982011998-05-0404 May 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-070/98-201, 50-073/98-201 & 50-183/98-201.First Example of Violation 2 Has Been Withdrawn.Actions Examined During Future Insp ML20217B7081998-04-14014 April 1998 Submits Errata to Annual Rept 29 for ESADA - Vallecitos Experimental Superheat Reactor ML20217C1171998-03-18018 March 1998 Forwards Insp Repts 50-070/98-201,50-073/98-201 & 50-183/98-201 on 980209-13 & Notice of Violation ML20198K2711998-01-0909 January 1998 Forwards Insp Repts 50-018/97-01,50-070-97-01 & 50-183/97-01 on 971204.No Violations Noted.One Unresolved Item Identified & Discussed in Section 1.2 of Encl Rept ML20059E3841993-12-21021 December 1993 Accepts Cost Estimate Related to Licenses DPR-1,R-33,TR-1 & DPR-10,per Review of Documents Provided Via 931013,1202 & 17 Ltrs in Support of 930831 Request for Decrease in Chemical Bank Ltr of Credit Amend & Trust Agreement Amount ML20059E4141993-12-0202 December 1993 Explains 1993 Cost Estimate for Regulatory Assurance Reduction,W/Respect to GE Ltr of Credit IR 05000183/19930041993-11-24024 November 1993 Forwards Insp Rept 50-183/93-04 on 931101-05.No Violations Noted ML20059E4021993-10-13013 October 1993 Explains 1993 Cost Estimate for Regulatory Assurance Reduction,W/Respect to GE Ltr of Credit ML20127D7751992-09-0404 September 1992 Forwards USGS Study of Seismic Potential of Northern Calaveras Fault,For Actions Required to Ensure That Safety Analysis Remain Valid ML20059F6501990-08-27027 August 1990 Advises That 900820 Request for Petition for Reconsideration of Denial of Specific Exemption from Financial Assurance Instrument Requirements of 10CFR50 & 70 Under Review.Request for Temporary Extension of 900831 Filing Deadline Granted ML20245B4531989-06-0808 June 1989 Forwards Encl Listed Info on Decommissioned & Shutdown Reactors Requested During Discussions at Saxton on 890511 ML20150D8641988-03-18018 March 1988 Informs of Relocation of NRR to Rockville,Md.Official Mailing Address Still Remains Same & Project Managers Have New Locations & Phone Numbers.Ts Michaels Still Lead Project Manager for Facility & a Adams Will Serve as Backup ML20148C3851988-01-14014 January 1988 Forwards Amend 4 to License DR-10 & Safety Evaluation.Amend Changes Tech Specs to Permit General Radiation Survey Annually Instead of Twice Annually,Per 870816 Request ML20235T2431987-09-24024 September 1987 Forwards Insp Repts 50-018/87-01,50-070/87-01,50-073/87-01 & 50-183/87-01 on 870901-03 & Notice of Violation ML20236N0511987-08-0303 August 1987 Forwards Amend 15 to License TR-1 & Safety Evaluation. Amend Changes Tech Specs by Deleting Cooling Tower from Definition of Reactor Facility ML20215C8891987-06-11011 June 1987 Informs of Recent Reorganization of Nrr.T Michaels Assigned as Project Manager for Facilities ML20214M6631987-05-22022 May 1987 Forwards Revised NRC Form 398.Rev Reflects Changes to 10CFR55 Effective on 870526.Revised Form Requires New Applications to Complete Each Category Including Educ, Training & Experience.Changes Detailed in Encl 2 ML20210S4131986-09-26026 September 1986 Further Response to FOIA Request for 16 Categories of Records Re Facilities.Forwards App D & E Documents.Documents Also Available in PDR ML20206M4181986-06-25025 June 1986 Forwards Insp Repts 50-018/86-01 & 50-183/86-01 on 860617.No Violation Noted ML20140G7211986-03-27027 March 1986 Lists Change in Telephone Number for H Bernard,Facility Project Manager,Due to NRR Reorganization.D Tondi New Nonpower Reactors & Safeguards Licensing Section Leader. Correspondence Should Be Sent to Listed Address ML20210H8751986-03-27027 March 1986 Lists Change in Telephone Number for H Bernard,Facility Project Manager,Due to NRR Reorganization.D Tondi New Nonpower Reactors & Safeguards Licensing Section Leader. Correspondence Should Be Sent to Listed Address ML20195C7181986-03-21021 March 1986 Responds to FOIA Request for Nine Categories of Records Re Damages Occurring to Nuclear Power Plants Following Earthquakes & 860131 Earthquake Near Perry Site.Forwards Apps a & B Documents.App B Documents Also Available in PDR ML20137R6811986-02-0505 February 1986 Forwards Amend 14 to License TR-1,safety Evaluation & Fr Notice.Amend Renews License for Possession Only Until 921001 ML20239A1971985-12-17017 December 1985 Further Response to 850927 & 1106 FOIA Requests for Documents Re Pressure Suppression Containment,Including Humboldt Bay & Bodega Bay Docket Files.Bodega Bay File Being Placed in Pdr.Review of Addl Documents Continuing ML20138B5131985-10-0808 October 1985 Forwards Corrected Page 2 to Insp Repts 50-070/85-01 & 50-073/85-02 Per 851007 Telcon Re Presence of Second Individual at Facility Whenever Licensed Operator W/Medical Restrictions Is Performing Licensed Activities ML20133H4331985-10-0101 October 1985 Forwards Insp Repts 50-070/85-01 & 50-073/85-02 on 850812-15 & Notice of Violation ML20133C2121985-09-30030 September 1985 Forwards Modified Tech Specs Re Storage & Disposal of Liquid Effluents & Elimination of Area Radiation Monitors for Shutdown of Test Reactor Facility.Info Suppls 850626 Submittal of License Renewal Info ML20128M2811985-07-15015 July 1985 Forwards Self-Evaluation of NSHC, Supplementing 850625 Application for Amend to License TR-1,changing Tech Specs to Permit Maint of Reactor in Possession/Nonoperating Status ML20128L6091985-06-26026 June 1985 Forwards Request to Revise 751021 Application to Renew License TR-1,authorizing Possession/Nonoperating Status for Getr,Per Revised Tech Specs ML20058D2491982-07-20020 July 1982 Requests Extension Until 821103 for Submitting Revised Emergency Plan,Based on Classification as Minor Facility ML20055B4601982-07-14014 July 1982 Forwards Revised Security Plan for Protection of Reactor Facilities.Plan Withheld (Ref 10CFR2.790) ML20126K5491981-05-12012 May 1981 Forwards 810507 Fr Notice of Hearing ML20126H2591981-04-0606 April 1981 Forwards Addl Copies of NRC 810403 Response to Intervenor Dellums Request for Production of Documents.W/O Encl ML20126H0771981-03-26026 March 1981 Forwards Annual Financial Rept 1980 ML20126F2571981-03-10010 March 1981 Advises That Notice of Public Hearings on Facility Will Be Forwarded When Issued,In Response to .Explains Procedure for Making Limited Appearance Statement ML20126E7211981-02-0808 February 1981 Requests Date & Place of Hearing & Procedure to Testify in Support of Facility ML20062J0091980-07-11011 July 1980 Submits Comments on 800616-17 Meeting on Getr.Requests Copy of Edac 117-253-01,Revision 1.Probabilistic Effects of Presentation of Combining Vibratory Motion W/Uplift Were Unclear ML20149K1911980-05-0707 May 1980 Generic Ltr 80-38 to All Nonpower Reactor Licensees Re NPR Physical Protection Requirements.Summary of Certain NPR Physical Protection Requirements Encl & Should Aid in Determining Safeguards Requirements Applicable to Facility ML20132A9491979-08-14014 August 1979 Forwards IE Info Notice 79-20, NRC Enforcement Policy - NRC Licensed Individuals. No Action Required ML20062G8471979-02-0909 February 1979 Forwards Annual Rept 11 for Deactivated Vallecitos Experimental Superheat Reactor ML20148A2751978-12-18018 December 1978 Forwards Rept Re 781205-6 Subj Facil Site Visit Re Trenches & Seismic Analysis ML20147H7361978-12-0505 December 1978 Corrects Error in NRC Staff Answer to Intervenors' Request for Referral & Licensee'S Motion for Imposition of Sanctions, Dtd 781129.On p2 Denied Should Read Granted. Staff Supports Licensee'S Request to Impose Sanctions ML20147C3121978-12-0404 December 1978 Requests Review of 771107 Preliminary Safety Eval in Light of Possible New Geological Evidence Which May Affect the Safety of Bldg 102,which Houses the Plutonium Labs ML20197D9001978-11-29029 November 1978 Forwards Logs of the Trenches at & Near Subj Facil.Logs Available in Central Files ML20150C6111978-11-17017 November 1978 Responds to Opposing Reopening of Subj Facil. Explains NRC Lic Process.Recipient Is Incl in Svc List of Those to Receive Notice Ofhearings on Subj.(See:Ano 7811080056) ML20150C5801978-11-15015 November 1978 Responds to by Forwarding a Copy of Nrc'S Reply to Mrs Delfino'S to Chairman Hendrie ML20148L0061978-11-13013 November 1978 Responds to to J Hendrie Re Subj Facils.Repts Eval of Both Facils Continues & That Discharges of Tritium Have Been Small Fraction of Reg Limits of 10CFR Part 20. W/Out Encl NRC Eval of Site ML20197C3411978-11-13013 November 1978 Responds to to Dept of Energy Re Present Status of Subj Facils.Based on Seismology & Site Geology Evaluation Continued Ntr Oper & Activities Authorized by Lic SNM-960 Were Found to Be Acceptable 1999-07-01
[Table view] Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20210T6011986-02-12012 February 1986 Submits Daily Staff Notes.Region Iii,Nrr & Cleveland Electric Illuminating Co Will Meet on 860211 Onsite to Discuss Reviews Re 860131 Earthquake Near Site & Readiness of Plant for Fuel Loading ML20126H2591981-04-0606 April 1981 Forwards Addl Copies of NRC 810403 Response to Intervenor Dellums Request for Production of Documents.W/O Encl ML20151B3451980-10-0606 October 1980 Forwards Overview of Geosciences Branch Workload,W/Priority Indicated.Requests Assistance W/Scheduling ACRS & Hearings ML20148B8491980-01-10010 January 1980 Notification of 800129 Meeting W/Ge & Consultants in Bethesda,Md to Discuss Presentation of Licensee Probability Analysis ML20147C5581978-12-13013 December 1978 Forwards Status Rept of Dse Review of Geology as It Relates to Potential for Surface Faulting of Getr Site.Data Is Incomplete & Does Not Allow Final Conclusions.Encl Request for Addl Info ML20147H7361978-12-0505 December 1978 Corrects Error in NRC Staff Answer to Intervenors' Request for Referral & Licensee'S Motion for Imposition of Sanctions, Dtd 781129.On p2 Denied Should Read Granted. Staff Supports Licensee'S Request to Impose Sanctions ML20147C4721978-11-27027 November 1978 Notice of 781205 Visit to Facil in Order to Inspect Trenches Completed in the Getr Site Fault Investigation ML20147C8621978-02-0303 February 1978 Forwards 780201 USGS Review of Potential Faulting at Subj Site.Feels Staff Should Not Take Firm Position Until After Its Review.W/Encl ANO:7809250067 ML20147C8701978-01-0909 January 1978 Identifies Sys Which Are Req to Assure Adequate Core Cooling, & Specifies Operability Conditions That Must Be Met by Each Sys ML20147C9411977-12-14014 December 1977 Summary of 771202 Meeting Re Geological & Seismological Matters Relating to Seismic re-evaluation of Getr. Requests That Facility Provide Info Re Surface Faulting in Support of 771024 Show Cause Order.W/List of Attendees ML20147D3651977-11-30030 November 1977 Discusses Status of Trench Closing at Vallecitos & Examination of Trenches by NRC & Other Agencies.Recommends That GE Be Allowed to Backfill Trenches 1,2 & 3 & the Large Boreholes Now Dug,W/Encl Comments for 771202 Getr Meeting ML20147D2141977-11-10010 November 1977 Requests Dor Provide Proposed Fed Register Notice Repting Shutdown of Getr as Abnormal Occurrence.W/Encl Copy of Previous FRN for Abnormal Occurrence for Info ML20147C5611977-10-28028 October 1977 Forwards Rept on Status of Assessment of Geology & Seismology at Getr Site, ML20147C7631977-10-27027 October 1977 Notice of Meeting W/Ge on 771029 to Provide Info to Justify Resuming Oper of Getr ML20147D2111977-10-26026 October 1977 Notification of 771028 Meeting in Bethesda W/Ge to Allow GE to Give NRC Its Assessment of All NRC-lic Activities at Vallecitos,As Req by 771024 Show Cause Order ML20147D3441977-10-25025 October 1977 Summarizes 771024 Conversation W/Ge & Consultants to Determine Ge'S Plans for Further Investigations of Faulting Near Vallecitos Facil & Status of Investigations ML20147C8061977-10-0404 October 1977 Discusses Rereview Re Ability to Cool Core Assuming Cooling Water Absence of Full Seismic Design Capability.Because of Various Assumptions,Staff Must Have Reasonable Assurance of Items Withstanding Seismic Forces ML20147E5761977-10-0404 October 1977 Requests That Geology & Seismology Branch Provide Tech Assistance to Div of Operating Reactors in the Geology & Seismology Review of the Subj Facil as Discussed in Enclosed TAC 7062.W/o Encl ML20147C6211977-09-15015 September 1977 Summarizes 770803 Meeting Re Discussion of Seismic Reeval of Subj Facil.Concluded That Addl Info Re Site Seismic & Geologic Info Is Needed from Gen Elec ML20147C8161977-09-15015 September 1977 Summarizes 770831 Briefing on Gen Elec'S Phase I Geological Investigation Which Presented a New Map of Livermore Valley & Interpreted the Geology & Seismology of Area Around Greenville & Las Positas Faults ML20147C6111977-09-12012 September 1977 Reports on Briefing by D Herd Re Detailed Field Mapping That Has Identified a Number of Faults W/Relatively Young Geological Movement Near Subj Facil ML20147C7821977-05-0606 May 1977 Forwards Form Reply Sent in Response to Pub Inquiries Re Pending Lic Renewal Appls.Forwards Mailing List for Notices to Be Issued on Renewal Appls ML20147C7981977-05-0606 May 1977 Forwards Draft Ltr Outlining NRC Review Process as Background Info for Getr Review.Requests Comments 1986-02-12
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20210T6011986-02-12012 February 1986 Submits Daily Staff Notes.Region Iii,Nrr & Cleveland Electric Illuminating Co Will Meet on 860211 Onsite to Discuss Reviews Re 860131 Earthquake Near Site & Readiness of Plant for Fuel Loading ML20126H2591981-04-0606 April 1981 Forwards Addl Copies of NRC 810403 Response to Intervenor Dellums Request for Production of Documents.W/O Encl ML20151B3451980-10-0606 October 1980 Forwards Overview of Geosciences Branch Workload,W/Priority Indicated.Requests Assistance W/Scheduling ACRS & Hearings ML20148B8491980-01-10010 January 1980 Notification of 800129 Meeting W/Ge & Consultants in Bethesda,Md to Discuss Presentation of Licensee Probability Analysis ML20147C5581978-12-13013 December 1978 Forwards Status Rept of Dse Review of Geology as It Relates to Potential for Surface Faulting of Getr Site.Data Is Incomplete & Does Not Allow Final Conclusions.Encl Request for Addl Info ML20147H7361978-12-0505 December 1978 Corrects Error in NRC Staff Answer to Intervenors' Request for Referral & Licensee'S Motion for Imposition of Sanctions, Dtd 781129.On p2 Denied Should Read Granted. Staff Supports Licensee'S Request to Impose Sanctions ML20147C4721978-11-27027 November 1978 Notice of 781205 Visit to Facil in Order to Inspect Trenches Completed in the Getr Site Fault Investigation ML20147C8621978-02-0303 February 1978 Forwards 780201 USGS Review of Potential Faulting at Subj Site.Feels Staff Should Not Take Firm Position Until After Its Review.W/Encl ANO:7809250067 ML20147C8701978-01-0909 January 1978 Identifies Sys Which Are Req to Assure Adequate Core Cooling, & Specifies Operability Conditions That Must Be Met by Each Sys ML20147C9411977-12-14014 December 1977 Summary of 771202 Meeting Re Geological & Seismological Matters Relating to Seismic re-evaluation of Getr. Requests That Facility Provide Info Re Surface Faulting in Support of 771024 Show Cause Order.W/List of Attendees ML20147D3651977-11-30030 November 1977 Discusses Status of Trench Closing at Vallecitos & Examination of Trenches by NRC & Other Agencies.Recommends That GE Be Allowed to Backfill Trenches 1,2 & 3 & the Large Boreholes Now Dug,W/Encl Comments for 771202 Getr Meeting ML20147D2141977-11-10010 November 1977 Requests Dor Provide Proposed Fed Register Notice Repting Shutdown of Getr as Abnormal Occurrence.W/Encl Copy of Previous FRN for Abnormal Occurrence for Info ML20147C5611977-10-28028 October 1977 Forwards Rept on Status of Assessment of Geology & Seismology at Getr Site, ML20147C7631977-10-27027 October 1977 Notice of Meeting W/Ge on 771029 to Provide Info to Justify Resuming Oper of Getr ML20147D2111977-10-26026 October 1977 Notification of 771028 Meeting in Bethesda W/Ge to Allow GE to Give NRC Its Assessment of All NRC-lic Activities at Vallecitos,As Req by 771024 Show Cause Order ML20147D3441977-10-25025 October 1977 Summarizes 771024 Conversation W/Ge & Consultants to Determine Ge'S Plans for Further Investigations of Faulting Near Vallecitos Facil & Status of Investigations ML20147C8061977-10-0404 October 1977 Discusses Rereview Re Ability to Cool Core Assuming Cooling Water Absence of Full Seismic Design Capability.Because of Various Assumptions,Staff Must Have Reasonable Assurance of Items Withstanding Seismic Forces ML20147E5761977-10-0404 October 1977 Requests That Geology & Seismology Branch Provide Tech Assistance to Div of Operating Reactors in the Geology & Seismology Review of the Subj Facil as Discussed in Enclosed TAC 7062.W/o Encl ML20147C6211977-09-15015 September 1977 Summarizes 770803 Meeting Re Discussion of Seismic Reeval of Subj Facil.Concluded That Addl Info Re Site Seismic & Geologic Info Is Needed from Gen Elec ML20147C8161977-09-15015 September 1977 Summarizes 770831 Briefing on Gen Elec'S Phase I Geological Investigation Which Presented a New Map of Livermore Valley & Interpreted the Geology & Seismology of Area Around Greenville & Las Positas Faults ML20147C6111977-09-12012 September 1977 Reports on Briefing by D Herd Re Detailed Field Mapping That Has Identified a Number of Faults W/Relatively Young Geological Movement Near Subj Facil ML20147C7821977-05-0606 May 1977 Forwards Form Reply Sent in Response to Pub Inquiries Re Pending Lic Renewal Appls.Forwards Mailing List for Notices to Be Issued on Renewal Appls ML20147C7981977-05-0606 May 1977 Forwards Draft Ltr Outlining NRC Review Process as Background Info for Getr Review.Requests Comments 1986-02-12
[Table view] Category:NRC TO ASLP
MONTHYEARML20126H2591981-04-0606 April 1981 Forwards Addl Copies of NRC 810403 Response to Intervenor Dellums Request for Production of Documents.W/O Encl ML20147H7361978-12-0505 December 1978 Corrects Error in NRC Staff Answer to Intervenors' Request for Referral & Licensee'S Motion for Imposition of Sanctions, Dtd 781129.On p2 Denied Should Read Granted. Staff Supports Licensee'S Request to Impose Sanctions 1981-04-06
[Table view] |
Text
<a Up p
n%,t UMTEo STATES P ]l+[C gO
[* s, , NUCLEAR REGULATORY COMMIS$ ION Cl)]f j ,Jg2 ,' j 1 WASHINGTON, D, C. 20555 gN
o
%, N*..../ December 5,1978 Edward Luton, Esq., Chairman Mr. Gustave A. Linenberger Atomic Safety and Licensing Board Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, D . C . 20555 Washington, D . C . 20555 -
Dr. Harry Foreman Box 305, Mayo f *72/ 4 University of Minnesota Minneapolis, Minnesota 55455 g h
In the Matter of General Electric Company - f N (Vallecitos Nuclear Center - General Electrif Test Reactor, Operating License No. TR-1)\
?c'Mp 8 Docket No. 50-70 (Show Cause) N g.) N y l j
G entlemen:
l l
In the "NRC Staff Answer to 1) Intervenors' Request for Referral and 2) Licensee's Motion for Imposition of Sanctions", dated November 29, 1978, on page 2, the sec-tion heading labeled "B . Licensee's Request for Appropriate Sanctions Should Be Denied" should be corrected to read " . . . Should be Granted." Although the Staff does not agree with the Licensee's suggestion in its Response that outright dismissal of Intervenors is warranted at this time, the Staff does support Licen-see's request for the imposition of appropriate sanctions, to be determined by the Board (Staff Answer, pp. 3,4) . I apologize for any confusion that this error may have caused the Board and the parties.
Sinc er ely ,
055 1
Daniel T. Swanson -
Counsel for NRC Staff l
cc: Hon. Ronald V. Dellums Hon. Phillip Burton Ms. Barbara Shockley Hon. John L. Burton ,
Andrew Baldwin, Esq. Atomic Safety and Licensing --
George Edgar, Esq. Board Panel Jed Somit, Esq. Atomic Safety and Licensing Mr. Ken Wade Appeal Panel Mr . Edward A. Firestone Docketing and Service Section 881227038I l