| IMPOSITION OF CIVIL PENALTY - $50,000 By EN 87-85 dated September 30, 1987 the Comission was notified of the intent of OE to issue a Notice of Violation and Proposed Irposition of Civil Penalty in the amount of Fifty Thousand Dollars ($50,000) to Northern States Generating Plant. This action was based on a violation involving the failure to establish and implement a procedure to evaluate the effects of electrical design changes on other portions of the system in the area of electrical coordination. This lead to a change being made which created an unreviewed safety question in that faults on non safety-related components could cause the loss of multiple essential buses during a design basis event. | | IMPOSITION OF CIVIL PENALTY - $50,000 By EN 87-85 dated September 30, 1987 the Comission was notified of the intent of OE to issue a Notice of Violation and Proposed Irposition of Civil Penalty in the amount of Fifty Thousand Dollars ($50,000) to Northern States Generating Plant. This action was based on a violation involving the failure to establish and implement a procedure to evaluate the effects of electrical design changes on other portions of the system in the area of electrical coordination. This lead to a change being made which created an unreviewed safety question in that faults on non safety-related components could cause the loss of multiple essential buses during a design basis event. |
| The licensee responded to the Notice in a letter dated November 4, 1987. After careful consideration of the licensee's request for mitigation, the staff has concluded that a sufficient basis for reduction of the preposed civil penalty was not provided. | | The licensee responded to the Notice in a {{letter dated|date=November 4, 1987|text=letter dated November 4, 1987}}. After careful consideration of the licensee's request for mitigation, the staff has concluded that a sufficient basis for reduction of the preposed civil penalty was not provided. |
| Accordingly, an Order Imposing Civil Penalty in the amount of $50,000 has been , | | Accordingly, an Order Imposing Civil Penalty in the amount of $50,000 has been , |
| issued today. Ur. der the teras of the Order, the licensee may within 30 days of the date of the Order, pay the civil penalty or request a hearing. | | issued today. Ur. der the teras of the Order, the licensee may within 30 days of the date of the Order, pay the civil penalty or request a hearing. |
Latest revision as of 13:27, 11 December 2021
EN-87-085A:on 880219,order Imposing Civil Penalty in Amount of $50,000 Issued to Licensee Based on Violation Involving Failure to Establish & Implement Procedure to Evaluate Effects of Electrical Design ChangesML20149K124 |
Person / Time |
---|
Site: |
Monticello |
---|
Issue date: |
02/19/1988 |
---|
From: |
Lieberman J, Luehman J NRC OFFICE OF ENFORCEMENT (OE) |
---|
To: |
|
---|
References |
---|
EA-87-147, EN-87-085A, EN-87-85A, NUDOCS 8802230373 |
Download: ML20149K124 (1) |
|
|
---|
Category:ENFORCEMENT ACTION NOTIFICATIONS
MONTHYEARML20247M5311998-04-13013 April 1998 EN-98-026:on 980420,informs Commission That NRC Will Exercise Enforcement Discretion Per Section VII.B.6 of Enforcement Policy & Not Issue NOV or Propose Civil Penalty to Northern States Power Co for Two Violations W/Rhr ML20149K1261988-02-19019 February 1988 EN-87-085A:on 880219,order Imposing Civil Penalty in Amount of $50,000 Issued to Licensee Based on Violation Involving Failure to Establish & Implement Procedure to Evaluate Effects of Electrical Design Changes.Record Copy ML20149K1241988-02-19019 February 1988 EN-87-085A:on 880219,order Imposing Civil Penalty in Amount of $50,000 Issued to Licensee Based on Violation Involving Failure to Establish & Implement Procedure to Evaluate Effects of Electrical Design Changes ML20235S7891987-09-30030 September 1987 EN-87-085:on 871005,notice of Proposed Imposition of Civil Penalty in Amount of $50,000 Issued to Licensee.Action Based on Failure to Establish & Implement Procedure to Evaluate Effects of Electrical Design Changes ML20211E5121986-10-17017 October 1986 EN-86-079:on 861020,order to Show Cause Why Radios or Other Electrical/Electronic Equipment Providing Background Music Should Not Be Removed,Will Be Issued.Licensee Aug 1985 Ltr Ack Radios Removed as Potential Distraction 1998-04-13
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000263/19990061999-10-21021 October 1999 Insp Rept 50-263/99-06 on 990813-0923.Non-cited Violations Noted.Major Areas Inspected:Operations,Engineering, Maintenance & Plant Support IR 05000263/19990121999-10-13013 October 1999 Insp Rept 50-263/99-12 on 990913-17.No Violations Noted. Major Areas Inspected:Various Aspects of RP Program Including Radioactive Waste Processing,Storage,Packaging & Transportation & General RP Practices IR 05000263/19993011999-09-27027 September 1999 NRC Operator Licensing Exam Rept 50-263/99-301(including Completed & Graded Tests) for Tests Administered on 990823-26.Both Applicants Passed All Sections of Exam IR 05000263/19990051999-09-0101 September 1999 Insp Rept 50-263/99-05 on 990702-0812.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering, Maint & Plant Support IR 05000263/19990041999-07-28028 July 1999 Insp Rept 50-263/99-04 on 990521-0701.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000263/19990111999-07-14014 July 1999 Insp Rept 50-263/99-11 on 990621-24.No Violations Noted. Major Areas Inspected:Licensee Performance During Exercise of Emergency Plan IR 05000263/19990021999-05-0303 May 1999 Insp Rept 50-263/99-02 on 990223-0408.One Violation Occurred & Being Treated as non-cited Violation.Major Areas Inpsected:Operations,Engineering,Maint & Plant Support IR 05000263/19990101999-04-0909 April 1999 Insp Rept 50-263/99-10 on 990308-12.No Violations Noted. Major Areas Inspected:Review of Training Administrative Procedures & Operating Exam Matls & Observation & Evaluation of Licensed Operators IR 05000263/19990011999-03-11011 March 1999 Insp Rept 50-263/99-01 on 990112-0222.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000263/19980181999-01-20020 January 1999 Insp Rept 50-263/98-18 on 981201-990111.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000263/19980191998-12-30030 December 1998 Insp Rept 50-263/98-19 on 981214-18.No Violations Noted. Major Areas Inspected:Review of Various Aspects of Licensees Chemistry & Radiation Protection Programs,Specifically REMP, PASS & Chemistry QC & Matl Condition IR 05000263/19980161998-12-14014 December 1998 Insp Rept 50-263/98-16 on 981014-1130.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support Re Performance of Emergency Preparedness Drill ML20198B7851998-12-14014 December 1998 Notice of Violation from Insp on 981014-1130.Violation Noted:As of 981113,several Fire Brigade Personnel Not Listed as Qualified Fire Brigade Members Had Not Participated in Required Number of Fire Brigade Drills IR 05000263/19980171998-11-24024 November 1998 Insp Rept 50-263/98-17 on 981026-30.No Violations Noted. Major Areas Inspected:Physical Security Program IR 05000263/19980151998-11-10010 November 1998 Insp Rept 50-263/98-15 on 980821-1014.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000263/19980121998-09-18018 September 1998 Insp Rept 50-263/98-12 on 980719-0831.No Violations Noted. Major Areas Inspected:Opertions,Maint,Engineering & Plant Support IR 05000263/19980131998-09-11011 September 1998 Insp Rept 50-263/98-13 on 980810-13.No Violations Noted. Major Areas Inspected:Licensee Implementation of 10CFR50.65, Requirements for Monitoring Effectiveness of Maint at Nuclear Power Plants IR 05000263/19980141998-09-0404 September 1998 Insp Rept 50-263/98-14 on 980810-14.No Violations Noted. Major Areas Inspected:Licensee Liquid & Gaseous Effluents Program,Calibration & Testing of Area & Process Radiation Monitors & Free Release Program IR 05000263/19980991998-08-26026 August 1998 SALP Rept 50-263/98-99 for Monticello Nuclear Generating Plant,Covering Period from 960721-980718 IR 05000263/19980111998-08-21021 August 1998 Insp Rept 50-263/98-11 on 980528-0718.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000263/19980091998-07-30030 July 1998 Insp Rept 50-263/98-09 on 980511-0612.No Violations Noted. Major Areas Inspected:Review of 10CFR50.59 Safety Evaluation & Screening Activities IR 05000263/19980071998-06-25025 June 1998 Insp Rept 50-263/98-07 on 980413-0527.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000263/19980101998-05-26026 May 1998 Insp Rept 50-263/98-10 on 980427-30.No Violations Noted. Major Areas Inspected:Plant Support IR 05000263/19980061998-05-11011 May 1998 Insp Rept 50-263/98-06 on 980323-0423.No Violations Noted. Major Areas Inspected:Maint IR 05000263/19980041998-05-0808 May 1998 Insp Rept 50-263/98-04 on 980224-0414.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000263/19980081998-04-30030 April 1998 Insp Rept 50-263/98-08 on 980406-09.No Violations Noted. Major Areas Inspected:Radiation Protection Activities During Refueling & Maint Outage ML20247M5311998-04-13013 April 1998 EN-98-026:on 980420,informs Commission That NRC Will Exercise Enforcement Discretion Per Section VII.B.6 of Enforcement Policy & Not Issue NOV or Propose Civil Penalty to Northern States Power Co for Two Violations W/Rhr ML20216B2871998-04-0303 April 1998 Insp Rept 50-263/98-05 on 980309-13.Violations Noted.Major Areas Inspected:Physical Security Program ML20217A6881998-03-18018 March 1998 Insp Rept 50-263/98-02 on 980113-0223.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20217A6751998-03-18018 March 1998 Notice of Violation from Insp on 980113-0223.Violation Noted:Inspectors Identified That Shift Supervisor Failed to Remove hold-and-secure Card Attached to Control Room hand- Switch for Number 13 ML20216C1521998-03-0606 March 1998 Notice of Violation from Insp on 980209-13.Violation Noted: on 971028,licensee Did Not Make Surveys to Assure Compliance w/10CFR20.1201(a),which Limits Occupational Radiation Exposure ML20216C1671998-03-0606 March 1998 Insp Rept 50-263/98-03 on 980209-13.Violations Noted.Major Areas Inspected:Various Aspects of Licensee RP Program Including Radwaste Processing,Packaging,Transportation & Implementation of Recent Changes to NRC & DOT Regulations IR 05000263/19970181998-02-0404 February 1998 Insp Rept 50-263/97-18 on 971125-980112.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20198G3171998-01-0606 January 1998 Page 6 of Plant Emergency Preparedness Exercise Insp Rept 50-263/97-16.Page Inadvertently Omitted W/Rept Transmitted by IR 05000263/19970161997-12-22022 December 1997 Insp Rept 50-263/97-16 on 971118-21.No Violations Noted. Major Areas Inspected:Evaluation of Performance During Plant Biennial Exercise of Emergency Plan by Regional EP Inspectors & Resident Inspector Staff from Plants ML20197B1731997-12-18018 December 1997 Insp Rept 50-263/97-15 on 971014-1124.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 07100014/20110241997-12-18018 December 1997 Notice of Violation from Insp on 971014-1124.Violation Noted:Activities Affecting Quality Were Not Accomplished in Accordance W/Documented Procedures IR 05000263/19970171997-12-15015 December 1997 Insp Rept 50-263/97-17 on 971118-21.No Violations Noted. Major Areas Inspected:General Radiation Protection Practices,Respiratory Protection Program & Radwaste Processing,Storage & Monitoring ML20199E5871997-11-13013 November 1997 Notice of Violation from Insp on 970830-1013.Violation Noted:From 960229-970410,northwest Corner of Established Vehicle Barrier Sys Not Adequate to Protect Against Use of Land Vehicle in That Barrier Not Continuous IR 05000263/19970141997-11-13013 November 1997 Insp Rept 50-263/97-14 on 970830-1013.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support.Rept Also Includes Insp follow-up of Security Related Issue by Regional Inspector IR 05000263/19970121997-09-18018 September 1997 Insp Rept 50-263/97-12 on 970708-0829.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000263/19970111997-08-19019 August 1997 Insp Rept 50-263/97-11 on 970707-10.No Violations Noted. Major Areas Inspected:Installation of Emergency Core Cooling Sys Suction Strainers & pressure-suppression Chamber Coating Program IR 05000263/19970131997-08-14014 August 1997 Forwards Partially Withheld Insp Rept 50-263/97-13 on 970714-18 (Ref 10CFR73.21) IR 05000263/19970101997-07-23023 July 1997 Insp Rept 50-263/97-10 on 970623-27.No Violations Noted. Major Areas Inspected:Review of Issues Surrounding Licensee Discovery of Error in Head Loss Across ECCS Suction Strainers ML20149H9291997-07-17017 July 1997 Insp Rept 50-263/97-08 on 970528-0707.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20149H9221997-07-17017 July 1997 Notice of Violation from Insp on 970528-0707.Violation Noted:Reactor Bldg Closed Cooling Water Valve 2-2 & Associated Piping Removed from Pump,However,Safety Tag on Valve Had Not Been Properly Released IR 05000263/19970091997-07-15015 July 1997 Insp Rept 50-263/97-09 on 970616-20.No Violations Noted. Major Areas Inspected:Licensees Chemistry & Radiation Protection Programs ML20141E8031997-06-18018 June 1997 Insp Rept 50-263/97-06 on 970412-0527.Violation Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support ML20141E7961997-06-18018 June 1997 Notice of Violation from Insp on 970412-0527.Violation Noted:Inspectors Identified That Operations Personnel Did Not Know That Number 13 ESW Pump Had Been Operating for 2 Days Following 970408 Loss of Power to Number 15 4160 Volt PNO-III-97-046, on 970516,WI Energy Co & Northern States Power Co Announced They Were Terminating Plans for Proposed Merger of Two Companies Into New Co,Primergy Corp.Utils Attributed Decision to Changing Regulatory Policies1997-05-16016 May 1997 PNO-III-97-046:on 970516,WI Energy Co & Northern States Power Co Announced They Were Terminating Plans for Proposed Merger of Two Companies Into New Co,Primergy Corp.Utils Attributed Decision to Changing Regulatory Policies 1999-09-27
[Table view] |
Text
__ _ _ - _ _ _ _ _ - _ _ _ _ _ _ _ _ _
Db February 19, 1908 EN 87-85A 0FFICE OF ENFORCEMENT NOTIFICATION CF SIGNIFICANT ENFORCEl!ENT ACTION Licensee: Northern States Power Company (EA 87-147)
(flonticello Nuclear Generating Plant)
License No. DPR-22 Docket No. 50-263
Subject:
IMPOSITION OF CIVIL PENALTY - $50,000 By EN 87-85 dated September 30, 1987 the Comission was notified of the intent of OE to issue a Notice of Violation and Proposed Irposition of Civil Penalty in the amount of Fifty Thousand Dollars ($50,000) to Northern States Generating Plant. This action was based on a violation involving the failure to establish and implement a procedure to evaluate the effects of electrical design changes on other portions of the system in the area of electrical coordination. This lead to a change being made which created an unreviewed safety question in that faults on non safety-related components could cause the loss of multiple essential buses during a design basis event.
The licensee responded to the Notice in a letter dated November 4, 1987. After careful consideration of the licensee's request for mitigation, the staff has concluded that a sufficient basis for reduction of the preposed civil penalty was not provided.
Accordingly, an Order Imposing Civil Penalty in the amount of $50,000 has been ,
issued today. Ur. der the teras of the Order, the licensee may within 30 days of the date of the Order, pay the civil penalty or request a hearing.
Contact:
J. Luehman, OE, 23280 J. Lieberman, OE, 20741 Distribution: .
p,y . O . . ;f f
HStreet[G#6 MNBB h is OWFli/.n/ll.,c_[
Chairman Zecli~ EDO NRR /
Com. Roberts DEDRO OE Comm. Bernthal P,f1 fiftSS Comm. Carr AEOD OGC -
Com. Rogers PA 01 l