Notice of Violation from Insp on 970528-0707.Violation Noted:Reactor Bldg Closed Cooling Water Valve 2-2 & Associated Piping Removed from Pump,However,Safety Tag on Valve Had Not Been Properly ReleasedML20149H922 |
Person / Time |
---|
Site: |
Monticello |
---|
Issue date: |
07/17/1997 |
---|
From: |
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
---|
To: |
|
---|
Shared Package |
---|
ML20149H920 |
List: |
---|
References |
---|
50-263-97-08, 50-263-97-8, NUDOCS 9707250251 |
Download: ML20149H922 (2) |
|
|
---|
Category:NOTICE OF VIOLATION OF A REGULATION
MONTHYEARML20198B7851998-12-14014 December 1998 Notice of Violation from Insp on 981014-1130.Violation Noted:As of 981113,several Fire Brigade Personnel Not Listed as Qualified Fire Brigade Members Had Not Participated in Required Number of Fire Brigade Drills ML20217A6751998-03-18018 March 1998 Notice of Violation from Insp on 980113-0223.Violation Noted:Inspectors Identified That Shift Supervisor Failed to Remove hold-and-secure Card Attached to Control Room hand- Switch for Number 13 ML20216C1521998-03-0606 March 1998 Notice of Violation from Insp on 980209-13.Violation Noted: on 971028,licensee Did Not Make Surveys to Assure Compliance w/10CFR20.1201(a),which Limits Occupational Radiation Exposure IR 07100014/20110241997-12-18018 December 1997 Notice of Violation from Insp on 971014-1124.Violation Noted:Activities Affecting Quality Were Not Accomplished in Accordance W/Documented Procedures ML20199E5871997-11-13013 November 1997 Notice of Violation from Insp on 970830-1013.Violation Noted:From 960229-970410,northwest Corner of Established Vehicle Barrier Sys Not Adequate to Protect Against Use of Land Vehicle in That Barrier Not Continuous ML20149H9221997-07-17017 July 1997 Notice of Violation from Insp on 970528-0707.Violation Noted:Reactor Bldg Closed Cooling Water Valve 2-2 & Associated Piping Removed from Pump,However,Safety Tag on Valve Had Not Been Properly Released ML20141E7961997-06-18018 June 1997 Notice of Violation from Insp on 970412-0527.Violation Noted:Inspectors Identified That Operations Personnel Did Not Know That Number 13 ESW Pump Had Been Operating for 2 Days Following 970408 Loss of Power to Number 15 4160 Volt ML20137A1631997-03-11011 March 1997 Notice of Violation from Insp on 970109-0219.Violation Noted:Surveillance Test 0466-1 Not Conducted Under Suitable Environ Conditions ML20138N6931997-02-20020 February 1997 Notice of Violation from Insp on 961118-970108.Violation Noted:On 960814,during Closeout of Design Change Package RHR Sys Pressure Upgrade Mod, Rev 1,safety Evaluation Failed to Provide Bases for Determination ML20133C3971996-12-27027 December 1996 Notice of Violation from Insp on 960829-1016.Violation Noted:On 961011 & 12,plant Operator Documented Incorrect Standby Liquid Control Tank Level in Surveillance 0090, Standby Liquid Control Sys Checks ML20247N8541989-05-26026 May 1989 Notice of Violation from Insp on 890329-0512.Violation Noted:Procedure 7140, RCIC Sys Annual Instrument Maint Procedure Inadequately Prepared ML20207R6241987-03-12012 March 1987 Notice of Violation from Insp on 870123-0213 ML20215D4051986-12-11011 December 1986 Notice of Violation from Insp on 860528-0905.Violations Noted:During 841102-860611 Both Trains of Standby Liquid Control Sys Incapable of Providing Injection Flow & Actions Not Taken to Initiate Orderly Shutdown ML20138R3871985-12-27027 December 1985 Notice of Violation from Insp on 851223 ML20058F2641982-07-15015 July 1982 Notice of Violation from Insp on 820301-0430 ML20058D8731982-07-12012 July 1982 Notice of Violation from Insp on 820504 ML20056B5771978-05-25025 May 1978 Notice of Violation from Insp on 780411-14 & 27-28.Violation Noted:On 780202 Work Activities Authorized by Work Request Authorization 78-147 Extended Beyond Scope of Approved Work Request Authorization ML20058K4541978-03-14014 March 1978 Notice of Violation from Insp on 780221-24.Violation Noted: Before mid-Jan 1978,analysis of Each Containment Purge Had Not Included Noble Gas Principal Gamma Emitters IR 05000263/19760111977-09-13013 September 1977 Notice of Violation from Insp on 770823-26.Violation Noted: Violations of TSs Reported in Insp Repts 50-263/76-11,77-01, 77-05,77-06,77-07 & 77-10 Were Not Reviewed & Documented by Operations Committee ML20056B5691977-07-0606 July 1977 Notice of Violation from Insp on 770613-16.Violation Noted:Failure to Have Portable Dose Rate Survey Instruments Calibr Annually 1998-03-06
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000263/19990061999-10-21021 October 1999 Insp Rept 50-263/99-06 on 990813-0923.Non-cited Violations Noted.Major Areas Inspected:Operations,Engineering, Maintenance & Plant Support IR 05000263/19990121999-10-13013 October 1999 Insp Rept 50-263/99-12 on 990913-17.No Violations Noted. Major Areas Inspected:Various Aspects of RP Program Including Radioactive Waste Processing,Storage,Packaging & Transportation & General RP Practices IR 05000263/19993011999-09-27027 September 1999 NRC Operator Licensing Exam Rept 50-263/99-301(including Completed & Graded Tests) for Tests Administered on 990823-26.Both Applicants Passed All Sections of Exam IR 05000263/19990051999-09-0101 September 1999 Insp Rept 50-263/99-05 on 990702-0812.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering, Maint & Plant Support IR 05000263/19990041999-07-28028 July 1999 Insp Rept 50-263/99-04 on 990521-0701.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000263/19990111999-07-14014 July 1999 Insp Rept 50-263/99-11 on 990621-24.No Violations Noted. Major Areas Inspected:Licensee Performance During Exercise of Emergency Plan IR 05000263/19990021999-05-0303 May 1999 Insp Rept 50-263/99-02 on 990223-0408.One Violation Occurred & Being Treated as non-cited Violation.Major Areas Inpsected:Operations,Engineering,Maint & Plant Support IR 05000263/19990101999-04-0909 April 1999 Insp Rept 50-263/99-10 on 990308-12.No Violations Noted. Major Areas Inspected:Review of Training Administrative Procedures & Operating Exam Matls & Observation & Evaluation of Licensed Operators IR 05000263/19990011999-03-11011 March 1999 Insp Rept 50-263/99-01 on 990112-0222.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000263/19980181999-01-20020 January 1999 Insp Rept 50-263/98-18 on 981201-990111.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000263/19980191998-12-30030 December 1998 Insp Rept 50-263/98-19 on 981214-18.No Violations Noted. Major Areas Inspected:Review of Various Aspects of Licensees Chemistry & Radiation Protection Programs,Specifically REMP, PASS & Chemistry QC & Matl Condition IR 05000263/19980161998-12-14014 December 1998 Insp Rept 50-263/98-16 on 981014-1130.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support Re Performance of Emergency Preparedness Drill ML20198B7851998-12-14014 December 1998 Notice of Violation from Insp on 981014-1130.Violation Noted:As of 981113,several Fire Brigade Personnel Not Listed as Qualified Fire Brigade Members Had Not Participated in Required Number of Fire Brigade Drills IR 05000263/19980171998-11-24024 November 1998 Insp Rept 50-263/98-17 on 981026-30.No Violations Noted. Major Areas Inspected:Physical Security Program IR 05000263/19980151998-11-10010 November 1998 Insp Rept 50-263/98-15 on 980821-1014.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000263/19980121998-09-18018 September 1998 Insp Rept 50-263/98-12 on 980719-0831.No Violations Noted. Major Areas Inspected:Opertions,Maint,Engineering & Plant Support IR 05000263/19980131998-09-11011 September 1998 Insp Rept 50-263/98-13 on 980810-13.No Violations Noted. Major Areas Inspected:Licensee Implementation of 10CFR50.65, Requirements for Monitoring Effectiveness of Maint at Nuclear Power Plants IR 05000263/19980141998-09-0404 September 1998 Insp Rept 50-263/98-14 on 980810-14.No Violations Noted. Major Areas Inspected:Licensee Liquid & Gaseous Effluents Program,Calibration & Testing of Area & Process Radiation Monitors & Free Release Program IR 05000263/19980991998-08-26026 August 1998 SALP Rept 50-263/98-99 for Monticello Nuclear Generating Plant,Covering Period from 960721-980718 IR 05000263/19980111998-08-21021 August 1998 Insp Rept 50-263/98-11 on 980528-0718.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000263/19980091998-07-30030 July 1998 Insp Rept 50-263/98-09 on 980511-0612.No Violations Noted. Major Areas Inspected:Review of 10CFR50.59 Safety Evaluation & Screening Activities IR 05000263/19980071998-06-25025 June 1998 Insp Rept 50-263/98-07 on 980413-0527.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000263/19980101998-05-26026 May 1998 Insp Rept 50-263/98-10 on 980427-30.No Violations Noted. Major Areas Inspected:Plant Support IR 05000263/19980061998-05-11011 May 1998 Insp Rept 50-263/98-06 on 980323-0423.No Violations Noted. Major Areas Inspected:Maint IR 05000263/19980041998-05-0808 May 1998 Insp Rept 50-263/98-04 on 980224-0414.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000263/19980081998-04-30030 April 1998 Insp Rept 50-263/98-08 on 980406-09.No Violations Noted. Major Areas Inspected:Radiation Protection Activities During Refueling & Maint Outage ML20247M5311998-04-13013 April 1998 EN-98-026:on 980420,informs Commission That NRC Will Exercise Enforcement Discretion Per Section VII.B.6 of Enforcement Policy & Not Issue NOV or Propose Civil Penalty to Northern States Power Co for Two Violations W/Rhr ML20216B2871998-04-0303 April 1998 Insp Rept 50-263/98-05 on 980309-13.Violations Noted.Major Areas Inspected:Physical Security Program ML20217A6881998-03-18018 March 1998 Insp Rept 50-263/98-02 on 980113-0223.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20217A6751998-03-18018 March 1998 Notice of Violation from Insp on 980113-0223.Violation Noted:Inspectors Identified That Shift Supervisor Failed to Remove hold-and-secure Card Attached to Control Room hand- Switch for Number 13 ML20216C1521998-03-0606 March 1998 Notice of Violation from Insp on 980209-13.Violation Noted: on 971028,licensee Did Not Make Surveys to Assure Compliance w/10CFR20.1201(a),which Limits Occupational Radiation Exposure ML20216C1671998-03-0606 March 1998 Insp Rept 50-263/98-03 on 980209-13.Violations Noted.Major Areas Inspected:Various Aspects of Licensee RP Program Including Radwaste Processing,Packaging,Transportation & Implementation of Recent Changes to NRC & DOT Regulations IR 05000263/19970181998-02-0404 February 1998 Insp Rept 50-263/97-18 on 971125-980112.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20198G3171998-01-0606 January 1998 Page 6 of Plant Emergency Preparedness Exercise Insp Rept 50-263/97-16.Page Inadvertently Omitted W/Rept Transmitted by IR 05000263/19970161997-12-22022 December 1997 Insp Rept 50-263/97-16 on 971118-21.No Violations Noted. Major Areas Inspected:Evaluation of Performance During Plant Biennial Exercise of Emergency Plan by Regional EP Inspectors & Resident Inspector Staff from Plants ML20197B1731997-12-18018 December 1997 Insp Rept 50-263/97-15 on 971014-1124.Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 07100014/20110241997-12-18018 December 1997 Notice of Violation from Insp on 971014-1124.Violation Noted:Activities Affecting Quality Were Not Accomplished in Accordance W/Documented Procedures IR 05000263/19970171997-12-15015 December 1997 Insp Rept 50-263/97-17 on 971118-21.No Violations Noted. Major Areas Inspected:General Radiation Protection Practices,Respiratory Protection Program & Radwaste Processing,Storage & Monitoring ML20199E5871997-11-13013 November 1997 Notice of Violation from Insp on 970830-1013.Violation Noted:From 960229-970410,northwest Corner of Established Vehicle Barrier Sys Not Adequate to Protect Against Use of Land Vehicle in That Barrier Not Continuous IR 05000263/19970141997-11-13013 November 1997 Insp Rept 50-263/97-14 on 970830-1013.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support.Rept Also Includes Insp follow-up of Security Related Issue by Regional Inspector IR 05000263/19970121997-09-18018 September 1997 Insp Rept 50-263/97-12 on 970708-0829.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000263/19970111997-08-19019 August 1997 Insp Rept 50-263/97-11 on 970707-10.No Violations Noted. Major Areas Inspected:Installation of Emergency Core Cooling Sys Suction Strainers & pressure-suppression Chamber Coating Program IR 05000263/19970131997-08-14014 August 1997 Forwards Partially Withheld Insp Rept 50-263/97-13 on 970714-18 (Ref 10CFR73.21) IR 05000263/19970101997-07-23023 July 1997 Insp Rept 50-263/97-10 on 970623-27.No Violations Noted. Major Areas Inspected:Review of Issues Surrounding Licensee Discovery of Error in Head Loss Across ECCS Suction Strainers ML20149H9291997-07-17017 July 1997 Insp Rept 50-263/97-08 on 970528-0707.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20149H9221997-07-17017 July 1997 Notice of Violation from Insp on 970528-0707.Violation Noted:Reactor Bldg Closed Cooling Water Valve 2-2 & Associated Piping Removed from Pump,However,Safety Tag on Valve Had Not Been Properly Released IR 05000263/19970091997-07-15015 July 1997 Insp Rept 50-263/97-09 on 970616-20.No Violations Noted. Major Areas Inspected:Licensees Chemistry & Radiation Protection Programs ML20141E8031997-06-18018 June 1997 Insp Rept 50-263/97-06 on 970412-0527.Violation Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support ML20141E7961997-06-18018 June 1997 Notice of Violation from Insp on 970412-0527.Violation Noted:Inspectors Identified That Operations Personnel Did Not Know That Number 13 ESW Pump Had Been Operating for 2 Days Following 970408 Loss of Power to Number 15 4160 Volt PNO-III-97-046, on 970516,WI Energy Co & Northern States Power Co Announced They Were Terminating Plans for Proposed Merger of Two Companies Into New Co,Primergy Corp.Utils Attributed Decision to Changing Regulatory Policies1997-05-16016 May 1997 PNO-III-97-046:on 970516,WI Energy Co & Northern States Power Co Announced They Were Terminating Plans for Proposed Merger of Two Companies Into New Co,Primergy Corp.Utils Attributed Decision to Changing Regulatory Policies 1999-09-27
[Table view] |
Text
, .
i NOTICE OF VIOLATION I Northern States Power Company Docket No. 50-263 1 Monticello Station License No. DPR-22 During an NRC inspection conducted on May 28 through July 7,1997, a violation of NRC !
requirements was identified, in accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," NUREG 1600 (60 FR 34381; June 30,1995), !
the violation is listed below:
1 10 CFR 50 Appendix B, Criterion V, " Instructions, Procedures, and Drawings," required that activities affecting quality be prescribed by, and accomplished in accordance with, {
documented instructions, procedures, or drawings. l
- a. Administrative Work instruction (AWI) 04.04.01, " Equipment isolation," step 4.2.1, I stated that safety-tagged equipment shall not be operated until the safety tag has been properly released. 1 Contrary to the above, on May 29,1997, the inspectors identified that reactor ;
building closed cooling water (RBCCW) valve 2-2 and its associated piping were l removed from the RBCCW pump; however, a safety tag (a hold-and-secure card) on !
the valve had not been properly released.
Also, on June 6,1997, the inspectors identified that the refueling bridge air !
compressor blowdown valve was repositioned from the OPEN position to the i CLOSED position: however, a safety tag on the valve had not been properly released.
- b. Northern States Power Company Operational Quality Assurance Plan, Revision 20, Section 8.5, " Drawing Control," required that drawings which represent physical and functional aspects of the operating nuclear plant which are critical to safe plant operation shall be maintained in a current status. !
Administrative Work Instruction 4 awl-02.04.01, " Drawing Control," Revision 5, section 4.3.2, required that Class 1 and 2 drawings shall be revised to represent current plant status.
Contrary to the above, on June 9,1997, the inspectors identified eight examples where Class 1 and 2 drawings did not represent current plant status. These examples includeo inc+alled fuses different from that specified in drawings, protection fuses not sho un on drawings, and differences between Class 1 and 2 drawings.
Thi.s is a Severity Level IV violation (Supplement 1).
9707250251 970717 PDR ADDCK 05000263 G pg
.. . - - - - . - - . . - - . _ - . . - _ _ _ - . . . _ _ . _ . ~ . ~ -
L l
L l
Notice.of Violation . !
l~
. Pursuant to the provisions of 10 CFR 2.201, NortSern States Power Company is hereby required to submit a written statement or explanation to the U.S. Nuclear Regulatory 1-Commission, ATTN: Document Control Desk,' Washington, D.C. 20555 with a copy to the L l Regional Administrator, Region 111, and a copy to the NRC Resident inspector at the Monticello Nuclear, Generating Plant, within 30 days of the date of the letter transmitting this Notice of Violatiori (Notice). This reply should be clearly marked as a " Reply to a-
- . Notice'of Violation" and should include
- (1) the reason for the violation, or, if contested, the basis for disputing the violation, (2) the corrective steps that have been taken and the L results achieved, (3) the corrective steps that will be taken to avoid further violations, and (4) the date when full compliance will be achieved. if an adequate reply is not received l ~ within the time specified in this Notice, an order may be issued to show cause why the - i license should not be modified, suspended, or revoked, or why such other action as may I be proper should not be taken. Where good cause is shown, consideration will be given to )
. extending the response time. l Because your response will be placed in the NRC. Pubic Document Room (PDR), to the extent possible, it should not include any personal privacy, proprietary, or safeguards information so that it can be'placed in the PDR without redaction. If personal privacy or' proprietary information is necessary to provide an acceptable response, then please !
provide a bracketed copy of your response that identifies the information that should be protected and a redacted copy of your response that deletes such information. If you .
request withholding of such material, you must specifically identify the portions of your !
response that you seek to have withheld and provide in detail the bases for your claim of I withholding (e.g., explain why the disclosure of information will create an unwarranted l invasion of personal privacy or provide the information required by 10 CFR 2.790(b) to l l
support a request for withholding confidential commercial or financial information), if l safeguards information is necessary to provide an acceptable response, please provide the !
level of protection described in 10 CFR 73.21. j Dated at Lisle, Illinois, l this 17th day of July 1997 l
l 1 o i f 1 i
I
_- _ _ _ _ _ . _ - . __. _ _ _ _ . . _.. _ J