NRC Generic Letter 1987-15

From kanterella
Jump to navigation Jump to search
NRC Generic Letter 1987-015: Policy Statement on Deferred Plants
ML031210002
Person / Time
Site: Beaver Valley, Millstone, Hatch, Monticello, Calvert Cliffs, Dresden, Davis Besse, Peach Bottom, Browns Ferry, Salem, Oconee, Mcguire, Nine Mile Point, Palisades, Palo Verde, Perry, Indian Point, Fermi, Kewaunee, Catawba, Harris, Wolf Creek, Saint Lucie, Point Beach, Oyster Creek, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Pilgrim, Arkansas Nuclear, Three Mile Island, Braidwood, Susquehanna, Summer, Prairie Island, Columbia, Seabrook, Brunswick, Surry, Limerick, North Anna, Turkey Point, River Bend, Vermont Yankee, Crystal River, Haddam Neck, Ginna, Diablo Canyon, Callaway, Vogtle, Waterford, Duane Arnold, Farley, Robinson, Clinton, South Texas, San Onofre, Cook, Comanche Peak, Yankee Rowe, Maine Yankee, Quad Cities, Humboldt Bay, La Crosse, Big Rock Point, Rancho Seco, Zion, Midland, Bellefonte, Fort Calhoun, FitzPatrick, McGuire, LaSalle, 05000000, Zimmer, Fort Saint Vrain, Washington Public Power Supply System, Shoreham, Satsop, Trojan, Atlantic Nuclear Power Plant, Clinch River
Issue date: 11/04/1987
From: Miraglia F
Office of Nuclear Reactor Regulation
To:
References
GL-87-015, NUDOCS 8711100431
Download: ML031210002 (2)


I

°0 UNITED STATES

NUCLEAR REGULATORY COMMISSION

WASHINGTON, D. C. 20555 November 4, 1987 TO ALL HOLDERS OF CONSTRUCTION PERMITS FOR A NUCLEAR POWER PLANT

SUBJECT: POLICY STATEMENT ON DEFERRED PLANTS (GENERIC LETTER 87-15)

The purpose of this letter is to provide you with a copy of a Policy Statement on Deferred Plants. The Policy Statement has been developed in order to pro- vide you with the Commission's position regarding the quality assurance requirements, particularly the maintenance, preservation and documentation requirements for deferred plants, and to state how new regulatory staff posi- tions will be applied to deferred plants that are reactivated.

The Policy Statement does not include any new regulatory requirements. The NRC staff has applied the regulations and guides, listed in the Statement, to the deferral and reactivation of previously deferred plants. The Statement has been prepared to combine the regulatory requirements applicable to deferral and reactivation in order to provide a focus for this activity and a level of stability and predictability to the regulatory process in this area.

Any questions regarding this statement should be directed to Theodore S. Michaels, U.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation, Washington, D.C. 20555, (301) 492-8251 Frank J Mi g Jr.

Associate Director for Projects Office of Nuclear Reactor Regulation Enclosure:

Policy Statement on Deferred Plants

7143 ZA

TO ALL HOLDERS OF CONSTRUCTION PERMITS FOR A NUCLEAR POWER PLANT

SUBJECT: POLICY STATEMENT ON DEFERRED PLANTS (GENERIC LETTER 87-15 )

The purpose of this letter is to provide you with a copy of a Policy Statement on Deferred Plants. The Policy Statement has been developed in order to pro- vide you with the Commission's position regarding the quality assurance requirements, particularly the maintenance, preservation and documentation requirements for deferred plants, and to state how new regulatory staff posi- tions will be applied to deferred plants that are reactivated.

The Policy Statement does not include any new regulatory requirements. The NRC staff has applied the regulations and guides, listed in the Statement, to the deferral and reactivation of previously deferred plants. The Statement has been prepared to combine the regulatory requirements applicable to deferral and reactivation in order to provide a focus for this activity and a level of stability and predictability to the regulatory process in this area.

Any questions regarding this statement should be directed to Theodore S.

Michaels, U.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation, Washington, D.C. 20555, (301) 492-8251 Frank J. Miraglia, Jr.

Associate Director for Projects Office of Nuclear Reactor Regulation Enclosure:

Policy Statement on Deferred Plants PDSNP 4 Ab,4/ PTSB

TMichpels:bd LRu nstein FSc oeder DCrutchfield SBlac

(04WI*o(/87 nr// /87 W9I1(/87 1g7LI /87 (o /6'

ADP

FMiragl ia J8/ /87 to