|
|
Line 20: |
Line 20: |
| * f e' | | * f e' |
| rn,oo. cn,mic.icom ,,ny September 14,1998 Mdland, Michigan 48667 Mr. Alexander Adams, Jr., Senior Project Manager Non-Power Reactors and Decommissioning Projects Directorate Division of Project Support | | rn,oo. cn,mic.icom ,,ny September 14,1998 Mdland, Michigan 48667 Mr. Alexander Adams, Jr., Senior Project Manager Non-Power Reactors and Decommissioning Projects Directorate Division of Project Support |
| - Office of Nuclear Reactor Regulation Dear Mr. Adams Enclosed is a proposed modified emergency plan for The Dow TRIGA Reactor, Facility Operating License No. R-108. Responses requested from your letter dated October 2, 1996 are submitted. Enclosed are two versions of the plan. One version has all changes i | | - Office of Nuclear Reactor Regulation Dear Mr. Adams Enclosed is a proposed modified emergency plan for The Dow TRIGA Reactor, Facility Operating License No. R-108. Responses requested from your {{letter dated|date=October 2, 1996|text=letter dated October 2, 1996}} are submitted. Enclosed are two versions of the plan. One version has all changes i |
| highlighted; either in the form of strikdhreg,h fornist (deletions) or bold format (additions); and an explanation for each change. One version has all changes incorporated into the text of the plan. Specific responses to your requests are addressed in the attachments. If you have any questions regarding these proposed changes, please contact me at ($17) 636-6584. | | highlighted; either in the form of strikdhreg,h fornist (deletions) or bold format (additions); and an explanation for each change. One version has all changes incorporated into the text of the plan. Specific responses to your requests are addressed in the attachments. If you have any questions regarding these proposed changes, please contact me at ($17) 636-6584. |
| Regards | | Regards |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217P7171999-10-26026 October 1999 Informs That Effective 991026,SW Holmes Will Be NRC Inspector for Facility at Dow Chemical Co,Due to Retirement of Previously Assigned Inspector ML20210P9881999-08-10010 August 1999 Forwards Insp Rept 50-264/99-201 on 990712-15.No Violations Noted.Insp Consisted of Selected Exams of Procedures & Representative Records,Interview with Personnel & Observations of Activities in Progress ML20210N3311999-08-0202 August 1999 Forwards Proprietary Details Re Loss of Communication Between Dow Emergency Services & Dow Triga Research Reactor. Details of Facility Security Plan Are Withheld Under Provisions of 10CFR2.790 ML20153B5451998-09-14014 September 1998 Forwards Proposed Modified Emergency Plan,Including Version in Form of Strikethrough Format (Deletions) or Bold Format (Additions) & Explanation for Change & Version Incorporated Into Text of Plan.With One Oversize Drawing ML20151Z4391998-07-27027 July 1998 Informs NRC That Wl Rigot Has Assumed Role of Facility Director of Dow Chemical Co Triga Nuclear Reactor,Replacing SB Butts.Sb Butts Will Replace J Roeck as Level 1 Mgt within Administration as Described in 6.1 of Facility TSs ML20203L1271998-02-26026 February 1998 Forwards Request for Addl Info Re Emergency Plan Submitted on 960708,as Supplemented on 980115.Responses Requested to Be Provided within 30 Days of Date of Ltr ML20203A0561998-02-11011 February 1998 Forwards Amend 8 to License R-108.Amend Increases Amount of Time from 30 to 60 Days That Temporary Radiation Monitor May Be Used in Place of Area Monitor ML20198P7821998-01-15015 January 1998 Forwards Proposed Modified Emergency Plan for Dow Triga Reactor & Responses to NRC ML20198B4181997-12-18018 December 1997 Forwards Insp Rept 50-264/97-201 on 971202-03.No Violations or Deviations Identified.Annual Emergency Plant Drill Acceptable Demonstration of Ability to Respond & to Mitigate Consequences of Reactor Event ML20217P3201997-08-22022 August 1997 Informs That Responsibility for Non-Power Reactor Insp Program Has Been Transferred from Nrr.All Related Repts, Correspondence & Inquires W/Docket Number Specified Should Be Directed to Listed Address ML20210R0971997-08-19019 August 1997 Forwards Amend 7 to License R-108 & Safety Evaluation.Amend Deletes Requirement for Scram Function on Min Reactor Period,Changes Periodic Insp of Reactor Fuel Schedule, & Modifies Facility Organizational Structure ML20141C2931997-06-16016 June 1997 Forwards Response to 970417 Request for Addl Info Re Amend Request for FOL R-108.Encl Includes Changes Proposed for Amend 7 & Explanation for Question Raised in NRC Ltr ML20140E5471997-04-23023 April 1997 Forwards Insp Rept 50-264/97-01 on 970407-11.No Violations Noted ML20135C7251997-02-24024 February 1997 Forwards Response to NRC Request for Addl Info Re Amend Request for Facility Operating License R-108,ltr Dtd 961217.Encl Includes Changes Proposed for Amend 7 & Explanation for Question Raised in Ltr ML20132D2781996-12-17017 December 1996 Forwards Request for Addl Info Re License Triga Research Reactor ML20132D5511996-12-16016 December 1996 Ack Receipt of Ltr Dtd 961030,transmitting Changes to Physical Security Plan for Dow Triga Research Reactor Submitted,Per 10CFR50.54(p) ML20133G3151996-12-0909 December 1996 Informs That Rept Describing Review of Decommissioning Costs Re Dow Triga Research Reactor Will Be Available for NRC Review When on-site Insp Occurs ML20129B5951996-10-0808 October 1996 Forwards Response to RAI Re 960912 Amend Request for License R-108 ML20129H1331996-10-0202 October 1996 Requests Addl Info Re Dow Triga Research Reactor Emergency Plan Submitted on 960708 Before Review Can Be Complete ML20115E6671996-07-0808 July 1996 Forwards Proposed Modified Emergency Plan,Including Strikethrough Format (Deletion) or Bold Format (Additions) Version & Version W/Changes Incorporated in Text ML20113C3661996-06-18018 June 1996 Responds to Request for Addl Info Re Amend Request for FOL R-108 ML20101H6281996-03-18018 March 1996 Forwards Annual Rept for Triga Facility for 1995 ML20087E4011995-08-0707 August 1995 Forwards TSs in Response to RAI Re 950607 Application for Amend to License R-108 ML20078M1371995-02-0808 February 1995 Forwards Response to RAI Re 941221 Application for Amend to License R-108 ML20069J1651994-06-0606 June 1994 Notifies That Cw Kocher Has Retired from Dow Chemical Co Effective 940531,therefore,no Longer Needs Senior Operator License SOP-3922 ML20065B2231994-03-28028 March 1994 Informs That Effective 940322,WL Rigot Has Replaced Cw Kocher as Supervisor for Dow Triga Nuclear Reactor (R-108) ML20057D4511993-09-30030 September 1993 Informs That RA Wolcott Replaced Jj Havel as Chairman of Reactor Operations Committee for Dow Triga Research Reactor ML20072Q9111991-03-14014 March 1991 Advises That Power Level Increase to 300 Kw,Authorized by Amend 5 to License R-108,issued on 890508,implemented. Neutron Detectors Near Reactor Core Moved to Reflect Higher Max Power Level ML20062F7411990-11-19019 November 1990 Forwards Microprocessor-Based I&C Sys for Dow Triga Research Reactor, Containing Mods to 901015 Amend Request for License R-108 ML20058N4841990-08-0101 August 1990 Forwards Insp Rept 50-264/90-01 on 900709-11.No Violations or Deviations Identified ML20055F6901990-07-0101 July 1990 Advises That Vendor Has Not Received Part 55 Svcs from NRC & Requests That 900627 Invoice I1111 Be Corrected ML20247H7581989-09-0707 September 1989 Forwards Matl Control & Accountability Insp Rept 50-264/89-02 on 890829-30.No Violations Noted ML20247C9361989-09-0505 September 1989 Forwards Physical Security Insp Rept 50-264/89-01 on 890829- 30.No Violations Noted ML20246M6451989-05-0808 May 1989 Forwards Amend 5 to License R-108,renewing License for 20 Yrs from Issuance Date & Authorizing Power Increase from 100 to 300 Kws.Environ Assessment,Safety Evaluation,Notice of Renewal & Environ Consideration Also Encl ML20247M8271989-03-30030 March 1989 Discusses Licensee Requests for Changes to Requalification Program.Requests Include Extension of Max Time Period of 24 Months for Requalification Cycle to Account for Changes in Outage Schedules & Reorganization of Training Programs ML20207C7931988-06-29029 June 1988 Advises That Jj Havel Replaced Mb Gibbs as Chair of Reactor Operations Committee,Effective 880623 ML20154C2651988-04-29029 April 1988 Forwards Mods to Suppl Application for Renewal of License R-108,per a Adams Request ML20151X1821988-04-28028 April 1988 Ack Receipt of Describing Proposed Mods to Security Plan.Changes Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20150D9721988-03-18018 March 1988 Informs of NRC Relocation to Stated Address.Mailing Address Unchanged.A Adams Project Manager & TS Michaels back-up Project Manager ML20148G8991988-01-14014 January 1988 Advises That 880107 Rev to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable.Encl to Contains Proprietary Info & Being Protected Against Unauthorized Disclosure (Ref 10CFR2.790(d)) ML20237E1481987-12-23023 December 1987 Forwards Exam Rept 50-264/OLS-87-01 of Exam Administered on 871201-02 ML20236B0621987-10-0505 October 1987 Informs That 870925 Audit of Triga Research Reactor Showed Two Tasks Involving Surveillance Required by Tech Specs Not Done Per Scheduled Weekly Checklist for Wk of 870713.Failure to Complete Tasks Did Not Violate Tech Specs ML20238A0461987-08-14014 August 1987 Forwards Supplementary Info Re Renewal of License R-108 for Dow Triga Research Reactor ML20237L4351987-08-14014 August 1987 Forwards Licensed Operator Requalification Program for Facility.Program Reflects Changes Made Following Guidance of Hn Berkow ,Ansi/Ans 15.1-1977 & Changes in 10CFR55 Effective 870526 ML20238A3091987-08-13013 August 1987 Forwards Answers to Questions Posed Following Submittal of May 1987 Formal Answers,Including More Detailed Info Re fire-fighting Equipment in Reactor Room & Nearby Areas & Detailed Analysis of Temp Rise Expected in Fuel Element ML20237H3941987-08-11011 August 1987 Requests Ref Matl Listed in Encl 1 & Applications 60 Days Prior to Operator & Senior Operator Licensing Exams Scheduled for Wk of 871130.Requirements for Administering Exam & Rules & Guidance Also Encl ML20236P5661987-08-0505 August 1987 Requests Addl Info Re Vendor Revs to 870702 Triga Research Reactor Requalification Program,Submitted in Response to NRC .Program Does Not Satisfy Revs to 10CFR55 That Became Effective on 870526.Response Requested in 30 Days ML20236H1311987-07-28028 July 1987 Forwards Revised Security Plan,Per RA Erickson 870526 Request.Rev Withheld (Ref 10CFR2.790) ML20215B4931987-06-11011 June 1987 Informs of Recent Reorganization in Nrr.Organization Now Called Standardization & Non-Power Reactor Directorate Under Div of Reactor Projects Iii,Iv,V & Special Projects.Project Manager for Facility Is a Adams ML20214U9841987-06-0303 June 1987 Forwards Revised NRC Form 398,personal Qualifications statement-licensee & NRC Form 396,certification of Medical Exam by Facility Licensee.Forms Revised to Reflect Changes to 10CFR55 Effective on 870526.W/o Encls 1999-08-02
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20210N3311999-08-0202 August 1999 Forwards Proprietary Details Re Loss of Communication Between Dow Emergency Services & Dow Triga Research Reactor. Details of Facility Security Plan Are Withheld Under Provisions of 10CFR2.790 ML20153B5451998-09-14014 September 1998 Forwards Proposed Modified Emergency Plan,Including Version in Form of Strikethrough Format (Deletions) or Bold Format (Additions) & Explanation for Change & Version Incorporated Into Text of Plan.With One Oversize Drawing ML20151Z4391998-07-27027 July 1998 Informs NRC That Wl Rigot Has Assumed Role of Facility Director of Dow Chemical Co Triga Nuclear Reactor,Replacing SB Butts.Sb Butts Will Replace J Roeck as Level 1 Mgt within Administration as Described in 6.1 of Facility TSs ML20198P7821998-01-15015 January 1998 Forwards Proposed Modified Emergency Plan for Dow Triga Reactor & Responses to NRC ML20141C2931997-06-16016 June 1997 Forwards Response to 970417 Request for Addl Info Re Amend Request for FOL R-108.Encl Includes Changes Proposed for Amend 7 & Explanation for Question Raised in NRC Ltr ML20135C7251997-02-24024 February 1997 Forwards Response to NRC Request for Addl Info Re Amend Request for Facility Operating License R-108,ltr Dtd 961217.Encl Includes Changes Proposed for Amend 7 & Explanation for Question Raised in Ltr ML20133G3151996-12-0909 December 1996 Informs That Rept Describing Review of Decommissioning Costs Re Dow Triga Research Reactor Will Be Available for NRC Review When on-site Insp Occurs ML20129B5951996-10-0808 October 1996 Forwards Response to RAI Re 960912 Amend Request for License R-108 ML20115E6671996-07-0808 July 1996 Forwards Proposed Modified Emergency Plan,Including Strikethrough Format (Deletion) or Bold Format (Additions) Version & Version W/Changes Incorporated in Text ML20113C3661996-06-18018 June 1996 Responds to Request for Addl Info Re Amend Request for FOL R-108 ML20101H6281996-03-18018 March 1996 Forwards Annual Rept for Triga Facility for 1995 ML20087E4011995-08-0707 August 1995 Forwards TSs in Response to RAI Re 950607 Application for Amend to License R-108 ML20078M1371995-02-0808 February 1995 Forwards Response to RAI Re 941221 Application for Amend to License R-108 ML20069J1651994-06-0606 June 1994 Notifies That Cw Kocher Has Retired from Dow Chemical Co Effective 940531,therefore,no Longer Needs Senior Operator License SOP-3922 ML20065B2231994-03-28028 March 1994 Informs That Effective 940322,WL Rigot Has Replaced Cw Kocher as Supervisor for Dow Triga Nuclear Reactor (R-108) ML20057D4511993-09-30030 September 1993 Informs That RA Wolcott Replaced Jj Havel as Chairman of Reactor Operations Committee for Dow Triga Research Reactor ML20072Q9111991-03-14014 March 1991 Advises That Power Level Increase to 300 Kw,Authorized by Amend 5 to License R-108,issued on 890508,implemented. Neutron Detectors Near Reactor Core Moved to Reflect Higher Max Power Level ML20062F7411990-11-19019 November 1990 Forwards Microprocessor-Based I&C Sys for Dow Triga Research Reactor, Containing Mods to 901015 Amend Request for License R-108 ML20055F6901990-07-0101 July 1990 Advises That Vendor Has Not Received Part 55 Svcs from NRC & Requests That 900627 Invoice I1111 Be Corrected ML20207C7931988-06-29029 June 1988 Advises That Jj Havel Replaced Mb Gibbs as Chair of Reactor Operations Committee,Effective 880623 ML20154C2651988-04-29029 April 1988 Forwards Mods to Suppl Application for Renewal of License R-108,per a Adams Request ML20236B0621987-10-0505 October 1987 Informs That 870925 Audit of Triga Research Reactor Showed Two Tasks Involving Surveillance Required by Tech Specs Not Done Per Scheduled Weekly Checklist for Wk of 870713.Failure to Complete Tasks Did Not Violate Tech Specs ML20238A0461987-08-14014 August 1987 Forwards Supplementary Info Re Renewal of License R-108 for Dow Triga Research Reactor ML20237L4351987-08-14014 August 1987 Forwards Licensed Operator Requalification Program for Facility.Program Reflects Changes Made Following Guidance of Hn Berkow ,Ansi/Ans 15.1-1977 & Changes in 10CFR55 Effective 870526 ML20238A3091987-08-13013 August 1987 Forwards Answers to Questions Posed Following Submittal of May 1987 Formal Answers,Including More Detailed Info Re fire-fighting Equipment in Reactor Room & Nearby Areas & Detailed Analysis of Temp Rise Expected in Fuel Element ML20236H1311987-07-28028 July 1987 Forwards Revised Security Plan,Per RA Erickson 870526 Request.Rev Withheld (Ref 10CFR2.790) ML20214T0611987-06-0202 June 1987 Forwards ALARA Policy Statement,Revised Requalification Program & Tech Specs & Addl Info in Support of Application for Renewal of License R-108,per a Adams Request ML20213G8111987-05-13013 May 1987 Forwards Endorsement 60 to Nelia Policy NF-160 ML20210S5901987-02-0909 February 1987 Forwards Revised Licensed Operator Requalification Program for Facility,Per Hn Berkow Recommendation.Revised Program Follows Guidance of Ansi/Ans 156.4-1977 ML20214V5141986-12-0202 December 1986 Forwards Check Inadvertently Omitted from 861117 Reactor License Renewal Application ML20116H1641985-04-23023 April 1985 Forwards Endorsement 56 to Nelia Policy NF-160 ML20137G9971985-03-20020 March 1985 Advises of Mods to Physical Security Sys Resulting in Change to Security Plan ML20112E7091984-12-21021 December 1984 Responds to NRC Re Violations Noted in Insp. Corrective Actions:All Licensed Senior Reactor Operators Received Written Reminders of Notification Requirements ML20090F1521984-07-13013 July 1984 Notifies That,Effective 840711,emergency Plan for Dow Triga Research Reactor Implemented ML20081A0941984-03-0101 March 1984 Forwards Revised Emergency Plan ML20028F6771983-01-10010 January 1983 Forwards Public Version of Emergency Plan,Originally Submitted in Oct 1982 ML20079K2791982-12-20020 December 1982 Forwards Public Version of Corrected Pages to Emergency Plan ML20065G8111982-09-29029 September 1982 Forwards Endorsements 47 & 48 to Nelia Policy NF-160. Endorsement 47 Amends Description of Facility to Include Larkin Lab ML20137G9511982-07-13013 July 1982 Notifies That Cw Kocher Reinstated as Reactor Supervisor, Effective 820607 & Fj Knoll Replaced Jm Macki as Research Manager of Bldg 1602 & Chairman of Reactor Operations Committee,Effective 820624 ML20054F5261982-06-10010 June 1982 Forwards Endorsement 46 to Nelia Policy NF-160 ML20041C1611982-02-12012 February 1982 Forwards Endorsement 44 to ANI Policy NF-160 ML20136H4101982-01-26026 January 1982 Responds to NRC 820113 Insp Rept on 811207-10.Requests Rept Be Modified Before Placement in Pdr.No Matls Disposed of by Incineration Under License 21-00265-06 ML20137G9031981-12-11011 December 1981 Informs That Cw Kocher Will Replace Ou Anders as Reactor Supervisor.Cw Kocher Resume Encl ML20004B0951981-04-28028 April 1981 Forwards Endorsement 42 to Nelia Policy NF-160 ML20003G9351981-04-27027 April 1981 Forwards Endorsements 40 & 41 to Nelia Policy NF-160 ML20008E2091980-10-10010 October 1980 Forwards Advance Premium,Std Premium & Reserve Premium Endorsements,Effective 800101.Also Forwards Amend 10 to Indemnity Agreement B-34 ML19351C9701980-09-25025 September 1980 Informs of Adding H Emmel,W Kocher & E Bickel to Reactor Operations Committee,As of 800826.T Parsons Was Deleted from Committee.Forwards Resumes.W/O Encls ML19323J2511980-06-0909 June 1980 Responds to NRC 800507 Ltr Re Dow Chemical Co Triga Reactor Facility Nonpower Reactor Physical Protection Requirement. Response Not Received Re Dow Triga 781005 Security Plan. Security Plan Meets 790724 & 800325 Fr Rules & Regulations ML20137H0451980-02-22022 February 1980 Informs of Personnel Changes in Reactor Operations Committee.H Gill Replaced by J Macki as Committee Chairman, Norwood Replaced by T Prasons as Health Physicist & P North Replaced by J Simpson as Senior Reactor Operator ML19296D3441980-02-22022 February 1980 Informs of Recent Personnel Changes in Reactor Operations. Reactor Operations Committee Chairman H Gill Replaced by J Macki,Health Physicist s Norwood Replaced by J Parsons & Senior Reactor Operator P North Replaced by J Simpson 1999-08-02
[Table view] |
Text
- - - - -..
rn,oo. cn,mic.icom ,,ny September 14,1998 Mdland, Michigan 48667 Mr. Alexander Adams, Jr., Senior Project Manager Non-Power Reactors and Decommissioning Projects Directorate Division of Project Support
- Office of Nuclear Reactor Regulation Dear Mr. Adams Enclosed is a proposed modified emergency plan for The Dow TRIGA Reactor, Facility Operating License No. R-108. Responses requested from your letter dated October 2, 1996 are submitted. Enclosed are two versions of the plan. One version has all changes i
highlighted; either in the form of strikdhreg,h fornist (deletions) or bold format (additions); and an explanation for each change. One version has all changes incorporated into the text of the plan. Specific responses to your requests are addressed in the attachments. If you have any questions regarding these proposed changes, please contact me at ($17) 636-6584.
Regards
/
- f CN Q >
~
-f Ward L. Rigot Reactor Supervisor (O
Dow TRIGA Research Reactor Dow ChemicalCompany V
9009230173 900914~
PDR ADOCK 05000264 F PDR.
~
~
.k 1 a; M_ ia y
y p w y.
1
J o
l RESPONSES TO REQUEST FOR ADDITIONAL INFORMATION DOW TRIGA RESEARCH REACTOR EMERGENCY PLAN l
1
- 1. The dennition of EPZ has been changes to be consistent. All references are to the reactor room (lab 51-A,1602 Building).
All references to operations boundary have been removed, including the definition.
All references to fenceline have been eliminated; therefore, no definition is !
necessary.
The definition of Site boundary has been changed for clarity.
I 2. I have included maps with the EPZ and site boundary labelled.
- 3. I have included a document from the manufacturer of ion chambers and G-M monitors to support our request for changes to calibration frequency.
- 4. I have included internal documents which describe the current training programs.
These documents are not intended for inclusion in the emergency plan, only as an explanation of the current practices..
- 5. Backups for the reactor supervisor are already included in the plan. There is no need for internal backups for other members of the emergency organization, since these roles are filled 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> a day,7 days a week. In the event additional emergency personnel are required they will be supplied by outside organizations, which are also l
described in the plan.
- 6. The training programs supplied annually by the Radiation Safety Officer is similar in scope to that received by the emergency organization and is included. Biennial training is required. We wish to have our training consistent with regulations.
Additionally, on-the-job training is a valuable training tool which can be tailored to the individual needs of the facility users, whether they are operators, experimenters or other laboratory personnel.
i i
- .m - __. _ _ . _ _ _ _ _ . _ _ . _ _ . _ _ _ . . _ . _ . - . _ . _ . _ . _ _ _ _ _ _ _
i
- 8. TRAINING FOR INDIVIDUALS WORKING IN OR FREQUENTING RESTRICTED AREAS.
l Training will be provided to all users of radioisotopes commensurate with the level of hazard.
I This training will be conducted prior to the use of radioisotopes and whenever there is a l
. si gnificant change in duties, regulations, of the terms of the License. Training is provided by the RSO, Alternate RSO, an Authorized User or Supervisor.
l 8.1 Incidental Personal All personnel that have a potential for exposure to radioactive materials will participate in a one
! hour orientation training session. This training is provided to incinerator operators, j medical / nursing staff, personnel receiving licensed material, housekeeping, and emergency j response / security staff,it is repeated annually, and includes the following topics:
r j- 1. Applicable regulations and license conditions l 2. Areas where radioactive material is used and stored l 3. Potential hazards associated with radioactive material
- 4. Appropriate radiation safety procedures
- 5. Individual's obligation to report unsafe conditions to the RSO
- 6. Appropriate response to emergencies or unsafe conditions
- 7. Workers' right to be informed of occupational radiation exposure and bioassay, results
- 8. Locations of pertinent regulations, licenses and other material required by regulations
- 9. Individual's responsibilitics
! The training courses for the groups named above are tailored for each group's special needs.
l Specific information is added to the above listed information for the following groups:
i i e Medical /Nursine staff: information on what isotopes and general quantities are used in what areas, what are the most likely incidents involving radioactive material to occur, level of I hazard based on isotope and quantity, priority of treatment (e.g. treat a serious physical j injury before decontamination of minor C-14 contamination), what type of injuries may be
, expected when using various sources of radioactive material (e.g. radiography sources may
( cause high level radiation exposures, X-ray diffraction machines may cause localized l extremity burns etc.).
i l
e Emercency Response / Security Staff: information on what isotopes and general quantities are used in what areas, what incidents involving radioactive material are most likely to occur, level of hazard based on isotope and quantity, priority of treatment (e.g. treat a serious physical injury before decontamination of minor C-14 contamination), where to set up access control boundaries, which individuals are authorized to enter controlled areas, how to use a radiation survey meter, health effects of acute exposures.
I i
t t
t
12/12/95 14.56 U505 473 9221 EBERLINE @ WW3 D>vilmE Instr uments -
501AirportRoad (505) 471 3232 RG Bat 2109 FAX:S05-473 9221 \
Santa Fa, NM87504-2108 Telax:170S15EICSFE December 12,1995 1
DOW CHEMICAL COMPANY 1803 BUILDING 1 MIDLAND,MI48674 l
Attention JanetGrappin Fax:(517)638-9975 l
Dear Ms. Grappin;
)
Per our telephone conversation about changing the calibration interval for any instnunent.
If the instrument is checked for functionality and acuraccy prior to each use then the interval of calibration maybe extended as far as one calendar year.
Note; If the functionality test does not pass then the instnunent is not serviceable anyway. If the accuracy test fails the unit will be requm:d to be calibrated before it can be placed into service. -
Respectfully, w
Albert C. Briggs
, Eberline Service Engineer e
i 4
A subsidiaryof
, 2bmaslastrumment SystemsInc.
J