Responds to NRC Re Violations Noted in Insp. Corrective Actions:All Licensed Senior Reactor Operators Received Written Reminders of Notification Requirements
ML20112E709
Person / Time
Site: Dow Chemical Company
Issue date: 12/21/1984
From: Berry D, Rampy L
DOW CHEMICAL CO.
To: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 8501150239
Download: ML20112E709 (2)


Text

,' ~

~

9 (n. d M DOW CHEMICAL U.S.A.

" " ^ " '"' "

December 21, 1984 MIDLAND, MICHIGAN 48640 C. E. Norelius Director, Division of Reactor Projects U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Sir:

This letter is in response to the notice of violation dated December 10, 1984, on Docket #50-264 This notice refers to the operation of the Dow TRIGA Research Reactor on September 23, 1983 (not 1984, as in the notice).

1. Corrective Action Taken and the Results Achieved The violation consisted of a failure to notify the Commission of a reportable event in a timely manner. Due to the nature of the violation there was no corrective action that could be taken.
2. Correction Action to be Taken to Prevent Further Noncompliance a) All licensed Senior Reactor Operators have received a written reminder of the requirements for notification of the Commission which are contained in the license.

b) The maintenance log book has been modified to improve the documen-tation of maintenance. This documentation includes a specific question concerning reportability which requires a written response.

.c) The requirements for notification of the Commission which are contained in the license have been placed in the maintenance log for easy reference.

-d) The violation notice and the license requirements for notification were thoroughly discussed at a meeting of the Reactor Operations Commit-tee on December 20, 1984, which was attended by seven of the eight Senior Reactor Operators, the Radiation Safety Officer, and a representative of Dow management.

e) Arrangements have been made to accent the topic of reportability of any events during the 1985 requalification program, scheduled for mid-January 1985.

8501150239 841221 PDR ADOCK 05000264 ,

G PDR AN OPERATING UNIT OF THE DoW CHEMICAL COMPANY >-

$nZEo/,0 l

, .e . -

C. E. Norelius December 21, 1984 Page 2

3. Date When Full Compliance Will Be Achieved Full compliance was achieved prior to December 3, 1984. This was demonstrated on that date following a reportable event, the malfunction (in a different manner than the event of September 23, 1983) of one of the reactor safety circuits during operation. The reactor was safely secured, the event was evaluated, and the telephoned and written reports to the Commission were made smoothly and in a timely manner.

Sincerely,

\

b L. W. Rampy Chairman, Radiation Safety Committee j Al $. j D. L. Berry Chairman, Reactor Operations Committee

@ /Gh C. W. Kocher Reactor Supervisor Analytical Laboratories 1602 Building

~kt h