#REDIRECT [[RIS 2015-16, Millstone, Units 2 & 3, North Anna, Units 1 & 2, and Surry, Units 1 & 2, NRC Regulatory Issue Summary 2015-16 Planned Licensing Action Submittals]]
{{Adams
| number = ML16130A564
| issue date = 05/02/2016
| title = Millstone, Units 2 & 3, North Anna, Units 1 & 2, and Surry, Units 1 & 2, NRC Regulatory Issue Summary 2015-16 Planned Licensing Action Submittals
| author name = Sartain M D
| author affiliation = Dominion Nuclear Connecticut, Inc, Virginia Electric & Power Co (VEPCO)
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000280, 05000281, 05000336, 05000338, 05000339, 05000423
| license number = DPR-032, DPR-037, DPR-065, NPF-004, NPF-007, NPF-049
| contact person =
| case reference number = RIS-15-016, SN 16-023
| document type = Graphics incl Charts and Tables, Letter
| page count = 8
| revision = 0
}}
See also: [[followed by::RIS 2015-16]]
 
=Text=
{{#Wiki_filter:'*' Dominion Resources Services, Inc. Innsbrook Technical Center 5000 Dominion Boulevard, 2SE, Glen Allen, VA 23060 May 2, 2016 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Serial No.: NLOS/MLW: Docket Nos.: License Nos.: DOMINION NUCLEAR CONNECTICUT, INC. (DNC) VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION) MILLSTONE POWER STATION UNITS 2 AND 3 NORTH ANNA POWER STATION UNITS 1AND2 SURRY POWER STATION UNITS 1 AND 2 NRC REGULATORY ISSUE SUMMARY 2015-16 PLANNED LICENSING ACTION SUBMITTALS 16-023 R4 50-336/423 50-338/339 50-280/281 DPR-65 NPF-49 NPF-4/7 DPR-32/37 In response to Nuclear Regulatory Commission (NRC) Regulatory Issue Summary 2015-16, Revision 1, "Planned Licensing Actions Submittals for All Power Reactor Licensees," Attachments 1 through 3 provide the requested information on proposed planned licensing action submittals for the next three calendar years for Millstone (MPS), North Anna (NAPS) and Surry (SPS) Power Stations. Neither DNC nor Dominion currently have power uprates planned in the nextfive years. The information in the attachments is being voluntarily provided to assist the NRC in planning for the necessary resources during the budget process. Alterations to the planned licensing actions in Attachments 1 through 3 will be communicated to the appropriate NRC Project Managers as they occur. If you have any questions concerning this information, please contact Michael Whitlock at (804) 273-3123.
 
Sincerely,Mark D. Sartain Vice President -Nuclear Engineering Dominion Nuclear Connecticut, Inc. Virginia Electric and Power Company Attachment 1: Table of Estimated Licensing Actions for Millstone Power Station Attachment 2: Table of Estimated Licensing Actions for North Anna Power Station Attachment 3: Table of Estimated Licensing Actions for Surry Power Station Commitments made in this letter: None cc: U. S. Nuclear Regulatory Commission Region I 2100 Renaissance Blvd. Suite 100 King of Prussia, 19406-2713 U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 R. V. Guzman U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 C-2 11555 Rockville Pike Rockville, MD 20852-2738 K. R. Cotton-Gross U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 Dr. V. Sreenivas U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station NRC Senior Resident Inspector North Anna Power Station NRC Senior Resident Inspector Surry Power Station Serial No. 16-023 Docket Nos.: 50-336/423 50-338/339 50-280/281 Page 2 of 2
*./ ATTACHMENT 1 Serial No. 16-023 Docket Nos.: 50-336/423 Table of Estimated Licensing Actions for Millstone Power Station MILLSTONE POWER STATION -UNITS 2 & 3 DOMINION NUCLEA.R CONNECTICUT, IN Table of Estimated Licensing Actions Millstone Power Station Units 2 and 3 Docket Nos: 50-336/50-423 TSTF Number, If Projected Submittal Outage Outage Related Can the NRC staff Proprietary Plant Name and Unit Number(*) Licensing Action Type Licensing Action Description/Title make the lnfonnallon C-ta any Date Related? Date public? lnfonnatlon Millstone Power Station Unit 2 and 3 Relief Request Relief Requests RR-04-23 and IR-03-28 to use UT in lieu of RT. 04/2016 Yes 102017 Yes No Millstone Power Station Unit 2 License Amendment LAR for Large Break LOCA Reanalysis 05/2016 Yes 402016 Yes Yes Millstone Power Station Unit 3 Exemptions Exemption for AXIOM Lead Test Assembly 07/2016 Yes 402017 Yes No Millstone Power Station Unit 2 License Amendment LAR to Revise MPS2 TS 3.8.1.1 to add a required ACTION that 09/2016 Yes 402017 Yes No would reduce shutdown risk at MPS3. (RSST) Millstone Power Station Unit 3 License Amendment LAR to Add New TS 3/4.7.15 for Main Feedwater Isolation, 12/2016 No Yes No Regulating, and Bypass Valves Millstone Power Station Unit 2 License Amendment Extension of Type A ILRT Interval to 15 Years. Revise TS for 10/2017 Yes 402018 Yes No Containment Leakage Rate Testing Requirements Millstone Power Station Units 2 and 3 License Amendment LAR for Electrical Cross-Tie Connection 2017 No Yes No Millstone Power Station Unit 3 License Amendment TSTF-556 LAR for Resolution of Open Phase Condition Bulletin 2012-01 -2017 No Yes No Design Vulnerability in electric power system Millstone Power Station Unit 2 License Amendment LAR to Revise SR 4.6.2.1.2.b to Increase RBCCW Minimum 2017 No Yes No Flow Rate to CAR Coolers from >500 gpm to >1700 gpm Millstone Power Station Unit 3 License Amendment TSTF-374 Modify TS requirements for EDG fuel oil testing 2017 No Yes No Millstone Power Station Units 2 and 3 License Amendment TSTF-552 Diesel Generator Frequency and Voltage Surveillance 2018 No Yes No Requirements. WCAP-17308-NP. Measurement Uncertainty Recapture (MUR) -Recovery of a Millstone Power Station Unit 2 License Amendment portion of the 2% measurements Uncertainty Required by 2018 No Yes No Rono Millstone Power Station Unit 2 License Amendment Delete Item 8 (Containment Water Level Narrow Range) from 2018 No Yes No Table 3.3-11 of TS 3.3.3.8 Millstone Power Station Unit 3 License Amendment Extension of Type A ILRT Interval to 15 Years. Revise TS for 10/2019 Yes 402020 Yes No Containment Leakage Rate Testing Requirements Page 1of1 ATTACHMENT 2 Serial No. 16-023 Docket Nos.: 50-338/339 Table of Estimated Licensing Actions for North Anna Power Station NORTH ANNA POWER STATION-UNITS 1 & 2 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
Table of Estimated Licensing Actions North Anna Power Station Unit 1 and Unit 2 Docket Nos: 50-338/339 Plant Name and Unit Number(s) North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Unit 1 North Anna Power Station, Units 1 and 2 North Anna Power Station, Unit 1 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 Licensing Action Type License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment Relief Request Relief Request Relief Request License Amendment License Amendment TSTF Number, If any TSTF-522 Licensing Action Description/Title EAL Revision -Fuel clad degradation and fuel clad barrier loss ISFSI License Renewal (for Pad 1 TN-32) Fuel Independent SBLOCA Analysis (TS Reference Change/COLR Mod) Revision to Spent Fuel Criticality Analysis -updated fuel design w/ 5% fuel enrichment LAR for PAD 5.0 and FSLOCA [Large Break] Adds Open Phase Condition (OPC) Isolation System operability and surveillance requirements for mitigation of an OPC Revise the Environmental Protection Plan to Correct CFR References Revise the surveillance requirements for TS 3.7.10 and 3.7.12 for the PREACS and MCR/ESGR Filters to operate them for greater than or equal to 15 minutes. Revise TS 5.5.10 to incorporate the requirements of Regulatory Guide 1.52, revision 3, which requires In-Place Filter Testing/Laboratory Testing to be extended to 24 months. Second Period Limited Examination Relief Request -N1-14-LMT-002 Request to extend the reactor vessel weld examinations by ten years. The PWR Owner's Group analysis by Westinghouse has already been started. N1-14-NDE-008 I N2-14-NDE-003 North Anna Unit 1 Fifth Interval ISi Program Relief Requests LAR to rely on off-site EMT's rather than on-site EMT's LAR to move the Local Emergency Operations Facility (LEOF) to an EOF located at Innsbrook Page 1of1 Projected Submittal Outage Outage Can the NRC staff Proprietary make the lnfonnatlon Comments Date Related? Related Data public? Yes or No Information 07/2016 No Yes No 05/2016 No Yes No 08/2016 No Yes Supports compliance Yes with 10CFR50.46(c) 09/2016 No Yes Yes 2018 No Yes Supports compliance Yes with 10CFR50.46(c) 2nd Otr 2018 01/2017 Yes (NAPS1) Yes No 4th Otr 2020 (NAPS2) 2017 No Yes No 09/2016 No Yes No 2017 No Yes No 07/2016 Yes 102018 Yes No 2018 Yes 302019 Yes No 2017 No Yes No 2017 No Yes No ATTACHMENT 3 Serial No. 16-023 Docket Nos.: 50-280/281 Table of Estimated Licensing Actions for Surry Power Station SURRY POWER STATION-UNITS 1 & 2 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
Table of Estimated Licensing Actions Surry Power Station Unit 1 and Unit 2 Docket Nos: 50-280/281 Plant Name and Unit Number(*) Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Licensing Action Type License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment Relief Request License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment TSTF Number, If any TSTF-547 Projected Submittal Licensing Action Description/Title Date Alternate monitoring of rod position with one 05/2016 inoperable rod position indicator Revises Residual Heat Removal (RHR) and Component Cooling (CC) Systems' TS 05/2016 Requirements and adds an RHR Surveillance Revises the Fuel Cladding Barrier Degradation and 06/2016 Loss Emergency Action Level Thresholds Extends the Charging Pump Service Water and MCR/ESGR AC Subsystems Flowpath Allowed 05/2016 Outage Time from 24 to 72 hrs Expands the Primary Grade (PG) Water Lockout TS 05/2016 Requirements Extends the Emergency Service Water Pump 06/2016 Allowed Outage Time from 7 to 14 days Adds Open Phase Condition (OPC) Isolation System operability and surveillance requirements 01/2017 for mitigation of an OPC Revises RCS Activity Limits and Dose 06/2016 Consequences for FHA, SGTR, MSLB and LRA TS change to extend ACT to permit replacement of the Reserve Station Service Transformer C and and 03/2017 cable/bus replacement ISi Alternative Request to permit use of CFRP application in buried safety related SW Piping as 07/2016 pressure boundary Administrative change deletes temporary/one-time TS AOTs/Requirements for previously completed 08/2016 chilled water pipe replacement project, and other Revised UFSAR Dose Analyses 09/2016 Fuel Independent SBLOCA Analysis 09/2016 Topical Report DOM-NAF-2 Appendix E (AGORA 12/2016 CHF Correlation) RLBLOCA for Vendor Qualification Program 04/2017 AGORA Vendor Qualification Program Submittal 04/2017 Spent Fuel Poot Criticality Analysis 2018 Full Spectrum LOCA Analysis 2018 Relocation of Leak Testing of Miscellaneous 2018 Radioactive Materails to TRM LAR to rely on off-site EMrs rather than on-site 2017 EMrs LAR to move the Local Emergency Operations 2017 Facility (LEOF) to an EOF located at Innsbrook Page 1of1 Outage Outage Related Can the NRC staff Proprietary make the Information Comments Related? Date public? Yea or No Information No Yes No No Yes No No Yes No No Yes No No Yes No No Yes No Yes 2nd Qtr 2018 (SPS1) Yes No 4th Qtr 2018 (SPS2) No Yes No Yes Yes No 3rd Qtr 2018 Yes Yes No 2nd Qtr 2017 No Yes No No Yes No No Yes Yes No Yes TBD No Yes TBD No Yes TBD No Yes Yes No Yes Yes No Yes No No Yes No No Yes No
}}

Revision as of 00:55, 23 February 2018

Millstone, Units 2 & 3, North Anna, Units 1 & 2, and Surry, Units 1 & 2, NRC Regulatory Issue Summary 2015-16 Planned Licensing Action Submittals
ML16130A564
Person / Time
Site: Millstone, Surry, North Anna  Dominion icon.png
Issue date: 05/02/2016
Revision: 0
From: Sartain M D
Dominion Nuclear Connecticut, Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RIS-15-016, SN 16-023
Download: ML16130A564 (8)


See also: RIS 2015-16

Text

'*' Dominion Resources Services, Inc. Innsbrook Technical Center 5000 Dominion Boulevard, 2SE, Glen Allen, VA 23060 May 2, 2016 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Serial No.: NLOS/MLW: Docket Nos.: License Nos.: DOMINION NUCLEAR CONNECTICUT, INC. (DNC) VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION) MILLSTONE POWER STATION UNITS 2 AND 3 NORTH ANNA POWER STATION UNITS 1AND2 SURRY POWER STATION UNITS 1 AND 2 NRC REGULATORY ISSUE SUMMARY 2015-16 PLANNED LICENSING ACTION SUBMITTALS16-023 R4 50-336/423 50-338/339 50-280/281 DPR-65 NPF-49 NPF-4/7 DPR-32/37 In response to Nuclear Regulatory Commission (NRC) Regulatory Issue Summary 2015-16, Revision 1, "Planned Licensing Actions Submittals for All Power Reactor Licensees," Attachments 1 through 3 provide the requested information on proposed planned licensing action submittals for the next three calendar years for Millstone (MPS), North Anna (NAPS) and Surry (SPS) Power Stations. Neither DNC nor Dominion currently have power uprates planned in the nextfive years. The information in the attachments is being voluntarily provided to assist the NRC in planning for the necessary resources during the budget process. Alterations to the planned licensing actions in Attachments 1 through 3 will be communicated to the appropriate NRC Project Managers as they occur. If you have any questions concerning this information, please contact Michael Whitlock at (804) 273-3123.

Sincerely,Mark D. Sartain Vice President -Nuclear Engineering Dominion Nuclear Connecticut, Inc. Virginia Electric and Power Company Attachment 1: Table of Estimated Licensing Actions for Millstone Power Station Attachment 2: Table of Estimated Licensing Actions for North Anna Power Station Attachment 3: Table of Estimated Licensing Actions for Surry Power Station Commitments made in this letter: None cc: U. S. Nuclear Regulatory Commission Region I 2100 Renaissance Blvd. Suite 100 King of Prussia, 19406-2713 U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 R. V. Guzman U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 C-2 11555 Rockville Pike Rockville, MD 20852-2738 K. R. Cotton-Gross U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 Dr. V. Sreenivas U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station NRC Senior Resident Inspector North Anna Power Station NRC Senior Resident Inspector Surry Power Station Serial No.16-023 Docket Nos.: 50-336/423 50-338/339 50-280/281 Page 2 of 2

  • ./ ATTACHMENT 1 Serial No.16-023 Docket Nos.: 50-336/423 Table of Estimated Licensing Actions for Millstone Power Station MILLSTONE POWER STATION -UNITS 2 & 3 DOMINION NUCLEA.R CONNECTICUT, IN Table of Estimated Licensing Actions Millstone Power Station Units 2 and 3 Docket Nos: 50-336/50-423 TSTF Number, If Projected Submittal Outage Outage Related Can the NRC staff Proprietary Plant Name and Unit Number(*) Licensing Action Type Licensing Action Description/Title make the lnfonnallon C-ta any Date Related? Date public? lnfonnatlon Millstone Power Station Unit 2 and 3 Relief Request Relief Requests RR-04-23 and IR-03-28 to use UT in lieu of RT. 04/2016 Yes 102017 Yes No Millstone Power Station Unit 2 License Amendment LAR for Large Break LOCA Reanalysis 05/2016 Yes 402016 Yes Yes Millstone Power Station Unit 3 Exemptions Exemption for AXIOM Lead Test Assembly 07/2016 Yes 402017 Yes No Millstone Power Station Unit 2 License Amendment LAR to Revise MPS2 TS 3.8.1.1 to add a required ACTION that 09/2016 Yes 402017 Yes No would reduce shutdown risk at MPS3. (RSST) Millstone Power Station Unit 3 License Amendment LAR to Add New TS 3/4.7.15 for Main Feedwater Isolation, 12/2016 No Yes No Regulating, and Bypass Valves Millstone Power Station Unit 2 License Amendment Extension of Type A ILRT Interval to 15 Years. Revise TS for 10/2017 Yes 402018 Yes No Containment Leakage Rate Testing Requirements Millstone Power Station Units 2 and 3 License Amendment LAR for Electrical Cross-Tie Connection 2017 No Yes No Millstone Power Station Unit 3 License Amendment TSTF-556 LAR for Resolution of Open Phase Condition Bulletin 2012-01 -2017 No Yes No Design Vulnerability in electric power system Millstone Power Station Unit 2 License Amendment LAR to Revise SR 4.6.2.1.2.b to Increase RBCCW Minimum 2017 No Yes No Flow Rate to CAR Coolers from >500 gpm to >1700 gpm Millstone Power Station Unit 3 License Amendment TSTF-374 Modify TS requirements for EDG fuel oil testing 2017 No Yes No Millstone Power Station Units 2 and 3 License Amendment TSTF-552 Diesel Generator Frequency and Voltage Surveillance 2018 No Yes No Requirements. WCAP-17308-NP. Measurement Uncertainty Recapture (MUR) -Recovery of a Millstone Power Station Unit 2 License Amendment portion of the 2% measurements Uncertainty Required by 2018 No Yes No Rono Millstone Power Station Unit 2 License Amendment Delete Item 8 (Containment Water Level Narrow Range) from 2018 No Yes No Table 3.3-11 of TS 3.3.3.8 Millstone Power Station Unit 3 License Amendment Extension of Type A ILRT Interval to 15 Years. Revise TS for 10/2019 Yes 402020 Yes No Containment Leakage Rate Testing Requirements Page 1of1 ATTACHMENT 2 Serial No.16-023 Docket Nos.: 50-338/339 Table of Estimated Licensing Actions for North Anna Power Station NORTH ANNA POWER STATION-UNITS 1 & 2 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)

Table of Estimated Licensing Actions North Anna Power Station Unit 1 and Unit 2 Docket Nos: 50-338/339 Plant Name and Unit Number(s) North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Unit 1 North Anna Power Station, Units 1 and 2 North Anna Power Station, Unit 1 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 Licensing Action Type License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment Relief Request Relief Request Relief Request License Amendment License Amendment TSTF Number, If any TSTF-522 Licensing Action Description/Title EAL Revision -Fuel clad degradation and fuel clad barrier loss ISFSI License Renewal (for Pad 1 TN-32) Fuel Independent SBLOCA Analysis (TS Reference Change/COLR Mod) Revision to Spent Fuel Criticality Analysis -updated fuel design w/ 5% fuel enrichment LAR for PAD 5.0 and FSLOCA [Large Break] Adds Open Phase Condition (OPC) Isolation System operability and surveillance requirements for mitigation of an OPC Revise the Environmental Protection Plan to Correct CFR References Revise the surveillance requirements for TS 3.7.10 and 3.7.12 for the PREACS and MCR/ESGR Filters to operate them for greater than or equal to 15 minutes. Revise TS 5.5.10 to incorporate the requirements of Regulatory Guide 1.52, revision 3, which requires In-Place Filter Testing/Laboratory Testing to be extended to 24 months. Second Period Limited Examination Relief Request -N1-14-LMT-002 Request to extend the reactor vessel weld examinations by ten years. The PWR Owner's Group analysis by Westinghouse has already been started. N1-14-NDE-008 I N2-14-NDE-003 North Anna Unit 1 Fifth Interval ISi Program Relief Requests LAR to rely on off-site EMT's rather than on-site EMT's LAR to move the Local Emergency Operations Facility (LEOF) to an EOF located at Innsbrook Page 1of1 Projected Submittal Outage Outage Can the NRC staff Proprietary make the lnfonnatlon Comments Date Related? Related Data public? Yes or No Information 07/2016 No Yes No 05/2016 No Yes No 08/2016 No Yes Supports compliance Yes with 10CFR50.46(c) 09/2016 No Yes Yes 2018 No Yes Supports compliance Yes with 10CFR50.46(c) 2nd Otr 2018 01/2017 Yes (NAPS1) Yes No 4th Otr 2020 (NAPS2) 2017 No Yes No 09/2016 No Yes No 2017 No Yes No 07/2016 Yes 102018 Yes No 2018 Yes 302019 Yes No 2017 No Yes No 2017 No Yes No ATTACHMENT 3 Serial No.16-023 Docket Nos.: 50-280/281 Table of Estimated Licensing Actions for Surry Power Station SURRY POWER STATION-UNITS 1 & 2 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)

Table of Estimated Licensing Actions Surry Power Station Unit 1 and Unit 2 Docket Nos: 50-280/281 Plant Name and Unit Number(*) Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Licensing Action Type License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment Relief Request License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment TSTF Number, If any TSTF-547 Projected Submittal Licensing Action Description/Title Date Alternate monitoring of rod position with one 05/2016 inoperable rod position indicator Revises Residual Heat Removal (RHR) and Component Cooling (CC) Systems' TS 05/2016 Requirements and adds an RHR Surveillance Revises the Fuel Cladding Barrier Degradation and 06/2016 Loss Emergency Action Level Thresholds Extends the Charging Pump Service Water and MCR/ESGR AC Subsystems Flowpath Allowed 05/2016 Outage Time from 24 to 72 hrs Expands the Primary Grade (PG) Water Lockout TS 05/2016 Requirements Extends the Emergency Service Water Pump 06/2016 Allowed Outage Time from 7 to 14 days Adds Open Phase Condition (OPC) Isolation System operability and surveillance requirements 01/2017 for mitigation of an OPC Revises RCS Activity Limits and Dose 06/2016 Consequences for FHA, SGTR, MSLB and LRA TS change to extend ACT to permit replacement of the Reserve Station Service Transformer C and and 03/2017 cable/bus replacement ISi Alternative Request to permit use of CFRP application in buried safety related SW Piping as 07/2016 pressure boundary Administrative change deletes temporary/one-time TS AOTs/Requirements for previously completed 08/2016 chilled water pipe replacement project, and other Revised UFSAR Dose Analyses 09/2016 Fuel Independent SBLOCA Analysis 09/2016 Topical Report DOM-NAF-2 Appendix E (AGORA 12/2016 CHF Correlation) RLBLOCA for Vendor Qualification Program 04/2017 AGORA Vendor Qualification Program Submittal 04/2017 Spent Fuel Poot Criticality Analysis 2018 Full Spectrum LOCA Analysis 2018 Relocation of Leak Testing of Miscellaneous 2018 Radioactive Materails to TRM LAR to rely on off-site EMrs rather than on-site 2017 EMrs LAR to move the Local Emergency Operations 2017 Facility (LEOF) to an EOF located at Innsbrook Page 1of1 Outage Outage Related Can the NRC staff Proprietary make the Information Comments Related? Date public? Yea or No Information No Yes No No Yes No No Yes No No Yes No No Yes No No Yes No Yes 2nd Qtr 2018 (SPS1) Yes No 4th Qtr 2018 (SPS2) No Yes No Yes Yes No 3rd Qtr 2018 Yes Yes No 2nd Qtr 2017 No Yes No No Yes No No Yes Yes No Yes TBD No Yes TBD No Yes TBD No Yes Yes No Yes Yes No Yes No No Yes No No Yes No