ML20065S144: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
(No difference)

Latest revision as of 04:19, 6 January 2021

Forwards Amend 19 to Fsar,Consisting of Revisions to Update Environ Qualification of Equipment Info in New Subsection 3.11.15,mechanical Equipment Qualifications & Revised Tables 3.11-1,3.11-2,3.11-3 & 3.11-20
ML20065S144
Person / Time
Site: Clinton Constellation icon.png
Issue date: 10/27/1982
From: Koch L
ILLINOIS POWER CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20065S147 List:
References
U-0568, U-568, NUDOCS 8211010099
Download: ML20065S144 (1)


Text

U-0568

/LL/ND/S POWER COMPANY L34(19)-82(10-27)-L 500 SOUTH 27TH STREET, DECATUR, ILLINOIS 62525 October 27, 1982 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Denton:

Clinton Power Station Unit 1 Docket No. 50-461 Final Safety Analysis Report (FSAR) Amendment No. 19 Illinois Power Company hereby files Amendment No. 19, dated October, 1982, for the Clinton Final Safety Analysis Report (CPS-FSAR). FSAR Amendment No. 19 consists of re-visions to update environmental qualification of equipment information in new Subsection 3.11.15, Mechanical Equipment Qualification, and revised Tables 3.11-1, 3.11-2, 3.11-3, 3.11-4 and 3.11-20.

Three (3) signed originals and eighty-five (85) copies are furnished for amending the FSAR sets provided to NRC per 10 CFR 50.30.

Respectfully submitted, ILLINOIS POWER COMPANY V /#

L J. Koch V ce President GEW/lt Subscribed and sworn to before me the 27th day QV g Q[

of Gctober, 1982 3 0%cov' 6 mr&

/ 1r Notary Public 8211010099 821027 PDR ADOCK 05000461 K PDR