| description = The inspectors identified a Severity Level IV noncited violation of 10 CFR 50.71 after Pacific Gas and Electric failed to include the current plant design basis for the 230kV degraded voltage protection scheme in the Final Safety Analysis Report Update. Title 10 CFR 50.71.(e) states in part, "Each person licensed to operate a nuclear power reactor shall update periodically, as provided in paragraphs (e) (3) and (4) of this section, the Fina! Safety ,ll.na!ysis Report Update originally submitted as part of the application for the operating license, to assure that the information included in the report contains the latest information developed. Contrary to the above, on March 14, 2010, the inspectors identified that Pacific Gas and Electric failed to update the Final Safety Analysis Report Update to include complete design basis information for the offsite degraded voltage protection scheme. The inspectors identified that Final Safety Analysis Report Update did not include the design basis for the allowable time delay or the limiting voltage setpoints. The licensee has entered this issue into their corrective action process as Notification 50313763. Failure to include the current plant design basis for the 230kV degraded voltage protection scheme in the Final Safety Analysis Report Update is a performance deficiency. Using  inspection Manual Chapter 0612, Appendix B, the team determined that this issue was to be evaluated using the traditional enforcement process because the performance deficiency was a failure to meet a requirement or standard, had the potential for impacting the NRC's ability to perform its regulatory function, and the concern was within the licensee's ability to foresee and correct and should have been prevented. The team used the General Statement of Policy and Procedure for NRC Enforcement Actions, Supplement I "Reactor Operations," dated January 14,2005, to evaluate the significance of this violation. The team concluded that the violation is more than minor because the incorrect Final Safety Analysis Report Update information had a potential impact on safety and licensed activities. Using Supplement I, Section D, Item 6, of the NRC Enforcement Policy, this performance deficiency will be treated as a Severity Level IV violation because the erroneous information was not used to make any unacceptable change to the facility or procedures. Using Inspection Manual Chapter 0609.04, "Phase 1 Initial  Screening and Characterization of Findings," the team concluded that the issue screened as having low safety significance (Green) under the significance determination process. Because this violation is of very low safety significance and was entered into the licensee's corrective action program, this violation is being treated as a noncited violation, consistent with Section VI.A.1 of the NRC Enforcement Policy. Because the violation included a performance deficiency, the inspectors also concluded the issue was a finding under the Reactor Oversight Process and had a crosscutting aspect in the area of problem identification and resolution associated with the corrective action program component because the licensee did not adequately evaluate the extent of the condition and take appropriate corrective actions after the NRC identified a similar violation.
| description = The inspectors identified a Severity Level IV noncited violation of 10 CFR 50.71 after Pacific Gas and Electric failed to include the current plant design basis for the 230kV degraded voltage protection scheme in the Final Safety Analysis Report Update. Title 10 CFR 50.71.(e) states in part, \"Each person licensed to operate a nuclear power reactor shall update periodically, as provided in paragraphs (e) (3) and (4) of this section, the Fina! Safety ,ll.na!ysis Report Update originally submitted as part of the application for the operating license, to assure that the information included in the report contains the latest information developed. Contrary to the above, on March 14, 2010, the inspectors identified that Pacific Gas and Electric failed to update the Final Safety Analysis Report Update to include complete design basis information for the offsite degraded voltage protection scheme. The inspectors identified that Final Safety Analysis Report Update did not include the design basis for the allowable time delay or the limiting voltage setpoints. The licensee has entered this issue into their corrective action process as Notification 50313763. Failure to include the current plant design basis for the 230kV degraded voltage protection scheme in the Final Safety Analysis Report Update is a performance deficiency. Using  inspection Manual Chapter 0612, Appendix B, the team determined that this issue was to be evaluated using the traditional enforcement process because the performance deficiency was a failure to meet a requirement or standard, had the potential for impacting the NRC\'s ability to perform its regulatory function, and the concern was within the licensee\'s ability to foresee and correct and should have been prevented. The team used the General Statement of Policy and Procedure for NRC Enforcement Actions, Supplement I \"Reactor Operations,\" dated January 14,2005, to evaluate the significance of this violation. The team concluded that the violation is more than minor because the incorrect Final Safety Analysis Report Update information had a potential impact on safety and licensed activities. Using Supplement I, Section D, Item 6, of the NRC Enforcement Policy, this performance deficiency will be treated as a Severity Level IV violation because the erroneous information was not used to make any unacceptable change to the facility or procedures. Using Inspection Manual Chapter 0609.04, \"Phase 1 Initial  Screening and Characterization of Findings,\" the team concluded that the issue screened as having low safety significance (Green) under the significance determination process. Because this violation is of very low safety significance and was entered into the licensee\'s corrective action program, this violation is being treated as a noncited violation, consistent with Section VI.A.1 of the NRC Enforcement Policy. Because the violation included a performance deficiency, the inspectors also concluded the issue was a finding under the Reactor Oversight Process and had a crosscutting aspect in the area of problem identification and resolution associated with the corrective action program component because the licensee did not adequately evaluate the extent of the condition and take appropriate corrective actions after the NRC identified a similar violation.
}}
}}

Latest revision as of 19:48, 20 February 2018

04
Site: Diablo Canyon Pacific Gas & Electric icon.png
Report IR 05000275/2010007 Section 1R21
Date counted Jun 30, 2010 (2010Q2)
Type: TEV: Severity level IV
cornerstone Mitigating Systems
Identified by: NRC identified
Inspection Procedure: IP 71111.21
Inspectors (proximate) T Farnholtz
S Makor
B Correll
S Hedger
R Kbpriva
CCA P.2, Evaluation
INPO aspect PI.2
'