| | Q | CCA | Title |
|---|
| 05000275/FIN-2009004-04 | 2009Q3 | P.1 P.1(a) | Failure to Update the Final Safety Analysis Report Update with Current Accident Analysis |
| 05000275/FIN-2009004-03 | 2009Q3 | H.7 | Failure to Follow Emergency Operating Procedures Following a Reactor Trip |
| 05000275/FIN-2009004-02 | 2009Q3 | P.5 P.2(a) | Failure to Perform Corrective Actions Resulted in an Unplanned Trip |
| 05000275/FIN-2009004-01 | 2009Q3 | P.2 | Failure to Identify and Correct a Degraded Fire Barrier |
| 05000275/FIN-2009008-01 | 2009Q3 | H.7 | Safe Shutdown Procedure Not Consistent With Safe Shutdown Analysis |
| 05000275/FIN-2009005-04 | 2009Q4 | P.1 P.1(a) | Less than Adequate Replacement Reactor Head Modification Design Control |
| 05000275/FIN-2009005-03 | 2009Q4 | P.2 | Inadequate 50.59 Evaluation for Steam Generator Tube Rupture Analysis |
| 05000275/FIN-2009005-05 | 2009Q4 | P.2 | Less than Adequate Change Evaluation to the Facility as Described in the Final Safety Analysis Report Update |
| 05000275/FIN-2009005-01 | 2009Q4 | H.4 H.9 | Less Than Adequate Work Planning Resulted in the Release of Two Gas Decay Tanks |
| 05000275/FIN-2009005-02 | 2009Q4 | H.5 | Failure to Properly Plan a Maintenance Activity |
| 05000323/FIN-2009009-02 | 2010Q1 | P.2 P.1(a) | Failure to Conduct an Adequate Post-Modification Test |
| 05000275/FIN-2010402-02 | 2010Q1 | | Security |
| 05000275/FIN-2010402-01 | 2010Q1 | | Security |
| 05000275/FIN-2010002-01 | 2010Q1 | P.3 | Failure to Effectively Implement the Seismically-Induced Systems Interaction Program |
| 05000275/FIN-2010002-04 | 2010Q1 | P.2 | Less Than Adequate Evaluation Following a Failure of Both Motor Driven Auxiliary Feedwater Trains |
| 05000323/FIN-2009009-01 | 2010Q1 | P.2 | Failure to Follow Design and Configuration Control Requirements |
| 05000323/FIN-2009009-03 | 2010Q1 | P.2 | Failure to Evaluate a Change to the Facility as Described in the Final Safety Analysis Report Update Associated with the Addition of Manual Actions in the Safety Analysis |
| 05000275/FIN-2010002-02 | 2010Q1 | P.2 | Failure to Update the Final Safety Analysis Report with the Current Plant Design Bases |
| 05000275/FIN-2010002-03 | 2010Q1 | | Failure to Report a Condition That Could Have Prevented the Fulfillment of a Safety Function |
| 05000275/FIN-2010002-05 | 2010Q1 | P.2 | Failure to Submit a LERE for a Common-Cause Inoperability of Independent Trains or Channels |
| 05000275/FIN-2010007-08 | 2010Q2 | P.2 | Inadequate Drawings and Procedures to Align
Emergency Makeup Water Supply from Diablo Canyon
Creek to Support the Auxiliary Feedwater System |
| 05000275/FIN-2010003-02 | 2010Q2 | | Inadequate Corrective Actions Following Identification of a
Nonconservative Technical Specification |
| 05000275/FIN-2010003-03 | 2010Q2 | P.2 | Failure to Report a Condition that Could Have Prevented the
Fulfillment of a Safety Function |
| 05000275/FIN-2010007-01 | 2010Q2 | H.14 | Less than Adequate Change Evaluation to the Facility as Described in the Final Safety Analysis Report Update |
| 05000275/FIN-2010007-07 | 2010Q2 | | Nonconservative Inputs into Motor Operated Valve Calculation |
| 05000275/FIN-2010007-06 | 2010Q2 | | Second Level Undervoltage Relay Time Delay to Initiate
Load Shed and Sequencing Upon the Diesel Generator is Adequate to Assure Plant Safety |
| 05000275/FIN-2010007-05 | 2010Q2 | P.2 | Inadequate Operability Determination Associated With
the Offsite Degraded Voltage Protection Scheme |
| 05000275/FIN-2010007-03 | 2010Q2 | H.14 | Non-Conservative Decision Making resulted in a Violation of Technical Specification |
| 05000275/FIN-2010007-02 | 2010Q2 | P.2 | Failure to Adequately Evaluate Changes to the Diesel
Testing as Described in the Final Safety Analysis Report
Update |
| 05000275/FIN-2010007-04 | 2010Q2 | P.2 | Failure to Update the Final Safety Analysis Report Update with the Current Plant Design Bases Section |
| 05000275/FIN-2010007-09 | 2010Q2 | | Failure to Update Feedwater Rupture Accident Analysis
in the Final Safety Analysis Report Update |
| 05000275/FIN-2010007-10 | 2010Q2 | | Failure to Update Text to Reflect Credited Design Class I Makeup Flowpath to Component Cooling Water Expansion Tank in the Final Safety Analysis Report Update |
| 05000275/FIN-2010003-01 | 2010Q2 | P.2 | Failure to Perform Unit 1 Containment Concrete Inspections |