| Q | CCA | Title |
---|
05000275/FIN-2009004-04 | 2009Q3 | P.1 P.1(a) | Failure to Update the Final Safety Analysis Report Update with Current Accident Analysis |
05000275/FIN-2009004-03 | 2009Q3 | H.7 | Failure to Follow Emergency Operating Procedures Following a Reactor Trip |
05000275/FIN-2009004-02 | 2009Q3 | P.5 P.2(a) | Failure to Perform Corrective Actions Resulted in an Unplanned Trip |
05000275/FIN-2009004-01 | 2009Q3 | P.2 | Failure to Identify and Correct a Degraded Fire Barrier |
05000275/FIN-2009008-01 | 2009Q3 | H.7 | Safe Shutdown Procedure Not Consistent With Safe Shutdown Analysis |
05000275/FIN-2009005-04 | 2009Q4 | P.1 P.1(a) | Less than Adequate Replacement Reactor Head Modification Design Control |
05000275/FIN-2009005-01 | 2009Q4 | H.4 H.9 | Less Than Adequate Work Planning Resulted in the Release of Two Gas Decay Tanks |
05000275/FIN-2009005-02 | 2009Q4 | H.5 | Failure to Properly Plan a Maintenance Activity |
05000275/FIN-2009005-05 | 2009Q4 | P.2 | Less than Adequate Change Evaluation to the Facility as Described in the Final Safety Analysis Report Update |
05000275/FIN-2009005-03 | 2009Q4 | P.2 | Inadequate 50.59 Evaluation for Steam Generator Tube Rupture Analysis |
05000275/FIN-2010002-05 | 2010Q1 | P.2 | Failure to Submit a LERE for a Common-Cause Inoperability of Independent Trains or Channels |
05000275/FIN-2010002-04 | 2010Q1 | P.2 | Less Than Adequate Evaluation Following a Failure of Both Motor Driven Auxiliary Feedwater Trains |
05000275/FIN-2010002-03 | 2010Q1 | | Failure to Report a Condition That Could Have Prevented the Fulfillment of a Safety Function |
05000275/FIN-2010002-02 | 2010Q1 | P.2 | Failure to Update the Final Safety Analysis Report with the Current Plant Design Bases |
05000323/FIN-2009009-03 | 2010Q1 | P.2 | Failure to Evaluate a Change to the Facility as Described in the Final Safety Analysis Report Update Associated with the Addition of Manual Actions in the Safety Analysis |
05000275/FIN-2010002-01 | 2010Q1 | P.3 | Failure to Effectively Implement the Seismically-Induced Systems Interaction Program |
05000275/FIN-2010402-01 | 2010Q1 | | Security |
05000275/FIN-2010402-02 | 2010Q1 | | Security |
05000323/FIN-2009009-02 | 2010Q1 | P.2 P.1(a) | Failure to Conduct an Adequate Post-Modification Test |
05000323/FIN-2009009-01 | 2010Q1 | P.2 | Failure to Follow Design and Configuration Control Requirements |