| | Q | CCA | Title |
|---|
| 05000275/FIN-2009002-02 | 2009Q1 | H.5 | Inadequate Procedure |
| 05000275/FIN-2009002-01 | 2009Q1 | H.2 | Failure to Follow Power Ascension Procedures |
| 05000275/FIN-2009003-03 | 2009Q2 | P.3 | Failure to Update the Final Safety Analysis Report Update with Current Plant Design Criteria |
| 05000275/FIN-2009003-05 | 2009Q2 | P.2 | Inadequate Corrective Actions Following the Loss of Design Control for the 500 kV Offsite Power Source |
| 05000275/FIN-2009003-01 | 2009Q2 | | Corrective Action Following Degraded Offsite Power System |
| 05000275/FIN-2009003-04 | 2009Q2 | H.8 | Failure to Promptly Declare an Unusual Event |
| 05000275/FIN-2009003-06 | 2009Q2 | P.2 | Failure to Evaluate a Change to the Facility as Described in the Final Safety Analysis Report Update Associated with 500 kV Offsite Power Source |
| 05000275/FIN-2009003-02 | 2009Q2 | P.2 | Failure to Submit a Licensee Event Report for a Condition Prohibited by the Plants Technical Specifications |
| 05000275/FIN-2009008-01 | 2009Q3 | H.7 | Safe Shutdown Procedure Not Consistent With Safe Shutdown Analysis |
| 05000275/FIN-2009004-01 | 2009Q3 | P.2 | Failure to Identify and Correct a Degraded Fire Barrier |
| 05000275/FIN-2009004-04 | 2009Q3 | P.1 P.1(a) | Failure to Update the Final Safety Analysis Report Update with Current Accident Analysis |
| 05000275/FIN-2009004-02 | 2009Q3 | P.5 P.2(a) | Failure to Perform Corrective Actions Resulted in an Unplanned Trip |
| 05000275/FIN-2009004-03 | 2009Q3 | H.7 | Failure to Follow Emergency Operating Procedures Following a Reactor Trip |
| 05000275/FIN-2009005-02 | 2009Q4 | H.5 | Failure to Properly Plan a Maintenance Activity |
| 05000275/FIN-2009005-05 | 2009Q4 | P.2 | Less than Adequate Change Evaluation to the Facility as Described in the Final Safety Analysis Report Update |
| 05000275/FIN-2009005-03 | 2009Q4 | P.2 | Inadequate 50.59 Evaluation for Steam Generator Tube Rupture Analysis |
| 05000275/FIN-2009005-01 | 2009Q4 | H.4 H.9 | Less Than Adequate Work Planning Resulted in the Release of Two Gas Decay Tanks |
| 05000275/FIN-2009005-04 | 2009Q4 | P.1 P.1(a) | Less than Adequate Replacement Reactor Head Modification Design Control |