| number = ML16237A060
| number = ML16256A311
| issue date = 08/31/2016
| issue date = 09/12/2016
| title = Mid-Cycle Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (report 05000498/2016005 and 05000499/2016005)
| title = Errata for Mid-Cycle Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2016005 and 05000499/2016005)
| author name = Taylor N H
| author name = Hipschman T R
| author affiliation = NRC/RGN-IV/DRP/RPB-B
| author affiliation = NRC/RGN-IV/DRS
| addressee name = Koehl D
| addressee name = Koehl D
| addressee affiliation = South Texas Project Nuclear Operating Co
| addressee affiliation = South Texas Project Nuclear Operating Co
| docket = 05000498, 05000499
| docket = 05000498, 05000499
| license number = NPF-076, NPF-080
| license number = NPF-076, NPF-080
| contact person = Taylor N H
| contact person = Hipschman T R
| case reference number = ML16237A060
| document report number = IR 2016005
| document report number = IR 2016005
| document type = Inspection Plan, Inspection Report, Letter
| package number = ML16256A306
| page count = 7
| document type = Letter
| page count = 13
}}
}}


Line 19: Line 21:
=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:
[[Issue date::August 31, 2016]]
[[Issue date::September 12, 2016]]


Mr. Dennis Koehl President and Chief Executive Officer STP Nuclear Operating Company P.O. Box 289 Wadsworth, TX 77483
Mr. Dennis Koehl President and CEO STP Nuclear Operating Company South Texas Project Electric Generating Station P.O. Box 289 Wadsworth, TX 77483
 
SUBJECT: ERRATA FOR MID-CYCLE ASSESSMENT LETTER FOR SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 (REPORT 05000498/2016005 AND 05000499/2016005)
 
==Dear Mr. Koehl:==
It was identified that the enclosed inspection plan in a letter to you dated August 31, 2016 (ML16237A060) was improperly marked. The inspection plan contained the markings of "Official Use Only - Sensitive Internal Information/Security-Related Information", however, the inspection plan did not contain information under that category. The inspection plan that was originally placed into ADAMS has been corrected by striking through the markings. The original Mid-Cycle Assessment Letter and the corrected inspection plan are enclosed. Please note that neither the content of the assessment letter, nor the inspection plan has changed. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agency wide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
Sincerely,/RA/ Thomas R. Hipschman, Team Leader Inspection Program and Assessment Team Division of Reactor Safety Docket Nos.: 50-498, 50-499 License Nos.: NPF-76 and NPF-80
 
===Enclosures:===
1. South Texas Project Electric Generating Station, Units 1 and 2 Inspection/Activity Plan 2. 2016 Mid-Cycle Assessment Letter (ML16237A060) Page 1 of 308/30/201609:36:28Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteSouth Texas ProjectInspection / Activity Plan07/01/2016-06/30/2018EP-2-EP PERFORMANCE INDICATORS21 IPDrill/Exercise Performance71151-EP0107/11/201607/15/20161 IPERO Readiness71151-EP0207/11/201607/15/20161 IPAlert & Notification System Reliability71151-EP0307/11/201607/15/2016EP-3-BIENNIAL EP EXERCISE INSPECTION41 IPExercise Evaluation711140107/11/201607/15/20161 IPEmergency Action Level and Emergency Plan Changes711140407/11/201607/15/2016TSB 52B-BIENNIAL PI&R INSPECTION41, 2 IPProblem Identification and Resolution71152B08/08/201608/12/20161, 2 IPProblem Identification and Resolution71152B08/22/201608/26/201671111.08-INSERVICE INSPECTION12 IPInservice Inspection Activities - PWR7111108P10/10/201610/21/2016RS 12 PI-RADIATION SAFETY21, 2 IPRadiological Hazard Assessment and Exposure Controls71124.0110/24/201610/28/20161, 2 IPOccupational ALARA Planning and Controls71124.0210/24/201610/28/20161, 2 IPOccupational Exposure Control Effectiveness71151-OR0110/24/201610/28/20161, 2 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0110/24/201610/28/2016RS 5678-RADIATION SAFETY - TEAM41, 2 IPRadiation Monitoring Instrumentation71124.0511/28/201612/02/20161, 2 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0611/28/201612/02/20161, 2 IPRadiological Environmental Monitoring Program71124.0711/28/201612/02/20161, 2 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0811/28/201612/02/2016EB2-05T-TRIENNIAL FIRE PROTECTION INSPECTION41, 2 IPFire Protection [Triennial]7111105T01/23/201701/27/20171, 2 IPFire Protection [Triennial]7111105T02/06/201702/10/2017EXAM-INITIAL EXAM61 INITIAL EXAM STP U1 (09/2017)X0259208/14/201708/18/20172 INITIAL EXAM STP U2 (09/2017)X0259308/14/201708/18/20171 INITIAL EXAM STP U1 (09/2017)X0259209/25/201710/04/20172 INITIAL EXAM STP U2 (09/2017)X0259309/25/201710/04/2017RS 13 PI-RADIATION SAFETY31, 2 IPRadiological Hazard Assessment and Exposure Controls71124.0103/27/201703/31/20171, 2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0303/27/201703/31/20171, 2 IPOccupational Exposure Control Effectiveness71151-OR0103/27/201703/31/2017This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
 
Page 2 of 308/30/201609:36:28Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteSouth Texas ProjectInspection / Activity Plan07/01/2016-06/30/2018RS 13 PI-RADIATION SAFETY31, 2 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0103/27/201703/31/201771111.08-INSERVICE INSPECTION UNIT 111 IPInservice Inspection Activities - PWR7111108P03/27/201704/07/2017EP-1-BIENNIAL EP PROGRAM INSPECTION11, 2 IPAlert and Notification System Testing711140205/08/201705/12/20171, 2 IPEmergency Preparedness Organization Staffing and Augmentation System711140305/08/201705/12/20171, 2 IPEmergency Action Level and Emergency Plan Changes711140405/08/201705/12/20171, 2 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140505/08/201705/12/2017EP-2-EP PERFORMANCE INDICATOR VERIFICATION11, 2 IPDrill/Exercise Performance71151-EP0105/08/201705/12/20171, 2 IPERO Readiness71151-EP0205/08/201705/12/20171, 2 IPAlert & Notification System Reliability71151-EP0305/08/201705/12/2017EB1-17T-STP 50.59 EVALUATIONS OF CHANGES, TESTS31, 2 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T05/22/201705/26/20171, 2 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T06/05/201706/09/2017ISFSI-DRY RUN INSPECTION (MULTIPLE WEEKS)11, 2 IPPreoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants60854.106/01/201707/20/2017RS 24-RADIATION SAFETY21, 2 IPOccupational ALARA Planning and Controls71124.0207/31/201708/04/20171, 2 IPOccupational Dose Assessment71124.0407/31/201708/04/2017ISFSI-FIRST CASK LOADING INSPECTION11, 2 IPOperation of an Independent Spent Fuel Storage Installation at Operating Plants60855.108/01/201708/10/2017BRQ-BRQ INSPECTION31, 2 IPLicensed Operator Requalification Program7111111B08/28/201709/01/20177111108-INSERVICE INSPECTION UNIT 212 IPInservice Inspection Activities - PWR7111108P04/02/201804/13/2018EB1-07T-STP HEAT SINK PERFORMANCE11, 2 IPHeat Sink Performance7111107T06/11/201806/15/2018EP-1-EP EXERCISE INSPECTION41, 2 IPExercise Evaluation711140106/11/201806/15/20181, 2 IPEmergency Action Level and Emergency Plan Changes711140406/11/201806/15/20181, 2 IPDrill/Exercise Performance71151-EP0106/11/201806/15/2018This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
 
Page 3 of 308/30/201609:36:28Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteSouth Texas ProjectInspection / Activity Plan07/01/2016-06/30/2018EP-1-EP EXERCISE INSPECTION41, 2 IPERO Readiness71151-EP0206/11/201806/15/20181, 2 IPAlert & Notification System Reliability71151-EP0306/11/201806/15/2018This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
 
August 31, 2016 Mr. Dennis Koehl President and Chief Executive Officer STP Nuclear Operating Company P.O. Box 289 Wadsworth, TX 77483


SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 (REPORT 05000498/2016005 AND 05000499/2016005)
SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 (REPORT 05000498/2016005 AND 05000499/2016005)

Revision as of 20:21, 18 February 2018

Errata for Mid-Cycle Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2016005 and 05000499/2016005)
ML16256A311
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 09/12/2016
From: Hipschman T R
Division of Reactor Safety IV
To: Koehl D
South Texas
Hipschman T R
Shared Package
ML16256A306 List:
References
ML16237A060 IR 2016005
Download: ML16256A311 (13)


Text

September 12, 2016

Mr. Dennis Koehl President and CEO STP Nuclear Operating Company South Texas Project Electric Generating Station P.O. Box 289 Wadsworth, TX 77483

SUBJECT: ERRATA FOR MID-CYCLE ASSESSMENT LETTER FOR SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 (REPORT 05000498/2016005 AND 05000499/2016005)

Dear Mr. Koehl:

It was identified that the enclosed inspection plan in a letter to you dated August 31, 2016 (ML16237A060) was improperly marked. The inspection plan contained the markings of "Official Use Only - Sensitive Internal Information/Security-Related Information", however, the inspection plan did not contain information under that category. The inspection plan that was originally placed into ADAMS has been corrected by striking through the markings. The original Mid-Cycle Assessment Letter and the corrected inspection plan are enclosed. Please note that neither the content of the assessment letter, nor the inspection plan has changed. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agency wide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,/RA/ Thomas R. Hipschman, Team Leader Inspection Program and Assessment Team Division of Reactor Safety Docket Nos.: 50-498, 50-499 License Nos.: NPF-76 and NPF-80

Enclosures:

1. South Texas Project Electric Generating Station, Units 1 and 2 Inspection/Activity Plan 2. 2016 Mid-Cycle Assessment Letter (ML16237A060) Page 1 of 308/30/201609:36:28Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteSouth Texas ProjectInspection / Activity Plan07/01/2016-06/30/2018EP-2-EP PERFORMANCE INDICATORS21 IPDrill/Exercise Performance71151-EP0107/11/201607/15/20161 IPERO Readiness71151-EP0207/11/201607/15/20161 IPAlert & Notification System Reliability71151-EP0307/11/201607/15/2016EP-3-BIENNIAL EP EXERCISE INSPECTION41 IPExercise Evaluation711140107/11/201607/15/20161 IPEmergency Action Level and Emergency Plan Changes711140407/11/201607/15/2016TSB 52B-BIENNIAL PI&R INSPECTION41, 2 IPProblem Identification and Resolution71152B08/08/201608/12/20161, 2 IPProblem Identification and Resolution71152B08/22/201608/26/201671111.08-INSERVICE INSPECTION12 IPInservice Inspection Activities - PWR7111108P10/10/201610/21/2016RS 12 PI-RADIATION SAFETY21, 2 IPRadiological Hazard Assessment and Exposure Controls71124.0110/24/201610/28/20161, 2 IPOccupational ALARA Planning and Controls71124.0210/24/201610/28/20161, 2 IPOccupational Exposure Control Effectiveness71151-OR0110/24/201610/28/20161, 2 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0110/24/201610/28/2016RS 5678-RADIATION SAFETY - TEAM41, 2 IPRadiation Monitoring Instrumentation71124.0511/28/201612/02/20161, 2 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0611/28/201612/02/20161, 2 IPRadiological Environmental Monitoring Program71124.0711/28/201612/02/20161, 2 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0811/28/201612/02/2016EB2-05T-TRIENNIAL FIRE PROTECTION INSPECTION41, 2 IPFire Protection [Triennial]7111105T01/23/201701/27/20171, 2 IPFire Protection [Triennial]7111105T02/06/201702/10/2017EXAM-INITIAL EXAM61 INITIAL EXAM STP U1 (09/2017)X0259208/14/201708/18/20172 INITIAL EXAM STP U2 (09/2017)X0259308/14/201708/18/20171 INITIAL EXAM STP U1 (09/2017)X0259209/25/201710/04/20172 INITIAL EXAM STP U2 (09/2017)X0259309/25/201710/04/2017RS 13 PI-RADIATION SAFETY31, 2 IPRadiological Hazard Assessment and Exposure Controls71124.0103/27/201703/31/20171, 2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0303/27/201703/31/20171, 2 IPOccupational Exposure Control Effectiveness71151-OR0103/27/201703/31/2017This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Page 2 of 308/30/201609:36:28Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteSouth Texas ProjectInspection / Activity Plan07/01/2016-06/30/2018RS 13 PI-RADIATION SAFETY31, 2 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0103/27/201703/31/201771111.08-INSERVICE INSPECTION UNIT 111 IPInservice Inspection Activities - PWR7111108P03/27/201704/07/2017EP-1-BIENNIAL EP PROGRAM INSPECTION11, 2 IPAlert and Notification System Testing711140205/08/201705/12/20171, 2 IPEmergency Preparedness Organization Staffing and Augmentation System711140305/08/201705/12/20171, 2 IPEmergency Action Level and Emergency Plan Changes711140405/08/201705/12/20171, 2 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140505/08/201705/12/2017EP-2-EP PERFORMANCE INDICATOR VERIFICATION11, 2 IPDrill/Exercise Performance71151-EP0105/08/201705/12/20171, 2 IPERO Readiness71151-EP0205/08/201705/12/20171, 2 IPAlert & Notification System Reliability71151-EP0305/08/201705/12/2017EB1-17T-STP 50.59 EVALUATIONS OF CHANGES, TESTS31, 2 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T05/22/201705/26/20171, 2 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T06/05/201706/09/2017ISFSI-DRY RUN INSPECTION (MULTIPLE WEEKS)11, 2 IPPreoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants60854.106/01/201707/20/2017RS 24-RADIATION SAFETY21, 2 IPOccupational ALARA Planning and Controls71124.0207/31/201708/04/20171, 2 IPOccupational Dose Assessment71124.0407/31/201708/04/2017ISFSI-FIRST CASK LOADING INSPECTION11, 2 IPOperation of an Independent Spent Fuel Storage Installation at Operating Plants60855.108/01/201708/10/2017BRQ-BRQ INSPECTION31, 2 IPLicensed Operator Requalification Program7111111B08/28/201709/01/20177111108-INSERVICE INSPECTION UNIT 212 IPInservice Inspection Activities - PWR7111108P04/02/201804/13/2018EB1-07T-STP HEAT SINK PERFORMANCE11, 2 IPHeat Sink Performance7111107T06/11/201806/15/2018EP-1-EP EXERCISE INSPECTION41, 2 IPExercise Evaluation711140106/11/201806/15/20181, 2 IPEmergency Action Level and Emergency Plan Changes711140406/11/201806/15/20181, 2 IPDrill/Exercise Performance71151-EP0106/11/201806/15/2018This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Page 3 of 308/30/201609:36:28Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteSouth Texas ProjectInspection / Activity Plan07/01/2016-06/30/2018EP-1-EP EXERCISE INSPECTION41, 2 IPERO Readiness71151-EP0206/11/201806/15/20181, 2 IPAlert & Notification System Reliability71151-EP0306/11/201806/15/2018This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

August 31, 2016 Mr. Dennis Koehl President and Chief Executive Officer STP Nuclear Operating Company P.O. Box 289 Wadsworth, TX 77483

SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 (REPORT 05000498/2016005 AND 05000499/2016005)

Dear Mr. Koehl:

On August 9, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of South Texas Project Electric Generating Station, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2015 through June 30, 2016. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. The NRC determined that overall, South Texas Project Electric Generating Station, Units 1 and 2, operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at South Texas Project Electric Generating Station, Units 1 and during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the second half of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. In response to the accident at Fukushima, the Commission issued Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events," and Order EA-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation." The NRC conducted audits of licensee efforts towards compliance with these Orders, and the information gathered will aid staff in development of the ultimate Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing Temporary Instruction 191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans." In Staff Requirements Memorandum - SECY 16-0009, "Recommendations Resulting from the Integrated Prioritization and Re-Baselining of Agency Activities," the Commission approved the NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue to conduct quarterly assessment meetings and communicate changes in the assessment of licensee performance in accordance with the guidance in Inspection Manual Chapter 0305, "Operating Reactor Assessment Program." In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at 817-200-1141 with any questions you have regarding this letter.

Sincerely,/RA/ Nicholas H. Taylor, Chief Projects Branch B Division of Reactor Projects Docket Nos.: 50-498, 50-499 License Nos.: NPF-76 and NPF-80

Enclosure:

South Texas Project Electric Generating Station, Units 1 and 2 Inspection/ Activity Plan Page 1 of 308/30/201609:36:28Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteSouth Texas ProjectInspection / Activity Plan07/01/2016-06/30/2018EP-2-EP PERFORMANCE INDICATORS21 IPDrill/Exercise Performance71151-EP0107/11/201607/15/20161 IPERO Readiness71151-EP0207/11/201607/15/20161 IPAlert & Notification System Reliability71151-EP0307/11/201607/15/2016EP-3-BIENNIAL EP EXERCISE INSPECTION41 IPExercise Evaluation711140107/11/201607/15/20161 IPEmergency Action Level and Emergency Plan Changes711140407/11/201607/15/2016TSB 52B-BIENNIAL PI&R INSPECTION41, 2 IPProblem Identification and Resolution71152B08/08/201608/12/20161, 2 IPProblem Identification and Resolution71152B08/22/201608/26/201671111.08-INSERVICE INSPECTION12 IPInservice Inspection Activities - PWR7111108P10/10/201610/21/2016RS 12 PI-RADIATION SAFETY21, 2 IPRadiological Hazard Assessment and Exposure Controls71124.0110/24/201610/28/20161, 2 IPOccupational ALARA Planning and Controls71124.0210/24/201610/28/20161, 2 IPOccupational Exposure Control Effectiveness71151-OR0110/24/201610/28/20161, 2 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0110/24/201610/28/2016RS 5678-RADIATION SAFETY - TEAM41, 2 IPRadiation Monitoring Instrumentation71124.0511/28/201612/02/20161, 2 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0611/28/201612/02/20161, 2 IPRadiological Environmental Monitoring Program71124.0711/28/201612/02/20161, 2 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0811/28/201612/02/2016EB2-05T-TRIENNIAL FIRE PROTECTION INSPECTION41, 2 IPFire Protection [Triennial]7111105T01/23/201701/27/20171, 2 IPFire Protection [Triennial]7111105T02/06/201702/10/2017EXAM-INITIAL EXAM61 INITIAL EXAM STP U1 (09/2017)X0259208/14/201708/18/20172 INITIAL EXAM STP U2 (09/2017)X0259308/14/201708/18/20171 INITIAL EXAM STP U1 (09/2017)X0259209/25/201710/04/20172 INITIAL EXAM STP U2 (09/2017)X0259309/25/201710/04/2017RS 13 PI-RADIATION SAFETY31, 2 IPRadiological Hazard Assessment and Exposure Controls71124.0103/27/201703/31/20171, 2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0303/27/201703/31/20171, 2 IPOccupational Exposure Control Effectiveness71151-OR0103/27/201703/31/2017This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Page 2 of 308/30/201609:36:28Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteSouth Texas ProjectInspection / Activity Plan07/01/2016-06/30/2018RS 13 PI-RADIATION SAFETY31, 2 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0103/27/201703/31/201771111.08-INSERVICE INSPECTION UNIT 111 IPInservice Inspection Activities - PWR7111108P03/27/201704/07/2017EP-1-BIENNIAL EP PROGRAM INSPECTION11, 2 IPAlert and Notification System Testing711140205/08/201705/12/20171, 2 IPEmergency Preparedness Organization Staffing and Augmentation System711140305/08/201705/12/20171, 2 IPEmergency Action Level and Emergency Plan Changes711140405/08/201705/12/20171, 2 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140505/08/201705/12/2017EP-2-EP PERFORMANCE INDICATOR VERIFICATION11, 2 IPDrill/Exercise Performance71151-EP0105/08/201705/12/20171, 2 IPERO Readiness71151-EP0205/08/201705/12/20171, 2 IPAlert & Notification System Reliability71151-EP0305/08/201705/12/2017EB1-17T-STP 50.59 EVALUATIONS OF CHANGES, TESTS31, 2 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T05/22/201705/26/20171, 2 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T06/05/201706/09/2017ISFSI-DRY RUN INSPECTION (MULTIPLE WEEKS)11, 2 IPPreoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants60854.106/01/201707/20/2017RS 24-RADIATION SAFETY21, 2 IPOccupational ALARA Planning and Controls71124.0207/31/201708/04/20171, 2 IPOccupational Dose Assessment71124.0407/31/201708/04/2017ISFSI-FIRST CASK LOADING INSPECTION11, 2 IPOperation of an Independent Spent Fuel Storage Installation at Operating Plants60855.108/01/201708/10/2017BRQ-BRQ INSPECTION31, 2 IPLicensed Operator Requalification Program7111111B08/28/201709/01/20177111108-INSERVICE INSPECTION UNIT 212 IPInservice Inspection Activities - PWR7111108P04/02/201804/13/2018EB1-07T-STP HEAT SINK PERFORMANCE11, 2 IPHeat Sink Performance7111107T06/11/201806/15/2018EP-1-EP EXERCISE INSPECTION41, 2 IPExercise Evaluation711140106/11/201806/15/20181, 2 IPEmergency Action Level and Emergency Plan Changes711140406/11/201806/15/20181, 2 IPDrill/Exercise Performance71151-EP0106/11/201806/15/2018This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Page 3 of 308/30/201609:36:28Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteSouth Texas ProjectInspection / Activity Plan07/01/2016-06/30/2018EP-1-EP EXERCISE INSPECTION41, 2 IPERO Readiness71151-EP0206/11/201806/15/20181, 2 IPAlert & Notification System Reliability71151-EP0306/11/201806/15/2018This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.