            ,                t GE Nuclear Energy an n u c, m Ii 5 Cur: < l mue San.hw CA 9b ??S May 31,1994                                                                    MFN No. 078-94 Docket No. STN 524)04 Document Control Desk U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention:      Richard W. Borchardt, Director Standardization Project Directorate
 
==Subject:==
NRC Requests for Additional Information (RAls) on the Simplified Boiling Water Reactor (SBWR) Design
 
==References:==
: 1. Transmittal of Requests for Additional Information (RAI)s Requesting the SBWR Design,1.ctter from M. Malloy to P. W. Marriott dated September 15,1993
: 2. MFN No. 005-94, NRC Requests for Additional Information (RAls) on the Simplified Boiling Water Reactor (SBWR)
Design, Letter from J. E. Leatherman to R. W. Borchardt datedjanuary 17,1994.
The Reference 2 letter responded to the Reference 1 letter's request for additional information regarding the SBWR test program. In fulfillment of this request for PANTHERS pre-test analyses, GE is submitting a response to RAI 900.35.
Sincerely,
                                            /M -
P. W. Marriott, Manager Advanced Plant Technologies M/C 781, (108) 9254948 1:nclosure cc:    M. Malloy, Prqject Manager (w/2 copies of Attachment 1)
F. W. liasselberg, Project Manager (w/l copy of Attachment 1) n ''1 ['. O d b                                                                                              g/
9406070327 940531                                                                                          L  j PDR    ADOCK052Og4                                                                                          g
 
  , t RAI Number: 900.35 Question:
What pre-test analyses have been performed using the TRACG code for 1%NTIIERS tests? What were the results?
1 1
GE Revised Response:                                                  ]
Pre-test calculations for the 1%NTHERS PCC tests are attached.
4
_ . _ _ _ _ _ _ _ _ _}}

Latest revision as of 23:03, 7 August 2020

Submits NRC Requests for Addl Info on Simplified Boiling Water Reactor Design Re Panthers pre-test Calculation
ML20069E685
Person / Time
Site: 05200004
Issue date: 05/31/1994
From: Marriott P
GENERAL ELECTRIC CO.
To: Borchardt R
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
Shared Package
ML20069E688 List:
References
MFN-078-94, MFN-78-94, NUDOCS 9406070327
Download: ML20069E685 (2)


Text

c 3

, t GE Nuclear Energy an n u c, m Ii 5 Cur: < l mue San.hw CA 9b ??S May 31,1994 MFN No. 078-94 Docket No. STN 524)04 Document Control Desk U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Richard W. Borchardt, Director Standardization Project Directorate

Subject:

NRC Requests for Additional Information (RAls) on the Simplified Boiling Water Reactor (SBWR) Design

References:

1. Transmittal of Requests for Additional Information (RAI)s Requesting the SBWR Design,1.ctter from M. Malloy to P. W. Marriott dated September 15,1993
2. MFN No. 005-94, NRC Requests for Additional Information (RAls) on the Simplified Boiling Water Reactor (SBWR)

Design, Letter from J. E. Leatherman to R. W. Borchardt datedjanuary 17,1994.

The Reference 2 letter responded to the Reference 1 letter's request for additional information regarding the SBWR test program. In fulfillment of this request for PANTHERS pre-test analyses, GE is submitting a response to RAI 900.35.

Sincerely,

/M -

P. W. Marriott, Manager Advanced Plant Technologies M/C 781, (108) 9254948 1:nclosure cc: M. Malloy, Prqject Manager (w/2 copies of Attachment 1)

F. W. liasselberg, Project Manager (w/l copy of Attachment 1) n 1 ['. O d b g/

9406070327 940531 L j PDR ADOCK052Og4 g

, t RAI Number: 900.35 Question:

What pre-test analyses have been performed using the TRACG code for 1%NTIIERS tests? What were the results?

1 1

GE Revised Response: ]

Pre-test calculations for the 1%NTHERS PCC tests are attached.

4