ML17249A923: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML17249A923
| number = ML17249A923
| issue date = 09/06/2017
| issue date = 09/06/2017
| title = Ltr 09/06/17 Prairie Island Station, Unit 2 - Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000282/2017004; 05000306/2017004 (Exf)
| title = Ltr 09/06/17 Prairie Island Station, Unit 2 - Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000282/2017004; 05000306/2017004 (EXF)
| author name = Fernandez E
| author name = Fernandez E
| author affiliation = NRC/RGN-III/DRS/EB1
| author affiliation = NRC/RGN-III/DRS/EB1

Revision as of 19:28, 15 February 2018

Ltr 09/06/17 Prairie Island Station, Unit 2 - Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000282/2017004; 05000306/2017004 (EXF)
ML17249A923
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 09/06/2017
From: Edison Fernandez
NRC/RGN-III/DRS/EB1
To: Northard S D
Northern States Power Co
References
IR 2017004
Download: ML17249A923 (8)


See also: IR 05000282/2017004

Text

September 6, 2017

Mr. Scott Site Vice President Prairie Island Nuclear Generating Plant Northern States Power Company, Minnesota 1717 Wakonade Drive East Welch, MN 55089-9642

SUBJECT: PRAIRIE ISLAND STATION, UNIT 2NOTIFICATION OF NRC BASELINE INSPECTION AND REQUEST FOR INFORMATION; INSPECTION REPORT 05000282/2017004; 05000306/2017004

Dear Mr. Northard:

On October 16, 2017, the U. S. Nuclear Regulatory Commission (NRC) will begin the Baseline Inservice Inspection (Procedure 71111.08). This onsite inspection is scheduled to be performed October 16, 2017, through October 26, 2017. Experience has shown that this inspection is resource intensive both for the NRC inspector and your staff. In order to minimize the impact to your onsite resources, and to ensure a productive inspection for both sides, we have enclosed a request for documents needed for this inspection. These documents have been divided into two groups. The first group identifies information necessary to ensure that the inspector is adequately prepared. The second group identifies the information the inspector will need upon arrival at the site. It is important that all of these documents are up-to-date, and complete, in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. We have discussed the schedule for inspection activities with your staff and understand that our regulatory contact for this inspection will be Ms. Pam Johnson, of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector Mr. Edison Fernandez at 630 829-9754 or via e-mail at Edison.Fernandez@nrc.gov. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number. This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR

Sincerely,/RA/ Edison Fernandez Engineering Branch 1 Division of Reactor Safety Docket Nos. 50282, 50306 License Nos. DPR42, DPR60

Enclosure:

Inservice Inspection Document Request cc: Distribution via LISTSERV