ML20137R706: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:v IN RESPONSE, PLEASE
    ./ pat: %                              UNITED STATES                REFER 'IO: M851119 8              ,              NUCLEAR REGULATORY COMMIMilON
{              g                      W ASHINGTON. D.C. 20555
    %**'**J                            Novenber 29, 1985 CFFKE OF THE SECRETARY MEMORANDUM FOR:        William J. 0.8.rck s Executive Director for Ope    ions FROM:                  Samuel J. Chilk, Secreta
 
==SUBJECT:==
STAFP REQUIREMENTS - DIS  S ION /POSSIBLE VOTE ON FULL POWER OPERA N LICENSE FOR RIVER BEND, 10:00 A.M., FRIDAY, NOVEMBER 15, 1985, COMMISSIONERS' CONFERENCE ROOM, D.C. OFFICE (OPEN TO PUBLIC ATTENDANCE)
The Commission met to discuss the issuance of a full power license for the River Bend Nuclear Power Plant, Unit 1.            ,
The Commission voted 5-0 to authorize the staff to issue a full power license for River Bend, Unit 1.
Chairman Palladino and Commissioner Zech requested that staff provide to the Commission the results of a proposed survey of all operating plants and the next few FTOL's to determine what percentage, if any, of shift technical advisors (STA's) do not possess degrees. The staff should additionally provide a proposal or recommendation, if warranted, with respect to its findings.
(NRR) cc:  Chairman Palladino Commissioner Roberts Commissioner Asselstine Commissioner Bernthal Commissioner Zech Commission Staff Offices EDO PDR - Advance DCS - 016 Phillips 8512060051 851119 PDR PT9.7 10CFR          PDR                                                          r
,                                                                                    -    13) k}}

Latest revision as of 19:45, 30 June 2020

Staff Requirements Memo on Commission 851115 Meeting in Washington,Dc Authorizing NRC to Issue Full Power License. Palladino & Zech Requested Results of Survey to Determine Percentage of Shift Technical Advisors W/O Degrees
ML20137R706
Person / Time
Site: River Bend Entergy icon.png
Issue date: 11/29/1985
From: Chilk S
NRC OFFICE OF THE SECRETARY (SECY)
To: Dircks W
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
References
REF-10CFR9.7 M851119, NUDOCS 8512060051
Download: ML20137R706 (1)


Text

v IN RESPONSE, PLEASE

./ pat: % UNITED STATES REFER 'IO: M851119 8 , NUCLEAR REGULATORY COMMIMilON

{ g W ASHINGTON. D.C. 20555

%**'**J Novenber 29, 1985 CFFKE OF THE SECRETARY MEMORANDUM FOR: William J. 0.8.rck s Executive Director for Ope ions FROM: Samuel J. Chilk, Secreta

SUBJECT:

STAFP REQUIREMENTS - DIS S ION /POSSIBLE VOTE ON FULL POWER OPERA N LICENSE FOR RIVER BEND, 10:00 A.M., FRIDAY, NOVEMBER 15, 1985, COMMISSIONERS' CONFERENCE ROOM, D.C. OFFICE (OPEN TO PUBLIC ATTENDANCE)

The Commission met to discuss the issuance of a full power license for the River Bend Nuclear Power Plant, Unit 1. ,

The Commission voted 5-0 to authorize the staff to issue a full power license for River Bend, Unit 1.

Chairman Palladino and Commissioner Zech requested that staff provide to the Commission the results of a proposed survey of all operating plants and the next few FTOL's to determine what percentage, if any, of shift technical advisors (STA's) do not possess degrees. The staff should additionally provide a proposal or recommendation, if warranted, with respect to its findings.

(NRR) cc: Chairman Palladino Commissioner Roberts Commissioner Asselstine Commissioner Bernthal Commissioner Zech Commission Staff Offices EDO PDR - Advance DCS - 016 Phillips 8512060051 851119 PDR PT9.7 10CFR PDR r

, - 13) k