ML031220145: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 2: | Line 2: | ||
| number = ML031220145 | | number = ML031220145 | ||
| issue date = 05/02/2003 | | issue date = 05/02/2003 | ||
| title = Request for Additional Information - Conversion from Subatmospheric to Atmospheric Containment | | title = Request for Additional Information - Conversion from Subatmospheric to Atmospheric Containment | ||
| author name = Colburn T | | author name = Colburn T | ||
| author affiliation = NRC/NRR/DLPM/LPD1 | | author affiliation = NRC/NRR/DLPM/LPD1 | ||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:May 2, 2003 Mr. Mark B. Bezilla Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Post Office Box 4 Shippingport, PA 15077 | ||
==SUBJECT:== | |||
BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 (BVPS-1 AND 2) - | |||
REQUEST FOR ADDITIONAL INFORMATION (RAI) - CONVERSION FROM SUBATMOSPHERIC TO ATMOSPHERIC CONTAINMENT (TAC NOS. MB5303 AND MB5304) | |||
==Dear Mr. Bezilla:== | |||
By letter dated June 5, 2002, as supplemented August 19 and December 2, 2002, and January 30, February 14, and March 19, 2003, FirstEnergy Nuclear Operating Company submitted a request for conversion of the BVPS-1 and 2 containments from subatmospheric to atmospheric operation. As part of that request, approval was sought for selective implementation of an alternate source term in accordance with Regulatory Guide 1.183, Alternate Source Terms for Evaluating Design Basis Accidents at Nuclear Power Plants, and Title 10 of the Code of Federal Regulations, Section 50.67. The Nuclear Regulatory Commission staff has determined that the information contained in the enclosed RAI will be needed for the staff to complete its review. These questions were previously faxed to your staff on April 23, 2003, in preparation for an April 28, 2003, conference call. | |||
As discussed with your staff, we request your response within 30 days of receipt of this letter. If you have any questions, please contact me at 301-415-1402. | |||
Sincerely, | |||
/RA/ | |||
Timothy G. Colburn, Senior Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412 | |||
==Enclosure:== | |||
RAI cc w/encl: See next page | |||
May 2, 2003 Mr. Mark B. Bezilla Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Post Office Box 4 Shippingport, PA 15077 | |||
==SUBJECT:== | |||
BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 (BVPS-1 AND 2) - | |||
REQUEST FOR ADDITIONAL INFORMATION (RAI) - CONVERSION FROM SUBATMOSPHERIC TO ATMOSPHERIC CONTAINMENT (TAC NOS. MB5303 AND MB5304) | |||
==Dear Mr. Bezilla:== | |||
By letter dated June 5, 2002, as supplemented August 19 and December 2, 2002, and January 30, February 14, and March 19, 2003, FirstEnergy Nuclear Operating Company submitted a request for conversion of the BVPS-1 and 2 containments from subatmospheric to atmospheric operation. As part of that request, approval was sought for selective implementation of an alternate source term in accordance with Regulatory Guide 1.183, Alternate Source Terms for Evaluating Design Basis Accidents at Nuclear Power Plants, and Title 10 of the Code of Federal Regulations, Section 50.67. The Nuclear Regulatory Commission staff has determined that the information contained in the enclosed RAI will be needed for the staff to complete its review. These questions were previously faxed to your staff on April 23, 2003, in preparation for an April 28, 2003, conference call. | |||
As discussed with your staff, we request your response within 30 days of receipt of this letter. If you have any questions, please contact me at 301-415-1402. | |||
Sincerely, | |||
/RA/ | |||
Timothy G. Colburn, Senior Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412 | |||
==Enclosure:== | |||
RAI cc w/encl: See next page DISTRIBUTION: | |||
PUBLIC MO'Brien ACRS TColburn PDI-1 R/F BPlatchek,RGN-I MReinhart SLaVie RLaufer RLobel ANotafrancesco EThrom OGC ACCESSION NO. ML031220145 OFFICE PDI-1/LA PDI-1/PM SPSB/SC PDI-1/SC NAME MOBrien TColburn JLee for MReinhart RLaufer DATE 4/29/03 4/28/03 4/30/03 5/1/03 OFFICIAL RECORD COPY | |||
REQUEST FOR ADDITIONAL INFORMATION (RAI) | |||
BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 (BVPS-1 AND 2) | |||
SUBATMOSPHERIC TO ATMOSPHERIC CONTAINMENT CONVERSION DOCKET NOS. 50-334 AND 50-412 The Nuclear Regulatory Commission (NRC) staff has determined that the information below will be needed for the staff to complete its review of the licensees request for amendment to allow conversion of the BVPS-1 and 2 containments from subatmospheric to atmospheric operation. | |||
As part of that request, the licensee requested selective implementation of an alternate source term in accordance with Regulatory Guide 1.183, Alternate Source Terms for Evaluating Design Basis Accidents at Nuclear Power Plants, and Title 10 of the Code of Federal Regulations, Section 50.67. | |||
: 1. Table 5.3.6-1 of the June 5, 2002, submittal tabulates the unflitered emergency mode inleakage as 30 cfm. However, Table 2.0.11-1 in the RAI response dated January 30, 2003, utilized an unfiltered intake rate of only 10 cfm. Please explain why 30 cfm was not used in establishing the main steamline break (MSLB) analysis scaling factors. | |||
: 2. NRC staff question 2.0.6 (NRC letter dated November 22, 2002) requested the licensee to provide a tabulation of assumptions used in the MSLB and locked rotor accident analyses. In its response, the licensee directed the NRC staff to earlier license amendments that had been approved by the NRC. | |||
The licensees March 28, 2001, submittal (supporting Amendment No. 244 issued September 28, 2001, for BVPS-1) included BVPS-1 calculation ERS-SFL-95-008, revision 7. Assumption 2.14 of that calculation listed an X/Q value of 2.43E-3 sec/m3. An adjacent note stated that this was the value for the turbine building and that it was conservative. The NRC staff compared this value to the newly calculated X/Q values tabulated in Table 5.3.4-2 of the June 5, 2002, submittal. The value of 2.43E-3 sec/m3 exceeded the newly calculated values tabulated for the main steam (MS) relief valves. Thus, the earlier conclusion that the value was conservative is still true. The situation for BVPS-2 is not as clear. The May 12, 2000, submittal (supporting Amendment Nos. 237 and 119 for BVPS-1 and 2, respectively, issued March 22, 2001) included marked-up pages for the BVPS-2 Updated Final Safety Analysis Report (UFSAR). The BVPS-2 UFSAR Table 15.0-14 shows the turbine building 0-8 hour X/Q as 2.72E-4 sec/m3. Table 5.3.4-3 of the June 5, 2002, submittal, which tabulates newly determined X/Q values, shows the BVPS-2 MS relief valves to BVPS-2 control room intake dispersion to be more limiting with a value of 5.01E-4 sec/m3. The NRC staff did not have a comparable calculation for BVPS-2. However, the NRC staff's confirmatory Enclosure | |||
calculation performed for the current amendment shows a control room dose greater than that documented in the May 12, 2000, submittal with a magnitude comparable to the difference in X/Q values. Please review the BVPS-2 calculation and confirm that the most conservative X/Q value was used in the BVPS-2 MSLB analysis. | |||
Beaver Valley Power Station, Units 1 and 2 Mary OReilly, Attorney FirstEnergy Nuclear Operating Company Rich Janati, Chief FirstEnergy Corporation Division of Nuclear Safety 76 South Main Street Bureau of Radiation Protection Akron, OH 44308 Deparment of Environmental Protection Rachel Carson State Office Building FirstEnergy Nuclear Operating Company P.O. Box 8469 Regulatory Affairs/Performance Harrisburg, PA 17105-8469 Improvement Larry R. Freeland, Manager Mayor of the Borough of Beaver Valley Power Station Shippingport Post Office Box 4, BV-A P O Box 3 Shippingport, PA 15077 Shippingport, PA 15077 Commissioner James R. Lewis Regional Administrator, Region I West Virginia Division of Labor U.S. Nuclear Regulatory Commission 749-B, Building No. 6 475 Allendale Road Capitol Complex King of Prussia, PA 19406 Charleston, WV 25305 Resident Inspector Director, Utilities Department U.S. Nuclear Regulatory Commission Public Utilities Commission Post Office Box 298 180 East Broad Street Shippingport, PA 15077 Columbus, OH 43266-0573 FirstEnergy Nuclear Operating Company Director, Pennsylvania Emergency Beaver Valley Power Station Management Agency ATTN: M. P. Pearson, Director 2605 Interstate Dr. Services and Projects (BV-IPAB) | |||
Harrisburg, PA 17110-9364 Post Office Box 4 Shippingport, PA 15077 Ohio EPA-DERR ATTN: Zack A. Clayton FirstEnergy Nuclear Operating Company Post Office Box 1049 Beaver Valley Power Station Columbus, OH 43266-0149 Mr. B. F. Sepelak Post Office Box 4, BV-A Dr. Judith Johnsrud Shippingport, PA 15077 National Energy Committee Sierra Club 433 Orlando Avenue State College, PA 16803 J. H. Lash, Plant Manager (BV-IPAB) | |||
FirstEnergy Nuclear Operating Company Beaver Valley Power Station Post Office Box 4 Shippingport, PA 15077}} |
Latest revision as of 17:31, 25 March 2020
ML031220145 | |
Person / Time | |
---|---|
Site: | Beaver Valley |
Issue date: | 05/02/2003 |
From: | Colburn T NRC/NRR/DLPM/LPD1 |
To: | Bezilla M FirstEnergy Nuclear Operating Co |
Colburn T, NRR/DLPM, 415-1402 | |
References | |
TAC MB5303, TAC MB5304 | |
Download: ML031220145 (6) | |
Text
May 2, 2003 Mr. Mark B. Bezilla Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Post Office Box 4 Shippingport, PA 15077
SUBJECT:
BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 (BVPS-1 AND 2) -
REQUEST FOR ADDITIONAL INFORMATION (RAI) - CONVERSION FROM SUBATMOSPHERIC TO ATMOSPHERIC CONTAINMENT (TAC NOS. MB5303 AND MB5304)
Dear Mr. Bezilla:
By letter dated June 5, 2002, as supplemented August 19 and December 2, 2002, and January 30, February 14, and March 19, 2003, FirstEnergy Nuclear Operating Company submitted a request for conversion of the BVPS-1 and 2 containments from subatmospheric to atmospheric operation. As part of that request, approval was sought for selective implementation of an alternate source term in accordance with Regulatory Guide 1.183, Alternate Source Terms for Evaluating Design Basis Accidents at Nuclear Power Plants, and Title 10 of the Code of Federal Regulations, Section 50.67. The Nuclear Regulatory Commission staff has determined that the information contained in the enclosed RAI will be needed for the staff to complete its review. These questions were previously faxed to your staff on April 23, 2003, in preparation for an April 28, 2003, conference call.
As discussed with your staff, we request your response within 30 days of receipt of this letter. If you have any questions, please contact me at 301-415-1402.
Sincerely,
/RA/
Timothy G. Colburn, Senior Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412
Enclosure:
RAI cc w/encl: See next page
May 2, 2003 Mr. Mark B. Bezilla Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Post Office Box 4 Shippingport, PA 15077
SUBJECT:
BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 (BVPS-1 AND 2) -
REQUEST FOR ADDITIONAL INFORMATION (RAI) - CONVERSION FROM SUBATMOSPHERIC TO ATMOSPHERIC CONTAINMENT (TAC NOS. MB5303 AND MB5304)
Dear Mr. Bezilla:
By letter dated June 5, 2002, as supplemented August 19 and December 2, 2002, and January 30, February 14, and March 19, 2003, FirstEnergy Nuclear Operating Company submitted a request for conversion of the BVPS-1 and 2 containments from subatmospheric to atmospheric operation. As part of that request, approval was sought for selective implementation of an alternate source term in accordance with Regulatory Guide 1.183, Alternate Source Terms for Evaluating Design Basis Accidents at Nuclear Power Plants, and Title 10 of the Code of Federal Regulations, Section 50.67. The Nuclear Regulatory Commission staff has determined that the information contained in the enclosed RAI will be needed for the staff to complete its review. These questions were previously faxed to your staff on April 23, 2003, in preparation for an April 28, 2003, conference call.
As discussed with your staff, we request your response within 30 days of receipt of this letter. If you have any questions, please contact me at 301-415-1402.
Sincerely,
/RA/
Timothy G. Colburn, Senior Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412
Enclosure:
RAI cc w/encl: See next page DISTRIBUTION:
PUBLIC MO'Brien ACRS TColburn PDI-1 R/F BPlatchek,RGN-I MReinhart SLaVie RLaufer RLobel ANotafrancesco EThrom OGC ACCESSION NO. ML031220145 OFFICE PDI-1/LA PDI-1/PM SPSB/SC PDI-1/SC NAME MOBrien TColburn JLee for MReinhart RLaufer DATE 4/29/03 4/28/03 4/30/03 5/1/03 OFFICIAL RECORD COPY
REQUEST FOR ADDITIONAL INFORMATION (RAI)
BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 (BVPS-1 AND 2)
SUBATMOSPHERIC TO ATMOSPHERIC CONTAINMENT CONVERSION DOCKET NOS. 50-334 AND 50-412 The Nuclear Regulatory Commission (NRC) staff has determined that the information below will be needed for the staff to complete its review of the licensees request for amendment to allow conversion of the BVPS-1 and 2 containments from subatmospheric to atmospheric operation.
As part of that request, the licensee requested selective implementation of an alternate source term in accordance with Regulatory Guide 1.183, Alternate Source Terms for Evaluating Design Basis Accidents at Nuclear Power Plants, and Title 10 of the Code of Federal Regulations, Section 50.67.
- 1. Table 5.3.6-1 of the June 5, 2002, submittal tabulates the unflitered emergency mode inleakage as 30 cfm. However, Table 2.0.11-1 in the RAI response dated January 30, 2003, utilized an unfiltered intake rate of only 10 cfm. Please explain why 30 cfm was not used in establishing the main steamline break (MSLB) analysis scaling factors.
- 2. NRC staff question 2.0.6 (NRC letter dated November 22, 2002) requested the licensee to provide a tabulation of assumptions used in the MSLB and locked rotor accident analyses. In its response, the licensee directed the NRC staff to earlier license amendments that had been approved by the NRC.
The licensees March 28, 2001, submittal (supporting Amendment No. 244 issued September 28, 2001, for BVPS-1) included BVPS-1 calculation ERS-SFL-95-008, revision 7. Assumption 2.14 of that calculation listed an X/Q value of 2.43E-3 sec/m3. An adjacent note stated that this was the value for the turbine building and that it was conservative. The NRC staff compared this value to the newly calculated X/Q values tabulated in Table 5.3.4-2 of the June 5, 2002, submittal. The value of 2.43E-3 sec/m3 exceeded the newly calculated values tabulated for the main steam (MS) relief valves. Thus, the earlier conclusion that the value was conservative is still true. The situation for BVPS-2 is not as clear. The May 12, 2000, submittal (supporting Amendment Nos. 237 and 119 for BVPS-1 and 2, respectively, issued March 22, 2001) included marked-up pages for the BVPS-2 Updated Final Safety Analysis Report (UFSAR). The BVPS-2 UFSAR Table 15.0-14 shows the turbine building 0-8 hour X/Q as 2.72E-4 sec/m3. Table 5.3.4-3 of the June 5, 2002, submittal, which tabulates newly determined X/Q values, shows the BVPS-2 MS relief valves to BVPS-2 control room intake dispersion to be more limiting with a value of 5.01E-4 sec/m3. The NRC staff did not have a comparable calculation for BVPS-2. However, the NRC staff's confirmatory Enclosure
calculation performed for the current amendment shows a control room dose greater than that documented in the May 12, 2000, submittal with a magnitude comparable to the difference in X/Q values. Please review the BVPS-2 calculation and confirm that the most conservative X/Q value was used in the BVPS-2 MSLB analysis.
Beaver Valley Power Station, Units 1 and 2 Mary OReilly, Attorney FirstEnergy Nuclear Operating Company Rich Janati, Chief FirstEnergy Corporation Division of Nuclear Safety 76 South Main Street Bureau of Radiation Protection Akron, OH 44308 Deparment of Environmental Protection Rachel Carson State Office Building FirstEnergy Nuclear Operating Company P.O. Box 8469 Regulatory Affairs/Performance Harrisburg, PA 17105-8469 Improvement Larry R. Freeland, Manager Mayor of the Borough of Beaver Valley Power Station Shippingport Post Office Box 4, BV-A P O Box 3 Shippingport, PA 15077 Shippingport, PA 15077 Commissioner James R. Lewis Regional Administrator, Region I West Virginia Division of Labor U.S. Nuclear Regulatory Commission 749-B, Building No. 6 475 Allendale Road Capitol Complex King of Prussia, PA 19406 Charleston, WV 25305 Resident Inspector Director, Utilities Department U.S. Nuclear Regulatory Commission Public Utilities Commission Post Office Box 298 180 East Broad Street Shippingport, PA 15077 Columbus, OH 43266-0573 FirstEnergy Nuclear Operating Company Director, Pennsylvania Emergency Beaver Valley Power Station Management Agency ATTN: M. P. Pearson, Director 2605 Interstate Dr. Services and Projects (BV-IPAB)
Harrisburg, PA 17110-9364 Post Office Box 4 Shippingport, PA 15077 Ohio EPA-DERR ATTN: Zack A. Clayton FirstEnergy Nuclear Operating Company Post Office Box 1049 Beaver Valley Power Station Columbus, OH 43266-0149 Mr. B. F. Sepelak Post Office Box 4, BV-A Dr. Judith Johnsrud Shippingport, PA 15077 National Energy Committee Sierra Club 433 Orlando Avenue State College, PA 16803 J. H. Lash, Plant Manager (BV-IPAB)
FirstEnergy Nuclear Operating Company Beaver Valley Power Station Post Office Box 4 Shippingport, PA 15077