| issue date = 03/10/1997
| issue date = 03/10/1997
| title = Forwards Response to RAI Re GL 87-02,including Responses to Nine Items from NRC Staff & Seismic Evaluation Work Sheets
| title = Forwards Response to RAI Re GL 87-02,including Responses to Nine Items from NRC Staff & Seismic Evaluation Work Sheets
| author name = FITZPATRICK E
| author name = Fitzpatrick E
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:CATEGORY 1 REGULAT INFORMATION DISTRIBUTION STEM (RIDS)ACCESSION NBR:9703170230 DOC.DATE: 97/03/10 NOTARIZED:
{{#Wiki_filter:CATEGORY 1 REGULAT       INFORMATION DISTRIBUTION         STEM (RIDS)
YES DOCKET FACIL:.50-315 Donald C.Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 50-316 Donald C.Cook Nuclear Power Plant, Unit 2, Indiana M 05000316 AUTH.NAME AUTHOR AFFILIATION FITZPATRICK,E.
ACCESSION NBR:9703170230         DOC.DATE:   97/03/10     NOTARIZED: YES           DOCKET FACIL:.50-315 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 50-316 Donald C. Cook Nuclear Power Plant, Unit 2, Indiana M 05000316 AUTH. NAME         AUTHOR AFFILIATION FITZPATRICK,E.     Indiana Michigan Power Co. (formerly Indiana 6 Michigan Ele RECIP.NAME         RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
Indiana Michigan Power Co.(formerly Indiana 6 Michigan Ele RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)


==SUBJECT:==
==SUBJECT:==
Forwards response to RAI re GL 87-02,including responses to nine items from NRC staff!seismic evaluation work sheets.C DISTRIBUTION CODE: A025D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Seismic Qualification of Equipment in Operating Plants-A-46-GL-87 T NOTES: RECIPIENT ID CODE/NAME OGC/HDS2 HICKMAN,J COPIES LTTR ENCL 1 1 1 1 RECIPIENT ID CODE/NAME PD3-3 PD COPIES LTTR ENCL 1 1 E 0 INTERN: FILE CE DE/ECGB NRR/DRCH/HHFB NRR/DRPE/PD1-3 EXTERNAL: NRC PDR 1 1 1 1 1 1 1 1 1 1 NRR/DE NRR/DE/EMEB NRR/DRCH/HICB NRR/DSSA/SRXB 1 1 2 2 1 1 1 1 D U NOTE TO ALL"RIDS" RECIPIENTS:
Forwards     response   to   RAI re GL 87-02,including responses     to nine items from     NRC   staff ! seismic evaluation work sheets.               C DISTRIBUTION CODE: A025D       COPIES RECEIVED:LTR         ENCL       SIZE:
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT.415-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 13 ENCL 13 Indgana Mich!gan~Power Company 500 CircIe Orive Buchanan, MI 491071395 INOlANSl MlCMGAN PQWM March 10, 1997 Docket Nos.: 50-315 50-316 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:
TITLE: Seismic   Qualification of     Equipment   in Operating Plants     A-46   GL-87 T
AEP: NRC: 1040E Donald C.Cook Nuclear Plant, Units 1 and 2 RESPONSE TO NRC LETTER REQUEST FOR ADDITIONAL INFORMATION RELATED TO COOK NUCLEAR PLANT'S RESPONSE TO GENERIC LETTER 87-02 (TAC NO.M69437)By letter dated October 21, 1996, the NRC requested additional information regarding our January 30, 1996, response to generic letter 87-02.The following attachments contain the requested information.
NOTES:
Attachment No.1 contains the responses to the nine items from the NRC staff Attachment No.2 Attachment No.3 Attachment No.4 Attachment No.5 Attachment No.6 contains the sample seismic evaluation work sheets (SEWS)and anchorage calculations as requested in item 2 contains the sample SEWS and anchorage calculations for tanks and heat exchangers as requested in item 5 contains the seismic adequacy calculations for tanks 1-TK-33 and 2-TK-32 as requested in item 6 contains the SEWS and anchorage calculations for horizontal tanks and heat exchangers as requested in item 7 contains the calculations for limited analytical reviews (LARs)of the cable and conduit raceways as requested in item 8 PP~j~Vice President vlb Attachments
E RECIPIENT          COPIES            RECIPIENT           COPIES ID CODE/NAME         LTTR ENCL       ID CODE/NAME         LTTR ENCL OGC/HDS2                  1    1      PD3-3 PD               1     1 HICKMAN,J                1    1                                                  0 INTERN   : FILE CE                 1    1      NRR/DE                  1    1 DE/ECGB             1    1      NRR/DE/EMEB            2    2 NRR/DRCH/HHFB             1    1      NRR/DRCH/HICB          1    1 NRR/DRPE/PD1-3           1     1     NRR/DSSA/SRXB           1     1 EXTERNAL: NRC PDR                    1     1 D
'P703i70230 9703i0 PDR ADOCK 05000315 P PDR r UUrg.g SWORN TO AND SUBSCRIBED BEFORE ME THIS IO~DAY OF Qd t 199,7 JAM NNSOW NOTARY PUBUC,BERRIEN COUNY, Ml MYCOMMISSION EXPIRES FEB.10,1999 rrrrrrrrInrrrrrrgmrrI[ItrllrgrrgIrgfr D~g/Notary Public JI My Commission Expires Ilil Ill ll>>l I~~p~I II I\J I' U.S.Nuclear Regulatory Commission Page 2 AEP: NRC: 1040E CC A.A.Blind A.B.Beach MDEQ-DW 6c RPD NRC Resident Inspector J.R.Padgett ATTACHMENT 1 TO AEP:NRC:1040E RESPONSES TO NRC REQUEST FOR ADDITIONAL INI"ORMATION (RAI)RELATED TO COOK NUCLEAR PLANT'S RESPONSE TO GENERIC LETTER 87-02 (TAC NO M69437)>)ozg ops  
U NOTE TO ALL "RIDS" RECIPIENTS:
" ll r/I r.J l'PaO.i tf9,"
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
RESPONSE TO THE USNRC REQUEST FOR ADDITIONAL INFORMATION UNRESOLVED SAFETY ISSUE USI A-46 REVIEW FOR DONALD C.COOK NUCLEAR PLANT, UNITS 1&2%ith rcspcct to Section 2.2, page 2-2, discuss the engineering basis for using the In-Structure Response Spectra (ISRS)developed for the Diesel Generator Building to determine loads in the Auxiliary Building at Elevation 609 fcct, and provide the Diesel Generator Building and Auxiliary Building ISRS.The basis for using the ISRS developed for the.diesel generator building to determine loads in the auxiliary building at elevation 609 feet is provided in the third full paragraph of page 2-2 of the final Seismic Evaluation and Walkdown Summary Report submittal.
TOTAL NUMBER OF COPIES REQUIRED: LTTR           13   ENCL     13
This paragraph states: "The ISRS are not available at some of the floor elevations where safe shutdown equipment is located.When this is the case, either the ISRS for a higher elevation or the ISRS developed by a linear interpolation between existing ISRS may be used in the evaluation.
 
In the case of the auxiliary building elevation 609 feet, since the interpolated ISRS are very close to the corresponding ISRS for the diesel generator building, the ISRS for the diesel generator building were used." To further illustrate this basis, figure 1 shows a plot of four ISRS (SSE, 5%equipment damping)for the elevations in question.These spectra include the auxiliary building 587'nd 633'levations which are the elevations where developed spectra exist directly'above and below the 609'levation, and the spectra at 609'n the diesel generator building.In addition to these spectra, a 609'uxiliary building spectra is provided that was generated by interpolating the spectral acceleration values at 587'nd 609'.The auxiliary building and diesel generator building share a common foundation mat.As shown in figure 1, there is essentially no difference between the diesel generator spectra at 609'nd the interpolated auxiliary building spectra at 609', and, therefore, there is no.engineering significance with regard to the load determination if either of these are used.With regard to the diesel generator building and auxiliary building ISRS, the ISRS for all elevations of all buildings at Cook Nuclear Plant included in the USI A-46 evaluation for 2%and 5%equipment damping have been provided in appendix 8 of the final Seismic Evaluation and Walkdown Summary Report submittal.
Indgana Mich!gan Power Company
1.50 Donald C.Cook Nuclear Plant Comparison of Selected Auxiliary Building FRS and 1.5xBS to Diesel Generator Building FRS at Elevation 609 feet-5%Damping Ql O Q Q O O C OCL G9 1.00 0.50 0.00 0.1 10 50 Frequency (Hz)Oteeel 609'ux 609'nterpohted 1.5xBS Figure l ISRS for D.G.Building El 609'ompared to ISRS for Auxiliary Building El.587', 609'633'5%Damping Discuss key examples of designated"rigorously analyzed anchorages," (page 4-6)using hand calculations and ANCHOR4 sofhvarc package and provide copies of their engineering calculations.
                        ~
Also discuss a few cases of anchorage verification based on thc results of tug tests conducted and provide a description of the tests and applicable engineering justification for such an approach.Table I provides a list of key examples of equipment items with varying levels of anchorage evaluations.
500 CircIe Orive Buchanan, MI 491071395 INOlANSl MlCMGAN PQWM March 10, 1997                                                                   AEP: NRC: 1040E Docket Nos.:         50-315 50-316 U.S. Nuclear Regulatory Commission Attn:       Document   Control Desk Washington, D.C.         20555 Gentlemen:
These examples include"rigorously analyzed anchorages," comparisons to analyzed equipment items and judgments based on the anchorage inspection and in some cases judgments supplemented by tug tests.Copies of the completed seismic evaluation work sheets (SEWS), the analysis (if applicable) and the corresponding anchorage inspection sheets are included in attachment 2 of this response to the RAI for those items marked with a*in table l.When comparison or judgment was used to satisfy the GIP anchorage criteria an appropriate description of the evaluation is documented in the notes of the SEWS.The anchorage inspections and installation testing performed for the Cook Nuclear Plant USI A-46 evaluations, discussed in greater detail in the response to RAI question 4, greatly exceed the requirements of the GIP.This provides greater confidence in the judgments made by the seismic review team (SRT)that capacity greatly exceeded demand when a formal anchorage calculation was not made.A review of notes within the data base for each equipment item in the Cook Nuclear Plant USI A-46 effort was conducted in order to respond to this request'for additional information (RAI).Anchorage evaluations performed can be categorized as follows: a)a detailed ANCHOR4 evaluation was performed; b)a detailed hand calculation was performed; c)the anchorage was screened based on an anchorage evaluation on an identical item of equipment and anchorage or a worst case evaluation of a similar equipment item;or d)the SRT judged, based on the weight and anchorage of the equipment, that the anchorage obviously met the GIP screening criteria.In some cases when method (d)was used, a tug test was performed.
Donald C. Cook Nuclear Plant, Units 1 and                       2 RESPONSE   TO NRC LETTER REQUEST FOR ADDITIONAL INFORMATION RELATED TO COOK NUCLEAR PLANT'S RESPONSE TO GENERIC LETTER 87-02 (TAC NO. M69437)
This was performed by an SRT member that would tug on the assembly in the weakest direction to a level of about two times the estimated weight of the item.The tug test from a practical standpoint was unnecessary due to the relative light weight and robust'anchorage of the equipment.
By   letter dated October 21, 1996, the NRC requested additional information regarding our January 30, 1996, response to generic letter 87-02. The following attachments contain the requested information.
Each anchorage evaluation whether detailed or by judgment was based on a detailed anchorage inspection and the SRT inspection.
Attachment No. 1           contains the responses to the nine items from the NRC staff Attachment No.       2     contains the sample seismic evaluation work sheets (SEWS) and anchorage calculations as requested in item 2 Attachment No.        3    contains the sample SEWS and anchorage calculations for tanks and heat exchangers as requested in item 5 Attachment No.        4    contains the seismic adequacy calculations for tanks 1-TK-33 and 2-TK-32 as requested in item 6
Items tug tested were in general light weight components.
Attachment No.        5    contains the SEWS and anchorage calculations for horizontal tanks and heat exchangers as requested in item 7 Attachment No.        6    contains    the         calculations               for limited analytical reviews (LARs) of the cable and conduit raceways as requested in item 8 SWORN TO AND SUBSCRIBED BEFORE ME PP~j~
Samples of detailed analysis performed by ANCHOR4 and by hand calculations are included with the sample SEWS in attachment 2.When judgment was used the basis for the judgment is included in the notes section of the SEWS.The detailed anchor inspection documentation is also included with each SEWS provided.The engineering justification for the approach used for performing the anchorage evaluations is described in section 4.4, page 4-26 second paragraph of the Rev.2 GIP.This paragraph states: "There are various combinations of inspections, analyses, and engineering judgment which can be used to verify the adequacy of equipment anchorage.
Vice President THIS IO ~ DAY OF Qd Notary t
The Seismic Capability Engineers should select the appropriate combination of elements for each anchorage installation based on the information available.
Public 199,7 JI My    Commission Expires vlb Attachments                                                         JAM NNSOW
For example, a simple hand calculation may be sufficient for a pump which has only a few, very rugged, anchor bolts in a symmetrical pattern.On the other hand, at times it may be advisable to use one of the computer codes to determine the loads applied to a multi-cabinet motor control center if its anchorage is not symmetrically located." The anchorage evaluations used the appropriate combinations of elements necessary to determine that any screened equipment met the GIP criteria.Table 1 provides a brief description of the anchorage evaluation performed.
'P703i70230 9703i0                                           NOTARY PUBUC,BERRIEN COUNY, Ml ADOCK 05000315                                        MYCOMMISSIONEXPIRES FEB. 10,1999 PDR P
There is a good cross section of examples that include all equipment classes on the Cook Nuclear Plant safe shutdown equipment list (SSEL)(1 to 20)and categories of anchorage evaluations performed.
r UUrg.g PDR D~g /
Examples of class 0 and 21 anchorage evaluations are provided in response to RAI questions 5 and 7.Table 1 Examples of Anchorage Evaluations Class Equipment ID 1-AB-N 1-ABD-A*2-ABV-A 2-AM-D 2-EZC-D 1-11A 1-52-RTB 2-21B 2-T21B 1-T11A 1-CRID-III-CVT I-TR11B 2-CRID-I-CVT*
rrrrrrrrInrrrrrrgmrrI[ItrllrgrrgIrgfr
Anchorage Evaluation Performed Three section MCC.Detailed ANCHOR4 evaluation performed.
 
Six section MCC.Detailed ANCHOR4 evaluation performed.
Ilil Ill ll>>
Six section MCC.Detailed ANCHOR4 evaluation performed.
l I~
Eight section MCC.Detailed ANCHOR4 evaluation performed.
                          ~I II
Eleven section MCC (including attached EZC-BS).Detailed ANCHOR4 evaluation performed.
                ~  p          I
Large Multisection 600V Switchgear.
\
J I
 
U.S. Nuclear Regulatory Commission AEP: NRC: 1040E Page 2 CC     A. A. Blind A. B. Beach MDEQ - DW 6c RPD NRC Resident Inspector J. R. Padgett
 
ATTACHMENT 1 TO AEP:NRC:1040E RESPONSES TO NRC REQUEST FOR ADDITIONALINI"ORMATION(RAI)
RELATED TO COOK NUCLEAR PLANT'S RESPONSE TO GENERIC LETTER 87-02 (TAC NO M69437)
>)ozg ops
 
          " ll r /
I
: r. J l'PaO. i tf9,"
 
RESPONSE TO THE USNRC REQUEST FOR ADDITIONALINFORMATION UNRESOLVED SAFETY ISSUE USI A-46 REVIEW FOR DONALD C. COOK NUCLEAR PLANT, UNITS 1 & 2
  %ith rcspcct to Section 2.2, page 2-2, discuss the engineering basis for using the In-Structure Response Spectra (ISRS) developed for the Diesel Generator Building to determine loads in the Auxiliary Building at Elevation 609 fcct, and provide the Diesel Generator Building and Auxiliary Building ISRS.
The basis for using the ISRS developed for the. diesel generator building to determine loads in the auxiliary building at elevation 609 feet is provided in the third full paragraph of page 2-2 of the final Seismic Evaluation and Walkdown Summary Report submittal. This paragraph states:
"The ISRS are not available at some of the floor elevations where safe shutdown equipment is located. When this is the case, either the ISRS for a higher elevation or the ISRS developed by a linear interpolation between existing ISRS may be used in the evaluation. In the case of the auxiliary building elevation 609 feet, since the interpolated ISRS are very close to the corresponding ISRS for the diesel generator building, the ISRS for the diesel generator building were used."
To further illustrate this basis, figure 1 shows a plot of four ISRS (SSE, 5% equipment damping) for the elevations in question. These spectra include the auxiliary building 587'nd 633'levations which are the elevations where developed spectra exist directly 'above and below the 609'levation, and the spectra at 609'n the diesel generator building. In addition to these spectra, a 609'uxiliary building spectra is provided that was generated by interpolating the spectral acceleration values at 587'nd 609'. The auxiliary building and diesel generator building share a common foundation mat. As shown in figure 1, there is essentially no difference between the diesel generator spectra at 609'nd the interpolated auxiliary building spectra at 609', and, therefore, there is no.engineering significance with regard to the load determination   ifeither of these are used.
With regard to the diesel generator building and auxiliary building ISRS, the ISRS for all elevations of all buildings at Cook Nuclear Plant included in the USI A-46 evaluation for 2%
and 5% equipment damping have been provided in appendix 8 of the final Seismic Evaluation and Walkdown Summary Report submittal.
 
Donald C. Cook Nuclear Plant Comparison of Selected Auxiliary Building FRS and 1.5xBS to Diesel Generator Building FRS at Elevation 609 feet- 5% Damping 1.50 Ql O       1.00 Q
Q O
O C
O      0.50 CL G9 0.00 0.1                                                                     10           50 Figure 609'ux Oteeel l ISRS for D.G. Building El 609'ompared Frequency (Hz) 609'nterpohted    1.5xBS to ISRS for Auxiliary Building El. 587', 609'     633' 5% Damping
 
Discuss key examples     of designated "rigorously analyzed anchorages," (page 4-6) using hand calculations and ANCHOR4 sofhvarc package and provide copies of their engineering calculations. Also discuss a few cases of anchorage verification based on thc results of tug tests conducted and provide a description of the tests and applicable engineering justification for such an approach.
Table I provides a list of key examples of equipment items with varying levels of anchorage evaluations. These examples include "rigorously analyzed anchorages," comparisons to analyzed equipment items and judgments based on the anchorage inspection and in some cases judgments supplemented by tug tests. Copies of the completed seismic evaluation work sheets (SEWS), the analysis (ifapplicable) and the corresponding anchorage inspection sheets are included in attachment 2 of this response to the RAI for those items marked with a
* in table l. When comparison or judgment was used to satisfy the GIP anchorage criteria an appropriate description of the evaluation is documented in the notes of the SEWS. The anchorage inspections and installation testing performed for the Cook Nuclear Plant USI A-46 evaluations, discussed in greater detail in the response to RAI question 4, greatly exceed the requirements of the GIP. This provides greater confidence in the judgments made by the seismic review team (SRT) that capacity greatly exceeded demand when a formal anchorage calculation was not made.
A review of notes within the data base for each equipment item in the Cook Nuclear Plant USI A-46 effort was conducted in order to respond to this request'for additional information (RAI). Anchorage evaluations performed can be categorized as follows: a) a detailed ANCHOR4 evaluation was performed; b) a detailed hand calculation was performed; c) the anchorage was screened based on an anchorage evaluation on an identical item of equipment and anchorage or a worst case evaluation of a similar equipment item; or d) the SRT judged, based on the weight and anchorage of the equipment, that the anchorage obviously met the GIP screening criteria.
In some cases when method (d) was used, a tug test was performed. This was performed by an SRT member that would tug on the assembly in the weakest direction to a level of about two times the estimated weight of the item. The tug test from a practical standpoint was unnecessary due to the relative light weight and robust'anchorage of the equipment. Each anchorage evaluation whether detailed or by judgment was based on a detailed anchorage inspection and the SRT inspection. Items tug tested were in general light weight components.
Samples of detailed analysis performed by ANCHOR4 and by hand calculations are included with the sample SEWS in attachment 2. When judgment was used the basis for the judgment is included in the notes section of the SEWS. The detailed anchor inspection documentation is also included with each SEWS provided.
The engineering justification for the approach used for performing the anchorage evaluations is described in section 4.4, page 4-26 second paragraph of the Rev. 2 GIP. This paragraph states: "There are various combinations of inspections, analyses, and engineering judgment which can be used to verify the adequacy of equipment anchorage. The Seismic Capability Engineers should select the appropriate combination of elements for each anchorage
 
installation based on the information available. For example, a simple hand calculation may be sufficient for a pump which has only a few, very rugged, anchor bolts in a symmetrical pattern. On the other hand, at times it may be advisable to use one of the computer codes to determine the loads applied to a multi-cabinet motor control center if its anchorage is not symmetrically located." The anchorage evaluations used the appropriate combinations of elements necessary to determine that any screened equipment met the GIP criteria.
Table   1 provides a brief description of the anchorage evaluation performed. There is a good cross section of examples that include all equipment classes on the Cook Nuclear Plant safe shutdown equipment list (SSEL) (1 to 20) and categories of anchorage evaluations performed.
Examples of class 0 and 21 anchorage evaluations are provided in response to RAI questions 5 and 7.
Table 1 Examples of Anchorage Evaluations Class             Equipment ID                       Anchorage Evaluation Performed 1-AB-N             Three section MCC. Detailed ANCHOR4 evaluation performed.
1-ABD-A*               Six section MCC.      Detailed ANCHOR4 evaluation performed.
2-ABV-A               Six section MCC.      Detailed ANCHOR4 evaluation performed.
2-AM-D               Eight section MCC. Detailed ANCHOR4 evaluation performed.
2-EZC-D              Eleven section MCC (including attached EZC-BS).
Detailed ANCHOR4 evaluation performed.
Detailed ANCHOR4 evaluation performed.
Reactor Trip Breaker Units composed of 4 breaker vertical sections.Detailed ANCHOR4 evaluation performed.
1-11A              Large    Multisection 600V Switchgear.      Detailed ANCHOR4    evaluation performed.
Large'ultisection 600V Switchgear.
1-52-RTB              Reactor Trip Breaker Units composed of 4 breaker vertical sections. Detailed ANCHOR4 evaluation performed.
Detailed ANCHOR4 evaluation performed.
2-21B              Large 'ultisection       600V     Switchgear. Detailed ANCHOR4 evaluation performed.
Large Multisection 4KV Switchgear...
2-T21B              Large     Multisection   4KV Switchgear... Detailed ANCHOR4 evaluation performed.
Detailed ANCHOR4 evaluation performed.
1-T11A              Large     Multisection   4KV Switchgear. Detailed ANCHOR4 evaluation performed.
Large Multisection 4KV Switchgear.
1-CRID-III-CVT          Small Transformer 4'-6" x 2'-6" x 2'-4". Weight estimated at 1180 lbs. Detailed ANCHOR4 evaluation performed.
Detailed ANCHOR4 evaluation performed.
I-TR11B              Large supply transformer.         Detailed ANCHOR4 evaluation performed.
Small Transformer 4'-6" x 2'-6" x 2'-4".Weight estimated at 1180 lbs.Detailed ANCHOR4 evaluation performed.
2-CRID-I-CVT*            Small Transformer 4'-6" x 2'-6" x 2'-4". Weight estimated at 1180 lbs. Detailed ANCHOR4 evaluation performed.
Large supply transformer.
 
Detailed ANCHOR4 evaluation performed.
Small Transformer 4'-6" x 2'-6" x 2'-4".Weight estimated at 1180 lbs.Detailed ANCHOR4 evaluation performed.
Table I (Continued)
Table I (Continued)
Examples of Anchorage Evaluations Class Equipment ID 2-TR-ELSC 1-PP-10W*1-PP-4 1-PP-50W 1-QT-111-AB 12-PP-31S 2-PP-26N 2-PP-3E 2-PP-46-4*
Examples of Anchorage Evaluations Class Equipment ID                     Anchorage Evaluation Pcrformcd 2-TR-ELSC         Small Transformer 20" D x 30" W x 36" H. Detailed ANCHOR4 evaluation performed.
2-PP-82S 2-QT-106-CD1 1-PP-7W 2-PP-9W 1-HV-AFP-8 RE-2 Anchorage Evaluation Pcrformcd Small Transformer 20" D x 30" W x 36" H.Detailed ANCHOR4 evaluation performed.
1-PP-10W*        .900 GPM pump. 'etailed ANCHOR4 evaluation performed including nozzle loadings on the suction and discharge piping.
.900 GPM pump.'etailed ANCHOR4 evaluation performed including nozzle loadings on the suction and discharge piping.440 GPM pump.Detailed ANCHOR4 evaluation performed including nozzle loadings on the suction and discharge piping.Large Pacific Pump with a weight of 20,000 lbs.Detailed , ANCHOR4 evaluation performed.
1-PP-4          440 GPM pump. Detailed ANCHOR4 evaluation performed including nozzle loadings on the suction and discharge piping.
Small 90 GPM Pump-weight about 800 lbs.Detailed ANCHOR4 evaluation performed.
1-PP-50W          Large Pacific Pump with a weight of 20,000 lbs. Detailed
100 GPM pump-2076 lbs.Detailed ANCHOR4 evaluation performed..
                        , ANCHOR4 evaluation performed.
Item was designated an outlier until nozzle loads are defined.Pacific Pump-total weight 5500 lbs.Detailed ANCHOR4 evaluation performed including nozzle loadings on the suction and discharge piping.Large Ingersoll Rand Pump-7935 lbs.Detailed ANCHOR4 evaluation performed.
1-QT-111-AB        Small 90 GPM Pump - weight about 800 lbs. Detailed ANCHOR4 evaluation performed.
Small Goulds Pump-511 lbs.Nozzle loads judged to be small by SRT.Anchorage screened by judgment after review of the anchorage inspection documentation (four 5l8" anchors)and the walkdown.Small Goulds Pump-214 lbs.Nozzle loads judged to be small by.SRT.Anchorage screened by judgment after review of the anchorage inspection documentation (four 5/8" anchors)and the walkdown.Small Worthington Pump-135 lbs.Detailed ANCHOR4 evaluation performed induding nozzle loadings on the suction arid discharge piping.Large vertical pump with a 45'ong vertical casing.Screening of anchorage based on a review of existing qualification that included an anchorage evaluation.
12-PP-31S        100 GPM pump - 2076 lbs.             Detailed ANCHOR4 evaluation performed.. Item was designated an outlier until nozzle loads are defined.
Vertical pump.Detailed ANCHOR4 evaluation performed'including nozzle loadings on the suction and discharge piping.Small light weight fan-154 lbs.Anchorage accepted by judgment aAer a review of the anchorage drawings.  
2-PP-26N          Pacific Pump - total weight 5500 lbs. Detailed ANCHOR4 evaluation performed including nozzle loadings on the suction and discharge piping.
2-PP-3E          Large Ingersoll Rand Pump - 7935 lbs.             Detailed ANCHOR4 evaluation performed.
2-PP-46-4*        Small Goulds Pump - 511 lbs. Nozzle loads judged to be small by SRT. Anchorage screened by judgment after review of the anchorage inspection documentation (four 5l8" anchors) and the walkdown.
2-PP-82S          Small Goulds Pump - 214 lbs. Nozzle loads judged to be small by. SRT. Anchorage screened by judgment after review of the anchorage inspection documentation (four 5/8" anchors) and the walkdown.
2-QT-106-CD1        Small Worthington Pump - 135 lbs. Detailed ANCHOR4 evaluation performed induding nozzle loadings on the suction arid discharge piping.
1-PP-7W          Large vertical pump with a 45'ong vertical casing.
Screening of anchorage based on a review of existing qualification that included an anchorage evaluation.
2-PP-9W          Vertical pump.         Detailed   ANCHOR4 evaluation performed'including nozzle loadings on the suction and discharge piping.
1-HV-AFP-8RE-2        Small light weight fan - 154 lbs. Anchorage accepted by judgment aAer a review of the anchorage drawings.
 
Table 1 (Continued) of Anchorage Evaluations
                                                'xamples Class  Kquipmcnt ID              Anchorage Evaluation Performed 1-HV-AFP-M1*    Medium size fan - 500 lbs, mounted with 16 1/2" steel to steel bolts. Anchorage accepted by judgment after a review of the anchorage drawings.
1-HV-AFP-Xl  Small light weight fan - 287 lbs, mounted with 12 3/8" steel to steel bolts. Anchorage accepted by judgment after a review of the anchorage drawings.
I-HV-CEQ-I  Large fan unit. Detailed ANCHOR4 evaluation performed.
12-HV-ES W-7*  Large fan unit. Detailed ANCHOR4 evaluation performed.
12-HU-ESW-1  Large fan unit similar to 12-HV-ESW-7. Anchorage screened based on comparison to ANCHOR4 evaluation for 12-HV-ESW-7.
2-HU-AFP-BRE-1  Small light weight fan - 154 lbs. Anchorage accepted by judgment after a review of the anchorage drawings.
2-HV-DGS-1    Large fan - 1531 lbs. Detailed ANCHOR4 evaluation performed.
9      2-HV-DGX-1    Large fan - 1100 lbs. Detailed ANCHOR4 evaluation performed.
10    1-HV-ACRA-1    Cooler unit with a weight estimate of 3000 lbs. Detailed ANCHOR4 evaluation performed.
10  1-HV-AES-1 (FLT) Large filter unit - 24,000 lbs. Detailed ANCHOR4 evaluation performed.
1-AFW*      Small wall mounted panel (36" H x 20" W x 6" D).
Panel estimated to weigh 50 lbs. Anchorage screened by judgment after a review of the anchorage description and a 100 lb. tug test.
14      1-BCTC-AB    Panel 38" W x 60" H x 9" D. Weight estimated at 300 lbs. Detailed ANCHOR4 evaluation performed.
14        1-CRCD    Rack 38" W x 84" H x 9" D - Weight estimated at 400 lbs. Detailed ANCHOR4 evaluation performed.
14        1-ELSC    Small wall mounted panel (36" H x 20" W x 6" D).
Panel estimated to weight 50 lbs. Anchorage screened by judgment after a review of the anchorage description and a 100 lb. tug test.
14        1-ELSCX    Small distribution panel 57" H x 22" W x 6" D.
Weight estimated at 370 lbs. Detailed ANCHOR4 evaluation performed.


Table 1 (Continued)
Table 1 (Continued)
'xamples of Anchorage Evaluations Class 9 10 10 14 14 14 14 Kquipmcnt ID 1-HV-AFP-M1*
Examples of Anchorage Evaluations Class Equipment ID                  Anchorage Evaluation Performed 14       1-MDAB        Wall mounted switchboard 38" W x 84" H x 9" D.
1-HV-AFP-Xl I-HV-CEQ-I 12-HV-ES W-7*12-HU-ESW-1 2-HU-AFP-BRE-1 2-HV-DGS-1 2-HV-DGX-1 1-HV-ACRA-1 1-HV-AES-1 (FLT)1-AFW*1-BCTC-AB 1-CRCD 1-ELSC 1-ELSCX Anchorage Evaluation Performed Medium size fan-500 lbs, mounted with 16 1/2" steel to steel bolts.Anchorage accepted by judgment after a review of the anchorage drawings.Small light weight fan-287 lbs, mounted with 12 3/8" steel to steel bolts.Anchorage accepted by judgment after a review of the anchorage drawings.Large fan unit.Detailed ANCHOR4 evaluation performed.
Anchorage accepted by comparison to the ANCHOR4 evaluation performed for 1-MCAB.
Large fan unit.Detailed ANCHOR4 evaluation performed.
: 14.      1-TDAB          Wall mounted switchboard 38" W x 84" H x 9" D.
Large fan unit similar to 12-HV-ESW-7.
Anchorage accepted by comparison to the ANCHOR4 evaluation performed for 1-MCAB.
Anchorage screened based on comparison to ANCHOR4 evaluation for 12-HV-ESW-7.
14  1-VDCD-1 8. 2     Pair of 22" W x 38" H x 7" D distribution panels.
Small light weight fan-154 lbs.Anchorage accepted by judgment after a review of the anchorage drawings.Large fan-1531 lbs.Detailed ANCHOR4 evaluation performed.
Anchorage accepted by comparison to the ANCHOR4 evaluation    performed    for 1-VDAB-1 (Identical Construction).
Large fan-1100 lbs.Detailed ANCHOR4 evaluation performed.
14      2-AFWX          Wall mounted panel - 57" H x 22" W x 6" D. Weight estimated at 100 to 150 lbs. Anchorage screened by judgment after a review of the anchorage description and a tug test.
Cooler unit with a weight estimate of 3000 lbs.Detailed ANCHOR4 evaluation performed.
14  2-BATT-N-SH        Wall mounted Battery Shunt. Weight estimated at 100 lbs. Anchorage screened by judgment after a review of the anchorage description, the ANCHOR4 evaluation performed for 1-BATT-N-SH and a tug test.
Large filter unit-24,000 lbs.Detailed ANCHOR4 evaluation performed.
14        2-DCN          Switchboard bolted to a steel rack. Anchorage screened based on comparison to the ANCHOR4 analysis for similar panel 1-DCN.
Small wall mounted panel (36" H x 20" W x 6" D).Panel estimated to weigh 50 lbs.Anchorage screened by judgment after a review of the anchorage description and a 100 lb.tug test.Panel 38" W x 60" H x 9" D.Weight estimated at 300 lbs.Detailed ANCHOR4 evaluation performed.
14  2-VDAB-1 & 2      Pair of 22" W x 38" H x 7" D distribution panels.
Rack 38" W x 84" H x 9" D-Weight estimated at 400 lbs.Detailed ANCHOR4 evaluation performed.
Anchorage screened based on comparison to the detailed ANCHOR4 evaluation performed for similar panel 1-VDAB-1.
Small wall mounted panel (36" H x 20" W x 6" D).Panel estimated to weight 50 lbs.Anchorage screened by judgment after a review of the anchorage description and a 100 lb.tug test.Small distribution panel 57" H x 22" W x 6" D.Weight estimated at 370 lbs.Detailed ANCHOR4 evaluation performed.
15    2-BATT-AB*        Substantial 2 - step battery rack. Anchorage evaluation based on a review of existing anchorage and recent modifications made to the racks.
16      1-BC-AB1        Battery Charger 3025 lbs. Detailed ANCHOR4 evaluation performed.
16    1-CIUD-I-INV      Inverter 2'-5" x 3'          6'-3" - 2100 lbs. Detailed ANCHOR4 evaluation performed.
16      2-BC-A        Battery Charger 32" L x 24" W x 46" H. Detailed ANCHOR4 evaluation performed.
16    2-D GAB-INV      Inverter 28" x 28" x 57".           Detailed ANCHOR4 evaluation performed.
1-OME-150-AB*      Large Diesel Generator.        Anchorage capacity for 2-OME-150-CD indicated an additional margin of 36.
Anchorage screened based on comparison to that evaluation.
 
Table 1 (Continued)
Table 1 (Continued)
Examples of Anchorage Evaluations Class 14 14.14 14 14 14 14 15 16 16 16 16 Equipment ID 1-M DAB 1-TDAB 1-VDCD-1 8.2 2-AFWX 2-BATT-N-SH 2-DCN 2-VDAB-1&2 2-BATT-AB*
Examples of Anchorage Evaluations Class Equipment ID                 Anchorage Evaluation Performed 18    1-CLI-113        Small transmitter - 27 lbs. Anchorage screened by judgment after review of the anchorage inspection documentation and the walkdown.
1-BC-AB1 1-CIUD-I-INV 2-BC-A 2-D GAB-INV 1-OME-150-AB*
18    1-CPS-317        Small 9" x 9" panel. Anchorage screened by judgment after review of the anchorage inspection documentation and the walkdown.
Anchorage Evaluation Performed Wall mounted switchboard 38" W x 84" H x 9" D.Anchorage accepted by comparison to the ANCHOR4 evaluation performed for 1-MCAB.Wall mounted switchboard 38" W x 84" H x 9" D.Anchorage accepted by comparison to the ANCHOR4 evaluation performed for 1-MCAB.Pair of 22" W x 38" H x 7" D distribution panels.Anchorage accepted by comparison to the ANCHOR4 evaluation performed for 1-V DAB-1 (Identical Construction).
1&    1-CPS-410        Rack supported device.       One detailed ANCHOR4 analysis was performed to encompass 1-CPS-410, 8c 420 and 2-CPS-410 Ec, 420.
Wall mounted panel-57" H x 22" W x 6" D.Weight estimated at 100 to 150 lbs.Anchorage screened by judgment after a review of the anchorage description and a tug test.Wall mounted Battery Shunt.Weight estimated at 100 lbs.Anchorage screened by judgment after a review of the anchorage description, the ANCHOR4 evaluation performed for 1-BATT-N-SH and a tug test.Switchboard bolted to a steel rack.Anchorage screened based on comparison to the ANCHOR4 analysis for similar panel 1-DCN.Pair of 22" W x 38" H x 7" D distribution panels.Anchorage screened based on comparison to the detailed ANCHOR4 evaluation performed for similar panel 1-V DAB-1.Substantial 2-step battery rack.Anchorage evaluation based on a review of existing anchorage and recent modifications made to the racks.Battery Charger 3025 lbs.Detailed ANCHOR4 evaluation performed.
18  1-MPP-232        Small pressure transmitter - 35 lbs. Anchorage screened by judgment after review of the anchorage inspection documentation and the walkdown.
Inverter 2'-5" x 3'6'-3"-2100 lbs.Detailed ANCHOR4 evaluation performed.
18    1-NPP-151        Small pressure transmitter - 24 lbs. including bracket.
Battery Charger 32" L x 24" W x 46" H.Detailed ANCHOR4 evaluation performed.
Anchorage screened by judgment aAer review of the anchorage inspection documentation and the walkdown.
Inverter 28" x 28" x 57".Detailed ANCHOR4 evaluation performed.
1&    2-8LI-110        Instrument on small, stiff bracket. Assembly weighs less than 100 lbs. Anchorage screened by judgment after review of the anchorage inspection documentation and
Large Diesel Generator.
                        ,the walkdown.
Anchorage capacity for 2-OME-150-CD indicated an additional margin of 36.Anchorage screened based on comparison to that evaluation.
18    2-CLI-113        Transmitter bolted to support composed of a small diameter pipe. Anchorage screened by judgment after review of the anchorage inspection documentation and the walkdown.
18  2-CPS-410        Small device on a rack. Detailed ANCHOR4 evaluation performed.
18    2-FFI-210      Transmitter bolted to support composed of a small diameter pipe. Anchorage screened by judgment after review of the anchorage inspection documentation and the walkdown.
18    2-IFI-311      Transmitter bolted to support composed of a small diameter pipe. Anchorage screened by judgment after review of the anchorage inspection documentation and the walkdown.
18    2-IFI-51      Transmitter bolted to support composed of a small diameter pipe. Anchorage screened by judgment after review of the anchorage inspection documentation and the walkdown.
 
Table 1 (Continued)
Table 1 (Continued)
Examples of Anchorage Evaluations Class 18 18 1&18 18 1&18 18 18 18 18 Equipment ID 1-CLI-113 1-CPS-317 1-CPS-410 1-MPP-232 1-NPP-151 2-8LI-110 2-CLI-113 2-CPS-410 2-FFI-210 2-IFI-311 2-IFI-51 Anchorage Evaluation Performed Small transmitter
Examples of Anchorage Evaluations Class Equipmcnt ID                   Anchorage Evaluation Performed 18  2-XRY-153        Small rack consisting of a small panel bolted to P1000 unistruts. Anchorage screened by judgment after review of   the anchorage     inspection documentation   and the walkdown.
-27 lbs.Anchorage screened by judgment after review of the anchorage inspection documentation and the walkdown.Small 9" x 9" panel.Anchorage screened by judgment after review of the anchorage inspection documentation and the walkdown.Rack supported device.One detailed ANCHOR4 analysis was performed to encompass 1-CPS-410, 8c 420 and 2-CPS-410 Ec, 420.Small pressure transmitter
19   1-VTS-356       Light weight component - 5 lbs. Anchorage screened by judgment after review of the anchorage inspection documentation, the walkdown and a tug test.
-35 lbs.Anchorage screened by judgment after review of the anchorage inspection documentation and the walkdown.Small pressure transmitter
20      2-Al 1*      Relay panel included in a section of panel from A6 to A15. Weight estimate of entire panel 3000 lbs. Detailed ANCHOR4 evaluation performed.
-24 lbs.including bracket.Anchorage screened by judgment aAer review of the anchorage inspection documentation and the walkdown.Instrument on small, stiff bracket.Assembly weighs less than 100 lbs.Anchorage screened by judgment after review of the anchorage inspection documentation and ,the walkdown.Transmitter bolted to support composed of a small diameter pipe.Anchorage screened by judgment after review of the anchorage inspection documentation and the walkdown.Small device on a rack.Detailed ANCHOR4 evaluation performed.
20    1-ACRA-2        Stand alone panel 24" L x 24" D x 84" H. Weight estimated @ 700 lbs. Detailed ANCHOR4 evaluation performed.
Transmitter bolted to support composed of a small diameter pipe.Anchorage screened by judgment after review of the anchorage inspection documentation and the walkdown.Transmitter bolted to support composed of a small diameter pipe.Anchorage screened by judgment after review of the anchorage inspection documentation and the walkdown.Transmitter bolted to support composed of a small diameter pipe.Anchorage screened by judgment after review of the anchorage inspection documentation and the walkdown.
20        1-CAS        Large Control Panel 24'-6" L x 6'-3" D x     7'. Hand calculation performed on the weak link in the anchorage system and found to be more than adequate.
Table 1 (Continued)
20      1-D GAB        Large Control Panel in Diesel Generator Room. Detailed ANCHOR4'evaluation performed.
Examples of Anchorage Evaluations Class 18 19 20 20 20 20 20 20 20 20 20 20 20 Equipmcnt ID 2-XRY-153 1-VTS-356 2-Al 1*1-AC RA-2 1-CAS 1-D GAB 1-GR-1 1-HSD1 1-NRI-23-ISO 2-CG2 2-PRZ 2-RPS-A 2-SWRR Anchorage Evaluation Performed Small rack consisting of a small panel bolted to P1000 unistruts.
20      1-GR-1        Relay Rack 6'-6" L x     8'. Weight estimated    300 lbs./lineal foot of rack. Hand calculation performed on the weak link in the anchorage system and found to be more than adequate.
Anchorage screened by judgment after review of the anchorage inspection documentation and the walkdown.Light weight component-5 lbs.Anchorage screened by judgment after review of the anchorage inspection documentation, the walkdown and a tug test.Relay panel included in a section of panel from A6 to A15.Weight estimate of entire panel 3000 lbs.Detailed ANCHOR4 evaluation performed.
20      1-HSD1        Walkthrough cabinet 12'         x 6'   x 8'. Detailed ANCHOR4 evaluation performed.
Stand alone panel 24" L x 24" D x 84" H.Weight estimated@700 lbs.Detailed ANCHOR4 evaluation performed.
20  1-NRI-23-ISO      Heavy duty rack. Anchorage judged adequate based on review of the anchorage inspection documentation, the walkdown and the obvious ruggedness and installation of this new design.
Large Control Panel 24'-6" L x 6'-3" D x 7'.Hand calculation performed on the weak link in the anchorage system and found to be more than adequate.Large Control Panel in Diesel Generator Room.Detailed ANCHOR4'evaluation performed.
20      2-CG2          Control cabinet 5'-6" L x 2'-6" W x 7'-7" H.
Relay Rack 6'-6" L x 8'.Weight estimated300 lbs./lineal foot of rack.Hand calculation performed on the weak link in the anchorage system and found to be more than adequate.Walkthrough cabinet 12'x 6'x 8'.Detailed ANCHOR4 evaluation performed.
Anchorage screened based on comparison to the ANCHOR4 evaluation performed for similar panel 1-RPC-1.
Heavy duty rack.Anchorage judged adequate based on review of the anchorage inspection documentation, the walkdown and the obvious ruggedness and installation of this new design.Control cabinet 5'-6" L x 2'-6" W x 7'-7" H.Anchorage screened based on comparison to the ANCHOR4 evaluation performed for similar panel 1-RPC-1.Item is included in a Control Panel with two other items.Total panel is 12'-3" L x 8'.Weight estimated at 300 Ibs/lineal ft.Anchorage screened based on comparison to the ANCHOR4 evaluation performed for 1-SG, Relay cabinet 90" W x 30" D x 90" H, welded to embedded steel.Detailed ANCHOR4 evaluation performed.
20      2-PRZ          Item is included in a Control Panel with two other items.
Cabinet 16'x 8'x 18" D.Weight estimated at 300 lbs/lineal ft.Detailed ANCHOR4 evaluation performed.  
Total panel is 12'-3" L x     8'. Weight estimated at 300 Ibs/lineal ft.       Anchorage screened based on comparison to the ANCHOR4 evaluation performed for 1-SG, 20      2-RPS-A        Relay cabinet 90" W x 30" D x 90" H, welded to embedded       steel. Detailed ANCHOR4 evaluation performed.
20      2-SWRR        Cabinet 16' x 8'         x 18" D. Weight estimated at 300 lbs/lineal ft. Detailed ANCHOR4 evaluation performed.
: 3) Table 4.5 shows that the 1.5 x Bounding Spectrum and the, GERS with an amplification factor of 7 do not cnvclopc thc floor response spectra. Provide copies of thc seismic demand versus capacity spectral comparison.
The location of the devices that are documented as outliers in table 4.5 are at elevation 687'n the containment building. Figure 2 shows a comparison of the ISRS at elevation 687'n the containment building to 1.5 times the bounding spectrum. The GERS must be compared to 1.5 times the demand spectra for median centered spectra because Cook Nuclear Plant response spectra was designated as median centered spectra by the NRC. An amplification factor through the piping and support of the piping system must also be considered when comparing GERS to the demand spectra. The GIP defines the upper bound amplification factor as 7. Therefore, the total ISRS was multiplied by 1.5 x 7 (10.5) to define the demand that is compared to the GERS. Figure 3 shows a comparison of the GERS for air operated valves (AOVs) to 10.5 x the ISRS at containment building elevation 687'. Figure 4 shows a comparison of the GERS for solenoid operated valves (SOUs) to 10.5 x the ISRS at containment building elevation 687'. Figure 5 shows a comparison of the GERS for motor operators to 10.5 x the ISRS at containment building elevation 687'. As shown in figures 2, 3, 4, and 5, the demand exceeds the capacity.
The outlier resolution for these items is to review the existing piping analyses and compare the demand acceleration from the analysis to the capacity acceleration. It is believed that the actual amplification factor is less than 7 and the capacity will be shown to be greater than the demand once the outlier resolution has been completed.
10
 
Donald C. Cook Nuclear Plant Cont. Bldg. Elev. 687.5 feet vs 1.5xBS 5% Damping 2,00 1,50 C
0 GJ S
Q)                                                                    :  ~ ~
i ~ .:  ~: ~ X I    ~ ~
u  1,00 0                              P
                                ~ ~  ~      ~ ~ ~      0 ~ ~
0 I        I ~ I ~ 'I 0.50
                                                      ~ ~ I    r            ~    5  ~ ~ ~ ~ \
                                    ~  r,, ~                  J' ~ ~  ~    ~    '1  ~  ~  I 0 00
      ~
0.1                                                                                    10 Frequency (Hz) 1.5xBS                                                  EL667.5 Figure 2 ISRS for Containment El. 6".7.5'. Vs. 1.5 x Bounding Spectrum - 5% Damping 11
 
Donald C. Cook Nuclear Plant Amplified Containment Building El. 687.5 feet vs AOV GERS 5o/o Damping 20
                                                                                  ~ ~ ~  r  ~ ~ ~ ~ ~ ~ ~ ~
15 C
0 l6$                        'I  r ~ r r ~ ~                                                                ~ ~ r
: 0)                            '  ~  h  ~
10 (5                                                                ~  r D
S
                                                                        .'/'./:
: a.      5 (0
                                            ~ ~ ~ ~ ~ ~ ~ ~
: r~..-'..
                                                            -:.r ~ ~ ~  ~ ~ ': ~:
                                                                                ~    ~  ': ~:.
                                                                                    ~  \4    ~
0 0.1                                                                                          10 Frequency (Hz) 1 O.Gx                                                      AOV EL687                                                        GERS Figure 3 Amplified ISRS for Containment El. 687.5's. AOV GERS -5% Damping
 
Donald C. Cook Nuclear Plant Amplified Containment Building El. 687.5 feet vs Solenoid Valve GERS 5/o Damping 20 I    I    I  I        \    I
                              ~  r                                            1    h      ~
                                    ~ \  h ~
15 O                              I'  I'  I                                                            'I ~ ~
C                                  r I                                ~    e ~                    0          ~        h    ~ ~
u    10 O
C                              I  ~                                          ~ ~ ~ h    ~ ~    h S
0 Q)
: a.      5 CO                          I  \  ~ h  h I j        I              ~    I'        ~  P
                                                ~
g
                                                    /~ ~ ~ ~ ~ ~ I~ ~ ~ ~ ~
                                                /                            ~ ~ ~ ~ h  ~ ~ ~ ~ ~ \ ~ ~
0.1                                                                                    10          50
                                              . Frequency (Hz) 1 0.5x                                                Solenoid EL687                                                  GERS F<igure 4  Amplified ISRS for Containment El. 687.5's. Solenoid Valve GERS - 5% Damping 13
 
Donald C. Cook Nuclear Plant Amplified Containment Building El. 687.5 feet vs MOV GERS 5% Damping 25                                                                        'r                '
                                                                              ~ ~    ~ ~  ~ ~ r ~
                                                              ~    r 20
                                                                                                                      'I
                                                                                                      . ~ s...  ~ .s.)  ~ ~ .... ~
C                                                                                                  ~:-          -':  I ~:. ~-
0                                                                                                        ~ ~ ~
r  ~ ~ ~
C 6                                            ~ ~ ~ ~  ~ t  I. r  ~ ~ ~
                                                    ~;:.I-
                                                        ~
                                                ~
O                            ~    4  % ~            . I...... '
O                                  e  e                                        0
                              ~ e ~        ~                                  ~    ~ ~  ~                    ~  ~ ./ ~
10
                                ~  ~
0                        '
r  ~ o'  ~              ~ ~    J'  ~    ~  ~ I ~ ~ ~ I CL (0    -5 t      r                    ~ ~ ~ 5
                            ~  5  0 0  4 1                                ~    8  ~  I 0
0.1                                                                                    10                              50 Frequency (Hz) 3 0.5x                                                  MOV EL687                                                  GERS Figure 5 Amplified ISRS for Containment El. 687.5's. Motor Operator GERS - 5% Damping l4
 
Regarding thc tightncss check of expansion anchors performed on a representative number of mechanical and electrical components, state whether the representative number meets thc sample size for expansion anchor tightness check as listed on table C.2-4 of the GIP.
The number of expansion bolts tightness tested for the Cook Nuclear Plant VSI A-46 effort exceeded the sample size for expansion anchor tightness check as listed on table C.2-4 of the GIP. Bolt tightness checks were conducted on every accessible expansion bolt in the scope of USI A-46 equipment on the SSEL. In addition all accessible steel to steel and cast-in-place bolts/nuts were visually inspected and loose nuts were tightened as needed. This was done to ensure that the bolts were snug and therefore active in the event of vertical reaction loadings on the anchorage during an earthquake. Other tests using ultrasonic techniques to determine embedment length and weld quality were also performed as an enhancement to the program. Anchorage inspection documentation is included with the SEWS in attachment 2 of this RAI.
When the type of expansion anchor used could not be positively determined, a 0.6 reduction factor for unknown expansion bolts was used in the anchorage evaluations performed in accordance with the GIP.
Inaccessible anchor bolts were not tightness tested. The GIP excludes inaccessible anchors from the sample and states in the second paragraph of section 4 4.1 that "all accessible anchorages should be visually inspected. All practicable'means should be tried to inspect inaccessible anchorages or those if                                                                if obstructed from view they are needed for strength to secure the item of equipment or they secure housing essential relays (to avoid impact or excessive cabinet motion). For exam'pie, it is 'quipment not  considered  practicable to resort to equipment disassembly, removal, etc., to inspect inaccessible anchorages. The basis for the engineering judgment for not performing these inspections should be documented." The majority of anchorages for SSEL equipment were accessible. These anchorages were tightness tested, had their embedment length verified and were visually inspected by the anchorage inspection team and were again visually inspected by the SRT.
There were some fans that had inaccessible anchorages that would have required removal of fire protection material to inspect and disposal of material that could possibly be contaminated. This would not have been consistent with the ALARAgoals at the site (dust and exposure). These fans had calculated or judgmental anchorage margins of 10 or greater and therefore were not inspected.
Anchorages for these were primarily cast in place or steel to steel bolts and the tightness check was not required to be performed. The regenerative heat exchanger anchorages were also not visually inspected due to the time required to remove insulation and to perform the anchorage inspection in a high radiation area. There werc also a number of wall mounted panels (class 14 and 20) that were not tightness checked. Tightness checking of these bolts would have required complete equipment disassembly and removal of the equipment. This activity would be contrary to section 4.4.1 of the GIP. These panels also had very high margins even when considering a 0.6 reduction factor for unknown expansion anchors. In the cases mentioned above, the engineering judgment for not performing the inspections were documented on the SEWS for the equipment item. There were also some cases when isolated bolts were not tested on a given assembly because they could not be reached without disassembly.          These cases are documented in the anchorage inspection documentation.
: 5) Table 5.1 shows only four (4) vertical tanks for GIP review. Provide the engineering criteria for sclccting only four vertical tanks and thc justification of the structural integrity of the other smaller vertical tanks for Safe Shutdown E<arthquakc (SSK). Indicate the number of vertical tanks supported on skirts and structural legs at Cook Nuclear Plant, Units 1 8r, 2.
Table 5.1 of the final Seismic Evaluation and Walkdown Summary Report submittal includes only the flat bottom vertical tanks that may be evaluated using the GIP methodology in section 7 of the GIP. These tanks are described in the first paragraph of section 7.3.1 of the GIP which states: "The type of vertical tanks covered by the screening guidelines are large, cylindrical tanks whose axis of symmetry is vertical and are supported, on their flat bottoms, directly on a concrete pad or a floor."
The evaluation of the remaining tanks are documented in table 4-7 of the final Seismic Evaluation and Walkdown Summary Report submittal. Items 1 and 2 of table 4-7 "Commentary on Equipment Items Meeting the Intent of the GIP Caveats" discuss this evaluation. Item 1 includes class 0 equipment items and states "There are 50 and 51 equipment items identified as class 0 in unit 1 and unit 2 respectively. These items were primarily passive and were similar to items considered as components of the class 21 equipment. For these equipment items the SRT assessed the potential for seismic damage and made the necessary evaluations. All these items were at locations in the plant where 1.5 times the bounding spectrum is greater than the floor response spectra where they are located. Anchorage was evaluated using the GIP criteria." Item 2 includes class 21 tanks and heat exchangers not covered by the GIP criteria (section 7 of the GIP). This item states:. "There are 63 and 58 equipment items identified as class 21 in unit 1 and unit 2 respectively. Of these tanks and heat exchangers, there were only 20 where the GIP criteria was applicable. The remaining 98 were evaluated by meeting the intent of the GIP criteria. Anchorage was evaluated using the GIP criteria."
The class 0 and 21 equipment items on the SSEL that may be categorized as tanks and heat exchangers for unit 1 and 2 are listed in tables 2 &, 3, respectively. The table includes a description of the tank or heat exchangers configuration and anchorage evaluation. Included in that list are all tanks supported on skirts and structural legs that are on the Cook Nuclear Plant SSEL. Tanks on legs include 1,2-QT-113-AB1, AB2, CD1, CD2 (eight diesel oil filters); 1,2-QT-144-AB, CD (four diesel oil filters}; 1,2-TK-10 (two reactor coolant letdown volume control tanks); 1,2-TK-11 (two boron injection tanks); 1-TK-12-N, 12-TK-12-M and 2-TK-12S (three boric acid storage tanks}. Tanks on skirts include 1,2-TK-37 (two component cooling water surge tanks); and 1,2-QT-141, AB1, AB2, CD1, CD2 (eight diesel starting air receivers).
Sample SEWS (including the calculations and anchorage inspection documentation) are provided in attachment 3 for the tanks that have an
* aAer the equipment ID in tables 2 and 3.


3)Table 4.5 shows that the 1.5 x Bounding Spectrum and the, GERS with an amplification factor of 7 do not cnvclopc thc floor response spectra.Provide copies of thc seismic demand versus capacity spectral comparison.
Table 2 Description of Configuration and Anchorage Evaluation for Tanks and Heat Exchangers (Unit 1)
The location of the devices that are documented as outliers in table 4.5 are at elevation 687'n the containment building.Figure 2 shows a comparison of the ISRS at elevation 687'n the containment building to 1.5 times the bounding spectrum.The GERS must be compared to 1.5 times the demand spectra for median centered spectra because Cook Nuclear Plant response spectra was designated as median centered spectra by the NRC.An amplification factor through the piping and support of the piping system must also be considered when comparing GERS to the demand spectra.The GIP defines the upper bound amplification factor as 7.Therefore, the total ISRS was multiplied by 1.5 x 7 (10.5)to define the demand that is compared to the GERS.Figure 3 shows a comparison of the GERS for air operated valves (AOVs)to 10.5 x the ISRS at containment building elevation 687'.Figure 4 shows a comparison of the GERS for solenoid operated valves (SOUs)to 10.5 x the ISRS at containment building elevation 687'.Figure 5 shows a comparison of the GERS for motor operators to 10.5 x the ISRS at containment building elevation 687'.As shown in figures 2, 3, 4, and 5, the demand exceeds the capacity.The outlier resolution for these items is to review the existing piping analyses and compare the demand acceleration from the analysis to the capacity acceleration.
Class        ID            Description      Building    El.           Description of Configuration and Anchorage Evaluation I-QT-112-AB &,      AB & CD EMERG      AUXILIARY 579    Small tank-like component containing oil, with a height of about 5', and a CD (2 filters)      DIESEL FULL                          diameter of 3'. Weight full = 2707 lbs. Anchored by three 3/8" diameter J-FLOW LUBE OIL FILTERS bolts and three 5/8" wedge anchors at 60 degree intervals (i.e., evenly spaced).
It is believed that the actual amplification factor is less than 7 and the capacity will be shown to be greater than the demand once the outlier resolution has been completed.
The anchorage was screened based on a review of an existing vendor calculation that indicated a high anchorage margin.
10
I-QT- I 13-AB I *, AB &, CD EMERG    AUXILIARY 579    Strainer supported on 4 angle legs. Each leg is anchored by one 1/2" J-bolt 113-AB2, 113-      DIESEL FULL                          anchor. The total weight is 1730 lbs. The ANCHOR4 analysis performed CD I, 113-CD2      FLOW LUBE OIL STRAINERS for 1-QT-113-AB1 and 1-QT-113-AB2 together, since they are connected (4 strainers) by a relatively rigid piping segment, indicated that the anchorage was adequate..
I-QT-116-AB &      AB &, CD EMERG    AUXILIARY 579    Heaters anchored by three 3/8" J-bolts at 120 degrees apart, on a 5" high CD (2 heater        DIESEL LUBE OIL                      concrete pad. The weight of the tank is approximately 152.5 lbs.
tanks)              HEATER (TANK)
Anchorage screened by an ANCHOR4 evaluation.
I-QT-118-AB &      AB EMERG DIESEL    AUXILIARY 579    Filter anchored by three 3/8" J-bolts with a minimum embedment      of CD (2 filters)     BYPASS LUBE OIL                      10.25", at 120 degrees.
FILTER The approximate weight of the tank is estimated to be the same as 1-QT-112-CD (Wt =2707 lbs.), because the tanks are of the same manufacturer, and size, and both hold oil.
Anchorage screened by an ANCHOR4 evaluation.


2,00 Donald C.Cook Nuclear Plant Cont.Bldg.Elev.687.5 feet vs 1.5xBS 5%Damping 1,50 C 0 GJ S Q)u 1,00 0 0 0.50 P~~~~~~0~~~~I r:~~i~.:~:~X I~~I I~I~'I~5~~~~\~r,,~J'~~~~'1~~I 0~00 0.1 10 Frequency (Hz)1.5xBS EL667.5 Figure 2 ISRS for Containment El.6".7.5'.Vs.1.5 x Bounding Spectrum-5%Damping 11
Table 2 (Continued)
Description of Configuration and Anchorage Evaluation for Tanks and Heat Exchangers (Unit 1)
Class      ID            Description      Building    El.          Description of Configuration and Anchorage Evaluation I-QT-143-ABI,   AB EMERG            AUXILIARY          Air dryer mounted on 2-1/2" x 2-1/2" x 1/4" angle steel frame with other AB2, CD I &      DIESEL CONTROL                          air dryer tanks. Angle frame on 1-3/4" Grout Pad. Frame anchored by CD2 (4 dryers)  AIR DRYER I eight 1/2" non-shell type expansion anchors, four per base plate. Tanks hold air and are the size of fire extinguishers.
Anchorage judged adequate based on the walkdown and review of the anchorage inspection documentation.
I-QT-144-AB      AB EMERG            AUXILIARY    58  Small filter 10" in diameter, 44" high, mounted on three angle legs
      & CD (2 filters) DIESEL FUEL OIL                    7  anchored by three 5/8" Phillips Red Head Wedge/coupling anchors TRANSFER FILTERS Anchorage screened based on an ANCHOR4 evaluation for 1-QT-144-AB.
I -TK-253-1, 2,  PRESSURIZER TR      CONTAINMENT    61  This horizontal tank contains air and is supported by other than standard 3 & 4 (4 tanks) "B" PRESSURE 2  saddles:
RELIEF VALVE NRV-152 RESERVE CONTROL AIR                            Tank is well welded to building steel, and judged adequate by the SRT.
TANKS 12-TK-207        REACTOR PLANT        GROUNDS      60  Similar to a horizontal heat exchanger; each tank is approximately 2'n NITROGEN BULK                      9  diameter and 20'ong (about 15'etween supports). Tank weight is about STORAGE TANKS 4800 lbs. Anchorage consists of four cast-in-place (in buried concrete
                      &#xb9;3,4,5,6,7,8 pedestals) 3/4" diameter J-Bolts.
Anchorage screened based on an ANCHOR4 evaluation.
18


20 Donald C.Cook Nuclear Plant Amplified Containment Building El.687.5 feet vs AOV GERS 5o/o Damping 15 C 0 6$l 0)10 (5 D S a.5 (0'I r~r r~~'~h~~~~r~~~~~~~~~r/:.'/'.: r~..~~~~~~~~-:.r~~~-'..~~':~~:~':~:.~~r 0 0.1~\4~10 Frequency (Hz)1 O.Gx EL687 AOV GERS Figure 3 Amplified ISRS for Containment El.687.5's.AOV GERS-5%Damping Donald C.Cook Nuclear Plant Amplified Containment Building El.687.5 feet vs Solenoid Valve GERS-5/o Damping 20~r I I I I 1 h~\I 15 O C I u 10 O C S 0 Q)a.5 CO~\h~I'I'I~r e~I~I\~h h I~~~h~~h j I~I'~P 0~h~~'I~~/~g~~~~~~I~~~~~/~~~~h~~~~~\~~0.1 10 50.Frequency (Hz)1 0.5x EL687 Solenoid GERS F<igure 4 Amplified ISRS for Containment El.687.5's.Solenoid Valve GERS-5%Damping 13 25 Donald C.Cook Nuclear Plant Amplified Containment Building El.687.5 feet vs MOV GERS 5%Damping~~'r~~~~r~'~r 20 C 0 C 6 O O 10 0CL (0-5~4%~~e~e e~~~'r~o'~r~~~~~~~~~t I.r~~~~~;:.I-.I......'~0~~~~~J'~~~I~~~I'I.~s...~.s.)~~....~~:-~~~-': I~:.~-~~./~t r~~~5 0 0.1~5 0 0 4 1~8~I 10 50 Frequency (Hz)3 0.5x MOV EL687 GERS Figure 5 Amplified ISRS for Containment El.687.5's.Motor Operator GERS-5%Damping l4 Regarding thc tightncss check of expansion anchors performed on a representative number of mechanical and electrical components, state whether the representative number meets thc sample size for expansion anchor tightness check as listed on table C.2-4 of the GIP.The number of expansion bolts tightness tested for the Cook Nuclear Plant VSI A-46 effort exceeded the sample size for expansion anchor tightness check as listed on table C.2-4 of the GIP.Bolt tightness checks were conducted on every accessible expansion bolt in the scope of USI A-46 equipment on the SSEL.In addition all accessible steel to steel and cast-in-place bolts/nuts were visually inspected and loose nuts were tightened as needed.This was done to ensure that the bolts were snug and therefore active in the event of vertical reaction loadings on the anchorage during an earthquake.
Table 2 (Continued)
Other tests using ultrasonic techniques to determine embedment length and weld quality were also performed as an enhancement to the program.Anchorage inspection documentation is included with the SEWS in attachment 2 of this RAI.When the type of expansion anchor used could not be positively determined, a 0.6 reduction factor for unknown expansion bolts was used in the anchorage evaluations performed in accordance with the GIP.Inaccessible anchor bolts were not tightness tested.The GIP excludes inaccessible anchors from the sample and states in the second paragraph of section 4 4.1 that"all accessible anchorages should be visually inspected.
Description of Configuration and Anchorage Evaluation for Tanks and Heat Exchangers (Unit 1)
All practicable'means should be tried to inspect inaccessible anchorages or those obstructed from view if they are needed for strength to secure the item of equipment or if they secure'quipment housing essential relays (to avoid impact or excessive cabinet motion).For exam'pie, it is not considered practicable to resort to equipment disassembly, removal, etc., to inspect inaccessible anchorages.
Class      ID        Description      Building     El.             Description of Configuration and Anchorage Evaluation 21  I-HE-11      REACTOR            AUXILIARY    609    Vertical Heat Exchanger is identical to 2-HE-11. The anchorage was COOLANT PUMP                            screened by comparison to the calculation for 2-HE-11.
The basis for the engineering judgment for not performing these inspections should be documented." The majority of anchorages for SSEL equipment were accessible.
SEAL WATER HEAT EXCHANGER 21  I-HE-13*    EXCESS LET        CONTAINMENT    612    Relatively small exchanger (1600 lbs) on two saddles in extremely high rad DOWN HEAT                                area.
These anchorages were tightness tested, had their embedment length verified and were visually inspected by the anchorage inspection team and were again visually inspected by the SRT.There were some fans that had inaccessible anchorages that would have required removal of fire protection material to inspect and disposal of material that could possibly be contaminated.
EXCHANGER Anchorage includes four 3/4" diameter J-bolts, embedded at least 2 feet into piers. Could not inspect the anchorage due to ALARAconsiderations.
This would not have been consistent with the ALARA goals at the site (dust and exposure).
Due to large anchorage (four 3/4" bolts) and small exchanger, the anchorage was judged adequate by the SRT.
These fans had calculated or judgmental anchorage margins of 10 or greater and therefore were not inspected.
21  I-HE-14      LETDOWN HEAT        AUXILIARY    633    Exchanger anchored with two 7/8" diameter J-bolts on 11-3/8" spacing.
Anchorages for these were primarily cast in place or steel to steel bolts and the tightness check was not required to be performed.
EXCHANGER                                Vertical distance from the base of exchanger to the C.G. of exchanger is 13".
The regenerative heat exchanger anchorages were also not visually inspected due to the time required to remove insulation and to perform the anchorage inspection in a high radiation area.There werc also a number of wall mounted panels (class 14 and 20)that were not tightness checked.Tightness checking of these bolts would have required complete equipment disassembly and removal of the equipment.
Vertical distance from the base of the exchanger to the top nozzle is 29".
This activity would be contrary to section 4.4.1 of the GIP.These panels also had very high margins even when considering a 0.6 reduction factor for unknown expansion anchors.In the cases mentioned above, the engineering judgment for not performing the inspections were documented on the SEWS for the equipment item.There were also some cases when isolated bolts were not tested on a given assembly because they could not be reached without disassembly.
Anchorage adequacy was accepted based on a short hand calculation..
These cases are documented in the anchorage inspection documentation.
21  I-HE-15E 8c  EAST AND WEST      AUXILIARY    609    Component Cooling Water Heat Exchanger on two reinforced saddles.
5)Table 5.1 shows only four (4)vertical tanks for GIP review.Provide the engineering criteria for sclccting only four vertical tanks and thc justification of the structural integrity of the other smaller vertical tanks for Safe Shutdown E<arthquakc (SSK).Indicate the number of vertical tanks supported on skirts and structural legs at Cook Nuclear Plant, Units 1 8r, 2.Table 5.1 of the final Seismic Evaluation and Walkdown Summary Report submittal includes only the flat bottom vertical tanks that may be evaluated using the GIP methodology in section 7 of the GIP.These tanks are described in the first paragraph of section 7.3.1 of the GIP which states: "The type of vertical tanks covered by the screening guidelines are large, cylindrical tanks whose axis of symmetry is vertical and are supported, on their flat bottoms, directly on a concrete pad or a floor." The evaluation of the remaining tanks are documented in table 4-7 of the final Seismic Evaluation and Walkdown Summary Report submittal.
W (2         CCW HEAT                                Anchorage is two 7/8" diameter J bolts. There are four 1" wedge expansion exchangers)  EXCHANGERS anchors in one pedestal in the horizontal direction.
Items 1 and 2 of table 4-7"Commentary on Equipment Items Meeting the Intent of the GIP Caveats" discuss this evaluation.
C.G. of exchanger from the top of the saddle pedestal about 3'.
Item 1 includes class 0 equipment items and states"There are 50 and 51 equipment items identified as class 0 in unit 1 and unit 2 respectively.
A hand calculation  was performed for the heat exchanger and the results show that the anchor bolts and saddles are adequate.
These items were primarily passive and were similar to items considered as components of the class 21 equipment.
19
For these equipment items the SRT assessed the potential for seismic damage and made the necessary evaluations.
All these items were at locations in the plant where 1.5 times the bounding spectrum is greater than the floor response spectra where they are located.Anchorage was evaluated using the GIP criteria." Item 2 includes class 21 tanks and heat exchangers not covered by the GIP criteria (section 7 of the GIP).This item states:."There are 63 and 58 equipment items identified as class 21 in unit 1 and unit 2 respectively.
Of these tanks and heat exchangers, there were only 20 where the GIP criteria was applicable.
The remaining 98 were evaluated by meeting the intent of the GIP criteria.Anchorage was evaluated using the GIP criteria." The class 0 and 21 equipment items on the SSEL that may be categorized as tanks and heat exchangers for unit 1 and 2 are listed in tables 2&, 3, respectively.
The table includes a description of the tank or heat exchangers configuration and anchorage evaluation.
Included in that list are all tanks supported on skirts and structural legs that are on the Cook Nuclear Plant SSEL.Tanks on legs include 1,2-QT-113-AB1, AB2, CD1, CD2 (eight diesel oil filters);1,2-QT-144-AB, CD (four diesel oil filters};1,2-TK-10 (two reactor coolant letdown volume control tanks);1,2-TK-11 (two boron injection tanks);1-TK-12-N, 12-TK-12-M and 2-TK-12S (three boric acid storage tanks}.Tanks on skirts include 1,2-TK-37 (two component cooling water surge tanks);and 1,2-QT-141, AB1, AB2, CD1, CD2 (eight diesel starting air receivers).
Sample SEWS (including the calculations and anchorage inspection documentation) are provided in attachment 3 for the tanks that have an*aAer the equipment ID in tables 2 and 3.
Table 2 Description of Configuration and Anchorage Evaluation for Tanks and Heat Exchangers (Unit 1)Class ID I-QT-112-AB
&, CD (2 filters)Description AB&CD EMERG DIESEL FULL FLOW LUBE OIL FILTERS Building El.AUXILIARY 579 Description of Configuration and Anchorage Evaluation Small tank-like component containing oil, with a height of about 5', and a diameter of 3'.Weight full=2707 lbs.Anchored by three 3/8" diameter J-bolts and three 5/8" wedge anchors at 60 degree intervals (i.e., evenly spaced).I-QT-I 13-AB I*, 113-AB2, 113-CD I, 113-CD2 (4 strainers)
I-QT-116-AB
&CD (2 heater tanks)I-QT-118-AB
&CD (2 filters)AB&, CD EMERG DIESEL FULL FLOW LUBE OIL STRAIN ERS AB&, CD EMERG DIESEL LUBE OIL HEATER (TANK)AB EMERG DIESEL BYPASS LUBE OIL FILTER AUXILIARY 579 AUXILIARY 579 AUXILIARY 579 The anchorage was screened based on a review of an existing vendor calculation that indicated a high anchorage margin.Strainer supported on 4 angle legs.Each leg is anchored by one 1/2" J-bolt anchor.The total weight is 1730 lbs.The ANCHOR4 analysis performed for 1-QT-113-AB1 and 1-QT-113-AB2 together, since they are connected by a relatively rigid piping segment, indicated that the anchorage was adequate..
Heaters anchored by three 3/8" J-bolts at 120 degrees apart, on a 5" high concrete pad.The weight of the tank is approximately 152.5 lbs.Anchorage screened by an ANCHOR4 evaluation.
Filter anchored by three 3/8" J-bolts with a minimum embedment of 10.25", at 120 degrees.The approximate weight of the tank is estimated to be the same as 1-QT-112-CD (Wt=2707 lbs.), because the tanks are of the same manufacturer, and size, and both hold oil.Anchorage screened by an ANCHOR4 evaluation.  


Table 2 (Continued)
Table 2 (Continued)
Description of Configuration and Anchorage Evaluation for Tanks and Heat Exchangers (Unit 1)Class ID Description Building El.Description of Configuration and Anchorage Evaluation I-QT-143-AB I, AB EMERG AB2, CD I&DIESEL CONTROL CD2 (4 dryers)AIR DRYER I AUXILIARY Air dryer mounted on 2-1/2" x 2-1/2" x 1/4" angle steel frame with other air dryer tanks.Angle frame on 1-3/4" Grout Pad.Frame anchored by eight 1/2" non-shell type expansion anchors, four per base plate.Tanks hold air and are the size of fire extinguishers.
Description of Configuration and Anchorage Evaluation for Tanks and Heat Exchangers (Unit 1)
I-QT-144-AB AB EMERG&CD (2 filters)DIESEL FUEL OIL TRANSFER FILTERS AUXILIARY 58 7 Anchorage judged adequate based on the walkdown and review of the anchorage inspection documentation.
Class         ID           Description     Building     El.           Description of Configuration and Anchorage Evaluation 21   I-HE-I7E & W (2     EAST & WEST       AUXILIARY   6P9     Anchorage more than adequate based on previous analysis       of exchanger exchangers)          RHR HEAT                              without top braces. Braces had since been installed.
Small filter 10" in diameter, 44" high, mounted on three angle legs anchored by three 5/8" Phillips Red Head Wedge/coupling anchors Anchorage screened based on an ANCHOR4 evaluation for 1-QT-144-AB.I-TK-253-1, 2, 3&4 (4 tanks)PRESSURIZER TR"B" PRESSURE RELIEF VALVE NRV-152 RESERVE CONTROL AIR TANKS CONTAIN MENT 61 2 This horizontal tank contains air and is supported by other than standard saddles: Tank is well welded to building steel, and judged adequate by the SRT.12-TK-207 REACTOR PLANT NITROGEN BULK STORAGE TAN KS&#xb9;3,4,5,6,7,8 GROUNDS 60 9 Similar to a horizontal heat exchanger; each tank is approximately 2'n diameter and 20'ong (about 15'etween supports).
EXCH ANGERS 21  I-HE-18E'      W (2  EAST & WEST      AUXILIARY    6P9    Very well engineered support structure.
Tank weight is about 4800 lbs.Anchorage consists of four cast-in-place (in buried concrete pedestals) 3/4" diameter J-Bolts.Anchorage screened based on an ANCHOR4 evaluation.
exchangers)          CONTAINMENT SPRAY HEAT EXCH ANGERS There is a ring support at top of the exchanger bracketed to the mall in each of the four quadrants. This takes the overturning loads on the exchanger.
18 Table 2 (Continued)
Bottom support (at about the 1/4 point of the exchanger, with the remainder of the exchanger hanging below) is a heavy duty ring with gussets at the bolt locations. These are bolted to a steel support structure that is obviously well engineered.
Description of Configuration and Anchorage Evaluation for Tanks and Heat Exchangers (Unit 1)Class 21 21 ID I-HE-11 I-HE-13*Description REACTOR COOLANT PUMP SEAL WATER HEAT EXCHANGER EXCESS LET DOWN HEAT EXCHANGER Building AUXILIARY CONTAINMENT El.609 612 Description of Configuration and Anchorage Evaluation Vertical Heat Exchanger is identical to 2-HE-11.The anchorage was screened by comparison to the calculation for 2-HE-11.Relatively small exchanger (1600 lbs)on two saddles in extremely high rad area.Anchorage includes four 3/4" diameter J-bolts, embedded at least 2 feet into piers.Could not inspect the anchorage due to ALARA considerations.
Qualification data indicates an analysis to the design basis. Based on the review of this analysis and anchorage inspection documentation the Heat Exchanger is adequate.
21 I-HE-14 LETDOWN HEAT EXCHANGER AUXILIARY 633 Due to large anchorage (four 3/4" bolts)and small exchanger, the anchorage was judged adequate by the SRT.Exchanger anchored with two 7/8" diameter J-bolts on 11-3/8" spacing.Vertical distance from the base of exchanger to the C.G.of exchanger is 13".Vertical distance from the base of the exchanger to the top nozzle is 29".Anchorage adequacy was accepted based on a short hand calculation..
21  I-HE-32E & 32W      EAST RHR PUMP    AUXILIARY    573    8" diameter by 2" wide exchanger, attached to East Residual Heat (2 exchangers)      PP-35E                                Removal Pump with two 1/2" bolts. Could have been considered with MECHANICAL SEAL HEAT the pump'using the rule of the box, however the exchanger was listed EXCHANGERS                            separately on the SSEL.
21 I-HE-15E 8c EAST AND WEST W (2 CCW HEAT exchangers)
Anchorage to the pumps was judged adequate by the SRT.
EXCHANGERS AUXILIARY 609 Component Cooling Water Heat Exchanger on two reinforced saddles.Anchorage is two 7/8" diameter J bolts.There are four 1" wedge expansion anchors in one pedestal in the horizontal direction.
20
C.G.of exchanger from the top of the saddle pedestal about 3'.A hand calculation was performed for the heat exchanger and the results show that the anchor bolts and saddles are adequate.19 Table 2 (Continued)
 
Description of Configuration and Anchorage Evaluation for Tanks and Heat Exchangers (Unit 1)Class ID Description Building El.Description of Configuration and Anchorage Evaluation 21 21 I-HE-I7E&W (2 exchangers)
I-HE-18E'W (2 exchangers)
EAST&WEST RHR HEAT EXCH ANGERS EAST&WEST CONTAINMENT SPRAY HEAT EXCH ANGERS AUXILIARY 6P9 AUXILIARY 6P9 Anchorage more than adequate based on previous analysis of exchanger without top braces.Braces had since been installed.
Very well engineered support structure.
There is a ring support at top of the exchanger bracketed to the mall in each of the four quadrants.
This takes the overturning loads on the exchanger.
Bottom support (at about the 1/4 point of the exchanger, with the remainder of the exchanger hanging below)is a heavy duty ring with gussets at the bolt locations.
These are bolted to a steel support structure that is obviously well engineered.
21 I-HE-32E&32W (2 exchangers)
EAST RHR PUMP PP-35E MECHANICAL SEAL HEAT EXCHANGERS AUXILIARY 573 Qualification data indicates an analysis to the design basis.Based on the review of this analysis and anchorage inspection documentation the Heat Exchanger is adequate.8" diameter by 2" wide exchanger, attached to East Residual Heat Removal Pump with two 1/2" bolts.Could have been considered with the pump'using the rule of the box, however the exchanger was listed separately on the SSEL.Anchorage to the pumps was judged adequate by the SRT.20  
~>
~>
Table 2 (Continued)
Table 2 (Continued)
Description of Configuration and Anchorage Evaluation for Tanks and Heat Exchangers (Unit I)Class 21 ID I-HE-33E&W(2 exchangers)
Description of Configuration and Anchorage Evaluation for Tanks and Heat Exchangers (Unit I)
Description EAST AND WEST CONTAINMENT SPRAY PUMP PP-9E MECHAN ICAL SEAL HEAT EXCHANGER Building El.AUXILIARY 573 Description of Configuration and Anchorage Evaluation 6" diameter by 8-3/4" high exchanger, attached to East Containment Spray Pump with two 1/2" bolts.Could have screened with the pump using the rule of the box, however the exchanger was listed separately on the SSEL.Anchorage to the pumps was judged adequate by the SRT.21 I-HE-34-NE*, 34-NW, 34-SE,&34-SW (4 exchangers)
Class         ID              Description      Building    El.          Description of Configuration and Anchorage Evaluation 21   I-HE-33E & W(2       EAST AND WEST       AUXILIARY 573     6" diameter by 8-3/4" high exchanger, attached to East Containment exchangers)          CONTAINMENT Spray Pump with two 1/2" bolts. Could have screened with the pump SPRAY PUMP PP-9E MECHANICAL                            using the rule of the box, however the exchanger was listed separately SEAL HEAT                              on the SSEL.
NORTH SAFETY INJECTION PUMP PP-26N INBOARD*MECHANICAL SEAL HEAT EXCHAN GERS AUXILIARY 587 6" diameter by 8-3/4" high exchanger, attached to North Safety Injection Pump with two 1/2" bolts.Could have screened with the pump using the rule of the box, however the exchanger was listed separately on the SSEL.Anchorage to the pumps was judged adequate by the SRT.21 I-HE-35N, 35S (2 coolers)NORTH SAFETY INJECTION PUMP PP-26N LUBE OIL COOLERS AUXILIARY 587 Small exchangers 1'-5" long and 4" in diameter attached to North Safety Injection Pump with four 1/4" bolts.Could have screened with the pump using the rule of the box, however the exchanger was listed separately on the SSEL.Anchorage to the pumps was judged adequate by the SRT.21 I
EXCHANGER Anchorage to the pumps was judged adequate by the SRT.
21   I-HE-34-NE*, 34-     NORTH SAFETY        AUXILIARY 587      6" diameter by 8-3/4" high exchanger, attached to North Safety Injection NW, 34-SE, & 34-     INJECTION PUMP Pump with two 1/2" bolts. Could have screened with the pump using SW (4 exchangers)   PP-26N INBOARD
* the rule of the box, however the exchanger was listed separately on the MECHANICAL SEAL HEAT                              SSEL.
EXCHANGERS Anchorage to the pumps was judged adequate by the SRT.
21  I-HE-35N, 35S (2    NORTH SAFETY       AUXILIARY 587      Small exchangers 1'-5" long and 4" in diameter attached to North Safety coolers)            INJECTION PUMP                         Injection Pump with four 1/4" bolts. Could have screened with the PP-26N LUBE OIL COOLERS                                pump using the rule of the box, however the exchanger was listed separately on the SSEL.
Anchorage to the pumps was judged adequate by the SRT.
21
 
I Table 2 (Continued)
Description of Configuration and Anchorage Evaluation for Tanks and Heat Exchangers (Unit 1)
Class          ID                Description          Building      El.      Description of Configuration and Anchorage Evaluation 21  I-HE-36-EN, 36-ES,  EAST & WEST                AUXILIARY     587   6" in diameter 8-3/4" high heat exchanger, attached to East 36-WN, 36-WS        CENTRIFUGAL                                    Centrifugal Charging Pump with two 1/2" bolts. Could have (4 exchangers)      CHARGING PUMP PP-50E screened with the pump using the rule of the box, however the INBOARD MECHANICAL SEAL HEAT                                      exchanger was listed separately on the SSEL.
EXCHANGERS Anchorage to the-pumps was judged adequate by the SRT.
21   I-HE-37E, 37W (2     EAST&, WEST                AUXILIARY     537  Small exchanger 1'-6" long and 5" in diameter attached to coolers)            CENTRIFUGAL                                    reinforced plate support with four 1/2" bolts. Plate support bolted CHARGING PUMP PP-to East Centrifugal Charging Pump with three 1/2" bolts. Could 50E, &50WGEAROIL COOLERS                                        have screened with the pump using the rule of the box, however the exchanger was listed separately on the SSEL.
Anchorage to the pumps was judged adequate by the SRT.
21   I-HE-38E & 38W (2    EAST & WEST              AUXILIARY      5g7  Small exchangers 1'-6" long and 5" in diameter bolted to two coolers)            CENTRIFUGAL                                          channel columns that are welded to the skid of the East 1'ong CHARGING PUMP BEARING LUBE OIL Centrifugal Charging Pump. Could have screened with the pump COOLERS                                        using the rule of the box, however the exchanger was listed separately on the SSEL.
Anchorage to the pumps was judged adequate by the SRT.
22
 
Table 2 (Continued)
Table 2 (Continued)
Description of Configuration and Anchorage Evaluation for Tanks and Heat Exchangers (Unit 1)Class ID Description Building El.Description of Configuration and Anchorage Evaluation 21 I-HE-36-EN, 36-ES, 36-WN, 36-WS (4 exchangers)
Description of Configuration and Anchorage Evaluation for Tanks and Heat Exchangers (Unit 1)
EAST&WEST CENTRIFUGAL CHARGING PUMP PP-50E INBOARD MECHANICAL SEAL HEAT EXCHANGERS AUXILIARY 587 6" in diameter 8-3/4" high heat exchanger, attached to East Centrifugal Charging Pump with two 1/2" bolts.Could have screened with the pump using the rule of the box, however the exchanger was listed separately on the SSEL.Anchorage to the-pumps was judged adequate by the SRT.21 I-HE-37E, 37W (2 coolers)EAST&, WEST CENTRIFUGAL CHARGING PUMP PP-50E,&50WGEAROIL COOLERS AUXILIARY 537 Small exchanger 1'-6" long and 5" in diameter attached to reinforced plate support with four 1/2" bolts.Plate support bolted to East Centrifugal Charging Pump with three 1/2" bolts.Could have screened with the pump using the rule of the box, however the exchanger was listed separately on the SSEL.21 I-HE-38E&38W (2 coolers)EAST&WEST CENTRIFUGAL CHARGING PUMP BEARING LUBE OIL COOLERS AUXILIARY 5g7 Anchorage to the pumps was judged adequate by the SRT.Small exchangers 1'-6" long and 5" in diameter bolted to two 1'ong channel columns that are welded to the skid of the East Centrifugal Charging Pump.Could have screened with the pump using the rule of the box, however the exchanger was listed separately on the SSEL.Anchorage to the pumps was judged adequate by the SRT.22 Table 2 (Continued)
Class             ID             Description       Building     El.         Description of Configuration and Anchorage Evaluation
Description of Configuration and Anchorage Evaluation for Tanks and Heat Exchangers (Unit 1)Class 21 ID-I-HE-47-ABN
      - I-HE-47-ABN & 47-     AB & CD EMERG       AUXILIARY     587   Aftercooler on Diesel Generator skid transfers its lateral load to the ABS, 47-CDN & 47-      DIESEL NORTH                            inlet manifolds. Gravity loads are carried by a post on a spring hanger CDS (4 aItercoolers)    COMBUSTION base, so the post is incapable of carrying lateral or longitudinal load.
&47-ABS, 47-CDN&47-CDS (4 aItercoolers)
AIR AFTERCOOLERS The Diesel Generator Turbochargers in Unit 1 were replaced in a recent outage. As part of the modification, an analysis was perforined for the associated piping and the aftercoolers. All supports met D.C. Cook acceptance criteria.
I-QP-21 Description AB&CD EMERG DIESEL NORTH COMBUSTION AIR AFTERCOOLERS NORTH BORIC ACID BLENDER (MIXING TEE)Building AUXILIARY AUXILIARY El.587 587 Description of Configuration and Anchorage Evaluation Aftercooler on Diesel Generator skid transfers its lateral load to the inlet manifolds.
21    I-QP-21                NORTH BORIC          AUXILIARY    587    Boric Acid Blender supported by piping. It is in-line with the pipe ACID BLENDER                              between two pipe supports offthe floor. Blender very small (6" in (MIXINGTEE) diameter and 11" long).
Gravity loads are carried by a post on a spring hanger base, so the post is incapable of carrying lateral or longitudinal load.The Diesel Generator Turbochargers in Unit 1 were replaced in a recent outage.As part of the modification, an analysis was perforined for the associated piping and the aftercoolers.
Screened based on drawings (insulation precluded inspection of the blender connection to the piping system) and inspection for interactions.
All supports met D.C.Cook acceptance criteria.Boric Acid Blender supported by piping.It is in-line with the pipe between two pipe supports off the floor.Blender very small (6" in diameter and 11" long).21 I-QT-107-AB&CD (2 tanks)CD EMERG DIESEL FUEL OIL DAY TANKS AUXILIARY 587 Screened based on drawings (insulation precluded inspection of the blender connection to the piping system)and inspection for interactions.
21    I-QT-107- AB & CD      CD EMERG            AUXILIARY    587  Horizontal tanks which sits on two saddles. Each saddle has two, 1/4" (2 tanks)              DIESEL FUEL OIL                          thick plates, forming a "U", with no gussets. There are two 5/8" anchors DAY TANKS per saddle.
Horizontal tanks which sits on two saddles.Each saddle has two, 1/4" thick plates, forming a"U", with no gussets.There are two 5/8" anchors per saddle.21 I-QT-110-AB
A Horizontal Tank Analysis was performed to show that the tank anchorage is adequate.
&CD (2 Coolers)AB&CD EMERG DIESEL LUBE OIL COOLERS AUXILIARY 587 A Horizontal Tank Analysis was performed to show that the tank anchorage is adequate.Lube Oil Coolers mounted to wall with fourteen 3/4" wedge type expansion anchors.External Anchor Analysis was performed on the Unit 2 Jacket Water Heater 2-QT-131-CD which has the same configuration as 1-QT-110-AB.Based on this.analysis, both supports are adequate.23 Table 2 (Continued)
21     I-QT-110-AB & CD       AB & CD EMERG       AUXILIARY     587   Lube Oil Coolers mounted to wall with fourteen 3/4" wedge type (2 Coolers)            DIESEL LUBE OIL                          expansion anchors.
Description of Configuration and Anchorage Evaluation for Tanks and Heat Exchangers (Unit 1)Class 21 ID I-QT-131-AB
COOLERS External Anchor Analysis was performed on the Unit 2 Jacket Water Heater 2-QT-131-CD which has the same configuration as 1-QT-110-AB. Based on this. analysis, both supports are adequate.
&, CD (2 Coolers)Description AB 64 CD EMERG DIESEL JACKET WATER COOLERS Building AUXILIARY El.587 Description of Configuration and Anchorage Evaluation Jacket Water Cooler mounted to wall by fourteen 3/4" wedge type expansion anchors.External Anchor Analysis was performed on the Unit 2 Jacket Water Heater 2-QT-131-CD..
23
Based on this analysis both supports are adequate.I-QT-133-AB
&CD (2 Tanks)AB 8c CD EMERG DIESEL JACKET WATER SURGE TANKS AUXILIARY 587 100 Gal.Tanks, 2'-6" D x 3'.Notes and the ANCHOR4 analysis for 1-QT-133-CD also apply to 1-QT-133-AB since they are essentially identical.
The surge tanks are supported (bolted)to a shelf.The shelf is bolted to the wall by four J-bolts.In addition, two 3/4" wedge anchors attach the top channel to the wall.The wedge anchors were conservatively left out of the ANCHOR4 analysis.21 I-QT-134-AB
&134-CD (2 Tanks)AB&CD EMERG DIESEL AUX JACKET WATER HEATERS (TANKS}AUXILIARY 587 The anchorage was screened based on an ANCHOR4 analysis for the anchorage to the shelf.The AB tank is the same as the CD tank except that 3/8" bolts were measured in the field instead of the 1/4" bolts on the drawings for AB.The ANCHOR4 analysis for 1-QT-134-CD (using 1/4" diameter Phillips Redhead Wedge Anchors)demonstrated adequacy.The base plates were also shown to be adequate.24


Table 2 (Continued)
Table 2 (Continued)
Description of Configuration and Anchorage Evaluation for Tanks and Heat Exchangers (Unit I)Class ID Description Building'l.
Description of Configuration and Anchorage Evaluation for Tanks and Heat Exchangers (Unit 1)
Description of Configuration and Anchorage Evaluation 21 21 21 I-QT-141-AB I, 141-AB2, 141-CD I, 141-CD2 (4 air receivers)
Class         ID           Description     Building     El.         Description of Configuration and Anchorage Evaluation 21   I-QT-131-AB &,     AB 64 CD EMERG    AUXILIARY    587    Jacket Water Cooler mounted to wall by fourteen 3/4" wedge type CD (2 Coolers)      DIESEL JACKET                        expansion anchors. External Anchor Analysis was performed on the Unit WATER 2 Jacket Water Heater 2-QT-131-CD..
I-TK-10 I-TK-11*AB&CD EMERG DIESEL STARTING AIR RECEIVERS I&2 REACTOR COOLANT LETDOWN VOLUME CONTROL TANK BORON INJECTION TANK AUXILIARY AUXILIARY AUXILIARY 5S7 Air tanks anchored by four 5/S" J-bolts (Ref.1, 4).Total weight for each tank is 6000 lb.Tank anchorage was verified by an ANCHOR4 analysis.Nozzle loads were included.609 Tank on 4 wide flange legs, 90 inches in diameter and 120 inches in height.Tank 1-TK-10 is similar to the 2-TK-10.Tank anchorage and wide.flange legs were evaluated in a hand calculation for 2-TK-10 and found to be adequate.612 Tank is 5'iameter by 10'n height supported by 4 Wide Flange Leg supports (10" WF w/5/S" flange)4'-4" in height...Each leg is bolted to the pedestal w/two embedded 1 3/4" bolts.21 I-TK-200 MAIN STEAM LEADS CONDENSATION DRAIN TANK (POT)The Seismic Evaluation of the Boric Acid Tank (2-TK-12S) is seismically adequate.The Boron Injection Tank (1-TK-11)is much smaller but has about the same support.Therefore, Tank 1-TK-11 is judged adequate based on comparison.
COOLERS Based on this analysis both supports are adequate.
621 Small tank supported from floor.Anchorage judged acceptable based on the walkdown and the anchorage inspection documentation.
I-QT-133-AB &       AB 8c CD EMERG   AUXILIARY    587    100 Gal. Tanks, 2'-6" D x 3'.
25
CD (2 Tanks)       DIESEL JACKET WATER SURGE TANKS Notes and the ANCHOR4 analysis for 1-QT-133-CD also apply to 1-QT-133-AB since they are essentially identical.
The surge tanks are supported (bolted) to a shelf. The shelf is bolted to the wall by four J-bolts. In addition, two 3/4" wedge anchors attach the top channel to the wall. The wedge anchors were conservatively left out of the ANCHOR4 analysis.
The anchorage was screened based on an ANCHOR4 analysis for the anchorage to the shelf.
21   I-QT-134-AB &      AB & CD EMERG    AUXILIARY    587    The AB tank is the same as the CD tank except that 3/8" bolts were 134-CD (2 Tanks)   DIESEL AUX                            measured in the field instead of the 1/4" bolts on the drawings for AB.
JACKET WATER HEATERS (TANKS}                              The ANCHOR4 analysis for 1-QT-134-CD (using 1/4" diameter Phillips Redhead Wedge Anchors) demonstrated adequacy. The base plates were also shown to be adequate.
24


Table 2 (Continued)
Table 2 (Continued)
Description of Configuration and Anchorage Evaluation for Tanks and Heat Exchangers (Unit 1)Class 21 ID I-TK-32 Description CONDENSATE STORAGE TANK Building El.GROUNDS 609 Description of Configuration and Anchorage Evaluation Large flat bottom tank 52'-0" inside diameter 34'-5 1/2" height (31'-7" liquid tank).500,000 gallons and weighs 128,700 lbs.Anchored with thirty 3/8" th x 5" w x 4'-4" long strap that is embedded in the concrete at a 2'epth with a 2" radius hook at the end.The strap detail is identical to the strap for the Unit 1 and 2 Refueling Water Storage Tanks (RWST)1-TK-33 and 2-TK-33.The calculation for the RWST resulted in the conclusion that the meld to the tank and embedment in the concrete was sufficient to develop the full yield strength of the strap.The RWST has a very similar configuration as this CST.The calculation for the RWST using the GIP methodology indicated an overall safety factor of 2.57 for overturning and 1.72 for shear.21 I-TK-33 REFUELING WATER STORAGE TAN K G ROUN DS 609 The CST was screened based on a comparison of the significant attributes to the RWST.Large flat bottom tank 48'-0" inside diameter 32'-3" height (31'iquid tank).420,000 gallons, weight 94,000 lbs.The tank is founded on a concrete pad and anchored with twenty-five 3/8" th x 5" W x 4'4" L strap, embedded in concrete a 2'epth with a 2" radius hook at the end.A detailed calculation was performed to the SQUG GIP criteria.The calculation resulted in the conclusion that the weld to the tank and embedment in the concrete was sufficient to develop the full yield strength of the strap.The calculation for the RWST using GIP methodology indicated an overall safety factor of 2.57 for overturning and 1.72 for shear.26  
Description of Configuration and Anchorage Evaluation for Tanks and Heat Exchangers (Unit I)
Class          ID            Description      Building'l.              Description of Configuration and Anchorage Evaluation I -QT-141-AB I,      AB & CD EMERG      AUXILIARY 21                                                          5S7    Air tanks  anchored by four 5/S" J-bolts (Ref. 1, 4). Total weight for 141-AB2, 141-CD I,  DIESEL STARTING each tank is 6000 lb.
141-CD2 (4 air      AIR RECEIVERS  I receivers)            &2 Tank anchorage was verified by an ANCHOR4 analysis. Nozzle loads were included.
21  I-TK-10              REACTOR            AUXILIARY    609    Tank on 4 wide flange legs, 90 inches in diameter and 120 inches in COOLANT height.
LETDOWN VOLUME CONTROL TANK                            Tank 1-TK-10 is similar to the 2-TK-10. Tank anchorage and wide
                                                                  .flange legs were evaluated in a hand calculation for 2-TK-10 and found to be adequate.
21  I-TK-11*              BORON INJECTION    AUXILIARY    612  Tank is 5'iameter by 10'n height supported by 4 Wide Flange Leg TANK supports (10" WF w/5/S" flange) 4'-4" in height..
                                                                  .Each leg is bolted to the pedestal w/ two embedded    1 3/4" bolts.
The Seismic Evaluation of the Boric Acid Tank (2-TK-12S) is seismically adequate. The Boron Injection Tank (1-TK-11) is much smaller but has about the same support. Therefore, Tank 1-TK-11 is judged adequate based on comparison.
21   I-TK-200            MAINSTEAM                        621    Small tank supported from floor.
LEADS CONDENSATION DRAIN TANK                              Anchorage judged acceptable based on the walkdown and the (POT)                                  anchorage inspection documentation.
25
 
Table 2 (Continued)
Description of Configuration and Anchorage Evaluation for Tanks and Heat Exchangers (Unit 1)
Class        ID            Description     Building     El.           Description of Configuration and Anchorage Evaluation 21  I-TK-32            CONDENSATE        GROUNDS      609    Large flat bottom tank 52'-0" inside diameter 34'-5 1/2" height (31'-7" STORAGE TANK                          liquid tank). 500,000 gallons and weighs 128,700 lbs. Anchored with thirty 3/8" th x 5" w x 4'-4" long strap that is embedded in the concrete at a 2'epth with a 2" radius hook at the end.
The strap detail is identical to the strap for the Unit 1 and 2 Refueling Water Storage Tanks (RWST) 1-TK-33 and 2-TK-33. The calculation for the RWST resulted in the conclusion that the meld to the tank and embedment in the concrete was sufficient to develop the full yield strength of the strap.
The RWST has a very similar configuration as this CST. The calculation for the RWST using the GIP methodology indicated an overall safety factor of 2.57 for overturning and 1.72 for shear.
The CST was screened based on a comparison of the significant attributes to the RWST.
21  I-TK-33            REFUELING          G ROUN DS    609    Large flat bottom tank 48'-0" inside diameter 32'-3" height (31'iquid WATER tank). 420,000 gallons, weight 94,000 lbs. The tank is founded on a STORAGE TANK concrete pad and anchored with twenty-five 3/8" th x 5" W x 4' 4" L strap, embedded in concrete a 2'epth with a 2" radius hook at the end.
A detailed calculation was performed to the SQUG GIP criteria. The calculation resulted in the conclusion that the weld to the tank and embedment in the concrete was sufficient to develop the full yield strength of the strap. The calculation for the RWST using GIP methodology indicated an overall safety factor of 2.57 for overturning and 1.72 for shear.
26


Table.2 (Continued)
Table.2 (Continued)
Description of Configuration and Anchorage Evaluation for Tanks and Heat Exchangers (Unit I)Class ID Description Building El.Description of Configuration and Anchorage Evaluation 21 I-TK-37*COMPONENT COOLING NATER SURGE TANK AUXILIARY 650 Skirted tank 11'-10 1/4" diameter and 17'n height.Skirt is 4'-6" high from the top of the pad to skirt connection to tank.Skirt has I/2" thickness.
Description of Configuration and Anchorage Evaluation for Tanks and Heat Exchangers (Unit I)
There are 8 bolts evenly spaced around tank, with a solid steel washer 3-3/4" high x 4" length x 2" width.Bolts suppoited from 3" x 3 x I/2" angle.21 21 I-TK-76N, 76S I-TK12-N CONTROL ROOM A/C NORTH AND SOUTH CHILL V/ATE R EXPANSION TANKS NORTH BORIC ACID STORAGE TANK AUXILIARY 650 AUXILIARY 537 The anchorage was screened based on a hand calculation performed for the bolt stresses.Small tank 2'n length x 9" in diameter on a I" diameter piping system.Tank in-line with pipe, supported by a U-bolt on a cantilevered angle (2 I/2" x 2 I/2" x 3/8")about I'6" long.Angle welded to a plate that is bolted to the wall with 2 I/2" expansion anchors.Anchorage and support for these small tanks were accepted by SRT judgment after the walkdown and a review of the anchora e ins ection documentation.
Class           ID           Description     Building     El.           Description of Configuration and Anchorage Evaluation 21   I-TK-37*             COMPONENT         AUXILIARY     650 Skirted tank 11'-10 1/4" diameter and 17'n height. Skirt is 4'-6" high from the top COOLING                              of the pad to skirt connection to tank. Skirt has I/2" thickness. There are 8 bolts NATER SURGE                          evenly spaced around tank, with a solid steel washer 3-3/4" high x 4" length x 2" TANK                                width. Bolts suppoited from 3" x 3 x I/2" angle.
Boric Acid Tank on 4 Wide Flange Beam Legs.This Tank is identical to tank 2-TK-12S which was evaluated-by means of a calculation.
The anchorage was screened based on a hand calculation performed for the bolt stresses.
The calculation indicated that the legs and anchorage are adequate.21 I 2-HE-I 6N NORTH SPENT FUEL PIT HEAT EXCHANGER AUXILIARY 609 3'2" diameter horizontal heat exchanger about 22'ong on two saddles supported by piers, Total weight full given as 26,200 lbs.Exchanger bolted into pier with four 7/8" diameter bolts per saddle.Piers are doweled into floor.The results of tank anal sis show that the tank anchora e and saddles are ade uate.
21  I -TK-76N, 76S        CONTROL          AUXILIARY    650  Small tank 2'n   length x 9" in diameter on a I" diameter piping system. Tank in-line ROOM A/C                            with pipe, supported by a U-bolt on a cantilevered angle (2 I/2" x 2 I/2" x 3/8")
NORTH AND                            about   I'6" long. Angle welded to a plate that is bolted to the wall with 2 I/2" SOUTH CHILL                          expansion anchors.
V/ATER EXPANSION                            Anchorage and support for these small tanks were accepted by SRT judgment after the TANKS                                walkdown and a review of the anchora e ins ection documentation.
21  I-TK12-N              NORTH BORIC      AUXILIARY    537  Boric Acid Tank on 4 Wide Flange Beam Legs.
ACID STORAGE TANK This Tank is identical to tank 2-TK-12S which was evaluated-by means of a calculation. The calculation indicated that the legs and anchorage are adequate.
21   I 2-HE- I 6N         NORTH SPENT       AUXILIARY     609 3' 2" diameter horizontal heat exchanger about 22'ong on two saddles supported by FUEL PIT HEAT                        piers, Total weight full given as 26,200 lbs. Exchanger bolted into pier with four EXCHANGER                            7/8" diameter bolts per saddle. Piers are doweled into floor. The results of tank anal sis show that the tank anchora e and saddles are ade uate.
 
Table 2 (Continued)
Table 2 (Continued)
Description of Configuration and Anchorage Evaluation for Tanks and Heat Kxchangers (Unit 1)Class 21 ID 12-OME-44N-2
Description of Configuration and Anchorage Evaluation for Tanks and Heat Kxchangers (Unit 1)
&44S-2 Descri tion NORTH&SOUTH RADIOACTIVE WASTE GAS COMPRESSOR OME-44N-2 SEAL WATER HEAT EXCHANGERS EI.Buildin AUXILIARY 609 Descri tion of Confi uration and Anchora e Evaluation Small Heat Exchanger 3'-2" long by 10" in diameter attached to South Radioactive Waste Gas Compressor OME-44S-1 with 4-1/2" bolts.Compressor anchored to ground with 4 3/4" bolts.The SRT reviewed the anchorage drawings for the compressor and judged the anchorage to be adequate (4 J-bolts).The compressor is not on the SSEL and only anchorage adequacy is required.21 12-TK-47-AB*
Class       ID              Descri tion      Buildin      EI.              Descri tion of Confi uration and Anchora e Evaluation 21   12-OME-44N-2 &     NORTH & SOUTH       AUXILIARY    609  Small Heat Exchanger 3'-2" long by 10" in diameter attached to South 44S-2              RADIOACTIVE                            Radioactive Waste Gas Compressor OME-44S-1 with 4 - 1/2" bolts.
&47-CD AB&CD EMERG DIESEL FUEL OIL STORAGE TANKS GROUNDS The anchorage of the compressor was judged acceptable after a review of the anchorage during the walkdown.609 Underground tanks.SRT evaluated this tank based on the available documentation in the equipment package.A tank calculation was performed by hand.The tank was modeled as a beam on elastic foundation.
WASTE GAS COMPRESSOR OME-44N-2 SEAL                          Compressor anchored to ground with 4 3/4" bolts. The SRT reviewed WATER HEAT                              the anchorage drawings for the compressor and judged the anchorage EXCHANGERS                              to be adequate (4 J-bolts). The compressor is not on the SSEL and only anchorage adequacy is required.
The overall tank stresses were very low (on the order of 3.6 ksi).21 12-TK12-M MIDDLE BORIC ACID STORAGE TANK AUXILIARY 587 Boric Acid Tank on 4 Wide Flange Beam Legs.All dimensions for the tank, legs, connections and anchorage given in the anchorage package for the tank.This Tank is identical to tank 2-TK-12S which was evaluated by means of a hand calculation.
The anchorage of the compressor was judged acceptable after a review of the anchorage during the walkdown.
The calculation indicated that the legs and anchorage are adequate.This tank was screened based on comparison to the Unit 2 calculation.
21  12-TK-47-AB* &    AB & CD EMERG      GROUNDS      609   Underground tanks. SRT evaluated this tank based on the available 47-CD              DIESEL FUEL OIL                        documentation in the equipment package.
28  
STORAGE TANKS A tank calculation was performed by hand. The tank was modeled     as a beam on elastic foundation. The overall tank stresses were very low (on the order of 3.6 ksi).
'k Table 3 Description of Anchorage Evaluation for Tanks and Heat E<xchangers (Unit 2)Class ID 12-HE-25A Description 15GPM RADIOACTIVE WASTE EVAPORATOR HE-25 CONDENSER Building AUXILIARY El.600 Description of Configuration and Anchorage Evaluation Component is supported off shell of much larger (about 4.0')diameter tank 12-TK-148 which is not on the SSEL.This component is designated an outlier due to concerns related to the anchorage for 12-TK-148 and nozzle loads.12-HE-25B&C (2 Coolers)2-QT-112-AB
21   12-TK12-M         MIDDLEBORIC        AUXILIARY     587   Boric Acid Tank on 4 Wide Flange Beam Legs. All dimensions for the ACID STORAGE                            tank, legs, connections and anchorage given in the anchorage package TANK for the tank.
&CD (2 filters)15 GPM RADIOACTIVE WASTE EVAPORATOR HE-25 DISTILLATE COOLERS AB&CD EMERGENCY DIESEL FULL FLOW LUBE OIL FILTER AUXILIARY AUXILIARY 587 579 The Heat Exchanger is about 14" in diameter and 10 feet long, supported by stiffened saddles with two 3/4" diameter anchor bolts in each saddle, supported off of a steel platform.Weight of HX<2000 lbs.Capacity exceeds demand for saddles, support frame and platform by inspection.
This Tank is identical to tank 2-TK-12S which was evaluated by means of a hand calculation. The calculation indicated that the legs and anchorage are adequate. This tank was screened based on comparison to the Unit 2 calculation.
Small tank, with a ht of about 5'nd a diameter of 3', anchored by six 1/2" expansion anchors at 60 degree intervals.
28
Tank contains oil, total maximum approximate weight=2707 lbs.ANCHOR analysis shows high margins and includes inlet and outlet nozzle loads.29 Table 3 (Continued)
 
Description of Anchorage Evaluation for Tanks and Heat Exchangers (Unit 2)Class Descri tion Buildin El.Descri tion of Confi uration and Anchora e Evaluation 2-QT-113-ABI, AB2, CDI&CD2 (4 Strainers)
'k Table 3 Description of Anchorage Evaluation for Tanks and Heat E<xchangers (Unit 2)
AB EMERGENCY DIESEL FULL FLOW LUBE OIL STRAINER 5 I AUXILIARY 579 Supported on four angle legs.Each leg is anchored by one I/2" J-bolt anchor.Weight=17304, c.g.at approx.mid-height
Class         ID           Description     Building      El.         Description of Configuration and Anchorage Evaluation 12-HE-25A          15GPM              AUXILIARY    600    Component is supported offshell of much larger (about 4.0') diameter RADIOACTIVE                            tank 12-TK-148 which is not on the SSEL. This component is WASTE EVAPORATOR designated an outlier due to concerns related to the anchorage for 12-TK-HE-25                                  148 and nozzle loads.
=33".The ANCHOR analysis performed for CDI&CD2 including nozzle loads showed a high margin.The inlet and outlet nozzle loads were assumed equally distributed between the two strainers.
CONDENSER 12-HE-25B   & C (2 15 GPM            AUXILIARY    587    The Heat Exchanger is about 14" in diameter and 10 feet long, Coolers)           RADIOACTIVE                            supported by stiffened saddles with two 3/4" diameter anchor bolts in WASTE each saddle, supported offof a steel platform. Weight of HX < 2000 lbs.
Anchorage for ABI and AB2 was acceptable by corn arison.2-QT-116-AB
EVAPORATOR HE-25 DISTILLATE                              Capacity exceeds demand for saddles, support frame and platform by COOLERS                                inspection.
&CD AB&CD EMERGENCY DIESEL LUBE OIL HEATER TAN K AUXILIARY 579 Small heater 9.5" Dia.x 3'-9.5" Ht.Anchorage screened based on the ANCHOR4 analysis for 116-CD.II 2-QT-118-A B&CD AB EMERGENCY DIESEL BYPASS LUBE OIL FILTER AUXILIARY 579 Filter anchored by nine anchors in three groups of three, so each group is 120 degrees for the next (i.e., evenly space).The approx.syeight of the tank is estimated to be the same as that of 2-QT-I l2-CD (Wt=2707//), because the tanks are of the same manufacturer, size, and both hold oil.2-QT-143-ABI, AB2 and CD I, CD2 (4 dryers)AB EMERGENCY DIESEL CONTROL AIR DRYER/II AUXILIARY 587 Anchorage screened based on an ANCHOR4 evaluation.
2-QT-112-AB &      AB&CD              AUXILIARY    579    Small tank, with a ht of about 5'nd a diameter of 3', anchored by six CD (2 filters)      EMERGENCY                              1/2" expansion anchors at 60 degree intervals. Tank contains oil, total DIESEL FULL FLOW LUBE OIL maximum approximate weight = 2707 lbs.
Small tank mounted together on steel frame with the other air dryer tank (ABI with AB2 and CDI with CD2).Frame anchored by eight 3/8" non-shell type expansion anchors, four per base plate.Tanks hold air and are the size of fire extinguishers, (approx.8.9 lbs.filled weight each).The nozzle loads are not a concern.Anchorage screened based on judgment aAer walkdown and review of anchorage inspection documentation.
FILTER ANCHOR analysis shows high margins and includes inlet and outlet nozzle loads.
30 Table 3 (Continued)
29
Description of Anchorage Evaluation for Tanks and Heat Exchangers (Unit 2)Class ID 2-QT-l44-AB
 
&CD (2 filters)Description AB&CD EMERGENCY DIESEL FUEL OIL TRANSFER FILTER Building AUXILIARY El.587 Description of Configuration and Anchorage Evaluation Small filter on three angle legs anchored by three 5/8" Phillips Red Head Wedge anchors.No interactions.
Table 3 (Continued)
Anchorage screened by judgment after walkdown and review of anchorage inspection documentation.
Description of Anchorage Evaluation for Tanks and Heat Exchangers (Unit 2)
0 2-TK-253-1
Class                 Descri tion       Buildin       El.                 Descri tion of Confi uration and Anchora e Evaluation 2-QT-113-   AB EMERGENCY       AUXILIARY       579   Supported on four angle legs. Each leg is anchored by one     I/2" J-bolt anchor.
&2 0 2-TK-253-3
ABI, AB2,    DIESEL FULL                              Weight = 17304, c.g. at approx. mid-height = 33".
&4 PRESSURIZER TRAIN'A'RESSURE RELIEF VLV NRV-153 RESERVE CONTROL AIR BOTTLE RACK PRESSURIZER TRAIN'B'RESSURE RELIEF VLV NRV-152 EMERGENCY AIR BOTTLE RACK CONTAINMENT 612 CONTAINMENT 650 This component is a small (about 4.5'ong x 16" diameter)air tank horizontally mounted (welded)on a short length of I beam which in turn is welded to building steel.Tank weight was assumed to be 250 lbs.An ANCHOR4 analysis showed a very high margin.This component is a cylindrical compressed air"bottle" about 12" in diameter and 60" tall, secured to the crane wall with steel straps that are attached to a very stout steel bracket arrangement, secured to the wall with a number of expansion anchors.AEPSC Structural
CDI & CD2 (4 FLOW LUBE OIL Strainers)  STRAINER 5 I                              The ANCHOR analysis performed for CDI & CD2 including nozzle loads showed a high margin. The inlet and outlet nozzle loads were assumed equally distributed between the two strainers. Anchorage for ABI and AB2 was acceptable by corn arison.
&Analytical Design Nuclear Section reviewed the as-found condition of the support for this tank, and found it to be adequate for design loads.21 12-HE-16S SOUTH SPENT FUEL PIT HEAT EXCHANGER AUXILIARY 609 Horizontal heat exchanger 3'2" diameter, and about 22'ong on two saddles supported by piers.Total weight full given as 26,200 lbs.Exchanger bolted into pier with four 718" diameter bolts per saddle.Piers are doweled into floor.The tank anchorage and saddles were adequate based on the analysis for 12-HE-16N as noted in Table 2.  
2-QT-116-AB AB&CD             AUXILIARY       579   Small heater 9.5" Dia. x 3'-9.5" Ht.
      &CD          EMERGENCY DIESEL LUBE OIL                          Anchorage screened based on the ANCHOR4 analysis for 116-CD.
HEATER TANK                                              II 2-QT-118-A B AB EMERGENCY       AUXILIARY       579   Filter anchored by nine anchors in three groups of three, so each group is 120 degrees
      &CD          DIESEL BYPASS                            for the next (i.e., evenly space).
LUBE OIL FILTER The approx. syeight of the tank is estimated to be the same as that of 2-QT-I l2-CD (Wt =2707//), because the tanks are of the same manufacturer, size, and both hold oil.
Anchorage screened based on an ANCHOR4 evaluation.
2-QT-143-   AB EMERGENCY      AUXILIARY       587   Small tank mounted together on steel frame with the other air dryer tank (ABI with ABI, AB2 and DIESEL                                    AB2 and CDI with CD2). Frame anchored by eight 3/8" non-shell type expansion CD I, CD2 (4 CONTROL AIR                              anchors, four per base plate. Tanks hold air and are the size of fire extinguishers, dryers)      DRYER/II                                  (approx. 8.9 lbs. filled weight each). The nozzle loads are not a concern.
Anchorage screened based on judgment aAer walkdown and review         of anchorage inspection documentation.
30
 
Table 3 (Continued)
Description of Anchorage     Evaluation for Tanks and Heat Exchangers (Unit 2)
Class       ID           Description          Building        El.                  Description of Configuration and Anchorage Evaluation 2-QT-l44-AB &   AB&CD                   AUXILIARY       587     Small filter on three angle legs anchored by three 5/8" Phillips Red Head Wedge CD (2 filters)  EMERGENCY                                        anchors. No interactions.
DIESEL FUEL OIL TRANSFER FILTER                                  Anchorage screened by judgment after walkdown and review of anchorage inspection documentation.
0   2-TK-253-1 & 2 PRESSURIZER            CONTAINMENT        612    This component is a small (about 4.5'ong x 16" diameter) air tank horizontally TRAIN                                            mounted (welded) on a short length of I beam which in turn is welded to building
                            'A'RESSURE RELIEF                           steel. Tank weight was assumed to be 250 lbs.
VLVNRV-153 RESERVE                                           An ANCHOR4 analysis showed a very high margin.
CONTROL AIR BOTTLE RACK 0  2-TK-253-3  &4 PRESSURIZER            CONTAINMENT       650   This component is a cylindrical compressed air "bottle" about 12" in diameter and TRAIN                                            60" tall, secured to the crane wall with steel straps that are attached to a very stout
                            'B'RESSURE RELIEF                          steel bracket arrangement, secured to the wall with a number of expansion anchors.
VLVNRV-152 EMERGENCY AIR                                    AEPSC Structural & Analytical Design Nuclear Section reviewed the as-found BOTTLE RACK                                      condition of the support for this tank, and found it to be adequate for design loads.
21   12-HE-16S       SOUTH SPENT             AUXILIARY        609     Horizontal heat exchanger 3' 2" diameter, and about 22'ong on two saddles FUEL PIT HEAT                                    supported by piers. Total weight full given as 26,200 lbs.
EXCHANGER Exchanger bolted into pier with four 718" diameter bolts per saddle. Piers are doweled into floor. The tank anchorage and saddles were adequate based on the analysis for 12-HE-16N as noted in Table 2.
 
Table 3 (Continued)
Description of Anchorage Evaluation for Tanks and Heat Exchangers (Unit 2)
Class      ID      Description        Building        El.              Description of Configuration and Anchorage Evaluation 21  2-HE-I I >>  REACTOR              AUXILIARY        609    Vertical Heat Exchanger on a Gusseted steel pedestal. Each Pedestal COOLANT PUMP                                is anchored to the floor with eight 3/4" J-Bolts embedded 20" into SEAL WATER HEAT                                        floor. Exchanger is 16" in diameter and 14'n height.
EXCHANGER Exchanger is bolted to the steel pedestal with two 1" diameter steel bolts on 6" centers in weak direction and 2'-8" in strong direction.
This connection is more limiting than the anchorage to the floor.
A hand calculation was performed      to demonstrate the adequacy  of these four bolts.
21  2-HE-13    EXCESS LETDOWN    CONTAINMENT        612    Heat exchanger (1600 Ibs) on two saddles in extremely high rad area.
HEAT EXCHANGER Anchorage includes four 3/4" diameter J-bolts, embedded at least 2 feet into piers. Due to large anchorage (four 3/4" bolts) and small exchanger, the anchorage is acceptable by SRT judgment.
21  2-HE-14    LETDOWN HEAT        AUXILIARY        633    Exchanger anchored with two 7/8" diameter J-bolts on 11-3/8" EXCHANGER                                    spacing. Vertical distance from the base of exchanger to the C.G. of exchanger is 13". Vertical distance from the base of the exchanger to the top nozzle is 29". Anchorage adequacy was accepted based on a short hand calculation.
21  2-HE-15E &  EAST k WEST          AUXILIARY        609    Component Cooling Water Heat Exchanger on two reinforced 15W (2      COMPONENT                                    saddles. Anchorage is two 7/8" diameter J bolts. There are four 1" exchangers) COOLING WATER HEAT                                        wedge expansion anchors in one pedestal in the horizontal direction.
EXCHANGER C.G. of exchanger from the top of the    saddle pedestal about 3'.
Anchorage screened based on a hand calculation for 1-HE-15E.
32
 
Table 3 (Continued)
Description of Anchorage Evaluation for Tanks and Heat Exchangers (Unit 2)
Class                    Descri tion    Buildin        El.                Descri tion of Confi oration and Anchora e Evaluation 21  2-HE-17E & 17W  EAST & WEST        AUXILIARY      609  Very well engineered support structure. There is a ring support at top of the RESIDUAL HEAT                            exchanger bracketed to the wall in each of the four quadrants. This takes the REMOVALHEAT                              overturning loads on the exchanger. Bottom support is a heavy duty steel gusset EXCHANGER                                structure supported by two peers. There are two bolts in each peer. The support structure for the exchanger is obviously well engineered.
Qualification data indicates an analysis to the design basis. Based on the inspection and anchorage data collected, the Heat Exchangers are adequate.
21  2-HE-18E & 18 W EAST& WEST        AUXILIARY      609    Very well engineered support structure. There is a ring support at top of the CONTAINMENT                              exchanger bracketed to the wall in each of the four quadrants. This takes the SPRAY HEAT                              overturning loads on the exchanger. Bottom support (at about the quarter point of the EXCHANGER                                exchanger, with the remainder of the exchanger hanging below) is a heavy duty ring with gussets at the bolt locations. These are bolted to a steel support structure that is obviously well engineered.
Qualification data indicates an analysis to the design basis. Based on the inspection and anchorage data collected the Heat Exchanger is adequate.
21  2-HE-32E & 32W  EAST & WEST        AUXILIARY      573  8" in diameter by 2" long exchanger, attached to East Residual Heat Removal Pump RESIDUAL HEAT                            with two 5/8" bolts. Could have screened with the pump using the rule of the box, REMOVALPUMP                              however the exchanger was listed separately on the SSEL.
PP-35E MECHANICAL                              Anchorage to the pumps was judged adequate by SRT judgment.
SEAL HEAT EXCHANGERS 33
 
Table 3 (Continued)
Description of Anchorage Evaluation for Tanks and Heat Exchangers (Unit 2)
Class      ID          Description        Building      El.          Description of Configuration and Anchorage Evaluation 21  2-HE-33E  &    EAST & WEST        AUXILIARY      573    6" diameter by 8-3/4" high exchanger, is not attached to the East 33W (2          CONTAINMENT                                Containment Spray Pump as shown on the anchorage sketch, however exchangers)    SPRAY PUMP PP-9E MECHANICAL                              piping can support the small exchanger. Could have screened with the SEAL HEAT                                  pump using the rule of the box, however the exchanger was listed EXCHANGERS                                separately oh the SSEL.
Anchorage to the pumps was judged adequate by the SRT.
21  2-HE-34-NE,    NORTH & SOUTH      AUXILIARY      587    6" diameter by 8-3/4" high exchanger, attached to North Safety 34-NW, 34-SE,  SAFETY                                    Injection Pump with two 1/2" bolts. Could have screened with the
      & 34-SW (4      INJECTION PUMP exchangers)    PP-26N                                    pump using the rule of the box, however the exchanger was listed OUTBOARD                                  separately on the SSEL.
MECHANICAL SEAL HEAT                                  Anchorage to the pumps was judged adequate by the SRT.
EXCHANGERS 2-HE-35N &      NORTH & SOUTH      AUXILIARY      587    Small exchanger 1'-5" long by 4" in diameter by 8-3/4", attached to 35S (2 Coolers) SAFETY                                    North Safety Injection Pump with four 1/4" bolts. Could have screened INJECTION PUMP PP-26N LUBE OIL with the pump using the rule of the box, however the exchanger was COOLERS                                    listed separately on the SSEL.
Anchorage to the pumps was judged adequate by the SRT.
 
Table 3 (Continued)
Description of Anchorage Evaluation for Tanks and Heat Exchangers (Unit 2)
Class        ID            Description        Building      El.          Description of Configuration and Anchorage Evaluation 21    2-HE-36-EN,    EAST & WEST            AUXILIARY      587    6" in diameter 8-3/4" high heat exchanger, attached to East Centrifugal Charging 36-ES, 36-WN,  CENTRIFUGAL                                  Pump with two I/2" bolts. Could have screened with the pump using the rule of 36-WS (4        CHARGING PUMP PP-                          the box, however the exchanger was listed separately on the SSEL.
exchangers)    50E INBOARD MECHANICALSEAL                              Anchorage to the pumps was judged adequate by the SRT.
HEAT EXCHANGERS 21    2-HE-37E,      EAST & WEST            AUXILIARY      587    Exchanger I'-6" long and 5" in diameter attached to reinforced plate support with 37W            CENTRIFUGAL                                  four I/2" bolts. Plate support bolted to East Centrifugal Charging Pump with CHARGING PUMP PP-                          three I/2" bolts. Could have screened using the rule of the box, however the 50E GEAR OIL                                exchanger has a separate SSEL listing.
COOLER Anchorage to the pumps was judged adequate by the SRT.
21  ~ 2-HE-38E*    &  EAST & WEST            AUXILIARY      587    Small exchanger I'-6" long and 5" in diameter bolted to 2 1'ong channel 38W            CENTRIFUGAL                                columns that are welded to the skid of the East Centrifugal Charging Pump.
CHARGING PUMP PP-                          Could have screened with the pump using the rule of the box, however the 50E LUBE OIL COOLER                        exchanger was listed separately on the SSEL.
Anchorage to the pumps was judged adequate by the SRT.
21    2-HE-47-ABN    AB & CD EMERGENCY      AUXILIARY      587  Aftercooler transfers its lateral load to the inlet manifolds. Gravity loads are
        &, 47-A BS, 47- DIESEL NORTH                                carried by a post on a spring hanger base, so the post is incapable of carryin CDN &47-        COMBUSTION AIR                              lateral or longitudinal load.
CDS (4          AFTER-COOLERS aAercoolers)                                                The Diesel Generator Turbochargers in Unit 2 were replaced in a recent outa< e.
As part of the modil ication an analysis was perlonned for thc associated piping and the aAercoolers. All supports met the D.C. Cook acceptance criteria.
35
 
Table 3 (Continued)
Description of Anchorage Evaluation for Tanks and Heat Exchangers (Unit 2)
Class      ID          Description        Building      El.          Description of Configuration and Anchorage Evaluation 21  2-QP-21        SOUTH BORIC ACID      AUXILIARY      587  Boric Acid Blender supported by piping. It is in-line with the pipe between two BLENDER                                    pipe supports offthe floor. Blender very small (6" in diameter and I I" long).
Screened based on drawings (insulation precluded inspection of the blender connection to the piping system) and inspection for interactions.
21  2-QT-107- AB  AB & CD EMERGENCY      AUXILIARY      587  Horizontal tanks which sits on two saddles. Each saddle has two I/4" thick plates,
      & CD (2 tanks) DIESEL FUEL OIL DAY                        forming a "U", with no gussets. There are two 5/8" anchors per saddle.
TANKS A Horizontal Tank Analysis was performed to show that the tank anchorage      is adequate.
21  2-QT-110-AB    AB & CD EMERGENCY      AUXILIARY      5/7  Lube Oil Coolers, mounted to wall by fourteen 3/4" Wedge type anchors.
      &CD            DIESEL LUBE OIL (2 Coolers)    COOLER                                      External ANCHOR4 analysis for 2-QT-110-CD was performed. Based on the results of this evaluation both coolers were screened.
21  2-QT-115-AB    AB & CD EMERGENCY      AUXILIARY      5 79  The tank sits on two saddles, two plates per saddle, I/O" thick. There are two 3/4"
      & CD(2        DIESEL LUBE OIL                            anchors per saddle. There are four anchors in total for the tank.
Tanks)        SUMP TANKS Anchorage screened based on review of the anchorage inspection documentation and the vendor qualification of the tanks.
21  2-QT-131-AB    AB & CD EMERGENCY      AUXILIARY      587  Jacket Water Cooler mounted to wall by fourteen 3/4" wedge type expansion
      & CD(2        DIESEL JACKET                              anchors.
Coolers)      WATER COOLER An ANCHOR4 was performed on 2-QT-131-CD. Based on that analysis both coolers were screened.
36


Table 3 (Continued)
Table 3 (Continued)
Description of Anchorage Evaluation for Tanks and Heat Exchangers (Unit 2)Class 21 ID 2-HE-I I>>Description REACTOR COOLANT PUMP SEAL WATER HEAT EXCHANGER Building AUXILIARY El.609 Description of Configuration and Anchorage Evaluation Vertical Heat Exchanger on a Gusseted steel pedestal.Each Pedestal is anchored to the floor with eight 3/4" J-Bolts embedded 20" into floor.Exchanger is 16" in diameter and 14'n height.Exchanger is bolted to the steel pedestal with two 1" diameter steel bolts on 6" centers in weak direction and 2'-8" in strong direction.
Description of Anchorage Evaluation for Tanks and Heat Exchangers (Unit 2)
This connection is more limiting than the anchorage to the floor.21 2-HE-13 EXCESS LETDOWN CONTAINMENT 612 HEAT EXCHANGER A hand calculation was performed to demonstrate the adequacy of these four bolts.Heat exchanger (1600 Ibs)on two saddles in extremely high rad area.Anchorage includes four 3/4" diameter J-bolts, embedded at least 2 feet into piers.Due to large anchorage (four 3/4" bolts)and small exchanger, the anchorage is acceptable by SRT judgment.21 21 2-HE-14 2-HE-15E&15W (2 exchangers)
Class       ID         Description       Building       El.         Description of Configuration and Anchorage Evaluation 21  2-QT-133-A B  AB&CD                AUXILIARY      587    100 GAL. TANK, 2'-6" D x    3'.
LETDOWN HEAT EXCHANGER EAST k WEST COMPONENT COOLING WATER HEAT EXCHANGER AUXILIARY AUXILIARY 633 609 Exchanger anchored with two 7/8" diameter J-bolts on 11-3/8" spacing.Vertical distance from the base of exchanger to the C.G.of exchanger is 13".Vertical distance from the base of the exchanger to the top nozzle is 29".Anchorage adequacy was accepted based on a short hand calculation.
      & CD (2 tanks) EMERGENCY DIESEL JACKET WATER SURGE The surge tanks are supported (bolted) to a shelf. The shelf is bolted TANK                                        to the wall by four 7/8" anchors.
Component Cooling Water Heat Exchanger on two reinforced saddles.Anchorage is two 7/8" diameter J bolts.There are four 1" wedge expansion anchors in one pedestal in the horizontal direction.
An ANCHOR4 was performed on 2-QT-133-CD. Based on that analysis both coolers were screened.
C.G.of exchanger from the top of the saddle pedestal about 3'.Anchorage screened based on a hand calculation for 1-HE-15E.32 Table 3 (Continued)
21   2-QT- l34-AB  AB & CD              AUXILIARY       587    Heater tanks separately mounted by three 1/2" coupling rods and
Description of Anchorage Evaluation for Tanks and Heat Exchangers (Unit 2)Class 21 2-HE-17E&17W Descri tion EAST&WEST RESIDUAL HEAT REMOVAL HEAT EXCHANGER Buildin AUXILIARY El.609 Descri tion of Confi oration and Anchora e Evaluation Very well engineered support structure.
      & CD4  (2    EMERGENCY                                  Phillips Redhead wedge type anchors.
There is a ring support at top of the exchanger bracketed to the wall in each of the four quadrants.
tanks)        DIESEL AUXILIARY JACKET WATER HEATER (TANK)                              An ANCHOR4 was performed on 2-QT-134-CD. Based on that analysis both coolers were screened.
This takes the overturning loads on the exchanger.
21   2-QT-14 I-     AB EMERGENCY        AUXILIARY       587    Air tanks anchored by four 5/8" J-bolts. Total weight for the tank is ABI, AB2,     DIESEL STARTING                            6000 lbs.
Bottom support is a heavy duty steel gusset structure supported by two peers.There are two bolts in each peer.The support structure for the exchanger is obviously well engineered.
CDI, & CD2(4   AIR RECEIVER III Air Receivers)
21 2-HE-18E&18 W EAST&WEST CONTAINMENT SPRAY HEAT EXCHANGER AUXILIARY 609 Qualification data indicates an analysis to the design basis.Based on the inspection and anchorage data collected, the Heat Exchangers are adequate.Very well engineered support structure.
The tank anchorage was verified by an ANCHOR4 analysis. Nozzle loads were included.
There is a ring support at top of the exchanger bracketed to the wall in each of the four quadrants.
21  2-TK-10        REACTOR COOLANT      AUXILIARY       609    Tank on four wide flange legs, 90 inches in diameter and 120 inches LETDOWN VOLUME                              in height.
This takes the overturning loads on the exchanger.
CONTROL TANK The tank leg support and anchorage was screened based on a hand calculation.
Bottom support (at about the quarter point of the exchanger, with the remainder of the exchanger hanging below)is a heavy duty ring with gussets at the bolt locations.
37
These are bolted to a steel support structure that is obviously well engineered.
 
21 2-HE-32E&32W EAST&WEST RESIDUAL HEAT REMOVAL PUMP PP-35E MECHANICAL SEAL HEAT EXCHANGERS AUXILIARY 573 Qualification data indicates an analysis to the design basis.Based on the inspection and anchorage data collected the Heat Exchanger is adequate.8" in diameter by 2" long exchanger, attached to East Residual Heat Removal Pump with two 5/8" bolts.Could have screened with the pump using the rule of the box, however the exchanger was listed separately on the SSEL.Anchorage to the pumps was judged adequate by SRT judgment.33 Table 3 (Continued)
Description of Anchorage Evaluation for Tanks and Heat Exchangers (Unit 2)Class 21 ID 2-HE-33E&33W (2 exchangers)
Description EAST&WEST CONTAINMENT SPRAY PUMP PP-9E MECHANICAL SEAL HEAT EXCHANGERS Building AUXILIARY El.573 Description of Configuration and Anchorage Evaluation 6" diameter by 8-3/4" high exchanger, is not attached to the East Containment Spray Pump as shown on the anchorage sketch, however piping can support the small exchanger.
Could have screened with the pump using the rule of the box, however the exchanger was listed separately oh the SSEL.21 2-HE-34-NE, 34-NW, 34-SE,&34-SW (4 exchangers)
NORTH&SOUTH SAFETY INJECTION PUMP PP-26N OUTBOARD MECHANICAL SEAL HEAT EXCHANGERS AUXILIARY 587 Anchorage to the pumps was judged adequate by the SRT.6" diameter by 8-3/4" high exchanger, attached to North Safety Injection Pump with two 1/2" bolts.Could have screened with the pump using the rule of the box, however the exchanger was listed separately on the SSEL.Anchorage to the pumps was judged adequate by the SRT.2-HE-35N&NORTH&SOUTH 35S (2 Coolers)SAFETY INJECTION PUMP PP-26N LUBE OIL COOLERS AUXILIARY 587 Small exchanger 1'-5" long by 4" in diameter by 8-3/4", attached to North Safety Injection Pump with four 1/4" bolts.Could have screened with the pump using the rule of the box, however the exchanger was listed separately on the SSEL.Anchorage to the pumps was judged adequate by the SRT.
Table 3 (Continued)
Table 3 (Continued)
Description of Anchorage Evaluation for Tanks and Heat Exchangers (Unit 2)Class ID Description Building El.Description of Configuration and Anchorage Evaluation 21 2-HE-36-EN, 36-ES, 36-WN, 36-WS (4 exchangers)
Description of Anchorage Evaluation for Tanks and Heat Exchangers (Unit 2)
EAST&WEST CENTRIFUGAL CHARGING PUMP PP-50E INBOARD MECHAN ICAL SEAL HEAT EXCHANGERS AUXILIARY 587 6" in diameter 8-3/4" high heat exchanger, attached to East Centrifugal Charging Pump with two I/2" bolts.Could have screened with the pump using the rule of the box, however the exchanger was listed separately on the SSEL.Anchorage to the pumps was judged adequate by the SRT.21 21 2-HE-37E, 37W~2-HE-38E*&38W EAST&WEST CENTRIFUGAL CHARGING PUMP PP-50E GEAR OIL COOLER EAST&WEST CENTRIFUGAL CHARGING PUMP PP-50E LUBE OIL COOLER AUXILIARY 587 AUXILIARY 587 Exchanger I'-6" long and 5" in diameter attached to reinforced plate support with four I/2" bolts.Plate support bolted to East Centrifugal Charging Pump with three I/2" bolts.Could have screened using the rule of the box, however the exchanger has a separate SSEL listing.Anchorage to the pumps was judged adequate by the SRT.Small exchanger I'-6" long and 5" in diameter bolted to 2 1'ong channel columns that are welded to the skid of the East Centrifugal Charging Pump.Could have screened with the pump using the rule of the box, however the exchanger was listed separately on the SSEL.21 2-HE-47-ABN
Class     ID     Description       Building     El.         Description of Configuration and Anchorage Evaluation 21   2-TK- I I BORON INJECTION      AUXILIARY    612    Tank is about 5'n diameter by 10'n height supported by 4 Wide TANK                                      Flange Leg supports (10" WF w/5/8" flange) 4'-4" in height..
&, 47-A BS, 47-CDN&47-CDS (4 aAercoolers)
Each leg is bolted to the pedestal w/ two embedded    1 3/4" bolts.
AB&CD EMERGENCY DIESEL NORTH COMBUSTION AIR AFTER-COOLERS AUXILIARY 587 Anchorage to the pumps was judged adequate by the SRT.Aftercooler transfers its lateral load to the inlet manifolds.
Weld  of leg to tank about 14" in length and 1/4" thickness on each side of the wide flange and 10" at the top of the wide flange.
Gravity loads are carried by a post on a spring hanger base, so the post is incapable of carryin lateral or longitudinal load.The Diesel Generator Turbochargers in Unit 2 were replaced in a recent outa<e.As part of the modil ication an analysis was perlonned for thc associated piping and the aAercoolers.
The seismic evaluation of the Boric Acid Tank (2-TK-12S) indicates that it is seismically adequate. The Boron Injection Tank is much smaller but has about the same support. Therefore, Tank 2-TK-11 is judged adequate based on comparison 21   2-TK-12S  SOUTH BORIC ACID     AUXILIARY     587   Boric Acid Tank on four Wide Flange Beam Legs.
All supports met the D.C.Cook acceptance criteria.35 Table 3 (Continued)
STORAGE TANK Tank anchorage and wide flange legs were evaluated using a hand calculation. The calculation indicated that the legs and anchorage are adequate.
Description of Anchorage Evaluation for Tanks and Heat Exchangers (Unit 2)Class ID Description Building El.Description of Configuration and Anchorage Evaluation 21 2-QP-21 SOUTH BORIC ACID BLENDER AUXILIARY 587 Boric Acid Blender supported by piping.It is in-line with the pipe between two pipe supports off the floor.Blender very small (6" in diameter and I I" long).21 21 21 21 2-QT-107-AB&CD (2 tanks)2-QT-110-AB
21  2-TK- 150 MAINSTEAM LEADS      AUXILIARY    600    Small horizontal tank bolted to wall in-line with the piping system.
&CD (2 Coolers)2-QT-115-AB
CONDENSATE DRAIN TANK Anchorage was judged acceptable based on the walkdown and a review of the anchorage inspection documentation.
&CD(2 Tanks)2-QT-131-AB
38
&CD(2 Coolers)AB&CD EMERGENCY DIESEL FUEL OIL DAY TANKS AB&CD EMERGENCY DIESEL LUBE OIL COOLER AB&CD EMERGENCY DIESEL LUBE OIL SUMP TANKS AB&CD EMERGENCY DIESEL JACKET WATER COOLER AUXILIARY 587 AUXILIARY 5/7 AUXILIARY 5 79 AUXILIARY 587 Screened based on drawings (insulation precluded inspection of the blender connection to the piping system)and inspection for interactions.
Horizontal tanks which sits on two saddles.Each saddle has two I/4" thick plates, forming a"U", with no gussets.There are two 5/8" anchors per saddle.A Horizontal Tank Analysis was performed to show that the tank anchorage is adequate.Lube Oil Coolers, mounted to wall by fourteen 3/4" Wedge type anchors.External ANCHOR4 analysis for 2-QT-110-CD was performed.
Based on the results of this evaluation both coolers were screened.The tank sits on two saddles, two plates per saddle, I/O" thick.There are two 3/4" anchors per saddle.There are four anchors in total for the tank.Anchorage screened based on review of the anchorage inspection documentation and the vendor qualification of the tanks.Jacket Water Cooler mounted to wall by fourteen 3/4" wedge type expansion anchors.An ANCHOR4 was performed on 2-QT-131-CD.
Based on that analysis both coolers were screened.36


Table 3 (Continued)
Table 3 (Continued)
Description of Anchorage Evaluation for Tanks and Heat Exchangers (Unit 2)Class ID Description Building El.Description of Configuration and Anchorage Evaluation 21 2-QT-133-A B&CD (2 tanks)AB&CD EMERGENCY DIESEL JACKET WATER SURGE TANK AUXILIARY 587 100 GAL.TANK, 2'-6" D x 3'.The surge tanks are supported (bolted)to a shelf.The shelf is bolted to the wall by four 7/8" anchors.21 2-QT-l34-AB&CD4 (2 tanks)AB&CD EMERGENCY DIESEL AUXILIARY JACKET WATER HEATER (TANK)AUXILIARY 587 An ANCHOR4 was performed on 2-QT-133-CD.
Description of Anchorage Evaluation for Tanks and Heat Exchangers (Unit 2)
Based on that analysis both coolers were screened.Heater tanks separately mounted by three 1/2" coupling rods and Phillips Redhead wedge type anchors.An ANCHOR4 was performed on 2-QT-134-CD.
Class     ID   Description       Building                   Description of Configuration and Anchorage Evaluation 21   2-TK-32 CONDENSATE          GROUNDS      609    Large flat bottom tank 52'-0" inside diameter 34'-5 1/2" height, STORAGE TANK                             500,000 gallons and weighs 128,700 lbs. Anchored with thirty 3/8" th x 5" w x 4' 4" long strap that is embedded in the concrete 2'epth with a 2" radius hook at the end.
Based on that analysis both coolers were screened.21 2-QT-14 I-ABI, AB2, CDI,&CD2(4 Air Receivers)
The strap detail is identical to the strap for the Unit 1 and 2 RWST 1-TK-33 and 2-TK-33. The calculation for the RWST resulted in the conclusion that the weld to the tank and embedment in the concrete was sufficient to develop the full yield strength of the strap.
AB EMERGENCY DIESEL STARTING AIR RECEIVER II I AUXILIARY 587 Air tanks anchored by four 5/8" J-bolts.Total weight for the tank is 6000 lbs.The tank anchorage was verified by an ANCHOR4 analysis.Nozzle loads were included.21 2-TK-10 REACTOR COOLANT LETDOWN VOLUME CONTROL TANK AUXILIARY 609 Tank on four wide flange legs, 90 inches in diameter and 120 inches in height.The tank leg support and anchorage was screened based on a hand calculation.
The RWST has a very similar configuration as this CST. The calculation for the RWST using GIP methodology indicated an overall safety factor of 2.57 for overturning and 1.72 for shear.
37 Table 3 (Continued)
The CST was screened based on a comparison of the significant attributes to the RWST.
Description of Anchorage Evaluation for Tanks and Heat Exchangers (Unit 2)Class 21 ID 2-TK-I I Description BORON INJECTION TANK Building AUXILIARY El.612 Description of Configuration and Anchorage Evaluation Tank is about 5'n diameter by 10'n height supported by 4 Wide Flange Leg supports (10" WF w/5/8" flange)4'-4" in height..Each leg is bolted to the pedestal w/two embedded 1 3/4" bolts.Weld of leg to tank about 14" in length and 1/4" thickness on each side of the wide flange and 10" at the top of the wide flange.21 21 2-TK-12S 2-TK-150 SOUTH BORIC ACID STORAGE TANK MAIN STEAM LEADS CONDENSATE DRAIN TANK AUXILIARY AUXILIARY 587 600 The seismic evaluation of the Boric Acid Tank (2-TK-12S) indicates that it is seismically adequate.The Boron Injection Tank is much smaller but has about the same support.Therefore, Tank 2-TK-11 is judged adequate based on comparison Boric Acid Tank on four Wide Flange Beam Legs.Tank anchorage and wide flange legs were evaluated using a hand calculation.
21  2-TK-33 REFUELING            GROUNDS      609    Large flat bottom tank 48'-0" inside diameter 32'-3" height (31'-0" WATER STORAGE                            liquid tank 420,000 gallons and weighs 94,000 lbs. Anchored with TANK twenty-five 3/8" th x 5" w x 4' 4" long strap that is embedded in the concrete 2'epth with a 2" radius hook at the end.
The calculation indicated that the legs and anchorage are adequate.Small horizontal tank bolted to wall in-line with the piping system.Anchorage was judged acceptable based on the walkdown and a review of the anchorage inspection documentation.
A detailed calculation was performed to the SQUG G1P criteria. The calculation resulted in the conclusion that the weld to the tank and embedment in the concrete was sufficient to develop the full yield strength of the strap. The calculation for the RWST using the GIP methodology indicated an overall safety factor of 2.57 for overturning and 1.72  for shear.
38 Table 3 (Continued)
39
Description of Anchorage Evaluation for Tanks and Heat Exchangers (Unit 2)Class 21 ID 2-TK-32 Description CONDENSATE STORAGE TANK Building GROUNDS 609 Description of Configuration and Anchorage Evaluation Large flat bottom tank 52'-0" inside diameter 34'-5 1/2" height, 500,000 gallons and weighs 128,700 lbs.Anchored with thirty 3/8" th x 5" w x 4'4" long strap that is embedded in the concrete 2'epth with a 2" radius hook at the end.The strap detail is identical to the strap for the Unit 1 and 2 RWST 1-TK-33 and 2-TK-33.The calculation for the RWST resulted in the conclusion that the weld to the tank and embedment in the concrete was sufficient to develop the full yield strength of the strap.The RWST has a very similar configuration as this CST.The calculation for the RWST using GIP methodology indicated an overall safety factor of 2.57 for overturning and 1.72 for shear.21 2-TK-33 REFUELING WATER STORAGE TANK GROUNDS 609 The CST was screened based on a comparison of the significant attributes to the RWST.Large flat bottom tank 48'-0" inside diameter 32'-3" height (31'-0" liquid tank 420,000 gallons and weighs 94,000 lbs.Anchored with twenty-five 3/8" th x 5" w x 4'4" long strap that is embedded in the concrete 2'epth with a 2" radius hook at the end.A detailed calculation was performed to the SQUG G1P criteria.The calculation resulted in the conclusion that the weld to the tank and embedment in the concrete was sufficient to develop the full yield strength of the strap.The calculation for the RWST using the GIP methodology indicated an overall safety factor of 2.57 for overturning and 1.72 for shear.39 Table 3 (Continued)
 
Description of Anchorage Evaluation for Tanks and Heat Exchangers (Unit 2)Class ID Description Building El.Description of Configuration and Anchorage Evaluation 21 2-TK-37 COMPONENT COOLING WATER SURGE TANK AUXILIARY 650 Skirted tank 11'-10 1/4" diameter and 17'n height.Skirt is 4'-6" high from the top of the pad to skirt connection to tank.Skirt has 1/2" thickness..
Table 3 (Continued)
There are eight bolts evenly spaced around tank, with a solid steel washer 3-3/4" high x 4" length x 2" width.Bolts supported from 3" x 3" x 1/2" angle.21 2-TK-76N*, 76S CONTROL ROOM AIR CONDITIONING NORTH AND SOUTH CHILL WATER EXPANSION TANKS AUXILIARY 650 2-TK-37 is similar to 1-TK-37.The support for 2-TK-37 was screened based on the hand calculation for 1-TK-37.Small tank 2'n length x 9" in diameter on a 1" diameter piping system.Tank in-line with pipe, supported by a U-bolt on a cantilevered angle (2 1/2" x 2 1/2" x 3/8")about 1'-6" long.Angle welded to a plate that is bolted to the reinforced block wall with three 5/8" diameter through bolts (other side of wall inspected and bolts came through).Anchorage and support for these small tanks were accepted by SRT judgment after the walkdown and a review of the anchorage inspection documentation.
Description of Anchorage Evaluation for Tanks and Heat Exchangers (Unit 2)
40 r
Class      ID        Description        Building      El.          Description of Configuration and Anchorage Evaluation 21  2-TK-37    COMPONENT            AUXILIARY    650    Skirted tank 11'-10 1/4" diameter and 17'n height. Skirt is 4'-6" high COOLING WATER                              from the top of the pad to skirt connection to tank. Skirt has 1/2" SURGE TANK thickness.. There are eight bolts evenly spaced around tank, with a solid steel washer 3-3/4" high x 4" length x 2" width. Bolts supported from 3" x 3" x 1/2" angle.
Section 5.1.2 states that all four tanks reviewed met the intent of the GIP.Indicate that thc GIP-2 guidclincs and methodology are fully.mct or identify any deviations from thc guidelines and thc methodology.
2-TK-37 is similar to 1-TK-37. The support for 2-TK-37 was screened based on the hand calculation for 1-TK-37.
Provide calculations for determining thc seismic adequacy of the tanks (ID 1-TK-33 and 2-TK-32)using thc methodology dcscribcd in section 7 of thc GIP-2.The evaluation of thc anchors which restrain the tank movement should also be provided.The flat bottom tanks were screened based on calculations performed on August 25, 1989, prior to the publication of the rev.2 GIP.The evaluation performed followed the procedure available at the time in the rev.1 GIP.There are only minor differences between the two revisions that do not affect the results due to the resulting high margins.There are two differences in the configuration of the RWST (1-TK-33)that are not in conformance with the GIP procedure:
21  2-TK-76N*, CONTROL ROOM AIR      AUXILIARY    650    Small tank 2'n length x 9 " in diameter on a 1" diameter piping 76S        CONDITIONING                              system. Tank in-line with pipe, supported by a U-bolt on a NORTH AND SOUTH CHILL WATER                                cantilevered angle (2 1/2" x 2 1/2" x 3/8") about 1'-6" long. Angle EXPANSION TANKS                            welded to a plate that is bolted to the reinforced block wall with three 5/8" diameter through bolts (other side of wall inspected and bolts came through).
a)the t JR=.0007351 which is less than the limits of the GIP screening table of.001;and b)the tank was not anchored with bolts but rather with twenty-five 3/8" x 5" x 4'4" long straps that are embedded in the concrete at a two foot depth with a two inch radius hook at the end.The t JR issue was accounted for by making an appropriate adjustment in the calculated natural frequency for the tank.The anchorage was considered by replacing the strap in the calculation with bolts of equivalent area and strength.Both of these modifications meet the intent of the GIP guidelines.
Anchorage and support for these small tanks were accepted by SRT judgment after the walkdown and a review of the anchorage inspection documentation.
The calculation resulted in the conclusion that the weld to the tank and embedment in the concrete was sufficient to develop the full yield strength of the strap.The calculation for the RWST using the Rev.1 GIP methodology indicated an overall safety factor of 2.57 for overturning and 1.72 for shear.In order to obtain further assurance that the RWST is seismically adequate a calculation that conformed to'ASCE Standard 4-86 was performed and'yielded similar results.The strap detail for the CST (2-TK-32)is identical to the strap for the RWST (1-TK-33).
40
The calculation for the RWST resulted in the conclusion that the weld to the tank and embedment in the concrete was sufficient to develop the full yield strength of the strap.The CST also has a very similar configuration as this RWST.The CST was therefore screened based on a comparison of the significant attributes to the RWST.The SEWS for 1-TK-33 and 2-TK-32 including the calculations are included as attachment
 
: 4.
r Section 5.1.2 states that all four tanks reviewed met the intent of the GIP. Indicate that thc GIP-2 guidclincs and methodology are fully.mct or identify any deviations from thc guidelines and thc methodology. Provide calculations for determining thc seismic adequacy of the tanks (ID 1-TK-33 and 2-TK-32) using thc methodology dcscribcd in section 7 of thc GIP-2. The evaluation of thc anchors which restrain the tank movement should also be provided.
7i Section 5.1.5 states that horizontal tanks and heat cxchangers rcviewcd mct thc intent of thc GIP.Indicate that the GIP-2 guidelines and methodology are fully met or identify any deviations from them.Provide calculations using the methodology described in section 7 of the GIP-2 for the following tanks and cxchangers:
The flat bottom tanks were screened based on calculations performed on August 25, 1989, prior to the publication of the rev. 2 GIP. The evaluation performed followed the procedure available at the time in the rev. 1 GIP. There are only minor differences between the two revisions that do not affect the results due to the resulting high margins.
1-HE-14, 2-HK-15K, 12-HE-16N, 1-QT-107-AB and 2-QT-115-CD.
There are two differences in the configuration of the RWST (1-TK-33) that are not in conformance with the GIP procedure: a) the tJR = .0007351 which is less than the limits of the GIP screening table of .001; and b) the tank was not anchored with bolts but rather with twenty-five 3/8" x 5" x 4' 4" long straps that are embedded in the concrete at a two foot depth with a two inch radius hook at the end.
The evaluation of the anchors which restrain thc tank movement should also be provided.As previously discussed in response to questions 2 and 5, anchorage and support evaluations took several different forms consistent with the GIP.These forms included for tanks and heat exchangers:
The tJR issue was accounted for by making an appropriate adjustment in the calculated natural frequency for the tank. The anchorage was considered by replacing the strap in the calculation with bolts of equivalent area and strength. Both of these modifications meet the intent of the GIP guidelines. The calculation resulted in the conclusion that the weld to the tank and embedment in the concrete was sufficient to develop the full yield strength of the strap. The calculation for the RWST using the Rev. 1 GIP methodology indicated an overall safety factor of 2.57 for overturning and 1.72 for shear. In order to obtain further assurance that the RWST is seismically adequate a calculation that conformed to'ASCE Standard 4-86 was performed and'yielded similar results.
a)detailed evaluations using the step by step procedure in section 7.4 of the GIP;b)detailed hand calculations; c)screening based on an anchorage evaluation for an identical item of equipment and anchorage or a worst case evaluation of a similar item;or d)the SRT judged, based on the weight and anchorage of the equipment, that the anchorage obviously met the GIP screening criteria.The GIP-2 guidelines for adequate strength of the tanks or exchangers, saddles and anchorage are met for all horizontal tanks and heat exchangers that were identified in the final report as screened.The step by step procedure in section 7.4 was not used for supports that were obviously rugged based on the inspection.
The strap detail for the CST (2-TK-32) is identical to the strap for the RWST (1-TK-33). The calculation for the RWST resulted in the conclusion that the weld to the tank and embedment in the concrete was sufficient to develop the full yield strength of the strap. The CST also has a very similar configuration as this RWST. The CST was therefore screened based on a comparison of the significant attributes to the RWST.
Exchangers that did not meet'the applicable ranges of parameters and assumptions contained in table 7-6 of the GIP could not be evaluated with the section 7.4 procedure.
The SEWS for 1-TK-33 and 2-TK-32 including the calculations are included as attachment 4.
These tanks were evaluated as, described in tables 2 and 3 of this response to item 5 of the RAI.SEWS that include the calculations and the anchorage inspection documentation for 1-HE-14, 2-HE-15E, 12-HE-16N, 1-QT-107-AB and 2-QT-115-CD are contained in attachment 5 of this submittal.
 
The evaluations for 1-HE-15E and 1-QT-107-CD are also provided since the screening for 2-HE-15E and 1-QT-107-AB are based on these evaluations, respectively.
7i Section 5.1.5 states that horizontal tanks and heat cxchangers rcviewcd mct thc intent of thc GIP. Indicate that the GIP-2 guidelines and methodology are fully met or identify any deviations from them. Provide calculations using the methodology described in section 7 of the GIP-2 for the following tanks and cxchangers: 1-HE-14, 2-HK-15K, 12-HE-16N, 1-QT-107-AB and 2-QT-115-CD. The evaluation of the anchors which restrain thc tank movement should also be provided.
These SEWS and calculations provide a good cross section of the evaluations performed.
As previously discussed in response to questions 2 and 5, anchorage and support evaluations took several different forms consistent with the GIP. These forms included for tanks and heat exchangers: a) detailed evaluations using the step by step procedure in section 7.4 of the GIP; b) detailed hand calculations; c) screening based on an anchorage evaluation for an identical item of equipment and anchorage or a worst case evaluation of a similar item; or d) the SRT judged, based on the weight and anchorage of the equipment, that the anchorage obviously met the GIP screening criteria. The GIP-2 guidelines for adequate strength of the tanks or exchangers, saddles and anchorage are met for all horizontal tanks and heat exchangers that were identified in the final report as screened. The step by step procedure in section 7.4 was not used for supports that were obviously rugged based on the inspection. Exchangers that did not meet 'the applicable ranges of parameters and assumptions contained in table 7-6 of the GIP could not be evaluated with the section 7.4 procedure. These tanks were evaluated as, described in tables 2 and 3 of this response to item 5 of the RAI.
The calculation for 1-HE-14 was a short hand calculation that indicated the anchorage had a safety margin of eight.A hand calculation was performed for 1-HE-15E that was also used to screen 2-HE-15E.These had a calculated safety margin of four.Heat exchanger 12-HE-16N and tanks 1-QT-107-CD and 2-QT-115-CD included a calculation using the step by step methodology in section 7.4 of the GIP.
SEWS that include the calculations and the anchorage inspection documentation for 1-HE-14, 2-HE-15E, 12-HE-16N, 1-QT-107-AB and 2-QT-115-CD are contained in attachment 5 of this submittal. The evaluations for 1-HE-15E and 1-QT-107-CD are also provided since the screening for 2-HE-15E and 1-QT-107-AB are based on these evaluations, respectively. These SEWS and calculations provide a good cross section of the evaluations performed. The calculation for 1-HE-14 was a short hand calculation that indicated the anchorage had a safety margin of eight. A hand calculation was performed for 1-HE-15E that was also used to screen 2-HE-15E. These had a calculated safety margin of four. Heat exchanger 12-HE-16N and tanks 1-QT-107-CD and 2-QT-115-CD included a calculation using the step by step methodology in section 7.4 of the GIP.
S)Tables 6-1 and 6-2 provide a summary of the limited analytical reviews (LARS)for thc sclcctcd cable and conduit raceways.Provide copies of the calculations of the analyses for resolution of thc outlicrs listed as LAR Numbers 005, 011, 022 and 023.Also provide typical sample calculations for thc raceways that arc not selected as outliers (i.e., LAR Numbers 001, 010, 027 and 030).The requested information is contained in attachment 6 to this RAI.
 
A' y 9)Discuss thc issue described in thc Information Notice 95-49 regarding Thermo-Lag panels, in particular, thc issue regarding seismic resistance capability of the cable tray and its support when appropriate weight and modulus of the Thermo-Lag are included in thc analysis.The fire-wrapped raceways were walked-down as part of the USI A-46 raceway evaluations, along with all of the other raceways in the plant.The weight of the Thermo-Lag material was considered in choosing LARS for the USI A-46 effort.None of the hangers supporting fire-wrapped raceways were selected for LAR because: (1)the SRT did not find them to be an enveloping case, i.e., other hangers of similar construction were more heavily loaded;and (2)the SRT was aware that the hangers supporting the fire-wrapped raceways had been evaluated and, unlike most other rod hangers in the plant, had been laterally braced.In addition, in response to NRC bulletin 92-01 and generic letter 92-08, we performed a walk down of all Thermo-Lag installations in the plant to determine whether seismically induced failure of the Thermo-Lag could result in the Thermo-Lag falling and damaging nearby equipment.
S) Tables 6-1 and 6-2 provide a summary of the limited analytical reviews (LARS) for thc sclcctcd cable and conduit raceways. Provide copies of the calculations of the analyses for resolution of thc outlicrs listed as LAR Numbers 005, 011, 022 and 023. Also provide typical sample calculations for thc raceways that arc not selected as outliers (i.e., LAR Numbers 001, 010, 027 and 030).
This walk down covered all Thermo-Lag installations, including conduits and cable trays, wall pilasters, and electrical equipment.
The requested information is contained in attachment 6 to this RAI.
The walkdown team concluded that the Thermo-Lag was well secured, so that large sections could not fall, but smaller pieces (golf ball size and smaller)could fall if local sections of the Thermo-Lag fractured.
 
As a result of the walkdown Thermo-Lag material was removed from some of the conduits to address the safety interface condition.
A' y 9) Discuss thc issue described in thc Information Notice 95-49 regarding Thermo-Lag panels, in particular, thc issue regarding seismic resistance capability of the cable tray and its support when appropriate weight and modulus of the Thermo-Lag are included in thc analysis.
In the mid 1980s, a minimum number (<10%)of the cable tray and conduit raceways were fire-wrapped with Thermo-Lag material as part of our 10 CFR 50 Appendix R efforts.Some of the Thermo-Lag material in the plant is being removed and will be replaced with DARMATT material.In some instances, the Thermo-Lag was removed and was not replaced by any other type of material...
The fire-wrapped raceways were walked-down as part of the USI A-46 raceway evaluations, along with all of the other raceways in the plant. The weight of the Thermo-Lag material was considered in choosing LARS for the USI A-46 effort. None of the hangers supporting fire-wrapped raceways were selected for LAR because: (1) the SRT did not find them to be an enveloping case, i.e., other hangers of similar construction were more heavily loaded; and (2) the SRT was aware that the hangers supporting the fire-wrapped raceways had been evaluated and, unlike most other rod hangers in the plant, had been laterally braced.
44 ATTACHMENT 2 TO AEP:NRC:1040E SAMPLE SEWS, ANCHORAGE CALCULATIONS, AND ANCHORAGE INSPECTION DOCUMENTATION FOR CLASS 1 THROUGH 20 EQUIPMENT RAI ITEM 2 This attachment includes sample SEWS, anchorage calculations and anchorage inspection documentation for a cross section of class 1 through 20 equipment items.The samples selected are designated with an*in Table 1 of this RAI.The following examples are included: lass 1-ABD-A 2-CRID-1-CVT 1-1'P-10W 14 17 1-HV-AFP-Mk 12-HV-E W-7 1-A W-A-A 1-Mk:-15-AB 2-Mk:-150-2-A11 Ol/16/92 PG.HO.I)SAfE SNUIOOuN EoulpHENT LIST (SSELup)f UHCI ION: 600 VAC STSTEH Equipment Io~1-ABD-A Equi pment Class: Train: I Drawing Number: 1-12001 1-12010 Systemt ELECTRICAL OlSTRIBUTIOH 600VAC Equip
In addition, in response to NRC bulletin 92-01 and generic letter 92-08, we performed a walk down of all Thermo-Lag installations in the plant to determine whether seismically induced failure of the Thermo-Lag could result in the Thermo-Lag falling and damaging nearby equipment. This walk down covered all Thermo-Lag installations, including conduits and cable trays, wall pilasters, and electrical equipment. The walkdown team concluded that the Thermo-Lag was well secured, so that large sections could not fall, but smaller pieces (golf ball size and smaller) could fall if local sections of the Thermo-Lag fractured. As a result of the walkdown Thermo-Lag material was removed from some of the conduits to address the safety interface condition.
In the mid 1980s, a minimum number (<10 %) of the cable tray and conduit raceways were fire-wrapped with Thermo-Lag material as part of our 10 CFR 50 Appendix R efforts. Some of the Thermo-Lag material in the plant is being removed and will be replaced with DARMATT material. In some instances, the Thermo-Lag was removed and was not replaced by any other type of material...
44
 
ATTACHMENT2 TO AEP:NRC:1040E SAMPLE SEWS, ANCHORAGE CALCULATIONS, AND ANCHORAGE INSPECTION DOCUMENTATION FOR CLASS 1 THROUGH 20 EQUIPMENT RAI ITEM 2
 
This attachment includes sample SEWS, anchorage calculations and anchorage inspection documentation for a cross section of class 1 through 20 equipment items. The samples selected are designated with an
* in Table 1 of this RAI. The following examples are included:
lass 1-ABD-A 2-CRID-1-CVT 1-1'P-10W 1-HV-AFP-Mk 12-HV-E W-7 14      1-A W
                                          -A    -A 17      1-  Mk:-15 -AB 2- Mk:-150-2-A11
 
Ol/16/92 I  )      PG. HO.
SAfE SNUIOOuN EoulpHENT LIST (SSELup) fUHCI ION:      600 VAC STSTEH Equi pment Class:               Train:     I Equipment Io ~       1-ABD-A                                           Drawing Number:     1-12001   1-12010 Systemt     ELECTRICAL OlSTRIBUTIOH 600VAC Equip


== Description:==
== Description:==
600VAC NCC ABD-A Bul l ding:    AUXIL I ART            Roomt    AB EHERG OIESEL GENERATOR ROON              Etevationt      587 Normal  state:                  Desired st'ate:                  Power Required:                  Sort:    U, Supporting System Drawing Munbert Required Interconnections and Suppo  upportt ing Components:
C Safety Related Status:          NUCLEAR SR                              flin/Optt HIM AOOITIOHAL IMFORNATIOM Alias Hubert                                                            Power  Train:    B Component Scrvedt        600Y KCC ABD-A Manufacturer:        CUTLER-HAMMER                                      Model:
Panel:
Elem Drawing:                                                            uiring Drawingt    1-9QOS    I-9C206 Power Source:      1-llAS ualkdownt      F                                                        Relay Only:    H Component    Type:      HCC ISO  Drawings:
Detailed Location:      IN tHE  MU RE'GIOM OF  tHE ROON ROON, NEAR THE NORTH MALL
D.C. COOK Unit 1                                      GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                        Status: Yes Sheet 1 of 12 ID: 1-ABD-A( Rev. 0)                                      Class: 1. Motor Control Centers
==
Description:==
600VAC MCC ABD-A Building: AUXILIARY                              Floor El.: 587.00                    Room, Row/Col: AB EDG RM, IN THE NWREGN OF THE RM, NEAR THE N WALL Manufacturer, Model, Etc.: CUTLER-HAMMER SEISMIC CAPACITY VS DEMAND Elevation where equipment receives seismic input                                                      587.00 Elevation of seismic input below about 40'rom grade (grade = 608.00)                                    N/A Equipment has fundamental frequency above about 8 Hz (est. frequency = )                                N/A Capacity based on:          1.50 Bounding Spectrum Demandbasedon:              1.00 RealisticMedian-CenteredFloorResponseSpectra
                          'I.200 1
I I              \
                                                      /
LOG                    I
                                              /
                                        /
0.000 0.50                            LOG        Hz                        50.00 Capacity ..... Demand File Capacit        CAGIPtGIPtspectra.des                            Label Boundin S ctrum Demand 1        C:tGIP'PROJ0035tspectra.des                      BUILDINGAuxilia ELEVATION 587 BROADEN N Demand 2        C.'tGIPIPROJ0035'Lspectra.dos                    BUILDINGAuxilia ELEVATION 587 BROADEN N Does capacity exceed demand'


600VAC NCC ABD-A Bul l ding: AUX IL I ART Roomt AB EHERG OIESEL GENERATOR ROON Etevationt 587 Normal state: Desired st'ate: Power Required: Sort: U, Supporting System Drawing Munbert Required Interconnections and Suppo t C upport ing Components:
D.C. COOK Unit 1                               GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                   Status: Yes Sheet 2 of 12 ID: 1-ABD-A(Rev. 0)                                   Class: 1. Motor Control Centers
Safety Related Status: NUCLEAR SR flin/Opt t HIMAlias Hubert AOOITIOHAL IMFORNATIOM Power Train: B Component Scrvedt 600Y KCC ABD-A Manufacturer:
CUTLER-HAMMER Model: Panel: Elem Drawing: uiring Drawingt 1-9QOS I-9C206 Power Source: 1-llAS ualkdownt F Relay Only: H Component Type: HCC ISO Drawings: Detailed Location: IN tHE MU RE'GIOM OF tHE ROON ROON, NEAR THE NORTH MALL D.C.COOK Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 1 of 12 ID: 1-ABD-A(Rev.0)Description:
600VAC MCC ABD-A Class: 1.Motor Control Centers Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: AB EDG RM, IN THE NWREGN OF THE RM, NEAR THE N WALL Manufacturer, Model, Etc.: CUTLER-HAMMER SEISMIC CAPACITY VS DEMAND Elevation where equipment receives seismic input Elevation of seismic input below about 40'rom grade (grade=608.00)Equipment has fundamental frequency above about 8 Hz (est.frequency=)Capacity based on: 1.50 Bounding Spectrum Demandbasedon:
1.00 RealisticMedian-CenteredFloorResponseSpectra 587.00 N/A N/A'I.200LOG 0.000 0.50 1'I I\/I//LOG Hz Capacity.....Demand 50.00 Capacit Demand 1 Demand 2 File CAGIPtGIPtspectra.des C:tGIP'PROJ0035tspectra.des C.'tGIPIPROJ0035'Lspectra.dos Label Boundin S ctrum BUILDING Auxilia ELEVATION 587 BROADEN N BUILDING Auxilia ELEVATION 587 BROADEN N Does capacity exceed demand' D.C.COOK Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 2 of 12 ID: 1-ABD-A(Rev.
0)Class: 1.Motor Control Centers


== Description:==
== Description:==
600VAC MCC ABD-A Building: AUXILIARY                            Floor El.: 587.00                Room, Row/Col: AB EDG RM, IN THE NW REGN OF THE RM, NEAR THE N WALL Manufacturer, Model, Etc.: CUTLER-HAMMER CAVEATS - BOUNDING SPECTRUM MCC/BS Caveat      1  - Earthquake Experience Data Base                                                  Yes MCC/BS Caveat      2  - Rating of 600 V or Less.                                                          Yes MCC/BS Caveat      3  - Adjacent Cabinets Bolted Together Yes MCC/BS Caveat      4  - Attached Weight of 100 Pounds or Less.                                            N/A MCC/BS Caveat        5 - Externaliy Attached Items Rigidly Anchored.                                        Yes MCC/BS Caveat      6  - General Configuration Similar to NEMA Standards.
Yes MCC/BS Caveat      7- Cutouts Not Large                                                                    Yes MCC/BS Caveat      8- Doors/Buckets Secured.                                                              Yes MCC/BS Caveat      9 - Natural Frequency Relative to 8 Hz Limit Considered.                                N/A MCC/BS Caveat        10 - Adequate Anchorage.                                                              Yes MCC/BS Caveat        11  - Potential Chatter of Essential Relays Evaluated.                              Yes MCC/BS Caveat        12 - No Other Concerns                                                                Yes Is the intent of all the caveats met for Bounding Spectrum/
ANCHORAGE
: 1. The sizes and locations of anchors have been determined                                                Yes
: 2. Appropriate equipment characteristics have been determined (mass, CG, natural freq.,                    Yes damping, center of rotation).
: 3. The type of anchorage is covered by the GIP                                                            Yes
: 4. The adequacy of the anchorage installation has been evaluated (weld quality and length, nuts            Yes and washers, expansion anchor tightness, etc.)
: 5. Factors affecting anchorage capacity or margin of safety have been considered: embedment                Yes length, anchor spacing, freewdge distance, concrete strength/condition, and concrete cracking.
: 6. For bolted anchorages, any gaps under the base are less than 1/4 .                                      Yes
: 7. Factors affecting essential relays have been considered: gaps under the base, capacity                  Yes reduction for expansion anchors.
: 8. The base has adequate stiffness and the effect of prying action on anchors has been                    Yes considered.
: 9. The strength of the equipment base and the load path to the CG is adequate                              Yes
: 10. The adequacy of embedded steel, grout pads or large concrete pads have been evaluated.                Yes
: 11. The anchorage capacity exceeds the demand.                                                            Yes Are anchorage requirements met'?


600VAC MCC ABD-A Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: AB EDG RM, IN THE NW REGN OF THE RM, NEAR THE N WALL Manufacturer, Model, Etc.: CUTLER-HAMMER CAVEATS-BOUNDING SPECTRUM MCC/BS Caveat 1-Earthquake Experience Data Base MCC/BS Caveat 2-Rating of 600 V or Less.MCC/BS Caveat 3-Adjacent Cabinets Bolted Together MCC/BS Caveat 4-Attached Weight of 100 Pounds or Less.MCC/BS Caveat 5-Externaliy Attached Items Rigidly Anchored.MCC/BS Caveat 6-General Configuration Similar to NEMA Standards.
D.C..COOK Unit 1                                   GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                 Status: Yes Sheet 3 of 12 ID: 1-ABD-A(Rev. 0)                               Class: 1. Motor Control Centers
MCC/BS Caveat 7-Cutouts Not Large MCC/BS Caveat 8-Doors/Buckets Secured.MCC/BS Caveat 9-Natural Frequency Relative to 8 Hz Limit Considered.
MCC/BS Caveat 10-Adequate Anchorage.
MCC/BS Caveat 11-Potential Chatter of Essential Relays Evaluated.
MCC/BS Caveat 12-No Other Concerns Is the intent of all the caveats met for Bounding Spectrum/ANCHORAGE Yes Yes Yes N/A Yes Yes Yes Yes N/A Yes Yes Yes 1.The sizes and locations of anchors have been determined 2.Appropriate equipment characteristics have been determined (mass, CG, natural freq., damping, center of rotation).
3.The type of anchorage is covered by the GIP 4.The adequacy of the anchorage installation has been evaluated (weld quality and length, nuts and washers, expansion anchor tightness, etc.)5.Factors affecting anchorage capacity or margin of safety have been considered:
embedment length, anchor spacing, freewdge distance, concrete strength/condition, and concrete cracking.6.For bolted anchorages, any gaps under the base are less than 1/4.7.Factors affecting essential relays have been considered:
gaps under the base, capacity reduction for expansion anchors.8.The base has adequate stiffness and the effect of prying action on anchors has been considered.
9.The strength of the equipment base and the load path to the CG is adequate 10.The adequacy of embedded steel, grout pads or large concrete pads have been evaluated.
11.The anchorage capacity exceeds the demand.Are anchorage requirements met'?Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes D.C..COOK Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 3 of 12 ID: 1-ABD-A(Rev.
0)Description:
600VAC MCC ABD-A Building: AUXILIARY Class: 1.Motor Control Centers Floor El.: 587.00 Room, Row/Col: AB EDG RM, IN THE NW REGN OF THE RM, NEAR THE N WALL Manufacturer, Model, Etc.: CUTLER-HAMMER INTERACTION EFFECTS 1.Soft targets are free from impact by nearby equipment or structures 2.If the equipment contains sensitive relays, it is free from all impact by nearby equipment or structures.
3.Attached lines have adequate flexibility.
4.Overhead equipment or distribution systems are not likely to collapse.5.No other adverse concerns were found.Is equipment free of interaction effects?Yes Yes Yes Yes Yes CO+IME~N 1-ABD-A&1-ABD-B in the same box.5 vertical panels on 4" concrete pad.Anchorage by bolts in front 4 1/2" J-bolts and 2 1/2" expansion anchors.Anchorage by welds in back 6 2" long 3/16" fillet.Anchor Pattern: f x][x][x][x][x x]Weight of MCC is a maximum of 800 Ibs/cabinet x 5=4000 Ibs, which was used in the anchor analysis.The AEPSC Rev.0 report" Fundamental Resonant Frequencies of Cook Nuclear Plant Cabinets, Panels, and Racks in Auxiliary Building Complex (Determined By In-Situ Modal Testing;Year 1985 and 1986)" dated August 10, 1994 documents the testing of four MCC assemblies.
The minimum fundamental frequancy from these tests was 9.6 Hz for MCC assembly 2-ABD-B/ABD-A.
The SRT based on this report judged that the frequancy for MCC assembly 1-ABD-A/ABD-B was above 8 Hz.However, for conservatism credit for MCC Assembly 1-ABD-A/ABD-B being above 8 Hz.was not taken, and therefore the caveats on this SEWs related to the 8 Hz issue were answered N/A.This enabled the conservative use of the 1.5 x Bounding Spectrum vs.floor spectrum comparison for capacity vs.demand and the use of the peak of the 5%damped floor spectrum for the anchorage calculations.
No interaction concern.Zap 345 MCC ABD-ABB Zap,346 Typ.Opening@bottom.Anchor Evaluation Performed by Bahaa Mahmoud-S8A Checked by George Gary Thomas.
D.C.COOK Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 4 of 12 ID: 1-ABD-A(Rev.0)Class: 1.Motor Control Centers


== Description:==
== Description:==
600VAC MCC ABD-A Building: AUXILIARY                        Floor El.: 587.00                    Room, Row/Col: AB EDG RM, IN THE NW REGN OF THE RM, NEAR THE N WALL Manufacturer, Model, Etc.: CUTLER-HAMMER INTERACTION EFFECTS
: 1. Soft targets are free from impact by nearby equipment or structures                                    Yes
: 2. If the equipment contains sensitive relays, it is free from all impact by nearby equipment or          Yes structures.
: 3. Attached lines have adequate flexibility.                                                              Yes
: 4. Overhead equipment or distribution systems are not likely to collapse.                                  Yes
: 5. No other adverse concerns were found.                                                                    Yes Is equipment free of interaction effects?
CO+IME~N 1-ABD-A & 1-ABD-B in the same box.
5 vertical panels on 4" concrete pad.
Anchorage by bolts in front 4 1/2" J-bolts and 2 1/2" expansion anchors. Anchorage by welds in back 6 2" long 3/16" fillet.
Anchor Pattern:
fx      ][    x][x    ][    x][x    x]
Weight of MCC is a maximum of 800 Ibs/cabinet x 5 = 4000 Ibs, which was used in the anchor analysis.
The AEPSC Rev. 0 report" Fundamental Resonant Frequencies of Cook Nuclear Plant Cabinets, Panels, and Racks in Auxiliary Building Complex ( Determined By In-Situ Modal Testing; Year 1985 and 1986)" dated August 10, 1994 documents the testing of four MCC assemblies. The minimum fundamental frequancy from these tests was 9.6 Hz for MCC assembly 2-ABD-B/ABD-A.The SRT based on this report judged that the frequancy for MCC assembly 1-ABD-A/ABD-B was above 8 Hz. However, for conservatism credit for MCC Assembly 1-ABD-A/ABD-B being above 8 Hz. was not taken, and therefore the caveats on this SEWs related to the 8 Hz issue were answered N/A. This enabled the conservative use of the 1.5 x Bounding Spectrum vs. floor spectrum comparison for capacity vs. demand and the use of the peak of the 5% damped floor spectrum for the anchorage calculations.
No interaction concern.
Zap 345 MCC ABD-ABB Zap,346 Typ. Opening @ bottom.
Anchor Evaluation Performed by Bahaa Mahmoud - S8A Checked by George Gary Thomas.


600VAC MCC ABD-A Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: AB EDG RM, IN THE NW REGN OF THE RM, NEAR THE N WALL Manufacturer, Model, Etc.: CUTLER-HAMMER Anchor calculation additional margin=1.634 Evaluated by Gary Thomas and Satyan Sharma on 7/17/92.Evaluated by: Date:
D.C. COOK Unit 1                               GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                             Status: Yes Sheet 4 of 12 ID: 1-ABD-A( Rev. 0)                           Class: 1. Motor Control Centers
D.C.COOK Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 5 of 12 ID: 1-ABD-A(Rev.0)Description:
600VAC MCC ABD-A Building: AUXILIARY Class: 1.Motor Control Centers Floor El.: 587.00 Room, Row/Col: AB EDG RM, IN THE NW REGN OF THE RM, NEAR THE N WALL Manufacturer, Model, Etc.: CUTLER-HAMMER MCC ABD-AM TYP.OPENING AT BOTTOM.
D.C.COOK Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 6 of 12 ID: 1-ABD-A(Rev.
0)Description:
600VAC MCC ABD-A Class: 1.Motor Control Centers Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: AB EDG RM, IN THE NW REGN OF THE RM, NEAR THE N WALL Manufacturer, Model, Etc.: CUTLER-HAMMER ANCHOR Report Eargm~Z'esponse Spectrum: Instructure Realistic Frequency:
GIP-Flexible Percent Damping: GIP-5.00 Spectral Values: Direction North-South East-West Vertical Acceleration (g's)1.04 1.04 0.17 Angle (N-S Direction makes with the X Axis): 0.00 Combination Criteria: SRSS~We ggs Number of Weights: 1 No Weight 1 4000.00 50.000 10.000 45.000 Fgrrgg Number of External Forces: 0 Eunmh'umber of External Moments: 0 fgc~LIRJRR Number of Anchor types: 2 Tension Shear Ultimate Ultimate Inter Inter Saf D.C.COOK Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 7 of 12 ID: 1-ABD-A(Rev.0)Class: 1.Motor Control Centers


== Description:==
==
Description:==
600VAC MCC ABD-A Building: AUXILIARY                      Floor El.: 587.00              Room, Row/Col: AB EDG RM, IN THE NW REGN OF THE RM, NEAR THE N WALL Manufacturer, Model, Etc.: CUTLER-HAMMER Anchor calculation additional margin = 1.634 Evaluated by Gary Thomas and Satyan Sharma on 7/17/92.
Evaluated by:                                                                  Date:


600VAC MCC ABD-A Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: AB EOG RM, IN THE NW REGN OF THE RM, NEAR THE N WALL Manufacturer, Model, Etc.: CUTLER-HAMMER No.Dia Manufact Product Tension Shear Coeff Coeff Fact 1 1/2 2 1/2 Other Other J-Bolt (90 deg)Unknown Expansion Anchor 6660.00 3330.00 2290.00 2380.00 1.00 1.00 0.30 0.30 1.00 1.00 Czmrch.Ultimate Stress: 3500.00 psi.Reduction Factor: 0.85 W~Allowable Stress: 30600 psi.Surry~c Number of Surfaces: 1 Surface Orientation No Direction Comp 0.000 Direction Comp Ny 0.000 Direction Comp 1.000 Anchor Pattern for Surface&#xb9;1 D.C.COOK Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 8 of 12 ID: 1-ABD.-A(Rev.
D.C. COOK Unit 1                           GIP Rev 2, Corrected, 2/14/92 SCREENING     EVALUATION   WORK SHEET (SEWS)               Status: Yes Sheet 5 of 12 ID: 1-ABD-A( Rev. 0)                     Class: 1. Motor Control Centers
0)Description:
600VAC MCC ABD-A Class: 1.Motor Control Centers Building: AUXILIARY Floor EI.: 587.00 Room, Row/Col: AB EDG RM, IN THE NW REGN OF THE RM, NEAR THE N WALL Manufacturer, Model, Etc.: CUTLER-HAMMER 4x Legend for Anchor Patterns Anchor Bolts: Concrete Uncs: Concrete Potnts:~IIII Neid Uncs: knobs" Number of Anchors: 6 Anch No.Id 1 1 2 1 3 1 4 2 5 2 6 1 Coord 3.750 36.500 43.800 76.600 83.900 96.300 Coord 1.500 1.500 1.500 1.500 1.500 1.500 Coord 0.000 0.000 0.000 0.000 0.000 0 000 Surf Id D.C.COOK Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2l14I92 Status: Yes Sheet 9 of 12 ID: 1-ABD-A(Rev.0)Description:
600YAC MCC ABD-A Class: 1.Motor Control Centers Building: AUXILIARY Floor El.: 587.00 Room, Rovi/Col: AB EDG RM, IN THE NW REGN OF THE RM, NEAR THE N WALL Manufacturer, Model, Etc.: CUTLER-HAMMER
&#xb9;of elements per line: 1 Number of Concrete Lines: 4 No Start X-Coord 0.000 100.00Q 100.000 0.000 Start Y-Coord 1.500 1.500 17.000 17.000 Start Z-Coo rd 0.000 0.000 0.000 0.000 End X-Coord 100.000 100.000 0.000 0.000 End Y-Coo rd 1.500 17.000 17.000 0.000 End Z-Coord 0.000 0.000 0.000 0.000 Sf Id Line Width 2.000 2.000 2.QQQ 2.000 Number of Concrete Points: 0&#xb9;of elements per line: 1 Number of Weld Lines: 6 Start No X-Coord Start Y-Coo rd Start Z-Coord End X-Coord End Y-Coo rd End Z-Coo rd ld Line Width 0.000 15.400 3-19.400 56.500 59.900 96.100 18.500 18.500 18.500 18.500 18.500 18.500 0.000 0.000 0.000 0.000 0.000 0.000 2.250 17.600 21.600 58.600 62.100 98.400 18.500 18.500 18.500 18.500 18.500 18.500 0.000 1 0.000 1 0.000 1 0.000 1 0.000 0.000 1 0.125 0.125 0.125 0.187 0.187 0.187 Reduction Factor Input for Anchor&#xb9;1 Embedment Length: (1 3.60 in.Min Reqd.to achieve full capacity):=27.25 in.Essential Relays in Cabinet: Yes Reduction Factor Input for Anchor&#xb9;2 Embedment Length: (13 40 in.Min Reqd.to achieve full capacity):=27.25 in.Essential Relays in Cabinet: Yes D.C.COOK Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 10 of 12 ID:1-ABD-A(Rev.
0)Class: 1.Motor Control Centers


== Description:==
==
Description:==
600VAC MCC ABD-A Building: AUXILIARY                Floor El.: 587.00              Room, Row/Col: AB EDG RM, IN THE NW REGN OF THE RM, NEAR THE N WALL Manufacturer, Model, Etc.: CUTLER-HAMMER MCC ABD-AM                                    TYP. OPENING AT BOTTOM.


600VAC MCC ABD-A Building: AUXILIARY Floor El.: 58?.00 Room, Row/Col: AB EDG RM, IN THE NW REGN OF THE RM, NEAR THE N WALL Manufacturer, Model, Etc.: CUTLER-HAMMER Reduction Factor Input for Anchor&#xb9;3 Embedment Length: (13.60 in.Min Reqd.to achieve full capacity):=27.25 in.Essential Relays in Cabinet: Yes Reduction Factor Input for Anchor&#xb9;4 Essential Relays in Cabinet: Yes Reduction Factor Input for Anchor&#xb9;5 Essential Relays in Cabinet: Yes Reduction Factor Input for Anchor&#xb9;6 Embedment Length: (13.50 in.Min Reqd.to achieve full capacity}:=27.25 in.Essential Relays in Cabinet: Yes Reduction Factors Data Current: Yes Anc No Id 1 1 2 1 3 1 4 2 5 2 6 1 PaIV Vali 3750.91 3330.00 3708.29 3330.00 3750.91 3330.00 1717.50 1785.00 1717.50 1785.00 3729.60 3330.00 Pallr/Vallr N/A N/A NIA N/A N/A NIA N/A N/A N/A N/A RT RN RL X 0.56 X 1.00 X 0.56 X 1.00 X 0.56 X 1.00 X X X X X X X X X 0.56 X 1.00 RG RS RE X X X X, X X X X X X X X X X X X X X X X X X X X RF RC X X X X X X X X X X X X X X X X X X X X X X RR RP RB 1.00 X X 1.00 X X 1.00 X X 1.00 X X 1.00 X X 1.00 X X 0.75 X X 0.75 X X 0.75 X X 0.75 X X 1.00 X X 1.00 X X RM N/A=Not Applicable Pall=Allowable Pull without Reduced Inspection Vali=Allowable Shear without Reduced Inspection Pallr=Allowable Pull with Reduced Inspection Vallr=Allowable Shear with Reduced Inspection
D.C. COOK Unit 1                           GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                   Status: Yes Sheet 6 of 12 ID: 1-ABD-A(Rev. 0)                                 Class: 1. Motor Control Centers
=Outlier=Reduction Factor Not Used RT=Reduction Factor for Type of Anchorage RN=Reduction Factor for Installation Adequacy D.C.COOK Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 11 of 12 ID: 1-ABD-A(Rev.0)Description:
600VAC MCC ABD-A Class: 1.Motor Control Centers Building: AUXILIARY Floor El.: 687.00 Room, Row/Col: AB EDG RM, IN THE NW REGN OF THE RM, NEAR THE N WALL Manufacturer, Model, Etc.: CUTLER-HAMMER RL=Reduction Factor for Embedment RG=Reduction Factor for Gap at Anchors RS=Reduction Factor for Spacing RE=Reduction Factor for Edge Distance RF=Reduction Factor for Concrete Strength RC=Reduction Factor for Concrete Cracks RR=Reduction Factor for Essential Relays RP=Reduction Factor for Base Stiffness and Prying Action RB=Reduction Factor for Base Strength and Load Path RM=Reduction Factor for Embed.Steel and Pads e Analysis Performed:
Yes Type of Analysis: Regular Spectral Accelerations (G's)10 12 13 14 16 17 19 20 22 N-S 1.038-1.038-1.038 1.038 1.038-1.038 1.038-1.038 0.415-0.415 0.415-0.415-0.415 0.415 0.415-0.415 0.415-0.415 0.415-0.415-0.415 0.415 0.416 0.415-0.415 0.415-0.415-0.415 0.415 0.415-0.415 1.038-1.038-1.038 1.038 1.038-1.038 1.038-1.038 0.415-0.415 0.415-0.415 0.415-0.415-0.415 Vertical 0.067-0.067 0.067-0.067 0.067-0.067-0.067 0.067 0.067-0.067 0.067-0.067 0.067-0.067-0.067 0.067 0.167-0.167-0.167 0.167 0.167-0.167 0.167 Safety Factor 3.653 7.048 3.526 7.085 6.863 3.652 3.787 6.819 1.634 3.990 3.976 1.676 1.643 4.055 1.666 3.912 3.816 9.487 4.302 8.494 3.838 9 673 8.579 D.C.COOK Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 12 of 12 ID: 1-ABD-A(Rev.
0)Class: 1.Motor Control Centers


== Description:==
==
Description:==
600VAC MCC ABD-A Building: AUXILIARY                            Floor El.: 587.00              Room, Row/Col: AB EDG RM, IN THE NW REGN OF THE RM, NEAR THE N WALL Manufacturer, Model, Etc.: CUTLER-HAMMER ANCHOR Report Eargm~Z Spectrum: Instructure Realistic
                  'esponse Frequency: GIP - Flexible Percent Damping: GIP - 5.00 Spectral Values:
Direction                  Acceleration (g's)
North - South                1.04 East - West                1.04 Vertical                    0.17 Angle (N-S Direction makes with the X Axis): 0.00 Combination Criteria: SRSS
~We ggs Number of Weights:            1 No        Weight 1        4000.00                50.000      10.000          45.000 Fgrrgg Number of External Forces: 0 Eunmh of External Moments: 0
            'umber fgc~LIRJRR Number of Anchor types: 2 Tension      Shear Ultimate      Ultimate    Inter        Inter    Saf


600VAC MCC ABD-A Building: AUXILIARY Floor EI.: 587.00 Room, Row/Col: AB EDG RM, IN THE NW REGN OF THE RM, NEAR THE N WALL Manufacturer, Model, Etc.: CUTLER-HAMMER 24 Z.415 0.415-0.167 4.333 Minimum Safety Factor: 1.634.The Anchorage Capacity is 1.634 times greater than the Demand
D.C. COOK Unit 1                                 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                               Status: Yes Sheet 7 of 12 ID: 1-ABD-A( Rev. 0)                               Class: 1. Motor Control Centers
**12 CHP 5021.CCD.019 TTACHHENT NO.1 ANCHOR INSPECTION DATA SHEET Bldg.Location Installation dwg./Rev.Anchora e Arran ement Sketch Equipment No./II VIE L~Q 4 p Og (7 E,-v.K E.i Lco'm<G.0 QOCOC.RETG (P~o 4 Drawn by: Verified by: QuM./Cert.
Inspector Date: Date: l~q~n Reviewed by: Date: nstructz.on Anchor Review Engineer Page 1 of 3 Revision 1
**12 CHP 5021.CCD.019 TTACHMENT NO.1 ANCHOR INSPECTION DATA SHEET Ab F~c,.i-..Ce~Q.~Unzt I Bldg.Locate.on Installation dwg./Rev.Anchora e Arran ement Sketch Equipment No.I 0~0~~r~1 I CLEi'-;8))/~r>Z~r-~I rr 0 ELCJ./AC+Lop>W)l'h Z Drawn by: Verified by: Qua1./Cert.Inspector Date: Date.Reviewed by: Date: 7 2>>~nstructzon Anchor Review Engineer Page 1 of 3 Revision 1  
*'CHP 5021.CCD.019.TTACHMENT NO.1 ANCHOR INSPECTION DATA SHEET 4'b C~c,.~.egg P~Un 3.t g-3"/&-Bldg.Locate.on Installation dwg./Rev.Anchora e Arran ement Sketch Equipment No.3-'I 6'-0 t<cpa pygmy 4p&%%cd P'g)g Q c~ll LJL~>A~5 An~So~(~!2-'FV>>0 1~/A, l 3'/g l'/i Typ 0VL fg Drawn by: Verified by: Qual./Cert.
Inspector Date: Date:>-r~Reviewed by: Date: onstructzon Anchor Reve.ew Engineer Page 1 of 3 Revision 1


!D~~II 0~~~~C~I I~~I~~~l~4~~~~~~~~~o~~~~II II~-r.Q P 0 R%&#xc3;~%~%~%%%~~~
==
j IIIIHRIIIIIIIIWH IIINIIIRIIIRRLL I551IIWIIILL eimmmimemrr RRIml%NIRSIj!mLL WRSHHR%WSLL
Description:==
~~5%~Wiiiimeemrr 0'I$~%k%$%R%5%$%WW~~l.~l I'alMKWF sC
600VAC MCC ABD-A Building: AUXILIARY                        Floor El.: 587.00                Room, Row/Col: AB EOG RM, IN THE NW REGN OF THE RM, NEAR THE N WALL Manufacturer, Model, Etc.: CUTLER-HAMMER No.     Dia      Manufact        Product        Tension      Shear        Coeff      Coeff      Fact 1      1/2       Other        J-Bolt (90        6660.00    3330.00      1.00         0.30    1.00 deg) 2      1/2        Other        Unknown          2290.00    2380.00      1.00        0.30    1.00 Expansion Anchor Czmrch.
**12 CHP 5021.CCD.03.9 ATTACHMENT NO.1 ANCHOR INSPECTION DATA SHEET Equipment No.: l-SO-Embedded Steel Dwg.No.:!-G3-PHYSICAL CHARACTERISTICS Dwg No.: 2"3 Weld ID T e Size Len th Cracks Yes 0 Yes Yes 3 I I Yes de C 3 II I Yes Yes<HZ'es No Yes No Weld T e Codes 1=Fillet 2=Plug/Slot 3=Groove Lack of Penetration Porosity Yes Yes CZb Yes Yes Yes Yes Yes Yes No Yes No Yes No Yes No 0 (=SC(-Qs 4 Wrv~a.r<4'.W~4(nc++0 aO KWUQS~Q gh'4e.UL LQ DCTRIL Equipment base flexible: 0 Yes 8 No Reviewed by: ons ruc ron re Date: 7 z fe Date: Verified by:ua.era.npsec or 0,:;I",: t!.<(.'i:I..".I"l!i!!Ao(.LLiP i>IJ('I':.: 4-'uc ron nc or eve.ew ngzneer f6~~(r;,i>(;!(I;.(r
Ultimate Stress: 3500.00 psi.
"..I('('((lhI; LI,:V/E!)Date: QQIIIJ(~~,.'age 3 of 3 Equipment No.: Tightness esvaoxzsned by"Snug Fit" Tightness verif ied by:~-',(Qual./Cert.Inspector Comments: 4 Mc~9 4c>)z s
Reduction Factor: 0.85 W~
Allowable Stress:    30600 psi.
Surry~c Number of Surfaces:    1 Surface Orientation Direction      Direction        Direction Comp            Comp            Comp No                         Ny 0.000          0.000            1.000 Anchor Pattern for Surface &#xb9; 1


S 5 A DEPARTl4ENT CONTROLLED DOCUMENT COPY NO.JOB ORDER NO.: 12 SHP 5050 NDE.008 ATTACHMENT NO.1 Uf TRASONXC TEST REPORT REPORT DATE: 8~REQUEST NO.IDENTIFICATION Unit Component:
D.C. COOK Unit 1                             GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                          Status: Yes Sheet 8 of 12 ID: 1-ABD.-A(Rev. 0)                       Class: 1. Motor Control Centers
Item Material Other Test Unit/S/NW Frea./Diameter Reference Standard Couplant/Batch No.TEST DATA REMARKS Ic''c 8'ERFORMED BY: REVIEWED BY: WD FORM NO.12 SHP 5050 NDE.008-1 f EVEf:~DATE: 'VEE:~DATE: Page 1 OE Revision 0 Equip Xd: 2-CRID-I-CVT Train: 2 Equip Class: 4 Drawing No.: 2-12050 ction: 120 VAC SYSTEM System: 120V CONTROL ROOM XNSTRUMENTATXON DXSTRIBUTXON Equip Desc: 10KVA TRANSFORMER
-CONSTANT VOLTAGE Building: AUXILIARY Room: 4KV ROOM-600 VOLTS SWITCHGEAR AREA Elev: 609 Sort: S,R Notes: Normal State: Desired State: Power Req'd: Support System Drawing: 2-98077, 2-12050 Req'd Support Comp: Safety Related Status: STANDARD Min/Opt: MXN Alias No: Comp Served: Power Train: A MFR: SOLIDSTATE CONTROLS INC.el: XSL12100 el: Elem.Drawing: 2-98077 Wiring Drawing: 2-91332 Power Source: 2-EZC-C-5AR Walkdown: F Relay Eval: Y Comp Type: TRANSFORMER k Xso Diawing: Location: XN THE MIDDLE EAST REGXON OF THE ROOM, 7 FEET SOUTH OF 600VAC BUS 21B SUPPLY TRAIN DC Cook Unit 2 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 1 of 11 ID: 2-GRID-I-CVT (Rev.0)Class: 4.Transformers


==
==
Description:==
Description:==
600VAC MCC ABD-A Building: AUXILIARY                  Floor EI.: 587.00              Room, Row/Col: AB EDG RM, IN THE NW REGN OF THE RM, NEAR THE N WALL Manufacturer, Model, Etc.: CUTLER-HAMMER 4x Legend for Anchor Patterns Anchor Bolts:
Concrete Uncs:
Concrete Potnts:    ~IIII Neid Uncs:
knobs" Number of Anchors: 6 Anch                                              Surf No.      Id      Coord        Coord          Coord        Id 1        1      3.750        1.500            0.000 2        1      36.500        1.500            0.000 3        1      43.800        1.500            0.000 4      2      76.600        1.500            0.000 5      2      83.900        1.500            0.000 6        1      96.300        1.500            0 000


10KVA TRANSFORMER
D.C. COOK Unit 1                                GIP Rev 2, Corrected, 2l14I92 SCREENING EVALUATIONWORK SHEET (SEWS)                                   Status: Yes Sheet 9 of 12 ID: 1-ABD-A(     Rev. 0)                         Class:  1. Motor Control Centers
-CONSTANT VOLTAGE Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: 4KV RM-600V SWGR AREA-IN THE MIDDLE EAST REGION OF THE ROOM, 7 FEET SOUTH OF 600VAC BUS 21B SUPPLY TRAIN Manufacturer, Model, Etc.: SOLIDSTATE CONTROLS INC.ISL12100 SEISMIC CAPACITY VS DEMAND Elevation where equipment receives seismic input Elevation of seismic input below about 40'rom grade (grade=608.00 Equipment has fundamental frequency above about 8 Hz (est.frequency=8.00)Capacity based on: 1.50*Bounding Spectrum Demand based on: 1.00*Realistic Mean-Centered Floor Response Spectra 633.00 N/A N/A 1.200 LOG 0.085\/\r/I////r 0.S0 LOG Hz Capacity.....Demand S0.00 Capacity Demand 1 Demand 2 C:tGIPLGIPtspectra.des C."tGIP'PROJ0032tspectra.des C:tGIPLPROJ0032tspectra.des Record LabellBounding Spectrum BUILDING Auxilia ELEVATION 633 BROADEN N BUILDING Auxilia ELEVATIONI633IBROADEN N Does capacity exceed demand' DC Cook Unit 2 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/1 4/92 Status: Yes Sheet 2 of 11 ID: 2-CRID-I-CVT(Rev.0)Class.'.Transformers


==
==
Description:==
Description:==
600YAC MCC ABD-A Building: AUXILIARY                          Floor El.: 587.00                Room, Rovi/Col: AB EDG RM, IN THE NW REGN OF THE RM, NEAR THE N WALL Manufacturer, Model, Etc.: CUTLER-HAMMER
&#xb9; of elements    per line:  1 Number of Concrete Lines: 4 Start          Start        Start          End          End          End      Sf      Line No      X-Coord        Y-Coord      Z-Coo rd      X-Coord      Y-Coo rd      Z-Coord      Id    Width 0.000          1.500        0.000        100.000        1.500        0.000            2.000 100.00Q          1.500        0.000        100.000      17.000        0.000            2.000 100.000          17.000        0.000          0.000      17.000        0.000            2.QQQ 0.000          17.000        0.000          0.000        0.000        0.000            2.000 Number of Concrete Points: 0
&#xb9; of elements    per line:  1 Number of Weld Lines: 6 Start          Start        Start          End          End          End              Line No      X-Coord        Y-Coo rd      Z-Coord        X-Coord      Y-Coo rd    Z-Coo rd      ld    Width 0.000          18.500        0.000          2.250      18.500        0.000      1      0.125 15.400          18.500        0.000          17.600      18.500        0.000      1      0.125 3
19.400          18.500        0.000        21.600        18.500        0.000      1      0.125 56.500          18.500        0.000        58.600        18.500        0.000      1      0.187 59.900          18.500        0.000        62.100        18.500        0.000            0.187 96.100          18.500        0.000        98.400        18.500        0.000      1      0.187 Reduction Factor Input for Anchor    &#xb9; 1 Embedment Length: (1 3.60 in. Min Reqd. to achieve full capacity):=27.25 in.
Essential Relays in Cabinet: Yes Reduction Factor Input for Anchor    &#xb9;2 Embedment Length: (13 40 in. Min Reqd. to achieve full capacity):=27.25 in.
Essential Relays in Cabinet: Yes


10KVA TRANSFORMER
D.C. COOK Unit 1                                GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                Status: Yes Sheet 10 of 12 ID:1-ABD-A(Rev. 0)                                 Class: 1. Motor Control Centers
-CONSTANT VOLTAGE Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: 4KV RM-600V SWGR AREA-IN THE MIDDLE EAST REGION OF THE ROOM, 7 FEET SOUTH OF 600VAC BUS 21B SUPPLY TRAIN Manufacturer, Model, Etc.: SOLIDSTATE CONTROLS INC.ISL12100 CAVEATS-BOUNDING SPECTRUM TRN/BS Caveat 1-Earthquake Experience Equipment Class TRN/BS Caveat 2-Rating of 4.16 KV or Less.'RN/BS Caveat 3-Transformer Coils Postively Restrained Within Cabinet TRN/BS Caveat 4-Coils Top Braced or Anal zed for Large Transformers.
TRN/BS Caveat 5-Clearance Between Energized Component and Cabinet.TRN/BS Caveat 6-Adequate Slack in High Voltage Leads.TRN/BS Caveat 7-Wall-Mounted Units Anchored Close to Enclosure Structure.
TRN/BS Caveat 8-Weak-Way Bending of Thin Webs Evaluated.
TRN/BS Caveat 9-Adjacent Cabinets Bolted Together.TRN/BS Caveat 10-Doors Secured.TRN/BS Caveat 11-Adequate Anchorage TRN/BS Caveat 12-Potential Chatter of Essential Relays Evaluated.
TRN/BS Caveat 13-No Other Concerns.Yes Yes Yes N/A Yes Yes N/A Yes N/A Yes Yes N/A Yes Is the intent of all the caveats met for Bounding Spectrum?ANCHORAGE 1.The sizes and locations of anchors have been determined 2.Appropriate equipment characteristics have been determined (mass, CG, natural freq., damping, center of rotation).
3.The type of anchorage is covered by the GIP 4.The adequacy of the anchorage installation has been evaluated (weld quality and length, nuts and washers, expansion anchor tightness,'etc.)
5.Factors affecting anchorage capacity or margin of safety have been considered:
embedment~length, anchor spacing, free-edge distance, concrete strength/condition, and concrete-cracking.6.For bolted anchorages, any gaps under the base are less than 1/4 7.Factors affecting essential relays have been considered:
gaps under the base, capacity reduction for expansion anchors.8.The base has adequate stiffness and the effect of prying action on anchors has been considered.
9.The strength of the equipment base and the load path to the CG is adequate.10.The adequacy of embedded steel, grout pads or large concrete pads have been evaluated.
11.The anchorage capacity exceeds the demand.Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes Yes Are anchorage requirements met?


DC Cook Unit 2 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 3 of 11 ID: 2-GRID-I-CVT'(Rev.0)Class: 4.Transformers
==
Description:==
600VAC MCC ABD-A Building: AUXILIARY                        Floor El.: 58?.00                Room, Row/Col: AB EDG RM, IN THE NW REGN OF THE RM, NEAR THE N WALL Manufacturer, Model, Etc.: CUTLER-HAMMER Reduction Factor Input for Anchor    &#xb9;3 Embedment Length: (13.60 in. Min Reqd. to achieve full capacity):=27.25 in.
Essential Relays in Cabinet: Yes Reduction Factor Input for Anchor  &#xb9;4 Essential Relays in Cabinet: Yes Reduction Factor Input for Anchor    &#xb9;5 Essential Relays in Cabinet: Yes Reduction Factor Input for Anchor    &#xb9;6 Embedment Length: (13.50 in. Min Reqd. to achieve full capacity}:=27.25 in.
Essential Relays in Cabinet: Yes Reduction Factors Data Current: Yes Anc      PaIV      Pallr/
No    Id      Vali      Vallr    RT    RN    RL    RG    RS  RE    RF    RC    RR    RP  RB    RM 1    1      3750.91    N/A              X    0.56        X    X    X    X    1.00  X    X 3330.00                      X    1.00        X    X,    X    X    1.00  X    X 2      1      3708.29    N/A              X    0.56        X    X    X    X    1.00  X    X 3330.00    NIA              X    1.00        X    X                1.00  X    X 3    1      3750.91    N/A              X    0.56        X    X    X    X    1.00  X    X 3330.00    N/A              X    1.00        X    X    X    X    1.00  X    X 4    2      1717.50    NIA              X    X          X    X    X    X    0.75  X    X 1785.00    N/A              X    X          X    X    X    X    0.75  X    X 5    2      1717.50    N/A              X    X          X    X    X    X    0.75  X    X 1785.00    N/A              X    X          X    X    X    X    0.75  X    X 6      1      3729.60                      X    0.56        X    X    X    X    1.00  X    X 3330.00    N/A              X    1.00        X    X    X    X    1.00  X    X N/A      = Not Applicable Pall      = Allowable Pull without Reduced Inspection Vali      = Allowable Shear without Reduced Inspection Pallr    = Allowable Pull with Reduced Inspection Vallr    = Allowable Shear with Reduced Inspection
          = Outlier
          = Reduction Factor Not Used RT        = Reduction Factor for Type of Anchorage RN        = Reduction Factor for Installation Adequacy
 
D.C. COOK Unit 1                                  GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                Status: Yes Sheet 11 of 12 ID: 1-ABD-A( Rev. 0)                               Class: 1. Motor Control Centers


==
==
Description:==
Description:==
600VAC MCC ABD-A Building: AUXILIARY                        Floor El.: 687.00                Room, Row/Col: AB EDG RM, IN THE NW REGN OF THE RM, NEAR THE N WALL Manufacturer, Model, Etc.: CUTLER-HAMMER RL      = Reduction  Factor  for Embedment RG      = Reduction  Factor  for Gap at Anchors RS      = Reduction  Factor  for Spacing RE      = Reduction  Factor  for Edge Distance RF      = Reduction  Factor  for Concrete Strength RC      = Reduction  Factor  for Concrete Cracks RR      = Reduction  Factor  for Essential Relays RP      = Reduction  Factor  for Base Stiffness and Prying Action RB      = Reduction  Factor  for Base Strength and Load Path RM      = Reduction  Factor  for Embed. Steel and Pads e
Analysis Performed: Yes Type of Analysis: Regular Spectral Accelerations (G's)
N-S                              Vertical      Safety Factor 1.038            0.415            0.067            3.653
          -1.038            -0.415            -0.067            7.048
          -1.038            0.415            0.067            3.526 1.038          -0.415            -0.067            7.085 1.038          -0.415            0.067            6.863
          -1.038            0.415            -0.067            3.652 1.038            0.415            -0.067            3.787
          -1.038            -0.415            0.067            6.819 0.415              1.038            0.067            1.634 10        -0.415            -1.038            -0.067            3.990 0.415            -1.038            0.067            3.976 12        -0.415              1.038          -0.067            1.676 13        -0.415              1.038            0.067            1.643 14          0.415          -1.038            -0.067            4.055 0.415              1.038          -0.067            1.666 16        -0.415            -1.038            0.067            3.912 17        0.415            0.415            0.167            3.816
          -0.415            -0.415            -0.167            9.487 19          0.415            0.415          -0.167            4.302 20        -0.415            -0.415            0.167            8.494
          -0.415            0.415            0.167            3.838 22          0.415          -0.415            -0.167            9 673 0.416          -0.415            0.167            8.579


10KVA TRANSFORMER
D.C. COOK Unit 1                               GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                            Status: Yes Sheet 12 of 12 ID: 1-ABD-A(Rev. 0)                           Class: 1. Motor Control Centers
-CONSTANT VOLTAGE Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: 4KV RM-600V SWGR AREA-IN THE MIDDLE EAST REGION OF THE ROOM, 7 FEET SOUTH OF 600VAC BUS 21B SUPPLY TRAIN Manufacturer, Model, Etc.: SOLIDSTATE CONTROLS INC.ISL12100 INTERACTION EFFECTS 1.Soft targets are free from impact by nearby equipment or structures 2.If the equipment contains sensitive relays, it is free from all impact by nearby equipment or structures.
3.Attached lines have adequate flexibility.
4.Overhead equipment or distribution systems are not likely to collapse.5.No other adverse concerns were found.Yes N/A Yes Yes Yes Is equipment free of interaction effects'P C L D~CON IE~S SRT: George G.Thomas (S8A)and Satyan Sharma-10/29/92 Anchorage:
Anchorage is 1/2" diameter wedge expansion bolts.Most likely they are Phillips anchors based on the Unit 1 GRID-CVT's.
Used unknown expansion anchor in ANCHOR analysis for conservatism.
Minimum embedment is 2-13/16" above GIP minimum embedment for all types of 1/2" expansion anchors.Weight estimate based on maximum weight for an inverter in Table C.1-1 of the GIP (configuration similar to an inverter).
Weight estimate is 45 Ibs/ft"3.Weight=(4.5'2.5'2.33')x 45 Ibs/ft"3=1180 Ib Fluorescent light above unit could come out.However interaction judged non4amaging Thin 3/16" thick angles at base of transformer that is bolted to the base channel is gusseted in two locations.(No weak way bending).Frequency judged by the SRT to be at least 8 Hz.ANCHOR analysis indicates an additional factor of safety of 1.97.Pictures: Zap shot 2629-Inside Cabinet Zap shot 2630-Outside of Transformer Zap shot 2631-Braced Base Channels DC Cook Unit 2 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 4 of 11 ID: 2-GRID-I-CVT (Rev.0)Class: 4.Transformers


==
==
Description:==
Description:==
600VAC MCC ABD-A Building: AUXILIARY                    Floor EI.: 587.00                Room, Row/Col: AB EDG RM, IN THE NW REGN OF THE RM, NEAR THE N WALL Manufacturer, Model, Etc.: CUTLER-HAMMER 24        Z.415          0.415          -0.167          4.333 Minimum Safety Factor:    1.634.
The Anchorage Capacity is    1.634 times greater than the Demand


10KVA TRANSFORMER
                                                          **12 CHP 5021. CCD. 019 TTACHHENT NO. 1 ANCHOR INSPECTION DATA SHEET Bldg.                Location Installation    dwg.    /  Rev.         Equipment No.
-CONSTANT VOLTAGE Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: 4KV RM-600V SWGR AREA-IN THE MIDDLE EAST REGION OF THE ROOM, 7 FEET SOUTH OF 600VAC BUS 21B SUPPLY TRAIN Manufacturer, Model, Etc.: SOLIDSTATE CONTROLS INC.ISL12100 Evaluated by: Date://<<gz
Anchora e Arran ement Sketch
                        /     II QOCOC.RETG VIE                                                          ( P~o 4
L~
0 Q  4 Og p
( 7 E,   -v. K E.i  Lco'm<  G.
Drawn by:                                                 Date:      l Verified by:                                              Date:          ~q~n QuM./Cert. Inspector Reviewed by:                                             Date:
nstructz.on Anchor Review Engineer Page  1  of    3 Revision      1


==Attachment:==
                                                    **12 CHP 5021.          CCD. 019 TTACHMENT NO. 1 ANCHOR INSPECTION DATA SHEET Ab F~    c,. i-.. Ce~ Q.~
Unzt I                Bldg.                Locate.on Installation  dwg.  /  Rev.      Equipment No.
Anchora e Arran ement Sketch I                                                  ~ ~  r~  1 I 0 ~
0 CLEi'-;    8) ) / ~r>Z~r-~
I  rr 0
ELCJ.  /AC+ Lop>W)l'h Z Drawn by:                                          Date:
Verified by:                                        Date.
Qua1.  /Cert. Inspector Reviewed by:                                        Date:          7  2>>~
nstructzon Anchor Review Engineer Page          1  of  3 Revision            1
 
                                                            * '    CHP 5021. CCD. 019
                                                                  .TTACHMENT NO. 1 ANCHOR INSPECTION DATA SHEET 4'b C    ~ c,.  ~.egg P~
Un 3.t  g              Bldg.                          Locate.on
        - 3"/&-
Installation    dwg.  / Rev.      Equipment No.
Anchora e Arran ement Sketch 3-'I                    6'-0 t<
cpa    pygmy  4p&    %%cd P'g) g  Qc ~ll LJL~>
A
                  ~5  An~So~
0              l'/i Typ
(  ~!
2-'FV>>            1~/A,    l 3'/g 0VL fg Drawn by:                                                    Date:
Verified by:                                                  Date:          >-r~
Qual./Cert. Inspector Reviewed by:                                                  Date:
onstructzon Anchor    Reve.ew      Engineer Page    1  of    3 Revision        1
 
                                    ~ ~                  I      I ~  ~
D ~      ~ II                                                                ~ ~
0                                                                  ~ ~ ~
I      ~  ~
                                  ~      ~
C ~                  ~    l~4
                                ~      -    r.
Q P                    0
            ~ ~          R%&#xc3;~%~%~%%%~~~
j IIIIHRIIIIIIIIWH
                    ~ ~
IIINIIIRIIIRRLL I551IIWIIILL
              ~
o ~
                    ~    eimmmimemrr RRIml%NIRSIj!mLL WRSHHR%WSLL
                          ~~5%~
Wiiiimeemrr    0'                      I
                          $~%k%$%R%5%$ %WW
    ~ II II                                        ~  ~l.~  l I'
alMKWF sC
 
                                                                                          **12 CHP 5021. CCD. 03.9 ATTACHMENT NO. 1 ANCHOR INSPECTION DATA SHEET Equipment No.:          l- SO-                                                                Dwg  No.:      2"3 Embedded  Steel  Dwg. No.:    !  -  G3-PHYSICAL CHARACTERISTICS Weld ID                                              C                                            Weld T    e Codes T  e Size                                    3 I I    3    II                                        1  = Fillet I
= Plug/Slot Len  th                                                                                                = Groove 3
Cracks          Yes    Yes      Yes    Yes      Yes            Yes
                                                                <HZ'es                      Yes 0                      de                                      No          No Lack  of      Yes      Yes      Yes    Yes      Yes                          Yes        Yes Penetration            CZb                                                      No          No Porosity                                          Yes          Yes            Yes        Yes No          No 0          (=
SC(-Qs  4 Wrv ~  a.r  <4'. W ~4(nc+          +0 aO            KWUQS~Q gh'4e.
UL LQ      DCTRIL Equipment base  flexible:          0 Yes    8  No ons ruc ron                    re Date:      7  z fe Reviewed by:                                                                                        Date:
ron  nc    or    eve.ew              ngzneer Verified by:              era.
f6~~(
or r  ;,i>(;!(I;.(r "..I('('((lhI; LI,:V/E!)        Date:
ua  .              npsec          0,:;I",: t !.<(.'i:I..".I "l!i!!Ao(.LLiP 4-'uc i>IJ( 'I      ':.:
QQIIIJ(          ~
                                                                                          ~,. 'age  3  of 3
 
Equipment No.:
Tightness esvaoxzsned by "Snug Fit" Tightness verified by:    ~-      ',(
Qual. /Cert. Inspector Comments:  4 Mc~      9 4c >
                          )  z s
 
12 SHP 5050 NDE.008 S 5 A DEPARTl4ENT DOCUMENT ATTACHMENT NO. 1 CONTROLLED COPY NO.                        Uf TRASONXC TEST REPORT JOB ORDER  NO.:          REPORT DATE:          8    ~    REQUEST NO.
IDENTIFICATION Unit                                      Test Unit/ S/NW Component:                                  Frea./Diameter Item                                        Reference Standard Material                                    Couplant/Batch No.
Other TEST DATA REMARKS Ic'            '
c 8'ERFORMED BY:                                  f EVEf:~          DATE:
REVIEWED BY: WD                                  'VEE:  ~        DATE:
FORM NO. 12 SHP 5050 NDE.008-1                      Page  1 OE Revision  0
 
Equip Xd: 2-CRID-I-CVT Train:        2  Equip Class:  4 Drawing No.: 2-12050 ction:  120 VAC SYSTEM System:  120V CONTROL    ROOM XNSTRUMENTATXON DXSTRIBUTXON Equip Desc: 10KVA    TRANSFORMER  CONSTANT VOLTAGE Building:    AUXILIARY      Room: 4KV ROOM  600 VOLTS SWITCHGEAR AREA Elev:  609    Sort: S,R        Notes:
Normal State:        Desired State:      Power Req'd:
Support System Drawing: 2-98077, 2-12050 Req'd Support Comp:
Safety Related Status:      STANDARD        Min/Opt:  MXN Alias  No:        Power  Train:  A Comp  Served:
MFR: SOLIDSTATE CONTROLS INC.
el:  XSL12100 el:
Elem. Drawing: 2-98077 Wiring Drawing: 2-91332 Power Source:    2-EZC-C-5AR Walkdown: F        Relay Eval:    Y Comp  Type:  TRANSFORMER k
Xso Diawing:
Location:    XN THE MIDDLE EAST REGXON OF THE ROOM,    7 FEET SOUTH OF 600VAC BUS 21B SUPPLY TRAIN


Pictures
DC Cook Unit 2                                        GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                        Status: Yes Sheet 1 of 11 ID: 2-GRID-I-CVT ( Rev. 0      )                      Class: 4. Transformers


==Attachment:==
==
Description:==
10KVA TRANSFORMER - CONSTANT VOLTAGE Building: AUXILIARY                            Floor El.: 609.00                      Room, Row/Col: 4KV RM - 600V SWGR AREA - IN THE MIDDLE EAST REGION OF THE ROOM, 7 FEET SOUTH OF 600VAC BUS 21B SUPPLY TRAIN Manufacturer, Model, Etc.: SOLIDSTATE CONTROLS INC. ISL12100 SEISMIC CAPACITY VS DEMAND Elevation where equipment receives seismic input                                                        633.00 Elevation of seismic input below about 40'rom grade (grade = 608.00                                      N/A Equipment has fundamental frequency above about 8 Hz (est. frequency = 8.00)                            N/A Capacity based on:          1.50
* Bounding Spectrum Demand based on:            1.00
* Realistic Mean-Centered Floor Response Spectra 1.200
                                                                  \
                                                      /
                                                                          \
r
                                                  /
I
                                              /
LOG                  /
                                      /
r/
0.085 0.S0                                LOG        Hz                            S0.00 Capacity  ..... Demand Record Capacity        C:tGIPLGIPtspectra.des                        LabellBounding Spectrum Demand 1        C."tGIP'PROJ0032tspectra.des                  BUILDINGAuxilia ELEVATION 633 BROADEN N Demand 2        C:tGIPLPROJ0032tspectra.des                    BUILDINGAuxilia ELEVATIONI633IBROADENN Does capacity exceed demand'
 
DC Cook Unit 2                                GIP Rev 2, Corrected, 2/1 4/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                Status: Yes Sheet 2 of 11 ID: 2-CRID-I-CVT( Rev. 0)                          Class .'. Transformers


ANCHOR Report
==
Description:==
10KVA TRANSFORMER - CONSTANT VOLTAGE Building: AUXILIARY                        Floor El.: 609.00                Room, Row/Col: 4KV RM - 600V SWGR AREA - IN THE MIDDLE EAST REGION OF THE ROOM, 7 FEET SOUTH OF 600VAC BUS 21B SUPPLY TRAIN Manufacturer, Model, Etc.: SOLIDSTATE CONTROLS INC. ISL12100 CAVEATS - BOUNDING SPECTRUM TRN/BS Caveat 1 - Earthquake Experience Equipment Class                                                  Yes TRN/BS Caveat 2 - Rating of 4.16 KV or Less.                                                              Yes Caveat 3- Transformer Coils Postively Restrained Within Cabinet
                                                  'RN/BS Yes TRN/BS Caveat 4- Coils Top Braced or Anal zed for Large Transformers.                                    N/A TRN/BS Caveat 5- Clearance Between Energized Component and Cabinet.                                      Yes TRN/BS Caveat 6- Adequate Slack in High Voltage Leads.                                                    Yes TRN/BS Caveat 7- Wall-Mounted Units Anchored Close to Enclosure Structure.                                N/A TRN/BS Caveat 8 - Weak-Way Bending of Thin Webs Evaluated.                                                Yes TRN/BS Caveat 9 - Adjacent Cabinets Bolted Together.                                                      N/A TRN/BS Caveat 10 - Doors Secured.                                                                        Yes TRN/BS Caveat 11 - Adequate Anchorage                                                                    Yes TRN/BS Caveat 12- Potential Chatter of Essential Relays Evaluated.                                        N/A TRN/BS Caveat 13 - No Other Concerns.                                                                    Yes Is the intent of all the caveats met for Bounding Spectrum?
ANCHORAGE
: 1. The sizes and locations of anchors have been determined                                              Yes
: 2. Appropriate equipment characteristics have been determined (mass, CG, natural freq.,                  Yes damping, center of rotation).
: 3. The type of anchorage is covered by the GIP                                                            Yes
: 4. The adequacy of the anchorage installation has been evaluated (weld quality and length, nuts          Yes and washers, expansion anchor tightness,'etc.)
: 5. Factors affecting anchorage capacity or margin of safety have been considered: embedment              Yes
~
length, anchor spacing, free-edge distance, concrete strength/condition, and concrete-cracking.
: 6. For bolted anchorages, any gaps under the base are less than 1/4                                      Yes
: 7. Factors affecting essential relays have been considered: gaps under the base, capacity                N/A reduction for expansion anchors.
: 8. The base has adequate stiffness and the effect of prying action on anchors has been                    Yes considered.
: 9. The strength of the equipment base and the load path to the CG is adequate.                            Yes
: 10. The adequacy of embedded steel, grout pads or large concrete pads have been evaluated.              Yes
: 11. The anchorage capacity exceeds the demand.                                                          Yes Are anchorage requirements met?


DC Cook Unit 2 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 5 of 11 ID: 2-GRID-I-CVT (Rev.0)Class: 4.Transformers
DC Cook     Unit 2                                 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                  Status: Yes Sheet 3 of 11 ID: 2-GRID-I-CVT'( Rev. 0     )                   Class: 4. Transformers


==
==
Description:==
Description:==
10KVA TRANSFORMER - CONSTANT VOLTAGE Building: AUXILIARY                          Floor El.: 609.00                  Room, Row/Col: 4KV RM - 600V SWGR AREA - IN THE MIDDLE EAST REGION OF THE ROOM, 7 FEET SOUTH OF 600VAC BUS 21B SUPPLY TRAIN Manufacturer, Model, Etc.: SOLIDSTATE CONTROLS INC. ISL12100 INTERACTION EFFECTS
: 1. Soft targets are free from impact by nearby    equipment or structures                                  Yes
: 2. If the equipment contains sensitive relays, it is free from all impact by nearby equipment or          N/A structures.
: 3. Attached lines have adequate flexibility.                                                                Yes
: 4. Overhead equipment or distribution systems are not likely to collapse.                                  Yes
: 5. No other adverse concerns were found.                                                                    Yes Is equipment free of interaction effects'P C    L  D
~CON      IE~S SRT: George G. Thomas (S8A) and Satyan Sharma -10/29/92 Anchorage: Anchorage is 1/2" diameter wedge expansion bolts. Most likely they are Phillips anchors based on the Unit 1 GRID-CVT's. Used unknown expansion anchor in ANCHOR analysis for conservatism. Minimum embedment is 2-13/16" above GIP minimum embedment for all types of 1/2" expansion anchors.
Weight estimate based on maximum weight for an inverter in Table C.1-1 of the GIP (configuration similar to an inverter). Weight estimate is 45 Ibs/ft"3.
Weight = (4.5'    2.5'  2.33') x 45 Ibs/ft"3 = 1180 Ib Fluorescent light above unit could come out. However interaction judged non4amaging Thin 3/16" thick angles at base of transformer that is bolted to the base channel is gusseted in two locations. (No weak way bending).
Frequency judged by the SRT to be at least 8 Hz.
ANCHOR analysis indicates an additional factor of safety of 1.97.
Pictures: Zap shot 2629 -Inside Cabinet Zap shot 2630 Outside of Transformer Zap shot 2631 Braced Base Channels


10KVA TRANSFORMER
DC Cook Unit 2                       GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                    Status: Yes Sheet 4 of 11 ID: 2-GRID-I-CVT ( Rev. 0)               Class: 4. Transformers
-CONSTANT VOLTAGE Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: 4KV RM-600V SWGR AREA-IN THE MIDDLE EAST REGION OF THE ROOM, 7 FEET SOUTH OF 600VAC BUS 21B SUPPLY TRAIN Manufacturer, Model, Etc.: SOLIDSTATE CONTROLS INC.ISL12100 P IC~UIRg$C t Braced Base Channels Inside Cabinet'Outside of Transformer DC Cook Unit 2 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 6 of 11 ID: 2-GRID-I-CVT(Rev.0)Class: 4.Transformers


==
==
Description:==
Description:==
10KVA TRANSFORMER - CONSTANT VOLTAGE Building: AUXILIARY                Floor El.: 609.00            Room, Row/Col: 4KV RM -600V SWGR AREA - IN THE MIDDLE EAST REGION OF THE ROOM, 7 FEET SOUTH OF 600VAC BUS 21B SUPPLY TRAIN Manufacturer, Model, Etc.: SOLIDSTATE CONTROLS INC. ISL12100 Evaluated by:                                                          Date:
                                                                                  //  <<gz


10KVA TRANSFORMER
==Attachment:==
-CONSTANT VOLTAGE 8uilding: AUXILIARY Floor El.: 609.00 Manufacturer, Model, Etc.: SOLIDSTATE CONTROLS INC.ISL12100 Room, Row/Col: 4KV RM-600V SWGR AREA-IN THE MIDDLE EAST REGION OF THE ROOM, 7 FEET SOUTH OF 600VAC 8US 218 SUPPLY TRAIN ANCHOR Report~~~use'esponse Spectrum:!nstructure Realistic Frequency:
Pictures
User-8.00 Percent Damping: User-5.00 Spectral Values: Direction North-South East-West Vertical Acceleration (g's)0.36 0.36 0.18 Angle (N-S Direction makes with the X Axis): 0.00 Combination Criteria: SRSS W~~s'umber of Weights: 1 No Weight 1 1180.00 14.000 14.250 35.375 Porcine Number of External Forces: 0 gl~oe~s Number of External Moments: 0~llowat~s.
~n~Number of Anchor types: 1 Ultimate Ultimate Tension Inter Shear Inter Saf No Dia Manufact Product Tension Shear'oeff Coeff Fact 1/2 Other Unknown Expansion Anchor 2290.00 2380.00 1.00 0.30 1.00~rgb Ultimate Stress: 3500.00 psi.


DC Cook Unit 2 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 7 of 11 ID: 2-GRID-I-CVT(Rev.
==Attachment:==
0)Class: 4.Transformers
ANCHOR Report
 
DC Cook Unit 2                           GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                        Status: Yes Sheet 5 of 11 ID: 2-GRID-I-CVT ( Rev. 0   )               Class: 4. Transformers


==
==
Description:==
Description:==
10KVA TRANSFORMER - CONSTANT VOLTAGE Building: AUXILIARY                    Floor El.: 609.00            Room, Row/Col: 4KV RM - 600V SWGR AREA - IN THE MIDDLE EAST REGION OF THE ROOM, 7 FEET SOUTH OF 600VAC BUS 21B SUPPLY TRAIN Manufacturer, Model, Etc.: SOLIDSTATE CONTROLS INC. ISL12100 P IC~UIRg$
C t
Braced Base Channels                                    Inside Cabinet Outside of Transformer


10KVA TRANSFORMER
DC Cook Unit 2                             GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                  Status: Yes Sheet 6 of 11 ID: 2-GRID-I-CVT( Rev. 0)                             Class: 4. Transformers
-CONSTANT VOLTAGE Building: AUXILIARY Floor El.: 609.00 Manufacturer, Model, Etc.: SOLIDSTATE CONTROLS INC.ISL12100 Reduction Factor: 0.85 Room, Row/Col: 4KV RM-600V SWGR AREA-IN THE MIDDLE EAST REGION OF THE ROOM, 7 FEET SOUTH OF 600VAC BUS 218 SUPPLY TRAIN~W Allowable Stress: 0 psi.~u Number of Surfaces: 1 Surface Orientation Direction Comp 0.000 Direction Comp 0.000 Direction Comp 1.000 Anchor Pattern for Surface 0 1 Legend for Anchor Patterns DC Cook Unit 2 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 8 of 11 ID: 2-GRID-I-CVT(Rev.0)Class: 4.Transformers


==
==
Description:==
Description:==
10KVA TRANSFORMER - CONSTANT VOLTAGE 8uilding: AUXILIARY                              Floor El.: 609.00              Room, Row/Col: 4KV RM - 600V SWGR AREA - IN THE MIDDLE EAST REGION OF THE ROOM, 7 FEET SOUTH OF 600VAC 8US 218 SUPPLY TRAIN Manufacturer, Model, Etc.: SOLIDSTATE CONTROLS INC. ISL12100 ANCHOR Report
~~~use Spectrum:!nstructure Realistic
                'esponse Frequency: User - 8.00 Percent Damping: User - 5.00 Spectral Values:
Direction                Acceleration (g's)
North - South              0.36 East - West                0.36 Vertical                  0.18 Angle (N-S Direction makes with the X Axis): 0.00 Combination Criteria: SRSS W~~s'umber of Weights:      1 Porcine No          Weight 1          1180.00              14.000          14.250          35.375 Number of External Forces: 0 gl~oe~s Number of External Moments: 0
~llowat~s.
~n~
Number of Anchor          types:  1 Tension      Shear Ultimate      Ultimate  Inter        Inter    Saf No        Dia          Manufact        Product      Tension        Shear  'oeff          Coeff    Fact 1/2            Other        Unknown        2290.00      2380.00    1.00        0.30    1.00 Expansion Anchor
~rgb Ultimate Stress: 3500.00 psi.


10KVA TRANSFORMER
DC Cook Unit 2                            GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                          Status: Yes Sheet 7 of 11 ID: 2-GRID-I-CVT(Rev. 0)                    Class: 4. Transformers
-CONSTANT VOLTAGE Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: 4KV RM-600V SWGR AREA-IN THE MIDDLE EAST REGION OF THE ROOM, 7 FEET SOUTH OF 600VAC BUS 21B SUPPLY TRAIN Manufacturer, Model, Etc.: SOLIDSTATE CONTROLS INC.ISL12100 Anchor Bolts: Concrete Lines:~Itin Concrete Points:~mtm W'eld Lines'.~Ge retry An(QIL'Number of Anchors: 4 No Anch Id Coord 1.500 26.438 1.750 26.875 Coord 0.750 0.750 27.750 27.750 Coord 0.000 0.000 0.000 0.000 Surf Id ft of elements per line: 1 Number of Concrete Lines: 2 No Start X-Coord 0.000 0.000 Start Y-Coord 0.891 27.609 Sta~Z-Coord 0.000 0.000 End X-Coord 28.063 28.000 End Y-Coord 0.891 2 7.609 End Z-Coord 0.000 0.000 Sf Id Line Width 1.781 1.781 Number of Concrete Points: 0 KeldJ.um 4 of elements per line: 5 Number of Weld Lines: 0 er i in u i a o Reduction Factor Input for Anchor 0 1


OC Cook Unit 2 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 9 of 11 ID: 2-GRID-I-CVT(Rev.
==
0)Class: 4.Transformers
Description:==
10KVA TRANSFORMER - CONSTANT VOLTAGE Building: AUXILIARY                  Floor El.: 609.00              Room, Row/Col: 4KV RM - 600V SWGR AREA - IN THE MIDDLE EAST REGION OF THE ROOM, 7 FEET SOUTH OF 600VAC BUS 218 SUPPLY TRAIN Manufacturer, Model, Etc.: SOLIDSTATE CONTROLS INC. ISL12100 Reduction Factor: 0.85
~W Allowable Stress:    0 psi.
~u Number of Surfaces:  1 Surface Orientation Direction    Direction    Direction Comp          Comp          Comp 0.000          0.000        1.000 Anchor Pattern for Surface 0 1 Legend for Anchor Patterns
 
DC Cook Unit 2                           GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                        Status: Yes Sheet 8 of 11 ID: 2-GRID-I-CVT( Rev. 0)                       Class: 4. Transformers


==
==
Description:==
Description:==
10KVA TRANSFORMER - CONSTANT VOLTAGE Building: AUXILIARY                      Floor El.: 609.00            Room, Row/Col: 4KV RM - 600V SWGR AREA - IN THE MIDDLE EAST REGION OF THE ROOM, 7 FEET SOUTH OF 600VAC BUS 21B SUPPLY TRAIN Manufacturer, Model, Etc.: SOLIDSTATE CONTROLS INC. ISL12100 Anchor Bolts:
Concrete Lines:    ~Itin Concrete Points:  ~mtm W'eld Lines  '.
~Ge    retry An(QIL' Number of Anchors: 4 Anch                                                Surf No        Id      Coord          Coord            Coord        Id 1.500          0.750            0.000 26.438          0.750            0.000 1.750        27.750            0.000 26.875        27.750            0.000 ft of elements per line: 1 Number of Concrete Lines: 2 Start      Start        Sta~          End        End      End        Sf      Line No      X-Coord    Y-Coord      Z-Coord      X-Coord    Y-Coord  Z-Coord      Id    Width 0.000      0.891        0.000        28.063      0.891    0.000              1.781 0.000      27.609        0.000        28.000      2 7.609  0.000              1.781 Number of Concrete Points: 0 KeldJ.um 4 of elements per line:  5 Number of Weld Lines: 0 er i      in      u i      a o Reduction Factor Input for Anchor 0 1


10KVA TRANSFORMER
OC Cook    Unit 2                              GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                              Status: Yes Sheet 9 of 11 ID: 2-GRID-I-CVT(Rev. 0)                      Class: 4. Transformers
-CONSTANT VOLTAGE Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: 4KV RM-600V SWGR AREA-IN THE MIDDLE EAST REGION OF THE ROOM, 7 FEET SOUTH OF 600VAC BUS 21B SUPPLY TRAIN Manufacturer, Model, Etc.: SOLIDSTATE CONTROLS INC.ISL12100 Adequately Installed:
Yes Gap at Threaded Anchor: 0.00 in.Edge Distance-Edge 1: 5.00 in.Crack Size: 0.000 in.-Cracks Affect<=50%Bolts Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed:
Yes Reduction Factor Input for Anchor&#xb9;2 Adequately Installed:
Yes Gap at Threaded Anchor: 0.00 in.Edge Distance-Edge 1: 5.00 in.Crack Size: 0.000 in.-Cracks Affect<=50%Bolts Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed:
Yes Reduction Factor Input for Anchor&#xb9;3 Adequately Installed:
Yes Gap at Threaded Anchor: 0.00 in.Edge Distance-Edge 1: 5.00 in.Crack Size: 0.000 in.-Cracks Affect<=50%Bolts Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed:
Yes Reduction Factor Input for Anchor&#xb9;4 Adequately Installed:
Yes Gap at Threaded Anchor: 0.00 in.Edge Distance-Edge 1: 5.00 in.Crack Size: 0.000 in.-Cracks Affect<=50%Bolts Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed:
Yes Reduction Factors Data Current: Yes Anc No Id PaIV Vali Pallr/Vallr RT RN RL RG RS RE RF RC RR RP RB RM 1'1202.25 N/A 0.60 1.00 X 1.00 1.00 1.00 0.88 1.00 1.00 1.00 1.00 1.00 1428.00 1202.25 N/A N/A 0.60 1.00 0.60 1.00 X 1.00 1.00 X 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.88 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00


DC Cook Unit 2 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 10 of 11 ID: 2-GRID-I-CVT(Rev.0)Class: 4.Transformers
==
Description:==
10KVA TRANSFORMER - CONSTANT VOLTAGE Building: AUXILIARY                    Floor El.: 609.00                  Room, Row/Col: 4KV RM - 600V SWGR AREA - IN THE MIDDLE EAST REGION OF THE ROOM, 7 FEET SOUTH OF 600VAC BUS 21B SUPPLY TRAIN Manufacturer, Model, Etc.: SOLIDSTATE CONTROLS INC. ISL12100 Adequately Installed: Yes Gap at Threaded Anchor: 0.00 in.
Edge Distance - Edge 1: 5.00 in.
Crack Size: 0.000 in. - Cracks Affect <= 50% Bolts Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factor Input for Anchor &#xb9;2 Adequately Installed: Yes Gap at Threaded Anchor: 0.00 in.
Edge Distance - Edge 1: 5.00 in.
Crack Size: 0.000 in. - Cracks Affect <= 50% Bolts Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factor Input for Anchor  &#xb9;3 Adequately Installed: Yes Gap at Threaded Anchor: 0.00 in.
Edge Distance - Edge 1: 5.00 in.
Crack Size: 0.000 in. - Cracks Affect <= 50% Bolts Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factor Input for Anchor  &#xb9;4 Adequately Installed: Yes Gap at Threaded Anchor: 0.00 in.
Edge Distance - Edge 1: 5.00 in.
Crack Size: 0.000 in. - Cracks Affect <= 50% Bolts Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factors Data Current: Yes Anc      PaIV    Pallr/
No    Id      Vali    Vallr    RT  RN    RL    RG    RS    RE    RF    RC    RR    RP    RB    RM 1          1202.25    N/A    0.60  1.00  X    1.00  1.00 1.00  0.88    1.00  1.00  1.00  1.00  1.00 1428.00    N/A    0.60  1.00  X    1.00  1.00 1.00  1.00  1.00  1.00  1.00  1.00  1.00 1202.25    N/A    0.60  1.00  X    1.00  1.00 1.00  0.88    1.00  1.00  1.00  1.00  1.00
 
DC Cook Unit 2                                     GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                    Status: Yes Sheet 10 of 11 ID: 2-GRID-I-CVT( Rev. 0)                         Class: 4. Transformers


==
==
Description:==
Description:==
10KVA TRANSFORMER CONSTANT VOLTAGE Building: AUXILIARY                        Floor El.: 609.00                  Room, Row/Col: 4KV RM - 600V SWGR AREA - IN THE MIDDLE EAST REGION OF THE ROOM, 7 FEET SOUTH OF 600VAC BUS 21B SUPPLY TRAIN Manufacturer, Model, Etc.: SOLIDSTATE CONTROLS INC. ISL1 2100 1428.00    NIA      0.60  1.00    X    1.00  1.00  1.00 1.00  1.00  1.00  1.00 1.00  1.00 3    1      1202.25    NIA      0.60  1.00    X    1.00  1.00  1.00 0.88  1.00  1.00  1.00 1.00  1.00 1428.00    NIA      0.60  1.00    X    1.00  1.00  1.00 1.00  1.00  1.00  1.00 1.00  1.00 1202.25    NIA      0.60  1.00    X    1.00  1.00  1.OO O.88  1.OO  1.00  1.00 1.00  1.00 1428.00    NIA      0.60  1.00    X    1.00  1.00  1.00 1.00  1.00  1.00  1.00 1.00  1.00 N/A      = Not Applicable I ali    = Allowable Pull without Reduced inspection Van      = Allowable Shear without Reduced Inspection Pallr    = Allowable Puli with Reduced Inspection Vallr    = Allowable Shear with Reduced Inspection
        = Outlier
        = Reduction Factor Not Used RT      = Reduction Factor for Type of Anchorage
        = Reduction Factor for Installation Adequacy RL      = Reduction Factor for Embedment RG      = Reduction Factor for Gap at Anchors RS      = Reduction Factor for Spacing
        = Reduction Factor for Edge Distance
        = Reduction Factor for Concrete Strength RC      = Reduction Factor for Concrete Cracks RR      = Reduction Factor for Essential Relays RP      = Reduction Factor for Base Stiffness and Prying Action
        = Reduction Factor for Base Strength and Load Path
        = Reduction Factor for Embed. Steel and Pads Analysis Performed: Yes Type of Analysis: Regular Spectral Accelerations (G's)
N-S            E-W              Vertical      Safety Factor 0.362            0.145            0.073              1.969
            -0.362          -0.145            -0.073              2.006
            -0.362            0.145            0.073              2.009 0.362          -0.145            -0.073              1.971 0.362          -0.145            0.073              1.971
            -0.362            0.145            -0.073              2.008 0.362            0.145            -0.073              1.969
            -0.362          -0.145            0.073              2.007 0.145            0.362            0.073              3.820


10KVA TRANSFORMER
DC Cook Unit 2                             GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                          Status: Yes Sheet 11 of 11 ID: 2-GRID-I-CVT(Rev. 0)                       Class: 4. Transformers
-CONSTANT VOLTAGE Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: 4KV RM-600V SWGR AREA-IN THE MIDDLE EAST REGION OF THE ROOM, 7 FEET SOUTH OF 600VAC BUS 21B SUPPLY TRAIN Manufacturer, Model, Etc.: SOLIDSTATE CONTROLS INC.ISL1 2100 1428.00 NIA 0.60 1.00 X 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 3 1 1202.25 NIA 1428.00 NIA NIA 1202.25 1428.00 NIA 0.60 1.00 X 0.60 1.00 X 0.60 1.00 X 0.60 1.00 X 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.88 1.00 1.00 1.00 1.00 1.OO O.88 1.OO 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 N/A I ali Van Pallr Vallr RT RL RG RS RC RR RP=Not Applicable
=Allowable Pull without Reduced inspection
=Allowable Shear without Reduced Inspection
=Allowable Puli with Reduced Inspection
=Allowable Shear with Reduced Inspection
=Outlier=Reduction Factor Not Used=Reduction Factor for Type of Anchorage=Reduction Factor for Installation Adequacy=Reduction Factor for Embedment=Reduction Factor for Gap at Anchors=Reduction Factor for Spacing=Reduction Factor for Edge Distance=Reduction Factor for Concrete Strength=Reduction Factor for Concrete Cracks=Reduction Factor for Essential Relays=Reduction Factor for Base Stiffness and Prying Action=Reduction Factor for Base Strength and Load Path=Reduction Factor for Embed.Steel and Pads Analysis Performed:
Yes Type of Analysis: Regular Spectral Accelerations (G's)N-S 0.362-0.362-0.362 0.362 0.362-0.362 0.362-0.362 0.145 E-W 0.145-0.145 0.145-0.145-0.145 0.145 0.145-0.145 0.362 Vertical 0.073-0.073 0.073-0.073 0.073-0.073-0.073 0.073 0.073 Safety Factor 1.969 2.006 2.009 1.971 1.971 2.008 1.969 2.007 3.820 DC Cook Unit 2 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 11 of 11 ID: 2-GRID-I-CVT(Rev.
0)Class: 4.Transformers


==
==
Description:==
Description:==
10KVA TRANSFORMER - CONSTANT VOLTAGE Building: AUXILIARY                    Floor El.: 609.00            Room, Row/Col: 4KV RM - 600V SWGR AREA - IN THE MIDDLF EAST REGION OF THE ROOM, 7 FEET SOUTH OF 600VAC BUS 21B SUPPLY TRAIN Manufacturer, Model, Etc.: SOLIDSTATE CONTROLS INC. ISL12100 10        -0.145      - -0.362          -0.073          4.196 0.145          -0.362          0.073          3.811 12        -0.145          0.362          -0.073          4.198 13        -0.145          0.362          0.073          3.86T 14        0.145          -0.362          -0.073          4.144 15        0.145          0.362          -0.073          4.146 16        -0.145          -0.362          0.073          3.869 17        0.145          0.145          0.183          4.917 18        -0.145          -0.145          -0.183          5.010 19        0.145          0.145          -0.183          4.922 20        -0.145          -0.145          0.183          5.016 21        -0.145          0.145          0.183          5.027 22        0.145          -0.145          -0.183          4.934 23        0.145          -0.145          0.183          4.928 24        -0.145          0.145          -0.183          5.022 Minimum Safety Factor:    1.969 The Anchorage Capacity is    1.969 times greater than the Demand
Coo Component  &#xc3;o.2  (  ~~~ "T C4T          Claca ~
Any particular area tha Sei.smic Review Team      should pay extra attention  tot Yes W      Ho        (Xf yes, check items that,  apply.)
Anchor Type Anchor Diameter Anchor Spacing Anchor Number Anchor Embedmentv Anchor Edge Distance Anchor Gap Anchor Thread Engagement Anchor Grip Anchor Angularity Concrete Crack Others (describe    briefly)
If there  is concern    for Design Basis Di.screpancy, circle the <<pplicable item and explain.
Harcfvare Haintenance Type Discrepancy Drawing Update Type Di.screpancy S igni.ff cant Operability/Design Basi.s Discrepancy Others Condition:
Actions Taken:
Prepared Sy                  Dsta ~R-<<  3
                                                          **12 CHP 5021.                CCD. 019 ATTACHMENT NO. 1 ANCHOR jNSPECTION DATA SHEET AuK                    VAv ~
Un1t                                                Location      0'7-'ldg.
      /2- ypt4 tR T3 W  <~-n-9>                4  Q.Pro-+-C.v w Installation  dwg.  /  Rev.            Equipment No.
Anchora e Arran ement Sketch 2    -CFiQ- 7=C.VT I  ~ II
                          "'ii&#xc3;7 3II il OS>  leaf.
9 clonic)
OV>>
                                              'Pao  ~i                  g tl ELp V.      V low    Looki'n      NoR~h Drawn by:                                                  Date:      ri zv e>>
Verified by. Q~(
Qual. /Cert. Inspector Reviewed by:  T Construction Anc or Review Engineer Date:  ~  ~            (l- 'l~
Page            1    of  3 Revision                  1
                                                      **12 CHP 5021.CCD.019 ATTACHMENT NO. 1 ANCHOR INSPECTION DATA SHEET Un1t                      Bldg.                      Location T3'~-II-9 W Installation  dwg.  /  Rev.        Equipment No.
Anchora e Arran ement Sketch
                                                    + /a.GYP BoLT EI-BQ-  glE,A  Lope.<toG- ER Drawn by:                                              Date:
Verified by:                                            Date:, I~.7- lZ.
Qual. /Cert. Inspector Reviewed by:  T  " 4>'~4~~.
Construction An hor Review Engineer Date:
Page  1 of  3 Revision  1
I
                                                                  ++12 CHP 5021-CCD.Q19 ATTACHMENT NO.            1 ANCHOR INSPECTION DATA SHEET VA v    ~~ 0 .'g'z5 Un>.t      5                      Bldg.                  Location i>- Sq.7&-        t
                                                'I>
7      ~> <I            C.~SO 2- Qvf Installation            dwg.    /  Rev.          Equipment No.
Anchora e Arran ement Sketch
                                                                ~ls ~i      )
d O'A IPIt  e      ~
                              ~  ~
          ~"~i"i ( Cur
                    > ~    Y t~".;ll  >O  )f95 Drawn by:
Verified by:
Reviewed by:
8 Construe 8 (f.
Qual. /Cert. Inspector T. +~'-<k.
won An  hor Review Engineer Date:
Date:
Date:
                                                                              /l 2'.
I Z=l- I Z.
7 Page    1  of  3 Revision        1


10KVA TRANSFORMER
                                                                                        **12 CHP 502 1 . CCD. 0 1.9
-CONSTANT VOLTAGE Building: AUXILIARY Floor El.: 609.00 Manufacturer, Model, Etc.: SOLIDSTATE CONTROLS INC.ISL12100 Room, Row/Col: 4KV RM-600V SWGR AREA-IN THE MIDDLF EAST REGION OF THE ROOM, 7 FEET SOUTH OF 600VAC BUS 21B SUPPLY TRAIN 10 12 13 14 15 16 17 18 19 20 21 22 23 24-0.145 0.145-0.145-0.145 0.145 0.145-0.145 0.145-0.145 0.145-0.145-0.145 0.145 0.145-0.145--0.362-0.362 0.362 0.362-0.362 0.362-0.362 0.145-0.145 0.145-0.145 0.145-0.145-0.145 0.145-0.073 0.073-0.073 0.073-0.073-0.073 0.073 0.183-0.183-0.183 0.183 0.183-0.183 0.183-0.183 4.196 3.811 4.198 3.86T 4.144 4.146 3.869 4.917 5.010 4.922 5.016 5.027 4.934 4.928 5.022 Minimum Safety Factor: 1.969 The Anchorage Capacity is 1.969 times greater than the Demand Coo Component&#xc3;o.2 (~~~"T C4T Claca~Any particular area tha Sei.smic Review Team should pay extra attention tot Yes W Ho (Xf yes, check items that, apply.)Anchor Type Anchor Diameter Anchor Spacing Anchor Number Anchor Embedmentv Anchor Edge Distance Anchor Gap Anchor Thread Engagement Anchor Grip Anchor Angularity Concrete Crack Others (describe briefly)If there is concern for Design Basis Di.screpancy, circle the<<pplicable item and explain.Harcfvare Haintenance Type Discrepancy Drawing Update Type Di.screpancy S igni.f f cant Operability/Design Basi.s Discrepancy Others Condition:
(        ATTACHMENT NO.         1 ANCHOR XNSPECTXON DATA SHEET Unxt g                              /CA+
Actions Taken: Prepared Sy Dsta~R-<<3
Bldg.
**12 CHP 5021.CCD.019 ATTACHMENT NO.1 Un1t ypt4 tR T3/2-W<~-n-9>Installation dwg./Rev.Anchora e Arran ement Sketch ANCHOR jNSPECTION DATA SHEET AuK VAv~0'7-'ldg.Location 4 Q.Pro-+-C.v w Equipment No.2-CFiQ-7=C.VT I~II"'ii&#xc3;7 OS>leaf.OV>>3II il 9 clonic)ELp V.V low Looki'n g tl'Pao~i NoR~h Drawn by: Verified by.Q~(Date: ri zv e>>Qual./Cert.Inspector Reviewed by: T Date:~~(l-'l~Construction Anc or Review Engineer Page 1 of 3 Revision 1  
                                                                                        ~g v'P~
Location Dg- g" Fc 5
                  )  ~-  3 q)'o -('))
                /                                     ) %-)l-I) >              g Q I O-Z-C.vg Installation                 dwg.       /   Rev.               Equipment No.
Anchora e Arran ement Sketch
                              '"4')                                                          D I:
Ii
                                    ~ I l
                                    ~
                                      ~
I e
I 0           I
                                        -3 II3II ~  rIrJ~)
el                    I 3 - D'li~
II
                                                                    - 9'/i).
R'h  l= )
l n e      ~ +  </) p' II'IA::<<U      lQ90 Lc'qy, $
Drawn by:                                                                               Date:
Verified Reviewed by:
b I')        (
Qual. /Cert. Xnspector
                                              &<L~I Construction Anchor Review Engineer Date:
Date:
                                                                                                    /2 7- "~.
Page   1 of   3 Revision     1


**12 CHP 5021.CCD.019 ATTACHMENT NO.1 ANCHOR INSPECTION DATA SHEET Un1t Bldg.T3'~-II-9 W Location Installation dwg./Rev.Anchora e Arran ement Sketch Equipment No.+/a.BoLT GYP EI-BQ-glE,A Lope.<toG-ER Drawn by: Verified by: Date: Date:, I~.7-lZ.Qual./Cert.Inspector Reviewed by: T" 4>'~4~~.Date: Construction An hor Review Engineer Page 1 of 3 Revision 1 I
lSSRSSLLLL RSLLL5 WWHRES HWl5WRHS RI - - WLHLL
++12 CHP 5021-CCD.Q19 ATTACHMENT NO.1 ANCHOR INSPECTION DATA SHEET VA v~~0.'g'z5 Un>.t 5 Bldg.Location i>-Sq.7&-t 7~><I'I>C.~SO 2-Qvf Installation dwg./Rev.Equipment No.Anchora e Arran ement Sketch~ls~i)d O'A~~IPIt e~~"~i"i>~(Cur Y t~".;ll>O)f95 Date:/l 2'.7 Drawn by: Verified by: 8 8 (f.Date: I Z=l-I Z.Qual./Cert.Inspector Reviewed by: T.+~'-<k.Date: Construe won An hor Review Engineer Page 1 of 3 Revision 1
~RHSSWS~~~~
**12 CHP 502 1.CCD.0 1.9 (ATTACHMENT NO.1 ANCHOR XNSPECTXON DATA SHEET g/CA+~g v'P~Dg-g" Fc Unxt 5 Bldg.Location)~-3 q)'o-('))/)%-)l-I)>g Q I O-Z-C.vg Installation dwg./Rev.Equipment No.Anchora e Arran ement Sketch e el 0'"4')I: Ii~I l~~I I I I-3 II3II~rIrJ~)D 3-D'li~II-9'/i).l e n~+</)p'II'IA::<<U lQ90 R'h l=)Lc'qy,$Drawn by: Date: Date:/2 7-"~.Verified b (Qual./Cert.Xnspector Reviewed by: I')&<L~I Date: Construction Anchor Review Engineer Page 1 of 3 Revision 1 lSSRSSLLLL RSLLL5 WWHRES HWl5WRHS RI--WLHLL~RHSSWS~~~~
55%5%5%RHWS.
55%5%5%RHWS.
5%RSWMMMWRI
5%RSWMMMWRI
~~~~~~~M  
~~~~~~~M
 
4*12  CHP  5021.CCD.019 ATTACHMENT NO.            1 ANCHOR XNSPECTXON DATA SHEET Equipment No.:            ~. C~ 0-      -                                        Dwg  No..:  ~V~<7 i <-3 q7b-te Steel    Dwg. No.:          VT'mbedded T ~i~-n- 'I PHYSXCAL CHARACTERXSTXCS Weld  XD            O'I    4/~
Weld T        e Codes T  e Size 1 =  Fillet 2  = Plug/Slot Len  th                                                                                3  = Groove Cracks              Yes                            Y  s  Yes  Yes    Yes    Yes N                          0    No    No    No    No Lack of              Yes        s                          Yes  Yes    Yes    Yes Penetration                  0                            No    No    No    No Porosity                                            Yes    Yes  Yes    Yes    Yes 0                            No    No    No    No Vt."~B  )0 18'~
Equipment base        flexible:      0 Yes              I No  T'>    u ~~4~~~
ons r c ron      e Date:
Reviewed'y:                                                                              Date:      I l.- il-ons    r    son            nc o    evxew  ngxneer Verified by:              n                                                              Date:    I Z. 7-~  L ua . er  . npsec or Page  3  of    3 Revision      1


4*12 CHP 5021.CCD.019 ATTACHMENT NO.1 ANCHOR XNSPECTXON DATA SHEET Equipment No.:~.C~0--VT'mbedded Steel Dwg.No.: PHYSXCAL CHARACTERXSTXCS Dwg No..:~V~<7 i<-3 q7b-te T~i~-n-'I Weld XD T e Size Len th O'I 4/~Weld T e Codes 1=Fillet 2=Plug/Slot 3=Groove Cracks Lack of Penetration Porosity Yes Yes N s 0 0 Y s 0 Yes Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Vt."~B)0 18'~Equipment base Reviewed'y:
S 8 A DEPARTMENT                                      12 SHP SOSO NDE.008 CONTROL.FO OOCUMENT                                  ATTACHMENT NO. 1 COPY NO.
Verified by: flexible: 0 Yes I No T'>u~~4~~~ons r c ron e ons r son nc o evxew ngxneer n ua.er.npsec or Date: Date: I l.-il-Date: I Z.7-~L Page 3 of 3 Revision 1  
ULTRASONIC TEST REPORT ZOB ORDER NO.:           REPORT DATE: //3:~ ~   REQUEST NO.
IDENTIFICATION Unit  /~                           Test Unit/ S/N Component                          Freq./Diameter Item r "   J                      Reference Standard      c - '() ~
Material  >5                      Couplant/Batch No.
Other TEST DATA REMARKS
                                  /,  g PERFORMED BY:                             LEVEL:~         DATE:    /
                                                          ~
REVIEWED BY:
FORM NO. 12 SHP S050 NDE.008-1 LEVEL:
Page 'f Revision 0 DATE:
1 ll


S 8 A DEPARTMENT CONTROL.FO OOCUMENT COPY NO.12 SHP SOSO NDE.008 ATTACHMENT NO.1 ULTRASONIC TEST REPORT ZOB ORDER NO.: REPORT DATE://3:~~REQUEST NO.IDENTIFICATION Unit/~Component Item r" J Material>5 Other Test Unit/S/N Freq./Diameter Reference Standard Couplant/Batch No.c-'()~TEST DATA REMARKS/, g PERFORMED BY: REVIEWED BY: FORM NO.12 SHP S050 NDE.008-1 LEVEL:~DATE:/LEVEL:~DATE: ll Page'f 1 Revision 0 Equipment No.:-CQX'Q-X-C.'d Tightness established by"Snug Fit" Tightness verif ied by:&(."z<PL'ual./Cert.Inspector Comments:
Equipment No.:     - CQX'Q-X-C.'d Tightness established by "Snug Fit" Tightness verified by: & (."z <PL
01/16/92>G.MG.72 sAFE'KvtoouN EGUIpHENT LisT (ssELMp)FUMCTIOM: CCM Equipment Class: 5 train: 1 Equipment IO: I-PP.IOM Orauing H+bert 1.5135A SyStem: CCM Equip
                          /Cert. Inspector
                                  'ual.
Comments:
 
01/16/92
          >G. MG. 72 sAFE'KvtoouN   EGUIpHENT   LisT (ssELMp)
FUMCTIOM:       CCM Equipment Class:       5           train:     1 Equipment IO:         I-PP.IOM                                             Orauing H +bert     1.5135A SyStem:       CCM Equip


== Description:==
== Description:==
LIESt CCM PVHP Building:        AUXILIARY                Room:    609 KALLMAY                                    Elevation:  609 Normal  state:      R/NR          Oesired state:      R              Pouer Required:      Y            Sort: M,R Suceorting System Orauing Herbert              1-12001  1-12060  1-98/05 Required Interconnections and Supporting Coeponentst                'I-T11A7  I.HCAB-3 fetv Related Status:          NUCLEAR SR                                Hin/Opt:  HIN
(
AOOITIONAL IHFORHATION I
Al ias Hubert                                                              Pouer Train:        8 C~nt          Served:      VEST CCM PVHP Hanufacturer:          IHGERSOI.L-RANO CO                                  Hodel:    9000CPH Panel:    I-CCM I-HSOI E I cm Orauing:      1-98405                                              Miring Orauing:        1-93011 Pover Source:      1-1'I IA7, 1-HCAB-3 ual tdount      F                                                          Relay Only:      Y C~nent        Type:      PVHP ISO  Orauings:
Oetai led Location:
D.C. COOK Unit 1                                    GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                      Status: Yes Sheet 1 of 11 ID: 1-PP-10W( Rev. 0)                                Class: 5. Horizontal Pumps
==
Description:==
WEST CCW PUMP Building: AUXILIARY                            Floor El.: 609.00                    Room, Row/Col: HALL AY, Manufacturer, Model; Etc.: INGERSOLL-RAND CO 9000GPM SEISMIC CAPACITY YS DEMAND
: 1.      Elevation where equipment receives seismic input                                                      609.00 Elevation of seismic input below about 40'rom grade (grade = 608.00)                                    Yes
: 3.      Equipment has fundamental frequency above about 8 Hz (est. frequency = 20.00)                          Yes Capacity based on:          1.00
* Bounding Spectrum Demand based on:            1.00 Design Basis Ground Response Spectrum 0.800 c'OCi
                                                    /rr
                                                /
                                            /
                                    //
                                /r 0.090 0.50                            LOG        Hz                              33.00 Capacity  ..... Demand Record Capacity        C:tGIPtGIPtspectra.des                        Label Bounding Spectrum Demand 1        C:tGIPLPROJ0035tspectra.des                  BUILDING Ground(ELEVATIONI608 BROADEN N Demand 2        CAGIPIPROJ0035tspectra.des                    BUILDINGGround ELEVATION 608 BROADEN N Does capacity exceed demand?


LIESt CCM PVHP Building: AUXILIARY Room: 609 KALLMAY Elevation:
D.C. COOK Unit 1                                   GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                  Status: Yes Sheet 2 of 11 ID:1-PP-10W(Rev. 0)                                 Class: 5. Horizontal Pumps
609 Normal state: R/NR Oesired state: R Pouer Required: Y Sort: M,R Suceorting System Orauing Herbert 1-12001 1-12060 1-98/05 Required Interconnections and Supporting Coeponentst
 
'I-T11A7 I.HCAB-3 fetv Related Status: NUCLEAR SR (Hin/Opt: HIN AOOITIONAL IHFORHATION I Al ias Hubert Pouer Train: 8 C~nt Served: VEST CCM PVHP Hanufacturer:
==
IHGERSOI.L-RANO CO Hodel: 9000CPH Panel: I-CCM I-HSOI E I cm Orauing: 1-98405 Miring Orauing: 1-93011 Pover Source: 1-1'I IA7, 1-HCAB-3 ual tdount F Relay Only: Y C~nent Type: PVHP ISO Orauings: Oetai led Location:
Description:==
D.C.COOK Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 1 of 11 ID: 1-PP-10W(Rev.0)Description:
WEST CCW PUMP Building: AUXILIARY                         Floor El.: 609.00                   Room, Row/Col: HALLWAY, Manufacturer, Model, Etc.: INGERSOLL-RAND CO 9000GPM CAVEATS - BOUNDING SPECTRUM HP/BS    Caveat  1 - Earthquake Experience Equipment Class                                                Yes HP/BS    Caveat  2- Driver and  Pump on Rigid Skid                                                        Yes HP/BS    Caveat  3 - Thrust Bearings in Both Axial Directions                                              Yes HP/BS    Caveat  4 - Check of Long Unsupported Piping                                                      Yes HP/BS    Caveat  5 - Base Vibration Isolation System Checked.                                             Yes HP/BS    Caveat  6 - Sufficient Slack and Flexibility of Attached Lines.                                   Yes HP/BS    Caveat  7 - Adequate Anchorage.                                                                   Yes HP/BS    Caveat  8 - Potential Chatter of Essential Relays Evaluated.                                     N/A HP/BS    Caveat  9- No Other Concerns.                                                                     Yes Is the intent of all the caveats met for Bounding Spectrum?
WEST CCW PUMP Class: 5.Horizontal Pumps Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: HALL AY, Manufacturer, Model;Etc.: INGERSOLL-RAND CO 9000GPM SEISMIC CAPACITY YS DEMAND 1.Elevation where equipment receives seismic input Elevation of seismic input below about 40'rom grade (grade=608.00)3.Equipment has fundamental frequency above about 8 Hz (est.frequency=20.00)Capacity based on: 1.00*Bounding Spectrum Demand based on: 1.00 Design Basis Ground Response Spectrum 609.00 Yes Yes 0.800 c'OCi 0.090/rr////r/0.50 LOG Hz Capacity.....Demand 33.00 Capacity Demand 1 Demand 2 C:tGIPtGIPtspectra.des C:tGIPLPROJ0035tspectra.des CAGIPIPROJ0035tspectra.des Record Label Bounding Spectrum BUILDING Ground(ELEVATIONI608 BROADEN N BUILDING Ground ELEVATION 608 BROADEN N Does capacity exceed demand?  
ANCHORAGE
: 1. The sizes and locations of anchors have been determined                                                Yes
: 2. Appropriate equipment characteristics have been determined (mass, CG, natural freq.,                    Yes damping, center of rotation).
: 3. The type of anchorage is covered by the GIP                                                            Yes
: 4. The adequacy of the anchorage installation has been evaluated (weld quality and length, nuts            Yes and washers, expansion anchor tightness, etc.)
: 5. Factors affecting anchorage capacity or margin of safety have been considered: embedment                Yes length, anchor spacing, free-edge distance, concrete strength/condition, and concrete cracking.
: 6. For bolted anchorages, any gaps under the base are less than 1/4                                        Yes
: 7. Factors affecting essential relays have been considered: gaps under the base, capacity                  N/A reduction for expansion anchors.
: 8. The base has adequate stiffness and the effect of prying action on anchors has been                    Yes considered.
: 9. The strength of the equipment base and the load path to the CG is adequate                              Yes
: 10. The adequacy of embedded steel, grout pads or large concrete pads have been evaluated.                 Yes
: 11. The anchorage capacity exceeds the demand.                                                             Yes*
Are anchorage requirements met?
INTERACTION EFFECTS
: 1. Soft targets are free from impact by nearby equipment or structures                                    Yes
: 2. If the equipment contains sensitive relays, it is free from all impact by nearby equipment or          N/A structures.
: 3. Attached lines have adequate flexibility                                                                Yes
: 4. Overhead equipment or distribution systems are not likely to collapse.                                  Yes
: 5. No other adverse concerns were found.                                                                   Yes Is equipment free of interaction effects?


D.C.COOK Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 2 of 11 ID:1-PP-10W(Rev.
D.C. COOK Unit 1                               GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                              Status: Yes Sheet 3 of 11 ID: 1-PP-10W(Rev. 0     }                      Class: 5. Horizontal Pumps
0)Description:
 
WEST CCW PUMP Class: 5.Horizontal Pumps Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: HALLWAY, Manufacturer, Model, Etc.: INGERSOLL-RAND CO 9000GPM CAVEATS-BOUNDING SPECTRUM HP/BS Caveat 1-Earthquake Experience Equipment Class HP/BS Caveat 2-Driver and Pump on Rigid Skid HP/BS Caveat 3-Thrust Bearings in Both Axial Directions HP/BS Caveat 4-Check of Long Unsupported Piping HP/BS Caveat 5-Base Vibration Isolation System Checked.HP/BS Caveat 6-Sufficient Slack and Flexibility of Attached Lines.HP/BS Caveat 7-Adequate Anchorage.
==
HP/BS Caveat 8-Potential Chatter of Essential Relays Evaluated.
Description:==
HP/BS Caveat 9-No Other Concerns.Is the intent of all the caveats met for Bounding Spectrum?ANCHORAGE Yes Yes Yes Yes Yes Yes Yes N/A Yes 1.The sizes and locations of anchors have been determined 2.Appropriate equipment characteristics have been determined (mass, CG, natural freq., damping, center of rotation).
WEST   CCW   PUMP Building: AUXILIARY                     Floor EI.: 609.00                 Room, Row/Col: HALLWAY, Manufacturer, Model, Etc.: INGERSOLL-RAND CO 9000GPM IS E UIPME T SEISMIC LLY DE UATE>                                                                     ~es CO   MEN S SRT: John D. Stevenson, Paul Wilson, Rick Leonard, and Kaifash Mahajan on 10/5/93.
3.The type of anchorage is covered by the GIP 4.The adequacy of the anchorage installation has been evaluated (weld quality and length, nuts and washers, expansion anchor tightness, etc.)5.Factors affecting anchorage capacity or margin of safety have been considered:
MFG: INGERSOLL-RAND PUMP, 9000 G.P.M.
embedment length, anchor spacing, free-edge distance, concrete strength/condition, and concrete cracking.6.For bolted anchorages, any gaps under the base are less than 1/4 7.Factors affecting essential relays have been considered:
Anchorage: 6-3/4" J-Bolts.
gaps under the base, capacity reduction for expansion anchors.8.The base has adequate stiffness and the effect of prying action on anchors has been considered.
Total WT=9580 lbs. C.G.=35" above base.
9.The strength of the equipment base and the load path to the CG is adequate 10.The adequacy of embedded steel, grout pads or large concrete pads have been evaluated.
'Minor cracks in non-Struct. pad judged insignificant.
11.The anchorage capacity exceeds the demand.Are anchorage requirements met?INTERACTION EFFECTS Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes Yes*1.Soft targets are free from impact by nearby equipment or structures 2.If the equipment contains sensitive relays, it is free from all impact by nearby equipment or structures.
Nozzle loads were applied in the ANCHOR analysis. Nozzle loads were obtained from AEP "
3.Attached lines have adequate flexibility 4.Overhead equipment or distribution systems are not likely to collapse.5.No other adverse concerns were found.Yes N/A Yes Yes Yes Is equipment free of interaction effects?
D.C.COOK Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 3 of 11 ID: 1-PP-10W(Rev.
0}Description:
WEST CCW PUMP Class: 5.Horizontal Pumps Building: AUXILIARY Floor EI.: 609.00 Room, Row/Col: HALLWAY, Manufacturer, Model, Etc.: INGERSOLL-RAND CO 9000GPM IS E UIPME T SEISMIC LLY DE UATE>~es CO MEN S SRT: John D.Stevenson, Paul Wilson, Rick Leonard, and Kaifash Mahajan on 10/5/93.MFG: INGERSOLL-RAND PUMP, 9000 G.P.M.Anchorage:
6-3/4" J-Bolts.Total WT=9580 lbs.C.G.=35" above base.'Minor cracks in non-Struct.
pad judged insignificant.
Nozzle loads were applied in the ANCHOR analysis.Nozzle loads were obtained from AEP"


==SUMMARY==
==SUMMARY==
OF LOAD ON EQUIPMENT" 11/2/71, Summary of Loads on Pumps for CCW&#xc3;1W PUMP, (microfilm page 00100020022) and included deadweight, thermal, thermal anchor movements, and seismic loads.Ref.Drwgs.: Ingersoll-Rand C-14ALV86X51, W-16ALV500X17, AEPSC 12-3286-9, 12-3073B-2, 12-3073A-3, 12-~~~3285-23, Livsey 8 Co.1-CCW-37, Rev.5, Sh.2 of 2.Picture f/12, Wk1, Tmi, Disk2 Evaluated by: c-/Date: Ot 8-ZS-qS tta nt'i u es achm'e 0  
OF LOAD ON EQUIPMENT" 11/2/71, Summary of Loads on Pumps for CCW &#xc3;1W PUMP, (microfilm page 00100020022) and included deadweight, thermal, thermal anchor movements, and seismic loads.
Ref. Drwgs.: Ingersoll-Rand C-14ALV86X51, W-16ALV500X17, AEPSC 12-3286-9, 12-3073B-2, 12-3073A-3, 12-
                                                              ~
3285-23, Livsey 8 Co. 1-CCW-37, Rev. 5, Sh. 2 of 2.
        ~                        ~
Picture f/12, Wk1, Tmi, Disk2 Evaluated by:                                                                     Date:
c-   /
Ot 8- ZS- qS tta     nt'i u es achm                   e 0


D.C.COOK Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 4 of 11 ID: 1-PP-10W(Rev.0)Class: 5.Horizontal Pumps
D.C. COOK Unit 1                           GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                       Status: Yes Sheet 4 of 11 ID: 1-PP-10W( Rev. 0)                    Class: 5. Horizontal Pumps
 
==
Description:==
WEST CCW PUMP Building: AUXILIARY                Floor El.: 609.00                Room, Row/Col: HALLWAY, Manufacturer, Model Etc.: INGERSOLL-RAND CO 9000GPM
                    ~
CTUR S 4 ~
L j
4 1-PP-10W West CCW Pump-Anchorage
 
D.C. COOK Unit 1                              GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                Status: Yes Sheet 5 of 11 ID: 1-PP-10W( Rev. 0)                            Class: 5. Horizontal Pumps
 
==
Description:==
WEST CCW PUMP Building: AUXILIARY                        Floor El.: 609.00                Room, Row/Col: HALLWAY, Manufacturer, Model, Etc.: INGERSOLL-RAND CO 9000GPM ANCHOR Report
~Ea  h ua        e:
Response Spectrum: SSE Frequency: GIP - Rigid Percent Damping: GIP - 5.00 Spectral Values:
Direction            Acceleration (g's)
North - South        0.38 East - West          0.38 Vertical              0.25 Angle (N-S Direction makes with the X Axis): 0.00 Combination Criteria: SRSS
~We'gag of Weights:
          'umber 1
No        Weight 1          9580.00        105.400        20.750          35.000 o ces Number of External Forces: 2 No                Fx          Fy            Fz 1      2.86E+003        1.24E+003    -3.24E+003          26.870      -5.250          17.000 2    -2.36E+003        2.24E+003    -4.85E+003          26.870      47.750          19.000
/~mme Number of External Moments: 2 No                Mx          My 1      4.88E+004        1.68E+005      3.34E+004 2      6.32E+004        8.76E+004    -1.60E+004
 
D.C. COOK Unit 1                                  GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                  Status: Yes Sheet 6 of 11 ID: 1-PP-10W ( Rev. 0 )                               Class: 5. Honzontal Pumps


== Description:==
== Description:==
WEST CCW PUMP Building: AUXILIARY                          Floor El.: 609.00                Room, Row/Col: HALLWAY, Manufacturer, Model Etc.: INGERSOLL-RAND CO 9000GPM
                        ~
~llowal>les:
~nor'umber of Anchor types:  1 Tension      Shear Ultimate    Ultimate      Inter        Inter    Saf Dia      Manufact        Product        Tension      Shear      Coeff        Coeff    Fact 3/4        Other          J-Bolt (90                    7510.00      1.00          0.30    1.00 deg)        15030.00 Gmseng Ultimate Stress: 3500.00 psi.
Reduction Factor: 0.85 Allowable Stress:      30600 psi.
S~ua  c~
Number of Surfaces:      1 Surface Orientation Direction      Direction        Direction Comp            Comp            Comp No            Nx              Ny                Nz 0.000          0.000            1.000 Anchor Pattern for Surface &#xb9; 1
t '
D.C. COOK Unit 1                            GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                          Status: Yes Sheet 7 of 11 ID:1-PP-10W(Rev. 0)                        Class: 5. Honzontal Pumps


WEST CCW PUMP Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: HALLWAY, Manufacturer, Model~Etc.: INGERSOLL-RAND CO 9000GPM CTUR S 4~L j 4 1-PP-10W West CCW Pump-Anchorage D.C.COOK Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 5 of 11 ID: 1-PP-10W(Rev.0)Class: 5.Horizontal Pumps
==
Description:==
WEST CCW PUMP Building: AUXILIARY                   Floor El.: 609.00               Room, Row/Col: HALLWAY, Manufacturer, Model, Etc.: INGERSOLL-RAND CO 9000GPM Legend for Anchor Patterns Anchor Bolts:      ~IIIK'~
Concrete Lines:    ~[~<nggg Concrete Points:
Weld Lines
                                                    .'~e Number of Anchors: 6 Anch                                              Surf Id      Coord          Coord        Coord        Id 1      1      10.000        4.250          0.000 2      1      59.750        4.250          0.000 3      1      109.500        4.250          0.000 4       1      10.000        37.250          0.000 5      1      59.750        37.250          0.000 6      1      109.500        37.250          0.000 r      in
 
D.C. COOK Unit 1                                GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                Status: Yes Sheet 8 of 11 ID: 1-PP-1 OW ( Rev. 0 )                          Class: 5. Horizontal Pumps
 
==
Description:==
WEST CCW PUMP Building: AUXILIARY                          Floor El.: 609.00                Room, Row/Col: HALLWAY, Manufacturer, Model, Etc.: INGERSOLL-RAND CO 9000GPM
&#xb9; of elements  per line:  1 Number of Concrete Lines: 4 Start          Start        Start          End        End          End      Sf      Line No      X-Coord        Y-Coo rd      Z-Coord        X-Coord    Y-Coord      Z-Coord              Width 8.250          2.625        0.000        129.000      2.625        0.000              1.000 8.250          2.625        0.000          8.250      37.250        0.000              1.000 8.250        37.250        0.000        129.000      37.250        0.000              1.000 129.000          2.625        0.000        129.000      37.250        0.000              1.000 r    Pin Number of Concrete Points: 0
&#xb9; of elements  per line: 5 Number of Weld Lines: 0 D  ter inati            du      on a Reduction Factor Input for Anchor    &#xb9; 1 Adequately Installed: Yes Embedment Length: (19.50 in. Min Reqd. to achieve full capacity):=40.88 in.
Gap at Threaded Anchor: 0.00 in.
Edge Distance - Edge 1: 4.00 in.
Crack Size: 0.016 in. - Cracks traverses thru Installation Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factor Input for Anchor    &#xb9;2 Adequately Installed: Yes Embedment Length: (19.50 in. Min Reqd. to achieve full capacity):=40.88 in.
Gap at Threaded Anchor: 0.00 in.
Edge Distance - Edge 1: 4.63 in.
Crack Size: 0.016 in. - Cracks traverses thru Installation Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factor Input for Anchor    &#xb9;3
 
I D.C. COOK Unit 1                               GIP Rev 2, Corrected 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                              Status: Yes Sheet 9 of 11 ID: 1-PP-10W ( Rev. 0 )                       Class: 5. Horizontal Pumps


== Description:==
== Description:==
WEST CCW PUMP Oa  Building: AUXILIARY                    Floor El.: 609.00                  Room, Row/Col: HALLWAY, Manufacturer, Model, Etc.: INGERSOLL-RAND CO 9000GPM Adequately Installed: Yes Embedment Length: (19.50 in. Min Reqd. to achieve full capacity):=40.88 in.
Gap at Threaded Anchor: 0.00 in.
Edge Distance - Edge 1: 4.00 in.
Crack Size: 0.016 in. - Cracks traverses thru Installation Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factor Input for Anchor f/4 Adequately Installed: Yes Embedment Length: (20.06 in. Min Reqd. to achieve full capacity):=40.88 in.
Gap at Threaded Anchor: 0.00 in.
Edge Distance - Edge 1: 4.50 in.
Crack Size: 0.016 in. - Cracks traverses thru Installation Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factor Input for Anchor 0 5 I Adequately Installed: Yes Embedment Length: (20.00 in. Min Reqd. to achieve full capacity):=40.88 in.
Gap at Threaded Anchor: 0.00 in.
Edge Distance - Edge 1: 4.63 in.
Crack Size: 0.016 in. - Cracks traverses thru Installation Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factor Input for Anchor f/6 Adequately Installed: Yes Embedment Length: (19.25 in. Min Reqd. to achieve full capacity):=40.88 in.
Gap at Threaded Anchor: 0.00 in.
Edge Distance - Edge 1: 4.38 in.
Crack Size: 0.016 in. - Cracks traverses thru Installation Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factors Data Current: Yes Anc    Pall/    Pallr/
No    Id    Vali      Vallr    RT    RN    RL    RG    RS    RE    RF  RC    RR    RP  RB  RM 5342.33    N/A    1.00 1.00  0.54    1.00  1.00 0.65  1.00  1.00  1.00  1.00 1.00 1.00 2798.39    N/A    1.00 1.00  1.00  1.00  1.00 0.37  1.00  1.00  1.00  1.00 1.00 1.00
D.C. COOK Unit 1                                    GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                        Status: Yes Sheet 10 of 11 ID: 1-PP-10W(Rev. 0)                                    Class: 5. Horizontal Pumps


WEST CCW PUMP Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: HALLWAY, Manufacturer, Model, Etc.: INGERSOLL-RAND CO 9000GPM ANCHOR Report~Ea h ua e: Response Spectrum: SSE Frequency:
== Description:==
GIP-Rigid Percent Damping: GIP-5.00 Spectral Values: Direction North-South East-West Vertical Acceleration (g's)0.38 0.38 0.25 Angle (N-S Direction makes with the X Axis): 0.00 Combination Criteria: SRSS~We'gag'umber of Weights: 1 No Weight 1 9580.00 105.400 20.750 35.000 o ces Number of External Forces: 2 No Fx Fy Fz 1 2.86E+003 1.24E+003-3.24E+003 2-2.36E+003 2.24E+003-4.85E+003 26.870 26.870-5.250 47.750 17.000 19.000/~mme Number of External Moments: 2 No Mx My 1 4.88E+004 1.68E+005 2 6.32E+004 8.76E+004 3.34E+004-1.60E+004
WEST CCW PUMP Building: AUXILIARY                           Floor El.: 609.00                     Room, Row/Col: HALLWAY, Manufacturer, Model, Etc.: INGERSOLL-RAND CO 9000GPM 5508,76        N/A      1.00 1.00    0.54  1.00    1.00  0.67 1.00  1.00  1.00  1.00 1.00  1.00 3741.21        NIA      1.00 1.00    1.00  1.00    1.00  0.50 1.00  1.00  1.00  1.00 1.00  1.00 5342.33        N/A      1.00 1.00   0.54  1.00    1.00  0.65 1.00  1.00  1.00  1.00 1.00  1.00 2798.39        NIA      1.00 1.00    1.00  1.00    1.00  0.37 1.00  1.00  1.00  1.00 1.00  1.00 5562.31        N/A      1.00 1.00    0.56  1.00   1.00  0.67 1.00 1.00  1.00  1.00 1.00  1.00 3541.72        N/A      1.00 1.00    1.00  1.00    1.00  0.47 1.00  1.00  1.00  1.00 1.00  1.00 5586.05        N/A      1.00 1.00    0.55  1.00    1.00  0.67 1.00  1.00  1.00  1.00 1.00  1.00 3741.21        N/A      1.00 1.00    1.00  1.00    1.00  0.50 1.00  1.00  1.00  1.00 1.00  1.00 1      5403.66        NIA      1.00 1.00    0.54  1.00    1.00  0.67 1.00  1.00  1.00  1.00 1.00  1.00 3347.69        N/A      1.00 1.00    1.00  1,00    1.00  0.45 1.00  1.00  1.00 1.00  1.00  1.00 N/A      = Not Applicable Pall      = Allowable Pull without Reduced Inspection Vali      = Allowable Shear without Reduced Inspection Pallr    = Allowable Pull with Reduced Inspection Vallr    = Allowable Shear with Reduced Inspection
            = Outlier X        = Reduction Factor Not Used RT        = Reduction Factor for Type of Anchorage RN        = Reduction Factor for Installation Adequacy RL        = Reduction Factor for Embedment RG        = Reduction Factor for Gap at Anchors RS        = Reduction Factor for Spacing RE        = Reduction Factor for Edge Distance RF        = Reduction Factor for Concrete Strength RC        = Reduction Factor for Concrete Cracks RR        = Reduction Factor for Essential Relays RP        = Reduction Factor for Base Stiffness and Prying Action RB        = Reduction Factor for Base Strength and Load Path RM        = Reduction Factor for Embed. Steel and Pads al  is Re Is'nalysis Performed: Yes Type of Analysis: Regular Spectral Accelerations (G's)
'-S No 0.375
              -0.375
              -0.375 0.375 E-W 0.150
                                    -0.150 0.150
                                    -0.150 Vertical 0.100
                                                    -0.100 0.100
                                                    -0.100 Safety Factor 3.680 4.948 4.002 4.555


D.C.COOK Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 6 of 11ID: 1-PP-10W (Rev.0)Description:
D.C. COOK Unit 1                                 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                             Status: Yes Sheet 11 of 11 ID: 1-PP-10W( Rev. 0)                         Class: 5. Horizontal Pumps
WEST CCW PUMP Class: 5.Honzontal Pumps Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: HALLWAY, Manufacturer, Model~Etc.: INGERSOLL-RAND CO 9000GPM~llowal>les:
~nor'umber of Anchor types: 1 Ultimate Ultimate Tension Inter Shear Inter Saf Dia Manufact Product Tension Shear Coeff Coeff Fact 3/4 Other J-Bolt (90 deg)15030.00 7510.00 1.00 0.30 1.00 Gmseng Ultimate Stress: 3500.00 psi.Reduction Factor: 0.85 Allowable Stress: 30600 psi.S~ua c~Number of Surfaces: 1 Surface Orientation No Direction Comp Nx 0.000 Direction Comp Ny 0.000 Direction Comp Nz 1.000 Anchor Pattern for Surface&#xb9;1 t'
D.C.COOK Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 7 of 11 ID:1-PP-10W(Rev.
0)Description:
WEST CCW PUMP Class: 5.Honzontal Pumps Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: HALLWAY, Manufacturer, Model, Etc.: INGERSOLL-RAND CO 9000GPM Legend for Anchor Patterns Anchor Bolts:~IIIK'~Concrete Lines:~[~<nggg Concrete Points: Weld Lines.'~e Number of Anchors: 6 Anch Id 1 1 2 1 3 1 4 1 5 1 6 1 Coord 10.000 59.750 109.500 10.000 59.750 109.500 Coord 4.250 4.250 4.250 37.250 37.250 37.250 Coord 0.000 0.000 0.000 0.000 0.000 0.000 Surf Id r in D.C.COOK Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 8 of 11 ID: 1-PP-1 OW (Rev.0)Description:
WEST CCW PUMP Class: 5.Horizontal Pumps Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: HALLWAY, Manufacturer, Model, Etc.: INGERSOLL-RAND CO 9000GPM&#xb9;of elements per line: 1 Number of Concrete Lines: 4 No Start X-Coord 8.250 8.250 8.250 129.000 Start Y-Coo rd 2.625 2.625 37.250 2.625 Start Z-Coord 0.000 0.000 0.000 0.000 End X-Coord 129.000 8.250 129.000 129.000 End Y-Coord 2.625 37.250 37.250 37.250 End Z-Coord 0.000 0.000 0.000 0.000 Sf Line Width 1.000 1.000 1.000 1.000 r Pin Number of Concrete Points: 0&#xb9;of elements per line: 5 Number of Weld Lines: 0 D ter inati du on a Reduction Factor Input for Anchor&#xb9;1 Adequately Installed:
Yes Embedment Length: (19.50 in.Min Reqd.to achieve full capacity):=40.88 in.Gap at Threaded Anchor: 0.00 in.Edge Distance-Edge 1: 4.00 in.Crack Size: 0.016 in.-Cracks traverses thru Installation Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed:
Yes Reduction Factor Input for Anchor&#xb9;2 Adequately Installed:
Yes Embedment Length: (19.50 in.Min Reqd.to achieve full capacity):=40.88 in.Gap at Threaded Anchor: 0.00 in.Edge Distance-Edge 1: 4.63 in.Crack Size: 0.016 in.-Cracks traverses thru Installation Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed:
Yes Reduction Factor Input for Anchor&#xb9;3 I
D.C.COOK Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected 2/14/92 Status: Yes Sheet 9 of 11 Oa ID: 1-PP-10W (Rev.0)Description:
WEST CCW PUMP Class: 5.Horizontal Pumps Room, Row/Col: HALLWAY, Floor El.: 609.00 Building: AUXILIARY Manufacturer, Model, Etc.: INGERSOLL-RAND CO 9000GPM Adequately Installed:
Yes Embedment Length: (19.50 in.Min Reqd.to achieve full capacity):=40.88 in.Gap at Threaded Anchor: 0.00 in.Edge Distance-Edge 1: 4.00 in.Crack Size: 0.016 in.-Cracks traverses thru Installation Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed:
Yes Reduction Factor Input for Anchor f/4 Adequately Installed:
Yes Embedment Length: (20.06 in.Min Reqd.to achieve full capacity):=40.88 in.Gap at Threaded Anchor: 0.00 in.Edge Distance-Edge 1: 4.50 in.Crack Size: 0.016 in.-Cracks traverses thru Installation Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed:
Yes Reduction Factor Input for Anchor 0 5 I Adequately Installed:
Yes Embedment Length: (20.00 in.Min Reqd.to achieve full capacity):=40.88 in.Gap at Threaded Anchor: 0.00 in.Edge Distance-Edge 1: 4.63 in.Crack Size: 0.016 in.-Cracks traverses thru Installation Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed:
Yes Reduction Factor Input for Anchor f/6 Adequately Installed:
Yes Embedment Length: (19.25 in.Min Reqd.to achieve full capacity):=40.88 in.Gap at Threaded Anchor: 0.00 in.Edge Distance-Edge 1: 4.38 in.Crack Size: 0.016 in.-Cracks traverses thru Installation Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed:
Yes Reduction Factors Data Current: Yes Anc No Id Pall/Vali 5342.33 2798.39 Pallr/Vallr N/A N/A RT RN 1.00 1.00 1.00 1.00 RL RG 0.54 1.00 1.00 1.00 RS RE 1.00 0.65 1.00 0.37 RF RC 1.00 1.00 1.00 1.00 RR 1.00 1.00 RP RB RM 1.00 1.00 1.00 1.00 1.00 1.00


D.C.COOK Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 10 of 11 ID: 1-PP-10W(Rev.
==
0)Description:
Description:==
WEST CCW PUMP Class: 5.Horizontal Pumps Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: HALLWAY, Manufacturer, Model, Etc.: INGERSOLL-RAND CO 9000GPM 5508,76 N/A 1.00 1.00 0.54 1.00 1.00 0.67 1.00 1.00 1.00 1.00 1.00 1.00 3741.21 NIA 1.00 1.00 1.00 1.00 1.00 0.50 1.00 1.00 1.00 1.00 1.00 1.00 5342.33 N/A 1.00 1.00 0.54 1.00 1.00 0.65 1.00 1.00 1.00 1.00 1.00 1.00 2798.39 5562.31 3541.72 NIA 1.00 N/A 1.00 N/A 1.00 1.00 1.00 1.00 1.00 1.00 0.56 1.00 1.00 1.00 1.00 1.00 1.00 0.37 1.00 1.00 0.67 1.00 1.00 0.47 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 5586.05 N/A 1.00 1.00 0.55 1.00 1.00 0.67 1.00 1.00 1.00 1.00 1.00 1.00 3741.21 1 5403.66 N/A 1.00 NIA 1.00 1.00 1.00 1.00 1.00 0.54 1.00 1.00 1.00 0.50 1.00 1.00 0.67 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 3347.69 N/A 1.00 1.00 1.00 1,00 1.00 0.45 1.00 1.00 1.00 1.00 1.00 1.00 N/A=Not Applicable Pall=Allowable Pull without Reduced Inspection Vali=Allowable Shear without Reduced Inspection Pallr=Allowable Pull with Reduced Inspection Vallr=Allowable Shear with Reduced Inspection
WEST CCW PUMP Building: AUXILIARY                     Floor El.: 609.00                 Room, Row/Col: HALLWAY, Manufacturer, Model, Etc.: INGERSOLL-RAND       CO 9000GPM 0.375          -0.150          0.100          4 428
=Outlier X=Reduction Factor Not Used RT=Reduction Factor for Type of Anchorage RN=Reduction Factor for Installation Adequacy RL=Reduction Factor for Embedment RG=Reduction Factor for Gap at Anchors RS=Reduction Factor for Spacing RE=Reduction Factor for Edge Distance RF=Reduction Factor for Concrete Strength RC=Reduction Factor for Concrete Cracks RR=Reduction Factor for Essential Relays RP=Reduction Factor for Base Stiffness and Prying Action RB=Reduction Factor for Base Strength and Load Path RM=Reduction Factor for Embed.Steel and Pads al is Re Is'nalysis Performed:
          -0.375          0.150          -0.100          4.181 0.375          0.150          -0.100          3.741
Yes Type of Analysis: Regular Spectral Accelerations (G's)No'-S 0.375-0.375-0.375 0.375 E-W 0.150-0.150 0.150-0.150 Vertical 0.100-0.100 0.100-0.100 Safety Factor 3.680 4.948 4.002 4.555 D.C.COOK Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 11 of 11 ID: 1-PP-10W(Rev.0)Class: 5.Horizontal Pumps
          -0.375          -0.150          0.100          4.641 0.150          0.375          0.100          2.376 10        -0.150          -0.375          -0.100          3.601 0.'I50        -0.375          0.100          3.403 12        -0.150          0.375          -0.100          2.503 13        -0.150          0.375          0.100          2.479 14        0.150          -0.375          -0.100          3.448 15        0.150          0.375          -0.100          2.400
          -0.150          -0.375          0.100          3.418 0.150          0.150          0.250          4.907 18        -0.150          -0.150          -0.250          7.950 19        0.150          0.150          -0.250          5.450 20        -0.150          -0.150          0.250          6.260 21        -0.150          0.150          0.250          4.909 22        0.150          -0.150         -0.250          7.606 23        0.150         -0.150           0.250          6.417 24        -0.150          0.150          -0.250          5.768 Minimum Safety Factor:    2.376 The Anchorage Capacity is    2.376 times greater than the Demand


== Description:==
                                                            **12 CHP 5021.CCD.019 ATTACHNENT NO .                1 ANCHOR  NSPECTXON DATA SHE
        .. Unxt                      Bldg.                          Zocatzon I- t    -
at>.on dwg.    / Rev.        Equipment No.        iow'nstal Anchora e Arran ement Sketch X- PP-(ox
        'IO          <'- z'l~                  "l-3 l~
0      0                        $ ~/~"
                                        ~$                                  cJ cP I                                I IN
          +0 I
A 0                pk 8
                                                "I- 3.VI INOIANA MICHIGA              'Efi SITE OESIGN CON RC WORKING C jUL 201 LERKT Drawn by:                                                     Date:            t"-  /Z V/ ~Z.
Verified by:                                                  Date:
Qual. /Cert. Inspector Reviewed by.                                                  Date:
                .Construction Anc or Review Engineer Page      1 of  3 Revision      3
 
                                                  ~~ Jd ('HJ 502 J CCD. Qlg
                                                                      ~
ATTACHMENT NO.          l CHOR  NSP CT ON DATA SHE CG RAh Unit                  Bldg.                Locat1'on X- PP-lnvl Installation  dwg. /  Rev.      Equ1pment No.
Anchora e Arran ement Sketch INOIANA IIICIIIGANP0%'R SITE DESIGN CONTROLLcO WORKING COPY JUL 201995 LERK  +
Drawn by:                                        Date:        / zl Verified by:                                      Date:
Qual. /Cert. Xnspector Reviewed by:      r-                              Date:      1 l    I <2 Construct1on      chor Rev1ew Engineer Page    1  of 3 Revision


WEST CCW PUMP Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: HALLWAY, Manufacturer, Model, Etc.: INGERSOLL-RAND CO 9000GPM 10 12 13 14 15 18 19 20 21 22 23 24 0.375-0.375 0.375-0.375 0.150-0.150 0.'I50-0.150-0.150 0.150 0.150-0.150 0.150-0.150 0.150-0.150-0.150 0.150 0.150-0.150-0.150 0.150 0.150-0.150 0.375-0.375-0.375 0.375 0.375-0.375 0.375-0.375 0.150-0.150 0.150-0.150 0.150-0.150-0.150 0.150 0.100-0.100-0.100 0.100 0.100-0.100 0.100-0.100 0.100-0.100-0.100 0.100 0.250-0.250-0.250 0.250 0.250-0.250 0.250-0.250 4 428 4.181 3.741 4.641 2.376 3.601 3.403 2.503 2.479 3.448 2.400 3.418 4.907 7.950 5.450 6.260 4.909 7.606 6.417 5.768 Minimum Safety Factor: 2.376 The Anchorage Capacity is 2.376 times greater than the Demand
ATTACHMENT NO.
**12 CHP 5021.CCD.019 ATTACHNENT NO.1 ANCHOR NSPECTXON DATA SHE..Unxt Bldg.Zocatzon I-t-iow'nstal at>.on dwg./Rev.Anchora e Arran ement Sketch X-PP-(ox Equipment No.'IO<'-z'l~"l-3 l~-0 0$~/~"~$cP I cJ I IN+0 I A 0 pk 8"I-3.VI INOIANA MICHIGA SITE OESIGN CON WORKING C jUL 201 RC'Efi LERKT Drawn by: Verified by: Date: t"-/Z V/~Z.Date: Qual./Cert.Inspector Reviewed by.Date:.Construction Anc or Review Engineer Page 1 of 3 Revision 3
ANCHOR ZNSPECTXON DATA S O I   A Unxt                       Bldg.                Location
~~Jd ('HJ 502 J~CCD.Qlg ATTACHMENT NO.l Unit CHOR NSP CT ON DATA SHE Bldg.CG RAh Locat1'on Installation dwg./Rev.Anchora e Arran ement Sketch X-PP-lnvl Equ1pment No.INOIANA IIICIIIGAN P0%'R SITE DESIGN CONTROLLcO WORKING COPY JUL 201995 LERK+Drawn by: Verified by: Reviewed by: Date:/zl Date: Qual./Cert.Xnspector r-Date: 1 l I<2 Construct1on chor Rev1ew Engineer Page 1 of 3 Revision ATTACHMENT NO.ANCHOR ZNSPECTXON DATA S O I A Unxt-5 8t'o-'t Bldg.Location g-I P-IQWf Znstallatz.on dwg./Rev.Anchora e Arran ement Sketch Equipment No.Q l)~z-FLE,U.Ux.ew uonxx.ea~urn+INOIANA IAICHIGAN POVIER SITE DESIGN CONTROLLED WORKING COPY)Ut.20$9SK LERK T Drawn by: Date: Date:+-lF-Qua./Cert:.Xn pector Reviewed by: Dat Construction nchor Review Engineer Verified by: 1-('i-9 x Page 1 of 3 Revision 0
          -5 8t'o-'t                             g- I P-   IQWf Znstallatz.on dwg.   /   Rev.       Equipment No.
J4 QJ4L Vv4 4~QPP gd y.TTACHMZNT Np.Equipment No.:-PP-'IO~Anchor type:~oi-~YPE.Z, Dia: Tightness established by: 0"Snug Fit" Torque Wrench No.: Tightness verified?0 Yes Dwg No.: Dwg No.: l2: 3A3g 0 Torque Cal, Due Date: 0 No Nk'ns ruc Date:--2 ion Date: ruc 1 n ARE Equipment base flexible?0 Yes g, No ons Bolt ID Gaps Comments Anchor len th Protruding
Anchora e Arran ement Sketch Q l)~z-INOIANA IAICHIGAN POVIER SITE DESIGN CONTROLLED WORKING COPY
<g len th.~Embedment fI v'1" Il fq-3~Bolt-P r1 Concrete condition Edge distance-'In<i"~~4,~r~'a KDc.E, oe Qo<-~TK'XC.T.Pac g'lq'A~Anchor s acin Anchor an larit Thread engagement
                                                              )Ut. 20   $ 9SK FLE,U. Ux.ew uonxx.ea ~urn+
~~I Z-5q 2:5~(Z.-'3 2-Sg Q~Q<Oa OK Q<Og Qa g.Qa Q<O<OK Comments: C s~o-S~aucv.P DR.x, V erified by: Q a./Cert.Inspector Revieved by: Construct1on IHOIAHA MIC4IGAW POWER WORKlt(G COPY JUL 20 1993 Date: ago 2 of 3 e r ion 3
LERK T Drawn by:                                           Date:
Verified by:                                        Date:       +-lF-Qua   ./Cert:. Xn pector Reviewed by:                                         Dat         1-('i-9 x Construction      nchor Review Engineer Page   1   of   3 Revision


S&A DEPARTMENT CONTROLLED DOCUMENT CopY NO.~SHP 5050 NDE pp8 ATTACHNEHT NO.ULTRASONIC TEST REPORT JOB ORDER NO.: REPORT DATE: u-aO~i9 REQUEST NO.IDENTIFICATION Unit On c Component J-7'P-)0 0 Item Material Test Unit/S/N 4 Frey./Diameter Jjz.Reference Standard 4-8 Couplant/Batch No.4<./TEST DATA REMARKS 4 wA-'~PERFORMED BY: REVIEWED BY;I.EVEE'~I EVEI:~DATE: DATE: FORM NO.12 SHP 5050 NDE.008-1 Page 1 of 1 Revision 0 Equip Xd: 2-PP-46-4 Train: 1 Equip Class: 5 Drawing No.: 12-5131 12-5131A tion: RI Syst: em: BORON MAKEUP (CVCS)Equip Desc: BORIC ACXD STORAGE TANKS TRANSFER PUMP g4 Building: AUXILXARY Room: BORXC ACID STORAGE TANK AREA Elev: 587 Sort: S,R Notes: Normal State: NR Desired State: R Power Req'd: Y Support System Drawing: 2-12010 2-98272 Req'd Support Comp: 2-AB-A-1D Safety Related Status: NUCLEAR SR Min/Opt: MIN Alias No: Power Train: B ,Comp Served: BAST MFR: GOULDS PUMPS XNC.Mo el: 3196 1: 2-BA 2-HSD2 Elem.Drawing: 2-98272 Wiring Drawing: 2-94217 Power Source: 2-AB-A-1D Walkdown: F Relay Eval: Y Comp Type: PUMP Iso Drawing: 0-DR-724'ocation: XN THE MXDDLE EAST REGION OF THE ROOM, 15 FEET'OUTHEAST OF MXDDLE BORIC ACXD STORAGE TANK 512-TK-12M, NEAR THE FLOOR D.C.COOK Unit 2 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 1 of4 ID: 2-PP-46-4 (Rev.0)Class: 5.Horizontal Pumps Building: AUXILIARY Floor El.: 587.00 Manufacturer, Model, Etc.: GOULDS PUMPS INC.3196 SEISMIC CAPACITY VS DEMAND 1.Elevation where equipment receives seismic input
0 J4  QJ4L  Vv4 4 ~ QPP gd y
                                                                            .TTACHMZNT Np.
Equipment No.:       - PP-   'IO~                                          Dwg No     .:
Anchor type: ~  oi      - ~YPE. Z,        Dia:                           Dwg    No.: l2: 3A3g Tightness established by: 0 "Snug Fit" 0 Torque Torque Wrench No.:                                           Cal, Due Date:
Tightness verified? 0 Yes 0 No Nk'ns                                      Date:             2 ruc ion Equipment base flexible? 0 Yes g, No                                     Date:
ons ruc 1 n ARE Bolt ID                                                                                      Comments Gaps Anchor len th Protruding <g          fI v'1"  Il fq-len th .~
Embedment                                                  3  ~
Bolt- P
                          - 'In<i"                ~~
                                                            ~r~'a r1 Concrete condition 4,                                          KDc.E, oe Edge                                                                                    Qo<- ~TK'XC.T.
distance                                                                                    Pac g'lq'A~
                                            ~          I Anchor      Z-5q 2:5~(       Z.-'3
                                                    ~
s  acin                                2- Sg Anchor                  Q<                          Q<
an    larit    Q~                Oa        OK                  Og Thread      Qa            g. Qa      Q<        O<        OK engagement Comments:                                                       DR.x, C    s  ~    o  - S~aucv. P V erified by:
Q a  ./Cert. Inspector Revieved by:                                            IHOIAHA MIC4IGAW POWER        Date:
Construct1on                                WORKlt(G COPY JUL 20 1993 ago    2  of  3 e    r ion    3


== Description:==
  & A DEPARTMENT NO.~
S                                                        SHP  5050 NDE pp8 CONTROLLED DOCUMENT                                  ATTACHNEHT NO.
CopY ULTRASONIC TEST REPORT JOB ORDER  NO.:             REPORT DATE:  u-aO~i9    REQUEST NO.
IDENTIFICATION Unit On c                            Test Unit/ S/N 4 Component    J - 7'P- )0 0            Frey./Diameter        Jjz.
Item                                  Reference Standard        4 -8 Material                              Couplant/Batch No.      4    <./
TEST DATA REMARKS wA-'~
4 PERFORMED BY:                              I.EVEE'~          DATE:
REVIEWED BY;                                I EVEI:~          DATE:
FORM NO. 12 SHP 5050 NDE.008-1                  Page  1 of  1 Revision  0


BORIC ACID STORAGE TANKS TRANSFER PUMP f/4 Room, Row/Col: BORIC ACID STOR TANK AREA-IN THE MIDDLE EAST REGION OF THE ROOM, 15 FEET SOUTHEAST OF MIDDLE BORIC ACID STORAGE TANK It/12-TK-12M, NEAR THE FLOOR 587.00 Elevation of seismic input below about 40'rom grade (grade=608.00)3.Equipment has fundamental frequency above about 8 Hz (est.frequency=20.00)Capacity based on: 1.50" Bounding Spectrum 5.Demand based on: 1.00 Realistic Median-Centered Floor Response Spectra N/A N/A 1.200 LOG: 0.080 l I\I\I I I I I I j/I r~0.50 LOG Hz Capacity.....Demand 50.00 Capacit Demand 1 Demand 2 File C:tGIP>GIP'Lspectra.des C:tGIPIPROJ0034tspectra.des C:tGIPIPROJ0034'Lspectra.des Record Label(Bounding Spectrum BUILDING Auxilia IELEVATION 587IBROADEN(N BUILDING Auxilia ELEVATION 587 BROADENIN Does capacity exceed demand?
Equip Xd: 2-PP-46-4        Train:  1  Equip Class: 5 Drawing No.: 12-5131        12-5131A tion:    RI Syst: em:  BORON MAKEUP (CVCS)
Equip Desc:      BORIC ACXD STORAGE TANKS TRANSFER PUMP g4 Building:    AUXILXARY      Room: BORXC ACID STORAGE TANK AREA Elev:    587    Sort: S,R        Notes:
Normal State: NR          Desired State:  R  Power Req'd: Y Support System Drawing: 2-12010 2-98272 Req'd Support Comp: 2-AB-A-1D Safety Related Status:        NUCLEAR SR        Min/Opt: MIN Alias    No:        Power  Train:  B
,Comp    Served:  BAST MFR: GOULDS PUMPS XNC.
Mo  el:  3196 1: 2-BA          2-HSD2 Elem. Drawing: 2-98272 Wiring Drawing: 2-94217 Power Source:      2-AB-A-1D Walkdown:    F      Relay Eval:  Y Comp    Type:  PUMP Iso Drawing: 0-DR-724
'ocation:      XN THE MXDDLE EAST REGION OF THE ROOM, 15 FEET OF MXDDLE BORIC ACXD STORAGE TANK   'OUTHEAST 512-TK-12M, NEAR THE FLOOR


D.C.COOK Unit 2 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 2 of 4 ID: 2-PP-46-4 (Rev.0)Class: 5.Horizontal Pumps Building: AUXILIARY Floor El.: 587.00 Manufacturer, Model, Etc.: GOULDS PUMPS INC.3196
D.C. COOK Unit 2                                           GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                            Status: Yes Sheet 1 of4 ID: 2-PP-46-4   ( Rev. 0 )                               Class: 5. Horizontal Pumps


== Description:==
== Description:==
BORIC ACID STORAGE TANKS TRANSFER PUMP f/4 Building: AUXILIARY                              Floor El.: 587.00                      Room, Row/Col: BORIC ACID STOR TANK AREA - IN THE MIDDLE EAST REGION OF THE ROOM, 15 FEET SOUTHEAST OF MIDDLE BORIC ACID STORAGE TANKIt/12-TK-12M, NEAR THE FLOOR Manufacturer, Model, Etc.: GOULDS PUMPS INC. 3196 SEISMIC CAPACITY VS DEMAND
: 1.      Elevation where equipment receives seismic input                                                          587.00 Elevation of seismic input below about 40'rom grade (grade = 608.00)                                        N/A
: 3.      Equipment has fundamental frequency above about 8 Hz (est. frequency = 20.00)                              N/A Capacity based on:          1.50 " Bounding Spectrum
: 5.      Demand based on:            1.00 Realistic Median-Centered Floor Response Spectra 1.200 l
I
                                                                        \
I                  \
I II LOG                        I I
I
                                          /j I
:            r~
0.080 0.50                                  LOG        Hz                            50.00 Capacity    ..... Demand File                                              Record Capacit        C:tGIP>GIP'Lspectra.des                          Label(Bounding Spectrum Demand 1        C:tGIPIPROJ0034tspectra.des                      BUILDINGAuxilia IELEVATION587IBROADEN(N Demand 2        C:tGIPIPROJ0034'Lspectra.des                      BUILDINGAuxilia ELEVATION 587 BROADENIN Does capacity exceed demand?


BORIC ACID STORAGE TANKS TRANSFER PUMP&Room, Row/Col: BORIC ACID STOR TANK AREA-IN THE MIDDLE EAST REGION OF THE ROOM, 15 FEET SOUTHEAST OF MIDDLE BORIC ACID STORAGE TANK 012-TK-12M, NEAR THE FLOOR CAVEATS-BOUNDING SPECTRUM HP/BS Caveat 1-Earthquake Experience Equipment Class HP/BS Caveat 2-Driver and Pump on Rigid Skid.HP/BS Caveat 3-Thrust Bearings in Both Axial Directions HP/BS Caveat 4-Check of Long Unsupported Piping.HP/BS Caveat 5-Base Vibration Isolation System Checked HP/BS Caveat 6-Sufficient Slack and Flexibility of Attached Lines.HP/BS Caveat 7-Adequate Anchorage.
D.C. COOK Unit 2                                 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                Status: Yes Sheet 2 of 4 ID: 2-PP-46-4 ( Rev. 0 )                           Class: 5. Horizontal Pumps
HP/BS Caveat 8-Potential Chatter of Essential Relays Evaluated.
HP/BS Caveat 9-No Other Concerns.Yes Yes Yes Yes Yes Yes Yes N/A Yes Is the intent of all the caveats met for Bounding Spectrum7 ANCHORAGE 1.The sizes and locations of anchors have been determined 2.Appropriate equipment characteristics have been determined (mass, CG, natural freq., damping, center of rotation).
3.The type of anchorage is covered by the GIP 4.The adequacy of the anchorage installation has been evaluated (weld quality and length, nuts and washers, expansion anchor tightness, etc.)5.Factors affecting anchorage capacity or margin of safety have been considered:
embedment length, anchor spacing, free-edge distance, concrete strength/condition, and concrete cracking.6.For bolted anchorages, any gaps under the base are less than 1/4 7.Factors affecting essential relays have been considered:
gaps under the base, capacity reduction for expansion anchors.8.The base has adequate stiffness and the effect of prying action on anchors has been considered.
9.The strength of the equipment base and the load path to the CG is adequate 10.The adequacy of embedded steel~grout pads or large concrete pads have been evaluated.
11.The anchorage capacity exceeds the demand.Are anchorage requirements met?Yes Yes Yes Yes Yes.Yes N/A Yes Yes Yes Yes D.C.COOK Unit 2 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 3 of 4 ID: 2-PP-46-4 (Rev.0)Class: 5.Horizontal Pumps Building: AUXILIARY Floor El.: 587.00 Manufacturer, Model, Etc.: GOULDS PUMPS INC.3196


== Description:==
== Description:==
BORIC ACID STORAGE TANKS TRANSFER PUMP &
Building: AUXILIARY                        Floor El.: 587.00                Room, Row/Col: BORIC ACID STOR TANK AREA - IN THE MIDDLE EAST REGION OF THE ROOM, 15 FEET SOUTHEAST OF MIDDLE BORIC ACID STORAGE TANK 012-TK-12M, NEAR THE FLOOR Manufacturer, Model, Etc.: GOULDS PUMPS INC. 3196 CAVEATS - BOUNDING SPECTRUM HP/BS    Caveat  1 - Earthquake Experience Equipment Class                                              Yes HP/BS    Caveat  2- Driver and Pump on Rigid Skid.                                                      Yes HP/BS    Caveat  3 - Thrust Bearings in Both Axial Directions                                            Yes HP/BS    Caveat  4 - Check of Long Unsupported Piping.                                                    Yes HP/BS    Caveat  5 - Base Vibration Isolation System Checked                                              Yes HP/BS    Caveat  6 - Sufficient Slack and Flexibility of Attached Lines.                                  Yes HP/BS    Caveat  7 - Adequate Anchorage.                                                                  Yes HP/BS    Caveat  8 - Potential Chatter of Essential Relays Evaluated.                                    N/A HP/BS    Caveat  9 - No Other Concerns.                                                                  Yes Is the intent of all the caveats met for Bounding Spectrum7 ANCHORAGE
: 1. The sizes and locations of anchors have been determined                                                Yes
: 2. Appropriate equipment characteristics have been determined (mass, CG, natural freq.,                  Yes damping, center of rotation).
: 3. The type of anchorage is covered by the GIP                                                          Yes
: 4. The adequacy of the anchorage installation has been evaluated (weld quality and length, nuts          Yes and washers, expansion anchor tightness, etc.)
: 5. Factors affecting anchorage capacity or margin of safety have been considered: embedment              Yes.
length, anchor spacing, free-edge distance, concrete strength/condition, and concrete cracking.
: 6. For bolted anchorages, any gaps under the base are less than 1/4                                      Yes
: 7. Factors affecting essential relays have been considered: gaps under the base, capacity                N/A reduction for expansion anchors.
: 8. The base has adequate stiffness and the effect of prying action on anchors has been                  Yes considered.
: 9. The strength of the equipment base and the load path to the CG is adequate                            Yes
: 10. The adequacy of embedded steel grout pads or large concrete pads have been evaluated.
                                        ~                                                                Yes
: 11. The anchorage capacity exceeds the demand.                                                          Yes Are anchorage requirements met?


BORIC ACID STORAGE TANKS TRANSFER PUMP I/4 Room, Row/Col: BORIC ACID STOR TANK AREA-IN THE MIDDLE EAST REGION OF THE ROOM, 15 FEET SOUTHEAST OF MIDDLE BORIC ACID STORAGE TANK 012-TK-12M, NEAR THE FLOOR INTERACTION EFFECTS 1.Soft targ'ets are free from impact by nearby equipment or structures 2.If the equipment contains sensitive relays, it is free from all impact by nearby equipment or structures.
D.C. COOK Unit 2                                  GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                  Status: Yes Sheet 3 of 4 ID: 2-PP-46-4     ( Rev. 0 )                      Class: 5. Horizontal Pumps
3.Attached lines have adequate flexibility.
4.Overhead equipment or distribution systems are not likely to collapse.5.No other adverse concerns were found.Yes NIA Yes Yes Yes ls equipment free of interaction effects?IS E U P ENTSEISIVIICA Y D U T~Ys COMMEN S SRT: John D.Stevenson, Paul Wilson, Rick Leonard, and kailash Mahajan on 10/05/93.GOULDS PUMP.Anchorage Four 5/8" diameter Ram anchor expansion bolts.Pump WT 511lbs, C.G=12 3/8" above base.The 5/8" diameter expansion anchors have 4" embedment into the base concrete below the 8" pad, per the anchorage inspection.
This judged adequate by the SRT for the light (511 (bs)pump.Attached piping is 2" or less.Nozzle toads judged not to be a problem by the SRT.Picture 0 49, Wk1, Tm1, Disk1.Evaluated by: Date: achm t: Pictures


D.C.COOK Unit 2 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 4 of 4 ID: 2-PP-46-4 (Rev.0)Class: 5.Horizontal Pumps
==
Description:==
BORIC  ACID STORAGE    TANKS    TRANSFER      PUMP I/4 Building: AUXILIARY                        Floor El.: 587.00                    Room, Row/Col: BORIC ACID STOR TANK AREA - IN THE MIDDLE EAST REGION OF THE ROOM, 15 FEET SOUTHEAST OF MIDDLE BORIC ACID STORAGE TANK012-TK-12M, NEAR THE FLOOR Manufacturer, Model, Etc.: GOULDS PUMPS INC. 3196 INTERACTION EFFECTS
: 1. Soft targ'ets are free from impact by nearby equipment or structures                                    Yes
: 2. If the equipment contains sensitive relays, it is free from all impact by nearby equipment or          NIA structures.
: 3. Attached lines have adequate flexibility.                                                              Yes
: 4. Overhead equipment or distribution systems are not likely to collapse.                                  Yes
: 5. No other adverse concerns were found.                                                                  Yes ls equipment free of interaction effects?
IS E U P      ENTSEISIVIICA      Y  D    U T                                                              ~Ys COMMEN S SRT: John D. Stevenson, Paul Wilson, Rick Leonard, and kailash Mahajan on 10/05/93.
GOULDS PUMP.
Anchorage Four 5/8" diameter Ram anchor expansion bolts.
Pump WT 511lbs, C.G=12 3/8" above base.
The 5/8" diameter expansion anchors have 4" embedment into the base concrete below the 8" pad, per the anchorage inspection.
This judged adequate by the SRT for the light (511 (bs) pump.
Attached piping is 2" or less. Nozzle toads judged not to be a problem by the SRT.
Picture 0 49, Wk1, Tm1, Disk1.
Evaluated by:                                                                          Date:
achm      t: Pictures


== Description:==
D.C. COOK Unit 2                              GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                            Status: Yes Sheet 4 of 4 ID: 2-PP-46-4  ( Rev. 0 )                    Class: 5. Horizontal Pumps
 
==
Description:==
BORIC ACID STORAGE TANKS TRANSFER PUMP N4 Building: AUXILIARY                    Floor El.: 587.00                Room, Row/Col: BORIC ACID STOR TANKAREA - IN THF MIDDLE EAST REGION OF THE ROOM, 15 FEET SOUTHEAST OF MIDDLE BORIC ACID STORAGE TANKf/12-TK-12M, NEAR THE FLOOR Manufacturer, Model, Etc.: GOULDS PUMPS INC. 3196 ICTUR S Boric Acid Storage Tank Transfer Pump 2-PP-46A-
                    ~
Anchors
 
Coo Component No.                                  Claaa Any  payticular prea the Seismic Review Team should pay extra attention tot Yam  ~    No W            (If yea, check items that apply. )
Anchor  Type Anchor  Diameter Anchor  Spacing Anchor  Number Anchor  Embedment Anchor  Edge Distance Anchor  Gap Anchor  Thread~Engagement Anchor  Grip Angularity v'nchor Concrete Crack Others (describe          briefly}
If there  is concern        for Design Basis Discrepancy, circle the applicable item and explain.
: 1. Hardvare Maintenance Type Discrepancy
: 2.      Drawing Up&,te Type Discrepancy
: 3.      Significant Operability/Doaign Basis Discrepancy Others Condition:
l4 Actions Taken:
PreI ared By T              Data
 
                                                                    *(* '. CHP 5021.CCD.019 ZTACHMENT NO.          1 NCHOR        NS  ECTION DATA SH E l          TO A    I= %ASK A,Re.I'-.
Unxt                                Bl g.                      Location Installation        dwg.        /  Rev.        Equipment No.
Anchora e Arran ement Sketch M5QLATi CIA Ol I  l
(
AP)Chorq CcO!
l ARE    Z~<<~
(
fyZ V)IR:P.
I I
1 I
I                    l
                  ',O'-      ',OI gI l
Ol All /I J/C.IIORq+g Pf r      ~ I    J PLA-rE >g  pPz x pP~      ~~
                      />>'o" INQIANA hIICHIGhN POwFR SITE DESIGN CONTRQI.LEO WORKING COPY
                    /-'8&#xc3;"                                      JUL t      Z  t995 PL%,M VIKVf I.ERK  T Drawn by:
Verified by:
Reviewed by:
Qua 7'ate:
                          ./Cert. Inspector
                          ~
Construction
                                        ~
An  hor Revs,ew  Engineer Date:
Date:
Page  1 Revision of 1
3


BORIC ACID STORAGE TANKS TRANSFER PUMP N4 Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: BORIC ACID STOR TANK AREA-IN THF MIDDLE EAST REGION OF THE ROOM, 15 FEET SOUTHEAST OF MIDDLE BORIC ACID STORAGE TANK f/12-TK-12M, NEAR THE FLOOR Manufacturer, Model, Etc.: GOULDS PUMPS INC.3196 ICTUR S Boric Acid Storage Tank Transfer Pump 2-PP-46A-~Anchors Coo Component No.Claaa Any payticular prea the Seismic Review Team should pay extra attention tot Yam~No W (If yea, check items that apply.)Anchor Type Anchor Diameter Anchor Spacing Anchor Number Anchor Embedment Anchor Edge Distance Anchor Gap Anchor Thread~Engagement Anchor Grip v'nchor Angularity Concrete Crack Others (describe briefly}If there is concern for Design Basis Discrepancy, circle the applicable item and explain.1.2.3.Hardvare Maintenance Type Discrepancy Drawing Up&,te Type Discrepancy Significant Operability/Doaign Basis Discrepancy Others Condition:
                                  ~ ~ ~
l4-33-Actions Taken: PreI ared By T Data
              ~ ~     l               ~   ~
*(*'.CHP 5021.CCD.019 ZTACHMENT NO.1 Unxt NCHOR NS ECTION DATA SH E Bl g.l TO A I=%ASK A,Re.I'-.Location Installation dwg./Rev.Anchora e Arran ement Sketch Equipment No.M5QLAT i CIA Ol I l (AP)Chorq CcO!l (ARE Z~<<~fyZ V)IR:P.I I I 1 I l gI l Ol',O'-',OI All/I J/C.IIORq+g Pf/>>'o"/-'8&#xc3;" PL%,M VIKVf r~I J PLA-rE>g pPz x pP~~~INQIANA hIICHIGhN POwFR SITE DESIGN CONTRQI.LEO WORKING COPY JUL t Z t995 I.ERK T Drawn by: Verified by: Date: Date: Qua./Cert.Inspector~~Reviewed by: 7'ate: Construction An hor Revs,ew Engineer Page 1 of 3 Revision 1
                        ~ ~             r
~~l~~~~~~~r~%~1~II o s~~~R%WWK~%WW&&
                                        ~     %~1
~ II                             o R%WWK~%WW&&
C4541%1LHLL KlSSWL1%%L
C4541%1LHLL KlSSWL1%%L
~LISWLRSL 5%5%WKRILSL mmWSLLXLL~HRRKR'%%saaslmMMM&i&
            ~LISWLRSL 5%5%WKRILSL
5%L%SKRRLR I r 4 a r i k JSC~r i~  
  ~
s ~
        ~
mmWSLLXLL
            ~HRRKR'%%saaslmMMM&i&
5%L%SKRRLR Ir                4 a                   r ik JSC~r i   ~


-pp'>T]ig,lg l (("~i'!":iROLl.E%
            - pp '> T]ig,lg l (                               2 SHP 50SO NDE.008 DOCui4&4T                              ATTACHMENT NO. 1
DOCui4&4T 2 SHP 50SO NDE.008 ATTACHMENT NO.1 UK TRASON I C TEST REPORT JOB ORDER NO.: REQUEST NO./A IDENTIFICATION Unit Component Item Material Other 5 P.s Test, Unit/S/N Freq./Diameter Reference Standard Couplant/Batch No.g l4 DS/TEST DATA REMARKS nc r PERFORMED BX: REUIEMED BY: FORM NO.12 SHP SOSO NDE.008-1 Page 1 of Revision 0:~Z-'3 Database: K:SSEL1B.DBF Equip XD: 1-HV-AFP-M1 Train: 2 Equip Class:9 ing No.: 12-5148B ction: HVAC System: TURBXNE BUXLDXNG VENTXLATION Equip Desc:.EAST MOTOR DRXV AUX FEEDWATER PUMP ROOM EXHAUST FAN Building: TURBXNE Room: EAST MOTOR DRIV.AUX FEEDWATER PUMP ROOM Elev: 591 Sort: S,R Notes: Normal State: Desired State: Power Req'd: Y Support System Drawing: 1-12030 1-98214 Req'd Support Comp: 1-AB-D-R2D Safety Related Status: NUCLEAR SR Min/Opt: MIN'lias No: Power Train: A Comp Served: EAST MOTOR DRXV AUX FEED PUMP MFR: 1: 10000 FT 3/MIN Panel: Elem.Drawing: 1-98214 Wiring Drawing: 1-94228 Power Source: 1-AB-D-R2D Walkdown: F Relay Eval Comp Type: VENT FAN Y Xso Drawing: Location: XN THE SW CORNER OF THE ROOM, 10'W OF EAST MDAFWP, ON THE WEST WALL, 12'BOVE THE FLOOR.
("~ i'!":iROLl.E%
D.C.COOK Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet1 of3 ID: 1-HV-AFP-M1 (Rev.0)Class: 9.Fans
I UK TRASON C TEST REPORT JOB ORDER     NO.:                                     REQUEST NO.   /A IDENTIFICATION P.s Unit                                    Test, Unit/ S/N Component                                Freq./Diameter               DS /
Item                                    Reference Standard Material                                Couplant/Batch No.g l4 Other 5 TEST DATA REMARKS nc   r PERFORMED BX:                                                     :~Z- '3 REUIEMED BY:
FORM NO. 12 SHP SOSO NDE.008-1                 Page 1 of Revision   0


== Description:==
Database:   K:SSEL1B.DBF Equip XD: 1-HV-AFP-M1 Train:    2    Equip Class:9 ing No.: 12-5148B ction:  HVAC System:  TURBXNE BUXLDXNG VENTXLATION Equip Desc:. EAST MOTOR DRXV AUX FEEDWATER PUMP      ROOM EXHAUST FAN Building:  TURBXNE    Room: EAST MOTOR DRIV. AUX FEEDWATER PUMP ROOM Elev: 591    Sort: S,R      Notes:
Normal State:        Desired State:    Power Req'd: Y Support System Drawing: 1-12030      1-98214 Req'd Support Comp: 1-AB-D-R2D Safety Related Status: NUCLEAR    SR        Min/Opt:
MIN'lias No:      Power Train: A Comp  Served:  EAST MOTOR DRXV AUX FEED PUMP MFR:
1: 10000 FT 3/MIN Panel:
Elem. Drawing: 1-98214 Wiring Drawing: 1-94228 Power Source:    1-AB-D-R2D Walkdown:  F    Relay Eval  Y Comp  Type: VENT  FAN Xso Drawing:
Location:  XN THE SW CORNER OF THE ROOM,    10'W  OF EAST MDAFWP, ON THE WEST WALL, 12'BOVE THE FLOOR.


EAST MOTOR DRIV AUX FEEDWATER PUMP ROOM EXHAUST FAN Building: TURBINE Floor El.: 591.00 Room, Row/Col: E MOTOR DRIV AUX FDWTR PUMP RM, IN THE SW CORNER OF THE RM, 10'W OF E MDAFWP, ON THE W WALL, 12'BOVE THE FLR.Manufacturer, Model, Etc.: JOY MANUFACTURING CO.~10000 FT"3/MIN SEISMIC CAPACITY VS DEMAND Elevation where equipment receives seismic input 2.Elevation of seismic input below about 40'rom grade (grade=608.00)Equipment has fundamental frequency above about 8 Hz (est.frequency=10.00)4.Capacity based on: 1.00 Bounding Spectrum 5.Demand based on: 1.00" Design Basis Ground Response Spectrum 591.00 Yes Yes 0.000 LOG 0.090/r r r 0.50 LOG Hz Capacity.....Demand 33.00, Capacit Demand 1 Demand 2 File C:tGIPtGIPtspectra.des C:LGIPLPROJ0035tspectra.des CAGIPLPROJ0035tspectra.des Record Label Bounding Spectrum BUILDING Ground ELEVATION 608 BROADEN N BUILDING Ground ELEVATIONI608 BROADEN N Does capacity exceed demand' D.C.COOK Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 2 of 3 ID: 1-HV-AFP-M1 (Rev.0)Class: 9.Fans
D.C. COOK Unit 1                                       GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                        Status: Yes Sheet1 of3 ID: 1-HV-AFP-M1 ( Rev. 0         )                   Class: 9. Fans


== Description:==
== Description:==
EAST MOTOR DRIV AUX FEEDWATER PUMP ROOM EXHAUST FAN Building: TURBINE                              Floor El.: 591.00                    Room, Row/Col: E MOTOR DRIV AUX FDWTR PUMP RM, IN THE SW CORNER OF THE RM, 10'W OF E MDAFWP, ON THE W WALL, 12'BOVE THE FLR.
Manufacturer, Model, Etc.: JOY MANUFACTURINGCO. 10000 FT"3/MIN  ~
SEISMIC CAPACITYVS DEMAND Elevation where equipment receives seismic input                                                      591.00
: 2. Elevation of seismic input below about 40'rom grade (grade = 608.00)                                    Yes Equipment has fundamental frequency above about 8 Hz (est. frequency = 10.00)                            Yes
: 4.      Capacity based on:            1.00 Bounding Spectrum
: 5.      Demand based on:              1.00 " Design Basis Ground Response Spectrum 0.000 LOG
                                              /
r r
r 0.090 0.50                          LOG        Hz                        33.00, Capacity  ..... Demand File                                          Record Capacit        C:tGIPtGIPtspectra.des                        Label Bounding Spectrum Demand 1        C:LGIPLPROJ0035tspectra.des                  BUILDINGGround ELEVATION 608 BROADEN N Demand 2        CAGIPLPROJ0035tspectra.des                    BUILDING Ground ELEVATIONI608 BROADEN N Does capacity exceed demand'


EAST MOTOR DRIV AUX FEEDWATER PUMP ROOM EXHAUST FAN Building: TURBINE Floor El.: 591.00 Room, Row/Col: E MOTOR DRIV AUX FDWTR PUMP RM, IN THE SW CORNER OF THE RM, 10'W OF E MDAFWP, ON THE W WALL, 12'BOVE THE FLR.Manufacturer, Model, Etc.: JOY MANUFACTURING CO., 10000 FT"3/MIN CAVEATS-BOUNDING SPECTRUM FAN/BS Caveat 1-Earthquake Experience Equipment Class FAN/BS Caveat 2-Drive Motor and Fan Mounted on Common Base.FAN/BS Caveat 3-Long Shafts Supported at Fan and at Motor.FAN/BS Caveat 4-No Possibility of Excessive Duct Distortion Causing Binding or Misalignment of Fan.FAN/BS Caveat 5-Base Vibration Isolation System Checked FAN/BS Caveat 6-Sufficient Slack and Flexibility of Attached Lines.FAN/BS Caveat 7-Adequate Anchorage.
D.C. COOK Unit 1                             GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                Status: Yes Sheet 2 of 3 ID: 1-HV-AFP-M1 ( Rev. 0         )                   Class: 9. Fans
FAN/BS Caveat 8-No Other Concerns Is the intent of all the caveats met for Bounding Spectrum7 ANCHORAGE Yes Yes Yes Yes N/A Yes Yes Yes 1.The sizes and locations of anchors have been determined 2.Appropriate equipment characteristics have been determined (mass, CG, natural freq., damping, center of rotation).
3.The type of anchorage is covered by the GIP 4.The adequacy of the anchorage installation has been evaluated (weld quality and length, nuts and washers, expansion anchor tightness, etc.)5.Factors affecting anchorage capacity or margin of safety have been considered:
embedment length, anchor spacing, free-edge distance, concrete strength/condition, and concrete cracking.6.For bolted anchorages, any gaps under the.base are less than 1/4 7.Factors affecting essential relays have been considered:
gaps under the base, capacity reduction for expansion anchors.8.The base has adequate stiffness and the effect of prying action on anchors has been considered.
9.The strength of the equipment base and the load path to the CG is adequate.10.The adequacy of embedded steel, grout pads or large concrete pads have been evaluated.
11.The anchorage capacity exceeds the demand.Are anchorage requirements met?Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes Yes D.C.COOK Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 3 of 3 ID: 1-HV-AFP-M1 (Rev.0)Class: 9.Fans


== Description:==
==
Description:==
EAST MOTOR DRIV AUX FEEDWATER PUMP ROOM EXHAUST FAN Building: TURBINE                            Floor El.: 591.00              Room, Row/Col: E MOTOR DRIV AUX FDWTR PUMP RM, IN THE SW CORNER OF THE RM, 10'W OF E MDAFWP, ON THE W WALL, 12'BOVE THE FLR.
Manufacturer, Model, Etc.: JOY MANUFACTURINGCO., 10000 FT"3/MIN CAVEATS - BOUNDING SPECTRUM FAN/BS Caveat 1 - Earthquake Experience Equipment Class                                                Yes FAN/BS Caveat 2 - Drive Motor and Fan Mounted on Common Base.                                          Yes FAN/BS Caveat 3 - Long Shafts Supported at Fan and at Motor.                                            Yes FAN/BS Caveat 4 - No Possibility of Excessive Duct Distortion Causing Binding or Misalignment          Yes of Fan.
FAN/BS Caveat      5  - Base Vibration Isolation System Checked                                        N/A FAN/BS Caveat      6  - Sufficient Slack and Flexibility of Attached Lines.                            Yes FAN/BS Caveat      7  - Adequate Anchorage.                                                            Yes FAN/BS Caveat      8  - No Other Concerns                                                              Yes Is the intent of all the caveats met for Bounding Spectrum7 ANCHORAGE
: 1. The sizes and locations of anchors have been determined                                              Yes
: 2. Appropriate equipment characteristics have been determined (mass, CG, natural freq.,                Yes damping, center of rotation).
: 3. The type of anchorage is covered by the GIP                                                          Yes
: 4. The adequacy of the anchorage installation has been evaluated (weld quality and length, nuts        Yes and washers, expansion anchor tightness, etc.)
: 5. Factors affecting anchorage capacity or margin of safety have been considered: embedment            Yes length, anchor spacing, free-edge distance, concrete strength/condition, and concrete cracking.
: 6. For bolted anchorages, any gaps under the. base are less than 1/4                                    Yes
: 7. Factors affecting essential relays have been considered: gaps under the base, capacity              N/A reduction for expansion anchors.
: 8. The base has adequate stiffness and the effect of prying action on anchors has been                  Yes considered.
: 9. The strength of the equipment base and the load path to the CG is adequate.                          Yes
: 10. The adequacy of embedded steel, grout pads or large concrete pads have been evaluated.              Yes
: 11. The anchorage capacity exceeds the demand.                                                          Yes Are anchorage requirements met?
 
D.C. COOK Unit 1                                    GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                  Status: Yes Sheet 3 of 3 ID: 1-HV-AFP-M1 ( Rev. 0      )                    Class: 9. Fans


EAST MOTOR DRIV AUX FEEDWATER PUMP ROOM EXHAUST FAN Building: TURBINE Floor El.: 591.00 Room, Row/Col: E MOTOR DRIV AUX FDWTR PUMP RM, IN THE SW CORNER OF THE RM, 10'W OF E MDAFWP, ON THE W WALL, 12'BOVE THE FLR.Manufacturer, Model, Etc.: JOY MANUFACTURING CO., 10000 FT"3/MIN INTERACTION EFFECTS 1.Soft targets are free from impact by nearby equipment or structures 2.If the equipment contains sensitive relays, it is free from all impact by nearby equipment or structures.
==
3.Attached lines have adequate flexibility 4.Overhead equipment or distribution systems are not likely to collapse.5.No other adverse concerns were found.Is equipment free of interaction effects'P Yes NIA Yes Yes Yes S U~CIELIRXR SRT: Gary Thomas, Gunnar Harstead and Harry Young on 10/20/93.Anchorage:
Description:==
.Fan mounted to embedded plate structure with at least 16 steel to steel bolts at least 1/2" in diameter.Weight of fan 500 lbs.No anchorage calculation required for a fan of this size with this robust anchorage.
EAST MOTOR DRIV AUX FEEDWATER PUMP ROOM EXHAUST FAN Building: TURBINE                         Floor El.: 591.00                   Room, Row/Col: E MOTOR DRIV AUX FDWTR PUMP RM, IN THE SW CORNER OF THE RM, 10'W OF E MDAFWP, ON THE W WALL, 12'BOVE THE FLR.
Therefore anchorage is OK based on SRT judgement and inspection.
Manufacturer, Model, Etc.: JOY MANUFACTURINGCO., 10000 FT"3/MIN INTERACTION EFFECTS
: 1. Soft targets are free from impact by nearby equipment or structures                                     Yes
: 2. If the equipment contains sensitive relays, it is free from all impact by nearby equipment or           NIA structures.
: 3. Attached lines have adequate flexibility                                                               Yes
: 4. Overhead equipment or distribution systems are not likely to collapse.                                 Yes
: 5. No other adverse concerns were found.                                                                   Yes Is equipment free of interaction effects'P S     U
~CIELIRXR SRT: Gary Thomas, Gunnar Harstead and Harry Young on 10/20/93.
Anchorage:     .
Fan mounted to embedded plate structure with at least 16 steel to steel bolts at least 1/2" in diameter.
Weight of fan 500 lbs.
No anchorage calculation required for a fan of this size with this robust anchorage. Therefore anchorage is OK based on SRT judgement and inspection.
Interaction:
Interaction:
Insulated pipe running outside the room the fan services could impact the outside screen of the fan.Pipe well insulated and will cushion the impact, therefore the SRT judged this as non4amaging.
Insulated pipe running outside the room the fan services could impact the outside screen of the fan. Pipe well insulated and will cushion the impact, therefore the SRT judged this as non4amaging.
Photo: Fan mounted outside the room with the damper on the inside, therefore could not get a good picture of fan.Evaluated by: Date:
Photo: Fan mounted outside the room with the damper on the inside, therefore could not get a good picture of fan.
0 2 CHP 5021.CCD.019 ATTACHMENT NO Unct I i 2.-5(:8 Xnstallatxon dwg./Rev.Anchora e Arran ement Sketch ANCHOR XNSPECTXON DATA SHEET TuRsit4P.OI4VW/gal Pq<~'T~~a,l 2 h&ogC R.oat FCMg v)ATCR.Paine poenh SauTuMCsT c~IM Bldg.Location i-t<-V-hFP-Mi Equipment No.Dla4~ON'5'p (g FP-Old7 Q SuP PO T~.Drawn by: Date:~'-8-~1~Verified by: Reviewed by Hh Date: Qual./Cert.Xnspector Anal~Date: Construction Anchor Review Engineer).-<)-~(3 Page 1 of 3 Revision 1  
Evaluated by:                                                                         Date:
 
0 2 CHP 5021.CCD.019 ATTACHMENT NO ANCHOR XNSPECTXON DATA SHEET TuRsit4P. OI4VW /gal             Pq<~'T ~~a,l   2 h&ogC R.oat FCMg v)ATCR. Paine poenh         SauTuMCsT     c~IM Unct I                      Bldg.                           Location i 2.-5(:8                                        i- t<-V- hFP-Mi Xnstallatxon      dwg.  /  Rev.          Equipment No.
Anchora e Arran ement Sketch Dla4~   ON'5'p
( g FP-Old7   Q SuP   PO   T ~.
Drawn by:                                                         Date:     ~'- 8-~1~
Verified by:                 Hh                                   Date:
Qual. /Cert. Xnspector Reviewed by              Anal~                                   Date:     ).- <) -~( 3 Construction Anchor Review Engineer Page   1   of   3 Revision       1
 
Database:    K:SSEL1B.DBF Eguip ID: 12-HV-ESW-7      Train:    2    Equip Class:9 wing No.: 12-5148B ction:  HVAC System:  SCREENHOUSE VENTXLATXON Equip Desc: UNIT    Q1 EAST ESW PUMP ROOM SUPPLY VENTXLATION FAN Building:  SCREENHOUSE      Room: EAST ESW PUMP ROOM Elev:  591    Sort: S,R          Notes:
Normal State:        Desired State:        Power Req'd: Y Support System Drawing: 1-12033          1-98415 Req'd Support Comp: 1-PS-D-2B Safety Related Status: NUCLEAR        SR        Min/Opt: MXN Alias No:        Power Train: A Comp  Served:  EAST ESW PUMP MFR: BUFFALO FORGE CO l:  5000 FT"3/MIN Panel:
Elem. Drawing: 1-98415      1-98721 Wiring Drawing: 1-95103 Power Source:    1-PS-D-2B Walkdown:  F    Relay Eval    :  Y Comp  Type:  VENT FAN Xso Drawing:
Location: IN    THE SW CORNER OF THE ROOM,        15'E  OF EAST ESW PP, THE FLOOR.                                          13'BOVE
 
l~
I


Database: K:SSEL1B.DBF Eguip ID: 12-HV-ESW-7 Train: 2 Equip Class:9 wing No.: 12-5148B ction: HVAC System: SCREENHOUSE VENTXLATXON Equip Desc: UNIT Q1 EAST ESW PUMP ROOM SUPPLY VENTXLATION FAN Building: SCREENHOUSE Room: EAST ESW PUMP ROOM Elev: 591 Sort: S,R Notes: Normal State: Desired State: Power Req'd: Y Support System Drawing: 1-12033 1-98415 Req'd Support Comp: 1-PS-D-2B Safety Related Status: NUCLEAR SR Min/Opt: MXN Alias No: Power Train: A Comp Served: EAST ESW PUMP MFR: BUFFALO FORGE CO l: 5000 FT"3/MIN Panel: Elem.Drawing: 1-98415 1-98721 Wiring Drawing: 1-95103 Power Source: 1-PS-D-2B Walkdown: F Relay Eval: Y Comp Type: VENT FAN Xso Drawing: Location: IN THE SW CORNER OF THE ROOM, 15'E OF EAST ESW PP, 13'BOVE THE FLOOR.
D.C. COOK Unit 1 SCREENING EVALUATIONWORK SHEET (SEWS)
l~I D.C.COOK Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)'IP Rev 2, Corrected, 2/14/92 Status: Yes Sheet1 of11 ID: 12-HV-ESW-7 Rev.0 Class: 9.Fans Descri tion: UNIT 41 EAST ESW PUMP ROOM SUPPLY VENTILATION FAN Building: SCREENHOUSE Floor El.: 591.00 Room, Row/Col: E ESW PUMP RM, IN THE SW CORNER OF THE RM, 15'SE OF E ESWPP, 13'BOVE THE FLR.Manufacturer, Model, Etc.: BUFFALO FORGE CO., 5000 FT"3/MIN SEISMIC CAPACITY VS DEMAND 1.Elevation where e ui ment receives seismic in ut Elevation of seismic in ut below about 40'rom rade rade=608.00 3.E ui menthasfundamentalfre uenc aboveabout8Hz est.fre uenc=10.00 Ca acit based on: 1.50'Boundin S ectrum Demand based on: 1.00*Realistic Median-Centered Floor Res onse S ectra 587.00 N/A N/A 1.200 LOG 0.080 0.50 l'\\\I\I I r j r LOG Hz Capacity.....Demand 50.00 Ca aci Demand 1 Demand 2 File C:tGIP<GIPIs ra.des C:(GIPIPROJ0035ls.des C:(GIPPROJ003Qs lra.des Record Label Boundin S trum BUILDING Auxilia ELEVATION 587 BROADEN N BUILDING Auxilia ELEVATION 587 BROADEN N Does capacity exceed demand?Yes  
                                                                              'IP         Rev 2, Corrected, 2/14/92 Status: Yes Sheet1 of11 ID: 12-HV-ESW-7 Rev. 0                             Class: 9. Fans Descri tion: UNIT 41 EAST ESW PUMP ROOM SUPPLY VENTILATIONFAN Building: SCREENHOUSE                       Floor El.: 591.00                       Room, Row/Col: E ESW PUMP RM, IN THE SW CORNER OF THE RM, 15'SE OF E ESWPP, THE FLR.
13'BOVE Manufacturer, Model, Etc.: BUFFALO FORGE CO., 5000 FT"3/MIN SEISMIC CAPACITY VS DEMAND
: 1. Elevation where e ui ment receives seismic in ut                                                         587.00 Elevation of seismic in ut below about 40'rom rade rade = 608.00                                         N/A
: 3. E ui menthasfundamentalfre uenc aboveabout8Hz est.fre uenc =10.00                                         N/A Ca acit based on:           1.50'Boundin S ectrum Demand based on:           1.00
* Realistic Median-Centered Floor Res onse S ectra 1.200 l
                                                                \
                                                                  \\
I I                           \
LOG                  I r jr 0.080 0.50                          LOG           Hz                         50.00 Capacity     ..... Demand File                                        Record Ca aci         C:tGIP<GIPIs   ra.des                       Label Boundin S      trum Demand 1      C:(GIPIPROJ0035ls       .des               BUILDINGAuxilia    ELEVATION 587 BROADEN N Demand 2      C:(GIPPROJ003Qs       lra.des               BUILDINGAuxilia    ELEVATION 587 BROADEN N Does capacity exceed demand?                                                                                     Yes


D.C.COOK Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 2 of 11 ID: 12-HV-ESW-7 Rev.0 Class: 9.Fans Descri tion: UNIT N EAST ESW PUMP ROOM SUPPLY VENTILATION FAN Building: SCREENHOUSE Floor El.: 591.00 Room, Row/Col: E ESW PUMP RM, IN THE SW CORNER OF THE RM, 15'SEOF E ESWPP, 13'BOVE THE FLR.Manufacturer, Model, Etc.: BUFFALO FORGE CO., 5000 FT"3/MIN CAVEATS-BOUNDING SPECTRUM FAN/BS Caveat 1-Earth uake Ex erience E ui ment Class FAN/BS Caveat 2-Drive Motor and Fan Mounted on Common Base.FAN/BS Caveat 3-Lon Shafts Su orted at Fan and at Motor.FAN/BS Caveat 4-No Possibility of Excessive Duct Distortion Causing Binding or Misali nment of Fan.FAN/BS Caveat 5-Base Vibration Isolation S stem Checked FAN/BS Caveat 6-Sufficient Slack and Flexibilit of Attached Lines.FAN/BS Caveat 7-Ade uate Anchora e.FAN/BS Caveat 8-No Other Concerns Yes Yes Yes Yes N/A Yes Yes Yes ts the intent of all the caveats met for Bounding Spectrum'ANCHORAGE 1.The sizes and locations of anchors have been determined 2.Appropriate equipment characteristics have been determined (mass, CG, natural freq., dam in, center of rotation.3.The t e of anchora e is covered b the GIP.4.The adequacy of the anchorage installation has been evaluated (weld quality and length, nuts and washers, ex ansion anchor ti htness, etc.5.Factors affecting anchorage capacity or margin of safety have been considered:
D.C. COOK Unit 1                                 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                  Status: Yes Sheet 2 of 11 ID: 12-HV-ESW-7 Rev.         0                   Class: 9. Fans Descri tion: UNIT N EAST ESW PUMP ROOM SUPPLY VENTILATIONFAN Building: SCREENHOUSE                     Floor El.: 591.00                   Room, Row/Col: E ESW PUMP RM, IN THE SW CORNER OF THE RM, 15'SEOF E ESWPP, THE FLR.
embedment length, anchor spacing, free-edge distance, concrete strength/condition, and concrete crackin.6.For bolted anchora es, an a s under the base are less than 1/4 7.Factors affecting essential relays have been considered:
13'BOVE Manufacturer, Model, Etc.: BUFFALO FORGE CO., 5000 FT"3/MIN CAVEATS - BOUNDING SPECTRUM FAN/BS Caveat 1- Earth uake Ex erience E ui ment Class                                                   Yes FAN/BS Caveat 2- Drive Motor and Fan Mounted on Common Base.                                             Yes FAN/BS Caveat 3- Lon Shafts Su orted at Fan and at Motor.                                                 Yes FAN/BS Caveat 4- No Possibility of Excessive Duct Distortion Causing Binding or                           Yes Misali nment of Fan.
gaps under the base, capacity reduction for ex ansion anchors.8.The base has adequate stiffness and the effect of prying action on anchors has been considered.
FAN/BS Caveat 5- Base Vibration Isolation S stem Checked                                                 N/A FAN/BS Caveat 6- Sufficient Slack and Flexibilit of Attached Lines.                                       Yes FAN/BS Caveat 7 - Ade uate Anchora e.                                                                   Yes FAN/BS Caveat 8- No Other Concerns                                                                       Yes ts the intent of all the caveats met for Bounding Spectrum'                                             Yes ANCHORAGE
9.Thestren th of thee ui mentbaseand the load athto the CG isade uate.10.The ade uac of embedded steel, rout ads or la e concrete ads have been evaluated.
: 1. The sizes and locations of anchors have been determined                                               Yes
11.The anchora e ca acit exceeds the demand.Are anchorage requirements met7 INTERACTION EFFECTS Yes Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes Yes Yes 1.Soft tar ets are free from im act b nearb e ui mentorstructures.
: 2. Appropriate equipment characteristics have been determined (mass, CG, natural freq.,                 Yes dam in, center of rotation .
2.If the equipment contains sensitive relays, it is free from all impact by nearby equipment or structures.
: 3. The t e of anchora e is covered b the GIP.                                                           Yes
3.Attached lines have ade uate flexibilit
: 4. The adequacy of the anchorage installation has been evaluated (weld quality and length,               Yes nuts and washers, ex ansion anchor ti htness, etc.
.4.Overhead e ui ment or distribution s stems are not likel to colla se.5.No other adverse concerns were found.Yes N/A Yes Yes Yes ls equipment free of interaction effects?Yes D.C.COOK Unit 1 SCREENING EVALLIATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 3 of 11 ID: 12-HV-ESW-7 Rev.0 Class: 9.Fans Descri tion: UNIT&#xb9;1 EAST ESW PUMP ROOM SUPPLY VENTILATION FAN Building: SCREENHOUSE Floor El.: 591.00 Room, Row/Col: E ESW PUMP RM, IN THE SW CORNER OF THE RM, 15'E OF E ESW PP, 13'BOVE THE FLR.Manufacturer, Model, Etc.: BUFFALO FORGE CO., 5000 FT"3/MIN IS EQUIPMENT SEISMICALLY ADEQUATE'P Yes COMMENTS SRT: Gary Thomas, Gunnar Harstead and Harry Young on 10/19/93.Capacity vs Demand: Component is in Screenhouse building using Auxiliary building Response Spectra for calculation Anchorage:
: 5. Factors affecting anchorage capacity or margin of safety have been considered:                       Yes embedment length, anchor spacing, free-edge distance, concrete strength/condition, and concrete crackin .
Fan sits on steel platform, bolted to the wall on two sides with 2-3/4" through bolts on each side, and hung at opposite corner by a 4x4x3/8" angle.Calculation should be rerun.This fan is the limiting analysis fo 12-HV-ESW-1,2,3,4,5,6,7,&8 Anchorage is adequate.The calculated anchorage safety factor is 32.8.~~Photo: Wk.2, Tm.2, Disk 1, Picture 29 Fan;30 Underside of frame showing two bolts to wall;31 Top of angle hanger support for platform.Evaluated by: Date:  
: 6. For bolted anchora es, an     a s under the base are less than 1/4                                   Yes
: 7. Factors affecting essential relays have been considered: gaps under the base, capacity                 N/A reduction for ex ansion anchors.
: 8. The base has adequate stiffness and the effect of prying action on anchors has been                   Yes considered.
: 9. Thestren th of thee ui mentbaseand the load athto the CG isade uate.                                 Yes
: 10. The ade uac of embedded steel, rout ads or la e concrete ads have been evaluated.                   Yes
: 11. The anchora e ca acit exceeds the demand.                                                           Yes Are anchorage requirements met7                                                                         Yes INTERACTION EFFECTS
: 1. Soft tar ets are free from im act b nearb e ui mentorstructures.                                     Yes
: 2. If the equipment contains sensitive relays, it is free from all impact by nearby equipment or         N/A structures.
: 3. Attached lines have ade uate flexibilit .                                                            Yes
: 4. Overhead e ui ment or distribution s stems are not likel to colla se.                                 Yes
: 5. No other adverse concerns were found.                                                                 Yes ls equipment free of interaction effects?                                                               Yes
 
D.C. COOK Unit 1                                 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALLIATIONWORK SHEET (SEWS)                                Status: Yes Sheet 3 of 11 ID: 12-HV-ESW-7 Rev. 0                           Class: 9. Fans Descri tion: UNIT &#xb9;1 EAST ESW PUMP ROOM SUPPLY VENTILATIONFAN Building: SCREENHOUSE                     Floor El.: 591.00                 Room, Row/Col: E ESW PUMP RM, IN THE SW CORNER OF THE RM, 15'E OF E ESW PP, THE FLR.          13'BOVE Manufacturer, Model, Etc.: BUFFALO FORGE CO., 5000 FT"3/MIN IS EQUIPMENT SEISMICALLYADEQUATE'P                                                                     Yes COMMENTS SRT: Gary Thomas, Gunnar Harstead and Harry Young on 10/19/93.
Capacity vs Demand:
Component is in Screenhouse building using Auxiliary building Response Spectra for calculation Anchorage:
Fan sits on steel platform, bolted to the wall on two sides with 2- 3/4" through bolts on each side, and hung at opposite corner by a 4x4x3/8" angle.
Calculation should be rerun. This fan is the limiting analysis fo 12-HV-ESW-1,2,3,4,5,6,7,&8 Anchorage is adequate. The calculated anchorage safety factor is 32.8.
Photo: Wk. 2, Tm. 2, Disk 1, Picture 29 Fan; 30 Underside of frame showing two bolts to wall; 31 Top of angle
              ~      ~
hanger support for platform.
Evaluated by:                                                                       Date:


==Attachment:==
==Attachment:==
Pictures
==Attachment:==
ANCHOR Re ort
0 D.C. COOK Unit 1                                GIP Rev 2, Corrected, 2/1 4/92 SCREENING EVAI UATION WORK SHEET (SEWS)                          Status: Yes Sheet 4 of 11 ID: 12-HV-ESW-7 Rev. 0                        Class: 9. Fans Descri tion: UNIT P1 EAST ESW PUMP ROOM SUPPLY VENTILATIONFAN 1 Building: SCREENHOUSE                  Floor El.: 591.00                Room, Row/Col: E ESW PUMP RM, IN THE SW CORNER OF THE RM, 15'E OF E ESW PP, THE FLR.
13'BOVE Manufacturer, Model, Etc.: BUFFALO FORGE CO., 5000 FT"3/MIN PICTURES Figure 1: Fan 12-HV-ESW-7                    Figure 2: Underside of frame showing two bolts to wall Figure 3: Top of angle hanger support for platform


Pictures
D.C. COOK Unit 1                              GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                            Status: Yes Sheet 5 of 11 ID: 12-HV-ESW-7 Rev. 0                          Class: 9. Fans Descri tion: UNIT &#xb9;1 EAST ESW PUMP ROOM SUPPLY VENTILATIONFAN Building: SCREENHOUSE                    F,loor El.: 591.00            Room, Row/Col: E ESW PUMP RM, IN THE SW CORNER OF THE RM, 15'SEOF E ESWPP, THE FLR.
13'BOVE Manufacturer, Model, Etc.: BUFFALO FORGE CO., 5000 FT"3/MIN ANCHOR Report Response Spectrum: SSE Frequency: GIP - Flexible Percent Damping: GIP - 5.00 Spectral Values:
Direction          Acceleration    's North - South      0.60 East - West        0.60 Vertical            0.25 Angle (N-S Direction makes with the X Axis): 0.00 Combination Criteria: SRSS
~Wei  htn:
Number of Weights:    1 No      Wei ht 1        500.00        35.000        23.000          18.000 Forces:
Number of External Forces: 0 Moments:
Number of External Moments: 0 Allowables:
Anchor:
Number of Anchor types:    1 Tension      Shear Ultimate    Ultimate  Inter        Inter    Saf No.      Dia      Manufact        Product        Tension      Shear    Coeff        Coeff    Fact


==Attachment:==
D.C. COOK Unit 1                                GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                              Status: Yes Sheet 6 of 11 ID: 12-HV-ESW-7 Rev. 0                          Class: 9. Fans Descri tion: UNIT &#xb9;1 EAST ESW PUMP ROOM SUPPLY VENTILATIONFAN Building: SCREENHOUSE                    Floor El.: 591.00              Room, Row/Col: E ESW PUMP RM, IN THE SW CORNER OF THE RM, 15'EOF E ESW PP, THE FLR.
13'BOVE Manufacturer, Model, Etc.: BUFFALO FORGE CO., 5000 FT"3/MIN 1      3/4        Other        Grouted In      1500.00    7510.00    1.00          0.30      1.00 Place Concrete:
Ultimate Stress: 3500.00 psi.
Reduction Factor: 0.85 Weld:
Allowable Stress:  31200 psi.
Surfaces:
Number of Surfaces: 2 Surface Orientation Direction      Direction      Direction Com            Com            Com No                          N              Nz 0.000          1.000          0.000 1.000          0.'000          0.000 Anchor Pattern for Surface &#xb9; 1 Anchor Pattern for Surface //2


ANCHOR Re ort 0
D.C. COOK Unit 1                           GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                      Status: Yes Sheet 7 of 11 ID: 12-HV-ESW-7 Rev. 0                     Class: 9. Fans Descri tion: UNIT &#xb9;1 EAST ESW PUMP ROOM SUPPLY VENTILATIONFAN Building: SCREENHOUSE                 Floor El.: 591.00           Room, Row/Col:   E ESW PUMP RM, IN THE SW CORNER OF THE RM, 15'E OF E ESW PP, THE FLR.
D.C.COOK Unit 1 SCREENING EVAI UATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/1 4/92 Status: Yes Sheet 4 of 11 ID: 12-HV-ESW-7 Rev.0 Class: 9.Fans Descri tion: UNIT P1 EAST ESW PUMP ROOM SUPPLY VENTILATION FAN 1 Building: SCREENHOUSE Floor El.: 591.00 Room, Row/Col: E ESW PUMP RM, IN THE SW CORNER OF THE RM, 15'E OF E ESW PP, 13'BOVE THE FLR.Manufacturer, Model, Etc.: BUFFALO FORGE CO., 5000 FT"3/MIN PICTURES Figure 1: Fan 12-HV-ESW-7 Figure 2: Underside of frame showing two bolts to wall Figure 3: Top of angle hanger support for platform D.C.COOK Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 5 of 11 ID: 12-HV-ESW-7 Rev.0 Class: 9.Fans Room, Row/Col: E ESW PUMP RM, IN THE SW CORNER OF THE RM, 15'SEOF E ESWPP, 13'BOVE THE FLR.F,loor El.: 591.00 Building: SCREENHOUSE Manufacturer, Model, Etc.: BUFFALO FORGE CO., 5000 FT"3/MIN ANCHOR Report Descri tion: UNIT&#xb9;1 EAST ESW PUMP ROOM SUPPLY VENTILATION FAN Response Spectrum: SSE Frequency:
13'BOVE Manufacturer, Model, Etc.: BUFFALO FORGE CO., 5000 FT"3/MIN Legend for Anchor Patterns Anchor Bolts:
GIP-Flexible Percent Damping: GIP-5.00 Spectral Values: Direction North-South East-West Vertical Acceleration
Concrete Uncs:
's 0.60 0.60 0.25 Angle (N-S Direction makes with the X Axis): 0.00 Combination Criteria: SRSS~Wei htn: Number of Weights: 1 No Wei ht 1 500.00 35.000 23.000 18.000 Forces: Number of External Forces: 0 Moments: Number of External Moments: 0 Allowables:
                                                        ~mm Concrete Points:
Anchor: Number of Anchor types: 1 Tension Shear Coeff Fact Shear Product Dia Ultimate Ultimate Inter Inter Saf No.Manufact Tension Coeff D.C.COOK Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 6 of 11 ID: 12-HV-ESW-7 Rev.0 Class: 9.Fans Descri tion: UNIT&#xb9;1 EAST ESW PUMP ROOM SUPPLY VENTILATION FAN Building: SCREENHOUSE Floor El.: 591.00 Room, Row/Col: E ESW PUMP RM, IN THE SW CORNER OF THE RM, 15'EOF E ESW PP, 13'BOVE THE FLR.Manufacturer, Model, Etc.: BUFFALO FORGE CO., 5000 FT"3/MIN 1 3/4 Other Grouted In 1500.00 7510.00 1.00 Place 0.30 1.00 Concrete: Ultimate Stress: 3500.00 psi.Reduction Factor: 0.85 Weld: Allowable Stress: 31200 psi.Surfaces: Number of Surfaces: 2 Surface Orientation Direction Com No 0.000 1.000 Direction Com N 1.000 0.'000 Direction Com Nz 0.000 0.000 Anchor Pattern for Surface&#xb9;1 Anchor Pattern for Surface//2
Weld Uncs:
Geometrei:
Anchor:
Number of Anchors: 4 Anch                                              Surf No.     Id    Coord          Coord          Coord        Id 1               16.100        46.000          4.000 2      1       52.600        46.000          4.000 3              70.000        41.300          4.000 4      1       70.000         4.800          4.000 Concrete Lines:


D.C.COOK Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 7 of 11 ID: 12-HV-ESW-7 Rev.0 Class: 9.Fans Descri tion: UNIT&#xb9;1 EAST ESW PUMP ROOM SUPPLY VENTILATION FAN Building: SCREENHOUSE Floor El.: 591.00 Room, Row/Col: E ESW PUMP RM, IN THE SW CORNER OF THE RM, 15'E OF E ESW PP, 13'BOVE THE FLR.Manufacturer, Model, Etc.: BUFFALO FORGE CO., 5000 FT"3/MIN Legend for Anchor Patterns Anchor Bolts: Concrete Uncs:~mm Concrete Points: Weld Uncs: Geometrei:
D.C. COOK Unit 1                           GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                          Status: Yes Sheet 8 of 11 ID: 12-HV-ESW-7 Rev. 0                         Class: 9. Fans Descri tion: UNIT &#xb9;1 EAST ESW PUMP ROOM SUPPLY VENTILATIONFAN Building: SCREENHOUSE                     Floor El.: 591:00             Room, Row/Col: E ESW PUMP RM, IN THE SW CORNER OF THE RM, 15'EOF E ESW PP, THE FLR.
Anchor: Number of Anchors: 4 Anch Surf No.Id 1 2 1 3 4 1 Coord 16.100 52.600 70.000 70.000 Coord 46.000 46.000 41.300 4.800 Coord 4.000 4.000 4.000 4.000 Id Concrete Lines:  
13'BOVE Manufacturer, Model, Etc.: BUFFALO FORGE CO., 5000 FT"3/MIN
&#xb9; of elements  per line: 1 Number of Concrete Lines: 2 start        start        start          End          End        End              Line No     X-Coo rd      Y-Coo rd    Z-Coo rd      X-Coord    Y-Coord    Z-Coord      Id   Width 0.000        46.000        4.000       70.000       46.000       4.000    1      3.000 70.000         0.000      4.000        70.000     46.000       4.000   2      3.000 Concrete Points:
Number of Concrete Points: 0 Weld Lines:
&#xb9; of elements  per line: 5 Number of Weld Lines: 0 Determination of Reduction Factors:
Reduction Factor Input for Anchor &#xb9;1 Adequately Installed: Yes Embedment Length: ( 7.50 in. Min Reqd. to achieve full capacity):= 7.50 in.
Gap at Threaded Anchor: 0.00 in.
Edge Distance - Edge 1: 6.63 in.
Crack Size: 0.000 in.
Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factor Input for Anchor  &#xb9;2 Adequately Installed: Yes Embedment Length: ( 7.50 in. Min Reqd. to achieve full capacity):= 7.50 in.
Gap at Threaded Anchor: 0.06 in.
Edge Distance - Edge 1: 6.63 in.
Crack Size: 0.000 in.
Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factor Input for Anchor  &#xb9;3 Adequately Installed: Yes


D.C.COOK Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 8 of 11 ID: 12-HV-ESW-7 Rev.0 Class: 9.Fans Descri tion: UNIT&#xb9;1 EAST ESW PUMP ROOM SUPPLY VENTILATION FAN Building: SCREENHOUSE Floor El.: 591:00 Room, Row/Col: E ESW PUMP RM, IN THE SW CORNER OF THE RM, 15'EOF E ESW PP, 13'BOVE THE FLR.Manufacturer, Model, Etc.: BUFFALO FORGE CO., 5000 FT"3/MIN&#xb9;of elements per line: 1 Number of Concrete Lines: 2 No start X-Coo rd 0.000 70.000 start Y-Coo rd 46.000 0.000 start Z-Coo rd 4.000 4.000 End X-Coord 70.000 70.000 End Y-Coord 46.000 46.000 End Z-Coord Id 4.000 1 4.000 2 Line Width 3.000 3.000 Concrete Points: Number of Concrete Points: 0 Weld Lines:&#xb9;of elements per line: 5 Number of Weld Lines: 0 Determination of Reduction Factors: Reduction Factor Input for Anchor&#xb9;1 Adequately Installed:
D.C. COOK Unit 1                                 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                Status: Yes Sheet 9 of 11 ID: 12-HV-ESW-7 Rev. 0                             Class: 9. Fans Descri tion: UNIT f/1 EAST ESW PUMP ROOM SUPPLY VENTILATIONFAN Building: SCREENHOUSE                       Floor El.: 591.00               Room, Row/Col: E ESW PUMP RM, IN THE SW CORNER OF THE RM, 15'E OF E ESW PP, THE FLR.
Yes Embedment Length: (7.50 in.Min Reqd.to achieve full capacity):=
13'BOVE Manufacturer, Model, Etc.: BUFFALO FORGE CO., 5000 FT"3/MIN Embedment Length: ( 7.50 in. Min Reqd. to achieve full capacity):= 7.50 in.
7.50 in.Gap at Threaded Anchor: 0.00 in.Edge Distance-Edge 1: 6.63 in.Crack Size: 0.000 in.Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed:
Gap at Threaded Anchor: 0.13 in.
Yes Reduction Factor Input for Anchor&#xb9;2 Adequately Installed:
Edge Distance - Edge 1: 6.63 in.
Yes Embedment Length: (7.50 in.Min Reqd.to achieve full capacity):=
Crack Size: 0.000 in.
7.50 in.Gap at Threaded Anchor: 0.06 in.Edge Distance-Edge 1: 6.63 in.Crack Size: 0.000 in.Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed:
Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factor input for Anchor 0 4 Adequately Installed: Yes Embedment I.ength: (7.50 in. Min Reqd. to achieve full capacity):= 7.50 in.
Yes Reduction Factor Input for Anchor&#xb9;3 Adequately Installed:
Gap at Threaded Anchor: 0.13 in.
Yes
Edge Distance - Edge 1: 6.63 in.
Crack Size: 0.000 in.
Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factors Data Current: Yes Anc      Pall/    Pallr/
No            Vali      Vallr    RT    RN    RL    RG    RS  RE    RF    RC    RR    RP  RB    RM 1500.00    N/A    1.00  1.00  1.00  1.00  1.00 1.00 1.00  1.00  1.00  1.00 1.00 7510.00    N/A    'l.oo  1.00  1.00  1.00  1.00 1.00              1.00  1.00 1.00 1500.00    NIA    1.00  1.00  1.00  1.00  1.00 1.00 1.00  1.00  1.00  1.00 1.00 7510.00    N/A    1.00  1.00  1.00  1.00  1.00 1.00 1.00  1.00  1.00  1.00 1.00 1500.00    NIA    1.00  1.00  1.00  1.00  1.00 1.00 1.00  1.00  1.00  1.00 1.00 7510.00    N/A    1.00  1.00  1.00  1.00  1.00 1.00              1.00  1.00 1.00 1      1500.00    NIA    1.00  1.00  1.00  1.00  1.00 1.00 1.00  1.00  1.00  1.00 1.00
              ?510.00    NIA    1.00  1.00  1.00  1.00  1.00 1.00 1.00  1.00  1.00  1.00 1,00
~Le  eed:
N/A      = Not A licable Pall      = Allowable Pull without Reduced Ins ection Vail      = Allowable Shear without Reduced Ins ection Pallr    = Allowable Pull with Reduced Ins ection Vallr    = Allowable Shear with Reduced Ins ection
          = Outlier
          = Reduction Factor Not Used RT        = Reduction Factor for T e of Anchora e RN        = Reduction Factor for Installation Ade uac RL        = Reduction Factor for Embedment RG        = Reduction Factor for Ga at Anchors RS        = Reduction Factor for S acin


D.C.COOK Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 9 of 11 ID: 12-HV-ESW-7 Rev.0 Class: 9.Fans Descri tion: UNIT f/1 EAST ESW PUMP ROOM SUPPLY VENTILATION FAN Building: SCREENHOUSE Floor El.: 591.00 Room, Row/Col: E ESW PUMP RM, IN THE SW CORNER OF THE RM, 15'E OF E ESW PP, 13'BOVE THE FLR.Manufacturer, Model, Etc.: BUFFALO FORGE CO., 5000 FT"3/MIN Embedment Length: (7.50 in.Min Reqd.to achieve full capacity):=
D.C. COOK Unit       1                       GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                             Status: Yes Sheet 10 of 11 ID: 12-HV-ESW-7 Rev. 0                             Class: 9. Fans Descri tion: UNIT N EAST ESW PUMP ROOM SUPPLY VENTILATIONFAN Building: SCREENHOUSE                       Floor El.: 591.00           Room, Row/Col: E ESW PUMP RM, IN THE SW CORNER OF THE RM, 15'SEOF E ESWPP, THE FLR.
7.50 in.Gap at Threaded Anchor: 0.13 in.Edge Distance-Edge 1: 6.63 in.Crack Size: 0.000 in.Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed:
13'BOVE Manufacturer, Model, Etc.: BUFFALO FORGE CO., 5000 FT"3/MIN
Yes Reduction Factor input for Anchor 0 4 Adequately Installed:
        = Reduction Factor for Ed e Distance RF      = Reduction Factor for Concrete Stren th RC      = Reduction Factor for Concrete Cracks RR      = Reduction Factor for Essential Reta s RP      = Reduction Factor for Base Stiffness and P in Action RB      = Reduction Factor for Base Stren th and Load Path
Yes Embedment I.ength: (7.50 in.Min Reqd.to achieve full capacity):=
        = Reduction Factor for Embed. Steel and Pads Anal sis Results:
7.50 in.Gap at Threaded Anchor: 0.13 in.Edge Distance-Edge 1: 6.63 in.Crack Size: 0.000 in.Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed:
Analysis Performed: Yes Type of Analysis: Regular S ectral Accelerations   G's No         N-S             E-W            Vertical      Safet Factor 0.600           0.240            0.100          44.553
YesReduction Factors Data Current: Yes No Anc Pall/Vali 1500.00 7510.00 1500.00 7510.00 1500.00 7510.00 Pallr/Vallr RT RN NIA N/A 1.00 1.00 1.00 1.00 NIA 1.00 1.00 N/A 1.00 1.00 N/A 1.00 1.00 N/A'l.oo 1.00 RL RG 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 RS RE 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 RF RC 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 RR RP RB 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 RM 1 1500.00?510.00 NIA 1.00 1.00 NIA 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1,00~Le eed: N/A=Not A licable Pall=Allowable Pull without Reduced Ins ection Vail=Allowable Shear without Reduced Ins ection Pallr=Allowable Pull with Reduced Ins ection Vallr=Allowable Shear with Reduced Ins ection=Outlier=Reduction Factor Not Used RT=Reduction Factor for T e of Anchora e RN=Reduction Factor for Installation Ade uac RL=Reduction Factor for Embedment=Reduction Factor for S acin RS RG=Reduction Factor for Ga at Anchors D.C.COOK Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 10 of 11 ID: 12-HV-ESW-7 Rev.0 Class: 9.Fans Descri tion: UNIT N EAST ESW PUMP ROOM SUPPLY VENTILATION FAN Building: SCREENHOUSE Floor El.: 591.00 Room, Row/Col: E ESW PUMP RM, IN THE SW CORNER OF THE RM, 15'SEOF E ESWPP, 13'BOVE THE FLR.Manufacturer, Model, Etc.: BUFFALO FORGE CO., 5000 FT"3/MIN RF RC RR RP RB=Reduction Factor for Ed e Distance=Reduction Factor for Concrete Stren th=Reduction Factor for Concrete Cracks=Reduction Factor for Essential Reta s=Reduction Factor for Base Stiffness and P in Action=Reduction Factor for Base Stren th and Load Path=Reduction Factor for Embed.Steel and Pads Anal sis Results: Analysis Performed:
            -0.600           -0.240            -0.100          59.948
Yes Type of Analysis: Regular S ectral Accelerations G's No 10 12 13 14 15 16 18't9 20 21 N-S 0.600-0.600-0.600 0.600 0.600-0.600 0.600-0.600 0.240-0.240 0.240-0.240-0.240 0.240 0.240-0.240 0.240-0.240 0.240-0.240-0.240 E-W 0.240-0.240 0.240-0.240-0.240 0.240 0.240-0.240 0.600-0.600-0.600 0.600 0.600-0.600 0.600-0.600 0.240-0.240 0.240-0.240 0.240 Vertical 0.100-0.100 0.100-0.100 0.100-0.100-0.100 0.100 0.100-0.'I 00 0.100-0.100 0.100-0.100-0.'I00 0.100 0.250-0.250-0.250 0.250 0.250 Safet Factor 44.553 59.948 77.054 50.897 48.716 59.565 49.641 106.184 31.796 53.068 91.151 32.444 33.585 56.103 33.321 87.648 56.453 59.642/6.162 205.015 67.138 22~0.240 0.240-0.240-0.240-0.250 0.250 67.333 76.365 24-0.240 0.240-0.250 59.986 Minimum Safety Factor: 31.796 D.C.COOK Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 11 of 11 ID: 12-HV-ESW-7 Rev.0 Class: 9.Fans Descri tion: UNIT&#xb9;1 EAST ESW PUMP ROOM SUPPLY VENTILATION FAN Building: SCREENHOUSE Floor El.: 591.00 Room, Row/Col: E ESW PUMP RM, IN THE SW CORNER OF THE RM, 15'SEOF E ESW PP, 13'BOVE THE FLR.Manufacturer, Model, Etc.: BUFFALO FORGE CO., 5000 FT"3/MIN The Anchorage Capacity is 31.796 times greater than the Demand Coo Component No.I'Z"&G~+-1 Cla>>a Any particular prea the Seismic Review Team>>hould pay extra attontion to7 Yes No v'Lf ye>>, check item>>that apply.)Anchor Type Anchor Diameter Anchor Spacing Anchor Number Anchor Embedment Anchor Edge Distance Anchor Cap Anchor Thread Engagement Anchor Crip Anchor Angularity Concrete Crack Other>>(describe brief].y)If there item and l.2.3.i>>concern.for Desi.gn Basis Discrepancy, circle tho applicable explain.Hardvare Maintenance Type Discrepancy Drawing Update Type Discrepancy Significant Operability/Do>>ign Basis Discrepancy Others Condi tion: Actions Taken: Prepared By~'aca~5>'" 3
          -0.600             0.240             0.100          77.054 0.600          -0.240           -0.100          50.897 0.600          -0.240             0.100          48.716
            -0.600            0.240           -0.100          59.565 0.600            0.240           -0.100          49.641
            -0.600          -0.240             0.100          106.184 0.240           0.600            0.100          31.796 10        -0.240          -0.600           -0.'I 00        53.068 0.240          -0.600             0.100          91.151 12        -0.240            0.600            -0.100          32.444 13        -0.240           0.600            0.100           33.585 14          0.240          -0.600            -0.100           56.103 15          0.240            0.600            -0.'I00          33.321 16        -0.240          -0.600            0.100           87.648 0.240            0.240            0.250           56.453 18        -0.240          -0.240            -0.250           59.642
't9        0.240            0.240            -0.250            /6.162 20        -0.240          -0.240            0.250          205.015 21        -0.240            0.240            0.250          67.138 22   ~     0.240           -0.240           -0.250          67.333 0.240           -0.240            0.250           76.365 24         -0.240           0.240           -0.250           59.986 Minimum Safety Factor:       31.796


*c'CHP@021.CCD.019.ZTACHNENT NO.1 O(v Unxt Xnstallatxon dwg./Rev.Anchora e Arran ement Sketch NCHOR XNSPECTION DATA SHEE E.M ea 4o~Bldg.Location iZ-9-ES-7 Equipment No.rAu&r I (OIAi~A MlCHIQAy POWER SITE i)ES I'H CO ITROLLEO WORKIIIQ COPY JUL>S tsSS<<RZ l.DETAIL A DETAIL(I 0 (0 CoHPon(EQ r I 8 I'-ITTAC'AGO T(o/V Cu~l QZ'Q'P I ATE a~(~)zz"p5~-as'~+~1rI cj(((I((VB AprlrI,E I I I F-(I (I l~3-P 8 eche~4AL~/A" B.<T't~f(pf,Q oP Top/)~i(J oo o Drawn by: Verified b Date: Qual./Cert.Xnspector Reviewed by: pate.F-RI-t 3 Construction An hor Review Engineer Page 1 of 3 Revision 1
D.C. COOK Unit 1                       GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                     Status: Yes Sheet 11 of 11 ID: 12-HV-ESW-7 Rev. 0                       Class: 9. Fans Descri tion: UNIT &#xb9;1 EAST ESW PUMP ROOM SUPPLY VENTILATIONFAN Building: SCREENHOUSE                Floor El.: 591.00          Room, Row/Col: E ESW PUMP RM, IN THE SW CORNER OF THE RM, 15'SEOF E ESW PP, THE FLR.
**l2 CHP 5021.CCD.019 I'TACHMENT NO.1 Unzt Xnstallatz.on dwg./Rev.Anchora e Arran ement Sketch NCHOR INSPECTXON DATA SHEET c.Yc.t Quod 0~E U 7 oow~Bldg.Location IZ,-Av-F>g-7 Equipment No.\Ow~I I I I I I'I I-~+/6 f'THRV Cbo'Erb I.7YP.Z lo Yig EL'E.V lEw'w Meir I IOIANA h'ICHIGAIJ POP,'/II Sl fF.OCSIGH CONTROLLED YIORKIIIG COPY JUL tg19SS.LCRK~Drawn by: Verified b Date: Y/2 q Date: 'PD Qual./Cert.Inspector~~~~~Reviewed by: T Date:~<'-'I~Construct>on A chor Review Engineer Page 1 of 3 Revision 1 i~2 CHP 5021-CCD.019 ATTACHMENT NO.1 Unct bNcHQR Bldg.NSPECTION DATA SHEET E Few Q~Locatzo Installation dwg./Rev.Anchora e Arran ement Sketch Equipment No.Top Wgo sps i pc Pbi77u~IV'2Z I'I~I-4/iS'I I)-4/iy I I~4'ib I WwACcc:ssibt 8 Pi@~TOP Mc)xwsoC vc Q II1vg 0 M V d Z" 5/POp Wc v~S<QQ Mib BO77~+i@I/u" PLtI Y-e i S S Ti Y'CS WE't DED YO Tnt')'Lr rv>c L.Sc CHANNEL IS bta'vT 87'FNos AnlQ HEEDED VOLrt-TI cr>>fi 7I 7 7<.L>>" 7c" TOP Qi~ZJlMg VV lb''vt48~Itt DIANA MICiIIGQN PPWt R SITC PESld't(CONTROLLt.J WORKING COPY f UL 1g tSSS~pRg T~E'WPD n'rawn by: Date:~~~~Verified by Qual./Cert.Inspector Reviewed by: T, Date: Construct>.on A chor Review Engineer')"2.I-Qg Page 1 of 3 Revision 1
13'BOVE Manufacturer, Model, Etc.: BUFFALO FORGE CO., 5000 FT"3/MIN The Anchorage Capacity is   31.796 times greater than the Demand
*" 2 CHP 5021-CCD~019 ATTACHMENT NO.1.Unxt NC OR INSPECTIO D TA S E C/8 N uSE Bldg.F..FSM R>iP oe Location 4-7 Installation dwg./Rev.Anchora e Arran ement Sketch Equipment No.C.0 gA"/Z./Q"/g" O>Oy ECT VI e&AA 0'5'~'~'+,>,~C, o tQg+>',:<-',~l8"+:~W.A~%~XI'>"5'I (rd S'4~~)'>-4<J~-56 AntCho<s A, d,c,iO APF.Y~"P mJ HAVE&ashore.I8 Q,.0 I Z'2" l2 Fi(." I I Pa cT is&P INOIRIIA VICMIGA>I POWER SITE OESlut<CONTfiOLLEO WORKING COPY lUL 1519S5 LCRK Drawn by: Date: Qual./Cert.Inspector Reviewed by: Date: Construction An hor Review Engineer Page 1 of 3 Revision 1


~~~e~~a-~~~~~9~~~e s~~~~o 14 V t 5%RRSRSHKLP MWWMMM&W R%1%RRRRSL MMWMMMW&RSRSSWRHLL 555%655%%LL R5%%%5%%88~~~~
Coo Component No. I'Z" & G~+-     1         Cla>>a particular prea the Any Yes         No v'Lfye>>,  Seismic Review Team>>hould pay extra check item>> that apply.)
5555WRIHHSE 54WWHRRSRI
attontion to7 Anchor Type Anchor Diameter Anchor Spacing Anchor Number Anchor Embedment Anchor Edge Distance Anchor Cap Anchor Thread Engagement Anchor Crip Anchor Angularity Concrete Crack Other>> (describe brief].y)
%8%&#xc3;%R4%~~M5%K'WWMMMWW P t 4 P C.4 4 c
If there  i>> concern. for Desi.gn Basis Discrepancy, circle tho applicable item and explain.
'12 CHP 5021.CCD.03.9 ATTACHMENT NO.1 ANCHOR INSPECTION DATA SHEET Equipment No.: IZ-AV'-Embedded Steel Dwg.No.: PHYSICAL CHARACTERISTICS Dwg No.': Iz.-$4 82-7 Weld ID T e Size Len th Cracks/3/Yes 57@Yes dRP Yes Yes~i M~w'~w//Yes cHZP Yes QRD~/i<"/'/y" Y s Weld T e Codes 1=Fillet 2=Plug/Slot 3=Groove Lack of Penetration Ye's Yes Yes Yes@HE Yes c85+Ys Yes 429 Yes CPS Porosity Yes Yes Yes Yes Yes Yes cHZP.895 Yes<HE lhQIAt(A te1ICH~GA I POII~R SlTE OrSlGH CONTROLLED WORKING COPY JUL t~199~LrPg T~CA Equipment base flexible: G Yes 8 No Reviewed by: ons ruc on re ns ruc 1on c or ev1ew ng1neer~~~verified by: ua.er.npsec or Date: Date: g-Ah-93 Page 3 of 3 Revision 1 (12 CHP 5021.CCD.019 ATTACHMENT NO.1 ANCHOR TNSPECTXON DATA SHEET quipment No.: l~-/-r V'-E'SV Embedded Steel Dwg.No.: h PHYSICAL CHARACTERISTICS Dwg No.: t+-W 4BZ.-7 Weld XD T e Size Len th Cracks Lack of Penetration Porosity'lie.Yes Yes Yes w'io Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes 4lZP Yes'RAN Qes Yes CfB Yes Ch Yes KD Yes Weld T e Codes 1=Fillet 2=Plug/Slot 3=Groove liVOIANA h".CH IGnN PO)".ER SITE OFSICH COlITROaa.EL'CRNlIt(C CCRC'UI.>g]995-tres T~~Equipment base flexible: 0 Yes 5 No T Reviewed by: ons ruc 1o re Date: 0->>-'l'3 Date: b-2,(-f2 Verified by:~~ons ruc 1on nc or ev1ew ng1neer ua.er.npsec or Date: Page 3 of 3 Revision 1
: l. Hardvare Maintenance Type Discrepancy
: 2. Drawing Update Type Discrepancy
: 3. Significant Operability/Do>>ign Basis Discrepancy Others Condi tion:
Actions Taken:
Prepared By ~'aca                ~5>'3


C'2 CHP 5021.CCD.019 ATTACHMENT NO-1 ANCHOR INSPECTION DATA SHEET quipment No.:/Z-A'mbedded Steel Dwg.No.: gh PHYSlCAL CHARACTERISTICS Dwg No..'Z-WC SZ-~Weld XD T e Size Len th Cracks Lack of Penetration Porosity Yes Yes Yes ges 3" Yes@Ys Yes Cb 3/s 0 Yes s Yes s 0 3/Yes 0 s Yes Weld T e Codes 1=Fillet 2=Plug/Slot 3=Groove INDI/(JA>.',~Q<ICAN PP;ygII SITC O~SlCN CONT(IDLI.ED YYDIIKIIIC CQP'f lUL~q 199" Equipment base flexible: 0 Yes 5 No on ruc x n re Date'2I Reviewed by: V rified by: on ruc>on nc o ua.er.npsec or evxew ngxneer Date: Page 3 of 3 Revision 1  
                                                                          *c'     CHP @021. CCD. 019
                                                                              . ZTACHNENT        NO. 1 NCHOR XNSPECTION DATA SHEE O(v                                                          E.        M      ea      4o~
Unxt                                      Bldg.                     Location iZ-  9-ES          -7 Xnstallatxon                dwg.       / Rev.           Equipment No.
Anchora e Arran ement Sketch I (OIAi~A MlCHIQAy POWER rAu &r                                                      SITE i)ES I'H CO ITROLLEO WORKIIIQ COPY JUL >S tsSS
                                                                            <<RZ      l.
DETAIL  A                                                DETAIL(I 0
(0 CoHPon(EQ  r  I8    I'-ITTAC'AGO T(o /V Cu~l QZ'Q              'P I ATE a~  (~)    zz"p5
                    ~-as'~+~1rI I
I                                3-P I
cj(((I((VB AprlrI,E F-(I (I
l~
8 eche  ~4AL
                                                                                      ~/A"  B.<T't      /)~i(J oo o
                                                                                      ~f(pf,Q  oP    Top Drawn by:
Verified  b                                                              Date:
Qual. /Cert. Xnspector Reviewed by:                                                             pate.         F-RI-      t 3 Construction                  An    hor Review Engineer Page   1  of     3 Revision         1


12 CHP 5021.CCD.019 ATTACHMENT NO.1 ANCHOR XNSPECTXON DATA SHEETquipment No.: 2--Sld-7 Embedded Steel Dwg.No.: g-3L8~PHYSXCAL CHARACTERXSTXCS Dwg No.: Z-W Z-7 Held XD T e 4JZ IJ~L 4AV Weld T e Codes 1=Fillet Size Len th Cracks Lack of Penetration Porosity Yes Yes kS'es 855 Yes Yes B5 Yes Yes QRI Yes c55'es Yes Yes cd&7'Fq Yes cRED Yes drab Yes CKb Yes es Yes Yes Yes mz.Hh Yes No Yes No Yes No 2=Plug/Slot 3=Groove QEhlOTES An/XII$4O~AJW uJEL A.INOIANA tIICHIGAN POWER SITE DESIGN CONTROLLED WORKING COPY JUL>~1995.LEAK 7 Eguipment base flexible: 0 Yes 8-No Reviewed by: ons uc zo re Date: ons ruc son or evzew ngxneer Verified by: ua.er.npsec or Date: Y-<-9'3 Page 3 of 3 Revision 1 II 1 S 8.A.DEPARTMENT CONTPOLLED DOCUtvlciNT COPY NO.3-l SHP 5050 NDE.008 ATTACHMENT NO.1 ULTRASONIC TEST REPORT JOB ORDER NO.:/8 REPORT DATE: 4-/-'73 REQUEST NO.IDENTIFICATION Unit Component Item n/i Material/<Other 5-FS i~~" Test Unit/S/N>(wS'r.'-5'2F-P~Freq./Diameter 7 zsZ~Reference Standard C-~P Couplant/Batch No.'=.c/~7aZ TEST DATA REMARKS PERFORMED BY: REVIEWED BY: FORM NO.12 SHP 5050 NDE.008-1:~3 LEVEL:~DATE:~///+Page 1 of 1 Revision 0 Equip XD: 1-AFW Train: 2 Equip Class: 14 Drawing No.: 1-12035 sction: 120 VAC SYSTEM stem: 120/208V MISC.SAFTEY RELATED POWER DXSTRIBUTXON J Equip Desc: POWER PANEL Building: AUXILIARY Room: CD EMERGENCY DXESEL GENERATOR ROOM Elev: 587 Sort: S, Notes: ,Normal State: Desired State: Power Req'd: Support System Drawing: Req'd Support Comp: Safety Related Status: NUCLEAR SR Alias No: Power Train: A Comp Served: Mfr: POWER ELECTRIC INC.Model: Min/Opt: MIN E em.Drawing: 1-98215 Wiring Drawing: 1-95022 Power Source: 1-ABD-C-2A Walkdown: F Relay Eval: N Comp Type: DISTRIBUTXON PANEL XSO Drawing: Location: 10 FEET NW OF CD EMERGENCY DIESEL GENERATOR gl-OME-150-CD(ON THE NORTH WALL DC Cook Unit1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/1 4/92 Status: Yes Sheet 1 of 3 ID: 1-AFW (Rev.0)Description:
                                                            **l2CHP          5021.CCD.019 I    'TACHMENT NO.           1 NCHOR INSPECTXON DATA SHEET c.Yc.t Quod  0           ~   E          U      7 oow Unzt                    ~
POWER PANEL Building: AUXILIARY Class: 14.Distribution Panels F(oor El.: 587.00 Room, Row/Col: CD EDG RM, 10 FEET NW OF CD EMERGENCY DIESEL GENERATOR C1-OME-150-CD, ON THE N WALL Manufacturer, Model, Etc.: POWELL ELECTRIC INC.SEISMIC CAPACITY VS DEMAND Elevation where equipment receives seismic input Flevation of seismic input below about 40'rom grade (grade=608.00)Equipment has fundamental frequency above about 8 Hz (est.frequency=)Capacity based on: 1.00'ounding Spectrum Demand based on: 1.00*Design Basis Ground Response Spectrum 587.00 Yes SRT 0.000 LOG r////////0 090 0.50 LOG Hz Capacity.....Demand 33.00 Capacity Demand 1 Demand 2 File C:tGIPtGIPtspectra.des C:LGIPIPROJ0031tspectra.des C:tGIPtPROJ0031tspectra.des Record Label Bounding Spectrum BUILDING GroundlELEVATION 608 BROADEN N BUILDING Ground(ELEVATION 608 BROADEN N Does capacity exceed demand?
Bldg.                         Location IZ,- Av- F>g-7 Xnstallatz.on dwg. / Rev.               Equipment No.
DC Cook Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 2 of 3 ID: 1-AFW (Rev.0)Description:
Anchora e Arran ement Sketch
POWER PANEL Building: AUXILIARY Class: 14.Distribution Panels Floor El.: 587.00 Room, Row/Col: CD EDG RM, 10 FEET NW OF CD EMERGENCY DIESEL GENERATOR f/1-OME-150-CD, ON THE N WALL Manufacturer, Model, Etc.: POWELL ELECTRIC INC.CAVEATS-BOUNDING SPECTRUM DP/BS Caveat I-Earthquake Experience Equipment Class DP/BS Caveat 2-Contains only Circuit Breakers and Switches DP/BS Caveat 3-Doors Secured.DP/BS Caveat 4-Adjacent Cabinets Bolted Together.DP/BS Caveat 5-General Configuration Similar to NEMA Standards.
                    \
DP/BS Caveat 6-Adequate Anchorage DP/BS Caveat 7-Potential Chatter of Essential Rela s Evaluated.
Ow
DP/BS Caveat 8-No Other Concerns.Is the intent of all the caveats met for Bounding Spectrum'7 Yes Yes Yes N/A Yes Yes N/A Yes ANCHORAGE 1.The sizes and locations of anchors have been determined 2.Appropriate equipment characteristics have been determined (mass, CG, natural freq., damping, center of rotation).
                                                        ~I I
3.The type of anchorage is covered by the GIP 4.The adequacy of the anchorage installation has been evaluated (weld quality and length, nuts and washers, expansion anchor tightness, etc.)5.Factors affecting anchorage capacity or margin of safety have been considered:
I-~+/6 I.           f  'THRV Cbo'Erb 7YP. Z I
embedment length, anchor spacing, free-edge distance, concrete strength/condition, and concrete cracking.6.For bolted anchorages, any gaps under the base are less than 1/4.7.Factors affecting essential relays have been'considered:
I I
gaps under the base, capacity reduction for expansion anchors.8.The base has adequate stiffness and the effect of prying action on anchors has been considered.
I
9.The strength of the equipment base and the load path to the CG is adequate.10.The adequacy of embedded steel, grout pads or large concrete pads have been evaluated.
                                                        'I lo  Yig I IOIANA h'ICHIGAIJ POP,'/II Sl fF. OCSIGH CONTROLLED YIORKIIIG COPY EL'E.V      lEw'w Meir                              JUL tg19SS
11.The anchorage capacity exceeds the demand.Yes Yes Yes Yes Yes Yes N/A Yes Yes N/A Yes Are anchorage requirements met?
                                                          . LCRK    ~
DC Cook Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 3 of 3 ID: 1-AFW(Rev.0)Description:
Drawn by:                                                   Date:            Y    /2  q Verified  b                                                 Date:                     'PD Qual. /Cert. Inspector
POWER PANEL Class: 14.Distribution Panels Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: CD EDG RM, 10 FEET NW OF CD EMERGENCY DIESEL GENERATOR 81-OME-150-CD, ON THE N WALL Manufacturer, Model, Etc.: POWELL ELECTRIC INC.INTERACTION EFFECTS 1.Soft targets are free from impact by nearby equipment or structures 2.If the equipment contains sensitive relays, it is free from all impact by nearby equipment or structures.
                        ~      ~
3.Attached lines have adequate flexibility 4.Overhead equipment or distribution systems are not likely to collapse.5.No other adverse concerns were found.Is equipment free of interaction effects?Yes N/A Yes Yes Yes S'E I NT ES C L Y DE U E SRT: George Gary Thomas (S&A)and Tom Huang (AEP)on 10/7/1993 Ref.1: Anchor Inspection Data Sheet: Anchorage Arrangement Sheet, 1/21/93.Ref.2: Dwg 0 1-12035-12 (internal components dwg).Capacity: BSCav.2: Verified by walkdown and Ref.2.Anchorage:
Reviewed by:
Wall mounted panel with dimensions:
    ~
36"Hx20''Wx6"Deep.
            ~    T  ~
Anchorage was not accessible.
Construct>on      A   chor Review Engineer Date:            ~   <'-'I~
Panel estimated to weigh less than 50 lbs.Tug tested by G.Thomas to at least 100 Ibs, OK;therefore, no explicit anchorage evaluation necessary.
Page    1 of    3 Revision        1
Evaluated by: Date:
(12 CHP 5021.CCD.019 ATTACENENT NO.1 ANCHOR INSPECTION DATA SHEET COE E gg I, Un>.t Bldg.Location Installation dwg./Rev.Anchora e Arran ement Sketch Equipment No.PHOO uuislr<<k 1-'8" C~lr (YI'I'.)t-a" r&AQUI!M)qua%lo un,pl~CASa)~)I'-8wZ-II 8!<<5/8~~l I 8 lv I (~)5Ctcwg~/~ssl cps LJII tC H Cd/AEc.f.un:sic<<I, H ufo'A.(9'rP)II'IDIMIt,'!CHICA,I
~W~II GITE DESIGII COII TIIOU.'60 VFORXING COPY APH 0 8 tS93..I.EAK Drawn by: verified by-Reviewed b 7-Date: 1-~I-'l3 ual./ert.nspector Date: Construction A chor Review Engineer Page 1 of 3 Revision 1 g~-eemseaarx RRRRRSRSHHEL RSRSRRRRMML&
WRRRSHHHRL QSSISLRLS HRRRRRRLLLL MWWWWW&W RWRlWRHSL W558WRLEL MWWWWMW&I k i 0 f~J4>~~
Database: K:SSEL2C.DBF Equip ID: 2-BATT-AB Train: 1 Equip Class:15 ywing No.: 2-12003 nction: 250 VDC SYSTEM System: 250VDC DISTRXBUTXON Equip Desc: PLANT BATTERY AB Building: AUXILIARY Room: AB BATTERY EQUIPMENT AREA Elev: 609 Sort: S,R Notes: Normal State: Desired State: Power Req'd: Support System Drawing: 2-98055, 2-12003 Req'd Support Comp: Safety Related Status: NUCLEAR SR Min/Opt: MIN Alias No: Power Train: B Comp Served: MFR: C 6 D BATTERIES l: LC-25 Panel: 2-BC-AB Elem.Drawing: 2-98055 Wiring Drawing: 2-91012, 2-91301 Power Source: 2-TDAB-5 Walkdown: C Relay Eval: Y Comp Type: BATTERY,*RHR WALKDOWN COMPONENT Iso.Drawing: Location: IN THE CENTER OF THE ROOM, 3 FEET NORTH OF THE ENTRANCE DOOR D.C.Cook Unit 2 Screening Evaluation Worksheet (SEWS)GIP Rev 2, Corrected, 2114/92 Status: No Sheet 1 of 6 ID: 2-BATT-AB (Rev.0)Class: 15.Batteries on Racks


== Description:==
i
                                                                                      ~2 CHP 5021 - CCD. 019 ATTACHMENT NO. 1 bNcHQR        NSPECTION DATA SHEET E  Few Q~
Unct                                            Bldg.                  Locatzo Installation                        dwg.      /  Rev.          Equipment No.
Anchora e Arran ement Sketch Top      Wgo sps ipc Pbi77u~  IV'2Z WwACcc:ssibt 8 Pi@
                                                                                                            ~    TOP Mc) xwsoC vc Q II1vg I
I 4/iS'                                            0  M
                                                      )
I 4/iy V
I                                                        d
                                                        ~
I I
4'ib Z"
I 'I~
5/
TOP    Qi~
POp  Wc v                                                                                    ZJlMg VV lb''vt48~
              ~S<QQ BO77~
Mib
                        +i@                                    fi 7I  7 7<. L>>" 7c" I/u" PLtI Y-e      iS                S Ti Y'CS WE't DED YO rv >c L.
Tnt')'Lr IttDIANA MICiIIGQN PPWt        R Sc CHANNEL IS bta                                                                SITC PESld't( CONTROLLt.J 87'FNos AnlQ                      'vT WORKING COPY HEEDED VOLrt-TI cr>>
f UL 1g    tSSS
                                                                                        ~ pRg    T~E'WPD n'rawn by:                                                                      Date:
Verified
        ~
by
~
Qual. /Cert. Inspector
                                              ~          ~
Reviewed by:                    T,                                                Date:      ') "2.I- Qg Construct>.on                      A    chor Review Engineer Page    1  of  3 Revision        1


PLANT BATTERY AB Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: AS BATTERY EQUIP AREA-IN THE CENTER OF THE ROOM, 3 FEET NORTH OF THE ENTRANCE DOOR Manufacturer, Model, Etc.: CBD Power Systems LC-25 Cells SEISMIC CAPACITY VS DEMAND 1.Elevation where equipment receives seismic input Elevation of seismic input below about 40'rom grade (grade=608.00)3.Equipment has fundamental frequency above about 8 Hz (est.frequency=8.00)Capacity based on: 1.00 Bounding Spectrum 5.Demand based on: 1.00" Design Basis Ground Response Spectrum 609.00 Yes SRT 0.850 LIN I r r~1 r r er~t 0.000 1.00 LOG Hz Capacity~....Demand 33.00 Capactt Demand 1 Demand 2 HAGIPtGIPtspectra.des H:tGIPtPROJOOSStspectra.des H:tGIPV'ROJ0058tspectra.des Record Label Bounding Spectrum BUILDING Ground Spectrum ELEVATION BROADEN BUILDING Ground Spectrum ELEVATION BROADEN Does capacity exceed demand'
                                                                              *"      2 CHP    5021-   CCD 019
                                                                                                              ~
ATTACHMENT NO.               1 NC OR    INSPECTIO        D TA    S    E C/8 N    uSE                F.. FSM R> iP        oe
            .Unxt                                  Bldg.                                 Location 4    -7 Installation            dwg.   /  Rev.           Equipment No.
Anchora e Arran ement Sketch C.
0 gA"     /Z.         /Q"        /g "
O>Oy ECT      VIe&        AA 0'5'~  '~ '+,>,~C, o tQg+>',:< -',~l8"+: ~  W.A  ~      %~XI'>"5'I (rd S '4~     ~ )'>-4 <J~       -56 AntCho<s      A, d,c,iO                          I8                          Q,.            0 APF. Y~"P mJ HAVE &ashore.
I Z'2"            l2 Fi(."          II Pa cT      is&              P INOIRIIA VICMIGA>I POWER SITE OESlut< CONTfiOLLEO WORKING COPY lUL 1519S5 LCRK Drawn by:                                                                      Date:
Qual. /Cert. Inspector Reviewed by:                                                                   Date:
Construction            An  hor Review Engineer Page  1  of  3 Revision      1


D.C.Cook Unit 2 Screening Evaluation Worksheet (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: No Sheet 2 of 6 ID: 2-BATT-AB (Rev.0)Description:
                                                    ~ ~ ~
PLANT BATTERY AB Building: AUXILIARY Class: 15.Batteries on Racks Floor El.: 609.00 Room, Row/Col: AG BATTERY EQUIP AREA-IN THE CENTER OF THE ROOM, 3 FEET NORTH OF THE ENTRANCE DOOR Manufacturer, Model, Etc.: CSD Power Systems LC-25 Cells CAVEATS-BOUNDING SPECTRUM BAT/BS Caveat I-Earthquake Experience Equipment Class BAT/BS Caveat 2-Battery Cell Plates are Lead-Calcium Flat-Plate, Plante, or Manchex Design.BAT/BS Caveat 3-Each Individual Battery Weighs Less Than 450 Pounds.BAT/BS Caveat 4-Close-Fitting Spacers between Cells..BAT/BS Caveat 5-Batteries Restrained by Side and End Rails BAT/BS Caveat 6-Battery Racks Have Longitudinal Cross Bracing.BAT/BS Caveat 7-Racks Constructed of Wood Evaluated.
e    ~ ~ a        ~  ~ e    s    ~
BAT/BS Caveat 8-Batteries Greater Than 10 Years Old Evaluated.
                                ~      ~  ~
BAT/BS Caveat 9-Adequate Anchorage BAT/BS Caveat 10-No Other Concerns.Is the intent of all the caveats met for Bounding Spectrum?Yes Yes Yes Yes Yes Yes N/A Yes Yes ANCHORAGE 1.The sizes and locations of anchors have been determined 2.Appropriate equipment characteristics have been determined (mass, CG, natural freq., damping, center of rotation).
  - ~  ~        ~    ~
3.The type of anchorage is covered by the GIP 4.The adequacy of the anchorage installation has been evaluated (weld quality and length, nuts and washers, expansion anchor tightness, etc.)5.Factors affecting anchorage capacity or margin of safety have been considered:
o    14
embedment length, anchor spacing, free-edge distance, concrete strength/condition, and concrete cracking.6.For bolted anchorages, any gaps under the base are less than 1/4 7.Factors affecting essential relays have been considered:
              ~        9 ~
gaps under the base, capacity reduction for expansion anchors.8.The base has adequate stiffness and the effect of prying action on anchors has been considered.
t 5%RRSRSHKLP MWWMMM&W R%1%RRRRSL MMWMMMW&
9.The strength of the equipment base and the load path to the CG is adequate 10.The adequacy of embedded steel, grout pads or large concrete pads have been evaluated.
RSRSSWRHLL 555%655%%LL R5%%%5%%88~~~~
11.The anchorage capacity exceeds the demand.Are anchorage requirements met?Yes Yes Yes Yes Yes Yes N/A Yes Yes N/A Yes D.C.Cook Unit 2 Screening Evaluation Worksheet (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: No Sheet 3 of 6 ID: 2-BATT-AB (Rev.0)Description:
5555WRIHHSE 54WWHRRSRI
PLANT BATTERY AB Class: 15.Batteries on Racks Building: AUXILIARY Floor EI.: 609.00 Room, Row/Col: AB BATI ERY EQUIP AREA-IN THE CENTER OF THE ROOM, 3 FEET NORTH OF THE ENTRANCE DOOR Manufacturer, Model, Etc.: C&D Power Systems LC-25 Cells INTERACTION EFFECTS 1.Soft targets are free from impact by nearby equipment or structures 2.If the equipment contains sensitive relays, it is free from all impact by nearby equipment or structures.
          %8%&#xc3;%R4%~~M5%K'WWMMMWW P
3.Attached lines have adequate flexibility 4.Overhead equipment or distribution systems are not likely to collapse.5.No other adverse concerns were found.Is equipment free of interaction effects?Yes N/A Yes Yes Yes S IC LLY D U~CON I~EN Date: 10/18/93 SRT: Tom Huang (AEP), Steve Anagnostis (S&A), Paul Krugh (AEP), Randy Steele (AEP)
t      4  P                  C.
4 4
c V


==References:==
                                                                    '12  CHP 5021. CCD. 03.9 ATTACHMENT NO. 1 ANCHOR INSPECTION DATA SHEET Equipment No.:        IZ- AV'-                                          Dwg    No.': Iz.-$ 4 82-7 Embedded  Steel  Dwg. No.:
PHYSICAL CHARACTERISTICS Weld ID        ~i        M~      w'~    w                                      Weld T e Codes T    e            /        /
1 = Fillet Size                                                                    ~/i<"
2    = Plug/Slot Len    th      / 3/                                                  / '/y"        = Groove 3
Cracks          Yes      Yes      Yes    Yes    Yes            Yes    Y s 57@      dRP                    cHZP          QRD Lack of        Ye's    Yes      Yes    Yes    Yes    +Ys    Yes    Yes Penetration                              @HE    c85            429    CPS Porosity        Yes      Yes    Yes            Yes    Yes    Yes    Yes cHZP  . 895    <HE lhQIAt(A te1ICH~GA I POII~R SlTE OrSlGH CONTROLLED WORKING COPY JUL t~199~
LrPg  T  ~ CA Equipment base    flexible:        G  Yes    8 No ons  ruc on      re Date:
Reviewed by:                                                                       Date:
ns ruc 1on        c  or  ev1ew    ng1neer verified
    ~
by:                                                                                  g-Ah- 93 ua  .~    er  .~    npsec or Page    3  of    3 Revision          1


1.Cook Dwgs 12-3476-18, 12-3073A-3, 12-3073D 2.C&D Power Systems Inc Dwgs K-5629-3, M-8654-C, M-8655-C, M-8665-D 3.Anchorage Package Four substantial welded steel 2-step battery racks well braced in both directions.
(
Two racks house 28 cells each, and two racks house 30 cells each.Each cell is a C&D Power Systems LC-25.The cells are well secured.Each rack is anchored with twelve (12)3/8" anchors.-see references for details.Frequency>8 Hz by inspection.
12 CHP 5021. CCD. 019 ATTACHMENT NO. 1 ANCHOR TNSPECTXON DATA SHEET quipment No.:     l~-/-r V'- E'SV                                    Dwg  No.: t+-W 4BZ.-7 Embedded Steel Dwg. No.:               h PHYSICAL CHARACTERISTICS Weld    XD          w'io Weld T e Codes T    e 1 = Fillet Size          'lie.
BS Caveat 2: Batteries are C&D lead calcium flat plate (per label on battery).BS Caveat 3: Each cell weighs 325 Ibs (Reference 2)BS Caveat 8: Batteries were installed in 1985.SQUG Action Item 002 was written to address the aging issue.ANCH Caveat 1: The anchorage package specifies the anchors as unknown 3/8" non-shell type expansion anchors.The original plant drawings (Ref 1)specify 3/8" J-bolts (90 degrees, 9", embedment), but when the current battery rack was replaced in 1985, a note was added to the plant drawing that, where necessary due to bolt hole misalignment in the rack, the original J bolts were to be cut off and replaced with 3/8" Kwik bolts.The current bolts are exactly where the original plant drawings locate the J bolts, and they look like J-bolts (cut-off threaded end).ANCH Caveat 2: Per Ref 2, the 28 cell racks weigh 10231 Ibs and the 30 cell racks weigh 10920 lbs.The cells are about 90%of the weight and the rack is about 10%of the weight.The attached"Battery Rack Weight Distribution" shows the geometry.ANCH Caveat 4, 6: Installation checked per Ref 3.
2   = Plug/Slot Len    th                                                                    3    = Groove Cracks        Yes    Yes    Yes    Yes  Yes    Yes        Yes  Yes 4lZP      CfB    KD Lack    of   Yes    Yes    Yes    Yes  Yes              Yes  Yes Penetration                                      Yes'RAN Ch Porosity      Yes    Yes    Yes                Qes liVOIANA h".CH IGnN PO)".ER SITE OFSICH    COlITROaa.EL'CRNlIt(C CCRC'UI.
D.C.Cook Unit 2 Screening Evaluation Worksheet (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: No Sheet 4 of 6 ID: 2-BATT-AB (Rev.0)Description:
                                                                                  >g]995
PLANT BATTERY AB Building: AUXILIARY Class: 15.Batteries on Racks Floor EI.: 609.00 Room, Row/Col: AB BATTERY EQUIP AREA-IN THE CENTER OF THE ROOM, 3 FEET NORTH OF THE ENTRANCE DOOR Manufacturer, Model, Etc.: C8D Power Systems LC-25 Cells ANCH Caveat 5: In the SRT's judgement, the anchors are the original J bolts.Per GIP Table C.4-1, these have nominal capacities of 3.74k pullout and and 1.87 kip shear.The pullout capacity is reduced by 0.51 to 1.91 kips due to the 9" embedment length.No other reductions are required.Note that if the anchors were 3/8" Kwik bolts (the replacements specified in Ref 1), the nominal capacities would be 1 46 k pullout and 1.42 kip shear.The pullout capacity would be reduced by 0.88 to 1.28 kips due to 3.5 ksi concrete.No other reductions would be required." ANCH Caveat 8: The racks are anchored through a pair of 3/4" thick plates that run along the front and back of the racks (see references and photos).This configuration may produce some prying on the anchors;although the plate may be stiff enough relative to the anchors to keep this to a minimum.Per the discussion for ANCH Caveat 11, the pullout load would have to increase by a factor of 6.2 for J-bolts (3.6 for Kwik,bolts) to reach the allowable limits.ANCH Caveat 11: The attached"Battery Rack Weight Distribution" shows that the front-to-back overturning moment for one rack is 55648 in-lbs.That moment is resisted by six anchors with a moment arm of 30", which produces a per bolt pullout load of 55648/6/30
                                                                  -tres    T  ~~
=309 lbs.The side-to-side seismic loads will not produce any significant pullout loads.The shear load is 4586 Ibs for one horizontal direction of input.SRSS'ing the two horizontal directions and dividing by the number of bolts produces a per bolt shear load of 1.41 x 4586/12=539 lbs.Using the bi-linear shear-tension interaction in GIP Figure C.3-2, the interaction for a J bolt anchor is 309/1910=0.16 (Note that the shear is less than 0.3 of the shear allowable).
Equipment base  flexible:      0 Yes  5 No   T ons ruc 1o          re Date: 0- >>- 'l'3 Reviewed by:                                                                  Date:                                b-2,(- f2 ons ruc 1on      nc or  ev1ew        ng1neer Verified by:
If a 3/8" Kwik bolt were assumed, the interaction would be 0.7 x (309/1280)
    ~  ~
+(539/1420)
Date:
=0.55.Photos: W2T1.11, 12 Evaluated by: Date:/c'o~S
ua  . er  . npsec or Page    3          of                  3 Revision                              1


==Attachment:==
C'2  CHP 5021. CCD. 019 ATTACHMENT NO- 1 ANCHOR INSPECTION DATA SHEET quipment No.:      / Z                                                      Dwg    No..'Z-WC SZ-~
Steel Dwg. No.:
A'mbedded gh PHYSlCAL CHARACTERISTICS Weld  XD Weld T          e Codes T  e Size                                                  3/                    3/      1    =  Fillet 2    = Plug/Slot Len  th                                3" 3    = Groove Cracks                Yes            Yes              s          Yes 0              0 Lack of        Yes    Yes            @Ys    Yes      s      s      s  Yes Penetration                                                  0 Porosity              ges              Yes          Yes Cb INDI/(JA  >.',~Q<ICAN PP;ygII SITC O~SlCN CONT(IDLI.ED YYDIIKIIICCQP'f lUL      ~q 199" Equipment base    flexible:              0 Yes    5 No on    ruc  x n  re Date            '2I Reviewed by:
on            ruc  >on  nc o    evxew    ngxneer V  rified by:    ua .      er        . npsec or Date:
Page      3    of  3 Revision          1


Pictures
12 CHP 5021. CCD. 019 ATTACHMENT NO. 1 ANCHOR XNSPECTXON DATA SHEET quipment No.:        2-          Sld- 7                            Dwg    No.:      Z-W Z-7 Embedded  Steel  Dwg. No.:                    g-3L8~
PHYSXCAL CHARACTERXSTXCS Held  XD      4JZ    IJ~L    4AV Weld T        e Codes T  e Size 1    =  Fillet 2    = Plug/Slot Len  th                                        7'Fq 3    = Groove Cracks          Yes              Yes          Yes    Yes      es  Yes CKb          No Lack  of      kS'es Yes 855 Yes    Yes    Yes cRED Yes    Yes    Yes  Yes Penetration                    c55'es QRI          drab                  No Porosity                Yes    Yes    Yes            Yes    Yes  Yes B5            cd&            mz  . Hh    No QEhlOTES      An/ XII $ 4O~AJW uJEL    A.
INOIANA tIICHIGAN POWER SITE DESIGN CONTROLLED WORKING COPY JUL >~ 1995
                                                                    .LEAK  7 Eguipment base    flexible:      0 Yes    8-No ons    uc zo    re Reviewed by:                                                                    Date:
ons ruc son            or evzew      ngxneer Verified by:                                                                  Date:        Y-<-9'3 ua  . er  . npsec or Page    3  of  3 Revision        1


==Attachment:==
II 1


Battery Rack Weight Distribution
    .A.DEPARTMENT                                            SHP  5050 NDE.008 S 8                                                      ATTACHMENT NO.        1 CONTPOLLED DOCUtvlciNT COPY NO.      3  -l ULTRASONIC TEST REPORT JOB ORDER NO.:      /8      REPORT DATE: 4-/- '73    REQUEST NO.
IDENTIFICATION Unit                                    Test Unit/ S/N    >    (wS'r.'- 5'2F-      P~
Component              -FS i~~ "        Freq./Diameter        7        zsZ~
C-    P Item n /i Material    /<
Reference Standard Couplant/Batch No.      '=. c/    ~
                                                                                      ~7aZ Other  5 TEST DATA REMARKS PERFORMED BY:                                                          :  ~3 REVIEWED BY:
FORM NO. 12 SHP 5050 NDE.008-1 LEVEL:  ~
Page  1  of DATE:
1
                                                                                  ~ ///+
Revision    0


D.C.Cook Unit 2 Screening Evaluation Worksheet (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: No Sheet 5 of 6 ID: 2-BATT-AB (Rev.0)Description:
Equip XD: 1-AFW Train:      2   Equip Class: 14 Drawing No.: 1-12035 sction:  120 VAC SYSTEM stem: 120/208V MISC. SAFTEY      RELATED POWER DXSTRIBUTXON J
PLANT BALI ERY AB Class: 15.Batteries on Racks Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: A8 BATTERY EQUIP AREA-IN THE CENTER OF THE ROOM, 3 FEET NORTH OF THE ENTRANCE DOOR Manufacturer, Model, Etc.: C8D Power Systems LC-25 Cells JPPGTUR s 0.12 L 0 D.C.Cook Unit 2 Screening Evaluation Worksheet (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: No Sheet 6 of 6 ID: 2-BATI-AB (Rev.0)Description:
Equip Desc:     POWER PANEL Building:   AUXILIARY   Room: CD EMERGENCY DXESEL GENERATOR ROOM Elev: 587      Sort: S,         Notes:
PLANT BATTERY AB Class: 15.Batteries on Racks Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: AB BATTERY EQUIP AREA-IN THE CENTER OF THE ROOM, 3 FEET NORTH OF THE ENTRANCE DOOR Manufacturer, Model, Etc.: C8D Power Systems LC-25 Cells ac W s ib P-11 CC of upper tie W x Sah=2295 Ib W x (1-0.4 Sov)~4958 Ib CG of lower tier W x Sah~2293 fb W=1/2 rack weight=5460 Ibs Soh=1.5 x 57.FRS O 8 Hz=0.42g Sav=2/3 x 1.5 x 5K FIIS I 20 Hz=0.23g'ateral Load=2 x 2293 Ib=4586 W x (1-0.4 Sov)=4958 Ib Overturning Momen't (sum moments about 8)~(2293 x 26)+(2293 x 48)-(4958 x 23)=55648 in fbs Base Channet Bolt lines D.C.Cook Unit 2 Outlier Seismic Verification Sheet (OSVS)GIP Rev 2, Corrected 2/14/92 Sheet 1 of 4 ID: 2-BATT-AB (Rev.0)Description:
,Normal State:        Desired State:     Power Req'd:
PLANT BATTERY AB Building: AUXILIARY Class: 15.Batteries on Racks Floor EI.: 609.00 Room, Row/Col: AB BATTERY EQUIP AREA-IN THE CENTER OF THE ROOM, 3 FEET NORTH OF THE ENTRANCE DOOR.OU L I SU DE I I ION-ec calan Eeet ical E u'a.Identify all the screening guidelines which are not met.(Check more than one if several guidelines could not be satisfied.)
Support System Drawing:
Capacity vs.Demand Caveats Anchorage Seismic Interaction Other b.Describe all the reasons for the outlier (i.e., if all the listed outlier issues were resolved, then the signatories would consider this item of equipment to be verified for seismic adequacy).
Req'd Support Comp:
The battery rack is an outlier due to BAT/BS Caveat 8-Batteries Greater Than 10 Years Old.2 P D DO U E 0 U N~ono, a.Defined proposed method(s)for resolving outlier.The attached"Position Paper on the Replacement of the Safety Related Batteries at the Donald C.Cook Nuclear Plant" (R.J.Roman May 10, 1993)states that AEPSC has committed to adopting the replacement criteria stated in ANSI/IEEE Std 450-1987.AEPSC's position is that this commitment resolves the outlier.b.Provide information needed to implement proposed method(s)for resolving outlier (e.g., estimate of fundamental frequency).
Safety Related Status:    NUCLEAR SR        Min/Opt: MIN Alias  No:       Power Train:  A Comp  Served:
3 C 4CE C 0 The information on this OSVS is, to the best of our knowledge and belief, correct and accurate, and resolution of the outlier issues listed on the previous page will satisfy the requirements for this item of equipment to be verified for seismic adequacy: F Approved by: Date:
Mfr: POWER  ELECTRIC INC.
Model:
E em. Drawing: 1-98215 Wiring Drawing: 1-95022 Power Source:    1-ABD-C-2A Walkdown: F      Relay Eval  : N Comp  Type: DISTRIBUTXON    PANEL XSO  Drawing:
Location:   10 FEET NW OF CD EMERGENCY DIESEL GENERATOR gl-OME-150-CD(   ON THE NORTH WALL


==Attachment:==
DC Cook Unit1                                        GIP Rev 2, Corrected, 2/1 4/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                        Status: Yes Sheet 1 of 3 ID: 1-AFW ( Rev. 0 )                                  Class: 14. Distribution Panels


Position Paper on the Replacement of Saf Related Batteries
==
~QI I~~~~~I II'It~I~I~~Ml~~'~, I~~t~I S I V~~I~~I~~I I s~C'>>I~s I I I I~I~~>>>>I~~~~~I~~II I~~~~I>>.~.~I I I II~I~I~~I~~II~I I I I~II I l I II.S~I~.~~I'Jl~>>I~~~~~~~>>'~I~~~~~~~~~~I~~~~I~~~I~I~~I II I~~I~~I Ii.~~I~'~~>>O~I~~~>>I~~~I~~I~~~I>>\~V~I I~~~I>>~I~~~~~~~C~~~~~~~'~~~~~~~~~~~I'I~I>>J~1J~I~I~4 I l L.~I~>>
Description:==
CHARTER POWER ersAfMS, INC, Plyrrmuth Meeting, Pennsyh an(a DATE: TO: FROM'6 February 1984 Ron Roman American Electric Power Service Corp.Graham Walker CM Charter Power Systems, inc.
POWER PANEL Building: AUXILIARY                            F(oor El.: 587.00                    Room, Row/Col: CD EDG RM, 10 FEET NW OF CD EMERGENCY DIESEL GENERATOR C1-OME-150-CD, ON THE N WALL Manufacturer, Model, Etc.: POWELL ELECTRIC INC.
SEISMIC CAPACITY VS DEMAND Elevation where equipment receives seismic input                                                        587.00 Flevation of seismic input below about 40'rom grade (grade = 608.00)                                      Yes Equipment has fundamental frequency above about 8 Hz (est. frequency = )                                  SRT Capacity based on:          1.00 'ounding Spectrum Demand based on:            1.00
* Design Basis Ground Response Spectrum 0.000 r
LOG                        //
                                              //
                                            /
                                        /
                                  //
0 090 0.50                                LOG      Hz                              33.00 Capacity ..... Demand File                                          Record Capacity        C:tGIPtGIPtspectra.des                        Label Bounding Spectrum Demand 1        C:LGIPIPROJ0031tspectra.des                    BUILDINGGroundlELEVATION 608 BROADEN N Demand 2        C:tGIPtPROJ0031tspectra.des                    BUILDINGGround(ELEVATION 608 BROADEN N Does capacity exceed demand?


==SUBJECT:==
DC Cook   Unit 1                               GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                   Status: Yes Sheet 2 of 3 ID: 1-AFW ( Rev.       0 )                         Class:   14. Distribution Panels
O.C, Cook Nuclear Plant Tmfn N, 250 Voft Safety Refatad Battery Seismic and Ufe Qualification I In response to your1B Feb 94 memo, our mes indicate the following;
'I 1.The Train N batteries were originally purchased ln May 1979 under, P.O.No.0887M21-8, as the Train C Auxiliary Feedwater System dattarfea.
2.The original Technical Specification, DCCEE-183&CN, Rev.2, 1 May 1878, requfmd only seismic qualification, 3, The C&Q Seismic QuafNcatfon Report submfttid for these batteries and racks fs No.VL7S10-02, ReV.2, dated 16 July 1878:.All doCumentatfcn at that time was submitted tha AEPSC offices In New Yofft', City.I I 4.The 3DCU-g has a 20 qualified life at a 77F arinual average operating ,l tomporature.
Qualification is by equivalence af conffguratfon, desfgn and materials to previously tested 3DCU-5, 3DCU-7 and OCU-17 models which were 20 years artNcfaffy aged in acconfance with fEEE<36 prfor to seismic testfng.The fEEE-344 seismfc qualNcation testing these caffe experienced envelopes the D.C.Cook fioor responsa spectrum.The reports for these!qualification tests are located at C&D Headquirters fn Plymouth Meeting, PA,.and are avaffabfa for review.I I lf you have any questions, pfease call me.I I Sincerely, Graham Wafkor Manage;Applications Engineering TOTAL P.03 volt-u->>ax Note 7671~~S~S Co JOopn Pnono N vs From.Co.Phono s Fat 0~4>>'>>~V t Date May 10, 1993 nnnpeot Position Paper on the RepIacemeat of the Safety Related Batteriea at the Donald C.Cook Nuclear Plant tron P~~Ro Je Roman/D~Re Smith%pie 1)J.A ra l+)s)+~~vA~~~l+CA<<~I"i><+~r/qg Based on a review of the surveillance raporto, history, and maintenance records/trend charta for the 2AB battery, tho decision hae been made to replace this battery during thc 1994 Unit 2 refueling outage.The results of similar raviaws for the five other safety-related batterieo has led to the decision to not replace any of these batteries during tho upcoming xafueling outages.Tha following discussion addreaaas the dotails of the reviews that, led to this decision.AEPSC'a plan had boon to replace the oafoty-related batteriea at the Donald C.cook Nuclaax Plant ovary-10 years even though they are purchased aa 20 year batteriea.
a nav lated to ton nt, was developed aaod on prev oua premature p a er eo and high temperatures oxperiencod in the battory rooms.Beforo the decision was made to adopt this plan, a study waa conducted by HVAC showing that it would ba lees expansive to raplaco the battaries avory tan years than to air condition the battery rooms.Baood on this plan alone, tha lAB battaxy should ba replaced in 1995 (since it wao manufactured in 1985), tha 1CD battery in 1995, the 1N battery in 1999, tha 2AB battory in 1994, the 2CD battery in 1996, and the 2N in 1998.During the EDSFI, the 10 year x'eplacemont pl,an came into qucation during a review of the original battary sizing calculationo.
After lengthy discussions between the inspector and Mr.Roman<AEPSC ccaxnittad to adopting the replacement criteria stated in ANSI/IEEE Std 450"1987r IEEE Rocoaaended Practice for Maintenance, Testing, and Replacement of Large Lead Storago Batteries fox'enerating Stations and Substations.
Specifically, IEEE 450 recommends replacing a battery when its capacity, aa determined by the 60 month performance tost, ia bolow 80t of tha manufacturer's rating.Under ideal conditions, a battery would roach'L A rule of thumb regarding high temperature is that, for ovary 15'F above a 77'F average temperature, a battery'lifo io shortened by 50%~The average temperatures in the battery roomo at the DCCNP are leoo than 92'F (77'F+15'F)however other factors, ao discussed in the body of this report, lead to accelerated aging and/ox aarly roplacament of large lead-acid storage bat'terios.
77 F average temperature, thorough maintenance throughout battery lifo, etc.intra-System r v~raa>>>>>>u~VC Poaition Paper on the R<<pl<<cement of the Safoty@el<<ted Batteries<<t tb+Donald C.Cook Nuclear Plant May 10, 1993 Page 2 thi.o point somewhere around 20 years.Under current DccNp conditions, battery could reach this point sooner (due to the high battery room tcmpcraturee mentioned previously).
Ao implied in the previous two statements however, factors other than age affect the viability of the battery.Physical characteristics, such as plate condition together with agc, are often determinants for complete battery replacement.
Failure to hold a charge, as shown by cell voltage and specific gravity readi.ngo, io a good indicator for further investigation into the need fox replacement.
lt io a combination of those factors, and not simply the age or capacity alone, that haa led to the decision to replace the 2AB battery during the 1994 Unit 2 refueling outage.Neither these factors, nor the age or capacity alone, indicate the need to replace any of tho other safety"related batteries at this time.Xn support of the decision to not xaplace any of the other safety" related batteries during 1994 r~fucling outagco, the following information i.a provided.QQCA Voc~g~2)3)4)March/April voltage trends of these batteries i.ndicatc that all of thc calls have voltagoa in the normal range of 2.20-2.24 volts (on a float charge).For comparison purpooao, thirteen (13)of the 2AB cell voltages ware leos than (or equal to)2.20 volts.A cursory review of the past tcn year's worth of these safety-reLated battery files reveals few occurrences, i.f any, involving cell low voltages, electrolytelspecific gravity concerns, and overall less than dcaircable physical conditions.
Ao a contrast, there wexe many instances of these same concerns regarding the 2AB battery.The files do not indicate that an issue waa made xagaxding the temperatures of the 1AB<1CD, 1N, 2CD,&2N battery xooms.Thc fi.lco do show, however, that, upon procuxement
&i.notallation of the 2AB battery, the manufacture'o xapxeaentativc atatod that the battery life would be shortened due to the high ambient temperatures in the battery room.While this is a recognized attribute for all of thc batteries/roomo, it appeared to be morc severe at the time fox tha 2AB battery room.Routine preventive and corrective maintenance ie a part of any battery's life.This maintenance should be fairly consistent from ono safety-xelated battery to another, ao they are all large, lead-acid stationary batteriee.
For the most part, thi.o maintenance hae been consistent for the majority of the Class 1E batteries.
As expected then, these Class 1E battcrico arc experiencing a normal, predictaEXe decrease in their ecrvico li.fc.The 2AB battery, howavex, hae demanded considerable additional maintenance and engineering time i.n the past couple of years n Nine (9)cells had voltages leoa than 2.20 vDc and four (4)cells had voltagco equal to 2.20 VDC.4 The aforcmcntioned study comparing the coot of more fx'cqucnt battory replacement versus ai.r conditioning the battery rooms supporto this otatament.
The atnbiont temperatures axe generally higher i.n the AB battery rooms, when compaxed to the cD and N Txain rooms, due to their physical location in the plant and their ventilation systems.
Position Paper on the Replacement of the Safety Related Batteriea at the Donald C.Cook?tucloar Plant May 10, 1993 Page 3 resolving issues concerning low voltages, specific gravities.
etc.Ae the additional time spent maintaining this battery is significant, it is believed that this is signaling tho end of this battery's useful life and that it will most probably not stay within the Tech Spec range for individual coll voltages beyond tho upcoming refueling outage.Toad acid storage batterieo are dynamic electrochemical devices.As ouch, the ability to predict their future performance and/or capacity represents a near formidable Cask.The decision to not replace any of tho other safety-related batterios outside of 2KB dura,ng the upcoming refueling outages was arrived at after careful consideration of all the factors involved-Tho information available simply does not support their replacement at this time.Therefore, it is recommended that those battories continue to be maintained and tasted in accordance with tho IREE standards and the recommendation to replace them corno when tho maintenance/testing data supports it.Preparod By/Date: os'/o 9 g Concurrence 8y/Date: n~~AC~~pS'07'.Concurranco Statement:
ass m~~~~~c: 0+Co Joffxoy/4+Rr tdlderoon/Reit+
Roman R.I.Ghoborg J.A.Kobyra D.R.Smith/J.Murtha-Bridgman T.A.Kratt-Bridgman AEPSC/NEEP Gafoty Related Battery File (c:ir$rXbatteryioefmemo.wp)
TOTAL P.G3


0~~I~~~~L~~0 0~~~~~mr r r~~I e~-h 0 Q~~0.104~-0~0~0~RSRKRIRWRSRIISII:-
==
RSMIIIII55III mmlsIIRIISIIB 55 I IRSIIII RIRSIRIIIRIRRIIII y 4 e o o IIHRIIRW~RwmIIER MWWWWMWW J 0 0 H j 0 e r~+~t 0 0~MWWMMWWW~~C r 0 h~'tta;EERIER 0 L~
Description:==
**12 CHP 5021~CCD.019".TACHMENT NO.1 NCHOR INS ECTION DATA SHEET W KV A6 CIAT7Egg ROOD Unz.t Bldg.Location z.-34~-8 t z.-3z z-serT-Installatxon dwg./Rev.Ecpxxpment No.Anchora e Arran ement Sketch Rr T-aQ ('T~r II INDIANA MICHIGAN POKIER SITE OESIGt<COtITIIOLLEO WOfiKIIIG COPY OCT 0 5 3995 I.ER'K T@I Q(~QJ.<l>.1r Il1 I 3-8/q.+~I)I'<(.Typ))I-3$<.>)c)/i 7 C/fhhlhgBL TYP, Eca.M Ni~Q 400k i'd&N<RAN 9.Drawn by: Verified by: Reviewed by:~~Date: 2 3 Date: I->6"4>I r-r-'2 Qual./Cert.Inspector w%n Date: Constructs.on Anchor Review Engineer Page 1 of 3 Revision 1
POWER PANEL Building: AUXILIARY                          Floor El.: 587.00                  Room, Row/Col: CD EDG RM, 10 FEET NW OF CD EMERGENCY DIESEL GENERATOR f/1-OME-150-CD, ON THE N WALL Manufacturer, Model, Etc.: POWELL ELECTRIC INC.
(>*12 CHP 5021.CCD.0].9 ATTACHMENT NQ.1 i i/vO Unct NS CT 0 T Avx (D C'F Bldg.AS E P V I P I'I!=U~Location/2" 3~='i'-7 Installation dwg./Rev.Anchora e Arran ement Sketch 2.->i il-A'ElEquipment No.INDIANA MICHIGAtt POVlCR SITC DESIGN CONTROLLCO lVORKING COPY OCV 05>99S GAY TBRY l 0 Yz.A I 4~20/q (spp-Sut'PoRr DI=TAI L)VJ Q L H f4'1 E." J: Q X3 4 4 i ORi<~D AhrGCC FRANC~<AT TB R'lO~L pc I e"X ZO'i+" (SPE ZLI!PORl QFTWI I S7g 4.g'$2 p II 2C-8~I I cRov t P&e T C.I4AN V I=I-GAS Ecv>o A Drawn by: Verified by: Date: Date: ual./Cert.
CAVEATS - BOUNDING SPECTRUM DP/BS    Caveat  I - Earthquake Experience Equipment Class                                                Yes DP/BS    Caveat  2  - Contains only Circuit Breakers and Switches                                          Yes DP/BS    Caveat  3 - Doors Secured.                                                                        Yes DP/BS    Caveat  4 - Adjacent Cabinets Bolted Together.                                                   N/A DP/BS    Caveat  5 - General Configuration Similar to NEMA Standards.                                     Yes DP/BS    Caveat  6 - Adequate Anchorage                                                                    Yes DP/BS    Caveat  7 - Potential Chatter of Essential Rela s Evaluated.                                     N/A DP/BS    Caveat  8 - No Other Concerns.                                                                   Yes Is the intent of all the caveats met for Bounding Spectrum'7 ANCHORAGE
inspector Reviewed by: T'4~4 Date: Construction Anc or Review Engineer t o.-5-'I3 Page 1 of 3 Revision.3
: 1. The sizes and locations    of anchors have been determined                                              Yes
: 2. Appropriate equipment characteristics have been determined (mass, CG, natural freq.,                    Yes damping, center of rotation).
: 3. The type of anchorage is covered by the GIP                                                            Yes
: 4. The adequacy of the anchorage installation has been evaluated (weld quality and length, nuts            Yes and washers, expansion anchor tightness, etc.)
: 5. Factors affecting anchorage capacity or margin of safety have been considered: embedment                Yes length, anchor spacing, free-edge distance, concrete strength/condition, and concrete cracking.
: 6. For bolted anchorages, any gaps under the base are less than 1/4 .                                     Yes
: 7. Factors affecting essential relays have been'considered: gaps under the base, capacity                  N/A reduction for expansion anchors.
: 8. The base has adequate stiffness and the effect of prying action on anchors has been                    Yes considered.
: 9. The strength of the equipment base and the load path to the CG is adequate.                             Yes
: 10. The adequacy of embedded steel, grout pads or large concrete pads have been evaluated.                 N/A
: 11. The anchorage capacity exceeds the demand.                                                             Yes Are anchorage requirements met?


**12 CHP 5021.CCD.019 ATTACHMENT NO.1 UnLt Ig-3P ZP-y P CT 0 T u cq'ldg.~&QA~raRg~JUL f'ME.~T.Boo H Location Installation dwg./Rev.Anchora e Arran ement Sketch//2, BAR aOi T.aC Equipment No.iiii)ll'lA:<iCi'IC" SIIE 0"SiGi'l CO"~'ii'OR!.IhC
DC Cook    Unit 1                                 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                  Status: Yes Sheet 3 of 3 ID: 1-AFW( Rev. 0)                                 Class: 14. Distribution Panels
(.Oi'OCT 05 1995>'+z Q 1I WI'h I'~4 Date: 2 Date: Drawn by: l g.-z-c.'~Verified by: Qual./Cert.
Inspector Reviewed by: T'i'v~v~~=~.;Date: Construct'>on Anchor Reve.ew Engineer Page 1 of 3 Revision.3 r h
(>*12 CHP 5021.CCP.019 ATTACHMENT NO.Tkvo Unzt N ECT 0 T.-ux got Bldg.A, 5.BA>~E.RY EC V'~>%COO;-q Location Installation dwg./Rev.Anchora e Arran ement Sketch Equipment No.II DIP.~Q.BOP EVERY 2.Wu OR ERD CATTP R'f FOR C-I MG-UMISTRVTS T'IG-HT A~IN S, r WTTI=RY INDIANA MICHIGAN PO'V(f R SITE DESIGN CONTROLLED WORKING COPY OCT 0 5 1995 UNl STRv 7 (hR>C.gI-=
T wa+,-2o58 II Yz Tt+K.E'c.OF RiGID Ih/SV LOFTI ON SOAR lo QR~~W GATTBRI&5 QP,~<Pg'I'VAPOR i DP.l Al L Drawn by: Verified by: ,Date: Date: Qual./Cert.Inspector Reviewed by: I'~F'I'5'h~-~(bQn Date: Construct>on Anchor Review Engineer Page 1 of 3 Revision.3
**12 CHP 5021.CCD.019 (ATTACHMENT No.Equipment No.: Embedded Steel Dwg.No.: CHOR XNS CT 0 HYS ICAL CHARACT RIST C Dwg No..: j Q-QQp-p Weld ID T e Size Len th Cracks Lack of Penetration Wi Q/~@CC es N Yes I/cr Yes 0 Y s Ct s es Yes Yes W3 w4 Yes No Yes No Yes No'Yes No es Yes No Yes No Yes 0 We d e Codes 1=Fillet 2=Plug/Slot 3=.Groove Porosity es es es o es 0 Yes No Yes No Yes No Y No INDIANA 41ICHIGAII POPOVER SITE OESIGII CONTROLLED WORKING COPY 0CT 05 19,I5 I.EP'K T'quipment base flexible: 0 Yes 8 No ons ruc ron re Date:-24 Reviewed by: Verified by: ons ruc z.o c or evxew ngzneer ua.e.npsec or Date: Date: (o-5'-f3 Page 3 of 3 Revision 3 I~
~~)0$t'R~~~~~~~~~~~~s~e~RRRSRRRRRSRWRSI5--.
I MIIIIIR8imi mmmSRIMIIMII IKRIIRRIIIIIII RSRIIIHRR I ERRI milli AIR%%LRRHLL/S~
0 0~~~~~t E 0~te a~E o~0 0~a~r~-l-~Q t l~l'4~-)f s 4~~o~0~IBK~EP~0~~RK~~~~RR
-,-RRRRRSRSRSRSRSRR~
.MRRRSMR58%55W RSMRIRSIH555$
55 RHRRSSRRRRRRRSRR RSESRRRHMRRWW RSRRRRRSRRRSRRS
~RWRHHEQHKRH5%6%
IHMWRRRSRHRIRH r e a e r r MMWMMMWW a~a-..EL.a ka~r g~r g e~W~J'He~~:aneesmw 8K e Ak'I~s


~y~I~~~~4 lj~~e~~e~~~~~~~-~~.~%4~-0~~.e e~~~e~~~~'RRRRRRRRRRRRRImi:;:
==
mmmmilmMIII RRRSElKRMIII IHIRRIIIMlmlm IIISmimimlRI y y r e~IIIIIREQR!SRwRSII MWWMWMWW r e 1 e r y r p i P t e MW&MMMW&Ca~C a'YSMe!E RP%%9&UIKQWJC
Description:==
'h~P~MWaMNaLMC)
POWER PANEL Building: AUXILIARY                        Floor El.: 587.00                    Room, Row/Col: CD EDG RM, 10 FEET NW OF CD EMERGENCY DIESEL GENERATOR 81-OME-150-CD, ON THE N WALL Manufacturer, Model, Etc.: POWELL ELECTRIC INC.
HNk&&%4%~a~~
INTERACTION EFFECTS
~~I~f~~~~~~~~~4~Q 0~-~~~5-8 o 1~4 o~RRNNRNR%5%5%555%-
: 1. Soft targets are free from impact by nearby equipment or structures                                    Yes
-.IKmmmmmmmm
: 2. If the equipment contains sensitive relays, it is free from all impact by nearby equipment or          N/A structures.
-mmlESRNmmmmm RES 1 mmmKlmm RSMEWRSmMMIR y e o r e r o~mmmmhhRRWHRmmmm mmmmmmm55m r~y~MWWMMM&W a j~0 C.'~~4~0 HFJBESISSI%leaSKHKaeRKSSP
: 3. Attached lines have adequate flexibility                                                                Yes
~i.K~%K8'
: 4. Overhead equipment or distribution systems are not likely to collapse.                                  Yes
: 5. No other adverse concerns were found.                                                                  Yes Is equipment free of interaction effects?
S'E      I    NT ES      C L Y    DE U      E SRT:    George Gary Thomas (S&A) and Tom Huang (AEP) on 10/7/1993 Ref. 1: Anchor Inspection Data Sheet: Anchorage Arrangement Sheet, 1/21/93.
Ref. 2: Dwg 0 1-12035-12 (internal components dwg).
Capacity:
BSCav.2: Verified by walkdown and Ref. 2.
Anchorage:
Wall mounted panel with dimensions: 36"Hx20''Wx6"Deep. Anchorage was not accessible.
Panel estimated to weigh less than 50 lbs. Tug tested by G. Thomas to at least 100 Ibs, OK; therefore, no explicit anchorage evaluation necessary.
Evaluated by:                                                                          Date:


~~I~~~~~~,.~~~s~I~~~~~~~-~~.s is)~-C~s~~~s~t KRERHHRWHMSRRSIIIII
12 CHP 5021. CCD. 019
.RRRSNIRSRRR%mm5I=-
(
I IIMIIIII 55IIISRIEIIII IIIIRRRRSRI5%
ATTACENENT NO. 1 ANCHOR INSPECTION DATA SHEET COE        E    gg  I, Un>.t                                  Bldg.                          Location Installation              dwg.    /  Rev.             Equipment No.
MIEIIRSRSRSIIIS 0~~~IIIIRWRESHESIIII IIEIIIIIIIIIIRHIRl 0 I'0 y MWWMMMW&~~4 4~s a 8 a R E M a%4%%~<'a..a i o~la a~sssIsss''~'%81sssssssssi%1E
Anchora e Arran ement Sketch t-a" PHOO uuislr<<k 1-'8" C~lr ( YI'I'.)
's~s.ssvissw.ssaake~sssIMII 25a4KM<&#xc3;tRQRUPk%0 r~~rr~O~l~e APL~~~1 S 8 A DEPART)so=AT CONTROl.LED DOCUMENT COPY NO.i 12 SHP 5050 NDL-008 ATTACPNENT HO.UITRASONIC TEST REPORT JOB ORDER NO.: REPORT DATE: REQUEST NO.IDENTIFICATION Unit~Q Component--A Item-~rS Material~S Other Test Unit/S/N (Freq./Diameter 5 m4z Reference Standard Couplant/Batch No.i<.TS c c-9 TEST DATA REMARKS AM r u.s'/z k.L PERFORMED BY: C REVIEWED BY: '" M~.Pc&FORM NO.12 SHP 5050 NDE.008-1 I EVE E,:.~~I EVEI'age 1 of Revision 0 DATE: C/.-5 y3 oly16192 PG.N0.425 SAFE'HUTDOWN EOUIPNEHT LIST (SSELUP)FUNCT IOH: 01ESEL GENERAT IOM Equipment Class: 17 Train: 1 Equipment ID: I-DHE-150-AB DraMing Number: 1.12001 1-5151A 1-51510 System: DIESEL GEHERATOR COM1'ROL AHD IHSTRlNENTAT ION Equip
r
                                    &AQUI!M                  )qua%
lo un,pl~
CASa)~I'-8wZ-II8! <<5 /8
                                  ~~                                     8 l                                      lvI I
(~)
5Ctcwg ~/~ssl cps LJII tC H                                II'IDIMIt,'!CHICA,I~W~II Cd/AEc.f. un:sic<<I, H ufo'A.                              GITE DESIGII COII TIIOU.'60 (9'rP)                                                           VFORXING COPY APH 0 8 tS93
                                                                            ..I.EAK Drawn by:                                                                                           7-verified      by-                                                           Date:
ual./ ert. nspector Reviewed b                                                                    Date:           1- ~I-'l3 Construction          A  chor Review Engineer Page    1 of   3 Revision       1


== Description:==
g
              ~-
eemseaarx RRRRRSRSHHEL RSRSRRRRMML&
WRRRSHHHRL QSSISLRLS HRRRRRRLLLL MWWWWW&W RWRlWRHSL W558WRLEL MWWWWMW&    I k    i 0          f
  ~J4>
                  ~ ~


AB EKERG DIESEL GEHERATOR Bui l ding: AUXILIARY Roan: AB EHERG DIESEL GEHERAI'OE ROOM Elevation:'87 Normal state: Desired state: Pouer Required: Sort: lI,R Si~rting System Orauing Number: Recnsired Interconnections and Supporting Conponentsl ty Related Status: E.NUCLEAR SR Min/Dpt: KIM ADDITIOMAL INFORHATIOH alias Number: Prier I'rain: B Conponent Served: AB EKERG DIESEL GEHERATOR Nanufacturerl GENERAL ELECIRIC CO Model: 'Pnneil 1-OGAB 1-OGABX Elcm Orauing: 1-98032 1-98051 1-98052 Uiring Drawing: 1-95301 Paver Source: 1-T11A11 1-T1164 1-TOAD-2 un I Ldoun: F Relay Only: Y Component'Type: ENG.GEN 3500XU,4KV ISO Drauingsl Detailed Location: IN tHE CENTER OF THE ROON
Database:  K:SSEL2C.DBF Equip ID: 2-BATT-AB Train:        1  Equip Class:15 ywing No.: 2-12003 nction:    250 VDC SYSTEM System:  250VDC DISTRXBUTXON Equip Desc:      PLANT BATTERY AB Building:   AUXILIARY     Room: AB BATTERY EQUIPMENT AREA Elev:  609      Sort: S,R      Notes:
Normal State:         Desired State:     Power Req'd:
Support System Drawing: 2-98055, 2-12003 Req'd Support Comp:
Safety Related Status: NUCLEAR       SR       Min/Opt: MIN Alias No:           Power Train: B Comp  Served:
MFR: C 6    D  BATTERIES l: LC-25 Panel: 2-BC-AB Elem. Drawing: 2-98055 Wiring Drawing: 2-91012, 2-91301 Power Source:     2-TDAB-5 Walkdown:     C    Relay Eval  : Y Comp  Type: BATTERY, *RHR      WALKDOWN COMPONENT Iso. Drawing:
Location: IN     THE CENTER OF THE ROOM, 3 FEET NORTH OF THE ENTRANCE DOOR


DC Cook Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet1 of4 ID: 1-OME-150-AB (Rev.0)Class: 17.Engine-Generators
D. C. Cook Unit 2                                    GIP Rev 2, Corrected, 2114/92 Screening Evaluation Worksheet (SEWS)                                Status: No Sheet 1 of 6 ID: 2-BATT-AB ( Rev.     0)                       Class: 15. Batteries on Racks


==
==
Description:==
Description:==
PLANT BATTERY AB Building: AUXILIARY                          Floor El.: 609.00                    Room, Row/Col: AS BATTERY EQUIP AREA - IN THE CENTER OF THE ROOM, 3 FEET NORTH OF THE ENTRANCE DOOR Manufacturer, Model, Etc.: CBD Power Systems LC-25 Cells SEISMIC CAPACITY VS DEMAND
: 1.      Elevation where equipment receives seismic input                                                    609.00 Elevation of seismic input below about 40'rom grade (grade = 608.00)                                  Yes
: 3.      Equipment has fundamental frequency above about 8 Hz (est. frequency = 8.00)                          SRT Capacity based on:          1.00 Bounding Spectrum
: 5.      Demand based on:            1.00 " Design Basis Ground Response Spectrum 0.850 LIN                            r r      I
                                                                ~1 r
r er
                    ~ t 0.000 1.00                                        LOG        Hz                                      33.00 Capacity  ~.... Demand Record Capactt          HAGIPtGIPtspectra.des                        Label Bounding Spectrum Demand 1        H:tGIPtPROJOOSStspectra.des                  BUILDING Ground Spectrum ELEVATION BROADEN Demand 2        H:tGIPV'ROJ0058tspectra.des                  BUILDING Ground Spectrum ELEVATION BROADEN Does capacity exceed demand'


AB EMERG DIESEL GENERATOR Building: AUXILIARY Floor El.: 687.00 Room, Row/Col: AB EDG RM, IN THE CENTER OF THE RM Manufacturer, Model, Etc.: GENERAL ELECTRIC CO SEISMIC CAPACITY VS DEMAND 1.Elevation where equipment receives seismic input Elevation of seismic input below about 40'rom grade (grade=608.00)3.Equipment has fundamental frequency above about 8 Hz (est.frequency=20.00)4.Capacity based on: 1.00 Bounding Spectrum Demand based on: 1.00" Design Basis Ground Response Spectrum 687.00 Yes Yes 0.800 G LOG 0.090 0.50 LOG Hz Capacity.....Demand 33.00 Ca aci Demand 1 Demand 2 C:IGIPtGIPLspectra.des C:tGIPLPROJ0031 tspectra.des C:LGIPIPROJ0031tspoctra.des Record Label Boundin Spectrum BUILDING Ground EI.EVATION 608 BROADEN N BUILDING Ground ELEVATION 608 BROADEN N Does capacity exceed demand'CAVEATS-BOUNDING SPECTRUM'G/BS Caveat 1-Earthquake Experience Equipment Class EG/BS Caveat 2-Driver and Driven Component on Rigid Skid.EG/BS Caveat 3-Base Vibration Isolation System Checked.EG/BS Caveat 4-Sufficient Slack and Flexibility of Attached Lines.EG/BS Caveat 5-Adequate Anchorage EG/BS Caveat 6-Potential Chatter of Essential Relays Evaluated.
D. C. Cook Unit 2                                GIP Rev 2, Corrected, 2/14/92 Screening Evaluation Worksheet (SEWS)                            Status: No Sheet 2 of 6 ID: 2-BATT-AB ( Rev.       0)                     Class: 15. Batteries on Racks
EG/BS Caveat 7-No Other Concerns.Yes Yes N/A Yes Yes N/A Yes Is the intent of all the caveats met for Bounding Spectrum' DC Cook Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)Glp Rev 2, Corrected, 2/14/92 Status: Yes Sheet2of4 ID: 1-OME-.150-AB (Rev.0)Class: 17.Engine-Generators


==
==
Description:==
Description:==
PLANT BATTERY AB Building: AUXILIARY                          Floor El.: 609.00                  Room, Row/Col: AG BATTERY EQUIP AREA - IN THE CENTER OF THE ROOM, 3 FEET NORTH OF THE ENTRANCE DOOR Manufacturer, Model, Etc.: CSD Power Systems LC-25 Cells CAVEATS - BOUNDING SPECTRUM BAT/BS Caveat      I - Earthquake Experience Equipment Class                                              Yes BAT/BS Caveat      2 - Battery Cell Plates are Lead-Calcium Flat-Plate, Plante, or Manchex                Yes Design.
BAT/BS Caveat      3- Each Individual Battery Weighs Less Than 450    Pounds.                            Yes BAT/BS Caveat      4- Close-Fitting Spacers between Cells..                                                Yes BAT/BS Caveat      5- Batteries Restrained by Side and End Rails                                          Yes BAT/BS Caveat      6 - Battery Racks Have Longitudinal Cross Bracing.                                      Yes BAT/BS Caveat      7- Racks Constructed of Wood Evaluated.                                                N/A BAT/BS Caveat      8 - Batteries Greater Than 10 Years Old Evaluated.
BAT/BS Caveat      9 - Adequate Anchorage                                                                  Yes BAT/BS Caveat      10 - No Other Concerns.                                                                Yes Is the intent of all the caveats met for Bounding Spectrum?
ANCHORAGE
: 1. The sizes and locations of anchors have been determined                                                Yes
: 2. Appropriate equipment characteristics have been determined (mass, CG, natural freq.,                    Yes damping, center of rotation).
: 3. The type of anchorage is covered by the GIP                                                            Yes
: 4. The adequacy of the anchorage installation has been evaluated (weld quality and length, nuts            Yes and washers, expansion anchor tightness, etc.)
: 5. Factors affecting anchorage capacity or margin of safety have been considered: embedment                Yes length, anchor spacing, free-edge distance, concrete strength/condition, and concrete cracking.
: 6. For bolted anchorages, any gaps under the base are less than 1/4                                        Yes
: 7. Factors affecting essential relays have been considered: gaps under the base, capacity                  N/A reduction for expansion anchors.
: 8. The base has adequate stiffness and the effect of prying action on anchors has been                    Yes considered.
: 9. The strength of the equipment base and the load path to the CG is adequate                              Yes
: 10. The adequacy of embedded steel, grout pads or large concrete pads have been evaluated.                N/A
: 11. The anchorage capacity exceeds the demand.                                                            Yes Are anchorage requirements met?


AB EMERG DIESEL GENERATOR Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: AB EDG RM, IN THE CENTER OF THE RM Manufacturer, Model, Etc.: GENERAL ELECTRIC CO ANCHORAGE 1.The sizes and locations of anchors have been determined 2.Appropriate equipment characteristics have been determined (mass, CG, natural freq., damping, center of rotation).
D. C. Cook Unit 2                                  GIP Rev 2, Corrected, 2/14/92 Screening Evaluation Worksheet (SEWS)                          Status: No Sheet 3 of 6 ID: 2-BATT-AB ( Rev. 0)                      Class: 15. Batteries on Racks
3.The type of anchorage is covered by the GIP 4.The adequacy of the anchorage installation has been evaluated (weld quality and length, nuts and washers, expansion anchor tightness, etc.)5.Factors affecting anchorage capacity or margin of safety have been considered:
 
embedment length, anchor spacing, free-edge distance, concrete strength/condition, and concrete cracking.6.For bolted anchorages, any gaps under the base are less than 1/4 7.Factors affecting essential relays have been considered:
== Description:==
gaps under the base, capacity reduction for expansion anchors.8.The base has adequate stiffness and the effect of prying action on anchors has been considered.
PLANT BATTERY AB Building: AUXILIARY                       Floor EI.: 609.00                   Room, Row/Col: AB BATI ERY EQUIP AREA - IN THE CENTER OF THE ROOM, 3 FEET NORTH OF THE ENTRANCE DOOR Manufacturer, Model, Etc.: C&D Power Systems LC-25 Cells INTERACTION EFFECTS
9.The strength of the equipment base and the load path to the CG is adequate.10.The adequacy of embedded steel, grout pads or large concrete pads have been evaluated.
: 1. Soft targets are free from impact by nearby equipment or structures                                     Yes
11.The anchorage capacity exceeds the demand.Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes Yes Are anchorage requirements met'P INTERACTION EFFECTS 1.Soft targets are free from impact b nearby equipment or structures 2.If the equipment contains sensitive relays, it is free from all impact by nearby equipment or structures.
: 2. If the equipment contains sensitive relays, it is free from all impact by nearby equipment or             N/A structures.
3.Attached lines have adequate flexibility 4.Overhead equipment or distribution systems are not likely to collapse.5.No other adverse concerns were found.Is equipment free of interaction effects'Yes N/A Yes Yes Yes C L D~Clggg~g SRT: George Gary Thomas (S&A)and Tom Huang (AEP)on 10/16/93.Diesel Generator and driver not on same skid, however large contrete foundations originate from common floor, differential motion not a concern.
: 3. Attached lines have adequate flexibility                                                                 Yes
DC Cook Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 3 of 4 ID: 1-OME-150-AB (Rev.0)Class: 17.Engine-Generators
: 4. Overhead equipment or distribution systems are not likely to collapse.                                   Yes
: 5. No other adverse concerns were found.                                                                     Yes Is equipment free of interaction effects?
S  IC LLY D       U
~CON I~EN Date: 10/18/93 SRT: Tom Huang (AEP), Steve Anagnostis (S&A), Paul Krugh (AEP), Randy Steele (AEP)
 
==References:==
: 1. Cook Dwgs 12-3476-18, 12-3073A-3, 12-3073D
: 2. C&D Power Systems Inc Dwgs K-5629-3, M-8654-C, M-8655-C, M-8665-D
: 3. Anchorage Package Four substantial welded steel 2-step battery racks well braced in both directions. Two racks house 28 cells each, and two racks house 30 cells each. Each cell is a C&D Power Systems LC-25. The cells are well secured. Each rack is anchored with twelve (12) 3/8" anchors.- see references for details.
Frequency > 8 Hz by inspection.
BS Caveat 2: Batteries are C&D lead calcium flat plate (per label on battery).
BS Caveat 3: Each cell weighs 325 Ibs (Reference 2)
BS Caveat 8: Batteries were installed in 1985. SQUG Action Item 002 was written to address the aging issue.
ANCH Caveat 1: The anchorage package specifies the anchors as unknown 3/8" non-shell type expansion anchors. The original plant drawings (Ref 1) specify 3/8" J-bolts (90 degrees, 9", embedment), but when the current battery rack was replaced in 1985, a note was added to the plant drawing that, where necessary due to bolt hole misalignment in the rack, the original J bolts were to be cut off and replaced with 3/8" Kwik bolts. The current bolts are exactly where the original plant drawings locate the J bolts, and they look like J-bolts (cut-off threaded end).
ANCH Caveat 2: Per Ref 2, the 28 cell racks weigh 10231 Ibs and the 30 cell racks weigh 10920 lbs. The cells are about 90% of the weight and the rack is about 10% of the weight. The attached "Battery Rack Weight Distribution" shows the geometry.
ANCH Caveat 4, 6: Installation checked per Ref 3.
 
D. C. Cook Unit 2                                  GIP Rev 2, Corrected, 2/14/92 Screening Evaluation Worksheet (SEWS)                            Status: No Sheet 4 of 6 ID: 2-BATT-AB ( Rev. 0 )                         Class: 15. Batteries on Racks


==
==
Description:==
Description:==
PLANT BATTERY AB Building: AUXILIARY                        Floor EI.: 609.00                  Room, Row/Col: AB BATTERY EQUIP AREA - IN THE CENTER OF THE ROOM, 3 FEET NORTH OF THE ENTRANCE DOOR Manufacturer, Model, Etc.: C8D Power Systems LC-25 Cells ANCH Caveat 5: In the SRT's judgement, the anchors are the original J bolts. Per GIP Table C.4-1, these have nominal capacities of 3.74k pullout and and 1.87 kip shear. The pullout capacity is reduced by 0.51 to 1.91 kips due to the 9" embedment length. No other reductions are required.
Note that if the anchors were 3/8" Kwik bolts (the replacements specified in Ref 1), the nominal capacities would be 1 46 k pullout and 1.42 kip shear. The pullout capacity would be reduced by 0.88 to 1.28 kips due to 3.5 ksi concrete. No other reductions would be required."
ANCH Caveat 8: The racks are anchored through a pair of 3/4" thick plates that run along the front and back of the racks (see references and photos). This configuration may produce some prying on the anchors; although the plate may be stiff enough relative to the anchors to keep this to a minimum. Per the discussion for ANCH Caveat 11, the pullout load would have to increase by a factor of 6.2 for J-bolts (3.6 for Kwik,bolts) to reach the allowable limits.
ANCH Caveat 11: The attached "Battery Rack Weight Distribution" shows that the front-to-back overturning moment for one rack is 55648 in-lbs. That moment is resisted by six anchors with a moment arm of 30", which produces a per bolt pullout load of 55648/6/30 = 309 lbs. The side-to-side seismic loads will not produce any significant pullout loads. The shear load is 4586 Ibs for one horizontal direction of input. SRSS'ing the two horizontal directions and dividing by the number of bolts produces a per bolt shear load of 1.41 x 4586/12 = 539 lbs.
Using the bi-linear shear-tension interaction in GIP Figure C.3-2, the interaction for a J bolt anchor is 309/1910 =
0.16 (Note that the shear is less than 0.3 of the shear allowable). If a 3/8" Kwik bolt were assumed, the interaction would be 0.7 x (309/1280) + (539/1420) = 0.55.
Photos: W2T1.11, 12 Evaluated by:                                                                        Date:        /c'o      ~S


AB EMERG DIESEL GENERATOR Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: AB EDG RM, IN THE CENTER OF THE RM Manufacturer, Model, Etc.: GENERAL ELECTRIC CO No interations.
==Attachment:==
See AEP anchorage data for seismic qualification.
Pictures
Engine anchored by fourteen 2" or larger anchors.Generatoranchoredbyeight1" anchors.Generatorshaftendanchoredbyfour1.75" anchors.the ANCHOR analysis gives a large safety margin (36)as shown by that done for 2-OME-150-CD.
Concern noted with regard to support of air manafold that supports aftercooler.
Aftercooler supported by spring mounted column.This concern was tracked and reconciled with items 1-HE47-ABS 8 ABN.Zap shot Wk.2, Team 2, Disk 2, Picture 20 8 21.Evaluated by: Date: i(-~-


==Attachment:==
==Attachment:==
Battery Rack Weight Distribution


Pictures DC Cook Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 4 of 4 ID: 1-OME-1 50-AB (Rev.0)Class: 17.Engine-Generators
D. C. Cook Unit 2                            GIP Rev 2, Corrected, 2/14/92 Screening Evaluation Worksheet (SEWS)                      Status: No Sheet 5 of 6 ID: 2-BATT-AB ( Rev. 0 )                   Class: 15. Batteries on Racks


==
==
Description:==
Description:==
PLANT BALIERY AB Building: AUXILIARY                  Floor El.: 609.00                Room, Row/Col: A8 BATTERY EQUIP AREA - IN THE CENTER OF THE ROOM, 3 FEET NORTH OF THE ENTRANCE DOOR Manufacturer, Model, Etc.: C8D Power Systems LC-25 Cells JPPGTUR  s 0.12


AB EMERG DIESEL GENERATOR Building: AUXILIARY Floor El.: 587.00 Manufacturer, Model, Etc.: GENERAL ELECTRIC CO Room, Row/Col: AB EDG RM, IN THE CENTER OF THE RM AB Emerg Diesel Generator 1-AB-150-AB AB Emerg Diesel Generator, 1-OME-150-AB AB Emerg.Diesel Generator 1-OME-150-AB AB Emerg.Diesel Generator, 1-OME-150-AB
L 0
~>12 CHP 5021~CCD 019 ATTACHMENT NO.1 CT Unzt IZ.-3458-3 Bldg.Instailat on dwg./Rev.Anchora e Arran ement Sketch~T'Pc''F DI~BL EV&INE GeS~ROT OR ROOnA Location r.'&ME.-/50-3 6 Equipment No./r l~z~g~~g 0, INDIANA MICHIG P SITE DESIGN NT L WORKING C Y SEP 2 7$995 EII D LERK/~gap-dv~Ion Vlpw Lmwivs BAs~D rawn by: (Verified by: Q a C rt.Xnspector Date: Date:~-8'Y-~.8 Reviewed by: Date: Construction chor Review Engineer Page 1 of 3 Revision 3


*12 CHP 5021.CCD.019 ATTACiQ&NT NO~1 PME'n t l2.-3468-l3 Installat on dwg./Rev.Eh/Q OP C(E.SE.I-G;euERATaR Roof.Bldg-Locatzon y.-awe,-l4o-AE Equipment No.Anchora e Arran ement Sketch COg r't+Cp/3y 9$9 tl Oo Oo s"q F Sf'I'/~g" 5fv'Q 5q~O Qo o PENT MACHlh/E BASF ft msanom~H.GRou T Paw INOIANA MICHIGAN POIVCII SITE DESIGN CONTROLLEO WORKING COPY SEP 27 1995 I Ol G H Qo Qo qual QMCHa R-MUV'" Ra.~SSaa lZ 2.+4"g x)5><"DE, (gEe C'BORE, TyP.(g)PL@5, KT I,J.Z.L A..-<sr<" Loll,-A45%&#xc3;S-kE-ABC+r//To EueZODEO mfa.Drawn by: Verified by.q.ert.Reviewed by: Construe on Date: Date: r-2~-F~Cn'age 1 of 3 Revision.3 Vvu Inspector ('2 chor Review Engineer
D. C. Cook        Unit 2                                  GIP Rev 2, Corrected, 2/14/92 Screening Evaluation Worksheet (SEWS)                                    Status: No Sheet 6 of 6 ID: 2-BATI-AB( Rev. 0 )                              Class: 15. Batteries on Racks
 
==
Description:==
PLANT BATTERY AB Building: AUXILIARY                            Floor El.: 609.00                      Room, Row/Col: AB BATTERY EQUIP AREA - IN THE CENTER OF THE ROOM, 3 FEET NORTH OF THE ENTRANCE DOOR Manufacturer, Model, Etc.: C8D Power Systems LC-25 Cells ac W            s ib P  11 CC of upper  tie W x Sah = 2295 Ib W x (1  0.4 Sov) ~ 4958 Ib CG of lower tier W  = 1/2 rack weight = 5460 Ibs Soh = 1.5 x 57. FRS O 8 Hz = 0.42g W x Sah  ~ 2293 fb            Sav = 2/3 x 1.5 x 5K FIIS  I 20 Hz =
0.23g'ateral Load = 2 x 2293 Ib = 4586 Overturning Momen't (sum moments about 8)
                                                                          ~ (2293 x 26) + (2293 x 48)  - (4958 x 23)
W x (1 -  0.4 Sov) = 4958 Ib                          = 55648 in fbs Base Channet Bolt lines


**12 CHP 5021.CCD.019 ATTACHKENT NO.1 I Equipment No.-Anchor type: re~c r Tightness established by: Torque Mrench No.: Tightness verified?0 Yes Equipment base flexible?0"Snug Fit" Q 8 No ons ruc 0 Yes N No ons DWg NOe'orque Cal.Due Date: Date: 1on ruc 1on ARE Bolt ZD Caps"I/I/CCATS I El 6 D W W&O'omments AIU'T<Ec SEE roc're" Anchor len th protruding len th Embedment 3~" 37>" rk Bolt;ri Concrete condition Edge distance ACC og eh'K1 b LE gq q gg C9,~'II Q~Rt'Xu rr4 6800 T&%DAN>EE~T~<i~" 3" v" Anchor+y~y.Anchor an larit O 0 Thread Fees engagement
D. C. Cook Unit 2                                     GIP Rev 2, Corrected 2/14/92 Outlier Seismic Verification Sheet (OSVS)                              Sheet 1 of 4 ID: 2-BATT-AB (Rev. 0)                               Class: 15. Batteries on Racks
~, I~-y'I Q''Q O 76cE556p ccs58 cc d8 cfcEIch emcee~z Comments: c~tA Verified by:., Cert:.Inspector I Reviewed by: Construct1on I MICHIGAN POWER SITE DESIGN CONTROLLED WORKING COPY SEP 2 7 1995 (tat I~+'AA~vl Date: Date: Paga 2 of Revision 3 S 8 A DEPARTMENT CONTROLLED DOCUMENT COPY NO.3 JOB ORDER NO.: SHP 5050 NDE.008 ATTACHMENT NO.1 ULTRASONIC TEST REPORT REPORT DATE:/d" 3 REQUEST NO.IDENTIFICATION Unit Component-OWN-/&Item AC+o S Material.S.Other TEST DATA REMARKS Test Unit/S/N Freq./Diameter Reference Standard Couplant/Batch No.Vs" Vs" PERFORMED BY: REVIEWED BY: FORM NO.12 SHP 5050 NDE.008-1 I.EVEI: M DATE:/P I EVE I:~DATE: Page 1 of 1 Revision 0 Equip Id: 2-OME-150-CD Train: 2 Equip Class: 17 D~<wing No~: 2-12002,,2-5151C, 2-5151D tion: DIESEL GENERATION System: DXESEL GENERATION, CONTROL&INSTRUMENTATXON Equip Desc: CD EMERGENCY DIESEL GENERATOR Building: AUXILXARY Room: CD EMERGENCY DIESEL GENERATOR ROOM Elev: 587'ort: S,R Notes: Normal State: Desired State: 'ower Req'd: Support System Drawing: 2-98033, 2-98051, 2-98052, 2-12002 Req'd Support Comp: Safety Related Status: NUCLEAR SR Min/Opt: MXN Alias No: Power Train: A Comp Served: CD EMERGENCY DXESEL GENERATOR MFR: GENERAL ELECTRXC CO.2 SAs 2 DGCD 2 DGCDX Elem.Drawing: 2-98033, 2-98051, 2-98052 Hiring Drawing: 2-95302 7 Power Source: 2-T21C3, 2-T21D8, 2-TDCD-2 Halkdown: F Relay Eval: Y Comp Type: ENG.GEN-3500KW, 4KV Iso Drawing: Location: XN THE CENTER OF THE ROOM, 10 FEET NORTH OP THE MAXN ENTRANCE DOOR D.C.COOK Unit 2 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet1 of14 ID: 2-OME-150-CD (Rev.0)Class: 17.Engine-Generators


==
==
Description:==
Description:==
PLANT BATTERY AB Building: AUXILIARY                          Floor EI.: 609.00                      Room, Row/Col: AB BATTERY EQUIP AREA - IN THE CENTER OF THE ROOM, 3 FEET NORTH OF THE ENTRANCE DOOR
.OU L        I  SU    DE  I  I ION- ec        calan      Eeet ical    E  u'
: a. Identify all the screening guidelines which are not met. (Check more than one if several guidelines could not be satisfied.)
Capacity vs. Demand Caveats Anchorage Seismic Interaction Other
: b. Describe all the reasons for the outlier (i.e., if all the listed outlier issues were resolved, then the signatories would consider this item of equipment to be verified for seismic adequacy).
The battery rack is an outlier due to BAT/BS Caveat 8 - Batteries Greater Than 10 Years Old.
2 P              D          DO      U    E        0  U      N    ~ono,
: a. Defined proposed method(s) for resolving outlier.
The attached "Position Paper on the Replacement of the Safety Related Batteries at the Donald C.
Cook Nuclear Plant" (R. J. Roman May 10, 1993) states that AEPSC has committed to adopting the replacement criteria stated in ANSI/IEEE Std 450-1987. AEPSC's position is that this commitment resolves the outlier.
: b. Provide information needed to implement proposed method(s) for resolving outlier (e.g., estimate of fundamental frequency).
3 C 4CE          C      0 The information on this OSVS is, to the best of our knowledge and belief, correct and accurate, and resolution of the outlier issues listed on the previous page will satisfy the requirements for this item of equipment to be verified for seismic adequacy:
F Approved by:                                                                                Date:
==Attachment:==
Position Paper on the Replacement of Saf                  Related Batteries
                                                                                ~                  QI I    ~          ~    ~
                          ~  ~ I        II '                    It
    ~    I  ~ I    ~                                                    ~            '                ~,  I  ~                        ~      t  ~  I  S      I        V    ~        ~  I
  ~  Ml ~
    ~    ~  I~    ~                                                                                                                    I    s I
    ~      C      '>>I        ~ s        I~      ~  >>>>          I      ~  ~
I          I                        ~  ~~  I~      ~ II      I          ~          ~  ~    ~  I>>.                                        ~      ~  II      ~      I        I I                l    I I      I      ~                ~  . ~    I          I        I II          ~      I          ~  I~                ~    I                              I  ~    II          I II. S      ~
I  ~ .        ~    ~                                        I      'Jl  ~  >>I        ~
                          ~  ~ ~        ~ ~                    ~  >>'        ~  I
                                          ~                  ~                                                                                                  ~  ~  ~      ~  ~            ~ ~
                                          ~        I  ~                ~ ~          ~ I                                                                      ~    ~
                                          ~  I~ I          ~ ~ I                II                                                                                  I  ~            ~
I~    ~ I    Ii.        ~  ~  I                                                                          ~
                                                                                                                                                                            ~ ~
    >>O  ~  I          ~                                                                                              ~ ~ I    ~  ~  I          ~  ~
        ~ ~      >>I    ~                                                                                                    ~  I      >>\  ~
V    ~ I        I~                        ~    ~  I          >>    ~          I  ~
                                    ~    ~
    ~    ~                                                                                                                                                                                                ~    ~
C  ~                                                                        ~      ~
                                                                                                    ~  ~                                                                ~      ~    '
                ~      ~                                                                                  ~  ~
                                                                                                        ~ ~                          ~  ~
                                                                                                                                                                      ~      ~
                                                                                      ~ I I            ~    I>>J    ~
1J ~    I        ~              I                                                                                                                                                          ~ 4 I
l                                                                  ~ I  ~  >>
L.
CHARTER POWER  ersAfMS, INC,                                                              Plyrrmuth Meeting, Pennsyh an(a DATE:                February 1984 TO:              Ron Roman American Electric Power Service Corp.
FROM'6Graham Walker CM Charter    Power Systems, inc.
==SUBJECT:==
O.C, Cook Nuclear Plant Tmfn N, 250 Voft Safety Refatad Battery Seismic and Ufe Qualification I
In response to your1B Feb 94 memo, our mes indicate the following;
                                                                'I
: 1. The Train N batteries were originally purchased ln May 1979 under, P.O. No. 0887M21-8, as the Train C Auxiliary Feedwater System dattarfea.
: 2. The original Technical Specification, DCCEE-183&CN, Rev. 2,      1 May 1878, requfmd only seismic qualification, 3, The C&Q Seismic QuafNcatfon Report submfttid for these batteries and racks fs No. VL7S10-02, ReV. 2, dated 16 July 1878:. All doCumentatfcn at that time was submitted tha AEPSC offices In New Yofft', City.
I I
: 4. The 3DCU-g has a 20 qualified life at a 77F arinual average operating tomporature. Qualification is by equivalence af conffguratfon, desfgn and          ,l materials to previously tested 3DCU-5, 3DCU-7 and OCU-17 models which were 20 years artNcfaffy aged in acconfance with fEEE<36 prfor to seismic testfng. The fEEE-344 seismfc qualNcation testing these caffe experienced envelopes the D.C. Cook fioor responsa spectrum. The reports for these              !
qualification tests are located at C&D Headquirters fn Plymouth Meeting, PA,
                  .and are avaffabfa for review.
I I
lf you have any questions, pfease call me.
I I
Sincerely, Graham Wafkor Manage; Applications Engineering TOTAL    P.03
                                                                                ~ 4>>'>>  ~ V  t volt-u- >>ax  Note      7671    vs Co JOopn
                    ~ ~S~S          .
From Co.
Pnono  N                        Phono s Fat 0 Date      May 10,    1993 nnnpeot  Position Paper      on the RepIacemeat      of the Safety Related Batteriea at the Donald C. Cook Nuclear Plant tron P~~
Ro Je Roman/D ~ Re Smith                            +  ~ ~vA~ ~~l
                            %pie J.A        ra    l+)
1) s)
                                                    << ~I"i><
                                                      +CA
                                                    +~r/qg Based on a review of the surveillance raporto, history, and maintenance records/trend charta for the 2AB battery, tho decision hae been made to replace this battery during thc 1994 Unit 2 refueling outage. The results of similar raviaws for the five other safety-related batterieo has led to the decision to not replace any of these batteries during tho upcoming xafueling outages.            Tha following discussion addreaaas the dotails of the reviews that, led to this decision.
AEPSC'a plan had boon to replace the oafoty-related batteriea at the Donald C. cook Nuclaax Plant ovary- 10 years even though they are purchased aa 20 year batteriea.                                  a nav          lated to        ton                nt, was developed aaod on prev oua premature a er eo and high temperatures oxperiencod in the battory rooms. p Beforo the decision was made to adopt this plan, a study waa conducted by HVAC showing that            it would ba lees expansive to raplaco the battaries avory tan years than to air condition the battery rooms. Baood on this plan alone, tha lAB battaxy should ba replaced in 1995 (since      it  wao manufactured in 1985), tha 1CD battery in 1995, the 1N battery in 1999, tha 2AB battory in 1994, the 2CD battery in 1996, and the 2N in 1998.
During the EDSFI, the 10 year x'eplacemont pl,an came into qucation during a review of the original battary sizing calculationo.                After lengthy discussions between the inspector and Mr. Roman< AEPSC ccaxnittad to adopting the replacement criteria stated in ANSI/IEEE Std 450"1987r IEEE Rocoaaended Practice for Maintenance, Testing, and Replacement of Large Lead Storago Batteries fox'enerating Stations and Substations.
Specifically, IEEE 450 recommends replacing a battery when its capacity, aa determined by the 60 month performance tost, ia bolow 80t of tha manufacturer's rating. Under ideal conditions, a battery would roach A rule of thumb regarding high temperature is that, for ovary 15'F
          'L above a 77'F average temperature, a battery'                lifo  io shortened by 50% ~ The average temperatures in the battery roomo at the DCCNP are leoo than 92'F (77'F + 15'F) however other factors, ao discussed in the body of this report, lead to accelerated aging and/ox aarly roplacament of large lead-acid storage bat'terios.
77 F average    temperature,      thorough maintenance throughout battery lifo, etc.
intra-System
rv ~ raa>>>>>>u      ~ VC Poaition Paper    on the R<<pl<<cement of the Safoty @el<<ted Batteries <<t tb+
Donald C. Cook Nuclear Plant May 10, 1993 Page 2 thi.o point somewhere around 20 years. Under current DccNp conditions, battery could reach this point sooner (due to the high battery room tcmpcraturee mentioned previously). Ao implied in the previous two statements however, factors other than age affect the viability of the battery. Physical characteristics, such as plate condition together with agc, are often determinants for complete battery replacement.
Failure to hold a charge, as shown by cell voltage and specific gravity readi.ngo, io a good indicator for further investigation into the need fox replacement. lt io a combination of those factors, and not simply the age or capacity alone, that haa led to the decision to replace the 2AB battery during the 1994 Unit 2 refueling outage.      Neither these factors, nor the age or capacity alone, indicate the need to replace any of tho other safety"related batteries at this time.
Xn support of the decision to not xaplace any of the other safety" related batteries during 1994 r~fucling outagco, the following information i.a provided.
QQCA Voc ~g~            March/April voltage trends of these batteries i.ndicatc that all of thc calls have voltagoa in the normal range of 2.20 - 2.24 volts (on a float charge). For comparison purpooao, thirteen (13) of the 2AB cell voltages ware leos than (or equal to) 2.20 volts.
: 2)    A cursory review of the past tcn year's worth of these safety-reLated battery files reveals few occurrences, i.f any, involving cell low voltages, electrolytelspecific gravity concerns, and overall less than dcaircable physical conditions. Ao a contrast, there wexe many instances of these same concerns regarding the 2AB battery.
: 3)    The files do not indicate that an issue waa made xagaxding the temperatures of the 1AB< 1CD, 1N, 2CD, & 2N battery xooms. Thc fi.lco do show, however, that, upon procuxement & i.notallation of the 2AB battery, the manufacture'o xapxeaentativc atatod that the battery life would be shortened due to the high ambient temperatures in the battery room. While this is a recognized attribute for all of thc batteries/roomo, it appeared to be morc severe at the time fox tha 2AB battery room.
: 4)      Routine preventive and corrective maintenance ie a part of any battery's life. This maintenance should be fairly consistent from ono safety-xelated battery to another, ao they are all large, lead-acid stationary batteriee. For the most part, thi.o maintenance hae been consistent for the majority of the Class 1E batteries. As expected then, these Class 1E battcrico arc experiencing a normal, predictaEXe decrease in their ecrvico li.fc.
The 2AB battery, howavex, hae demanded considerable additional maintenance and engineering time i.n the past couple of years n
Nine (9)  cells had voltages  leoa than 2.20 vDc and four (4)  cells had  voltagco equal to 2.20    VDC.
4 The aforcmcntioned study comparing the coot of more fx'cqucnt battory replacement versus ai.r conditioning the battery rooms supporto this otatament.
The atnbiont temperatures axe generally higher i.n the AB battery rooms, when compaxed to the cD and N Txain rooms, due to their physical location in the plant  and  their ventilation  systems.
Position Paper on the Replacement of the Safety Related      Batteriea at the Donald C. Cook ?tucloar Plant May 10, 1993 Page 3 resolving issues concerning low voltages, specific gravities. etc.
Ae  the additional time spent maintaining this battery is significant,    it is believed that this is signaling tho end of this battery's useful life and that it will most probably not stay within the Tech Spec range for individual coll voltages beyond tho upcoming refueling outage.
Toad acid storage batterieo are dynamic electrochemical devices.        As ouch, the ability to predict their future performance and/or capacity represents a near formidable Cask. The decision to not replace any of tho other safety-related batterios outside of 2KB dura,ng the upcoming refueling outages was arrived at after careful consideration of all the factors involved- Tho information available simply does not support their replacement at this time. Therefore, it is recommended that those battories continue to be maintained and tasted in accordance with tho IREE standards and the recommendation to replace them corno when tho maintenance/testing data supports it.
Preparod By/Date:                  os'/o  9 g Concurrence 8y/Date:                        n~ ~AC~~pS'07'.
Concurranco Statement:
ass m c:    0+Co  Joffxoy/4+Rr tdlderoon/Reit+
                        ~  ~            ~    Roman R.I. Ghoborg J.A. Kobyra D.R. Smith/J. Murtha    - Bridgman T.A. Kratt  - Bridgman AEPSC/NEEP    Gafoty Related Battery File (c:ir$ rXbatteryioefmemo.wp)
TOTAL P.G3


CD EMERGENCY DIESEL GENERATOR Building: AUXILIARY Manufacturer, Model, Etc.: Floor El.: 587.00 Room, Row/Col: CD EMER DSL GEN RM-IN THE CENTER OF THE ROOM, 10 FEET NORTH OF THE MAIN ENTRANCE DOOR SEISMIC CAPACITY VS DEMAND 1.Elevation where equipment receives seismic input Elevation of seismic input below about 40'rom grade (grade=608.00)3.Equipment has fundamental frequency above about 8 Hz (est.frequency=)Capacity based on: 1.00 Bounding Spectrum Demand based on: 1.00*Design Basis Ground Response Spectrum 587.00 Yes SRT 0.800 LOG////r/r~/r 0.090 0.50 LOG Hz Capacity.....Demand 33.00'apacit Demand 1 Demand 2 File C:LGIPtGIPLs ectra.des C:tGIPIPROJ0034ts ectra.des C:tGIPtPROJ0034tspectra.des Record Label Boundin Spectrum BUILDING Ground ELEVATION 608 BROADEN N BUILDING Ground ELEVATION 608 BROADEN N Does capacity exceed demand?
0 ~        ~ I    ~
0 0 D.C.COOK Unit 2 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 2 of 14 ID: 2-OME-150-CD (Rev.0)Class: 17.Engine-Generators
                        ~      ~ ~ L          ~  ~ 0  0      ~
rmr    r
              ~          ~                                        ~  ~
                ~  ~        I                  Q    ~  ~
                                                                    ~-
e 0    .104
                              ~      -  h 0 0 ~
0  ~
0 ~
IIRSIIII RSRKRIRWRSRIISII:-
RSMIIIII55III mmlsIIRIISIIB 55 RIRSIRIIIRIRRIIII y          4 IIHRIIRW~RwmIIER e                  o    o MWWWWMWW J            0            0    H        j 0                                                      e    r t
MWWMMWWW
          ~          +            ~                          0    0    ~
                  ~  ~        C                                                'tta    0 r                          ;EERIER          ~              L ~
0 h
 
                                                                **12 CHP 5021    ~ CCD. 019
                                                                    ".TACHMENT NO.      1 NCHOR INS ECTION DATA SHEET W KV  A6  CIAT7Egg ROOD Unz.t                    Bldg.                        Location z.-34~  8 t z.-3z Installatxon dwg. / Rev.
z -serT-Ecpxxpment No.
Anchora e Arran ement Sketch Rr T-aQ INDIANA MICHIGAN POKIER SITE OESIGt< COtITIIOLLEO WOfiKIIIG COPY OCT 0 5 3995 I'<
('T~r II                      I.ER'K  T @I Q(~QJ.<l>.1r                    I l
1 I
3-8/q.
  +~I)                              i'd&(.Typ)<RAN
                                        )
I -3$ <.>)c)
                                                                  /i 7 C/fhhlhgBL      TYP, Eca.M        Ni~Q 400k            N      9.
Drawn by:                                                      Date:        2      3 Verified by:                                                    Date:    I->6"4>
Qual. /Cert. Inspector Reviewed by:
    ~
                ~  w %n                                        Date:    I r -r-'2 Constructs.on Anchor Review Engineer Page    1  of  3 Revision      1
 
(    >*12 CHP 5021. CCD. 0].9 ATTACHMENT NQ.            1 NS  CT 0        T AS i i/vO                          Avx    (D  C'F                E P V I P I'I!=U ~
Unct                              Bldg.                        Location
        /2  "3~    =  'i'- 7                                2.->i      i l  - A'El Installation        dwg.    /    Rev.          Equipment No.
Anchora e Arran ement Sketch INDIANA MICHIGAtt POVlCR SITC DESIGN CONTROLLCO lVORKING COPY GAY TBRY OCV    05  >99S        l 0 Yz. A I 4 ~ 20 /q (spp- Sut'PoRr DI=TAIL)
VJ Q L H f4'1 E ." J:
Q X3 4      4  i  ORi <~D AhrGCC FRANC
                              ~<AT TB R' lO ~L pc I  e "X ZO'i+"                                              S7g (SPE ZLI! PORl QFTWI I                                                    4.g 2
II 2C-8p
                                                    ~  I I
cRov t P&e T    C.I4AN V I= I- GAS Ecv>o              A Drawn  by:                                                              Date:
Verified by:                                                            Date:
ual./Cert. inspector Reviewed by:         T '4~4                                            Date:      t o.-5-'I3 Construction Anc or Review Engineer Page    1 of      3 Revision      . 3
 
                                                            **12 CHP 5021.CCD.019 ATTACHMENT NO.                1 P CT 0            T
                                                                    ~ & QA~raRg u                        ~JUL f'ME.~T. Boo H UnLt                            cq'ldg.
Location Ig - 3P ZP-y Installation  dwg.  /  Rev.                Equipment No.
Anchora e Arran ement Sketch iiii)ll'lA: <iCi'IC "
                        / /2,  BAR                                  SIIE 0"SiGi'l CO"    ~
                                                                            'ii'OR!.IhC (.Oi' aOi T.aC OCT      05 1995
                                              >'+z Q            1I WI
                                                                                  'h I'
                                                                                ~
4 Drawn by:                                                    Date:            2 Verified by:                                                Date:
Qual./Cert. Inspector Reviewed by:    T'i' Construct'>on v~v~~=~.;                        Date:      l g.-z -c.'~
Anchor Reve.ew          Engineer Page      1    of  3 Revision            .3
 
r h
( >*12 CHP 5021. CCP. 019 ATTACHMENT NO.
N    ECT 0        T A, 5 .BA>~E.RY Tkvo                          .-  ux    got            EC  V'~
Location
                                                                                      > %COO;-q Unzt                          Bldg.
Installation      dwg.    /  Rev.           Equipment No.
Anchora e Arran ement Sketch II DIP . ~ Q. BOP EVERY 2.Wu OR ERD CATTP R'f FOR C-I MG-                INDIANA MICHIGAN PO'V(f R              UNl STRv  7 UMISTRVTS T'IG-HT                    SITE DESIGN CONTROLLED                  (hR>C.gI-= T A~INS, WTTI=RY r                            WORKING COPY wa+,-2o58 OCT 0 5 1995 II Yz  Tt+K. E'c.
OF RiGID Ih/SV LOFTI ON SOAR lo QR~~W GATTBRI & 5 QP,~<Pg'I'VAPOR                    i    DP.l Al L Drawn by:                                                            ,Date:
Verified by:                                                          Date:
Qual. /Cert. Inspector Reviewed by:            I '~F'I'5'h~-~(bQn                          Date:
Construct>on Anchor Review Engineer Page  1 of  3 Revision    . 3
 
                                                                                    **12 CHP 5021. CCD. 019
(      ATTACHMENT No.
CHOR XNS        CT 0 Equipment No.:                                                                          Dwg No..:  j Q -QQp- p Embedded  Steel  Dwg. No.:
HYS ICAL CHARACT                  RIST  C Weld ID        Wi                W3    w4                                                      d We          e Codes T  e Size            Q/~@
CC I/ cr                                                              1 =  Fillet Ct                                            2 =  Plug/Slot Len  th                                                                                      3  =.Groove Cracks            es      Yes        s    es                Yes    Yes      es    Yes N          0                                  No      No              No Lack  of      Yes      Y s      Yes    Yes                Yes    'Yes    Yes    Yes Penetration                                                  No      No    No        0 Porosity          es      es        es    es                Yes    Yes    Yes    Y o      0                  No      No      No      No INDIANA 41ICHIGAII POPOVER SITE OESIGII CONTROLLED WORKING COPY 0CT 05 19,I5 I.EP'K base  flexible:          0 Yes    8 No T'quipment Date:      -24 ons    ruc ron      re Reviewed by:                                                                                    Date:    (o-5'- f3 ons ruc      z.o    c    or evxew                  ngzneer Verified by:                                                                                    Date:
ua    . e    . npsec or Page  3  of  3 Revision      3
 
I ~
                                        ~ ~ ~
                      ~    ~ ~  ~  ~
t'R
    ~ ~ )0  $
                ~ ~            ~  ~
s ~
I I RRRSRRRRRSRWRSI5--.
MIIIIIR8imi mmmSRIMIIMII IKRIIRRIIIIIII e ~
milliAIR RSRIIIHRR ERRI
              %%LRRHLL
                        /S ~
 
0 0  ~        ~
                                                                                              ~
                                ~ ~ t            ~      te    a        ~
0                                          0    0        r
                                                                                ~ a    ~
E                    E      o    ~
                                                                          ~ -  l
                  - ~                                      tl                ~-
                                                          ~        l'4 Q                                  )
s 4        ~~RK~~~~RR RRRRRSRSRSRSRSRR~
MRRRSMR58%55W
  ~
      ~
RSMRIRSIH555$ 55 RHRRSSRRRRRRRSRR f
0 o ~
              ~ RSESRRRHMRRWW RSRRRRRSRRRSRRS
                ~RWRHHEQHKRH5%6%
IHMWRRRSRHRIRH              r                            e r
MMWMMMWW                              a                e        r IBK~EP~:aneesmw a ~a ka ~
                                -.. EL.
r a
g    ~ r
                                                  ~ W~
g J'He~~ e 0                       8K                                                            e Ak s
I  ~
 
                                                                        ~    y        ~ I ~
                      ~  ~ ~ 4      lj    ~ ~ e  ~    ~
                                                                ~ ~    ~
                                                                  ~    ~
e  ~
                                                          ~ -  ~
                                                              ~ .
                                                  ~    %4
                        ~      - 0 ~                          ~ .
e
                                        ~'
e ~
RRRRRRRRRRRRRImi:;:
~  ~
mmmmilmMIII RRRSElKRMIII
      ~
e ~
            ~
IHIRRIIIMlmlm IIISmimimlRI        y                    y      r            e
                ~IIIIIREQR!SRwRSII MWWMWMWW r        e  1                      e      r            y i                    t MW&MMMW&      r    p                      P Ca e
                                                                                    ~C      a P
                ~MWaMNaLMC)RP%%9&UIKQWJC HNk&&%4%
                                                                                              'YSMe!E
          'h  ~
                                                                            ~    a
                                                                      ~  ~
 
                            ~  ~            ~    ~ ~  4    ~
    ~ ~ I~
f ~
      ~
                    ~  ~                      Q      0  ~
              - ~              ~  ~
o    1~4 5    -  8 o ~
RRNNRNR%5%5%555%-                                          -.
IKmmmmmmmm RES      1 mmlESRNmmmmm RSMEWRSmMMIR mmmKlmm y                  e      o        r            e r o
            ~mmmmhhRRWHRmmmm mmmmmmm55m                            r MWWMMM&W j    ~
a
                          ~      y 0
                                                  ~
C.'                  ~  ~
              ~0 4
HFJBESISSI%leaSKHKaeRKSSP
                      ~          i. K~%K8'
 
                                                                                  ~    ~      ~    ~
                                                                                                  ~
I ~
                                                  ~  ~ ~  s        ~
~  ~,.                                                                     ~  ~
                                                                            ~  ~
I    ~  ~
                                                                      ~ -  ~
                                                                          ~ .
s      is)
IIIMIIIII
                                ~      -  C ~
t s ~          KRERHHRWHMSRRSIIIII .
RRRSNIRSRRR%mm5I=-
  ~  ~
55IIISRIEIIII IIIIRRRRSRI5%
s ~
MIEIIRSRSRSIIIS 0          ~    ~
                  ~IIIIRWRESHESIIII IIEIIIIIIIIIIRHIRl 0      I' MWWMMMW&
0 4  4~ ~
y 8    R      M a%4%%~<'
                          ~
a..
s a        i    o a
                                                                                          ~
a la    a E
                                                                                                        ~
sssIsss.ssvissw
            ~ ~
                              ''~'%81sssssssssi%1E
                                              .       ssaake~
rr ~ sssIMII 25a4KM<&#xc3;tRQRUPk%0                r
                                                                                  's~s O  ~l~e APL                          ~  ~
                                                                                    ~ 1
 
i S 8  A DEPART)so=AT                                12 SHP 5050    NDL- 008 CONTROl.LED DOCUMENT                                ATTACPNENT HO.
COPY NO.
UITRASONIC TEST REPORT JOB ORDER  NO.:            REPORT DATE:              REQUEST NO.
IDENTIFICATION Unit        ~Q                        Test Unit/ S/N (            i<.TS c c-9 Component              -A            Freq./Diameter 5 m4z Item    -~      rS                    Reference Standard Material  ~  S                        Couplant/Batch No.
Other TEST DATA REMARKS AM    r
: u. s'/z k.
L PERFORMED BY:
REVIEWED BY:
FORM NO.
                '" M ~.
C 12 SHP 5050 NDE.008-1 Pc&
I EVE E,:.~~
I EVEI'age 1 of DATE:  C /.- 5 y3 Revision  0
 
oly16192 PG. N0.425 SAFE'HUTDOWN EOUIPNEHT LIST (SSELUP)
FUNCT IOH:      01ESEL GENERAT IOM Equipment Class:    17        Train:    1 Equipment ID:          I-DHE-150-AB                                    DraMing Number:    1.12001  1-5151A  1-51510 System:      DIESEL GEHERATOR COM1'ROL AHD IHSTRlNENTATION Equip
 
== Description:==
AB EKERG  DIESEL GEHERATOR Bui l ding:      AUXILIARY            Roan:    AB EHERG DIESEL GEHERAI'OE ROOM            Elevation:'87 Normal  state:                  Desired state:                  Pouer Required:                  Sort:  lI,R Si~rting      System Orauing Number:
Recnsired Interconnections      and Supporting Conponentsl ty Related Status:        NUCLEAR SR                            Min/Dpt: KIM E.
ADDITIOMAL INFORHATIOH alias  Number:                                                        Prier I'rain:    B Conponent Served:          AB EKERG DIESEL GEHERATOR Nanufacturerl        GENERAL ELECIRIC CO                              Model:
  'Pnneil      1-OGAB    1-OGABX Elcm Orauing:        1-98032  1-98051  1-98052                      Uiring Drawing:      1-95301 Paver Source:      1-T11A11  1-T1164  1-TOAD-2 un I Ldoun:      F                                                      Relay Only:    Y Component    'Type:      ENG. GEN 3500XU,4KV ISO  Drauingsl Detailed Location:      IN tHE CENTER OF THE  ROON
 
DC Cook      Unit 1                                      GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                            Status: Yes Sheet1 of4 ID: 1-OME-150-AB ( Rev. 0)                                 Class: 17. Engine-Generators


==
==
Description:==
Description:==
AB EMERG DIESEL GENERATOR Building: AUXILIARY                                  Floor El.: 687.00                    Room, Row/Col: AB EDG RM, IN THE CENTER OF THE RM Manufacturer, Model, Etc.: GENERAL ELECTRIC CO SEISMIC CAPACITY VS DEMAND
: 1.      Elevation where equipment receives seismic input                                                            687.00 Elevation of seismic input below about 40'rom grade (grade = 608.00)                                        Yes
: 3.      Equipment has fundamental frequency above about 8 Hz (est. frequency = 20.00)                                Yes
: 4. Capacity based on:            1.00 Bounding Spectrum Demand based on:            1.00 " Design Basis Ground Response Spectrum 0.800 G
LOG 0.090 0.50                                    LOG      Hz                              33.00 Capacity ..... Demand Record Ca aci          C:IGIPtGIPLspectra.des                            Label Boundin Spectrum Demand 1        C:tGIPLPROJ0031 tspectra.des                      BUILDINGGround EI.EVATION 608 BROADEN N Demand 2        C:LGIPIPROJ0031tspoctra.des                        BUILDING Ground ELEVATION 608 BROADEN N Does capacity exceed demand' CAVEATS - BOUNDING SPECTRUM Caveat  1 - Earthquake Experience Equipment Class
                                              'G/BS Yes EG/BS    Caveat  2- Driver and Driven Component on Rigid Skid.                                                      Yes EG/BS    Caveat  3- Base Vibration Isolation System Checked.                                                        N/A EG/BS    Caveat  4 - Sufficient Slack and Flexibility of Attached Lines.                                            Yes EG/BS    Caveat  5 - Adequate Anchorage                                                                            Yes EG/BS    Caveat  6 - Potential Chatter of Essential Relays Evaluated.                                              N/A EG/BS    Caveat  7 - No Other Concerns.                                                                            Yes Is the intent of all the caveats met for Bounding Spectrum'


CD EMERGENCY DIESEL GENERATOR Building: AUXILIARY Manufacturer, Model, Etc.: Floor El.: 587.00 Room, Row/Col: CD EMER DSL.GEN RM-IN THE CENTER OF THE ROOM, 10 FEET NORTH OF THE MAIN ENTRANCE DOOR CAVEATS-BOUNDING SPECTRUM EG/BS Caveat 1-Earthquake Experience Equipment Class EG/BS Caveat 2-Driver and Driven Component on Rigid Skid EG/BS Caveat 3-Base Vibration Isolation System Checked EG/BS Caveat 4-Sufficient Slack and Flexibili of Attached Lines EG/BS Caveat 5-Adequate Anchorage.
DC Cook Unit 1                                   Glp Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                 Status: Yes Sheet2of4 ID: 1-OME-.150-AB ( Rev. 0     )                 Class: 17. Engine-Generators
EG/BS Caveat 6-Potential Chatter of Essential Relays Evaluated.
EG/BS Caveat 7-No Other Concerns.Yes Yes N/A Yes Yes NIA Yes Is the intent of all the caveats met for Bounding Spectrum'ANCHORAGE 1.The sizes and locations of anchors have been determined 2.Appropriate equipment characteristics have been determined (mass, CG, natural freq., damping, center of rotation).
3.The type of anchorage is covered by the GIP 4.The adequacy of the anchorage installation has been evaluated (weld quality and length, nuts arid washers, expansion anchor tightness, etc.)5.Factors affecting anchorage capacity or margin of safety have been considered:
embedment length, anchor spacing, freewdge distance, concrete strength/condition, and concrete cracking.6.For bolted anchorages, any gaps under the base are less than 1/4 7.Factors affecting essential relays have been considered:
gaps under the base, capacity reduction for expansion anchors.8.The base has adequate stiffness and the effect of prying action on anchors has been considered.'.
The strength of the equipment base and the load path to the CG is adequate 10.The adequa of embedded steel, grout pads or large concrete pads have been evaluated.
11.The anchorage capacity exceeds the demand.Are anchorage requirements met?INTERACTION EFFECTS Yes Yes Yes Yes Yes Yes N/A Yes Yes Yes Yes 1.Soft targets are free from impact by nearby equipment or structures.
2.If the equipment contains sensitive relays, it is free from all impact by nearby equipment or structures.
3.Attached lines have adequate flexibility 4.Overhead equipment or distribution systems are not likely to collapse.5.No other adverse concerns were found.Is equipment free of interaction effects?Yes NIA Yes Yes D.C.COOK Unit 2 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 3 of 14 ID: 2-OME-150-CD (Rev.0)Class: 17.Engine-Generators


==
==
Description:==
Description:==
AB EMERG DIESEL GENERATOR Building: AUXILIARY                        Floor El.: 587.00                    Room, Row/Col: AB EDG RM, IN THE CENTER OF THE RM Manufacturer, Model, Etc.: GENERAL ELECTRIC CO ANCHORAGE
: 1. The sizes and locations of anchors have been determined                                                Yes
: 2. Appropriate equipment characteristics have been determined (mass, CG, natural freq.,                    Yes damping, center of rotation).
: 3. The type of anchorage is covered by the GIP                                                            Yes
: 4. The adequacy of the anchorage installation has been evaluated (weld quality and length, nuts            Yes and washers, expansion anchor tightness, etc.)
: 5. Factors affecting anchorage capacity or margin of safety have been considered: embedment                Yes length, anchor spacing, free-edge distance, concrete strength/condition, and concrete cracking.
: 6. For bolted anchorages, any gaps under the base are less than 1/4                                        Yes
: 7. Factors affecting essential relays have been considered: gaps under the base, capacity                  N/A reduction for expansion anchors.
: 8. The base has adequate stiffness and the effect    of prying action on anchors has been                Yes considered.
: 9. The strength of the equipment base and the load path to the CG is adequate.                            Yes
: 10. The adequacy of embedded steel, grout pads or large concrete pads have been evaluated.                Yes
: 11. The anchorage capacity exceeds the demand.                                                            Yes Are anchorage requirements met'P INTERACTION EFFECTS
: 1. Soft targets are free from impact b nearby equipment or structures                                    Yes
: 2. If the equipment contains sensitive relays, it is free from all impact by nearby equipment or          N/A structures.
: 3. Attached lines have adequate flexibility                                                                Yes
: 4. Overhead equipment or distribution systems are not likely to collapse.                                  Yes
: 5. No other adverse concerns were found.                                                                  Yes Is equipment free of interaction effects' C L      D
~Clggg~g SRT: George Gary Thomas (S&A) and Tom Huang (AEP) on 10/16/93.
Diesel Generator and driver not on same skid, however large contrete foundations originate from common floor, differential motion not a concern.


CD EMERGENCY DIESEL GENERATOR Building: AUXILIARY Manufacturer, Model~Etc.: Floor EI.: 587.00 Room, Row/Col: CD EMER DSL GEN RM-IN THE CENTER OF THE ROOM, 10 FEET NORTH OF THE MAIN ENTRANCE DOOR S U SESMC LL D~cbmgp~SRTs are TR Satyan-Sharma, W.Djordjevic, J.Nieto, and R.Steele.-.10/5/93 REF: 1.Anchorage Inspection Data Sheet, Anchorage Arrangement Sketches of generator anchorage, 9/8/93.2.Report on Seismic Analysis of Equipment Supplied by Worthington Compressors Inc.for the D.C.Cook Nuclear Plant, Report EG-37017, 9/20/74-Engine on Foundation calculation.
DC Cook Unit 1                                   GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                               Status: Yes Sheet 3 of 4 ID: 1-OME-150-AB ( Rev. 0 )                   Class: 17. Engine-Generators
3..Dwgs 12-3241-12, 12-3468-13.
4.Anchor Bolt Schedule, Dwg 12-3073A-3.
5.General Arrangement Dwg W501812AT.
Anchorage:
See Reference 0 2 for seismic qualification of Engine.Engine is anchored by 14-2" anchors.Generator anchored by 8-1" CIP anchors.An edge distance reduction factor is taken for the 4 inside anchors (they are located approx.3.7" from the pit's edge).Generator shaft end anchored by 4-1.75" CIP anchors (modeled as 1.375" anchors ANCHOR because this is the largest size anchor covered in the GIP).See ANCHOR analysis.Photo: DG21-34&35, 36 and 37 (-34 of bolt,-35 from SW corner,-36 from NW corner, and-37 from NE corner).Evaluated by: Date: 9 GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 4 of 14 Class: 17.Engine-Generators ID: 2-OME-150-CD (Rev.0)Description:
CD EMERGENCY DIESEL GENERATOR Building: AUXILIARY Manufacturer, Model, Etc.: Floor El.: 587.00 Room, Rov//Col: CD EMER DSL GEN RM-IN THE CENTER OF THE ROOM, 10 FEET NORTH OF THE MAIN ENTRANCE DOOR D.C.COOK Unit 2 SCREENING EVALUATION WORK SHEET (SEWS)PJCT~UQS Figure 2: 2-OME-150-CD (Photo DG21.35)Figure 3: 2-OME-150-CD (Photo DG21.36)Figure 4: 2-OME-150-CD (Photo DG21.37)Figure1: 2-OME-150-CD (Photo DG21.34)
D.C.COOK Unit 2 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 5 of 14 ID: 2-OME-150-CD (Rev.0)Class: 17.Engine-Generators


==
==
Description:==
Description:==
AB EMERG DIESEL GENERATOR Building: AUXILIARY                      Floor El.: 587.00                  Room, Row/Col: AB EDG RM, IN THE CENTER OF THE RM Manufacturer, Model, Etc.: GENERAL ELECTRIC CO No interations. See AEP anchorage data for seismic qualification. Engine anchored by fourteen 2" or larger anchors. Generatoranchoredbyeight1" anchors. Generatorshaftendanchoredbyfour1.75" anchors. the ANCHOR analysis gives a large safety margin (36) as shown by that done for 2-OME-150-CD.
Concern noted with regard to support of air manafold that supports aftercooler. Aftercooler supported by spring mounted column. This concern was tracked and reconciled with items 1-HE47-ABS 8 ABN.
Zap shot Wk. 2, Team 2, Disk 2, Picture 20 8 21.
Evaluated by:                                                                      Date:
i(-~


CD EMERGENCY DIESEL GENERATOR Building: AUXILIARY Manufacturer, Model, Etc.: ANCHOR Report~Ea t~e Response Spectrum: SSE Frequency:
==Attachment:==
GIP-Rigid Percent Damping: GIP-5.00 Spectral Values: Floor El.: 587.00 Room, Row/Col: CD EMER DSL GEN RM-IN THE CENTER OF THE ROOM, 10 FEET NORTH OF THE MAIN ENTRANCE DOOR Direction.
Pictures
North-South East-West Vertical Acceleration (g's)0.38 0.38 0.25 Angle (N-S Direction makes with the X Axis): 0.00 Combination Criteria: SRSS Wejg+g'umber of Weights: 1 No Weight 1 10000.00 50.500 85.400 51.250 alee Number of External Forces: 0 Number of External Moments: 0~li wattg~hach@.'umber of Anchor types: 2 Tension Shear D.C.COOK Unit 2 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 6 of 14 ID: 2-OME-150-CD (Rev.0)Class: 17.Engine-Generators
 
DC Cook Unit 1                           GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                        Status: Yes Sheet 4 of 4 ID: 1-OME-1 50-AB ( Rev. 0 )               Class: 17. Engine-Generators


==
==
Description:==
Description:==
AB EMERG DIESEL GENERATOR Building: AUXILIARY                  Floor El.: 587.00              Room, Row/Col: AB EDG RM, IN THE CENTER OF THE RM Manufacturer, Model, Etc.: GENERAL ELECTRIC CO AB Emerg Diesel Generator, 1-OME-150-AB AB Emerg Diesel Generator 1-AB-150-AB AB Emerg. Diesel Generator, 1-OME-150-AB AB Emerg. Diesel Generator 1-OME-150-AB
                                                                      ~ >12 CHP 5021 CCD 019
                                                                                      ~
ATTACHMENT NO. 1 CT
                                                                          ~T'Pc''F      DI~BL EV &INE      GeS~ROT OR ROOnA Unzt                        Bldg.                    Location IZ.-3458-            3                    r.' &ME. /50-3 6 Instailat        on dwg.    / Rev.        Equipment No.
Anchora e Arran ement Sketch
                                                        /r l~z
        ~    ~
g 0,g
          ~
INDIANA MICHIG      P  EII SITE DESIGN      NT    L  D WORKING C  Y SEP 2 7  $ 995 LERK                                              / ~
gap dv      ~Ion Vlpw Lmwivs BAs~
D rawn      by:                                                    Date:
(
Verified by:                                                        Date:    ~-8 'Y- ~.8 Q  a    C  rt. Xnspector Reviewed by:                                                        Date:
Construction          chor Review Engineer Page  1 of  3 Revision    3
                                                                    *12  CHP    5021.CCD.019 ATTACiQ&NT NO            ~  1 Eh/Q OP C(E.SE.I-G;euERATaR Roof.
PME'n t                            Bldg-                      Locatzon l2.-3468 - l3                                y. awe,    -l4o-AE Installat    on dwg.        /  Rev.          Equipment No.
Anchora e Arran ement Sketch
                                                                              /3y COg                                                        9$
r't
                      +Cp Oo          Oo      Sf'I'/~g" tl 9                                              s  "q        F PENT                      I 5q Q
                      ~O                                                  Ol qual G              H Qo          o          MACHlh/E BASF        ft      Qo          Qo msanom~          H.
5fv'                                  GRou T    Paw INOIANA MICHIGAN POIVCII SITE DESIGN CONTROLLEO WORKING COPY SEP  27  1995 QMCHa R- MUV    '"                      KT                                I,J.Z.L A..-< sr<"
Ra.~SSaa        lZ                                                Loll,-A45%&#xc3;S-kE- ABC+
: 2. +4"g x        "DE, (gEe                                      r//To EueZODEO mfa.
              )5><
C'BORE, TyP. (g) PL@              5, Drawn by:                                                          Date:
Verified by.                                  Vvu                  Date:        r -2~ - F~
q          . ert. Inspector
('2 Reviewed by:                                                                    Cn'age Construe          on      chor Review Engineer 1 of  3 Revision          .3
                                                                                  **12 CHP 5021.CCD.019 ATTACHKENT NO. 1 I Equipment No.-
Anchor type:  re ~c r DWg NOe Tightness established by:        0 "Snug      Fit"        Q
                                                                                                  'orque Torque Mrench No.:                                                Cal. Due    Date:
Tightness verified? 0 Yes            8 No ons ruc 1on Date:
Equipment base  flexible?        0 Yes N No ons ruc 1on ARE Bolt  ZD                                    D            W          W        &                O'omments Caps      "I/I/    CCATS      I El 6    AIU'T        <Ec        SEE      roc're                    "
Anchor len th protruding                                                              3~"      37>"              rk len th Embedment eh'K1                                    b LE Bolt;                          ACC ri                                                              gq q gg  C9,~'II      Q~Rt' Concrete                            og                                Xu        rr4 condition                                                            6800 T    &%DAN>            EE~ T
                                                                                ~ <i~"    3"                v" Edge distance Anchor      +y~      y.
an Anchor larit Thread    Fees O          0            Q''
76cE556p        ccs58    cc d8 Q
cfcEIch O
emcee engagement      ~,          'I I~
y                                          ~z Comments:
c Verified by:          tA
                                                    ~
Date:
                          .,  Cert:. Inspector I
Reviewed by:                                                                                    Date:
Construct1on                                I    MICHIGAN POWER SITE DESIGN CONTROLLED WORKING COPY SEP 2 7 1995 Paga 2              of
( tat  I  ~+'AA~vl                Revision                3


CD EMERGENCY DIESEL GENERATOR Building: AUXILIARY Manufacturer, Model, Etc.: Floor El.: 587.00 Room, Row/Col: CD EMER DSL GEN RM-IN THE CENTER OF THE ROOM, 10 FEET NORTH OF THE MAIN ENTRANCE DOOR Ultimate Ultimate Inter Inter Saf Dia Manufact Product Tension Shear Coeff Coeff Fact 1-3/8 Other Other Cast In Place (A-307)Cast In Place (A-307)26690.00 13350.00 50400.00 25250.00 1.00 1.00 0.30 0.30 1.00 1.00 Ultimate Stress: 3500.00 psi.Reduction Factor: 0.85~WI Allowable Stress: 30600 psi.~ance Number of Surfaces: 2 Surface Orientation No Direction Comp 0.000 0.000 Direction Comp 0.000 0.000 Direction Comp Nz 1.000 1.000 Anchor Pattern for Surface ff.1  
SHP  5050 NDE.008 S 8 A DEPARTMENT                                    ATTACHMENT NO. 1 CONTROLLED DOCUMENT COPY NO. 3 ULTRASONIC TEST REPORT JOB ORDER  NO.:         REPORT DATE: / d"  3    REQUEST NO.
IDENTIFICATION Unit                              Test Unit/ S/N Component    -OWN- /&            Freq./Diameter Item AC+o S                        Reference Standard Material    .S.                   Couplant/Batch No.
Other TEST DATA REMARKS Vs" Vs" PERFORMED BY:                            I.EVEI:  M          DATE: / P REVIEWED BY:                             I EVE I: ~         DATE:
FORM NO. 12 SHP 5050 NDE.008-1                 Page  1 of  1 Revision  0


D.C.COOK Unit 2 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 7 of 14 ID: 2-OME-150-CD (Rev.0)Class: 17.Engine-Generators
Equip  Id:    2-OME-150-CD      Train:  2  Equip Class: 17 D~<wing  No ~  :  2-12002,,2-5151C,    2-5151D tion:    DIESEL GENERATION System: DXESEL GENERATION,          CONTROL  & INSTRUMENTATXON Equip Desc:        CD EMERGENCY    DIESEL GENERATOR Building:      AUXILXARY      Room: CD EMERGENCY DIESEL GENERATOR ROOM Elev: 587    'ort:      S,R        Notes:
Normal State:            Desired State:      'ower    Req'd:
Support System Drawing: 2-98033, 2-98051, 2-98052, 2-12002 Req'd Support Comp:
Safety Related Status:        NUCLEAR SR            Min/Opt: MXN Alias  No:          Power  Train:  A Comp  Served:      CD EMERGENCY DXESEL GENERATOR MFR: GENERAL ELECTRXC CO.
2 SAs      2 DGCD 2 DGCDX Elem. Drawing: 2-98033,          2-98051, 2-98052 Hiring Drawing: 2-95302        7 Power Source:        2-T21C3, 2-T21D8, 2-TDCD-2 Halkdown:      F      Relay Eval:    Y Comp  Type:    ENG. GEN-3500KW,      4KV Iso Drawing:
Location: XN        THE CENTER OF THE ROOM,      10 FEET NORTH OP THE MAXN ENTRANCE DOOR
 
D.C. COOK Unit 2                                       GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                       Status: Yes Sheet1 of14 ID: 2-OME-150-CD ( Rev. 0        )                  Class: 17. Engine-Generators
 
== Description:==
CD EMERGENCY DIESEL GENERATOR Building: AUXILIARY                          Floor El.: 587.00                    Room, Row/Col: CD EMER DSL GEN RM - IN THE CENTER OF THE ROOM, 10 FEET NORTH OF THE MAIN ENTRANCE DOOR Manufacturer, Model, Etc.:
SEISMIC CAPACITY VS DEMAND
: 1. Elevation where equipment receives seismic input                                                      587.00 Elevation of seismic input below about 40'rom grade (grade = 608.00)                                          Yes
: 3. Equipment has fundamental frequency above about 8 Hz (est. frequency = )                                      SRT Capacity based on:          1.00 Bounding Spectrum Demand based on:            1.00
* Design Basis Ground Response Spectrum 0.800 r~
                                                    /r LOG                        /
                                            /
                                          /
                                        /
                                  /r 0.090 0.50                              LOG        Hz                            33.00 Capacity  ..... Demand File                                          Record                                          'apacit C:LGIPtGIPLs ectra.des                        Label Boundin Spectrum Demand 1      C:tGIPIPROJ0034ts ectra.des                  BUILDINGGround ELEVATION 608 BROADEN N Demand 2      C:tGIPtPROJ0034tspectra.des                  BUILDINGGround ELEVATION 608 BROADEN N Does capacity exceed demand?
 
0 0
 
D.C. COOK Unit 2                                GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                              Status: Yes Sheet 2 of 14 ID: 2-OME-150-CD ( Rev. 0)                              Class: 17. Engine-Generators
 
== Description:==
CD EMERGENCY DIESEL GENERATOR Building: AUXILIARY                              Floor El.: 587.00                Room, Row/Col: CD EMER DSL .
GEN RM - IN THE CENTER OF THE ROOM, 10 FEET NORTH OF THE MAIN ENTRANCE DOOR Manufacturer, Model, Etc.:
CAVEATS - BOUNDING SPECTRUM EG/BS          Caveat 1 - Earthquake Experience Equipment Class                                              Yes EG/BS          Caveat 2 - Driver and Driven Component on Rigid Skid                                          Yes EG/BS          Caveat 3 - Base Vibration Isolation System Checked                                            N/A EG/BS          Caveat 4 - Sufficient Slack and Flexibili of Attached Lines                                    Yes EG/BS          Caveat 5 - Adequate Anchorage.                                                                Yes EG/BS          Caveat 6 - Potential Chatter of Essential Relays Evaluated.                                    NIA EG/BS          Caveat 7- No Other Concerns.                                                                  Yes Is the intent of all the caveats met for Bounding Spectrum' ANCHORAGE
: 1. The sizes and locations of anchors have been determined                                                    Yes
: 2. Appropriate equipment characteristics have been determined (mass, CG, natural freq.,                      Yes damping, center of rotation).
: 3. The type of anchorage is covered by the GIP                                                                Yes
: 4. The adequacy of the anchorage installation has been evaluated (weld quality and length, nuts                Yes arid washers, expansion anchor tightness, etc.)
: 5. Factors affecting anchorage capacity or margin of safety have been considered: embedment                    Yes length, anchor spacing, freewdge distance, concrete strength/condition, and concrete cracking.
: 6. For bolted anchorages, any gaps under the base are less than 1/4                                            Yes
: 7. Factors affecting essential relays have been considered: gaps under the base, capacity                      N/A reduction for expansion anchors.
: 8. The base has adequate stiffness and the effect of prying action on anchors has been                        Yes considered.'.
The strength of the equipment base and the load path to the CG is adequate                              Yes
: 10. The adequa            of embedded steel, grout pads or large concrete pads have been evaluated.          Yes
: 11. The anchorage capacity exceeds the demand.                                                                Yes Are anchorage requirements met?
INTERACTION EFFECTS
: 1. Soft targets are free from impact by nearby          equipment or structures.                              Yes
: 2. If the equipment contains sensitive relays, it is free from all impact by nearby equipment or              NIA structures.
: 3. Attached lines have adequate flexibility                                                                    Yes
: 4. Overhead equipment or distribution systems are not likely to collapse.                                      Yes
: 5. No other adverse concerns were found.
Is equipment free of interaction effects?
 
D.C. COOK Unit 2                                GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                              Status: Yes Sheet 3 of 14 ID: 2-OME-150-CD ( Rev. 0 )                     Class: 17. Engine-Generators


==
==
Description:==
Description:==
CD EMERGENCY DIESEL GENERATOR Building: AUXILIARY                      Floor EI.: 587.00                Room, Row/Col: CD EMER DSL GEN RM - IN THE CENTER OF THE ROOM, 10 FEET NORTH OF THE MAIN ENTRANCE DOOR Manufacturer, Model Etc.:
                    ~
S    U        SESMC LL          D
~cbmgp~
SRTs are TR Satyan-Sharma, W. Djordjevic, J. Nieto, and R. Steele. -. 10/5/93 REF: 1. Anchorage Inspection Data Sheet, Anchorage Arrangement Sketches of generator anchorage, 9/8/93.
: 2. Report on Seismic Analysis of Equipment Supplied by Worthington Compressors Inc. for the D. C. Cook Nuclear Plant, Report EG-37017, 9/20/74- Engine on Foundation calculation.
3.. Dwgs 12-3241-12, 12-3468-13.
: 4. Anchor Bolt Schedule, Dwg 12-3073A-3.
: 5. General Arrangement Dwg W501812AT.
Anchorage:
See Reference 0 2 for seismic qualification of Engine. Engine is anchored by 14 - 2" anchors.
Generator anchored by 8-1" CIP anchors. An edge distance reduction factor is taken for the 4 inside anchors (they are located approx. 3.7" from the pit's edge). Generator shaft end anchored by 4-1.75" CIP anchors ( modeled as 1.375" anchors ANCHOR because this is the largest size anchor covered in the GIP). See ANCHOR analysis.
Photo: DG21-34&35, 36 and 37 (-34 of bolt, -35 from SW corner, -36 from NW corner, and -37 from NE corner).
Evaluated by:                                                                    Date:
9


CD EMERGENCY DIESEL GENERATOR Building: AUXILIARY Manufacturer, Model, Etc.: Floor EI.: 587.00 Room, Row/Col: CD EMER DSL GEN RM-IN THE CENTER OF THE ROOM, 10 FEET NORTH OF THE MAIN ENTRANCE DOOR Anchor Pattern for Surface//2 Legend for Anchor Patterns D.C.COOK Unit 2 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 8 of 14 ID: 2-OME-150-CD (Rev.0)Class: 17.Engine-Generators
D.C. COOK Unit 2                             GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                          Status: Yes Sheet 4 of 14 ID: 2-OME-150-CD ( Rev. 0 )               Class: 17. Engine-Generators


==
==
Description:==
Description:==
CD EMERGENCY DIESEL    GENERATOR Building: AUXILIARY                  Floor El.: 587.00                Room, Rov//Col: CD EMER DSL GEN RM - IN THE CENTER OF THE ROOM, 10 FEET NORTH OF THE MAIN ENTRANCE DOOR Manufacturer, Model, Etc.:
PJCT~UQS Figure 2: 2-OME-150-CD (Photo DG21.35)
Figure 3: 2-OME-150-CD (Photo DG21.36)
Figure 4: 2-OME-150-CD (Photo DG21.37)
Figure1: 2-OME-150-CD (Photo DG21.34)


CD EMERGENCY DIESEL GENERATOR Building: AUXILIARY Manufacturer, Model, Etc.: Floor El.: 587.00 Room, Row/Col: CD EMER DSL GEN RM-IN THE CENTER OF THE ROOM, 10 FEET NORTH OF THE MAIN ENTRANCE DOOR Anchor Bolts.'oncrete Lines'.Concrete Points.Weld Lines.mmmm geoJHefXK'umber of Anchors: 12 10 12 Anch Id Coord 98.700 93.200 93.200~98.700 2.300 8.060 8.060 2.300 30.750 30.750 70.250 70.250 Coord 76.750 76.750 129.250 129.250 129.250 129.250 76.750 76.750 10.000 22.000 10.000 22.000 Coord 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 8.500 8.500 8.500 8.500 Surf Id ttt of elements per line: 5 Number of Concrete Lines: 4 sta~stan s~art End End End sf Line X-Coord 5.000 96.000 35.500 Y-Coord 39.360 39.360 0.000 Z-Coord 0.000 0.000 8 500 X-Coo rd 5.000 96.000 35 500 Y-Coo rd 131.360 131.360 32.000 Z-Coord id 0.000 1 0.000 1 8.500 2 Width 10.000 10.000 30.000 D.C.COOK Unit 2 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 9 of 14 ID: 2-OME-150-CD (Rev.0)Class: 17.Engine-Generators
D.C. COOK Unit 2                           GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                        Status: Yes Sheet 5 of 14 ID: 2-OME-150-CD ( Rev. 0         )           Class: 17. Engine-Generators


==
==
Description:==
Description:==
CD EMERGENCY DIESEL GENERATOR Building: AUXILIARY                      Floor El.: 587.00              Room, Row/Col: CD EMER DSL GEN RM - IN THE CENTER OF THE ROOM, 10 FEET NORTH OF THE MAIN ENTRANCE DOOR Manufacturer, Model, Etc.:
ANCHOR Report
~Ea      t~e Response Spectrum: SSE Frequency: GIP - Rigid Percent Damping: GIP - 5.00 Spectral Values:
Direction.            Acceleration (g's)
North - South          0.38 East - West            0.38 Vertical              0.25 Angle (N-S Direction makes with the X Axis): 0.00 Combination Criteria: SRSS Wejg+g of Weights:
              'umber 1
No          Weight 1        10000.00        50.500    85.400          51.250 alee Number of External Forces: 0 Number of External Moments: 0
~li wattg~
hach@.'umber of Anchor types: 2 Tension      Shear
D.C. COOK Unit 2                                  GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                Status: Yes Sheet 6 of 14 ID: 2-OME-150-CD ( Rev. 0)                      Class: 17. Engine-Generators
== Description:==
CD EMERGENCY DIESEL GENERATOR Building: AUXILIARY                      Floor El.: 587.00                  Room, Row/Col: CD EMER DSL GEN RM - IN THE CENTER OF THE ROOM, 10 FEET NORTH OF THE MAIN ENTRANCE DOOR Manufacturer, Model, Etc.:
Ultimate    Ultimate      Inter        Inter    Saf Dia      Manufact        Product        Tension      Shear        Coeff        Coeff    Fact Other          Cast In                                    1.00        0.30      1.00 Place (A-      26690.00    13350.00 307) 1-3/8      Other          Cast In                                    1.00        0.30      1.00 Place (A-      50400.00    25250.00 307)
Ultimate Stress: 3500.00 psi.
Reduction Factor: 0.85
~WI Allowable Stress:    30600 psi.
~ance Number of Surfaces: 2 Surface Orientation Direction        Direction      Direction Comp            Comp            Comp No                                          Nz 0.000          0.000          1.000 0.000            0.000          1.000 Anchor Pattern for Surface  ff. 1


CD EMERGENCY DIESEL GENERATOR Building: AUXILIARY Manufacturer, Model, Etc.: Floor El.: 587.00 Room, Row/Col: CD EMER DSL GEN RM-IN THE CENTER OF THE ROOM, 10 FEET NORTH OF THE MAIN ENTRANCE DOOR 4 65.500 0.000 8.500 65.500 32.000 8.500 2 30.000 Number of Concrete Points: 0&#xb9;of elements per line: 5 Number of Weld Lines: 0 Dete a'educti F Reduction Factor Input for Anchor&#xb9;1 Adequately Installed:
D.C. COOK Unit 2                           GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                        Status: Yes Sheet 7 of 14 ID: 2-OME-150-CD ( Rev. 0)               Class: 17. Engine-Generators
Yes Embedment Length: (61.38 in.Min Reqd.to achieve full capacity):=10.00 in.Gap at Threaded Anchor: 0.00 in.Edge Distance-Edge 1: 8.75 in.Crack Size: 0.000 in.Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed:
Yes Reduction Factor Input for Anchor&#xb9;2 Adequately Installed:
Yes Embedment Length: (61.38 in.Min Reqd.to achieve full capacity):=10.00 in.Gap at Threaded Anchor: 0.00 in.Edge Distance-Edge 1: 3.70 in.Crack Size: 0.000 in.Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed:
Yes Reduction Factor Input for Anchor&#xb9;3 Adequately Installed:
Yes Embedment Length: (61.38 in.Min Reqd.to achieve full capacity):=10.00 in.Gap at Threaded Anchor: 0.00 in.Edge Distance-Edge 1: 3.70 in.Crack Size: 0.000 in.ssential Relays in Cabinet: No D.C.COOK Unit 2 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 10 of 14 ID;2-OME-1 50-CD (Rev.0)Class: 17.Engine-Generators


==
==
Description:==
Description:==
CD EMERGENCY DIESEL GENERATOR Building: AUXILIARY                Floor EI.: 587.00                Room, Row/Col: CD EMER DSL GEN RM - IN THE CENTER OF THE ROOM, 10 FEET NORTH OF THE MAIN ENTRANCE DOOR Manufacturer, Model, Etc.:
Anchor Pattern for Surface //2 Legend for Anchor Patterns
D.C. COOK Unit 2                                          GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                          Status: Yes Sheet 8 of 14 ID: 2-OME-150-CD ( Rev. 0)                          Class: 17. Engine-Generators


CD EMERGENCY DIESEL GENERATOR Building: AUXILIARY Manufacturer, Model, Etc.: Floor El.: 587.00 Room, Row/Col: CD EMER DSL GEN RM-IN THE CENTER OF THE ROOM, 10 FEET NORTH OF THE MAIN ENTRANCE DOOR Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed:
== Description:==
Yes Reduction Factor Input for Anchor&#xb9;4 Adequately Installed:
CD EMERGENCY DIESEL GENERATOR Building: AUXILIARY                           Floor El.: 587.00                         Room, Row/Col: CD EMER DSL GEN RM - IN THE CENTER OF THE ROOM, 10 FEET NORTH OF THE MAIN ENTRANCE DOOR Manufacturer, Model, Etc.:
Yes Embedment Length: (61.38 in.Min Reqd.to achieve full capacity):=10.00 in.Gap at Threaded Anchor: 0.00 in.Edge Distance-Edge1:
Anchor Bolts Lines
8.75in.Crack Size: 0.000 in.Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed:
                                                                  .'oncrete Concrete Points              . mmmm Weld Lines    .
Yes Reduction Factor Input for Anchor&#xb9;5 Adequately Installed:
geoJHefXK
Yes Embedment Length: (61.38 in.Min Reqd.to achieve full capacity):=10.00 in.Gap at Threaded Anchor: 0.00 in.Edge Distance-Edge 1: 8.75 in.Crack Size: 0.000 in.Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes.Embedment Steel and Pads Adequately Installed:
                'umber of Anchors: 12 Anch                                                                    Surf Id        Coord          Coord            Coord                      Id 98.700          76.750            0.000 93.200          76.750            0.000 93.200  ~      129.250            0.000 98.700          129.250            0.000 2.300          129.250            0.000 8.060        129.250              0.000 8.060          76.750            0.000 2.300          76.750            0.000 30.750          10.000            8.500 10                   30.750          22.000            8.500 70.250          10.000            8.500 12                  70.250          22.000           8.500 ttt of elements per line: 5 Number of Concrete Lines: 4 sta~          stan          s~art          End                        End    End        sf    Line X-Coord        Y-Coord        Z-Coord        X-Coo rd                  Y-Coo rd Z-Coord      id    Width 5.000        39.360          0.000          5.000                  131.360  0.000      1    10.000 96.000        39.360          0.000        96.000                    131.360  0.000      1     10.000 35.500          0.000         8 500        35 500                    32.000  8.500      2      30.000
Yes Reduction Factor Input for Anchor&#xb9;6 Adequately Installed:
Yes Embedment Length: (61.38 in.Min Reqd.to achieve full capacity):=10.00 in.Gap at Threaded Anchor: 0.00 in.Edge Distance-Edge 1: 3.70 in.Crack Size: 0.000 in.Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed:
Yes Reduction Factor Input for Anchor&#xb9;7 Adequately Installed:
Yes Embedment Length: (61.38 in.Min Reqd.to achieve full capacity):=10.00 in.Gap at Threaded Anchor: 0.00 in.Edge Distance-Edge 1: 3.70 in.Crack Size: 0.000 in.Essential Relays in Cabinet: No dequate Equipment Base Strength and Structural Load Path: Yes


D.C.COOK Unit 2 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 11 of 14 ID: 2-OME-1 50-CD (Rev.0)Class: 17.Engine-Generators
D.C. COOK Unit 2                             GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                             Status: Yes Sheet 9 of 14 ID: 2-OME-150-CD ( Rev. 0 )                    Class: 17. Engine-Generators
 
== Description:==
CD EMERGENCY DIESEL GENERATOR Building: AUXILIARY                      Floor El.: 587.00              Room, Row/Col: CD EMER DSL GEN RM - IN THE CENTER OF THE ROOM, 10 FEET NORTH OF THE MAIN ENTRANCE DOOR Manufacturer, Model, Etc.:
4      65.500        0.000        8.500        65.500    32.000        8.500    2      30.000 Number of Concrete Points: 0
&#xb9; of elements  per line: 5 Number of Weld Lines: 0 Dete        '
a          educti    F Reduction Factor Input for Anchor  &#xb9; 1 Adequately Installed: Yes Embedment Length: (61.38 in. Min Reqd. to achieve full capacity):=10.00 in.
Gap at Threaded Anchor: 0.00 in.
Edge Distance - Edge 1: 8.75 in.
Crack Size: 0.000 in.
Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factor Input for Anchor  &#xb9;2 Adequately Installed: Yes Embedment Length: (61.38 in. Min Reqd. to achieve full capacity):=10.00 in.
Gap at Threaded Anchor: 0.00 in.
Edge Distance - Edge 1: 3.70 in.
Crack Size: 0.000 in.
Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factor Input for Anchor  &#xb9;3 Adequately Installed: Yes Embedment Length: (61.38 in. Min Reqd. to achieve full capacity):=10.00 in.
Gap at Threaded Anchor: 0.00 in.
Edge Distance - Edge 1: 3.70 in.
Crack Size: 0.000 in.
ssential Relays in Cabinet: No
 
D.C. COOK Unit 2                              GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                            Status: Yes Sheet 10 of 14 ID; 2-OME-1 50-CD ( Rev. 0 )                 Class: 17. Engine-Generators


==
==
Description:==
Description:==
CD EMERGENCY DIESEL GENERATOR Building: AUXILIARY                  Floor El.: 587.00                  Room, Row/Col: CD EMER DSL GEN RM - IN THE CENTER OF THE ROOM, 10 FEET NORTH OF THE MAIN ENTRANCE DOOR Manufacturer, Model, Etc.:
Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factor Input for Anchor &#xb9;4 Adequately Installed: Yes Embedment Length: (61.38 in. Min Reqd. to achieve full capacity):=10.00 in.
Gap at Threaded Anchor: 0.00 in.
Edge Distance-Edge1: 8.75in.
Crack Size: 0.000 in.
Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factor Input for Anchor &#xb9;5 Adequately Installed: Yes Embedment Length: (61.38 in. Min Reqd. to achieve full capacity):=10.00 in.
Gap at Threaded Anchor: 0.00 in.
Edge Distance - Edge 1: 8.75 in.
Crack Size: 0.000 in.
Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes.
Embedment Steel and Pads Adequately Installed: Yes Reduction Factor Input for Anchor &#xb9;6 Adequately Installed: Yes Embedment Length: (61.38 in. Min Reqd. to achieve full capacity):=10.00 in.
Gap at Threaded Anchor: 0.00 in.
Edge Distance - Edge 1: 3.70 in.
Crack Size: 0.000 in.
Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factor Input for Anchor &#xb9;7 Adequately Installed: Yes Embedment Length: (61.38 in. Min Reqd. to achieve full capacity):=10.00 in.
Gap at Threaded Anchor: 0.00 in.
Edge Distance - Edge 1: 3.70 in.
Crack Size: 0.000 in.
Essential Relays in Cabinet: No dequate Equipment Base Strength and Structural Load Path: Yes


CD EMERGENCY DIESEL GENERATOR Building: AUXILIARY Manufacturer, Model, Etc.'.Floor El.: 687.00 Room, Row/Col: CD EMER DSL GEN RM-IN THE CENTER OF THE ROOM, 10 FEET NORTH OF THE MAIN ENTRANCE DOOR Embedment Steel and Pads Adequately Installed:
D.C. COOK Unit 2                              GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                            Status: Yes Sheet 11 of 14 ID: 2-OME-1 50-CD ( Rev. 0 )                Class: 17. Engine-Generators
Yes Reduction Factor Input for Anchor&#xb9;8 Adequately Installed:
 
Yes Embedment Length: (61.38 in.Min Reqd.to achieve full capacity):=10.00 in.Gap at Threaded Anchor: 0.00 in.Edge Distance-Edge 1: 8.75 in.Crack Size: 0.000 in.Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed:
== Description:==
Yes Reduction Factor Input for Anchor&#xb9;9 Adequately Installed:
CD EMERGENCY DIESEL GENERATOR Building: AUXILIARY                   Floor El.: 687.00                 Room, Row/Col: CD EMER DSL GEN RM - IN THE CENTER OF THE ROOM, 10 FEET NORTH OF THE MAIN ENTRANCE DOOR Manufacturer, Model, Etc.'.
Yes Embedment Length: (54.50 in.Min Reqd.to achieve full capacity):=13.75 in.Gap at Threaded Anchor: 0.00 in.(Edge Distance-Edge 1: 8.75 in.Crack Size: 0.000 in.Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed:
Embedment Steel and Pads Adequately Installed: Yes Reduction Factor Input for Anchor &#xb9;8 Adequately Installed: Yes Embedment Length: (61.38 in. Min Reqd. to achieve full capacity):=10.00 in.
Yes Reduction Factor Input for Anchor&#xb9;10 Adequately Installed:
Gap at Threaded Anchor: 0.00 in.
Yes Embedment Length: (54.50 in.Min Reqd.to achieve full capacity):=13.75 in.Gap at Threaded Anchor: 0.00 in.Edge Distance-Edge 1: 8.76 in.Crack Size: 0.000 in.Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed:
Edge Distance - Edge 1: 8.75 in.
Yes Reduction Factor Input for Anchor&#xb9;11 Adequately Installed:
Crack Size: 0.000 in.
Yes Embedment Length: (64.50 in.Min Reqd.to achieve full capacity):=13.75 in.Gap at Threaded Anchor: 0.00 in.Edge Distance-Edge 1: 8.75 in.Crack Size: 0.000 in.Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes=mbedment Steel and Pads Adequately Installed:
Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factor Input for Anchor &#xb9;9 Adequately Installed: Yes Embedment Length: (54.50 in. Min Reqd. to achieve full capacity):=13.75 in.
Yes D.C.COOK Unit 2 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 12 of 14 ID: 2-OME-1 50-CD (Rev.0)Class: 17.Engine-Generators
Gap at Threaded Anchor: 0.00 in.
( Edge Distance - Edge 1: 8.75 in.
Crack Size: 0.000 in.
Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factor Input for Anchor &#xb9; 10 Adequately Installed: Yes Embedment Length: (54.50 in. Min Reqd. to achieve full capacity):=13.75 in.
Gap at Threaded Anchor: 0.00 in.
Edge Distance - Edge 1: 8.76 in.
Crack Size: 0.000 in.
Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factor Input for Anchor &#xb9; 11 Adequately Installed: Yes Embedment Length: (64.50 in. Min Reqd. to achieve full capacity):=13.75 in.
Gap at Threaded Anchor: 0.00 in.
Edge Distance - Edge 1: 8.75 in.
Crack Size: 0.000 in.
Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes
  =mbedment Steel and Pads Adequately Installed: Yes
 
D.C. COOK Unit 2                                 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                               Status: Yes Sheet 12 of 14 ID: 2-OME-1 50-CD ( Rev. 0 )                      Class: 17. Engine-Generators
 
== Description:==
CD EMERGENCY DIESEL GENERATOR Building: AUXILIARY                        Floor EI.: 587.00                Room, Row/Col: CD EMER DSL GEN RM - IN THE CENTER OF THE ROOM, 10 FEET NORTH OF THE MAIN ENTRANCE DOOR Manufacturer, Model, Etc.:
Reduction Factor Input for Anchor  &#xb9; 12 Adequately Installed: Yes Embedment Length: (54.50 in. Min Reqd. to achieve full capacity):=13.75 in.
Gap at Threaded Anchor: 0.00 in.
Edge Distance - Edge 1: 8.75 in.
Crack Size: 0.000 in.
Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factors Data Current: Yes Anc      Paii/      Paltr/
No            Vail      Vallr    RT    RN    RL    RG    RS    RE  RF    RC    RR  RP    RB  RM 1    20671.79      N/A    1.00  1.00  1.00  1.00  0.77  1.00 1.00  1.00  1.00 1.00  1.00 1.00 13350.00    N/A      1.00  1.00  1.00  1.00  1.00 1.00 1.00  1.00  1.00 1.00  1.00 1.00 0.00      N/A      1.00  1.00  1.00  1.00  0.77      1.00  1.00  1.00 1.00  1.00  1.00 0.00      NIA      1.00  1.00  1.00  1.00  1.00      1.00  1.00  1.00 1.00  1.00  1.00 0.00      N/A      1.00  1.00  1.00  1.00  0.77      1.00  1.00  1.00 1.00  1.00 0.00      N/A      1.00  1.00  1.00  1.00  1.00      1.00  1.00  1.00 1.00  1.00  1.00 1    20671.79    N/A    1.00    1.00  1.00  1.00  0.77  1.00 1.00  1.00  1.M  1.00  1.00  1.00 13350.00    N/A      1.00  1.00  1.00  1.00  1.00  1.00 1.00  1.00  1.00 1.00  1.00  1.00 1    20907.90    N/A    1.00    1.00  1.00  1.00  0.78  1.00 1.00  1.00  1.00 1.00  1.00  1.00 13350.00    N/A    1.00    1.00  1.00  1.00  1.00  1.00 1.00  1.00  1.00 1.00  1.00  1.00 0.00      NIA    1.00    1.00  1.00  1.00  0.78      1.00  1.00  1.00  1.00  1.00 0.00      N/A    1.00    1.00  1.00  1.00  1.00      1.00  1.00  1.00 1.00  1.00  1.00 7            0.00      N/A    1.00    1.00  1.00  1.00  0.78      1.00  1.00  1.00  1.00  1.00  1.00 0.00      N/A    1.00    1.00  1.00  1.00  1.00      1.00  1.M  1.00  1.00  1.00  1.00 1    20907.90    N/A    1.00    1.00  1.00  1.00  0.78  1.00 1.00  1.00  1.00  1.00  1.00  1.00 13350.00    N/A    1.00    1.00  1.00  1.00  1.00  1.00 1.00  1.00  1.00  1.00  1.00  1.00 2    39829.26    N/A    1.00    1.00  1.00  1.00  0.88  0.90 1.00  1.00  1.M  1.00  1.00  1.00 13395.02    NIA    1.00    1.00  1.00  1.00  1.00  0.53 1.M  1.00  1.00  1.00  1.00  1.00 10    2    39829.26    NIA    1.00    1.00  1.00  1.00  0.88  0.90 1.00  1.00  1.00  1.00  'i.oo 1.00 13395.02    NIA    1.00    1.00  1.00  1.00  1.00  0.53 1.00  1.00  1.00  1.00 2    39829.26    N/A    1.00    1.00  1.00  1.00  0.88  0.90 1.00  1.00  1.00  1.00  1.00  1.00 13395.02    NIA    1.00    1.00  1.00  1.00  1.00  0.53 1.00  1.00  1.00  1.00  1.00  1.00 12    2    39829.26    N/A    1.00    1.00  1.00  1.00  0.88  0.90 1.00  1.00  1.00  1.00  1.00  1.00 13395.02    N/A    1.00    1.00  1.00  1.00  1.00  0.53 1.00  1.00  1.00  1.00  1.00  1.00 N/A      = Not Applicable Pall    = Allowable Pull without Reduced Inspection Vali    = Allowable Shear without Reduced Inspection Pallr    = Allowable Pull with Reduced Inspection
 
0 D.C. COOK Unit 2                                  GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                  Status: Yes Sheet 13 of 14 ID: 2-OME-1   50-CD ( Rev. 0 )                   Class: 17. Engine-Generators


==
==
Description:==
Description:==
CD EMERGENCY DIESEL GENERATOR Building: AUXILIARY                        Floor El.: 587.00                  Room, Row/Col: CD EMER DSI GEN RM - IN THE CENTER OF THE ROOM, 10 FEET NORTH OF THE MAIN ENTRANCE DOOR Manufacturer, Model, Etc.:
Vallr    = Allowable Shear with Reduced Inspection
        = Outlier
        = Reduction Factor Not Used RT      = Reduction Factor for Type of Anchorage RN      = Reduction Factor for Installation Adequacy RL      = Reduction Factor for Embedment RG      = Reduction Factor for Gap at Anchors RS      = Reduction Factor for Spacing RE      = Reduction Factor for Edge Distance
        = Reduction Factor for Concrete Strength RC      = Reduction Factor for Concrete Cracks RR      = Reduction Factor for Essential Relays RP      = Reduction Factor for Base Stiffness and Prying Action RB      = Reduction Factor for Base Strength and Load Path RM      = Reduction Factor for Embed. Steel and Pads SI        u Analysis Performed: Yes Type of Analysis: Regular Spectral Accelerations (G's)
No          N-S              E-W            Vertical      Safety Factor 0.375            0.150            0.100          49.387
            -0.375          -0.150            -0.100          66 437
            -0.375            0.150            0.100          49.196 0.375          -0.150            -0.100          66.700 0.375          -0.150            0.100          36.848
            -0.375            0.150            -0.100          79.872 0.375            0.160            -0.100          80.174
            -0.375          -0.150            0.100          36.703 0.150            0.375            0.100          84.089 10        -0.150          -0.375            -0.100          84.919 0.150          -0.375            0.100          41.166 12        -0.150            0.375            -0.100        124.223 13        -0.160            0.375            0.100          84.082 14          0.150          -0.375            -0.100          85.264 15          0.150            0.375            -0.100        124.223
            -0.150          -0.375            0.100          41 142 17          0.150            0.150            0.250          57.447


CD EMERGENCY DIESEL GENERATOR Building: AUXILIARY Manufacturer, Model, Etc.: Floor EI.: 587.00 Room, Row/Col: CD EMER DSL GEN RM-IN THE CENTER OF THE ROOM, 10 FEET NORTH OF THE MAIN ENTRANCE DOOR Reduction Factor Input for Anchor&#xb9;12 Adequately Installed:
D.C. COOK Unit 2                                 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                              Status: Yes Sheet 14 of 14 ID: 2-OME-1 50-CD ( Rev. 0 )                   Class: 17. Engine-Generators
Yes Embedment Length: (54.50 in.Min Reqd.to achieve full capacity):=13.75 in.Gap at Threaded Anchor: 0.00 in.Edge Distance-Edge 1: 8.75 in.Crack Size: 0.000 in.Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed:
Yes Reduction Factors Data Current: Yes No Anc Paii/Vail Paltr/Vallr RT RN RL RG RS RE RF RC RR RP RB RM 7 1 20671.79 13350.00 0.00 0.00 0.00 0.00 1 20671.79 13350.00 1 20907.90 13350.00 0.00 0.00 0.00 0.00 1 20907.90 N/A 1.00 1.00 N/A 1.00 1.00 N/A 1.00 1.00 NIA 1.00 1.00 N/A N/A N/A 1.00 1.00 1.00 1.00 1.00 1.00 N/A 1.00 1.00 1.00 1.00 N/A N/A 1.00 1.00 N/A 1.00 1.00 N/A 1.00 1.00 N/A 1.00 1.00 NIA 1.00 1.00 N/A 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.77 1.00 1.00 1.00 0.77 1.00 0.77 1.00 0.77 1.00 1.00 1.00 0.78 1.00 1.00 1.00 0.78 1.00 0.78 1.00 0.78 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.M 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.M 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 13350.00 2 39829.26 N/A N/A 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.88 0.90 1.00 1.00 1.00 1.00 1.00 1.00 1.M 1.00 1.00 1.00 1.00 1.00 10 12 13395.02 2 39829.26 13395.02 2 39829.26 13395.02 2 39829.26 13395.02 NIA 1.00 1.00 N/A 1.00 1.00 N/A 1.00 1.00 NIA 1.00 1.00 NIA 1.00 1.00 NIA 1.00 1.00 N/A 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.53 0.88 0.90 1.00 0.53 0.88 0.90 1.00 0.53 0.88 0.90 1.00 0.53 1.M 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00'i.oo 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 N/A=Not Applicable Pall=Allowable Pull without Reduced Inspection Vali Pallr=Allowable Shear without Reduced Inspection
=Allowable Pull with Reduced Inspection 0
D.C.COOK Unit 2 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 13 of 14 ID: 2-OME-1 50-CD (Rev.0)Class: 17.Engine-Generators


==
==
Description:==
Description:==
CD EMERGENCY DIESEL GENERATOR Building: AUXILIARY                      Floor El.: 587.00                Room, Row/Col: CD EMER DSL GEN RM - IN THE CENTER OF THE ROOM, 10 FEET NORTH OF THE MAIN ENTRANCE DOOR Manufacturer, Model, Etc.:
18        -0.150          -0.150          -0.250        2091.746 19        0.150            0.150          -0.250          735.385 20        -0.150          -0.150            0.250          37.892
          -0.150            0.150          0.250          57.220 22        0.150          -0.150          -0.250        2091.804 23        0.150          -0.150          0.250          38.041 24        -0.150            0.150          -0.250          735.242 Minimum Safety Factor:    36.703 The Anchorage Capacity is    36.703 times greater than the Demand
REPORT ON  SEISMIC ANALYSIS OF EQUIPMENT    SUPPLIFD BY WORTffINGTON CohfPRFSSORS  INC.
FOR TllE D. C. COOK NUCLEAR PLANT or AMERICAN ELECTRIC POWER SERVICF. CORPORATION REPORT  HG-37017,    Ldition C September    20, 1974
CC 05A SUMKCT                                              oooo Sheet  ofSee.'
RL Comment No. DES CRXPTXOH Engine SepecMications Foundation Bolt Specifications
                      @@gine  Flange Specifications Poundation Bolts  Tension - Rocking, Operating, Tightening, Seismic~
Stresses    8c F.S.
Foundation Bolts - Bending lA,3    Foundation Bolts - Shear      S Combined Stresses    K  F.S.
15                    P1ange  -  Bending    - Rocking, Torque, Stress  &; P. S.
Conclusions
su~acr    E~~i<<P~ ~~rzow TYPF                        ~RG    No W-$0/B/Zg        a~    ~ ~J2sr    .
x a
0 x                                                                              \
O Q
z
                                              ~  p'iv&dpggeV (z ~g. r.s~)
Soar S CZPr) x 0                                g =44 Ill/SO      (ke  44~m. sK- w~ssa) b)  C'. k -4s Swuc  w ('r~~ A~w Jaia) c) Ovr~pci c&nv.  - /r  J>ocul J) po~g~w~<g = gfdP ('y~~ 5>~ca.)
eg pe. = 5z~ Cr~+ >~w Js- t1>sA)
          ~) louadareu AzT 5rsds( rkE8 CA kA X~srcw)
                                            =
                                              +                              wr
odour'~ ''
                                                      '(- goaooaHW                        /7 She<<t    of~            Shts.
a/s ~+
WCL. 5 D3 F<vgb/lTioH UogTS Li =  8.)l,g.            b,:  'l,8I5'4 L, =  6. O iH.            D.- S.~ Pjog.
L~ =  6~.0    iN.            ~25      iH  ~
c- .
EioNP/ToH        Lb
                                                  . lo8 s io      'H/Lb+
(~  4is7 N.)(So o'PSib
                                              .Ol & y. io          '"/gb+
(Io  6o> lN  )(Polio    PSi) 42,0    IN
                                                . 35'Z. X io      '"/L/~
('3.sb7& iu  )( s  y>oo'si) 4,,-        4,  +6, tK,-                          (o      /g ]<
I~
golstil<R. Rargr<oH gpouT          Poise                      7 go.v s  (g.  /Cr/t I o//
7
                            .06%iiio                                                        .'/.by, A////4'o//L As%/pccu~n              r .'
oh'/o                      7  g/o
                                                        <. ~  ~ S E>4 <>>  ~l< FPu<DATiwAf
                                                                      +  aucu.
I CAL 8Y
                              ~g        No  4'CIL/ZA~
oaovp Sheet M  of ~Shte.
F l (I 4) SK 5'u)
              -  ~            c $ 5 .5  < 8+ - W CdiV'f/~        =
                                        =,o      =
D  7P/0 l.
8g  'Wi>    Ssdrss  gp~~  PF~ouwmw~+irg: 7(                      ':/gyp'~<
    ~>eA iud +u+swrs >/gvw.worww
          @/<~ dN>~c 7o P~~c" Pw dwy~w
                                          /  ~ j 4'~size~~~
gi pg,
                                                                    /oAyzcwy~c
                                                                                    ')
4'e Fp)  =
WP~)
H Pc/'file 5 jeers J~~ goer        =~.- ~~
          ~~  =
Pve rp kc~rwq                              i/~        ggjjgY, 0
C5 z
I a
il  g J
su~m +86/PE ON +@nba/7/PW                                  ~gp. C-  J: i" MRG. No.    -E(O      5A    Qwet  of ~~%4.
x 0
I I
                                ~  <fg 3
bh    C4-Z3(4'      7S)
        /2 x
0 I
C9 z
I
      ~<< ~zz JL
                    ~4.io        c~os~
                                        .zs  3  y ro  '"    Z~e
                                                              /JY- Z Q~
0                        DS.S ZD3'0        io  = Z/p, 37      xl0 zo        /gaa g    .
5 pic'+c    Cc h's7      lh'FRzzs uir4              a~~v-y:
A'p I                      /                /
                            ~P goLTS      2l9,37>./0            5.p  x ro 5.@gal x /0 Cd~~                              s5sw        r~"
A-A                  gZSg /o
                                                    ~ )    ~
    ~~ Fk'/r/Pr A fuuPddziu//                                          oaoue CAL BY
                                    ~RG      No W        g OY64    ~    Sheet ~~  of Shte.
                                /E4. 4 z.~
                . Odd&
4ryz~c    A +u~a///ruN; O
use Lk r HrrupE -Wc~              /ou//ORnu//            ur.rz Ckr XA'c:
Jig~    ~  /~~sruti.
: 8) F<ung  gwsAwsw        S/uWc'HW  +i'm/    .'zEu        =
QS7 As, g~s/s azw/rr pu~er x
O
                /  =.04dN 'XwC. Pju, g)                  ~ s/o 4>~uurb
              += 8/parr/rN = . 2~                          co g. gag,    g gpss z
K                    75oi. ru~/ C+aoe            S3 0                              ~~~zCz.~),=        id<-le          ~'<    .
                    ~crs
: 5) Cl &'rPilA'$ 5jgp(g         
                                      /ZcRc err    Po      giv4rrru  4/puu cb A/                    5/p
                    'Yw          B$ "
                                                /f/P/O'' D',p
'                        J' zi
                                  /I,gag (Sl QGES  oH  SAhl.LEs  7    CR~AS <Cc.7>apJ      OF COM HD2 (T u  FOUN  DA'TI0H      60(1)
              ++4/A 8' w  Fp~A////J/4//'YPF                                GROUP
                                              ~Rg. N<> k-S/0'/A /0 CAL BY e)/w/r~>r /cA~/m tw Aces Pic'o //y//jew///t':
us~~<  4    /+ed~ 4zwx~~z~~ c~ c = 4 z.
(/Arm gzEuc n//(gc'y /eupcuys  ////////<~
Cf~srr~~~r X~/x                    A.~)
2=  Aw,A~~ Pr~                          =  Z/~
X O
            /  - /Ai////a                /o+gw      - @os des      -Fj . PAP'w. XA c) 7~ <8+
z~~ e, A        ((zP@)
c8                        (y. z.)(Z. xx/)
" X                                            gP~ 00<  Q 0
fee CO X
0
0 I
QiVr,rate- giY  tl&h/87iVpl                                      '" ~
                                                                                  ~
GROUP TYPF                                RG      N~ +-  /096  //      Sheet    of    Shte.
CAL SY
                                              ~s
                    /
7  =    r            ~o/7  r fzAnt Ezj'PcPsr        SPE<148        ZnP/E    +4 6.<
        +- g~yt/iFzM =
9  =  /''/l A~/>        ) -iHC~'>~8 (pg) =        P/g/fg ~)    = /o 776 6
!              =
                                ~
                            /o7766'(, 2)
                  ~/p)      6,Zog.
  <j    F><iN    ~rMS  =
( rcw&oa        Cw gers)
P~~l~r~(          SEJM /L        =
                                                        /8 5 / I    /'s/
4'4arw'Cr Sw/os        s'z
                                                        /od  0, 3    Esp
          +    pdwl~lc" Sea'sue                        5 9$ r  3 f'sl 3z 6/,9 aa
: 5) scrag          PF 5$ FE/Y,
                                                                                  /8'gvos/Ed
                                  +E y/B'av AFF+~<+y- ~+J<it'Ides
                ~uAP~rnw          Mrs, h          PA&i<rivx~c. +aserrv~swiA g/lg gg Jgr PP              gjP      gcs8d.cQ P(rrre~r          ~/aa~iWe,<'gzyp~+r                      (S~ss. fr~ri~s:
          +$ gp~ +  oPA84Xi4~
sUMKT TYPE CAL BY
          ......~RG.            No. ~ ~
oaove Sheet ~ of ~~ Shta.
z 0
Fi~v~ lAloklHirlklopl P4Tc~lAL 5/diiFic~7r~h'f.
z 0
Q z
K 0
E8/cpwE'iY fpuHorg/'roAI
                                                                    ~
GROUP gg N      5 00009k~    Sheet  of  Shh.
CAL BY                                                  hde z
0 W /%dr dF rsrugg-                swdN4 -/Sw&'riuw gers          los I            jg Pip/Pop'<gr$d/J'WIC 5W
    ~,  =  8+/rw            8  =
                                  ~6,+/rrr.
z 8, =<LOr+
0                8 4 Q                    =,oe9'8 =.ot"/(I8IS)          =
4'      ZZ./+
z I                            o< P~ >)    =  9! oo+ err
                ~ji+ -      ~~p(~ ~~)+- / 256 rrr 0
o
CALCU.
Ew&Ne gw Wiu&4PJ~
TYPF CAL BY
                          ~G.      No.
oaom Sheet lo of ~  Shts.
z 0
      /J Y  Scdstrtutlug  (g /rrro  Qi 'oiN4 y Sug&8rrn/4 Jlr l OLmcuW4,'
X 0
0 x
                      '" fur~ ag-.
0 pq cx437
GRoUp  r z.C 't Sheet gJ of J.. Shts, Inrccc//ri//r, g~.co:
1
            /
                    /
P Pc/(x  M) $ //(w-oL)  j p// (x-$)g +      C3 X
0    y
          /    "/ g                / (X ~L)
                                              '3 cL)-
I Q~
E              p~(gg e    ~~              Pc( Cy
                      ]  I
                +
X 0
0 X
0 8cZcc<rrc/o/,'
SPA///'G  Lo//cm'//r lu Lciroiuyg
I gUgpg ZiVW/A + Pp 845PPA /fdic                        oooo MG. Ro. ~                Sheet~  of  7$ hh.
Date
                /Z4      s~c
: 8) /E.~ i8i~A4f~ gg~r J~i5 CPA~~
g  ~~zcrrum~c ~a~wc          g7wru ~w +wuzmw WoaWaaWru~    .
P" X~ew ~ r ~~~a = (P~) ~ ( +~~c~ Pu~ Sr7~e+w                  .
                                                    /or  gS
                                    / Pd&E/c'>c'clxwzg ~c'cw)
            = ld/ 6'      (i vJc'Eo. ~oog- prpr,z3 = zunis-wd@
e~ WwlcleeAr      ~
Q 5  +$ /zc  c vf
caecU.
cuuiw~  ck X~w8/jail f"Shoo'Pi/M SUEJECT                                                      eaoUp CAL BY Sheet ~ of                    Shit.
                                              ~oo~zi > rgro
            ~//c1ro 1 '>>    j/            Saf/
rs/o'vd
                      /+pe//48'//n//    4/047. F~B/A ~z Nc Ac uAc
              /pe /o ///F          ////oF/ower. Pnwr:i +6"/s//~@
g~r/~ +cP/                          //82'0/?/PcvYE/Pc 7sis /8'o/-        /so /ipAe //f P/r///                              .
            /u    Xrt~  /auwda/~w Aces go~                Wo 5M> M/e 4nwds'.
                                                                                        ~ ~
>~E~ EIIIrIIIIC.P'OWIII47IoII                                                                        oaout RG. No.
f'- 5-~Do o&PJW Sheet        ~
                                                                                                            / / of ~l~ Shto.
III  Moof    OF      FAllVFE SHcno- ill FouuoArloH                                                  Boa rS      bul:
To Sogt>o/7'Ai s6IRWIC- I.oh,JIHAD, F=(FI ~>        t.urh              CW'h~ tg(ZS'O) =
FRom        P PF'g,
                                          "  I  OO    'fl L I c T to H W8'/citaly FgloT        )    ~pl      ~      'Io 9ol'L).LE 'tI                l  9 7Pd                            QEscu E:tnt              i'd          r orred/7i'c h'            +YE
                ~A IH 6 88$ E                  rj cf uM Po SHCJ+ For2i 85 Tc F4+WSW j7TE8 EO 7M Fpc aOarroN got.rS.
LINEA 3E  f  oubNA  <ro    N goer          w iriHl.        revctoo          )  jt'.          F  tom l I9u Wogttt < )Le- -o                  Rove CTtH              II.'3IR 6        I      )gQ            GEE.T'CS l ToQ.QVG =              l %CO -~s<0 Fr- imp Ftt+M      bCt the        OC    +AC NNC                  CH15          4 i)    l r'Iti'C, (
5QP                      C.=,~                    b    .-
(r>-cc)(.tug cb                                              7p Ooo            L6~
hQ VIlIl&k.C    Mttad;          ~Q.      A~
                                                        "- LSg        tel SHAR< p<          =  2,  6  ie 7- =-=    t<9IY.i
                                                              ~f>9                      III                                IN
                                                                                                                              .',G 4$ 40~%%. 5ccito 4                            n 3.16 pig Ag      ~
rt.(
5pg~g      g:,    ),Q 76      ( ll iver/~              r  . 9V75    "t
: g. 76                                                                    /H cg  F.~., (ualaa')
4 icalo li''rl.9        I
                                                                  ~ g                p  5 r
                                                                                                    -. (6)(lo(o~o) ivv<<l l b~F~. (~.~ay)-
                                                ]999>
v1'3
EWp/A/E t/+ ~~~~gQ Sly~                                        <
aaovv ....
CAL SY 6  No
                                            -    0 Yd<W      Sheet ~    of MZ,Shts.
o
        / ~d~ ~F Hh~uP< ocul% '/ ~N                      E H~~4'J>4 fane  i6'. 4: 7 =.pion~~~                                      /
FZow  ~sP~us~ fjwcXm& Cw>wg              . Fire  = gd.7 grf4A'ri l~HgZ                                    8A rifpl/i4 x                          sic  5')
M~ 8~x            4cdg, O
I                        Ck. w)
(P~~~ w) 0  c>)  f'~~    IZocA/A di, (p ~)
F~
X O                    p/ (pic,~iz~~+g
                                      = rs<
X            w= wg) =(q,>~a):~~) =              see.~V      ~>;>>
                    /J/< (lib> /)6 l9 )            pg~~    L/If a


CD EMERGENCY DIESEL GENERATOR Building: AUXILIARY Manufacturer, Model, Etc.: Floor El.: 587.00 Room, Row/Col: CD EMER DSI GEN RM-IN THE CENTER OF THE ROOM, 10 FEET NORTH OF THE MAIN ENTRANCE DOOR Vallr=Allowable Shear with Reduced Inspection
L    CALCU.
=Outlier=Reduction Factor Not Used RT=Reduction Factor for Type of Anchorage RN=Reduction Factor for Installation Adequacy RL=Reduction Factor for Embedment RG=Reduction Factor for Gap at Anchors RS=Reduction Factor for Spacing RE=Reduction Factor for Edge Distance=Reduction Factor for Concrete Strength RC=Reduction Factor for Concrete Cracks RR=Reduction Factor for Essential Relays RP=Reduction Factor for Base Stiffness and Prying Action RB=Reduction Factor for Base Strength and Load Path RM=Reduction Factor for Embed.Steel and Pads SI u Analysis Performed:
              &CIIIO @~yAIDHTi~II                                        "
Yes Type of Analysis: Regular Spectral Accelerations (G's)No 10 12 13 14 15 17 N-S 0.375-0.375-0.375 0.375 0.375-0.375 0.375-0.375 0.150-0.150 0.150-0.150-0.160 0.150 0.150-0.150 0.150 E-W 0.150-0.150 0.150-0.150-0.150 0.150 0.160-0.150 0.375-0.375-0.375 0.375 0.375-0.375 0.375-0.375 0.150 Vertical 0.100-0.100 0.100-0.100 0.100-0.100-0.100 0.100 0.100-0.100 0.100-0.100 0.100-0.100-0.100 0.100 0.250 Safety Factor 49.387 66 437 49.196 66.700 36.848 79.872 80.174 36.703 84.089 84.919 41.166 124.223 84.082 85.264 124.223 41 142 57.447
c-.j. ~
                                                                                ~
GROUP iYPE                            ~RG. No.>    ~~~  "~< ~      Shoot      of      Shta.
CAL SY C  4r~/>Cu44 r)//oc44$ ///op/ P~A/Pp//r//c 6/fislc i) ~upas gC~qL/W
            ///~ ju/a/8'/- QcM +i+//'rc-///II@ Zu~~5'Ad
            /+~ILo+Flg/~E +8 g+4P c4'4~~>/II'I/ 'C8 0'/IWCy X
0             JFx2c sr  Pew/'//Ir//II<~o+
rI FaW ><I/yp          6 P>C///4c        FCr~r~rS lp r-put-g.
(gl/IS IJ PVEPII'dII'SFNVllIILI'P      DOC      ~
r//E rp/~ocrIn/'E coI/I/II''J
: 4) 'gdcrs g~      I /I/'I/g$ E:(ddiuoI4$  )
O      ~    a ef~<rrwq Z, 3+
Z/
j
                                .7a ZIO ~ 4DZ P e)  5plcrf /8cpo/2,                    yy  =  7<, uc //. 'L
                                                                          /0 WPI, J'>OC C ~/
                                      ~3o Z4 7Z


D.C.COOK Unit 2 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 14 of 14 ID: 2-OME-1 50-CD (Rev.0)Class: 17.Engine-Generators
SUBJ~ ENGINE  ON  FOUNDATION-                                GROUP I
TYPF                              G. No.                     Sheet ~>  of ~>  She.
CAL BY CONCLUSIONS<
P >4 )
POUNDATXON BOLT      F S
                                        ~
2 4'        j F THXS SAFETY FACTOR    IS  DUE TO THE PREIOAD ON THE FOUNDATION BOLT AND OCCURS ON THE LOWER PART OF THE  3-PIECE BOLT,     FRXCTXON BETWEEN THE ENGINE AND FOUNDATION ALIDW NO SHEAR OR BENDING IN THE z            BOLTSE SO THE PRETENSIONS        BEING CONSIDERABLY 0
GREATER THAN TZNSIXZ IOADS CAUSED BX ENGINE ROCKING, IS  THE GOVERNING FACTOR.
0      XI    ENGINE MOUNTING FLANOES:         R.S.    - <<.23      (P.Z6) v FREQUENCIES:
((')
k A)   ENGZNE ROCKZNG: F          3 9:('PS THXB  IS  VERY CONSERVATIVE BECAUSE XT        IS cr'p BASED ON FOUNDATXON BOLT EIDNGATION AND THE PKDENSION SHOULD ALMW NONE ~
B)  VERTLCAL -'        . ~  44 CPS        v3


==
Coo Componene Po. 2-086- ISO-~            Claia  ~l pazpicular area Any Yes ~      No che Seismic Roviev Team should pay (If yea,  check icema that apply. )
Description:==
extra actontion cot Anchor Anchor Anchor Type Diameter Spacing ~ /
Anchor  Number Anchor  Embedment                                      /wG~A Anchor  Edge Distance~
Anchor  Gap
        'Anchor Thread Engagement Anchor Grip Anchor Angularity Concrete Crack Others (describe    briefly)
IE chere ia concern. for Design Basis Discrepancy, circle  the applicable itom and explain.
: l.      Hardvare maintenance Type Discrepancy
: 2.      Drawing UpWt ~ Type Discrepancy
: 3.      Significant Operability/Dosign Basis Discrepancy Others Condition:
k) ORB Actions Taken:
Proparad By  T.              Dato 1-~-'V ~
 
                  ~ K A
                                ~  ~
r      s s ~ ~                ~  ~
y                                P
            ~ 0                      ~ I
    ~ ~ ~
o  ~
                            ~r N
I
'P e
MPWi.                  '
I I
                                                              ~    o s s
                                                                  ~
L                  PV
  ~ 0
          /~      y~ //
                      /
                                          ~
                                          ~ i r
0
  ~ ~                                                  4
                                                  ~  ~
 
                      ~    a ~            ~  ~ I P
                                      ~ ~ ~          ~ P    ~
                    ~    8
              ~      ~    ~
    ~ e ~          o    ~
P e  y  I  ~a
                  .          I O~      O~                            O~      0>>
                                                                                ~
I ~
P                                                                    I  '      I
                                                                ~ '
o  I I g
~ P
              ~I              iifr./                    /          r
~    ~
~    ~


CD EMERGENCY DIESEL GENERATOR Building: AUXILIARY Manufacturer, Model, Etc.: Floor El.: 587.00 Room, Row/Col: CD EMER DSL GEN RM-IN THE CENTER OF THE ROOM, 10 FEET NORTH OF THE MAIN ENTRANCE DOOR 18 19 20 22 23 24-0.150 0.150-0.150-0.150 0.150 0.150-0.150-0.150 0.150-0.150 0.150-0.150-0.150 0.150-0.250-0.250 0.250 0.250-0.250 0.250-0.250 2091.746 735.385 37.892 57.220 2091.804 38.041 735.242 Minimum Safety Factor: 36.703 The Anchorage Capacity is 36.703 times greater than the Demand REPORT ON SEISMIC ANALYSIS OF EQUIPMENT SUPPLIFD BY WORTffINGTON CohfPRFSSORS INC.FOR TllE D.C.COOK NUCLEAR PLANT or AMERICAN ELECTRIC POWER SERVICF.CORPORATION REPORT HG-37017, Ldition C September 20, 1974 CC 05A SUMKCT RL oooo Sheet ofSee.'Comment No.DES CRXPTXOH Engine SepecMications Foundation Bolt Specifications
                                                                                <<1Z  CHP >Ox      l. CCD. O1 g ATTACHMZHT No.
@@gine Flange Specifications Poundation Bolts Operating,-Tension-Rocking, Tightening, Seismic~Stresses 8c F.S.lA,3 Foundation Bolts-Bending Foundation Bolts-Shear S Combined Stresses K F.S.15 P1ange-Bending-Rocking, Torque, Stress&;P.S.Conclusions
Equipment No.:                                                                   ~g No.: /2-Z4C8                l3 Anchor type:      UD A CHEART PF~~ Dia:                                        Dwg No.: /Z-30T5A,           g Tightness established by: 0 "Snug Fit 0 Torque Torque Wrench No.:                        QA                      Cal. Due Date:
Tightness verified? 0 Yes 8, No                                                Date:
ons r c zo Equipment base flexible? 0 Yes 8- No 7                                          Date:
ons uc              ARE P    YSICAL CHARACT RUSTIC Bolt  ZD                                                                                  H'omments Gaps        /Arpa7 eRMJ                  -. - bV                CE.SS B        pv    A c oPQ
                                    -Cu'AGL Anchor len th                    5                  S -5" S-4            s-("      ~ ~        +      Pc. R. 'Dw&.
                                                                                                      ~ -"/z-Zo~:A, 13  ll Protruding len th Embedment      5 - I/g
                            /I 5  -III S-Ig3/l 6 -ling g II g-2.       S-  /II    I    ~l I ll I~( 5-l~ S-lg, 3
                                      /Cn Bolt                  ll              I'll Z~          5"          I/
2 /)(
ri          Z zg                    /b        /&                                I(. 2/&
Concrete                                                                        gk          CK condition Edge        V '~e"                                      ly/I distance Il        p /I            S-B~ II Z'~    /3"      /3 II      gll s
Anchor acin        5 cg~        5                                        S  ~~    S~
Anchor                                                      0" an    larit                                                                          0''V Thread          Ol(        old      oh        OK                                        oK.
engagement Comments: W A      C. AC.Q        H  F:C.OOR  C     AT'I&6-             WA A,. H RS    PRF-SP.=&      ~,
Verified by:                                                                                    Date:
Qual. /Cert. Xnspector I
Reviewed by:        T                                          INDIANA                        Date:      I->-   J~
Construction                                        ESIGN CONTROLLCD WORKING COPY SEP  08  1998 I.CRK ~      '~~                age  2 gvi<IoA of  3


su~acr E~~i<<P~~~rzow TYPF~RG No W-$0/B/Zg a~~~J2sr.x a 0 x O Q z x 0 g=44\~p'iv&dpggeV Soar S CZPr)(z~g.r.s~)Ill/SO (ke 44~m.sK-w~ssa)b)C'.k-4s Swuc w ('r~~A~w Jaia)c)Ovr~pci c&nv.-/r J>ocul J)po~g~w~<g=gfdP ('y~~5>~ca.)eg pe.=5z~Cr~+>~w Js-t1>sA)~)louadareu AzT 5rsds(rkE8=+CA kA X~srcw)wr
~ /
'(-goaooaHW odour'~''She<<t of~Shts./7 a/s~+WCL.5 D3 Li=8.)l,g.L,=6.O iH.L~=6~.0 iN.F<vgb/lTioH UogTS b,: 'l,8I5'4 D.-S.~Pjog.~25 iH~.35'Z.X io'"/L/~EioNP/ToH Lb c-..lo8 s io'H/Lb+(~4is7 N.)(So o'PSib.Ol&y.io'"/gb+(Io 6o>lN)(Polio PSi)42,0 IN ('3.sb7&iu)(s y>oo'si)4,,-4,+6, tK,-golstil<R.
S A                                                                 12 SHP 5050 NDE-008 DEt'ARTMEt'GHTROLLED Du CUt4tNT                                ATTACHMENT NO- 1 COPY NO.                                         ULTRASONIC TEST REPORT JOB ORDER                  NO  ~ :            REPORT DATE:            REQUEST NO.   (Q ) Q IDENTIFICATION                                            TECHNI UE Unit                                                      Test Unit/ S/N k.         S Component                    -   pr E,. 0 -C            Freq./Diameter              S Item                                                      Reference Standard Material                      C.   &                      Couplant/Batch No.
Rargr<oH gpouT Poise.06%iiio" 7 A////4'o//L As%/pccu~n r.'oh'/o (o/g]<I~7 go.v s (g./Cr/t I o//.'/.by, 7 g/o
Other TEST DATA REMARKS c-S-Qvc ~I
<.~'~S CAL 8Y E>4<>>~l<FPu<DATiwAf
                                                          '/z PERFORMED BY:
~g No 4'CIL/ZA~+aucu.I oaovp Sheet M of~Shte.0 C5 z I a F l-(I~4)SK 5'u)c$5.5<8+-W CdiV'f/~==,o=D 7P/0 l.8g'Wi>Ssdrss gp~~PF~ouwmw~+irg:
REVIEWED BY:                                                    LEVEL:  ~       DATE:
7(':/gyp'~<')~j~>eA iud+u+swrs>/gvw.worww
(
/4'~size~~~
FORM NO.                 12 SHP 5050 NDE. 008-1                      Page 1 of 1 Revision 1
/oAyzcwy~c
@/<~dN>~c 7o P~~c" Pw dwy~w gi pg, 4'e Fp)=WP~)H~~=Pc/'file 5 jeers J~~goer=~.-~~ggjjgY, Pve rp kc~rwq i/~
J il g su~m+86/PE ON+@nba/7/PW MRG.No.-E(O 5 A~gp.C-J: i" Qwet of~~%4.x 0 I I<fg~x 0 I C9 z I 0 3 bh C4-Z3(4'7S)/2~<<~zz~4.io c~os~.zs 3 y ro'" Z~e JL DS.S zo/JY-Z Q~io=Z/p, 37 xl0/gaa g.ZD3'0 5 pic'+c Cc h's7 lh'FRzzs uir4 a~~v-y: A'p I~P goLTS 5.@gal x/0//2l9,37>./0 5.p x ro Cd~~A-A s5sw r~" gZSg/o
~)~~~Fk'/r/Pr A fuuPddziu//
~RG No W g OY64~CAL BY oaoue Sheet~of~Shte./E4.4 z.~.Odd&O x O z K 0 4ryz~c A+u~a///ruN; use Lk r HrrupE-Wc~-/ou//ORnu//
ur.rz Ckr XA'c: Jig~~/~~sruti.8)F<ung gwsAwsw S/uWc'HW+i'm/.'zEu=QS7 As, g~s/s azw/rr pu~er/=.04dN'XwC.Pju, g)~s/o 4>~uurb co g.gag, g gpss+=8/parr/rN=.2~75oi.ru~/C+aoe S3~~~zCz.~),=
id<-le~'<.~crs 5)Cl&'rPilA'$5jgp(g-/ZcRc err Po giv4rrru 4/puu cb A/5/p''Yw B$" J'zi/I,gag/f/P/O''D',p (Sl QGES oH SAhl.LEs 7 CR~AS<Cc.7>apJ OF COM HD2 (T u FOUN DA'TI0H 60(1)


++4/A 8'w Fp~A////J/4//'YPF
Uatabase:  K: SSEL2C. DBF Equip Xd: 2-All Train:    NA  Equip Class: 20 Drawing No.:~ NONE~
~Rg.N<>k-S/0'/A/0 CAL BY GROUP X O" X 0 fee CO X 0 e)/w/r~>r/cA~/m tw Aces Pic'o//y//jew///t':
nction:~
us~~<4/+ed~4zwx~~z~~c~c=4 z.(/Arm gzEuc n//(gc'y/eupcuys-////////<~
System: EQUIPMENT    CONTROL AND XNDXCATXON STATXONS Equip Desc: AUXXLIARY RELAY    PANEL  All Building:  AUXXLIARY    Room: CONTROL ROOM Elev:  633    Sort: S,       Notes:
Cf~srr~~~r X~/x A.~)2=Aw,A~~Pr~=Z/~/-/Ai////a/o+gw-@os des-Fj.PAP'w.XA c)7~<8+z~~e, A ((zP@)c8 (y.z.)(Z.xx/)gP~00<Q 0 I TYPF CAL SY QiVr,rate-giY tl&h/87iVpl RG N~+-/096//GROUP'"~Sheet of~Shte.!/od 0, 3 Esp 5 9$r 3 f'sl 3z 6/,9 aa~s/7=r~o/7 r fzAnt Ezj'PcPsr SPE<148 ZnP/E+4 6.<+-g~yt/iFzM=9=/''/l A~/>)-iHC~'>~8 (pg)=~P/g/fg~)=/o 776 6=~/p)/o7766'(, 2)>6,Zog.<j F><iN~rMS=(rcw&oa Cw gers)P~~l~r~(SEJM/L=/8 5/I/'s/4'4arw'Cr Sw/os s'z pdwl~lc" Sea'sue+5)scrag PF 5$FE/Y,+E y/B'av AFF+~<+y-~+J<it'Ides
Normal State:        Desired State:    Power Req'd:
/8'gvos/Ed
Support System Drawing:
~uAP~rnw Mrs, h PA&i<rivx~c.
Req'd Support Comp:
+aserrv~swiA g/lg gg Jgr PP gjP gcs8d.cQ P(rrre~r~/aa~iWe,<'gzyp~+r (S~ss.fr~ri~s:
Safety Related Status: NUCLEAR    SR        Min/Opt: MIN Alias No:       Power Train:
sUMKT+$gp~+oPA84Xi4~TYPE......~RG.
Comp  Served:
No.~~CAL BY oaove Sheet~of~~Shta.z 0 z 0 Q z K 0 Fi~v~lAloklHirlklopl P4Tc~lAL 5/diiFic~7r~h'f.
MFR Model:
CAL BY E8/cpwE'iY fpuHorg/'roAI gg N 5 00009k~GROUP Sheet of~Shh.hde z 0 Iz 0 Q z I 0 W/%dr dF rsrugg-swdN4-/Sw&'riuw gers los jg Pip/Pop'<gr$
Elem. Drawing:
d/J'WIC 5W~,=8+/rw 8=~6,+/rrr.8,=<LOr+8 4=,oe9'8=.ot"/(I8IS)
Wiring Drawing: 2-92071 Power Source:
=4'ZZ./+o<P~>)=9!oo+err o~ji+-~~p(~~~)+-/256 rrr TYPF CAL BY Ew&Ne gw Wiu&4PJ~~G.No.CALCU.oaom Sheet of~Shts.lo z 0 X 0 0 x 0/J Y Scdstrtutlug (g/rrro Qi'oiN4 y Sug&8rrn/4 Jlr l OLmcuW4,''" fur~ag-.pq cx437 GRoUp r z.C't Sheet of J..Shts, gJ Inrccc//ri//r, g~.co://1 P Pc/(x M)$//(w-oL)j p//(x-$)g+C3 X 0 I Q~y/E"/g p~(gg e~~]I+'3/(X~L)Pc(Cy cL)-X 0 0 X 0 8cZcc<rrc/o/,'
Walkdown:  F    Relay,Eval:  N Comp  Type: INSTRUMENT/RELAY RACK Xso Drawing:
SPA///'G Lo//cm'//r lu Lciroiuyg gUgpg ZiVW/A+Pp 845PPA/fdic MG.Ro.~I oooo Sheet~of 7$hh.Date/Z4 s~c 8)/E.~i8i~A4f~gg~r J~i5 CPA~~g~~zcrrum~c
Location:  XN THE NORTHEAST CORNER OF THE ROOM
~a~wc g7wru~w+wuzmw WoaWaaWru~
.P" X~ew~r~~~a=(P~)~(+~~c~Pu~Sr7~e+w./or gS/Pd&E/c'>c'clxwzg
~c'cw)=ld/6'(i vJc'Eo.~oog-prpr,z3=zunis-wd@e~WwlcleeAr~Q 5+$/zc c vf


cuuiw~ck X~w8/jail SUEJECT CAL BY f"Shoo'Pi/M caecU.eaoUp Sheet~of Shit.~oo~zi>rgro~//c1ro j/1'>>Saf/rs/o'vd/+pe//48'//n//
0 T
4/047.F~B/A~z Nc c Ac uA/pe/o///F////oF/ower.
Pnwr:i+6"/s//~@//82'0/?/PcvYE/Pc g~r/~+cP/7sis/8'o/-/so/ipAe//f P/r///./u Xrt~/auwda/~w Aces go~Wo 5M>M/e 4nwds'.


~~>~E~EIIIrIIIIC.P'OWIII47IoII f'-5-~Do o&PJW RG.No.oaout Sheet of~Shto.//~l~III Moof OF FAllVFE SHcno-ill FouuoArloH Boa rS bul: To Sogt>o/7'Ai s6IRWIC-I.oh,JIHAD, F=(FI~>t.urh CW'h~tg(ZS'O)=FRom P P" I OO'fl L F'g, I c T to H FgloT)~pl~'Io 9ol'L).LE'tI l 9 7Pd W8'/citaly QEscu E:tnt i'd r orred/7i'c h'+YE~A IH 6 88$E rj cf uM Po SHCJ+For2i 85 Tc F4+WSW j7TE8 EO 7M Fpc aOarroN got.rS.3E f oubNA<ro N goer w iriHl.revctoo)jt'.F tom l I9u Wogttt<)Le--o Rove CTtH II.'3IR 6 I-)gQ GEE.T'CS l ToQ.QVG=l%CO-~s<0 Fr-imp Ftt+M bCt the OC+AC NNC LINEA CH15 4 i)l r'Iti'C, (5QP C.=,~b.-(r>-cc)(.tug cb 7p Ooo L6~hQ VIlIl&k.C Mttad;~Q.A~"-LSg tel SHAR<p<=2, 6 ie 7-=-=t<9IY.i-.',G~f>9 III IN 4$40~%%.5ccito 4 n pig Ag~3.16 rt.(5pg~g g:,),Q 76 (ll iver/~r.9V75" t g.76/H cg F.~., (ualaa')..icalo~g p 5-.(6)(lo(o~o) 4 li''rl.9-I r ivv<<l l b~F~.(~.~ay)-]999>v1'3
D. C. Cook Unit 2                                      GIP Rev 2, Corrected, 2/14/92 Screening Evaluation Worksheet (SEWS)                                  Status: Yes
                                                                                          'Sheet 1 of 8 ID: 2-A11 Rev. 0                                            Class: 20. Instrumentation and Control Panels and Cabinets Descri tion: AUXILIARYRELAY PANEL A11 Building: AUXILIARY                                  Floor El.: 633.00                    Room, Row/Col:.CONTROL ROOM - IN THE NORTHEAST CORNER OF THE ROOM Manufacturer, Model, Etc.:
SEISMIC CAPACITY VS DEMAND Elevation where e ui ment receives seismic in ut                                                        633.00 Elevation of seismic in ut below about 40'rom rade rade = 608.00                                          Yes E ui menthasfundamental fre uenc above about8Hz est.fre uenc =11.00                                      Yes Ca acit based on:            1.00'Boundin S eclrum Demand based on:              1.00
* Desi n Basis Ground Res onse S ectrum 0.850 LIN 0.000 1.00                                          LOG        Hz                                        33.00 Capacity  ..... Demand File                                          Record Ca                    H:tGIPLGIPts ectra.des                        Label Boundin S    trum ac'emand 1        H:$GIPIPROJ0059ts      tra.des                BUILDING Grounds ectrum ELEVATION BROADEN Demand 2              H:LGIPIPROJ0059ts      tra.des                BUILDINGGround S ectrum ELEVATION BROADEN Does capacity exceed demand?                                                                                          Yes


CAL SY EWp/A/E t/+~~~~gQ Sly~6 No-0 Yd<W aaovv....<Sheet~of MZ, Shts.o x O I 0 X O X a/~d~~F Hh~uP<ocul%'/~N E H~~4'J>4 fane i6'.4: 7=.pion~~~FZow~sP~us~fjwcXm&Cw>wg.grf4A'ri l~-HgZ sic 5')Ck.w)(P~~~w)/Fire=gd.7 8A rifpl/i 4 M~8~x 4cdg, c>)f'~~IZocA/A di, (p~)(pic,~iz~~+g
D. G. Gook Unit 2                              GIP Rev 2, Corrected, 2/14/92 Screening    Evaluation  Worksheet (SEWS)                   Status: Yes Sheet 2 of 8 ID: 2-A11 Rev. 0                                   Class: 20. Instrumentation and Control Panels and Cabinets Descri tion: AUXILIARYRELAY PANEL A11 Building: AUXILIARY                          Floor El.: 633.00                Room, Row/Col: CONTROL ROOM - IN THE NORTHEAST CORNER OF THE ROOM Manufacturer, Model, Etc.:
=rs<F~p/w=wg)=(q,>~a):~~)
CAVEATS - BOUNDING SPECTRUM l&C/BS Caveat      1 - Earth uake Ex erience E ui ment Class                                            Yes l&C/BS Caveat      2- Com    uters and Pro rammable Controllers Evaluated Se aratel                    N/A l&C/BS Caveat      3 - Stri Chart Recorders Evaluated.                                                   N/A l8 C/BS Caveat      4 - Structural Ade uate.                                                             Yes l&C/BS Caveat      5 - Ad acent Cabinets or Panels Bolted To ether                                      Yes I8,C/BS Caveat      6 - Drawers or E ui ment on Slides Restrained                                        N/A 18C/BS Caveat      7- Doors Secured.                                                                    Yes l&C/BS Caveat      8 - Sufficient Slack and Flexibilit of Attached Lines.                               Yes l8 C/BS Caveat      9 - Ade uate Anchora e.                                                              Yes l8C/BS Caveat      10 - Potential Chatter of Essential Rela s Evaluated.                                Yes I&C/BS Caveat      11 - No Other Concerns.                                                              Yes Is the intent of all the caveats met for Bounding Spectrum'                                               Yes ANCHORAGE
=see.~V~>;>>/J/<(lib>/)6 l9)pg~~L/If iYPE CAL SY&CIIIO@~yAIDHTi~II
: 1. The sizes and locations of anchors have been determined                                              Yes
~RG.No.>~~~"~<~L CALCU.c-.j.~GROUP" Shoot of~Shta.X 0 C 4r~/>Cu44 r)//oc44$///op/P~A/Pp//r//c 6/fislc i)~upas gC~qL/W///~ju/a/8'/-QcM+i+//'rc-///II@
: 2. Appropriate equipment characteristics have been determined (mass, CG, natural freq.,                  Yes dam in center of rotation .
Zu~~5'Ad/+~ILo+Fl g/~E+8 g+4P c4'4~~>/II'I/
              ~
'C8 0'/IWCy JFx2c sr Pew/'//Ir//II<~o+
: 3. The t e of anchora e is covered b the GIP                                                            Yes
rI lp FaW><I/yp 6 P>C///4c FCr~r~rS r-put-g.(gl/IS IJ PVEPII'dII'SFNVllI ILI'P DOC~r//E rp/~ocrIn/'E coI/I/II''J 4)'gdcrs g~I/I/'I/g$E:(ddiuoI4$
: 4. The adequacy of the anchorage installation has been evaluated (weld quality and length,                Yes nuts and washers, ex ansion anchor ti htness, etc.
)O~a ef~<rrwq Z, 3+j ZIO~4DZ P Z/.7a e)5plcrf/8cpo/2,~3o Z4 7Z yy=7<, uc//.'L/0 WPI, J'>OC C~/'
: 5. Factors affecting anchorage capacity or margin of safety have been considered:                       Yes embedment length, anchor spacing, free-edge distance, concrete strength/condition,-and concrete crackin .
SUBJ~ENGINE ON FOUNDATION-TYPF CAL BY G.No.GROUP I Sheet~>of~>She.z 0 CONCLUSIONS<
: 6. For bolted anchora es, an        a s under the base are less than 1/4                                N/A
POUNDATXON BOLT F S~2 4'P>4)j F THXS SAFETY FACTOR IS DUE TO THE PREIOAD ON THE FOUNDATION BOLT AND OCCURS ON THE LOWER PART OF THE 3-PIECE BOLT, FRXCTXON BETWEEN THE ENGINE AND FOUNDATION ALIDW NO SHEAR OR BENDING IN THE BOLTSE SO THE PRETENSIONS BEING CONSIDERABLY GREATER THAN TZNSIXZ IOADS CAUSED BX ENGINE ROCKING, IS THE GOVERNING FACTOR.0v XI ENGINE MOUNTING FLANOES: R.S.-<<.23 (P.Z6)FREQUENCIES:
: 7. Factors affecting essential relays have been considered: gaps under the base, capacity                Yes reduction for ex ansion anchors.
k A)ENGZNE ROCKZNG: F 3 9:('PS ((')THXB IS VERY CONSERVATIVE BECAUSE XT IS BASED ON FOUNDATXON BOLT EIDNGATION AND THE PKDENSION SHOULD ALMW NONE~B)VERTLCAL-'.~44 CPS cr'p v3 Coo Componene Po.2-086-ISO-~Claia~l Any pazpicular area che Seismic Roviev Team should pay extra actontion cot Yes~No (If yea, check icema that apply.)Anchor Type Anchor Diameter/Anchor Spacing~Anchor Number Anchor Embedment Anchor Edge Distance~Anchor Gap'Anchor Thread Engagement Anchor Grip Anchor Angularity Concrete Crack/wG~A Others (describe briefly)IE chere ia concern.for Design Basis Discrepancy, circle the applicable itom and explain.l.2.3.Hardvare maintenance Type Discrepancy Drawing UpWt~Type Discrepancy Significant Operability/Dosign Basis Discrepancy Others Condition:
: 8. The base has adequate stiffness and the effect of prying action on anchors has been                  Yes considered.
k)ORB Actions Taken: Proparad By T.Dato 1-~-'V~
: 9. Thestren thofthee ui mentbaseandtheload                athtotheCGisade uate.                         Yes
~K A~~r s s~~~~y~0~I P~~~o~~r N I'P e MPWi.I I'L PV~~o s s 0/~y~//~r~0/~i~~4~~
: 10. The ade uac of embedded steel, rout ads or lar e concrete ads have been evaluated.                   Yes
~a~~~I P~~~~P~~8~~~~e~o~P.I e y I~a O~O~O~0>>P~I~I'I~'g o I I~P~I i/if r./r~~~~
: 11. The anchora e ca acit exceeds the demand.                                                            Yes Are anchorage requirements met?                                                                          Yes INTERACTION EFFECTS
<<1Z CHP>Ox l.CCD.O 1 g ATTACHMZHT No.~g No.:/2-Z4C8-l3 Dwg No.:/Z-30T5A,-g 0 Torque Cal.Due Date: Date: ons r c zo Equipment No.: Anchor type: UD A CHEART PF-~~Dia: Tightness established by: 0"Snug Fit Torque Wrench No.: QA Tightness verified?0 Yes 8, No Equipment base flexible?0 Yes 8-No 7 ons uc P YSICAL CHARACT RUSTIC Date: ARE Bolt ZD Gaps Anchor len th/Arpa7 eRMJ 5-Cu'AGL-.-bV S-5" S-4 CE.SS B s-(" H'omments pv A c oPQPc.R.'Dw&.~~+~-"/z-Zo~:A, Protruding len th Embedment/I 5-I/g II 5-I-/Cn 3/l g II S-Ig 6-ling g-2.13 ll/II I~l I 3 ll S-I~(5-l~S-lg, Bolt ri Concrete condition Edge distance ll Z zg V'~e" I'll Z~/b 5"/&I/2/)(ly/I I(.2/&gk CK Anchor s acin~Il 5 cg p/I 5~II S-B/3" Z'~/3 II gll S~~S~Anchor an larit Thread engagement Ol(old oh OK 0" 0''V oK.Comments: W A C.AC.Q H F:C.OOR C AT'I&6-WA A,.H RS PRF-SP.=&~, Verified by: Qual./Cert.Xnspector I Reviewed by: T Construction INDIANA ESIGN CONTROLLCD WORKING COPY SEP 08 1998 Date: Date: I->-J~I.CRK~'~~age 2 of 3 gvi<IoA
: 1. Soft ta etsare free fromim act b nearb e ui mentorstructures                                          Yes
~/
: 2. If the equipment contains sensitive relays, it is free from all impact by nearby equipment or        Yes structures.
S 8 A DEt'ARTMEt'GHTROLLED Du CUt4tNT COPY NO.12 SHP 5050 NDE-008 ATTACHMENT NO-1 ULTRASONIC TEST REPORT JOB ORDER NO~: REPORT DATE: REQUEST NO.(Q)Q IDENTIFICATION Unit Component-pr E,.0-C Item Material C.&Other TECHNI UE Test Unit/S/N k.Freq./Diameter Reference Standard Couplant/Batch No.S S TEST DATA REMARKS c-S-Qvc~I'/z PERFORMED BY: REVIEWED BY: (FORM NO.12 SHP 5050 NDE.008-1 LEVEL:~DATE: Page 1 of 1 Revision 1 Uatabase: K: SSEL2C.DBF Equip Xd: 2-All Train: NA Equip Class: 20 Drawing No.: NONE~~~nction: System: EQUIPMENT CONTROL AND XNDXCATXON STATXONS Equip Desc: AUXXLIARY RELAY PANEL All Building: AUXXLIARY Room: CONTROL ROOM Elev: 633 Sort: S, Notes: Normal State: Desired State: Power Req'd: Support System Drawing: Req'd Support Comp: Safety Related Status: NUCLEAR SR Min/Opt: MIN Alias No: Comp Served: MFR Power Train: Model: Elem.Drawing: Wiring Drawing: 2-92071 Power Source: Walkdown: F Relay,Eval:
: 3. Attached lines have ade uate flexibilit                                                              Yes
N Comp Type: INSTRUMENT/RELAY RACK Xso Drawing: Location: XN THE NORTHEAST CORNER OF THE ROOM 0 T D.C.Cook Unit 2 Screening Evaluation Worksheet (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes'Sheet 1 of 8 ID: 2-A11 Rev.0 Descri tion: AUXILIARY RELAY PANEL A11 Class: 20.Instrumentation and Control Panels and Cabinets Building: AUXILIARY Manufacturer, Model, Etc.: Floor El.: 633.00 Room, Row/Col:.CONTROL ROOM-IN THE NORTHEAST CORNER OF THE ROOM SEISMIC CAPACITY VS DEMAND Elevation where e ui ment receives seismic in ut Elevation of seismic in ut below about 40'rom rade rade=608.00 E ui menthasfundamental fre uenc above about8Hz est.fre uenc=11.00 Ca acit based on: 1.00'Boundin S eclrum Demand based on: 1.00*Desi n Basis Ground Res onse S ectrum 633.00 Yes Yes 0.850 LIN 0.000 1.00 LOG Hz Capacity.....Demand 33.00 Ca ac'emand 1 Demand 2 File H:tGIPLGIPts ectra.des H:$GIPIPROJ0059ts tra.des H:LGIPIPROJ0059ts tra.des Record Label Boundin S trum BUILDING Grounds ectrum ELEVATION BROADEN BUILDING Ground S ectrum ELEVATION BROADEN Does capacity exceed demand?Yes  
: 4. Overhead e ui ment or distribution s stems are not likel to colla se.                                 Yes
: 5. No other adverse concerns were found.                                                                 Yes ls equipment free of interaction effects?                                                               Yes


D.G.Gook Unit 2 Screening Evaluation Worksheet (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 2 of 8 ID: 2-A11 Rev.0 Descri tion: AUXILIARY RELAY PANEL A11 Class: 20.Instrumentation and Control Panels and Cabinets Building: AUXILIARY Manufacturer, Model, Etc.: Floor El.: 633.00 Room, Row/Col: CONTROL ROOM-IN THE NORTHEAST CORNER OF THE ROOM CAVEATS-BOUNDING SPECTRUM l&C/BS Caveat 1-Earth uake Ex erience E ui ment Class l&C/BS Caveat 2-Com uters and Pro rammable Controllers Evaluated Se aratel l&C/BS Caveat 3-Stri Chart Recorders Evaluated.
D. C. Cook Unit 2                                 GIP Rev 2, Corrected, 2/14/92 Screening    Evaluation  Worksheet (SEWS)                        Status: Yes Sheet 3 of 8 ID: 2-A11 Rev. 0                               Class: 20. Instrumentation and Control Panels and Cabinets Descri tion: AUXILIARYRELAY PANEL A11 Building: AUXILIARY                       Floor El.: 633.00                   Room, Row/Col: CONTROL ROOM - IN THE NORTHEAST CORNER OF THE ROOM Manufacturer, Model, Etc.:
l8 C/BS Caveat 4-Structural Ade uate.l&C/BS Caveat 5-Ad acent Cabinets or Panels Bolted To ether I8,C/BS Caveat 6-Drawers or E ui ment on Slides Restrained 18C/BS Caveat 7-Doors Secured.l&C/BS Caveat 8-Sufficient Slack and Flexibilit of Attached Lines.l8 C/BS Caveat 9-Ade uate Anchora e.l8C/BS Caveat 10-Potential Chatter of Essential Rela s Evaluated.
IS EQUIPMENT SEISMICALLYADEQUATE?                                                                             Yes COMMENTS Date: 11/1/93 SRT: Satyan Sharma (AEP), Paul Krugh (AEP), Steve Anagnostis (S&A), Randy Steele (AEP - Relay Engineer)
I&C/BS Caveat 11-No Other Concerns.Is the intent of all the caveats met for Bounding Spectrum'Yes N/A N/A Yes Yes N/A Yes Yes Yes Yes Yes Yes ANCHORAGE 1.The sizes and locations of anchors have been determined 2.Appropriate equipment characteristics have been determined (mass, CG, natural freq., dam in~center of rotation.3.The t e of anchora e is covered b the GIP 4.The adequacy of the anchorage installation has been evaluated (weld quality and length, nuts and washers, ex ansion anchor ti htness, etc.5.Factors affecting anchorage capacity or margin of safety have been considered:
embedment length, anchor spacing, free-edge distance, concrete strength/condition,-and concrete crackin.6.For bolted anchora es, an a s under the base are less than 1/4 7.Factors affecting essential relays have been considered:
gaps under the base, capacity reduction for ex ansion anchors.8.The base has adequate stiffness and the effect of prying action on anchors has been considered.
9.Thestren thofthee ui mentbaseandtheload athtotheCGisade uate.10.The ade uac of embedded steel, rout ads or lar e concrete ads have been evaluated.
11.The anchora e ca acit exceeds the demand.Yes Yes Yes Yes Yes N/A Yes Yes Yes Yes Yes Are anchorage requirements met?INTERACTION EFFECTS 1.Soft ta etsare free fromim act b nearb e ui mentorstructures 2.If the equipment contains sensitive relays, it is free from all impact by nearby equipment or structures.
3.Attached lines have ade uate flexibilit 4.Overhead e ui ment or distribution s stems are not likel to colla se.5.No other adverse concerns were found.ls equipment free of interaction effects?Yes Yes Yes Yes Yes Yes Yes D.C.Cook Unit 2 Screening Evaluation Worksheet (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 3 of 8 ID: 2-A11 Rev.0 Descri tion: AUXILIARY RELAY PANEL A11 Class: 20.Instrumentation and Control Panels and Cabinets Building: AUXILIARY Manufacturer, Model, Etc.: Floor El.: 633.00 Room, Row/Col: CONTROL ROOM-IN THE NORTHEAST CORNER OF THE ROOM IS EQUIPMENT SEISMICALLY ADEQUATE?Yes COMMENTS Date: 11/1/93 SRT: Satyan Sharma (AEP), Paul Krugh (AEP), Steve Anagnostis (S&A), Randy Steele (AEP-Relay Engineer)


==References:==
==References:==
: 1. Anchorage Package
: 2. AEPSC USI A-46 Project Report No MT2, Rev 0, "Summary Report of Fundamental Frequencies Determined by ln-Situ Transfer Function Modal Testing at Cook Nuclear Plant", Aug 1994.
: 3. Drawing No 12-3388-3 A11 -15 form an 10"-2" long x 8'all x 2'eep control panel. The panel is constructed of welded steel plate, angles, and channels. The panel is welded along the front to embedded steel at 4 points, and along the back at two points. A11 and A13 contain essential relays.
Based on modal test data of similar panels in the control room (Ref 2) the SRT estimates the lower bound
                                                                          ~
fundamental frequency at 11 Hz.
The overhead control room ceiling and raceways have been evaluated as part of the raceway walkdown and judged acceptable - see the control room PASS form for details.
There is a door at the far end of the A6-A15 bank that is commonly left open. The door could, strike the panel, but the SRT judges the impact is far enough away from the essential relays not to be significant.
There is a ladder secured against the wall in front of the panel - it is secured so it will not strike the panel - judged acceptable.
There is a fire extinguisher hung on the end of A6 that wilt bang against the cabinet. The SRT judges that it will not affect the essential relays in A11 and A13.
Anchorage:
: 1. The anchorage package shows details for 1 of the four front edge weldments - the others are similar.
: 2. The back edge weldments were not detailed - the SRT added these details to the anchorage package.
: 3. The SRT conservatively estimates the weight at 300 Ibs/ lineal foot.
: 4. The strength of the weldments is equivalent to at least a 1.5" x 1/8" fillet weld (4 kips per GIP Table C.6-1).
The embedded steel is a 5/16" steel plate anchored with a 1/2" x 4" Nelson stud every 12" (4.4 kips per GIP Table C.3-1 including a .65 knockdown for embedment length). The weldment controls. The attached ANCHOR analysis shows a margin of 3.3.


1.Anchorage Package 2.AEPSC USI A-46 Project Report No MT2, Rev 0,"Summary Report of Fundamental Frequencies Determined by ln-Situ Transfer Function Modal Testing at Cook Nuclear Plant", Aug 1994.3.Drawing No 12-3388-3 A11-15 form an 10"-2" long x 8'all x 2'eep control panel.The panel is constructed of welded steel plate, angles, and channels.The panel is welded along the front to embedded steel at 4 points, and along the back at two points.A11 and A13 contain essential relays.Based on modal test data of similar panels in the control room (Ref 2)~the SRT estimates the lower bound fundamental frequency at 11 Hz.The overhead control room ceiling and raceways have been evaluated as part of the raceway walkdown and judged acceptable
D. C. Cook Unit 2                           GIP Rev 2, Corrected, 2/14/92 Screening Evaluation Worksheet (SEWS)                      Status: Yes Sheet 4 of 8 ID: 2-A11 Rev. 0                           Class: 20. Instrumentation and Control Panels and Cabinets Descri tion: AUXILIARYRELAY PANEL A11 Building: AUXILIARY                  Floor El.: 633.00                Room, Row/Col: CONTROL ROOM - IN THE NORTHEAST CORNER OF THE ROOM Manufacturer, Model, Etc.:
-see the control room PASS form for details.There is a door at the far end of the A6-A15 bank that is commonly left open.The door could, strike the panel, but the SRT judges the impact is far enough away from the essential relays not to be significant.
Evaluated by:                                                               Date:
There is a ladder secured against the wall in front of the panel-it is secured so it will not strike the panel-judged acceptable.
There is a fire extinguisher hung on the end of A6 that wilt bang against the cabinet.The SRT judges that it will not affect the essential relays in A11 and A13.Anchorage:
1.The anchorage package shows details for 1 of the four front edge weldments-the others are similar.2.The back edge weldments were not detailed-the SRT added these details to the anchorage package.3.The SRT conservatively estimates the weight at 300 Ibs/lineal foot.4.The strength of the weldments is equivalent to at least a 1.5" x 1/8" fillet weld (4 kips per GIP Table C.6-1).The embedded steel is a 5/16" steel plate anchored with a 1/2" x 4" Nelson stud every 12" (4.4 kips per GIP Table C.3-1 including a.65 knockdown for embedment length).The weldment controls.The attached ANCHOR analysis shows a margin of 3.3.
D.C.Cook Unit 2 Screening Evaluation Worksheet (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 4 of 8 ID: 2-A11 Rev.0 Descri tion: AUXILIARY RELAY PANEL A11 Room, Row/Col: CONTROL ROOM-IN THE NORTHEAST CORNER OF THE ROOM Floor El.: 633.00 Building: AUXILIARY Manufacturer, Model, Etc.: Class: 20.Instrumentation and Control Panels and Cabinets Evaluated by: Date:  


==Attachment:==
==Attachment:==
ANCHOR Report


ANCHOR Report  
D. C. Cook Unit 2                                GIP Rev 2, Corrected, 2/14/92 Screening Evaluation Worksheet (SEWS)                          Status: Yes Sheet 5 of 8 ID: 2-A11 Rev. 0                                Class: 20. Instrumentation and Control Panels and Cabinets Descri tion: AUXILIARYRELAY PANEL A11 Building: AUXILIARY                      Floor El.: 633.00                Room, Row/Col: CONTROL ROOM - IN THE NORTHEAST CORNER OF THE ROOM Manufacturer, Model, Etc ANCHOR Report Response Spectrum: Instructure Realistic Frequency: User - 11.00 Percent Damping: User- 5.00 S ectral Values:
Direction          Acceleration    's North - South      0.314 East - West        0.314 Vertical          0.183 Angle (N-S Direction makes with the X Axis): 0.00 Combination Criteria: SRSS
~eicehts:
Number of Weights:    1 No        Wei ht 1        3000.00        60.000          0.000          50.000 Forces:
Number of External Forces: 0 Moments:
Number of External Moments: 0 Allowables:
Anchor:
Number of Anchor types:    1 Tension        Shear Ultimate      Ultimate      Inter        Inter    Saf Dia      Manufact        Product      Tension        Shear      Coeff        Coeff    Fact 3/8        Hilti        Kwik-Bolt        1460.00      1420.00      1.00        0.30    1.00 N
Concrete:
Ultimate Stress: 3500.00 psi.
Reduction Factor: 0.85 Weld:
Allowable Stress:  30600 psi.


D.C.Cook Unit 2 Screening Evaluation Worksheet (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 5 of 8 ID: 2-A11 Rev.0 Descri tion: AUXILIARY RELAY PANEL A11 Class: 20.Instrumentation and Control Panels and Cabinets Building: AUXILIARY Manufacturer, Model, Etc ANCHOR Report Floor El.: 633.00 Room, Row/Col: CONTROL ROOM-IN THE NORTHEAST CORNER OF THE ROOM Response Spectrum: Instructure Realistic Frequency:
D. C. Cook Unit 2                             GIP Rev 2, Corrected, 2/14/92 Screening Evaluation Worksheet (SEWS)                        Status: Yes Sheet 6 of 8 ID:2-A11 Rev. 0                               Class: 20. Instrumentation and Control Panels and Cabinets Descri tion: AUXILIARYRELAY PANEL A11 Building: AUXILIARY                     Floor El.: 633.00                 Room, Row/Col: CONTROL ROOM - IN THE NORTHEAST CORNER OF THE ROOM Manufacturer, Model, Etc.:
User-11.00 Percent Damping: User-5.00 S ectral Values: Direction Acceleration
Surfaces:
's North-South 0.314 East-West Vertical 0.314 0.183 Angle (N-S Direction makes with the X Axis): 0.00 Combination Criteria: SRSS~eicehts: Number of Weights: 1 No Wei ht 1 3000.00 60.000 0.000 50.000 Forces: Number of External Forces: 0 Moments: Number of External Moments: 0 Allowables:
Number of Surfaces:     1 Surface Orientation Direction       Direction    Direction Com              Com        Com No 0.000           0.000       1.000 Anchor Pattern for Surface &#xb9;1 gY Legend for Anchor Patterns Anchor Bolts:
Anchor: Number of Anchor types: 1 Tension Shear Dia Manufact Product Ultimate Tension Ultimate Shear Inter Coeff Inter Saf Coeff Fact 3/8 Hilti Kwik-Bolt N 1460.00 1420.00 1.00 0.30 1.00 Concrete: Ultimate Stress: 3500.00 psi.Reduction Factor: 0.85 Weld: Allowable Stress: 30600 psi.
Concrete Vines:     ~Ppgy(Peg!P Concrete Points:     ~5m+
D.C.Cook Unit 2 Screening Evaluation Worksheet (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 6 of 8 ID:2-A11 Rev.0 Descri tion: AUXILIARY RELAY PANEL A11 Class: 20.Instrumentation and Control Panels and Cabinets Building: AUXILIARY Manufacturer, Model, Etc.: Floor El.: 633.00 Room, Row/Col: CONTROL ROOM-IN THE NORTHEAST CORNER OF THE ROOM Surfaces: Number of Surfaces: 1 Surface Orientation Direction Com No 0.000 Direction Com 0.000 Direction Com 1.000 Anchor Pattern for Surface&#xb9;1gY Legend for Anchor Patterns Anchor Bolts: Concrete Vines:~Ppgy(Peg!P Concrete Points:~5m+Weio uncs:~5~5~Geomer Anchor: Number of Anchors: 0 Concrete Lines:&#xb9;of elements per line: 1  
Weio uncs:         ~5~5
~Geomer Anchor:
Number of Anchors: 0 Concrete Lines:
&#xb9; of elements per line: 1


D.C.Cook Unit 2 Screening Evaluation Worksheet (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 7 of 8 ID: 2-A11 Rev.0 Descri lion: AUXILIARY RELAY PANEL A11 Class: 20.Instrumentation and Control Panels and Cabinets Building: AUXILIARY Manufacturer, Model, Etc.: Floor El.: 633.00 Room, Row/Col: CONTROL ROOM-IN THE NORTHEAST CORNER OF THE ROOM Number of Concrete Lines: 0 Concrete Points: Number of Concrete Points: 6 No Coord 19.000 47.000 75.000 103.000 2.000 118.000 Y Coord 2.000 2.000 2.000 2.00Q 22.000 22.000 Coord 0.000 0.000 0.000 0.000 0.000 0.000 Surf Id Conc-Pt Area 9.000 9.000 9.000 9.000 9.000 9.000 Weld Lines:&#xb9;of elements per line: 1 Number of Weld Lines: 6 No Start X-Coo rd 19.000 47.000 75.000 103.000 2.000 118.000 Start Y-Coord 2.000 2.000 2.000 2.000 22.000 22.000 Staa Z-Coord 0.000 0.000 0.000 0.000 0.000 0.000 X-Coord 20.500 48.500 76.500 104.500 3.500 119.500 End Y-Coord 2.000 2.000 2.000 2.000 22.000 22.000 Z-Coo rd 0.000 0.000 0.000 0.000 0.000 0.000 St Id Line Width 0.125 0.125 0.125 0.125 0.125 0.125 Determination of Reduction Factors: Reduction Factors Data Current: Yes Anal sis Results: Analysis Performed:
D. C. Cook Unit 2                                   GIP Rev 2, Corrected, 2/14/92 Screening Evaluation Worksheet (SEWS)                                Status: Yes Sheet 7 of 8 ID: 2-A11 Rev. 0                                     Class: 20. Instrumentation and Control Panels and Cabinets Descri lion: AUXILIARYRELAY PANEL A11 Building: AUXILIARY                         Floor El.: 633.00                   Room, Row/Col: CONTROL ROOM - IN THE NORTHEAST CORNER OF THE ROOM Manufacturer, Model, Etc.:
Yes T eofAnal sis:Re ular S ectral Accelerations G's No N-S 0.314-0.314-Q.314 0.314 0.314-0.314 E-W 0.125-0.125 0.125-0.125-0.125 0.125 Vertical 0.073-0.073 0.073-0.073 0.073-0.073 Safet Factor 13.973 8.111 13.973 8.111 8.500 18.535-0.314-0.125 0.073'8.500 7 0.314 0.125-0.073 18.535 0
Number of Concrete Lines: 0 Concrete Points:
D.C.Cook Unit 2 Screening Evaluation Worksheet (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 8 of 8 IO: 2-A11 Rev.0 Descri tion: AUXILIARY RELAY PANEL A11 Class: 20.Instrumentation and Control Panels and Cabinets Building: AUXILIARY Manufacturer, Model, Etc.: Floor EI.: 633.00 Room, Row/Col: CONTROL ROOM-IN THE NORTHEAST CORNER OF THE ROOM 10 12 13 14 15 16 17 18 19 20 21 22 23 24 0.125-0.125 0.125-0.125-0.125 0.125 0.125-0.125 0.125-0.125 0.125-0.125-0.125 0.125 0.125-0.125 0.314-0.314-0.314 0.314 0.314-0.314 0.314-0.314 0.125-0.125 0.125-0.125 0.125-0.125-0.125 0.125 0.073-0.073 0.073-0.073 0.073-0.073-0.073 0.073 0.183-0.183-0.183 0.183 0.183-0.183 0.183-0.183 7.505 3.290 3.352 8.921 7.505 3.290 8.921 3.352 12.626 7.842 37.028 8.816 12.626 7.842 8.816 36.553 Minimum Safety Factor: 3.290 The anchorage can withstand 3.290 times greater seismic demand I**12 CHP 502 1.CCD.019 ATTACHMENT NO.1 Unzt z-maw'-o CT 0 Bldg-Mop<H E+SI-coR+FR, O(=l HE'ROOM Location Installation dwg./Rev.Anchora e Arran ement Sketch Equipment No.AVx, Pa.LA,Y PAMC-LS A-II T'HRL(A-IS I'BR DMS I, 2,-Zg'I'F-lo 2-SS'<0-0?-C4 4<A-I g~2."ZZ'46-I~lg/o-?p A-IS Q-0 IHOIAHA t(IICHICAH POW-A SITE OESIGH COHTAOLLEO WOAKIHG COPV SEP 21 1995 SEC DE,r4.I L I'(z, g I'!'a x S 4 SH(n ELev.VIEw LYG-, EAST'LEAK+Drawn by: Verified by: Date:/Date: ga.g9 Qual./Cert.inspector Reviewed by: F Date: Construction Anch r Review Engineer-2-I-t3 page 1 of 3 Revision.3
Number of Concrete Points: 6 Y                          Surf        Conc-Pt No       Coord           Coord            Coord            Id          Area 19.000             2.000          0.000                       9.000 47.000             2.000           0.000                       9.000 75.000             2.000           0.000                        9.000 103.000             2.00Q          0.000                       9.000 2.000           22.000           0.000                       9.000 118.000           22.000           0.000                       9.000 Weld Lines:
~fq
&#xb9; of elements   per line: 1 Number of Weld Lines: 6 Start          Start          Staa                            End                  St      Line No     X-Coo rd      Y-Coord        Z-Coord        X-Coord          Y-Coord    Z-Coo rd     Id    Width 19.000         2.000         0.000         20.500            2.000     0.000             0.125 47.000         2.000         0.000         48.500            2.000     0.000             0.125 75.000         2.000         0.000         76.500            2.000     0.000             0.125 103.000         2.000         0.000         104.500           2.000     0.000             0.125 2.000         22.000         0.000           3.500          22.000     0.000             0.125 118.000         22.000         0.000         119.500          22.000      0.000              0.125 Determination of Reduction Factors:
**12 CHP 5021 CCD p19 ATTACHMENT NO.NS CT 0 T V Bldg.yCR+E4gl COB.IVI=-R 3F T F.~WH Location Installation dwg./Rev.Anchora e Arran ement Sketch Ecgxzpment No.E~A)~~~i t.A'(g~~I~~'9v D~CD"S~~~~V~/tb 1~gltVC~'SK4<~I~~V9 r I'Lk~~~VS I os~~S>D e')~/I II I lg~II (6~~28~28'Z8~IB~Q I I~I 28 2B ZB ZB'Ie ZE:E: DF-1 AIL I CTI"A A'A..'NOIAtIA MICklGAt(POWER SITE OESIGN Cott TAOLLEO WORKING COP'f SEP 2i>99<5t~o (I.~~A=jhrPCCF S5]BLK LEAK T Drawn by: Verified by-Date: Date:/y 3 Qual./Cert.Inspector Reviewed by: Date: Construction Anc or Review Engineer Page 1 of 3 Revision
Reduction Factors Data Current: Yes Anal sis Results:
Analysis Performed: Yes T eofAnal sis:Re ular S ectral Accelerations     G's No         N-S               E-W            Vertical        Safet    Factor 0.314               0.125            0.073            13.973
            -0.314             -0.125           -0.073              8.111
            -Q.314              0.125           0.073           13.973 0.314              -0.125          -0.073               8.111 0.314             -0.125           0.073               8.500
            -0.314               0.125           -0.073             18.535 7          0.314              0.125           -0.073            18.535
            -0.314             -0.125           0.073             '8.500


""~4<Ha'021.CCD oa9 ATTACHMENT NO.a Equipment No.: Embedded Steel Dwg.No.: CHOR INS CTIO H S ICAL CHARACTERIS C.: 2~22 eV-Weld ID T e Size Len th Cracks WJ WZ I I y//g I/0 W3 W<WS I TAcK.I/II'3/'l W7'z" Y No Weld e Codes 1=Fillet 2=Plug/Slot 3 Groove Lack of Penetration Porosity o o o 0 Ye No Yes No W I IS WELD Pb oN 1=OUR S(DE.S, W Q Y8" L/hrQE.R CV1 W 3+8 ClhJC)BQCL/
0 D. C. Cook Unit 2                                GIP Rev 2, Corrected, 2/14/92 Screening Evaluation Worksheet (SEWS)                          Status: Yes Sheet 8 of 8 IO: 2-A11 Rev. 0                                Class: 20. Instrumentation and Control Panels and Cabinets Descri tion: AUXILIARYRELAY PANEL A11 Building: AUXILIARY                      Floor EI.: 633.00                Room, Row/Col: CONTROL ROOM - IN THE NORTHEAST CORNER OF THE ROOM Manufacturer, Model, Etc.:
7 W 4./4 LrNDCR Cu T'/4.UIVO E:P, CU t.4v Cg/4 UMDL=RCV T'8/4 UADER cvT II 3 Ia 8 I2 Q HOLW WIt-H WASHSR5 RMBE.@DE 0~C I 4l X 3 X~PING LI:-3 HAGI, 0 a WI SEc.TIo~e E'aYAIL-I S E.c-~101 C C.Equipment base flexible: Cl Yes E No ons ruc son re Reviewed by: Verified by: ua.er.npsec or Irrl)IANA FiIICHIGAN PO'V/FTI SITE OCSIOrr Cotr TIIOLLt.o V/OII~Ir G COI V SEP 2 l 1993 ons ruc son c or evzew ngzneer Date: Date: 5+page 3 of Revision
0.125          0.314            0.073          7.505 10        -0.125          -0.314          -0.073          3.290 0.125          -0.314            0.073          3.352 12        -0.125          0.314          -0.073          8.921 13        -0.125          0.314            0.073          7.505 14        0.125          -0.314          -0.073          3.290 15        0.125          0.314          -0.073          8.921 16        -0.125          -0.314            0.073          3.352 17        0.125          0.125            0.183          12.626 18        -0.125          -0.125          -0.183          7.842 19        0.125          0.125          -0.183          37.028 20        -0.125          -0.125            0.183          8.816 21        -0.125          0.125            0.183          12.626 22        0.125          -0.125          -0.183          7.842 23        0.125          -0.125            0.183          8.816 24        -0.125          0.125          -0.183          36.553 Minimum Safety Factor:     3.290 The anchorage can withstand    3.290 times greater seismic demand


ATTACHMENT 3 TO AEP:NRC:1040E SAMPLE SEWS, ANCHORAGE CALCULATIONS, AND ANCHORAGE INSPECTION DOCUMENTATION FOR TANKS Ec HEAT EXCHANGERS EVALUATED FOR USI A-46 THAT ARE NOT COVERED BY THE PROCEDURES IN SECTION 7 OF THE GIP RAI ITEM 5 This attachment includes sample SEWS, anchorage calculations and anchorage inspection documentation for a cross section of class 0 and 21 tanks and heat exchangers that are not covered by the procedures in Section 7 of the GIP.The samples selected are designated with an*in Table 2 and 3 of this RAI.The following examples are included: lass 21 1-T-113-AB1 1-HE-13 21 21 21 1--34-1-'I'K-11 1-'1 K-37 21 21 21 2--11 2--3 2--134-D Equip ID: 1-QT-113.-AB1
I
" wing No.: 1-5151Ation: EMERG DXESEL Train: 1 Equip Class:0 System: DIESEL LUBE OXL Equip Desc: AB EMERG DIESEL PULL PLOW LUBE OIL STRAINER 1 Building: AUXILIARY Room: AB EMERG DXESEL LUBE OXL PXT Elev: 579 Sort: S, Notes: Normal State: Desired State: Power Req'd: N Support System Drawing: Req'd Support Comp: Safety Related Status: NUCLEAR SR Min/Opt: MIN Alias No: Power Train: NA Comp Served: LUBE OXL STRAXNER 1 MPR: NUGENT 1'1554-4L3B P l Elem.Drawing: N/A Wiring Drawing: N/A Power Source: N/A Walkdown: A Relay Eval;Comp Type: STRAINER Xso Drawing: Location:
                                                                          **12 CHP 502 1. CCD. 019 ATTACHMENT NO.       1 CT 0 Mop  <  H E+SI- coR+FR, O(=  l HE'ROOM Unzt                        Bldg-                             Location z-maw'-             o Installation        dwg.  / Rev.          Equipment No.
Anchora e Arran ement Sketch AVx, Pa.LA,Y PAMC-LS A-II T'HRL( A-IS I'BR DMS I, 2,-Zg'I'F-lo 2-SS'<0-0
                              ? -C4 4<A- I g~    2."ZZ'46- I lg
                                              /o-? p~
A-IS Q-0 SEC DE,r4.I L            I IHOIAHA t(IICHICAH POW-A
                                                          '(z, g I '!'a    xS 4  SH(n SITE OESIGH COHTAOLLEO WOAKIHG COPV ELev. VIEw LYG-,
SEP 21 1995 EAST'LEAK
        +
Drawn  by:                                                               Date:       /
Verified by:                                                             Date:           ga. g9 Qual  ./Cert. inspector Reviewed by:                 F                                          Date:         I- t3 Construction Anch      r  Review Engineer page      1 of  3 Revision      .3


DC Cook Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet1 of11 ID;,1-QT-113-AB1 (Rev.0)Class: 0.Other Descnption:
~ fq
AB EMERG DIESEL FULL FLOW LUBE OIL STRAINER 1 Building: AUXILIARY Floor El.: 579.00 Room, Row/Col: AB EDG LUBE OIL PIT, Manufacturer, Model, Etc.: NUGENT 1554PL3B SEISMIC CAPACITY VS DEMAND 1.Elevation where equipment receives seismic input Elevation of seismic input below about 40'rom grade (grade=608.00)Equipment has fundamental frequency above about 8 Hz (est.frequency=8.00)Capacity based on: Judgment 5.Demand based on: 1.00'ealistic Mean-Centered Floor Response Spectra 587.00 N/A N/A Ca acit Demand 1 Demand 2 File C:LGIPtPROJ0031tspectra.des C:<GIPIPROJ0031'Lspectra.des Record BUILDING uxilia ELEVATION 587 BROADEN N BUILDING uxilia ELEVATION 5S7 BROADEN N Does capacity exceed demand'ANCHORAGE 2.Appropriate equipment characteristics have been determined (mass, CG, natural fretful., damping, center of rotation).
                                                                                **12 CHP 5021                  CCD p19 ATTACHMENT NO.
3.Thh pe of anchorage is coveredb the GIP.4.The adequacy of the anchorage installation has been evaluated (weld quality and length, nuts and washers, expansion anchor tightness, etc.)5.Factors affecting anchorage capacity or margin of safety have been considered:
NS    CT 0                  T yCR    + E4gl              COB.IVI=-R V                                      3F    T F.~WH Bldg.                                      Location Installation      dwg.    /    Rev.                  Ecgxzpment No.
embedment length, anchor spacing, free-edge distance, concrete strength/condition, and concrete cracking.6.For bolted anchorages, any gaps under the base are less than 1/4.7.Factors affecting essential relays have been considered:
Anchora e Arran ement Sketch E
gaps under the base, capacity reduction for expansion anchors.8.The base has adequate stiffness and the effect of prying action on anchors has been considered.
                                                ~A  ) ~~    ~i t.A    '
9.The strength of the equipment base and the load path to the CG is adequate.10.The adequac of embedded steel, grout pads or large concrete pads have been evaluated.
(      g ~  ~I        ~ ~'9v              D~CD
11.The anchorage capacity exceeds the demand.Yes Yes Yes Yes Yes N/A Yes Yes Yes Yes Are anchorage requirements met?
                                                                  ~~
DC Cook Unit1 SCREENING EVALUATION WORK SHEET (SEWS)~GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 2 of 11 ID: 1-QT-113-AB1 (Rev.0)Class: 0.Other
                                                                          "S~~
V
                                                        ~/tb gltVC    ~      'SK4 <~
1 ~
os~e')
I I
V9
                                                    ~~
r    I 'Lk~      ~~VS                                ~
                                  ~28'Z8 ~IB~Q S> D
              ~/I (6~      ~        28 II                      I lg
                                                                                                  ~II I                          I
                                                                                        ~ I 28                  2B                          ZB              ZB                              'Ie ZE:E: DF-1              AIL      I CTI                  "A A'A                          ..'NOIAtIA MICklGAt( POWER SITE OESIGN Cott TAOLLEO WORKING COP'f SEP    2i  >99<
5t
                                                                                                                      ~o (I.
      ~~A =  jhrPCCF S5]BLK                                                  LEAK  T Drawn by:                                                                        Date:            /y              3 Verified by-                                                                    Date:
Qual. /Cert. Inspector Reviewed by:                                                                    Date:
Construction              Anc    or Review Engineer Page    1          of  3 Revision
 
                                                                                          ""~4 <Ha'021.CCD          oa9 ATTACHMENT NO.        a CHOR      INS    CTIO Equipment No.:                                                                                            .: 2~22 eV Embedded        Steel    Dwg.      No.:
H S ICAL CHARACTERIS                C Weld ID                  WJ        WZ      W3 W< WS                                                  Weld        e Codes T    e                  I          I          I  TAcK.      I                  W7'z"
                                                  /II'                                                  1 = Fillet Size                                                                                                      =
Len    th                y//        g I/
3/'l                                          2      Plug/Slot 3      Groove Cracks                                                                                        Y 0                                                        No Lack      of                                                                                  Ye Penetration                                                                                    No Porosity                                                                                      Yes o          o          o                            0                No WI      IS WELD Pb oN                    1=OUR        S(DE.S, WQ        Y8" L/hrQE.R CV1 W3        +8 ClhJC)BQCL/ 7 W 4.      /4 LrNDCR Cu T
          '/4. UIVO E:P, CU t.
4v Cg    /4 UMDL=RCV          T'8 I2
            /4  UADERII cvT                                                    Q HOLW    WIt-H WASHSR5 3                                                                                    RMBE.@DE 0 Ia                        8                            I
                                                                            ~
C 4l X 3 X~    PING LI:-
0 3  HAGI,                      a WI SEc.TIo~          e  E'aYAIL-                                    I                        S E.c-~101        C C.
Equipment base            flexible:            Cl    Yes  E  No ons ruc son              re Reviewed by:                                                                                            Date:
ons ruc son                c  or    evzew          ngzneer Verified by:              ua  .      er    .      npsec or Date: 5    +
Irrl)IANA FiIICHIGAN PO'V/FTI SITE OCSIOrr Cotr TIIOLLt.o V/OII~Ir G COI V SEP 2 l 1993 page  3  of Revision
 
ATTACHMENT3 TO AEP:NRC:1040E SAMPLE SEWS, ANCHORAGE CALCULATIONS, AND ANCHORAGE INSPECTION DOCUMENTATION FOR TANKS Ec HEAT EXCHANGERS EVALUATED FOR USI A-46 THAT ARE NOT COVERED BY THE PROCEDURES IN SECTION 7 OF THE GIP RAI ITEM 5
 
This attachment includes sample SEWS, anchorage calculations and anchorage inspection documentation for a cross section of class 0 and 21 tanks and heat exchangers that are not covered by the procedures in Section 7 of the GIP. The samples selected are designated with an
* in Table 2 and 3 of this RAI. The following examples are included:
lass 1-  T-113-AB1 21      1-HE-13 21      1-                                    21      1-'I'K-11 21      1-'1 K-37 21      2-    -11 21      2-    -3 21      2-    -134- D
 
Equip ID: 1-QT-113.-AB1    Train:  1 Equip Class:0
    " wing No.: 1-5151A tion:  EMERG DXESEL System: DIESEL LUBE OXL Equip Desc:    AB EMERG DIESEL PULL PLOW LUBE  OIL STRAINER 1 Building:  AUXILIARY    Room: AB EMERG DXESEL LUBE OXL PXT Elev:  579    Sort: S,        Notes:
Normal State:        Desired State:    Power Req'd: N Support System Drawing:
Req'd Support Comp:
Safety Related Status:    NUCLEAR SR        Min/Opt: MIN Alias  No:      Power Train:  NA Comp  Served:  LUBE OXL STRAXNER 1 MPR: NUGENT 1'      1554-4L3B P    l Elem. Drawing: N/A Wiring Drawing: N/A Power Source: N/A Walkdown: A      Relay Eval
; Comp  Type: STRAINER Xso Drawing:
Location:
 
DC Cook Unit 1                                   GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                  Status: Yes Sheet1 of11 ID;,1-QT-113-AB1 ( Rev. 0 )                       Class: 0. Other Descnption: AB EMERG DIESEL FULL FLOW LUBE OIL STRAINER                   1 Building: AUXILIARY                         Floor El.: 579.00                   Room, Row/Col: AB EDG LUBE OIL PIT, Manufacturer, Model, Etc.: NUGENT 1554PL3B SEISMIC CAPACITYVS DEMAND
: 1.     Elevation where equipment receives seismic input                                                 587.00 Elevation of seismic input below about 40'rom grade (grade = 608.00)                               N/A Equipment has fundamental frequency above about 8 Hz (est. frequency = 8.00)                       N/A Capacity based on:         Judgment
: 5. Demand based on:           1.00 'ealistic Mean-Centered Floor Response Spectra File                                        Record Ca acit Demand 1         C:LGIPtPROJ0031tspectra.des                 BUILDING uxilia  ELEVATION 587 BROADEN N Demand 2        C:<GIPIPROJ0031'Lspectra.des               BUILDING uxilia   ELEVATION 5S7 BROADEN N Does capacity exceed demand' ANCHORAGE
: 2. Appropriate equipment characteristics have been determined (mass, CG, natural         fretful.,         Yes damping, center of rotation).
: 3. Thh pe of anchorage is coveredb the GIP.                                                                 Yes
: 4. The adequacy of the anchorage installation has been evaluated (weld quality and length, nuts             Yes and washers, expansion anchor tightness, etc.)
: 5. Factors affecting anchorage capacity or margin of safety have been considered: embedment                 Yes length, anchor spacing, free-edge distance, concrete strength/condition, and concrete cracking.
: 6. For bolted anchorages, any gaps under the base are less than 1/4.                                       Yes
: 7. Factors affecting essential relays have been considered: gaps under the base, capacity                   N/A reduction for expansion anchors.
: 8. The base has adequate stiffness and the effect of prying action on anchors has been                     Yes considered.
: 9. The strength of the equipment base and the load path to the CG is adequate.                             Yes
: 10. The adequac of embedded steel, grout pads or large concrete pads have been evaluated.                   Yes
: 11. The anchorage capacity exceeds the demand.                                                             Yes Are anchorage requirements met?
 
DC Cook Unit1                                     GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                          ~      Status: Yes Sheet 2 of 11 ID: 1-QT-113-AB1 ( Rev. 0 )                   Class: 0. Other


== Description:==
== Description:==
AB EMERG DIESEL FULL FLOW LUBE OIL STRAINER                  1 Building: AUXILIARY                      Floor El.: 579.00                    Room, Row/Col: AB EDG LUBE OIL PIT.
Manufacturer, Model, Etc.: NUGENT 1554PL3B INTERACTION EFFECTS
: 1. Soft targets are free from impact by nearby equipment or structures                                      Yes
: 2. If the equipment contains sensitive relays, it is free from all impact by nearby equipment or            N/A structures.
: 3. Attached lines have adequate flexibili .                                                                Yes
: 4. Overhead equipment or distribution systems are not likely to collapse.                                  Yes
: 5. No other adverse conce'ms were found.                                                                  Yes Is equipment free of interaction effects' SRT: Tom Huang (AEP) and George Gary Thomas (S&A) on 10/6/93 REF: 1. Anchor Inspection Data Sheets: Anchorage Arrangement Sketches and Physical Characteristics Data Sheet, Certified 6//6/92 for both 1-QT-113-AB1 and 1-QT-113-AB2.
: 2. Dwg 0 10-089
: 3. Worthington Co. Full Flow Oil Lube Strainer Calculation, 8/26/74.
MFG: NUGENT, WM W8Co -1554M-L3B-DN-100 Seismic Capacity vs Demand: The Bounding Spectrum does not apply for Class 0 items. This component is seismically rugged based on SRTIudgement and inspection, and anchor analysis.
Anchorage:
Supported on 4 angle legs. Each leg is anchored by one 1/2" J bolt anchor. The ANCHOR analysis was performed for 1-QT-113-AB1 and 1-QT-113-AB2 together, since they are connected by a relatively rigid piping segment.
Frequency was judged to be greater than 8 Hz.
The total weight is 17305, with the CG located at an approx. mid-height = 33" (Ref. 2).
The minimum embedment of the 1/2" J-bolts for 1-QT-113-AB1 and'1-QT-113-AB2 is 9.125" and was used for the embedment reduction factor for the J-bo! ts.
The SRT also judged the bolts may be subject to prying. therefore a very conservative.5 reduction factor was applied for prying.
ANCHOR analysis includes nozzle loads as specified in Ref. 3, Sheet 15. Conservatively assume that the inlet and outlet nozzle loads are distributed between the two strainers, 1-QT-113-AB1 and AB2, because of the way they are joined (see Ref. 2). Therefore the nozzle loads modeled in the ANCHOR analysis are the absolute values of


AB EMERG DIESEL FULL FLOW LUBE OIL STRAINER 1 Building: AUXILIARY Floor El.: 579.00 Room, Row/Col: AB EDG LUBE OIL PIT.Manufacturer, Model, Etc.: NUGENT 1554PL3B INTERACTION EFFECTS 1.Soft targets are free from impact by nearby equipment or structures 2.If the equipment contains sensitive relays, it is free from all impact by nearby equipment or structures.
DC Cook Unit 1                                   GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUA'TIONWORK SHEET (SEWS)                              Status: Yes Sheet 3 of 11 ID: 1-QT-113-AB1 ( Rev. 0   )                   Class: 0. Other
3.Attached lines have adequate flexibili.4.Overhead equipment or distribution systems are not likely to collapse.5.No other adverse conce'ms were found.Yes N/A Yes Yes Yes Is equipment free of interaction effects'SRT: Tom Huang (AEP)and George Gary Thomas (S&A)on 10/6/93 REF: 1.Anchor Inspection Data Sheets: Anchorage Arrangement Sketches and Physical Characteristics Data Sheet, Certified 6//6/92 for both 1-QT-113-AB1 and 1-QT-113-AB2.
2.Dwg 0 10-089 3.Worthington Co.Full Flow Oil Lube Strainer Calculation, 8/26/74.MFG: NUGENT, WM W8Co-1554M-L3B-DN-100 Seismic Capacity vs Demand: The Bounding Spectrum does not apply for Class 0 items.This component is seismically rugged based on SRTIudgement and inspection, and anchor analysis.Anchorage:
Supported on 4 angle legs.Each leg is anchored by one 1/2" J bolt anchor.The ANCHOR analysis was performed for 1-QT-113-AB1 and 1-QT-113-AB2 together, since they are connected by a relatively rigid piping segment.Frequency was judged to be greater than 8 Hz.The total weight is 17305, with the CG located at an approx.mid-height
=33" (Ref.2).The minimum embedment of the 1/2" J-bolts for 1-QT-113-AB1 and'1-QT-113-AB2 is 9.125" and was used for the embedment reduction factor for the J-bo!ts.T he SRT also judged the bolts may be subject to prying.therefore a very conservative.5 reduction factor was applied for prying.ANCHOR analysis includes nozzle loads as specified in Ref.3, Sheet 15.Conservatively assume that the inlet and outlet nozzle loads are distributed between the two strainers, 1-QT-113-AB1 and AB2, because of the way they are joined (see Ref.2).Therefore the nozzle loads modeled in the ANCHOR analysis are the absolute values of DC Cook Unit 1 SCREENING EVALUA'TION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 3 of 11 ID: 1-QT-113-AB1 (Rev.0)Class: 0.Other


== Description:==
== Description:==
AB EMERG DIESEL FULL FLOW LUBE OIL STRAINER                1 Building: AUXILIARY                        Floor El.: 579.00                Room, Row/Col: AB EDG LUBE OIL PIT, Manufacturer, Model, Etc.: NUGENT 1554AL3B the larger of the two loads specified in Ref. 3, Sheet 15. The way the loads are defined in Ref. 3," they correspond to the x,y,z coordinate system as follows: c=x, a=y, and b=z.
The ANCHOR analysis even with the highest nozzle loads and anchorage reduction factors, shows a high margin of safety (2.5).
Zap Shot, Wk1, Tm 2, Disk 1, Picture 45 Evaluated by:                                                                      Date:


AB EMERG DIESEL FULL FLOW LUBE OIL STRAINER 1 Building: AUXILIARY Floor El.: 579.00 Room, Row/Col: AB EDG LUBE OIL PIT, Manufacturer, Model, Etc.: NUGENT 1554AL3B the larger of the two loads specified in Ref.3, Sheet 15.The way the loads are defined in Ref.3," they correspond to the x,y,z coordinate system as follows: c=x, a=y, and b=z.The ANCHOR analysis even with the highest nozzle loads and anchorage reduction factors, shows a high margin of safety (2.5).Zap Shot, Wk1, Tm 2, Disk 1, Picture 45 Evaluated by: Date:
==Attachment:==
Pictures


==Attachment:==
==Attachment:==
ANCHOR Report
0 DC Cook Unit 1                        GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                    Status: Yes Sheet 4 of 11 ID: 1-QT-113-AB1 ( Rev. 0  )                  Class: 0. Other
==
Description:==
AB EMERG DIESEL FULL FLOW LUBE OIL STRAINER      1 Building: AUXILIARY                    Floor El.: 579.00        Room, Row/Col: AB EOG LUBE OIL PIT, Manufacturer, Model, Etc.: NUGENT 1554<L3B P~CI BKR AB Emerg Diesel Full Flow Lube Oll Strainer 1, 1-QT-113-ABI


Pictures
DC Cook Unit 1                          GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                    Status: Yes Sheet 5 of 11 ID: 1-QT-113-AB1 ( Rev. 0 )                                  Class: 0. Other


==Attachment:==
==
Description:==
AB EMERG DIESEL FULL FLOW LUBE OIL STRAINER                      1 Building: AUXILIARY                                  Floor El.: 579.00            Room, Row/Col: AB EDG LUBE OIL PIT, Manufacturer, Model, Etc.: NUGENT 1554-4L3B ANCHOR Report gy~gi~g Spectrum: Instructure Realistic
                        'esponse Frequency: User - 8.00 Percent Damping: User - 5.00 Spectral Values:
Direction                        Acceleration (g's)
North South                      0.32 East - West                      0.32 Vertical                        0.17 Angle (N-S Direction makes with the X Axis): 0.00 Combination Criteria: SRSS Nciahtm Number of Weights: 2 No            Weight 1730.00                  22.875        0.000        33.000 1730.00                  -22.875        1.000        33.000 EQKQR Number of External Forces: 2 No                    Fx                  Fy          Fz 1.23E+002                1.23E+002    7.03E+002          0.000    12.000          24.000 3.31E+002              4.02E+002      6.24E+002          0.000  -12.000          24.000
%@arnis of External Moments: 2
                'umber Mx 1          8.64E+003              -1.86E+004      6.86E+003 2          3.98E+003              -8.52E+002      2.54E+003 hlhMrat~
haabuc'umber of Anchor types:          1


ANCHOR Report 0
DC Cook Unit 1                                 GlP Rev 2, Corrected, 2/14/92 SCREENING EYALUATIONWORK SHEET (SEWS)                                        Status: Yes Sheet 6 of 11 ID: 1-QT-113-AB1 ( Rev, 0)                               Class: 0. Other
DC Cook Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 4 of 11 ID: 1-QT-113-AB1 (Rev.0)Class: 0.Other


== Description:==
==
Description:==
AB EMERG DIESEL FULL FLONl LUBE OIL STRAINER                      1 Building: AUXILIARY                              Floor El.: 579.00                Room, Row/Col: AB EDG LUBE OIL PIT, Manufacturer, Model, Etc.: NUGENT 1554<L3B Tension      Shear Ultimate    Ultimate      Inter        Inter    Saf No. Dia              Manufact        Product      Tension        Shear      Coeff        Coeff    Fact 1      1/2              Other        J-Bolt (90      6660.00      3330.00      1.00          0.30    1.00 deg)
Qaac&c Stress: 3500.00 psi.
          'ltimate Reduction Factor: 0.85
~i Allowable Stress:          30600 psi.
Qi~g~
Number of Surfaces:          1 Surface Orientation Direction              Direction      Direction Comp                  Comp            Comp Nx              Ny 0.000          0.000          1.000 Anchor Pattern for Surface &#xb9; 1 Legend for Anchor Patterns


AB EMERG DIESEL FULL FLOW LUBE OIL STRAINER 1 Building: AUXILIARY Floor El.: 579.00 Room, Row/Col: AB EOG LUBE OIL PIT, Manufacturer, Model, Etc.: NUGENT 1554<L3B P~CI BKR AB Emerg Diesel Full Flow Lube Oll Strainer 1, 1-QT-113-ABI DC Cook Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 5 of 11 ID: 1-QT-113-AB1 (Rev.0)Class: 0.Other
DC Cook Unit 1                                   GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                    Status: Yes Sheet 7 of 11 ID: 1-QT-113-AB1 ( Rev. 0         )               Class: 0. Other


== Description:==
== Description:==
AB EMERG DIESEL FULL FLOW LUBE OIL STRAINER                          1 Building: AUXILIARY                          Floor El.: 579.00                    Room, Row/Col: AB EDG LUBE OiL PIT, Manufacturer, Model, Etc.: NUGENT 1554-4L3B Anchor Bolts:
mmmm Concrete Lines:          ~mt//+
Concrete Points
                                                                  .'eld Lines
                                                            .'ux; hrzhac.'umber of Anchors: 8 Anch                                                          Surf No          Id        Coord          Coord          Coord              Id
                        -30.719        -7.260          0.000
                        -16.531        -7.250          0.000
                        -30.719          7.250          0.000
                        -16.531          7.250          0.000 30.719        -7.250          0.000 16.531        -7.250          0.000 30.719          7.250          0.000 16.531          7.250          0.000 0 of elements per line: 4 Number of Concrete Lines: 0 Number of Concrete Points: 8 Surf          Conc-Pt No            Coord          Coord          Coord          Id            Area
                -30.719          -7.250        0.000                        4.000
                -16.531          -7.250        0.000                        4.000
                -30.719          7.250        0.000                        4.000
                -16.531          7.250        0.000                        4.000 30.719          -7.250        0.000                        4.000 16.531          -7.250        0.000                        4.000 30.719          7.250        0.000                        4.000 16.531          7.260        0.000                        4.000


AB EMERG DIESEL FULL FLOW LUBE OIL STRAINER 1 Building: AUXILIARY Floor El.: 579.00 Room, Row/Col: AB EDG LUBE OIL PIT, Manufacturer, Model, Etc.: NUGENT 1554-4L3B ANCHOR Report gy~gi~g'esponse Spectrum: Instructure Realistic Frequency:
DC Cook Unit 1                               GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEvVS)                            Status: Yes Sheet 8 of 11 ID: 1-QT-113-AB1 ( Rev. 0     )               Class: 0. Other
User-8.00 Percent Damping: User-5.00 Spectral Values: Direction North-South East-West Vertical Acceleration (g's)0.32 0.32 0.17 Angle (N-S Direction makes with the X Axis): 0.00 Combination Criteria: SRSS Nciahtm Number of Weights: 2 No Weight 1730.00 1730.00 22.875-22.875 0.000 1.000 33.000 33.000 EQKQR Number of External Forces: 2 No Fx Fy Fz 1.23E+002 3.31E+002 1.23E+002 7.03E+002 4.02E+002 6.24E+002 0.000 0.000 12.000-12.000 24.000 24.000%@arnis'umber of External Moments: 2 Mx 1 8.64E+003-1.86E+004 2 3.98E+003-8.52E+002 6.86E+003 2.54E+003 hlhMrat~haabuc'umber of Anchor types: 1 DC Cook Unit 1 SCREENING EYALUATION WORK SHEET (SEWS)GlP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 6 of 11 ID: 1-QT-113-AB1 (Rev, 0)Class: 0.Other


== Description:==
==
Description:==
AB EMERG DIESEL FULL FLOW LUBE OIL STRAINER              1 Building: AUXILIARY                    Floor El.: 579.00                  Room, Row/Col: AB EDG LUBE OIL PIT, Manufacturer, Model, Etc.: NUGENT 1554AL3B EcldJ.iaaf '
of elements per line: 4 Number of Weld Lines: 0 Reduction Factor Input for Anchor 0  1 Adequately Installed: Yes Embedment Length: (27.25 in. Min Reqd. to achieve full capacity):= 9.13 in.
Gap at Threaded Anchor: 0.00 in.
Edge Distance - Edge 1: 4.38 in.
Crack Size: 0.000 in. - Cracks traverses thru Installation Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factor Input for Anchor 0 2 Adequately Installed: Yes Embedment I.ength: (27.25 in. Min Reqd. to achieve full capacity):= 9.13 in.
Gap at Three'ded Anchor: 0.00 in.:
Edge Distance - Edge 1: 4.38 in.
Crack Size: 0.000 in. - Cracks traverses thru Installation Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factor Input for ..ichor 0 3 Adequately In"tailed: Yes Embedment Length: (27.25 in. Min Reqd. to achieve full capacity):= 9.13 in.
Gap at Threaded Anchor: 0.00 in.
Edge Distance - Edge 1: 4.38 in.
Crack Size: 0.000 in. - Cracks traverses thru Installation Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factor Input for Anchor 0 4 Adequately Installed: Yes Embedment Length: (27.25 in. Min Reqd. to achieve full capacity):= 9.13 in.
Gap at Threaded Anchor: 0.00 in.
Edge Distance - Edge 1: 4.38 in.
Crack Size: 0.000 in. - Cracks traverses thru Installation Essential Relays in Cabinet: No


AB EMERG DIESEL FULL FLONl LUBE OIL STRAINER 1 Building: AUXILIARY Floor El.: 579.00 Room, Row/Col: AB EDG LUBE OIL PIT, Manufacturer, Model, Etc.: NUGENT 1554<L3B Ultimate Ultimate Tension Inter Shear Inter Saf No.Dia 1 1/2 Manufact Other Product J-Bolt (90 deg)Coeff Shear Tension 6660.00 3330.00 1.00 Coeff Fact 0.30 1.00 Qaac&c'ltimate Stress: 3500.00 psi.Reduction Factor: 0.85~i Allowable Stress: 30600 psi.Qi~g~Number of Surfaces: 1 Surface Orientation Direction Comp Nx 0.000 Direction Comp Ny 0.000 Direction Comp 1.000 Anchor Pattern for Surface&#xb9;1 Legend for Anchor Patterns DC Cook Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 7 of 11 ID: 1-QT-113-AB1 (Rev.0)Class: 0.Other
DC Cook     Unit1                                GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                Status: Yes Sheet 9 of 11 ID: 1-QT-113-AB1 ( Rev. 0)                   Class: 0. Other


== Description:==
== Description:==
AB EMERG DIESEL FULL FLOW LUBE OIL STRAINER                1 Building: AUXILIARY                      Floor EI.: 579.00                  Room, Row/Col: AB EDG LUBE OIL PIT, Manufacturer, Model, Etc.: NUGENT 15544L3B Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factor Input for Anchor  &#xb9;5 Adequately Installed: Yes Embedment Length: (27.25 in. Min Reqd. to achieve full capacity):= 9.13 in.
Gap at Threaded Anchor: 0.00 in.
Edge Distance - Edge 1: 4.38 in.
Crack Size: 0.000 in. - Cracks traverses thru Installation Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factor Input for Anchor  &#xb9;6 Adequately Installed: Yes
'mbedment Length:      (27.25 in. Min Reqd. to achieve full capacity):= 9.13 in.
Gap at Threaded Anchor: 0.00 in.
Edge Distance - Edge 1: 4.38 in.
Crack Size: 0.000 in. - Cracks traverses thru Installation Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factor Input for Anchor  &#xb9;7 Adequately Installed: Yes Embedment Length: (27.25 in. Min Reqd. to achieve full capacity):= 9.13 in.
Gap at Threaded Anchor: 0.00 in.
Edge Distance - Edge 1: 4.38 in.
Crack Size: 0.000 in. - Cracks traverses thru Installation Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factor Input for Anchor  &#xb9;8 Adequately Installed: Yes Embedment Length: (27.25 in. Min Reqd. to achieve full capacity):= 9.13 in.
Gap at Threaded Anchor: 0.00 in.
Edge Distance - Edge 1: 4.38 in.
Crack Size: 0.000 in. - Cracks traverses thru Installation Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes


AB EMERG DIESEL FULL FLOW LUBE OIL STRAINER 1 Building: AUXILIARY Floor El.: 579.00 Room, Row/Col: AB EDG LUBE OiL PIT, Manufacturer, Model, Etc.: NUGENT 1554-4L3B Anchor Bolts: mmmm Concrete Lines:~mt//+Concrete Points.'eld Lines.'ux;hrzhac.'umber of Anchors: 8 No Anch Id Coord-30.719-16.531-30.719-16.531 30.719 16.531 30.719 16.531 Coord-7.260-7.250 7.250 7.250-7.250-7.250 7.250 7.250 Coord 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Surf Id 0 of elements per line: 4 Number of Concrete Lines: 0 Number of Concrete Points: 8 No Coord-30.719-16.531-30.719-16.531 30.719 16.531 30.719 16.531 Coord-7.250-7.250 7.250 7.250-7.250-7.250 7.250 7.260 Coord 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Surf Id Conc-Pt Area 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 DC Cook Unit 1 SCREENING EVALUATION WORK SHEET (SEvVS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 8 of 11 ID: 1-QT-113-AB1 (Rev.0)Class: 0.Other
DC Cook Unit 1                                   GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                    Status: Yes Sheet 10 of 11 ID: 1-QT-113-AB1 ( Rev. 0         )                   Class: 0. Other


== Description:==
==
Description:==
AB EMERG DIESEL FULL FLOW LUBE OIL STRAINEP.                    1 Building: AUXILIARY                            Floor El.: 579.00                Room, Row/Col: AB EDG LUBE OIL PIT, Manufacturer, Model, Etc.: NUGENT 1554-4L3B Reduction Factors Data Current: Yes Anc      Pall/      Pallr/
No    ld      VaIl      Vallr        RT    RN    RL    RG    RS  RE  RF    RC    RR  RP    RB  RM 1    1      1398.60      N/A        1.00  1.00  0.42    1.00  1.00 1.00 1.00  1.00  1.00 0.50  1.00  1.00 3330.00      N/A        1.00  1.00  1.00  1.00  1.00 1.00 1.00  1.00  1.00  1.00 1.00  1.00 2      1      1398.60      N/A        1.00  1.00  0.42  1.00  1.00 1.00 1.00  1.00  1.00 0.50  1.00  1.00 3330.00    N/A              1.00  1.00  1.00  1.00 1.00 1.00  1.00  1.00  1.00 1.00  1.00 3      1      1398.60    N/A        1.00  1.00  0.42  1.00  1.00 1.00 1.00  1.00  1.00 0.50  1.00  1.00 3330.00    N/A        1.00  1.00  1.00  1.00  1.00 1.00 1.00  1.00  1.00 1.00  1.00  1.00 4    1      1398.60    N/A        1.00  1.00  0.42  1.00  1.00 1.00 1.00  1.M    1.00 0.50  1.00 3330.00    NIA              1.00  1.00  1.00  1.00 1.00 1.00  1.00  1.00 1.00  1.00  1.00 5    1      1398.60    N/A        1.00  1.00  0.42  1.00  1.00 1.00 1.00  1.00  1.00 0.50  1.00  1.00 3330.00    N/A        1.00  1.00  1.00  1.00  1.00 1.00 1.00  1.00  1.0Q 1.0Q  1.00  1.QO 6    1      1398.60    N/A        1.00  1.00  0.42  1.00  1.00 1.00 1.00  1.00  1.00 0.50  1.00  1.00 3330.00    N/A        1.QO  1.00  1.00  1.QO  1.00 1.QO 1.QO  1.00  1.00 1.00  1.00  1.00 7    1      1398.60    N/A        1.00  1.00  0.42  1.00  1.00 1.00 1.00  1.GO  1.00 0.50  1.00 3330.00    N/A        1.QO  "s.00  1.00  1.00  1.00 1.00 1.00  1.00  1.00 1.00  1.00  1.00 8    1      1398.60    N/A        1.00  1.00  0.42  1.00  1.00 1.00 1.00  1.00  1.M  0.50  1.'00 1.00 3330.00    NIA              1.00  1.00  1.00  1.M  1.00 1.00  1.00  1.00 1.00  1.00  1.00 N/A      = Not Applicable all    Allowabi Pull without Reduced Inspection Vail      = Allowable Shear without Reduced Inspection Pallr    = Allowable Pull with Reduced Inspection Vallr    = Allowable Shear with Reduced Inspection
          = Outlier
          = Reduction Factor Not Used RT        = Reduction Factor for Type of Anchorage RN        = Reduction Factor for In tallation Adequacy RL        = Reduction Factor for Embedment RG        = Reduction Factor for Gap at Anchors RS        = Reduction Factor for Spacing RE        = Reduction Factor for Edge Distance RF        = Reduction Factor for Concrete Strength RC        = Reduction Factor for Concrete Cracks RR        = Reduction Factor for Essential Relays RP        = Reduction Factor for Base Stiffness and Prying Action RB        = Reduction Factor for Base Strength and Load Path RM        = Reduction Factor for Embed. Steel and Pads Analysis Performed: Yes ype of Analysis: Regular IA      elerations (G's)


AB EMERG DIESEL FULL FLOW LUBE OIL STRAINER 1 Building: AUXILIARY Floor El.: 579.00 Room, Row/Col: AB EDG LUBE OIL PIT, Manufacturer, Model, Etc.: NUGENT 1554AL3B EcldJ.iaaf
DC Cook Unit 1                              GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUAlION WORK SHEET (SEWS)                          Status: Yes Sheet11 of11 ID: 1-QT-113-AB1 ( Rev. 0   )                   Class: 0. Other
'of elements per line: 4 Number of Weld Lines: 0 Reduction Factor Input for Anchor 0 1 Adequately Installed:
Yes Embedment Length: (27.25 in.Min Reqd.to achieve full capacity):=
9.13 in.Gap at Threaded Anchor: 0.00 in.Edge Distance-Edge 1: 4.38 in.Crack Size: 0.000 in.-Cracks traverses thru Installation Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed:
Yes Reduction Factor Input for Anchor 0 2 Adequately Installed:
Yes Embedment I.ength: (27.25 in.Min Reqd.to achieve full capacity):=
9.13 in.Gap at Three'ded Anchor: 0.00 in.: Edge Distance-Edge 1: 4.38 in.Crack Size: 0.000 in.-Cracks traverses thru Installation Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed:
Yes Reduction Factor Input for..ichor 0 3 Adequately In" tailed: Yes Embedment Length: (27.25 in.Min Reqd.to achieve full capacity):=
9.13 in.Gap at Threaded Anchor: 0.00 in.Edge Distance-Edge 1: 4.38 in.Crack Size: 0.000 in.-Cracks traverses thru Installation Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed:
Yes Reduction Factor Input for Anchor 0 4 Adequately Installed:
Yes Embedment Length: (27.25 in.Min Reqd.to achieve full capacity):=
9.13 in.Gap at Threaded Anchor: 0.00 in.Edge Distance-Edge 1: 4.38 in.Crack Size: 0.000 in.-Cracks traverses thru Installation Essential Relays in Cabinet: No DC Cook Unit1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 9 of 11 ID: 1-QT-113-AB1 (Rev.0)Class: 0.Other


== Description:==
==
Description:==
AB EMERG DIESEL FULL FLOW LUBE OIL STRAINER 1 Building: AUXILIARY                      Floor El.: 579.00            Room, Row/Col: AB EDG I.UBE OIL PIT, Manufacturer, Model, Etc.: NUGENT 1554-4L3B No        N-S            E-W            Vertical      Safety Factor 1        0.325          0.130            0.067          5.843 2        -0.325          -0.130            -0.067          7.456 3        -0.325          0.130            0.067          5.843 4        0.325          -0.130            -0.067          7.456 5        0.325          -0.130            0.067          5.853 6        -0.325          0.130            -0.067          7.213 7        0.325          0.130            -0.067          7.213 8        -0.325          -0.130            0.067          5.853 9        0.130          0.325            0.067          2.478 10        -0.130          -0.325            -0.067          2.756 11        0.130          -0.325            0.067          2.503 12        -0.130          0.325            -0.067          2.695 13        -0.130          0.325            0.067          2.478 14        0.130        -0.325            -0.067          2.756 15        0.130          0.325            -0.067          2.695 16        -0,130        -0.325              0.067          2.503 17        0.130          0.130            0.167          5.114 18        -0.130        -0.130            -0.167          9 385
            .130          0.130            -0.167          8.752 20        -0.130        -0.130              0.167          5.040 21        -0.130          0.130            0.167          5.114 22        0.130        -0.130            -0.167          9.385 23        0.130        -0.130              0.167          5.040
          -0.130          0.130            -0.167          8.752 Minimum Safety Factor:    2 I78 The Anchorage Capacity is      2.478 times greater than the Demand
 
SUBJECT    F  F nM S AIN R                          GROUP ak G. No.                  ~~of      Sos.
CAL BY PAGE                DESCREPTIOH Fig. 1 2-S                Frequency  of System Seismic leg forces Nozzle loads z
0        7-9                Leg  forces due to nozzle loads 10-11              Leg  stresses O          12                Base  Plate 13                Flolding down  bolt 14                Meld  of leg to tank X
Q          15                Local Shell Stresses X          29                Recommendation  sketch (SK-7940) 30                Summary I
0


AB EMERG DIESEL FULL FLOW LUBE OIL STRAINER 1 Building: AUXILIARY Floor EI.: 579.00 Room, Row/Col: AB EDG LUBE OIL PIT, Manufacturer, Model, Etc.: NUGENT 15544L3B Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed:
JOB NUMBER  / 8 Calculations                      NUMBER            "(0
Yes Reduction Factor Input for Anchor&#xb9;5 Adequately Installed:
                                                /'/'ILE
Yes Embedment Length: (27.25 in.Min Reqd.to achieve full capacity):=
9.13 in.Gap at Threaded Anchor: 0.00 in.Edge Distance-Edge 1: 4.38 in.Crack Size: 0.000 in.-Cracks traverses thru Installation Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed:
Yes Reduction Factor Input for Anchor&#xb9;6 Adequately Installed:
Yes'mbedment Length: (27.25 in.Min Reqd.to achieve full capacity):=
9.13 in.Gap at Threaded Anchor: 0.00 in.Edge Distance-Edge 1: 4.38 in.Crack Size: 0.000 in.-Cracks traverses thru Installation Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed:
Yes Reduction Factor Input for Anchor&#xb9;7 Adequately Installed:
Yes Embedment Length: (27.25 in.Min Reqd.to achieve full capacity):=
9.13 in.Gap at Threaded Anchor: 0.00 in.Edge Distance-Edge 1: 4.38 in.Crack Size: 0.000 in.-Cracks traverses thru Installation Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed:
Yes Reduction Factor Input for Anchor&#xb9;8 Adequately Installed:
Yes Embedment Length: (27.25 in.Min Reqd.to achieve full capacity):=
9.13 in.Gap at Threaded Anchor: 0.00 in.Edge Distance-Edge 1: 4.38 in.Crack Size: 0.000 in.-Cracks traverses thru Installation Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed:
Yes DC Cook Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 10 of 11 ID: 1-QT-113-AB1 (Rev.0)Class: 0.Other


== Description:==
==SUBJECT:==
WC/ -/Ci iC ~ ( Q..( SHEET    /      OF SY  A  Y  /'A/ OATE~F APP              CATE


AB EMERG DIESEL FULL FLOW LUBE OIL STRAINEP.1 Building: AUXILIARY Floor El.: 579.00 Room, Row/Col: AB EDG LUBE OIL PIT, Manufacturer, Model, Etc.: NUGENT 1554-4L3B Reduction Factors Data Current: Yes Anc No ld 1 1 2 1 Pall/VaIl 1398.60 3330.00 1398.60 3330.00 Pallr/Vallr N/A N/A N/A N/A RT 1.00 1.00 1.00 RN RL 1.00 0.42 1.00 1.00 1.00 0.42 1.00 1.00 RG RS 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 RE RF RC 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 RR RP RB 1.00 0.50 1.00 1.00 1.00 1.00 1.00 0.50 1.00 1.00 1.00 1.00 RM 1.00 1.00 1.00 1.00 3 1 4 1 1398.60 N/A 3330.00 N/A 1398.60 N/A 1.00 1.00 1.00 1.00 0.42 1.00 1.00 1.00 0.42 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.M 1.00 0.50 1.00 1.00 1.00 1.00 1.00 0.50 1.00 1.00 1.00 3330.00 NIA 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 5 1 6 1 1398.60 N/A 3330.00 N/A 1398.60 N/A 1.00 1.00 1.00 1.00 0.42 1.00 1.00 1.00 0.42 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.50 1.00 1.0Q 1.0Q 1.00 1.00 0.50 1.00 1.00 1.QO 1.00 3330.00 N/A 1.QO 1.00 1.00 1.QO 1.00 1.QO 1.QO 1.00 1.00 1.00 1.00 1.00 7 1 8 1 3330.00 1398.60 N/A N/A 1398.60 N/A 1.00 1.QO 1.00 1.00 0.42"s.00 1.00 1.00 0.42 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.GO 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.50 1.00 1.00 1.00 1.00 1.M 0.50 1.'00 1.00 1.00 3330.00 NIA 1.00 1.00 1.00 1.M 1.00 1.00 1.00 1.00 1.00 1.00 1.00 N/A all=Not Applicable
JOB NUMBER  Z5-r  d Calculations FILE NUMBER    C-<0
-Allowabi Pull without Reduced Inspection Vail=Allowable Shear without Reduced Inspection Pallr=Allowable Pull with Reduced Inspection Vallr=Allowable Shear with Reduced Inspection
=Outlier=Reduction Factor Not Used RT=Reduction Factor for Type of Anchorage RN=Reduction Factor for In tallation Adequacy RL=Reduction Factor for Embedment RG=Reduction Factor for Gap at Anchors RS=Reduction Factor for Spacing RE=Reduction Factor for Edge Distance RF=Reduction Factor for Concrete Strength RC=Reduction Factor for Concrete Cracks RR=Reduction Factor for Essential Relays RP=Reduction Factor for Base Stiffness and Prying Action RB=Reduction Factor for Base Strength and Load Path RM=Reduction Factor for Embed.Steel and Pads Analysis Performed:
Yes ype of Analysis: Regular I A elerations (G's)


DC Cook Unit 1 SCREENING EVALUAl ION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet11 of11 ID: 1-QT-113-AB1 (Rev.0)Class: 0.Other
==SUBJECT:==
SHEET  Z    OF BY  ~~1     DA~
APP          DATE l
27'r ps  S fif FA'r
      /~f 0'


== Description:==
Calculations SU6JECT:                                                  SHEET      Z        OF BY    A TH/        DATE~
                                                                          'PP                  DATE 2    t/
A'47
                        +Cj Ol\g+Q      4      <<4<<L /    gS<<t~
AC AZg Sds 4
N7 4        g<<    CF    /            /2 ~
t                  S            .S" r Se~p~
                                              /0 >                      IdZ4 gC                            Q/            Z/
7                                          /2 B
                    'i C
rim 0'5'    '/
                                          /r
                                                                                <</P4  f
                          .rg = .'
                                      +44 g'(
                                                  /z w"        Q~Z'        c FAC(    t'    F
                                                                  ~ ~
r
                                                      /Sgs        Car: ~C gJ
        /F
  &#xc3;
~
4Q        <<
    ~ ~


AB EMERG DIESEL FULL FLOW LUBE OIL STRAINER 1 Building: AUXILIARY Floor El.: 579.00 Room, Row/Col: AB EDG I.UBE OIL PIT, Manufacturer, Model, Etc.: NUGENT 1554-4L3B No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 20 21 22 23 N-S 0.325-0.325-0.325 0.325 0.325-0.325 0.325-0.325 0.130-0.130 0.130-0.130-0.130 0.130 0.130-0,130 0.130-0.130.130-0.130-0.130 0.130 0.130-0.130 E-W 0.130-0.130 0.130-0.130-0.130 0.130 0.130-0.130 0.325-0.325-0.325 0.325 0.325-0.325 0.325-0.325 0.130-0.130 0.130-0.130 0.130-0.130-0.130 0.130 Vertical 0.067-0.067 0.067-0.067 0.067-0.067-0.067 0.067 0.067-0.067 0.067-0.067 0.067-0.067-0.067 0.067 0.167-0.167-0.167 0.167 0.167-0.167 0.167-0.167 Safety Factor 5.843 7.456 5.843 7.456 5.853 7.213 7.213 5.853 2.478 2.756 2.503 2.695 2.478 2.756 2.695 2.503 5.114 9 385 8.752 5.040 5.114 9.385 5.040 8.752 Minimum Safety Factor: 2 I78 The Anchorage Capacity is 2.478 times greater than the Demand
0 t~,
I I
JOB NUMBER  26 I  TdJ Calculations                      ~"              FILE NUMBER EU@EDT: fjordJIVE re                            SHEET          OF Q/g. ~ 1 ~/AJ/E +          BY            DA APP            DATE
    ~ WcrvOM F~eA r-rW')P 7u~)(                  ~o>'-.+                    6v S'.~
r~/ )    l-a'gw E
C<<34>EE      MOTIF 5
                                  +


SUBJECT F F nM CAL BY S AIN R G.No.ak GROUP~~of Sos.PAGE DESCREPTIOH z 0 O X QX I 0 2-S 7-9 10-11 12 13 14 15 29 30 Fig.1 Frequency of System Seismic leg forces Nozzle loads Leg forces due to nozzle loads Leg stresses Base Plate Flolding down bolt Meld of leg to tank Local Shell Stresses Recommendation sketch (SK-7940)Summary
Calculations                                              FILE NUMBER


Calculations
==SUBJECT:==
LJog~)ply ~y pl                                SHEET          OF 8 654 Or l. ~A/&k4                              BV  I ~
DATIVE APP            DATE
    /UA7 V        Fzr  uw<c          o<
7)rr ZZC7 )od r~rJ)C
                ~p g    (          F.      "    FEZ 5  F. gg~  px~ ~z) x  (I S                                                  &4S ZC~)AJ C x ~AFEF                                                                Q~)my xxlz      'x,assed+                sZ P        Is?+PD4              T  9?e t    24/ 7
              ~7~      /2d 0 cga Z rr 29/
llrS 2    ll)&I  QZ,M                              Ax/g/
99~6      l      z
                                    ~l. 6?          x                              WA5%
                        ~l 2                                                                      CfpfC./)r-))
87    + 3,{?r,            7,(2. ]
                  ~~<  "i/8&
Formals-iA    Fizgcy      ~    &~g~Ay/~                    l P~
                                                                    't 6xsnc    8esEr    p  sr +~ srs                  ~  az    F) ~l x?zoP +sos      g  F~ v azszj'El CC
                              ~K                l2)'4                  > g4 rg>EE(O 4          I
(  FEE@ w EP~~>1    ~~ 5                          /224          4 lO  Z+O
 
Cak:ulations. FILE NUMBER  C I0


==SUBJECT:==
==SUBJECT:==
WC/-/Ci iC~(Q..(JOB NUMBER/8/'/'ILE NUMBER"(0 SHEET/OF SY A Y/'A/OATE~F APP CATE Calculations
SHEET~      OF APP        DATE
 
                              ,~P Calculations          FILE NUMBER +  l0 SUSJECTI              SKEET~      OF eV    ALH    DATE29 APP          DATE C~
x  DS X
ZzC                  25 7a >
      /
p4 gi 2.                    &#xb9;/
 
                              ~P Calculations     FILE NUMBER


==SUBJECT:==
==SUBJECT:==
JOB NUMBER FILE NUMBER SHEET Z BY~~1 APP Z5-r d C-<0 OF DA~DATE l 27'r ps S fif FA'r/~f 0' Calculations SU6JECT: SHEET Z OF BY A TH/DATE~'PP DATE+Cj 2 t/Ol\g+Q 4<<4<<L/gS<<t~AC AZg A'47 4 Sds gC 7/0>Q/4 t g<<Z//2 B CF N7/S IdZ4/2~S" r-.Se~p~'i 0'5''/.rg./r='+44 C rim<</P4 f g'(/z w" FAC(t'/Sgs Q~Z'c~~F r J Car:~C g/F&#xc3;~Q 4<<~~
SHEET~       OF BY   +CW    DATE APP          DATE
0 Calculations
              /
~" EU@EDT: fjord JIVE re Q/g.~1~/AJ/E+t~, I SHEET BY OF DA I JOB NUMBER 26 I TdJ FILE NUMBER APP DATE~WcrvOM F~eA rW')P 7u~)(r-~o>'-.+6v S'.~r~/)l-a'gw E C<<34>EE MOTIF 5+
3            F/
/UA7 V Calculations
l I
K O
z X
O
 
Cele Uiations FILE NUMBER Q~ l


==SUBJECT:==
==SUBJECT:==
LJog~)ply~y pl 8 654 Or l.~A/&k 4 Fzr uw<c o<FILE NUMBER SHEET OF BV I~DATIVE APP DATE 7)rr ZZC7)od~p g (-F." FEZ 5 F.gg~px~~z)r~rJ)C x (I S&4S ZC~)AJ C x~AFEF xxlz'x,assed+sZ Q~)my Is?+PD4 T 9?e t 24/7 P~7~/2d 0 cga Z rr 29/2 llrS 99~6 l z~l.6?~l 2 87+3,{?r, ll)&I QZ,M x 7,(2.]Ax/g/WA5%CfpfC./)r-))
SHEET~     OF APP         DATE z
~~<"i/8&Formals-iA Fizgcy~&~g~Ay/~-l P~'t 6xsnc 8esEr p sr+~srs~az F)~l x?zoP+sos g F~v azszj'El CC~K l2)'4 (FEE@w EP~~>1~~5 lO Z+O 4>g4 rg>EE(O I/224 4 Cak:ulations.
 
0
                                                      ' ~ E
              ~
Calculations                                    FILE NUMBER


==SUBJECT:==
==SUBJECT:==
FILE NUMBER C I 0 SHEET~OF APP DATE Calculations SUSJECTI,~P FILE NUMBER+l 0 SKEET~OF eV A L H DATE29 APP DATE x DS C~X ZzC 25 p4/7a>gi 2.&#xb9;/  
,  IJy~rHW C7 oA/                      SHEET            OF BYE r            OA~~/g J-~)f8  A7  G4 SIT PP'EtZW                            DATE rl/o pr ACr]a+i                P  PierrlCrlOV          ~ Srg<CrxOal D an dr    /~ca  r
            /2.6 mid -W.i                  Wc 7 g,5    -asA  ie            /D7.0 A7
                                                -ig,/  -Wee  irk
                                                                            -87)  NEO
                                                                    -I/AZ  ]~0 77,'5'82li
                                                                    -39rd //Qr S
          - Hr Z W.j      -a,d          -4dr3 iS,S  -/4P u.i      -
Co<By/Al /045
                                                -/ IB- 5                +S'Z
                    ->Br 7
                                                -/&Br'B.7
                                                                          )- a7Z-l
                                                                          ~~)
O CC O
 
JOB NUMBER    619,o Calcuiations                                          FILE NUMBER suwscTI    QocruFFT'o&                                SHEET            OF BY                DATE 5reru    A. Zs-~fr OP    I-r~C ~         APP               DATE
~Eh      /
A F OL(F 4 OFF g ATF
  <GO    ~    ~  cg CJ g ~PC            ( gA ~    ~FFFDOF'F" /0)
Sq'cnxc c  -Pg,P              y - <<B,G          ~~      - iS'S,G'        g  482F)    +$ 7+
            - /99r 7
          "/9917'/r>e'er&+ 5+rB >l/i~w~ b -S'~/g
          -//,34 - w,47 -/.5                              <<48 7&
(sFrd sziFrrr      Fo )
          - /7,/2    Ws/
        /                          'r ~44?M  P   r' g/'
( V<M~ ld+3 aqua  ++
 
JOB NUMBER Calculations                        FILE NUMBER su+EcT:  4~grA w'c7ohl              SHEET    C          OF
            /age& dr  Sos'p      &cd'5 BV  l                ATE APP                  OA7E .
  /a)L&#xc3;T                  /vmr
/jiZ              4,7    -8r 7
                                -/6il
                                                          -St
                                                  //5i5 a,2  -Br                graf 3 are''
 
JOB NUMBER      N/          rO Calculations                                F I LE NUMBE R sUBJEGT:  ~4R7 //IA< re                    SHEET BY OF DA~TE fuge& g/ 9QsF np    Z4'          APP                    DATE
          /&mr                                                  JWLEP F~ /7 2  -5ZA -Bdr7          8(7  -28$ C3rg                                          '7r,l Fdic                      /DOr
                                                                          ~5',P.ER
                                                                                          ?Br2.
2',        Or 0 I
                                                                    -le
                                                                                          ~
4d
                                                                  -II& ~7 Wc 8'E2  -37                      -/B    A,9  -e/            z& -as4              . 4r3 muvt7Zo+S
                          's Q,B                  -aZ.1                      /7Pr 9
            -XZ.4                    /LS M                  ~
Xj/r 7-'
(~ .r~ 5 77-    2                r 69,8,                    +7'T i E
' 0 z
0
 
JOB NUMBER        /,o Calculations                                  FILE NUMBER
                        'UBJECT:
SHEET    K      OF BY            'ATE  /
PoA?c~  g7          9AM    ~ 'c5      APP             DATE IHuZ7        C~l                    IecEp              Aur
/3F6        HC'i/ 8F5              HE 7 -m,5 ZSA      BS(d -/o70 -4i 7 IWi4 -/6i/ -Wr3    sc}E3 -3g2  -JCO
                                                              //5i
-BF g ~ D F7                      40F3  -/8S j4P      77iS -zs>
i$ )C
                                                  /
                                          ~ 5"I


Calculations
Calculations
                                                                              ~f FILE NUMBER      s  t 0


==SUBJECT:==
==SUBJECT:==
~P FILE NUMBER SHEET~OF BY+CW DATE APP DATE 3 l I/F/K O z X O Cele Uiations
SHEET~/          OF APP               OATS
        .u
                                              ~
r 3's'K Ce'zs.    ~
s SF K          +g  E
                                                                  'j, K                    SSS'4 gg o 6'P+
                                        ~
OPIA i~s" Y oh''  ~
4's  /
WF Sl
                                ~ ) 3C~ - '            >C:C-'    ~  QgSF P FQ~ I fez
                              '6/    g l   ~
so 4s"      4i    x+ v
                                                          ~-c      ~~+
                                                                                                        ~  ~
X =    -4'dv                /XX F       S'g      =          - A/SF  ~
y I
F QS          ~j          =    ~2k'5
    -res
  -  -rOZZ rr>-"
      =- res Krrs < & 9g          r24"  s      ~rr'          w4 s-<~
7ro''O''
Pw
 
JOB NUMBER Calculations                                                              FILE NUMBER      6  I 0


==SUBJECT:==
==SUBJECT:==
FILE NUMBER Q~l SHEET~OF APP DATE z 0
SHEET~             OF APP               OATS r~        S  ~        g~~                /5    ~
'~E~Calculations
y~    +(g                              gr. -g'.g            y = - ) s's .y - 4 s        =  -ag. p'
                                  ~
PEP"  t          r              4'/CP J
                                                                                                ~ rti.~ <<>>..
V            7
(/4/        K  6 sC I
                                            'I  /O'P  s''//)        //. S            'SFFS
                    ~d5S          W  rSC      rr  ~  + AO>P' 4'po      w  '~y.0        ~    MA" Ping
                                                              -  5'C    r-Ss    c r7pa H                          fr 4
                                                                ~
K~                              - S'Z .7                rO +  ~ S'4's'        =  145 3' r'C I
                ~        <<'~          rg              V=,~s>            ~
    ..zn                          C  ~we c.~
ASIA                        ~p  pro
+Qp  (
        ~
jr/      ..
i
                                        ~C'~w Aging    o
                                                              /rr g'/          p /r 0        S  r z
VA                gag /f  SE'.~E  8  gus'
                                                                                          =    rrv'
            ~ ES~    E'Fg K    ~ Z r~1 FS ne        /.        r
 
JOB NUMBFR    /  O Calculations                                           FILE NUMBER


==SUBJECT:==
==SUBJECT:==
, IJy~rHW C7 oA/rl/o J-~)f8 A7 G4 SIT PP'EtZW FILE NUMBER SHEET OF BYE r OA~~/g DATE pr AC r]a+i P PierrlCrlOV
SHEET BY          DATE r"
~Srg<CrxOal D an dr/~ca r/2.6 mid-W.i-Hr Z W.j-a,d Wc 7-4dr3 g,5-asA i e-ig,/-Wee irk iS,S-/4P u.i-I/AZ-39rd-77,'5'82li
                            ;~   ~'f <<vj M~~
-87)]~0//Qr S NEO/D7.0 A7 Co<By/Al/045-/IB-5-+S'Z->Br 7-/&Br'B.7)-a7Z-l~~)O CC O Calcuiations suwscTI QocruFFT'o&
DATE
5reru A.Zs-~fr OP I-r~C~JOB NUMBER FILE NUMBER SHEET BY APP 619,o OF DATE DATE~Eh/A F OL(F 4 OFF g ATF<GO~~cg CJ g~PC (gA~~FFFDOF'F"/0)c-Pg,P Sq'cnxc y-<<B,G~~-iS'S,G'g 482F)+$7+-/99r 7"/9917'/r>e'er&+
/~p/Ag              (/&W + l~     &) <<(           IC'rE!+
5+rB>l/i~w~b-S'~/g-//,34-w,47-/.5<<48 7&-/7,/2 Ws/(sFrd sziFrrr Fo)/'r~44?M P r&#x17d;g/'(V<M~ld+3 aqua++
C ai  2 2
Calculations su+EcT: 4~grA w'c7ohl/age&dr Sos'p&cd'5 JOB NUMBER FILE NUMBER SHEET C BV l APP OF ATE OA7E./a)L&#xc3;T/vmr/jiZ 4,7-8r 7-/6il a,2-Br graf 3//5i5-St are''
lo2P r.
Calculations sUBJEGT:~4R7//IA<re fuge&g/9QsF np Z4'F I LE NUMB E R SHEET BY APP OF DA~TE DATE JOB NUMBER N/rO/&mr JWLEP F~Wc/7 2 8'E2-5ZA-37-Bdr7 8(7-28$C3rg Fdic-/B A,9-e/~5',P.ER/DOr 2', Or 0-le-II&~7 z&-as4'7r,l?Br2.~I 4d.4r3 muvt7Zo+S's Q,B-aZ.1/7Pr 9-XZ.4-77-2-/LS M (~.r~5 r 69,8,~Xj/r 7-'+7'T i E'0 z 0 Calculations
Ip g e ~ rEEE    rr't/       jr' <<<7l gr'(.
'UBJECT: PoA?c~g7 9AM~'c5 JOB NUMBER FILE NUMBER SHEET K BY APP/,o OF'ATE/DATE IHuZ7 C~l IecEp Aur/3F6 HC'i/8F5 HE 7 IWi4-m,5-/6i/ZSA-Wr3 BS(d sc}E3-/o70-4i 7-3g2-JCO-BF g~D F7 40F3-/8S j4P 77iS//5i-zs>i$)C/~5"I Calculations
rx<<AE    .w)mArD E  y,lrcP.'jvr~ ~W                        E'~
        /
(4 o'MW~/               i>p+ /4
 
h ~
Calculations                                     FILE NUM8ER    Q.- (c


==SUBJECT:==
==SUBJECT:==
~f FILE NUMBER s t 0 SHEET~/OF APP OATS.u~r 3's'K SF K o 6'P+~OPIA s+g E'j, K Ce'zs.~SSS'4 gg WF Sl i~s" Y~oh''~)3C~-'>C:C-'4's/~QgSF P FQ~I fez'6/g l~so 4s" 4i x+v~-c~~+X=-4'dv-/XX F S'g=-A/SF~y F~~I QS~j=~2k'5-res--rOZZ rr>-"=-res Krrs<&9g r24" s~rr'w4~s-<ro Pw 7''O''
SHEET           OF ev              OA~ k APP             DATE A. JE  ((      :Z~r                                   /de o CI'+0
                                                            /4 to
                                  + (~~~-D)        J      '.DgP
  ~%
        ~ 1 &o(                  ~ ogp
      /    C                        r-       y. Z,y                C         FK P
7c a~&
C
                          ~" M.( r.
                      ~
                    ~
Arf><
2IJJ 7- g. ~ y           j~~~rSy g      ~~ A r FS        /
0 CC 0
z


Calculations
                                                                        ,~F'    F.
Calculations                                       FILE NUMBER SUMECT:                                            SHEET~        OF APP          OATS
          ~Ca  AVE      g  > E5'7 E" y" z ~        y'&Ma I ~  JA.                                      4'm    JP4&~iT'C Igg r s4        Z Ted
~I ~~'j ~    ZPE'ii) s
                                                    >K    C APtg t gfs
                      ~
ggP  ~
                                            ~gg  S
                                                  - ~c J d
                                                              ~St 8'c tS
 
0 JOB NUMBER Calculations                                      FILE NUMBER


==SUBJECT:==
==SUBJECT:==
JOB NUMBER FILE NUMBER 6 I 0 SHEET~OF APP OATS-r~S~-g~~-/5~y~+(g gr.-g'.g y=-)s's.y-4 s=-ag.p'~rti.~<<>>..~PEP" t r 4'/CP J V 7 (/4/K 6 sC'I/O'P s''//)//.S I~d5S W rSC rr~+AO>P'4'po w'~y.0~MA" Ping'SFFS-5'C r-Ss c r7pa H fr~4 K~-S'Z.7 rO+~S'4's'=145 3'I r'C~<<'~rg V=,~s>~..zn C~we c.~ASIA+Qp (r/j..~C'~w~i Aging o z VA~ES~FS E'Fg~p pro/rr g'/p/r 0 gag/f SE'.~E 8 gus'K~Z r~1 ne/.r S r=rrv' Calculations
SHEET                 OF BY r                  DATE
                                                              ~ APP                   0 ATE rr
      ~ ~
rr                              rr,/rr M    / r~p~ r      r r/r f p /(Z,(e~/  rr /
(A ~
C4F/~ ~       Q7P      lj Qow7LR      C
                                            >0, lr HLC r  afUrr apF- ~47              raw.
T                            t./ i9 2<            2.  /44      ~  lC L
dZ.~T ~~I
                                        ~ zcZ5    X .~
o<.
98~,
 
                                                  ~ 8"  ~ 2
  ,'~~ Euic Fiow                L~ac. Gt~ 'STRAINER                                GROUP C -I 0 TYP                                        RG. No.
                                                            /0-O89                Sheet    of CAL BY a/z ~/~~
Local        S Hc~~      - Tz.css  as    '
go~'hem LoAbs              ~   (As pEi                    6/zA 7+3 sn/~r.''i OLl7 LET; VZZS C.Q              -/29      Lb~                    + +0l lb(           ~ /$
F8  +  +/0 /6/             - 7o3 Lb~                      +  O     Lby, -Ca+
fc  ~  /zZ /bg,-            sr~ >g                                48<, - ~              L.b~
z j4  t5'L>(A) w-Q I- IA7cl) w-/bg                          k p>oft) ~ -lQ    ~
                                                                                  -  lf]2)  /n'-LLg 0 A  + s~zbz) w        zb<,-z-i;z&4i~-+                     2/2 ((Z) lpl-lip      2 C(E)  ll Ac  t y4j(il) iN      Lbg - 7z-ci&z) ur                              w ~by    - 3ER.C/~) w-4@45'/o(>R)
                                            , C c+c iaI.C.f u
                                                                ~Y
                                                                        +
0LJ7+ @
l5.Gr2.5
 
SU~EOT  FULL FL>'W LU    E  OiL STRA IN ER.                      eaour TYP                                RS. No. ~~                      Sheet  of          Shta, CAL BY XL  T'RANKKtL OF LoAbh FR< M IDYLL'T g OUT LCT'HOKKLEh To TAvK sH<it Ho~zizs.: (sxgrcH P.ts )
ASSo&E eHvg oHE Ho4ht t Peg TAHE 5t cs NC
                                    ~
LeA1% PRO& ~C (HECT g OVT<6 r )JG4%LE'Sf
      "~ Fr.~ Fa.:
y=
l FR. I f Fig        I~~+i3
                                                                  =as/k No KRC.E S 4)A~i":
g]ace    ~=        w (m<h SK                              I v>>= w.~~~~. (;~+~Fj...)(z)bv.6LR 8
                                            = (i>>+i>>(')( s.l.~)    8 5 3/ Pg gp(      L5g'l Fa. leg Fa our
                                      'a
                                      /VORRLEg              2 Alp - (~<jpg      ~F1,p)(l)(li b l3)  .(>'Zq ~VOL)(~)(gJ,Q)P e                        8 2  07/~   7  /jll LSy a)Fiz.~ F6:
iZ F6/s,;
Fb,~ t6,".,            ~" ~    zo ~    L4-
                            /       ~ppp aceg
                    <)  p'=    (Fb;~ F'<;,')(x)(igloo)) Ce" ~~)(t)(cpu) 8 j
                              =  go/.5
                                        ~p'0 Qp    c.Cg jL ('Fb'- /b..,),g(qi0~) =
zqgc) zH. 6 g


==SUBJECT:==
p t  ULL FLoW LLJE,F    OIL    ~i TRAtHEk,                  eaom TYP                                  RG. No. lO-DBS              Shoat    of    Sh?s.
JOB NUMBFR FILE NUMBER SHEET BY/O DATE DATE/~p/A g;~~'f~<<vj M~@r" (/&W+l~&)<<A (IC'rE!+y C 2 ai 2 lo2P I p g e~rEEE rr't/r.gr'(.jr'<<<7l rx<<AE.w)mArD E y,lrcP.'jvr~
CAL BY                                                                    8/26/>+
~W E'~/(4 o'MW~/i>p+/4 h~
                              $ >f5,6 (Fs,- F h,,      ()    ( .z - v)(  )
Calculations
4 go4%v6g ag Fh,F'k,~:
                    ~
(F8        -Pk )
                                  ~Pc RRc.FS
                                                        ~  ~  'oy
                            =
Y          Py          - zg  ')(/i,sc>) (<<y      wry) (i)-(n.<cry 8
w -44' p/~+'Fb,> Fb +) (is)                (6iv vilo)(iz)
X pro Z4l 55                Z Fb,.";
                            = (F8,z        ~b  +,) ('i)(ir6~r) (7~> -~) (z) (vc6is3 3
: 2. 7f 4 i / lu s
                                                - L 4+
8
                          = (r-b,,~ t h,+,)(i~) (go~+.) (i~)
                                    )QRR Lc. 5              L
 
FUI-l- t l.ow      vila Ole Cl RAIIIER                                                        C - IO OROLP RG      N                                    Sheet i8  af    Shh.
mL  sV                                                                                            8/2 ~/w-c) [rooc FC.
    - Fc+'c+
F    -F            ,        KE  I-l23 hlo+KLC. L
            <)
poor      goALy,          cesE.        o>,      p. II3:
Fy
                    + =.
: p.  =  6  (+L-*)                            L=2iL              a.-
cC  i)(F          "    "<<cJ                                  zs s,g 6~5                      IL,6 aj c
(2LIc- p~            )  =    ~/~
Fc        )    I 2 ( I 3 it<i 3'$
i3 6>      IN - LQ I. c,- f c~                ~76-"      >
I'IS l            '
                                                                                        ~
                                                                                                ~6g
                              + go <a<6 $
(,vS)  (ii)(3occ'3')
                                              >gr 6iS IJ, 6ig c) ig(Fc,cr    ~  I'c.,j              '>e ~u L                                                                  (2cr 3
                                  ~ oo~~icS
                                      )g  6  yg                            I f o6  L S
                          =  l2< ~~in        ~'oor)          l"(IC3    '4)          29'J 3
          <<)~Cooj h)  I
                    +        F'cia  ""        adT          ~~70  t~~~
                                    /OR+ 5    (t Fy        CFc,-      F              I  )(>r'I (-'ll-3zl (i\(>I) 2Q 3                        '
IC 6                                      /0,6>5
              'c) Q z    -  i    (F2c Itl        co    lb>>( j~e 3II)-
 
l$
gU~E~ FULL I ~4& L~4'C QlL  R t k.Av<C mOuI C JO TYP                      RG. No.
GAL BY z
0 I
I z
0
                        +
O z              b) I'ly
                        +
I 0
 
CAMl.
gU~~  FUI.U FLDw LDEE      OIL    C
                                      ~TRAI<KN                                      c-P TYP                            RG. No.                                    Sheet ZO of      Shts.
CAL BY
    <2 Fa+  I4:    rsvp///ulcc'b 5            0    .'
              /'46~  /6...:
Fi8a& //>'/98K'  CPS'8    '3 7      P//g
                          =R        ('~)                      .''y L= 23.
                              =  6' (gL -~)
( $ 7?.W 1I Q PI@
                ~) fiam    /des', dgM:v, /.//>:
Ega.- gq.g =
pl<
                                                &>>'' &l                    3!"L cg
                                +bw +~~aug Zfia L    ~
7g  (..IH,        >>pJ      .7g    (iL  5  1l-l<)
LQ 3 Q.,(n
                                        /7,'6 Z p                  / 6'    t)
                    )  p:            - ~be-r <<(s          ~i-]i): NFa i~
5
 
FvW. MW Lv K6 ~tL. Sl l~hlA~K.
L~
gU@ECT                                                                      GROlP Re. No.                          Shoot    >/  af      Shta.
CAL BY F] Fl~!!!!! N C,      pgAHE!.A'TC          to 0, p
                  +    !!e,+Hc,(<Q(~el+<<<3 avf
            @5 szS. 7 b) A y =      (gFp      ( is  (!.t')  xt i~<!'(!r iver!).
3                                                    I'l7/,$      /8-C4~
8 Pp            c.
g      c y    (Q(yq)    ply)
                            + plo~kt,c.      5 M~,+AC,            t>(al.o eP~X) g (<~q                l  C  (x)
                          \. I K.  (l5.6>J5      p  (! iL )(>ggi~)                      aJ - l.4+
7.o  5 g,  7 8
                            ~c      -  Hc l.(l Ac '
                                                                            ).
                                  +
                              ~>!!    Rc ~      ii(<!!l-'B<) <q
: l. C <1 )            y ( I h)
                  /!! y = (i!(F~)(<! 6U~ ( L) (!'l,! ) (u'6'L!
                                              ~
8                        8
              ) pg          H,z      +    c~<        zt(991  3!31$
                                                                        = Ob>E'-~4'
 
Qe FLow 4'u      KE. Qlc        Cli2AIHKR.                                        C-I<
RG No 22 Sheet          of            Sos.
uu sv                                                                                          Si23 jXy 8c,, Wc+
: 22) 'F+=
8            :  ~t,~)                      a (.1~)
: 2. (. F~ ) C~r.ecr)              cg3.si )(iroc3')
g c)  p)(          rVc          +COol-        i3.(X3OF  3CO)
                                                                                '= Jggp X
0
                                        &#xb9; Plo+    W  (C$
6J CoNPCLAT<oN OF              I  RAHC feR'Peg          /Mal.e        LCO*bC
                                                                                        'q Fv.')
Fy  =
Fg> + Fx<                  = ~F3.3+2.nx      =    6Y$  5        Lbg
                ~) Fy    -
Fy      +    p>      =
                                                        ~~ ~~py        =    all    Lbg X              Fy,'
0        zq
                                                  +        '+
O                                I '5) <      I  ~    ~ F Yy - 2(LAPGJ f'4'fl 4    >        -    0 "rcl z
Fyi +        Fy< "FYoi
                                                                =
                                                                    &33  + 2.el+  i~i 8      "-  'is 6:S 0
          ~F-=            .          '.
f ~ "t      F~ + F+>- fogy 3'/pv 3K',g                        "-
By/,g Q~
: 6)  F4 =      FZ    + I'+++ FK> =              '663,3  0  /332  3P 5    %.=    2'52VJ+.'I
          ~'l    x:
                    <<q  Ax  =
P1x+ Nx~              =  62ov e sszcx = @733'j                  w-t5<
6)8x: iitp          +    <x<      =
l2is+v63's.        -" 8866 Q jiff;
                      @  Ay=      py> + p7y2            +/ye      =
l6ol p+il9yvi27ls=seUio.c6>
s)
Ny  =
Ny, + Ny~~ayz                =  no~.6+Shl~zosv',7 =/wf).3 63  ~~:
0+ Pa,                                                t s22. = 23                            26 2
a)      =          ~ I'1a      <isa~ - col.2 +iso3                            6 3 m 2                                              e iilfh/ +    /fan  t g<        =  aoxV,2% /363 +          S'3S2'78/;2              IO
 
l CK ~ IA                                                      ~ ~
RANEE'.
FULL FLoW LU5E QlL                    S1 OkOVF TYP RL5 RG. Na              Sheet M  of    Shh, gy                                                                8    gt/7P Hj Dlo<'o&ENTAYloN OP TRANLF'EgpED goK+lc LaAgg '
gi-      (
F y, = +6%5,      g  Lb<, - Kll LI+
FY=      +>>&.S L4q, - <<-~.e+
Fh=+ 8'll.S L4~ '~- lying,g              LIl iH) 4 Ll)Bi/ IH        c'4g ) 8 BC6 w-LL<      .
p HY      + %(41  I tH  LQ  j  IYl893nr 5,'~ X~
AK +      2s sag'3  lN  L4y~ "s 78/,Q  N.t.g~      I o
I
 
II *
-',"U~ I.ui-    r"      Luis; Q)~ =pi(p,i~i<<                              oooo      C RG. No                          Sheet M  of    Shts.
CAL BY                                                                            82m      O TAH V. 5 HCI < IH  )Q6    iE < 1 Y J    I >RikaH TAa aEl<KlC.                Bt HbiNQ        ~pi2C(t c7 t
                    =  I-o~4r n orNHC 5T'rc c'A d~d 5 C/J  ~/p      g.Np+g,    ( Rcvhirlgg r~ Pc    /r pc/~IWc.
AT l3  -2          P        ]C  -rl.dLJ      =  3A',+ iu 3 0          zz.
( P,Sg
(~.<)
                            "/p)(l'L)            g(  I>S QJ(~)(gg-y/,p) g~~  (>(, g)
                      =+is4.      I
                                        '"'/  >
 
il
",~~ uii )ioW I                        LueE        Qi    STggiHZP No      Io -O    0S RG                                    Sheet                    of  Shta.
CAL BY      L                                                                                    a ~s/~
3 K GlcMH Fi'6< Q QH blH ro CpiEr i ic 6 t) v r 7~ Jl/o y~( g gQA ii6
              'lT t~      f ~v 8      LQ  SAT QE FcLLumtHQ l oAb~ Cog't~< lg vga MW Y LANK c4~5 R VA TtV C $ 6 HQlfFQ Lgg Qg po ~g l-CH        P.>3 )
                                                                                                    ++gal.,''SIi.e Rg    H>    =    l>,6'(FV) i My
                          =    la,g ('l i Hi6$ + +Si 6              .-  ~i +88,  6 iH -L) g P$    py    =        i;r(ry) (~)('Fp)+                      H)
                        =    n.S(~ii') <<(e)(2~-LS.S') + iqiZS,>)                      >>oiler,iH--le I/                                        i' l.
bt V~o>(o Rc cr
                    +
Sri>ess MPob g
9  Al
                                          ~LuE
                                              =
Pg H.
To Llo&#xc3; 4uo~.7 -+'ll7o.
gogz<v 6  +  87ol.l.,I 5  64/
Leppy
                                                                                      //H
                                                                                                  '26op7 I)  a      =          ~g              YX~'f 7                            g,~
AREA                /<(g,    gg, L  y g-                  /u F~
                                            - (io'- iS.Pl-)
F}
CooihiHeh          6tH eH EiL            STso    sr@ 6 !
O    =      ~+~ +        + +-cr l +os'+c        0        +
I dye ~
tie.i+f8,6+ u>5,            3 S    <i~v, C+ 7S,q      =
                                                                                            ~S  eo,~                  jw.
                      ~s a
l
                                      +~~ ~
                                                  ~+~
P        5 1(  l, I +  Fc,~+      li'70,5 + w1        (
                                                                              -  J1oG  ~ l Thai Q
                                              +    HL46,7              /iH~
 
t us.s-  fMsss Luge Ola STRA(HC 6 RG. N
  , CAL BY NSIH Q    WRC QOl L.6 T'Ihl              I>1,      7HC  I-DC 6E    PRI AHP l    5'l PE'Sr ~S THE  ~A~~ SHEI.~, OVC F                      ~  VERY CoI4EERVd H~'%+I-6 ~DO f oN P.2.3 *g.E SHOm 8                    >IVY'R.AI4SFKRL64 OA Qht'h 'SHEE, T,      P.L'7> F POD PQIHT Oug,P, X5, SIHCE:Pt< 5 H6AR IH'r6HSI t'r i f <ma((, gapa@.TIDE                                                    2. F'ak 7He CoebIH6 l-R.e~S IOTGH(Ir r uH beer-8 S~F7, P. ~7, LVI<i 'QE    ll5 6 0, z                                                                                                                      Dc.
0                                                                          n7't,7 I
                                  "%IS~ 3 iIX84.7 ltz80,p                                                              &29,7
                          -u n.8  ?.i            t'ss7,2.      t'337,l. -3i7/.I    -3>>i I    7s-34,i '7$ 36,2 7l(I'Nsgi
    ~), =
Sy($)+a~        78<9./                /ohio 9 los 0,      Q  -9o) tl / ->oJ O',I 2 ~ ~1              4  R 2.'19~ 7 m.=      5                    -~01,/          .il KP9',7    p2I4'      lo897, loZ37,I >f96,X 0
I 0
z
    ~IJ H        5AFET'r F8ct"u                  r2          f. S.  -"
9oaov P5/            <ftA 8 "4'2 A~- ~
                                      $ (7oOD Z,64 0                          ~e      il  2t Y, 7
 
i LILI          7'I asm                LaaP(.        UII              b 7 fdlSIIILfc H2g a a~by
                                                            -XTabto 5-Computation                        Shoat for Local Strossos in Cylindrical Shells                                          Cb    g - //e,tro L=      2  )77.S                    C" c.b)                                                                                                                                                Q Tg.-        )(x&t'o, P              SQ c      =  /s.cis I)
(P.                                                                                                                                                              g.f'g te AS ~ li04 I ooo Radial loof,
                                        ~                                                              2. Geoee ~ Iris Poionerera                                'c L/2 Mr ot) w   =
Circ, Itaieant ~                          1>>.C 1;~ lb.                                                                                            Ou IIL I.".lan~ ~ lb                                                                                                                        ROUND Loilp Honiont a ~
                      'T ~ talon Houont,              si e Vc        ~lb st/+lan          Ib>>                                    (0.4)$ )~ 0 Rin e3                          OL Au                  Bu ATTACHMENT Shoot Load, Sheer Loode                    VL      T~VIb 5II~ I ~ ConceniI ~ Iion due I ~
                                                                                                              ~ ) Ieenbiano Ised, Kn I/
2I Oueu Hrr                                                                                                                  ~r. 0 I IS)1                                        b) bondtnp leod, Kb Vessel Ihicl I ~ aa,                                                                                                                                      uCL            X/
Atteclvaent rudiva,            r                                                    'HOT EI Ent ~ I oil 4tco valves in
                                                                                                            ~ ccoidence arith ~ ipn convention Yo ~ aot Iediv ~ ~                                                                                                                        CYLINDRICAL SHELL F~                Rood cvrvsa                    Course ~ ebsolvt ~ valves ~ f                          STRE$ 5ES      if lead  a ~ OSSOIII ~ thor shove, teeerse  ~ ipns shove Flp                        lor                      ~ II~ I ~ ~ Iid enter I ~ @ii) I ~                    Av        AL            Bu        BL        Cu        CL        Dv        OL His Sc        d/Rie                                                                                                                  7      89 '/ In'/I                                  y Fa Kb                ~
  ,o L5            IC 2A Hc/ Rut/i                                                                                                                                    0 /7$ C) /'7it 0          /7f 0
                                ~ I IS
  .I)/ g                    sar/ Ruff Ag            2~
HIS                                                                                                                      7)S'7
                              ~HL/ N~>/7                                                                                77                    77SS 14    ~r        Hier
, CIOBQ          'I ~  I    HL/a        ll Add ~ Itehiotseur 4I aueueonoo                                                                                                                                              +'s
              ~ IIS ~ Ilsaaes, ~ Ics P 4 I 5> X>+Tfa                                                                                    sq 1 2.'l                      /oS 3.'t          cC H~
lr I I' Hc/Rural
                                                                                                                                    /69I'0/69 Hs 2C        r I                                                                                                            +
    ,Ol Ne dA        Itc/Rutll                                                                                                                                5 Hs 2A da Na                                  He      \        HL HL/RntP                            HV~tg/            R    I/)T Ha 2O    or I    IaL/ Reel)
Add ~ Iceluoiaollr
              ~ I K ateeaaia,na 4I ouu
                                          ~
vien (i      =  <>is')+L Ht 6fs        6fs3        1.7S      L7r        7  S'l>>                S6 Sheer stress duo te lee ~ Iuu Ils                            IIS ~          r ~ Si          2d It0 T
                                                                                                                                                                                                    +
5heor arrest      40                                                              V I ~ leod. Yc                                                r aaS 5heor steer ~ duo                                                                  VL to leod, VL                                                                            Y Add Altearolcatlr fer eurenenen
                ~ I sacer ~ iieaaea, r                                                                                    0          0            o          0        0          0        0 COII~ IHED 5TRE55 IHTEHSITTI $
I)  when    ny      ~, tr                              it                    IIOFI  Cr t I  a        ~    lna'I hero lthe sites 2l trhear            'O          5      4iseei ol      $$  ~ Ie er      IISI    ~
t            )
I    ~
Sl    Wh      d~an                                                                                                                                                                    I hoes uafko Htaa              5      t I'isis      es)'        ~ rr
                                                                                                                                                                                                            ~,
                                                                                                                                                                                                                ~  I l0                                                                                                  ,Iifrrapra irt >bohr IIR
 
Qd~
I IUn                                                                                                                            ',(,    '"
F. F. L. 0.
                                                                                                                                                                                    ~
                        ?
JDC, strainer'C,ODf!,!i.!,
I                  KD
                        ?
f\
14  ~  p    3 ~ 42r(p      G    ~            G        J/    1  ~ ((    1 ~
(.'.
~
(
                        ~
                            / ~ eV p ("(L',: (T,
                              ~ 1 V'", 'lL.:
* g
                                                                                                                                                                            ~ (
p              4>o 5/ 27uu '2g    ~                       $ 41v3 o            >y 1 17 3'i,    !7S ~ Vg
( ~
P    Jorp('                                                                                       (
I ~ (/r'    025  g  lo 3((',                        ~  ~  O.C4'p    >2 o 35./
F:;C,F / p F 'k A/ F 2 r'1 p i~ 4 D p F 2 ('/
3 3<
                                          ~        ~ Ql, "~ 2; '025                                    g    1  ~ 35/ .014 I      ~
                                                          "    LAX=""':.:.
537                                                        1698 o
J
      ~
          ..        'iCn                                    .'C.",=                                (
                                                                                                      "        1102            ( ~ ~
        ~
i7SO                                                          SG54
              'I                              "17 lu          D":!= ~; ..                                    3.51 q o  ~                7755          -.r.P v                                          4if55
            ~:."
l.r
                    ~  rFr P=
                        ~
F~X=                        '130 11630
                                                                                                                                        ~ I r                                                                                                                    ~ ~
I gg//m Ni~Y'i~i      ~/('((//(
                                                                                                                            ~~4      '('d  j'. gzz>: rP4z vu~p~;< -.-..;
gczupg 8/'./Wy +~jvzcj~j'.,P/"-:".
                                                                                                                                                                                  'I
                                                                                                                                                    ~ O,',  '.Pq ~ 'I    ~ ~
                                                                                                                                                        "~                      I
 
Ot 4>                                                                                                                      ~ AAT N(L                              VAICAW              tATT. NO
                                                                                                                              <<~/                                z.y c        xc        DiZ3 iy, d/A'A'///.
St.'.  "45          COP                    A/
4 g5A'$
                                                                                                                      ~ah//              <  WliVFg Pfd'dPAcwb
                                                                                                        ~ "alp'vP                      s4L d~ $gAAi+HA'gdPM VP jg/$j/h/&
                                                    /.F8-
                                                                                                        ~ i'd&    /0~~~+f /HA-XZg-Pdldd SuZ/
                                                                                                                                ~.a <Crx~ag SPW/h/+g
                                                /5'/5g.x5 4                                                      /-M IWEPg. 486 /O.P8$
t                          ~ ~
                                        /Z5
                                                                                                          ~        W==.k~/. F4uiAffbkj'~g                        fgK FEF7 Tl
      ~
kfJ$7 8f- A@/ddt >'c.v'= 6I oF Pp'z$ fwd- LEE'S 7d jH''g l                                                                                                              /CCoyyaORPa g~Z MzrV,"'7/4 the/aiA                            ppP ig FFS Pafs jj/d/ 8'/jl~g          R/7ERlh'CT. SQA&#xc3;lhFR I
I    ~
                                                                                                          ~        ti~u;i5  i dddE.; A$///E--SEC foal SO  5 4/A'C,'.:                                                                  ~&        M)ygz>C A/$g/4&            i~<'/35Cg/h/6- Oh/
t'A'Cc&
ACE Ep/$j/h+
800 8-8  j'/arV s~ir-:r~~                                                         VNIXSS DIN(ANISE SttC. ID(CA, CEO<<CIA(0 STVSOES DNICNSIONS ~ NNAI\I        1    VSAII TI ~ I IIEA I IlACC DCC t tlACC DCC (Cal IS>Sf al at
                                                                                                                                                                        ~ IlAihlllI S I NAICN 1 C $ S CI AOVNotI($$
S t(ACC DCC ANCECS TIISCADL VN D(attl IAI~
ra(o
                                                                                                                                                                    $ (C II tAAAllllllV tf      1 t(N OI CVEAA ANCLIAAITT ms /coypu..                                    Ssipgic          Sf"Pf tllltftaSA le AAA
                                                                                                                                      ~ ACAA CONN(AS  at ~ Er IIAC.
Aoh( VT I AOC tollI ION DON((NI1Iclff 1ENOYt SVAAS                          STVNII1I slvNAN Ioo<<n.vah      t CS(ttfl                              Sf//>JMEA /OVil            i& pOOIF: p
                                                                ~ I tOIIION ~                                                                  WO ~ TIIISC501  Cotto ~ ATIOII II INC(ON (ANION                                                              CCVtttftnt    ~ CACIAC  DIT. SVf f1(0, A. 5,
                                                        <<Ohltlal IOCO<<ONII                                                        Ohh g                        Attn, g g(  CW~L                                    l$
                                                                                                                                  'N "-"-"-VM NOA MNO Oh  ~~ AA\
                                                            ~ Ihlln I ~ IAII ~                <<Ohl INOI( h 1  ~
NOAINV CION Ol <<CAVO J              cy ~          I            >I              I              I
 
Calculations SUBJECT-'/ 04KB/h(<-'C"c/4 2 u8<
                      ~o'MMAK C~u Y'OB    ~rp~wEp NUMBER FILE NUMBER SHEET BY APP 0
C -/0 OF DA~
DATE Cr  F                            F5    / 8)                P //
FE      /- Z              Pid
                                                                    '4 F
('w                                wein        . r c'(4    T'c        F Acct  Fc.FAF+cccccf C
r (4
F
                .TK4' ~l        ; cr cc          I6      Cd~~y        FA    +c,cAA~    1o Ei A,<~    .OEEE  WS/    rn    l<.r&PPd~                  CHAFE    PF  5K PLATO.      SW I            r /  ,'7c cr.'-~EEOC Fr>
r<      /~7'~            ~E/        ~ 4&l
                                                        ~~gf 4(r r/                              g IM 8/EE                  g,g4 3 rrt      Cr                                                                A dcS (F
Qr O
z
 
                                                                **12 CHP 5021.          CCD. 019 ATTACHMENT NO. 1 ANCHOR INSPECTION DATA SHEET CION'RO. Qiagai L~OL: Qc, Pi-,
Unxt N                  Bldg.                      Location
                /8-  J9 Installation  dwg.. /  Rev.          Equipment No.
Anchora e Arran ement Sketch
                                  ~ g                    I i V~'(%e) 0-6"
                                                        ~
                                  ~                    ~ ~
g
                                                        ~ ~
                                  ~ g
                                                        ~ ~
g ~
I ~
                                  ~ I                  ~ ~
                                  ~ g 5 g  Type Qol %5 Cfyp)
                                      )                I sc&  L Drawn by:                                                Date:
(',i''L Verified by:                                            Date:          '2--') -/2 Qual. /Cert. Inspector Reviewed 'by:
onstructz.on Anchor Review Engineer Date:          l Page 1 h~
of    3
 
                                                      **12 CHP 5021-CCD-019 ATTACHMENT NO.          1 C OR  INSPECTION DATA SHEET Give  LMM'ic      /i i Unzt                      Bldg.                  Location
        /2- 3zae                                - Ql -/13-A82 Installation  dwg. /  Rev.          Equipment No.
Anchora e Arran ement Sketch
                                  - Q/z Drawn by:                                              Date:          5 Verified by:                                          Date:    r3  ~A+ Q~"p )
Qu  ./Ce t. Inspector Reviewed by:                                          Date:      G  lc 5'<
nstructxon Anchor Review Engineer Page 1    of  3 Revision      1
 
                                                                      ~  ~  ~
                                        ~ ~ a  i  e 0 ~      ~ II
                                                        ~ ~ ~            ~
r
                                            ~  ~
o ~    RSR%RRKi%WW&W                                        .
a a      o    o mRSRIN WALLS 0    ~
wwweaarr m55555LSRL s ~
RSmmmRHE%
RRHHRRHHEL mRSmmELSL lIRSHRRELLL
  ~ II II MW&M MWW 0
s1 ~                        I ~
                                                                  ~
hl
                            'rr ~
                                                  ~JUL i sir    ~~
 
                                                                      *+12 CHP  5021.CCD.019 ATTACHMENT NO. 1 ANCHOR INSPECTION DATA SHEET ipment No.:      l-6 t-      II3-8                                    Dwg  No.:    l&3c&#xc3;V-//
edded  Steel  Dwg. No.:              ~lb PHYSICAL CHARACTERISTICS Held ID                                                                        Held T      e Codes T  e 1 =  Fillet Size                                                                          2 =
3'lL Plug/Slot Len  h                                                                          = Groove 3
Cracks          Yes    Yes        Yes      Yes    Yes    Yes          Yes Lack  of Penetration Yes c3g9 CRh Yes QtV HZP Yes    Yes No Yes No
                                                              'esNo Yes No No Yes No Porosity        Yes  Yes        Yes        es  Yes    Yes    Yes    Yes No    No    No 5~7'PGR<      QQac.~ -    evhu s Qg~ggg        (gal.kl0%bb 0
0 Ecpxipment hase    flexible:        Cl  Yes    8 No ons  ruc  won    e Date:      cP-Reviewed by:                                                                    Date:
ons ruc ron              c or  evzew    ngxneer V  'ed    by:
                      . er
                            ~/'a
                                  . npsec or Date:      ~'~  ~ 'i Page  3 of  3 Revision    1
 
                                                                **12 CHP 5021  CCD    019 ATTACHMENT NO ~      1 ANCHOR INSPECTION DATA SHEET ipment No.:      - GT- i(3- 6 mbedded Steel Dwg. No.:
PHYSICAL CHARACTERISTICS Weld ID                                                                  Weld T e Codes T  e Size 1 =  Fillet 2 = Plug/Slot Len                                                                          = Groove 3
Cracks        Yes  ~Ys    Yes    Yes  Yes      Yes    Yes    Yes No      No    No Lack of      Yes          Yes    Yes  @Ys      Yes    Yes    Yes Penetration    0            0                    No      No    No Porosity      Yes 0
Yes      es    Yes  Yes      Yes    Yes    Yes 65      No      No    No SQPPoR 7    QRhc.k. -      E'YFh~s Qg~ggg        $ g>c.atoll ~
0' fP)
                                ~ I a                  O Ecpxipment base flexible:    0 Yes      8 No ons    ruc son    re Date:
Reviewed by:                                                                Date:
ons ruc son        c  or evxew ngxneer V  'fied  by:
er Date:    0 35 9" ua ;        . npsec or Page  3 of  3 Revision    1


==SUBJECT:==
                                                                **12 CHP 502 1 . CCD. 0 19 ATTACHMENT NO. 1 ANCHOR INSPECTION DATA SHEET quipment No.:        /-     -    - Q3.                            Dwg  No.:    IB-8 "zV-il Embedded  Steel  Dwg. No.:          A PHYSICAL CHARACTERXSTXCS Weld ID                                                                  Weld T        e Codes T  e Size 1  =  Fillet 2  =  Plug/Slot:
FILE NUM8ER SHEET ev APP Q.-(c OF OA~k DATE A.JE ((:Z~r/de o CI'+0/4 to+(~~~-D)J'.DgP~%~1&o(~ogp/C 7c a~&r-y.Z,y C C FK P~" M.(r.~~2IJJ 7-g.~y r FS Arf><j~~~rSy g~~A/0 CC 0 z Calculations SUMECT:,~F'F.FILE NUMBER SHEET~OF APP OATS E" y"~Ca AVE g>E5'7 I~JA.z~y'&Ma 4'm JP4&~iT'C r s4~I~~'j~ZPE'ii)Igg Z Ted>K s C t~gfs APtg S ggP~~gg-~c J d~St 8'c tS 0
Len  h                                                                    = Groove 3
Calculations
Cracks        Yes    Yes      Yes    Yes  Yes    Yes  Yes
                                                          'Lto Yes No            No Lack  of      Yes    Yes      Yes    Yes  Yes    Yes  Yes    Yes Penetration                                        No    No      No Porosity      Yes    Y  s    Yes    Yes  Yes    Yes  Yes    Yes No    No      No 50PPoR 7     QPhck c-    EYRi~s
                                            +KCT Qg~gg+        (<xc,Kf4%'bb Ecpxiyment hase flexible:      CI  Yes    8 No ons ruc won    re Reviewed by:                                                              Date:
ons ruc ron          c or evxew ngzneer ified  by:  ua . e    . npsec or Date: ~ r      5 y.'age 3  of  3 Revision    1


==SUBJECT:==
'I 4
JOB NUMBER FILE NUMBER SHEET BY r~APP OF DATE 0 ATE~~rr rr rr,/rr M/r~p~r r r/r f p/(Z,(e~/rr/(A~C4F/~~-Q7P lj Qow7LR C>0, lr HLC r afUrr apF-~47 raw.T 2<L t./i9 2./44~lC~zcZ5 X.~dZ.~T~~I o<.98~,
                                                                ~~j.~ (  riP 4021 CCD 019 ATTACHMENT NO- 1 ipment No.:
mbedded  Steel I/
Dwg. No.:
ANCHOR INSPECTION DATA SHEET g
g    .:  ~g PHYSICAL CHARACTERISTICS Weld ID                                                                      Weld T e Codes T  e 1 = Fillet Size 2 = Plug/Slot Len  h                                                                        = Groove 3
Cracks        Yes    Yes    Yes    Yes  Yes    Yes    Yes    Yes QRD            0            No    No      No Lack  of      Yes    Yes    Yes    Yes  Yes    Yes    Yes      Yes Penetration          cKRP            0      0    No      No      No Porosity      Yes    Yes    Yes    Yes  Yes    Yes    Yes    Yes Cgg)    0            o    No    No      No 507'PoQ~   QQ&ck -       EYRg  5,
                                  ~ I O                                (Hi(.k8%&:
BS.RC.kC 7 Equipment base    flexible:    0 Yes    8 No ons  ruc 1on      re Date:
Reviewed by:                                                                    Date:
ons ruc 1on      c or    ev1ew    nglneer V  'fied  by:                                                                  Date:
ua . . npsec or Page    3  of  3 Revision      1


~8"~2 ,'~~Euic Fiow L~ac.Gt~'STRAINER TYP RG.No./0-O89 CAL BY C-I 0 GROUP Sheet of a/z~/~~z 0u Local S Hc~~-Tz.css as'go~'hem LoAbs~(As pEi sn/~r.''i VZZS C.Q-/29 Lb~F8++/0/6/-7o3 Lb~fc~/zZ/bg,-sr~>g j4 t5'L>(A)w-Q I-IA7cl)w-/bg A+s~zbz)w zb<,-z-i;z&4i~-+
Equipment No.:
Ac t y4j(il)iN Lbg-7z-ci&z)ur , C c+c iaI.C.f 6/zA 7+3 OLl7 LET;++0l lb(~/$+O Lby,-Ca+48<,-~L.b~k p>oft)~-lQ~-lf]2)/n'-LLg 2/2 ((Z)lpl-lip 2 C(E)ll 45'/o(>R)w~by-3ER.C/~)w-4@~Y+0LJ7+@l5.Gr2.5 TYP CAL BY RS.No.~~SU~EOT FULL FL>'W LU E OiL STRA IN ER.eaour Sheet of Shta, XL T'RANKKtL OF LoAbh FR<M IDYLL'T g OUT LCT'HOKKLEh To TAvK sH<it Ho~zizs.: (sxgrcH P.ts)ASSo&E eHvg oHE Ho4ht t Peg TAHE 5t cs NC LeA1%PRO&~C (HECT g OVT<6 r)JG4%LE'Sf
    ~
"~Fr.~Fa.: FR.I f Fig I~~+i3 y=~=as/k l No KRC.E S 4)A":~i g]ace~=w (m<h SK I v>>=w.~~~~.(;~+~Fj...)(z)bv.6LR 8=(i>>+i>>(')(s.l.~)8 5 3/Pg gp(L5g'l Fa.Fa leg our'a/VORRLEg 2 Alp-(~<jpg~F1,p)(l)(li b l3).(>'Zq~VOL)(~)(gJ,Q)P e 8 2 07/~7/jll LSy a)Fiz.~F6: iZ F6/s,;Fb,~t6,".,~"~zo~L4-/~ppp aceg<)p'=(Fb;~F'<;,')(x)(igloo))
              ~ ~   ( - G~-<6 - RSX Tightness established by "Snug      Fit" Tight:ness veri fied by:
Ce"~~)(t)(cpu) 8=go/.5 jL ('Fb'-/b..,),g(qi0~)
Qual. /Cert. Xnspector
j-=zqgc)zH.6 g~p'0 Qp c.Cg TYP CAL BY RG.No.lO-DBS p t ULL FLoW LLJE,F OIL~i TRAtHEk, eaom Shoat of Sh?s.8/26/>+$>f5,6--(Fs,-F h,, ()(.z-v)()4 go4%v6g ag Fh,F'k,~: (F8-Pk)~~'oy~~Pc RRc.FS Y=Py-zg')(/i,sc>)
                              )pP Comments:
(<<y wry)(i)-(n.<cry 8 w-44'p/~+'Fb,>
Fb+)(is)(6iv vilo)(iz)X pro Z4l 55 Z Fb,.";=(F8,z~b+,)('i)(ir 6~r)(7~>-~)(z)(vc6is3 3 s 8 2.7f 4 i/lu-L 4+=(r-b,,~t h,+,)(i~)(go~+.)(i~))QRR Lc.5 L mL sV FUI-l-t l.ow vila Ole Cl RAIIIER RG N C-IO OROLP i8 Sheet a f Shh.8/2~/w-c)[rooc FC.-Fc+'c+F-F, KE I-l23 hlo+KLC.L<)poor goALy, cesE.o>, p.II3: Fy=p.=6-(+L-*)L=2iL a.-+.cC i)(F""<<cJ 6~5 IL,6 aj c (2LIc-p~)=~/~Fc)I 2 (I 3 it<i 3'$i3 6>zs s,g IN-LQ c)L I.c,-f c~+go<a<6$>gr 6iS ig(Fc,cr~I'c.,j~76-">I'IS~l~6g'(,vS)(ii)(3occ'3')
IJ, 6ig'>e~u (2cr 3~oo~~icS)g 6 yg I f o6 L S=l2<~~in~'oor)l"(IC3'4)29'J 3<<)~Cooj h)I+F'cia"" adT~~70 t~~~/OR+(t 5 Fy CFc,-F I)(>r'I (-'ll-3zl (i\(>I)2Q 3 IC 6'/0,6>5'c)Q z-i (F2c Itl co lb>>(j~e 3II)-
l$gU~E~FULL I~4&L~4'C QlL R t k.Av<C TYP RG.No.GAL BY mOuI C JO z 0 I I z 0 O z I 0+b)I'ly+
C gU~~FUI.U FLDw LDEE OIL~TRAI<KN TYP RG.No.CAL BY CAMl.c-P Sheet of Shts.ZO<2 Fa+I4: rsvp///ulcc'b 5 0.'/'46~/6...: Fi8a&//>'/98K'CPS'8'3 7 P//g.''y=R=6'(gL-~)L=23.('~)($7?.W 1I Q PI@~)fiam/des', dgM:v,/.//>: Ega.-gq.g=pl<&>>''&l 3!" L cg)p: 5+bw+~~aug Zfia L~7g (..IH,>>pJ.7g (iL 5 1l-l<)3 Q.,(n/7,'6 Z p/6't)-~be-r<<(s~i-]i): NFa i~LQ-gU@ECT FvW.MW Lv K6~tL.Sl l~hlA~K.Re.No.CAL BY L~GROlP Shoot af Shta.>/F]Fl~!!!!!N C, pgAHE!.A'TC to 0,@5 p+!!e,+Hc,(<Q(~el+<<<3 avf szS.7 b)A y=(gFp (is (!.t')xt i~<!'(!r iver!).3-I'l7/,$/8-C4~8 Pp c.g c y (Q(yq)ply)+plo~kt,c.5 M~,+AC,t>(al.o eP~X)g (<~q l C (x)\.I K.(l5.6>J5 p (!iL)(>ggi~)7.o 5 g, 7 aJ-l.4+8~c-Hc l.(l Ac'+~>!!Rc~ii(<!!l-'B<)
<q l.C<1)y (I h)/!!y=(i!(F~)(<!
~6U~(L)(!'l,!)(u'6'L!).8 8)pg H,z+c~<zt(991 3!31$=Ob>E'-~4' Qe FLow 4'u KE.Qlc Cli2AIHKR.
RG No uu sv C-I<Sheet of Sos.22 Si23 jXy X 0 8c,, Wc+22)'F+=8 c)p)(:~t,~)a (.1~)2.(.F~)C~r.ecr)cg3.si)(iroc3')g rVc+COol-i3.(X3OF 3CO)&#xb9;Plo+W (C$'=Jggp X 0 O z 0 6J CoNPCLAT<oN OF I RAHC feR'Peg/Mal.e LCO*bC'q Fv.')Fy=Fg>+Fx<=~F3.3+2.nx
=6Y$5 Lbg~)Fy-Fy+p>=~~~~py=all Lbg zq Fy,'+'+I'5)<I~~F Yy-2(LAPGJ f'4'fl>4-0"rclFyi+Fy<"FYoi=&33+2.el+i~i 8"-'is 6:S~F-=.'.f~"t F~+F+>-fogy 3'/pv 3K',g"-By/,g Q~6)F4=FZ+I'+++FK>='663,3 0/332 3P 5%.=2'52VJ+.'I
~'l x:<<q Ax=P1x+Nx~=62ov e sszcx=@733'j w-t5<6)8x: iitp+<x<=l2is+v63's.
-" 8866 Q jiff;@Ay=py>+p7y2+/ye=l6ol p+il9yvi27ls=seUio.c6>
s)Ny=Ny,+Ny~~ayz=no~.6+Shl~zosv',7
=/wf).3 63~~: a)0+=Pa,~I'1a 2<isa~-col.2+iso3 t s22.=23 e 6 3 m 26g-iilfh+/fan t g<=aoxV,2%/363+S'3S2'78/;2 IO 26S-/
CK~IA l~~FULL FLoW LU5E QlL S1 RANEE'.TYP RG.Na gy RL5 OkOVF Sheet M of Shh, 8 gt/7P Hj Dlo<'o&ENTAY loN OP TRANLF'EgpED goK+lc LaAgg'gi-(F y,=+6%5, g Lb<,-Kll LI+FY=+>>&.S L4q,-<<-~.e+Fh=+8'll.S L4~'~-lying,g LIl iH)4 Ll)Bi/IH c'4g)8 BC6 w-LL<.p H Y+%(41 I tH LQ j IYl893nr 5,'~X~AK+2s sag'3 lN L4y~"s 78/,Q N.t.g~I o I II*
-',"U~I.ui-r" Luis;Q)~=pi(p,i~i<<
RG.No CAL BY oooo C Sheet M of Shts.82m O TAH V.5 H C I<I H)Q 6 iE<1 Y J I>RikaH TAa aEl<KlC.Bt HbiNQ~pi2C(t c7=I-o~4r n orNHC 5T'rc c'A d~d r~Pc/r pc/~IWc.t 5 C/J~/p g.Np+g, (Rcvhirlgg AT l3-2 P]C-rl.dLJ 3=3A',+iu 0 zz.(P,Sg (~.<)"/p)(l'L)g(I>S QJ(~)(gg-y/,p) g~~(>(, g)=+is4.I'"'/>
il",~~I uii)ioW LueE Qi STggiHZP RG No Io-O 0S CAL BY L Sheet of Shta.a~s/~3 K GlcMH Fi'6<Q QH blH ro CpiEr i ic 6 t)v r 7~Jl/o y~(g gQA ii6'lT t~f~v 8 LQ SAT QE FcLLumtHQ l oAb~Cog't~<lg vga MW Y LANK c4~5 R VA TtV C$6 HQlfFQ Lgg Qg po~g++gal.,''SIi.e l-CH P.>3)Rg H>=l>,6'(FV)i My=la,g ('l i Hi6$++Si 6.-~i+88, 6 iH-L)g P$py=i;r(ry)(~)('Fp)+H)=n.S(~ii')<<(e)(2~-LS.S')
+iqiZS,>)->>oiler,iH--le I/l.i'9 Al Llo&#xc3;6+87ol.l.,I'26op7 bt MPob 4uo~.7 cr--=-+'ll7o.5 64/<+g Pg H.//H V~o>(o Rc Sri>ess~LuE To gogz<v Leppy I)a=~g YX~'f 7 g,~/u AREA/<(g, gg, L y g-F~-(io'-iS.Pl-)F}CooihiHeh 6tH eH EiL STso sr@6!++l 0+O=~+~+-cr+os'+c I dye~tie.i+f8,6+
u>5, 3 S<i~v, C+7S,q=~S eo,~jw.~s l~P 5 a+~~~+~1(l, I+Fc,~+li'70,5+w1 (--J1oG~l+HL46,7/iH~Thai Q
, CAL BY t us.s-fMsss Luge Ola STRA(HC 6 RG.N NSIH Q WRC QOl L.6 T'Ihl I>1, 7HC I-DC 6E PRI AHP l 5'l PE'Sr~S THE~A~~SHEI.~, OVC F~VERY CoI4EERVd>IVY'R.AI4SFKRL64 H~'%+I-6~DO f oN P.2.3*g.E SHOm 8 OA Qht'h'SHEE, T, P.L'7>F POD PQIHT Oug,P, X5, SIHCE:Pt<5 H6AR IH'r6HSI t'r i f<ma((, gapa@.TIDE 2.F'ak 7He CoebIH6l-R.e~S IOTGH(Ir r uH beer-8 S~F7, P.~7, LVI<i'QE ll 5 6 0, z 0 I-u n.8~),=Sy($)+a~78<9./m.=5"%IS~3?.i 7l(I'Nsgi-~01,/iIX84.7 t'ss7,2./ohio 9.il KP9',7 ltz80,p n7't,7 t'337,l.-3i7/.I los 0, Q-9o)tl/p2I4'lo897,-3>>i I 7s-34,i->oJ O',I 2~~1 4 loZ37,I>f96,X Dc.&29,7'7$36,2 R 2.'19~7 0 I 0 z 0~IJ H 5AFET'r F8ct"u r2$(7oOD il 2t Y, 7~e f.S.-" 9oaov P5/<ftA 8"4'2 A~-~Z,64 i LILI 7'I asm LaaP(.UII b 7 fdlSIIILfc L=2)77.S C" Tg.-)(x&t'o, I)(P.te AS~li04 I ooo~Radial loof, Circ, Itaieant~Loilp Honiont a~'T~talon Houont, Shoot Load, Sheer Loode 1>>.C 1;~lb.IIL I.".lan~~lb si e st/+lan Ib>>Vc~lb VL T~VIb 2.Geoee~Iris Poionerera (0.4)$)-~0 e3 Rin'c L/2 Ou OL Au-XTabto 5-Computation Shoat for Local Strossos in Cylindrical Shells c.b)H2g a a~by Cb Q g-//e,tro P SQ c=/s.cis ot)w=g.f'g Mr ROUND ATTACHMENT Bu 2I Oueu Hrr Vessel Ihicl I~aa, Atteclvaent rudiva, Yo~aot Iediv~~I IS)1 r 5II~I~ConceniI~Iion due I~I/~)Ieenbiano Ised, Kn b)bondtnp leod, Kb~r.0'HOT EI Ent~I oil 4tco valves in~ccoidence arith~ipn convention uCL X/CYLINDRICAL SHELL ,o L5 F~Flp Sc IC Rood cvrvsa lor His d/Rie Course~ebsolvt~valves~f~II~I~~Iid enter I~@ii)I~Kb~Av AL Bu BL Cu CL Dv 7 89'/In'/I STRE$5ES if lead a~OSSOIII~thor shove, teeerse~ipns shove OL y Fa.I)/g Ag , CIOBQ 2A 2~14~r'I~I Hc/Rut/i~I IS sar/Ruff HIS~HL/N~>/7 Hier HL/a ll 77 77SS 7)S'7 0/7$C)/'7it 0/7f 0 3.'t cC H~lr I I'Add~Itehiotseur 4I aueueonoo~IIS~Ilsaaes,~Ics P 4 I 5>X>+Tfa/69I'0/69 sq 1 2.'l+'s/oS ,Ol 2C dA 2A da 2O or I Hs I r Ne Itc/Rutll Hs Hc/Rural Na HL/RntP Ha IaL/Reel)He\HL HV~tg/R I/)T+5 Ht IIS~r~Si 2d It T 0 Sheer stress duo te lee~Iuu Ils Add~Iceluoiaollr 4I ouu vien~I K ateeaaia,na
~(i=<>is')+L 6fs 6fs3 1.7S L7r 7 S'l>>S6+5heor arrest 40 I~leod.Yc 5heor steer~duo to leod, VL r aaS V VL Y Add Altearolcatlr fer eurenenen~I sacer~iieaaea, r COII~IHED 5TRE55 IHTEHSITTI
$I)when ny~, tr hero lthe sites t I a it~lna'I IIOFI Cr 0 0 o 0 0 0 0 2l trhear'O Sl Wh d~an hoes uafko Htaa 5 4iseei ol$$~Ie er t IISI~)5 t I'isis es)'~rr I~I~,~I l0 ,Iifrrapra irt>bohr IIR Qd~~(?JDC, I?~1 f\~/~eV p p (~P Jorp('F:;C,F IUn F.F.L.0.strainer'C,ODf!,!i.!, KD 14~p 3~42r(p G~G J/1~((1~("(L',: (T, V'",'lL.:*4>o 5/27uu~'2g$41v3 o>y 1 17 I~(/r'025 g lo 3((',~~O.C4'p>2 o 35.//p F'k A/F 2 r'1 p i~4 D p F 2 ('/3~3<~Ql,"~2;'025 g 1~35/3'i,!7S (.014~Vg I g',(,'"~(.'.~(I~J o~~..'iCn'I o~~r~:."~rF P=l.r r 537" LAX=""':.:.i7SO.'C.",=(""17 lu D":!=~;..7755-.r.P v'130 F~X=1698 1102 SG54 3.51 q 4if55 11630 (~~~I~~I~~4'('d j'.gczupg 8/'gg//m Ni~Y'i~i~/('((//(gzz>: rP4z vu~p~;<-.-..;./Wy+~jvzcj~j'.,P/"-:".
'I~O,','.Pq~'I~~"~I Ot 4>~AAT N(L VAICAW tATT.NO iy, d/A'A'///.
4 g5A'$Pfd'dPAcwb
<<~/St.'."45~ah//COP<WliVFg z.y c xc DiZ3 A/~t l the/aiA~~SO 5 4/A'C,'.:VP/Z5 jg/$j/h/&/.F8-/5'/5g.x5 4 ppP ig Tl I I~ms/coypu..Ep/$j/h+800 j'/arV 8-8 s~ir-:r~~~"alp'vP s4L d~$gAAi+HA'gdPM
~/0~~~+f/HA-XZg-Pdldd SuZ/i'd&~.a<Crx~ag SPW/h/+g/-M IWEPg.486/O.P8$~W==.k~/.F4uiAffbk j'~g fgK FEF7 kfJ$7 8f-A@/ddt>'c.v'=6I jH''g oF Pp'z$fwd-LEE'S 7d/CCoyyaORPa g~Z MzrV,"'7/4 FFS j 8'/jl~g R/7ERlh'CT.
SQA&#xc3;lhFR Pafs j/d/i~ti~u;i5 dddE.;A$///E--SEC foal~&A/$g/4&i~<'/35Cg/h/6-Oh/M)ygz>C ACE t'A'Cc&VNIXSS DIN(ANISE SttC.DNICNSIONS
~NNAI\I ID(CA, CEO<<CIA(0 STVSOES 1 VSAII TI~I IIEA~IlAihlll S I NAICN I 1 C$S CI AOVNotI($$II tAAAllllllV tf 1 t(N OI CVEAA ANCLIAAITT Aoh(VT I AOC toll I ION DON((NI1Iclff STVNII1I I IlACC DCC (Cal t tlACC DCC IS>Sf S t(ACC DCC D(attl ANCECS TIISCADL VN IAI~al at a(o r$(C tllltft aSA le AAA~ACAA CONN(AS at~Er IIAC.1ENOYt SVAAS Ssipgic Sf"Pf~I tOII ION~II INC(ON (ANION<<Ohltlal IOCO<<ONII~Ihlln I~IAII~NOAINV CION Ol<<CAVO slvNAN Ioo<<n.vah t CS(ttfl NOA MNO Oh~~AA\<<Ohl INOI(h 1~Sf//>JMEA/OVil i&pOOIF: p WO~TIIISC501 Cotto~ATIOII CCVtttf tnt~CACIAC DIT.SVf f1(0, A.5, Ohh g g(CW~L Attn, g l$'N"-"-"-VM J cy~I>I I I Calculations SUBJECT-'/
04KB/h(<-'C"c/4 2 u8<C~u~rp~wEp~o'MMAK Y'OB NUMBER FILE NUMBER SHEET 0 BY APP C-/0 OF DA~DATE Cr F F5/8)P//FE/-Z Pid ('w C F (4.TK4'~l A,<~.OEEE WS/rn F wein.r c'(4 T'c'4 F Acct Fc.FAF+cccccf r Ei;cr cc I 6 Cd~~y FA+c,cAA~1o l<.r&PPd~CHAFE PF 5K PLATO.SW I r/,'7c cr.'-~EEOC Fr>r</~7'~~E/~4&l~~gf 4(r r/8/EE g,g4 g IM 3 rrt Cr (F A dcS Qr O z
**12 CHP 5021.CCD.019 ATTACHMENT NO.1 Unxt N/8-J9 ANCHOR INSPECTION DATA SHEET Bldg.CION'RO.Qiagai L~OL: Qc, Pi-, Location Installation dwg../Rev.Anchora e Arran ement Sketch Equipment No.0-6"~g~g~g g~~I~I~~~~~~I~~~i V~'(%e)~g 5 g Type>Qol%5 Cfyp))I sc&L (',i''LDrawn by: Verified by: Reviewed'by: Date: Date: '2--')-/2 Qual./Cert.onstructz.on Page 1 of 3 h~Inspector Date: l Anchor Review Engineer


**12 CHP 5021-CCD-019 ATTACHMENT NO.1 C OR INSPECTION DATA SHEET Give LMM'ic/i i Unzt/2-3zae Bldg.Location-Ql-/13-A82 Installation dwg./Rev.Anchora e Arran ement Sketch Equipment No.-Q/z Drawn by: Verified by: Reviewed by: Qu./Ce t.Inspector nstructxon Anchor Review Date: Date: Date: Engineer 5 r3~A+Q~"p)G lc 5'<Page 1 of 3 Revision 1
Equip ID: 1-HE-,13      Train: 12  Equip Class: 21 Drawing No.: 1-5129A 1-5135
~~~0~~II~~a i e~~~~~~r o~0~s~RSR%RRKi%WW&W
  .ction: RI
.a a o o mRSRIN WALLS wwweaarr m55555LSRL RSmmmRHE%RRHHRRHHEL mRSmmELSL lIRSHRRELLL MW&M MWW~II II 0'rr~s~1~JUL i I~~hl sir~~
        ~
            ~
Sys tern:  CVCS Equip Desc:      EXCESS LETDOWN HEAT EXCHANGER Building:      CONTAINMENT    Room: REGENERATIVE HEAT EXCHANGER ROOM, AZ 295 Elev:    612    Sort: S,        Notes:
Normal State:          Desired State:    Power.Req'd:  N Support System Drawing:
Req'd Support Comp:
Safety Related Status: NUCLEAR      SR      Min/Opt: MIN Alias No:           Power Train: NA Comp  Served:    EXCESS LETDOWN HEAT EXCHANGER Mfr:   ATLAS INDUSTRIAL MANUFACTURING CO Model:
Elem. Drawing:
Wiring Drawing:
Power Source:
Walkdown: F      G Relay Eval  : N Comp  Type:    HEAT EXCHANGER XSO  Drawing:
Location:      ON THE CONTAXNMENT WALL  SIDE OF THE  RM


*+12 CHP 5021.CCD.019 ATTACHMENT NO.1 ANCHOR INSPECTION DATA SHEET ipment No.: l-6 t-II3-8 edded Steel Dwg.No.:~lb PHYSICAL CHARACTERISTICS Dwg No.: l&3c&#xc3;V-//Held ID T e Size Len h Cracks Lack of Penetration Porosity Yes Yes c3g9 Yes 3'lL Yes CRh Yes QtV Yes Yes Yes Yes HZP Yes es Yes Yes Yes Yes No Yes No Yes No'es No Yes No Yes No Yes No Yes No Yes No Held T e Codes 1=Fillet 2=Plug/Slot 3=Groove 5~7'PGR<QQac.~-evhu s Qg~ggg (gal.kl0%bb 0 0 Ecpxipment hase flexible: Cl Yes 8 No ons ruc won e Date: cP-Reviewed by: V'ed by: ons ruc ron c or evzew ngxneer~/'a.er.npsec or Date: Date:~'~~'i Page 3 of 3 Revision 1
DC Cook Unit 1 SCREENING EVALUATIONWORK SHEET (SEWS)                                   Status: Yes Sheet 1 of 1 ID:   1-HE-13   (Rev. 0)                           Class:   21 - Tanks and Heat Exchangers
**12 CHP 5021 CCD 019 ATTACHMENT NO~1 ANCHOR INSPECTION DATA SHEET ipment No.:-GT-i(3-6 mbedded Steel Dwg.No.: PHYSICAL CHARACTERISTICS Weld ID T e Size Len Cracks Lack of Penetration Yes~Ys Yes 0 Yes Yes 0 Yes Yes Yes@Ys Yes No Yes No Yes No Yes No Yes No Yes No Weld T e Codes 1=Fillet 2=Plug/Slot 3=Groove Porosity Yes 0 Yes es Yes Yes 65 Yes No Yes No Yes No SQPPoR 7 QRhc.k.-E'YFh~s Qg~ggg$g>c.atoll~fP)~I a 0'O Ecpxipment base flexible: 0 Yes 8 No ons ruc son re Date: Reviewed by: V'fied by: ons ruc son c or evxew ngxneer ua;er.npsec or Date: Date: 0 35 9" Page 3 of 3 Revision 1
**12 CHP 502 1.CCD.0 19 ATTACHMENT NO.1 ANCHOR INSPECTION DATA SHEET quipment No.:/---Q3.Embedded Steel Dwg.No.: A PHYSICAL CHARACTERXSTXCS Dwg No.: IB-8"zV-il Weld ID T e Size Len h Cracks Lack of Penetration Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes No Yes No Yes'Lto Yes No Yes No Yes No Weld T e Codes 1=Fillet 2=Plug/Slot:
3=Groove Porosity Yes Y s Yes Yes Yes Yes No Yes No Yes No 50PPoR 7 QPhck c-EYRi~s+KCT Qg~gg+(<xc,Kf4%'bb Ecpxiyment hase flexible: CI Yes 8 No ons ruc won re Reviewed by: ified by: ons ruc ron c or evxew ngzneer ua-.e.npsec or Date: Date:~r 5 y.'age 3 of 3 Revision 1
'I 4
~~j.~(riP 4021 CCD 019 ATTACHMENT NO-1 ANCHOR INSPECTION DATA SHEET ipment No.:-97-I/g mbedded Steel Dwg.No.: PHYSICAL CHARACTERISTICS g.:~g Weld ID T e Size Len h Cracks Lack of Penetration Porosity Yes Yes Yes Yes QRD Yes cKRP Yes Cgg)Yes Yes Yes 0 Yes 0 Yes 0 Yes Yes Yes 0 Yes o Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Weld T e Codes 1=Fillet 2=Plug/Slot 3=Groove 507'PoQ~QQ&ck-EYRg 5,~I O BS.RC.kC 7 (Hi(.k8%&:
Equipment base flexible: 0 Yes 8 No Date: ons ruc 1on re Reviewed by: V'fied by: ons ruc 1on c or ev1ew nglneer ua.e.npsec or Date: Date: Page 3 of 3 Revision 1 Equipment No.: (-G~-<6-RSX~~~Tightness established by"Snug Fit" Tight:ness veri f i ed by: Qual./Cert.Xnspector Comments:)pP Equip ID: 1-HE-,13 Train: 12 Drawing No.: 1-5129A 1-5135.ction: RI~~Equip Class: 21 Sys tern: CVCS Equip Desc: EXCESS LETDOWN HEAT EXCHANGER Building: CONTAINMENT Room: REGENERATIVE HEAT EXCHANGER ROOM, AZ 295 Elev: 612 Sort: S, Notes: Normal State: Desired State: Power.Req'd:
N Support System Drawing: Req'd Support Comp: Safety Related Status: NUCLEAR SR Min/Opt: MIN Alias No: Power Train: NA Comp Served: EXCESS LETDOWN HEAT EXCHANGER Mfr: ATLAS INDUSTRIAL MANUFACTURING CO Model: Elem.Drawing: Wiring Drawing: Power Source: Walkdown: F G Relay Eval: N Comp Type: HEAT EXCHANGER XSO Drawing: Location: ON THE CONTAXNMENT WALL SIDE OF THE RM DC Cook Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)Status: Yes Sheet 1 of 1 ID: 1-HE-13 (Rev.0)Class: 21-Tanks and Heat Exchangers


==
==
Description:==
Description:==
EXCESS LETDOWN HEAT EXCHANGER Building: CONTAINMENT                      Floor El.: 612.00                    Room, Row/Col: REGENERATIVE HEAT EXCHANGER RM, ON THE CONT WALLSIDE OF THE RM Manufacturer, Model, Etc.: ATLAS It!DUSTRIAL MANUFACTURINGCO BASIS: External analysis
: 1. The buckling capacity of the shell of a large, flat-bottom, vertical tank is equal to or greater          N/A than the demand.
: 2. The capacity of the anchor bolts and their embedments is equal to or greater than the                    Yes demand.
: 3. The capacity of connections between the anchor bolts and the tank shell is equal to or                    Yes greater than the demand.
: 4. Attached piping has adequate fiexibilityto accommodate the motion of a large, fiat-bottom,                Yes
  , vertical tank.
: 5. A ring-type foundation is not used to support a large, flat-bottom, vertical tank.
C~MMEE.'Q SRT: George G. Thomas (SS A) and Tom Huang (AEP), April 13, 1995.
l Ref: Unit'1 and 2 Anchor Bolt Schedule (Drwg.      &#xb9; 3073A-3 and 3073D), and Unit      1  8 2 Containment Building
                          &#xb9; Concrete Floor (Drwg. 1-2-3207-23)
Relatively small exchanger (1600 Ibs) on two saddles in extremely high rad area.
Could not inspect anchorage due to it being hidden from view with insulation. Removal of insulation was not performed because of ALARAconsiderations.
Anchorage includes four 3/4" diameter J-bolts, embedded at least 2 feet into piers. Due to large anchorage (four 3/4" bolts) and small exchanger, the anchorage is acceptable by SRT judgment, Evaluated by:                                                                            Date:
iz /~ /~s
01/16/92 PG. NO.539 SAFE SHUTDOuN EOUIPHENT  LIST (SSELMP)
FUHCTIOH:      ESN Equipment Class:      2'I      Train:      2 Eeiirment IO:        1-HE- IBE                                          Drawing Nunbert      1-5113  I-51C4 Svstem:    COHTAINHENT SPRAY Enufo
== Description:==
EAST CONTAINHENI'PRAY HEAT EXCHANGER Rui lriing:      AUX I L IARY            Room:    E CONTAINHENI'PRAY HEAT EXCKAHGER    ROOII  Elevation:    609 wnr~l state:                      Desired state:                  Power Required:    N            Sort:  u, Siaoorting System Drawing        Number:
Required Interconnections and Supporting Components:
fetv Related Status:          NUCLEAR SR                            Hin/Opt: HIN ADDITIONAL INFORMATION 4l ias Number:                                                          Power  Train:  NA Cnmcx  nent Served:          EAST COHTAINMENT SPRAY HEAT EXCHANGER wsnufacturer:        YUSA                                                Node l:
oanel:
EIem Drawing:        H/A                                                wiring Drawing:      N/A cower Source:      N/A ualtdown:      F Relay Only:    NO Comoonent    Type:        HE ISO  Drawings:
Detailed Locatian:


EXCESS LETDOWN HEAT EXCHANGER Building: CONTAINMENT Floor El.: 612.00 Room, Row/Col: REGENERATIVE HEAT EXCHANGER RM, ON THE CONT WALL SIDE OF THE RM Manufacturer, Model, Etc.: ATLAS It!DUSTRIAL MANUFACTURING CO BASIS: External analysis 1.The buckling capacity of the shell of a large, flat-bottom, vertical tank is equal to or greater than the demand.2.The capacity of the anchor bolts and their embedments is equal to or greater than the demand.3.The capacity of connections between the anchor bolts and the tank shell is equal to or greater than the demand.4.Attached piping has adequate fiexibility to accommodate the motion of a large, fiat-bottom, , vertical tank.5.A ring-type foundation is not used to support a large, flat-bottom, vertical tank.N/A Yes Yes Yes C~MMEE.'Q SRT: George G.Thomas (SS A)and Tom Huang (AEP), April 13, 1995.l Ref: Unit'1 and 2 Anchor Bolt Schedule (Drwg.&#xb9;3073A-3 and 3073D), and Unit 1 8 2 Containment Building Concrete Floor (Drwg.&#xb9;1-2-3207-23)
                            .DC COOK Unit 1                                       GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                   Status: Yes Sheet 1 of 2 ID: 1-HE-18E (Rev. 0)                             Class: 21 - Tanks and Heat Exchangers
Relatively small exchanger (1600 Ibs)on two saddles in extremely high rad area.Could not inspect anchorage due to it being hidden from view with insulation.
Removal of insulation was not performed because of ALARA considerations.
Anchorage includes four 3/4" diameter J-bolts, embedded at least 2 feet into piers.Due to large anchorage (four 3/4" bolts)and small exchanger, the anchorage is acceptable by SRT judgment, Evaluated by: Date: iz/~/~s 01/16/92 PG.NO.539 SAFE SHUTDOuN EOUIPHENT LIST (SSELMP)FUHCTIOH: ESN Equipment Class: 2'I Train: 2 Eeiirment IO: 1-HE-IBE Drawing Nunbert 1-5113 I-51C4 Svstem: COHTAINHENT SPRAY Enufo


== Description:==
== Description:==
EAST CONTAINMENTSPRAY HEAT EXCHANGER Building: AUXILIARY                        Floor El.: 609.00                    Room, Row/Col: E CONT SPRAY HEAT EXCHANGER RM, Manufacturer, Model, Etc.: YUBA (VERTICAL)
BASIS: External analysis
: 1. The buckling capacity of the shell of a large, flat-bottom, vertical tank is equal to or greater          N/A than the demand.
: 2. The capacity of the anchor bolts and their embedments is equal to or greater than the                    Yes demand.
: 3. The capacity of connections between the anchor bolts and the tank shell is equal to or                    Yes greater than the demand.
: 4. Attached piping has adequate flexibilityto accommodate the motion of a large, fiat-bottom,                Yes vertical tank.
: 5. A ring- pe foundation is not used to support a large, flat-bottom, vertical tank.                        N/A C LL      0        T?
~C)JJV~N$
SRT: Gary Thomas, Tom Huang and Kailash Mahajan on 11/3/93.
ery well engineered support structure.
There is a ring support at top of the exchanger bracketed to the wall in each of the 4 quadrants. This takes the overturning loads on the exchanger.
Bottom support (at about the 1/4 point of the exchanger, with the remainder of the exchanger hanging below) is a heavy duty ring with gussets at the bolt locations. These are bolted to a steel support structure that is obviously well engineered.
Qualification data (Yuba Heat Transfer Division Calculation 69-G-226) indicates an analysis to the design basis.
Based on the inspection and anchorage data collected the Heat Exchanger is adequate.
Evaluated by:                                                                            Date:
cQ                                                                            > /I g
                                                                                                    /8-    ~  -  fi
==Attachment:==
Pictures


EAST CONTAINHENI'PRAY HEAT EXCHANGER Rui lriing: AUX I L IARY Room: E CONTAINHENI'PRAY HEAT EXCKAHGER ROOII Elevation:
DC COOK Unit 1                           GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                        Status: Yes Sheet 2 of 2 ID: 1-HE-18E (Rev. 0)                     Class: 21 - Tanks and Heat Exchangers
609 wnr~l state: Desired state: Power Required: N Sort: u, Siaoorting System Drawing Number: Required Interconnections and Supporting Components:
fetv Related Status: NUCLEAR SR Hin/Opt: HIN ADDITIONAL INFORMATION 4l ias Number: Power Train: NA Cnmcx nent Served: EAST COHTAINMENT SPRAY HEAT EXCHANGER wsnufacturer:
YUSA Node l: oanel: EIem Drawing: H/A wiring Drawing: N/A cower Source: N/A ualtdown: F Relay Only: NO Comoonent Type: HE ISO Drawings: Detailed Locatian:
.DC COOK Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 1 of 2 ID: 1-HE-18E (Rev.0)Class: 21-Tanks and Heat Exchangers


==
==
Description:==
Description:==
EAST CONTAINMENTSPRAY HEAT EXCHANGER Building: AUXILIARY                Floor El.: 609.00              Room, Row/Col: E CONT SPRAY HEAT EXCHANGER RM, Manufacturer, Model, Etc.: YUBA (VERTICAl)
ELC3XKE>
BASE GUSSETED SUPPORT                                    TOP SUPPORT


EAST CONTAINMENT SPRAY HEAT EXCHANGER Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: E CONT SPRAY HEAT EXCHANGER RM, Manufacturer, Model, Etc.: YUBA (VERTICAL)
P. O. BOX 3158    ~  TULSA, OKLAHOMA74101  o  (918) 939.2201                  YUSA ItlOUSTA!SS, lNC.
BASIS: External analysis 1.The buckling capacity of the shell of a large, flat-bottom, vertical tank is equal to or greater than the demand.2.The capacity of the anchor bolts and their embedments is equal to or greater than the demand.3.The capacity of connections between the anchor bolts and the tank shell is equal to or greater than the demand.4.Attached piping has adequate flexibility to accommodate the motion of a large, fiat-bottom, vertical tank.5.A ring-pe foundation is not used to support a large, flat-bottom, vertical tank.N/A Yes Yes Yes N/A C LL 0 T?~C)JJV~N$SRT: Gary Thomas, Tom Huang and Kailash Mahajan on 11/3/93.ery well engineered support structure.
December 7, l971 American    Electric      Power Two Broadway New  York,   New  York        10004
There is a ring support at top of the exchanger bracketed to the wall in each of the 4 quadrants.
                                                                            ,C~~~ F'LA~>
This takes the overturning loads on the exchanger.
ORD - grD    f,gpss Attention: Mr.       R. A. Kadlec                                            ~rCTIDN Mechanical Engineering Division                             E~~GtNV;.q DATE
Bottom support (at about the 1/4 point of the exchanger, with the remainder of the exchanger hanging below)is a heavy duty ring with gussets at the bolt locations.
These are bolted to a steel support structure that is obviously well engineered.
Qualification data (Yuba Heat Transfer Division Calculation 69-G-226)indicates an analysis to the design basis.Based on the inspection and anchorage data collected the Heat Exchanger is adequate.Evaluated by: cQ Date:>/I g/8-~-fi


==Attachment:==
==Subject:==
Indiana    &  Michigan Electric Company                  ~LEANT LIPEy~ME Donald    CD  Cook Nuclear Plant                            DATE TO PLANT Contract      1241 Containment Spray Heat Exchangers 0 NOH pERHAHENr HlNQfUM g~~N~
Yuba Job Number 69-G-226 Gentlemen:
Qe  are enclosing ji refer to  a six (6) copies letter of Novem b""
                                    ~ ~
                                        'f o  our Seismic Stress Analysis for the subject gob.
Qr 9 1971. written by your Mr. A. Sherman,
                                                      ~                    ~  ~                request'ing additional a              clarification. As a resu      suit we have completely rewritten this            a      y
* as Rev. 2.
Please return one (1)                    i
( ) copy in d'cating your approval and/or comment        nts at    our  earliest convenience.
Uery  truly yours, YUBA HEAT TRANSFER CORPORATION B. F. Forman Des  ign Engineer BFF:dc cc: Mr. A. Sherman Main File Eng. File I
                                              /U                                            J        1
 
Y \/."!< .!!::/s7 1 8 N"SF  0!'l V I S I Ql~                                                                    Page  1 op
          >U3/s l(vov ~>ales, Inc,                                                                                Rev. 2 Seismic S trc. s Anal vsis Indiana & Michigan Electric Company Donald C. Cook tiuc lea r Plant Contract 1241 Containment Spray Heat Exchangers Yuba Reference 69-G-226 S  tresses      in the support ring structure resulting from the operating load                  on  supports,  thc forces        due    to seismic acceleration and operating pressure                will be  investigated using the refer-ences      listed    below.
The support          structur'e consists of two 4" x 2" rings encircling the exchanger together with    a 1"      thick    wear  plate      and q"  shell plate. Refer to  Page  5  for vertical support details.
The    following stresses            will be  calculated:
: 1. Longitudinal bending stress            due  to shell acting    as a  cantilever  beam and loaded    with horizontal seismic force.
: 2. Bending stress            in ring structure loaded with operating wt.        and vertical seismic and horizontal seismic force acting at center of gravity of exchanger.
: 3. Circumferential            and longitudinal stress in shell      due to pressure  in shell.
The period          of vibration'is determined using References              1 and 2 below:
: l.  "Introduction to Matrix            Method  of Structural Analysis",    by Harold C.
Martin, McGraw-Hill Book            Company,  1966.
: 2. Yuba Computer Program            to determine loads    and  reactions in structures by the    direct stiffness        method per reference    1  above. The program  also
                          /
I calculates          the natural frequencies of structures.        See discussion on Pages    10 and 11.
 
"LIU/i I SCAT TRANSF!. R 0! Vl" IYOUSTalas, INC.
IQl':.'OA
('        ..    'u  <g  u  /  l~  U  4                Page Rcv.
2 ci k
W  =  94.4  Total Operating Wt.              ~
  <Vertical, Acceleration                Av = .17
                                                ~
  *Horizontal Acceleration                  AH =  .3 A =  10/12 Ft-B =  18/12  Ft.
C  = 9.42    Ft.
(See  Fig. 2 Page    5)
D =    3.46  Ft.
E =  6.92. Ft.
6 =  45' k
HF = W      x  AH =  94.4          x .3  =  28.3 VF =    W  x (1 $    A ) =          94.4  x 1.17 = 110.4 2 PE    Sin  8 = VF D      Sin 6+CHF
    . 2 P  x 6.92 x .707          =    110.4" x 3.46'          .707    ]
9.42'    28.3 P =  54.9 k (Vertical reaction at one support)
      'Zhe    following forces are horizontal components acting normal to the rings.                            Tvo forces act at each support -                    See Fig. 2 Page        5.
A    x P                  '/12'          54.9k          22 . 8  k (Force  due  to moment caused by ver tica 1 Rl      2/3B x 2                  2/3 (] 8/] 2 )      2 reac Lion)
HF/2 Sin 0                28.3 /2 x .707                                                          I 1=      4x2                                          =  1.25      (Horizontal shehr in each ring)
HF  Sin  6          28.3 k x .707 hg =                                                =  2.5 k (Force due to        moment cuased  by horizontal 4x2                      4x2                      reaction)
 
U  i'      (.'      i
".,I-:l 7 Tf? ANSF ER DIVISION                                                                            Pago 3 o ~
YVOfi'IIIDVSTAICS,II6c.                                                                                      Rev. 2 R=        l~, h  1
                        ~I  h 2    -"228'k      ~125k>25k I
      =  26.55 k, 24.05 k                (Total horizontal force acting normal to the ring See  Fig. 2 Page 4)
Using''            2" Rings and the loading "R" shown in Figure 2, calculations were made      to determine stresses.
For stress        in rings      see Page 6.
Stress in Shell (Due  to HF Acting at    CG) k M =        'F  x C =  28.3        x 9.42'      12 = 3200    in k  (Moment    in Shell)
Section Modulus                                        Where d = outside diameter      of shell, in.
(d4            d 4)                            di  = inside diameter of shell, in.
    = .049087
          ~
R 43300 30 3    =  1426  ill M        3  200.000    in lb Stress      =
S
                      =
                                . 1426 2245  psi Shell Stress The above      calculations      were'' based on the    horizontal    &  vertical acceleration given in your specification 42373-NK.                                                                  I The  accelerations used to obtain stresses                correspond closely to those obtained by      calculating the natural frequency of the exchanger                      see Page 9  for values plotted on the response            spectra curve      it Floor    EL.633.
I The  natural period of the exchanger              as obtained    from our computer program and based        on loadings shown on Figure 1.              Page 4  is 1.275    Second  (maximum).
                                                          ~('
 
f
                                                                                        ~ ~
v'                V jI (. I, ~,.r.. Q,"
y i ~
                                                                                                                                        )
k
                                                                                                                                                            ~~ 'I 0l
(.
Wrr7r& C. C Hr-                                                                              C..
C C
Og t                                                                          Qa' 0
(I) 4 O
('Xl+                                                                ++        OO 7~-'ll rt~
c'as"        .
c 5i
                                /rr 'g"            t:f Hcg I
I S+7W 7 SS r/
7u4< Sr'          .                                  ,r
                                            /r Phoo 6+~7'nA Or~
                            ,:7~
(K
                                                                                                                      .~zS Wa I:
                              / -~o'                                                                                ~WC>
QOyZ'7.
l(Q                                                                                                                    l kic=zG ir 7S
                                                                                                                                      ~
                                                                                                                                                ~                  rm II'LVO                                                                                                < 11'L" V6i};:,.A VS!M7          '1 I..'.~ I."i:.."i'-FL Ci~e~f'O'LCAVlIf.u;.-'iI  ~
I.i
: s. cvvvIIIIrIIvoI Y~i:A COI:."r~iIufTZC> l!:Dl1~Tl'.lI.".. ll!C.
(
4 1%.".t 0
          ~
0 0
            ~ ill h I I AVI:
                        ~tr    'I'A 3515 Ol 'V .ON lmAO. 1'Ut ltWLV
                                                                            'a. 0! LAf<Q1.1A 0Vo'C.
ez-g-              ~=a      -/
 
'l l ~
                                                          ~ L r, ~
                                  %Iran'
  ~ J 0 '4 ~~ v 4 4 dA~r IV J A U        llha    ~ ~~  J    ~ ~ ~
 
YUUh HLAI1'AANSF 613 Ol VISION                                  Q I\    '':j. I'.    !J:;.        4,  4  aI Pa e  Go.."
YVOA IMDVSTAIFS, INC.                                                                                                Rev. 2 STRRSS  I!;  Rl;;CS Reference "Formulas For Stress 6                        Strain"    by Roark (See Page 7)
Miome'nts      in Rin 17'
-~
      =
      =
28'os            Cos e
()k
                                            =
                                              ~
                                                .9563
                                                  = .8830 26.55 k x 31.5" R  ='26.55 k              r  =    31.5"                                          2
                                                                  =418 in k
'MR =    - ~3-R  r  (--
1 e
Cote)
MR'      5 R  r  (    si      e
                                                        -)
1 e
M'0 = 4  R  r (sin  .
1      -)  1 e          e R
(Cos o(                  1)
Sin    e            e MR =  -418    (    1
                    .7853            1) = -113.8            in k  (Moment    at load      due to load)                      Q  Oc. plH5
      =  418 ('8830 1
                                        .7853 )
                                                    =  -10.4S    in  Ic  (Moment    at  R'ue    to load at    R)
                  .707 1                    1 418 (
                  .707                  .7853 )
                                                    =  59.4 in k (Moment at 0 due to load zt R) 418 (
                  . 9563
                  .707 1
                                        .7853 }
                                                      =  33.4    in k    (Moment  at    0'ue    to load at    R)
MR  (Total)      =      (113.8        + 10.45)        =  -.124.25    in k in k 1
M0  (Total)      =  (59.4      p 33.4)            =    92.8 Moment        of Inertia of Rin                                                    T
                .3                            3 2  x 4            15    x 1.5 1=      12
                    +            12            q L 8x 22+22 5m .752]
QF.
I=    59.51 in4                  S
: 59. 51 = 14.9 in3
                                                                                                                                  ~ll~ ti RADlVS Mc Max. Stress        (at load)                    or I
        -124250 in. lbs.
8,350 psi        (in 4"    x 2"  ring) 14-9 in3                                                                                              a 22.5 x .75  8 x 3.5 CG  =  2 x 4 $ 1.5 x 15
        -124250 in. lbs. x 1.5" 59.51 in                                        3,140 psi    (in shell) 5II
 
isa.re: o',
Y'J13fs r'L;AT TftAl"SFCR DIVISrQN YVOA INOUSTAISS, INC.
Copy Taken From "Formulas For Stress and Strain" by Roark Tauu:      VIII.      Fonstur~s          ron Clncof,*n Braes win Ancnns Bf'n 2'n Vn Bf, T, and V arc positive xvhcn as shosvn, negative ivhcn reversed. Allapplied forces and couples arc positive svhcn as sirocco, negative svhcn reversed. The follosving notation is ctnploycd: g w niodufug~ of f
elasticity (lb. ppr sq. in.); ~ moment of incrl,ia bf ring cross section (in.'); 1V or F as shovrn ~ applied load or I              y/~ '      reaction (lb.); w ~ applied load (lb. pcr lin. in.); l: ~ freight of contain'd liquid (lb. pcr cu. in.) ~ ~ si<< ~
                                        ~ cosa;s ~ sin 0,c ~ cos0;n ~ sinO, c ~ cos O; p sruti,q ~ cosp. Allanglcs~uradians,distanccsin NI            ' ~i      2      inches, forces in pounds, moments in inch-pounds.                              +D, or +Drncans incrcasc, -D, or -Dmeans decrease in diamctcrs. +drR means increase, -aR means dccrcasc, in upper half of vertical diameter.                                                                        C TI trtn VIII.          FolMULAs l'OR ClncvLAR Itngcs                          A'Ho    Ar'cncs.(Confinucd) fzalin ruppxe      and      Formulas for tending moment    II, eireumfere  rfsl 4ensfon 2', rsdtst shear V at a    u!ar dieesneo  r from toirnm o ting and for Vi. shan't in Lairosut drnmeeer, cow  numM                                                                                and  D,. change in versiesi dismerer f bx fdK under sny num                                l  /u
                              ~ eton ~ I) It'-frI!(---):hfag+If                  ~ l rfP/  /l        x                                            l /l eor sr each hf ~ --frP(-
of equal radial  (a                                  c)"                        4s      e)  at    o,h,dd,            htss (o        I}        load forem cqusay spsad I              Il/                                                            r ~ -l  'I r eot C at toads.
IO'~./,0
        '                                              load foist ~ -@L        (y+,e I '
Z(b.-. 0 Jlr ludisl disrtseement ef each                2n.L, (2 2 lrlfs/2      1  'X  )    .fnsrsrd ftsdisi dupfae me  t se r  0, 2I, In, ere.                      C-Ilr                                                    gal (C      ~      ss)
 
. VU/i II::Al 'I IIAisSICI:II OIVISIQN YVOA ftaovSTRIES. tNc.
SUlMARY OF STRESSES Combined Lon          itudinal Stress s
Longitudinal stress            due to pressure  =
r  x        -    .2 2t                  p ghere      r  =  inside radius of shell, t        =  shell thickness        & p =  design pressure 2x      5"            .2 x 150 psi = 4,470    psi Combines      stress    =  pressure stress  + bending    stress (Page 3)
      =  4,470    + 2,245      =  6,715 psi                      h Combined    Circumferential Stress Circumferential stress              due to pressure  =
r  x          -  .6 t  ~
p Combined        stress      =  pressure stress  $  bending        s tress (Page 6)
      =  8,910 +3,140            =  12,050 psi Shear      S tress s
      'Xhe  shear stress          in the shell  can be ignored since the            ring structure takes the load in bending.


Pictures DC COOK Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 2 of 2 ID: 1-HE-18E (Rev.0)Class: 21-Tanks and Heat Exchangers
ggll alii 5alll    ) ~
gmgg~~
gg gggg
  ~ g55I
~SR
~  g


==
                                                                        '<<i'..cc'ice!i
Description:==
                  'j'his        procvc(ct7 uses                  the direcL              sti.'.i'(.ss        Ur Lilod as si:o-:n b> Ii.            C<<  I.'artif! jn s';AL')    i;(    f'jnL'hlods ol.              Stl.uctul:al tlnal)'8).s            l
                                                                                                      ~
Xn      the case                or:    "-
been      a:ith      a  distributed load, the              load      is d'vide(. into f an...
pOint lOadS SpaCed alOng thf:                                                  Laealf}.
g    i:/f't.
L = len('th The problenl (!ould be appzo>:ifvated as F
t:
F              F              F p        I'I~I/ ('<<1)              )<he) e H = 'fao          ~    pk Load l pints Fro}fr here                t >e      program calculates                          ti:e nov>'<<ts at each loari point and th reactions at each load point                                                  and    the reactions at each support.                          Also, (:ith the input:, the natural fzcque;.cies                                                  may be        calculated.
                'Co    find tl.e natural fze(Iucncv tnc stiifness:".atri>:                                                  Sound above              is  used  in  r.:;:"'.
the        sa.,~a @ay                  ..". spring constant in a vibrating spriqg and'rf".ss systera.                                                        For a spring F =       "IZ                        F=-          hl
                                                                                                    . X I oo        =    -g:       buL    for    an      of;cillilting 4
8)'S teal          rrC4    }IV                                              $}}c/ is in radians/sec v  l  ~ <<I    I  aa <<a  ~~w vhv J~
or (W' Z N ta
                                                                );;-0
[CD EY.p      J AIf~
                                                                                                                  'iV = g/~phd    '
fa}O  i ('l<<l            <<I<<<<I<<<<Illa lc    II I pre    ~ cly  cf                                          Ercq  ..- ~/Z g        rye    le<</ccc lllcl      Yrvracflr I)!ci~ ivr., '<<ld I ~ rc I lc. Lc r ~ >'.d da'd        I 4 IClc
                    ~
                              ~
                                ~ I \I l J l, I <<Ir I IC<<C l Cr 4 l val ~
                                              ~                    ~
f,l ca    Crr.rr fr.V<< ll<<C l f<< r V<<.lcf Il I ~ CCCC<<l .C<<l,        ~
(V ~ ra} ~ t C<<f ~ VII(<<CCC      I'I~ 4f CICr Jl        Cl    ll 0      l C<< l Ca'vr I Ivr Cf ~ I (<<IVI IICA v
aa<<va<<<<v~<<<<a            ~l          avv4 <<wav        ~k a<<t    J 1~ I J<<ae    ~ ~ ve<<A4U
                                                                                                                              ~ C<<C.C:
                                                                                                                                          ~ <<<<<<4<<rv  vva~ v    vJ cv IAa  v 1
YUB.'.            i,'.'}':YRI=.S.            lNC.
Ca<T I                      }I(;<<    f.f I'<<l      "l <I!              I'(:f '>:.. (:l:.l '.ll!!I!r 'I:I(<<.::


EAST CONTAINMENT SPRAY HEAT EXCHANGER Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: E CONT SPRAY HEAT EXCHANGER RM, Manufacturer, Model, Etc.: YUBA (VERTICAl)
                                                                                                                                                                                  "1    1 Fo        our case                  F =: 1',                      aa! Ia  "r'e      1  1S    'Lh<.: S  t it llfeS fr      i'eai tr )  .".
ELC3XKE>BASE GUSSETED SUPPORT TOP SUPPORT
I r-;
F  f.t point loGds                  O'Ad                                        are the displace.~. nt.. at the point loads.
p            wt+      2)e                                        vllere        H  =-      hV 2
or        "11    )i    X  . KZ,                                          where X..
or        (1'            H tf    ) X = 0,                     since'tlie displecer.ents "re not                                            nll equal to Zero the deterninate                            of.        thc 1!atria                    (1; + H            X.) aust equal Ze.o.                            Then      W'=~7'nd P  -.. W cycles/sec..
2 A 4 ev e v PLRv                                                      ~  vev v          '
lie.alt -%Let        4tnvle.g>    11    11 a    fena  till  CI Ievbt ftnhatae fteaetfCte ~ ~ hV ~ I Vl IC 1 V 1 ~ eV e
Ovnta IC ~ 't vlf ~ tet Iti pCII ~ hOf I ~ Cr I . ~ ge'r pre ~
ehntt Othtt It.nn Il.nt fn ~ a haah il ea                    tr'l ~ 'IeCCelf f at hlahnef ~ vllhnvl It.et C v 0 ~ 4 tvl Cf Iv LC tta 41 Tent.liat    fraeetecee
                                                                              '' '' '$Ij" 'at''
  ~ '
ve vvvear            k4it4A        a    ~    ra      acr  A'L~ v                  re A    ~e pv JNrv vh eva e~>          dva    vlNkbr      e'a'  rreaeaealwre        ~vie 'AAwAA,av e ee r ~
teaa    et,                                                                                                                                           TITI.Ir
                            /I4+      je          1 ~  I' '    .        a  '        I'      ~,aa    ~
I I    (I pt(Z ~ ~    ~
lw Vl
                                                                                      ~                                  ~
C cate.
fJLeefw              a  ~ e  s'a  i          ~    ~  af    e ~  aa    ~  I        ~
J        ~
Y U'5r          1r"i~hIS'1              f1'L:         lflC
.at  r.
0'cela".
t (:    tr'Or'a      wl aell              I lf.      'era          i.'I' etc!II  ala  I'I'I. I  L'h.:.4 i


P.O.BOX 3158~TULSA, OKLAHOMA 74101 o (918)939.2201 December 7, l971 YUSA ItlOUSTA!SS, lNC.American Electric Power Two Broadway New York, New York 10004 Attention:
XNSTRUC LIONS FOR XNSTALLATXON, OPERATXON AM) MA XIQENANCE or SHELL AM) TUBE IIEAT EXCHAlxGERS FOR AZRXCAIT ELECTRIC POHEP, P'HVXCE CORPORATXOH XIIDXAIIA8: 11XCHXOAD ELECTRXC CO&ZiQK DONALD  C. COOK  IICL"P3 PL~I'HXT 1 AllD 2 GUSTO."KR'    PURCHASE ORDER IMBIBER Contract  1243.
Mr.R.A.Kadlec Mechanical Engineering Division
YUBA HEAT TRANSFER      DIVISION JOB      NUIIBER 69-G-226 DESIGNED AM) BUILT BY YUBA HEAT TRANSFER DXVXSXON TULSA,  OKLAHOa~M,


==Subject:==
VV'I:       D  HHQ,'I7                        ll i;ZQ,I.JGL-;.2 L'3i"'7J"I'~"'~I.G
Indiana&Michigan Electric Company Donald CD Cook Nuclear Plant Contract 1241 Containment Spray Heat Exchangers Yuba Job Number 69-G-226 ,C~~~F'LA~>ORD-grD f,gpss~rCTIDN E~~GtNV;.q DATE~LEANT LIPEy~ME DATE TO PLANT 0 NOH pERHAHENr HlNQfUM g~~N~Gentlemen:
                                                                                                                                                          ;,Qg
(6)'f our Seismic Stress Analysis for the subject gob.Qe are enclosing six (6)copies o our b"" 9 1971.written by your Mr.A.Sherman, request'ing ji refer to a letter of Novem Qr~~~~~a'suit we have completely rewritten this a y*additional clarification.
                                                                                                                                                                ,/
As a resu as Rev.2.nts at our earliest Please return one ()copy in i (1)d'cating your approval and/or comment convenience.
P. O. OOX 3158                  ~ TULSA, OKLAIIOMA 24101              ~
Uery truly yours, YUBA HEAT TRANSFER CORPORATION B.F.Forman Des ign Engineer BFF:dc cc: Mr.A.Sherman Main File Eng.File/U J I 1 Y\/."!<.!!::/s7 1 8 N" SF 0!'l V I S I Ql~>U3/s l(vov~>ales, Inc, Seismic S trc.s Anal vsis Indiana&Michigan Electric Company Donald C.Cook tiuc lea r Plant Contract 1241 Containment Spray Heat Exchangers Yuba Reference 69-G-226 Page 1 op Rev.2 S tresses in the support ring structure resulting from the operating load on supports, thc forces due to seismic acceleration and operating pressure will be investigated using the refer-ences listed below.The support structur'e consists of two 4" x 2" rings encircling the exchanger together with a 1" thick wear plate and q" shell plate.Refer to Page 5 for vertical support details.The following stresses will be calculated:
19161  939 2201                                                        69-G-226 EXCHANGER SPECIFICATION SHEET YVGA INOUSTAIES. INC, CUSTOI 1E R         American                    Electric          Power Corn.                     OAT F.                       9-18-70 CVST. NO.                   42373-P(IY PLANT LocATIQN      Donald                  C~  Cook tguclear            Plant                    PROPOSAL NO.               OG-898-64 S    ra    Cooler                          ITEMi NO                    EA" 1 60-355 Vertxca'ontainment SIZE                                    TYPE    CFU                                              POSITION 200            sHELLs PF                Four NO. OF UNITS          One                    SHELL ARRANGEMENT                    PARALLEL                                                    ENGRS.           TEB PERFORMANCE OF ONE UNIT SH'ELL SIDE                                  TVOE SIDE FLVIO CIRCVLATEO                                                  Lake Hichigan        Ilater                  Boraced    NaOH I                        ater B TOTAL FLVIO ENTERING                                    lHR.       1  650,000 - 3300          GPI~I           1,600,000 - 3200                               GPif VAPOR                                          /HR.
1.Longitudinal bending stress due to shell acting as a cantilever beam and loaded with horizontal seismic force.2.Bending stress in ring structure loaded with operating wt.and vertical seismic and horizontal seismic force acting at center of gravity of exchanger.
10          LIQVIO                                    v.- /KA.       1   650 000                                  1 600 000 STEAM                                          /HR.
3.Circumferential and longitudinal stress in shell due to pressure in shell.The period of vibration'is determined using References 1 and 2 below: l."Introduction to Matrix Method of Structural Analysis", by Harold C.Martin, McGraw-Hill Book Company, 1966.2.Yuba Computer Program to determine loads and reactions in structures by the direct stiffness method per reference 1 above.The program also/I calculates the natural frequencies of structures.
              'NON CONOENSAGLES                              /HR.
See discussion on Pages 10 and 11.
13 FI.VIO VAPORI?ED OR CONOENSEO                            /HA.
"LIU/i I SCAT TRANSF!.R 0!Vl" IQl':.'OA IYOUSTalas, INC.('..'u<g u/l~U 4 Page 2 ci Rcv.k~~W=94.4 Total Operating Wt.<Vertical, Acceleration Av=.17*Horizontal Acceleration AH=.3 A=10/12 Ft-B=18/12 Ft.C=9.42 Ft.D=3.46 Ft.E=6.92.Ft.(See Fig.2 Page 5)6=45'k HF=W x AH=94.4 x.3=28.3 VF=W x (1$A)=94.4 x 1.17=110.4 2 PE Sin 8=VF D Sin 6+CHF.2 P x 6.92 x.707=110.4" x 3.46'.707]9.42'28.3 P=54.9 k (Vertical reaction at one support)'Zhe following forces are horizontal components acting normal to the rings.Tvo forces act at each support-See Fig.2 Page 5.A x P'/12'54.9k Rl 2/3B x 2 2/3 (]8/]2)2 22.8 k (Force due to moment caused by ver tica 1 reac Lion)HF/2 Sin 0 1=4x2 HF Sin 6 hg=4x2=2.5 (Force due to moment cuased by horizontal k reaction)28.3/2 x.707 I=1.25 (Horizontal shehr in each ring)28.3 x.707 k 4x2
14 STEAM Coia/OENSEO                                    =/HR.
".,I-:l 7 Tf?ANSF ER DIVISION YVOfi'IIIDVSTAICS, II6c.U i'(.'i Pago 3 o~Rev.2 h~h R=l~, 1 I 2-"228'k~125k>25k I=26.55 k, 24.05 k (Total horizontal force acting normal to the ring See Fig.2 Page 4)Using''2" Rings and the loading"R" shown in Figure 2, calculations were made to determine stresses.For stress in rings see Page 6.Stress in Shell (Due to HF Acting at CG)k M='F x C=28.3 x 9.42'12=3200 in k (Moment in Shell)Section Modulus Where d=outside diameter of shell, in.(d4~~=.049087 R d 4)di=inside diameter of shell, in.30 3=1426 ill 43300 M 3 200.000 in lb Stress=S=.1426 2245 psi Shell Stress The above calculations were''based on the horizontal
15 GRAVITY.I,IQUIO                                          oAP I 16 VISCOSITY-I.IQVIO                                          CP.
&vertical acceleration given in your specification 42373-NK.I The accelerations used to obtain stresses correspond closely to those obtained by calculating the natural frequency of the exchanger see Page 9 for values plotted on the response spectra curve it Floor EL.633.I The natural period of the exchanger as obtained from our computer program and based on loadings shown on Figure 1.Page 4 is 1.275 Second (maximum).
MOLcCULAR.V(EIGHT VAPORS 16 SP. HEAT-GTV/=(aF      FNTHAL.PY-GTV/='G TEMPERATURE IN                                            oF      76                                            167.5 20 TEMPEAATVRE OVT                                                      141. 5                                       100 21 OPERATING PRESSVRE                P.S.I.A.           P.S.I.G.
~('
IMPER OF P S                                                                                                 tWO LOCITY                                        F TJSEC.                                                       3.7 24 pRcssuRc ORop                                            PD. t      10     at.LowEo      l,4       c" t.c. 10    aLLowEo                            4. 0    cat.c.
f
F ov'LING REslsTANcE                                                .001                                        .0005 26 HEAT EXCHANGco-G.T.UJHR.                                             107, 850, 000                      M.T.O. ~+~V-~ OF.                              25 ~ 6 22'RANSFER      RATE SERVICE                                          375 CON STR UCTI ON-EACH SHEL L 29  OESIGN PRESSVAE                                                    150                                          300 GO  TEST PRESSURE                                          I a.t. 225                                          450 DESIGN TEMPERATURE                                        oF      200                                          200 A249 TP316                                                  No- 1150 U            0 0 5/8            IN 20        GwG.AvG.gt+;vaLL LENGTH 29                    PITCH    'l 3/l 6<<                          > 7LYA((
~~v'y V)jI (.I,~,.r..Q," i~k~~'I C Hr-Wrr7r&C.C 0l (.C..C Og t Qa'0 (I)4 ('Xl+7~-'ll rt~/rr'g" t:f c 5i Hcg++O OO c'as".I I S+7W 7 SS r/7u4<Sr'.,r/r Or~(K ,:7~/-~o'l(Q Phoo 6+~7'nA.~zS Wa I:~WC>QOyZ'7.lII'LVO I.i V6i};:,.A VS!M7'1 I..'.~I."i:.."i'-FL Ci~e~f'O'LCAVlIf.u;.-'iI
7 60<<o.
~<11'L" kic=zG ir 7S~~rm s.cvvvIIIIrIIv oI Y~i:A COI:."r~iIufTZC>
                                                                                                                                                                ~
l!:Dl1~Tl'.lI."..
Steel                                      INOM. I. O.                                               o.
ll!C.(3515 Ol'V.ON lmAO.1'Ut'a.0!LAf<Q1.1A I I A VI: 4 1%.".t 0 0 0~~ill h~tr'I'A ltWLV 0Vo'C.ez-g-~=a-/  
'QS  SKELI. COVER IINTEGRAL Qp<~~~QItS+                                                            F LTG. KO. COVER 26 CKANNEL.                                     304 S ta in less Steel                            CHANiiIEL COV E R                304 S.Steel Cla o? TUBE sHEETs sTATIONARY Steel 6 Overlav                                                          FLOATING GB  BAFFI.Es sEGME'(TAL                          Steel                    P ITCH                  lt CUT                        F I.OW QG  BAFFLE-LONG                                  Steel                                            IMP'T.           Stainless Steel 40 TYPC JQINTs sHELL                          . Bo1 ted                                          TUBES            Bolted 41 GAsKETs-sHELL          S.Steel Clad                                  FLTG. HO                                  cHaNNEL S.Steel Clad 4? CONNECTIONS-SHEI.L-IN 18                                              OUT        18            SEAIES CHANNEL- IN                                            oUT        t,2<<           SERIES            VE 44 CORROSION ALLQIVANCE SKELL SIOB                                  l./8                            TUBE SIOE E"REQUIREMENTS-as<<E 1968 Sect.I IC Tube Sec= 8 STA'.I~IYEst                                              6~Y        TEMAcLAss 4         HTS EacH sHELI ANO GUNQI E                            60 000            GVNOLE ONLY                          FULI- OF lvATEA                        94,400 EMARKs: Edd        current                    cesc tubes.
''l l~~L r,~~J 0'4~~v 4 4 dA~r I V J A U%Iran'llha~~~J~~~
Seal weld tuoes.
Q I\'':j.I'.!J:;.4, 4 aI YUUh HLAI 1'AANSF 613 Ol VISION YVOA IMDVSTAIFS, INC.STRRSS I!;Rl;;CS Reference"Formulas For Stress 6 Strain" by Roark (See Page 7)Miome'nts in Rin Pa e Go.." Rev.2=17'-~=28'os ()k=.9563 Cos e-~=.8830 R='26.55 k r=31.5" 26.55 k x 31.5" 2'MR=-~3-R MR'5 R r r (--Cote)1 e (si e 1-)e=418 in k M'0=4 R r (.--)1 1 sin e e R (Cos o(1)Sin e e MR=-418 (-1.7853=418 ('8830.707 1)=-113.8 in k (Moment at load due to load)1)=-10.4S in Ic (Moment at R'ue to load at R).7853 Q Oc.plH5 418 (--)=59.4 in k (Moment at 0 due to load zt R)1 1.707.7853 418 (-}=33.4 in k (Moment at 0'ue to load at R).9563 1.707.7853 I=59.51 in4 S 59.51=14.9 in3 MR (Total)=(113.8+10.45)=-.124.25 in k M0 (Total)=(59.4 p 33.4)=92.8 in k Moment of Inertia of Rin.3 3 1=12+12 q L 8x 22+22 5m 2 x 4 15 x 1.5 1 T.752]QF.~ll~ti RADlVS Max.Stress (at load)-124250 in.lbs.14-9 in3 Mc or I-124250 in.lbs.x 1.5" 8,350 psi (in 4" x 2" ring)a 22.5 x.75 8 x 3.5 CG=2 x 4$1.5 x 15 59.51 in 3,140 psi (in shell)5II Y'J13fs r'L;AT TftAl"SFCR DIVISrQN YVOA INOUSTAI SS, INC.isa.re: o', Copy Taken From"Formulas For Stress and Strain" by Roark Tauu: VIII.-Fonstur~s ron Clncof,*n Braes win Ancnns Bf'n 2'n Vn Bf, T, and V arc positive xvhcn as shosvn, negative ivhcn reversed.All applied forces and couples arc positive svhcn as sirocco, negative svhcn reversed.The follosving notation is ctnploycd:
Full suo ort olace a                              U  bends.
g w niodufug~of elasticity (lb.ppr sq.in.);f~moment of incrl,ia bf ring cross section (in.');1V or F as shovrn~applied load or I y/~reaction (lb.);w~applied load (lb.pcr lin.in.);l:~freight of contain'd liquid (lb.pcr cu.in.)~~si<<~~i'~cosa;s~sin 0,c~cos0;n~sinO, c~cos O;p sruti,q~cosp.Allanglcs~uradians,distanccsin NI'2 inches, forces in pounds, moments in inch-pounds.
+D, or+Drncans incrcasc,-D, or-Dmeans decrease in diamctcrs.
+drR means increase,-aR means dccrcasc, in upper half of vertical diameter.C TI trtn VIII.-FolMULAs l'OR ClncvLAR Itngcs A'Ho Ar'cncs.-(Confinucd) fzalin ruppxe and cow numM Formulas for tending moment II, eireumfere rfsl 4ensfon 2', rsdtst shear V at a u!ar dieesneo r from toirnm o ting and for Vi.shan't in Lairosut drnmeeer, and D,.change in versiesi dismerer f fdK under sny num bx of equal radial forem cqusay spsad I Il/IO'~./,0'I'Jlr Z(b.-.0 Ilr (a~eton~I)It'-frI!(---):hfag+If
~rfP/x at o,h,dd, l/u l/l c)" 4s e)r~-'I r eot C at toads.l ludisl disrtseement ef each load foist~-@L (y+,e 2n.L, (2 2)lrlfs/2 1'X.ftsdisi dupfae me t se r 0, 2I, In, ere.'C-fnsrsrd gal (C~ss)htss-hf~--frP(--eor I}sr each load l/l (o
.VU/i II::Al'I IIAisSICI:II OIVISIQN YVOA ftaovSTRIES.
tNc.SUlMARY OF STRESSES Combined Lon itudinal Stress s r x Longitudinal stress due to pressure=2t-.2 p ghere r=inside radius of shell, t=shell thickness&p=design pressure 2x 5".2 x 150 psi=4,470 psi Combines stress=pressure stress+bending stress (Page 3)=4,470+2,245=6,715 psi h Combined Circumferential Stress r x Circumferential stress due to pressure=-.6 p t~Combined stress=pressure stress$bending s tress (Page 6)=8,910+3,140=12,050 psi Shear S tress s'Xhe shear stress in the shell can be ignored since the ring structure takes the load in bending.
ggll alii 5alll gmgg~~gg gggg~g55I~SR~g)~
'<<i'..cc'ice!i
'j'his procvc(ct7 uses the direcL sti.'.i'(.ss Ur Lilod as si:o-:n b>Ii.C<<I.'artif!jn s';AL')i;(f'jnL'hlods ol.Stl.uctul:al tlnal)'8).s
~l Xn the case or: "-been a:ith a distributed load, the load is d'vide(.into f an...pOint lOadS SpaCed alOng thf: Laealf}.g i:/f't.L=len('th The problenl (!ould be appzo>:ifvated as F F F F t: 'p I'I~I/('<<1))<he)e H='fao~pk Load l pints Fro}fr here t>e program calculates ti:e nov>'<<ts at each loari point and th reactions at each load point and the reactions at each support.Also, (:ith the input:, the natural fzcque;.cies may be calculated.
'Co find tl.e natural fze(Iucncv tnc stiifness:".atri>:
Sound above is used in r.:;:"'.the sa.,~a@ay..".spring constant in a vibrating spriqg and'rf".ss systera.For a spring F="IZ hl F=--.X I oo=-g: buL for 48)'S teal rrC4-}IV or (W'-);;-0 Z[CD EY.v l~<<I I aa<<a~~w vhv J~N ta p J AIf~an of;cillil ting$}}c/is in radians/sec
'iV=g/~phd'fa}O i ('l<<l<<I<<<<I<<<<Illa lc II I pre~cly cf lllcl Yrvracflr I)!ci~ivr.,'<<ld I~rc I lc.Lc r~>'.d da'd I~4 IClc~~I\I l J~l, I<<Ir I IC<<C l~Cr 4 l val~f,l ca Crr.rr fr.V<<ll<<C l f<<r V<<.lcf Il I~CCCC<<l~.C<<l, (V~ra}~t C<<f~VII(<<CCC I'I~4f CICr Jl Cl ll 0 l C<<l I Ivr Cf~I (<<IVI IICA Ercq..-~/Z g rye le<</ccc~<<<<<<4<<rv vva~v v J cv IA a v~C<<C.C: aa<<va<<<<v~<<<<a
~l avv4<<wav~k a<<t J 1~I J<<ae~~ve<<A4U 1 Ca'vr v Ca<T I YUB.'.i,'.'}':YRI=.S.
lNC.I'(:f'>:..(:l:.l'.ll!!I!r'I:I(<<.::}I(;<<f.f I'<<l"l<I!


Fo our case F=: 1', aa!Ia"r'e 1 1S'Lh<.: S t it llfeS fr i'eai tr).".I"1 1 r-;F f.t point loGds O'Ad are the displace.~.
JUL   11 M~4'i(/7I'~                                         7//f C-YQBA HEAT TRANSFER CRPORATION P. O. BOX 3158   ~   TULSA, OKLAHOMA74101            ~   (9181 939-2201 July 9,     1.975 American     Electric       Power   Service Corporation Two Broadway New York, New       York 10004 Attention: Mr. Cherry
nt..at the point loads.p wt+2)e vllere H=-hV or"11)i X-.KZ, where X..2 or (1'H tf)X=0, since'tlie displecer.ents"re not nll equal to Zero the deterninate of.thc 1!atria (1;+H X.)aust equal Ze.o.Then W'=~7'nd P--..cycles/sec..
W 2 A 4 ev e v PLRv~vev v'lie.alt-%Let 4tnvle.g>11 11 a fena till CI Ievbt ftnhatae fteaetfCte
~~hV e~I Vl IC 1 V 1~eV Ovnta IC~'t vlf~tet Iti pCII~hOf I~Cr I.~ge'r pre~ehntt Othtt It.nn Il.nt fn~a haah il ea tr'l~'IeCCelf f at hlahnef~vllhnvl It.et C v 0~4 tvl Cf Iv LC tta 41 Tent.liat fraeetecee
~'ve vvv ear teaa et, C cate..at r.k4it4A a~ra acr A'L~v re A~e pv JNrv vh eva e~>dva vlNkbr'''''"~''/I4+je 1~I'.a'~I'~,aa~'$I I~(I pt(Z~~fJLeefw a~e s'a i~~af e~aa~I Ij'at J lw~Vl~Y U'5r 1r"i~hIS'1 f1'L: lflC t (: tr'Or'a wl aell I lf.'era i.'I'etc!II ala I'I'I.I L'h.:.4 i e'a'rreaeaealwre
~vie'AAwAA,av e ee r~TITI.Ir 0'cela".
XNSTRUC LIONS FOR XNSTALLATXON, OPERATXON AM)MA XIQENANCE or SHELL AM)TUBE IIEAT EXCHAlxGERS FOR AZRXCAIT ELECTRIC POHEP, P'HVXCE CORPORATXOH XIIDXAIIA 8: 11XCHXOAD ELECTRXC CO&ZiQK DONALD C.COOK IICL" P3 PL~I'HXT 1 AllD 2 GUSTO."KR' PURCHASE ORDER IMBIBER Contract 1243.YUBA HEAT TRANSFER DIVISION JOB NUIIBER 69-G-226 DESIGNED AM)BUILT BY YUBA HEAT TRANSFER DXVXSXON TULSA, OKLAHOa~M, VV'I: D HHQ,'I7 ll i;ZQ,I.JGL-;.2 L'3i"'7J"I'~"'~I.G P.O.OOX 3158~TULSA, OKLAIIOMA 24101~19161 939 2201 EXCHANGER SPECIFICATION SHEET;,Qg ,/69-G-226 YVGA INOUSTAIES.
INC, CUSTOI 1E R American Electric Power Corn.OAT F.CVST.NO.9-18-70 42373-P(IY PROPOSAL NO.OG-898-64 PLANT LocATIQN Donald C~Cook tguclear Plant SIZE 60-355 TYPE CFU POSITION Vertxca'ontainment S ra Cooler EA" 1 ITEMi NO 200 sHELLs PF Four NO.OF UNITS One SHELL ARRANGEMENT PARALLEL ENGRS.TEB PERFORMANCE OF ONE UNIT 10 VAPOR LIQVIO/HR.v.-/KA.FLVIO CIRCVLATEO B TOTAL FLVIO ENTERING lHR.SH'ELL SIDE Lake Hichigan Ilater 1 650,000-3300 GPI~I 1 650 000 TVOE SIDE Boraced NaOH I ater 1,600,000-3200 GPif 1 600 000 STEAM/HR.'NON CONOENSAGLES
/HR.13 FI.VIO VAPORI?ED OR CONOENSEO/HA.14 STEAM Coia/OENSEO 15 GRAVITY.I,IQUIO 16 VISCOSITY-I.IQVIO MOLcCULAR.V(EIGHT VAPORS=/HR.oAP I CP.16 SP.HEAT-GTV/=(aF FNTHAL.PY-GTV/='G TEMPERATURE IN 20 TEMPEAATVRE OVT oF 76 141.5 167.5 100 21 OPERATING PRESSVRE P.S.I.A.P.S.I.G.IMPER OF P S tWO 24 LOCITY pRcssuRc ORop F ov'LING REslsTANcE F TJSEC.PD.t.001.0005 3.7 10 at.LowEo l,4 c" t.c.10 aLLowEo 4.0 cat.c.26 HEAT EXCHANGco-G.T.U JHR.22'RANSFER RATE SERVICE 107, 850, 000 375 M.T.O.~+~V-~OF.25~6 29 OESIGN PRESSVAE CON STR UCTI ON-EACH SHEL L 150 300 GO TEST PRESSURE DESIGN TEMPERATURE A249 TP316 Steel I a.t.225 oF 200 No-1150 U 450 200 0 0 5/8 IN 20 GwG.AvG.gt+;vaLL LENGTH 29 7 PITCH'l 3/l 6<<~>7LYA((INOM.I.O.60<<o.o.'QS SKELI.COVER IINTEGRAL Qp<~~~QItS+
26 CKANNEL.304 S ta in less Steel o?TUBE sHEETs sTATIONARY Steel 6 Overlav F LTG.KO.COVER CHANiiIE L COV E R 304 S.Steel Cla FLOATING GB BAFFI.Es sEGME'(TAL Steel P ITCH lt CUT F I.OW QG BAFFLE-LONG Steel IMP'T.Stainless Steel 40 TYPC JQINTs sHELL.Bo1 ted TUBES Bolted 41 GAsKETs-sHELL S.Steel Clad 4?CONNECTIONS-SHEI.L-IN 18 CHANNEL-IN 44 CORROSION ALLQIVANCE SKELL SIOB l./8 FLTG.HO cHaNNEL S.Steel Clad OUT 18 SEAIES oUT t,2<<SERIES VE TUBE SIOE FULI-OF lvATEA 94,400 4 HTS EacH sHELI ANO GUNQI E 60 000 GVNOLE ONLY EMARKs:-Edd current cesc tubes.Seal weld tuoes.Full suo ort olace a U bends.E"REQUIREMENTS-as<<E 1968 Sect.I IC Tube Sec=8 STA'.I~IYEst 6~Y TEMAcLAss JUL 11 M~4'i(/7I'~
C-7//f YQBA HEAT TRANSFER CRPORATION P.O.BOX 3158~TULSA, OKLAHOMA 74101~(9181 939-2201 July 9, 1.975 American Electric Power Service Corporation Two Broadway New York, New York 10004 Attention:
Mr.Cherry  


==Subject:==
==Subject:==
Indiana&Michigan Electric Co.Donald C.Cook Nuclear Plant Contract 1241 Containment Spray Heat Exchanger Yuba Job Number 69"G-226  
Indiana     & Michigan       Electric     Co.
Donald C. Cook Nuclear Plant Contract 1241 Containment Spray Heat Exchanger Yuba Job Number 69"G-226


==Reference:==
==Reference:==
Seismic Report          for  American      Electric      Power Gentlemen:
Confirming our recent telephone conversations regarding,our Seismic Analysis, our 69-G-226 vertical containment spray'heat exchanger for t'e-Donald C. Cook Nuclear Power Plant, the natural period of vibration is
    .108 sec. rather than .787 sec. as stated in the report.
Please note that the .108 sec. perio'd will result                            in lower accelerations and stresses        than those in the Seismic Report.
If we    may be    of further assistance,              please contact us.
Very    truly yours, YUBA HEAT TRANSFER CORPORAT                  N WiXliam C. Newland,            Jr.
Design Engineer WCN/et cc:. Mr. R. H. Shaw Mr. T. R. Harrington Mr. Bill Newland Main File Engineering File ALL AGREEMENTS CONTINGENT UPON STRIKES, ACCIOENTS ANO OTHER CONOITIONS BEYONO OUR CON o'LLCO NTRACTS ARE SVLIECT TO APPROVAL SY AN OFFICER OF THE COMPANY. QUOTA'TIONS SUMECT TO CHANGE YYITHOUTNOTICE,
712 I
                                                    "V U-TUBE EXCHANGER REMOVABLE CHAN."$=L AND COVER TOO PASS SHELL EVEN PASS TU" E SIDE TEMA CLASS 'R'ONSTRUCTION VUGG V~CaV Vna,usvt-:v. D<vrorota        TYPICAL CONSTR U CTION YVOA INOVSTAI4S'NC  ir~ ~ ~
FEATURES OF YUBA TYPE CFU EXCHANGER
IT e
          '%f' 0              ~>V" l~
      ~l g(
y(
    /
rr:o /re% ro                                                ,t/ %'
r<<o ~
                                                                                                            ,0 gg~~t got                4  ~
a~/ SOAP Ctootorr ooo goo<</7 L
w ooo<<<<  to lo tv<<or  It Coo<<
: f. ooo                            rtt /~tr raW/
tr                                        rtoooota I                                                                  o ~
trf                                        ~ ao    <<o C.(iPICC                                                tS  /<</<<J CC                                          rto<</tt  <<r~. .4 tp I    /                                                                                                                          o J ot h>
ct. ~. toI/%it Ct o      oo k
to/I /~
A'too J Cooo toIltoo.
oC
                                                  .Sc r r/root B P g                                                  YVSA lQAT TRAPGFA NYIQIOII TIBIA WKANlWoo, poC,
                                                                                                                                                <<o, ~
rttr~ artoo r<<
rtrrtce    oo          /~~r//
o<<rrro ro<<oorrI rw to<<<<<<r o/II<<o ro fr&rot.
to<<tD<<4 r/~
rtl';  ~  '. It 4'oI
Co Component Zo. t    H 6-(8 6            Class Any  particular    area the Seismic Review Team should pay extra attontion to?
Yes        No          (If yes, check items that apply.)
Anchor Type Anchor Diameter hnchor Spac:fag Anchor Number
                          ~
Anchor Embedment Anchor Edge Distance Anchor Gap Anchor Thread Engagement Anchor Grip Anchor Angularity Concrete Crack Others (describe      briefly)
If there  is concern      for Design Basis Discrepancy, circle the applicable item and explain.
: l.      Hardvare Maintenance Type Discrepancy
: 2.      Drying Up&,te Type Discrepancy 3,      Significant Operability/Design Basis Discrepancy    .
Others Condition:
Actions Taken:
t4  odC Prepared By T.                naos > <3 7Z
                                                                  ~~l4 Vrxr'441.V O.ulr ATTACHMENT NO- 1
                                .ANCHOR INSPECTION DATA SHEET Avx E.c. bog'-g      u Unxt 0                    Bldg.                  Location t 'Z-  ) 5 A -0, I 2-39I >- J          1- H  ~8f Installation          dwg.  /  Rev.        Equipment No.
Anchora e Arran ement Sketch
                                                                                                  ~ ~z VI 0  ~
r 1  (a~)
(AO'-0" It(OlAl(P 4ICHI( A g flQ)l 4,  ~
i'l fPOi.'
tahiseg    rdnY MAR    2g LORY. T ELGu. i "4 Loose)6    NGS
                ~                                                                        g  4 4  or>'
          ~
            '                                                                              V  ~
4    ~
0                                                                                          r gp )      (  ~
Drawn by:                                                        Date:
Verified by:                                                      Date:
Q al./Cert.
                              ~        ~  nspector Reviewed by:
    ~
Date:    8 <>83 Construction    An  or Review Engineer Page 1        of    3 Revision          1
                                                                  **12 CHP 5021                CCD NO.        01'TTACHMENT CHOR  INSPECTION DATA              S EE 0
                                                        , ~      ~<T.5'PR~                %.6-  R~g 0'ldg.
Location Installation      dwg. / Rev.          Equxpm'ent No.
Anchora e Arran ement Sketch kg+  p oiT, 4lh5~,HMT (STCAM)
Sl'. "=
                                                                            ~  ~~
                                                                            ~ J ~', ik I ~ g Q 2S 1995
                                                                    'ngr lp~ 4
                  'Fg I8 W$g ig T'~ Lmt-mm,a 4'rawn by:                                                      Date:
Verified by:
    ~ ~
Date:
Q    al./Cert. Inspector Reviewed by:                                                      Date:
Construction    An  hor Review Engineer Page 1                of  3 Revision                1
                                                        **12 CHP 5021.CCD.019 ATTACHMENT NO.            1 NCHOR INSPECTION D TA SHEE A  '~. Ct. Voq-o"    ,~    WvT SPRR'/ ~ 6- RooI4 Unxt                    Bldg.                        Location i<- '39IS S                            I-HG- I55 Installation    dwg. / Rev.            Ecpxxpment No.
Anchora e Arran ement Sketch II II              fpll c CE    'c IVV 'i.< ~ ii II II                    MAR      2g the~
II I'
                                        ~
g II II II II II II
                                        ~l                    PLP,g          Ul~  .
(B e.Oe t mme.886<I)
Drawn by:          7.W ..U                              Date:            3- I'i< ~
Verified by:                                            Date:
qual./Cert. Inspector Reviewed by:                                            Date:            3-aS-'f>
Construction An hor Review Engineer Page 1      of    3 Revision        1
                                                                              **12 CHP 5021. CCD. 019 ATTACHMENT NO. 1 ANCHOR INSPECTION DATA SHEE
                                                ~! . pg          q
                                                                    ~
40NT 5 PRA'/  H Q-  Pop~
Unxt                              Bldg.                              Location 12-39 lb Installatl.on A
dwg.    /  Rev.
A                          1-Equipment No.
                                                                          ~  - (QE.
Anchora e Arran ement Sketch 6I        &s~/sP!                                                            24,+jg~p4.
9
                                                  >40 50!.T,! o~<
Wh5~, NOT
(~r. 5)
                                                                            ~
SE. CT. 'A,-A                                                        S'ECT. 5-8
                                                                          !3 2/g+'/g ~ pg)                                                        ~h.~4gw) 3'/2 xg    x>/y x 8'jf 4
(p~)
c  4-I t<0!*!!A V.!,"'l!"t::
WOc",Kl!":" C~
IO ACCT,'c-c MAR 7 Z l~~'BCT 0-D
.Drawn  by:                  &~L4nln                                        Date: ~-~~-'~Z Verified by:                                                                Date:
Qual. /Cert. Inspector Reviewed by:        T-                                                      Date:
Constru        son An hor Pevxew Engineer Page 1  of  3 Revision    1


Seismic Report for American Electric Power Gentlemen:
                                                              *+12  CHP    5021.CCD.019 ATTACHMENT NO. 1 ANCHOR INSPECTION DATA S EE w~t- zpn.~              w c - a<p~
Confirming our recent telephone conversations regarding,our Seismic Analysis, our 69-G-226 vertical containment spray'heat exchanger for t'e-Donald C.Cook Nuclear Power Plant, the natural period of vibration is.108 sec.rather than.787 sec.as stated in the report.Please note that the.108 sec.perio'd will result in lower accelerations and stresses than those in the Seismic Report.If we may be of further assistance, please contact us.Very truly yours, YUBA HEAT TRANSFER CORPORAT N WCN/et cc:.Mr.R.H.Shaw Mr.T.R.Harrington Mr.Bill Newland Main File Engineering File WiXliam C.Newland, Jr.Design Engineer , ALL AGREEMENTS CONTINGENT UPON STRIKES, ACCIOENTS ANO OTHER CONOITIONS BEYONO OUR CON o'LLC N O TRACTS ARE SVLIECT TO APPROVAL SY AN OFFICER OF THE COMPANY.QUOTA'TIONS SUMECT TO CHANGE YYITHOUT NOTICE, 712"V I U-TUBE EXCHANGER REMOVABLE CHAN."$=L AND COVER TOO PASS SHELL EVEN PASS TU" E SIDE TEMA CLASS'R'ONSTRUCTION VUGG V~CaV Vna,usvt-:v.
Un t                        Bldg.                         Location A            0                I- l-h=- ISI:
D<vrorota YVOA INOVSTAI4S'NC ir~~~TYPICAL CONSTR U CTION FEATURES OF YUBA TYPE CFU EXCHANGER
                            /
Installat  on dwg.     Rev.         Equipment No.
Anchora e Arran ement Sketch IB <</zX g" I~ I/a x Wy        (STI~a  Wmeg
                                                              +~ I/2 R) 5/4. cp 54l  T w 1TH  lo M Hh&%9 p l/+ +p~i  ~ ~ll    RHOT StHM  K OH CIT~ Se6          Or RR HEe          I~ VO7        S~WH SECT. F-E 0~    g (RW) p    l I
0  I
                                                                        ~:>l ~ !i>i'cV. CQpy MAR      2Z 1S95
                                                                -LCRK,T 5CcT. F-F Drawn by:        T      AuL4esp                              Date:    ~-' -'(~
Verified by:                                                  Date:
ua  ./Cert. Tnspector Reviewed by:                                                  Date:
Constru      son      hor Review Engineer Page 1            of  3 Revision            1


0 e'%f'l~~l IT~>V" g(y(/
                                                                          ~ ~
                        ~  +
~ ~ II                                                    s    ~
                                                        ~ s    ~
                ~  ~
                                                  ~    - ~
              ~ ~i        ~      ~
LI W    1
                    ~
KR~~~RRKR
                                +    ~            ~
                              ~    ~        ~  v  l    ~
j mmwmmlHmm e ~
m mml@mmR1mmRI mRSWRIRRNSNKl MWWWWW&W 5%mmRMSRRmm RQmmmRRRRR%l%
        ~
MW&MMWW&0        I  0        Cs    4          ~
                                                                  ~ r~gs r W


rr:o/re%ro r<<o~,t/%',0 gg~~t a~/SOAP got 4~Ctootorr ooo goo<</7 L f.ooo tr I w ooo<<<<to lo tv<<or It Coo<<rtt/~tr raW/rtoooota o~I/k C.(iPICC tS/<</<<J trf CC~ao<<o rto<</tt.4 tp<<r~.o J ot Ct o/%it ct.~.toI oo h>to/I/~A'too J.Sc r r/root B P g Cooo toIl too.YVSA lQAT TRAPGFA NYIQIOII TIBIA WKANlWoo, poC,<<o,~oC rttr~oo too r<</~ro fr&rot.rtrrtce ar o<<rrro o/II<<o to<<tD<<4 ro<<oorrI rw to<<<<<<r~r//r/~rtl';~'.It 4'oI Co Component Zo.t H 6-(8 6 Class Any particular area the Seismic Review Team should pay extra attontion to?Yes No (If yes, check items that apply.)Anchor Type Anchor Diameter hnchor Spac:fag~Anchor Number Anchor Embedment Anchor Edge Distance Anchor Gap Anchor Thread Engagement Anchor Grip Anchor Angularity Concrete Crack Others (describe briefly)If there is concern for Design Basis Discrepancy, circle the applicable item and explain.l.2.3, Hardvare Maintenance Type Discrepancy Drying Up&,te Type Discrepancy Significant Operability/Design Basis Discrepancy
0 tW -~~
.Others Condition:
Actions Taken: t4 odC Prepared By T.naos><3 7Z
~~l4 Vrxr'441.V O.ulr ATTACHMENT NO-1 Equipment No.Anchora e Arran ement Sketch.ANCHOR INSPECTION DATA SHEET Avx E.c.bog'-g u Unxt 0 Bldg.Location t'Z-)5 A-0, I 2-39I>-J 1-H~8f Installation dwg./Rev.1 (a~)~~z VI 0~r (AO'-0" It(OlAl(P 4ICHI(tahiseg MAR 2g A g flQ)l~4, i'l fPOi.'rdnY LORY.T~~4 or>'0'gp)(~ELGu.i"4 Loose)6 NGS g 4 4~V~r Drawn by: Date: Date: Verified by:~~~Q al./Cert.nspector Reviewed by: Date: 8<>83 Construction An or Review Engineer Page 1 of 3 Revision 1
**12 CHP 5021 CCD 01'TTACHMENT NO.CHOR INSPECTION DATA S EE ,~~<T.5'PR~%.6-R~g 0 0'ldg.Location Installation dwg./Rev.Anchora e Arran ement Sketch Equxpm'ent No.kg+p oiT, 4lh5~,HMT (STCAM)Sl'."=~~~~J~', ik I~g Q 2S 1995'ngr lp~4'Fg I8 W$g ig 4'rawn by: T'~Lmt-mm,a Date: Verified by:~~~~Date: Q al./Cert.Inspector Reviewed by: Date: Construction An hor Review Engineer Page 1 of 3 Revision 1
**12 CHP 5021.CCD.019 ATTACHMENT NO.1 Unxt i<-'39IS S I-HG-I55 Ecpxxpment No.Installation dwg./Rev.Anchora e Arran ement Sketch NCHOR INSPECTION D TA SHEE ,~WvT SPRR'/~6-RooI4 A'~.Ct.Voq-o" Bldg.Location II II II II II I'g~fpll c CE'c IVV'i.<~ii MAR 2g the~II II II II II II~l PLP,g Ul~.(B e.Oe t mme.886<I) 7.W..U Date: 3-I'i<~Date: Drawn by: Verified by: qual./Cert.
Inspector Reviewed by: Date: 3-aS-'f>Construction An hor Review Engineer Page 1 of 3 Revision 1
**12 CHP 5021.CCD.019 ATTACHMENT NO.1 Unxt 12-39 lb A Installatl.on dwg./Rev.Anchora e Arran ement Sketch ANCHOR INSPECTION DATA SHEE~!.pg q~40NT 5 PRA'/H Q-Pop~Bldg.Location A 1-~-(QE.Equipment No.6 I&s~/sP!9 24,+jg~p4.
>40 50!.T,!o~<-~Wh5~, NOT (~r.5)SE.CT.'A,-A S'ECT.5-8 2/g+'/g~pg)!3~h.~4gw)3'/2 xg x>/y x 8'jf (p~)4 c 4-IO ACCT,'c-c I t<0!*!!A V.!,"'l!" t:: WOc",Kl!":" C~MAR 7 Z l~~'BCT 0-D Date:~-~~-'~Z Date:&~L4nln.Drawn by: Verified by: Qual./Cert.Inspector Reviewed by: T-Date: Constru son An hor Pevxew Engineer Page 1 of 3 Revision 1
*+12 CHP 5021.CCD.019 ATTACHMENT NO.1 Un t>A Installat on dwg./Rev.Anchora e Arran ement Sketch ANCHOR INSPECTION DATA S EE w~t-zpn.~w c-a<p~Bldg.Location 0 I-l-h=--ISI: Equipment No.p l/++p~i~~ll 5/cp 54l T w 1TH lo 4.M Hh&%9 RHOT IB<</zX g" I~I/a x Wy (STI~a Wmeg+~I/2 R)StHM K OH CIT~Se6 Or RR HEe I~VO7 S~WH SECT.F-E (RW)0~g p l I 0 I~:>l~!i>i'cV.CQpy MAR 2Z 1S95-LCRK,T 5CcT.F-F T AuL4esp Date:~-'-'(~Date: Drawn by: Date: hor Review Engineer Page 1 of 3 Revision 1 Verified by: ua./Cert.Tnspector Reviewed by: Constru son


~~~~II~~~~i~+~~s~~s~~-~'L I W 1 KR~~~RRKR~+~~~~~v l~j-mmwmmlHmm m mml@mmR1mmRI e~mRSWRIRRNSNKl MWWWWW&W 5%mmRMSRRmm RQmmmRRRRR%l%
                                                                              **12 CHP 5021.       CCD. 019 ATTACHMENT NO. 1 Equipment No.:                                                                    Dwg   No.: )~- S ))SA- 0 Anchor type NR)GC           t.lfeR.       Dia:           >/                     Dwg    No.:
~0 I 0 Cs 4~MW&MMWW&~r~gs r W 0 tW-~~
Tightness established by: 0 "Snug Fit" 5 Torque Torque Nrench No.:             ~~+ ~) )                         Cal. Due Date:                 C   04       3 Tightness verified? 5.Yes 0 No               7- '~'~'<~'i                       Date: "-< )-')3 ons ruc ron Equipment base flexible? 0 Yes 8 No ''.""""<>>"l: Date: 3                                       '-     l3 Bolt ID                 l 0     tL       lK             )'5                   l S'     lo     Comments Caps                                                                                            GETw&&nJ CoNC:Q L Anchor len th Protruding len th Embedment 84        sq s4" tp  g"
**12 CHP 5021.CCD.019 ATTACHMENT NO.1 Dwg No.:)~-S))SA-0 Dwg No.:Equipment No.: Anchor type NR)GC t.lfeR.Dia:>/Tightness established by: 0"Snug Fit" 5 Torque Torque Nrench No.:~~+~))Cal.Due Date: C 04 3 Tightness verified?5.Yes 0 No 7-'~'~'<~'i Date: "-<)-')3 ons ruc ron Equipment base flexible?0 Yes 8 No''.""""<>>"l:
                                                                    '"/s            ( 3y    653 l)
Date: 3'-l3 Bolt ID Caps Anchor len th l 0 tL lK)'5 84 sq s4" l S'lo Comments GETw&&nJ CoNC:Q L Protruding len th Embedment Bolt ri/S S/j'/II" tp g"'"/s l)(3y 653~4.~/g Concrete condition Cj OQQ 0 00$G,OOg g o 0g (WOOLD 40OP'oop Coop Edge distance Anchor s acin Anchor an larit Thread engagement
Bolt ri         /S     S/j'/II"                                                 ~4.     ~/g Concrete               0 00$                                        40OP'oop          Coop condition   Cj OQQ             G,OOg   g o 0g       (WOOLD Edge distance Anchor         +(l     ~rr     gl l                   g 9/)@                  4 Il Q II s  acin Anchor an    larit Thread    /eI m&S       OK     olc. oL                                     OE     Og.       hJUT   tsSl~"
+(l~rr gl l/eI m&S OK olc.oL g 9/)@4 Il Q II OE Og.hJUT tsSl~" T&lclL.Comments: Verified by: q a./Cert.Inspector Date:+Reviewed by: T-Const ct og I II)Ir Nh tfil~rI Gr'll I<Wr;'rYODK)AG COPY y;qB 23 1993 Pago 2 of 3 1-Revision Date: 3-a3-qg gu4 J.~<i', ggg ATTACHMENT NO.ANCHOR INSPECT ON D T S~~~~Equipment No.: I-1+6-<SG Embedded Steel Dwg.No.: HYSICAL C CT RIST C D g No.: I-Bhi5A-a Weld ID T e Size Len h Cracks Lack of Penetration 3lltp Yes Yes 0 Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Weld e Codes 1=Fillet 2=Plug/Slot 3=Groove Porosity Yes Yes No Yes No Yes'o Yes No Yes Yes No No R&.os 8 TYpLce io<+71()N<
engagement                                                                                            T&lclL .
AAB g~6 pg, sTR084 R~~T-'-re-'tz INGIABO'<t SITe 0=<" VIP LEACH+r Equipment base flexible: Reviewed by: Qns ruc Ops'Qy Verified by: ua.e Q Yes Q.No 7 43 Lw~<w-u ons c 1on re xon c or evzew ngxneer ov hy'.npsec or Date: 3-<" Date: Date: Page 3 of 3 Revision 1  
Comments:
Verified by:
                      ./Cert. Inspector Date:       +
q a Reviewed by:   T-                                 I II)Ir Nh tfil~rI Gr'll I <Wr; Date:        3- a3- qg Const    ct  og                          'rYODK)AG COPY y;qB     23 1993 Pago 2     of   3
                                                                                      -Revision       1


S 8 A CEPARTMENT CONTROL.LEO DOCUMc 8'l COPY NO.12 SHP 5050 NDE.008 ATTACHMENT NO.1 Ul',TRASONIC TEST REPORT JOB ORDER NO.:>If(REPORT DATE:>'+lZ REQUEST NO.l IA.IDENTIFICATION Unit C hlE Component l AC.l F Item Material Other TECHNI UE Test Unit/S/N Freq./Diameter 6 Reference Standard C.Ke Couplant/Batch No.i~cMA 6t=o".'3e TEST DATA REMARKS PERFORMED BY: REVIEWED BY: FORM NO.12 SHP 5050 NDE.008-1 I EVEI:~DATE: E.EVEL:~DATE: 5 Page 1 of 1 Revision 0 0
gu4  J. ~ <i', ggg ATTACHMENT NO.
01/16/92 PG.MO.SC5 SAFE SHUTOOMM EOUIPHENT LIST (SSELMP)FUNCTION: Equipment Class: 21 I'rain: 2 Equipment IO: 1-HE-3C-HE Drawing Number: 1-5135A Svstem: CCM Equip
ANCHOR INSPECT ON D T              S 1+6-< SG Equipment No.:                                                                            g No.: I- Bhi5A-a
    ~
                    ~              I                                                  D Embedded      Steel      Dwg.  ~ No.:    ~
HYSICAL    C        CT  RIST    C Weld ID                                                                                    Weld          e Codes T    e Size                    3lltp 1 =      Fillet 2 = Plug/Slot Len    h 3  = Groove Cracks                Yes      Yes        Yes    Yes    Yes      Yes      Yes  Yes 0      No      No      No        No      No    No Lack    of                                Yes    Yes    Yes      Yes      Yes  Yes Penetration                                No      No      No        No      No    No Porosity              Yes                Yes    Yes    Yes'o    Yes      Yes  Yes No      No                No      No    No R&.os        8    TYpLce        io<+71()N< AAB          g~6      pg, sTR084 R T-'
                                                                                              ~~            -re-'tz INGIABO '<t SITe 0=<"
VIP LEACH +        r Equipment base          flexible:          Q  Yes    Q. No      7 43    Lw~<w-u            Date: 3- <"
ons      c 1on  re Reviewed by:                                                                                  Date:
Ops'Qy      Qns    ruc xon      c  or      evzew ov hy'.
ngxneer Verified by:            ua.          e        npsec or Date:
Page  3    of  3 Revision      1
 
S 8 A CEPARTMENT CONTROL.LEO DOCUMc 8'l                               12 SHP 5050 NDE.008 ATTACHMENT NO. 1 COPY NO.
Ul',TRASONIC TEST REPORT JOB ORDER   NO.:   > If( REPORT DATE:   > '+ lZ   REQUEST NO. l IA.
IDENTIFICATION                         TECHNI UE Unit     C hlE                       Test Unit/ S/N Component   l AC.l F                 Freq./Diameter                 6 Item                                  Reference Standard       C. Ke
                                                                            '3e Material                              Couplant/Batch No. i~ cMA 6t=       o".
Other TEST DATA REMARKS PERFORMED BY:                               I EVEI: ~        DATE:
REVIEWED BY:
FORM NO. 12 SHP 5050 NDE.008-1 E.EVEL: ~
Page 1 of DATE:
1 5
Revision 0
 
0 01/16/92 PG. MO.SC5 SAFE SHUTOOMM EOUIPHENT     LIST (SSELMP)
FUNCTION:
Equipment Class:         21         I'rain:   2 Equipment IO:       1-HE-3C-HE                                             Drawing Number:       1-5135A Svstem:   CCM Equip


== Description:==
== Description:==
NORTH SAFETY INJECTION PUMP    PP.26N OUTBOARD MECHANICAL SEAL HEAT EXCHANGER Building:      AUXILIARY              Room:    NORTH SAFETY    INJEC'IIOH  PUMP ROOII            Elevation:  587 Normal  State:                  Desired state:                    iPower Required:        M            Sort: lf, Suoonrting System Drawing Humber:
omvired Interconnections and Supporting          Components:
fety Related Status:        NUCLEAR SR                                Min/Opt:  MIN ADDITIONAL INFORMATION AIIas Number:                                                              Power  Train:      MA Cnmonnent Served:        NORTH SAFETY INJECTION PUMP PP 26N wanufacturert      BORG. MARNER                                          Kodeit    NX  0500-FM Panel EC~ Drawing:        H/A                                                  Miring Drawing:        N/A Pnwer Source:    N/A Mal%down:      F                                                          Relay Only:      M Comoonent  I'ype:    HE  ~
ISO  Drawings:
Detailed Location:


NORTH SAFETY INJECTION PUMP PP.26N OUTBOARD MECHANICAL SEAL HEAT EXCHANGER Building: AUXILIARY Room: NORTH SAFETY INJEC'IIOH PUMP ROOII Elevation:
DC COOK Unit 1                                      GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                    Status: Yes Sheet 1 of 2 ID: 1-HE-34-NE (Rev. 0)                            Class: 21 - Tanks and Heat Exchangers
587 Normal State: Desired state: iPower Required: M Sort: lf, Suoonrting System Drawing Humber: omvired Interconnections and Supporting Components:
 
fety Related Status: NUCLEAR SR Min/Opt: MIN ADDITIONAL INFORMATION AIIas Number: Cnmonnent Served: NORTH SAFETY INJECTION PUMP PP 26N Power Train: MA wanufacturert BORG.MARNER Kodeit NX 0500-FM Panel EC~Drawing: H/A Miring Drawing: N/A Pnwer Source: N/A Mal%down: F Relay Only: M Comoonent I'ype: ISO Drawings: HE~Detailed Location:
== Description:==
DC COOK Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 1 of 2 ID: 1-HE-34-NE (Rev.0)Class: 21-Tanks and Heat Exchangers
NORTH SAFETY INJECTION PUMP PP-26N INBOARD MECHANICALSEAL HEAT EXCHANGER Building: AUXILIARY                         Floor El.: 587.00                    Room, Row/Col: N SAFETY INJECTION PUMP RM, Manufacturer, Model, Etc.: BORG-WARNER, NX-0500-FW BASIS: External analysis
: 1. The buckling capacity of the shell of a large, flat-bottom, vertical tank is equal to or greater          N/A than the demand.
: 2. The capacity of the anchor bolts and their embedments is equal to or greater than the                    Yes demand.
: 3. The capacity of connections between the. anchor bolts and the tank shell is equal to or                  Yes greater than the demand.
: 4. Attached piping has adequate flexibilityto accommodate the motion of a large, flat-bottom,              Yes vertical tank.
: 5. A ring-type foundation is not used to support a large, flat-bottom, vertical tank.                      N/A S  S  C
~co  vins SRT: Gary Thomas, Tom Huang and Kailash Mahajan on 11/1/93.
ANCHORAGE ACCEPTABLE BY ENGINEERING JUDGMENT OF THE SRT.
6" diameter by 8-3/4" high exchanger, attached to North Safety Injection Pump with 2 1/2" bolts. Could have screened with the pump using the rule of the box, however the exchanger was listed seperately on the SSEL.
Crane above in a parked and locked position.
Evaluated by:                                                                           Date:
 
==Attachment:==
Pictures
 
DC COOK Unit 1                           GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                  ~    Status: Yes Sheet 2 of 2 ID: 1-HE-34-NE (Rev. 0)                   Class: 21 - Tanks and Heat Exchangers


==
==
Description:==
Description:==
NORTH SAFETY INJECTION PUMP PP-26N INBOARD MECHANICALSEAL HEAT EXCHANGER Building: AUXILIARY                Floor El.: 587.00                Room, Row/Col: N SAFETY INJECTION Pt MP RM, Manufacturer, Model, Etc.: BORG-WARNER, NX-0500-FW NORTH SAFETY INJECTION PUMP PP-26N


NORTH SAFETY INJECTION PUMP PP-26N INBOARD MECHANICAL SEAL HEAT EXCHANGER Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: N SAFETY INJECTION PUMP RM, Manufacturer, Model, Etc.: BORG-WARNER, NX-0500-FW BASIS: External analysis 1.The buckling capacity of the shell of a large, flat-bottom, vertical tank is equal to or greater than the demand.2.The capacity of the anchor bolts and their embedments is equal to or greater than the demand.3.The capacity of connections between the.anchor bolts and the tank shell is equal to or greater than the demand.4.Attached piping has adequate flexibility to accommodate the motion of a large, flat-bottom, vertical tank.5.A ring-type foundation is not used to support a large, flat-bottom, vertical tank.N/A Yes Yes Yes N/A S S C~co vins SRT: Gary Thomas, Tom Huang and Kailash Mahajan on 11/1/93.ANCHORAGE ACCEPTABLE BY ENGINEERING JUDGMENT OF THE SRT.6" diameter by 8-3/4" high exchanger, attached to North Safety Injection Pump with 2 1/2" bolts.Could have screened with the pump using the rule of the box, however the exchanger was listed seperately on the SSEL.Crane above in a parked and locked position.Evaluated by: Date:  
                                                                      ~~xc  vnr ~vs~      iiu. via ATTACHMENT NO.          1 ANCHOR INSPECTION DATA SHEET A. 5a4z  h~ e~  ',  9  Rn Un1t    g                      Bldg.                        Locat1on C
Installat1on        dwg.    /  Rev.        Equ1pment No.
Anchora e Arran ement, Sketch F46'v. J>I=4 45DksQl          c yj'4    Ooi~
Yyp Vlc o.O.
Oo I
                                                  ~l FLo 'E4.
INDiAHA." llCHIGA"I POY(ER                        '-0 CONSTRLICT!Oib CGLTROLLEO
                                                                ~ T, EYORKING COPY 4  Gr a      ' i q
S~P g g tqap CLERK k
7 Drawn by:                                                          Date:        /8-/-
Verified by:                                                      Date:    L- Z.- 'P  <
Qual. /Cert. Inspector
,:I Reviewed by:                                                      Date:
nstruct1on Anchor          Rev1ew Engineer Page 1      of  3 Revision        1
 
Equipment No.:
Tightness established by "Snug  Fit" Tightness veri'ed by:    'C.
goal./Cert. Inspector Tightness Verified by:
onstruction  ARE Comments:
 
Equip ID: 1-TK-11        Train:  12  Equip Class: 21 Drawing No.: 1-5142 ction: RI ys tern:  BORON INJECTION Equip Desc:      BORON  INJECTION TANK Building:    AUXILXARY    Room: BORON INJECTION TANK ROOM Elev:  612    Sort: S,          Notes:
Normal State:          Desired State:      Power Req'd:
Support System Drawing:
Req'd Support Comp:
Safety Related Status:        NUCLEAR SR        Min/Opt: MIN Alias    No:        Power  Train:
Comp    Served:  BORON  INJECTION TANK Mfr:  STRUTHERS-WELL-CORP.
Model: 900      GALS, O'I Elem. Drawing: 1-98282 Wiring Drawing: 1-95222 Power Source: '1-AM-D-5A 1-AM-A-2A Walkdown: F        Relay Eval  : N Comp  Type:    TANK a
ISO Drawing:
Location:      XN THE MIDDLE OF ROOM,    15'W  OF THE ROOM'S ENTiVQICE DOORWAY.
 
DC COOK Unit 1                                      GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                    Status: Yes Sheet 1 of 3 ID: 1-TK-11 (Rev. 0)                              Class: 21 - Tanks and Heat Exchangers
 
== Description:==
BORON INJECTION TANK Building: AUXILIARY                       Floor El.: 612.00                     Room, Row/Col: BORON INJECTION TANK RM, IN THE MIDDLE OF RM, 15'WOF THE RM'S ENTRANCE DOORWAY.
Manufacturer, Model, Etc.: STRUTHERS-WELL-CORP. 900 GALS,                 4'l BASIS: External analysis
: 1. The buckling capacity of the shell of a large, flat-bottom, vertical tank is equal to or greater         N/A than the demand.
: 2. The capacity of the anchor bolts and their embedments is equal to or greater than the                   Yes demand.
: 3. The capacity of connections between the anchor bolts and the tank shell is equal to or                   Yes greater than the demand.
: 4. Attached piping has adequate flexibilityto accommodate the motion of a large, flat-bottom,               Yes vertical tank.
: 5. A ring-type foundation is not used to support a large, flat-bottom, vertical tank.                       N/A SMC
~CO    ~~S SRT: Gary Thomas, Tom Huang and Kailash Mahajan on 11/3/93.
ADEQUACYOF ANCHORAGE AND TANK TO SUPPORT CONNECTION BASED ON JUDGMENT BY THE SRT AND COMPARISON TO THE BORIC ACID TANK EVALUATION.
Tank is 5'iameter by 10'n height supported by 4 Wide Flange Leg supports (10" WF w/5/8" flange) 4'R" in height..
Each leg is bolted to the pedestal w/ two embedded      1 3/4" bolts with 2'-11" embedment Weld of leg to tank about 14" in length and 1/4" thickness on each side of the wide flange and 10" at the top of the wide flange.
Adjacent Block wall reinforced with column supports and it is not an interaction concern.
The Seismic Evaluation of the Boric Acid Tank (2-TK-12S) is seismically adequate. The Boron Injection Tank (1-TK-11) is much smaller but has about th. same support. Therefore, Tank 1-TK-11 is judged adequate.
 
DC COOK Unit 1                            GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                        Status: Yes Sheet 2 of 3 ID: 1-TK-11 (Rev. 0)                      Class: 21 - Tanks and Heat Exchangers
 
==
Description:==
BORON INJECTION TANK Building: AUXILIARY                Floor El.: 612.00              Room, Row/Col: BORON INJECTION TANK RM, IN THE MIDDLE OF RM, 15'WOF THE RM'S ENTRANCE DOORWAY.
Manufacturer, Model, Etc.: STRUTHERS-WELL-CORP. 900 GALS. 4'l Evaluated by:                                                             Date:
                                                                                              -  fs.


==Attachment:==
==Attachment:==
Pictures


Pictures DC COOK Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)~GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 2 of 2 ID: 1-HE-34-NE (Rev.0)Class: 21-Tanks and Heat Exchangers
DC COOK Unit 1                             GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                        Status: Yes Sheet 3 of 3 ID: 1-TK-11 (Rev. 0)                       Class: 21 - Tanks and Heat Exchangers


==
==
Description:==
Description:==
BORON INJECTION TANK Building: AUXILIARY                Floor El.: 612.00                Room, Row/Col: BORON INJECTION TANK RM, IN THE MIDDLE OF RM, 15'W OF THE RM'S ENTRANCE DOORWAY.
Manufacturer, Model, Etc.: STRUTHERS-WELL-CORP. 900 GALS,      4'l ELILlEH BASE ANCHORAGE PEDESTAL                      SUPPORT COLUMN TO TANK CONNECTION


NORTH SAFETY INJECTION PUMP PP-26N INBOARD MECHANICAL SEAL HEAT EXCHANGER Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: N SAFETY INJECTION Pt MP RM, Manufacturer, Model, Etc.: BORG-WARNER, NX-0500-FW NORTH SAFETY IN JECTION PUMP PP-26N
Coo Component No.   ~   TK.                 <laic Ql payticulir  area the Seismic Revue~ Teaa should pay extra attention to?
~~xc vnr~vs~iiu.via ATTACHMENT NO.1 ANCHOR INSPECTION DATA SHEET Un1t g Bldg.A.5a4z h~e~', 9Rn Locat1on C Installat1on dwg./Rev.Anchora e Arran ement, Sketch Equ1pment No.F46'v.J>I=4 45DksQl c yj'4 Ooi~Yyp Vlc o.O.INDiAHA." llCHIGA"I POY(ER CONSTRLICT!Oib CGLTROLLEO EYORKING COPY S~P g g tqap Oo I~l FLo'E4.'-0~T, 4 Gr a q'i CLERK k 7 ,:I Drawn by: Verified by: Reviewed by: Date:/8-/-Date: L-Z.-'P<Qual./Cert.Inspector Date: nstruct1on Anchor Rev1ew Engineer Page 1 of 3 Revision 1 Equipment No.: Tightness Veri f ied by: Tightness established by"Snug Fit" Tightness veri'ed by: 'C.goal./Cert.
Any Yes ~       No       (If yea, check items that apply.)
Inspector onstruction ARE Comments:
Anchor Type Anchor Diameter Anchor Spacing Anchor Number Anchor Embedment <
Equip ID: 1-TK-11 Train: 12 Equip Class: 21 Drawing No.: 1-5142 ction: RI ys tern: BORON INJECTION Equip Desc: BORON INJECTION TANK Building: AUXILXARY Room: BORON INJECTION TANK ROOM Elev: 612 Sort: S, Notes: Normal State: Desired State: Power Req'd: Support System Drawing: Req'd Support Comp: Safety Related Status: NUCLEAR SR Alias No: Power Train: Comp Served: BORON INJECTION TANK Mfr: STRUTHERS-WELL-CORP.
Anchor Edge Distance Anchor Cap Anchor Thread Engagement Anchor Crip Anchor Angularity Concrete Crack Others (describe    briefly)
Model: 900 GALS, O'I'.Elem.Drawing: 1-98282 Wiring Drawing: 1-95222 Power Source: '1-AM-D-5A 1-AM-A-2A Walkdown: F Relay Eval: N Comp Type: TANK a ISO Drawing: Min/Opt: MIN Location: XN THE MIDDLE OF ROOM, 15'W OF THE ROOM'S ENTiVQICE DOORWAY.
If there  ts concern  for  Design Basis Discrepancy, circle the applicable item and explain.
DC COOK Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 1 of 3 ID: 1-TK-11 (Rev.0)Description:
: l.     Hardvare Maintenance Type Discrepancy
BORON INJECTION TANK Class: 21-Tanks and Heat Exchangers Building: AUXILIARY Floor El.: 612.00 Room, Row/Col: BORON INJECTION TANK RM, IN THE MIDDLE OF RM, 15'WOF THE RM'S ENTRANCE DOORWAY.Manufacturer, Model, Etc.: STRUTHERS-WELL-CORP.
: 2.     Drawing Up&,te Type Discrepancy
900 GALS, 4'l BASIS: External analysis 1.The buckling capacity of the shell of a large, flat-bottom, vertical tank is equal to or greater than the demand.2.The capacity of the anchor bolts and their embedments is equal to or greater than the demand.3.The capacity of connections between the anchor bolts and the tank shell is equal to or greater than the demand.4.Attached piping has adequate flexibility to accommodate the motion of a large, flat-bottom, vertical tank.5.A ring-type foundation is not used to support a large, flat-bottom, vertical tank.N/A Yes Yes Yes N/A SMC~CO~~S SRT: Gary Thomas, Tom Huang and Kailash Mahajan on 11/3/93.ADEQUACY OF ANCHORAGE AND TANK TO SUPPORT CONNECTION BASED ON JUDGMENT BY THE SRT AND COMPARISON TO THE BORIC ACID TANK EVALUATION.
: 3.     Significant Operability/Design Basis Discrepancy 4(,. Others Condition:
Tank is 5'iameter by 10'n height supported by 4 Wide Flange Leg supports (10" WF w/5/8" flange)4'R" in height..Each leg is bolted to the pedestal w/two embedded 1 3/4" bolts with 2'-11" embedment Weld of leg to tank about 14" in length and 1/4" thickness on each side of the wide flange and 10" at the top of the wide flange.Adjacent Block wall reinforced with column supports and it is not an interaction concern.The Seismic Evaluation of the Boric Acid Tank (2-TK-12S) is seismically adequate.The Boron Injection Tank (1-TK-11)is much smaller but has about th.same support.Therefore, Tank 1-TK-11 is judged adequate.
Actions Taken:
DC COOK Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 2 of 3 ID: 1-TK-11 (Rev.0)Description:
Prepared By                  D444
BORON INJECTION TANK Class: 21-Tanks and Heat Exchangers Building: AUXILIARY Floor El.: 612.00 Room, Row/Col: BORON INJECTION TANK RM, IN THE MIDDLE OF RM, 15'WOF THE RM'S ENTRANCE DOORWAY.Manufacturer, Model, Etc.: STRUTHERS-WELL-CORP.
900 GALS.4'l Evaluated by: Date:-fs.


==Attachment:==
0 L2 CHP 5021.CCD.019 ATTACHM.NT NO. 1 AQ'L    ~~I'-0"  Cl        BORON'MKCTIOM tAMI(                t=.I GM Un  t                      Bldg.                      Location I2- 3514.-17                          I - T>C. -Il                                          O Installation      dwg.    / Rev.        Equipment      NO. Ycxwk, Loc. =+i@~ +aK<Ir Anchora e Arran ement Sketch                                    Pro~ Dwg. (0-33] "t-l7 E    I" x I5"X l5" W IO>> 4.5                                                    o I ~1~'+ AMOS HQLY'5 PEP DRAINlklC
  ) Q.357')-20                                                            O.
6J Qc 40 Qg      INOI.-'sic. r'.I.,r< ".
                                                                                            ~
SITE 0::SIGN COr WORKING CGc        ~
JUL        lg    tSS5 LERK Drawn by:
Verified, by:        ~                                            Date:
Qua . Cert. Inspector Reviewed by:            =     4,                                Date:
Construct on      c  or Review Engineer Page 1            of    3 Revision              1


Pictures
                                                    .2 CHP 5021. CCD. 019 ATTACHMENT NO. 1 AUX. (oQ'-0" EL. BQROQ M,K,CT'lQKL TAMK PQQM Un  t                Bldg.                  Location I- TK-)i Installation  dwg. / Rev.      Equxpment No.
Anchora e Arran ement Sketch
                                                    )8 I NOIANA MICKIGAN POWER SITE DESIGN CONTROLLEO WORKING COPY ELK.V. LKC.        UHH              lUt. 1)1995 LERK~
Drawn by:                                          Date:
Verified by:                                      Date:
Qua . Cert. Xnspector Reviewed by:                                      Date:              3 Construction  An  or Review Engineer Page 1    of  3 Revision      1


DC COOK Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 3 of 3 ID: 1-TK-11 (Rev.0)Description:
                                                                                                          ~~~ 4 4 vo 4 gag
BORON INJECTION TANK Class: 21-Tanks and Heat Exchangers Building: AUXILIARY Floor El.: 612.00 Room, Row/Col: BORON IN JECTION TANK RM, IN THE MIDDLE OF RM, 15'W OF THE RM'S ENTRANCE DOORWAY.Manufacturer, Model, Etc.: STRUTHERS-WELL-CORP.
                                                                                                                        ~        t/i y)
900 GALS, 4'l ELILlEH BASE ANCHORAGE PEDESTAL SUPPORT COLUMN TO TANK CONNECTION
ATTACHMENT No.
quipment No,                 I- Vl(-iL No i ~pe. c i-.Yaw<
                                                    ~
                                                                                                      ~g    No.:        /o    Pj ~J  I  ~
Anchor type:        >~+ ~"P~ ~ I~~ Dia: I ++                                                    Dwg  No.:        )Q %~7+
Tightnass cata isnas hy: FJ "snug Fit" 0 Torque g Torque  Wrench No.:                                    hlh                    Cal. Due Date:
                                                                                                                'j
  - Tightness verified'? 0 Yes                    0 No                                            Date:
+Q ons ruc ron q Equipment base flexible7                      D    Yes     I    No
                                                                                  <">l ons ruc xo              ARE Date:
Bolt ID       '/tie" A    '13K COIIIments        I A
s  //'                                          w'//                              v4 Anchor                                                                                                                      1eb' len h                        Z'-II"            @            0        ~ '- II
                                                                                              ~          g        2'-I Protruding      p~~T~o FE.CE~
                                                      ~a RGCLGSE.O ga P.ECESXQ Ih
                                                                                                                              <ITT I HICK  Ill
~v        len th                        < ~/
4 p/+>>        )/In ~>
                                                                                                          +          @
I ICD Embedment                      2-6'/s"                                  2'-5'e Bolt                                            '4" ri              Z."~<~"    2 '~o"          6          2'/e"      E>4"
          '""'te condition      CO~Cea            iS        CeC~
V<t." GPGUY PER CPAV{LLLCs IL BELD-LCa Edge          4/A          N/A            M /'A        IM/4,     4/A        4/0,         hL/0,     g/A      &z)g<
distance                                                                                                          TIS IQ Q.m Anchor              6'/z"        8'/z"          8"        B"        8"                      5"        8" s  acin Atu QIOR Anchor                                                                                        U/4 4/A an    larit      N 4/4        4/A            kVA
                                                      >/S '
U JA I+"
kl /A        IJ/A
                                                                                            ~/~-
                                                                                                                            &Hi u~TW our mi~~a-.
(
Thread  "
                          ~ecE~ t-I<                  RE~a RccEss                0 i4      P,G  Ess    DK. H IC engagement Comments,   +  UA'TA, 'QoT      QwtlkiEQ DUE 'To                      7      AYLQM.
INA UUOKTALNA                LIE TCi            T  P, Verified by-                                                                                                  Date:         ->      3 gua ,//Cert                inspector Ravieved by:
Construct on              ARE INDIANA LIIGHT'..:
SITE OESIGN CONTRC~          0 WORKING COPY Pago 2        of  3 Revision          1 LERK              9 '~    I


Coo Component No.~TK.<laic Ql Any payticulir area the Seismic Revue~Teaa should pay extra attention to?Yes~No (If yea, check items that apply.)Anchor Type Anchor Diameter Anchor Spacing Anchor Number Anchor Embedment<Anchor Edge Distance Anchor Cap Anchor Thread Engagement Anchor Crip Anchor Angularity Concrete Crack Others (describe briefly)If there ts concern for Design Basis Discrepancy, circle the applicable item and explain.l.2.3.4(,.Hardvare Maintenance Type Discrepancy Drawing Up&,teType Discrepancy Significant Operability/Design Basis Discrepancy Others Condition:
      'A DEPAR'FMENT                                            2 SHP 5050 NDE.008 S '8                                                            ATTACP2KNT NO. 1 CONTROLLED DOCUMENT COPY NO.         'P -l ULTRASONiC TEST REPORT C
Actions Taken: Prepared By D444 0
A'/Tg REQUEST NO. JA gy IDENTIFICATION                                TECHNI UE
L2 CHP 5021.CCD.019 ATTACHM.NT NO.1 AQ'L~~I'-0" Cl Bldg.I-T>C.-Il Equipment Un t I2-3514.-17 Installation dwg./Rev.Anchora e Arran ement Sketch BORON'MKCTIOM tAMI(t=.I GM Location O NO.Ycxwk, Loc.=+i@~+aK<Ir Pro~Dwg.(0-33]"t-l7 E I" x I5"X l5" W IO>>4.5 I~1~'+AMOS HQLY'5 PEP DRAINlklC)Q.357')-20 o O.6J Qc 4 0 Qg INOI.-'sic.
                                                                  -'tl Unit        +e                                  Test Unit/ S/NL(.i -'/'S        Cz  c "RQS Component:       - 7    f      -//            Freq./Diameter Item      n/ A/'/--                           Reference Standard Naterial      ~/                                Couplant/Batch No.
r'.I.,r<~".SITE 0::SIGN COr WORKING CGc~JUL lg tSS5 LERK Drawn by: Verified, by:~Qua.Cert.Inspector Date: Reviewed by:=4, Construct on Date: c or Review Engineer Page 1 of 3 Revision 1
Other  C)
.2 CHP 5021.CCD.019 ATTACHMENT NO.1 Un t AUX.(oQ'-0" EL.Bldg.BQROQ M,K,CT'lQKL TAMK PQQM Location Installation dwg./Rev.Anchora e Arran ement Sketch I-TK-)i Equxpment No.)8 ELK.V.LKC.UHH I NOI AN A MICK IGAN POWER SITE DESIGN CONTROLLEO WORKING COPY lUt.1)1995 LERK~Drawn by: Verified by: Reviewed by: Date: Date: Construction An Date: or Review Engineer Qua.Cert.Xnspector 3 Page 1 of 3 Revision 1
TEST DATA RENARKS A /T c'L C PERFORMED BY:                                            LEVEL~         DATE: 3  23 ~13 REVIEWED BY:"                                            LEVEL:~        DATE: Y ZS FORM NO. 12 SHP 5050 NDE.008-1                          Page 1 of   1 Revision   0


~~~4 4 vo 4~gag t/i y)ATTACHMENT No.quipment No, I-Vl(-iL~No i~pe.c i-.Yaw<~g No.: Anchor type:>~+~"P~~I~~Dia: I++Dwg No.: Tightnass cata isnas hy: FJ"snug Fit" 0 Torque g Torque Wrench No.: hlh Cal.Due Date:+Q-Tightness verified'?
Equip ID: 1-TK-37       Train: 12   Equip Class:21 Drawing No.: 1-S13SA ction:
0 Yes 0 No Date: ons ruc ron q Equipment base flexible7 D Yes I No'<">l Date: ons ruc xo ARE/o Pj~J I~)Q%~7+Bolt ID'/tie" A'13K A COIIIments I Anchor len h s//'w'//'j 1eb'v 4 Z'-II"@0~'-I I"~g 2'-I FE.CE~RGCLGSE.O Protruding p~~T~o<~/.,~a ga len th P.ECESXQ<ITT I HICK Ill 4 p/+>>)/In~>+@Ih I ICD Embedment~v 2-6'/s" 2'-5'e Bolt ri Z."~<~" 2'~o" 6'4" 2'/e" E>4" V<t." GPGUY condition'""'te CO~Cea iS CeC~IL BELD-LCa PER CPAV{LLLCs Edge 4/A N/A M/'A IM/4, 4/A 4/0, hL/0, g/A&z)g<distance TIS IQ Q.m Anchor s acin Anchor an larit 6'/z" 8'/z" 8" B" 8" 5" 8" Atu QIOR 4/4 4/A kVA U JA kl/A IJ/A U/4 4/A&Hi u~TW (N>/S'I+"~/~-our mi~~a-.Thread"~ecE~t-I<RE~a RccEss 0 i4 P,G Ess DK.H IC engagement Comments,+UA'TA,'QoT QwtlkiEQ DUE'To 7 AYLQM.IN A UUOKTALNA LIE TCi T P, Verified by-gua ,//Cert inspector Ravieved by: Construct on ARE INDIANA LIIGHT'..:
        ~
SITE OESIGN CONTRC~0 WORKING COPY Date:->3 Pago 2 of 3 Revision 1 LERK 9'~I S'8'A DEPAR'FMENT CONTROLLED DOCUMENT COPY NO.'P-l 2 SHP 5050 NDE.008 ATTACP2KNT NO.1 ULTRASONiC TEST REPORT C A'/Tg gy REQUEST NO.JA IDENTIFICATION Unit+e Component:
              ~ CCW System:     CCW Equip Desc:     COMPONENT COOIING WATER SURGE TANK ggc Building:     AUXILIARY   Room:~     HALLWAY
-7 f-//Item n/A/'/--Naterial~/Other C)TECHNI UE-'tl Test Unit/S/NL(.i-'/'S Freq./Diameter Reference Standard Couplant/Batch No.Cz c"RQS TEST DATA RENARKS A/T c'L C PERFORMED BY: REVIEWED BY:" FORM NO.12 SHP 5050 NDE.008-1 LEVEL~DATE: 3 23~13 LEVEL:~DATE: Y ZS Page 1 of 1 Revision 0 Equip ID: 1-TK-37 Train: 12 Equip Class:21 Drawing No.: 1-S13SA ction: CCW~~System: CCW Equip Desc: COMPONENT COOIING WATER SURGE TANK ggc Building: AUXILIARY Room:~HALLWAY$5o Elev:%69-Sort: S, Notes: Normal State: Desired State: Power Req'd: N Support System Drawing: Req'd Support Comp: Safety Related Status: NUCLEAR SR Min/Opt: MIN Alias No: Power Train: NA Comp Served: CONDENSATE COOLING TANK MFR: SPEAR AND WOOD Y"Gel: 10000GAL, 2'x 12''lem.Drawing: N/A Wiring Drawing: N/A Power Source: N/A Walkdown: F Relay Eval: N Comp Type: TANK (COMMON DIVIDED BY BAFFLE}Iso Drawing: Location:
          $ 5o Elev: %69-     Sort: S,       Notes:
DC Cook Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet1 of5 ID: 1-TK-37 (Rev.0)Class: 21-Tanks and Heat Exchangers
Normal State:         Desired State:     Power Req'd: N Support System Drawing:
Req'd Support Comp:
Safety Related Status:       NUCLEAR SR       Min/Opt: MIN Alias     No:       Power Train:   NA Comp   Served:   CONDENSATE COOLING TANK MFR: SPEAR AND WOOD Y"Gel: 10000GAL, 2'       x 12'
'lem.
Drawing: N/A Wiring Drawing: N/A Power Source: N/A Walkdown: F         Relay Eval : N Comp   Type:   TANK (COMMON DIVIDED BY BAFFLE}
Iso Drawing:
Location:


==
DC Cook Unit 1                                      GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                    Status: Yes Sheet1 of5 ID: 1-TK-37 (Rev. 0)                              Class: 21 - Tanks and Heat Exchangers
Description:==


COMPONENT COOLING WATER SURGE TANK Building: AUXILIARY Floor El.: 650.00 Room, Row/Col: HALLWAY, Manufacturer, Model, Etc.: SPEAR AND WOOD, 10000GAL, 2'x 12'BASIS: External analysis 1.The buckling capacity of the shell of a large, flat-bottom, vertical tank is equal to or greater than the demand.2.The capacity of the anchor bolts and their embedments is equal to or greater than the demand.3.The capacity of connections between the anchor bolts and the tank shell is equal to or greater than the demand.4.Attached piping has adequate flexibility to accommodate the motion of a large, flat-bottom, vertical tank.5.A ring-pe foundation is not used to support a large, flat-bottom, vertical tank.N/A Yes Yes Yes N/A SRT: Gary Thomas and Tom Huang on 11/3/93.Skirted tank 11'-10 1/4" diameter and 17'n height.Skirt is 4'4" high from the top of the pad to skirt connection to tank.Skirt has 1/2" thickness.
== Description:==
There are 8 bolts evenly spaced around tank, with a solid steel washer 3-3/4" high x 4" length x 2" width.Bolts supported from 3" x 3" x 1/2" angle.Crane above tank has been evaluated by AEPSC for seismic loads.The results gave a safety factor of 1.06 for the anchor bolts using the GIP penalty for J-bolt embedment.
COMPONENT COOLING WATER SURGE TANK Building: AUXILIARY                       Floor El.: 650.00                     Room, Row/Col: HALLWAY, Manufacturer, Model, Etc.: SPEAR AND WOOD, 10000GAL, 2'                 x 12' BASIS: External analysis
A hand calculation that included in the package was performed for the bolt stresses.Evaluated by: Date:  
: 1. The buckling capacity of the shell of a large, flat-bottom, vertical tank is equal to or greater         N/A than the demand.
: 2. The capacity of the anchor bolts and their embedments is equal to or greater than the                     Yes demand.
: 3. The capacity of connections between the anchor bolts and the tank shell is equal to or                   Yes greater than the demand.
: 4. Attached piping has adequate flexibilityto accommodate the motion of a large, flat-bottom,               Yes vertical tank.
: 5. A ring- pe foundation is not used to support a large, flat-bottom, vertical tank.                         N/A SRT: Gary Thomas and Tom Huang on 11/3/93.
Skirted tank 11'-10 1/4" diameter and 17'n height. Skirt is 4'4" high from the top of the pad to skirt connection to tank. Skirt has 1/2" thickness. There are 8 bolts evenly spaced around tank, with a solid steel washer 3-3/4" high x 4" length x 2" width.
Bolts supported from 3" x 3" x 1/2" angle.
Crane above tank has been evaluated by AEPSC for seismic loads.
The results gave a safety factor of 1.06 for the anchor bolts using the GIP penalty for J-bolt embedment.
A hand calculation that included in the package was performed for the bolt stresses.
Evaluated by:                                                                           Date:


==Attachment:==
==Attachment:==
 
Pictures
Pictures  


==Attachment:==
==Attachment:==
External Anchorage Analysis for 1-rK-37


External Anchorage Analysis for 1-rK-37 DC Cook Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet2of5 ID: 1-TK-37 (Rev.0)Class: 21-Tanks and Heat Exchangers
DC Cook Unit 1                           GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                        Status: Yes Sheet2of5 ID: 1-TK-37 (Rev. 0)                     Class: 21 - Tanks and Heat Exchangers


==
==
Description:==
Description:==
COMPONENT COOLING WATER SURGE TANK Building: AUXILIARY                Floor El.: 650.00              Room, Row/Col: HALLWAY, Manufacturer, Model, Etc.: SPEAR AND WOOD, 10000GAL, 2'    x 12' BOLT TO TANK DETAIL


COMPONENT COOLING WATER SURGE TANK Building: AUXILIARY Floor El.: 650.00 Room, Row/Col: HALLWAY, Manufacturer, Model, Etc.: SPEAR AND WOOD, 10000GAL, 2'x 12'BOLT TO TANK DETAIL CUENT<<Iota S'+t-I"" attar~or~Stevenson and Assodates 8 A Structural Meelto atcol Coo<atria<5 Eat<to<<a<toy Fr<ra D 5~~5P fA~~6 Cl>>th~.\<It>>tu l.'.-<o>>(<<o 45 i~'I'L~I I, A,S>>hf tht I hr h>>ft gl Pg ti<;>>I'<<rtr l tth.I~I I (~f~~<<'l'\I~I*I>>5 p.<<, I~'<~.,~.If yh(l~5\~of (tl'551<>>>>~r>>Cf Pl>>h I ftjj I I<<L pt'p tr 5>>I tt''I 11 lh l O.Il trrlh I u (5>>r l>>g r~tt ro~t 55>'5 t,:.It}I~
CUENT                               <<Iota     S'+t-I ""             attar       ~ or~
CIJENT 4(S Sl.8"" L I.,'7 M stru.~I SUBJECT~~s'1 P w w Cg<<I Ccs~.~uI<, I(J>1.c 7E A Ic-[<<~g~5 7 Stevenson and Assodates A S(ruccurc!.MccIsr aces l Coarul((s(r Ea(r(act((ay E(rsi is>>I 4.,".~, gc'?N.4 E~E.I<<II)I IEII,(u~1'ilr 7 r(c'I~~8'ci 1*5~1 1.'cc~II'I~4 r?~>>1~h.Il.CI V I Qlr~1 I 41\5,*4~4)i%tl7 (l>>P re>>~t (1;I.I lrr,'114"C?u qg.c i r PL?cl>>>>I>>cl'4'i.''7(~C 7('5.Itrr~I~C E~'~l C'I cgt 114 QI CI fine>>4 1~l,''F V I\~~ir p7~t I rli~roc 2?P O'<<'>>I'r I-,c;r(lr>>;~ir c>>I x 5 7 4 44 kt'''I lr>>E 1 I>>7 S"Cj 4'PW I'ic~CI C("'"'I t<<lv,<<(7s, c~'r<<r,.Ttt(I I 5>>r:Lt~I".1 ()r E~4 r' 4 CuEHT Y)9~'" SHEET OF g@~C~~~F~~a V~c.ter-4-IJt r.Z>>7 ht tc, (h'r Steve@son and Assodatcs 0*Stractara)-Mac)raalcal Coarldttay Ka2ltaccrlatr Ftral 44 (2 2 7.'2 4"4'fcr.gf
Stevenson and Assodates 8       A Structural Meelto atcol Coo<atria<5 Eat<to<<a<toy Fr<ra D
,44 rr~44144 2 I F Jt ll~I r-'29'vY t~".4.''r Jtt'2 4" V i g 2'tFI't 4)'I I~\Fr YYt g'I~'~'1'.~>''r.Vr x 2FI'-41.241~4 h~4 1~Pl 2~44,'Yr Y I;"2~Ih 222~''1 fI rl\IF)4Y.C 44 Y'4 22Y2", I.f~.g;\s Yl*)f.h'F.y I  
5
**12 CHP 5021.CCD.019 ATTACHMENT NO.1 ANCHOR INSPECTION DATA SHEET Unxt"/2-3 Z7 Bldg.Y(-Location Installation dwg./Rev.Anchora e Arran ement Sketch Equipment No.'w MG ORNA INDIANA CONST RU w a 3~992 MICHIGAN POWER TION CONTROLLEO RKIHG COPY<<~L 4''-o Drawn by.Verified by Date: Date: Reviewed by: Q al./Cert.Inspector Date: S nstructzon Anchor Review Engineer Page 1 of 3 Revision 1
                                                                                              ~ ~
**12 CHP 5021 CCD O19 ATTACHMENT NO.1 ANCHOR INSPECT10N DATA SHEET Unxt g Q-3 Bldg.Locate.on Installation dwg./Rev.Anchora e Arran ement Sketch Ecpxzpment No.INDIANA MICHIGAN POWER CONSTRUCTION CONTROLLED WORKING COPY AUG 1>1992 CLERK.>+~~8/y.:c"a q'.e Drawn by: Verified by: Reviewed by: QG./Cert.nstructxon Date: Date: Inspector P Date: Anchor Review Engineer-I-l Page 1 of 3 Revision 1 0
5P   fA
**12 CHP 5021.CCD.019 ATTACHMENT NO.1 r ANCHOR INSPECTION DATA SHEET Unxt g Bldg.Location Installatz.on dwg./Rev.Anchora e Arran ement Sketch Equipment No.1--3 (gp($+4<4(QH>GAB POWER QON$TQQCv n~GONTSOLLEO wOR~.'Ci CC('Y azw p~l~b c<~(omnlsonS Votv SrC r~a~+i~>Leo+H>>+Fl 6 oP)s 4r 3+c//<&#xc3;s B%3'ls Drawn by: Verified by: Reviewed by: Date: Date: Q l./Cert.Inspector Date: onstructxon Anchor Review Engineer Page 1 of 3 Revision 1 l s fi~~~I~~,;~/~N~~~~~~s~~W~sRM~RHR%
                                                                                                                                          ~       ~
a~~a MMIIIIIII II585mmlmmm RSIIIRIMIIIII RSIIISIIIRSRRIIII 55.Iles%..l%I%IIIIIISIIIHII a Rse&R4%&#xc3;%RM~RJ%8%5%
6                           >>
MWWMWMW&I~La Sl~~i~~K9MEX>L L~L~(~~asia~~~I~~~~~~~i f~~~
Cl th
Equipment No.: I.!-~'ightness established by"Snug Fit" Tightness veri fi ed by: Qual./Cert.Xnspector Comments:
                <It >> tu l.'. 45  i                                hf                                                                                      ti                                I I
Equip XD: 12-TK-47-AB Train: 1 Equip Clays,:21 wing No.: 2-5151C tion: EMERG DIESEL System: DIESEL FUEL OXL Equip Desc: AB EMERG DIESEL FUEL OIL STORAGE TANK (BURIED IN THE YARD)Building: GROUNDS Room: INNER PLANT GROUNDS Elev: 609 Sort: S, Notes: Normal State: Desired State: Power Req'd: N Support System Drawing: Req'd Support Comp: Safety Related Status:.NUCLEAR SR Alias No: Power Train: NA Comp Served: AB FUEL OXL STORAGE TANK MFR: 60,000 GALS (12'IA X 72'ONG)'Panel: Elem'.Drawing: NgA Hiring Drawing: N/A Min/Opt: MIN Power Source: N/A Walkdown: F Relay Eval: N Comp Type: TANK (COMMON FOR UNIT 1 AND UNIT 2)240 HRS FULL LOAD.Xso Drawing: 7 Location: BEXNG REPLACED UNDER RFC 12-4113,, CI NOT APPROVED AS OF 9-15-92.
                                            'L ~ I                                                                    hr                    gl Pg                                            ~
                -<o>>   ( <<o         ~ 'I     I,     A,S>>
      \
I '<<rtr
  ~ .
tht I                                   h>>ft                   <; >>       tth.
l
                                    <<'l'                  *                                                                                                                          '
( tl          551<>>>>
I ~ '<
                                                                                                                              ~
I 5                                          of I (~f ~   ~
                                          \
                                                      ~ I
                                                          >>5 I p. <<,           ~
                                                                                    .,                               yh(l If.
                                                                                                                  ~
                                                                                                                                        \~
11 lh l                                                         r ~ tt     55>'5 t,:.It}
5                                               O                                                      ro
        >>   Cf  Pl>>h I ftjj I
I<<L pt      'p tr tt ''I                         trrlh      u (
                                                                                                                                                          >>r l>>g I~
                                                          >> I                                                                                                            ~ t
~ r                                                                                                               .Il                                5 I


DC Cook Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 1 of 11 ID: 12-TK47-AB (Rev.0)Class: 21-Tanks and Heat Exchangers
CIJENT
                                                                                ~ ~s'1     P w w Cg<<I              Ccs 4(S Sl. 8 "" L I ., '7 M stru.
                                                                                                                        ~.~ uI <, I(J>1.c      7E
                                                                                                                                                                        ~      I SUBJECT A Ic-        [ <<  ~g      ~5 7 Stevenson and Assodates A S(ruccurc!.MccIsr aces l Coarul((s(r Ea(r(act((ay E(rsi gc    '?N.
is>>I  4.,"  .  ~,
4  E~E. I<<II)I IEII,(
                                                                                                                                                                                                  'I ~        ~
u          ~ 1 ilr                                                                                                                                                                          7 r(c
                                                                                                          ~ II                                                            r?                h.
8'ci 1
* Il  .CI  V
                                                                                                            'I ~                                                                                                    I  Qlr ~
5 ~1 1.'cc                                                                          4
                                                                                                                                                                      ~  >> 1
                                                                                                                                                                            ~
1        I                                                                                              cgt                        ~
I>> cl                                                                                                              ~roc 2?P 41\5,
                )i% tl7 (l>>P                                                                                                                    V p7                            -,c;  r(lr>>;~
l,''F
* re>>      t  (1;  I.I                                          '                                                                                                    ir                          5 4
4
            ~
lrr, ~
                                '114  "C                                              ~
c>>I x    7 fine                              I      O'<<
                                                                                                                                                                      '>>I'
                                        ?u                          ~ C 114  QI                                        \  ~
qg.c  ir    PL    ?cl                  7(
                                                                      '5 Itrr                                                                                ~ ir                          rI
                                                                                  ~C E          ~ l  C'I CI
                                                                                                                                >>4 1
                                                        '4'i. ''7(                                                                                                                                                    4 44
                                              >>>>                                                                                                                                                                  kt'
                                                                  ~  I
                                                                                                                                                                ~ t rli I
                                                                                                                                                                                                                    ''I 1 I>>7 S"Cj 4'PW I'ic                        C("'"'      I    t<<lv,
                                                                                                                                                        'r<<r,.
                                                                                                                                                          <<(7s, Ttt(I              :Lt ~I".1 ()r
                                                                                                  ~ CI                                              c ~
lr>>E                                                                                                                                          I    5>>r E
                                                                                                                                                                                  ~  4 r'


==
4 CuEHT                                                  Y) 9 ~'        "  SHEET                OF g@~          C ~~~    ~~          a V        ~ c.ter-    4-IJt r.Z>>
Description:==
F 7  ht tc,        (  h'r Steve@son and Assodatcs
                                *Stractara)-Mac)raalcal 0    Coarldttay Ka2ltaccrlatr Ftral 44 (2
2  7.
'2 4"4'fcr.gf
            ,44                44144 rr  ~          2 I                                            ll I
                                                                                                      ~
F Jt
                          ".4.                                                                '2
                            '  'r Jtt                                                        4"                                                      V r-'29'vY t ~
i  g 2 'tFI't          4)
                                                                              ~
                                                                                                                                                      ~4 YYt
                'I I
                  ~  \
4 1 ~
Fr            'I g
                                                        ~  '        '  1'  .~> ''r.
Vr x 2FI'                  -  41. 241 h    ~
      ~  44,                    Y
        'Yr
* rl fI\IF                                                                  )f.
Pl                                        I;"2                                                  ) 4Y                        22Y2", I.f        ~ .g;\s          Yl 2                                        Ih ~                                                  .C 44 222
                                                              ~
                                                                ' '1 Y'4 h'F.y I
 
                                                          **12 CHP 5021. CCD. 019 ATTACHMENT NO. 1 ANCHOR INSPECTION DATA SHEET Unxt "                Bldg.                Location
                /2-3 Z7                                Y(-
Installation    dwg.  / Rev.      Equipment No.
Anchora e Arran ement Sketch
                                                    'w MG  ORNA POWER INDIANAMICHIGAN CONTROLLEO CONST RU TION w RKIHG COPY a 3 ~992
                                                                        << ~L 4''-o Drawn by.                                            Date:
Verified      by                                    Date:
Q  al./Cert. Inspector Reviewed by:                                          Date:  S nstructzon Anchor Review Engineer Page 1 of  3 Revision  1
 
                                                    **12 CHP 5021      CCD O19 ATTACHMENT NO.        1 ANCHOR INSPECT10N DATA SHEET Unxt  g                Bldg.                  Locate.on Q-3 Installation  dwg. / Rev.          Ecpxzpment No.
Anchora e Arran ement Sketch INDIANAMICHIGAN POWER CONSTRUCTION CONTROLLED            8/y WORKING COPY AUG 1 > 1992 CLERK  .>  +~~
                                                              .:c q'.e "a
Drawn by:                                            Date:            -I-  l Verified by:                                        Date:
QG  ./Cert. Inspector P
Reviewed by:                                        Date:
nstructxon Anchor Review Engineer Page      1 of  3 Revision      1
 
0
                                                              **12 CHP 5021. CCD. 019 ATTACHMENT NO. 1 r
ANCHOR INSPECTION DATA SHEET Unxt  g                Bldg.                        Location Installatz.on  dwg. / Rev.            Equipment No.
Anchora e Arran ement Sketch 1-        -3 (gp($ +4 <4(QH>GAB POWER QON$ TQQCv n~ GONTSOLLEO wOR ~. 'Ci CC('Y azw
                                ~ p~l ~b          c<
(omnlsonS Votv SrC r~a~ +i~>
Fl    6 Leo +
H>>  +                                    4r    3+
oP)s              c//<  &#xc3;s    B%    3'ls Drawn by:                                                    Date:
Verified by:                                                  Date:
Q  l./Cert. Inspector Reviewed by:                                                  Date:
onstructxon Anchor Review Engineer Page 1 of  3 Revision  1
 
                                  ~    ~
                                                                ~ ~    ~
                                                                ~ ~    ~
I        ~  ~
l    s              ,;~/ N ~
fi ~
                  ~ W~sRM~RHR%
MMIIIIIII II585mmlmmm a        ~                ~      a RSIIIRIMIIIII s ~
RSIIISIIIRSRRIIII
: 55.        Iles%                ..                      l%I%
IIIIIISIIIHII                    a Rse&R4%&#xc3;%RM~RJ%8%5%
MWWMWMW&          ~ La I
Sl  ~ ~i L ~ L  ~ (
                                                          ~~asia L
~~K9MEX >
                                                        ~
I  ~
                                            ~      ~        ~
    ~ ~
                                    ~
                                      ~  ~    if    ~
                                                      ~ ~
 
Equipment No.:      I  .! -
established by "Snug
                            ~'ightness Fit" Tightness veri fied by:  Qual. /Cert. Xnspector Comments:
 
Equip  XD: 12-TK-47-AB    Train:  1  Equip Clays,:21 wing No.: 2-5151C tion:  EMERG  DIESEL System: DIESEL FUEL OXL Equip Desc:    AB EMERG DIESEL FUEL    OIL STORAGE TANK (BURIED  IN THE YARD)
Building:    GROUNDS    Room: INNER PLANT GROUNDS Elev:  609    Sort: S,        Notes:
Normal State:          Desired State:      Power Req'd: N Support System Drawing:
Req'd Support Comp:
Safety Related Status:.NUCLEAR        SR        Min/Opt: MIN Alias  No:        Power  Train:  NA Comp  Served:  AB FUEL OXL STORAGE TANK MFR:
60,000  GALS  (12'IA X    72'ONG)
'Panel:
Elem'. Drawing: NgA Hiring Drawing: N/A Power Source: N/A Walkdown: F        Relay Eval  : N Comp  Type: TANK    (COMMON FOR UNIT 1 AND    UNIT 2) 240  HRS FULL LOAD.
Xso Drawing: 7 Location:    BEXNG REPLACED UNDER RFC      12-4113,, CI  NOT APPROVED AS OF 9-15-92.
 
DC Cook Unit 1                                    GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                    Status: Yes Sheet 1 of 11 ID: 12-TK47-AB (Rev. 0)                            Class: 21 - Tanks and Heat Exchangers


AB EMERG DIESEL FUEL OIL STORAGE TANK Building: GROUNDS Floor El.: 609.00 Room, Row/Col: INNER PLANT GROUNDS UNIT 0 2 BURIED SOUTH OF TURBINE BUILDING Manufacturer, Model, Etc.: 12'IA X 69'-10"LONG, 60000 GALS BASIS: External analysis 1.The buckling capacity of the shell of a large, flat-bottom, vertical tank is equal to or greater than the demand.-2.The capacity of the anchor bolts and their embedments is equal to or greater than the demand.3.The capacity of connections between the anchor bolts and the tank shell is equal to or greater than the demand.4.Attached piping has adequate flexibility to accommodate the motion of a large, flat-bottom, vertical tank..5.A ring-type foundation is not used to support a large, flat-bottom, vertical tank.N/A Yes Yes N/A N/A mQKS SRT: George G.Thomas (SBA)and Tom Huang (AEP)'C Underground tank.SRT evaiuated this tank based on the ave~~able documentation in the equipment package.A tank calculation was performed (included in the tank package)based on the reference drawings The tank was modeled as a beam on elastic foundation.
== Description:==
The overall tank stresses were very low (on the order of 3.6 ksi).Evaluated by:~g i-)Date: il/Z~low"  
AB EMERG DIESEL FUEL OIL STORAGE TANK Building: GROUNDS                           Floor El.: 609.00                   Room, Row/Col: INNER PLANT GROUNDS UNIT 0 2 BURIED SOUTH OF TURBINE BUILDING Manufacturer, Model, Etc.:     12'IA X 69'-10"LONG,     60000 GALS BASIS: External analysis
: 1. The buckling capacity of the shell of a large, flat-bottom, vertical tank is equal to or greater         N/A than the demand.
-2. The capacity of the anchor bolts and their embedments is equal to or greater than the                   Yes demand.
: 3. The capacity of connections between the anchor bolts and the tank shell is equal to or                   Yes greater than the demand.
: 4. Attached piping has adequate flexibilityto accommodate the motion of a large, flat-bottom,               N/A vertical tank..
: 5. A ring-type foundation is not used to support a large, flat-bottom, vertical tank.                       N/A mQKS SRT: George G. Thomas (SBA) and Tom Huang (AEP)
    'C Underground tank. SRT evaiuated this tank based on the ave~~able documentation in the equipment package.
A tank calculation was performed (included in the tank package) based on the reference drawings The tank was modeled as a beam on elastic foundation. The overall tank stresses were very low (on the order of 3.6 ksi).
Evaluated by:                                                                           Date:
                            ~g i-)                                                     il /Z ~low"


==Attachment:==
==Attachment:==
EVALUATIONOF STRESSES IN THE TANK
CUENT
                                                    - a4CttO g          5~
Stcvcnson and Assodatcs A Structural Maclen aleut EI  Conautttatr Kntrtncartng Ftrra      > cn tn-OSC
CLlEHT SUMECT Stevenson and Associates A scuctvcal Mechanical El  coasulctsy Elplaoocno f4'
CUENT Stcvcnson and Associates k    A Stsucturel-M eAe nlesl Coaoultlaa Koalnooriay Fina      . C. ~ Ca~ 4


EVALUATION OF STRESSES IN THE TANK CUENT g-a4CttO 5~Stcvcnson and Assodatcs EI A Structural Maclen aleut Conautttatr Kntrtncartng Ftrra>cn tn-OSC CLlEHT SUMECT Stevenson and Associates El A scuctvcal Mechanical coasulctsy Elplaoocno f4' CUENT Stcvcnson and Associates k A Stsucturel-M eAe nlesl Coaoultlaa Koalnooriay Fina.C.~Ca~4
CUENT Stevenson and Assodates A StnsctvcehMocha alcal R  Coaaoltlay Eagtoeeaay Fina     De +e C-WO W


CUENT Stevenson and Assodates R A StnsctvcehMocha alcal Coaaoltlay Eagtoeeaay Fina De+e C-WO W CUENT Stevenson and Assodates h st(udvrasMecha aleaf Coawltlay Knylnoodng fire  
CUENT Stevenson and Assodates h st(udvrasMecha aleaf Coawltlay Knylnoodng fire


g CUENT Stevenson and Assodates Il A Structursl-Mschs nicsl Consulting Engtn<<ring Sirrn z 0 8 Pu 5~4, No~o-1'3 lOc 3%c 4 CUENT Stevenson end Assodatcs l5 A Srrucrural.Mcchaalcal Caarulung Kaalaccriny flrra Pr Cr 8 WOCr CUENT Stevenson and Associates II h StructurohM echo uk ol Cuaoulttau Kactaoortatr f to ra I 2.S (
g                 CUENT 5 ~    4, No~ o z0 8
0 CUENT Stevenson and Assodates 8 A SICIICIVC1I.MWL4OIC4I Coaoul5sy Kaylneorlng Feaa D.a ggg V i' CUENT SVMEGT Stcvcnson and hssodatcs 8 A Svuctural.Mechanical Coaaultiog K~laoeclny Eitoa Y-t A.
Stevenson and Assodates Pu Il   A Structursl-Mschs nicsl Consulting Engtn<<ring Sirrn
Equip ID: 2-HE-11 Train: 12 Equip Class: 21 Drawing No.: 2-5129A 2-5135~~~ction: RI System: REACTOR COOLANT PUMP SEAL WATER INZ/LEAKOFF Equip Desc: REACTOR COOLANT PUMP SEAL WATER HEAT EXCHANGER Building: AUXILIARY Room: SEAL WATER HEAT EXCHANGER ROOM Elev: 609 Sort: S, Notes: Normal State: Desired State: Power Req'd: N Support System Drawing: Req'd Support Comp: Safety Related Status: NUCLEAR SR Alias No: Power Train: NA Comp Served: REACTOR COOLANT PUMP Mfr: ATLAS INDUSTRIAL MANUFACTURING CO.Blem.Drawing: N/A Wiring Drawing: N/A Power Source: Walkdown: F Relay Bval: N Min/Opt: MIN Comp Type: HEAT EXCHANGER ISO Drawing: 2-CS-91 2-CS-100 Location: IN WEST AREA OF ROOM DC COOK Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 1 of 7 ID: 2-HE-11 (Rev.0)Class: 21-Tanks and Heat Exchangers
                                      '3 1      lOc     3%
c


==
CUENT 4
Description:==
Stevenson end Assodatcs l5 A Srrucrural.Mcchaalcal Caarulung Kaalaccriny flrra      Pr Cr 8 WOCr


REACTOR COOLANT PUMP SEAL WATER HEAT EXCHANGER Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: SEAL WTR HEAT XCHGR RM-IN WEST AREA OF ROOM Manufacturer, Model, Etc.: ATLAS INDUSTRIAL MANUFACTURING CO.BASIS: External analysis 1.The buckling capacity of the shell of a large, flat-bottom, vertical tank is equal to or greater than the demand.2.The capacity of the anchor bolts and their embedments is equal to or greater than the demand.3.The capacity of connections between the anchor bolts and the tank shell is equal to or greater than the demand.4.Attached piping has adequate flexibility to accommodate the motion of a large, flat-bottom, vertical tank.5.A ring-type foundation is not used to support a large, flat-bottom, vertical tank.N/A Yes Yes Yes N/A S U~CVIF~S SRT: Gary Thomas and Tom Huang on 11/3/93.Vertical Heat Exchanger on a Gusseted steel pedestal.Each Pedestal is anchored to the floor with 8-3/4" J-Bolts embedded 20" into floor.Exchanger is 16" in diameter and 14'n height.Exchanger is bolted to the steel pedestal with,2 1" diameter steel bolts on 6" centers in weak direction and 2'-8" in strong direction.
CUENT I 2.
This connection is more limiting than the anchorage to the floor.Attached calculation was to judge adequacy of these for bolts.The exchanger has a frequency of 10.6 Hz and the bolts had a safety factor in tension of 3.54.Evaluated by: Date: IC)/4~g~CZ
Stevenson and Associates II    h StructurohM echo uk Cuaoulttau Kactaoortatr ol f ra to S (


==Attachment:==
0 CUENT Stevenson and Assodates 8    A SICIICIVC1I.MWL4OIC4I Coaoul5sy Kaylneorlng Feaa      D.
a ggg


Pictures ttachment:
V i'
Verification of Bolt Connection


DC COOK Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 2 of 7 ID: 2-HE-11 (Rev.0)Class: 21-Tanks and Heat Exchangers
CUENT SVMEGT Stcvcnson and hssodatcs 8    A Svuctural.Mechanical Coaaultiog K~laoeclny Eitoa Y-t A.


==
Equip ID: 2-HE-11        Train:  12  Equip Class: 21 Drawing No.: 2-5129A
Description:==
      ~
2-5135 ction: RI
        ~
            ~
System:    REACTOR COOLANT PUMP SEAL WATER      INZ/LEAKOFF Equip Desc:      REACTOR COOLANT PUMP SEAL WATER HEAT EXCHANGER Building:    AUXILIARY    Room: SEAL WATER HEAT EXCHANGER ROOM Elev:    609    Sort: S,          Notes:
Normal State:          Desired State:      Power Req'd: N Support System Drawing:
Req'd Support Comp:
Safety Related Status:        NUCLEAR SR        Min/Opt: MIN Alias    No:        Power Train:    NA Comp  Served:    REACTOR COOLANT PUMP Mfr:  ATLAS INDUSTRIAL MANUFACTURING CO.
Blem. Drawing: N/A Wiring Drawing: N/A Power Source:
Walkdown:      F    Relay Bval  : N Comp  Type:      HEAT EXCHANGER ISO Drawing: 2-CS-91                  2-CS-100 Location: IN      WEST AREA OF ROOM


REACTOR COOLANT PUMP SEAL WATER HEAT EXCHANGER Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: SEAL WTR HEAT XCHGR RM-IN WEST AREA OF ROOM Manufacturer, Model, Etc.: ATLAS INDUSTRIAL MANUFACTURING CO.ECUlKR SUPPORT PEDESTAL TOP OF THE EXCHANGER CUENT SUBJECT t'()Ne.Q CaO<~Stevenson and Assodates S A Sllvclvl al-MCCIII alcol Coalvlgag Saglaotllag Fitch Ahchol'~Acca oaohC Slcatch 2-HHI Ioalcro Vatlaco tacofa SllC DYSICN CDNYIDSIIO clalclha cotY Sfp lS 1SSS I~I(I~h'YI'nt>NYCT lS fC(WF)~, Cl yl ,~')eIC.S~qvr)"..'LEV l K(o C)SST~~~~r~~~.~~.~I~~I~I~-~~~~~~~r er'~~~'~~h'~~rt'acatl4c
DC COOK Unit 1                                       GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                     Status: Yes Sheet 1 of 7 ID: 2-HE-11 (Rev. 0)                               Class: 21 - Tanks and Heat Exchangers
".)pP;I@aha'li cac~\hr 5't,o IODIINC IVQOCAN YOOC~cl 5 Dcslca cahl caslto voc claa can SSP lS lSSS SIC IYCSO IAI L~FA)AD CI Yclta J IICCDI13 (YYY)<<CIO II3 (rlrg.-,'t IYCSO'Wt (tel Y3)~ICSDWI lg~I~'I."~T eotT trit)tr (>>3ECY.'t\3 c cc(cccl c-c N occuv)r~C A B l I'oh 0 0 p 0 0 0 c e o.~0 0 II IC 0 0 F>3 e(FID)0 0 IC 0 0 C I\L C,caclr~E sell:'rc I 0 0 T.rL~,Ql 01hhc I cocah cocca<<lc Dl gas cac IDLsco aacclha catt Sf P'S SSSS acscT r 0~aa Iaa S.g.)i~r g+Ps Yah CI'I c I, tC'&#xc3;)'~'S C CUEHF QJBJECT Stevenson and Assodatcs 8 A Structural-Mectfaalcal Coaru!o oft Eatftocurtafr Fifa<P P.~i'I, h ,f~P.'~cK<<<<I j.fipv>><YA
~iver fl" gv vruhu'.'P<%.fc\u<K h..'g"I~)I t>>f<<~lg'tfr lg<<>>u'P vh tlap P..~,'<<r r'pi t,'hr>f.~I~p pfr>>~>>I~<<~u/Pf>>P h P..htrfu P~h<<I P gh'I l'I r<up I'P H f'<<'~ru~I~I qtr~>>Irph r'tfu Ip.hFrutarp toKj.ifu*~h r,
CUENT JOB No.SUBJECT~@Awe EW Stevenson and Assoctntes IR.A St(ucfuf al.Macha afccl Cuafulffaff Raff face(Lay Sic(a 4~1~+1~I Jul gl>>~'g I u4<<P Irp (~/<<<<<<ls 1,14'la>>n.~\'..IP'f>>J Sir!I'I.4.'"4,')!e/Off P CP'"'5 II I,I(lr<<"<<>>l<<'+rrf>>V tf PP P rir I~1~I ru I'<<"f~'I~p I'-l-'5 4 crap l>>Q,:If (~"r,~44I (l<<>>I'l('l I~uf'I 14.C'<<PPP~1,1 P~<<1<<''1 1(Q/'1>>t%14 r I II u~rpl rp I 0(fg ff CUENT JOB No.~'HEET OF Stevenson and Assodatcs 5 A Structural.l4ucha attut Coaruttiag Kagtauurtag Firar L.~r~r, Coo Componone yo, 2 Class l Any paxpicular area the Seismic Review Teaa should pay extra attention tot Yes<No (Xf yea, check items that apply.)Anchor Typo Anchor Diameter Anchor Spacing Anchor Number Anchor Embodmont<
Anchor Edge Distance Anchor Cap Anchor Thread Engagement Anchor Crip Anchor Angularity Concrete Crack~qs~~~T gjO I/E;Q Pl I IJ (.)<Al (=(g E'L Other'a (describe bri.oily)TE there is concern for Design Basis Discrepancy, cir'clo the applicable item and explain.1.2.3.Hardware Maintenance Type Discrepancy l'raving Upd?te Typo Discrepancy Signil.'icant Operability/Design Basis Discrepancy Others Condition:
Actions Taken: Prepared By
**12 CHP 5021.CCD.019 ATTACHMENT NO.1 ANCHOR INSPECTION DATA SHEE SBfn DATER I+&AT AX.M@Oq-01'AC,HAhl4BR g.oug Bldg.Location Installation dwg./Rev.Anchora e Arran ement Sketch 2..~-I t Ectuzpment No.2-HG"I I INDIANA I IICMIGAN POWCR SITE DESIGN CONTROLLEO WORKING COPY SEP t)1995 g (~Il<YPg~i1 R(7<~)I/Z,R.(~p)
~Ag~b<~0\~h~<~b PLED.gK.G C A&T Date: Date: Drawn by: Date: Engineer.Verified by:~ual./Cer.Inspector Reviewed by: T Construe won An hor Review Page 1 of 3 Revision 1
**12 CHP 5021.CCD.019 ATTACHMENT NO.1 ANCHOR INSPECT ON DATA SH E Unxt l2-3z Xnstallatxon dwg./Rev.Anchora e Arran ement Sketch Equipment No.(>yp)IVB&(T9P)I ,'A 0 0 P 0 0 I~4 I 0 0 0 0>/g Z(~p)0 0 8 C AFOOT Pee.0 0 I-O'RP I IOIAPIA iVICHIGAN POPOVER SITE OESIGN CONTROlLED YPORKIHG COPY SEP t~1995.LFRKT Drawn by: Date: Verified by: Date: al.Cert.Xnspector Reviewed by: Date: Construction Anch r Review Engineer Page 1 of 3 Revision 1
*12 CHP 5021.CCD.019 ATTACHMENT NO.1 CHOR INSPECTION DAT S A"SX~gPa'-O" S~%PITCH&BR'T BXCHfHI GBR.RooH Unit l 2-525s Bldg.Installation dwg./Rev.Anchora e Arran ement SketchH~-1(Equipment No.Location INDIANA I.IICHIGAN PO'ilE'R SITE DLSIGN COMTROLLiD WORKING COPY SF.P 13 ISSUE LERK W~Hb ('TYPE)3/(y WMA j~/II (~P'L)/I g HMH$~P2.)~I(w~wB wm wl.bi,'ob'4'ga J BoiT (~P)e'$~~5CCT, Z-8 (scca c;c~<<~+~~)Drawn by: Date:~1 Verified by:~~ual Cert.Inspector Reviewed by: T Construe won chor Review Date: Date: Engineer-F-F Page 1 of 3 Revision 1 ATTACHMENT NO~1 ANC OR SP Equipment No.-'mbedded Steel Dwg.No.: YS I CA CHARA IS C Dwg No.: Weld ID T e Size Len th Cracks 2I/Yes Yes Yes Yes s'/~II I>/II 3li t l II/%4"<4'8I/Yes o Yes No Yes No Weld e Codes 1=Fillet 2=Plug/Slot 3=Groove Lack of~e Penetration es Yes es QeQs Yes No No Yes No Porosity Yes Yes Yes Yes Yes'es Yes No Yes No INDIANA MICHIGAN POWER SITE DESIGN CONTROLLED WORKING COPY SEP tg t995 LERK Equipment base flexible: 0 Yes 5-No ons ruc z n e Date: Reviewed'y:
Verified by: ons ruc won c or evzev ngxneer V a..e.npsec or Date: t l2 3 Date: Page 3 of 3 Revision
*~12 CHP 5021~CCD.019 ATTACHMENT NO.1 Equipment No.: Anchor type: GODET Tightness established by: 0 Torque Wrench No.: Tightness verified?0 Yes Equipment base flexible?0 Dia: "Snug Fit" Dwg No.: l2-32 pwg No~: I 2-'32 8$0 Torque Cal.Due Date: No Date: 1 ons c 10 Yes C(No~.Date: 0 1-13 ons uc 1 n ARE C C Bolt ID Gaps Anchor len th A 5 C O e.F c l aeT I/S~"em Yg>'ST c$$$Hpv gpss\It I"'I V<ii i il c<<I II 2.-0 2,-0 Z-o 2.-o 2-o g-0 2o 0 2-0 Comments f~IYI QCfCj I 2.-3vlgG Protruding p I5/l~g" p'I~'>/~~"/g Z~Jy edment)I)I//)~i iI qu 1<qu lI-1" li q'i~I 1 qy8)q Bolt ri Concrete condition Edge distance g (2./I X P I 2.">I W)I>W t 2.0 I 2.7i2-Anchor s acin Anchor an larit Thread engagement
@II@tl@'II@II (4 u~4 Oo i~o 00 g0 OO O4 ()0 oy 0 y ng oK.ot.ck ok o((Comments: Verified by: r9 a., ert.Inspector Revieved by: Construct on ARE SITE DESIGN CONTROLLED WOIIKING COPY SEP l~1995 LEIIK Date: Date: ago2of 3 ovision-3 r4
~I e~~k~~'~~~~e~~e~~I-~~4'~/I e 14 elec~~II I-d e W'.R Lk o mmmmiimmmi
.-IIIIIIIIHI mmmIIRlmmmm RRIIIRI mm58~~~o p o~-=ISRIIRHIIIIIIR5lRR REMI IMMIT&~i g$J I']'0)J WW%%~.0 S 8 A DEPARTMENT CONTROLLEO DOCUMENT COPY NO.12 SHP 5050 NDE.008 ATTACHMENT NO.1 ULTRASONIC TEST REPORT JOB ORDER NO.: CQ 4, REPORT DATE: REQUEST NO.M A, IDENTIFICATION Unit'l~CD Component 2--l l Item Material+S Other TECHNI UE Test Unit/S/Frey./Diameter Reference Standard Couplant/Batch No.C<TEST DATA REMARKS PERFORMED BY: REUIEWED BY: FORM NO.12 SHP 5050 NDE.008-1 LEVEL: M~DATE:/5 Page 1 of 1 Revision 0 Emlip ID: 2-HE-38E Train: 2 Equip Class:21 J wing No.: 2-5135A ction: CCW System: MISCELLANEOUS SEALING AND COOLXNG Equip Ddsc: EAST CENTRIFUGAL CHARGING PUMP PP-50E LUBE OIL COOLER Building: AUXILIARY Room: EAST CENTRIFUGAL CHARGING PUMP ROOM Elev: 587 Sort: S, Notes: Normal State: Desired State: Support System Drawing: Req'd Support Comp: Safety Related Status: NUCLEAR SR Power Req'd: N Min/Opt: MIN Alias No: Power Train: NA Comp Served: EAST CENTRXFUGAL CHARGING PUMP MFR: AMERXCAN PRECISION INDUSTRIES (BASCO)M Pa l Elem.Drawing: N/A Wiring Drawing: N/A Power Source: N/A Walkdown: F Relay Eval: N Comp Type: HE Iso Drawing: 2-CC&#xc3;-515, 2-CCW-508 Location: XN THE NORTHEAST PART OF THE ROOM, 2 FEET NORTHEAST OF EAST CENTRXFUGAL CHARGING PUMP g2-PP-50E DC COOK Unit 2 SCREENING EVALUA PION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 1 of 2ID: 2-HE-38E (Rev.0)Class: 21-Tanks and Heat Exchangers Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: E CENTRIFUGAL CHARG PMP ROOM-'IN THE NORTHEAST PART OF THE ROOM, 2 FEET NORTHEAST OF EAST CENTRIFUGAL CHARGING PUMP&#xb9;2-PP-50E Manufacturer, Model, Etc.: MIDLAND-ROSS/ROSS-OPERATING VALVE CO.BASIS: External analysis


== Description:==
== Description:==
 
REACTOR COOLANT PUMP SEAL WATER HEAT EXCHANGER Building: AUXILIARY                        Floor El.: 609.00                    Room, Row/Col: SEAL WTR HEAT XCHGR RM - IN WEST AREA OF ROOM Manufacturer, Model, Etc.: ATLAS INDUSTRIALMANUFACTURINGCO.
EAST CENTRIFUGAL CHARGING PUMP PP-50E LUBE OIL COOLER 1.The buckling capacity of the shell of a large, flat-bottom, vertical tank is equal to or greater than the demand.2.The capacity of the anchor bolts and their embedments is equal to or greater than the demand.3.The capacity of connections between the anchor bolts and the tank shell is equal to or greater than the demand.4.Attached piping has adequate flexibility to accommodate the motion of a large, flat-bottom, vertical tank.5.A ring-type foundation is not used to support a large, flat-bottom, vertical tank.N/A Yes Yes Yes N/A C Y D SRT: Gary Thomas, Tom Huang and Kailash Mahajan on 11/2/93.ANCHORAGE TO PUMP ACCEPTABLE BY ENGINEERING JUDGMENT OF THE SRT Small exchanger 1'W" long and 5" in diameter bolted to 2 1'ong channel columns that are welded to the skid of the East Centrifugal Charging Pump.Could have screened with the pump using the rule of the box, however the exchanger was listed seperately on the SSEL.Crane above in a parked and locked position.Evaluated by: Date:  
BASIS: External analysis
: 1. The buckling capacity of the shell of a large, flat-bottom, vertical tank is equal to or greater         N/A than the demand.
: 2. The capacity of the anchor bolts and their embedments is equal to or greater than the                     Yes demand.
: 3. The capacity of connections between the anchor bolts and the tank shell is equal to or                   Yes greater than the demand.
: 4. Attached piping has adequate flexibilityto accommodate the motion of a large, flat-bottom,                 Yes vertical tank.
: 5. A ring-type foundation is not used to support a large, flat-bottom, vertical tank.                         N/A S      U
~CVIF~S SRT: Gary Thomas and Tom Huang on 11/3/93.
Vertical Heat Exchanger on a Gusseted steel pedestal.        Each Pedestal is anchored to the floor with 8- 3/4" J-Bolts embedded 20" into floor.
Exchanger is 16" in diameter and    14'n height.
Exchanger is bolted to the steel pedestal with,2 1" diameter steel bolts on 6" centers in weak direction and 2'-8" in strong direction. This connection is more limiting than the anchorage to the floor.
Attached calculation was to judge adequacy of these for bolts.
The exchanger has a frequency of 10.6 Hz and the bolts had a safety factor in tension of 3.54.
Evaluated by:                                                                           Date:
IC) /4
                                                          ~g~ CZ


==Attachment:==
==Attachment:==
Pictures ttachment: Verification of Bolt Connection


Pictures DG COOK Unit 2 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet2of2 ID: 2-HE-38E (Rev.0)Class: 21-Tanks and Heat Exchangers
DC COOK Unit 1                            GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                        Status: Yes Sheet 2 of 7 ID: 2-HE-11 (Rev. 0)                       Class: 21 - Tanks and Heat Exchangers


==
==
Description:==
Description:==
REACTOR COOLANT PUMP SEAL WATER HEAT EXCHANGER Building: AUXILIARY                  Floor El.: 609.00              Room, Row/Col: SEAL WTR HEAT XCHGR RM - IN WEST AREA OF ROOM Manufacturer, Model, Etc.: ATLAS INDUSTRIALMANUFACTURINGCO.
ECUlKR SUPPORT PEDESTAL                                  TOP OF THE EXCHANGER
CUENT SUBJECT t'()Ne. Q    CaO<~
Stevenson and Assodates A Sllvclvlal-MCCIIIalcol S  Coalvlgag Saglaotllag Fitch Ahchol'    ~    Acca    oaohC Slcatch Ioalcro Vatlaco tacofa SllC DYSICN CDNYIDSIIO 2-HHI                      clalclha cotY Sfp lS      1SSS I~
I ~ I(
h'YI'nt>
lS fC(WF)
NYCT
                                                                                                                ~,                                                                                            ,~
Cl                                                                                                    ')
eIC.S    ~
yl                                                                                  qvr)
                                                                                                                                                                                                              "..'LEV l  K(o C)SST
                                                                                                        ~  ~  ~ ~  r ~ ~ ~ .  ~ ~  .    ~ I~ ~  I    ~
I ~  - ~  ~          ~    ~  ~  ~      ~  r                    er'
                                                                                                                  ~        ~        ~            '          ~  ~  h              '
                                                                                                                                                                                        ~r      ~
            ;I@aha                            li cac                                                              0                    ~ aa          Iaa S.
rt'acatl4c ~  \hr 5't,o                                      IODIINC IVQOCAN YOOC
                                                              ~ cl 5 Dcslca cahl caslto                                                                                                                                            g.)i voc claa can SSP  lS  lSSS r                                                                                                                            ~ r SIC
                                                                                                              ~
lA    IB                                                                        'oh 0        0                                          tC p        0                          g IYCSO IAI L~FA)      AD CI
                                                                                    <<CIO II3 (rlrg.    -,'t                          c 0      0 e
0 II 0
IC
: o. ~
                                                                                                                                                                                                                                    +Ps YcltaJ IICCDI13 (YYY  )                                                                                              0      0                                                        0        0 IYCSO'Wt                                                                                                                                            'I Yah CI (tel Y3)                                            F                                >3 e(FID)                        IC
                                                                                                    ~ I
                                                                                ~ ICSDWI      ~                                                                                                                        rL ~
lg                                                    0      0                                C,caclr                0        0 C        I\                                                                T.
                                                                                                                                                ~E I.  "~                          L                                                                                            ,Ql                        '&#xc3;)'  ~
I cocah T eotT trit)                              C sell:'rc          I          01hhc
                                                                                                                                                                                  <<lc Dl gas cocca cac IDLsco aacclha catt Sf P'    S SSSS I,
3ECY.'t\3 ccc(cccl c-c N occuv)                                                                                                                                                                      c      'S tr                                                                                                                                                        acscT
". )pP    (>>
C
CUEHF QJBJECT Stevenson and Assodatcs 8    A Structural-Mectfaalcal Coaru! o oft Eatftocurtafr Fifa<
P P.
                                                                                                                              ~  i'I,    h        ,f ~
P.'
                          ~ cK g"I
      <<<<I                                                                                          '
fl"                                                      h..
j.fipv>><YA                      ~ iver gv                            vruhu '. 'P<% .fc\u <K
                                            ~
                                              )
I t>> f<<~lg                                                                                                                                  'tfr lg<<>>u          tlap
                                                                                                                                                  'P vh
                                                                                                                                                    ~,  '<<      r'pi r
P..              t,'hr >
                                                                                                            >> I P
: f.  ~ I ~
                                                                                              >>~                            u p                                                                                                                  ~
                                                                                                                                                    / Pf>>
                                                                                                            ~    <<
pfr h
htrfu  P
                  ~ h                                I l'I r<                                                      f '<<                                              hFrutarp P..                                    gh'              up                                                                ~ ru  ~                  qtr ~ >>Irph I
I                                                                I'P H                                                r'tfu Ip. toKj  .ifu P                                                                                        ~      I                                  * ~
h


EAST CENTRIFUGAL CHARGING PUMP PP-50E LUBE OIL COOLER Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: E CENTRIFUGAL CHARG PMP ROOM-IN THE NORTHEAST PART OF THE ROOM, 2 FEET NORTHEAST OF EAST CENTRIFUGAL CHARGING PUMP&#xb9;2-PP-50E Manufacturer, Model, Etc.: MIDLAND-ROSS/ROSS-OPERATING VALVE CO.EAST CENTRIFUGAL CHARGING PUMP PP-50E LUBE OIL COOLER
r, CUENT                                    JOB No.
**12 CHP 5021~CCD.019 ATTACHMENT NO.1 Un1t NA Installation dwg./Rev.Anchora e Arran ement Sketch ANCHOR INSPECTION DATA SHEET hu-&.g z'-o'ldg.Location'2-H-E-5 6 Ecgxzpment No.INDIANA MICHIGAN PPW'Fg SITE DESIGN CONTROLLED WORKING COPY AUG 25 t985 LEgK T'(eek>~O'-III"~~~7O QCIC E, g,g<, wssT Date: 6 a-pa Drawn by-Verified by: goal.]ert.Inspector Reviewed by: Dt: Constructxon nchor Review Engineer Page 1 of 3 Revision 1
SUBJECT                              ~@Awe EW Stevenson and Assoctntes A St( ucfuf al.Macha afccl IR.Cuafulffaff Raff face(Lay Sic(a
**12 CHP 5021~CCD.019 ATTACHMENT NO.1 Unct g Mh Installation dwg./Rev.Anchora e Arran ement Sketch ANCHOR INSPECTION DATA SHEET~gT c.CHTRi~h~
    ~
C.~)gg~X-BL 5'5 t-0 Puca A.o~e Bldg.Location a-~-BEE Equipment No.INOIAtEA PiCHIGAW"OWER SITE OESICh CON~RGu.EO AORKltIQ COPT AUG 25 1885 I.ERi<7 y+'~PPI T, CJ~~~qq~si~e u)~T~P)~l I ookiQt ORTH Drawn by-Verified by'-~/~la,~D t Date: ual./Cert.
4 1   ~
Inspector Reviewed by: T Date: Construct@on An hor Review Engineer Page 1 of 3 Revision 1 Equip ID: 2-QT-134-CD Train: 2 Equip Class:21 D awing No.: 2-5151D tion: EDG System: DIESEL JACKET WATER Equip Desc: CD EMERGENCY DIESEL AUXILIARY JACKET WATER HEATER (TANK)Building: AUXILIARY Room: CD EMERGENCY DIESEL GENERATOR ROOM Elev: 587 Sort: S, Notes: B Normal State: Desired State: Power Req'd: Y Support System Drawing: 2-12030 2-98014 Req'd Support Comp: 2-ABD-C-1D Safety Related Status: STANDARD Min/Opt: MIN Alias No: Power Train: A Comp Served: CD AUXILIARY JACKET WATER HEATER MFR: INDEECO 75KW HEATER Panel: 2-DGCD Elem.Drawing: 2-98014 Wiring Drawing: 2-95302 Power Source: 2-ABD-C-1D Walkdown: F Relay Eval: N Comp Type: TANK Iso Drawing: Location: IN THE NORTHEAST PART OF THE ROOM, 5 FEET NORTH OF CD EMERGENCY DIESEL JACKET WATER PUMP g2-QT-130-CD2, DC Cook Unit 2 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 1 of 14 ID: 2-QT-134-CD (Rev.0)Class: 21-Tanks and Heat Exchangers
l crap l>>
Q,:If
              -'5 PP
                  ~
tf "r,(
1~
I Jul gl>>
u4 I
P
                                                            <<P Irp rir I~ 1
                                                                              ~
(~
44
                                                                                          /<<<<
4
                                                                                                  ~
                                                                                                    'g   <<ls
                                                                                                                    ~ I
                                                                                                                            +
1,14 'la>>
ru n.
                                                                                                                                          \'..
IP 'f I'<<
                                                                                                                                                ~
                                                                                                                                                  >>J "f
                                                                                                                                                  ~ 'I Sir! I I'-p~
                                                                                                                                                                    'I .4 "4,')!e/
Off P .'
CP
                                                                                                                                                                          '"'5 >>l II I,I(lr<<"<<
                                                                                                                                                                                    <<'+rrf>>V I
rp
                                                                                                    ~ <<1 lI ~
14.C'
                                                                                    ~ 1,1 P
                                                                                                                                                  %14  ruI II uf        PPP I                                                           'I                                                    /
                                                                                                                          '1 1(Q                        ~ rpl (l<<>>I'l('
                                                                                                              '1
                                                                                                                  >>t 0(fg      ff


==
CUENT JOB No. ~ 'HEET OF Stevenson and Assodatcs 5    A Structural.l4ucha attut Coaruttiag Kagtauurtag Firar L.
Description:==
                    ~ r
                                                          ~ r,
 
Coo Componone  yo,  2                      Class l Any  paxpicular area the Seismic Review Teaa should pay extra attention tot Yes  <    No        (Xf yea, check items that apply.)
Anchor Typo Anchor Diameter Anchor Spacing Anchor Number Anchor Embodmont<
                                                                  ~qs            ~    ~~T Anchor Edge Distance Anchor Cap gjO I/ E; Q Pl I IJ (. ) <Al(= (g E'L Anchor Thread Engagement Anchor Crip Anchor Angularity Concrete Crack Other'a (describe  bri.oily)
TE  there is concern for Design Basis Discrepancy, cir'clo the applicable item and explain.
: 1. Hardware Maintenance Type Discrepancy
: 2. l'raving Upd?te Typo Discrepancy
: 3. Signil.'icant Operability/Design Basis Discrepancy Others Condition:
Actions Taken:
Prepared By
 
                                                              **12 CHP 5021.CCD. 019 ATTACHMENT NO.          1 ANCHOR INSPECTION DATA SHEE SBfn DATER I+&AT AX M @Oq -01'AC,HAhl4BR g.oug Bldg.                      Location 2..~-I    t Installation  dwg.    /    Rev.          Ectuzpment No.
Anchora e Arran ement Sketch INDIANA I IICMIGAN POWCR SITE DESIGN CONTROLLEO 2-HG "I I            WORKING COPY SEP    t)1995 g      ~ I
(
l<YPg
                                                                  ~i1    R(7<~)
I/Z,R.(~p)  ~Ag
      ~b<
      ~0
          \
        ~ h~
        <~b PLED. gK.G C A&T Drawn by:                                                  Date:
.Verified by:                                                Date:
              ~ ual./Cer        . Inspector Reviewed by:    T Construe Date:
won An      hor Review Engineer Page 1    of  3 Revision      1
 
                                                          **12 CHP 5021.          CCD. 019 ATTACHMENT NO. 1 ANCHOR INSPECT ON DATA SH E Unxt l2- 3z Xnstallatxon    dwg. / Rev.      Equipment No.
Anchora e Arran ement Sketch
(>yp) IVB    &
(T9P)
I
                ,'A                                                0      0 P
I 0        0      ~4                                  0      0 I
0      0
                                            >/g Z(~p) 0        0                  C AFOOT                0      0 8                      Pee    .
I-O'RP I  IOIAPIA iVICHIGAN POPOVER SITE OESIGN CONTROlLED YPORKIHG COPY SEP    t~1995
                                                    .LFRKT Drawn by:                                                Date:
Verified by:                                              Date:
al. Cert. Xnspector Reviewed by:                                              Date:
Construction Anch    r Review Engineer Page 1      of    3 Revision        1
 
                                                                  *12  CHP 5021. CCD. 019 ATTACHMENT NO. 1 CHOR    INSPECTION DAT S A"SX  ~    gPa'-O"    S~    %PITCH &BR'T BXCHfHI  GBR. RooH Unit                          Bldg.                    Location l 2- 525s                                      H~ -1(
Installation            dwg.    / Rev.        Equipment No.
Anchora e Arran ement Sketch INDIANA I.IICHIGAN PO'ilE'R SITE DLSIGN COMTROLLiD WORKING COPY SF.P  13  ISSUE LERK W~Hb                                                                w~ wB
('TYPE)      3/( y WMAj      ~/II
(~P'L)      /I g HMH$
                ~P2.)    ~I(
wm wl
        .bi,                                                                            e'$
                                                                                        ~  ~
        'ob'4'ga J BoiT
(~P) 5CCT, Z -8      (scca c;c ~<<~+~~)
Drawn by:                                                        Date:      ~ 1 Verified by:
    ~ ~
Date:          -F-F ual    Cert. Inspector Reviewed by:            T                                        Date:
Construe        won    chor Review Engineer Page 1      of    3 Revision        1
 
ATTACHMENT NO      ~  1 ANC OR        SP Equipment                                                                      Dwg  No.:
Steel No.-'mbedded Dwg. No.:
I YS CA      CHARA      IS  C Weld ID                                                                              Weld        e Codes T  e Size                            '/      ~II I    >/II  3li t 1 = Fillet
                                                                                          = Plug/Slot Len  th                2I/    l II/    %4"      <4'8I/                            2 3  = Groove Cracks                  Yes    Yes      Yes    Yes        s  Yes  Yes    Yes o  No    No Lack  of              ~e        es    Yes      es          QeQs  Yes    Yes Penetration                                                    No  No    No Porosity                Yes    Yes      Yes    Yes    Yes'es      Yes No Yes No INDIANA MICHIGAN POWER SITE DESIGN CONTROLLED WORKING COPY SEP  tg t995 LERK Equipment base            flexible:      0 Yes      5-No ons ruc z n      e Date:
Reviewed'y:                                                                            Date:    t l2  3 ons ruc won          c  or evzev ngxneer Verified by:                a ..
V e    . npsec    or Date:
Page    3  of 3 Revision
 
                                                                                      *~12  CHP 5021 ~ CCD. 019 ATTACHMENT NO. 1 Equipment No.:                                                                            Dwg      No.:      l2-32 Anchor type:          GODET                        Dia:                                  pwg No ~:          I2  - '32 8$
Tightness established by: 0 "Snug                    Fit"        0 Torque Torque Wrench No.:                                                      Cal.      Due    Date:
Tightness verified? 0 Yes                  No                                          Date:            1 ons          c 10 Equipment base    flexible?            0 Yes C(No ~.                                    Date:          0 1-13 ons uc            1  n ARE C    C Bolt ID        A          5          C          O              e.          F        c                    Comments Gaps                    c l$$ aeT    $ Hpv I/S~"em gpss Yg>'ST 0
Anchor len th
                    \
2.-  0 It    I 2,-  0
                                      "    'I Z-o V            <
2.- o ii 2-i o il        c g-0 2oI    II 2-0 f~    IYI QCfCj I  2.-3vlgG Protruding      p I5/l~        g"      p'I          ~  '>/~                ~"/g      Z~Jy edment  )I  )I//)~i iI    qu    1<    qu    lI-1"        li q'i~I    1  qy8  )    q Bolt ri Concrete condition Edge distance g    ( 2.    /IX      P I 2."      >  I W        ) I>        W t 2. 0  I 2. 7i2-Anchor        @II        @tl      @'II        @II              4 s  acin                                                        (                u Anchor              4 Oo        i~o          00            g0 an    larit          ~                                                        OO        O4          ()
0 Thread          oy        0y        ng          oK.            ot.        ck        ok          o((
engagement Comments:
Verified by:                                                                                            Date:
r9 a      .,  ert. Inspector Revieved by:                                                                                          Date:
Construct on          ARE                      SITE DESIGN CONTROLLED WOIIKING COPY SEP    l~  1995 ago2of          3 LEIIK                              ovision      -3


CD EMERGENCY DIESEL AUXILIARY JACKET WATER HEATER (TANK)Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: CD EMER DSL GEN RM-IN THE NORTHEAST PART OF THE ROOM, 5 FEET NORTH OF CD EMERGENCY DIESEL JACKET WATER PUMP 82-QT-130-CD2, Manufacturer, Model, Etc.: 75KW HEATER BASIS: External analysis 1.The buckling capacity of the shell of a large, flat-bottom, vertical tank is equal to or greater than the demand.2.The capacity of the anchor bolts and their embedments is equal to or greater than the demand.3.The capacity of connections between the anchor bolts and the tank shell is equal to or greater than the demand.4.Attached piping has adequate flexibility to accommodate the motion of a large, flat-bottom, vertical tank.5.A ring-pe foundation is not used to support a large, fiat-bottom, vertical tank.N/A Yes Yes Yes N/A DE SRT: W.Djordjevic and TR Satyan Sharma.10/6/93.REF: 1.Anchor Inspection Data Sheets: Anchorage Arrangement Sketches and Physical Characteristics Data Sheet, Certified 8/31/93.2.Dwg 0 12-3468-13.
r4
3.Worthington Corp.Dwg.SK7938, 8-23-74 Anchorage:
                                                                                    ~ I e
2-QT-134-CD is the J.W.Heater, separately mounted by three1/2" coupling configuration of rod and Phillips Redhead wedge type anchors.Tightness was verified by torque, 6/28/93.For anchorage evaluation, see External ANCHOR analysis, File: 2QT134CD.ANC.
                                                  ~        ~ '
Weight of full water tank is estimated as 550 Ib (assumed with 12.75" OD,.375" Wall thickness, flat.375" thick end plates, 64" height, and 4.18 cu.ft volume of water).Considered as a cantilever with distributed load, the fundamental frequency is estimated to be 82.5 Hz.Actual response is governed by fixity of the base;anchorage system consists of three 5/16" x 2" x 6.25" plates welded to the bottom of the tank at 120 degree intervals.
                                                                        ~ ~  e
Considering the base flexibility and configuration, the frequency was estimated to be 8.96 Hz.as indicated on the attached calculation.
                                                                        ~ ~  e
The ANCHOR analysis intlicates a factor of safety of 3.74, however, the capacity of the anchorage is controlled by the base plates with a factor of safety of 1.84 as shown in the attached calculation.
                        ~ ~      k                              ~ ~
DC Cook Unit 2 SCREENING EVALUATION WORK SHEET (SEWS}GIP Rev 2, Corrected, 2114I92 Status: Yes Sheet 2 of 14 ID: 2-QT-134-CD (Rev.0)Class: 21-Tanks and Heat Exchangers
~ ~
I
                  - ~  ~          4'          ~
                                                  /        I e  14
~  ~ II                        I      - d e elec W
                                              .R Lk          '
IIIIIIIIHI o
mmmmiimmmi mmmIIRlmmmm RRIIIRI mm58        ~    ~              ~          o  p      o
        ~ - =
ISRIIRHIIIIIIR5lRR
    ~
REMIIMMIT&
i        g        $    J               I'            ]'
WW%%
0        )         J
                                                                                ~ .
0


==
12 SHP 5050 NDE.008 S 8 A DEPARTMENT                                    ATTACHMENT NO. 1 CONTROLLEO DOCUMENT COPY NO.                    ULTRASONIC TEST REPORT JOB ORDER  NO.:  CQ 4,    REPORT DATE:            REQUEST NO. M A, IDENTIFICATION                      TECHNI UE Unit    'l
Description:==
              ~CD                      Test Unit/ S/
Component    2    -ll              Frey./Diameter Item                                Reference Standard Material    +S                      Couplant/Batch No. C  <
Other TEST DATA REMARKS PERFORMED BY:
REUIEWED BY:                              LEVEL: M~        DATE:   / 5 FORM NO. 12 SHP 5050 NDE.008-1                Page 1  of  1 Revision  0


CD EMERGENCY DIESEL AUXILIARY JACKET WATER HEATER (TANK)Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: CD EMER DSL GEN RM-IN THE NORTHEAST PART OF THE ROOM, 5 FEET NORTH OF CD EMERGENCY DIESEL JACKET WATER PUMP 42-QT-130-CD2, Manufacturer, Model, Etc.: 75KW HEATER Evaluated by: Date'./L/i 3~/~g
Emlip ID: 2-HE-38E      Train:  2 J
Equip Class:21 wing No.: 2-5135A ction:  CCW System: MISCELLANEOUS SEALING      AND COOLXNG Equip Ddsc:  EAST CENTRIFUGAL CHARGING PUMP PP-50E      LUBE OIL COOLER Building:   AUXILIARY     Room: EAST CENTRIFUGAL CHARGING PUMP ROOM Elev: 587     Sort: S,          Notes:
Normal State:        Desired State:        Power Req'd: N Support System Drawing:
Req'd Support Comp:
Safety Related Status:    NUCLEAR SR          Min/Opt: MIN Alias  No:        Power  Train:  NA Comp  Served:  EAST CENTRXFUGAL CHARGING PUMP MFR: AMERXCAN PRECISION INDUSTRIES (BASCO)
M Pa  l Elem. Drawing: N/A Wiring Drawing: N/A Power Source:    N/A Walkdown: F      Relay Eval  : N Comp  Type:  HE Iso Drawing: 2-CC&#xc3;-515, 2-CCW-508 Location:  XN THE NORTHEAST PART OF THE ROOM, 2 FEET NORTHEAST OF EAST CENTRXFUGAL CHARGING PUMP g2-PP-50E


==Attachment:==
DC COOK Unit 2                                      GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUAPION WORK SHEET (SEWS)                                    Status: Yes Sheet 1 of 2 ID: 2-HE-38E (Rev. 0)                            Class: 21 - Tanks and Heat Exchangers


Pictures
== Description:==
EAST CENTRIFUGAL CHARGING PUMP PP-50E LUBE OIL COOLER Building: AUXILIARY                        Floor El.: 587.00                    Room, Row/Col: E CENTRIFUGAL CHARG PMP ROOM -'IN THE NORTHEAST PART OF THE ROOM, 2 FEET NORTHEAST OF EAST CENTRIFUGAL CHARGING PUMP &#xb9;2-PP-50E Manufacturer, Model, Etc.: MIDLAND-ROSS/ROSS-OPERATING VALVECO.
BASIS: External analysis
: 1. The buckling capacity of the shell of a large, flat-bottom, vertical tank is equal to or greater          N/A than the demand.
: 2. The capacity of the anchor bolts and their embedments is equal to or greater than the                    Yes demand.
: 3. The capacity of connections between the anchor bolts and the tank shell is equal to or                    Yes greater than the demand.
: 4. Attached piping has adequate flexibilityto accommodate the motion of a large, flat-bottom,                Yes vertical tank.
: 5. A ring-type foundation is not used to support a large, flat-bottom, vertical tank.                        N/A C      Y D SRT: Gary Thomas, Tom Huang and Kailash Mahajan on 11/2/93.
ANCHORAGE TO PUMP ACCEPTABLE BY ENGINEERING JUDGMENT OF THE SRT Small exchanger 1'W" long and 5" in diameter bolted to 2 1'ong channel columns that are welded to the skid of the East Centrifugal Charging Pump. Could have screened with the pump using the rule of the box, however the exchanger was listed seperately on the SSEL.
Crane above in a parked and locked position.
Evaluated by:                                                                            Date:


==Attachment:==
==Attachment:==
Pictures


Anchor Plate Seismic Capacity Evaluation for 2-QT-l34-CD DC Cook Unit 2 SCREENING EVALUATION WORK SHEET (SEWS'j GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 3 of 14 ID: 2-QT-134-CD (Rev.0)Class: 21-Tanks and Heat Exchangers
DG COOK Unit 2                             GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                          Status: Yes Sheet2of2 ID: 2-HE-38E (Rev. 0)                     Class:   21 - Tanks and Heat Exchangers


==
==
Description:==
Description:==
EAST CENTRIFUGAL CHARGING PUMP PP-50E LUBE OIL COOLER Building: AUXILIARY                Floor El.: 587.00                Room, Row/Col: E CENTRIFUGAL CHARG PMP ROOM - IN THE NORTHEAST PART OF THE ROOM, 2 FEET NORTHEAST OF EAST CENTRIFUGAL CHARGING PUMP &#xb9;2-PP-50E Manufacturer, Model, Etc.: MIDLAND-ROSS/ROSS-OPERATING VALVECO.
EAST CENTRIFUGAL CHARGING PUMP PP-50E LUBE OIL COOLER


CD EMERGENCY DIESEL AUX!LIARY JACKET WATER HEATER (TANK)Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: CD EMER DSL GEN RM-IN THE NORTHEAST PART OF THE ROOM, 5 FEET NORTH OF CD EMERGENCY DIESEL JACKET WATER PUMP&#xb9;2-QT-130-CD2, Manufacturer, Model, Etc.: 75KW HEATER 2-QT-134-CD CUFNT SUBJECT Stovenson and Assodatcs 8 A S!rucru ral.Mocha a!col Coaoulaa4 KOO!aoorlaO Flrra ttt ch>>I~I I cA~gcggg~E//z$guG-8g+s~t,+~447rdP'p4/g, 0~~/GALS.(7-".zw.l~S)IOO'P~p//8&gdVf 8&.ChF gh'E-.~CU~ge~~Eg ti/VSr d~Q-//di~gg 444'/0~i gh~APOXg'rdn44 Q FC707 5'?h"4'.e i'~Sf l I.'r)I i 8 I$0'5 zo'', III~~~~~I O~.i I>>ICg+rt)%hi kj.It'!ho'r I*I~h roll 04f8 Igd 095 t.tt).AMERlCAN ELECTRiC POWER.,'@RVICE CORPORATiON)gf'APPtHOVEO (N GENERAL"8-~IOVED EXCEPT AS NOTED'U:.NOT APPROVED 0:~MFEREN E ONLY DzR!.I l5 Zrv/./j I~or>>or Ioor IOIIC uott Iorouorltc OOI C.p4 c.ubr I IIIIO'c~''LI'I''~L t.tent L 4 I i':.''~":5'l'Li Y'),, I~I
                                                            **12 CHP 5021      ~ CCD. 019 ATTACHMENT NO. 1 ANCHOR INSPECTION DATA SHEET hu  -&. g Un1t                                                    Location z'-o'ldg.
NA                                      '2-H-E-5    6 Installation  dwg. / Rev.        Ecgxzpment No.
Anchora e Arran ement Sketch INDIANA MICHIGAN PPW'Fg SITE DESIGN CONTROLLED WORKING COPY AUG  25 t985 LEgK  T'(eek>~
O'- III "
                                                                ~~~         7O QCIC    E, g,g<, wssT Drawn by-                                                   Date:
Verified by:
goal.] ert. Inspector 6    a-pa Reviewed by:
Constructxon    nchor Review Engineer Dt:
Page 1    of    3 Revision    1


CUEN~P Stevenson and Assochtes 8 A Sttuctu tat.Mcchaatcal Coatutttay Eaglacortay Fttta z t~4',r.)}c%)~~~ul I ,1%St.~~i ag~i/pcs c rt ft u Mc 0
                                                  **12 CHP 5021        ~ CCD. 019 ATTACHMENT NO. 1 ANCHOR INSPECTION DATA SHEET
CUENT R~IZI qs.8 Stevenson and Assodatcs 5 A Sciacra ral44>eba alaal Caaralaay Karrlaeerlarr furr 1'1~r~h LA~'I'v>>r>>4+~>>I I LhU IC~'I Ah~I~A LV A I Il Al.LC hl 1 VC h.~gQ re<A g~'(if'J 5~>li~~;S>>1~ra av~b ALII U~IP I~, rv~1 I r>>>>'.IVI S~QI h>>Il iri A IL, ag~I ol I~Lr lh I Lhr.'I'Ij$>>>C'I ('I VI I a.l~'"i v4'C S 11>I:m al>.i~>>I.I).h I~A'Il'~I A I' CUENT SVBJECT SHEET OF Stevenson and Associates A SvvctuwhMeehs nleel Coaeu!tlag Kagiaoeriaq face\2/0 9s
                              ~X-BL                ~gT c.CHTRi~h~ C.~)gg 5'5  t-0    Puca A.o~e Unct  g                Bldg.                  Location Mh                              a-~-BEE Installation  dwg. / Rev.       Equipment No.
Anchora e Arran ement Sketch INOIAtEA PiCHIGAW "OWER SITE OESICh CON~RGu.EO AORKltIQ COPT AUG    25 1885 I.ERi< 7 y+'~   PPI T,  CJ~~
                                                      ~qq~si~ e      u) ~T~P)
                    ~l I
ookiQt  ORTH Drawn by-          ~/ ~la,~                       D  t Verified  by'-                                    Date:
ual./Cert. Inspector Reviewed by:      T                                Date:
Construct@on An hor Review Engineer Page 1    of  3 Revision      1


CLiFNT Stevenson and Assodatcs 8 A Strttctttral Meeit4444eal COatultttty sag(4444tlttti fltat 4+0'-~P 4~4, 4~'S at" I*.g!tQ;,<J S*SS4 i+~I 4 St S p~S rs p 4 44
Equip ID: 2-QT-134-CD        Train: 2  Equip Class:21 D awing No.: 2-5151D tion:  EDG System: DIESEL JACKET        WATER Equip Desc:    CD EMERGENCY    DIESEL AUXILIARYJACKET WATER HEATER (TANK)
Building:    AUXILIARY      Room: CD EMERGENCY DIESEL GENERATOR ROOM Elev: 587      Sort: S,          Notes:  B Normal State:          Desired State:      Power Req'd: Y Support System Drawing: 2-12030          2-98014 Req'd Support Comp: 2-ABD-C-1D Safety Related Status:        STANDARD        Min/Opt: MIN Alias  No:          Power  Train:  A Comp  Served:    CD  AUXILIARYJACKET    WATER HEATER MFR: INDEECO 75KW HEATER Panel:  2-DGCD Elem. Drawing: 2-98014 Wiring Drawing: 2-95302 Power Source:      2-ABD-C-1D Walkdown: F        Relay Eval    : N Comp  Type:  TANK Iso Drawing:
Location: IN    THE NORTHEAST PART OF THE ROOM, 5 FEET NORTH OF CD EMERGENCY    DIESEL JACKET WATER PUMP g2-QT-130-CD2,


DC Cook Unit 2 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 9 of 14 ID: 2-QT-134-CD (Rev.0)Class: 21-Tanks and Heat Exchangers Room, Row/Col: CD EMER DSL GEN RM-IN THE NORTHEAST PART OF THE ROOM, 5 FEET NORTH OF CD EMERGENCY DIESEL JACKET WATER PUMP&#xb9;2-QT-130-CD2, Floor El.: 587.00 Building: AUXILIARY Manufacturer, Model, Etc.: 75KW HEATER
DC Cook Unit 2                                       GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                      Status: Yes Sheet 1 of 14 ID: 2-QT-134-CD (Rev. 0)                           Class: 21 - Tanks and Heat Exchangers


== Description:==
== Description:==
CD EMERGENCY DIESEL AUXILIARYJACKET WATER HEATER (TANK)
Building: AUXILIARY                          Floor El.: 587.00                    Room, Row/Col: CD EMER DSL GEN RM - IN THE NORTHEAST PART OF THE ROOM, 5 FEET NORTH OF CD EMERGENCY DIESEL JACKET WATER PUMP 82-QT-130-CD2, Manufacturer, Model, Etc.: 75KW HEATER BASIS: External analysis
: 1. The buckling capacity  of the shell of a large, flat-bottom, vertical tank is equal to or greater          N/A than the demand.
: 2. The capacity of the anchor bolts and their embedments is equal to or greater than the                    Yes demand.
: 3. The capacity of connections between the anchor bolts and the tank shell is equal to or                    Yes greater than the demand.
: 4. Attached piping has adequate flexibility to accommodate the motion of a large, flat-bottom,              Yes vertical tank.
: 5. A ring- pe foundation is not used to support a large, fiat-bottom, vertical tank.                        N/A DE SRT: W. Djordjevic and TR Satyan Sharma. 10/6/93.
REF: 1. Anchor Inspection Data Sheets: Anchorage Arrangement Sketches and Physical Characteristics Data Sheet, Certified 8/31/93.
: 2. Dwg 0 12-3468-13.
: 3. Worthington Corp. Dwg. SK7938, 8-23-74 Anchorage: 2-QT-134-CD is the J.W. Heater, separately mounted by three1/2" coupling configuration of rod and Phillips Redhead wedge type anchors. Tightness was verified by torque, 6/28/93.
For anchorage evaluation, see External ANCHOR analysis, File: 2QT134CD.ANC. Weight of full water tank is estimated as 550 Ib (assumed with 12.75" OD, .375" Wall thickness, flat.375" thick end plates, 64" height, and 4.18 cu. ft volume of water). Considered as a cantilever with distributed load, the fundamental frequency is estimated to be 82.5 Hz. Actual response is governed by fixity of the base; anchorage system consists of three 5/16" x 2" x 6.25" plates welded to the bottom of the tank at 120 degree intervals. Considering the base flexibility and configuration, the frequency was estimated to be 8.96 Hz. as indicated on the attached calculation. The ANCHOR analysis intlicates a factor of safety of 3.74, however, the capacity of the anchorage is controlled by the base plates with a factor of safety of 1.84 as shown in the attached calculation.


CD EMERGENCY DIESEL AUXILIARY JACKET WATER HEATER (TANK)K Ij:tbaualx
DC Cook Unit 2                                 GIP Rev 2, Corrected, 2114I92 SCREENING EVALUATIONWORK SHEET (SEWS}                              Status: Yes Sheet 2 of 14 ID: 2-QT-134-CD (Rev. 0)                         Class: 21 - Tanks and Heat Exchangers
'esponse Spectrum: User Frequency:
User-8.96 Percent Damping: User-0.0G Spectral Values: Direction North-South East-West Vertical Acceleration (g's)0.38 0.38 0.23 Angle (N-S Direction makes with the X Axis): 0.00 Combination Criteria: SRSS~Wight umber of Weights: 1 No Weight 1 550.00 6.875 0.000 32.000 Number of External Forces: 0 Xmas Number of External Moments: 0 gggygiJPp~
hachar Number of Anchor types: 1 Ultimate Ultimate Tension Inter Shear Inter Saf No Dia Manufact Product Tension Shear Coeff Coeff Fact 1/2 Phillips Wedge (N)2290.00 2380.00 1.00 0.30 1.00 Qmmta'ltimate Stress: 3500.00 psi..eduction Factor: 0.8.
 
DC Cook Unit 2 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/ti4/92 Status: Yes Sheet 10 of 14 ID: 2-QT-134-CD (Rev.0)Class: 21-Tanks and Heat Exchangers


==
==
Description:==
Description:==
CD EMERGENCY DIESEL AUXILIARYJACKET WATER HEATER (TANK)
Building: AUXILIARY                      Floor El.: 587.00                Room, Row/Col: CD EMER DSL GEN RM - IN THE NORTHEAST PART OF THE ROOM, 5 FEET NORTH OF CD EMERGENCY DIESEL JACKET WATER PUMP 42-QT-130-CD2, Manufacturer, Model, Etc.: 75KW HEATER Evaluated by:                                                                    Date'.
                                                                                              / L/i  3 ~/~g


CD EMERGENCY DIESEL AUXILIARY JACKET WATER HEATER (TANK)Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: CD EMER DSL GEI'I RM-IN THE NORTHEAST PART OF THE ROOM, 5 FEET NORTH OF CD EMERGENCY DIESEL JACKET WATER PUMP&#xb9;2-QT-130-CD2, Manufacturer, Model, Etc.: 75KW HEATER Kaid'llowable Stress: 30600 psi.Rzfvm'umber of Surfaces: 1 Surface Orientation No Direction Comp Nx 0.000 Direction Comp 0.000 Direction Comp Nz 1.000 Anchor Pattern for Surface&#xb9;1 Legend for Anchor Patterns Anchor Bolts.Concrete Linen:~mm Concrete Points.Vleld Lines:  
==Attachment:==
Pictures


DC Cook Unit 2 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92'tatus:
==Attachment:==
Yes Sheet 11 of 14 ID: 2-QT-134-CD (Rev.0)Class: 21-Tanks and Heat Exchangers
Anchor Plate Seismic Capacity Evaluation for 2-QT-l34-CD
 
DC Cook Unit 2                           GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS'j                      Status: Yes Sheet 3 of 14 ID: 2-QT-134-CD (Rev. 0)                 Class: 21 - Tanks and Heat Exchangers


==
==
Description:==
Description:==
CD EMERGENCY DIESEL AUX!LIARYJACKET WATER HEATER (TANK)
Building: AUXILIARY                Floor El.: 587.00              Room, Row/Col: CD EMER DSL GEN RM - IN THE NORTHEAST PART OF THE ROOM, 5 FEET NORTH OF CD EMERGENCY DIESEL JACKET WATER PUMP
                                                                    &#xb9;2-QT-130-CD2, Manufacturer, Model, Etc.: 75KW HEATER 2-QT-134-CD


CD EMERGENCY DIESEL AUXILIARY JACKET WATER HEATER (TANK)Building: AUXILIARY Floor EI.: 587.00 Room, Row/Col: CD EMER DSL GEN RM-IN THE NORTHEAST PART OF THE ROOM, 5 FEET NORTH OF CO EMERGENCY DIESEL JACKET WATER PUMP&#xb9;2-QT-130-C02, Manufacturer, Model, Etc.: 75KW HEATER Qmmdn hrzhar.Number of Anchors: 3 No Anch Id Coord 0.000 14.063 14.063 Coord 0.000-8.119 8.119 Z Coord 0.000 0.000 0.000 Surf Id&#xb9;of elements per line: 1 Number of Concrete Lines: 3 Start Start End End End Sf Line No X-Coord Y-Coo rd Z-Coord X-Coord Y-Coo rd Z-Coo rd Id Width-1.000 11.438 11.438 0.000-3.572 3.572 0.000 0.000 0.000 6.250 14.563 14.563 0.000-8.985 8.985 , 0.000 1 0.000 1 0.000 1 2.000 2.000 2.000 Number of Concrete Points: 0 EcldJ.bm'of elements per line: 4 Number of Weld Lines: 0 Reduction Factor input for Anchor&#xb9;1 Adequately Installed:
CUFNT SUBJECT Stovenson and Assodatcs 8        A S!rucru ral. Mocha a!col Coaoulaa4 KOO!aoorlaO Flrra ch ttt cA                                                                                                            'P
Yes Embedment Length: (2.13 in.Min Reqd.to achieve full capacity):=
                                                                                ~
2.13 in.Gap at Threaded Anchor: 0.00 in.Edge Distance-Edge 1: 5.00in.Crack Size: 0.000 in.-Cracks Affect<=50%Bolts Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes mbedment Steel and Pads Adequately Installed:
IOO
Yes OC Cook Unit 2 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 12 of 14 ID: 2-QT-134-CD (Rev.0)Class: 21-Tanks and Heat Exchangers
        >>I ~ I I                                                                gcggg~ E//z$guG-s~t,+~447rdP'p4/g, 0 8g+            ~p//8               &gdVf 8&.ChF gh'E-
                                                                                                                              .~CU~ge~              ~Eg ti/VSr d~
                                                                                  ~~/GALS. (7-". zw.l~S)                        Q-//di~            gg 444'/0     ~i gh~        APOXg'rdn44      Q    FC707  5
                                                                                                                              '?h"4'.e      i'~Sf l
5 I
i        8
                                  $ 0'                                                                zo'',
I.'r)
III I                                                                                                                                                          ~~
                                                          ~~
                                                            ~ I DzR O  ~  .
I    ~
I  ~
iI ICg+
I l5                                  Zrv/.
rt  )%hi
                                                                                        /j t.tt kj.
h roll  04f8 Igd 095
                        .AMERlCAN ELECTRiC POWER
                                                                            )
          'r It'!ho
                          .,'@RVICE CORPORATiON
                      )gf'APPtHOVEO (N GENERAL "8- ~IOVED EXCEPT AS NOTED                                                                                                                      .p4
                        'U:.NOT APPROVED                                                                                                                                      c. ubr I
0:~        MFEREN          E ONLY or>>or Ioor uott IOIIC Iorouorltc OOI C I  IIIIO          '      c  '            'LI '                              I'    ' ~ L        t.tent  L      4 I i':. ''~":5'l'Li
                                                ~
Y'),, I
                                                                                                                                                                                ~ I


==
CUEN~ P Stevenson and Assochtes 8    A Sttuctu tat.Mcchaatcal Coatutttay Eaglacortay Fttta z
Description:==
t ~
4',r.)}
                                                                                                ,1
                                                      ~                                        ~
c                                                        ~          ~ ul I        %St .
%)
                                                                  ~ i c
ag rt
                                            ~
i/                                pcs ft u            Mc


CD EMERGENCY DIESEL AUXILIARY JACKET WATER HEATER (TANK)Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: CD EMER DSL GEN RM-IN THE NORTHEAST PART OF THE ROOM, 5 FEET NORTH OF CD EMERGENCY DIESEL JACKET WATER PUMP&#xb9;2-QT-130-CD2, Manufacturer, Model, Etc.: 75KW HEATER Reduction Factor Input for Anchor&#xb9;2 Adequately Installed:
0 CUENT R~ IZI          qs.
Yes Embedment Length: (2.13 in.Min Reqd.to achieve full capacity):=
8 Stevenson and Assodatcs 5     A Sciacra ral44>eba alaal Caaralaay Karrlaeerlarr furr 1'1
2.13 in.Gap at Threaded Anchor: 0.00 in.Edge Distance-Edge 1: 5.00 in.Crack Size: 0.000 in.-Cracks Affect<=50%Bolts Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed:
                                                                                          ~ r
Yes Reduction Factor Input for Anchor&#xb9;3 Adequately Installed:
                                                                                                                                                ~ h LA ~
Yes Embedment Length: (2.13 in.Min Reqd.to achieve full capacity):=
    'I'v>>r>>4+
2.13 in.Gap at Threaded Anchor: 0.00 in.Edge Distance-Edge 1: 5.00 in.Crack Size: 0.000 in.-Cracks Affect<=50%Bolts Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed:
              ~ >>I I LhU IC
Yes Reduction Factors Data Current: Yes Anc No Id 1 1 2 1 3 1 PaIV Vali 2003.75 2380.00 2003.75 2380.00 2003.75 2380.00 Pallrl Vallr RT RN 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.M 1.00 1.00 1.00 1.00 RL RG RS 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.M 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 RE RF Rc RR 1.00 0.88 1.00 1.00 1.00 1.00 1.00 1.00 1.M 0.88 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.88 1.M 1.00 1.00 1.00 1.00 1.00 RP RB RM 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.M 1.M 1.00 1.00 1.00 1.00 N/A=Not Applicable Pall=Allowable Pull without Reduced Inspection Vali=Allowable Shear without Reduced Inspection Pallr=Allowable Pull with Reduced Inspection Vailr=Allowable Shear with Reduced Inspection
                                                                                                                        ~ 'I      Ah
=Outlier=Reduction Factor Not Used RT RL=Reduction Factor for Type of Anchorage=Reduction Factor for Installation Adequa=Reduction Factor for Embedment 0
                                                                                                                                                ~ I~
DC Cook Unit 2,~'CREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 13 of 14 ID: 2-QT-134-CD (Rev.G)Class: 21-Tanks and Heat Exchangers
A LV                                              I A                      Il Al
                                                                                                                                                .LC hl
: h. ~
S>>1  ~
gQ    re<A g~'(  ra VC 1                         if'J  5~> li~~;
av  ~ b I
                                                                                        , rv
                                                                                              ~
r>>>>'.IVI S
ALII    U          ~
IP 1
I    ~
h                  >>Il ol I~
Lr I Lhr              .'I'Ij $ >
                                                                                                              'I I a.l VI
                                                                                                                                        ~
                                                                                                                                          '"i v4                    11>I:m    al >.
iri ag A IL, lh
              ~  QI
                                                          ~ I                                        >>C'I
(                                   'C S i    ~ >>
I  .I).h I ~  A'                                    Il'
                                                                                              ~  I                              A      I


==
CUENT    SHEET  OF SVBJECT 2/0 9s
Description:==
                                        \
Stevenson and Associates A SvvctuwhMeehs nleel Coaeu!tlag Kagiaoeriaq face


CD EMERGENCY DIESEL AUXILIARY JACKET WATER HEATER (TANK)Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: CD EMER DSL GEN RM-IN THE NORTHEAST PART OF THE ROOM, 5 FEET NORTH OF CD EMERGENCY DIESEL JACKET WATER PLIMP&#xb9;2-QT-130-CD2, Manufacturer, Model, Etc.: 75KW HEATER RG RS RF RC RR RP RB=Reduction Factor for Gap at Anchors=Reduction Factor for Spacing=Reduction Factor for Edge Distance=Reduction Factor foi Concrete Strength=Reduction Factor for Concrete Cracks=Reduction Factor for Essential Relays=Reduction Factor for Base Stiffness and Prying Action=Reduction Factor for Base Strength and Load Path=Reduction Factor for Embed.Steel and Pads Analysis Performed:
CLiFNT Stevenson and Assodatcs 8    A Strttctttral Meeit4444eal COatultttty sag(4444tlttti fltat
Yes Type of Analysis: Regular Spectral Accelerations (G's)No N-S E-W Vertical Safety Factor 10 12 13 14 16 17 18 19 20 22 23 24 0.380-0.380-0.380 0.380 0.380-0.380 0.380-0.380 0.152-0.152 0.152-0.152-0.152 0.152 0.152-0.152 0.152-0.152 0.152-0.152-0.152 0.152 0.152-0.152 0.152-0.152 0.152-0.152-0.152 0.152 0.152-0.152 0.380-0.380-0.380 0.380 0.380-0.380 0.380-0.380 0.152-0.152 0.152-0.152 0.152-0.152-0.152 0.152 0.092-0.092 0.092-0.092 0.092-0.092-0.092 0.092 0.092-0.092 0.092-0.092 0.092-0.092-0.092 0.092 0.230-0.230-0.230 0.230 0.230-0.230 0.230-0.230 4.204 4.704 4.514 4.612 4.204 4.704 4.612 4.514 5.698 3.039 5.698 3.859 3.740 6.064 6.064 3.740 8.257 7.950 15.006 6.830 6.830 15.006 8.257 7.950
                                                +0'-                   4
                                                          ~P
                                                                                            ~
4         ~ 4, 4
                                                                                              'S at"I      *
                                                                              .g! tQ;,<J S
* SS4 i I            S p
                                                + ~    4 St
                                                                          ~ S rs p                                        44 4


DC Cook Unit 2 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet14 of14 ID: 2-QT-134-CD (Rev.0)Class: 21-Tanks and Meat Exchangers
DC Cook Unit 2                               GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                          Status: Yes Sheet 9 of 14 ID: 2-QT-134-CD (Rev. 0)                                     Class: 21 - Tanks and Heat Exchangers


==
==
Description:==
Description:==
CD EMERGENCY DIESEL AUXILIARYJACKET WATER HEATER (TANK)
Building: AUXILIARY                                    Floor El.: 587.00              Room, Row/Col: CD EMER DSL GEN RM - IN THE NORTHEAST PART OF THE ROOM, 5 FEET NORTH OF CD EMERGENCY DIESEL JACKET WATER PUMP
                                                                                        &#xb9;2-QT-130-CD2, Manufacturer, Model, Etc.: 75KW HEATER K Ij:tbaualx Spectrum: User
                      'esponse Frequency: User - 8.96 Percent Damping: User - 0.0G Spectral Values:
Direction                        Acceleration (g's)
North - South                    0.38 East - West                      0.38 Vertical                        0.23 Angle (N-S Direction makes with the X Axis): 0.00 Combination Criteria: SRSS
~Wight umber of Weights:                1 No        Weight 1                550.00                  6.875          0.000          32.000 Number of External Forces: 0 Xmas Number of External Moments: 0 gggygiJPp~
hachar Number of Anchor types:                  1 Tension      Shear Ultimate    Ultimate    Inter        Inter    Saf No      Dia                  Manufact        Product      Tension      Shear      Coeff        Coeff      Fact 1/2                    Phillips      Wedge (N)        2290.00      2380.00      1.00        0.30      1.00 Qmmta Stress: 3500.00 psi..
          'ltimate eduction Factor: 0.8 .


CD EMERGENCY DIESEL AUXILIARY JACKET WATER HEATER (TANK)Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: CD EMER DSL GEN RM-IN THE NORTHEAST PART OF THE ROOM, 5 FEET NORTH OF CD EMERGENCY DIESEL JACKET WATER PUMP&#xb9;2-QT-130-CD2, Manufacturer, Model, Etc.: 75KW HEATER Minimum Safety Factor: 3.740 The Anchorage Capacity is 3.740 times greater than the Demand Coo ComponenC Po.'2" KT)~4'laia Any payticu1.ar area the Seismic Review Team should pay extra attention tot Yes V No (If yea, check itima that apply.)Anchor Type Anchor Diameter Anchor Spacing Anchor Number Anchor Embedmen'nchor Edge Distance Anchor Gap Anchor Thread Engagements~
DC Cook Unit 2                           GIP Rev 2, Corrected, 2/ti4/92 SCREENING EVALUATIONWORK SHEET (SEWS)                               Status: Yes Sheet 10 of 14 ID: 2-QT-134-CD (Rev. 0)                             Class: 21 - Tanks and Heat Exchangers
Anchor Grip Anchor Angularity Concrete Crack&khumrJsa eA-Others (describe bri.eely)IE there is concern for Design Basis Discrepancy, circle th>>applicable i.tom and explain.1.2.3.Hardvc,re Maintenance Type Discrepancy Drawing Update Type Discrepancy Significant Operability/Design Basis Discrepancy Others Condition:
a)c,(,~<)~P vV(c.8-o K b>p,>F.+g0+R j~)g->$4 Actions Taken: prepared By T.Dat.0>>/~
'.2 CHP 5021~CCD.019~TTACEQKNT NO.1 TWQ Un (Z-34K-l3 Znsta at on dwg./Rev.Anchora e Arran ement Sketch~P,qHEA,gg F OR'f)OQ OF ROC'OOM.Sa7-0" L Bldg-Locat on 2,-GT-isa-CD Equipment No.IIZ'a l30LT VllTH QVERSlZED WASHY.R 4 NUT)hl>s" 38(CK, K, NG'9 54QTTEQ HQLE, L'-0'ia" MO WAG%.R+A QA INDIANA MICHIGAN POWER SITE DESIGN CONTROLLED WORKING COPY AUG 51 1S95 LERK~~Drawn by: Date: c Date:-0 Date: or Review Engineer Verified by: Qu./Cert.Xnspector Reviewed by: Construe on Page 1 of 3 Revision 1
~~s~~0~~~~II~~~I~I~'~4~w~~~~~~
i I~r~~II 4~~~e'L~+~i~~'l~~~~~~~~~-.Ci~I l-s.L~o li)I I~~~II r~I I I~0 RHMeWsaMMMWW HHHL%%%EE.SL~LE55-ewmaaara 858QERLl LE WlRISR%i EL.-l%RiR~HRLWLL MWWWWW~W&mmRIHRHLIL 5%l%SRHRRli%
&WWWWK%RRiRgRkigi%~~~~~~
~S~~g'I~~IE>~l~,~'~'
5<".~A DEPT.Ri('v'.'='',".
CONTROLLED DOCUMENT COPY NO.'2 SHP 5050 mE 008 ATTACPNENT NO.3 ULTRASONIC TEST REPORT JOB ORDER NO.:/A Q~)IDENTIFICATION Unit Component Material V~Other 5-.TECHNI UE Test Unit/S/N y'S-'l~CA.c'.-'s Freq./Diameter Reference Standard Couplant/Batch No.TEST DATA REMARKS~wl+%CC'.CS<<L c C+PERFORMED BX: REVIEWED BY: FORM NO.12 SHP 5050 NDE.008-1 LEVEL:~DATE: LEVEL~-DATE.Page 1 of 1 Revision 0 Equip XD: 2-TK-76N Train: 2 Equip Class:21 P~awing No.: 2-5149~~~~~ction: HVAC System: CONTROL ROOM AIR CONDXTXONING CHILL WATER Equip Desc: CONTROL ROOM AIR CONDITIONING NORTH CHXLL WATER EXPANSION TANK Building: AUXILIARY Room: CONTROL ROOM AXR CONDITIONER ROOM Elev: 650 Sort: S, Notes: Normal State: Desired State: Power Req'd: N Support System Drawing: Req'd Support Comp: Safety Related Status: STANDARD Min/Opt: MXN Alias No: Comp Served: MFR: Power Train: Panel: Elem.Drawing: NOT APPL Wiring Drawing: NOT APPL Power Source: Walkdown: F Relay Eval: N Comp Type: TANK.Iso Drawing: 2-VW-529 Location: 4 FEET EAST OF THE ROOM'S ENTRANCE GATE, AT THE NORTH WALL, 7 FEET ABOVE THE FLOOR DC COOK Unit 2 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet1 of2 ID: 2-TK-76N (Rev.0)Class: 21-Tanks and Heat Exchangers


==
==
Description:==
Description:==
CD EMERGENCY DIESEL AUXILIARYJACKET WATER HEATER (TANK)
Building: AUXILIARY                          Floor El.: 587.00                Room, Row/Col: CD EMER DSL GEI'I RM - IN THE NORTHEAST PART OF THE ROOM, 5 FEET NORTH OF CD EMERGENCY DIESEL JACKET WATER PUMP
                                                                              &#xb9;2-QT-130-CD2, Manufacturer, Model, Etc.: 75KW HEATER Kaid
      'llowable  Stress:    30600 psi.
Rzfvm of Surfaces:
                'umber 1
Surface Orientation Direction          Direction  Direction Comp              Comp        Comp No                    Nx                      Nz 0.000        0.000      1.000 Anchor Pattern for Surface &#xb9; 1 Legend for Anchor Patterns Anchor Bolts .
Concrete Linen:      ~mm Concrete Points .
Vleld Lines:


CONTROL ROOM AIR CONDITIONING NORTH CHILL WATER EXPANSION TANK Building: AUXILIARY Manufacturer, Model, Etc.: BASIS: External analysis Floor El.: 650.00 Room, Row/Col: CTRL RM AIR CONDIT RM-4 FEET EAST OF THE ROOM'S ENTRANCE GATE, AT THE NORTH WALL, 7 FEET ABOVE THE FLOOR 1.The buckling capacity of the shell of a large, flat-bottom, vertical tank is equal to or greater than the demand.2.The capacity of the anchor bolts and their embedments is equal to or greater than the demand.3.The capacity of connections between the anchor bolts and the tank shell is equal to or greater than the demand.4.Attached piping'has adequate flexibility to accommodate the motion of a large, flat-botton vertical tank.5.A ring-type foundation is not used to support a large, flat-bottom, vertical tank.N/A Yes Yes Yes N/A S C L DE~C SRT: Gary Thomas, Tom Huang and Kailash Mahajan on 11/3/93.ANCHORAGE AND SUPPORT OF TANK ACCEPTABLE BY JUDGMENT BY THE SRT FOR THIS SMALL TANK.Small tank 2'n length x 9" in diameter on a 1" diameter piping system.Tank in-line with pipe, supported by a U-bolt on a cantelevered angle (2 1/2" x 2 1/2" x 3/8")about 1'6" long.Angle welded to a plate that is bolted to the reinforced block wall with 3 5/8" diameter through bolts (other side of wall Inspecied and bolts came through).Glass site tube judged acceptable (no interactions).
DC Cook Unit 2                                GIP Rev 2, Corrected, SCREENING EVALUATIONWORK SHEET (SEWS) 2/14/92'tatus:
Evaluated by: Date:  
Yes Sheet 11 of 14 ID: 2-QT-134-CD (Rev. 0)                         Class: 21 - Tanks and Heat Exchangers


==Attachment:==
== Description:==
CD EMERGENCY DIESEL AUXILIARYJACKET WATER HEATER (TANK)
Building: AUXILIARY                        Floor EI.: 587.00                Room, Row/Col: CD EMER DSL GEN RM - IN THE NORTHEAST PART OF THE ROOM, 5 FEET NORTH OF CO EMERGENCY DIESEL JACKET WATER PUMP
                                                                            &#xb9;2-QT-130-C02, Manufacturer, Model, Etc.: 75KW HEATER Qmmdn hrzhar.
Number of Anchors: 3 Anch                                            Z        Surf No      Id        Coord          Coord          Coord          Id 0.000          0.000            0.000 14.063        -8.119            0.000 14.063          8.119            0.000
&#xb9; of elements  per line: 1 Number of Concrete Lines: 3 Start        Start          End          End          End      Sf      Line No    X-Coord        Y-Coo rd    Z-Coord        X-Coord      Y-Coo rd    Z-Coo rd    Id      Width
          -1.000        0.000        0.000          6.250        0.000    , 0.000    1        2.000 11.438        -3.572        0.000        14.563      -8.985      0.000    1        2.000 11.438          3.572        0.000        14.563        8.985      0.000    1        2.000 Number of Concrete Points: 0 EcldJ.bm '
of elements per line: 4 Number of Weld Lines: 0 Reduction Factor input for Anchor  &#xb9; 1 Adequately Installed: Yes Embedment Length: ( 2.13 in. Min Reqd. to achieve full capacity):= 2.13 in.
Gap at Threaded Anchor: 0.00 in.
Edge Distance- Edge 1: 5.00in.
Crack Size: 0.000 in. - Cracks Affect <= 50% Bolts Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes mbedment Steel and Pads Adequately Installed: Yes


Pictures DC COOK Unit 2 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 2 of 2 ID: 2-TK-76N (Rev.0)Class: 21-Tanks and Heat Exchangers
OC Cook Unit 2                                 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                Status: Yes Sheet 12 of 14 ID: 2-QT-134-CD (Rev. 0)                           Class: 21 - Tanks and Heat Exchangers


==
==
Description:==
Description:==
CD EMERGENCY DIESEL AUXILIARYJACKET WATER HEATER (TANK)
Building: AUXILIARY                          Floor El.: 587.00                Room, Row/Col: CD EMER DSL GEN RM - IN THE NORTHEAST PART OF THE ROOM, 5 FEET NORTH OF CD EMERGENCY DIESEL JACKET WATER PUMP
                                                                              &#xb9;2-QT-130-CD2, Manufacturer, Model, Etc.: 75KW HEATER Reduction Factor Input for Anchor    &#xb9;2 Adequately Installed: Yes Embedment Length: ( 2.13 in. Min Reqd. to achieve full capacity):= 2.13 in.
Gap at Threaded Anchor: 0.00 in.
Edge Distance - Edge 1: 5.00 in.
Crack Size: 0.000 in. - Cracks Affect <= 50% Bolts Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factor Input for Anchor    &#xb9;3 Adequately Installed: Yes Embedment Length: (2.13 in. Min Reqd. to achieve full capacity):= 2.13 in.
Gap at Threaded Anchor: 0.00 in.
Edge Distance - Edge 1: 5.00 in.
Crack Size: 0.000 in. - Cracks Affect <= 50% Bolts Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factors Data Current: Yes Anc      PaIV      Pallrl No    Id      Vali      Vallr    RT    RN    RL    RG    RS  RE    RF    Rc    RR    RP  RB    RM 1      1      2003.75            1.00    1.00  1.00  1.00  1.00 1.00 0.88  1.00  1.00 1.00  1.00  1.00 2380.00            1.00    1.00  1.00  1.00  1.00 1.00 1.00  1.00  1.00 1.00  1.00  1.00 2      1      2003.75            1.00    1.00  1.00  1.00  1.M  1.M  0.88  1.00  1.00 1.00  1.00  1.00 2380.00            1.00    1.M  1.00  1.00  1.00 1.00 1.00  1.00  1.00 1.00  1.00  1.00 3      1      2003.75            1.00    1.00  1.00  1.00  1.00 1.00 0.88  1.M  1.00 1.M  1.M  1.00 2380.00            1.00    1.00  1.00  1.00  1.00 1.00 1.00  1.00  1.00 1.00  1.00  1.00 N/A      = Not Applicable Pall      = Allowable Pull without Reduced Inspection Vali      = Allowable Shear without Reduced Inspection Pallr    = Allowable Pull with Reduced Inspection Vailr    = Allowable Shear with Reduced Inspection
          = Outlier
          = Reduction Factor Not Used RT        = Reduction Factor for Type of Anchorage
          = Reduction Factor for Installation Adequa RL        = Reduction Factor for Embedment


CONTROL ROOM AIR CONDITIONING NORTH CHILL WATER EXPANSION TANK Building: AUXILIARY Manufacturer, Model, Etc.: QJCT~I=S Floor El.: 650.00 Room, Row/Col: CTRL RM AIR CONDIT RM-4 FEET EAST OF THE ROOM'S ENTRANCE GATE, AT THE NORTH WALL, 7 FEET ABOVE THE FLOOR CONTROL ROOM AIR CONDITIONING NORTH CHILL WATER EXPANSION TANK Coo Component go, 2 TK 7~~Class 2~Any payticular area the Seismic Review Team should pay axtra attention to?Yes<No (If'es, check items that apply.)Anchor Type Anchor Diameter Anchor Spacing Anchor&#xc3;umber Anchor Embedment Anchor Edge Distance Anchor Cap Anchor Thread Engagement Anchor Crip Anchor Angulari~Concrete Crack<Others (describe brieily)If there is concern for Design Basi.s Discrepancy, circle the applicable item and explain.l.3.Fardvare Naintenanc'a Type Discrepancy ruling Update Type Discrepancy Significant Operability/Dosi~
0 DC Cook Unit                                             GIP Rev 2, Corrected, 2/14/92 EVALUATIONWORK SHEET (SEWS) 2,~'CREENING Status: Yes Sheet 13 of 14 ID: 2-QT-134-CD (Rev. G)                                   Class: 21 - Tanks and Heat Exchangers
Basis Discrepancy Others Condition:
WoH6 Actions Taken: Prepared B nasa 12 CHP 5021.CCD.019 ATTACHMENT NO.1 Unit 0-NSP CT 0 D T AU'L (50'-Q".Bldg.%&#xc3;THWE,ST CORKP OF CbNTRQl.RIM AlR (.:I'"lT>gq s ROOM IC WAL 1"0" AEOVF FLQClr Location Installation dwg./Rev.Anchora e Arran ement Sketch Z.-Tl(-IC 0 Equipment No.R>g" x 4"x I'-4" ZI r~r'.IO~g e R{'.D'ltllTll-{.UE<C VUH'P.i Wl 83+/$g4.'t&L~QOCK%I&44 SEC TlQM"4-k" I7A Z>"x3"x~ra"-J Q LQ'iX 5'"+Z'6 I'r" I Z" Z." CO o~C.O>.-rL n-et;~Pp UO O C9 O 2.'Y.~~O 4/l ZO&~us Qy n t.4LI+amQ<S CRACWCD VC CBLIMG, ALSQ.MQPTAR BEl'WCCkl t" LQCI(5 C RACK E.Q~/s"4 5%6-ROD 0)-'EB5llED
%A'5'.5 SEC Y."2-K'ECT.
'Y-C" Drawn by: Verified by:~~~ual./ert.Reviewed by: Construction Date: C.-/Date: Inspector Date: Anc or Review Engineer Page 1 of 3 Revision 1 ATTACHMENT Np.Equipment No.: Embedded Steel Dwg.No.: Dwg No.: Weld ID size Len h cracks Lack of Penetration Porosity No Yes Yes Yes Yes Yes Yes No No Ho No No No Yes Yes Yes Yes Yes Yes No No No No No No Yes Yes Yes Yes'es Yes No No No No No , No des 1~Fillet 2~Plug/s3.ot 3~Groove Yes No Yes No Yes No(MGLC.N'ES
~kFQQMQ'REM.YVC.LD I~UMQCR<U'T AND FMDS OF AMC LE.H<'~e" I" QF 7Hz TOP HQR I"'TAL WELD I 5 CQ~~<~>WASHER lh3IA;IA h'ijcH(QQN T~o~i~c woaxi-G carr AUG 181995 LKRK T I Equipment base flexible: 0 Yes 8 No ons ruc I.on e Date: Reviewed by: I Verified by: ua ons ruc won c or evxew gxneer npsec or Date: Pago 3 of 3 Revision 1 ATTACHMENT 4 TO AEP:NRC:1040E SAMPLE SEWS, ANCHORAGE CALCULATIONS, AND ANCHORAGE INSPECTION DOCUMENTATION FOR LARGE FLAT BOTTOM TANKS RAI ITEM 6 This attachment includes sample SEWS, anchorage calculations and anchorage inspection documentation for the large fiat bottom tank evaluations requested in RAI Question 6.Included in this attachment are the evaluations for 1-TK-33 (RWST)and 2-TK-32 (CST).
wquip ID: 1-TK-33 Txain: 12 Equip Class: 21 Drawing No.: 1-5144~~~~.'ction: DRI System: REFUELING WATER STORAGE TANK SUPPLY Equip Desc: REFUELING WATER STORAGE TANK Building: GROUNDS Room: RWST ARBA Elev: 609 Sort: S, Notes: Normal State: Desixed State: Powex Req'd: Support System Drawing: Req'd Support Comp: Safety Related Status: NUCLBAR SR Min/Opt: MIN Alias No: Power Train: Comp Served: RWST Mfr: GRAVER TANK AND MAMJPACTURING CO Model: 420,000 GALS" Elem.Drawing: Wiring Drawing: Power Source: Walkdown: F Relay Bval: N Comp Type: TANK ISO Drawing: Location: 25'ORTH OF UNIT 1 CONTAINMENT BUILDING.
>12 CHP 5021-CCD.019 ATTACHE'.NT NO.l Un t i-2-3049 GA, ufo+Bl g.25 HEPTA OI-Awrearr&T.
Local on lc-33 Insta at on wg./Rev.Anchora e Arran ement Sketch Equipment No.RW.S T 7~k.DiN&NCioM'.$DIRx 5'2'-'5 ttlAH 2'5~C.&R STR~Q&@A~(SB&hJRcy pa.g9 poP, aT~ncvWg<g gHC CT'%Re (S SW1 PraOuHO~e.~~w~c~~p,~<</$4 ove'e (e%ro4 TH@SoTTOM oF Ttl@~t46-GF~>(g CIaeug~WCP TeS V~T'tb array'OOR.IS TA.imM)fH~~~I~NX,l-Pagan.AROOHO SNaoTH MO They~~q Faorn~ll4)TO YQ (F R12T QF T~'2 Gtl>S~<0 FtC.SCL)SV:
-To'4~&/$6~$6 0 F r~nC'e'7~&<~aiI mZ~Su~>oa), INDIANA I/ICHIGAN POWER SITE DESIGN CONTROLLED WORKING COPY OCT kB tSSZ LERKT Date: IQ-1 t2 D te: Drawn by: Verifiod by: gga.Ce.Znspector Reviewed by: 2 Cons ruct on Anc or Review Engineer Page 1 oi'Revision.3
'(I 0
>12 CHP 502 1~CCD~019 ATTACHMENT NO.1 B g.Insta at on dwg./Rev.Anchora e Arran ement Sketch'2S NOR t H OF NOTWWYYI~.T Locat on'l-TK.-33 Equipment No.r=C+3uau>/II"<is'w IP I e<O u>qOMrI'S'NIIYI~hS Ceo~Q O I 3/br'" norns TRt4K.a4., 4 ,4 4 s 4~4~a INDIANA MICHIGAN POWER SITE DESIGN CONTROLLEIi WORKING COPY Ot;T 15 1995 LERK+SECT.'A A 8~04T 66 tYRACVAW~Q.AT~S~gg 4p M~All(.+K STRFtP (DCThiL c.av~a b be.measu.va a.c.cu.va4)T hue Q~iv su.toko av'F'adi~S Date: 1G 1 Drawn by: Uerified by: Date:/<'-Qua.Cert.Inspector Reviewed by: Date.l 0-13-'9'X Cons ruct on Anc or Rev ew Engineer Page 1 of 3 Revision.3 DC Cook Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet1 of26 ID: 1-TK-33 (Rev.0)Class: 21-Tanks and Heat Exchangers


==
==
Description:==
Description:==
CD EMERGENCY DIESEL AUXILIARYJACKET WATER HEATER (TANK)
Building: AUXILIARY                        Floor El.: 587.00                          Room, Row/Col: CD EMER DSL GEN RM - IN THE NORTHEAST PART OF THE ROOM, 5 FEET NORTH OF CD EMERGENCY DIESEL JACKET WATER PLIMP
                                                                                      &#xb9;2-QT-130-CD2, Manufacturer, Model, Etc.: 75KW HEATER RG      = Reduction  Factor  for Gap at Anchors RS      = Reduction  Factor  for Spacing
        = Reduction  Factor  for Edge Distance RF      = Reduction  Factor  foi Concrete Strength RC      = Reduction  Factor  for Concrete Cracks RR      = Reduction  Factor  for Essential Relays RP      = Reduction  Factor  for Base Stiffness and Prying Action RB      = Reduction  Factor  for Base Strength and Load Path
        = Reduction  Factor  for Embed. Steel and Pads Analysis Performed: Yes Type of Analysis: Regular Spectral Accelerations (G's)
No          N-S            E-W            Vertical              Safety Factor 0.380            0.152            0.092                    4.204
          -0.380          -0.152          -0.092                      4.704
          -0.380            0.152            0.092                    4.514 0.380          -0.152          -0.092                      4.612 0.380          -0.152            0.092                    4.204
          -0.380            0.152            -0.092                    4.704 0.380            0.152            -0.092                    4.612
          -0.380          -0.152            0.092                    4.514 0.152            0.380            0.092                    5.698 10        -0.152          -0.380          -0.092                      3.039 0.152          -0.380            0.092                    5.698 12        -0.152            0.380          -0.092                      3.859 13        -0.152            0.380            0.092                    3.740 14        0.152          -0.380            -0.092                    6.064 0.152            0.380            -0.092                    6.064 16        -0.152          -0.380            0.092                    3.740 17        0.152            0.152            0.230                    8.257 18        -0.152          -0.152            -0.230                    7.950 19        0.152            0.152            -0.230                    15.006 20        -0.152          -0.152            0.230                    6.830
          -0.152            0.152            0.230                    6.830 22        0.152          -0.152            -0.230                    15.006 23        0.152          -0.152            0.230                    8.257 24        -0.152            0.152            -0.230                    7.950


REFUELING WATER STORAGE TANK Building: GROUNDS Floor El.: 609.00 Room, Row/Col: RWST AREA, 25'OF UNIT 1 CONT BUILDING.Manufacturer, Model, Etc.: GRAVER TANK AND MANUFACTURING CO.420,000 GALS BASIS: External analysis 1.The buckling capacity of the shell of a large, flat-bottom, vertical tank is equal to or greater than the demand.2.The capacity of the anchor bolts and their embedments is equal to or greater than the demand.3.The capacity of connections between the anchor bolts and the tank shell is equal to or greater than the demand..4.Attached piping has adequate flexibility to accommodate the motion of a large, flat-bottom, vertical tank.5.A ring-type foundation is not used to support a large, flat-bottom, vertical tank.Yes Yes Yes Yes Yes COJg NINES~~SRT: George G.Thomas and Tom Huang on 10/5/93 0 Large flat bottom tank 48'-0" inside diameter 32'-3" height (31'-0" liquid tank).Tank manufactured by Graver Tank, made of ASTM A240 Type 304 Steel, 420,000 gallons and weighs 94,000 lbs.Anchored with 25 3/8" th x 5" w x 4'4" long strap that is embedded in the concrete 2'epth with a 2" radius hook at the end.A detailed calculation was performed to the SQUG GIP criteria as part of the Stevenson 8 Associates report"Earthquake Analysis of D.C.Cook NPP Refueling Water Storage Tank Subjected to Nozzle Loadings to Original and Current Design Criteria", September 12, 1989.The calculation for the RWST resulted in the conclusion that the weld to the tank and embedment in the concrete was sufficient to develop the full yield strength of the strap.The calculation for the RWST using GIP methodology indicated an overall safety factor of 2.57 for overturning and 1.72 for shear.The calculation is included as a document of this SEWS.The tank is founded on a concrete pad per drawing 0 1-2-3048.g4 Although anchora the straps were not rusted to the degree that the SRT judged the;e should be reduction in capacity.A flin ing of the walkdown was that these straps should be cleaned and painted to maintain their integrity.
DC Cook Unit 2                                GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                            Status: Yes Sheet14 of14 ID: 2-QT-134-CD (Rev. 0)                       Class: 21 - Tanks and Meat Exchangers
Picture 2, Wk.1, Tm 2, Disk 1-Pipe at the Bottom of the RWST Picture 1, Wk.1, Tm 2, Disk 1-Typical Rusted Strap Picture 3, Wk.1, Tm 2, Disk 1-Buckled out Anchor Strap DC Cook Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 2 of 26 ID: 1-TK-33 (Rev.0)Class: 21-Tanks and Heat Exchangers


==
==
Description:==
Description:==
CD EMERGENCY DIESEL AUXILIARYJACKET WATER HEATER (TANK)
Building: AUXILIARY                      Floor El.: 587.00              Room, Row/Col: CD EMER DSL GEN RM - IN THE NORTHEAST PART OF THE ROOM, 5 FEET NORTH OF CD EMERGENCY DIESEL JACKET WATER PUMP
                                                                        &#xb9;2-QT-130-CD2, Manufacturer, Model, Etc.: 75KW HEATER Minimum Safety Factor:    3.740 The Anchorage Capacity is    3.740 times greater than the Demand


REFUELING WATER STORAGE TANK Building: GROUNDS Floor El.: 609.00 Room, Row/Col: RWST AREA, 25'OF UNIT 1 CONT BUILDING.Manufacturer, Model, Etc.: GRAVER TANK AND MANUFACTURING CO.420,000 GALS Evaluated by: Date:/~-zg-
Coo ComponenC Po. '2" KT          ) ~4'laia Any payticu1.ar area the Seismic Review Team should pay          extra attention tot Yes  V    No        (If yea,       check itima that apply.)
Anchor Type                                          khumrJsa Anchor  Diameter Anchor  Spacing                                    eA-Anchor  Number Anchor  Embedmen Edge Distance
                          'nchor Anchor Gap Anchor Thread Engagements~
Anchor Grip Anchor Angularity Concrete Crack&
Others (describe bri.eely)
IE there is concern for Design Basis Discrepancy,           circle    th>> applicable i.tom and  explain.
: 1. Hardvc,re Maintenance Type Discrepancy
: 2. Drawing Update Type Discrepancy
: 3. Significant Operability/Design Basis Discrepancy Others P vV( c.8-o K Condition:
b> p,  >F.  +g0+R j~              a)c,(,~  <)~
                                    ) g->$ 4 Actions Taken:
prepared By T.                  Dat. 0  >> /~


==Attachment:==
                                                          '.2 CHP 5021 CCD.019
                                                                          ~
                                                          ~TTACEQKNT NO. 1 OR'f TWQ                            Sa7-0" L ~P,qHEA,gg F )OQ                OF ROC'OOM.
Un                      Bldg-                      Locat on (Z-34K- l3                        2,-GT-isa- CD Znsta at on dwg.  /  Rev.          Equipment No.
Anchora e Arran ement Sketch IIZ'a l30LT VllTH QVERSlZED WASHY.R 4 NUT )hl >s" 38(CK, K, NG'9 54QTTEQ      HQLE, L'-0'ia" MO WAG%.R
            +A                                                QA INDIANA MICHIGAN POWER SITE DESIGN CONTROLLED WORKING COPY AUG 51 1S95 LERK  ~  ~
Drawn by:                                            Date:        c Verified by:                                          Date:        - 0 Qu  ./Cert. Xnspector Reviewed by:                                          Date:
Construe  on        or Review Engineer Page 1  of  3 Revision    1
 
                                            ~ ~
s ~ ~
0 ~ ~              ~ ~ II
    ~ ~    ~ I
                                    ~    I
                                      ~
  ~            4 ~w~    ~
~ ~
                                  ~
                                    ~
 
i I ~
r  ~  ~ II 4
e 'L  ~  +                  ~  i      ~ ~    'l      ~
                                                                                        ~
                                                                                          ~
                                                                                          ~
                                                                                            ~
                                                                                            ~
                        ~  ~ ~
                                        ~    ~
o    li)
                                      ~      -. Ci  ~                I l-s. L ~
RHMeWsaMMMWW HHHL%%%EE ewmaaara        .SL~LE55 858QERLl LE I
I~ ~    ~ II r~
WlRISR%i EL l%RiR~HRLWLL MWWWWW~W&
mmRIHRHLIL 5%l%SRHRRli%
I I
I
        ~  0 RRiRgRkigi%~~~~~~
                                          &WWWWK%
                        ~ S ~
I      ~      ~
                                              ~g                    IE
                                                    '                                        > ~ l ~,
                                                                                ~    '
                                                                                  ~ '
 
5 <".~ A DEPT.Ri('v'.'='',".
CONTROLLED DOCUMENT                                      '2    SHP 5050 mE 008 COPY NO.                                                ATTACPNENT NO.      3 ULTRASONIC TEST REPORT JOB ORDER    NO.:  /A                                  Q          ~)
IDENTIFICATION                      TECHNI UE Unit                                Test Unit/ S/N      y'S    -'l~  CA.c'. -'s Component                          Freq. /Diameter Reference Standard Material V~                          Couplant/Batch No.
Other  5-  .
TEST DATA REMARKS
                                                      ~ wl+%CC'.CS<<L cC+
PERFORMED BX:
REVIEWED BY:
LEVEL:
LEVEL
                                                          ~
                                                        ~-
DATE:
DATE.
FORM NO. 12 SHP 5050 NDE.008-1              Page 1    of  1 Revision    0
 
Equip XD: 2-TK-76N Train:        2  Equip Class:21 P~awing No.: 2-5149
    ~
            ~ ~
ction:
      ~
HVAC
  ~
System:    CONTROL ROOM  AIR  CONDXTXONING CHILL WATER Equip Desc:      CONTROL ROOM  AIR CONDITIONING  NORTH CHXLL WATER EXPANSION TANK Building:    AUXILIARY    Room: CONTROL ROOM AXR CONDITIONER ROOM Elev:    650    Sort: S,        Notes:
Normal State:          Desired State:    Power Req'd: N Support System Drawing:
Req'd Support Comp:
Safety Related Status: STANDARD            Min/Opt:  MXN Alias No:          Power Train:
Comp  Served:
MFR:
Panel:
Elem. Drawing:      NOT APPL Wiring Drawing:      NOT APPL Power Source:
Walkdown:    F      Relay Eval  : N Comp  Type: TANK.
Iso Drawing: 2-VW-529 Location: 4 FEET EAST      OF THE ROOM'S ENTRANCE GATE, AT THE NORTH WALL,    7 FEET ABOVE THE FLOOR


Pictures
DC COOK Unit 2                                      GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                    Status: Yes Sheet1 of2 ID: 2-TK-76N (Rev. 0)                              Class: 21 - Tanks and Heat Exchangers
 
== Description:==
CONTROL ROOM AIR CONDITIONING NORTH CHILL WATER EXPANSION TANK Building: AUXILIARY                        Floor El.: 650.00                    Room, Row/Col: CTRL RM AIR CONDIT RM - 4 FEET EAST OF THE ROOM'S ENTRANCE GATE, AT THE NORTH WALL, 7 FEET ABOVE THE FLOOR Manufacturer, Model, Etc.:
BASIS: External analysis
: 1. The buckling capacity of the shell of a large, flat-bottom, vertical tank is equal to or greater          N/A than the demand.
: 2. The capacity of the anchor bolts and their embedments is equal to or greater than the                    Yes demand.
: 3. The capacity of connections between the anchor bolts and the tank shell is equal to or                    Yes greater than the demand.
: 4. Attached piping'has adequate flexibilityto accommodate the motion of a large, flat-botton                Yes vertical tank.
: 5. A ring-type foundation is not used to support a large, flat-bottom, vertical tank.                        N/A S  C    L    DE
~C SRT: Gary Thomas, Tom Huang and Kailash Mahajan on 11/3/93.
ANCHORAGE AND SUPPORT OF TANKACCEPTABLE BY JUDGMENT BY THE SRT FOR THIS SMALL TANK.
Small tank 2'n length x 9 " in diameter on a 1" diameter piping system. Tank in-line with pipe, supported by a U-bolt on a cantelevered angle (2 1/2" x 2 1/2" x 3/8") about 1' 6" long. Angle welded to a plate that is bolted to the reinforced block wall with 3 5/8" diameter through bolts (other side of wall Inspecied and bolts came through).
Glass site tube judged acceptable (no interactions).
Evaluated by:                                                                            Date:


==Attachment:==
==Attachment:==
Pictures


Seismic Evaluation of The RWST
DC COOK Unit 2                          GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                        Status: Yes Sheet 2 of 2 ID: 2-TK-76N (Rev. 0)                     Class: 21 - Tanks and Heat Exchangers
&5 OC Cook Unit1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 3 of 26 ID: 1-TK-33 (Rev.0)Class: 21-Tanks and Meat Exchangers


==
==
Description:==
Description:==
CONTROL ROOM AIR CONDITIONING NORTH CHILL WATER EXPANSION TANK Building: AUXILIARY                Floor El.: 650.00              Room, Row/Col: CTRL RM AIR CONDIT RM -4 FEET EAST OF THE ROOM'S ENTRANCE GATE, AT THE NORTH WALL, 7 FEET ABOVE THE FLOOR Manufacturer, Model, Etc.:
QJCT~I=S CONTROL ROOM AIR CONDITIONING NORTH CHILL WATER EXPANSION TANK


REFUELING WATER STORAGE TANK Building: GROUNDS Floor El.: 609.00 Room, Row/Col: RWST AREA, 25'OF UNIT 1 CONT BUILDING.Manufacturer, Model, Etc.: GRAVER TANK AND MANUFACTURING CO.420,000 GALS 5<<I!g5(Sl''))I Buckled out Anchor Strap Pipe at the Bottom of the RWST)c"5'5'I E yj Rusted Anchor Strap 4 l'h pP 1
Coo Component go,   2 TK 7~ ~             Class  2~
+pshsg"'"',ggr~t STEVENSON R ASSOCIATES a IlruclaiknoCnanlcal ccinclnng englnnnrlng flan CC,(WCC!4 Ev AL Q AT (a4 0 a,~(a 5 v8 I 3 I-, I (J s I L:O'+np.n.C.ERIC I/7 g~r~i~!~!'y p I IL.~~8~~/rs(PJ7 Ir-i-rl~~I I jd 7+t.I.h.k.+As.g
Any payticular area the Seismic Review Team should pay axtra attention to?
(!e..IH~LC SgW I I I I I i I I gLCJ f!~I I~I'I$!f 6 cnI.Q,uy~i>~~<.I.I I i rr 7 I'I Ir I I!)!i I I I I I d,i I l I I~s~.Li 1~2.C (I.M s'i I s~~I I 1.CD&.ii I 7 7 I I I I P'H~.:--'25~I+L i l i I I o~qi gA~-r-j I I 1 j+I r V'-~-!(',C I(~..m I I" I I i!I 7'I 7 Mod.'C g I i I Icn e)!I-.i.I I~~t~C'Ial~O'.-PPl/~C~.OJ L kl I~I I Qgl I r h I I~~~I i~I~~~7 7 I Acct(a'r<I 8 a~I I I I I j (D'MC.I(.C'B~AuD 2$pig II'7 I s I I~~~r I j j
Yes  <    No      (If'es, check items that apply.)
Anchor Type Anchor Diameter Anchor Spacing Anchor &#xc3;umber Anchor Embedment Anchor Edge Distance Anchor Cap Anchor Thread Engagement Anchor Crip Anchor Angulari~
Concrete Crack<
Others (describe  brieily)
If there  is concern  for Design Basi.s Discrepancy, circle the applicable item and explain.
: l. Fardvare Naintenanc'a Type Discrepancy ruling Update Type Discrepancy
: 3. Significant Operability/Dosi~ Basis Discrepancy Others Condition:
WoH6 Actions Taken:
Prepared  B                   nasa


SUBJECT nt 4 I SHEET OF'BO Z-NM>zan 0 RcJ STEVENSON 5 ASSOCIATES 0 Ifn>>clUTCHnechonlcot con>>vtttng engtneeltng ttt>>n NS-~.C e PP L.t~I I I I I'I.<<I!i~l I RQ.C.-I a.<)p~p I I I w~J.E,DclsP LL t c eL.Pp~i,~I,'pm, sb~~.FI,EE.I.'!>>i i~M.4 P~(A.'IFt IP/t ti i l t MBLc~I k t!r,aT~~i I~et-c.~'a~A~j:.SWJ I Q,>>ti m Pg I~':)3~'.ca:~:
12 CHP 5021. CCD. 019 ATTACHMENT NO. 1 0   -   NSP CT          0 D T
l g cc.Ec.~~Cw:.~)-'-C-~--'.-'-::-Ce)---'.--'C~-">-'-.----'
                                                                                  %&#xc3;THWE,ST CORKP OF CbNTRQl.           RIM AlR (.:I'"lT>gq s AU'L           ( 50'- Q" . ROOM            IC        WAL  1"0" AEOVF FLQClr Unit                          Bldg.                               Location Z.- Tl(- IC 0 Installation          dwg. /   Rev.                 Equipment No.
C~>--'--: I'I I.=.I i']I i I Tl I I.C.'Z CC.j.z 6...,..''..5;.
Anchora e Arran ement Sketch R  > g" x 4 "x I'-4" ZI r~r'.IO
t.: '.,:2~.'.]!~T!~I>>~I~..l l%.O i W,O i I I i I I.,o.5:G.~,~i 09''.Z->>I.t A EFA=.n.t.I I t~>>I~~I 1 i I I+I I 4~I I i I!I~, I I i''I 7 8, I i'e:~I~I i'I I~.P M~K 7+Z,-olr,b, I'I I I i.,2A T j l~I I I i 1!i~~e*., i., I.~~t!.i.C,tq-.J Z.dD..VZ 0 Q.Q,~IS.g>>-!
                                                    ~g e R{'.D 'ltllTll
M~I fl>gs q P,s to>>I s.in F..,'E.F>>, a!FFE.c.'rP-'.
                                                    -{.UE<C i VUH'P.
FE, i P I g,r s~o a.etc E>>~-4-CM~-E M~-4/t.l~TEI m..cc'AGAN n.A'~a 6 c~,~~a.@~'~w~.s..y c.'F-M.c..ks.jpJ t i!i)rex t pU ws.(~-~, p-..Ei'.A.,c:)ir
I7A Wl 83+/ $
..'<h,>>~<.J>>FAG,P.h EA.kaIP'nk
g4.'t&L
..i.m~46+S.IV S~P-,A..n.p.!WHX., H,z.&.t.D~I I I C C IFFY I 2 E i I I~l I i>>I I I~I~~~~rr-f~~~I~I I P~H~C~C.k..I Response Spectra EOASP 1.0 08-03-1989 g V~~FREO 1.0.10 2.0.13 3.0.16 4.0.20 5.0.25 6.0.32 7.0.40 a.O.5O 9.i 0.63 10.0.79 11.1.00 12.1.26 13.1.58 14.2.00 15.2.51 DAMP.050 9.872E-03 1.790E-02 2.700E-02 3.660E-02 4.832E-02 6.133E-b2 7.518E-02 9.276E.02 1.219E-01 1.434E-01 1.702E-01 2.040E-01 2.357E-01 2.604E-01 2.834E-01 DAMP.040 1.008E-02 1.846E-02 2.794E-02 3.798E-02 5~043E-02 6.432E-02 7.920E-02 9.817E-02 1.306E.01 1'40E-01 1.838E-01 2.217E-01 2.572E.01 2.849E-01 3.108E-01 1/3 FREQ 16.3.16 17.3.98 18.5.01 19.6.31 20.7.94 21.10.00 22.12.59 23.15.85 24.19.95 25.25.12 26.31.62 27.39.81 28.50.12 29.63.10 30.79.43 DAMP DAMP.050.040 2.288E-01~92~+2 G'$~~05&91~~1 Qv3BH.Ql~~1 0&61 2A78E 01 3.066E-01 3.371E-01 3.290E-01 3.629E-01 3.292E-01 3.630E-01 2.937E-O'1 3.208E-01 fo+'.591E-01 2.809E-01 2.337E-01 2.514E-01 2.20?E-01 2.367E-01 t'.Zc 2.292E-01 2%38~1 2/3 5 2-~6'5 cf-P-EF SHEETM~Ol42.~
                                                                              ~QOCK %I&44 SEC    TlQM "4-k" Z'I'r"                    Z" Z."
g~S-S*\'I'STEVENSON R ASSOCIATES a Ittuatu)CHnechanlcaf consul)lng cnglnccnng nrrn 2)2,.e C+,4 23 (I.I 8 aS~'o ms 4w i!I L j (I I l I O'O i I I I~.s g 0 C., 3-8J~C.H&l?=~I I I w4w~w..P aEWEf=mA I I I f I'~-V'nil p~'.T F~l I f I I j I'I j""'.G.~~r~.b.of e.&v.'C,fw.C.A IA,.C~~~~.~)<.~'~I T!..c..)i.A&,c.y'.g f g, LV J.f,a4~oi,7 I,rl&.6)kd.MQA G.=Ex P'wv.'J I!I: I I I I j>~I~I~I I.io'z<~~I!'l I L'''-I wi.i ,b..~.f,a C.y...8.V.....VZa.,O L..fd..CV.Cv'6S..
I Z   >"x3"x ~ra"     J         Q LQ'iX    5'"+
~l~I I l~f" i,*', I I I I I I l~pi 4 I I I: c.~~S~4./i'T ri-i'5 j I I I~/05 5"73 (I (I 5 l I i 3 M'Ao I (I i!(I I!I'I l 1~~I I i I~l I I I I f I I~g'" 3cO+J ji j=.o, a Ol....Ua CD;.3'~lIl I STEVENSON'ASSOCIATES a Iinrcturojtnochonlcot ccnsuNIAII oncinooring Ilrm SUBJECT~&~IC P6 JOB No.'e"''''J'u'..C'C'*Q,P.P s(i g CPS'Q e-s.-e O CII III c o~<C!T li Tn I+I+L!I I~J M!5~~c~(~~.E~E.k'~~a I oj~N'"=RE..~C'4:.'...orrT=..
CO                                                                                          ~/s"4 5%6-ROD o~
I.~!O'O.j I l.g.opj I Assio<<([a I I , nM.I r I I T'I~I I I~~<6,P."..==.I.-I I J+'L.Q~'~p.'i:MC' tj C.C K I i~}I!: I (I I I I I!o8~I,~I I I'I i~'I 4.:,4 c.c I I I I I i r<<T$'-'a''Z.Z.I"~l I t I I'~Qo i i 3 4~I oI da , (''6 I I~I T~r I i SUBJECT sosi(0.++<'1<~7'HssTMa oFEPM ,;-.'STEVENSON 8c ASSOClATES a ttructutoHnechantcot Cohuttt<<JQ cttglttcctut(I tttttt 5 (K O<<C j I H l-X,.9.~.~J3.6~j j L l j j j t I~t I I ((t I 1 t I I, (I<<J I (j<<MC P'-B~0 4<WGR'lJJ!~<<<<<<<<I.
C.O>.                                                                                               0)-'EB5llED
P Q P mJII J Q g S Q~P'4 e l W jy~C't i j I il I.!2Q I~$4<<L Ia4-I j~~+~I I-I i<<j i I~I!t<<~I'<<j 3~i I~I!'.I I.(~<<~I~~~I~t I~4 S.E GAA.P H.D~I~~-~L~a.t/,~6='.I I~<<~',.';.Sj..'S~P..J@.-.....,: G'.c~.-.gg;,~.~
-rL n-et; ~ Pp
i~a I.'t-.'.o....PP-.E'.'.s:~a.+:~
                  + amQ<S CRACWCD VC CBLIMG,                                                 %A'5'.5 UO  O C9            ALSQ. MQPTAR BEl'WCCkl t" LQCI(5 O 2.'
L~a g.;pl@&'C(A D-6 H.tat I Q'p, g~(g i.Jci~((<<-tc';T (7):~I I~, I l I t.<<0 (~~I*',~~pl Hr~..I j lQ ,'./g....j:,...Z 0...I.:~,=i j.'..+..)=.J<'>~p>>~<<I'<<-c--I I.!P.
Y.
Pp STEVENSON h ASSOCIATES a IttuotWOHneChcnlCOI Cchfttltlttg OttghtOOttttg tttttl I=ID X O ttt)Itl IK t-trg.I~t I~~I I'/9?~(.'I!('t I''I g TLI g~iQ~l ((j~(K<M.c aA PA44 t t I.'j~I L..t,b I t r I t~I/trr 4 r'r*I I)1 3'~I~I IA/I I t.E8'.I WN D~..DE'te." I I y~~~lt x.EI..~~H.rw4R:.:,LoAD cd'i r I I~I I r I SUBJECT JOB Ng~r!s Ils-S/'s.s O'ZcJ V-S-S~/r I'TEVENSON 8c ASSOCIATES ccnrvttlng ongrnooltng trim~-Dc..RP;~LL Qs+3O LID 5 PEP>8 e, aa L,7 J KJ I r 4>.w I t~S..H.-fc i~I i I I s I r~s I I'..w c a~@'!I.>I I',;I', IIJ~>cp.p~Liri'Tlc>,nJ
C   RACK E.Q 4/l
-r--~'--"---"~-~=~I I I I~~.5 WE,P I/.Q.....g.j..~C+5~CT*e icI:7-+);: I I i l q)S zap (...ID,....-...
~   ~O ZO&
2.>I r I" r'i L.J.'A.R.E....!..
~us Qy          t.
W nH:C.c~I DQ I 4I~.t t 4 9~g~cA.&Q r~~I~'i'lt I O..~+H.Q I pQ p~i~f jig nI Lp~p.+~g~I I i~I..A-.M....,..
n       4LI SEC    Y."2-K'ECT. 'Y -C" Drawn by:                                                                     Date:           C.-/
-'S~L?'FPI'l'-I Cia I 7.O:...Eg.5g.g/i;..
Verified by:                                                                   Date:
'Z:B.Ai..+8;CQ
ual./ ert. Inspector
~'~~I I r~l t.'L.<mrt,a ww<.CA~+.c,.(mv'.I.I j~~I c.6 6;J..I.S&~3 I'4?I r.'C)I&.&I C p4(I, I], I I I I~~r<<'t~!I'.C n.y~: I (..I (.I!~s~I~.F I I I''I.(''I~I i'R 2's/I('I L.Li-,.V~~, r r>0-r-~".I I IN\I t I'-I 1 r'r'V'.I ,.L l, I I'M r I I I I I I>~'s I vrl st I:lsr<<rr rT'.rs,!s,'i'I~!'I j J I I/I rl~3.I-s-...I I I j~~I j I*q~r t'!I I I: L,=..2+%~;L..ICE, I/.'I!--I l l I I~.,r s i" R'I~I I t~I I I~t I r.$sL~I I I i r~!
                                        ~       ~
SUBJECT i'A,VV.v.STEVENSON 8c ASSOClATES O ItnIClwalmechoNcol consaNng cnginoc!Ing II!m P~cv C Q.A/A~g vll.X A l AA~c-!i.T T''i,y~.+'ip i L L tk~~.3.l.8, i~I wP.EC Lam~8'e'A'.Pm Je'~.c.d'i i I i I P.I-.A.-I 6 8 B,Nm 4~~v p cI'I='.!ri, g./JAN'J,: 4 i'j ps';pv~i lDa lij~~ns A-I'~c5=.Q''(y.e+$5c+=',,Lel...
Reviewed by:
C?'ps i!os.d 2%co'p~S,UR E vvj E.~c.c A, FIc c-'l.=,$5.~i>/z'..".)..!2
              ~
=,<<!>."~7,.%
Date:
,~J C I v:,..t=wLQ f g.'wg.nL.v'...
Construction Anc or Review Engineer Page 1           of  3 Revision            1
~P g~~P'.P C..~'a I,.PC&,..~~..,...C!g.a
~i,a P..'.,: l I!'i~\I!i~'I~A Bee.'!N;v.D.i'~
.G'.HK'.~r L DA&~'~L~~I I i~~L t.:,'=.:>'rZ.: CZI.).=..2S;,3;:W
..2.>..~H~r~.~~A c T'~'~i T A,c.v.e~.'~+
!AacMk~i+.vv<~i.~, I!>J, 5 i i PA (rTVV'~T V~/aREFnR.Py~g.I I-, I l v I<I'!!I I t;I~'.i~''a mZ!~vi vL..'.C'e S vILA~Kv iv'E v'.'I I;!: I l: l I'.!I!L: R.I,S~...:.H-C'.,CW
.~o.GS.APE~4.9.:4:..~B'EF~Q.460 I I'I I I P I<, i~I.*.I)-.0~.T L!--I---.-,-,-.---,-
!-.;--,-,,----,'PC I,'ai-I PL a'~'.I'&I f"Il r.T-'''!''.J, j:..'.LL~S v.D'~&rH.!=I2'C~7S)+!O'LZ,.5D=.I
?:'i i!!I!!.:.;:!i Y"'.vvc iv'v.'w'f7 E'...,.....,,......v....,.
.....g,v./..T,...!i.....,J.L.:....'..
I.: I;',.ME~OI...CAP,...=
I Z,5.(,.VCIP)....;'8;, C7~..: ".3.;.l..7.67,>C~.=.~~w v I~~'A>>vd~v v~JA<<~v v 4 v'~v 4 4 V4 lv
~s~2." s SUBJECT S I~I+~JOB NI4.+vl I id STEVENSON 80 ASSOCIATES a IIIIIChslCIIIIOChcnleol coniutiinII engineering turn 0,.C.o M K O Io III K f~ZZ 37" 7"~I QI ,'iT I I I I s I e~L'~C~I*'1!, 1 5 so..='e..~
I i L r~i$qf-r PAL I'.~ERE(F,'M.Lm.<wWCR&i~~lM.oC T I, s'9fz'l~r~g C I.~.$.I.m<.,5, I 1 M Pr4D i.PR=~,LED ag.c.".'I r I~l~dOSi I.Py~&$a my'~I I I I I I I I~~I I~r',''.I I I l lgl r I'4$P.~c.c-.a~'..,H ctv E~m..8.<.]c.O.u R..I&..e r.II-.~,.CT.I.t.a I I'M.C}=i+D e MA 4 C..lc'i I.e,~c.r.nsr..~J'.I l'A.hD I ta,~i@ES.'t W.~..~....(.~l!L I'I i.Q>>~..C....C.C a.I~''.ua iI j.W C.!,n.Wr~g-"..,Sq-..'ygPZ~
I L'e~k~~.', a.~..'..'.:~..~..~~.g i...S'n U.C-.'.U.S,Z.:.-:..+.6;'.!'.I.., I I Prs co+.sP=L.na sruti.or.'-.'-.rs 6 I CiZ..I ,'I III.f S M rE-.~'~--r I I!i I I I~*r I~s I I-I', rs I j I', I I'I I~I-~I I r I r~I r, I s't t r~~~I s s I~~~~\~I r I~I I I I r w r r I~r rr s~r I I I I I I I I
\t~4 SUBJECT C ISnn I*oa er-P JOB No.~~+~+~~SHEETglll Ol4~STEYENSON 5 ASSOCIATES centeIIInii englnoednII nrm O Ii)ill CC i I 4.+~i i;I J~L I L I I~ll~i i I I I~i I I i3 I I i!i i~i I 8 Ec5!~., l''.i i I p i I Ql I I I L, 8!7 i I.5 I'I I I f I I I I t~I I I i I:.2M LI'.3 I7 C;3Li I i,:I l I I I.F~.a]i I I I~~I":!I I I)II'g'<i i I gA I P'I.l.+J IO'.II.S V..S=J.)IL>~~i A I I, I I~,hlA~u P.B)i~i~O.g~v fo'~I I i)=N 4-.c-cn&lrACs d~'l I I t-.)C+i.X4D 8 i i t W, l!
SHEET~~~'~~STEVENSON 5 ASSOCIATES conwNng onglnoorlng Irrm O~/5 I I 21E 2 h'I l!-'e!8~I F~'u.l2.4'I v J hAAv=~~~1 g+s.ss..D I l'I e I e PC<5'IW'V: a f-e~!l l l I I'I 1 l.h~~I e 1 k!I: 1~r I l H.K L(xP2.'~~I I 1 I l~QtJ I Ttt&kr I I e I!I!I I I I l..i I i I e I Lr g e&~e 32~2 I I I I~1~i 1 I 1-'-i I i i l J'E I Dj i 1-8-:5--f 1 J e e e~e e e l M1'..3.6I:..Ft'.E.'.MM.A.
HE.H.'4 Z6<<<4 e e I 4 e l , j I J I I I I l.~l I l I i l I I'i'I.I I~~v r i~>>~e>>e>>e'~EE~
STEVENSON 5 ASSOCIATES O Itiuolvrolctt4Chorticol coriirrtttrco 44QIA44rtog Itrrri SUBJECT JOB No.(-I+I<<J.SHEETBL+'OfJQ-2-RM'F-S-''CCCC: rir<<~" I , P 8+~~C 2K.2hz I-i~t 5-t zfz 8Se'~.3M'e6~~a"., JC,(M g i~7 L3~:~+I f~fg 5 I ri (I r I I I r 1~(y.g I~i!I'l(I (~~i-~~I'.r I I J~C I C'~C\r~~.~.,~~,.r,,..r i+-, i nrr~l4~1 (!, I I r~-'I I".*" I I 5 o<<<<.<<",f=rr r.I.="pa cr o-c,<<..r,r rrr<<rcrff;ao aa.6$*<<<<r.<<f r rrw I J~~~~~r~*I~I I I!.'.f, u P T-)Mphil Ql 8 A 0 ES P 5h CP X7-I('gP%gW jFi-,F X'u''R~8 C 1 7.I{I=...,S~!5!!(~J,DMH Atua.HANS L Ecvz.a~0 I FRE.uEZ,C.r.
C.r=., OV..A.I.I i~.6..RI'Xi'Oa.OF.4''r H EROS JJ IM O 4 (LJC C~.HI~+~8++r',,'.re.J..g:S..
AS..A:.CS H~f f e~VSC-~,H.'r I i I!~~~~~~r'=.~C~~~r A5s~v K ggQ~JP-8'!l~I" I pl+(I~l I I (>r I!(-~4-(I r'I!I I r W 4,!...,.3,'5.'L4r?.EI Ir...MMs U 5.(.g,Q,>~~~i." QP'I(A.I~'.~l,'~w~
~F.v.s.PPP.&x f M.A.+f~M<<<<c~H p rr A rrc rL.....CCI g Sg hl,~q.u j I'i l l I;I 5 8 g(g.~C~I f!,'~c (I i, t 4>>w t I C'r~<<-r r r~,;i!!~I l j r...~'..~~',~'a<<~!
'"k>>'>>r~Irk I>>~r I 8~:-.STEVENSON'.-.;'.at, ASSOCIATES
.';".'a It>>I>>CttltattnootlantCOI
>>~'Ctcttttlg 0tlgtt>>00tttlg tits>>~k k SUBJECT I'JOB No.I k I>>A~V A i t~W~le P.~t f O Ill.k=!>>>>F-'>>'-'b 5~trYI~'I'C n"'f I>>>>~I I}((J LIJ T I~t j t gj I',li&Br~~i ij I.'J-i+-5 I'l CI-~Z~I I I~5 l.Z,.P (c 2S I o+z)o2>cQoQ (2e+
4/g 4~'
STEVENSON',.',&ASSOC3ATES
~o structrrroHnechohtcot COIN(tthg Oh(t(hchfthg (If!ill CVP u Arc~n(-0!ft (t KcJ-S-8'J>VV>VI>M>IJ}I I t~','3 i 3 t~t 3}!!i}~t}f;i I=I 3 i~>~I 1 3 I J I I]~!3 I~1 4'}(4 I I I t}+I J'(4 P y.fj, t 4 I}v 4D A i>}r.I(-I (+-I I I 1 I I I I L 3!i~~I t t~3~~3 k-~4 3 I I 4 I I~I~~I''>>~'I L SUBJECT C STEVENSON 8('ASSOCIATES
'6@G c o)ftucfut~cf)otucof tuA)uN(thg OtlglhOOflog fltm~'OB No.+++j+~~z O~I IH(IT~OIII N 9 cP'-5-8).'C.'-,y>,'pt 1', lh't'C~C s R.S i C>>I,'i~~I I I a Ii g'W7 P~~!I X~ESS~C.6.I i~~t~.i.S'~At.8'VT'I.O.+
~I~~I)R!" I~, i I L.~I~~'I i I l I I e I I I i!)j, I t~I I l I&i%.j!!EQ R.~I!I t I I I I~c Dr~t-.~~I l~:, I i'i (&r.O..~.&.W.R.Q.;.):6,C EO Sm)4I':~~OK.D'~~s 4.~,'<w~nP,~c.~~
urn+~I i I i!t t I I I l C.35o+-I (D/p-~~i I E:j M I~i'C~tV'C fi..4!.D'.E't~..~~: ')I~I~'I I.I..Pg,.S.O~(=ty't=)j.Crt,igPP C.A.C I~~.~.t~I~-I a.,~,)~,,'I~,,~~,~~t'1~~~~~~.,~~.~~,~.~~~~~I g:0'0 STEVENSON'I ASSOCIATES a Itn(cturotrnochontcol coewWng eng(noortng firm h E E (~sm r E I~S 9$c(=I r E 2)I I I+~,.~r s 5'o I I Q~I I)LGJ I I I I , S I I (r r~~+&, l ln,sac 8&Vt5>QW I I-"/'i (s3!~(I (JVl (J.2 o5.k'Q Lo5 2 1 I: Cpp (I I 8&m 4)I (II I"i i)l i I~i~~7 I E L.'I X-CE L I (a g i).j L I.L tt d II 0 STEVENSON 8;ASSOC1ATES cont)itttng entttneerlntt tltm i UP7 tmA C F-ej&5 m r I-P.c)SHEET'4~~0 Ctt-s-z 0 Itt Ut~L~~l~f!7(o'i I (,I t.'o.+77gg cate jM~~!i'S.~~a.oJjR,O
.I P.~~~V"4".!jct B I'R-O t'<5~Lt'QF 5 t:.SIC'R b j~jt I)l t l I 1~!i I I 3;4't)~~, if'OS)), J+i I~j.D CI 7~.~R C~....~i+, Q pent')'i<~~-.,r'" SVZ-,'ace.II"lo
)','.c)n7'.""co s t)'i(3-'j, s',-'~I'I~~~Pi 3 35 5~~I I~~~*-I J i~'5'~~j~~I I i i I I l~I~)L I l I t.'...5 Q~pj, ij...h/+~+i i'P jc~''l~&.2i tt t pea (2-.2..p,e I.....y.J3.3.4%9;.K 5;....'P~t.','...., y.:.=H CC3.C.'+5.O..t)S'.i.',Ir.i=.:.37'rr t.(n.,o po F.J'4-n p~g l t~i t, tt)I I I~~I~f'" I t~I~.....'3.,5.Q.p.s,.l,,=...tl j''I)I J I I.='J&.2.:..!'I~I I I~I++tt~.3.l.f P s.i=.='.=.(''t f~~i (*\~~4.A~<<IA 4)I~A'y I 5 i I jo i\i I.I~I t ti J I!I I I I i i I~
r'ai<Q, r'rot rr, s ,;.;";.'TEVENSON
'"'-Ik ASSOCIATES o slructuroirnochonlcol consurrrng ongrneerlng tlrrn SUBJECT (C'OB No.~DC l~u'i(~c''AP.R V)z O rrt cc ss ssr@~orrt<
~.~l~sls 4/~5~g s n-s~fs"s s~0 s rats c."J~r i;,~.r'M t J'.K L'u.P,.i l~r.....s..l ic k,.to y.I'P.~i gH~Im~r ((~g~.~&#x17d;)M<.csO.A.a.,&,5 , i C.s..MH./i AsJ,rtc s.~~~~>Q 2 IO+'(-=,3 2 co.'c'rc....'-ps) r r~F R I=-~w.(.a.k'.~'..:.7~L~L~I A.w~~..$, p'.ig.'<i,.4 t.C.Pg;:C.~5 sJ r(c:C~F F~8 D.A.n'<E.,rt r.h:e r~!.t p'I.Q 6,.J., Cl t g r.o 4 r I r r I~((E L ,'3 4 5+~..I n.J.i f~I 7 Q I, r, I 8S x lc~HZ-(.2 359 t i~I L l~I I I<<',H..p h'..J'WnJ'g,g~<~'.s-r,~~.Ent.C.t W.'.~r,,<~~tl C I I=2-;I I i 3/a(e da~I r i t i e 4.+z'~I I I r I I~-.'I~1'i Lsd i.8-Q rns~MM L r'L~~-1 I
~4 CC,)C f~','TEVENSON
..-8CASSOClATES O Ithfotchc<<hOChoh<CO<
cohfcfltlhp cop<hoof<tip hfhl SUBJECT Ar)'G.O'S<-.'G: c.c.~!A PP.':~'O R O V)U<SHEETS~&#x17d;PF gP~'~.<r r'O<5j$<&S++!i I'C I~O I I I!','5o.8 I I~Jt0~$I x I+-l-3 I)~!i I I I T9-W!~UL3.ed1~C i I.~I 1,'~~~~I~I~I~', j W'7 ff'1 i c I~I I r, I I~1 1 r 1" I I I I I I I I I I I I I I I I C S IO I~~I5+x In.~B'~~v5'3'f~~~R<j~..I 8 f l I i.,.7.e.Z), W, L-Z d,27~,g 4~E!,Q~~)I+-I I~~I<..~.I I i~!I M~'Z.I V~~I<~~~1 I I I I~',~.I!i I''~~(J g.a I S.,i,)(,~.4
...,E,0<~I.Oa.
C.C-=A<<S.FuP-rt.v<..<S..
i og-I!I r I 1 I I r r I I~~I I:.~.~~'.I;I~c I~~I+,+<<.,~1 I...~*r.~~,.1.C...I.c~..A r~'r c rcr,~a.e~c''.....I-rhrrrf....;,.I KSS:S....e&l~:.S'E+,:='.+.(C26 CClCS..)i..


4 J SUBJEGT~c.ri, jOBMJ:-J33C f55 9..'.'SHEET/2 I B~2Z::+Ac Y<g..f-d Wc'-5-STEVENSON 8c ASSOC}ATES O ItnjclllloH54Chonlcol conIIJINny englneerlny ntm 0 EO~'I~" IJS~J S k I7 axe~I cn+}I I;"}~~I ,po I I I 1~.7p~I I i r~)I I~J i 1 R!8~C-~iP'IO~IE.<~
ATTACHMENT Np.
L E~'I}I i C}A P'+!)'pl'.Qg t4'5(o 4~4 R.E I>>.1.F.U<~<6.%3:[
Equipment No.:                                                           Dwg  No.:
a~I?=Aj C L..S~IE-JJ JI I~I)I I~~1 ,.Z.B&'~I I SZ,I2 O I A I i g 0 1l R h>'I
Embedded  Steel  Dwg. No.:
'1 1 1terrrr 14 r rA~1 rt SUBJECT'~Wr~--t;tt r~g~V.tri':4"""~~" STEVENSON""''.-';;:
Weld ID des size 1 ~ Fillet 2  ~ Plug/s3.ot Len    h 3 ~ Groove cracks                Yes  Yes    Yes    Yes    Yes        Yes    Yes No    No    Ho    No      No        No       No Lack  of              Yes  Yes    Yes    Yes    Yes        Yes     Yes Penetration      No    No    No    No    No      No        No      No Porosity              Yes No Yes No Yes No Yes'es  No Yes No Yes No            ,           No (MGLC.N'ES YVC.LD I ~
"..'-".: 8t ASSOCIATES"'-', conrurrrnp enprnaorlng nrrn Ok&/."T et e:i ii'~>."""'11+'" X 0 ro UI cr..".ggq Jt..r" rut-r..rt)tpf.pPi 3~I~~Res 4~I ct W~8.~604 SW.'t52,4++~~~i''~l i~I I g'7+-8+1-.(-1 I t ZSB-Z S.'8'~I.I e~I I I I I I 4~~i P-..C~~~QQ)8''I I 2S.S II I I 2.B,B:,.5 IA I I!.f.'g tI ,w C.1!Let.1 r<J g~~i~s4!f.k.'-(.8 j 5.pc Wff..rf'~J 1~~I I t I , ('7 4rtt Ct~I.'real I'g, r r r--~l r (g~,gg)i I I I I I t I'CAP I I I 1 I t.t 2)+(7O,>u)(J (to 4.Q I+~g'++;~'h3'i'I l 1 I~1~t I Ki~S<J)~I~~V Equip Id: 2-TK-32 Train: 12 Equip Class: 21'ng No.: 2-5106A Function: D System: CONDENSATE STORAGE TANK SUPPLY Equip Desc: CONDENSATE STORAGE TANK Building: GROUNDS Room: INNER PLANT GROUNDS Elev: 609 Sort: Sg Notes: Normal State: Desired State: Power Req'd: N Support System Drawing: Req'd Support Comp: Safety Related Status: STANDARD Min/Opt: MIN Alias No: Power Train: NA Comp Served: CONDENSATE STORAGE TANK MFR: GRAVER TANK&MFG.CO., INC.l: 500,000 GALS.Panel: Elem.Drawing: NOT APPL Wiring Drawing: NOT APPL Power Source: Walkdown: F Relay Eval: N;i'omp Type: TANK Iso Drawing: Location: 50 FEET SOUTH OF THE UNIT 2 CONTAINMENT DOME DC Cook Unit 2 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 1 of 3 ID: 2-TK-32 (Rev.0)Description:
                    ~ kFQQMQ 'REM.
CONDENSATE STORAGE TANK Class: 21-Tanks and Heat Exchangers Building: GROUNDS Floor El.: 609.00 Room, Row/Col: INNER PLANT GROUNDS-50 FEET SOUTH OF THE UNIT 2 CONTAINMENT DOME Manufacturer, Model, Etc.: GRAVER TANK&MFG.CO., INC.500,000 GALS.BASIS: External analysis 1.The buckling capacity of the shell of a large, flat-bottom, vertical tank is equal to or greater than the demand.2.The capacity of the anchor bolts and their embedments'is equal to or greater than the demand.3.The capacity of connections between the anchor bolts and the tank shell is equal to or greater than the demand.4.Attached piping has adequate flexibility to accommodate the motion of a large, flat-bottom, vertical tank.5.A ring-type foundation is not used to support a large, flat-bottom, vertical tank.Yes Yes Yes Yes Yes E P El IC COJHI)LES SRT: George G.Thomas and Tom Huang on 10/5/93 Large flat bottom tank 52'-0" inside diameter 34'-5 1/2" height.Tank manufactured by Graver Tank, made of ASTM A240 Type 304 Steel, 500,000 gallons and weighs 128,700 lbs.Anchored with 30 3/8" th x 5" w x 4'4" long strap that is embedded in the concrete 2'epth with a 2" radius hook at the end.The strap detail is identical to the strap for the Unit 1 and 2 refueling Water Storage Tanks (RWST)1-TK-33 and 2-TK-33.The calculation for the RWST.resulted in the conclusion that the weld to the tank and embedment in the concrete was sufficient to develop the full yield strength of the strap.The RWST has a very similar configuration as this CST.The calculation for the RWST using GIP methodology indicated an overall safety factor of 2.57 for overturning and 1.72 for shear.Calculation is attached to the SEWS of 1-TK-33.Comparison of significant attributes of the tanks is shown below: RWST CST 48'iameter 31'iquid Height 25'trap Anchors 52'iameter 31'-7" Liquid Height 30'trap Anchors For shear the tanks are essentially identical since the demand and capacity are both proportional to the area under the base.
UMQCR<U'T AND FMDS OF        AMC LE.     H<     '~e" I" QF 7Hz    TOP HQR I "'TAL    WELD    I 5 CQ~~<~>
4%,h II's'.il r DC Cook Unit 2 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 3 of 3 ID: 2-TK-32 (Rev.0)Description:
WASHER lh3IA;IA h'ijcH(QQN T~o ~i~ c woaxi-G carr AUG      181995 LKRK  T I
CONDENSATE STORAGE TANK Class: 21-Tanks and Meat Exchangers Building: GROUNDS Floor El.: 609.00 Room, Row/Col: INNER PLANT GROUNDS-50 FEET SOUTH OF THE UNIT 2 CONTAINMENT DOME Manufacturer, Model, Etc.: GRAVER TANK 8 MFG.CO., INC.500,000 GALS.ELXUHIR ,, jest 7 T y4)4X, h P~o'p ht~g t h 2'uckled Out Anchor Strap Pipes at the Bottom of the RWST
Equipment base    flexible:   0 Yes    8 No ons  ruc I.on          e Date:
+*12 CHP 5021.CCD.O].9 ATTACHMENT NO.I-K-30 B g.'2 Tg-'7'4 Location Insta at on wg./Rev.Anchora e Arran ement Sketch Ecgxxpment No.~gDGg<RTE KToRRG6 fdic Ii DIN&4<<od.-><
Reviewed by:
DIp g s4.-S/<%AH McA)R+'TRRPs~(bbJQ QT'p.~fQ)NQ~gQQ,~)
I                ons ruc won    c  or  evxew        gxneer Verified by:       ua          npsec or Date:
>+B GF TM H~~U~y pp~~~~s~~<'T y+" p~T 4 FK.LES,Q)Gu6
Pago  3 of  3 Revision   1
~<<~TIos 1 QF T W~TO~g~U RAT-INDIANA MICHIGAN POWE~R SITE DESIGN CONTROLLED WORKING COPY OCT$5 tBS5 Drawn by: Verified by: Qua.Ce Inspector Date: Date: Reviewed by: Date: Cons ruct on Anc or Review Engineer t o-l>page 1 of 3 Revision.3 0
**12 CHP 5021.CCD~019 ATTACHKENT NO.1 Un t I-'l-'90 4 9 B g.CQ N p Eblis~C S I 0 C,M c 2.T(c-'3Q Insta~at on dwg./Rev.Anchora e Arran ament Sketch Equipment No.~/g wl L Q~R Ae&-O~g, 0 I N 3/yx5"<Toms b INDIANA hflOg, AN POLI c SITE OKSIGN C"ITROLL WORKING OPY OCT'[5 1995 8("KY'r<Q~rb LERK T++4~'5 A'~'amS OIIYl~I4N~ts, 8Q'ECT.'A A+~847 rn&AS'uk'a~~~
e,~so'F%6$4~TIW-8'3 C7~~S WIICy)X 4~Re'>~T<<Date: I o-1-'l2 D te: Drawn by: Verified by: Qua./Ce.Inspector Reviewed by: Date: I o-<3-'7>Cons ruct on Anc r Rev ew Engineer Page 1 ol.'Revision ATTACHMENT 5 TO AEP:NRC:1040E SAMPLE SEWS, ANCHORAGE CALCULATIONS, AND ANCHORAGE INSPECTION DOCUMENTATION FOR HORIZONTAL TANKS AND HEAT EXCHANGERS RAI ITEM 7 This attachment includes sample SEWS, anchorage calculations and anchorage inspection documentation for the horizontal tank and heat exchanger evaluations requested in RAI Question 7.Included in this attachment are the evaluations for 1-HE-14, 2-HE-15E, 12-HE-16N, 1-QT-107-AB, 2-QT-1 1$-CD, 1-HE-.15E and 1-QT-107-CD.
01/16/92 PG.N0.53'AFE SHUTDOWN EQUIPMEHT I.IST (SSELWP)FUNCTION: CC'W Equipment Class: 21 Train: 12 Equipment ID: 1-NE-1C Drawing Number: 1-5135 System: CVCS Equip


== Description:==
ATTACHMENT4 TO AEP:NRC:1040E SAMPLE SEWS, ANCHORAGE CALCULATIONS, AND ANCHORAGE INSPECTION DOCUMENTATION FOR LARGE FLAT BOTTOM TANKS RAI ITEM 6


LETDOWN HEAT EXCHANGER Ruilding: AUXILIARY Room: LETDOWN HEAT EXCHANGER ROOM Elevation:
This attachment includes sample SEWS, anchorage calculations and anchorage inspection documentation for the large fiat bottom tank evaluations requested in RAI Question 6. Included in this attachment are the evaluations for 1-TK-33 (RWST) and 2-TK-32 (CST).
633 Normal state: Desired state: Power Required: H Sort: Suooorting System Drawing Number: acquired Interconnections and Supporting Components:
fety Related Status: NUCLEAR SR Min/Opt: MIN ADDITIONAL INFORMATIOQ Al ias Number: Power Train: NA Comnonent Served: LETDOWN HEAT EXCHAHGFR Manufacturer:
AILAS INDUSTRAIAL MANUFACTURING CO Model: 1000 GPM Panel: Elem Drawing: H/A Wiring Drawing: N/A Power Source: N/A Walkdownt F Relay Only: N Comoonent Type: HE (ONE PER UHIT)ISO Drawings: Detailed Location:
DC Cook Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet1 of3 ID: 1-HE-14 (Rev.0)Description:
LETDOWN HEAT EXCHANGER Class: 21-Tanks and Heat Exchangers Building: AUXILIARY Floor El.: 633.00 Room, Row/Col: LETDOWN HEAT EXCHANG, Manufacturer, Model, Etc.: ATLAS INDUSTRAIAL MANUFACTURING CO, 1000 GPM BASIS: External analysis 1.The buckling capacity of the shell of a targe, flat-bottom, vertical tank is equal to or greater than the demand.2.The capacity of the anchor bolts and their embedments is equal to or greater than the demand.3.The capacity of connections between the anchor bolts and the tank shell is equal to or greater than the demand.4.Attached piping has adequate flexibility to accommodate the motion of a large, flat-bottom, vertical tank.-5.A ring-type foundation is not used to support a large, fIat-bottom, vertical tank.N/A Yes Yes Yes N/A SRT: Gary Thomas, and Tom Huang on 11/3/93.ANCHORAGE ADEQUACY ACCEPTABLE TO SRT BASED ON BACK OF ENVELOPE CALCULATION SHOWN BELOW.Nozzle loads on heat exchanger are small (on the order of 600 lbs.and 600 ft.-lbs.).
Anchored with 2-7/8" diameter J-bolts on 11-3/8" spacing.Vertical distance from the base of exchanger to the C.G.of exchanger is 13".Vertical d'stance from the base of the exchanger to the top nozzle is 29".Supports for saddle dowled into base concrete.Saddle supports are adequately reinforced to transfer loads to bolts.SRT judged that the Heat Exchanger is rigid.Back of the envelope calculation:
0.24g (DBE ZPA at floor)x 1.25 (for realistic spectra)x 3320 lbs.(wt.of HX)x 13" (to C.G.)/[2 (bolts)x (11.375")]
+700 Ibs x 29" (Nozzle loads)/(2 x 11.375"]+700 (ft.-Ibs)x12 in/ft/(2 x11.375")=1830 lbs.tension/bolt-3320 (.76g)/4 (dead wt.-vertical earthquake)
)=1199 lbs.tension/bolt
.24 x 1.25 x 3320/4 (bolts)+700/4=424 lbs.shear/bolt Embedment for the 7/8" diameter J-bolts is 19.5" or 19.5/.875=22.3 bolt diameters into concrete.RLp for embedment (90 degree hook)=]19.5+8(7/8)]/(62.5 x.875)=0.49.
Allowable for tension=20.44 x 0.49=9.8 k>1.2 k.For shear=10.22 k>0.424 k.OK.  


DC COOK Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 2 of 3 ID: 1-HE-14 (Rev.0)Description:
wquip ID: 1-TK-33 Txain:           12  Equip Class: 21 Drawing No.: 1-5144
LETDOWN HEAT EXCHANGER Class: 21-Tanks and Heat Exchangers Building: AUXILIARY Floor El.: 633.00 Room, Row/Col: LETDOWN HEAT EXCHANG, Manufacturer, Model, Etc.: ATLAS INDUSTRAIAL MANUFACTURING CO, 1000 GPM Evaluated by: Date: 8/f5 (~>w (p (p-
      ~
                ~ ~
    .'ction: DRI
          ~
System: REFUELING        WATER STORAGE TANK SUPPLY Equip Desc:        REFUELING WATER STORAGE TANK Building:       GROUNDS      Room: RWST ARBA Elev:      609    Sort: S,       Notes:
Normal State:            Desixed State:    Powex  Req'd:
Support System Drawing:
Req'd Support Comp:
Safety Related Status: NUCLBAR          SR        Min/Opt: MIN Alias No:              Power Train:
Comp    Served:    RWST Mfr:    GRAVER TANK AND MAMJPACTURING CO Model: 420,000        GALS Elem. Drawing:
Wiring Drawing:
Power Source:
Walkdown: F            Relay Bval  : N Comp    Type:  TANK ISO Drawing:
Location: 25'ORTH            OF UNIT 1 CONTAINMENT BUILDING.


==Attachment:==
                                                                    >12 CHP 5021- CCD. 019 ATTACHE'.NT NO.          l GA,  ufo+                25    HEPTA OI-    Awrearr&T.
Un  t                        Bl g.                          Local on i 3049                                          lc- 33 Insta    at  on  wg.  /    Rev.          Equipment No.
Anchora e Arran ement Sketch RW.S T 7~k.        DiN&NCioM          '.$ DIRx            5'2'- '5  ttlAH 2'5 ~C.&R            STR~          Q  &@A~
( SB& hJRcy        pa.g9              aT~
gHC TH@
CT'%Re (S SoTTOM SW1 oF poP, PraOuHO Ttl@
                                                        ~~
ncvWg<g p,~<<
: e.  ~~w~ c~ ro4
                                                                    /$ 4 ove    'e (e%
      ~t46- GF IS
                  ~      >(g TA.imM)
CIaeug~
fH    ~~~
WCP TeS I ~ NX,l-V~        T'tb Pagan array
                                                                                          'OOR.
                                                                        ~~q
      ~ll4) TO YQ
        '4~&/ $ 6 ~$ 6 AROOHO SNaoTH
( F R12T 0
QF F  r~
T~  '2 Gtl>S    ~
MO They nC'e'7~& <~aiI Faorn
                                                                    <0 FtC.SCL)SV: To mZ ~Su~>oa),
INDIANA I/ICHIGAN POWER SITE DESIGN CONTROLLED WORKING COPY OCT kB tSSZ LERKT Drawn by:                                                          Date:      IQ-1 t2 Verifiod by:                                                      D  te:
gga . Ce      . Znspector Reviewed by:                                                                            2 Cons  ruct    on Anc      or Review Engineer Page 1 oi' Revision    .3


Pictures DC COOK Unit 1 SCREENING EVALUATION WORK SHEET (SEWS}GIP Rev 2 Corrected 2/14/92 Status: Yes Sheet 3 of 3 ID: 1-HE-14 (Rev.0)Description:
  '(
LETDOWN HEAT EXCHANGER Class: 21-Tanks and Heat Exchangers Building: AUXILIARY Floor El.: 633.00 Room, Row/Col: LETDOWN HEAT EXCHANG, Manufacturer, Model, Etc.: ATLAS INDUSTRAIAL MANUFACTURING CO, 1000 GPM Overall Exchanger Saddle Support Coo ComponenC No.Class Any parget:icular area the Seismic Roviev Teaa should pay oxtra attontion to?Yes<No (If yea, check items that apply.)5 Anchor Type Anchor Diameter Anchor Spacing Anchor Number Anchor Embedment~
I 0
Anchor Edge distance Anchor Cepv'nchor Thread Engagement Anchor Grip Anchor Angularity Concrete Crack khamxha lhd 4=kt('.~<fn r('I'<~~P~lg"~4/)J (T (p C04~AJ Others (((sstribs brisrly)"~N I Ik~~NO bl AS~5.)~5<,&~f (IE there ia concern, for Design Basis Discrepancy, circle the applicable item and explain.1.2.3.Hardvare Maintenance Type Discrepancy Dra~ing Up&,te Type Discrepancy Significant Operabili.ty/Design Basis Discrepancy Others Condition:
Actions Taken: lJDIJB (AG.H P PrO(AT(O(~
Prepared By T Data ('s>l P--


'HP 5021 CCD.019..i'TACHMENT NO 1 lt 5bPI-ZZ lZ,-332.5-'9 ALlX I 33'-O" EL.LETDOWN BEAT EXCHANC ER RQQM Bl g.Location I-HE.-I4-Insta at on wg./Rev.Anchora e Arran ement Sketch Equipment No.OI 4 CC'V DUE, TQ HIC H RADIA'TIOM AREA CSO v.~b HALT LOCKTIQMS WE.PE.NQT QBTALME.D QM THC KkG1 PE.D'E5'TAL C)GI VlERE, DEXERMME.Q 5(M(LAR TQ THE.WEST PE.QEGTAL.
                                                                      > 12 CHP 502 1 CCD 019
Wr II/N 5'~z-'a I'iz," 5'e" 0>5E.C T/QM"4-A" PLA,M I Drawn by: Verified by: Reviewed by: Date: 4!-Z>-'B Date: ua./Cert.Xnspector 7 Date: Construction An hor Review Engineer Page 1 of 3 Revision 1
                                                                                      ~      ~
ATTACHMENT NO. 1
                                                                    '2S  NOR t H OF    NOTWWYYI~.T B    g.                         Locat on
                                                              'l- TK.-33 Insta     at on dwg.   /   Rev.             Equipment No.
Anchora e Arran ement Sketch r=
C+3uau
                                >/II"< is'w      IP Ie<        O u>q OMrI'S 'NIIYI~
hS Ceo~Q O                                                      TRt4K.
I                3/br'" norns
                                                    ,4 4  s 4
a4.         ~  4  ~
                                        , 4            a INDIANA MICHIGAN POWER SITE DESIGN CONTROLLEIi WORKING COPY Ot;T 15 1995 LERK  +
8  ~04T 66 tYRACVAW
                                                                  ~Q.AT~ S~gg 4p M~
SECT.'A A                                        All(.+K STRFtP          (DCThiL c.av~a av 'F 'adi~measu.va b  be.                      a.c.cu.va4)T hue Q~
S iv su.toko Drawn by:                                                             Date:     1G  1 Uerified by:                                                         Date:     /<'-
Qua . Cert. Inspector Reviewed by:                                                          Date. l 0 '9'X Cons    ruct  on Anc or Rev ew Engineer Page 1   of   3 Revision     .3


++12 CHP 5021~CCD.019 ATTACHMENT NO.pgg No.: IZ-3)ZI-U.
DC Cook Unit 1                                      GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                    Status: Yes Sheet1 of26 ID: 1-TK-33 (Rev. 0)                              Class:   21 - Tanks and Heat Exchangers
II IZ-3.)ZE~gag No.;IZ-50 t)-ZO Tightness verified?0 Yes 0 No Date: ons ruc on Equipment base flexible?0 Yes I No Date: ons ruc o ARE~~~quipment No.: I-HE-I4.Anchor type:~>~<~~~PE Z Dia: Tightness established by: 0"Snug Fit" 0 Torque Torque Wrench No.: Cal.Due Date: Bolt ID I~3 4 GaPs BFlwk5l BEfivEEIU I Comments Anchor len th 2'-I'~z" Z'-I'li''-I~i" 7'-I'jz" 41'~z"~41'l4"4lg" 41"L Protruding
~sic~-~su--~6~.len th Bolt ri Concrete condition Edg>>distance,)I'-7 lc I'-7~i~" I.'-/'rz" I'-7Yz->8'/4">8" W Rli"dh a7Vr."~V~~'/2>/4" 2'1(" L>~C.SACK Ihl CGMCRETT:~1(UOTII SIDE5 4'/q 4'/4 Anchor s acin Anchor an larit Thread engagement I I~/s" II~~a" 4 IO'lQ (50'LQ CD I(OIC OK&IC Comments 4 QtlE TD Hlf'RADIKfloLI AREA Iso Ar'I MLT Loc.ATI wERc hloT QKTAll.l THC EAST P WERE DE:TER~I IMILAR, TO THE UV'C5i'T PE'0'TAI Ih A I hl SPEC T'L(5hl.15 I R\h H R R ll ICo Varified by: Qua./Cert.Inspector Revieved by!T'ons ruct on Date: Date!Page 2 of 3 Revision l siss've w i vvui ver ATTAVBKNT NO.l l-HE,-l 4-edded Steel Dwg.No.: Dug No.: re&Weld ID Size Cracks Lack of Penetration 3(/v ((/~~y&>>(/4IP 3(/gr I, (/Yes Yes No QKO Yes s Yes No/~/4"(('//,/y">>'//,''lg">>'l4" Yes W~WS Vl4 WS'IMr-W V l l I/~I/~I/S des Yes Wa, l 1~Fillet~((~I/>>2~Plllg/slot 3~Groove Porosity Yes Yes Yes Yes No Yes's Yes Equipment base flexible: 0 Yes 8-No ons ruc x Reviewed by: ons ruc son c or evxev ngxneer Uerified by: To<~+wc.s<<~o ua.e.npsec or Date: Page 3 of 3 Revision 1


ssaC aVC J~4 SU~V J V ATTACHMENT NO.1~ipment No.1-HE,-l4 added Steel Dwg.No.: Dwg No.: WR Meld ID Size Cracks g>/g'~~lg" Yes Yes Yes Yes Yes Yes YQS No No No No No No No l~Fillet es'Plug/Slot 3~Groove Lack of.~Yes Yes.Yes Penetration KaJ No No No Yes Yes Yes Yes No No No No Porosity Y Yes Yes Yes Yes'es Yes Yes o No No No No No No No Equipment hase flexible: 0 Yas E No on ruc z n a Reviewed by: Veri.f ied by: 7c l e ons ruc son c or avxew gxnaer e.np ec r Date: Page 3 of 3 Revision 1 S 8 A DEPARTMENT CONTROLLED DOCUMENT COPY NO.3-~12 SHP 5050 NDE pp8 ATTACHMENT NO.1 ULTRASONIC TEST REPORT JOB ORDER NO.:~l REPORT DATE: REgUEST NO.IDENTIFICATION Unit Component Item Material Other 5 TECHNI UE Test Unit/S/N 5k Freq./Diameter Reference Standard Couplant/Batch No.'7 SB TEST DATA REMARKS PERFORMED BY: REVIEWED BY: FORM NO.12 SHP 5050 NDE.008-1 LEVEL~DATE LEVEL:~'-DATE: Z 5 Page 1 of 1 Revision 0 Equip ID: 2-HE-15E Train: 2 Equip Class:21 wing No.: 2-5135A 2-5113 tion: CCW System: COMPONENT COOLING WATER Equip Desc: EAST COMPONENT COOLING WATER HEAT EXCHANGER Building: AUXILIARY Room: 609 HALLWAY Elev: 609 Sort: S, Notes: Normal State: 4 Desired State: Power Req'd: N Support System Drawing: Req'd Support Comp: Safety Related Status: NUCLEAR SR Min/Opt: MIN Alias No: Power Train: NA Comp Served: EAST COMPONENT COOLING WATER HEAT EXCHANGER MPR: M.L.W.INDUSTRIES Pa el: Elem.Drawing: NOT APPL Wiring Drawing: NOT APPL Power Source: NOT APPL Walkdown: F Relay Eval: N Comp Type: HE Iso Drawing: 2-CCW-41, 2-CCW-42 Location: 30 FEET EAST OP THE N2 MONITOR TANK
== Description:==
REFUELING WATER STORAGE TANK Building: GROUNDS                            Floor El.: 609.00                  Room, Row/Col: RWST AREA, 25' OF UNIT 1 CONT BUILDING.
Manufacturer, Model, Etc.: GRAVER TANKAND MANUFACTURINGCO. 420,000 GALS BASIS: External analysis
: 1. The buckling capacity of the shell of a large, flat-bottom, vertical tank is equal to or greater          Yes than the demand.
: 2. The capacity of the anchor bolts and their embedments is equal to or greater than the                    Yes demand.
: 3. The capacity of connections between the anchor bolts and the tank shell is equal to or                  Yes greater than the demand..
: 4. Attached piping has adequate flexibilityto accommodate the motion of a large, flat-bottom,                Yes vertical tank.
: 5. A ring-type foundation is not used to support a large, flat-bottom, vertical tank.                       Yes COJg NINES SRT: George G. Thomas and Tom Huang on 10/5/93 0
Large flat bottom tank 48'-0" inside diameter 32'-3" height (31'-0" liquid tank). Tank manufactured by Graver Tank,      ~
made of ASTM A240 Type 304 Steel, 420,000 gallons and weighs 94,000 lbs. Anchored with 25 3/8" th x 5" w x            ~
long strap that is embedded in the concrete 2'epth with a 2" radius hook at the end.
4'4" A detailed calculation was performed to the SQUG GIP criteria as part of the Stevenson 8 Associates report "Earthquake Analysis of D.C. Cook NPP Refueling Water Storage Tank Subjected to Nozzle Loadings to Original and Current Design Criteria", September 12, 1989.
The calculation for the RWST resulted in the conclusion that the weld to the tank and embedment in the concrete was sufficient to develop the full yield strength of the strap.
The calculation for the RWST using GIP methodology indicated an overall safety factor of 2.57 for overturning and 1.72 for shear. The calculation is included as a document of this SEWS.
The tank is founded on a concrete pad per drawing 0 1-2-3048.
g4 Although anchora      the straps were not rusted to the degree that the SRT judged the;e should be reduction in capacity. A flin ing of the walkdown was that these straps should be cleaned and painted to maintain their integrity.
Picture 2, Wk. 1, Tm 2, Disk    1- Pipe at the Bottom of the RWST Picture 1, Wk. 1, Tm 2, Disk    1 - Typical Rusted Strap Picture 3, Wk. 1, Tm 2, Disk    1 - Buckled out Anchor Strap


DC COOK Unit 2 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet1 of2 ID: 2-HE-15E (Rev.0)Class: 21-Tanks and Heat Exchangers
DC Cook Unit 1                            GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                        Status: Yes Sheet 2 of 26 ID: 1-TK-33 (Rev. 0)                       Class: 21 - Tanks and Heat Exchangers


==
==
Description:==
Description:==
REFUELING WATER STORAGE TANK Building: GROUNDS                    Floor El.: 609.00              Room, Row/Col: RWST AREA, 25' OF UNIT 1 CONT BUILDING.
Manufacturer, Model, Etc.: GRAVER TANK AND MANUFACTURINGCO. 420,000 GALS Evaluated by:                                                              Date:
                                                                                    /~  -zg-
==Attachment:==
Pictures


EAST COMPONENT COOLING WATER HEAT EXCHANGER Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: 609 HALLWAY-30 FEET EAST OF THE&#xb9;2 MONITOR TANK Manufacturer, Model, Etc.: M.L.W.INDUSTRIES (HORIZONTAL)
==Attachment:==
BASIS: External analysis 1.The buckling capacity of the shell of a large, flat-bottom, vertical tank is equal to or greater than the demand.2.The capacity of the anchor bolts and their embedments is equal to or greater than the demand.3.The capacity of connections between the anchor bolts and the tank shell is equal to or greater than the demand.4.Attached piping has adequate flexibility to accommodate the motion of a large, flat-bottom, vertical tank.5.A ring-type foundation is not used to support a large, flat-bottom, vertical tank.N/A Yes Yes Yes N/A C LL 0~CO I~S SRT: Gary Thomas, Tom Huang, and Kailash Mahajan on 11/2/93.Component Cooling Water Heat Exchanger on two reinforced saddles.Anchorage is two 7/8" diameter J bolts.There are 4 1" wedge expansion anchors in one pedestal in the horizontal direction.
Seismic Evaluation of The RWST
C.G.of exchanger from the top of the saddle pedestal about 3'.Pedestal concrete is cracked.AEPSC tracking the problem through a condition report.SRT has reviewed the resolution of this problem and determined that it is resolved.This unit is the same as 1-HE-15E except there are no horizontal anchors on 1-HE-15E.The anchorage for this exchanger is more robust.The calculations of 1-HE-15E show that the anchors are adequate and the saddles are safe.Evaluated by: , sb.~Date: ttachment:
 
Pictures DC COOK Unit 2 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 2 of 2 ID: 2-HE-15E (Rev.0)Class: 21-Tanks and Heat Exchangers
& 5 OC Cook Unit1                            GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                            Status: Yes Sheet 3 of 26 ID: 1-TK-33 (Rev. 0)                         Class: 21 - Tanks and Meat Exchangers


==
==
Description:==
Description:==
REFUELING WATER STORAGE TANK Building: GROUNDS                      Floor El.: 609.00                Room, Row/Col: RWST AREA, 25' OF UNIT 1 CONT BUILDING.
Manufacturer, Model, Etc.: GRAVER TANKAND MANUFACTURINGCO. 420,000 GALS Sl'')
        ! g5(
5 <<I Buckled out Anchor Strap
                                                                                  )I Pipe at the Bottom of the RWST
  )
                  "5' c
5
                                  'I E yj Rusted Anchor Strap
4 l
'h p
P 1
    +  pshsg
    "'"',ggr
    ~ t a,~    (a 5 v8 0                                              I STEVENSON                                                                                                                                              3 I-, I R ASSOCIATES a IlruclaiknoCnanlcal ccinclnng englnnnrlng flan CC,( WCC! 4              Ev AL Q AT (a4 L
I                                                          :O'
                                                                                                                          +np.                    n.C. ERIC (J  s I/                                                                  'y      I IL.~~8~~                / rs( PJ7    I 7
p g~r~i ~          !~!
(    !
r-i -rl      I    I  jd
                                                                          .I.h.k.+As.g                    e..IH ~LC I
SgW I  I I
7
                  ~    ~
                                          +      t I                                                                  !    i    I                      I    I                        I i
                                                                                  ~  I      '        I                            I                              I
                                                                                                                !                                    i    rr I    I                                                                                  $                          I 7
                                                                                                                                                                  'I I.                                                  Ir
                                          !~ I gLCJ f I
f 6 cnI. Q,uy ~i>~~<.
d,i I
                                                            .Li I  ~
1~2.C (I.M s    ~
I        I
                                                                                                              .CD&.ii 1
I  I P
I
                                                                                                                                          'H  ~
                                                                                                                                                )
I
                                                                                                                                                    .:      -'25I
                                                                                                                                                                      ~
I            I l
s  '
s ~    i
                                                                        ~
I        7 I
I 7
                                                                    ~      r-    j o~ qi      gA I
I I
Icn e) j      I      1 V'-~!            +I  (',C  I(~ ..m r                                                                                            Qgl I                            I  "  I 7
I    i      I  7 I                      !              '      I                  - .i. I                                        t L
l
                        +
Mod    .'C g    I C'        Ial C~
                                                                                                ~
I O'. .OJ - L I
klPPl /~
                                                                                                                                  ~  ~    ~
iI        i    I                                    i        I                                      I  ~
(D'MC.I(.C'B~AuD                            pig III
                                                                                                                                        '7 I                                                                                                                                                        I    ~
s h              I    I  ~  ~
I              ~    ~
r r
                                                                                              ~              ~
i                        7
                                                                              ~I I    Acct(a I  I I'r<  ~~
I    8 a~      7 I
2$
I I                        j I
j j
SUBJECT                                                                          SHEET              OF
                                                                                                                                                              'BO  Z-nt 4I 0
NM > zan RcJ STEVENSON 50 Ifn>>clUTCHnechonlcot ASSOCIATES                                    NS              -        ~.        C            e  PP con>>vtttng engtneeltng ttt>>n I!        i
                                                                                    ~l            I L.t~                                                                  RQ.C. I a. <                      ~M.4 P~                                    I A.'IFt (IP/        ~ et- c.~'a~A I
w~J. E,DclsP                                                        !r,aT          ~~
I I    I        I    'I
                      .<<                        LL                                                            t ti i    l  t              i
                                        )p~ p t c eL. Pp~i,~
                                                      'pm,~~.FI,EE        sb I,                      MBLc      ~I
                                                                                                  .                k I      I  I i  i I      .'!                              t
~j:    . SWJ                Q,>>ti m      Pg I
I    ~
                                                      ':)3~'.ca:~:                                                                                  l  g cc.Ec.
                  ~    ~
Cw:.~)          C- ~-
                                                                      -'. -'                            -::-Ce)-- -'.--'C~-">-'-.----' C~>--'--:
I      .    =.I                  I  '          I i    ']    I        i            I Tl    I
: j. z6        ...,..''..5;.        t  .: '.,:2 ~        .'. ]
    ~ ..l  ~    I l
I I. C.'Z CC.            %. O        i            !
t~
                                                                  ~
I          i        I I  . t          .,o.5:G.
                                                              ,                ~
                                                                                                              ~          T  !        ~    I    >>
A EFA=. n  . t.
I W,O          i I
I                                    i I~~I 09''.Z->>
I
                                                                                                                                        ~,
I                I
                                                                                                    +I
                                                                  ~
I i
                          'I 7                                                      8,                  I  i I
4 I
i    '
I    I
                                                                                                                                                          ~    I i
                                                                                +lr,b,o 1
M~K              I  i'e:~I                I~    .P I
I  I 7                Z,-                                            I  '
I i
                                                                .,2A T
j                                                                ~
I I
i I
i
                                                ~ ~  e*.,        i.,  I. ~ ~ t                                      I 1  !
0.i.C,tq-.J Z.dD                      VZP,s to>>I s            !
                                                                            .in      .,'E.F>>, l g,r s~o                a.etc      a!FFE.c.'rP-'. FE,
                                                              ~-4-CM~-E                                      M~ 4/t.l ~ TEI m.c.'F-
                                            ..                                  F.
Q.Q,~IS.g>>-! M I E>>
                            ~                                    i P fl>gs q                                      .cc'AGAN                  n.A        '~a    6      c~,~~a.@~'~w~.s..y M.c..ks.
i jpJ i
t rex t pU                  ws.( ~-~, p- ..Ei'.A.,c:)ir          ..'<        h,>>~<. J
          +S.IV ~P-,A.. WHX.,
                      !S        )
H,z.& .          >>FAG,P.h EA.kaIP'nk                    ..i.m~46 P~ n.p. t.D~        !                                      H ~C        ~C.              k..                                  I C    C    IFFY I
2        E I
I    I l                                                                                                                                    i i
rrfI
  >>        I    I    ~        I      I
                                        ~    ~  ~    ~                          I  I
                                                                                        ~
                                                                                              ~
                                                                                                                      ~    ~
I I  ~                      I
g V
                                                                          ~ ~
EOASP 1.0 Response  Spectra                            08-03-1989 FREO        DAMP            DAMP
                    .050            .040
: 1. 0. 10  9.872E-03        1.008E-02
: 2. 0.13    1.790E-02      1.846E-02
: 3. 0.16    2.700E-02      2.794E-02
: 4. 0.20    3.660E-02      3.798E-02
: 5. 0.25    4.832E-02      5~043E-02
: 6. 0.32    6.133E-b2      6.432E-02
: 7. 0.40    7.518E-02      7.920E-02
: a. O.5O    9.276E.02      9.817E-02
: 9. i  0.63    1.219E-01      1.306E.01
: 10. 0.79    1.434E-01      1 '40E-01
: 11.      1.00    1.702E-01      1.838E-01
: 12. 1.26    2.040E-01      2.217E-01
: 13.      1.58    2.357E-01      2.572E. 01
: 14.      2.00    2.604E-01      2.849E-01
: 15.      2.51    2.834E-01      3.108E-01 1/3 FREQ        DAMP            DAMP
                    .050            .040
: 16.      3.16    3.066E-01      3.371E-01
: 17.      3.98    3.290E-01      3.629E-01
: 18.      5.01    3.292E-01      3.630E-01
: 19.      6.31    2.937E-O'1      3.208E-01  fo
: 20.      7.94                    2.809E-01      +'.591E-01
: 21. 10.00    2.337E-01      2.514E-01
: 22. 12.59    2.20?E-01      2.367E-01
: 23. 15.85              t'.Zc 2. 292E-01
: 24. 19.95    2%38~1 2.288E-01 25.
26.
25.12 31.62
                                ~92~+  ~    2 G'$
27.
28.
39.81 50.12 0&61 2A78E 01        ~~1
                                ~05&91 29.
30.
63.10 79.43                    ~~1 Qv3BH. Ql 2/3
5              2      -                          ~6'5                SHEETM~Ol42.~              \
cf-            P-EF                                                                  'I g~      S-S
          'STEVENSON R ASSOCIATES a Ittuatu)CHnechanlcaf consul)lng cnglnccnng nrrn 2) 2,.e
                                                                        ,4  23                              . I 8 aS C+                                    (      I
                                                                                                    ~'o ms 4w              (I  I l O'O  I i  !    I                            i  I I  I L        j
                                            ~.s        0    C.,    3-8J~              C.H&l?=~                              I  I w4w~w..P
                                            ~-V'nil p~ '.T F~
I g                                                                                                '
I    I      f  I aEWEf=mA        I l        f              j                              j  "
C~~~~.~) <.~'
I              I
                                              .G.~~r~.b.ofI e.&v I'                    I
                                                                                    'C,fw.C.A
                                                                                .                                  IA,        .
l
    ~
l          l c..)
                              ~
i . A      &,c .y'.g f
                                                    ~  f" I:
i, g,
                                                            ,b..~.f,a LV J.f,a J
C
                                                                                .y...
                                                                                    ', V.....ExVZa
: 8. I 4 ~oi,7 I,rl I  j    >
I
                                                                                                                        &.6)kd.MQAG.=
I
                                                                                                                              ~
                                                                                                                            .,O L wv.'
P' I
I
                                                                                                                              ~  I I
                                                                                                                                      ..fd I
I T
                                                                                                                                              .. CV.Cv'6S..
I
                                                                                                                                                      ~
                                                                                                                                                      ~
I I
I I    !          I                  I
    ! '        l
                .i I  L'' '-    I  wi                                                                                                  I  .io'z <~~
I I      I I
:  c.~~S~4./i'T 05 5"73 /
ri-i'5 I  I ~
                            ~pi            4 I
j
( I  (    I                                  i I
3 M                              'Ao                                          I I    (      I                  i  !I    (  I                            !
l1 5                                                                                                                            I l
I
  ~  ~  I j=.o, I
I    I    f a
I Ol      ~
                                                                                ....Ua i                      CD I  ~l I                                                          I g '" 3cO+J      ji        ;.3'~  lI l
I
e" '''
SUBJECT~&~IC
                                                                'J    'u'.        P6    JOB No.'
CPS'Q  e-s.-e s(i gO CII STEVENSON ASSOCIATES a Iinrcturojtnochonlcot
                                                                      .C 'C'                  *Q,P.P        III ccnsuNIAII oncinooring Ilrm c  o
                                            ~
                                              <C Tn I+I
                                                  !    I
                                                            ~
                                                              +L    I J M!5~
                        ~c~ (~~.E~E.                        k'~~a                I  oj~ N                                  Assio <<([a
                                                        '"=RE..~
! T li                              C '4:.'...orrT=.. I.~!O 'O.
j  I I
: l.      g
                                                                      .        opj I    ,
r nM.II                      I
                        <6,P.        .-I
                                  "..==.I I I                                  T tj C.C  KI
                                                                                                                ~ ~
I
                                                                                                                            ~
I  I I
I
(
J+    'L    . Q~'~p.'i:MC'                                i
                                                                                                        ~
                                                                                                            }
I I  I  I  I I I
o8
  ~
I    I I    I,
                  '        ~
I    i I i r<<T $
I  I  '    t
                                                                                'Z.Z .I" ~
                                                                          '-'a'
  ~
I          4                          l                                                        I
                                .:,4 c.c I    I  I
                                                          ~  Qo    i
(''6 i
4~I 3 oI da I
  ~
I I
T  ~
r


EAST COMPONENT COOLING WATER HEAT EXCHANGER Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: 609 HALLWAY-30 FEET EAST OF THE&#xb9;2 MONITOR TANK Manufacturer, Model, Etc:: M.L.W.INDUSTRIES (HORIZONTAL)
I                i SUBJECT                                      sosi(0.     ++<'1<~7'HssTMa                  oFEPM K
BLCLI le ONE SADDLE WITH 4 HORIZONTAL BOLTS OTHER SADDLE SUPPORT Coo Component No.'2--I S E Cloaa Any pazpicular area tho Seismic Review Teaa should pay extra attontion to?Yea<No (If yea, check Stoma that apply.)Anchor Typo Anchor Diameter Anchor Spacing Anchor lumbar Anchor Embodmont+
O                            <<C
Anchor Edge Distance Anchor Gap M Anchor Thread Engagement Anchor Grip Anchor Angularity Concrete Cracks'thers (describe briefly)If there ia concern for Design Basis Discrepancy, circle tho applicable atom and explain.1.2.3.Hardvare Maintenanco Type Discrepancy Dra~ing Update Typo Discrepancy Significant Operability/Design Basis Discrepancy Others Condition:
      ,;-.'STEVENSON 8c ASSOClATES a ttructutoHnechantcot 5 (
HotJ8 Actions Taken: 9 SING Preparod By Dasa
Cohuttt<<JQ cttglttcctut(I tttttt j        H I              l -X,.9
**12 CHP 5021 CCD.019 ATTACHMENT NO.1 Equipment No.Anchora e Arran ement Sketch ANCHOR INSPECTION DATA SHEET 2 6)x B..goy'-0" worry sourH~w~q Unzt 0 Bldg.Location i2.-B~Qg-2s,iz-3zb-z-R6-l56 Installation dwg./Rev.74'-'/a~tt Ypg l~0-C,RPICe IIJ4ROVl.I J C+ACK II I 6 CCouT INDIANA MICHIGAN POVIER SITE DESIGN CONTROLLED Y(OR KING COPY AUG 24 1S95 LERK/~g CRAuC T'O FLIIIIR 0'-l'/a+'/5 (gyp)Drawn by: Date: Date:&~~~~~~~Verified by: Qual./Cert.Inspector Reviewed by: 7 Date: 8~t~Construction Anc or Review Engineer Page 1 of 3 Revision 1
                                                                                                          .~. ~J3.6        il I.!2Q l
**12 CHP 5021.CCD.019 ATTACHMENT NO.1 2.Unxt l 2.-3285-23 f2-'328 ANCHOR INSPECTION DATA SHEET he~M bO I'-O" NORTH~GATV~W~q Bldg.Location Installation dwg./Rev.Anchora e Arran ement Sketch Equipment No.INOIANA MICHIGAN POvggR SITE DESIGN CONTROLI.EP
                                                                                                                  ~j            I  ~
'tYORKING COPY AUG 24 tSIIS I.ERK Y9P cR.Ac.z g~XoIVV e6T.08.00T 4 CoLlC, ROOT@TOP t BOGCf FB.Wl PB)K'TEIDE
j L          j
't'L 0 IJ 0 ly+7z'y 7-E<S~<>xP)El Ev.~<ca UooicuQG Drawn by: Date: Dat:e: Verified by: gua./Cert.Inspector Reviewed by: T Date: Construct on An hor Review Engineer Page 1 of 3 Revision 1 0
                              <<MC P            '-
**12 CHP 5021.CCD.019 ATTACHMENT NO.1 2 Unxt 0 l2.-N.SS-25, is-32eg-Installatz.on dwg./Rev.Anchora e Arran ement Sketch ANCHOR INSPECTION DATA SHEET Bl..IOOq'-g~I hJQATA COOT/HAU u~Bldg.Location z-HB-t58 Equipment No.z-Bg-i'd%Ql/g 9~lOC4TlOA 0$~(,N0R.d ItIDIANA MICMIGAW POWER SITE DESIGN CONTROLLED WORKING COPY AUG 24 1998 LERK T-4 gv i EL.CV.U'I-UO k IQ OuY C<~c 0 Date: Date: Drawn by: gual./Cert:.
B         ~ 0 4<WGR            'lJJ!~<<<<<<<<I.
Inspector Reviewed by: Dat Constru tron chor Review Engineer Verified by:~~~~e: Page 1 of 3 Revision 1 0
P              Q P mJII                                L Ia4-I j            j                                J Q gS      Q~ P'4t e l W jy t
**12 CHP 5021.CCD.019 ATTACHMENT NO.1 2 Unzt 0 12.-8296-S t2.-3xg-Installation dwg./Rev.Anchora e Arran ement Sketch Equipment No.ANCHOR INSPECTION DATA SHEET PrOX&1-boq'-o" NORTH SbQTH RPn~+Bldg.Location I/bklg (7Yp()7 6O~QOGIFI@)AT4X+CRRcX)'p j94C80 8, uJP 5AER 0 V INOIANA MICHIGAN PO)VER SITE DESIGN CONTROLLED YYOR KING COPY AUG 24 1895 LERK+~~p a CI d CPP~Q f~Volh)7 gC,TWd&hl 4,RouT~MQC.EI Eu.J)EM tppkx&#xc3;I 0 IA Drawn by: Verified by: Date: Date: Q a./Cert.InsPector Reviewed by: 7 Date: Construction An hor Review Engineer Page 1 of 3 Revision 1
                                                                                                ~C' I                     i    j
**12 CHP 502 1.CCD.0 19 ATTACHMENT No.Equipment No.: '-H C IGC Anchor type: Z BGU Dia: Tightness established by: 0"Snug Fit" 0 Torque Wrench No.: rJA Tightness verified?0 Yes 5 No HR ons ruc Equipment base flexible7 0 Yes S.No T'ns Dwg No.: IR-3298" f Dvg No.: Torque Cal.Due Date: c o ARE Bolt ED Gaps t 2, 3+o Comments Anchor+I p]~+I g/~'i I3q''.~3(~" len th Protruding q3/~)IS(I>'en h Q~r I Embedment Z~~~~ZI~I~/', 2'4'/<37/~tv QW4>a-3o13 8-Z<o~mCC~>/8'.5'ee eEL v Bolt ri~/8 E"/IIo 2'IX.<"/II.To~mc6+>/g Sbg LjoTE GEL4w.Concrete CRAB CRACK.GRfKK GRhW condition Edge&''" (oo distance CEGTcH To~&+~/~'nchor s acin Anchor an larit Thread engagement Tp L,~W<6 I/q" Comments.X/Ig'g~&67~QLITJtHASSSR, Yiq 4'GTW6&J Wm~oI PII R 0'I4h CRIT~P 0 Serai To OI'T RIP~HOT M u RR~C'T verified by: Qua./Cert.nspector Revieved by: Construct on SITE.DESIGN CONTROLLED YIOIIKING COPY'UG 2419SK Date: D te: 8->>"I'ERKT Pa Re e2of 3 ision 1
                                                                        ~        I t
**12 CHP 5021.CCD.P19 ATTACHMENT No,~~~Equipment No.: Anchor type:<~t.PrH(&OP.Tightness established by: 0 Torque Wrench No.: P Tightness verified?I Yes Equipment base flexible?0 kg No.: '+>>S8-Dia: I'wg No.:~>8>"ZA"Snug Fit" E Torque l?--Board I Cal.Due Date: 0 No S%a~~Date: 4.<>95 ons ruc ion Yes 8 No~~Date: 0+>13 ons ruc on ARE Bolt ID Gaps Comments Anchor len Protruding len h 7~/y'ual Ct II Embedment 5l(q." Bolt ri C n ete C,~<MPCQ CRPcv CppcE.condition Edge distance Anchor s acin Anchor an larit Thread engagement
I t  I
/I (p$~/l(p 4 4" (3/$V)3tqlI gyl/II 5" I g'3/8" 5', C~(<I," 0 0 0 Og.ot'K, Vo TOP OFC SHIIT Ta ToPoF AN<Comments: Y~gh ac.ss C'erified by: Qua./ert.Inspector evieved by: Const ct on ARE A~M J I INDIANA MICHIGAN POWER SITE DESIGN CONTROLLED WORKING COPY AUG 24 19S5 Re LERK Date: Date: o2of 3 ision 1
(
**12 CHP 5021.CCD.019 ATTACHMENT NO.1 Equipment No.: Embedded Steel Dwg.No.: OR S CT 0 CAL Dwg No.: I 2-8>98-Weld XD T e Size Len h Cracks~li Io~hb Yes Yes Yes No QL gZ W3 g]~Yes Yes No Yes No Yes No Yes No We e Codes 1=Fillet 2=Plug/Slot 3=Groove Lack of.Les Penetration QR Yes Yes No es Yes No Yes No Yes No Yes No Porosity Yes Yes Yes No Yes No Yes Yes No.No Yes No&GQ hi<'R.~/~3 RYgxqx.q" IA'4.4~J)44+4~4 o.0,~4.INDIANA MICHIGAN PO'LYER SITE DESIGN CONTRCI.LEO IVORKING COPY AUG 24 1895~~qyeHh RCCBpT 7~~O~" Equipment base flexible: 0 Yes g No 1 Date:<-2'~ons ruc z n e Reviewed by: ified by: ons ruc ron c or evxew ngxneer ua.e.npsec or:~S.-3 Date: Page 3 of 3 Revision 1 S 8 A DEPARTMENT CONTROLlED DOCUMENT COPY NO.~/12 SHP 5050 NDE.008 ATTACHMENT NO.1 Uf TRASONIC TEST REPORT JOB ORDER NO<<::~/.>>.~*./A IDENTIFICATION Unit Waa Component Item A~a.Material Other 5 Test Unit/S/Nfl VSR-CNC-9'K Freq./Diameter.asD Reference Standard&C'-8 Couplant/Batch No.~~/~lP88 TEST DATA REMARKS P.EPV C.EE E IJ~PERFORMED BY: REVIEWED BY: FORM NO.12 SHP 5050 NDE.008-1 LEVEL:~~DATE: IY'-/3~z3 LEVEL:~DATE: Page 1 of 1 Revision 0
I,        (
~Yi atabase: K:SSEL1B.DBF Equip ID: 12-HE-16N Train: 12 Equip Class:21~~~ing No.: 12-5136, 1-5135 Function: SFP COOLING AND CCW System: SPENT FUEL PIT COOLING&CCW Equip Desc: NORTH SPENT FUEL PIT HEAT EXCHANGER Building: U-1 AUXILIARY Room: SPENT FUEL PIT HE ROOM Elev: 609 Sort: S, Notes: Normal State: Desired State: Power Req'd: N Support System Drawing: Req'd Support Comp: Safety Related Status: STANDARD Alias No: Power Train: NA~Comp Served: OAT, JOSEPH, CORP MFR: 5: Panel: Elem.Drawing: Wiring Drawing: Power Source: Walkdown: F Relay Eval: N Comp Type: HE Min/Opt: MIN Iso Drawing: 12-SF-5, 7, 1-CCW-l, 7 Location: NW AREA OF RM DC COOK Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 1 of 9 ID: 12-HE-16N (Rev.0)Class: 21-Tanks and Heat Exchangers
I J
I I    (
                                                                                                                                    $4    ~
j I i
                                                                                                                                                    ~~+
I-
                                                                                                                                                    <<j      i I
I
                                                                                                                                                  ~ I  !
j                                                      t I
                                                                                                  '<<j 1
t                    <<    ~             I
                                                                                                                                '  ~     i            I
                                                                                                                                                  .I
                                                                                                                                                    ~
                                                                                                                            !          . I  I        (
3
          ~ <<
                      ~
I        ~ ~
I
                                                                                            ~ ~-~L~
                                                                      ~                                                                    ~   t              I
                                            ~
4    S.E        GAA.P H.D~                 I                        a.t/,~ 6='
I    I                          <<
                                                                                                    .'t-.'.
                                                              ~
Sj
                                                      ~
        ',.';    .            ..'S~P..J @                  ......,: G'.c~..gg;,~.~ i~a I                         o....PP-.E'.'.s:~a.+:~         L~a g.;
6 H.tat I Q '
pl@&'C(A D
                                                                      ~,
p, g~(        g  i.Jci  ~        ((<<-tc'; T      (7): ~ I l                    I                                                                I Hr~       ..I                    pl j lQ I                      I  *',              ,'./g....j:,...Z 0 ...I.:~, =i                    j.'.. +
                                            ~  ~
t
                                                                                                                                        ..)=. J <'      >~ p>>
                .<<0
              ~     ~
(
I
                                                                          ~     <<
                                                                                                                    -c--II      .
P.
 
Pp I=
ID X
O STEVENSON h ASSOCIATES
                                                                                    )Itl ttt IK a IttuotWOHneChcnlCOI Cchfttltlttg OttghtOOttttg tttttl t-trg.
                                                ~ ~
I I I ~    t    I
                                                                                                    '  / 9?~
                          'I j        ~(
g TLI g~iQ~                      K<M        .c aA    PA44
(    .               !  (    ' t I
                                                              'I  l (
(
t    t  I  .'
                                                                                                                  ~
j I
L.. t,b I                                                 /             trr 4 t              r                                                              r' I
t                          r
                                            ~   I
* I                I
                                                                                                        )  1 3
                                                                                                            '          ~
~
I IA/    D~..      DE'te."
I                  I        I    y
: t. E8'.I WN I
                                                                                                            ~         ~   ~
lt x.EI..
                                                                                          ~     ~
H.rw4R:.:,LoAD r                  I cd'i I ~
I I r I
 
SUBJECT                                                  JOB Ng                                    ~       r! s                Ils      ~ /
r S/'s.s                  I O'ZcJ            V-S-S
                  'TEVENSON 8c    ASSOCIATES ccnrvttlng ongrnooltng trim
                                                                                    ~-Dc.                                           .RP;~
Qs+             3                          O LL LID 5 PEP L,7                                              >          8    e,            KJ                                                      aa I    t~4>.           w .5 WE,P J
I   /.Q.....
CT*e            icI:7- +);:    g.j..~C+ 5~
I r
S..H.-            fc      i~
I                                                                                                        I I
I i                  s I      r    ~
s    I
                                                                        '..w c a~@'!
I I
            ~     ~
I I                                                                     r--I         ~ '- >"-- "',;-
                                                                                                                .                I    I
                                                                                                                                                    ~   ~ =~
I I
IIJ ~>cp.p~Liri'Tlc>,nJ r I          "  r            '
i I
i L.J I
l    q)          S    zap      (...ID,....-... 2.>                                                                          .'A.R.E....!.. W                    nH:C.c          ~
f I
I O. .~         ~
                                        + H.' Q      I i
pQ p                ~i~                    lt jig nI I
Lp~p.+ ~g                                                            DQ      I 4I ~.t
              .. A-.M....,.. -'S i  ~ ~     I I
                                            ~L?'FPI'l'-I Cia                    I I
7.O :...Eg.5g.g/i;.. 'Z:B.Ai..+8;CQ 4 9~g~cA.&Q t
                                                                                                                        '                         ~
r
                                                                            ~
                                                                                                                  ~
I      I r      l
                .'L.<mrt,a ww<.                             CA~+.c,.( mv'.
                                                                                                                              ~                                                                   t I,
                                                                                                                  ~   ~
I I        '
                                                                                                                  .I
                  .F4? I r.'C) I&.&
                                                                                                                                            ],
j          ~                         ~     I I  C   p4(                                                            c      . 6 6; J..I.S&~3 I    I  I
                                            '                '                      <<'tI  .                ( ''                  I                I
(..I
                                                                              ~ ~    r      ~
            ~: I'.C n.y I      I
(.
I                                                                ~  I I                                                                                                                                                                    I I                              !      ~    s                                      ~   I      ~
I  vrl st I:lsr                <<rr      rT'.rs,! s,                                                                                                          I I
I
:   L,=..2+% ~;L..                                      I/. '
i'R 2's        /I('
                                                    -,.V~    ~,
r
                                                                                                \
r ICE, I                        t
                                                                                                                                                      'i I
                                                                                                                                                                                ~
                                                                                                                                                                                  !              I  j
                                                                      's l,
                                                    >0
                                          -r        ~". I                                                                                                                J L. Li  I                  I      IN                      I      '-
I    1 I
Mr
                                                                                                                                                                  ~        ~
r'r'V '. I I
I> ~
I    I I              3. I/I rl I      ~
s-... I          I    *q I
                                                                                                                                                                      ~
jr I                                                                              I              j
                      ,.L                                                                                                            I I
                  '                  I t      '!
I l
I l
                        !                                                            s i" R'                          I                          ~
I I
I I      ~
t I                                                        t
                                                                                                                                                                  ~
I I                                                                                                                          I
: r.  $                                                                            sL    ~  I I                                                    I                                        i
  ~ .,r                                                                                                                                                                            r              ~ !
 
SUBJECT                                                                                                      i'A,VV.v.
STEVENSON 8c    ASSOClATES O  ItnIClwalmechoNcol consaNng cnginoc!Ing II!m P                ~cv          C Q.A/A~                                                                  g vll .X L tk~~. 3.l.8, A
l AA~c-   !i  .T  T''i,y~.
                                                                                                        +          'ip Lam~
wP.EC i i  I 8
i
                                                                              'e              i
                                                                                                      'A'.Pm Je'~.c.d'
                                                                                                      ~
P.I-.A.-I 6 I
8 B,Nm 4~
                                                    ='.!ri, g./JAN 'J,:
I i
L                            cI'I                                                                            4  i'j ps';pv~i                        ~
lDa v  p lij~~ns A Q''(y.e+$ 5c +=',,Lel...
                                                  ='
                                                                                                          'l                                'ps i !os.d
                                                                      ~
I c5                  .                                                                        C?                                    2%co'p~
                                                        .~ c.c                                                                                                                    ,~
S,UR E              vvj E                        A,                  FIc  c-          .=,$ 5.        ~i
                                                                                                                                        >/z'..".)..!2 =,<<!>."~7,.%
-                                C J
:, .. t=wLQ f g.'wg.nL.v'...
I
                                                                      ~P g~~                        P    '. P  C..~'a I,.PC&,..~~..,...C!g.a  v
                                                                                                                                                                          ~i,a      P..'.,:
I I
I
                            )  -    .        0 I
                                                          ~
I T
L I    P        I  <                                                i            ~  I
    !                                                                                                                            !                        'i
                ~      \                                                                                                l  I I
L DA &~'~                        'I~A          Bee.                I
                                                                                                  '!N;v.D.i'~ .HK'.~r    i
                                                                                                                          . G'
                                                                                                                                                                                      !      i
                                                                                                                                                                                                ~
                                                                                                                                                                                      ~
                                        ~      ~                                                                                                ~          ~
I L      t.:,'=.:      >'                rZ.:          CZI .)              .=..2S;,3;:W ..2.>..~
L
                              ~ r~.~ ~ 5 H
                                                              .i~
I A c T'~
                                                                      ''a mZ! ~
I i  i PA l(rTVV I
                                                                                                  '~i v
T I
vi vL..
A,c.v.e~.'~+
                                                                                                                    ~
I T'
                                                                                                                    '.C'e i
V~/aREFnR .Py~g.
I;!:..~B 'EF~Q.460 vILA! ~Kv S
AacMk I
iv'E l: I'.! I!
I    t;v'.'
                                                                                                                                                        ~, ~i+.vv<
I I
                                                                                                                                                                              ~
J, L
I                            I              l
:  R.I,S~...:.H-C'.,CW                            .    ~o.GS                      .APE ~4.9.:4:
                                                                                                    -I- .,-,.---,            '~
I,
                                  'PC                                                          'ai-I            PL        a I                                      I f"Il r.      T-'
i J,
i j:
                                      ..'.LL~S I      !
v.D'~ &rH.! I2'C~7S)+!O'LZ,.5D=.I
                        .....,,......v....,. ..... g,v
                                                    !      .:.;:                        !      i
                                                                                                    =
Y"'.vvc. /..iv'v.              'w' T,...!i .....,J.                f7      E'...,
                                                                                                                                                                              ?:'
L.:....'.. I.:          I    ;', ME~OI...CAP,...=
                                          .                                                  I  Z,5. (,. VCIP)            ....;        '8;, C7~..: ".3.;. l..7. 67,>C~.=.                          ~
  ~ w    v                  I                      ~ ~ 'A>>      vd        ~  v          v    ~  JA              <<            ~v v      4    v    '  ~          v          4 4 V4        lv
 
SUBJECT vl s
S      I  ~ I+      ~                JOB NI4.+      ~s I      id
                                                                                                                                                                              ~2."
M K
O STEVENSON                                                                                                                                            Io 80 ASSOCIATES a IIIIIChslCIIIIOChcnleol 0,        . C.o                                        III K
coniutiinII engineering turn f~ZZ 37" 7"
                                ~        I    QI                                                                                                                e~L'~C ~
                                          ,'iT                      I      I                I                  I      I s                                                  I
                    !,    1 5 so..='e..~                                                                                                          r  ~i PAL$ qf-r I                            i L                                                                                                                                              I
                                                                                            '.  ~ERE(                                                    F,'M.Lm. < wWCR &i~~
oC I,
1    M      Pr4D                                    dOSi        I.Py~&$ a I
my'~
lM        .
T
                                '9fz            'l~              s i.
PR=~,LED ag.c.".                              '
I          I I
r                                                                                      I                    I
                              ~g              C I  .~.$ .I.m<.,5, I
r I          ~                                        l
                                                                          ''.ua iI I                                                                                                                                ~
                .Q>>      ~..C      .... C.C              a.I~                                              j.W C.          !,n.Wr~g-"..,Sq-..'ygPZ~
I L'e~ k~~.',                                  a.~.  .'..  '.:~..~ ..              ~~.g                i...S  'n U.C-.                        '.U. S,Z.:.            :..+.6;      '.
I..,
I                                                                                I Prs co+.sP=L.na                              sruti                    .or.'-.'-.rs 6                            CiZ ..I                                  III.
f r
            .II-I . ~,.CT.I.t I .a
                          ~    ~
I I
I ctv E
                                                                                                  ~
                                                                                          ~m ..8.<
I r
I'4 $',''.I P.~c.c-.a
                                                                                                                                    ~
                                                                                                                                        '..,H
                                                                                                                                                              ,'I I        I
                                                                                                                                                                        .O.u R.. I&..e r
l  lgl
                        +D e                MA I'M.C}=i I. e,~c.r .nsr.                                                      .]c                            4  C..lc '
                                                            .~ J                  '.
I                                                                                                    i ta,~i@ES.'t                              W.~..~ ....(.
l
      ~l!                L    I      '            I      i
                                                                                                                                                                                      'A.hD I
S M rE-r
                                                                                            .~'~
I I
I                                                                                  ! i I
* I
                                                          ~                      r              I                                                                          I I      ',
I I
I
                                                                        'I I
I
                                                                                                                            ~
I r
s I          ',          I rs r  ~
                                                                                ~ I    - ~
I j
I              I    I I
s                                ~  ~    I                I  r    I                ~    I
                                    't          t          r    ~
r, I
I                                                                                                        I      I                                          r  I        I I
                                                                                                                                                                  ~                                I s  I s
                                                          ~                                                          r        r r  w I                                                                                                                                            I
                                                                                                                                                ~  r
                                                                              ~    ~          ~  \      ~        rr      s
 
  \
t SUBJECT    C ISnn I    JOB No.    ~~+~ +~~              SHEETglll      Ol4~
      ~ 4
* oa er-  P O
Ii)
STEYENSON ill 5 ASSOCIATES                                                                              CC centeIIInii englnoednII nrm i3  I
                                                                +~i i; J
                                                                      ~LI I
                                                                            ~ll~
I I
i I
i I
I i
I i!
                                                                                                              ~i        i
: 4.                I L                i
                                                                                                          ~    ., l''
8 Ec5!
                                                                                                                                    . i i i                                                                ~
I    I I
I                              I  I  I p
i        I Ql I. 5 L,
8!7 i                                                          I    '      I I    I f
I I
t~  I I
I    I      i  I LI I
:.2M
                                                                                                                                      '.3 I    i,:IC;3Li I7 I
l I    I I
i
                                                                                        .F~.a    ]        I    I I
                                                                                                                    ~  ~
I I                                                  ,hlA~u P.B          )
                                              )II'        i      A
          ":!                                            I, i  ~
i g'<                  I I
I  ~
                                                                                                  ~O.g~v fo'
                                                                                                                                ~
I I
i I
I gA P'I i
i        I
                                                                                'l I      I d~          t-.)C
                                                                                                                          )=
                                                                                                                      +i.X4D N 4-.c-cn&lrACs 8
i
                                .l.+J IO'.II.S                                                                                        i V..S =J.)IL>~~
 
t W,
l
 
SHEET~~~    '~~
O STEVENSON 5 ASSOCIATES conwNng onglnoorlng Irrm
                                          ~/5  I I
21E 2            h' I      l
                                                            !8 ~e J    hAAv=~ ~~                      I F ~'u.l2.4'I                e~!        I        I l
l    l 1
I
                                              . ss ' ..D                  v l        I  e I
e
      !                                  g+s                PC <5'IW'V: a f-I 1
I
        ~        ~
e
                            .h
                                  !  I:      1
                                                  ~
H.K L(xP2.
r
                                                              '~~
I l  I  I I
1 Ttt&      kr
                                                                                                                                          !  I  !
l    k                1 I  I  e I                                I I    I  I l~QtJ  I e    I
                                                                                                                                        ..i  l I  I  I  I I  i I                                                                    i
                                                                                                                      ~
i 1
1 1
                                                                                                                              ~
I I  i  i  l J'E Lr  g  e& ~
e      32    ~ 2 I
Dj i  1-8-:5
                                                                                            --f      1 J                                                      e e
I e  e                                                    e e            e e ~
4 I
l  M1 '.. 3.6I:..Ft'.E.'.MM.A. HE.                                  H    .'        4 Z6<<<4 j
J            I      I I                  e
                                                                                                    ~
I                    l                                                                                                                  I
: l.              l I
l                i          l I    I    '          i    '                  I I
    ~    v    r I
                                          .      ~
                                                                                                              ~ >>~    ie>>e>>e'~EE~
 
SUBJECT                                                                    JOB No.        (-I+                  SHEETBL+          'OfJQ                                                                                                                                              I <<J.
RM'F-S-
                                                                                                                                                                                                      '' CCCC:
STEVENSON 5 ASSOCIATES O  Itiuolvrolctt4Chorticol                                                                                                                                                                        rir I
                                                                                                                                                                                                                << ~ "
coriirrtttrco 44QIA44rtog Itrrri
                                                        , P      8+                                                                                          2K.                      2hz I g
                                                                                                                        ~
                                                            ~      ~    C
                                                    -i~t                                ,    JC,(M              5          t i
: 7. 3M'e6 ~~a                                  ".                    zfz 8Se'~
L3~:                                          f~
fg
                            ~+I 5
I        ri                I
(
r I
I                          I r
          ~( y.g I~            1 i!            I'l(              ~ ~    i      -~
I    (
                                                                                                        .,                                                                                  +-,
                                                                                                                                                    ~
I
                                        . r I              I C                          I
                                                                                                .~                          ~              ~,.r,,..C    \'
Jr
                                                                                                                                                                    ~
r
                                                                                                                                                                      ~
i Mphil                                                                                                                                      i nrr~l4        ~
                      !,      I
(
                                                                                                                  *"                                      r        ~  -
I I
1
                                                                  <<.<<",f=rr I                "
                                                                                                                                                                                    .6$
I                                                              o<<                                r .          I.="pa cr o-c,<<..r,r                I  rrr<<rcrff;ao aa I I*<<<<r.<<f r rrw 5
                          !.  '.f, u        P T- )                    Ql          8 A 0 ES                        P    5h                CP    X7- I('gP%gW        jFi-,F X'u''R~ 8 I
                                                                                                ~            ~    ~ ~    ~            r ~      *I        ~        I                              J C        1 FRE.uEZ,C.r.                      C.r=.,          OV..A.I .I            i~.6..RI'Xi'Oa                      .OF .4''
                                  ~J,DMH Atua .                            HANS 7.r H I{I= EROS                    ...,S~ Ecvz.a~                                I 0 IM            O JJ
                                                                                                          !        5      !      !      (
L 4          LJC            C~.HI              ~+~            8++ A5s~ v K ggQ                ~            pl+
                                    .re.J..g:S..
I AS ..A:.CS r
(
H ~f f e~VSC-~,H.'r i
I
                                                                                                                                                          !~
JP-  8'          !  l~          ~l
(  I I
                                                      ~      ~  ~    ~      ~  ~r                                            =.  ~    C    ~~
I"                          I r
Ir...
I r
(>
(-~4                                                                              Ir r
I
(    r W I4,! ...,. 3,'5.'L4r?                                .EI                                                                                            MMs                  !
        ~,;
I                            !                                                I r                                i        !
r...            '..      ',    '                          a<<                                                      ! ~    I    l  j rL...
                                                                    ~        ~  ~    ~                                ~
U 5.(.g,Q,                >
                                              ~'.~l,'~w~        ~F.v. s.                ~            PPP.&x f M.A.+ f ~M
                                                                                                                                              <<<<c ~H
                                                                                                                                                                    ~~ i.    "
QP'
                  ..CCI  g Sg I;            hl,~q.u    I(    A.                    8 g(g.~C~                                                      I prrA rrc j  I '          i
                      !,'~c l  l                    I  5 I        f 4>>
t I
(
i,        t                                            w                                'r      ~    <<      -  r C
I
 
'"k>>'>> r Irk                                                                                                    k
  ~
                                                    >>  ~
SUBJECT            I    '            JOB No.
k I                Ill.k=! >>>>F-'>>'
k le
                                                                                                                                                        'b I>> A~V A i t~ W                ~
I>>                                                                        P                                                          5~
t f .  ~                                  O                  trYI  ~ '
:-. STEVENSON
          '.-.; '. at, ASSOCIATES
    ~ r
          .';".' Ctcttttlg
          >> ~
                  ' a It>>I>>CttltattnootlantCOI 0tlgtt>>00tttlg tits I'C 8~
I
                                                                                                                                                          "' f n
I >>
I
                                                                                    ~
I}        ((J I
LIJ T
                                                                                                        ',li
                                                                                                        ~
t
                                                                                                          - i+      & Br~~
gj i
                                                                                                    ~
ij I
I  .'J I
                                                                                                                          -5 I  ~
5' I
I l  CI-t j                                                                              ~ Z I
l.Z,. P                                          (c  2S o+z) o2>                              cQoQ (2e+
 
4/g  4
    ~ '
 
J>      VV VI>M> IJ CVP  u Arc~ n(-
KcJ      -S-8' 0
                                                                                                    !ft STEVENSON
  ',.', & ASSOC3ATES                                                                                (t
        ~
o structrrroHnechohtcot COIN(tthg Oh(t(hchfthg (If!ill
                                                                  }
I I
t 3    i 3
                              ~
                                      ','                                                                                  t~  t
                                                              }
i }
3                                            ~  t }
3                                          ~
                                                                                                                          >  ~
I  =
I i                                                I 1
f;    i 3
J I
3 I  ~
I I
                        ]~!                        (
4 1  4  '      }                                          I    I I  t
                      }+                                      J  '
I I
                                                                                                            }
v
                                                                                                                        +-
(4  P  y.fj,  t 4        4D A i I
                                                                                                              >}r. I(
(
I I                                3 I  I  I    I 1  I L
I  !  i
                                            ~  ~    t  t
                                            ~      ~      ~
3 4
3 I
4                I 3                              I                          I k-    ~                      ~  I      ~
I ' ~
                                                                                '>>    ~              'I L
 
I
                                                                                                          ~
                                                                                                                        +++ j +~~                    IH(IT~OIII
                                                                                                                                                                    ~
                                                                                                            'OB SUBJECT                                                                No.
C
                                                                                                                                                                                  ).'C. '-,y>,
z                N9    cP'-5-8          'pt
                                                                                                                                                                                      ', lh 1
O STEVENSON                                                                                                                                                                      't' 8('ASSOCIATES o )ftucfut~cf)otucof 6@ G          c                                                                                                                        C
                                                                                                                                                                                          ~
tuA)uN(thg OtlglhOOflog fltm C    s    R i    . S                                                                        C>>
I,'                i
                                                                                                                                                                          ~
                                                                                                                                                                            ~
I I                  I a Ii g'W7 P~~!
I I
X~ESS~              ~
C.6. ~.i.S'~At.8'VT'I.O.+
i    ~
t
                                                                            ~    ~
I
                                                  ~  I                                    )
I R
I                              li
                                                                                                                                                              )        j,    I
                                        ~,
I i                            e  I I
I I
I I
t ~
I L.                      i                                                                                                    I
                                                                                                                  ~:,
                                        ~
I        ~
l  I
                                    ~          '
                                                                                                                            ~            ~                        '
I              l                                  I          i          (  i I
                                                                          &r. O..~.&.W.R.Q.;.):6,C                          EO    Sm        )4I':~ ~OK.
t j        !
            &i%      .
                !EQ R.~
                                          ~  I c
I    I    I Dr~t-. D'~ ~ s                    4.~,'<w~nP,~c.~~                                              urn+
I t
~ I  i        I                i      !    t
( D/p I
I  I l                    C.35o+-
I
                                                                                                                                                              )
I    I~
E:j            M  I    ~        i              'C  ~tV'C            fi..4!.D            '.E't ~..~~:
                                                                                                                        ~
                                                                                                                            ~            i      I
                                                                                ..Pg,
                                                                                                                    ~ '
I
                                                                            .I                    . S.O~(=ty              't=) j.      I Crt,igPP            C.A.C
          ~    I    ~  -I    a .,      ~, )          ~,,    'I
                                                                      ~
                                                                    ~,,
I~
                                                                              ~ ~, ~ ~ t    '1 ~  ~
                                                                                                        ~ ~
                                                                                                              ~
                                                                                                              ~  ~
                                                                                                                        .,  ~    ~ . ~
t
                                                                                                                                        ~, ~ .  ~ ~ ~~
                                                                                                                                                                              ~ I
 
g
:0
'0
 
STEVENSON              'I ASSOCIATES a Itn(cturotrnochontcol coewWng eng(noortng firm E
E h
(~sm r
9$ c(=
I r
E                E I~ S                                                      2
                                          )
I I              I
                        + ~,.~r s 5'o Q    ~ I    I r
I  (    r  ~  ~
I I
      )
                                                                                              +&,    l I          LGJ I                                          , S          I I
I ln,sac  8&
Vt5>QW
                                            'i (s3! ~
(        I  (            (
I    I 8&m i  )    l  i JVl I  ~
(
J
                                                .2  o5.k              :
Cpp
: 4) I  (
                                                                                  "i II I E
i~~7      I I  (a    g i
I    I  -"    /      2 'Q  Lo5                                            I X- CE      L 1
I                                  L.'                          )
                    .j L I
                                                                                                              . L
 
tt d II 0
 
i UP7        tmA            C F-                          ej    &
SHEET          '4~~      )
0 5          m r              I                                  Ctt z
0
                                                                                                                                                                    -s-Itt STEVENSON 8; ASSOC1ATES                                                  -P. c                                                          Ut cont)itttng entttneerlntt tltm f
                            ~
                                ~ ~l L
                                            ~
7(o 'i I  (,I                          t  .'o.+77gg I                'R-O        t'<5~Lt'QF 5' t:.SIC'R
                                                      ~
                                                                !      i cate        jM~                                                                  b S.~~a.oJjR,O              . I P.~~~V "4"          .!jct B j~jt I  )
                                                                                    'OS)),              I 3;    4't)        ~~,
1    ~
I        !  i  I
                                                                            .D CI      7  ~ .~R              C  ~....~i +, Q if i    I    ~
j J+
pent')'
s',
l    t    l
                                              ~  I                                            <~                                    -
                                                                                                                                                .,r'            "
SVZ i 3                  35                        i
                                                                                            )                    '.""co s t)'i(3-'j,
                                                                                                          ~
                                                                                                ','.c)n7                                                                '
5~
  'I P
                                                                                                                                                                                -,'ace.II"lo
        ~                  ~            ~
                                        ~
I  I          ~ ~                      ~ *                                - I                  J i      ~          '
5'
                                                                          ~  ~
j      ~
                                                                                                                                  ~
                                                                                                                                    ~
I          I ~) I        iL    i      I          I        l
                                                                            .'...5          Q      ~pj,      ij... h/                                                                      pea  (
                                                                                                                                              +~ ''      +i i'P I l  I jc~              l t                                                                                                                      ~&.2i tt t t
I I ~
          ~
          ~          I I  ~
I t,      tt) tl  j''
i f
                                                                      ~.....'3.,5.Q
                                                                                  .'+ 5.O 2-.2
                                                                              %9;.K 5;....'P I
                                                                                                  ..p,e
                                                                                                        ~
                                                                                                  ..t) S'.i.
                                                                                                    .p.s,.l,,
                                                                                                    )
I..... y .J3.3.4 t.','...., y.:.= CC3.C I    J
                                                                                                                      ',Ir.i
                                                                                                                    =... I H
                                                                                                                                        =.:.37 t    ~
                                                                                                                                                  'rr I
t.(n.,o po F
                                                                                                                                                                        .J'4-n p~g I
                                                    .= 'J&.2.: ..!            '      ~                                                ~
l ~  ~ i I                                I    I        I I
                                                          ++          tt          ~.3.l.f        P  s.i    =.='.=.
(                t f
i    \          i    I    .          I  ~ I I 5          i t ti I      jo J    I                  !    I      I    I  I    i\                i      I
(                                                                                                                                                            *            ~
                                                                                                                                                                                                  ~
                                                ~
                                                                                                                                                                                        ~
4                              . A              <<  IA              4                                    )    I~  A'y
 
r'ai <Q,                                      SUBJECT                (C    'OB                  No.
                                                                                                ~u'i(~c
                                                                                                          ~DC l                  ss  ssr@~orrt<
                                                                                                                                                    ~l~sls
                                                                                                                                                              ~.  "ss ~ fs s
s~0 s rats c."J n-rr,r'rot                                                                                                                  V)            4/        ~5 ~g s
z O
rrt
,;.; ";.'TEVENSON Ik ASSOCIATES o slructuroirnochonlcol AP.R            cc consurrrng ongrneerlng tlrrn                                                                                                                                ~r i;,            ~ .
r'M gH~ Im~                                                          Q 2
(~
                                          '.K          i t
J L'u .P,.        g ~.~') M<.csO.A .a.,&,5 r
(
                                                                                                                              ~
IO+'(-
                                                        .....s    l~r
                                                                  .. l ic k,.                                    , i C.s .. MH        ./i        AsJ,rtc s.
to y. I'P.~i                                                                      ~
                                                                                                                                      ~ ~>
                                    =,3    2 co .'c'        rc....'-ps)                  F      R  I=-~ w.(.a.k'. ~'..:.7~L L~                        ~
r    r              ~                                          I  A.w ~ ~..$ p'.ig.'<i,.4 t.C
                                                                                                                  ,                      .Pg;:C.~ 5 r(c:C  sJ    ~
h'..                      WnJ'g,g ~< ~
I
                                                    <<',H..p                          '                                    '.s-r,~
F                                                J                                                    ~
                                                                                                                                    .Ent.C .t W.'.~r,,<~~tl C I
F~ 8      D.A.n'< E.,rt              h:e r~ !      . t p'I.Q 6, .J., Cl t g o 4          r.
f~
r.
i                                r I          r                                                  r        I          (
I,
                                                                                                                                                ~
(
E I
t    I i    ~
L L
                                                              ,'3 4 5+          ~ ..I n. J  .
7Q                        r,        I l    ~
8S x lc      ~HZ -(. 2              359 I                  I I                                                                        =  2-;
i I
3/a(e da  I r
                                                                                                          ~    I I        I    r
                                                                                                                                                ~ -. '
I I
i 4.+z '~
t                                                        i                          I e
I
                                                                                                                                                  ~1 '
Lsd          i i .8-Q rns~MM L
                                        'L          r                    -
                                                                ~        ~      1 I
 
    ~  4 CC,
        ~
          )C f
          ','TEVENSON .
        .- 8CASSOClATES O Ithfotchc<<hOChoh<CO<
cohfcfltlhp cop<hoof<tip hfhl SUBJECT Ar )'
G.O'S      <
                                                                        ~
                                                                          'O
                                                                          .'G:c.            c.~!              A PP ':          .
R O
V)
U<
SHEETS~'PF gP          ~'
                                                                                                                                                                                                .<r r'O
                                                                                                                                                                                                        ~
                                                                <5j                                                                                                          $ <  &S
                                              'C .8 '5o ~O I
Jt0~$
I    ~
I    x                                                        3 I  I I
                                                                                                                                              +-l-
                                +
I                                                                                                                                I
                                +!i        I                                                                                                                                      )~!i I  !'                                                                                                          I        I I                T9- W!~UL3.ed 1
                          ~C                                                                                                          I    .~
i 1,              '    I                                            W'7  ff'                                                              i                              I        I              I r,
1                            c        ~
                      ~    ~  ~
1 I
      ~        I    ~              I    ~ I        I                                I                        I    I
                                                                                                                                            ~
1
                                                                                                                                                                          "    1  r I  I I    I        I
  ~  ',      j                                                                                                                                                                                        I I
I
                                                      ~ I5 +      x In.~B'                    ~~v5'3'f ~                          ~~                                                R      <j~.. IO S I 8 I~
                                                                                                                                          ~)
l    I    i
                                        ~!    I  M V .,.7.e.Z),
                                                        ~
W,      L-    Z d,27              ~,g  4~E!,Q~                                                'Z. I I    +-
I  I    ~                                                                              ~                        I I        I          I
                                                                                                                        <..          ~.
I                                                                                                                          I  I                        i f
I
                                      ~
C
                      ~    ~                ~
                                  ~
I    <
1 I                        I I                                  I                                      ~  ',      ~      . I      !
i            I                    ~              ~
(  J    g.a          I S.,i,)(,~.4 ...,E,0<~I.Oa.            C.C-              =A<< S                  .FuP-rt.v<..<S.. i og-I  !
I
~
1  I
      ~
r I    r  r          I I KSS:S.... e&l I  I:'r
                                                                            ~:.
                                                                                ~
1 S
I c
                                                                                                'E
                                                                                                  ... ~
rcr,
                                                                                                        ~
                                                                                                          +,:='.+.I;(C26 CClCS..)i..~I+,+<<.,
                                                                                                          *r
                                                                                                                  ~
                                                                                                                    ~
a.
                                                                                                                        ~
                                                                                                                        ~ ~,. .C...I e~c
                                                                                                                                        '  1 I
                                                                                                                                                  '.....I-rhrrrf....;,.I
                                                                                                                                                                          ~    c I
I
                                                                                                                                                                                      ~
                                                                                                                                                                                        .c r
                                                                                                                                                                                            ~ ..A
                                                                                                                                                                                                          ~
 
SUBJEGT 4
                                                      ~    c. ri,      J jOBMJ:-J33C  f55 9..'.'SHEET/2            I  B~2Z::
                                            +Ac Y  <g..      f-0 d Wc'                                                                                                                            ~  'I STEVENSON                                                                      EO    ~"
IJS            ~ J  S k 8c ASSOC}ATES O ItnjclllloH54Chonlcol conIIJINny englneerlny ntm I7                                                                                                        axe I
cn+
                                          ~
                                                              ,po                1~ .
                                              ~  ~
I 7p I;"
      }      I              }
I I
I
                                                                                        ~    I i
                                                                                            )
r~
I I
L  1 E  ~
R    !8 ~ C-~iP'IO~IE.<~ C
                                                                                                                                  }
                                                                                                          'I      I J
                                                                                                                }        i I      ~
i 4 R. E A P'+  ! )'pl  '.
Qg t4'5(o 4    ~
I
                                                                                    >>. 1.F.U<~<6.%3:[ a~I?=Aj                C L  ..
S~IE- JJ JI I                              I)    I SZ,I2 O
                  ~
                          ~    ~
I 1
                    ,.Z. B&'
  ~  I                              I I
A I
 
i g
0 1l R
h
      'I
 
            '1 1 1terrrr  14  r rA  ~  1            rt SUBJECT      '~                                                                                                            t;tt Wr  r~g
                                                                                                                                                                                                        ~ V.tri
                                                                                                                                                                                                          ~--
Ok        &/    .  "T  et  e:i ii'~          '" +X
                                                                                                                                            >."""'11 0
ro
  ':4"""~~"STEVENSON UI
      "..'-".:  8t ASSOCIATES"
                                                      '-',                                                                                            cr.        .".ggq Jt..r" rut-r ..rt)tpf.
conrurrrnp enprnaorlng nrrn pPi 3 ~
I      ~
I I ct W~ 8.~                                            g
                                                                                                                                                                        '7+-8+1-.(-1 604 SW.'t52,4
                                  ~Res            4~                                                      ~ ~
                                                                                                                          ++                                              I        t I
                                                                    ~i                    '            ~l i~
                                                                                                                                  ~
I I  I I  I        I        I ZSB- Z S.'8                      '
                                                                                                                                          .I  e  ~
                                ~i                                                                                                                                                            I II
                                                                                                                                                          ,w C.2.B,B:,                IA 2S.S I      I P-..C
                                                                                                                                                                                . 5
                                  ~                ~
4    ~
                                                            ~
I.'real                                    1 !Let.
QQ)8'                        'I                                                                                      I I
                                                                                                                                                                                        .f.'g  tI
                                                              ~ J    j 5. pcI Wff..rf' f.
                                                                              ~
: k.    '- (.8            <J g      ~~i~s4!
                                                                                                                              --~l 1          ~
t      I I                                                                                            I  I    I
                                                      ,    ('7 4rtt Ct~                                  I g,        r                                      I t
I I
r                                    r 1                        r r
(g~,gg)      i
                  'CAP I    I I                                                                                                                      ~
g'++; 'h3'
                                                                                                                                                              ~              i 1
I                        J
: t. t 2)      +    (7O,>u)(                      (to 4. Q I+
'                                                                  I          l 1    I      ~ 1
                                                                                                    ~
t I
Ki~S    < J)
                  ~          I                                                                      V
                                                                                                                              ~    ~
 
Equip  Id: 2-TK-32  Train:  12  Equip Class: 21
        'ng No.: 2-5106A Function:  D System:  CONDENSATE STORAGE TANK SUPPLY Equip Desc:    CONDENSATE STORAGE TANK Building:  GROUNDS    Room: INNER PLANT GROUNDS Elev:  609    Sort: Sg        Notes:
Normal State:        Desired State:    Power Req'd: N Support System Drawing:
Req'd Support Comp:
Safety Related Status:    STANDARD        Min/Opt: MIN Alias  No:      Power  Train:  NA Comp  Served:  CONDENSATE STORAGE TANK MFR: GRAVER TANK    & MFG. CO.,  INC.
l:  500,000 GALS.
Panel:
Elem. Drawing:    NOT APPL Wiring Drawing:    NOT APPL Power Source:
Walkdown: F      Relay Eval:  N
;i'omp    Type:  TANK Iso Drawing:
Location: 50    FEET SOUTH OF THE UNIT 2 CONTAINMENT DOME
 
DC Cook Unit 2                                      GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                      Status: Yes Sheet 1 of 3 ID: 2-TK-32 (Rev. 0)                                Class: 21 - Tanks and Heat Exchangers
 
== Description:==
CONDENSATE STORAGE TANK Building: GROUNDS                            Floor El.: 609.00                    Room, Row/Col: INNER PLANT GROUNDS - 50 FEET SOUTH OF THE UNIT 2 CONTAINMENT DOME Manufacturer, Model, Etc.: GRAVER TANK & MFG. CO., INC. 500,000 GALS.
BASIS: External analysis
: 1. The buckling capacity  of the shell of a large, flat-bottom, vertical tank is equal to or greater          Yes than the demand.
: 2. The capacity of the anchor bolts and their embedments'is equal to or greater than the                      Yes demand.
: 3. The capacity of connections between the anchor bolts and the tank shell is equal to or                      Yes greater than the demand.
: 4. Attached piping has adequate flexibilityto accommodate the motion of a large, flat-bottom,                  Yes vertical tank.
: 5. A ring-type foundation is not used to support a large, flat-bottom, vertical tank.                        Yes E    P          El    IC COJHI)LES SRT: George G. Thomas and Tom Huang on 10/5/93 Large flat bottom tank 52'-0" inside diameter 34'-5 1/2" height. Tank manufactured by Graver Tank, made of ASTM A240 Type 304 Steel, 500,000 gallons and weighs 128,700 lbs. Anchored with 30 3/8" th x 5" w x 4'4" long strap that is embedded in the concrete 2'epth with a 2" radius hook at the end.
The strap detail is identical to the strap for the Unit 1 and 2 refueling Water Storage Tanks (RWST) 1-TK-33 and 2-TK-33. The calculation for the RWST.resulted in the conclusion that the weld to the tank and embedment in the concrete was sufficient to develop the full yield strength of the strap.
The RWST has a very similar configuration as this CST. The calculation for the RWST using GIP methodology indicated an overall safety factor of 2.57 for overturning and 1.72 for shear. Calculation is attached to the SEWS of 1-TK-33.
Comparison of significant attributes of the tanks is shown below:
RWST                                                  CST 48'iameter                                        52'iameter 31'iquid Height                                  31'-7" Liquid Height 25'trap  Anchors                                30'trap Anchors For shear the tanks are essentially identical since the demand and capacity are both proportional to the area under the base.
 
4%,h II
's'.il r
 
DC Cook Unit 2                                                  GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                              Status: Yes Sheet 3 of 3 ID: 2-TK-32 (Rev. 0)                         Class: 21 - Tanks and Meat Exchangers


==
==
Description:==
Description:==
CONDENSATE STORAGE TANK Building: GROUNDS                      Floor El.: 609.00                                  Room, Row/Col: INNER PLANT GROUNDS - 50 FEET SOUTH OF THE UNIT 2 CONTAINMENT DOME Manufacturer, Model, Etc.: GRAVER TANK 8 MFG. CO., INC. 500,000 GALS.
ELXUHIR T
7
                                                                  ,, jest y4)4X, h P
                                                        ~ o
                                                        'p  ht ~
g      t h 2'uckled Pipes at the Bottom of the RWST Out Anchor Strap


NORTH SPENT FUEL PIT HEAT EXCHANGER Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: SPENT FUEL PIT HEAT XCHGR RM, NWAREA OF RM Manufacturer, Model, Etc.: OAT, JOSEPH, CORP.BASIS: Horizontal TANK analysis 1.The buckling capacity of the shell of a large, flat-bottom, vertical tank is equal to or greater than the demand.2.The capacity of the anchor bolts and their embedments is equal to or greater than the demand.3.The capacity of connections between the anchor bolts and the tank shell is equal to or greater than the demand.4.Attached piping has adequate flexibility to accommodate the motion of a large, flat-bottom, vertical tank.5.A ring-type foundation is not used to support a large, flat-bottom, vertical tank.N/A Yes Yes Yes N/A C~CM@NN Q RT: Gary Thomas, Tom Huang and Kailash Mahajan on 11/3/93.3'2" diameter horizontal heat exchanger about 22'ong on two saddles supported by piers.Total weight full given as 26,200 lbs.Exchanger bolted into pier with 4 7/8" diameter bolts per saddle.Piers are dowled into floor.The results of tank analysis show that the tank anchorage is adequate and also the saddles are safe.Evaluated by: Date:  
                                                          +*12 CHP 5021.CCD.O].9 ATTACHMENT NO.
B    g.                     Location I- K-30                                '2 Tg-'7'4 Insta  at  on  wg. /  Rev.           Ecgxxpment No.
Anchora e Arran ement Sketch
            ~gDGg<RTE          KToRRG6            fdic Ii DIN&4<<od.->< DIp g s4.-S/<          %AH McA)R      +'TRRPs  ~
( bbJQ    QT'p.~     fQ  )NQ~gQQ,~)
      >+B    GF  TM    H~~ U~y pp~~~~                    s~~<'T y+"   p~T 4    FK.LES,Q)Gu6
      ~<<~TIos                                                                  1 QF    T W    ~TO ~g    ~U          RAT-INDIANA MICHIGAN POWE~R SITE DESIGN CONTROLLED WORKING COPY OCT  $ 5  tBS5 Drawn by:                                                  Date:
Verified by:                                              Date:
Qua . Ce      Inspector Reviewed by:                                               Date:   t o-l>
Cons  ruct on Anc or Review Engineer page 1  of  3 Revision    .3


==Attachment:==
0
                                                                  **12 CHP 5021.CCD 019            ~
ATTACHKENT NO.                  1 Eblis CQ N p      ~C    S I0 C,M c Un  t                        B    g.
I
              'l-'90 4 9                                2. T(c- '3Q Insta~ at on dwg. / Rev.                        Equipment No.
Anchora e Arran ament Sketch
                                  ~/g wl L    Q~R Ae&- O~g, 0
I N                3/yx5" <Toms 8("KY'        r < Q~
rb b                        INDIANA hflOg, AN POLI c SITE OKSIGN C "ITROLL WORKING OPY OCT  '[5 1995 LERK  T
    ++    4~ '5    A'~'amS          OIIYl~I4N +    ~847      rn&AS'uk'a~~~
                                                          %6$ 4~TIW- 8 '3 C7~
e,~so'F
          ~
ts,                                                                        ~S 8Q'ECT.'A A                            WIICy)X      4~Re'>~T<<
Drawn by:                                                         Date:        I  o 'l2 Verified by:                                                      D  te:
Qua  ./Ce    . Inspector Reviewed by:                                                      Date:        I o-<3-'7>
Cons  ruct  on Anc        r  Rev ew    Engineer Page 1 ol.'
Revision
 
ATTACHMENT5 TO AEP:NRC:1040E SAMPLE SEWS, ANCHORAGE CALCULATIONS, AND ANCHORAGE INSPECTION DOCUMENTATION FOR HORIZONTAL TANKS AND HEAT EXCHANGERS RAI ITEM 7
 
This attachment includes sample SEWS, anchorage calculations and anchorage inspection documentation for the horizontal tank and heat exchanger evaluations requested in RAI Question
: 7. Included in this attachment are the evaluations for 1-HE-14, 2-HE-15E, 12-HE-16N, 1-QT-107-AB, 2-QT-1 1$ -CD, 1-HE-.15E and 1-QT-107-CD.


Pictures
01/16/92 PG.
N0.53'AFE SHUTDOWN EQUIPMEHT  I.IST (SSELWP)
FUNCTION:      CC'W Equipment Class:      21        Train:    12 Equipment ID:        1-NE-1C                                          Drawing Number:      1-5135 System:      CVCS Equip


==Attachment:==
== Description:==
LETDOWN HEAT EXCHANGER Ruilding:        AUXILIARY            Room:    LETDOWN HEAT EXCHANGER ROOM                  Elevation:  633 Normal  state:                  Desired state:                  Power Required:      H            Sort:
Suooorting System Drawing Number:
acquired Interconnections and Supporting Components:
fety Related Status:        NUCLEAR SR                            Min/Opt:  MIN ADDITIONAL INFORMATIOQ Al ias Number:                                                        Power  Train:    NA Comnonent Served:        LETDOWN HEAT EXCHAHGFR Manufacturer:        AILAS INDUSTRAIAL MANUFACTURING CO                Model:    1000 GPM Panel:
Elem Drawing:        H/A                                              Wiring Drawing:      N/A Power Source:      N/A Walkdownt        F                                                    Relay Only:    N Comoonent    Type:      HE (ONE PER  UHIT)
ISO  Drawings:
Detailed Location:


TANK Analysis Results
DC Cook Unit 1                                      GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                    Status: Yes Sheet1 of3 ID: 1-HE-14 (Rev. 0)                              Class: 21 - Tanks and Heat Exchangers


==Attachment:==
== Description:==
LETDOWN HEAT EXCHANGER Building: AUXILIARY                        Floor El.: 633.00                    Room, Row/Col: LETDOWN HEAT EXCHANG, Manufacturer, Model, Etc.: ATLAS INDUSTRAIALMANUFACTURINGCO, 1000 GPM BASIS: External analysis
: 1. The buckling capacity of the shell of a targe, flat-bottom, vertical tank is equal to or greater          N/A than the demand.
: 2. The capacity of the anchor bolts and their embedments is equal to or greater than the                      Yes demand.
: 3. The capacity of connections between the anchor bolts and the tank shell is equal to or                    Yes greater than the demand.
: 4. Attached piping has adequate flexibilityto accommodate the motion of a large, flat-bottom,                Yes vertical tank.
-5. A ring-type foundation is not used to support a large, fIat-bottom, vertical tank.                        N/A SRT: Gary Thomas, and Tom Huang on 11/3/93.
ANCHORAGE ADEQUACY ACCEPTABLE TO SRT BASED ON BACK OF ENVELOPE CALCULATIONSHOWN BELOW.
Nozzle loads on heat exchanger are small (on the order of 600 lbs. and 600 ft.-lbs.).
Anchored with 2 - 7/8" diameter J-bolts on 11-3/8" spacing. Vertical distance from the base of exchanger to the C.G. of exchanger is 13". Vertical d'stance from the base of the exchanger to the top nozzle is 29".
Supports for saddle dowled into base concrete. Saddle supports are adequately reinforced to transfer loads to bolts.
SRT judged that the Heat Exchanger is rigid.
Back of the envelope calculation:
0.24g (DBE ZPA at floor) x 1.25 (for realistic spectra) x 3320 lbs. (wt. of HX) x 13" (to C.G.) / [2 (bolts) x (11.375")]
+ 700 Ibs x 29" (Nozzle loads)/(2 x 11.375" ]+ 700 (ft. -Ibs) x12 in/ft/(2 x11.375") = 1830 lbs. tension/bolt-3320 (.76g )/4 (dead wt. - vertical earthquake) ) = 1199 lbs. tension/bolt
  .24 x 1.25 x 3320/4 (bolts) + 700/4 = 424 lbs. shear/bolt Embedment for the 7/8" diameter J-bolts is 19.5" or 19.5/.875 = 22.3 bolt diameters into concrete. RLp for embedment (90 degree hook) = ]19.5+8(7/8)]/(62.5 x.875)=0.49. Allowable for tension = 20.44 x 0.49 = 9.8 k >
1.2 k. For shear = 10.22 k > 0.424 k. OK.


Check of Stresses in Saddles DC COOK Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet2of9 ID: 12-HE-16N (Rev.0)Class: 21-Tanks and Heat Exchangers
DC COOK Unit 1                             GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                        Status: Yes Sheet 2 of 3 ID: 1-HE-14 (Rev. 0)                       Class: 21 - Tanks and Heat Exchangers


==
==
Description:==
Description:==
LETDOWN HEAT EXCHANGER Building: AUXILIARY                  Floor El.: 633.00              Room, Row/Col: LETDOWN HEAT EXCHANG, Manufacturer, Model, Etc.: ATLAS INDUSTRAIALMANUFACTURINGCO, 1000 GPM Evaluated by:                                                              Date:
8/f5        (~>w (p    (p-


NORTH SPENT FUEL PIT HEAT EXCHANGER Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: SPENT FUEL PIT HEAT XCHGR RIVI, NW AREA OF RM Manufacturer, Model, Etc.: OAT, JOSEPH, CORP.NORTH SPENT FUEL PIT HEAT EXCHANGER
==Attachment:==
Pictures


DG COCK Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 3 of 9 ID: 12-HE-16N (Rev.0)Class: 21-Tanks and Heat Exchangers
DC COOK Unit 1                             GIP Rev 2 Corrected 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS}                          Status: Yes Sheet 3 of 3 ID: 1-HE-14 (Rev. 0)                       Class: 21 - Tanks and Heat Exchangers


==
==
Description:==
Description:==
LETDOWN HEAT EXCHANGER Building: AUXILIARY                  Floor El.: 633.00                Room, Row/Col: LETDOWN HEAT EXCHANG, Manufacturer, Model, Etc.: ATLAS INDUSTRAIALMANUFACTURINGCO, 1000 GPM Overall Exchanger                                      Saddle Support


NORTH SPENT FUEL PIT HEAT EXCHANGER Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: SPENT FUEL PIT HEAT XCHGR RM, NW AREA OF RM Manufacturer, Model, Etc.: OAT, JOSEPH, CORP.TANK Analysis Results Step 1-Input Data a)Assumptions 1.Tank is cylindrical, horizontally oriented and supported on saddles.2.Tank and saddles are made of carbon steel 3.Saddles are uniformly spaced.4.Saddles overhang is less than spacing/2 5.Base plates have slotted anchor bolt holes for thermal growth except for the base plate under the fixed saddle.6.Imposed nozzle loads are not significant.
Coo ComponenC No.                                     Class Any parget:icular area the Seismic Roviev Teaa should pay                oxtra attontion to?
7.The tank foundation is adequate.8.Anchor bolts are cast in place or expansion type.Yes Yes Yes Yes Yes Yes Yes Yes b)Materials Weight of Tank+Fluid Weight Density of Tank+Fluid Saddle Elastic Modulus Saddle Shear Modulus Base Plate Yield Strength Anchor Type c)Dimensions Tank Diameter, D Tank Length, L Tank Thickness, t Height of Tank+Fluid C.G., Hcg Number of Saddles Saddle Spacing, S Saddle Height, h Saddle Shear cross-sectional area Saddle Weak Axis Moment of Interia Number of Bolt Locations/Saddle Number of Bolts/Bolting Location Extreme Bolt Spacing, D'nchor Bolt Eccentricity, e Weld Thickness Base Plate Thickness 26.2 kips 151 Ibs/ftn3 30000.0 ksi 1".500.0 ksi 30000.0 ksi 7/8 in 90 deg.J-Bolts 3.17 ft 22.0 ft 0.44 in 2.16 ft 13.0 ft 4.9 in 23 63 inn2 24.36 in"4 1.83 ft 3.0 in 0.188 in 0.5 in
Yes  <    No                (If yea, check items that apply.)
5 Anchor
                                                                                            ~
Type                                              khamxha Anchor      Diameter Anchor    Spacing                              lhd 4= kt('.~<fn r(        'I '<      ~  P~
Anchor  Number Anchor    Embedment~
Anchor Anchor Edge        distance Thread Engagement Cepv'nchor Anchor Grip lg" ~4/)        J  (p C04~AJ (T
Anchor Angularity Concrete Crack Others (((sstribs NO bl                AS~5.       )~
brisrly)
(
Ik~~
                                                            ~ N 5<,&~
I f
IE there ia concern,           for  Design Basis Discrepancy,     circle the applicable item and explain.
: 1. Hardvare Maintenance Type Discrepancy
: 2.     Dra~ing Up&,te Type Discrepancy
: 3. Significant Operabili.ty/Design Basis Discrepancy Others Condition:
Actions Taken:
lJDIJB (AG.H P PrO(AT(O(~
Prepared By    T                    Data  ('s >l P--


DC COOK Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet4of9 ID: 12-HE-16N (Rev.0)Class: 21-Tanks and Heat Exchangers
                                                                            'HP 5021  CCD.019
                                                                        ..i'TACHMENT NO      1 ALlX    I 33'-O" EL. LETDOWN BEAT EXCHANC ER RQQM Bl g.                      Location lt 5bPI-ZZ                                            - HE.- I4-lZ,- 332.5 - '9                                    I Insta        at  on  wg.    /    Rev.        Equipment No.
Anchora e Arran ement Sketch OI DUE, TQ HIC H RADIA'TIOM AREA 4
CSO v.~b HALT LOCKTIQMS WE.PE.
CC
    'V      NQT QBTALME.D QM THC KkG1 PE.D'E5'TAL C)GI VlERE, DEXERMME.Q 5(M(LAR TQ THE. WEST PE.QEGTAL.
Wr II/ N 5'~z-'a I'iz," 5'e" 0>
5E.C T/QM "4-A" PLA,M        I Drawn by:                                                            Date:      4! -Z>-'B Verified by:                                                        Date:
ua ./Cert. Xnspector Reviewed by:            7                                            Date:
Construction          An  hor Review Engineer Page 1  of  3 Revision  1
 
                                                                                              ++12 CHP 5021 CCD. 019~
ATTACHMENT NO.
quipment No.:        ~ ~
I-HE-I4.                                                      pgg No.: IZ-3)ZI-U. II IZ-3.)ZE        ~
Anchor type:        ~    ~ >~<~                ~~PE Z          Dia:                            gag No.; IZ-50 t ) -ZO Tightness established by: 0 "Snug                                  Fit"        0 Torque Torque Wrench No.:                                                                  Cal. Due    Date:
Tightness verified? 0 Yes 0 No                                                                  Date:
ons ruc        on Equipment base              flexible? 0                Yes    I No          ons ruc    o Date:
ARE Bolt ID                          I          ~          3            4                                              Comments GaPs              BFlwk5l          BEfivEEIU Anchor len th I
2 '- I '~z"
                                          ~
Z'- I'li ''-
4lg "
I ~i"  7'- I'jz" "L
Protruding 41'~z"
                            ~sic                --~6~.
41'l4"
                                          ~ -~su                      41 len th
                            )I'-7 lc        I'-7~i~" I.'- /'rz" I'-7Yz-
                            >8'/4"            >8" W Rli "dh a7Vr.
Bolt ri                2>/4 "          2'1("
                                                          "~V~
L>~
                                                                    ~'/
C.SACK Ihl Concrete                                            ~1(
CGMCRETT:
condition                                                      UOTII SIDE5 Edg>>                                              4'/q      4 '/4 distance, Anchor                                                ~/s"    II ~~a" s  acin                                            II Anchor                                            (50'LQ an      larit            4 IO'              lQ Thread                CD I(            OIC        OK          &IC engagement Comments            4  QtlE TD Hlf'        RADIKfloLI AREA              Iso Ar'I MLT    Loc.ATI        wERc hloT QKTAll.l THC    EAST P                            WERE    DE:TER~I                IMILAR, TO THE  UV'C5i'T PE'0    'TAI          Ih  R ll ICo A      I hl SPEC T'L(5hl.
15    I R    \h H R Varified by:                                                                                                    Date:
Qua          ./Cert. Inspector Revieved by!                                                                                                Date!
T'ons ruct  on Page 2        of  3 Revision          l
 
siss've    wi vvui ver ATTAVBKNT NO.          l l- HE,- l 4-                                                                Dug    No.:      re&
edded Steel  Dwg. No.:
Weld ID                W~        WS          Vl4          WS          'IMr-        WV      Wa, des l          l                                                          l Size                    I/~      I/~          I/S 1 ~  Fillet 3(/v ( (/~ ~y &>> (/4IP 3(/ gr I, (/ /~/4"(('//,  /y ">> '//,''lg">>'l4"  ~((~I/ >>  2  ~  Plllg/slot 3  ~ Groove Cracks        Yes      Yes                                Yes No      QKO Lack  of      Yes          s    Yes                                                        Yes Penetration    No Porosity      Yes No Yes        Yes        Yes        Yes's                              Yes Equipment base  flexible:          0 Yes            8- No ons    ruc x Reviewed by:
ons ruc son                c or          evxev          ngxneer Uerified  by: To <~+wc. s ua . e . npsec or
                                    <<~            o                                                      Date:
Page    3  of  3 Revision      1
 
ssaC aVC J  ~ 4 SU ~ V J V ATTACHMENT NO. 1
  ~ipment    No .          1- HE, - l4                                          No.:          WR Dwg added  Steel    Dwg.      No.:
Meld ID es' Size l~    Fillet g >/g'~~lg "
Plug/Slot 3  ~ Groove Cracks                      Yes      Yes  Yes    Yes  Yes    Yes  YQS Lack  of .
Penetration    ~
KaJ No Yes No No Yes No No
                                            .Yes No No Yes No No Yes No No Yes No No Yes No Porosity        Y o
Yes No Yes No Yes No Yes'es No  No Yes No Yes No Equipment hase    flexible:            0 Yas    E No on    ruc z n    a Reviewed by:
ons ruc son        c  or  avxew    gxnaer Veri.fied by: 7c l e                                                            Date:
e    . np ec    r Page    3  of    3 Revision        1
 
S 8 A DEPARTMENT CONTROLLED DOCUMENT                                  12 SHP 5050 NDE pp8 COPY NO. 3- ~
ATTACHMENT NO. 1 ULTRASONIC TEST REPORT JOB ORDER  NO.: ~l      REPORT DATE:            REgUEST NO.
IDENTIFICATION                      TECHNI UE Unit                                Test Unit/ S/N        5k Component                          Freq./Diameter Item                                Reference Standard Material                            Couplant/Batch No.              '7 SB Other  5 TEST DATA REMARKS PERFORMED BY:                            LEVEL  ~        DATE REVIEWED BY:                              LEVEL:~'-        DATE: Z5 FORM NO. 12 SHP  5050 NDE.008-1                Page 1  of  1 Revision  0
 
Equip ID: 2-HE-15E      Train:  2  Equip Class:21 wing No.: 2-5135A      2-5113 tion:  CCW System:  COMPONENT COOLING WATER Equip Desc:    EAST COMPONENT COOLING WATER HEAT EXCHANGER Building:    AUXILIARY    Room: 609 HALLWAY Elev:  609    Sort: S,          Notes:
Normal State:
4 Desired State:      Power Req'd: N Support System Drawing:
Req'd Support Comp:
Safety Related Status:      NUCLEAR SR        Min/Opt: MIN Alias  No:        Power  Train:  NA Comp  Served:  EAST COMPONENT COOLING WATER HEAT EXCHANGER MPR:  M.L.W. INDUSTRIES Pa el:
Elem. Drawing: NOT APPL Wiring Drawing:    NOT APPL Power Source:    NOT APPL Walkdown: F        Relay Eval  : N Comp  Type:  HE Iso Drawing: 2-CCW-41,      2-CCW-42 Location: 30 FEET EAST      OP THE N2 MONITOR TANK
 
DC COOK Unit 2                                        GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                     Status: Yes Sheet1 of2 ID: 2-HE-15E (Rev. 0)                              Class: 21 - Tanks and Heat Exchangers
 
== Description:==
EAST COMPONENT COOLING WATER HEAT EXCHANGER Building: AUXILIARY                          Floor El.: 609.00                    Room, Row/Col: 609 HALLWAY-30 FEET EAST OF THE &#xb9;2 MONITOR TANK Manufacturer, Model, Etc.: M.L.W. INDUSTRIES (HORIZONTAL)
BASIS: External analysis
: 1. The buckling capacity  of the shell of a large, flat-bottom, vertical tank is equal to or greater          N/A than the demand.
: 2. The capacity of the anchor bolts and their embedments is equal to or greater than the                      Yes demand.
: 3. The capacity of connections between the anchor bolts and the tank shell is equal to or                    Yes greater than the demand.
: 4. Attached piping has adequate flexibilityto accommodate the motion of a large, flat-bottom,                Yes vertical tank.
: 5. A ring-type foundation is not used to support a large, flat-bottom, vertical tank.                        N/A C LL      0
~CO    I~S SRT: Gary Thomas, Tom Huang, and Kailash Mahajan on 11/2/93.
Component Cooling Water Heat Exchanger on two reinforced saddles. Anchorage is two 7/8" diameter J bolts.
There are 4 1" wedge expansion anchors in one pedestal in the horizontal direction.
C.G. of exchanger from the top of the saddle pedestal about 3'.
Pedestal concrete is cracked. AEPSC tracking the problem through a condition report. SRT has reviewed the resolution of this problem and determined that it is resolved.
This unit is the same as 1-HE-15E except there are no horizontal anchors on 1-HE-15E. The anchorage for this exchanger is more robust. The calculations of 1-HE-15E show that the anchors are adequate and the saddles are safe.
sb.~
Evaluated by:                                                                              Date:
ttachment: Pictures
 
DC COOK Unit 2                              GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                          Status: Yes Sheet 2 of 2 ID: 2-HE-15E (Rev. 0)                       Class: 21 - Tanks and Heat Exchangers


==
==
Description:==
Description:==
EAST COMPONENT COOLING WATER HEAT EXCHANGER Building: AUXILIARY                  Floor El.: 609.00              Room, Row/Col: 609 HALLWAY-30 FEET EAST OF THE &#xb9;2 MONITOR TANK Manufacturer, Model, Etc:: M.L.W. INDUSTRIES (HORIZONTAL)
BLCLI le ONE SADDLE WITH 4 HORIZONTAL BOLTS                            OTHER SADDLE SUPPORT
Coo Component No.      '2-          I S  E          Cloaa Any pazpicular area tho Seismic Review              Teaa should pay extra attontion to?
Yea    <  No                (If yea,  check Stoma  that apply.)
Anchor Typo Anchor Diameter Anchor Spacing Anchor lumbar Anchor Embodmont+
Anchor Edge Distance Anchor Gap M Anchor Thread Engagement Anchor Grip Anchor Angularity Concrete Cracks'thers (describe            briefly)
If there  ia concern for Design Basis Discrepancy, circle tho applicable atom and  explain.
: 1. Hardvare Maintenanco Type Discrepancy
: 2. Dra~ing Update Typo Discrepancy
: 3. Significant Operability/Design Basis Discrepancy Others Condition:
HotJ8 Actions Taken:
9  SING Preparod By                    Dasa
                                                                        **12 CHP 5021      CCD. 019 ATTACHMENT NO. 1 ANCHOR INSPECTION DATA SHEET 2                      6)x B..goy'-0"              worry sourH      ~w~q Unzt 0                            Bldg.                        Location i2.- B~Qg-      2s,iz-3zb-                          z-R6-l56 Installation        dwg.    /  Rev.              Equipment No.
Anchora e Arran ement Sketch 74'-'/a
                                                                        ~tt Ypg l~
0 I
C,RPICe IIJ4ROVl  .
J C+ACK II I 6 CCouT INDIANA MICHIGAN POVIER SITE DESIGN CONTROLLED Y(OR KING COPY AUG  24  1S95 LERK
                                  /~g CRAuC  T'O  FLIIIIR 0
                                                '- l'/a +'/5 (gyp)
Drawn by:                                                              Date:
Verified by:
    ~  ~
Date:        &
Qual. /Cert. Inspector
                            ~          ~
Reviewed by:              7                                            Date:        8  ~  t~
Construction Anc or Review Engineer Page 1    of  3 Revision    1
                                                                **12 CHP 5021.      CCD. 019 ATTACHMENT NO. 1 ANCHOR INSPECTION DATA SHEET
: 2.                    he~  M bO I'-O"        NORTH ~GATV        ~W~q Unxt                        Bldg.                    Location l 2.-3285-23 f2-'328 Installation        dwg.  /  Rev.        Equipment No.
Anchora e Arran ement Sketch INOIANA MICHIGAN POvggR SITE DESIGN CONTROLI.EP
                                                                  'tYORKING COPY AUG  24 tSIIS I.ERK ROOT@ TOP
  ~
Y9P cR.Ac.z XoIVV e6T.
08.00T 4 CoLlC, g
t BOGCf FB. Wl                              PB)K'TEIDE 't'L 0
IJ  0 ly+
7z 'y 7-E <S~
                                        <>xP)
El  Ev.    ~<ca  UooicuQG Drawn by:                                                      Date:
Verified by:                                                    Dat:e:
gua  ./Cert. Inspector Reviewed by:              T                                    Date:
Construct on An hor Review Engineer Page 1    of  3 Revision      1
0
                                                            **12 CHP 5021.CCD.019 ATTACHMENT NO.          1 ANCHOR INSPECTION DATA SHEET 2
Unxt    0 Bl..IOOq'-g~I Bldg.
hJQATA COOT/ HAU Location u~
l2.- N. SS-25, is-32eg-                        z- HB-t58 Installatz.on dwg. / Rev.              Equipment No.
Anchora e Arran ement Sketch z- Bg  - i'd%
        ~ Ql/g 9 lOC4TlOA 0$ ~(,N0R.
d ItIDIANA MICMIGAW POWER SITE DESIGN CONTROLLED WORKING COPY AUG    24 1998 LERK    T-4                                            C  <
                                                                    ~  c gv i                                                          0 EL.CV. U'I -  UO  k IQ    OuY Drawn by:                                                Date:
Verified by:
    ~ ~
Date:
gual./Cert:. Inspector Reviewed by:                                              Dat e:
Constru tron      chor Review Engineer Page 1      of  3 Revision        1
0
                                                                  **12 CHP 5021.          CCD. 019 ATTACHMENT NO. 1 ANCHOR INSPECTION DATA SHEET 2                            PrOX &1  - boq'-o"      NORTH SbQTH            RPn~+
Unzt    0                        Bldg.                      Location 12.-8296-        S  t2.-3xg-Installation      dwg.      /  Rev.            Equipment No.
Anchora e Arran ement Sketch QOGIFI@)    AT4X+
I /bklg  (7Yp()                              CRRcX 7  6 O~
                                                                              )'p j94C80 8, uJP 5AER 0
V INOIANA MICHIGAN PO)VER SITE DESIGN CONTROLLED YYOR KING  COPY AUG    24  1895 LERK  +
CI
              ~  ~
a p
CPP  ~ f~Q      Volh)7 gC,TWd&hl 4,RouT~ MQC.
d EI Eu  . J)EM    tppkx&#xc3;I        0  IA Drawn by:                                                          Date:
Verified by:                                                      Date:
Q a  ./Cert. InsPector Reviewed by:          7                                            Date:
Construction        An    hor Review Engineer Page 1        of  3 Revision        1
                                                                                        **12 CHP  502 1. CCD. 0 19 ATTACHMENT No.
Equipment No.:
Anchor type:
Z HC BGU IGC                                                  Dwg  No.: IR-3298"                          f Dia:                            Dvg No.:
Tightness established by: 0 "Snug                          Fit"        0 Torque Torque Wrench No.:                              rJA                        Cal. Due Date:
Tightness verified? 0 Yes 5 No                                    HR ons ruc Equipment base      flexible7                0 Yes      S. No    T'ns      c    o    ARE Bolt    ED        t            2,          3          +                                                    Comments Gaps o
Anchor        +I  p]~    +I    g/~'i I3q''.~3(~"                                                    ~tv                        QW4 len th                                                                                              >      a-3o13 8-Z Protruding        q3/~          )IS(I                                37/                                  <o~mCC h                        >'en
                                                                                                          ~>/8'. 5'ee eEL v Embedment        Z~  ~~~    ZI  ~I~/',      '/< 2'4 Q ~r        I Bolt                                                                                                To~mc6+>/g ri          ~ /8        E"/IIo        2'IX.      < "/II Sbg            LjoTE GEL4w.
Concrete        CRAB        CRACK.        GRfKK GRhW                                                                    CEGTcH condition Edge                                                (oo distance                                                                                                To~&+~/~'nchor Tp              L,~W <6 s  acin                                                                                                                I/q" Anchor an    larit Thread engagement Comments. X    /Ig'g~    &67~ QLITJtHASSSR,                          Yiq  4'GTW6&J Wm~
oI    PII  R CRIT                              0            Serai 0  'I4h              OI 'T    RIP      ~HOT
                                                        ~    P M      u              RR      ~      C'TTo verified by:                                                                                        Date:
Qua    ./Cert.            nspector Revieved by:                                                                                      D te:  8->>
Construct on                                          SITE. DESIGN CONTROLLED YIOIIKING COPY
                                                                          'UG 2419SK                                          "I'ERKT Pa  e2of                3 Re  ision  1
                                                                                  **12 CHP 5021.CCD.P19 ATTACHMENT No, Equipment No.:
Anchor type: < ~
                ~ ~
                      ~t.
Tightness established by: 0 "Snug PrH(&OP.          Dia:
Fit" I'wg E Torque kg    No.:
No.:
                                                                                                '+ >>S8-
                                                                                                ~>  8>"ZA l?-- Board I
Torque Wrench No.:                        P                            Cal. Due Date:
Tightness verified?                  I  Yes 0 No          S ons ruc
                                                                %a~~ ion Date: 4.<> 95 Equipment base        flexible?                0 Yes 8 No ons ruc
                                                                        ~~  on ARE Date:    0 +> 13 Bolt ID                                                                                        Comments Gaps Anchor len              7~/y'ual                            Ct II Protruding len h Embedment          5l(q."
Bolt ri C n    ete        C,~<              MPCQ CRPcv      CppcE.
condition
                                                            "                                      Vo TOP      SHIIT Edge              /I (p          $ ~/l(p    4      4                                                OFC distance                                              /II (3/$V            )3tqlI    gyl                                              Ta  ToPoF AN<
s Anchor acin 5" I g'3/8"                5',  C  ~(<I,"
Anchor an    larit                            0        0    0 Thread engagement Og.      ot'K, Comments:
Y~ gh  ac.ss                                                  A~MJ  I by:            C'erified Date:
Qua    ./ ert.            Inspector evieved by:                                                                                Date:
Const            ct  on ARE                    INDIANA MICHIGAN POWER SITE DESIGN CONTROLLED WORKING COPY 24 AUG      19S5 o2of      3 Re  ision  1 LERK
                                                                              **12 CHP 5021.        CCD. 019 ATTACHMENT NO. 1 OR    S    CT 0 Equipment No.:                                                                    Dwg    No.:      I  2-8>98-Embedded  Steel  Dwg. No.:
CAL Weld  XD        QL      gZ          W3 We            e Codes T  e Size            ~li Io  ~hb 1  =  Fillet g] ~                                          2 = Plug/Slot Len  h 3 = Groove Cracks          Yes    Yes        Yes    Yes      Yes  Yes        Yes      Yes No              No    No          No        No Lack  of  . Les      Yes        Yes    es      Yes  Yes        Yes      Yes Penetration    QR                  No              No    No          No        No Porosity        Yes      Yes        Yes              Yes  Yes        Yes      Yes No              No    No  . No        No INDIANA MICHIGAN PO'LYER
                          &GQ hi<                                                    SITE DESIGN CONTRCI.LEO IVORKING COPY
                                                                    ~
J)
                                    'R. ~/~3                          44                AUG  24 1895 RYgxqx. q"
                                                                    +4  ~
4 o IA
                              '4.                                            .0,
                                                                            ~
4.
4
                                                            ~  ~qyeHh          RCCBpT    7~ ~O~"
Equipment base    flexible:          0 Yes    g    No          1 ons ruc z n              e Date:      <-2'~
Reviewed by:
ons ruc ron          c    or  evxew    ngxneer
:  ~S.    -3 ified  by:                                                                              Date:
ua . e    . npsec or Page    3  of    3 Revision      1
12 SHP 5050 NDE.008
            ~/
8 A DEPARTMENT S                                                      ATTACHMENT NO. 1 CONTROLlED DOCUMENT COPY NO.                  Uf TRASONIC TEST REPORT JOB ORDER NO<<:                            :~/.>>.          ~  *    .  /A IDENTIFICATION Unit Waa                                Test Unit/ S/Nfl VSR-            CNC-9'K Component                                Freq./Diameter                .asD Item A~a.                                Reference Standard    &C'-8 Material                                Couplant/Batch No.        ~ ~/~        lP88 Other 5 TEST DATA REMARKS EE P. EPV C.                                        I  E
J ~
PERFORMED BY:                                  LEVEL:~~          DATE: IY'-/3 ~z3 REVIEWED BY:                                  LEVEL:~            DATE:
FORM NO. 12 SHP 5050 NDE.008-1                      Page 1  of  1 Revision    0


NORTH SPENT FUEL PIT HEAT EXCHANGER Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: SPENT FUEL PIT HEAT XCHGR RM, NW AREA OF RM Manufacturer, Model, Etc.: OAT, JOSEPH, CORP.d)Anchor Bolts Type=90 Deg J-Bolt Manufacturer
                                ~
=Diameter=7/8 in Product Name=Nominal Capacity Pullout 20.44 kips Shear 10.22 kips Concrete Compression Strength, fc'3500.0 psi Reduction Parameters Capacity Reduction Factor Label Check Condition Pullout Shear 1.Type of Anchorage 2.Installation Adequacy Yes Yes Installation is adequate 1.0 1.0 1.0 1.0 3.Embedment Length Yes Embedment Length=18.75 in 0.47 1.0 4.Gap at Threaded Anchors 5.Spacing between Anchorages Yes Gap size=0.0 in Yes 1.0 1.0 1.0 1.0 7.Concrete Strength and Condition 8.Concrete Crack Location and Size 9.Essential Relays in Cabinets 10.Base Stiffness and Prying Action 11.Equipment Base Strength and Structural Load Path 12.Embedment Steel and Pads Yes Base strength and load path are O.K.Yes Installation is O.K.Yes Yes Crack Size=0.0 in No Yes 1.0 1.0'1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Does the tank satisfy all the assumptions and is within the applicable range of parameters?
Yi atabase:    K:SSEL1B.DBF Equip ID: 12-HE-16N      Train:    12  Equip Class:21 ing No.: 12-5136, 1-5135
Step 2-The allowable bolt loads Allowable Tension Load, Pu'llowable Shear Load, Vu'.211 kips 7.967 kips Step 3-Determine base plate bending strength reduction factor RB 346.7068 DC COOK Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes'heet 5 of 9 ID: 12-HE-16N (Rev.0)Class: 21-Tanks and Heat Exchangers
      ~
              ~
Function: SFP COOLING AND CCW
        ~
System: SPENT FUEL PIT COOLING          & CCW Equip Desc:    NORTH SPENT FUEL     PIT HEAT EXCHANGER Building: U-1 AUXILIARY Room: SPENT FUEL PIT                HE ROOM Elev: 609      Sort: S,            Notes:
Normal State:          Desired State:          Power Req'd:  N Support System Drawing:
Req'd Support Comp:
Safety Related Status:      STANDARD              Min/Opt: MIN Alias    No:        Power Train:    NA
~
Comp  Served:    OAT, JOSEPH,  CORP MFR:
5:
Panel:
Elem. Drawing:
Wiring Drawing:
Power Source:
Walkdown: F        Relay Eval  : N Comp  Type:  HE Iso Drawing: 12-SF-5, 7, 1-CCW-l,            7 Location: NW AREA OF RM
 
DC COOK Unit 1                                      GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                    Status: Yes Sheet 1 of 9 ID: 12-HE-16N (Rev. 0)                            Class: 21 - Tanks and Heat Exchangers
 
== Description:==
NORTH SPENT FUEL PIT HEAT EXCHANGER Building: AUXILIARY                        Floor El.: 609.00                   Room, Row/Col: SPENT FUEL PIT HEAT XCHGR RM, NWAREA OF RM Manufacturer, Model, Etc.: OAT, JOSEPH, CORP.
BASIS: Horizontal TANK analysis
: 1. The buckling capacity  of the shell of a large, flat-bottom, vertical tank is equal to or greater        N/A than the demand.
: 2. The capacity of the anchor bolts and their embedments is equal to or greater than the                    Yes demand.
: 3. The capacity of connections between the anchor bolts and the tank shell is equal to or                    Yes greater than the demand.
: 4. Attached piping has adequate flexibilityto accommodate the motion of a large, flat-bottom,                Yes vertical tank.
: 5. A ring-type foundation is not used to support a large, flat-bottom, vertical tank.                       N/A C
~CM@NN Q RT: Gary Thomas, Tom Huang and Kailash Mahajan on 11/3/93.
3' 2" diameter horizontal heat exchanger about 22'ong on two saddles supported by piers. Total weight full given as 26,200 lbs.
Exchanger bolted into pier with 4 7/8" diameter bolts per saddle. Piers are dowled into floor.
The results of tank analysis show that the tank anchorage is adequate and also the saddles are safe.
Evaluated by:                                                                            Date:
 
==Attachment:==
Pictures
 
==Attachment:==
TANK Analysis Results
 
==Attachment:==
Check of Stresses in Saddles
 
DC COOK Unit 1                             GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                        Status: Yes Sheet2of9 ID: 12-HE-16N (Rev. 0)                     Class: 21 - Tanks and Heat Exchangers


==
==
Description:==
Description:==
NORTH SPENT FUEL PIT HEAT EXCHANGER Building: AUXILIARY                  Floor El.: 609.00              Room, Row/Col: SPENT FUEL PIT HEAT XCHGR RIVI, NW AREA OF RM Manufacturer, Model, Etc.: OAT, JOSEPH, CORP.
NORTH SPENT FUEL PIT HEAT EXCHANGER
DG COCK Unit 1                                GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                  Status: Yes Sheet 3 of 9 ID: 12-HE-16N (Rev. 0)                            Class: 21 - Tanks and Heat Exchangers
== Description:==
NORTH SPENT FUEL PIT HEAT EXCHANGER Building: AUXILIARY                          Floor El.: 609.00                Room, Row/Col: SPENT FUEL PIT HEAT XCHGR RM, NW AREA OF RM Manufacturer, Model, Etc.: OAT, JOSEPH, CORP.
TANK Analysis Results Step 1 Input Data a) Assumptions
: 1. Tank is cylindrical, horizontally oriented and supported on saddles.                                    Yes
: 2. Tank and saddles are made of carbon steel                                                                Yes
: 3. Saddles are uniformly spaced.                                                                          Yes
: 4. Saddles overhang is less than spacing /2                                                                Yes
: 5. Base plates have slotted anchor bolt holes for thermal growth except for the base plate under          Yes the fixed saddle.
: 6. Imposed nozzle loads are not significant.                                                              Yes
: 7. The tank foundation is adequate.                                                                        Yes
: 8. Anchor bolts are cast in place or expansion type.                                                      Yes b) Materials Weight of Tank+ Fluid                                                          26.2 kips Weight Density of Tank+ Fluid                                                  151 Ibs/ftn3 Saddle Elastic Modulus                                                        30000.0 ksi Saddle Shear Modulus                                                          1". 500.0 ksi Base Plate Yield Strength                                                    30000.0 ksi Anchor Type                                                              7/8 in 90 deg. J-Bolts c) Dimensions Tank Diameter, D                                                                  3.17 ft Tank Length, L                                                                    22.0 ft Tank Thickness, t                                                                0.44  in Height of Tank+ Fluid C.G., Hcg                                                    2.16 ft Number of Saddles Saddle Spacing, S                                                                  13.0 ft Saddle Height, h                                                                  4.9 in Saddle Shear cross-sectional area                                              23 63 inn2 Saddle Weak Axis Moment of Interia                                            24.36 in"4 Number of Bolt Locations / Saddle Number of Bolts / Bolting Location Extreme Bolt Spacing,                                                              1.83 ft Bolt Eccentricity, e D'nchor 3.0 in Weld Thickness                                                                  0.188 in Base Plate Thickness                                                              0.5 in
DC COOK Unit 1                                GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                      Status: Yes Sheet4of9 ID: 12-HE-16N (Rev. 0)                                Class:  21 - Tanks and Heat Exchangers
== Description:==
NORTH SPENT FUEL PIT HEAT EXCHANGER Building: AUXILIARY                            Floor El.: 609.00                  Room, Row/Col: SPENT FUEL PIT HEAT XCHGR RM, NW AREA OF RM Manufacturer, Model, Etc.: OAT, JOSEPH, CORP.
d) Anchor Bolts Type = 90 Deg J-Bolt                                              Diameter = 7/8 in Manufacturer =                                                    Product Name =
Pullout                            Shear Nominal Capacity                          20.44 kips                        10.22 kips Concrete Compression Strength, fc'            3500.0 psi Reduction Parameters Capacity Reduction Factor Label                          Check                Condition                Pullout        Shear
: 1. Type  of Anchorage                            Yes                                            1.0            1.0
: 2. Installation Adequacy                          Yes      Installation is adequate              1.0            1.0
: 3. Embedment Length                              Yes      Embedment Length = 18.75              0.47            1.0 in
: 4. Gap at Threaded Anchors                        Yes      Gap size = 0.0 in                      1.0            1.0
: 5. Spacing between Anchorages                    Yes                                            1.0            1.0
: 7. Concrete Strength and Condition                Yes                                            1.0            1.0
: 8. Concrete Crack Location and Size              Yes      Crack Size = 0.0 in                    1.0            1.0
: 9. Essential Relays in Cabinets                    No
: 10. Base Stiffness and Prying Action              Yes                                            '1.0          1.0
: 11. Equipment Base Strength and                  Yes      Base strength and load path            1.0            1.0 Structural Load Path                                    are O.K.
: 12. Embedment Steel and Pads                      Yes      Installation is O.K.                  1.0            1.0 Does the tank satisfy all the assumptions and is within the applicable range of parameters?
2- The allowable bolt loads Vu'.211 Step Allowable Tension Load,                                                                    kips Shear Load,    Pu'llowable 7.967 kips Step 3 Determine base plate bending strength reduction factor RB                                                                                  346.7068
DC COOK Unit 1                                GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                        Status: Yes 5 of 9 'heet ID: 12-HE-16N (Rev. 0)                        Class: 21 - Tanks and Heat Exchangers
== Description:==
NORTH SPENT FUEL PIT HEAT EXCHANGER Building: AUXILIARY                    Floor El.: 609.00                Room, Row/Col: SPENT FUEL PIT HEATXCHGR RM, NWAREAOF RM Manufacturer, Model, Etc.: OAT, JOSEPH, CORP.
Step 4 Determine base plate weld strength reduction factor RW                                                                        3.3848 Step 5 Determine the anchorage tension and shear allowable loads Allowable Anchorage Tension Load, Pu                                      7.211 kips Allowable Anchorage Shear Load, Vu                                        7.967 kips Step 6 Calculate the ratios and values alpha (Pu/Vu)                                                                0.91 3.28 kips/bolt Vu /Wb                                                                        2.43 Hcg /                                                                        1.18
    /S D'cg 0.166 F1                                                                          2.236 F2                                                                          2.475 Step  7- Determine  the acceleration capacity of the tank anchorage lambda 1                                                                  1.088 G lambda u                                                                  0.772 G Anchor Acceleration capacity, lambda                                      0.772 G Step 8 Determine the maximum saddle spacing for transverse and vertical rigid frequency response Maximum Saddle Spacing, Sc                                                  13.45 ft Step 9 Compute the resonant frequency of the tank in the longitudinal direction Saddle Stiffness, Ks                                                  13948.206 kipsfin R    nant Frequency of Tank in Longitudinal Direction                    72.15 Hz
DC COOK Unit 1                            GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                            Status: Yes Sheet 6 of9 ID: 12-HE-16N (Rev. 0)                        Class: 21 - Tanks and Heat Exchangers
== Description:==
NORTH SPENT FUEL PIT HEAT EXCHANGER Building: AUXILIARY                    Floor El.: 609.00                Room, Row/Col: SPENT FUEL PIT HEAT XCHGR RM, NW AREA OF RM Manufacturer, Model, Etc.: OAT, JOSEPH, CORP.
Step 10 Determine the seismic demand acceleration ZPA                                                                      0.275 G Tank is rigid in all three directions.
Tank anchorage is adequate because anchorage acceleration capacity is greater than ZPA Step 11 Check the saddle stresses The program does not check the saddle stresses Check the saddle stresses by an independent calculation
CUENT Cr
                                                                                                          ~    H~hmou Stevenson and Associates A Struoiurnl Mnohnaionl conrulbag Engiauutiny Firm
      ''/gag: .4~ J,l~ s4 ke:ss e.s              i P
II I
I                          I I
1 I
i3<<) VI S
                                                                                                  /r'""
24'z
                                  'j8' irin<yjt.p /g.u.IIII            .<<.g '(.,      J  = ...3    .I        PS
        -'A--n.o-L          Aro-'n I
                                      ".CIopn.oI ig g                '=    r Ir0 J.  (I:rru    CI'FiOar)
        --Z'.pa--                    .'pg j.
E
                          ~
I        "    ~
I
                        ~  Qf'W I        ~
                                              'I r<<I I
                                                    -<<  ~
I l          I I
I
          'I    1                  ~I gg L u
Lire, 2.l r
S        ZBIrls..u  ru.      I
                                                                                                                    ~
                                                                                                      ~
I' I
j                                                                                                    i      I I
                                                                                                                      ~ I
                                                                                                                  ~
i I  I i    I i  l,I  I I
                                                                        ~4I i2!
j i  j    I
W)
CUENT            JOB No.      SHEET OF SUBJECT Z
0 8
Stevenson and Associates 5
5    A Srrucrurnl Mcchnnrcnl Conrulnnrr Enprnncnnrr fum o
                                      ~ ~ ~~ ~
o ~ ~
      ~  ~            ~ ~ II e e ~  0 II I  I  I I
~ ~                            '
~ ~
                                ~ ~
I'
r vms ~ we'll ~ Q J,g eo ATTACHMENT HO.              l Equipaent No.:
Anchor types'              '.
                        'li- HE-(4 0 Tightness established by: 0 "Snug VDCY            Dia:
Fit" ie"+
0 Torque
                                                                                          ~g Dwg No.:
No.:
IL 5L97A-I4 IL M135 2 Torque Wrench No.:                                                      Cal. Due      Date:
Tightness verified? 0 Yes EI No                                                          Date: ((-(o- 2 ons        c          n Equipment hase      flexible? 0          Yes K No                                      Date:            -(0- l2 ons ruc            on ARE Bolt Caps Anchor len Pro~ding len XD
                  ',  I
                        '- l l"
                      ~i',-
l'-ll"
                                    ~" ~
I'-II" p "8,"
I'-ll" 4iia 'i I'- l l"    I'- l I "  I I I" Comments
                                                                                                                  ~m ox~
I'-(I" 1%" 30'73-g 2,'            0    2,'+"
                                                  ~
Concrete                                                                  OK        OK condition        0((        Ql<      QK        QK                                                    OK Edge                    gIz"    C  'i'."                                4 distance
    '. Anchor                                                                      4          4 acin      Q 7 IEI,"  3 1/i    >~tg"    > 'iZ"          4 Anchor                                                        4            4            4          4 larit      0          0 an Thread engagement OlC.      OIC.
Zo QK po Ok;        .. Ol(      'l(          Qk            GK Comments:      4 5QRr
'Yean.m.                                                                                                      CKo~W    A~a, IM                                  T PER      RA&I      I Z, ~
Verified by:                                                                                                Date:
Qua .      Cert. nspect      r                                                  .
5-2.z-)z Reviewed bye Construct on                          INDIA IA MICHIGAN POVIER SITE DESIGN CONTROLLED VlORKING COPY AUG 2        4.1995                  Page 2        of Revision        l3 LEAK


NORTH SPENT FUEL PIT HEAT EXCHANGER Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: SPENT FUEL PIT HEATXCHGR RM, NWAREAOF RM Manufacturer, Model, Etc.: OAT, JOSEPH, CORP.Step 4-Determine base plate weld strength reduction factor RW 3.3848 Step 5-Determine the anchorage tension and shear allowable loads Allowable Anchorage Tension Load, Pu Allowable Anchorage Shear Load, Vu 7.211 kips 7.967 kips Step 6-Calculate the ratios and values alpha (Pu/Vu)Vu/Wb Hcg/D'cg/S F1 F2 0.91 3.28 kips/bolt 2.43 1.18 0.166 2.236 2.475 Step 7-Determine the acceleration capacity of the tank anchorage lambda 1 lambda u Anchor Acceleration capacity, lambda 1.088 G 0.772 G 0.772 G Step 8-Determine the maximum saddle spacing for transverse and vertical rigid frequency response Maximum Saddle Spacing, Sc 13.45 ft Step 9-Compute the resonant frequency of the tank in the longitudinal direction Saddle Stiffness, Ks R nant Frequency of Tank in Longitudinal Direction 13948.206 kipsfin 72.15 Hz DC COOK Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 6 of9 ID: 12-HE-16N (Rev.0)Class: 21-Tanks and Heat Exchangers
ATTAU96&#xc3;Z NO.              1 Equipment No.:         )Z.-HC -IGM                                                  Dug    No.:
Embedded    Steel. Dry. No.:
geld  y  'Ihfi            Wz.       Wa l
W<        VVs    Wr      W~        Ws I                    I        I    I        t          I Size              /~r      ~i<.     ~i(       If~"      IS    ~i i  >li      ~/ic.
1 ~    Fillet 2 ~ Plug/slot Lan              5~~ic"    44.'i'z"  Z.>a"    5 '~s"      2."  Z ~a"  L~~s"  .
E.'~4" 3 ~ Groove Cracks            Yea      Yea        Y  s    Yea      Yes    Yea    Yea      Yea No        No                  No        No    No      No        No Lack  of        Yea      Yes        Yes    . Y        Yea    Yea    Yea      Yes Penetration      No        No                  N        No    No      No        No Porosity          Yea No Yes No          o s    es No.
Yea'es No    No Yea No Yea No CXlALLTY CQMTRQL TEC W MlC.IAU QLll Y VERIFIE,D 'AE.LDQ 'INS. Vl4, WS.                                     4  NIo PER    COGGTRUCTLOM, AbKHQR REVlEVl E.MCLMEER,'5 RE.QDE.'5 T W+  HA'5 5LAC  AND its"    POPlTLOM 15 UklKR CUT.
Wi Wz                                                                          WII LJ
                                                                                                  ? ~~
BIO      6~ O >.
Cg
                                                                                                  <i-o
                                                                                                  ~NO QO
                                                                                                  ~OQ OX-
                                                                                                  ~@X co o ZO?
O i-Wa                        'l L
UFV. LK            . V/E.GY                          PAC E  l QFK Equipment base      flexihles 0             Yea      8  No ons            n        e Date:
Revieyed by                                                                                    Date ons ruc        on      c    or ev ev      g    eer Verified by:        ua    ~          ~  npsec or Date:
Page  3  of    3 Revision        1


==
ATTAauKNT No.      l Equipment No.:        IZ HC IGM                                                %g No.:
Description:==
Embedded  Steel Dry. No.:
Weld ID        Ws      VYIo        W ii        'lliz Size            ~l(c.
I
                        ~/I(
1 Wi(
l ~ Fillet 5'4                                2 ~  Plug/Slot Lan            5 A    Z ~s        4.4'i~
3 ~ Groove Cracks                      s      Yes        Yes      Yes  Yes      s    Yes o        No        No        No    No    N      No Lack of                            Yes      .Yes      Yes  Yes  Yes    Yes Penetration      o      o        No        No        No    No    No      o Porosity        Y      Y o
Yes No Yes No Yes'es No    No Yes No Y
No We  '~s" PQRTIOkl CF VlE.EO            )6    UQQE.RC O'T.
INDIANA MICHIGAN PO(VER SITE DESIGN CONTROLLED
                                          'IVORKING COPY AUG  24 1995 "L ERK  T PACE  Z.OF5 Equipment base    flexible:          0 Yes          H. No  T' on    e Date:
Reviewed by:
ons  ru          o        c    r  evlev  g  eer Verified by:       a . e      .      npsec or Pago  3 of    3 Revision  3.


NORTH SPENT FUEL PIT HEAT EXCHANGER Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: SPENT FUEL PIT HEAT XCHGR RM, NW AREA OF RM Manufacturer, Model, Etc.: OAT, JOSEPH, CORP.Step 10-Determine the seismic demand acceleration ZPA 0.275 G Tank is rigid in all three directions.
ATTACEBKNT No.
Tank anchorage is adequate because anchorage acceleration capacity is greater than ZPA Step 11-Check the saddle stresses The program does not check the saddle stresses Check the saddle stresses by an independent calculation CUENT Cr~H~hmou Stevenson and Associates A Struoiurnl Mnohnaionl conrulbag Engiauutiny Firm''/gag:.4~J,l~s4 ke:ss e.s.i P II I I I I 1 I i3<<)VI S/r 24'z'""'j8'*'irin<yjt.p
Equipment No.:       'lh  HC )AU                                                  Dwg    No.:
/g.u.IIII.<<.g'(., J=...3.I PS I-'A--n.o-L Aro-'n".CIopn.oI ig g'=r Ir0 J.--Z'.pa----.'pg j.E (I:rru CI'FiOar)I"~~I~-<<~I'I~Qf'W r<<I I I l I I I'I 1 u 2.l~I gg L Lire, r-ZBIrls..u ru.S j I~I I'I i I~I~~i i I I~4I i2!j i j I I I i l,I I CUENT SUBJECT W)JOB No.SHEET OF Stevenson and Associates 5 A Srrucrurnl Mcchnnrcnl Conrulnnrr Enprnncnnrr fum Z 0 8 5 o~~~~~
Embedded  Steel    Dwg. No.:
o~~~~~~II e e~0 II I I I I~~'~~~~I' eo r vms~we'll~Q J,g ATTACHMENT HO.l~g No.: IL 5L97A-I4 Dwg No.: IL M135 2 Equipaent No.: 'li-HE-(4 0 Anchor types''.VDCY Dia: ie"+Tightness established by: 0"Snug Fit" 0 Torque Torque Wrench No.: Cal.Due Date: Tightness verified?0 Yes EI No Date: ((-(o-2 ons c n Equipment hase flexible?0 Yes K No Date:-(0-l2 ons ruc on ARE Bolt XD Caps Comments Anchor',,~m ox~len I'-l l" l'-ll" I'-I I" I'-l l" I'-l l" I'-l I" I'-I I" I'-(I" 1%" 30'73-g Pro~ding~i',-~"~p"8," 4iia'i len Edge distance gIz" C'i'."0~2,'2,'+" Concrete condition 0((Ql<QK QK OK OK OK 4.Anchor'acin Anchor an larit Thread engagement Q 7 IEI," 3 1/i>~tg">'iZ" 4 4 4 0 0 Zo po 4 4 4 4 OlC.OIC.QK Ok;..Ol('l(Qk GK Comments: 4 5QRr'Yean.m.IM T PER RA&I I Z,~CKo~W A~a, Verified by: Qua.Cert.nspect r Reviewed bye Construct on INDIA IA MICHIGAN POVIER SITE DESIGN CONTROLLED VlORKING COPY.Date: 5-2.z-)z AUG 2 4.1995 LEAK Page 2 of 3 Revision l
Weld ID          V/)s   W i~      W is    W    ic  W..)~ W)e                Wm W
I         I         I       I       I size            ~/)C    +Iso      )/s,     ~ha-     Pi~     )IS              ~~Is.
1 ~   Fillet 44'Iz"                                                                      2 ~   Plug/Slot Z.'ls"   Z'~z"   L "e,"   Z."e"   Z.'Iz"   Z.'~e" 3 ~ Groove Cracks          Yea      Yes      Yes      Yes        Yes    Yea      Yea      Yes No      No        No      No        No    No        No      No Lack of        Yea      Yes      Yea    ,Yes        Yea    Yea      Yea      Yea Penetration    No      No        No      No        No    No        No      No Porosity        Yea No Yes No Yes No Yea No Yes'es No    No Yes No Yes No WELD'QM        'THI5    PAC E. WC.KE. MOT 'tE.RAFIEO              aV    a .C.. T~~<~D~-
W)+
INDIANA MICHIGAN POWER SITE DESIGN CONTROLLED WORKING COPY
                                                                                            ~UG  24 tSSS W)s W)                                        LERK    T Equipment base    flexible:        0 Yes        EL  No                                      Date:
ona            0        e Reviewed by:                                                                                  Date:   ~-~-~~
ona    ruc on          c o        evxew        gxneer Verified by:                                                                                  Date:
ua .     o      . npsec or Page     3  of   3 Revision       1


ATTAU96&#xc3;Z NO.1 Equipment No.:)Z.-HC-IGM Embedded Steel.Dry.No.: Dug No.: I l I I I t I>li~/ic.1~Fillet 2~Plug/slot 3~Groove/~r~i<.~i(If~" IS~i i Size 5~~ic" 44.'i'z" Z.>a" 5'~s" 2." Z~a" L~~s".E.'~4" Lan Cracks Yea Yea Y s Yea Yes Yea No No No No No Yea Yea No No Yea Yes No No Yea Yea No No'AE.LDQ'INS.Vl4, WS.4 NIo RE.QDE.'5 T Lack of Yea Yes Yes.Y Penetration No No N Yea Yea No No Porosity Yea Yes s es Yea'es No No o No.No No CXlALLTY CQMTRQL TEC W MlC.IAU QLll Y VERIFIE,D PER COGGTRUCTLOM, AbKHQR REVlEVl E.MCLMEER,'5 W+HA'5 5LAC AND its" POPlTLOM 15 UklKR CUT.geld y'Ihfi Wz.Wa W<VVs Wr W~W s Wi Wz Wa WII BIO LJ~?~6~O>.Cg~NO<i-o QO~OQ OX-~@X co o ZO?O i-'l L UFV.LK.V/E.GY PAC E l QFK Equipment base flexihles 0 Yea 8 No ons Revieyed by n e Date: Date ons ruc on c or ev ev g eer Verified by: ua~~npsec or Date: Page 3 of 3 Revision 1 ATTAauKNT No.l Equipment No.: IZ HC IGM Embedded Steel Dry.No.:%g No.: Weld ID Size Lan Ws VYIo W ii'll iz I 1~l(c.~/I(Wi(5 A Z~s 4.4'i~5'4 Cracks Lack of Penetration o Porosity Y s Yes o No Yes Yes Yes No No No Yes.Yes Yes Yes o No No No No Y Yes Yes Yes'es o No No No No l~Fillet 2~Plug/Slot 3~Groove s Yes N No Yes Yes No o Yes Y No No We'~s" PQRTIOkl CF VlE.EO)6 UQQE.RC O'T.INDIANA MICHIGAN PO(VER SITE DESIGN CONTROLLED
SHP  5050 NDE.008 S Px A DEPARTMENT                                         ATTACHMENT NO. 1 CONTROLLED DOCUMENT COPY NO.
'IVORKING COPY AUG 24 1995"L ERK T PACE Z.OF5 Equipment base flexible: 0 Yes H.No T'on e Date: Reviewed by: Verified by:ons ru o a.e.npsec or c r evlev g eer Pago 3 of 3 Revision 3.
UITRASONIC TEST REPORT JOB ORDER NO.: ~ A     REPORT DATE:         9       REQUEST NO. hl IDENTIFICATION                     TECHNI UE Unit       a                       Test Unit/ S/N Component                          Freq./Diameter             Ra Item                                Reference Standard Material Other Couplant/Batch No.       'g       L   S TEST DATA REMARKS r                 4 Y     T     A LE     SA'F
ATTACEBKNT No.Equipment No.: 'lh HC)AU Embedded Steel Dwg.No.: Dwg No.: Weld ID size V/)s W i~W is W ic W..)~W)e I~/)C+Iso I I I I)/s,~ha-Pi~)IS 44'Iz" Z.'ls" Z'~z" L"e," Z."e" Z.'Iz" Z.'~e" Wm W 1~Fillet~~Is.2~Plug/Slot 3~Groove Cracks Lack of Penetration Porosity Yea Yes No No Yea Yes No No Yea Yes No No Yes Yes Yes Yea No No No No Yea ,Yes Yea Yea No No No No Yes Yea Yes'es No No No No Yea No Yea No Yes No Yes No Yea No Yes No WELD'QM'THI5 PAC E.WC.KE.MOT'tE.RAFIEO aV a.C..T~~<~D~-W)+INDIANA MICHIGAN POWER SITE DESIGN CONTROLLED WORKING COPY~UG 24 tSSS W)s W)LERK T Equipment base flexible: 0 Yes EL No ona 0 e Date: Reviewed by: Verified by: ona ruc ua.o.npsec or on c o evxew gxneer Date:~-~-~~Date: Page 3 of 3 Revision 1 S Px A DEPARTMENT CONTROLLED DOCUMENT COPY NO.SHP 5050 NDE.008 ATTACHMENT NO.1 UITRASONIC TEST REPORT JOB ORDER NO.:~A REPORT DATE: 9 REQUEST NO.hl IDENTIFICATION Unit a Component Item Material Other TECHNI UE Test Unit/S/N Freq./Diameter Ra Reference Standard Couplant/Batch No.'g L S TEST DATA REMARKS r 4 Y T A LE SA'F'T't A.F wio PERFORMED BY: W REVIEWED BY: FORM NO.12 SHP 5050 NDE.008-1 DATE: Page 1 of 1 Revision 0 I EVER: I I EVE?:~DATE:
                                            'T'         t A.
Equip ID: 1-QT-107-AB Train: 1 Equip Class:21 Drawing No.: 1-5151A~~~~~~tion: EMERQ DIESEL System: DIESEL FUEL OIL Equip Desc: AB EMERG DXESEL FUEL OIL DAY TANK Building: AUXILIARY Room: AB EMERG DIESEL GENERATOR ROOM Elev: 587 Sort: S, Notes: Normal State: Desired State: Power Req'd: N Support System Drawing: Req'd Support Comp: Safety Related Status: NUCLEAR SR Alias No: Power Train: NA Comp Served: AB FUEL OXL DAY TANK MFR: el: 36" D x 108" L, 465 GAL.el: Elem.Drawing: N/A Wiring Drawing: N/A Power Source: N/A Walkdown: F Relay Eval: N Min/Opt: MIN Comp Type: TANK (CAPACITY-2HRS FULL LOAD OPERATION)
F   wio PERFORMED BY: W                           I EVER:                DATE:
Iso Drawing: Location: XN THE SW REGION OF THE ROOM INSIDE THE AB EMERGENCY DIESEL FUEL OIL DAY TANK ENCLOSURE,, AT 599 EL.
REVIEWED BY:                               I EVE?:    ~          DATE:
DC Cook Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 1 of 2 ID: 1-QT-107-AB (Rev.0)Class: 21-Tanks and Heat Exchangers
I FORM NO. 12 SHP 5050 NDE.008-1                   Page 1     of   1 Revision     0


==
Equip ID: 1-QT-107-AB          Train: 1    Equip Class:21 Drawing No.: 1-5151A
Description:==
    ~
                ~ ~
tion:
        ~
            ~  EMERQ  DIESEL System: DIESEL FUEL OIL
          ~
Equip Desc:        AB EMERG DXESEL FUEL    OIL DAY TANK Building:      AUXILIARY      Room: AB EMERG DIESEL GENERATOR ROOM Elev: 587          Sort: S,        Notes:
Normal State:            Desired State:      Power Req'd: N Support System Drawing:
Req'd Support Comp:
Safety Related Status: NUCLEAR          SR        Min/Opt: MIN Alias No:              Power Train: NA Comp  Served:      AB FUEL OXL DAY TANK MFR:
el:      36"  D  x 108" L,  465 GAL.
el:
Elem. Drawing: N/A Wiring Drawing: N/A Power Source: N/A Walkdown: F            Relay Eval  : N Comp  Type: TANK (CAPACITY-        2HRS FULL LOAD OPERATION)
Iso Drawing:
Location: XN        THE SW REGION OF THE ROOM INSIDE THE AB EMERGENCY DIESEL FUEL OIL DAY TANK ENCLOSURE,, AT 599 EL.


AB EMERG DIESEL FUEL OIL DAY TANK Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: AB EDG RM, Manufacturer, Model, Etc.: 36 D x 108 L,465 GAL.BASIS: External analysis 1.The buckling capacity of the shell of a large, flat-bottom, vertical tank is equal to or greater than the demand.2.The capacity of the anchor bolts and their embedments is equal to or greater than the demand.3.The capacity of connections between the anchor bolts and the tank shell is equal to or greater than the demand.4.Attached piping has adequate flexibility to accommodate the motion of a large, flat-bottom, vertical tank.5.A ring-type foundation is not used to support a large, fiat-bottom, vertical tank.N/A Yes Yes Yes N/A COh0iggNT!j SRT: George G.Thomas (SM)and Tom Huang (AEP), 10/7/93.~~Same as 1-QT-107-CD, except that the grout is in much better condition for 1-QT-107-AB.
DC Cook Unit 1                                      GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                    Status: Yes Sheet 1 of 2 ID: 1-QT-107-AB (Rev. 0)                          Class: 21 - Tanks and Heat Exchangers
Evaluated by:  
 
== Description:==
AB EMERG DIESEL FUEL OIL DAY TANK Building: AUXILIARY                       Floor El.: 587.00                     Room, Row/Col: AB EDG RM, Manufacturer, Model, Etc.: 36 D x 108 L,465 GAL.
BASIS: External analysis
: 1. The buckling capacity of the shell of a large, flat-bottom, vertical tank is equal to or greater         N/A than the demand.
: 2. The capacity of the anchor bolts and their embedments is equal to or greater than the                   Yes demand.
: 3. The capacity of connections between the anchor bolts and the tank shell is equal to or                   Yes greater than the demand.
: 4. Attached piping has adequate flexibilityto accommodate the motion of a large, flat-bottom,               Yes vertical tank.
: 5. A ring-type foundation is not used to support a large, fiat-bottom, vertical tank.                       N/A COh0iggNT!j SRT: George G. Thomas       (SM) and Tom Huang       (AEP), 10/7/93.
                                                            ~
Same as 1-QT-107-CD, except that the grout is in much better condition for 1-QT-107-AB.
                        ~
Evaluated by:                                                                           Date:
                                                                                                      /I 9 ~85 ed=                              /
l    e


==Attachment:==
==Attachment:==
Pictures                                                  I


Pictures ed=/I Date:/I 9~85 e l DC Cook Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 2 of 2 ID: 1-QT-107-AB (Rev.0)Class: 21-Tanks and Heat Exchangers
DC Cook Unit 1                               GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                          Status: Yes Sheet 2 of 2 ID: 1-QT-107-AB (Rev. 0)                     Class: 21 - Tanks and Heat Exchangers


==
==
Description:==
Description:==
AB EMERG DIESEL FUEL OIL DAY TANK Building: AUXILIARY                  Floor El.: 587.00                Room, Row/Col: AB EDG RM, Manufacturer, Model Etc.: 36 D x 108 L, 465 GAL.
                  ~
~PC~FQ AB Emerg. Diesel Fuel Oil Day Tank 1-QT-1 07-AB


AB EMERG DIESEL FUEL OIL DAY TANK Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: AB EDG RM, Manufacturer, Model~Etc.: 36 D x 108 L, 465 GAL.~PC~FQ AB Emerg.Diesel Fuel Oil Day Tank 1-QT-1 07-AB
                                                                  ++12 CHP 5021 CCD 019 ~     ~
++12 CHP 5021~CCD~019 ATTACHMENT NO.1 AUX Un iQ-369Q-2-i-QT-ia7-A5 Equipment No.Insta at.on dwg./Rev.Anchora e Arran ement Sketch 50UTH%E57 5'le QF'@o,g pM UP w~iCr)-O AG EMCPGt:M(Y QKSEL T11Q Oll OlE't XLktl(b'i Bldg.Location gl Qil 4e p4 II FfP.)+I Qll E l E.V.LM.5QUTH 5y'E.CY1 QD'A-A" D,rawn by: Q.ROTC, Verified by: Qua./Cart.Reviewed by: Construct on Inspector Date: Date: Date: Anc r Review Engineer f 2.-'LS-g g Page 1 of 3 Revision 1  
ATTACHMENT NO. 1 50UTH%E57 5'le QF'@ o,g pM UP w~iCr AUX              ) -O     AG EMCPGt:M(Y QKSEL T11Q Oll OlE't XLktl( b'i Un                          Bldg.                             Location iQ- 369Q                            i- QT- ia7- A5 Insta    at. on dwg.  /  Rev.          Equipment No.
Anchora e Arran ement Sketch gl Qil 4e                                     II p4 FfP.)
                                        +I Qll E l E.V. LM. 5QUTH 5y'E.CY1 QD 'A- A" D,rawn by:         Q. ROTC,                                     Date:
Verified by:                                                     Date:
Qua   ./Cart. Inspector 2.- 'LS-g g Reviewed by:                                                     Date:
Construct on Anc       r Review Engineer f
Page 1   of   3 Revision   1


~~l-~~~~~i S~~0-~s'%~4 l kt.S&5%~~%aaa ISWISRRRHLL mmeeasmmmm RRE555RRRLL WWWRHaLa ii)aa)kal ggggggggggg~~~~
                                  ~ i
        ~ ~    l                 S    ~ ~
0 - ~
    - ~ ~       ~   ~
s   '%~4 l kt.S
  &5%~~%aaa ISWISRRRHLL mmeeasmmmm RRE555RRRLL WWWRHaLa ii)     aa) kal ggggggggggg~~~~
gggg@gg++QQ
gggg@gg++QQ
%555%WLLLL
  %555%WLLLL 4                    4
~4 k k 4 MWWMWWWW Pg I
~
S (%A DEPAiRTMFNT CONTROLLED DOCUMENT COPY NO.SHP 5050 NDE.QQ8 ATTACHMENT NO.1 ULTRASONIC TEST REPORT JOB ORDER NO.: REPORT DATE: gr 1 REQUEST NO.IDENTIFICATION Unit Component Item Material Other TECHNI UE Test Unit/S/N Frey./Diameter
MWWMWWWW k       k Pg
~ABC)Reference Standard Couplant/Batch No.L&p TEST DATA REMARKS W6/7~" 7c'PERFORMED BY: LEVEL:~&DATE:/REVIEMED BY: LEVEL: DATE: FORM NO.12 SHP 5050 NDE.008-1.
 
Page 1 of 1 Revision 0 Page No.770 10/19/94 SYSTEM DESCRIPT DRAWINGNO BUILDXNG NORMSTATE DESXRSTATE POWERREQD ALIASNO POWERTRAXN COMPSERVED MANUFACTUR MODEL PANEL ELEMDWG WIRXNGDWG PWRSOURCE QUALXF WALKDOWN PFDOPT SUPPSYSDWG REQSUPP EVAL TYPE NOTES FUNCT XON.E'VATION KTXON.Y P TYPE ISO DWGS DETAIL LOC FLOOR FLOW PATH REV REV LOCK LOCK DATE SHOW INDEX TAG S IGNATURES REV NOTES 2 21 2-QT-115-CD DIESEL LUBE OIL CD EMERGENCY DIESEL LUBE OXL SUMP TANK 2-5151C AUXILIARY NA CD LUBE OIL SUMP TANK 775GALS NOT APPL NOT APPL NOT APPL NUCLEAR SR F MIN Seismic Only EDG 579.00 CD EMER DSL LUBE OIL PIT N TANK XN THE WEST PART OF THE PXT, NEAR THE WEST WALL, 3 FEET ABOVE THE S 0 N//Y N Donald C.Cook Niiclear Plant, Unit 2 GIP Rev 2, Corrected, 2/14/92 SCREENING EyALUATION WORK SHEET (SEWS)Status: Yes Sheet1 of7 ID: 2-QT-115-CD Rev.0 Class: 21-Tanks and Heat Exchan ers Descn tion: CD EMERGENCY DIESEL LUBE OIL SUMP TANK Building: AUXILIARY Manufacturer, Model, Etc.: 775GALS BASIS: Horizontal TANK analysis Floor El.: 579.00 Room, Row/Col: CD EMER DSL LUBE OIL PIT-IN THE WEST PART OF THE PIT, NEAR THE WEST WALL, 3 FEET ABOVE THE FLOOR 1.The buckling capacity of the shell of a large, fiat-bottom, vertical tank is equal to or greater than the demand.2.The capacity of the anchor bolts and their embedments is equal to or greater than the demand.3.The capacity of connections between the anchor bolts and the tank shell is equal to or reater than the demand.4.Attached piping has adequate flexibility to accommodate the motion of a large, flat-bottom, vertical tank.5.A rin-t e foundation is not used to su ort a la e, flat-bottom, vertical tank.N/A Yes Yes N/A N/A IS E UIPMENT SEISMICALLY ADE UATE?Yes COMMENTS SRT: W.Djordjevic and TR Satyan Sharma.10/6/93.REF: 1.Anchor inspection Data Sheets: Anchorage Arrangement Sketches and Physical Characteristics Data Sheet, Certi".:ed 10/1/93.2.Worthington Dwg&#xb9;700003BY.3.Worthington Co.Lube Oil Sump Tank Calculation, 8/22/74.Anchorage:
I S (% A DEPAiRTMFNT                                     SHP 5050 NDE.QQ8 CONTROLLED DOCUMENT                                ATTACHMENT NO. 1 COPY NO.
The tank sits on 3 saddles, 2 plates per saddle, 1/4" thick.There are two 3/4" anchors per saddle.There are 4 anchors in total for the tank because the middle saddle has no anchorage on it.Horizontal Tank Analysis: Saddle Weak Axis Moment of Inertia=2I+2(ad"2)=2((36"x0.25in"3)/1 2)+2(1 8in"2 x (5"2)in"2")
ULTRASONIC TEST REPORT JOB ORDER NO.:           REPORT DATE:   gr 1     REQUEST NO.
=900in"4.Saddle stresses analyzed in Ref.3.Nozzle loads judged not significant by SRT.Evaluated by: Date: U go 0
IDENTIFICATION                     TECHNI UE Unit                                Test Unit/ S/N Component                          Frey./Diameter             ~ ABC)
Donald C.Cook Nuclear Plant, Uni~2 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 2 of 7 ID: 2-QT-115-CD Rev.0 Class: 21-Tanks and Heat Exchan ers Descri tion: CD EMERGENCY DIESEL LUBE OIL SUMP TANK Building: AUXILIARY Manufacturer, Model, Etc.: 775GALS  
Item                                Reference Standard Material                            Couplant/Batch No.L&p Other TEST DATA REMARKS W6
                                                  /7~"
7c' PERFORMED BY:                             LEVEL:~&         DATE: /
REVIEMED BY:                             LEVEL:           DATE:
FORM NO. 12 SHP 5050 NDE.008-1.               Page 1 of   1 Revision   0
 
Page No. 770 10/19/94 2
21 2-QT-115-CD SYSTEM        DIESEL LUBE OIL DESCRIPT      CD EMERGENCY DIESEL LUBE OXL   SUMP TANK DRAWINGNO      2-5151C BUILDXNG      AUXILIARY NORMSTATE DESXRSTATE POWERREQD ALIASNO POWERTRAXN    NA COMPSERVED    CD LUBE OIL SUMP TANK MANUFACTUR MODEL          775GALS PANEL ELEMDWG        NOT APPL WIRXNGDWG      NOT APPL PWRSOURCE      NOT APPL QUALXF        NUCLEAR SR WALKDOWN      F PFDOPT        MIN SUPPSYSDWG REQSUPP EVAL TYPE      Seismic Only NOTES FUNCT XON. EDG E'VATION        579.00 KTXON    CD EMER DSL LUBE OIL PIT
    . Y      N P TYPE    TANK ISO DWGS DETAIL LOC    XN THE WEST PART OF THE   PXT, NEAR THE WEST WALL, 3 FEET ABOVE THE FLOOR FLOW PATH      S REV                0 REV LOCK      N LOCK DATE SHOW    INDEX Y
                  / /
TAG            N S IGNATURES REV NOTES
 
Donald C. Cook Niiclear Plant, Unit 2                             GIP Rev 2, Corrected, 2/14/92 SCREENING EyALUATIONWORK SHEET (SEWS)                                     Status: Yes Sheet1 of7 ID: 2-QT-115-CD Rev. 0                             Class: 21 - Tanks and Heat Exchan ers Descn tion: CD EMERGENCY DIESEL LUBE OIL SUMP TANK Building: AUXILIARY                         Floor El.: 579.00                     Room, Row/Col: CD EMER DSL LUBE OIL PIT - IN THE WEST PART OF THE PIT, NEAR THE WEST WALL, 3 FEET ABOVE THE FLOOR Manufacturer, Model, Etc.: 775GALS BASIS: Horizontal TANK analysis
: 1. The buckling   capacity of the shell of a large, fiat-bottom, vertical tank is equal to or greater       N/A than the demand.
: 2. The capacity of the anchor bolts and their embedments is equal to or greater than the                     Yes demand.
: 3. The capacity of connections between the anchor bolts and the tank shell is equal to or                   Yes reater than the demand.
: 4. Attached piping has adequate flexibilityto accommodate the motion of a large, flat-bottom,               N/A vertical tank.
: 5. A rin -t e foundation is not used to su ort a la e, flat-bottom, vertical tank.                           N/A IS E UIPMENT SEISMICALLYADE UATE?                                                                           Yes COMMENTS SRT: W. Djordjevic and TR Satyan Sharma. 10/6/93.
REF: 1. Anchor inspection Data Sheets: Anchorage Arrangement Sketches and Physical Characteristics Data Sheet, Certi".:ed 10/1/93.
                      &#xb9;
: 2. Worthington Dwg 700003BY.
: 3. Worthington Co.Lube Oil Sump Tank Calculation, 8/22/74.
Anchorage:
The tank sits on 3 saddles, 2 plates per saddle, 1/4" thick. There are two 3/4" anchors per saddle. There are 4 anchors in total for the tank because the middle saddle has no anchorage on it.
Horizontal Tank Analysis:
Saddle Weak Axis Moment of Inertia = 2I + 2(ad "2) = 2((36"x0.25in"3)/1 2) + 2(1 8in"2 x (5"2)in"2") =     900in "4.
Saddle stresses analyzed in Ref. 3.
Nozzle loads judged not significant by SRT.
Evaluated by:                                                                           Date:
go U
 
0 Donald C. Cook Nuclear Plant, Uni~ 2                 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                      Status: Yes Sheet 2 of 7 ID: 2-QT-115-CD Rev. 0                   Class: 21 - Tanks and Heat Exchan ers Descri tion: CD EMERGENCY DIESEL LUBE OIL SUMP TANK Building: AUXILIARY               Floor El.: 579.00              Room, Row/Col: CD EMER DSL LUBE OIL PIT - IN THE WEST PART OF THE PIT, NEAR THE WEST WALL, 3 FEET ABOVE THE FLOOR Manufacturer, Model, Etc.: 775GALS


==Attachment:==
==Attachment:==
Pictures
==Attachment:==
TANK Analysis Results
Donald C. Cook Nuclear Plant, Unit 2                  GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)
Sheet 3 of 7 ID: 2-QT-115-CD Rev. 0                Class:  21 - Tanks and Heat Exchan ers Descri tion: CD EMERGENCY DIESEL LUBE OIL SUMP TANK Building: AUXILIARY                Floor El.: 579.00                Room, Row/Col: CD EMER DSL LUBE OIL PIT - IN THE WEST PART OF THE PIT, NEAR THE WEST WALL, 3 FEET ABOVE THE FLOOR Manufacturer, Model, Etc.: 775GALS PICTURES 2-QT-115-CD
Donald C. Cook Nuclear Plant, Unit 2                        GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                              Status: Yes Sheet 4 of 7 ID: 2-QT-115-CD Rev. 0                          Class: 21 - Tanks and Heat Exchan ers Descri tion: CD EMERGENCY DIESEL LUBE OIL SUMP TANK Building: AUXILIARY                        Floor El.: 579.00                Room, Row/Col: CD EMER DSL LUBE OIL PIT - IN THE WEST PART OF THE PIT, NEAR THE WEST WALL, 3 FEET ABOVE THE FLOOR Manufacturer, Model, Etc.: 775GALS TANK Analysis Results Step  1 Input Data a Assum tions
: 1. Tank is c lindrical, horizontall oriented and su orted on saddles.                                  Yes
: 2. Tank and saddles are made of carbon steel                                                          Yes
: 3. Saddles are uniforml s aced.                                                                        Yes
: 4. Saddles overhan is less than s acin /2                                                              Yes
: 5. Base plates have slotted anchor bolt holes for thermal growth except for the base plate            Yes under the fixed saddle.
: 6. Im osed nozzle loads are not si nificant                                                            Yes
: 7. The tank foundation is ade uate                                                                    Yes
: 8. Anchorbolts are cast in lace or ex ansion t e.                                                      Yes b Materials Wei ht of Tank+ Fluid                                                        6.83 ki s Wei ht Densit of Tank+ Fluid                                                60 Ibs/ft*3 Saddle Elastic Modulus                                                    29000.0 ksi Saddle Shear Modulus                                                        1150.0 ksi Base Plate Yield Stren th                                                    36.0 ksi Anchor T e                                                            3/4 in 90 de . J-Bolts c Dimensions Tank Diameter, D                                                                3.8 ft TankLen th, L                                                                  10.0 ft Tank Thickness, t                                                            0.19 in Hei ht of Tank+ Fluid C.G., H                                                  2.08 ft Number of Saddles Saddle S acin, S                                                              7.67 ft Saddle Hei ht, h                                                                2.0 in Saddle Shear cross-sectional area                                            18.0 in"2 Saddle Weak Axis Moment of Interia                                          900.0 in"4 Number of Bolt Locations / Saddle Number of Bolts / Boltin Location Extreme Bolt S acin,                                                          2.67  ft Bolt Eccentricit, e D'nchor 0.02  in Weld Thickness                                                                0.19  in Base Plate Thickness                                                          0.25  in
0 Donald C. Cook Nuclear Plant, Unit 2                              GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                    Status: Yes Sheet 5 of 7 ID: 2-QT-115-CD Rev. 0                                          -
Class: 21 Tanks      and Heat  Exchan ers Descri tion: CD EMERGENCY DIESEL LUBE OIL SUMP Ti NK Building: AUXILIARY                          Floor El.: 579.00                    Room, Row/Col: CD EMER DSL LUBE OIL Pl, - IN THE WEST PART OF THE PIT, NEAR THE WEST WALL, 3 FEET ABOVE THE FLOOR Manufacturer, Model, Etc.: 775GALS d Anchor Bolts T e = 90 De J-Bolt                                              Diameter= 3/4 in Manufacturer =                                                  Product Name =
Pullout                            Shear Nominal Ca acit                          15.03ki s                          7.51 ki s Concrete Com ression Stren th,        fc'= 4000.0  si Reduction Parameters Ca acit Reduction Factor Label                      Check                Condition                  Pullout        Shear
: 1. T    e of Anchora  e                        Yes                                              1.0            1.0
: 2. Installation Ade uac                        Yes      installation is ade uate                1.0            1.0
: 3. Embedment Length                            Yes      Embedment Length = 27.0                0.7            1.0 in
: 4. Ga at Threaded Anchors                      Yes      Ga size = 0.0 in                        1.0            1.0
: 5. S acin betweenAnchora es                    Yes                                              1.0            1.0
: 6. Edge Distance                              Yes      Edge Distance = 6.0 in                0.41          0.31 Another Edge Distance = 4 in
: 7. Concrete Stren th and Condition            Yes                                              1.0            1.0
: 8. Concrete Crack Location and Size            Yes      Crack Size = 0.0 in                    1.0            1.0
: 9. Essential Relays in Cabinets                Yes      Essential relays are not                1.0            1.0 resent
: 10. Base Stiffness and P in Action            Yes                                              1.0            1.0
: 11. Equipment Base Strength and                Yes      Base strength and load path            1.0            1.0 Structural Load Path                                  are O.K.
: 12. Embedment Steel and Pads                  Yes      Installation is O.K.                    1.0 Does the tank satisfy all the assumptions and is within the applicable range of parameters?                  Yes Vu'.344 Step 2 The allowable bolt loads Allowable Tension Load,                                                                  ki s Shear Load,  Pu'llowable 2.346 ki s Step  3  Determine base plate bending strength reduction factor 0.1726


Pictures
Donald C. Cook Nuclear Plant, Un<<2                        GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                            Status: Yes Sheet 6 of 7 ID: 2-QT-115-CD    Rev. 0                  Class:  21  - Tanks and Heat  Exchan ers Descri lion: CD EMERGENCY DIESEL LUBE        OIL  SUMP    TANK Building: AUXILIARY                  Floor El.: 579.00                  Room, Row/Col: CD EMER DSL OIL PIT - IN THE WEST 'UBE PART OF THE PIT, NEAR THE WEST WALL, 3 FEET ABOVE THE FLOOR Manufacturer, Model, Etc.: 775GALS Step  4- Determine  base plate weld strength reduction factor RW                                                                        0.0379 Step 5 Determine the anchorage tension and shear allowable loads Allowable Anchora e Tension Load, Pu                                    0."i64ki s Allowable Anchora e Shear Load, Vu                                      2.346 ki s Step 6 Calculate the ratios and values al ha Pu/Vu                                                                  0.07 Wb                                                                    1.71 ki s/bolt Vu/Wb                                                                        1.37 H    /0'                                                                  0.779
    /S                                                                    0.271 2.236 F2                                                                          1.779 Step 7 Determine the acceleration capacity of the tank anchorage lambda 1                                                                  0.614 G lambda u                                                                  0.568 G Anchor Acceleration ca acit, lambda                                      0.568 G Step  8- Determine  the maximum saddle spacing for transverse and vertical rigid frequency response Maximum Saddle S    acin, Sc                                              14.2 ft Step 9 Compute the resonant frequency of the tank in the longitudinal direction
 
0 Donald C. Cook Nuclear Plant, Unit 2                    GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                            Status: Yes Sheet 7 of 7 ID: 2-QT-115-CD Rev. 0                        Class: 21 - Tanks and Heat Exchan ers Descri tion: CD EMERGENCY DIESEL LUBE OIL SUMP TANK Building: AUXILIARY                    Floor El.: 579.00                Room, Row/Col: CD EMER DSL LUBE OIL PIT - IN THE WEST PART OF THE PIT, NEAR THE WEST WALL, 3 FEET ABOVE THE FLOOR Manufacturer Model, Etc.: 775GALS Saddle Stiffness, Ks                                                10339.067 ki s/in Resonant Fre uenc of Tank in Lon itudinal Direction                    121.66 Hz Step 10 Determine the seismic demand acceleration ZPA                                                                      0.25 G Tank is rigid in all three directions.
Tank anchorage is adequate because anchorage acceleration capacity is greater than ZPA Step 11  Check the saddle stresses The program does not check the saddle stresses Check the saddle stresses by an independent calculation
~Summa IS E UIPMENT SEISMICALLYADE UATE'?
The tank anchorage is adequate.
 
                                                                      *12  CHP 5021. CCD. 019 ATTACHMENT NO. 1 ANCHOR INSPECTION DATA SHEET
                                      ~<'    ~
: 6. CD                          I Unzt                          Bldg.                        Location l 2.- 5'2                    Iz                2. -QT-)  I
                                                                          - CC Installation        dwg.    /  Rev.          Equipment No.
Anchora e Arran ement Sketch I/O".
8 Qp,  UYe) bb P,~/X,ID a5-2" 7 DIM G RouT PC%
LZ.3241 12- 4, O'4              na
                      'b I'-Z"(~p 0/4Q 3 604$ ('7$ P)
I/j. R AbSHCR INOIANA MICHIGAN      POWE'ITE OKSIGN GONTPQLI.Q)O WOIIKINQ CQPY                  0 AUG  271995 LKRK  T Drawn by:                                                          D.te.
Verified by:                                                        Date:
ua    ./Cert. Inspector Reviewed by:                                                        Date:        8  -+~          +~
Constructs.on An hor Review Engineer Page      1          of  3 Revision                1
 
                                                            *~L2 CHP 0023.. CCD. ()] g ATTACHMENT NO        l ANCHOR INSPECTION DATA SHE Unit  g
                                  &x,gldg.
c.D                    PIT Locate.on l~-  9 Installation I
dwg. / Rev.
2.- a.y -
Equipment No.
( t g-CD Anchora  e Arran ement Sketch 0
6 CL I
CQ p
                                                                    -- -0 (o"                                      INOIANA MICHIGAN POWER SITE OESIGN CONTROLLEO WORKING COPY AUG 2't 3995 LERK  +
7'ate:
Drawn by:                                                  Date:        Q-t 0-gg Verified by:                                                Date:
ual.fCert. Inspector Reviewed by:                                                              't ~
Construction  A char Review Engineer Page  1  of  3 Revision    1
 
                                                                                                **12 CHP 5021.        CCD. 0 lg ATTACHMENT N(3.
Equipment No.:
    ~
                    ~
                          +    @T      I< 5    l  D                                              Dwg  No.:        I  2-3Z~t-1 Anchor type:      ~        BOL                                    ~  ~Bl                        Dwg  No.:      l  2-3qpZg Tightness established by: 0 "Snug                            Fit" 0 Torque Torque Vrrench No.:
Tightness verified? Cl Yes Cl No QA NPI      7 ons ru t,z.on Cal,      Due Date:
ll  ""*
Equipment base          flexible?          0 Yes 8 No                                          Date: ~      ~D      I~
onstruc          x  n ARE PHYSICAL CHARACTERISTICS Bolt ID                                                                                                            Comments Gaps Anchor len th                        2-8il                '2-I 8
I'                                                l2- Bolas Protruding                                                                                                          5 ~~ ~HOT len th Embedment                                                      l 2-3/Ib Bolt          fIb~iY<                              7((g+l'I~                                                  SC~
ri Concrete                      C,RhC I( IN  CR~
QA.OVT      Itl QROV T condition Edge          9~ht" distance            @Il<il Anchor                                  2.-  oI s    acin                                                                                                              <v(c.',AHhl0<
Anchor              0 an      larit Thread engagement M~SR~          GP-OUT      T~~~~<              ~
JS    Il                    P JOT'P DOING (SoKaTH H~C C)Sl C?1 &AC 9                          ADDING  I /  T M        ~IL  FR.OM,  OP  OF C ROOT. %                ACC.~ 55IGL6                    gl                                            4D I      "Y&nl 5 >3"          >I P 0            AC          WP(5l            R.CSPGC.TIV      Y.
Verified by:                                                                                                  Date:
Qual. /Cert.
                              ~          ~  nspector Reviewed by:            T I NOI ANA kt ICHIGAN POWER SITE DESIGN CONTROLLED            Date:        8'1                I ~
Construction AUG    27 tS8~
LERK    +                      Page    2    of    3 Revis ion        3
 
  '                                                    '    SHP 5050 NDE. 008 8 A DEPARTMENT                                  ATTACFNEVZ NO .
CONTROLLEO DOCUMENT COPY NO.      2 I LTRASONIC TEST REPORT JOB ORDER    NO.:    i  6      REPORT DATE-'    ~ Q      REQUEST NO.
IDENTIFICATION Unit      l ~<3                          Test Unit/ S/N Component      -    7- l  - t 4          Freer./Diameter        h Item                                      Reference Standard Material C. S,                        Couplant/Batch No.
Other TEST DATA REMARKS 1&(l~                              L w  l PERFORMED BY:
REVIEWED BY:                                    EZVEI    ~          DATE: ~ /7 FORM NO. 12 SHP 5050 NDE.008-1                        Page  1 of Revision  0
 
01/16/92 PG. N0.535 SAFE SHUTDOWN EOUIPHENI'IST (SSELWP)
FUNCTION:      CCM Equipment Class:    21        Train:    2 Cauiamcnt  IO:    1.HE.15E                                        Orawing Nurbert      \-5135A  1-5113 Svstcm:    CCM Cauip Oescription:        CAST CCM HEAT EXCHAHGER Building:      AUXILIARY            Room:    609 HALLMAY                                Elevation:    609 wnrmaI  state-                Oesired state:                  Po~er Required:    M          Sort:  M, Sunnorting System Drawing Number:
oeauired Interconnections and Supporting Components:
fety Related Status:        NUCLEAR SR                            Nin/Opt 4 HIN ADDITIONAL INFORMATION Al ias Number:                                                      Power  Train:    NA C~nent      Served:      EAST CCW HEAT EXCHANGER Hanufacturcr:      NL'M INOUSTRIES                                  Model t Pahei 4 Elem Orawing:      M/A                                              Miring Orawing:      N/A Po~er Source:    N/A uaILdown:      F                                                    Relay Only:    N Comoonent  Type:      HE ISO  Orawings:
Octallcd Location:
 
DC COOK Unit 1                                      GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                    Status: Yes Sheet 1 of 6 ID:  1-HE-15E  (Rev. 0)                                      -
Class: 21 Tanks and Heat Exchangers
 
== Description:==
EAST CCW HEAT EXCHANGER Building: AUXILIARY                        Floor El.: 609.00                    Room, Row/Col: HALLWAY, Manufacturer, Model, Etc.: MLW INDUSTRIES (HORIZONTAL)
BASIS: External analysis
: 1. The buckling capacity  of the shell of a large, flat-bottom, vertical tank is equal to or greater        N/A than the demand.
: 2. The capacity of the anchor bolts and their embedments is equal to or greater than the                    Yes demand.
: 3. The capacity of connections between the anchor bolts and the tank shell is equal to or                    Yes greater than the demand.
: 4. Attached piping has adequate flexibility to accommodate the motion of a large, flat-bottom,              Yes vertical tank.
: 5. A ring-type foundation is not used to support a large, flat-bottom, vertical tank.                        N/A IS E  UP EN SEIS        C L      0    U    E?                                                          ~Ye C~I~IVIEN S SRT: Gary Thomas, Tom Huang, and Kailash Mahajan on 11/2/93'.
Component Cooling Water Heat Exchanger on two reinforced saddles. Anchorage is two 7/8" diameter J bolts.
There are 4 1" wedge expansion anchors in one pedestal in the horizontal direction.
C.G. of exchanger from the top of the saddle pedestal about 3'.
Pedestal concrete in good condition, but can see the grout to concrete interface.
Hand calculation was performed for the heat exchanger and the results show that the anchor bolts are adequate and the saddles are safe.
Evaluated by:                                                                            Date:
L


==Attachment:==
==Attachment:==
Pictures


TANK Analysis Results Floor El.: 579.00 Room, Row/Col: CD EMER DSL LUBE OIL PIT-IN THE WEST PART OF THE PIT, NEAR THE WEST WALL, 3 FEET ABOVE THE FLOOR Donald C.Cook Nuclear Plant, Unit 2 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATION WORK SHEET (SEWS)Sheet 3 of 7 ID: 2-QT-115-CD Rev.0 Class: 21-Tanks and Heat Exchan ers Descri tion: CD EMERGENCY DIESEL LUBE OIL SUMP TANK Building: AUXILIARY Manufacturer, Model, Etc.: 775GALS PICTURES Floor El.: 579.00 Room, Row/Col: CD EMER DSL LUBE OIL PIT-IN THE WEST PART OF THE PIT, NEAR THE WEST WALL, 3 FEET ABOVE THE FLOOR 2-QT-115-CD Donald C.Cook Nuclear Plant, Unit 2 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 4 of 7 ID: 2-QT-115-CD Rev.0 Class: 21-Tanks and Heat Exchan ers Descri tion: CD EMERGENCY DIESEL LUBE OIL SUMP TANK Building: AUXILIARY Floor El.: 579.00 Room, Row/Col: CD EMER DSL LUBE OIL PIT-IN THE WEST PART OF THE PIT, NEAR THE WEST WALL, 3 FEET ABOVE THE FLOOR Manufacturer, Model, Etc.: 775GALS TANK Analysis Results Step 1-Input Data a Assum tions 1.Tank is c lindrical, horizontall oriented and su orted on saddles.2.Tank and saddles are made of carbon steel 3.Saddles are uniforml s aced.4.Saddles overhan is less than s acin/2 5.Base plates have slotted anchor bolt holes for thermal growth except for the base plate under the fixed saddle.6.Im osed nozzle loads are not si nificant 7.The tank foundation is ade uate Yes Yes Yes Yes Yes Yes Yes 8.Anchorbolts are cast in lace or ex ansion t e.b Materials Wei ht of Tank+Fluid Wei ht Densit of Tank+Fluid Saddle Elastic Modulus Saddle Shear Modulus Base Plate Yield Stren th Anchor T e 6.83 ki s 60 Ibs/ft*3 29000.0 ksi 1150.0 ksi 36.0 ksi 3/4 in 90 de.J-Bolts Yes c Dimensions Tank Diameter, D TankLen th, L Tank Thickness, t Hei ht of Tank+Fluid C.G., H Number of Saddles Saddle S acin, S Saddle Hei ht, h Saddle Shear cross-sectional area Saddle Weak Axis Moment of Interia Number of Bolt Locations/Saddle Number of Bolts/Boltin Location Extreme Bolt S acin, D'nchor Bolt Eccentricit, e Weld Thickness Base Plate Thickness 3.8 ft 10.0 ft 0.19 in 2.08 ft 7.67 ft 2.0 in 18.0 in"2 900.0 in"4 2.67 ft 0.02 in 0.19 in 0.25 in 0
==Attachment:==
Donald C.Cook Nuclear Plant, Unit 2 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 5 of 7 ID: 2-QT-115-CD Rev.0 Class: 21-Tanks and Heat Exchan ers Descri tion: CD EMERGENCY DIESEL LUBE OIL SUMP Ti NK Building: AUXILIARY Manufacturer, Model, Etc.: 775GALS d Anchor Bolts Floor El.: 579.00 Room, Row/Col: CD EMER DSL LUBE OIL Pl,-IN THE WEST PART OF THE PIT, NEAR THE WEST WALL, 3 FEET ABOVE THE FLOOR T e=90 De J-Bolt Manufacturer
ANCHORAGE ANALYSIS FOR THE TANK
=Diameter=3/4 in Product Name=Nominal Ca acit Pullout 15.03ki s Shear 7.51 ki s Concrete Com ression Stren th, fc'=4000.0 si Reduction Parameters Ca acit Reduction Factor Label 1.T e of Anchora e Check Yes Condition Pullout 1.0 Shear 1.0 2.Installation Ade uac 3.Embedment Length 4.Ga at Threaded Anchors 5.S acin betweenAnchora es Yes Embedment Length=27.0 in Yes Ga size=0.0 in Yes Yes installation is ade uate 1.0 0.7 1.0 1.0 1.0 1.0 1.0 1.0 6.Edge Distance Yes Edge Distance=6.0 in Another Edge Distance=4 in 0.41 0.31 7.Concrete Stren th and Condition 8.Concrete Crack Location and Size Yes Yes Crack Size=0.0 in 1.0 1.0 1.0 1.0 9.Essential Relays in Cabinets Yes Essential relays are not resent 1.0 1.0 10.Base Stiffness and P in Action 11.Equipment Base Strength and Structural Load Path 12.Embedment Steel and Pads Yes Yes Yes Installation is O.K.Base strength and load path are O.K.1.0 1.0 1.0 1.0 1.0 Does the tank satisfy all the assumptions and is within the applicable range of parameters?
Yes Step 2-The allowable bolt loads Allowable Tension Load, Pu'llowable Shear Load, Vu'.344 ki s 2.346 ki s Step 3-Determine base plate bending strength reduction factor 0.1726 Donald C.Cook Nuclear Plant, Un<<2 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 6 of 7 ID: 2-QT-115-CD Rev.0 Class: 21-Tanks and Heat Exchan ers Descri lion: CD EMERGENCY DIESEL LUBE OIL SUMP TANK Building: AUXILIARY Manufacturer, Model, Etc.: 775GALS Floor El.: 579.00 Room, Row/Col: CD EMER DSL'UBE OIL PIT-IN THE WEST PART OF THE PIT, NEAR THE WEST WALL, 3 FEET ABOVE THE FLOOR Step 4-Determine base plate weld strength reduction factor RW 0.0379 Step 5-Determine the anchorage tension and shear allowable loads Allowable Anchora e Tension Load, Pu Allowable Anchora e Shear Load, Vu 0."i64ki s 2.346 ki s Step 6-Calculate the ratios and values al ha Pu/Vu Wb Vu/Wb H/0'/S F2 0.07 1.71 ki s/bolt 1.37 0.779 0.271 2.236 1.779 Step 7-Determine the acceleration capacity of the tank anchorage lambda 1 lambda u Anchor Acceleration ca acit, lambda 0.614 G 0.568 G 0.568 G Step 8-Determine the maximum saddle spacing for transverse and vertical rigid frequency response Maximum Saddle S acin, Sc 14.2 ft Step 9-Compute the resonant frequency of the tank in the longitudinal direction 0
Donald C.Cook Nuclear Plant, Unit 2 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 7 of 7 ID: 2-QT-115-CD Rev.0 Class: 21-Tanks and Heat Exchan ers Descri tion: CD EMERGENCY DIESEL LUBE OIL SUMP TANK Building: AUXILIARY Manufacturer Model, Etc.: 775GALS Floor El.: 579.00 Room, Row/Col: CD EMER DSL LUBE OIL PIT-IN THE WEST PART OF THE PIT, NEAR THE WEST WALL, 3 FEET ABOVE THE FLOOR Saddle Stiffness, Ks Resonant Fre uenc of Tank in Lon itudinal Direction 10339.067 ki s/in 121.66 Hz Step 10-Determine the seismic demand acceleration ZPA 0.25 G Tank is rigid in all three directions.
Tank anchorage is adequate because anchorage acceleration capacity is greater than ZPA Step 11-Check the saddle stresses The program does not check the saddle stresses Check the saddle stresses by an independent calculation
~Summa IS E UIPMENT SEISMICALLY ADE UATE'?The tank anchorage is adequate.


*12 CHP 5021.CCD.019 ATTACHMENT NO.1 ANCHOR INSPECTION DATA SHEET Unzt l 2.-5'2~<'~6.CD Bldg.Iz I Location 2.-QT-)I-CC Installation dwg./Rev.Anchora e Arran ement Sketch Equipment No.I/O".Qp, UYe)bb'b P,~/X,ID a5-2" 7 DIM LZ.3241 12-8 G RouT PC%4, O'4 na I'-Z"(~p 0/4Q 3 604$('7$P)I/j.R AbSHCR INOIANA MICHIGAN POWE'ITE OKSIGN GONTPQLI.Q)O WOIIKINQ CQPY 0 AUG 271995 LKRK T D.te.Date: Drawn by: Verified by: ua./Cert.Inspector Reviewed by: Date: 8-+~+~Constructs.on An hor Review Engineer Page 1 of 3 Revision 1
DC COOK Unit 1                             GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                         Status: Yes Sheet 2 of 6 ID: 1-HE-15E (Rev. 0)                     Class: 21 - Tanks and Heat Exchangers


*~L2 CHP 0023..CCD.()]g ATTACHMENT NO l ANCHOR INSPECTION DATA SHE&x,g c.D PIT Locate.on 2.-a.y-(t g-C D Unit g l~-9 I ldg.Equipment No.Installation dwg./Rev.Anchora e Arran ement Sketch 0 6 CQ p CL I---0 (o" INOIANA MICHIGAN POWER SITE OESIGN CONTROLLEO WORKING COPY AUG 2't 3995 LERK+Drawn by: Verified by: Date: Date: Q-t 0-gg ual.fCert.
==
Inspector Reviewed by: 7'ate: Construction A char Review Engineer-27-'t~Page 1 of 3 Revision 1
Description:==
**12 CHP 5021.CCD.0 lg ATTACHMENT N(3.Dwg No.: I 2-3Z~t-1 Dwg No.: l 2-3qpZg PHYSICAL CHARACTERISTICS Equipment No.:+@T I<5lD~~~~Anchor type: BOL~Bl Tightness established by: 0"Snug Fit" 0 Torque Torque Vrrench No.: QA Cal, Due Date: Tightness verified?Cl Yes Cl No NPI 7': ll-""*ons ru t,z.on Equipment base flexible?0 Yes 8 No Date:~~D I~onstruc x n ARE Bolt ID Gaps Comments Anchor len th Protruding len th Embedment il 2-8'2-8 I I'l 2-3/Ib l2-Bolas 5~~~HOT Bolt ri Concrete condition Edge distance Anchor s acin Anchor an larit Thread engagement fIb~iY<9~ht"@Il<il 0 C,RhC I(IN QA.OVT CR~Itl QROV T 2.-oI 7((g+l'I~SC~<v(c.',AHhl0<
EAST CCW HEAT EXCHANGER Building: AUXILIARY                 Floor EI.: 609.00               Room, Row/Col: HALLWAY, Manufacturer, Model, Etc.: MLW INDUSTRIES (HORIZONTAL)
M~SR~GP-OUT T~~~~<~JS Il P JOT'P DOING (SoKaTH H~C C)Sl C?1&AC 9 ADDING I/T M~IL FR.OM, OP OF C ROOT.%ACC.~55IGL6 gl 4D I"Y&nl 5>3">I P 0 AC WP(5l R.CSPGC.TIV Y.Verif ied by:~~Qual./Cert.Reviewed by: T Construction nspector I NOI AN A kt ICHIGAN POWER SITE DESIGN CONTROLLED AUG 27 tS8~Date: Date: 8'1 I~LERK+Page 2 of 3 Revis ion 3
CTU ES kgb I
'8 A DEPARTMENT CONTROLLEO DOCUMENT COPY NO.2 I'SHP 5050 NDE.008 ATTACFNEVZ NO.LTRASONIC TEST REPORT JOB ORDER NO.: i 6 REPORT DATE-'~Q REQUEST NO.IDENTIFICATION Unit l~<3 Component-7-l-t 4 Item Material C.S, Other Test Unit/S/N Freer./Diameter h Reference Standard Couplant/Batch No.TEST DATA REMARKS 1&(l~L w l PERFORMED BY: REVIEWED BY: FORM NO.12 SHP 5050 NDE.008-1 EZVEI~DATE:~/7 Page 1 of Revision 0 01/16/92 PG.N0.535 SAFE SHUTDOWN EOUIPHENI'IST (SSELWP)FUNCTION: CCM Equipment Class: 21 Train: 2 Cauiamcnt IO: 1.HE.15E Orawing Nurbert\-5135A 1-5113 Svstcm: CCM Cauip Oescription:
ONE SADDLE WITH 4 HORIZONTAL BOLTS                          OTHER SADDLE SUPPORT
CAST CCM HEAT EXCHAHGER Building: AUXILIARY Room: 609 HALLMAY Elevation:
609 wnrmaI state-Oesired state: Po~er Required: MSort: M, Sunnorting System Drawing Number: oeauired Interconnections and Supporting Components:
fety Related Status: NUCLEAR SR Nin/Opt 4 HIN ADDITIONAL INFORMATION Al ias Number: Power Train: NA C~nent Served: EAST CCW HEAT EXCHANGER Hanufacturcr:
NL'M INOUSTRIES Model t Pahei 4 Elem Orawing: M/A Miring Orawing: N/A Po~er Source: N/A uaILdown: F Relay Only: N Comoonent Type: HE ISO Orawings: Octallcd Location:
DC COOK Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 1 of 6 ID: 1-HE-15E (Rev.0)Description:
EAST CCW HEAT EXCHANGER Class: 21-Tanks and Heat Exchangers Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: HALLWAY, Manufacturer, Model, Etc.: MLW INDUSTRIES (HORIZONTAL)
BASIS: External analysis 1.The buckling capacity of the shell of a large, flat-bottom, vertical tank is equal to or greater than the demand.2.The capacity of the anchor bolts and their embedments is equal to or greater than the demand.3.The capacity of connections between the anchor bolts and the tank shell is equal to or greater than the demand.4.Attached piping has adequate flexibility to accommodate the motion of a large, flat-bottom, vertical tank.5.A ring-type foundation is not used to support a large, flat-bottom, vertical tank.N/A Yes Yes Yes N/A IS E UP EN SEIS C L 0 U E?~Ye C~I~IVIEN S SRT: Gary Thomas, Tom Huang, and Kailash Mahajan on 11/2/93'.Component Cooling Water Heat Exchanger on two reinforced saddles.Anchorage is two 7/8" diameter J bolts.There are 4 1" wedge expansion anchors in one pedestal in the horizontal direction.
C.G.of exchanger from the top of the saddle pedestal about 3'.Pedestal concrete in good condition, but can see the grout to concrete interface.
Hand calculation was performed for the heat exchanger and the results show that the anchor bolts are adequate and the saddles are safe.Evaluated by: Date: L


==Attachment:==
CUENT              SHEEf        OF SUBJECT 0
8 Stevenson and Associates lU K
II    h Svurtvsal Macha Conaulnnp Cnpmawlnp nial f neo It gfl(
                ~~o I
2o- 0 3
(gy) x5 8
g 6~a&
                                                          <<Ig P(3g'0 P'I ..7ke t.                    /a.
 
CUENT                                                JOO No.                          SHEET        Ft          OF SUOJECT
                                                                                                                                                ~    Ah~rto>
Stevenson and Associates A Sicuniucni llsolsnnionl i-H tea 5l  ConculnnSI EnqsnsucsnFI Fsc su I
I i . i S. E.gojs, 'TbM. X<'fnlg] .. o.
I
(.QM ..~6OI';                    kx)  it:.:
I      '              I
~,                  . ~      c s      I  ~ '
I                                      IF p    ..-Qn      I
                                                                                                            ~      ~
i,*  ~,    s  s  C                                              i                                  51cuC40'f
                                                                                                                        ~.l    cn I
I                ~ '                                                                                >el ty                                .
Z-s~
      ~                                                                                  s r
w.o~ ~p.b'.=,                                  A>(.oo gg T.WS              ..SS.:=.~              , . 1.3.'gi
                                                                                      = ISI      s TS/'S          I
                                          ~ ~    s ~  ~
    ~.g>~~A.. l'i<</g.n~g~
                        ~    ~
                                  ~
l'~2.                              M xS~      y3                z    5'.
ly 4.)oscs
                                                                                                                                                                      ~O  Vn'. Ess'J I
                                                                                                                                                                  .I z zgh) ., ~(+ i.l~s)                                            c}-.
K7$    (f 7qOD'),                gQ          ~      .87ESC    +'7. O .O)          cital 2              ~$ ,27S)      +qboIS
                                                                                              .I,
                                                                                                                                                                ~
I J...          3
                                              ',.'c,l~                                                        nV ~                                                  I'
                                  ~
FE~      4                                            2 '6                  sun
: 4.                        ~      <<                    I  ~  ~
i              I Jl      2CIC?.l,              '.,    =           '8    8 VS      ii,7 c          D        .'.,6):                      WSITSI II
                                                                                                                                        .        ~        ']9, 8 O'CW I
                                ~ F    I s
I                                                ~  I I                s                          ~
I s
iI"7."2.>;"F"",Z, S/< 356 'I;
          ~
I~:                s I    ~
I            I i    I    ~
I      I I ~
                                                                      -s    ~
J                                              ~ 'I
                        )    I I        * ~
 
CLIENT                                            SHEET            OF
                                                                                              ~ f~ > " 'KO cr p g
Stevenson and Associates S
A,QIOg~io(
r.'TE A Srrncrvrnl hlcchcnrccl Consnlrlnp Enprnccrrnp Flrrn T'yY'
                                                            $      K$ .tv'4 40(.$ $
l0( gxd
    ~    E.-.4CQ        <4C >~4J(LE:k.            "'-
o5
                                      ~,q
( <<j 3xAo        f                      p
          ~
            ...'.,o-ro ~.yy-y.+      t
                                                                - lg lg =.+.oc                  ...:.3'.+6    .=.Io8
                            ~
5 X 3
37 3'    E. g g  ( l 5) 2-        'ZT I P TS
 
CLIENT                                                          sHEET ~      o Stcvcnson and Associates 0    A Srrucrurel hlechenreel Cnnsulrrng Engrneenng Frrnr I
o,g75g VP //ader'<                  =         i 7y344
                                                          =       2Zjyoo      glOE.
2 Jr zI ~ 2 75 )t',  gg y ~ g      .
( g 1I )          Z 3 Z. 6 5
                                                  .J
: f.                  nl      ~~H~              ~        Hg
                                                                      " 'tSZ.lS Z7    SoS  .+/
                                              .I Z~~
o8 (C <<)'~
E 6)
(I SS)'f,
                                                                          .SIPED 7.S)j'                Se 7 77-              (    rlr I  "g)I'-S  r'e o.y 3 Z..$
7 7Z Ts  '27SX    2f go c  ~ 1 Z        III ~ 3  Z(
                                                                ~z V'~    S.fT..
 
                                                                    **12 CHP 5021      ~  CCD. 019 ATTACHMENT NO. 1 ANCHOR INSPECTION DATA SHEET
                                                                                  @AU MA Unzt    g                    Bldg.                Location 1- H~ -isG Installation            dwg.  /  Rev.        Equipment No.
Anchora e Arran ement Sketch I- RE- 'I5F PcQRGWA,c                                PZDE5t&a 4                                                  a 0
0 T>~ a                        ~ 4
                                                " Z-'vcr                          cl "jg li"I Ihtlh MiCHIGAN POWER                      (vxP)
CO STRUC IO."I COI': ROLLEO
        ~'r'ORKI AG COPY f'UG1      (  ]quip 0'rawn by:                                                    Date:      /D Verified by:                                                        Date:
Q~  l-/Cert.      Xnspector Reviewed by:
structxon Anchor Review Engineer Date:    X/7          z.
Page 1    of          3 Revision            1
 
                                                        "*12 CHP 5021.CCD.019 ATTACHMENT NO.            1 ANCHOR INSPECTION DATA SHEET Un1t  0              Bldg.                      Location F-
                          /
Installation  dwg. Rev.            Equipment No.
Anchora e Arran ement Sketch
                                            <I I
3  II il
                                        )5
                                    -a
                                  ~
                                          /i~
                                - I'/g 'x                    INDIA%'i I8!CtOGAI'I POlVEI OiISTBlICTIO".I CO.'ITROLL
                                                                  'ViOlIKii'IGCOPY P,UG  l 7 19gr CL RK Drawn by:
Uerified by:
Qu  ./Cert. Inspector Reviewed by:                                            Date:
onstructxon Anchor Review Engineer Page 1      of    3 Revision        1
 
~ '
                                                        +*12  CHP 5021. CCD. 019 ATTACHMENT NO. 1 ANCHOR INSPECTION DATA SHEET Unxt      0              Bldg.                  Location
                                                -I L" Installation      dwg.  / Rev.        Equipment No.
Anchora e Arran ement Sketch ll 0-'9                                                    O-S1i o
4'Nr:4'<I                                          l,!CHIGA!<
                                                                            .!!r~ .0! nnP "i'0".K.'."<G CGPY P0'ON'rr;;C r~
C A
              ~
II 4
L Cicv. Ui-    Vo GK lQ    00 Y' rawn by:
Verified by:                                            Date:      4>- )2 Q  l./Cert. Inspector Reviewed by:                                            Date:
onstructzon Anchor Review Engineer Page 1      of    3 Revision          1
 
0
                                                      '+12  CHP      5021.CCD.019 ATTACHMENT NO.                1 ANCHOR INSPECTION DATA SHEET Unxt 4                  Bldg.                  Location Zl                              E- eE Installatz.on    dwg.  / Rev.        Equipment No.
Anchora e Arran ement Sketch
                                  -HE-i goal
                        ~F 4oLH      Imhusg V~e) or'                                            0 rr
                    + O 0 y~
Ei . Uicu ll'(~'lb''i/. V.i(::-'IGA'i PO'Q CQNGTR~.'"."IG:< C.l":.i: RG .LED AUG j. 7 8,"'>
CL'n~(
0o Q- Pt<
0-9 O~
0 V      +< D ELEv. 48.& UookiAe      0 H Drawn by:                                            Date:            to l Verified by:                                        Date:      P -~/u >
Q  al./Cert. Inspector Reviewed by:                                        Date:
onstructxon Anchor Review Engineer Page 1          of      3 Revision              1
 
                                                                  ~  ~
                ~    e ~ t            ~ )a
                                                        ) ~ ~
          ~  ~
ti''                  ~ ~
                                                    ~ -
                                                        ~
                                                        )
                                                          ~ ~
                                            ~  '1~4 gQ+Q~gig~~~~
kRWWWKHEL mmmmmHHLL RSRSmmRRSL IR555m55LLLS RSWRIRHRRLS RSW K%%5 .. RRWWWW
                          ~      HLLLL MWWREWW&W
  %%55WRIHR RSRRRSRRLL R%8%8%RRMMW&
MWWWWMWW                  sl  ~ !
                    ~      I~ C  Iu                              ~a
        >>Bl  kl>> ~
al z&                                                      ~ ~
its


Pictures
H
                                                                                                              ) ~  r
                                ~ ~ t                    '
                                                                      ~ ~      s      ~
                                                                                                ~ ~    ~        r I r
                                                                                                                  ~
iaL a ~ s.                                                                  ~ ~    ~
                                                                ~      ~      ~
          -  ~                              0~
                                            '(
                                                ~e~ ~      ..t ia..'. ~r 1
                                                                        ~            4
                              ~          r~      ~    ~                  ~ ~              ~-
t  0 555%5%%%%LL RSR55%mHHLS 55&#xc3;%8NNLLLL WISNRRRKLL RWWSWLLLL RIRSSRRLELE RRRWRWW RSWRWELLL RSWWQLEEL R%R%RSRWMMWW MW&WWW&&
    ~ ~  a.                        0 ~    l 1                      A            1    a a gh                            A.. s                        OJ      r            ~    IL    ~ ~
5  ~    ~                saaJ
>LkL    '      err
      /5I                                                      I                                          i Ji4 4A L                                                                                              ~
                                                              ~      ~
f


==Attachment:==
Equipment No.:
Tightness established by "Snug Pit" 7
Tightness verified by:    -c Qual. /Cert. Inspector Comments:


ANCHORAGE ANALYSIS FOR THE TANK DC COOK Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 2 of 6 ID: 1-HE-15E (Rev.0)Description:
12 SHP 5050 NCE.OOG
EAST CCW HEAT EXCHANGER Class: 21-Tanks and Heat Exchangers Building: AUXILIARY Floor EI.: 609.00 Room, Row/Col: HALLWAY, Manufacturer, Model, Etc.: MLW INDUSTRIES (HORIZONTAL)
    /w uEPARTPAENI                            ATTACHMENT NO. 1 CONTROLLED OOCUMEHT coPYI'-. I       ULTRASONIC TEST REPORT JOB ORDER  NO ~ : ~$    REPORT DATE: 2          REQUEST NO.
CTU ES kgb I ONE SADDLE WITH 4 HORIZONTAL BOLTS OTHER SADDLE SUPPORT CUENT SUBJECT SHEEf OF Stevenson and Associates II h Svurtvsal Macha nial Conaulnnp Cnpmawlnp f neo 0 8 lU K It gfl(~~o I 2o-0 3 (gy)x5 8 g 6~a&<<Ig P(3g'0 P'I..7ke t./a.
IDENTIFICATION Unit                              Test Unit/ S/N  ifj Component                          Freq./Diameter Item                              Reference Standard Material C.S                      Cocuplant/Batch No.
CUENT SUOJECT JOO No.SHEET Ft OF~Ah~rto>Stevenson and Associates 5l A Sicuniucni llsolsnnionl ConculnnSI EnqsnsucsnFI Fsc su i-H-tea I I i.i S.E.gojs,'TbM.X<'fnlg]..o.(.QM..~6OI';kx)it:.: I I'I c~,.~s I~'*~, s s C i, I I~'~I p..-Qn I i s IF~~~.l cn 51cuC40'f>el ty.Z-s~r w.o~~p.b'.=, A>(.oo gg s T.WS..SS.:=.~.=ISI TS/'S I ,.1.3.'gi~~s~~~.g>~~A..l'i<</g.n~g~
Other TEST DATA REMARKS ll~ V II              r/"
~~~l'~2.M xS~y3 z zgh)., z 5'.~(+i.l~s)ly I~Vn'.Ess'J 4.)oscs O.I c}-.~I iI"7."2.>;"F"",Z, S/<356'I;~I~: s I~K7$(f 7qOD'), gQ~.87ESC+'7.O.O)cital 2~$,27S)+qboIS~~I V~J...3~~FE~4 n 2'6 sun*I'4.~<<I~~i I',.'c,l Jl 2CIC?.l,'.,='8 8 VS-ii,7 c D.'.,6): WSITSI II.I,.~']9, 8 O'CW I~F I s I~I I s s i I I~~I I I I J)I-s~~'I I*~
II /I             A PERFORMED BY:                            LEVEL:~           DAT<:
CLIENT SHEET OF~f~>"'KO cr p g Stevenson and Associates S A Srrncrvrnl hlcchcnrccl Consnlrlnp Enprnccrrnp Flrrn A,QIOg~io(r.'TE T'yY'$K$.tv'4 40(.$$l0(gxd~E.-.4CQ<4C>~4J(LE:k.
REVIEWED BY:                                    ~-         DATE:
"'-o5'(<<j 3xAo f~,q p~...'.,o-ro
I'EVEL:
~.yy-y.+t-lg.lg=.+.oc...:.3'.+6
FORM NO. 12 SHP 5050 NDE.008-1              Page  1  of  1 Revision    0
.=.Io8 3 2-~5 X 37 3'E.g g (l 5)-'ZT I P TS CLIENT sHEET~oStcvcnson and Associates 0 A Srrucrurel hlechenreel Cnnsulrrng Engrneenng Frrnr I o,g75g VP//ader'<==2Zjyoo glOE.i 7y344 2 Jr zI~2 75)t', gg y~g.(g 1I)-Z 3 Z.6 5.J f.nl~~H~~Hg Z7 SoS.+/Z~~E 6)"'tSZ.lS 7.S)j'o8.SIPED.I (C<<)'~(I SS)'f, Se 7 77-(rlr I"g)I'-S r'e o.y 3 Z..$7 7Z Ts'27SX 2f go c~1 Z~z III~3 Z(V'~S.fT..-.


**12 CHP 5021~CCD.019 ATTACHMENT NO.1 ANCHOR INSPECTION DATA SHEET Unzt g Bldg.@AU MA Location 1-H~-isG Installation dwg./Rev.Anchora e Arran ement Sketch Equipment No.I-RE-'I5F PcQRGWA,c PZDE5t&a li"I CO 4 0 0 Ihtlh MiCHIGAN POWER STRUC IO."I COI': ROLLEO~'r'ORKI AG COPY f'UG1 (]quip T>~a"jg" Z-'vcr (vxP)a~4 cl 0'rawn by: Verified by: Reviewed by: Date:/D-7-Date: Q~l-/Cert.Xnspector Date: X/7 z.structxon Anchor Review Engineer Page 1 of 3 Revision 1
Equip ID: 1-QT-107-CD      . Train: 2  Equip Class:21 Drawing No.: 1-5151C
              ~ ~
nction:
        ~
EMERG  DIESBL System: DXESEL FUEL OXL
          ~
Equip Desc:      CD EMERG DIESEL FUEL OXL DAY TANK Building:    AUXILXARY    Room: CD EMERG DIESEL GENERATOR ROOM Elev: 587        Sort: S,        Notes:
Normal State:          Desired State:    Power Req'd: N Support System Drawing:
Req'd Support Comp:
Safety Related Status:      NUCLEAR SR        Min/Opt: MXN Alias    No:       Power Train: NA Comp  Served:     CD FUBL OXL DAY TANK MPR:
Model: 36"    D  x 108" L, 465 GAL.
El em. Drawing: N/A Wiring Drawing: N/A Power Source:     N/A Walkdown:    P      Relay Eval  : N Comp  Type:    TANK (CAPACITY - 2 HRS PULL LOAD OPERATION)
Xso Drawing:
Location:    XN THE NW REGXON OP THE ROOM, 10 FEET NW OP THE GEN END OP DGCD INSIDE THE FUEL OXL DAY TANK ENCLOSURE, AT THB 599 EL.


"*12 CHP 5021.CCD.019 ATTACHMENT NO.1 ANCHOR INSPECTION DATA SHEET Un1t 0 Bldg.F->Location Installation dwg./Rev.Anchora e Arran ement Sketch Equipment No.I<I 3 II il~)5-a/i~-I'/g'x INDIA%'i I8!CtOGAI'I POlVEI OiISTBlICTIO".I CO.'ITROLL
DC Cook Unit1                                       GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                    Status: Yes Sheet1 of6 ID: 1-QT-107-CD (Rev. 0)                           Class: 21 - Tanks and Heat Exchangers
'ViOlIKii'IG COPY P,UG l 7 19gr CL RK Drawn by: Uerified by: Reviewed by: Qu./Cert.Inspector Date: onstructxon Anchor Review Engineer Page 1 of 3 Revision 1
~'
+*12 CHP 5021.CCD.019 ATTACHMENT NO.1 ANCHOR INSPECTION DATA SHEET Unxt 0 Bldg.-I L" Location Installation dwg./Rev.Anchora e Arran ement Sketch Equipment No.0-'9 ll O-S1i o 4'Nr:4'<I l,!CHIGA!<
P0'ON'rr;;C
.!!r~.0!nnP"i'0".K.'."<G CGPY C A 4 r~~II L Cicv.Ui-Vo GK lQ 00 Y'rawn by: Verified by: Date: Q l./Cert.Inspector Reviewed by: Date: onstructzon Anchor Review Engineer 4>-)2 Page 1 of 3 Revision 1 0
'+12 CHP 5021.CCD.019 ATTACHMENT NO.1 ANCHOR INSPECTION DATA SHEET Unxt 4 Zl Bldg.Installatz.on dwg./Rev.Anchora e Arran ement Sketch-E-eE Equipment No.Location-HE-i~For'r+O r Ei.Uicu goal 4oLH Imhusg V~e)0 0~y ll'(~'lb''i/.
V.i(::-'IGA'i PO'Q CQNGTR~.'"."IG:<
C.l":.i: RG.LED AUG j.7 8,"'>0o CL'n~(Q-Pt<0-9 ELEv.48.&UookiAe 0 H O~0 V+<D Drawn by: Verified by: Reviewed by: Date: to-7-l Date: P-~/u>Q al./Cert.Inspector Date: onstructxon Anchor Review Engineer Page 1 of 3 Revision 1
~~~e~t~~ti''~)a)~~~~~~~~-)~'1~4 gQ+Q~gig~~~~
kRWWWKHEL mmmmmHHLL RSRSmmRRSL IR555m55LLLS RSWRIRHRRLS RSW~HLLLL K%%5..RRWWWW MWWREWW&W%%55WRIHR RSRRRSRRLL R%8%8%RRMMW&
MWWWWMWW sl~!~I~C Iu>>Bl kl>>~~a al z&its~~
H
)~r i aL a~s.~~t'~~s~~~~~~~~~~I r~r~->LkL'err-~0~e~~..t ia..'.~r'(~~1 4~r~~t~~~0 555%5%%%%LL RSR55%mHHLS 55&#xc3;%8NNLLLL WISNRRRKLL RWWSWLLLL RIRSSRRLELE RRRWRWW RSWRWELLL RSWWQLEEL R%R%RSRWMMWW MW&WWW&&~~a.0~l 1 A 1 a a~~gh A..s OJ r~IL 5~~saaJ I/5 Ji4 4A L I~~f~i Equipment No.: Tightness established by"Snug Pit" 7 Tightness verified by:-c Qual./Cert.Inspector Comments:
/w uEPARTPAENI CONTROLLED OOCUMEHT coPYI'-.9 I 12 SHP 5050 NCE.OOG ATTACHMENT NO.1 ULTRASONIC TEST REPORT JOB ORDER NO~:~$REPORT DATE: 2 REQUEST NO.IDENTIFICATION Unit Component Item Material C.S Other Test Unit/S/N ifj Freq./Diameter Reference Standard Cocuplant/Batch No.TEST DATA REMARKS ll~V II r/" II/I A PERFORMED BY: REVIEWED BY: FORM NO.12 SHP 5050 NDE.008-1 LEVEL:~DAT<: I'EVEL:~-DATE: Page 1 of 1 Revision 0 Equip ID: 1-QT-107-CD
.Train: 2 Equip Class:21 Drawing No.: 1-5151C~~~~nction: EMERG DIESBL System: DXESEL FUEL OXL Equip Desc: CD EMERG DIESEL FUEL OXL DAY TANK Building: AUXILXARY Room: CD EMERG DIESEL GENERATOR ROOM Elev: 587 Sort: S, Notes: Normal State: Desired State: Power Req'd: N Support System Drawing: Req'd Support Comp: Safety Related Status: NUCLEAR SR Min/Opt: MXN Alias No: Power Train: NA Comp Served: CD FUBL OXL DAY TANK MPR: Model: 36" D x 108" L, 465 GAL.": El em.Drawing: N/A Wiring Drawing: N/A Power Source: N/A Walkdown: P Relay Eval: N Comp Type: TANK (CAPACITY-2 HRS PULL LOAD OPERATION)
Xso Drawing: Location: XN THE NW REGXON OP THE ROOM, 10 FEET NW OP THE GEN END OP DGCD INSIDE THE FUEL OXL DAY TANK ENCLOSURE, AT THB 599 EL.
DC Cook Unit1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet1 of6 ID: 1-QT-107-CD (Rev.0)Class: 21-Tanks and Heat Exchangers


==
==
Description:==
Description:==
CD EMERG DIESEL FUEL OIL DAY TANK Building: AUXILIARY                        Floor El.: 587.00                    Room, Row/Col: CD EDG RM, Manufacturer, Model, Etc.: 36 D x108 L,465 GAL.
BASIS: Horizontal TANK analysis
: 1. The buckling capacity  of the shell of a large, fiat-bottom, vertical tank is equal to or greater        N/A than the demand.
: 2. The capacity of the anchor bolts and their embedments is equal to or greater than the                    Yes demand.
: 3. The capacity of connections between the anchor bolts and the tank shell is equal to or                    Yes greater than the demand.
: 4. Attached piping has adequate flexibilityto accommodate the motion of a large, fiat-bottom,                Yes vertical tank.
: 5. A ring-type foundation is not used to support a targe, flat-bottom, vertical tank.                        N/A D        T 7 SRT: George G. Thomas (SB A) and Tom Huang (AEP)            10/7/93.
REF: 1. Anchor Inspection Data Sheets: Anchorage Arrangement Sketches and Physical Characteristics Data Sheet, Certified 4/5/93.
: 2. Worthington Dwg it/ 700006BU
: 3. Worthington Co. Fuel Oil Day Tank Calculation, 8/1 //74.
Anchorage: 1-QT-107-CD is a horizontal tank which sits on 2 saddles. Each saddle has 2, 1/4" thick plates, forming a "U", with no gussets. There are 2 - 5/8" anchors per saddle.
Cracks in the leveling grout on the concrete pad were identified. The SRT judged this acceptable since the structural concrete pads are intact.
Horizontal Tank Analysis:
Saddle Weak Axis Moment of Inertia = 2I + 2(ad*2) = 2((30"x0.25in"3)/1 2) + 2(15in"2 x (4"2)in"2") = 480in"4.
Results of Horizontal Tank Analysis show tank anchorage is adequate (conservatively using expansion bolts for the 5/8" diameter Nelson Stud anchors), and Ref. 3 calculation contains saddle stresses check.
Interactions: Block wall has been confirmed by AESPC to have been evaluated in the IE 80-11 program.
Evaluated by:                                                                            Date:
I l /Z ~! eW


CD EMERG DIESEL FUEL OIL DAY TANK Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: CD EDG RM, Manufacturer, Model, Etc.: 36 D x108 L,465 GAL.BASIS: Horizontal TANK analysis 1.The buckling capacity of the shell of a large, fiat-bottom, vertical tank is equal to or greater than the demand.2.The capacity of the anchor bolts and their embedments is equal to or greater than the demand.3.The capacity of connections between the anchor bolts and the tank shell is equal to or greater than the demand.4.Attached piping has adequate flexibility to accommodate the motion of a large, fiat-bottom, vertical tank.5.A ring-type foundation is not used to support a targe, flat-bottom, vertical tank.N/A Yes Yes Yes N/A D T 7 SRT: George G.Thomas (SB A)and Tom Huang (AEP)-10/7/93.REF: 1.Anchor Inspection Data Sheets: Anchorage Arrangement Sketches and Physical Characteristics Data Sheet, Certified 4/5/93.2.Worthington Dwg it/700006BU 3.Worthington Co.Fuel Oil Day Tank Calculation, 8/1//74.Anchorage:
DC Cook Unit 1                             GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                          Status: Yes Sheet 2 of 6 ID: 1-QT-107-CD (Rev. 0)                   Class: 21 - Tanks and Heat Exchangers
1-QT-107-CD is a horizontal tank which sits on 2 saddles.Each saddle has 2, 1/4" thick plates, forming a"U", with no gussets.There are 2-5/8" anchors per saddle.Cracks in the leveling grout on the concrete pad were identified.
The SRT judged this acceptable since the structural concrete pads are intact.Horizontal Tank Analysis: Saddle Weak Axis Moment of Inertia=2I+2(ad*2)=2((30"x0.25in"3)/1 2)+2(15in"2 x (4"2)in"2")
=480in"4.Results of Horizontal Tank Analysis show tank anchorage is adequate (conservatively using expansion bolts for the 5/8" diameter Nelson Stud anchors), and Ref.3 calculation contains saddle stresses check.Interactions:
Block wall has been confirmed by AESPC to have been evaluated in the IE 80-11 program.Evaluated by: Date: I l/Z~!eW DC Cook Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 2 of 6 ID: 1-QT-107-CD (Rev.0)Class: 21-Tanks and Heat Exchangers


==
==
Description:==
Description:==
 
CD EMERG DIESEL FUEL OIL DAY TANK Building: AUXILIARY                   Floor El.: 587.00               Room, Row/Col: CD EDG RM, Manufacturer, Model, Etc.: 36 D x 108 L,465 GAL.
CD EMERG DIESEL FUEL OIL DAY TANK Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: CD EDG RM, Manufacturer, Model, Etc.: 36 D x 108 L,465 GAL.


==Attachment:==
==Attachment:==
TANK Analysis Results


TANK Analysis Results DC Coo4;Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 3of6 ID: 1-QT-107-CD (Rev.0)Class: 21-Tanks and Heat Exchangers
DC Coo4; Unit 1                             GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                Status: Yes Sheet 3of6 ID: 1-QT-107-CD (Rev. 0)                           Class: 21 - Tanks and Heat Exchangers


==
==
Description:==
Description:==
CD EMERG DIESEL FUEL OIL DAY TANK Building: AUXILIARY                          Floor El.: 587.00                Room, Row/Col: CD EDG RM, Manufacturer, Model, Etc.: 36 Dx108 L,465GAL.
TANK Analysis Results Step  1 Input Data a) Assumptions
: 1. Tank is cylindrical, horizontally oriented and supported on saddles.                                  Yes
: 2. Tank and saddles are made of carbon steel                                                              Yes
: 3. Saddles are uniformly spaced.                                                                          Yes
: 4. Saddles overhang is less than spacing /2.                                                              Yes
: 5. Base plates have slotted anchor bolt holes for thermal growth except for the base plate under          Yes the fixed saddle.
: 6. Imposed nozzle loads are not significant.                                                              Yes
: 7. The tank foundation is adequate.                                                                      Yes
: 8. Anchor bolts are cast in place or expansion type.                                                      Yes b) Materials Weight of Tank + Fluid                                                          4.5 kips Weight Density of Tank+ Fluid                                                70.7 Ibs/ft"3 Saddle Elastic Modulus                                                        29000.0 ksi Saddle Shear Modulus                                                          1150.0 ksi Base Plate Yield Strength                                                      36.0 ksi Anchor Type                                                            5/8 in Expansion Bolts c) Dimensions Tank Diamete; D                                                                  3.03 ft Tank Length, L                                                                    9.0 ft Tank Thickness, t                                                                0.19 in Height of Tank+ Fluid C.G., Hcg                                                  1.71 ft Number of Saddles Saddle Spacing, S                                                                6.0 ft Saddle Height, h                                                                2.38 in Saddle Shear cross-sectional area                                              15.0 in"2 Saddle Weak Axis Moment of Interia                                            480.0 in"4 Number of Bolt Locations / Saddle Number of Bolts / Bolting Location Extreme Bolt Spacing,                                                            2.1? ft Bolt Eccentricity, e D'nchor 6.0 in Weld Thickness                                                                  0.19 in Base Plate Thickness                                                            0.19 in


CD EMERG DIESEL FUEL OIL DAY TANK Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: CD EDG RM, Manufacturer, Model, Etc.: 36 Dx108 L,465GAL.TANK Analysis Results Step 1-Input Data a)Assumptions 1.Tank is cylindrical, horizontally oriented and supported on saddles.2.Tank and saddles are made of carbon steel 3.Saddles are uniformly spaced.4.Saddles overhang is less than spacing/2.5.Base plates have slotted anchor bolt holes for thermal growth except for the base plate under the fixed saddle.6.Imposed nozzle loads are not significant.
DC Cook Unit1                                 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                                        Status: Yes Sheet 4 of 6 ID: 1-QT-107-CD (Rev. 0)                                 Class: 21 - Tanks and Heat Exchangers
7.The tank foundation is adequate.8.Anchor bolts are cast in place or expansion type.b)Materials Yes Yes Yes Yes Yes Yes Yes Yes Weight of Tank+Fluid Weight Density of Tank+Fluid Saddle Elastic Modulus Saddle Shear Modulus Base Plate Yield Strength Anchor Type c)Dimensions Tank Diamete;D Tank Length, L Tank Thickness, t Height of Tank+Fluid C.G., Hcg Number of Saddles Saddle Spacing, S Saddle Height, h Saddle Shear cross-sectional area Saddle Weak Axis Moment of Interia Number of Bolt Locations/Saddle Number of Bolts/Bolting Location Extreme Bolt Spacing, D'nchor Bolt Eccentricity, e Weld Thickness Base Plate Thickness 4.5 kips 70.7 Ibs/ft" 3 29000.0 ksi 1150.0 ksi 36.0 ksi 5/8 in Expansion Bolts 3.03 ft 9.0 ft 0.19 in 1.71 ft 6.0 ft 2.38 in 15.0 in"2 480.0 in"4 2.1?ft 6.0 in 0.19 in 0.19 in DC Cook Unit1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 4 of 6 ID: 1-QT-107-CD (Rev.0)Class: 21-Tanks and Heat Exchangers


==
==
Description:==
Description:==
CD EMERG DIESEL FUEL OIL DAY TANK Building: AUXILIARY                              Floor El.: 587.00                  Room, Row/Col: CD EDG RM, Manufacturer, Model, Etc.: 36 D x108 L,465 GAL.
d) Anchor Bolts Type = Expansion Anchor                                            Diameter = 5/8 in Manufacturer = Phillips                    Stud (S)                Product Name =
Pullout                            Shear Nominal Capacity                            3.17 kips                        3.79 kips Concrete Compression Strength, fc'            3500.0 psi Reduction Parameters Capacity Reduction Factor Label                          Check                Condition                Pullout        Shear
: 1. Type of Anchorage                                Yes                                            1.0            1.0
: 2. Installation Adequacy                            Yes    Installation is adequate              1.0            1.0
: 3. Embedment Length                                Yes    Embedment Length = 2.38                1.0            1.0 in
: 4. Gap at Threaded Anchors                          Yes    Gap size = 0.0 in                      1.0            1.0
: 5. Spacing between Anchorages                      Yes                                            1.0            1.0
: 6. Edge Distance                                    Yes    Edge Distance = 6.25 in                1.0            1.0
: 7. Concrete Strength and Condition                  Yes                                          0.88            1.0
: 8. Concrete Crack Location and Size                Yes    Crack Size = 0.0 in                    1.0            1.0
: 9. Essential Relays in Cabinets                    Yes    Essential relays are not              1.0            1.0 present
: 10. Base Stiffness and Prying Action                Yes                                            1.0            1.0
: 11. Equipment Base Strength and                    Yes    Base strength and load path            '<.0          1.0 Structural Load Path                                      are O.K.
: 12. Embedment Steel and Pads                        Yes    Installation is O.K.                  1.0            1.0 Does the tank satisfy all the assumptions and is within the applicable range of parameters?
Vu'.774 Step 2 The allowable bolt loads Allowable Tension Load,                                                                      kips Shear Load,  Pu'llowable 3.79 kips Step  3 Determine base plate bending strength reduction factor RB                                                                                      0.1562


CD EMERG DIESEL FUEL OIL DAY TANK Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: CD EDG RM, Manufacturer, Model, Etc.: 36 D x108 L,465 GAL.d)Anchor Bolts Type=Expansion Anchor Manufacturer
DC Cook Unit 1                              GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS}                          Status: Yes Sheet5of6 ID: 1-QT-107-CD (Rev. 0)                        Class: 21 - Tanks and Heat Exchangers
=Phillips Stud (S)Diameter=5/8 in Product Name=Nominal Capacity Pullout 3.17 kips Shear 3.79 kips Concrete Compression Strength, fc'3500.0 psi Reduction Parameters Capacity Reduction Factor Label 1.Type of Anchorage Check Yes Condition Pullout 1.0 Shear 1.0 2.Installation Adequacy 3.Embedment Length 4.Gap at Threaded Anchors 5.Spacing between Anchorages 6.Edge Distance 7.Concrete Strength and Condition 8.Concrete Crack Location and Size Yes Installation is adequate Yes Embedment Length=2.38 in Yes Gap size=0.0 in Yes Yes Edge Distance=6.25 in Yes Yes Crack Size=0.0 in 1.0 1.0 1.0 1.0 1.0 0.88 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 9.Essential Relays in Cabinets 10.Base Stiffness and Prying Action 11.Equipment Base Strength and Structural Load Path Yes Yes Yes Essential relays are not present Base strength and load path are O.K.1.0 1.0'<.0 1.0 1.0 1.0 12.Embedment Steel and Pads Yes Installation is O.K.1.0 1.0 Does the tank satisfy all the assumptions and is within the applicable range of parameters?
 
Step 2-The allowable bolt loads Allowable Tension Load, Pu'llowable Shear Load, Vu'.774 kips 3.79 kips Step 3-Determine base plate bending strength reduction factor RB 0.1562 DC Cook Unit 1 SCREENING EVALUATION WORK SHEET (SEWS}GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet5of6 ID: 1-QT-107-CD (Rev.0)Class: 21-Tanks and Heat Exchangers
== Description:==
CD EMERG DIESEL FUEL OIL DAY TANK Building: AUXILIARY                       Floor El.: 587.00               Room, Row/Col: CD EDG RM, Manufacturer, Model, Etc.: 36 D x 108 L, 465 GAL.
Step 4 Determine base plate weld strength reduction factor RW                                                                            17.7858 Step 5 Determine the anchorage tension and shear allowable loads Allowable Anchorage Tension Load, Pu                                        0.433 kips Allowable Anchorage Shear Load, Vu                                          3.79 kips Step 6 Calculate the ratios and values alpha (Pu/Vu}                                                                  0.11 1.13 kips/bolt Vu /Wb                                                                          3.37 Hcg /                                                                          0.788 D'cg/S 0.285 2.236 F2                                                                            1.804 Step  7- Determine      the acceleration capacity of the tank anchorage lambda 1                                                                     1.507 lambda u                                                                            G G'.715 Anchor Acceleration capacity, lambda                                        0.715 G Step 8      - Determine the maximum saddle spacing for transverse    and vertical rigid frequency response Maximum Saddle Spacing, Sc                                                    13.42 ft Step 9 Compute the resonant frequency of the tank in the longitudinal direction Saddle Stiffness, Ks                                                    7230.98 kips/in Resonant Frequency of Tank in Longitudinal Direction                        125.34 Hz
 
DC Cook Unit 1                           GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS)                            Status: Yes Sheet 6 of6 ID: 1-QT-107-CD (Rev. 0)                       Class: 21 - Tanks and Heat Exchangers


==
==
Description:==
Description:==
CD EMERG DIESEL FUEL OIL DAY TANK Building: AUXILIARY                    Floor El.: 587.00                Room, Row/Col: CD EDG RM, Manufacturer, Model, Etc.: 36 D x 108 L, 465 GAL.
4 Step 10 Determine the seismic demand acceleration ZPA                                                                        0.25 G Tank is rigid in all three directions.
Tank anchorage is adequate because anchorage acceleration capacity is greater than ZPA Step 11  Check the saddle stresses The program does not check the saddle stresses Check the saddle stresses by an independent calculation 5mamaw IC The tank anchorage is adequate.
Coo Component No. i  QT- l 0"( -( i)      Claaa IIEIUll Any  pazticularprea the Seismic Review Teaa should pay axtra attention to1 Yes          No ~    (Xf yea, check items that apply.)
Anchor Type Anchor Diameter Anchor Spacing Anchor Number Anchor Embedment Anchor Edge Distance Anchor Gap Anchor Thread Engagement Anchor Grip Anchor Angularity Concrete Crack Others (describe bri.efly)
If there  ia concern  for  Design Basis Discrepancy,  circle the applicable item and explain.
: l.      Hardvaro Maintenance Type Discrepancy
: 2.      .rawing Update Type Discrepancy
: 3.      Significant Operability/Design Basis Discrepancy
: 4.      Others Condition:
            'oo!6 Actions Taken:
Jog~
peaparad  By T'~~co        Dace 4'+ ~ ~
                                                      "*12 CHP 5021.'CCD. 019 ATTACHMENT NO.          1 TVE. Moli>tH 5F'~. QP "C D" D~~ .CCi-'P IMSLQE IHE. TUEL OlL W.Y fh'tW-Bldg.                Locatxon IZ..>> 890 Insta    at  on dwg.    / Rev.        Equipment No.
Anchora e Arran ement Sketch j'j4 5~a Ql Q/I EEEV. 4K&. MQR'TH                      APR  D 5 19S LEIIK~Q FACE'~ W C,Rg8 (TVF Drawn by:            d. RQ~IL                        Date:
Verified by:                                          Date:
Qua    ./Cert. Inspector Reviewed by:      T        o.~l~                    Date:
Construction      chor Review Engineer Page 1    of  3 Revision      1
0
                                                                                        ~      g
                                                                                      ~
f y  ~ i            +Jl  ~  > e  e      ~
                                                                                ~  ~    ~
                  'i
                      ~  ~  t                          ~    ~  ~
                                                                            ~ -  li e      'l~l I.
                              ~      -  s.~  r t                      L.S e ~            R%K~SWKiRWWWW                                                                    .
1          0          0        0 RRRSRSRS
        ~  ~
WWHHHHQL 88558LL55 e ~
  ~    ~
WII~WHL HHI%55%L 5
8 RESRE5555RWW&&
55RRRRHRilN                                                                        I 5%5%i%
6%5%5%RSMMRaIR
                                                -                    %SIN MWWMWWWW h  0 J              l    l'          a1
      ~  ~                                                                                  ~ ~
SHP  5050 NDE-008 ATTACHMENT NO. 1 UI.TRASONIC TEST REPORT JOB ORDER  NO.:          REPORT DATE:    g7 5      REQUEST NO.      A IDENTIFICATION Unit                                Test Unit/ S/N Component                          Freq./Diameter    ~
Item                                Reference Standard Material                            Couplant/Batch No.
Other TEST DATA REMARKS
                                                ~ 7D
                                                . 7$ "
PERFORMED BY:                            LEVEL:  W          DATE: /
REVIEWED BY:                              I EVEE'            DATE:
FORM NO. 12 SHP 5050 NDE.008-1                Page  1 of  1 Revision    0
ATTACHMENT6 TO AEP:NRC:1040E SAMPLE LARS CALCULATIONS 001, 005, 010, 011, 022, 023, 027 AND 030 RAI ITEM 8
This attachment contains thc following:
: 1. A 16 page document    containing thc proccdurcs, input data, and rcfcrcnccs used in the Limited Analytical Reviews.
: 2. The rcqucsted Limited Analytical Rcvicws: LAR IIs 001,005,010,011,022,023,027    and 030.
: 3. Thc calculation used to resolve the outlicr gcncratcd by LAR 022.
: 4. The proccdurc used to address the outlier gcneratcd by LAR 005.
  'I k
PROCEDURES, INPUT DATA, AND REFERENCES USED IN THI: I,IMnZDANAI,VSIS azmm S
: 3. LIMITEDANALYTICALREVIEWS 3.1  Problem Statement This Limited Analytical Review (LAR), performed within the scope of Unresolved Safety issue (USI) A46, evaluates the structural integrity of cable tray and conduit supports which have been chosen as representative, worst case examples of the major different types of raceway support configurations within D.C.Cook Nuclear Power Plants 1 and 2. Twenty nine sample supports have been chosen from the plant raceway support systems for evaluation.
3.2 Summary      of Results The critical interaction value and related comments for each of the raceway support evaluations in this LAR are summarized in Table 3.1 below. Refer to the Attachments to this section for details of each of the evaluations.
D. C. Cook  A46 Cable Tray and Conduit Raceway Review October 1995 page    3-1
Table 3.1 Critical Interaction Values Interaction Value LAR No.              Members/Connections                      Anchorage                          Maximum 001                    0.18          DL                  0.68                    3DL      0.68        3DL
                                ~ ee 002 003                    0.50          OL                  0.48                      DL      0.50          DL 004                    0.29          DL                  (LOW)              ...
                                                                        ~,'e<'ew ''e<
OL      0.29          DL K":005."j!:.:::::-'i~                  <@FOP'<g~ e~~c'~p; 'e""w,'5'~<                gxQD<p,%:e ItgQLKI 006                    0.50          DL                  0.76                    3DL      0.76        30L 007                    0.81          DL                  0.56                    3DL      0.81          DL 008                    0.94          DL                  0.33                      DL      0.94          DL 009                    0.85          LL                                            LL      0.85          LL 010                    1.05          DL                  0.43                      DL      1.05          OL 011                    0.28          LL                  1.02                    LL      1.02          LL 012                    0.15          DL                  0.45                      DL      0.45          DL 013                    0.72          OI                  0.58                      LL      0.72          DL 014                    0.38          DL                  0.93                    30L      0.93        30L 015                    0.84          DL                  0.32                      LL      0.84          OL 016                    0.79          LL                  0.40                      LL      0.79          LL 017                    0.70          DL                  0.31                    30L      0.70          DL 018                    0.72          DL                    1.04                    3DL      1.04        30L 019                    0.33                                                        DL      0.33          DL 020                    0.18          DL                  0.67                      DL      0.67          DL 021                    low          DL                  0.22                    DL      0.22          DL O'D,L"':k 023                    0.77          DL                  0.90                    DL      0.90          DL 024                    0.25          DL                  0.10                    OL      0.25          OL 025                    0.55          LL                  0;23                    LL      0.55          LL
                                *1 ~
026 027                    0.75          DL                  0.96                    30L      0.96        30L 028                    0.14          DL                  low                              0.14          DL
                                ~ e*
029 030                    low          DL                    low                    DL      low          DL 031                    0.12          DL                  0.20                    DL      0.19          DL 032                    0.68          DL                  0.24                    DL      0.68          DL DL                Dead Load 30L              3x Dead Load (Vertical Load Check)
LL                Lateral Load Check RF                Rod Fatigue Check
~f'i~/'::'::      Qellier
  ***              Not used.
D. C. Cook A-46 Cable Tray and Conduit Raceway Review October 1995 Page      3-2
i    i    m f          a      Tr                        v I i Logic diagrams indicating the evaluation path taken to demonstrate the acceptance of each of the raceway supports are shown below. Note that the particular evaluation path taken for the support in question is defined in heavy outline.
LAR Nos. 003, 004, 008, 010, 012, 019, 020, 021, 023, 024, 030, 031, 032 START 8.3.1 Does the Support Have Vertical Dead Load Capacity With Eccentricities      ~  t.0 x OL?
Yes 8.3.1 Yes        Directly mounted to or rigidly cantilevered from an adjacent structural wall or ceiling?
                            +No 8.3.7 Yes Floor mounted?
                                    ; Ho 8.3.2 Does the Support Have Vertical Capacity      ~    3.0 x OL?
Yes 8.3.3                                        8.3.4        No Does the Supped Have Ductile                    Does the Support Have Adequate            l Response to Lateral Loading?                    Lateral Load Strength '?
Yes                                                  Yes 8.3.5                                        8.3.5 Yes                                    tfo Is the Support a Fixed- End Rod Hanger?
                                                                      ~
Does the Support Pass the Fatigue Evaluation?
Yes Pass Analytical                                                          Outlier Review (Rigid Mount)
D. C. Cook    AA6 Cable Tray and Conduit Raceway Review October 1995 page 3-3
LAR Nos. 005, 022 START 8.3.1 Does the Support Have                  No With Eccentricities      )
Vertical Dead Load Capacily 1.0 x OL?
8.3.1 Yes Directly mounted to or rigidly cantilevered from an adjacent structural wall or ceiling7 8.3,7 Yes Floor mounted?
No 8.3.2 Does the Support Have Vertical Capacity -,. 3.0 x DL?
Yes 8.3.3                  I                  8.3.4 No Does the Support Havo Ductile                Does the Support Have Adequate I
Response lo Lateral Loading?                Lateral Load Strength 7 Yes                                                Yes 8.3.5                                      8.3.5 Yes Is the Support a Fixed - End                  Does the Supporl Pass tho Rod Hanger 7                                  Fatigue Evaluation 7 Yes No
                              .V...
1 Pass Analytical                                                      Outlier Review (Any support failing OL)
D. C. Cook A-46 Cable Tray and Conduit Raceway Review October 1995 page  3A
LAR Nos. 009, 011, 016, 025 START 8.3.1 Does the Support Have Vertical Dead Load Capacity W~th Eccentricities      ~  1.0 x Dt.?
Yes 8.3.1 Yes        Directly mounted to or rigidly cantilevered from an adjacent structural wall or ceiling?
No 8,3.?
Yes Floor mounted?
l No I
8.3.2 Does the Support Have VeicaIG      pocky        30xDL2 l Yes 8.3.3                                      8,3.4 Does the Support Have Ouctge                Does the Support Have Adequate Response to Lateral Loading '7              Lateral Load Strength?
Yes                                                Yes 8.3.5                                    8.3.5 Yes Is Ihe Supporl a Fixed - End                  Does the Support Pass the Rod Hanger?                                  Fatigue Evaluation '?
Yes Pass Analytical                                                      Outlier Review (Floor Mounted Support) j                                                      D. C. Cook AAG Cable Tray and Conduit Raceway Review October 1995 page  3-5
LAR Nos. 014, 028 START 8.3.1 Does thc Support Havo                    No Vertical Dead Load Capacity With Ecccntricities      ~    1.0 x DL '?
Yes 8.3.1 Ycs Directly mounted to or rigidly cantilevered from an adjacent structural wall or ceiting?
No 8.3.7 Yes Floor rnounted2 No 8.3.2 Does the Support Have Vertical Capacity      ~    3.0 x OL 2 Ycs 8.3.3                                        8.3.4        No Does the Support Have Ductile                  Does thc Support Have Adequate Response to Lateral Loading 7                  Lateral Load Strenglh 7 Yes                                                Ycs 8.3.5                                      8.3,5 Yes Is lhe Support a Fixed    ~ End                Does the Support Pass thc Rod Hanger '?                                  Fatigue Evaluation?
Yes Pass Analytical                                                            Outlier Review (Trapeze Frames)
D. C. Cook    AA6 Cable Tray and Conduit Raceway Review October 1995 page  3-6
LAR Nos. 001, 006, 007, 017, 018, 027 START 8.3.1 Does the Support Have                    No With Eccentricities      )
Vertical Dead Load Capacity 1.0 x DL '?
Yes 8.3.1 Yes        Directly mounted Io or rigidly cantilevered from an adjacent structural wall or ceiling?
8.3.7 Floor mounted?
Does the Support Kavo Vertical Capacity      ~    3 o x OL?
Yes 8.3.3                                      8.3.4 Does tho Support Have Ductile                Does the Support Havo Adequate Response to Lateral Loading '?              Lateral Load Strength 7 Yes                                                Yes 8.3.5                                      8.3.5 Yes Is the Support a Fixed - End                  Does tho Support Pass tho Rod Hanger?                                  Fatigue Evaluation?
I                                          Yes No Pass Analytical Outger Review (Rod Hanger Trapezes)
D. C. Cook    A46 Cable Tray and Conduit Raceway Review October 1995 page  3-7
LAR Nos. 013, 015 START 8.3,1 Does the Support Have Vertical Dead Load Capacity With Eccentricities      ~  I.O x DL 7 Yes 8.3.1 Yes Directly mounted to or rigidly cantilevered from an adjacent structural wall or ceiting?
8.3.?
Yes Floor mounted?
8.3.2 Does the Support Have Vertical Capacity          3.0 x OL '?
Yes 8.3.3                                    8.3.4 No Does the Support Have Ouctige                Does the Support Have Adequate Response to Lateral Loading 7                      Load Strength 2        'ateral Yes                                              Yes 8.3.5                                    8.3.5 Yes Is the Support a Fixed - End                  Does the Support Pass the Rod Hanger 7                                  Faligue Evaluabon?
Yes No Pass Analytical
                /          Review Outlier (Floor to Ceiling Supports)
D. C. Cook    AA6 Cable Tray and Conduit Raceway Review October 1995 page  3-8


CD EMERG DIESEL FUEL OIL DAY TANK Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: CD EDG RM, Manufacturer, Model, Etc.: 36 D x 108 L, 465 GAL.Step 4-Determine base plate weld strength reduction factor RW 17.7858 Step 5-Determine the anchorage tension and shear allowable loads Allowable Anchorage Tension Load, Pu Allowable Anchorage Shear Load, Vu 0.433 kips 3.79 kips Step 6-Calculate the ratios and values alpha (Pu/Vu}Vu/Wb Hcg/D'cg/S F2 0.11 1.13 kips/bolt 3.37 0.788 0.285 2.236 1.804 Step 7-Determine the acceleration capacity of the tank anchorage lambda 1 lambda u Anchor Acceleration capacity, lambda 1.507 G'.715 G 0.715 G Step 8-Determine the maximum saddle spacing for transverse and vertical rigid frequency response Maximum Saddle Spacing, Sc 13.42 ft Step 9-Compute the resonant frequency of the tank in the longitudinal direction Saddle Stiffness, Ks Resonant Frequency of Tank in Longitudinal Direction 7230.98 kips/in 125.34 Hz DC Cook Unit 1 SCREENING EVALUATION WORK SHEET (SEWS)GIP Rev 2, Corrected, 2/14/92 Status: Yes Sheet 6 of6 ID: 1-QT-107-CD (Rev.0)Class: 21-Tanks and Heat Exchangers
3.3 Method    of Solution Hand calculations are performed employing the methodology outlined in Section 8 of Reference 3.6.4, "Generic Implementation Procedure (GIP) for Seismic Verification of Nuclear Plant Equipment.",Support structures are broken down, where applicable, into subsections which lend themselves to common, closed form solutions for structures subjected to static loading.
3.4 Allowables and Assumptions The following is a compilation of allowable stress and load criteria used throughout the raceway support evaluations.
strength of 36 ksi. AISC Specification allowables for Allowable Stress Design (Ref. 3.6.1) are used for the dead load analysis. For other analyses, the allowable stress is increased to 0.9 Fy = 32.4 ksi.
J2.5 of Ref. 3.6.1, is 0.3 x 60 = 18 ksi for dead load analysis. For all other analyses, 1.7 x 0.3 x 60 =
30.6 ksi is used.
i:  Dimensions, properties, and allowables use'd to analyze various Unistrut support system components are based on the Manufacturer's Catalog Data provided in Refs.
3.6.2 and 3.6.3. These values are used for the dead load analysis and all other analyses. Values for Unistrut components commonly used at D.C.Cook are summarized below:
Unistrut bending moment:                                            Ref. 3.6.3, p.23 P1000: 5080 in-Ib (allowable bending stress of 25 ksi)
Channel nuts/bolts                                                  Ref. 3.6.3, p.69 5/8": pullout in P1000 or P3000:          2500 Ib 5/8": slip in P1000 or P3000:            1500 Ib 1/2": pullout in P1000 or P3000:          2000 Ib 1/2": slip in P1000 or P3000:            1500 Ib 3/8": pullout in P1000 or P3000:          1000 Ib 3/8": slip in P1000 or P3000:              800 Ib Bolts are assumed tightened to manufacturer's recommended values r          I:  D.C. Cook embedded channels are Unistrut P1000 (or equivalent) galvanized, 12 ga. channels with a material yield strength = 33 ksi, modilied by the addition of 3/8 $ x 4"L Nelson Studs at 12" o.c. Results of tests of modified channels (Ref 3.6.20) indicate a minimum pullout capacity of 6400 lb/ft. The mode of failure was ripping of strut material around the stud; stud remaining in concrete. Using the AISC Allowable Stress Design allowable shear stress of 0.4 x Fy = 13.2 ksi on a 45'one shaped slip surface results in an allowable pullout of 13.2 ksi x n x (D + t) x t = 13.2 x 3.14 x (0.375 + 0.105) x 0.105" = 2090 Ib, therefore use the standard catalog value of 2000 Ib, but not more than the allowable value for pullout of Unistrut channel nuts/bolts as listed above. For all other load cases, use an allowable stress of 1.7 x 0.4 x Fy resulting in an allowable pullout of 3550 Ib, but not more than the catalog allowable value for the pullout of Unistrut channel nuts/bolts as listed above.
D. C. Cook A-46 Cable Tray and Conduit Raceway Review October 1995 page        3-9
 
To summarize:
Pullout of embedded strut:                2000 Ib        5/8" channel nuVbolt (dead load analysis)                        2000 Ib        1/2" channel nut/bolt 1000 Ib        3/8" channel nut/bolt Pullout of embedded strut:                2500 Ib        5/8" channel nut/bolt (all other analyses)                        2000 Ib        1/2" channel nut/bolt 1000 Ib        3/8" channel nut/bolt Concentrated loads may not be spaced closer than 12" apart unless the sum total of concentrated loads on any 12" of Unistrut length does not exceed the single load allowable.
Reference 3.6.14, will be used unless noted otherwise within the individual LAR's.
1/2"            1.1 Ib/ft 3/4"              1.3 Ib/ft II 1                2.0 Ib/ft 1-1/2"          3.5 Ib/ft II 2                4.9 Ib/ft 3 II            11.1 Ib/ft 4ll              16.6 Ib/ft wide by 6" high) is 25 pounds per linear foot, unless noted otherwise within the individual LAR's.
h      I:  Concrete anchor bolt allowables used in alf analyses are based on Tables C.2-1 and C.2-2 of the GIP, Ref. 3.6.4. The anchor bolt type must be known to use the maximum values.
If anchor bolts are'identified as "non-shell" type anchors on the PASS, then, per Ref. 3.6.12, the anchors are either 5/8" Hilti "Kwik-Bolts"or 5/8" Phillips wedge-type anchors. All other anchors must be identified on the PASS or they will be considered "unknown." Unknown anchors require a reduction factor of 0.6 on the allowable toads provided in Ref. 3.6.4, Tables C.2-1 and C.2-2.
All concrete anchors, known or unknown, shell or non-shell type, which are not loaded in tension by dead weight, require an additional reduction factor of 0.75 for the "Reduced Inspection Alternative", and, because one third of the anchor bolts (there must be a minimum of six) must be assumed to be "not available", another reduction factor of 0.67 must be taken.
The design concrete strength at D. C. Cook is 3500 psi. This requires a reduction factor of 0.875 to be applied to the pullout capacity of all anchors. No reduction is required for the shear capacity.
If a tightness check has been performed, it will be so stated on the PASS and the "Reduced Inspection Alternative" reduction factors may be waived.
'                                                    D. C. Cook A<6 Cable Tray and Conduit Raceway Review October 1995 Page  3-10
 
r      n  or    I To summarize:
                  "Known" concrete anchors such as 5/8" Hilti "Kwik-Bolts", 5/8" Phillips Wedge-type, or 5/8" Phillips Red Head "self drills":
Pall = 3.17 kips x 0.8T5 x 0.75 x 0.67= 1.39 kips          (not in tension by deadweight)
Vali = 3.79 kips x 0.75 x 0.67= 1.90 kips Pall = 3.17 kips x 0.875 = 2.77 kips                      (in tension by deadweight)
Vali = 3.79 kips                                                 I All other 5/8" concrete anchors:
Pall = 3.17 kips x 0.875 x 0.6 x 0.75 x 0.67 = 0.83 kips  (not in tension by deadweight)
Vali = 3.T9 kips x 0.6 x 0.75 x 0.67= 1.14 kips Pall = 3.17 kips x 0.875 x 0.6 = 1.66 kips                (in tension by deadweight)
Vali = 3.79 kips x 06 = 228 kips All 3/4" concrete anchors:
Pall = 4.69 x 0.875. x 0.6 x 0.75 x 0.67 = 1.23 kips      (not in tension by deadweight)
Vali = 5.48 x 0.6 x 0.75 x 0.67 = 1.65 kips Pall = 4.69 x 0.&'F5 x 0.6 = 2.46 kips                    (in tension by deadweight)
Vali = 5.48 x 0.6 = 3.29 kips All 1/2" concrete anchors:
Pall = 2.29 x 0.875 x 0.6 x 0.75 x 0.67 = 0.60 kips      .(not in tension by deadweight)
Vail = 2.38 x 0.6 x 0.75 x 0.67 = 0.72 kips Pall = 2.29 x 0.875 x 0.6 = 1.20 kips                      (in tension by deadweight)
Vali = 2.38 x 0.6 = 1.43 kips All 3/8" concrete anchors:
Pall = 1.46 x 0.875 x 0.6 x 0.75 x 0.67 = 0.39 kips        (not in tension by deadweight)
Vali = 1.42 x 0.6 x 0.75 x 0.67 = 0.43 kips Pall = 1.46 x 0.875 x 0.6 = 0.77 kips                      (in tension by deadweight)
Vall=142x06=085kips Shear-tension interaction limitations per the GIP, Ref. 3.6.4, Section C.2.11 will be used to evaluate the effect of combined anchor bolt loading.
D. C. Cook A-46 Cable Tray and Conduit Raceway Review October 1995 Page  3-11
 
3.5 input Data The hangers evaluated in this calculation were selected by the Seismic Review Team (SRT) that performed the raceway walkdown. The selections are documented in the Plant Area Summary Sheets (PASS), which are part of the project documentation.
Pl      ei  i Horizontal seismic accelerations are required for the Lateral Load Evaluation and the Rod Hanger Fatigue Evaluations as defined in the GIP, Ref. 3.6.4.
Three options are presented in the GIP, Ref. 3.6.4, Section 8.3.4 for determining the horizontal seismic acceleration to be used in lateral load evaluations. Acceleration values for D.C.Cook corresponding to each of the options are summarized below.
Elevation      ZPA        Building    Option 1    Option 2    Option 3 587          0.20        Aux        1.21        0.63        0.94 633          0.22        Aux        1.21        0.69        0.94 650          0.22        Aux        1.21        0.69        0.94 609          0.22        DGB        1.21        0.69        0.94 598          0.32        Cont        1.21        1.00        0.94 612          0.37        Cont        1.21        1.16        0.94 625          0.42        Cont        1.21        1.31        0.94 651          0.52        Cont        1.21        1.63        0.94 699          0.80        Cont        1.21        2.50        2.50 Option 1: 2g scaled by the maximum of SSE/Bounding Spectrum (ZPA value controls)
Option 2: 2.5*1.25'Floor ZPA (1.25 is for 'realistic'loor spectra)
Option 3: 2.5'1.25 1.5'SSE ZPA (within 40'f grade)


==
==
Description:==
Conclusion:==
Option 2 for Aux and DGB, Option 3 for Containment D. C. Cook A-46 Cable Tray and Conduit Raceway Review October 1995 page 3-12
 
0 The rod fatigue bounding spectra provided in the GIP, Ref. 3.6.4, Figure 8-9, are plotted below vs. the envelope of the D.C.Cook 5% damping spectra for the Auxiliary Building and the envelope for Containment at El. 650'nd below. These curves are used to determine the applicable bounding curve in the Fatigue Evaluation Screening Charts, Figure 8-10 to 8-14 of the GIP.
20                                            I      s  ~  ss I  I  I  I  I I I        I        I  I    I I  I I  I  I  I  I I I        I      I  I    I I  I I  I 1
I I
I I
I 11 I
I I I I I
I I                            I I  I  I  I I I I          I      I  I    I I I I  I I I                I  I  I II I I I I          I sl I  I I
II 1.5 I
I I I I I I I I'I'r I
I I
I IN
                                                                    ~  ~
I III'I I
I I
1 I
N I
I I I I I I I I I  I I I                I  I      1111          I  I      I  I    I I I I I I  I I I                I  I  I  I I I  I    I  I      I  I    I I I I I I I I I                  I  I  I  I I I  I    I  I      I  I    I I I I I I I I I                  I  11      I I I    I    I  I        I  I    I I I I I I I I I                  I  I  I  ~  I I  I    I  I      I  I    111 I I I I I I                                I    I    I  I        I  I    I I I I I I I I I                  I  11      I  I I I      I  I        I  I    I I I I I I I I I                  I  11      I  I I        I  I        I  I    I I I 1.0 I  I I I I                  I  I  ~  ssl          I 111 I      I  I g                I  I I I I I I                  I  I  ~  s  I  I ~    I                  I I  I I  I I I I I I                      I    I  I  I I I        I        I  I    I I  I I
I I
I I
I I I I I I    I I    I  I  I  I  I I I I
I I
I I
I I
I I
I I I I I
I I  I I I    I I                            I I I I                          I I I I  11    111            I,                I I I        I  I        I  I    I I I I  I I I  I I I                              I I I I      I  I        I  I    I I I I  I  I I I              I                    I I I        I        I  I    111 0.5 I  I I r I rr I I    I      is      1 I  I  yl
                                                                        ~
                                                                        -rrrrI I I    I f
I      I  I
                                                                                                        -I rrr I I I
                                              //
1  I 1                              I I I      I I          I        I    I                I  I        I  I    I  I I I
                              'I I
I I
I I I I
I I I I
I I
I I
I I
s I
                                                                      ~  ~
gl II I 111 I
I I
I
                                                                                              ~11  I I
I I
I I
I I I I
I I
I I
I 11 I I II I I I I
                                    ~    I I I
I I
I I
I
                                                                      ~  ~
                                                                          ~  I I I I ~ I I
I  I I
I      I I
I I
I I I I
                                                                                                            ~ ~
I I
I r  I I I I                  I  I  I      I I I    I  I      I  I    I I I 0
0.1                                                              10 F~(Hz) 20 6508AdbctoA)
I I
I s  s II  ~        I I
I I
I I I I I I I  I  ~  I I I        I        I        I I I I        I      I        I I I I  I I I  I I I          I    I  I  I      I    I      I        I        I I I I  I I 1111              I    I  I  I  I I I I          I      I        I I I I  I I I  I I I          I    I  I  I  ~  I I I        I      I        I I I I I I I I                      I                      I                I I I 1.5          H I
I I
I I
I I I I I I I  SS' I
I H
I  I I
                                                                    ~
I
                                                                        ~
II
                                                                            ~
I            I I
I I
I I I I SSI I  I  I I  I I                I  I  I      I I I        I      I        I I I I  I I I I  I I                I  I  s  I I I I        I        I        I I I I  I I I I  I I          I    ~  ~  I  ~  I I I        I      I        I I I I  I I I I  I I                I  I  I      I I I        I      I        I I I I  I I I I  I I        I I)    I  I  I  ~  I I I        I      I        I ss I  I I I  I  I I                                    I        I      I        I I I I  I I I  I I I        I  I    I  I  I  ~  I I I        I      I        I I I I  I I I I I I            I    I  I  I  ~  ~  I          I      I        I I I I
I  1.0 I
1 I
I I
I I
I rrrr I I I I I  I I  I      I I  I I
I I
                                                                    'I I
                                                                        -rrrs I I I J  I  I I 1
I I
I I
I  I I
I rrr I I I I I I I  I I I>I I                        11        111          I      I I
I I
I I
I I I I I I I
I          I I  I
                                                                        ~
I I I I
I      I I
I I
I I II I I I I I I I I  I I I    III    I              I  ~    '    ls                    I  I I I I I
                            ~
I I
I I
I I I I I  I  I I
I~I I  I I      III
                                                                            ~  I                    I I
I I I I I I I I 111 0.5 I
I
                            ~
I I
I
                                  ~
I I
I I I
                                    ~
I
                                      ~
III  /      I
                                                            ~  I I  s      s  I I    s  I I
I I
I I
I I I I I I I I  I I    I  I I                    I  I      I  I I        I      I  I  ~ I I I I  I      I  I                      I            ~ I                  I  I I I I s
                            ~
I I
I s
I I
s~s II                    I I
I
                                                                    ~
                                                                            ~
I I I
                                                                            ~  II        I
                                                                                            ~ 339 I
I I
I I
                                                                                                          ~
11
                                                                                                              ~  I
                                                                                                                ~
I  I                                I  I      I  I I        I      I  I  I I I I I                                I            II III        I      I  I  I    I I-
                            ~                                      s      ~                              ~    ~
I    I I  I I I                    I  ~                    ~      ~  I  I I I I I I  I I I                    ~  ~      ~  ~          ~      ~  I  ~ ~  ~  I 0
0.1                                                              10 Frequency (H )
(                                                        D. C. Cook A-46 Cable Tray and Conduit Raceway Review October 1995 page 3-13
 
i      vl in          r  nn            Po        r All threaded rods used in raceway supports at O.C.Cook are manufactured all-thread rods.
Some rods, however, are anchored using the welded rod coupler detail shown to the right.
The SRT was concerned that the coupler material is not as ductile as the rod material, particularly after being welded.                                                            2.
Fatigue tests were performed on O.C.Cook threaded rods with the welded rod coupler detail (Ref.3.6.23). These tests show that for the same ductilitydernand, the number of cycles to failure using the welded coupler detail is approximately half the number of cycles to failure using typical "nutted" rod connection details at O.C. Cook (Ref. 3.6.6, Table 8-2).
I The test data points for the welded coupler detail are plotted below on Figure 8=5 from Reference 3.6.6 (this figure was used to develop the fatigue evaluation screening charts in the GIP). Each test data point represents 3 tests (6 tests total) on 5/8" rods with an applied axial tensile preload (ITT) of 2.2 ksi (500 lb.)
The test data points lie above the "2/3 Strain Acceptance l.ine", which represents the ductility demand vs.
cycles to failure acceptance criteria for field-threaded rods. Therefore, in these LAR's, in order to cover rod-hung raceway supports that have not been selected as LAR candidates because of lower weight or longer length, but which may have welded coupler anchorage details, Rod Hanger Fatigue Evaluations will conservatively include the procedures specified in the G1P for field-threaded rods.
FATIGUE DATA FOR THREADED RODS COMPEER. ~INST. CVRV8 W/ flGD THRIVED 3.20 2.80 2.60                                                    aa06      ltae~~~
                                                                                <<Ildt40W4c AQ(.
3    2a0            ACCEPTANCE LINE P    2.20 a
1.60 1.40 1.20                                                            0 1.00 1.008+00 NOt5lAUZED OVOllUIYDo&NO O. C. Cook AA6 Cable Tray and Conduit Raceway Review October 1995 page 3-14
 
3.6 References 3.6.1  "Manual of Steel Construction, Allowable Stress Design", 9th Edition, American Institute of Steel Construction, lnc. Chicago, IL, 1989.
3.6.2  "General Engineering Catalog", No. 10, Unistrut Building Systems, GTE Products Corporation, Wayne, Ml, 1983.
3.6.3  "General Engineering Catalog", No. 12, North American Edition, Unistrut Corporation, Wayne, Ml, 1992.                                                                I 3.6 4  "Generic Implementation Procedure (GIP), for Seismic Verification of Nuclear Plant Equipment",
Revision 2A, March, 1993, Seismic Qualification Utility Group.
3.6.5  "Design of Welded Structures", Orner W. Blodgett, James F. Lincoln Arc Welding Foundation, July 1976.
3.6.6  "Seismic Evaluation of Rod Hanger Supports for Electrical Raceway Systems", EPRI NP-7152-D, March, 1991.
3.6.7  "Cable Tray and Conduit System Seismic Evaluation Guidelines", EPRI NP-7151-D, March, 1991.
3.6.8  "The Performance of Raceway Systems in Strong-Motion Earthquakes", EPRI NP-7150-D, March, 1991.
3.6.9  "Seismic Verification of Nuclear Plant Equipment Anchorage" EPRI NP 5228-SL, Revision 1,Volume 1, June, 1991.
3.6.10 AEP Guideline No. 18.3, Rev. 4, 4/9/86: "Guide for Cable Tray Loading" 3.6.11 Test Report 91C1681-02, Testing of D.C.Cook typical Unistrut attachment brackets for rod hung cable trays.
3.6.12 AEP Drawing No. 1-2-EDS433-14, Sheet      1 of 2, 5/31/91.
3.6.13  "Longitudinal Load Resistance in Seismic Experience Database Raceway Systems", EPRI NP-7153-D, March 1991.
3.6.14 AEP Document No. 02-0120-1097, Revision 0, Page 3 (Rigid Conduit Weights) 3.6.15 Letter from I.C.Huang of AEP Service Corporation to Steve Anagnostis of Stevenson and Associates, 1/10/94, re: as-installed conduit weights for raceway supports LAR011 and LAR017.
3.6.16 "Rigid Frame Formulas", A. Kleintogei, Frederick Ungar Publishing Co., New York, 1952.
/.                                                D. C. Cook A-46 Cable Tray and Conduit Raceway Review October 1995 page 3-15
 
3.6.17 Donald C. Cook Nuclear Plant Drawings:
1-1594-4 1-1460-75 1-1528-51 1-1525-57 1-1464-83 3.6.18 AEP Guideline No. 18.2A, Rev. 0, 6/27/86: "Guide for Cable Tray System Design".
3.6.19 Telecopy dated 4/29/94 from I. Huang of AEP to Steve Anagnostis of Stevenson and Associates regarding as-installed cable tray and conduit weights for LAR's 1,3,5,9",10,16,18, and 22.
3.6.20 Letter from I.C.Huang/AEP to Steve Anagnostis/Stevenson and Associates, April 7, 1994-results of testing of D C Cook modified embedded Unistrut, 3.6.21 Stevenson 8 Associates Design Report, AEP Raceways 82C200-02, Cable Tray Testing-Analysis and Report, 9/30/83.
3.6.22 Telecopy from I.C.Huang/AEP to Steve Anagnostis/Stevenson and Associates, May 6, 1994-Field information concerning LAR011 (bolt spacing and conduit spans).
3.6.23  "Low Cycle Fatigue Tests on 5/8 inch Threaded Road" by Dario A. Gasparini, P.E.IPh.D., Dept. of Civil Engineering, Case Western Reserve University for Stevenson 8 Associates, March 25, 1992.
D. C. Cook  A<6 Cable Tray and Conduit Raceway Review October 1995 page 3-16
 
REQUESTED SAMPLE LAR CALCULATIONS 001,005,010,011,022,023,027,030
 
I CUENT        JOB No. IS' SHEET OF Fb ~KM Stl.'VenSOn and ASSOdateS A 5rruc rural Maclra alca I Hl  Coarultrag Eagiaaerrag Frrra
                                                                    ./9
 
CUENT
                                        %6 DC 4    ZAZ-ooi Stevenson end Associates                        O5' C7 Il    A SrrnclnrohMochoalcol Coaoolliag Englnoorlng flrra
                                                      ~cr /(
 
CUENT SUOJEGT gd g~g<  Zs4- oo/
Stevenson and Assodatcs A Sauctural.Mechoolrsl
                                        ~. aoP 5I  coasu!5og Knylnoaanq Few c
Or8          ~Adds
 
CUENT smu acr ce      ~ ~M-oat Stevenson and Associates                sa        / Il h Souelvwl.Mechanical R  Coasulaao Kayiaoorlaa Flies
 
ZXt$ g C
                                            ~Fthm<                            'Os6fyL OMIQN-S I      s P",
sl        I s                        IL 4" s                I      s
                                                                                                                                      ~rSI6,CW yV        I      I I
I iW. 80K sl fs I
I 4 Q'IIILT4)~
EHVDpQ                                $ I,V-RLl 0'cow  vt                I
                      ..'sr.r,',        . ss          IIIII~1WT                                        YC'IsgL
                                                                                                                          'ag)~gL  @0
              ~
7    I' ~ ~ '4I g.        >  . ~ 'I>y~
t,Mss 's&  s' ~  +Jlgt s'      I  LLI t  ~        1,        t                      .=r arS Wt+~~I.SI~gq~
ss N.IHP B.
631'- 0" yss g'laos'r. IL~"e~
$ 3ss I'3s's                                            3y  ~    II CIJLMIS (TC0 Skt"~h"s CI M Gib
                                                    $              I gs II lg ss gs, gII
                                                                                                                            ~~IoO    ao  IIEr~rrIar WI5  ~Et OVK GLKVhToR..
IIEET WO
                              ~PPoRY ACeVa          rL. LL cO1Lo"
                                                              &#xb9;2
 
tPIlfyl.      wY'g4iW.
                                                            ~    (
Qf&Ar
                                                                              +PC~~'                                  I
                                                                                                                                    >> Y,'
I I I              n,>/sr>
Z4L
                                                                                                                                                      '4.
I I          I I
I
                                                                                                                                          + g>> ml>>)>VS cAOA                ~l II5I~P                                                                  1 ling,,
fdJla>>>> t i>> t>> %A>> ~  >>>>A>>>> e    P>>>>>>J,            x wan ar>> a            tat u>>>>Ie>>'sr&.s.>>>>~~          ag
        ~:
Al  -'P tL fdPP Na>
22,15t 5 lts5IFT                                                      12.444 LSSlI=T glc%$ Ppi'>'h~
II>>C    I5 I2,55t'        $5/FT                                                        10.4$ L$5lFT                                      z C
n 6,tA  C m
D l
    ~
1S;hLS>iFT                              GIAN 693 O
m N
AlRm+      C1  6-4
                                  'z4. 5(o4      $ 5rFt'y>>
1Q.625 LBSf FT v:c&ts N)
                                              ~
                                                              ~
sk@i    6~'4 YAM-FS l>>r 4'T%lC
                          . 1LQIcd&'4'IGLOO 2      .c,t23                                                                              g>>        )II hllKHHVf                                                                                                                            SVRh4 C46. I>>QY WO 5 LCVh'To@>>
g>>>> I>>ll At'TUEL                      WT5 FOR LAR4' SUPPLY R.>> %L
                                              &#xb9; <
C>>5>>I>>r 0  ~
COH001T VVEJC lOEHTlFI CATION UNKNOWN
 
0                  CUENT L
r Stevenson and Assodates            <85$ 'D9 l'ScM/oZ II    A s<ruclural Moehaalcal Coneulling Enylnooeny l'leaa
 
. ~
CUENT ggu~    +  '4@8 S Stevenson and Assodates SS JQ II    A svuciurel.Mechanical f
con oui li ay agiaoorlny Fa w      x  C.>>
 
CUENT sum ccr ~+'>
(                                  DQ 2ccm Stcvcnson and Assodatcs A Suwtvral Moehoaleol Q  Cosevl8og Eaylaoorlay Fires 4 S CP
 
CUENT Smuem P~rr Stevenson and Associates Q    A SnueNral Mechanical cohsulUay laglaoo<lnp n<m  4'4rx Lad- Wc ID'
 
SC'IC CUENT SUOJ~  4 b 4AZM cv5
                                                        /HPO auaac 6 oa c Rcvcnson and Assodates        AY~re M Fitch's~-          ~roB ~>Pz H    A Steuccusahkechaalcal Coa>ulpop Kaplaeeclop      Ace  ~ W~. ma.
                                                    ~ ~
 
S zs 9 Z4Z-oos Stevenson and Associates Il  A Svuctuwl Moeho nlcsl Coaeu!5'nginooenp    Fans
 
p'g. A ~                                                        ~~ ~OQ ~
                                                  ~  ~
We.ckc@D goo Yo RaD Cc&PL/JJh To L 'j$',Q RgoUklP WSLD (mK)
                                                &EE VETAlL "C-C" 1%AC~
ear>                                                            ~/~      TAI 2'-to 11 I
2/g IAMC8      I AN P3 U-eu    MPs pp    >Q f "1/g'
                                      '- 4/g"                                  &EE 5~~  6"                                        PETA'lL U - t'LAMPS l AM-XIO      I AMP QvQ
                                                      )1 p gI Ie,"(n@
l AN-CGQ    f A,N< CG [  l  AM-C82 g1/ Il
 
2'D I
I I
I                              l l
lqx2x2 x)0 L          l I
I
/g. UN&BRUT
            ~
BoLl(~) i I
I 8 MC5>t=-0
            )
I I    )0+g" DEg Rv'T PETAlL "c.-c'PXT                        <wI'poRT TNP-
                                          ~ vPFg~
A
                                ')>r5 HOT eAGHL=E
 
          '34 l8:46      FROn AEPSC NUCLEAR DES PAGE.OQ4 LEFT'O RIGHT IA."-2840(o-I, 2.98 LBS / FT                          ACTUAL NElGWT5 FOR LAR            ~5 I'I~"- 50IIZR- I, 3.2.2 LK5/ FT
      <r~-- SOIOSV-I,  S.ZZLS>r Vr I  - 9957R-I,  I.73 LBS/FT
        'q ~    I"-205I3-I, I.BI( 6 LHS/FT                                          ~
j,Pp
                                                                                  ~o  gg~
                                                              ~ ~
We.Eke@& BOD
                                                ~o Hot Cc vPLQK~-                          t-PIUM@
XC    L    3/4. nu >aV4C>                EL. 633'~f wctu> I'~eg
                                                &EE OFTA1L              "c-c"
      'R&KP eon P
a'< ~~z                                                      g 'pg&hDP l0. 95 LB5/FT 2 3O
                                                      '29.Hr 5 L65IFT U-cLkNPs                                    3~C8              3AM PZ 3          LEFT TO      RKHT 1t    0"-9Z.G2PS-I) IO;75 L55/FT 4'-'MBPS-I fO.GHL65/FT U-CVd4P5                                    lANxto )ANTE .
C~Q LEFT TO RIGHT I4. 291'o LD5/FT w.~ra".                                              25 'H54L65/'I-T t-3 g yl1                      3g Q~)
3 AN-'C80  I~~CG t          I AM-C82 I.FI-T TO RISIIT
                                                                                    +I.95 LSD/FT l 25cg'xP "SF~ (TYP)      34.Z7 LB5/ FT
                                                                                  >2,77 I.Pv/ FT
 
D2  o Joulk>. +~~+~
III O sHEEf ~ oFM~
Elf'UENT 4AM-use              8 Stevenson and Assodates A svuctu( ~ I Mn<<hnnlcnl R  Cnnlulgng Knglnuuslng LJ.
OW
 
CUENT
                              ~guECT D  O o
Stovenson and Assodates II cosoullsy A Strwte re lkoAo nlcs1 Ksylaoooay Fleas
 
CUENT        XeN. ~<~<~~ SHEET 3 OF~~
E muccr > C Stevenson and Associates                  id'      ~Z II    AS(naciecabHocbaeleal Coasulliny Enolsoerlsa I <<w
 
0 CUENT
                              ~c Stevenson and Assoclates A slnscturel Mechanical im  Coastal'5aO Kngtnoedsg Fhm
 
CUENT l
Stcvcnson and Assodatcs A structural Hocbaaiea'I ER coneulsny Englnoodna Fcce
 
V h
 
CUENT Stevenson and Associates A SlluclulnlJlochn nlcnl H Con<utgng  Cnglnuurlng finn 7d
                                        ~ C
 
CUENT mum Stevenson end Assodetes h Srrac<arsl Mschsslcsl W  Cssralriarr taylssarlsy Firrs xg
 
Rcvcnson and Associates IL Suuctu<al  Mochaalcal RI Con o  villa@ Esglaeorlay E'l(a
 
CUENT    JOG No.
Stcvcnson and Associates          o5' A ScwNral htoehonlcal Nm CoaevlCng Caglaoeslsy Fwa
 
CUENT Stevenson and Assodatcs A Stiactvial Mechanical S  Coaouluny Eaoisoeclsy flea
 
CUENT SUBJECT Stevenson and Associates A Sltvc(v ral MoAo alcsl Rl  Conoul5sa Kaylnoorlao Faa l/
                              ~ ~
 
CUENT Stevenson and Associates Il    A S<oadvrol.Woc4alcsl Coaoultley Eaglnoo(lay Foes O
 
CUENT E
Stevenson and Assodatcs A sv~ousal Mechaaical E5 Coa>vlsay Ksglaoerlay Fns
 
CUENT L
Stevenson and Associates A Snvctssal l4ochaaks1 l5  coao~hay Esyisoonay nba d
 
CUENT Stevenson and Associates 24&a 0 El A Suvelurst.Mechanical Consolan'aylneorlng fl<w      CD'c
 
CUENT    JOO Na MS O SliEEE ~& OF ~F Stcvcnson and Associates h strvciscn Mechanical l5  conovlUne ssolssorlnp fires
                                      /z
 
CUE~r SUOJECr Stevenson and Associates II    A suuelucol Mechanical Conouluna Esglaoorlsp Fifa
 
              .<'                              (S          ag
(( I W4                              I p'rf      att/+
                                                                                                                                                      +  ae                a                                                                                                                                      , ACTUAI WEIG
                                                                  ~                                  ~  ~
(              ~ ~                                        ~
                                                                                                                                                                                                                                                                                                                  !  FOV      LAR~IO QJ IrJ a
Q.
I,    ~  ~
                                      ~,
ei
                                                          ~
tV
                                                            ~    r,'
JI g"
                                                                                                                                  ~
                                                                                                                                    ~
r Jttr
                                                                                                                                        ~  'I+a
                                                                                                                                                  ~
                                                                                                                                                      ~
                                                                                                                                                            ~e
                                                                                                                                                          ~ ~    t
                                                                                                                                                                                    ~
3c',
J ~IS
                                                                                                                                                                                          ~
fvyt
                                                                                                                                                                                                ~ ~ r
                                                                                                                                                                                                    ~
J
                                                                                                                                                                                                                ~
r(
tva I
f
                                                                                                                                                                                                                      ~ ~
                                                                                                                                                                                                                                ~
th)
I
                                                                                                                                                                                                                              . a(htJ (JC.S'.
                                                                                                                                                                                                                                                                                  &PPoRT
                                                                                                                                                                                                                                                                                                      ~  ~ ~
I I
                                                                                                                                                                                                                                                                                                                      &#xb9;      )0 Sr I'
te
                              ~
                                                                              ~
1  ~
g)y; Nr.            I kgu(r                                          er rt t    at                  I          t
                                                                                  ~
                                                                                                                                                                                                ~ ~ ~'
                                        ~                ~  *
                                                                                                                                                        \                                                ~                    +A  ~
rat                                                                    ~        ~ ~      I
                    ~ t                      ~                ~
                                                                                                                              \                                                                lai
                      ~
                                          ~
                                                                                                                                    ~
g
                                                                                                                                                        ~    I  ~
                            ~
                                        ~
:jt                                      QI(J  '
                                                                                                                                                                                                                                                                      ~
r
                                                                                                                                                                                                                                                                                ~
                                                                                                                                                                                                                                                                                      ~        ~
r'.              J J
I
                                  ~
                                    )'jest I                                                                  I"- 9957R-I                        ~        'I      ~
                                                  'J ge                                                          'LB>/I:T                              . I'
                                            ~                                                                                                                        'i75
                                                                                                                                                      ~
JCJ!4        ICJ'CJ r I"- coNOUjT (JJ CI
                                                                                                        '.77 LM/i-"7                            '~                                'JI ;i      I
                                                                                                                                                                                                        ~
I TRAY          L, j
TQ fZ '-':.,
                                                                                                                                                                                                                                                                                    ;  ~
                                                                                                                                                                                                                                                                                                  ~
R COiOuITJ                                                                      gt t ICT- C(l ~: (ri. .,a    -;
  ~ I"-'253I- I                                                                                                                                .                                                            ~ Ir I Na I CT- Ce                                                                      ~  ~
                                                                                                                                                                                                                    ~ Ia t,s,".'>
  ~~ I b'I LBS/Pg
                          '          '.')                                                  ~ I    ~ ~
                                                                                                          '7s70 Leih/                F.'.T        i                                                                                          l CT C7 a]))Sg J(    'a D
z I"-2528-I                                                                                                                              ~
Qg, Ji.tt FROHT            ~    ~        ~    ~
I
                                                                                                                                                                    ~
TRAY MIGII76                      L
  ~(IS(ng LES// I-T              ~
N                                                                                        ~                    'I                                                                                  ~
q                                      2;l,07 M5/k7 C                                                                      I~
: 0.                                                                                                                                            i                                                                                                                                                        ~    r a I(IQ. - 0 f(S 0 4. - I
            'I
                                                                                                                                      ~
                                                                                                                                                    ~  ~
                                                                                                                                                              ~
                                                                                                                                                              ~
                                                                                                                                                                    ~
lt.                      ~ rTlt I9, M, .LE'J/ PTJ:
4-'+bI(JPY-f,
                                                                                                                                                                                                                                                                                          ~
z I,(I5 LB5/I=T                I ~ '.,~            'C                                                              IOIIl.LR5/ FT                                                                                                            20.08 LP&/FT
(      ~  I
                            ~    I                                                                                                                                                                                        ~
                                                                                                                          ~                                                                                                  ~C
                                                                                                                                ~
REAR I''I                                                                                                                                                na'I  >      c r
r      ~                                                                                              ~
ml                                                                                                                                                          rat                                                                                                                            al I5
                                                                                                                                                                      ~                                                                                                                ~
~l
* 1 i,.(p r
                                                                                                                                ~
                                                                                                                                                      ~        \                              ~a    IM N
IGT.-
I CT-
                                              ~
                                                                                                                                            ~
a                                                                                                                                ~                                                                                                                                                            ~C  ~
IA I                                                                                                              +'l- 8(l&qFf-I                ~
XI I I    ~                                                                                                                                                                                                          (
I                                                                                                          ~
IOI6 LSD/                                                                                                              Jg    REAlZ m!                                                  ~
J
                                                                        ~
                                                                        ~
r I
:      "$  l:
I                ~
I        ~
                                                                                                                                                                ~
                                                                                                                                                                                  ~    ~
(ea I'IH        n..a!LRS/Xr (JJ:                                  I  ~                                                                                                                                                  \ ~
                                                                                                                                                                                                                                                                                      ~      J    CI                  ~ I ~  r>
(SJ '                                                                      r                                                                                                                'V rt I'"''I I
80
                                            /I
                                                                            ~
                                                                            ~ t        ~
LB5lPT'l't..
                                                                  ~
I 'a    ~
Q..
a,                                              S
                                                ~  I tr    ~
                                                                                                                                ~        ~
                                                                                                                                                                                          ~ ~
I I
I                                                et                I ~,
                                                ~  te)                a
                                              ~          f                      I                                                                                                                                                                  tl. Ii tait)VL I                                                      ~
J  J'I ~ ~    ~e  t t ~,C    ~
                                                                                                                        'I    ~                                                r)  ~      ~
                                                                                                                                                                                                                          ~~ >V,.:
                                                                                                                                                                                                                                                                      "~              .    ~
                                                                                                                                                                                                                                                                                                    /
                                                                                                                                                                                                                                                                  ~
 
a4"
                                                                  ~ I      ~
                                ~      r r  g4"recco                  'I~
                                  ~ 1  ~,      Korrl                  F-
                                  ~            ~                          bC          ~ 4
                              ~ Ite)o 4          I eh
                                                                                                                                      ~  r r4e Oe~        r
                                                                                                                                                        ~ vrouw
                                                                                                                                                                                ~
Sel I
                                                                                                                                                                                            ~
SUPPoRT.                    &#xb9;        >0
                                                  ~ g                            ro .'goJ'sA tp                Atr I II(                          r 'o                                                                            II ~
                                                                                                                    'I                                                                                                                  'le    ~
I          I  ~
                                                                              ~ ~  O.    . Jgpq ~q            I so ~
Qfttr                                                                                                                              AA aClvej IS                                                                  <tr        "~            J,I1 I ef}e  I~IAII A I                      s..IJIC        I
                                                                                                                                                  ~
IJ I    'I        I ..'
                                                                                                                                            ~    ~              I e
spl I h      ~  o t.'~
                                                                                                                                                                                                                    ~    I  ~
                                                                                                            ~
                                                                                                                \                  I. I I                                                                                                                            Its!I'e.t' Ikl+'Cr                        ICI Cl s    'I'',
                                                                                                                                        ~        ~
ff        K                    I'lr I
                                                                                                                                  <<II' s'
S s
IsosrtI S
I        I I JI
  \                                                                                                                              I:II                                                                                      I
~
I Cutltf P                      II s
                                                                                                                                              . I etel ~ ~      ~~ re tA
:  -rr    ~        A.04
                        'I f:4~3 ore. e%%                  ~ o e'I ~~~
I ~ II I                                                                                                          ~  St.s'r 1 J')'
                                                                                                                                  )'Io s II            I I.'ll I'            I
                                                                                                                                                        ~
I                                                ~
I II
                                                                                                                                                ~
f>c                                          I I .Il          I I II I,II          ~
                                                                                                                                                                                                              ~      ~
I r'
                                                                                                                                @Ager                        ~  rrr'  ' 'I                                                  I
                                                                                                                                                                ~  rsrr
                                                                                                        'f I I I                          I                                                                          I~      ~
          ~
r            ~                            I                                                                                                                                                                                                Ie CIIJ)
I r                                    I I
IlI
                                                                                                                                      ~
I                                                                                                                        sl                                                                                                      I' rl '
I
                                                                                    -e      ~
                                                                                              '' e'rie K ~  L.                          I I~
I II
                                                                                                                                              ~
                                                                                                                                                                                                                                                      )!I"r.. ~
II  ~
J"                  ~ rKr  /          I Ie I    ~
                                                                                                                                      ~o
                                                                                                                                                      ~
                                                                                                                              ~      ~ I I
                                                                                    ~"                                        ~  Ce6
                                                                                                                                'I \ $ r r
                                                                                                                                                    ~~  slee
                                                                                                                                                    ~ ~ ~ leer o
                                                                                                    ~      \
Il e.
I
                                                                                                                              ~
II
                                                                                                                                    ~  I
                                                                                                                                              ~
                                                                                                                                              ~
                                                                                                                                                    ~                                                                                                                      Ilsr't tt"
            ~  \                                                                                                              s
                                                                                                                                    )  ~    I I
                                                                                                                                            ~
sg I Ii I
                                                                                                      'P
                                                                                                                              ~    IS      ~
                                                                                                                              ~
                                                                                                                              ~
e',I ~
I        ~
          ~D eOeS  I Sr\,
I
                                                                                                                                  .IL.'                                      ISnrICIrs IIA I                                                                                                                                                                                                    '"  ~    r J.  ~~
                          '                  ,~
                                                                ~ @
                    "rll,'r                                                                                                                                                                                                                                              'g    Ietll 'r t AALU                                I
                                            ~ ~
r                                                                                                                                                              rs I I In I''A" 11'J  i  ~  ~
                                                      ~  ~
I's ~ L ~
                                                                ~                                                      ,r)I ~ (~              ~
                                                                                                                                                                                                      ~
                                                                                                                                                                                                            ~  'rt IeorSIII


CD EMERG DIESEL FUEL OIL DAY TANK Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: CD EDG RM, Manufacturer, Model, Etc.: 36 D x 108 L, 465 GAL.4 Step 10-Determine the seismic demand acceleration ZPA 0.25 G Tank is rigid in all three directions.
0 CCW 5' S
Tank anchorage is adequate because anchorage acceleration capacity is greater than ZPA Step 11-Check the saddle stresses The program does not check the saddle stresses Check the saddle stresses by an independent calculation 5mamaw IC The tank anchorage is adequate.
Stevenson and Associates A Structural Mechoslcil
Coo Component No.i QT-l 0"(-(i)Claaa IIEIUll Any pazticularprea the Seismic Review Teaa should pay axtra attention to1 Yes No~(Xf yea, check items that apply.)Anchor Type Anchor Diameter Anchor Spacing Anchor Number Anchor Embedment Anchor Edge Distance Anchor Gap Anchor Thread Engagement Anchor Grip Anchor Angularity Concrete Crack Others (describe bri.efly)If there ia concern for Design Basis Discrepancy, circle the applicable item and explain.l.2.3.4.Hardvaro Maintenance Type Discrepancy.rawing Update Type Discrepancy Significant Operability/Design Basis Discrepancy Others Condition:
@I Cosovlllay Eaylaooclny Fam 6
!'oo!6 Actions Taken: Jog~peaparad By T'~~co Dace 4'+~~
"*12 CHP 5021.'CCD.
019 ATTACHMENT NO.1 IZ..>>890 Bldg.TVE.Moli>tH 5F'~.QP"C D" D~~.CCi-'P IMSLQE IHE.TUEL OlL W.Y fh'tW-Locatxon Insta at on dwg./Rev.Anchora e Arran ement Sketch Equipment No.j'j4 5~a Ql Q/I EEEV.4K&.MQR'TH APR D 5 19S LEIIK~Q FACE'~W C,Rg8 (TVF Drawn by: Verified by: d.RQ~IL Date: Date: Reviewed by: Qua./Cert.Inspector T o.~l~Date: Construction chor Review Engineer Page 1 of 3 Revision 1 0
~g~f'i y~i~~t+Jl~>e e~~~~~~~~-li I.e'l~l~-s.~r t L.S e~~~e~~~R%K~SWKiRWWWW
.1 0 0 0 RRRSRSRS WWHHHHQL 88558LL55 WII~WHL 5 HHI%55%L 8 RESRE5555RWW&&
55RRRRHRilN 5%5%i%-%SIN 6%5%5%RSMMRaIR MWWMWWWW h 0 I J l'l a1~~~~
SHP 5050 NDE-008 ATTACHMENT NO.1 UI.TRASONIC TEST REPORT JOB ORDER NO.: REPORT DATE: g7 5 REQUEST NO.A IDENTIFICATION Unit Component Item Material Other Test Unit/S/N Freq./Diameter
~Reference Standard Couplant/Batch No.TEST DATA REMARKS~7D.7$" PERFORMED BY: REVIEWED BY: FORM NO.12 SHP 5050 NDE.008-1 LEVEL: W DATE:/I EVEE'DATE: Page 1 of 1 Revision 0 ATTACHMENT 6 TO AEP:NRC:1040E SAMPLE LARS CALCULATIONS 001, 005, 010, 011, 022, 023, 027 AND 030 RAI ITEM 8 This attachment contains thc following:
1.A 16 page document containing thc proccdurcs, input data, and rcfcrcnccs used in the Limited Analytical Reviews.2.The rcqucsted Limited Analytical Rcvicws: LAR IIs 001,005,010,011,022,023,027 and 030.3.Thc calculation used to resolve the outlicr gcncratcd by LAR 022.4.The proccdurc used to address the outlier gcneratcd by LAR 005.
k'I PROCEDURES, INPUT DATA, AND REFERENCES USED IN THI: I,IMnZD ANAI,VSIS azmm S 3.LIMITED ANALYTICAL REVIEWS 3.1 Problem Statement This Limited Analytical Review (LAR), performed within the scope of Unresolved Safety issue (USI)A46, evaluates the structural integrity of cable tray and conduit supports which have been chosen as representative, worst case examples of the major different types of raceway support configurations within D.C.Cook Nuclear Power Plants 1 and 2.Twenty nine sample supports have been chosen from the plant raceway support systems for evaluation.


===3.2 Summary===
0 SUOJFCT 4d 844&
of Results The critical interaction value and related comments for each of the raceway support evaluations in this LAR are summarized in Table 3.1 below.Refer to the Attachments to this section for details of each of the evaluations.
DC    Coen STEVENSON
D.C.Cook A46 Cable Tray and Conduit Raceway Review October 1995 page 3-1 Table 3.1 Critical Interaction Values Interaction Value LAR No.001 002 Members/Connections 0.18 DL~ee Anchorage 0.68 3DL Maximum 0.68 3DL 003 0.50 OL 0.48 DL 0.50 DL 004 K":005."j!:.:::::-'i~
&a slntctwo4nochonlcot ASSOClATES              H8'SS  rD> rica"ro/ M~A/
0.29 DL<@FOP'<g~(LOW)...OL e~~c'~p;'e""w,'5'~<
conwtttng onglncottng tlrm
~,'e<'ew''e<gxQD<p,%:e 0.29 DL ItgQLKI 006 007 008 009 010 011 012 013 014 015 016 017 018 019 020 021 023 024 025 026 027 028 029 030 031 032 0.50 0.81 0.94 0.85 1.05 0.28 0.15 0.72 0.38 0.84 0.79 0.70 0.72 0.33 0.18 low 0.77 0.25 0.55*1~0.75 0.14~e*low 0.12 0.68 DL DL DL LL DL LL DL OI DL DL LL DL DL DL DL DL DL LL DL DL DL DL DL 0.76 0.56 0.33 0.43 1.02 0.45 0.58 0.93 0.32 0.40 0.31 1.04 0.67 0.22 0.90 0.10 0;23 0.96 low low 0.20 0.24 3DL 3DL DL LL DL LL DL LL 30L LL LL 30L 3DL DL DL DL DL OL LL 30L DL DL DL 0.76 0.81 0.94 0.85 1.05 1.02 0.45 0.72 0.93 0.84 0.79 0.70 1.04 0.33 0.67 0.22 0.90 0.25 0.55 0.96 0.14 low 0.19 0.68 30L DL DL LL OL LL DL DL 30L OL LL DL 30L DL DL DL O'D,L"':k DL OL LL 30L DL DL DL DL DL Dead Load 30L 3x Dead Load (Vertical Load Check)LL Lateral Load Check RF Rod Fatigue Check~f'i~/'::'::
Qellier***Not used.D.C.Cook A-46 Cable Tray and Conduit Raceway Review October 1995 Page 3-2 i i m f a Tr v I i Logic diagrams indicating the evaluation path taken to demonstrate the acceptance of each of the raceway supports are shown below.Note that the particular evaluation path taken for the support in question is defined in heavy outline.LAR Nos.003, 004, 008, 010, 012, 019, 020, 021, 023, 024, 030, 031, 032 START 8.3.1 Does the Support Have Vertical Dead Load Capacity With Eccentricities
~t.0 x OL?Yes Yes 8.3.1 Directly mounted to or rigidly cantilevered from an adjacent structural wall or ceiling?+No 8.3.7 Floor mounted?;Ho Yes 8.3.2 Does the Support Have Vertical Capacity~3.0 x OL?Yes 8.3.3 Does the Supped Have Ductile Response to Lateral Loading?Yes 8.3.4 Does the Support Have Adequate Lateral Load Strength'?Yes No l 8.3.5 Is the Support a Fixed-End Rod Hanger?Yes 8.3.5 Does the Support Pass the Fatigue Evaluation?
~Yes tfo Pass Analytical Review Outlier (Rigid Mount)D.C.Cook AA6 Cable Tray and Conduit Raceway Review October 1995 page 3-3 LAR Nos.005, 022 START 8.3.1 Does the Support Have Vertical Dead Load Capacily With Eccentricities
)1.0 x OL?No Yes 8.3.1 Directly mounted to or rigidly cantilevered from an adjacent structural wall or ceiling7 8.3,7 Floor mounted?No Yes 8.3.2 Does the Support Have Vertical Capacity-,.3.0 x DL?Yes8.3.3 Does the Support Havo Ductile Response lo Lateral Loading?Yes I No I 8.3.4 Does the Support Have Adequate Lateral Load Strength 7 Yes 8.3.5 Is the Support a Fixed-End Rod Hanger 7 No.V...1 Pass Analytical Review Yes 8.3.5 Does the Supporl Pass tho Fatigue Evaluation 7 Yes Outlier (Any support failing OL)D.C.Cook A-46 Cable Tray and Conduit Raceway Review October 1995 page 3A LAR Nos.009, 011, 016, 025 START 8.3.1 Does the Support Have Vertical Dead Load Capacity W~th Eccentricities
~1.0 x Dt.?Yes Yes 8.3.1 Directly mounted to or rigidly cantilevered from an adjacent structural wall or ceiling?No 8,3.?Floor mounted?l No I 8.3.2 Does the Support Have VeicaIG pocky 30xDL2 l Yes Yes 8.3.3 Does the Support Have Ouctge Response to Lateral Loading'7 Yes 8,3.4 Does the Support Have Adequate Lateral Load Strength?Yes 8.3.5 Is Ihe Supporl a Fixed-End Rod Hanger?Yes 8.3.5 Does the Support Pass the Fatigue Evaluation
'?Yes Pass Analytical Review Outlier (Floor Mounted Support)j D.C.Cook AAG Cable Tray and Conduit Raceway Review October 1995 page 3-5 LAR Nos.014, 028 START 8.3.1 Does thc Support Havo Vertical Dead Load Capacity With Ecccntricities
~1.0 x DL'?Yes No Ycs 8.3.1 Directly mounted to or rigidly cantilevered from an adjacent structural wall or ceiting?No 8.3.7 Floor rnounted2 No Yes 8.3.2 Does the Support Have Vertical Capacity~3.0 x OL 2 Ycs 8.3.3 Does the Support Have Ductile Response to Lateral Loading 7 Yes 8.3.4 Does thc Support Have Adequate Lateral Load Strenglh 7 Ycs No 8.3.5 Is lhe Support a Fixed~End Rod Hanger'?Yes 8.3,5 Does the Support Pass thc Fatigue Evaluation?
Yes Pass Analytical Review Outlier (Trapeze Frames)D.C.Cook AA6 Cable Tray and Conduit Raceway Review October 1995 page 3-6 LAR Nos.001, 006, 007, 017, 018, 027 START 8.3.1 Does the Support Have Vertical Dead Load Capacity With Eccentricities
)1.0 x DL'?Yes No Yes 8.3.1 Directly mounted Io or rigidly cantilevered from an adjacent structural wall or ceiling?8.3.7 Floor mounted?Does the Support Kavo Vertical Capacity~3 o x OL?Yes 8.3.3 Does tho Support Have Ductile Response to Lateral Loading'?Yes 8.3.4 Does the Support Havo Adequate Lateral Load Strength 7 Yes 8.3.5 Is the Support a Fixed-End Rod Hanger?No I Yes 8.3.5 Does tho Support Pass tho Fatigue Evaluation?
Yes Pass Analytical Review Outger (Rod Hanger Trapezes)D.C.Cook A46 Cable Tray and Conduit Raceway Review October 1995 page 3-7 LAR Nos.013, 015 START 8.3,1 Does the Support Have Vertical Dead Load Capacity With Eccentricities
~I.O x DL 7 Yes Yes 8.3.1 Directly mounted to or rigidly cantilevered from an adjacent structural wall or ceiting?8.3.?Floor mounted?Yes 8.3.2 Does the Support Have Vertical Capacity 3.0 x OL'?Yes 8.3.3 Does the Support Have Ouctige Response to Lateral Loading 7 Yes No 8.3.4 Does the Support Have Adequate'ateral Load Strength 2 Yes 8.3.5 Is the Support a Fixed-End Rod Hanger 7 No Yes 8.3.5 Does the Support Pass the Faligue Evaluabon?
Yes Pass Analytical
/Review Outlier (Floor to Ceiling Supports)D.C.Cook AA6 Cable Tray and Conduit Raceway Review October 1995 page 3-8


===3.3 Method===
SUOJEGT A      JOB No. ++ ~~~ ~ SHEET~~ OF~~
of Solution Hand calculations are performed employing the methodology outlined in Section 8 of Reference 3.6.4,"Generic Implementation Procedure (GIP)for Seismic Verification of Nuclear Plant Equipment.",Support structures are broken down, where applicable, into subsections which lend themselves to common, closed form solutions for structures subjected to static loading.3.4 Allowables and Assumptions The following is a compilation of allowable stress and load criteria used throughout the raceway support evaluations.
gA z449 S
strength of 36 ksi.AISC Specification allowables for Allowable Stress Design (Ref.3.6.1)are used for the dead load analysis.For other analyses, the allowable stress is increased to 0.9 Fy=32.4 ksi.J2.5 of Ref.3.6.1, is 0.3 x 60=18 ksi for dead load analysis.For all other analyses, 1.7 x 0.3 x 60=30.6 ksi is used.i: Dimensions, properties, and allowables use'd to analyze various Unistrut support system components are based on the Manufacturer's Catalog Data provided in Refs.3.6.2 and 3.6.3.These values are used for the dead load analysis and all other analyses.Values for Unistrut components commonly used at D.C.Cook are summarized below: Unistrut bending moment: Ref.3.6.3, p.23 P1000: 5080 in-Ib (allowable bending stress of 25 ksi)Channel nuts/bolts Ref.3.6.3, p.69 5/8": pullout in P1000 or P3000: 2500 Ib 5/8": slip in P1000 or P3000: 1500 Ib 1/2": pullout in P1000 or P3000: 2000 Ib 1/2": slip in P1000 or P3000: 1500 Ib 3/8": pullout in P1000 or P3000: 1000 Ib 3/8": slip in P1000 or P3000: 800 Ib Bolts are assumed tightened to manufacturer's recommended values r I: D.C.Cook embedded channels are Unistrut P1000 (or equivalent)
O CO STEYENSON                                        tU 5, ASSOCIATES 0 lttvclw04Mchonlcol conwNny enqlnoodnp Arm
, galvanized, 12 ga.channels with a material yield strength=33 ksi, modilied by the addition of 3/8$x 4"L Nelson Studs at 12" o.c.Results of tests of modified channels (Ref 3.6.20)indicate a minimum pullout capacity of 6400 lb/ft.The mode of failure was ripping of strut material around the stud;stud remaining in concrete.Using the AISC Allowable Stress Design allowable shear stress of 0.4 x Fy=13.2 ksi on a 45'one shaped slip surface results in an allowable pullout of 13.2 ksi x n x (D+t)x t=13.2 x 3.14 x (0.375+0.105)x 0.105"=2090 Ib, therefore use the standard catalog value of 2000 Ib, but not more than the allowable value for pullout of Unistrut channel nuts/bolts as listed above.For all other load cases, use an allowable stress of 1.7 x 0.4 x Fy resulting in an allowable pullout of 3550 Ib, but not more than the catalog allowable value for the pullout of Unistrut channel nuts/bolts as listed above.D.C.Cook A-46 Cable Tray and Conduit Raceway Review October 1995 page 3-9 To summarize:
Pullout of embedded strut: (dead load analysis)2000 Ib 2000 Ib 1000 Ib 5/8" channel nuVbolt 1/2" channel nut/bolt 3/8" channel nut/bolt Pullout of embedded strut: (all other analyses)2500 Ib 2000 Ib 1000 Ib 5/8" channel nut/bolt 1/2" channel nut/bolt 3/8" channel nut/bolt Concentrated loads may not be spaced closer than 12" apart unless the sum total of concentrated loads on any 12" of Unistrut length does not exceed the single load allowable.
Reference 3.6.14, will be used unless noted otherwise within the individual LAR's.1/2" 3/4" 1 II 1-1/2" 2 II 3 I I 4ll 1.1 Ib/ft 1.3 Ib/ft 2.0 Ib/ft 3.5 Ib/ft 4.9 Ib/ft 11.1 Ib/ft 16.6 Ib/ft wide by 6" high)is 25 pounds per linear foot, unless noted otherwise within the individual LAR's.h I: Concrete anchor bolt allowables used in alf analyses are based on Tables C.2-1 and C.2-2 of the GIP, Ref.3.6.4.The anchor bolt type must be known to use the maximum values.If anchor bolts are'identified as"non-shell" type anchors on the PASS, then, per Ref.3.6.12, the anchors are either 5/8" Hilti"Kwik-Bolts" or 5/8" Phillips wedge-type anchors.All other anchors must be identified on the PASS or they will be considered"unknown." Unknown anchors require a reduction factor of 0.6 on the allowable toads provided in Ref.3.6.4, Tables C.2-1 and C.2-2.All concrete anchors, known or unknown, shell or non-shell type, which are not loaded in tension by dead weight, require an additional reduction factor of 0.75 for the"Reduced Inspection Alternative", and, because one third of the anchor bolts (there must be a minimum of six)must be assumed to be"not available", another reduction factor of 0.67 must be taken.The design concrete strength at D.C.Cook is 3500 psi.This requires a reduction factor of 0.875 to be applied to the pullout capacity of all anchors.No reduction is required for the shear capacity.If a tightness check has been performed, it will be so stated on the PASS and the"Reduced Inspection Alternative" reduction factors may be waived.'D.C.Cook A<6 Cable Tray and Conduit Raceway Review October 1995 Page 3-10 r n or I To summarize: "Known" concrete anchors such as 5/8" Hilti"Kwik-Bolts", 5/8" Phillips Wedge-type, or 5/8" Phillips Red Head"self drills": Pall=3.17 kips x 0.8T5 x 0.75 x 0.67=1.39 kips Vali=3.79 kips x 0.75 x 0.67=1.90 kips Pall=3.17 kips x 0.875=2.77 kips Vali=3.79 kips All other 5/8" concrete anchors: (not in tension by deadweight)(in tension by deadweight)
I Pall=3.17 kips x 0.875 x 0.6 x 0.75 x 0.67=0.83 kips (not in tension by deadweight)
Vali=3.T9 kips x 0.6 x 0.75 x 0.67=1.14 kips Pall=3.17 kips x 0.875 x 0.6=1.66 kips Vali=3.79 kips x 06=228 kips All 3/4" concrete anchors: (in tension by deadweight)
Pall=4.69 x 0.875.x 0.6 x 0.75 x 0.67=1.23 kips Vali=5.48 x 0.6 x 0.75 x 0.67=1.65 kips Pall=4.69 x 0.&'F5 x 0.6=2.46 kips Vali=5.48 x 0.6=3.29 kips All 1/2" concrete anchors: (not in tension by deadweight)(in tension by deadweight)
Pall=2.29 x 0.875 x 0.6 x 0.75 x 0.67=0.60 kips Vail=2.38 x 0.6 x 0.75 x 0.67=0.72 kips Pall=2.29 x 0.875 x 0.6=1.20 kips Vali=2.38 x 0.6=1.43 kips All 3/8" concrete anchors:.(not in tension by deadweight)(in tension by deadweight)
Pall=1.46 x 0.875 x 0.6 x 0.75 x 0.67=0.39 kips Vali=1.42 x 0.6 x 0.75 x 0.67=0.43 kips Pall=1.46 x 0.875 x 0.6=0.77 kips Vall=142x06=085kips (not in tension by deadweight)(in tension by deadweight)
Shear-tension interaction limitations per the GIP, Ref.3.6.4, Section C.2.11 will be used to evaluate the effect of combined anchor bolt loading.D.C.Cook A-46 Cable Tray and Conduit Raceway Review October 1995 Page 3-11


===3.5 input===
SUBJECT        JOB No. ~~~++~ SKEET'=OF~
Data The hangers evaluated in this calculation were selected by the Seismic Review Team (SRT)that performed the raceway walkdown.The selections are documented in the Plant Area Summary Sheets (PASS), which are part of the project documentation.
                                    ~/
Pl ei i Horizontal seismic accelerations are required for the Lateral Load Evaluation and the Rod Hanger Fatigue Evaluations as defined in the GIP, Ref.3.6.4.Three options are presented in the GIP, Ref.3.6.4, Section 8.3.4 for determining the horizontal seismic acceleration to be used in lateral load evaluations.
DOC~ b~r~ J STEVENSON Du-o'er' 5 ASSOCIATES a sliucturo4neehonlecA conwWAg ong'Inoohng Nm
Acceleration values for D.C.Cook corresponding to each of the options are summarized below.Elevation ZPA Building Option 1 Option 2 Option 3 587 633 650 609 598 612 625 651 699 0.20 0.22 0.22 0.22 0.32 0.37 0.42 0.52 0.80 Aux Aux Aux DGB Cont Cont Cont Cont Cont 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 0.63 0.69 0.69 0.69 1.00 1.16 1.31 1.63 2.50 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 2.50 Option 1: 2g scaled by the maximum of SSE/Bounding Spectrum (ZPA value controls)Option 2: 2.5*1.25'Floor ZPA (1.25 is for'realistic'loor spectra)Option 3: 2.5'1.25 1.5'SSE ZPA (within 40'f grade)Conclusion:
Option 2 for Aux and DGB, Option 3 for Containment D.C.Cook A-46 Cable Tray and Conduit Raceway Review October 1995 page 3-12 0
The rod fatigue bounding spectra provided in the GIP, Ref.3.6.4, Figure 8-9, are plotted below vs.the envelope of the D.C.Cook 5%damping spectra for the Auxiliary Building and the envelope for Containment at El.650'nd below.These curves are used to determine the applicable bounding curve in the Fatigue Evaluation Screening Charts, Figure 8-10 to 8-14 of the GIP.20 1.5 g 1.0 0.5 0 0.1 I I I I I I I I I 1 I I I I I I I I I I I I I I I I I I I I I I I I I I I 11 I I I I I I 1 I I I'I I I I I 11 I I r I I I I I I I I I I I I I'I'r I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 111 I I I I I I I I I I r rr I I I I I I I I I I I I I I I II~I I I I I I I I, I is/I/I s I I I I I I 1 I I I I I I I I I I I I~IN I I I I I I I I I 11 I I I I 11 I 11 I I~I I~I I I I I I I yl 1 I I I I I s I I I I I~I I~I I I I I I I~ss I I I I I I I I I I I I I I I I I I I I II~II I I I'I 1111 I I I I I I I I I I I I~I I I I I I I I I I I I ssl s I I~I I I I I I I I I I I I I I I I I I I I~I I I I I I-rrrr gl I~II~111~I I I I~I I I I 10 I I I I I I I 11 I I I I I I I I I I sl I I I I 1 N I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 111 I I I I I I I I I I I I I I I I I I I I I I I I I I f I I I I I I I I~I I I I I I 11 I I I I I I I I I I I I I I I I I I I I I I I I I I I II I I I I I I I I I I I I I I I I I I 111 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 111 I I I-I rrr I I I I I I I I I I I I I I I I I I~~I I I I F~(Hz)20 1.5 I 1.0 0.5 I-0 0.1 I I I I I I I I I I H I I I I I I I I I I I I I I I I I I I 1 I I I I I I I I I I I I I~I I I I I~I I I I I s I~I I I~I I I I I I I I 1111 I I I I I I I I I I I I I I I I I SS'I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I rrrr I I I I I I I>I I I I I I I I I I I I I II I I I I I I I I I~I I I I~~I I I II I I I I I I I I I II s s~s I I I I I I I I I I I I II~6508AdbctoA)
I s s I I~I I I I I I I I I I I~I I I I I I s~I I I I I I I I I I I I I I H I I I~I I)I I I I I I I I I I I I~I I I~~II I I I I I I I I~I I I I I I~I I I I~I I I~~I I I I-rrrs J I I I~111 I I I I I I I I I I I I I I'I I I 11 I I I I I/I I I~'ls I I I~I I~I I III~I I s I I I I I I~I I I s I~~~s I I I I I~~I I I I~II I I I~II II~~I 10 s I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 1 I I I I I I I I I I~339 I I I I I I~~~~I I I I I I I I I I I I I I I I I I I I I I~I I I I I I I I I I I I I~I I I I I I I I I I I I I I I I I I I I I I I I I I I SSI I I I I I I I I I I I I I ss I I I I I I I I I I I I rrr I I I I I I II I I I I I I I I I I I I 111 I I I I I I I I I I I I~~I 11~I I I~I~I I I~~I Frequency (H)(D.C.Cook A-46 Cable Tray and Conduit Raceway Review October 1995 page 3-13 i vl in r nn Po r All threaded rods used in raceway supports at O.C.Cook are manufactured all-thread rods.Some rods, however, are anchored using the welded rod coupler detail shown to the right.The SRT was concerned that the coupler material is not as ductile as the rod material, particularly after being welded.2.Fatigue tests were performed on O.C.Cook threaded rods with the welded rod coupler detail (Ref.3.6.23).
These tests show that for the same ductilitydernand, the number of cycles to failure using the welded coupler detail is approximately half the number of cycles to failure using typical"nutted" rod connection details at O.C.Cook (Ref.3.6.6, Table 8-2).I The test data points for the welded coupler detail are plotted below on Figure 8=5 from Reference 3.6.6 (this figure was used to develop the fatigue evaluation screening charts in the GIP).Each test data point represents 3 tests (6 tests total)on 5/8" rods with an applied axial tensile preload (ITT)of 2.2 ksi (500 lb.)The test data points lie above the"2/3 Strain Acceptance l.ine", which represents the ductility demand vs.cycles to failure acceptance criteria for field-threaded rods.Therefore, in these LAR's, in order to cover rod-hung raceway supports that have not been selected as LAR candidates because of lower weight or longer length, but which may have welded coupler anchorage details, Rod Hanger Fatigue Evaluations will conservatively include the procedures specified in the G1P for field-threaded rods.3.20 FATIGUE DATA FOR THREADED RODS COMPEER.~INST.CVRV8 W/fl GD THRIVED 2.80 2.60 3 2a0 P 2.20 a 1.60 1.40 ACCEPTANCE LINE aa06 ltae~~~<<Ildt40W4c AQ(.1.20 0 1.00 1.008+00 NOt5lAUZED OVOllUIY Do&NOO.C.Cook AA6 Cable Tray and Conduit Raceway Review October 1995 page 3-14


===3.6 References===
0 SUBJECT                JOB No. o SHEEf 5   OF
3.6.1"Manual of Steel Construction, Allowable Stress Design", 9th Edition, American Institute of Steel Construction, lnc.Chicago, IL, 1989.3.6.2"General Engineering Catalog", No.10, Unistrut Building Systems, GTE Products Corporation, Wayne, Ml, 1983.3.6.3 3.6 4"General Engineering Catalog", No.12, North American Edition, Unistrut Corporation, Wayne, Ml, 1992.I"Generic Implementation Procedure (GIP), for Seismic Verification of Nuclear Plant Equipment", Revision 2A, March, 1993, Seismic Qualification Utility Group.3.6.5"Design of Welded Structures", Orner W.Blodgett, James F.Lincoln Arc Welding Foundation, July 1976.3.6.6"Seismic Evaluation of Rod Hanger Supports for Electrical Raceway Systems", EPRI NP-7152-D, March, 1991.3.6.7"Cable Tray and Conduit System Seismic Evaluation Guidelines", EPRI NP-7151-D, March, 1991.3.6.8"The Performance of Raceway Systems in Strong-Motion Earthquakes", EPRI NP-7150-D, March, 1991.3.6.9"Seismic Verification of Nuclear Plant Equipment Anchorage" EPRI NP 5228-SL, Revision 1,Volume 1, June, 1991.3.6.10 AEP Guideline No.18.3, Rev.4, 4/9/86: "Guide for Cable Tray Loading" 3.6.11 Test Report 91C1681-02, Testing of D.C.Cook typical Unistrut attachment brackets for rod hung cable trays.3.6.12 AEP Drawing No.1-2-EDS433-14, Sheet 1 of 2, 5/31/91.3.6.13"Longitudinal Load Resistance in Seismic Experience Database Raceway Systems", EPRI NP-7153-D, March 1991.3.6.14 AEP Document No.02-0120-1097, Revision 0, Page 3 (Rigid Conduit Weights)3.6.15 Letter from I.C.Huang of AEP Service Corporation to Steve Anagnostis of Stevenson and Associates, 1/10/94, re: as-installed conduit weights for raceway supports LAR011 and LAR017.3.6.16"Rigid Frame Formulas", A.Kleintogei, Frederick Ungar Publishing Co., New York, 1952./.D.C.Cook A-46 Cable Tray and Conduit Raceway Review October 1995 page 3-15 3.6.17 Donald C.Cook Nuclear Plant Drawings: 1-1594-4 1-1460-75 1-1528-51 1-1525-57 1-1464-83 3.6.18 AEP Guideline No.18.2A, Rev.0, 6/27/86: "Guide for Cable Tray System Design".3.6.19 Telecopy dated 4/29/94 from I.Huang of AEP to Steve Anagnostis of Stevenson and Associates regarding as-installed cable tray and conduit weights for LAR's 1,3,5,9",10,16,18, and 22.3.6.20 Letter from I.C.Huang/AEP to Steve Anagnostis/Stevenson and Associates, April 7, 1994-results of testing of D C Cook modified embedded Unistrut, 3.6.21 Stevenson 8 Associates Design Report, AEP Raceways 82C200-02, Cable Tray Testing-Analysis and Report, 9/30/83.3.6.22 Telecopy from I.C.Huang/AEP to Steve Anagnostis/Stevenson and Associates, May 6, 1994-Field information concerning LAR011 (bolt spacing and conduit spans).3.6.23"Low Cycle Fatigue Tests on 5/8 inch Threaded Road" by Dario A.Gasparini, P.E.IPh.D., Dept.of Civil Engineering, Case Western Reserve University for Stevenson 8 Associates, March 25, 1992.D.C.Cook A<6 Cable Tray and Conduit Raceway Review October 1995 page 3-16 REQUESTED SAMPLE LAR CALCULATIONS 001,005,010,011,022,023,027,030 I
                                            /~
CUENT Fb~KM JOB No.IS'SHEET OF Stl.'VenSOn and ASSOdateS Hl A 5rruc rural Maclra alca I Coarultrag Eagiaaerrag Frrra./9 CUENT%6 DC 4 ZAZ-ooi Stevenson end Associates Il A SrrnclnrohMochoalcol Coaoolliag Englnoorlng flrra O5'C7~cr/(
D2 Caom        ~im                    S Xd' STEVENSON              S4M-w/'r'ASE 84 ASSOCIATES a aovchroHnochoNcd rap Wca-COhWNAQ Ohglhlhrlhg Sftl
CUENT SUOJEGT gd g~g<Zs4-oo/Stevenson and Assodatcs 5I A Sauctural.Mechoolrsl coasu!5og Knylnoaanq Few~.aoP c Or8~Adds CUENT smu acr ce~~M-oat Stevenson and Associates R h Souelvwl.Mechanical Coasulaao Kayiaoorlaa Flies sa/Il
'Os6fyL ZXt$g C OMIQN-~Fthm<EHVDpQ..'sr.r,',.ss IIIII~1WT~7 I'~~'4I g.>.~'I>y~$I,V-RLl s S yV 0'cow vt YC'IsgL I sl I I sl I fs s P", s I s I I I I I'ag)~gL@0~rSI6,CW iW.80K 4 Q'IIILT4)~
IL 4" yss t,Mss's&s'ss~+Jlgt s'I LLI~t 1, t N.IHP B.631'-0".=r arS Wt+~~I.SI~gq~
g'laos'r.IL~"e~$3ss I'3s's 3y~II CIJLMIS (TC0$$I Skt"~h"s CI M Gib gs II lg ss gs, gII~~IoO ao IIEr~rrIar WI5~Et OVK IIEET WO GLKVhToR..
~PPoRY&#xb9;2 ACeVa rL.LL cO1Lo" wY'g4iW.Qf&Ar II5I~P~(tPIlfyl.+PC~~'1 cAOA ling,, I I I I I I I I>>Y,'I~l n,>/sr>'4.Z4L+g>>ml>>)>VS~: fd Jla>>>>t i>>t>>%A>>~>>>>A>>>>e P>>>>>>J, Al-'P fdPP tL Na>22,15t 5 lts5IFT glc%$Ppi'>'h~x wan ar>>a tat u>>>>Ie>>'sr&.s.>>>>~~
ag 12.444 LSSlI=T II>>C I5~l I2,55t'$5/FT 1S;hLS>iFT 6,tA C GIAN 693 10.4$L$5lFT z C n m D O m N'z4.5(o4$5rFt'y>>v:c&ts N)~~AlRm+C1 6-4 sk@i 6~'4 1Q.625 LBSf FT YAM-FS 2.c,t23 l>>r.1LQI g>>)II hllKHHVf cd&'4'IGLOO g>>>>I>>ll 4'T%lC SVRh4 C46.I>>QY WO 5 LCVh'To@>>SUPPLY&#xb9;<-R.>>%L C>>5>>I>>r 0~At'TUEL VVEJC WT5 FOR LAR4'COH001T lOEHTlFI CATION UNKNOWN 0 L CUENT r Stevenson and Assodates II A s<ruclural Moehaalcal Coneulling Enylnooeny l'leaa<85$'D9 l'ScM/oZ
.~
CUENT ggu~+'4@8 S Stevenson and Assodates II A svuciurel.Mechanical con oui li ay f agiaoorlny Fa w SS JQ x C.>>
(Stcvcnson and Assodatcs Q A Suwtvral Moehoaleol Cosevl8og Eaylaoorlay Fires CUENT sum ccr~+'>DQ 2ccm 4 S CP CUENT Smuem P~rr Stevenson and Associates Q A SnueNral Mechanical cohsulUay laglaoo<lnp n<m 4'4rx Lad-Wc ID' CUENT SUOJ~4 b 4AZM SC'IC/HPO auaac 6 oa c Rcvcnson and Assodates H A Steuccusahkechaalcal Coa>ulpop Kaplaeeclop Fitch's~-cv5 AY~re M~roB~>Pz Ace~W~.ma.~~
Stevenson and Associates Il A Svuctuwl Moeho nlcsl Coaeu!5'nginooenp Fans Z4Z-oos S zs 9 p'g.A~1%AC~ear>~~We.ckc@D goo Yo RaD Cc&PL/JJh To L'j$',Q RgoUklP WSLD (mK)&EE VETAlL"C-C"~~~OQ~~/~TAI 2'-to U-eu MPs pp>Q I 11 2/g IAMC8 I AN P3 U-t'LAMPS QvQ f"1/g''-4/g" 5~~6" l AM-XIO I AMP&EE PETA'lL Ie,"(n@l AN-CGQ)1 p gI f A,N<CG[l AM-C82 g1/Il 2'D I l/g.UN&BRUT~BoLl(~)i I lqx2x2 x)0 L I I I l l I I I 8 MC5>t=-0)I I)0+g" DEg Rv'T PETAlL"c.-c'PXT<wI'poRT TNP-~vPFg~')>r5 A HOT eAGHL=E
'34 l8:46 FROn AEPSC NUCLEAR DES LEFT'O RIGHT IA."-2840(o-I, 2.98 LBS/FT I'I~"-50IIZR-I, 3.2.2 LK5/FT<r~--SOIOSV-I, S.ZZLS>r Vr I-9957R-I, I.73 LBS/FT'q~I"-205I3-I, I.BI(6 LHS/FT~~~j,Pp~o gg~PAGE.OQ4 ACTUAL NElGWT5 FOR LAR~5 2 3O'R&KP P eon U-cLkNPs a'<~~z We.Eke@&BOD~o Hot Cc vPLQK~-XC L 3/4.nu>aV4C>wctu>I'~eg&EE OFTA1L"c-c" l0.95 LB5/FT'29.Hr 5 L65IFT 3~C8 3AM PZ t-PIUM@EL.633'~f g'pg&hDP U-CVd4P5 C~Q yl1 w.~ra".3 1t 3g Q~)LEFT TO RKHT 0"-9Z.G2PS-I)
IO;75 L55/FT 4'-'MBPS-I fO.GHL65/FT lANxto)ANTE.t-3 g LEFT TO RIGHT I4.291'o LD5/FT 25'H54L65/'I-T 3 AN-'C80 I~~CG t I AM-C82 l 25cg'xP"SF~(TYP)I.FI-T TO RISIIT+I.95 LSD/FT 34.Z7 LB5/FT>2,77 I.Pv/FT


Stevenson and Assodates R A svuctu(~I Mn<<hnnlcnl Cnnlulgng Knglnuuslng Elf'UENT D2 o 4AM-use Joulk>.+~~+~sHEEf~oFM~III O 8 LJ.OW CUENT~guECT D O Stovenson and Assodates II A Strwte re lkoAo nlcs1 cosoullsy Ksylaoooay Fleas o E CUENT muccr>C XeN.~<~<~~SHEET 3 OF~~Stevenson and Associates II AS(naciecabHocbaeleal Coasulliny Enolsoerlsa I<<w id'~Z 0
SUBJECT                      SHEET 0F STEVENSON K0 IIWCfutCHAOChQhICCI ASSOCIATES COA WIIIAP CAQfhtOAlg fllfh 844-Oi/
CUENT~c Stevenson and Assoclates im A slnscturel Mechanical Coastal'5aO Kngtnoedsg Fhm CUENT l Stcvcnson and Assodatcs ER A structural Hocbaaiea'I coneulsny Englnoodna Fcce V h CUENT Stevenson and Associates H A Slluclulnl Jlochn nlcnl Con<utgng Cnglnuurlng finn 7d~C CUENT mum Stevenson end Assodetes W h Srrac<arsl Mschsslcsl Cssralriarr taylssarlsy Firrs xg
HA2~ JDW P ag /0/ ~ Nl 0
I/I 5
UJ
                                                                  ~ 0


Rcvcnson and Associates RI IL Suuctu<al Mochaalcal Con o villa@Esglaeorlay E'l(a CUENT JOG No.Stcvcnson and Associates Nm A ScwNral htoehonlcal CoaevlCng Caglaoeslsy Fwa o5' CUENT Stevenson and Assodatcs S A Stiactvial Mechanical Coaouluny Eaoisoeclsy flea CUENT SUBJECT Stevenson and Associates Rl A Sltvc(v ral MoAo alcsl Conoul5sa Kaylnoorlao Faa l/~~
CLIENT amECT Qa Stevenson and Associates A suvctvtal Mochoslcol coneulusq ssolhttclly Flra
CUENT Stevenson and Associates Il A S<oadvrol.Woc4alcsl Coaoultley Eaglnoo(lay Foes O E CUENTStevenson and Assodatcs E5 A sv~ousal Mechaaical Coa>vlsay Ksglaoerlay Fns


L CUENTStevenson and Associates l5 A Snvctssal l4ochaaks1 coao~hay Esyisoonay nba d CUENT Stevenson and Associates El A Suvelurst.Mechanical Consolan'aylneorlng fl<w 24&a 0 CD'c CUENT JOO Na MS O SliEEE~&OF~F Stcvcnson and Associates l5 h strvciscn Mechanical conovlUne ssolssorlnp fires/z CUE~r SUOJECr Stevenson and Associates II A suuelucol Mechanical Conouluna Esglaoorlsp Fifa
0 g ~ ~ S STEVENSON 5a slrvcluroHn+chantcol ASSOCIATES conwmng nnglnonnng Arm xo/
.<'(((S ag~I W4~~I (p'rf+att/+ae a~~~, ACTUAI WEIG!FOV LAR~IO QJ IrJ a Q.I,~,~~ei tV~~r,'JI g" Jttr.~~'I+a~~e~r~~~t Sr 3c', J IS~~~I~~J~f r(fvyt tva~~~r th)~I.a(htJ (JC.S'.I I&PPoRT&#xb9;)0~~~t at te~I'I~t~*rat~~~t~~~~~)'jest I~'J ge (JJ CI R~I"-'253I-I~~I b'I LBS/Pg''.')D z I"-2528-I~(IS(ng LES//I-T~N 0.a I(IQ.-'I 0 f(S 0 4.-I z I,(I5 LB5/I=T I~'.,~'C~I r~ml~l a~*IA I I~J m!I~(JJ: I~(SJ'/I Q..a,~I S I I et~te)~f I~~~r~I r rt~~~t t~r a I~, I~J J'I~~~e~'I~i I~~~~~~4-'+bI(JPY-f, IOIIl.LR5/FT~~r~$rat~1 i,.(p r I''I~\~~~+'l-8(l&qFf-I~IOI6 LSD/~: "$l: I~~I~I'a~~~t t~,C~'I~1~g)y;Nr.I kgu(r~~~I\\~g~I~I I"-9957R-I~'I~'i75'LB>/I: T~.I'I"-coNOUjT'.77 LM/i-"7'~COiOuITJ.'7s70 Leih/F.'.T i~I~~~Qg,~I er rt~~~'~+A~:jt'JI lt.lai JCJ!4 ICJ'CJ r I I;i~gt t~I r I Na~Ia~q~rTlt~~C~a IM N~~\~'V (ea I'IH I~~r)~~~~>V,.: QI(J'J r~~r'.J~~l CT C7 Ji.tt FROHT~~~~TRAY MIGII76 L 2;l,07 M5/k7 C I9, M,.LE'J/PTJ:~20.08 LP&/FT'REAR IGT.-I5 I CT-X I I~al Jg REAlZ~r (~I n>c a'I~C~(n..a!LRS/Xr
6
~J I'"''I 80 LB5lPT'l't..
                            ~j
CI tl.Ii tait)VL"~.~/~..j;~TRAY L, TQ fZ'-':.,~ICT-C(l~:-;.(ri.,a I CT-Cet,s,".'>~~a]))Sg J('a I~~I~r>
a4"~r r g4"recco~1~, Korrl~~~I~'I~F-bC~4~Ite)o Sel I~~4 I eh~r Oe~r4e r~vrouw SUPPoRT.&#xb9;>0~g I I~so~aClvej IS spl I h~o r'~r~I r I~\sg I~D eOeS I Sr\, I'"rll,'r r ,~~~11'Ji~~~\I'I I I I I I~@~~~I's~L~ff K IsosrtI Cutltf P I f>c'f K~L.-e~''e'rie J"~rKr/I~"~\'P I r'o Qfttr J,I1 I s..IJIC I IJ~I'I I..'~~I.I I Ikl+'Cr~~s'I'', I s'I'lr s<<I S S I'I I I JI I:II s I I.I f:4~3.I~II I)'Io s II I~I.'ll I I'~~I II I I.Il I I II~I,II@Ager I I I~~Il I~I sl rl~I I~'I II II~I I~I~e~~o~I~Ce6'I\$r r~e.Il I II~~~~I~s)~I i~I I I~IS~~e',I~~I~.IL.'I e ICI Cl etel~~ore e%%~~re tA~o e'I~~~~rrr'''I~rsrr~~slee o~~leer ,r)I~(~~ro.'goJ'sA tp Atr I II('I~~O..Jgpq~q I<tr"~ef}e I~IAII A I~t.'~\ISnrICIrs AALU II~'le~AA'~I~Its!I'e.t' I:-rr~A.04~St.s'r 1 J')'I~~I Ie CIIJ)I')!I"r..~II A~~J'"~r.I rs I I In I''A"~~'rt IeorSIII Ilsr't tt"'g Ietll'r t 0 CCW 5'S Stevenson and Associates
@I A Structural Mechoslcil Cosovlllay Eaylaooclny Fam 6 0
SUOJFCT 4 d 844&DC Coen STEVENSON&ASSOClATES a slntctwo4nochonlcot conwtttng onglncottng tlrm H8'SS rD>rica"ro/M~A/
STEYENSON 5, ASSOCIATES 0 lttvclw04Mchonlcol conwNny enqlnoodnp Arm SUOJEGT A gA z449 O CO tU S JOB No.++~~~~SHEET~~OF~~
SUBJECT JOB No.~~~++~SKEET'=OF~
~/STEVENSON 5 ASSOCIATES a sliucturo4neehonlecA conwWAg ong'Inoohng Nm DOC~b~r~J Du-o'er' 0
SUBJECT JOB No.o 5 SHEEf OF/~STEVENSON 84 ASSOCIATES a aovchroHnochoNcd COhWNAQ Ohglhlhrlhg Sftl D2 Caom~im S4M-w/'r'ASE rap Wca-S Xd' SUBJECT SHEET 0F STEVENSON K ASSOCIATES 0 IIWCfutCHAOChQhICCI COA WIIIAP CAQfhtOAlg fllfh 844-Oi/HA2~JDW P ag/0/~Nl 0 I/I 5 UJ~0


CLIENT amECT Qa Stevenson and Associates A suvctvtal Mochoslcol coneulusq ssolhttclly Flra 0
CUGNT Stevenson and Associates 8     A stnaclvwl Hechaslcal f
g~~S STEVENSON 5 ASSOCIATES a slrvcluroHn+chantcol conwmng nnglnonnng Arm xo/~j 6 CUGNT Stevenson and Associates 8 A stnaclvwl Hechaslcal cosevhisy tsglooonng f na  
cosevhisy tsglooonng na


SUZeRT.-To
SUZeRT.-To
-=jPSRS~"~~-~
                                            =             jPSRS~"~~-~
SUPPORT...mHF NSro85-V"~)..'d'8'k3'~i~" L'2 24 27/ii&2Q.:ply Il 22 pal'2I~u.20~r-FL.EL.SSS'-o<<~~l.~8>, 8 QQp 19 lB i>-e rt)y lo]~.r>'lb is io Sf 3~X/qL---=~V---'-'A=---A
SUPPORT ...
'~.)5UI'f'opT AHCRog.PiN, PLBX i SL.P.C.OT tx 0)q>bc.PI>~)@8'4~l@>0 x)q ola M'M.H'.-..s
mHF NSro85-V"~)                     .. 'd' M'M.H'...s ...
...(TYI',)~ms'eor.,Y=
(TYI',)
-ASQQo.R..piM~ioMG (T~P)25.7/')>8 sJ@~he bc:.1ND<kNP N~CWC kg po%ER DoNKLD c..cooK NuciEp,p PLAN~.DP-.B<.N.MAa~R...DATE: E4.BB&'-.o."........BUILp'1N&,"AUX.: LoC.P,YiOH RvJGw, can.;.:.PiPE
                                                                    ~ms'eor.,Y=  ASQQo.R..piM~ioMG (T~P) 25 '2 7/')>
.-YUQHEL JN/7@4 SR GHEE RH ant~AGEE LAP go pg
                                                .                                                   8'k3'~ i~"L 8
.ATTACHMENT NQ.3 ypP'~Yt<lC))J~~>~vcr~'ue>oW'ery+~
24 27/ ii 2Q.:ply    Il 22  pal
g~un~sun~LoQ Bod 5o]JF YT SvPPi&T MlS SuFPoR~Ch)F iu Rv)<V'@Pc'Yu~)UF L Gun-<Phoo g/Wq//~l I I I I tl 5 I 7 r 5 pig Acx EoLTI+'ovC~I))l 0 lo+%"zg~g',dy~
                  '2I FL. EL. SSS'-o
4v t}/ga/4Apg'3 glO ATTACHMENT NO.1 COOK NUCLEAR PLANT A-46 RACEWAY EVALUATIONS LARoll CONDUiT NO.(SEE ATTACH.3)10 CONDUXT SIZE AND TYPE 3/4" EMT 1" EMT 1" EMT 1 1/2" RIGID STEEL RIGID STEEL 1 1/2" RIGID STEEL 2" RXGXD STEEL 2" RIGID STEEL 3" RIGID STEEL 3" RIGID STEEL 2" RIGID STEEL 2 i'IGID STEEL 3" RXGXD STEEL CABLE TYPE AND SIZE XN CONDUIT 1-12/C f12 XLA 2-2T/C f16 1-STP g16 1-4/C g7/3.8 1-4/C g7/18 1-4/C g7/18 1-3TC g4 1-1/C g4 1-4/C gl2 1-3TC g2/0 1-1/C g2 1-3TC g2/0 1-1/C g"2 1-3TC g2 1-1/C g4 1-4/C/12 1-3TC g4/0 1-1/C g2/0 POUNDS PER FOOT OF CONDUIT AND CABLE 0.97 0.73 0'9 2.87 2.87 2.87 3.81 3'2 7'1 7'1 3'2 3'2 8'9 BASIS FOR WEIGHT.CALCULATION (SEE LXSTED ATTACH.NOS.)5&7C 5&8B 5&13B 6&7C 6&7C 6&7C 6i 9i&10 6&7C 6, 9,&10 6, 9,&10 6, 9,&10 6&7C 6c 9,.&10 f)p)i~'~giant~II%IS n)a~a<~)gg O l8)la)hl 4l 0 88 rn'rM KAF.'i%%f QS&#xc3;l.I%f4 Nr>%%.Pi~I%$4~C~5~~)+~eat I~03<iS Cl Ot l~0z,.'lRE J/J~'P A~
                          ~u.
CUENT C.AQ 5 Stcvcnson and Associates Il llstevcwcal Hochanlcal CDlllll4llig KllglhoollhO Fcm GNAT iDP~-os~ezra~.  
20~<<~~l. r-        ~8>, 8 19 lB i>
                      -      e        rt)y QQp                        Sf 3~X/qL
                                                                                      ---=~V---'-'A=---A      '~.)
lo
                                ]~
                                    .       r>          'lb                          5UI'f'opT AHCRog. PiN, is                                                PLBX i SL.P. C.OT
>0                                                                          tx    0)q>
io 8'
bc.
PI >  4~)
                                                                                                                ~l@
x)q                                                                                            sJ@
ola
                                                                                                                                    ~he bc
:. 1ND<kNP          N~CWC          kg        po%ER DoNKLD c.. cooK                      NuciEp,p                  PLAN~
    . DP-. B<. N. MAa~R                     ...DATE
:   E4. BB&'-.o."........BUILp'1N&, "AUX.                                                                             SR  GHEE RH ant 4                        AGEE LAP go    pg
                                                                                                                        ~
: LoC.P,YiOH         RvJGw, can.;.:.PiPE .-YUQHEL JN/7                                 @
 
                                                                      '~Yt<lC )    )J~
. ATTACHMENT NQ.3
                                          ~>~vcr~'ue>oW'ery+~
ypP g                     ~un~ sun~
LoQ Bod 5o ]JF YT SvPPi&T MlS SuFPoR~ Ch)F iu Rv)<V
                              '@Pc 'Yu~)UF                   L Gun-<
l Phoo                                               I I
I I
g/                                             tl Wq//~
5           pig Acx EoLTI
                                                                        +'ovC~I)
I 7
r 5
                                      )l 0
lo
    +%     "zg~g',dy~ 4v t
                                                                          }/ ga
                                                                                /4Apg'3 glO
 
ATTACHMENT NO. 1 COOK NUCLEAR PLANT A-46 RACEWAY EVALUATIONS LARoll CONDUiT CONDUXT SIZE    CABLE TYPE      POUNDS PER FOOT      BASIS FOR WEIGHT NO. AND TYPE        AND SIZE      OF CONDUIT AND        .CALCULATION (SEE                      XN CONDUIT          CABLE      (SEE LXSTED ATTACH. NOS.)
ATTACH.3) 3/4"   EMT   1-12/C f12 XLA          0.97              5 &  7C 1"   EMT     2-2T/C f16            0.73              5 &  8B 1"   EMT      1-STP g16              0 '9              5 &  13B 1 1/2" RIGID     1-4/C g7/3.8          2.87              6 & 7C STEEL RIGID   1-4/C g7/18            2.87              6 & 7C STEEL 1 1/2" RIGID     1-4/C g7/18            2.87              6 & 7C STEEL 2"   RXGXD    1-3TC g4              3.81            6i 9i  &  10 STEEL       1-1/C g4 2" RIGID STEEL 1-4/C gl2            3 '2              6 & 7C 3" RIGID STEEL 1-3TC g2/0 1-1/C g2 7 '1            6, 9,  &  10 10        3" RIGID      1-3TC g2/0            7 '1            6, 9,  &  10 STEEL        1-1/C g"2 2" RIGID STEEL 1-3TC g2 1-1/C g4 3 '2            6, 9,  &  10 2 i'IGID STEEL 1-4/C /12            3 '2              6 & 7C 3"  RXGXD STEEL 1-3TC g4/0 1-1/C g2/0 8 '9            6c 9,.&  10
 
                                                        )p) f i                    ~'
        ~giant
            ~ II%IS la) hl 4l n)a~a
        <~)    gg    O                  0 l8)
        'i%% f QS&#xc3;l      .
                                                ~eat I%f4                                      I Nr>                      ~03 4~
C ~
I%$
Pi~                ~ )+
                                            <iS Cl 88            5 ~
rn        KAF.                       Ot
        'rM                                    l~0z,.'
lRE J
    /
J  ~
      'P A
                      ~
 
CUENT C.AQ  5 Stcvcnson and Associates          GNAT iDP ~    -  os ~ezra ~.
Il  llstevcwcal Hochanlcal CDlllll4lligKllglhoollhO Fcm
 
CLIENT SmuECT  4+6 Stevenson and Associates A Sttuatutal Nathan(cal SX  i&~
Q  CaaeulUntt Eaelnaatlng fltta Zo      r
 
GUENON sujet~  8' CA/Z ~
Stevenson and Associates SZ A Snueivr ~ I.MecLanical Q  Conevlsny Kayisoocag Firm
 
                          <  s''
                                  ~s
                    ~nno5r CA Dirt hsf'Lo
                                                                                      ~ ~
                                                                                                                        ~ l
                            ~
I                                                                                            l  gQQQ+      C5>>
GUPPY%
                                                                                  +/DAN GSZC-P2.
I>s                                    Op        L GSZC-CS                                          nAS:
: 18. 5'2        I.B5/ I=T f
tt t'S ll'~
                ~o Sl mrs"  ZOO                    L I'>>A'b
                                                                    'AA''07
              ~
                    ~JA  0                                    SECT 3 - M.'T8"Z.
9.'ISLETS/ T
                                                                      '-~I 65(PT IZ+KC-Z.
d'iJ    gp~~~
                                                                                                      <A4        ~
I5i01 PIOOO                                                            ItIIgPy,
                                                                                                                                            ~ I>> gO
                                                                                                                                                  ~
                                                                                                                                          ~ ~
1'COT t,  ~,  ~
scrrrrH m v sum's
                                                                                                                            ~
Au                      ~  ~
Z.'>> 7SGM 2.
4.A 4 I.65/ PX O
D I
D 0
ACTUAL VJElC HT5 FOR 4/AR:~ZZ Cl m
IQCMTIPICATIOH QF It        <,  Il/2." g C,D'5UNKHOWH Ci7 C)
 
g~o7 Tg 1I' JCC.
N>  2 L~t%555o Lk (Tft3 iiI
                                                                                                                  ~
II il il I
I'O'I ~
ue      Octal. A I'it+It &to L I'-44'4 SECT
            'A'A'g'll co-.
                                                                        %'tt cor        ~    ~
l'a Pg  M, f I 4 CoiIOIItt                                OX I&i('ii~                                                                                        CII. I.HM4IIIII%
                                                                                  ~ ~                  CWTX  II'IC~ 'll.
BOVTEM        MhY    SVPT'5 PEAN VlEW t
 
Egad o  SHEEf  OF d
CCW  5  dPc O
0                CO STEVENSON
: 5. ASSOCIATES                  s5 zD8  Pea 659 &~<9 tU K
a Itntcfvtctmocttantcol conutttlnp onplnoottntt Ilrm gyy 4  @f82/8 ~4..
 
SUBJECT          JOB No. SHEET~UQF 4+5 848~
0 STEVENSON 5, ASSOCIATES a Auelvcahnoe~
cantina ongfnoodng nrm b
 
SUMFGT STEVENSON K ttructurotrnnchontcol ASSOCIATES o
conautNng nnptneertnq nrm
 
P I
                                    '4 ~, ~ ~
0        0        0    0 g1l  @l <
pl l  Qll
:cga-TKg A-g SEE-.: DETAK.      A 4          ~    I ll e I fL. Gl  6l2-0"
 
0 SUNEGT STEVENSON
: 5. ASSOCIATES 0 ltmchnol4lochohlcol coneNnp onplnoonnp turn A5s ro+&W 9 uzi 5r
 
sussex STEVENSON 8(  ASSOCIATES
 
SUBJECT        JOB Ho. +~~~ SHEET &OF~~
PAz7 STEVENSON 844- oP 2
: 8. ASSOCIATES a sovclvrounochoMol CchNNho Ohglhccdho Alhl ESP
 
SUBJECT Goo~ err          0 STEVENSON 8c ASSOCIATES                      S/D  C COhSVINhg OhQIA40tlhg flllA O r'/
O S
 
SUBJECT JOB No STEVENSON 8(  ASSOCIATES conwmng onpHoorlng am
 
0 M
                                ~w//7 5 z,S 0
STEVENSON 5 ASSOCIATES          Mrz P3 conweng onplnoonnp Arm 1/
g
 
0
 
SUBJECT      lPIIHF.STD/K 0 SHEET F OF O
STEVENSON 8( ASSOCIATES o Etructrrrolrnochonlcot consrrtttng ongtnoortng arm 0
su~O a7    ~    F
 
6w/i 2 STEVENSON 8t. ASSOCIATES Q ltntchl<OHTi4ctMtnlcnl cntuttlnp ongtnoorlnp tttm
 
S    CCC 5  /7
                                    -/C.
O re STEVENSON                  ltt 8c ASSOCIATES                tt o structurotrnoctronlccl conruttlng onglnoorlng llrm
 
STEVENSON 8c ASSOCIATES o rrruclrrrcHnochanrccl conrrrrtlng onprnoodnp tlrm
 
SUBJECT JOB Ho.
STEVENSON 8(  ASSOCIATES a ttructvrctrnochcnlcnl ccnwtttnp onglnoortnp hrm
 
SUBJECT                JOB No.
                                    +6 84r8 s Z
STEVENSON 8  ASSOCIATES eonsuenp onplntorlng tern 7 %imam    WC,
 
r el(
((( oA~      S))1)OI SAC'lh.                  ~
                                                                                                                        \'o1 Oe(ll 'IAI(
(    )
                                                                                                                                              <<UNh r Ci>f
( Alta  4 9(
V14)
(4 fool l((fI o%~
f(IOA  IIII'1o
                                                                                    ,h4<)('() telo IOtfftf g W OV(f
                                                                          ~ ~ If~r SOT'TEN            lRAYS NC&c~~i CI,All II f(IIIKO ho CIA an t1'I'11~'Wb
                                                                                                                                                                  ~0 ~
o      [lo                          ~ I'
                                                                                                                                                                  ~~
                                                            )i/
                                                              ~  I(fII
                                                        ~AIII1AII A(I K>    I(IOI a)It) fAt4 1S                  LC1~'(f V I ((                            ~  (    lo C(OKAY C COSMIC lLCLIAt IAAI(f                                              Cr Aflgis'It"I'Ia.      rCCTIC((I      A A' COnll((((n(% (Oftf IIO t
                    ~ (fAS 0 ~
L. 01'4 CC IIO- 1
~ I,    WI((AS'5
: t. ((A(I4LI('I OATC            I(.1(  '%1.
tC C44
                                                                                                                    ~
                                                                                                                ~    ~
2c C~S
                                                                                                                  ~
                                                                                                                    )                                                I~1 COL 17                                                                                                J 2C'CW      i (J(                                                    ~    I                                                  1
                                ~A -                zc I    ~
I I
I I
I
                                                                                                                ~    I                                                I. l
                                                                                                      ~
gpP ww T'II    AY5-
 
SUBJECT            ...SZC/5 9o o  >~i              0 STEVENSON ZAg- o So                    rrs 8( ASSOCIATES o ssrvctwosrnochonrcol consurrlnSS onynoorhq rrrrn  2oar&#xc3;rww)ewe    8cbp3 -ro ro Og QC
 
SUBJECT ZAN>
r STEVENSON
&0 IoMclvfokhochnnkcl ASSOCIATES Conukonp onplnoohng ilrm
 
9'TEVENSON 8( ASSOCIATES 0 SlcUClvt04IhlChohtCN COAWNA9 OA9414OEIA9 llCN
 
SUBJECT JOG No. 6/      SHEET~ OF 0
C/l STEVENSON                                  UJ
: 8. ASSOCIATES                                  CC 0 oltMcIvcoMlochofllcol consvNng onglnoodng tlcm                  "r'O
 
2" 5/8  ROD BENT AROUND PIPE AND BOLTED INSIDE P1000        ANGLE I
5/8  EXPANSION ANCHORS
                                                    ~ ~
I I
EMBEDDED STRUT                        2'-0" 31 ~
2'-6" 1'-0" 10" PIPE CRANE WALL VIEW A-A o ALL ANGLES ARE  3X3X1/4 o PIPE PENETRATES CRANE WALL AT EL. 603' 10 AND RUNS UP INSIDE CRANE WALL TO A JUNCTION BOX AT EL. 625'-6". THERE IS A LATERAL SUPPORT AT EL. 610'. NO OTHER SUPPORTS EXCEPT PENETRATION AND JUNCTION BOX.
o PIPE LAYOUT SHOWN IN DRAWING 1 1460 (SEE SECTION 1X-1X AND DRAWING 1-1525).
UNIT 1, LOWER CONTAINMENT CONDUIT 1A1:    10" PIPE D. C. COOK A-46  RACEWAY WALKDOWN PASS ID//: RACE-1>1, LAR    //2
 
CALCULATIONUSED TO RESOLVE THE OUTLIER GENERATED BY LAR 8022
 
QUENT C/    cuccc ~ a" 89C1570-HF-OOI
                                                      ~
Stevenson and Assodatcs A Sauctuccl Mochoalccl mm Coaoulu ap Kaplaocrlup Puca cc
 
CUENT nrem ran Stcvcnson and Assodatcs A Stractaral.Mochankal Q  Conrrrttintt Enpinoortnrt Firm
 
CUENT SUOJECT Stevenson and Associates I    A Sgupturnl Mnpbnnlpnl Cpneuliing Englnnoeng Fgw
 
1 CUENT SUBJECT 5 SHEET ~    OF ~~
                                                  . CF Stevenson and Associates A STTHSTE T ~ I MSOiTSEICSI R  COOSE'lung EnglnESTing FTTES OF'I
 
CUENT      smM DF Stevenson and Associates A Sfrucluf41 Muchnnicnl R5 Cnnrulrinp Knpinnnrinp firm 6      4 3(
 
0 L
CUENT C S ~ SHEEi. ~pP~
Stevenson and Associates A st<ucNs ~ I Mechanical Q  conevaino Ksqineoano arm
 
CUENT S 8 C- OGQ Stevenson and Associates h Suuct~ral Mechanical H  cossunisy Esglaoeany fnm
 
CUENT JOE HF C    SHEET $ OF ~
Stevenson and Associates ii, SIT S Iiurs hMSSha OiC*l l3  ConSVIITOTI KngiOSSriOTI fTTTTI 43 IF
 
cuEwr SUBJECT
/
Stevenson and Associates A Suuc<u< ~I Mechonlgal 55  conovning engineering l'atm PS l
g k
 
PROCEDURE USED TO ADDRESS THE OUTLIER GENERATED BY LAR 8005
: 1. Introduction and Summary The prying-action detail documented in Plant Area Summary Sheet RACE103 and analyzed in Limited Analytical Review LAR005 resulted in an outlier. Per the Outlier Seismic Verification Sheet, the recommended resolution to this outlier is to walk-down the plant and document.all occurrences of this detail, screen the specific configuration of each detail using an acceptance criteria based on the LAR requirements, and modify those occurrences that do not meet the criteria. This document addresses the first part of this resolution - the walkdown and screening. The screening criteria is described in Section 2, the screening walkdown documentation is contained in Section 3.
This walkdown was performed by the Seismic Review Team members that did the bulk of the original raceway walkdown: I. C. Huang (AEPSC) and Stephen Anagnostis (SEA). The walkdown included all the areas of the plant covered in the raceway walkdown except for the Unit 1 containment above El 650 and inside the crane wall below El 650, as the unit was operating (the Unit 1 containment annulus was included). Based on the original raceway walkdown and that this walkdown of the Unit 2 containment did not find any significant occurrences of the prying-action detail, the SRT concluded that the Unit 1 containment does not contain any significant occurrences of the prying-action detail.
The results of this walkdown is summarized in Table 1. The first column contains the walkdown worksheet number (the worksheets are in Section 3), the second column describes the location of the hangers with the prying-action detail, and the third column states whether the hangers passed or failed the screening criteria. About 50 hangers with the prying-action detail were found (note. that some worksheets cover more than one hanger). Twelve of those hangers failed the screening criteria. All of the hangers that failed are located in one area of the plant - the Unit 1 Vestibule and the adjacent section of the Unit 1 Reactor Cable Tunnel.
Table 1. Summary of the Prying Action Detail screening walkdown.
Worksheet ff          Hanger Location                                                                Pass/Fail, 1-092694-1          Aux1, El 596, RCT Quad 3 North                                                  Pass Hangers 9, 10, 11 along the right wall counting from door 1-DR-AUX323.
1-092694-2          Aux1, El 596, RCT Quad 4                                                      Pass Hangers 5, 6, 7, 8, 9 on the left wall counting from door 1-DR-AUX329.
1-092694-3          Aux1, El 596, RCT Quad 4                                                      Fail (1J Directly across the hall from penetration 1-CEP-4P5 1-092694K            Aux1, El 596, RCT Quad 4                                                      P3ass Adjacent to penetration 1-CEP-4P5 1-092694-5          Aux1, El 596, RCT Quad 1                                                      Pass Two hangers across the hallway from penetration 1-CEP-1PG One hanger near MCC 1-CT-BN 1-092694-6          Aux1, El 596, RCT Quad 1                                                      Pass (2)
Upper platform, 1st hanger on right facing door 1-DR-AUX467 1-092694-7          Aux1, El 596, RCT Quad 1                                                      Pass [3]
Upper platform, first 3 hangers on left facing door 1-DR-AUX467 1-092694-8          Aux1, El 596, RCT Quad 1                                                      Fail Upper platform, first hanger on right off the edge of the platform.
2-092794-1          Aux2, El 596, RCT Quad 3 South                                                  Pass Near 2-VRS-2200 (Upper Cntmt RMS "B" Data Acq Module) 2-092794-2          Aux2, El 596, RCT Quad 1                                                        Pass Upper platform, two hangers about 3 hangers away from Door 2-OR-AUX468.
Attachment to the OSVS for RACE103 Prying-Action Detail Screening Criteria and Walkdown page 1
 
1-092794-3        Aux1, El 609, 4kV Area                                                            Pass Above 600V Bus IIA 1-092794-4        Aux1, El 609, Transformer Room                                                    Pass One hanger above 1-DGTAB and one hanger at the right side of the entrance.
1-092794-5        Aux1, Auxiliary Cable Vault                                                      Pass [4]
15'outh of the hatch 2-092894-1        Aux2, EI 573                                                                      Pass 6'outh of gate 2-GT-AUX1 013 (U2 Rx Coolant Drain Pump Room) 2-092894-2        Aux2, El 573                                                                      Pass South end of the hallway common to both units 1-092894-3        Aux1, El 609, elevated area adjacent to the control room cable vault              Pass Above 12HV-ACA-FLT-3 2-092894-4        Aux2, El 609                                                                      Pass Near Miscellaneous Rack 2-H-H 2-092894-5        Aux2, El 609                                                                      Pass Above cabinet 2-BITH2 1-0928944        Aux1, El 612, Vestibule, upper platform leading to RCT                            Pass [5]
Next to 1-DR-AUX467 1-092894-?                El 612, Vestibule, upper platform leading to RCT
                                              'ux1, Pass 3rd hanger on left from the edge of the platform 1-092894-8        Aux1, El 612, Vestibule, upper platform leading to RCT                            Pass 4th hanger on left from the edge of the platform 1-092894-9        Aux1, El 612, Vestibule, upper platform leading to RCT                            Fail [6]
2nd hanger on right from the edge of the platform 1-092894-1 0      Aux1 El 612, Vestibule
                          ~
Fail 4 hangers along the containment wall just before the upper platform leading to the RCT.
1-092894-11      Aux1, El 612, Vestibule                                                          Fait [73 The hanger above the west end of 1-HE-22 and the next hanger west.
The two or three hangers south of these running along the block wall.
2-092894-12      Aux2, El 612, Vestibule, upper platform leading to RCT                            Pass 4th hanger on right from the edge of the platform 2-092894-13      Aux2, El 633                                                                      Pass Hangers between the Containment Auxiliaries Panel and 2-MSI-1.
2-092994-1        Cont2, El 598, Annulus                                                          Pass Several hangers near Column 1, Az 63, Quad 1
[1] The angle is "clipped" to the embedded channel with the edge of a washer bolted into the embedded channel. Repair by drilling a hole through the angle and rebolting.
[2] This case doesn't meet the screening criteria, but was judged acceptable as the span between the tw'o adjacent supports is <= 10', so GIP requirements would be met even if this support was removed. Note that the adjacent hanger would then have a tributary length of    8'5'n    one side and 3'n    the other) and a load per rod of 640ft.. This load satisfies the allowables of 20000 for DL and 2500&#xc3; for 3DL as specified in the LAR calculation.
[3] This case doesn't meet the screening criteria for 3DL, but was judged acceptable as the r/c wall on one side and a large pipe, and platform steel and handrail on the other side will prevent any significant lateral motion.
'                                                                        Attachment to the OSVS for RACE103 Prying-Action Detail Screening Criteria and Walkdown page 2


CLIENT SmuECT 4+6 Stevenson and Associates Q A Sttuatutal Nathan(cal CaaeulUntt Eaelnaatlng fltta SX i&~Zo r GUENON sujet~8'CA/Z~Stevenson and Associates Q A Snueivr~I.MecLanical Conevlsny Kayisoocag Firm SZ
[4] This case doesn't meet the screening criteria, but was judged acceptable as the span between the two adjacent supports is <= 10', so GIP requirements would be met even if this support was removed. Note that the adjacent hanger would then have a tributary length of 7'4.5'n one side and 3.5'n the other) and a load per rod of 440% This load satisfies the allowables of 2000@ for DL and 2500@ for 3DL as specified in the LAR calculation.
<s''~s~nno5r~I GSZC-P2.~~CA Dirt hsf'Lo~l l gQQQ+C5>>I>s GSZC-CS 18.5'2 I.B5/I=T tt t'S ll'~~o~mrs" ZOO~JA 0 3-M.'T8"Z.9.'ISLETS/
[5] This case doesn't meet the screening criteria, but was judged acceptable as the span between the two adjacent supports is 9'<= 10'), so GIP requirements would be met even if this. support was removed.
T PIOOO Op L GUPPY%nAS: Sl f+/DAN L I'>>A'b SECT'AA''07 d'iJ gp~~~'-IZ+KC-Z.<A4~~I 65(PT I5i01 ItIIgPy, I>>gO~~1'COT scrrrrH m v sum's Au~~~t,~,~~~Z.'>>7SGM 2.4.A 4 I.65/PX O D I 0 D Cl m Ci7 C)ACTUAL VJElC HT5 FOR 4/AR:~ZZ IQCMTIPICATIOH QF It<, Il/2." g C,D'5UNKHOWH g~o7 Tg 1I'JCC.N>2 L~t%555o Lk (Tf t3 ii~I II il il I I'O'I~I'it+It&to ue Octal.A L I'-44'4 SECT'A'A'g'll co-.%'tt cor~~l'a I&i('ii~I 4 CoiIOIItt BOVTEM MhY SVPT'5 PEAN VlEW~~t Pg M, f OX CII.I.HM4III II%CWTX II'IC~'ll.
Note that the adjacent hanger would then have a tributary length of 7.5'4.5'n. one side and        3'n  the other) and a load per rod of 600iti. This toad satisfies the allowables of 2000'or DL and 2500ft for 3DL as I
Egad o SHEEf OF CCW 5 dP d c STEVENSON 5.ASSOCIATES a Itntcfvtctmocttantcol conutttlnp onplnoottntt Ilrm 0 s5 zD8 Pea 659&~<9 gyy 4@f82/8~4..O CO tU K SUBJECT 4+5 848~JOB No.SHEET~UQF STEVENSON 5, ASSOCIATES a Auelvcahnoe~
specified in the LAR calculation.
cantina ongfnoodng nrm b 0 SUMFGT STEVENSON K ASSOCIATES o ttructurotrnnchontcol conautNng nnptneertnq nrm P
[6] Both rods on this hanger do not meet the screening criteria (this hanger was the subject of LAR iIi'5, which initiated this effort).
0 0 0 0 g1l@l<pl l Qll I'4~,~~:cga-TKg A-g SEE-.: DETAK.A 4~I ll e I fL.Gl 6l2-0" 0
[7} The two hangers above 1-HE-22 probably need both rod anchorages to be modilied - these two hangers are on either side of a removable concrete hatch. The rods furthest from the corners of the hatch were clearly visible (and do not meet the criteria), the rods nearest the corner were not easily visible but look like they will also require modification.
SUNEGT STEVENSON 5.ASSOCIATES 0 ltmchnol4lochohlcol coneNnp onplnoonnp turn A5s ro+&W 9 uzi 5r sussex STEVENSON 8(ASSOCIATES
I The rods immediately adjacent to the block wall of two or three hangers running along the block wall were not clearly visible, but do not look like they will meet the screening criteria.
i                                                                          Attachment to the OSVS for RACE103 Prying-Action Detail Screening Criteria and Walkdown page 3
: 2. Screening Criteria 2.1  Criteria Development This criteria is for evaluating the D. C. Cook cable tray hanger anchorage detail shown below for seismic adequacy in accordance with GIP procedures (Ref. 1).
Lg P v vpv
                                                                      'v V
I/2  OR    5/8 UNISTRUT NUT AND BOLT IN EMBEDDED UNISTRUT L2x2x1/4 or L3x3xl/4
                                              'c
    = Bearing force on concrete FR = Te'nsile load in threaded rod Fa = Tensile load on Unistrut bolt Force in Unistrut bolt:           Fa = FR(1 + Lg/Lq)      => FR = Fa/(1+ Lg/L1)
Maximum moment in angle:          MMAx = FRL2                  FR'MAx/L2 In this detail, bending stresses in the angle and pullout force on the Unistrut bolt will each limit the capacity of the anchorage. The equations above show that the bending moment in the angle is related to L2, while the force in the Unistrut bolt is related to the ratio of L2 to L<. As the ratio L2/L< increases, the lever action on the Unistrut bolt increases for a given rod load FR.
r    li  'I The anchorage detail above is used on rod-hung trapeze hangers. For trapeze-type supports, which may swing laterally during an earthquake, the GIP requires both a Dead Load Check and a Vertical Capacity Check (3 x DL) of the anchorage. The vertical capacity check ensures that there is extra design margin in the anchorage to account for additional loads due to support displacement.
This detail is also used on wall-mounted brackets to provide vertical support at the cantilevered end. These supports are directly attached to building structure and are not free to move during an earthquake. Per GIP procedures, only a Dead Load Check is necessary for these supports.
Attachment to the OSVS for RACE103 Prying-Action Detail Screening Criteria and Walkdown page 4


SUBJECT JOB Ho.+~~~SHEET&OF~~STEVENSON 8.ASSOCIATES a sovclvrounochoMol CchNNho Ohglhccdho Alhl 844-oP 2 PAz7 ESP SUBJECT STEVENSON 8c ASSOCIATES COhSVINhg OhQIA40tlhg flllA Goo~err S/D C 0 O r'/O S  
Allowa    I  n    b ndi    s ess Bending stresses in angles are calculated in accordance with the AISC specification for single-angle members, Ref. 2. Per Section 5.2.1b of the specification, the calculated bending stress, fa, is:
fa= 1.25M/S = 1.25FnLz/S where S is the geometric section modulus of the angle section.
For the Dead Load Check, the working stress allowables given in Ref. 2 are used. Per Sections 5.1 and 5.2 of Ref. 2, the allowable bending stress is 0.66 Fq for 2x2x1/4 L's, and 0.6 Fq for 3x3x1/4 L's. For the 3 x DL Check, an allowable bending stress of 0.9FY is used for both angle sections. The bending stress, fa, and the stress limits are summarized as follows:
1.25FnLz/(0.247)        5  0.66Fy      for L2x2x1/4,    DL Case 1.25FqLz/(0.577)        5  0.60Fy      for L3x3x1/4,    DL Case 1.25FnLz/(0.247)        5  0.90Fy      for L2x2x1/4,    3DL Case 1.25FnLz/(0.577)        6  0.90Fy      for L3x3x1/4,    3DL Case liow  le  nis    b      llo    I d Allowable pullout loads for the Unistrut bolt are summarized below (see Ref 3 for discussion):
1/2" bolt      2000  Ib,      DL Case 5/8" bolt      2000  Ib,      DL Case 1/2" bolt      2000    Ib,      .3DL Case 5/8" bolt      2500  Ib,        3DL Case Limits for Lz and Lz/L< for a given Fz are listed below for all combinations of angle size, Unistrut bolt size, and load case.
DL case, bending in L2x2x1/4:
1 25F+Lz/S 6 0 66Fy            Lz 5 0 66 (36 000)(0 247)/(1 25Fn)        >      Lz 5 4690/Fn DL case, bending in L3x3x1/4:
1.25FnLz/S S 0.60Fy =>          Lz 6 0.60 (36,000)(0.577)/(1.25Fn)      =>      Lz 6 9970/Fn 3DL case, bending in L2x2x1/4:
3x1.25FpLz/S s 0.9Fy            =      Lz s 0.90 (36,000)(0.247)/(1.25x3Fn)      =>      Lz s 2130/Fn 3DL case, bending in L3x3x1/4:
3x1.25FL,/S 6 0.9Fy                            Lz 5 0.90 (36,000)(0.577)/(1.25x3Fq)      =>    Lz s 4990/Fn Attachment to the OSVS for RACE103 Prying-Action Detail Screening Criteria and Watkdown page 5


SUBJECT JOB No STEVENSON 8(ASSOCIATES conwmng onpHoorlng am 0
DL case, pullout of 1/2" Unistrut bolt:
STEVENSON 5 ASSOCIATES conweng onplnoonnp Arm Mrz P3~w//7 M 5 z,S 0 g 1/
FR(1+LE/Lq) 5 2000 Ib          =>      L2/Lq 5 (2000/FR)-1 DL case, pullout of 5/8" Unistrut bolt:
0!
FR(1+L2/Lq) 52000 Ib          =>      L2/Lq 5(2000/FR)-1 3DL case, pullout of 1/2" Unistrut bolt:
SUBJECT lPIIHF.STD/K 0 SHEET F OF STEVENSON 8(ASSOCIATES o Etructrrrolrnochonlcot consrrtttng ongtnoortng arm 0 su~O a7~F O
3FR(1+LE/Lq)  52000    Ib    =>      LP/Lq  5(667/FR)-1 3DL case, pullout of 5/8" Unistrut bolt:
3FR(1+L2/Lg)  52500 Ib        =>      LP/Lq  6(833/FR)-1 The equations above are summarized in table form below.
LOAD CASE ANGLE        UNISTRUT      DL                              3DL (LB)        SIZE          BOLT SIZE    L2 (IN., MAX)    L2/Lg(MAX)    L2 (IN., MAX)  Lp(L/(MAX) 2x2x1/4      1/2"          4690/  FR        (2000/FR)  1  2130/  FR    ( (667/FR)-1 5/8"          4690/  FR    I (2000/FR)  1  2130/  FR    I (833/FR)  1 1/2"                        l                              l 3x3x1/4                    9970/ FR        I (2000/FR)-1  4990/  FR    , (667/FR)-1 5/8"          9970/ FR        '(2000/FR)-'I  4990/  FR    '833/FR)-1 2.2 References
: 1.        Generic Implementation Plan Procedure (GIP), for Seismic Verification of Nuclear Plant Equipment", Revision 2A, March, 1993, Seismic Qualification Utility Group.
: 2.      "Specification for Allowable Stress Design of Single-Angle Members," from Section 5 of the AISC Manual of Steel Construction, Allowable Stress Design, Ninth Edition, American Institute of Steel Construction, Inc. Chicago, IL, 1989.
: 3.      LAR criteria document Attachment to the OSVS for RACE103 Prying-Action Detail Screening Criteria and Walkdown page 6


6w/i 2 STEVENSON 8t.ASSOCIATES Q ltntchl<OHTi4ctMtnlcnl cntuttlnp ongtnoorlnp tttm STEVENSON 8c ASSOCIATES o structurotrnoctronlccl conruttlng onglnoorlng llrm S O re ltt tt CCC 5/-/C.7  
2.3 Screening Charts Screening charts for F in increments of 25 lb up to 800 lb. appear on the following pages.
SCREENlNG CHART FOR                            FR <      'l00 LB LOAD CASE Fn      ANGLE      UNISTRUT                  DL                          3DL (LB)      SIZE    BOLT SIZE    L2 (IN., MAX) L2/L) (MAX) L2 (IN., MAX) L2/L) (MAX)
I 2x2x1/4        1/2"          188          79.0          85.2'25.7 6/8"          188          79.0          85.2    I    32.3 I
I I
3x3x1/4        1/2"          399          79.0          200      I    25.7 5/8"          399          79.0          200      I 32.3 I
I I
2x2x1/4        1/2"          93.8          39.0          42.6'12.3 5/8"          93.8          39.0          426      I    157 I
I I
3x3x1/4        1/2"          199          39.0          998      I    123 5/8"          199          39.0          998      I 16,7 I
I I
            '2x2x1/4        1/2"          62.5          25.7          28,4    I    7,9 5/8"          62.5          25.7          28.4    I    10.1 I
I I
3x3x1/4        1/Z'/8" 133          25.7          66.5    I 7.9 133          25.7          665      I    101 I
I I
2x2x1/4        1/2"          46.9          19.0          21.3      I    5.7 5/8"          46.9          19.0          213      t    73 I
100                                                                          I I
3x3x1/4        1 /2 II    , 99.7          19.0          499      I 57 5/8"          99.7          19.0          49.9      I    7.3 I
I Attachment to the OSVS for RACE103 Prying-Action Detail Screening Criteria and Walkdown page 7


STEVENSON 8c ASSOCIATES o rrruclrrrcHnochanrccl conrrrrtlng onprnoodnp tlrm SUBJECT JOB Ho.STEVENSON 8(ASSOCIATES a ttructvrctrnochcnlcnl ccnwtttnp onglnoortnp hrm
SCREENING CHART FOR                        FR <    200 LB LOAD CASE Fr( ANGLE  UNISTRUT              DL          ~ ~
3DL (LB)  SIZE  BOLT SIZE L2  (IN., MAX) Lg/Li(MAxl L2      (IN., MAXI  L2(L)(MAXI 2x2x1/4    1/2"        37.5          15.0          17.0          4.3 5/8"        37.5          15.0          17.0          5.7 125 3x3x1/4    1/2"        79.8          15.0          39.9          4.3 5/8"        79.8          15.0          39.9          5.7 2x2x1/4    1/2"      '1.3            12.3          14.2          34 5/8"        31.3          12.3          14.2          4.6 150 3x3x1/4    1/2"        66.5          12.3          33.3          34 5/8"        66.5          12.3          33.3          4.6 2x2x1/4    1/2"'/8" 26.8          104            12.2          2.8 26.8          10.4          12.2          3.8 175 3x3x1/4    1/2"        57.0          10.4          28.5          2.8 5I8"        57.0          10.4          28.5          3.8 2x2x1/4    1/2"        23.5            9.0          10.7          2.3 5/8"        23.5            9.0          10.7          3.2 200 3x3x1/4    1/2"        49.9            9.0          25.0          2.3 5/8"        49.9            9.0          25.0          3.2 Attachment to the OSVS for RACE103 Prying-Action Detail Screening Criteria and Walkdown page 8


SUBJECT+6 84r8 s Z JOB No.STEVENSON 8 ASSOCIATES eonsuenp onplntorlng tern 7%imam WC, fool l((f I o%~(((oA~S))1)OI SAC'lh.r el(<<UNh\'o Oe(ll'IAI(~1 ()(r 4 9((4 Alta Ci>f V14)f(IOA IIII'1o ,h4<)('()telo IOtfftf g W OV(f~~If~r SOT'TEN lRAYS-NC&c~~i CI,All II f(IIIKO ho CIA an t1'I'11~'Wb o[lo~I'~0~~~I ((~(lo C(OKAY C COSMIC lLCLIAt IAAI(f COnll((((n(%(Oftf IIO t~(fAS 0~L.01'4 CC IIO-1~I, WI((AS'5 t.((A(I4 LI('I OATC I(.1('%1.COL 17~I(f II)i/~AIII1AI I A(I K>I(IOI Cr Aflgis'It" I'Ia.a)It)fA t4 1S rCCTIC((I A A'~~~~)J LC1~'(f V tC C44 2c C~S I~1 2C'CW i 1 (J(~A-zc~I I~I I~I I I I I.l gpP T'II AY5-~ww SUBJECT...SZC/5 9o STEVENSON 8(ASSOCIATES o ssrvctwosrnochonrcol consurrlnSS onynoorhq rrrrn o>~i ZAg-o So 2oar&#xc3;rww)ewe 8cbp3-ro 0 rrs ro Og QC SUBJECT ZAN>r STEVENSON&ASSOCIATES 0 IoMclvfokhochnnkcl Conukonp onplnoohng ilrm
SCREENING CHART FOR                      FR <      300 LB LOAD CASE Fn  ANGLE  UNISTRUT              DL                          3DL (LB)  SIZE  BOLT SIZE L2 tlN., MAX) L2/LIlMAX) L2    lIN.. MAX) L2/LIlMAX) 2x2x1/4    1/2"      20.8          7.9            9.5          2.0 5/8"      20.8          7.9            9.5          2.7 225 3x3x1/4    1/2"      44.3          7.9            22.2          2.0 5/8"      44.3          7.9           22.2          2.7 2x2x1/4   1/2"      18.8          7.0             8.5          1.7 5/8"      18.8          7.0             8.5          2.3 250 3x3x1/4   1/2"      39.9          7.0            20.0          1.7 5/8"      39.9          7.0            20.0          2.3 I
2x2x1/4    1/2"      17.1    I 6.3            ?.7          1.4 5/8        17.1         6.3            7.7          2.0 I
I I
3x3x1/4    1/2"       36.3          6.3            18.1           1.4 5/8"      36.3          6.3            18.1           2.0 I
I I
2x2x1/4    1/2"      15.6          5.7            7.1          1.2 5/8"      15.6          5.7            7.1          1.8 I
300                                I, I
3x3x1/4    1/2"      33.2          5.7            16.6          1.2 5/8"      33.2          5.7            16.6          1.8 I
I Attachment to the OSVS for RACE103 Prying-Action Detail Screening Criteria and Walkdown page 9


9'TEVENSON 8(ASSOCIATES 0 SlcUClvt04IhlChohtCN COAWNA9 OA9414OEIA9 llCN SUBJECT JOG No.6/SHEET~OF STEVENSON 8.ASSOCIATES 0 oltMcIvcoMlochofllcol consvNng onglnoodng tlcm"r'O 0 C/l UJ CC 2" 5/8 ROD BENT AROUND PIPE AND BOLTED INSIDE P1000 ANGLE I~~I I 5/8" EXPANSION ANCHORS EMBEDDED STRUT 2'-0" 2'-6" 31~10" PIPE 1'-0" CRANE WALL VIEW A-A o ALL ANGLES ARE 3X3X1/4 o PIPE PENETRATES CRANE WALL AT EL.603'10 AND RUNS UP INSIDE CRANE WALL TO A JUNCTION BOX AT EL.625'-6".THERE IS A LATERAL SUPPORT AT EL.610'.NO OTHER SUPPORTS EXCEPT PENETRATION AND JUNCTION BOX.o PIPE LAYOUT SHOWN IN DRAWING 1-1460 (SEE SECTION 1X-1X AND DRAWING 1-1525).UNIT 1, LOWER CONTAINMENT CONDUIT 1A1: 10" PIPE D.C.COOK A-46 RACEWAY WALKDOWN PASS ID//: RACE-1>1, LAR//2 CALCULATION USED TO RESOLVE THE OUTLIER GENERATED BY LAR 8022 89C1570-HF-OOI QUENT C/cuccc~a"~-Stevenson and Assodatcs mm A Sauctuccl Mochoalccl Coaoulu ap Kaplaocrlup Puca cc
SCREENlNG CHART FOR                        FR  < 400 LB LOAD CASE Fr( ANGLE  UNISTRUT              DL          ~ ~
3DL (LBj  SIZE  BOLT SIZE Lp (IN., MAX}  L2/Lt(MAX} Lp    (IN., MAXl  L2/L)(MAX) 2x2x1/4    1/2"      14.4            5.2            6.6-          1.1 5/8"      14.4            5.2            6.6          1.6 325 3x3x1/4    1/2"       30.7            5.2          15.4          1.1 5/8"      30.7          , 5.2          15.4          1.6 I
I 2x2x1/4    1/2"      13.4      I 4.7            6.1          0.9 I
5/8"       13A      I    4.7            6.1          1.4 I
350                                  I I
I 3x3x1/4    1/2"      28.5      I    4.7          14.3          0.9 I
5/8"       28.5      I    4.7          14.3          1.4 I
I 2x2x1/4    1/2"       12.5            4.3            5.7          0.8 5/8"       12.5            4.3            5.7          1.2 375 3x3x1/4    1/2"       26.6            4.3          13.3          0.8 5/8"       26.6            4.3          13.3          1.2 2x2x1/4    1/2"       11.7            4.0            5.3          0.7 5/8"      11.7            4.0            5.3          1.1 400 3x3x1/4    1/2"      24.9            4.0          12.5          0.7 5/8"       24.9            4.0          12.5          1.1 Attachment to the OSVS for RACE103 Prying-Action Detail Screening Criteria and Wa}kdown page 10


CUENT nrem ran Stcvcnson and Assodatcs Q A Stractaral.Mochankal Conrrrttintt Enpinoortnrt Firm
SCREENING CHART FOR                      FR <      500 LB LOAD CASE Fn  ANGLE  UNISTRUT              DL                          3DL (LBI  SIZE  BOLT SIZE L2  (IN., MAXl L2/L> (MAxl L2 (IN., MAX) L,iL,(MAxl 2x2x1/4    1/2"        11.0          3.7            5.0            0.6 5/8"        11.0          3.7            5.0 425 3x3x1/4    1/2"        23.5          3.7            11.7          0.6 5/8"        23.5          3.7            11.7          1.0 2x2x1/4    1/2"        10.4          34            4.7            0.5 5/8"    -  10.4,        34            4.7            0.9 450 3x3x1/4    1/2"        22.2          34            11.1          0.5 5/8"        22.2          3.4            11.1          0.9 2x2x1/4    1/2"        9.9          3.2            4.5          0.4 5/8"        9.9          3.2            4.5          0.8 3x3x1/4    1/2"        21.0          3.2            10.5          0.4 5/8"        21.0          3.2            10.5          0.8 2x2x1/4    1/2"        9.4          3.0            4.3          0.3 5/8"        9.4          3.0            4.3            0.7 500 3x3x1/4    1/2"        19.9          3.0            10.0          0.3 5/8"        19.9          3.0            10.0          0.7 I                                                    Attachment to the OSVS for RACE103 Prying-Action Detail Screening Criteria and Walkdown page 11


CUENT SUOJECT Stevenson and Associates I A Sgupturnl Mnpbnnlpnl Cpneuliing Englnnoeng Fgw 1
0 SCREENlNG CHART FOR                      FR    < 600 LB LOAD CASE Fn  ANGLE  UNISTRUT              DL                          3DL (LB)  SIZE  BOLT SIZE L2 llN., MAX) L2/L) lMAX) L2 llN., MAX) L2/L1 lMAX) 2x2x1/4    1/2"        8.9          2.8            4.1            0.3 5/8"        8.9          2.8            4.1            0.6 3x3x1/4    1/2"      19.0          2.8            9.5            0.3 5/8"      19.0          2.8            9.5            0.6 2x2x1/4    1/2"        8.5          2.6            3.9            0.2 5/8"        8.5          2.6            3.9            0.5 550 3x3x1/4    1/2"      18.1          2.6            9.1            0.2 5/8"      18.1          2.6            9.1            0.5 2x2x1/4    1/2"        8.2          2.5            3.7            0.2 5/8"        8.2          2.5            3.7            0.4 575 3x3x1/4    1/2"      17.3          2.5            8.7            0.2 5/8"      17.3          2.5            8.7            0.4 2x2x1/4    1/2"        7.8          2.3            3.6            0.1 5/8"        7.8          2.3            3.6           0.4 600 3x3x1/4    1/2"      16.6          2.3            8.3           0.1 5/8"        16.6        2.3            8.3            0.4 Attachment to the OSVS for RACE103 Prying-Action Detail Screening Criteria and Wa)kdown page 12
CUENT SUBJECT 5 SHEET~OF~~.CF Stevenson and Associates R A STTHSTE T~I MSOiTSEICSI COOSE'lung EnglnESTing FTTES OF'I CUENT smM DF Stevenson and Associates R5 A Sfrucluf41 Muchnnicnl Cnnrulrinp Knpinnnrinp firm 6 4 3(
0 L CUENT C S~SHEEi.~pP~Stevenson and Associates Q A st<ucNs~I Mechanical conevaino Ksqineoano arm CUENTStevenson and Associates H h Suuct~ral Mechanical cossunisy Esglaoeany fnm S 8 C-OGQ


CUENT JOE HF C SHEET$OF~Stevenson and Associates l3 ii, SIT S Iiurs hMSSha OiC*l ConSVIITOTI KngiOSSriOTI fTTTTI 43 IF cuEwr SUBJECT Stevenson and Associates
        $ CREENING CHART FOR                    FR <      700 LB LOAD CASE Fn  ANGLE  UNISTRUT              DL                          3DL (LB)  SIZE  BOLT SIZE L2 IIN., MAX) I 2/L) lMAX) L2  (IN., MAX) L2/L)lMAX) 2x2x1/4    1/2"        7.5          2.2            3.4          0.0 5/8"        7.5          2.2            3.4          0.3 3x3x1/4    1/2"      16.0          2.2            8.0          0.0 5/8"      16.0          2.2            8.0          0.3 2x2x1/4    1/2"        7.2          2.1            3.3          0.0 5/8"        7.2          2.1            3.3          0.3 650 3x3x1/4    1/2"      15.3          2.1            7.7          0.0 5/8"      15.3          2.1            7.7          0.3 2x2x1/4    1/2"        6.9          2.0            3.2          -0.0 5I8"        6.9          2.0            3;2          0.2 675 3x3x1/4    1/2"      14.8          2.0            7.4          -0.0 5/8"      14.8          2.0            7.4          0.2 2x2x1/4    1/2"        6.7          1.9            3.0          -0.0 5/8"        6.7          1.9            3.0          0.2  .
/55 A Suuc<u<~I Mechonlgal conovning engineering l'atm PS g l k PROCEDURE USED TO ADDRESS THE OUTLIER GENERATED BY LAR 8005
700 3x3x1/4    1/2"      14.2          1.9            7.1          -0.0 5/8"      14.2          1.9            7.1          0.2 Attachment to the OSVS for RACE103 Prying-Action Detail Screening Criteria and Watkdown page 13


1.Introduction and Summary The prying-action detail documented in Plant Area Summary Sheet RACE103 and analyzed in Limited Analytical Review LAR005 resulted in an outlier.Per the Outlier Seismic Verification Sheet, the recommended resolution to this outlier is to walk-down the plant and document.all occurrences of this detail, screen the specific configuration of each detail using an acceptance criteria based on the LAR requirements, and modify those occurrences that do not meet the criteria.This document addresses the first part of this resolution
SCREENING CHART FOR                        FR  < 800 LB LOAD CASE Fn  ANGLE  UNISTRUT              DL          ~ ~
-the walkdown and screening.
30L LB)  SIZE  BOLT SIZE Lp {IN., MAX) Lp(L){MAX) L2    {IN., MAXI  L2/L]{MAX) 5/8"      6.5            1.8           2.9           0.1 3x3x1/4   1/2"       13.8          1.8            6.9          N/A 5/8"      13.8          1.8            6.9            0.1 2x2x1/4   1/2"       6.3            1.7            2.8           N/A 5/8"      6.3           1.7            2.8            0.1 750 3x3x1/4    1/2"      13.3           't.7          6.7           N/A 5/8"      13.3           1.7            6.7           0.1 2x2x1/4   1/2"      6.1           1.6            2.7          N/A 5/8"      6.1           1.6            2.7          0.0 3x3x1/4   1/2"      12.9          1.6            6.4          N/A 5/8"      12.9          1.6            6.4            0.0 2x2x1/4   1/2"       5.9          1.5            2.?          N/A 5/8"       5.9          1.5             2.7          0.0 800 3x3x1/4   1/2"      12.5          1.5            6.2          N/A 5/8"      12.5          1.5            6.2            0.0 Attachment to the OSVS for RACE103 Prying-Action Detail Screening Criteria and Walkdown page 14
The screening criteria is described in Section 2, the screening walkdown documentation is contained in Section 3.This walkdown was performed by the Seismic Review Team members that did the bulk of the original raceway walkdown: I.C.Huang (AEPSC)and Stephen Anagnostis (SEA).The walkdown included all the areas of the plant covered in the raceway walkdown except for the Unit 1 containment above El 650 and inside the crane wall below El 650, as the unit was operating (the Unit 1 containment annulus was included).
Based on the original raceway walkdown and that this walkdown of the Unit 2 containment did not find any significant occurrences of the prying-action detail, the SRT concluded that the Unit 1 containment does not contain any significant occurrences of the prying-action detail.The results of this walkdown is summarized in Table 1.The first column contains the walkdown worksheet number (the worksheets are in Section 3), the second column describes the location of the hangers with the prying-action detail, and the third column states whether the hangers passed or failed the screening criteria.About 50 hangers with the prying-action detail were found (note.that some worksheets cover more than one hanger).Twelve of those hangers failed the screening criteria.All of the hangers that failed are located in one area of the plant-the Unit 1 Vestibule and the adjacent section of the Unit 1 Reactor Cable Tunnel.Table 1.Summary of the Prying Action Detail screening walkdown.Worksheet ff 1-092694-1 1-092694-2 1-092694-3 1-092694K 1-092694-5 1-092694-6 1-092694-7 1-092694-8 2-092794-1 2-092794-2 Hanger Location Aux1, El 596, RCT Quad 3 North Hangers 9, 10, 11 along the right wall counting from door 1-DR-AUX323.
Aux1, El 596, RCT Quad 4 Hangers 5, 6, 7, 8, 9 on the left wall counting from door 1-DR-AUX329.
Aux1, El 596, RCT Quad 4 Directly across the hall from penetration 1-CEP-4P5 Aux1, El 596, RCT Quad 4 Adjacent to penetration 1-CEP-4P5 Aux1, El 596, RCT Quad 1 Two hangers across the hallway from penetration 1-CEP-1PG One hanger near MCC 1-CT-BN Aux1, El 596, RCT Quad 1 Upper platform, 1st hanger on right facing door 1-DR-AUX467 Aux1, El 596, RCT Quad 1 Upper platform, first 3 hangers on left facing door 1-DR-AUX467 Aux1, El 596, RCT Quad 1 Upper platform, first hanger on right off the edge of the platform.Aux2, El 596, RCT Quad 3 South Near 2-VRS-2200 (Upper Cntmt RMS"B" Data Acq Module)Aux2, El 596, RCT Quad 1 Upper platform, two hangers about 3 hangers away from Door 2-OR-AUX468.Pass/Fail, Pass Pass Fail (1J P3ass Pass Pass (2)Pass[3]Fail Pass Pass Attachment to the OSVS for RACE103 Prying-Action Detail Screening Criteria and Walkdown page 1 1-092794-3 1-092794-4 1-092794-5 2-092894-1 2-092894-2 1-092894-3 2-092894-4 2-092894-5 1-0928944 1-092894-?
1-092894-8 1-092894-9 1-092894-1 0 1-092894-11 2-092894-12 2-092894-13 2-092994-1 Aux1, El 609, 4kV Area Above 600V Bus IIA Aux1, El 609, Transformer Room One hanger above 1-DGTAB and one hanger at the right side of the entrance.Aux1, Auxiliary Cable Vault 15'outh of the hatch Aux2, EI 573 6'outh of gate 2-GT-AUX1 013 (U2 Rx Coolant Drain Pump Room)Aux2, El 573 South end of the hallway common to both units Aux1, El 609, elevated area adjacent to the control room cable vault Above 12HV-ACA-FLT-3 Aux2, El 609 Near Miscellaneous Rack 2-H-H Aux2, El 609 Above cabinet 2-BITH2 Aux1, El 612, Vestibule, upper platform leading to RCT Next to 1-DR-AUX467
'ux1, El 612, Vestibule, upper platform leading to RCT 3rd hanger on left from the edge of the platform Aux1, El 612, Vestibule, upper platform leading to RCT 4th hanger on left from the edge of the platform Aux1, El 612, Vestibule, upper platform leading to RCT 2nd hanger on right from the edge of the platform Aux1~El 612, Vestibule 4 hangers along the containment wall just before the upper platform leading to the RCT.Aux1, El 612, Vestibule The hanger above the west end of 1-HE-22 and the next hanger west.The two or three hangers south of these running along the block wall.Aux2, El 612, Vestibule, upper platform leading to RCT 4th hanger on right from the edge of the platform Aux2, El 633 Hangers between the Containment Auxiliaries Panel and 2-MSI-1.Cont2, El 598, Annulus Several hangers near Column 1, Az 63, Quad 1 Pass Pass Pass[4]Pass Pass Pass Pass Pass Pass[5]Pass Pass Fail[6]Fail Fait[73 Pass Pass Pass[1]The angle is"clipped" to the embedded channel with the edge of a washer bolted into the embedded channel.Repair by drilling a hole through the angle and rebolting.
[2]This case doesn't meet the screening criteria, but was judged acceptable as the span between the tw'o adjacent supports is<=10', so GIP requirements would be met even if this support was removed.Note that the adjacent hanger would then have a tributary length of 8'5'n one side and 3'n the other)and a load per rod of 640ft..This load satisfies the allowables of 20000 for DL and 2500&#xc3;for 3DL as specified in the LAR calculation.
[3]This case doesn't meet the screening criteria for 3DL, but was judged acceptable as the r/c wall on one side and a large pipe, and platform steel and handrail on the other side will prevent any significant lateral motion.'Attachment to the OSVS for RACE103 Prying-Action Detail Screening Criteria and Walkdown page 2
[4]This case doesn't meet the screening criteria, but was judged acceptable as the span between the two adjacent supports is<=10', so GIP requirements would be met even if this support was removed.Note that the adjacent hanger would then have a tributary length of 7'4.5'n one side and 3.5'n the other)and a load per rod of 440%This load satisfies the allowables of 2000@for DL and 2500@for 3DL as specified in the LAR calculation.
[5]This case doesn't meet the screening criteria, but was judged acceptable as the span between the two adjacent supports is 9'<=10'), so GIP requirements would be met even if this.support was removed.Note that the adjacent hanger would then have a tributary length of 7.5'4.5'n.
one side and 3'n the other)and a load per rod of 600iti.This toad satisfies the allowables of 2000'or DL and 2500ft for 3DL as specified in the LAR calculation.
I[6]Both rods on this hanger do not meet the screening criteria (this hanger was the subject of LAR iIi'5, which initiated this effort).[7}The two hangers above 1-HE-22 probably need both rod anchorages to be modilied-these two hangers are on either side of a removable concrete hatch.The rods furthest from the corners of the hatch were clearly visible (and do not meet the criteria), the rods nearest the corner were not easily visible but look like they will also require modification.
I The rods immediately adjacent to the block wall of two or three hangers running along the block wall were not clearly visible, but do not look like they will meet the screening criteria.i Attachment to the OSVS for RACE103 Prying-Action Detail Screening Criteria and Walkdown page 3 2.Screening Criteria 2.1 Criteria Development This criteria is for evaluating the D.C.Cook cable tray hanger anchorage detail shown below for seismic adequacy in accordance with GIP procedures (Ref.1).Lg v vpv'v P V I/2 OR 5/8 UNISTRUT NUT AND BOLT IN EMBEDDED UNISTRUT L2x2x1/4 or L3x3xl/4'c=Bearing force on concrete FR=Te'nsile load in threaded rod Fa=Tensile load on Unistrut bolt Force in Unistrut bolt: Fa=FR(1+Lg/Lq)=>FR=Fa/(1+Lg/L1)Maximum moment in angle: MMAx=FRL2 FR&#x17d;MAx/L2 In this detail, bending stresses in the angle and pullout force on the Unistrut bolt will each limit the capacity of the anchorage.
The equations above show that the bending moment in the angle is related to L2, while the force in the Unistrut bolt is related to the ratio of L2 to L<.As the ratio L2/L<increases, the lever action on the Unistrut bolt increases for a given rod load FR.r li'I The anchorage detail above is used on rod-hung trapeze hangers.For trapeze-type supports, which may swing laterally during an earthquake, the GIP requires both a Dead Load Check and a Vertical Capacity Check (3 x DL)of the anchorage.
The vertical capacity check ensures that there is extra design margin in the anchorage to account for additional loads due to support displacement.
This detail is also used on wall-mounted brackets to provide vertical support at the cantilevered end.These supports are directly attached to building structure and are not free to move during an earthquake.
Per GIP procedures, only a Dead Load Check is necessary for these supports.Attachment to the OSVS for RACE103 Prying-Action Detail Screening Criteria and Walkdown page 4 Allowa I n b ndi s ess Bending stresses in angles are calculated in accordance with the AISC specification for single-angle members, Ref.2.Per Section 5.2.1b of the specification, the calculated bending stress, fa, is: fa=1.25M/S=1.25FnLz/S where S is the geometric section modulus of the angle section.For the Dead Load Check, the working stress allowables given in Ref.2 are used.Per Sections 5.1 and 5.2 of Ref.2, the allowable bending stress is 0.66 Fq for 2x2x1/4 L's, and 0.6 Fq for 3x3x1/4 L's.For the 3 x DL Check, an allowable bending stress of 0.9FY is used for both angle sections.The bending stress, fa, and the stress limits are summarized as follows: 1.25FnLz/(0.247) 1.25FqLz/(0.577) 1.25FnLz/(0.247) 1.25FnLz/(0.577) 5 0.66Fy 5 0.60Fy 5 0.90Fy 6 0.90Fy for L2x2x1/4, DL Case for L3x3x1/4, DL Case for L2x2x1/4, 3DL Case for L3x3x1/4, 3DL Case liow le nis b llo I d Allowable pullout loads for the Unistrut bolt are summarized below (see Ref 3 for discussion):
1/2" bolt 5/8" bolt 1/2" bolt 5/8" bolt 2000 Ib, 2000 Ib, 2000 Ib, 2500 Ib, DL Case DL Case.3DL Case 3DL Case Limits for Lz and Lz/L<for a given Fz are listed below for all combinations of angle size, Unistrut bolt size, and load case.DL case, bending in L2x2x1/4: 1 25F+Lz/S 6 0 66Fy Lz 5 0 66 (36 000)(0 247)/(1 25Fn)>Lz 5 4690/Fn DL case, bending in L3x3x1/4: 1.25FnLz/S S 0.60Fy=>Lz 6 0.60 (36,000)(0.577)/(1.25Fn)
=>Lz 6 9970/Fn 3DL case, bending in L2x2x1/4: 3x1.25FpLz/S s 0.9Fy=Lz s 0.90 (36,000)(0.247)/(1.25x3Fn)
=>Lz s 2130/Fn 3DL case, bending in L3x3x1/4: 3x1.25FL,/S 6 0.9Fy 4990/Fn Lz 5 0.90 (36,000)(0.577)/(1.25x3Fq)
=>Lz s Attachment to the OSVS for RACE103 Prying-Action Detail Screening Criteria and Watkdown page 5 DL case, pullout of 1/2" Unistrut bolt: FR(1+LE/Lq) 5 2000 Ib=>L2/Lq 5 (2000/FR)-1 DL case, pullout of 5/8" Unistrut bolt: FR(1+L2/Lq) 52000 Ib=>L2/Lq 5(2000/FR)-1 3DL case, pullout of 1/2" Unistrut bolt: 3FR(1+LE/Lq) 52000 Ib=>LP/Lq 5(667/FR)-1 3DL case, pullout of 5/8" Unistrut bolt: 3FR(1+L2/Lg) 52500 Ib=>LP/Lq 6(833/FR)-1 The equations above are summarized in table form below.(LB)ANGLE SIZE UNISTRUT BOLT SIZE LOAD CASE DL 3DL L2 (IN., MAX)L2/Lg(MAX)
L2 (IN., MAX)Lp(L/(MAX) 2x2x1/4 3x3x1/4 1/2" 5/8" 1/2" 5/8" 4690/FR 4690/FR 9970/FR 9970/FR (2000/FR)1 I (2000/FR)1 l I (2000/FR)-1
'(2000/FR)-'I 2130/FR 2130/FR 4990/FR 4990/FR ((667/FR)-1 I (833/FR)1 l , (667/FR)-1
'833/FR)-1


===2.2 References===
2.4 Anchora e Evaluation Works eet LI r,              Fo Hanger Identification and Location:
1.Generic Implementation Plan Procedure (GIP), for Seismic Verification of Nuclear Plant Equipment", Revision 2A, March, 1993, Seismic Qualification Utility Group.2."Specification for Allowable Stress Design of Single-Angle Members," from Section 5 of the AISC Manual of Steel Construction, Allowable Stress Design, Ninth Edition, American Institute of Steel Construction, Inc.Chicago, IL, 1989.3.LAR criteria document Attachment to the OSVS for RACE103 Prying-Action Detail Screening Criteria and Walkdown page 6
vVV    VVV V
t                  VVVVV
                                      ~ ~
I/2   DR 5/d VRIvvIRVI IIVI AND DDL'I VI CIIOCDDLD VIIISIRVl L2v2vl/I VI L2I2II/O Span:                                          Estimated load on threaded rod, FR.
FSTIMATED CABLE TRAY                      Calculations:
AND CONDUIT WEIGHTS, PLF ITEM                            PLF CABLE TRAYS                    25 1/2 CONDUIT                    1.1 3/4 CONDUIT                    1.3 1"   CONDUIT                  2.0 1.5" CONDUIT                    3.5 2    CONDUIT                  4.9 3    CONDUIT                  11.1 4    CONDUIT                  16.6 FIELD DATA:
Angle size:                                Unistrut Bolt Size:
Lengths:        L1                                            L2/L1 LIMITINGVALUES FROM SCREENING CHART FOR FR=                                            LB:
DL CASE                                    3 X DL CASE (IF APPLICABLE)*
Max L                                    Max L2/L1                  Max L                      Max L>/L1 Actual L                                Actual L>/L1                Actual L                    Actual L>/L1 PASS:                                    PASS:                      PASS:                        PASS:
YES              NO                    YES        NO              YES        NO              YES          NO
*3xDL case N/A for wall mounted brackets.
Attachment to the OSVS for RACE103 Prying-Action Detail Screening Criteria and Walkdown 1
page 15


===2.3 Screening===
I 3. Screening     Walkdown Worksheets Worksheot  &#xb9;  Hanger Location 1-092694-1     Aux1, El 596, RCT Quad 3 North Hangers 9, 10, 11 along the right wall counting from door 1-OR-AUX323.
Charts Screening charts for Fin increments of 25 lb up to 800 lb.appear on the following pages.SCREENlNG CHART FOR FR<'l00 LB LOAD CASE Fn (LB)ANGLE SIZE UNISTRUT BOLT SIZE DL L2/L)(MAX)L2 (IN., MAX)3DL L2 (IN., MAX)L2/L)(MAX)100 2x2x1/4 3x3x1/4 2x2x1/4 3x3x1/4'2x2x1/4 3x3x1/4 2x2x1/4 3x3x1/4 1/2" 6/8" 1/2" 5/8" 1/2" 5/8" 1/2" 5/8" 1/2" 5/8" 1/Z'/8" 1/2" 5/8" 1/2 II 5/8" 188 188 399 399 93.8 93.8 199 199 62.5 62.5 133 133 46.9 46.9 , 99.7 99.7 79.0 79.0 79.0 79.0 39.0 39.0 39.0 39.0 25.7 25.7 25.7 25.7 19.0 19.0 19.0 19.0 I 85.2'25.7 85.2 I 32.3 I I I 200 I 25.7 200 I 32.3 I I I 42.6'12.3 426 I 157 I I I 998 I 123 998 I 16,7 I I I 28,4 I 7,9 28.4 I 10.1 I I I 66.5 I 7.9 665 I 101 I I I 21.3 I 5.7 213 t 73 I I I 499 I 57 49.9 I 7.3 I I Attachment to the OSVS for RACE103 Prying-Action Detail Screening Criteria and Walkdown page 7 SCREENING CHART FOR FR<200 LB LOAD CASE Fr((LB)ANGLE SIZE UNISTRUT BOLT SIZE DL~~Lg/Li(MAxl L2 (IN., MAX)3DL L2(L)(MAXI L2 (IN., MAXI 125 2x2x1/4 3x3x1/4 1/2" 5/8" 1/2" 5/8" 37.5 37.5 79.8 79.8 15.0 15.0 15.0 15.0 17.0 17.0 39.9 39.9 4.3 5.7 4.3 5.7 150 2x2x1/4 3x3x1/4 1/2" 5/8" 1/2" 5/8"'1.3 31.3 66.5 66.5 12.3 12.3 12.3 12.3 14.2 14.2 33.3 33.3 34 4.6 34 4.6 175 2x2x1/4 3x3x1/4 1/2"'/8" 1/2" 5I8" 26.8 26.8 57.0 57.0 104 10.4 10.4 10.4 12.2 12.2 28.5 28.5 2.8 3.8 2.8 3.8 200 2x2x1/4 3x3x1/4 1/2" 5/8" 1/2" 5/8" 23.5 23.5 49.9 49.9 9.0 9.0 9.0 9.0 10.7 10.7 25.0 25.0 2.3 3.2 2.3 3.2 Attachment to the OSVS for RACE103 Prying-Action Detail Screening Criteria and Walkdown page 8 SCREENING CHART FOR FR<300 LB LOAD CASE Fn (LB)ANGLE SIZE UNISTRUT BOLT SIZE DL L2/LI lMAX)L2 tlN., MAX)3DL L2/LI lMAX)L2 lIN..MAX)225 2x2x1/4 3x3x1/4 1/2" 5/8" 1/2" 5/8" 20.8 20.8 44.3 44.3 7.9 7.9 7.9 7.9 9.5 9.5 22.2 22.2 2.0 2.7 2.0 2.7 250 2x2x1/4 3x3x1/4 1/2" 5/8" 1/2" 5/8" 18.8 18.8 39.9 39.9 7.0 7.0 7.0 7.0 8.5 8.5 20.0 20.0 1.7 2.3 1.7 2.3 2x2x1/4 3x3x1/4 1/2" 5/8 1/2" 5/8" 17.1 I I 17.1 I I I 36.3 36.3 I I 6.3 6.3 6.3 6.3?.7 7.7 18.1 18.1 1.4 2.0 1.4 2.0 300 2x2x1/4 3x3x1/4 1/2" 5/8" 1/2" 5/8" 15.6 15.6 33.2 33.2 I 5.7 5.7 I I, I 5.7 5.7 I I 7.1 7.1 16.6 16.6 1.2 1.8 1.2 1.8 Attachment to the OSVS for RACE103 Prying-Action Detail Screening Criteria and Walkdown page 9 SCREENlNG CHART FOR FR<400 LB LOAD CASE Fr((LBj ANGLE UNISTRUT SIZE BOLT SIZE DL~~L2/Lt (MAX}Lp (IN., MAX}3DL L2/L)(MAX)Lp (IN., MAXl 325 2x2x1/4 3x3x1/4 1/2" 5/8" 1/2" 5/8" 14.4 14.4 30.7 30.7 5.2 5.2 5.2 , 5.2 6.6-6.6 15.4 15.4 1.1 1.6 1.1 1.6 350 2x2x1/4 3x3x1/4 1/2" 5/8" 1/2" 5/8" 13.4 13A 28.5 28.5 I I I I I I I I I I I I I I 4.7 4.7 4.7 4.7 6.1 6.1 14.3 14.3 0.9 1.4 0.9 1.4 375 2x2x1/4 3x3x1/4 1/2" 5/8" 1/2" 5/8" 12.5 12.5 26.6 26.6 4.3 4.3 4.3 4.3 5.7 5.7 13.3 13.3 0.8 1.2 0.8 1.2 400 2x2x1/4 3x3x1/4 1/2" 5/8" 1/2" 5/8" 11.7 11.7 24.9 24.9 4.0 4.0 4.0 4.0 5.3 5.3 12.5 12.5 0.7 1.1 0.7 1.1 Attachment to the OSVS for RACE103 Prying-Action Detail Screening Criteria and Wa}kdown page 10 SCREENING CHART FOR FR<500 LB LOAD CASE Fn (LBI ANGLE SIZE UNISTRUT BOLT SIZE DL L2/L>(MAxl L2 (IN., MAXl 3DL L,iL,(MAxl L2 (IN., MAX)425 2x2x1/4 3x3x1/4 1/2" 5/8" 1/2" 5/8" 11.0 11.0 23.5 23.5 3.7 3.7 3.7 3.7 5.0 5.0 11.7 11.7 0.6 0.6 1.0 450 2x2x1/4 3x3x1/4 1/2" 5/8" 1/2" 5/8" 10.4-10.4, 22.2 22.2 34 34 34 3.4 4.7 4.7 11.1 11.1 0.5 0.9 0.5 0.9 2x2x1/4 3x3x1/4 1/2" 5/8" 1/2" 5/8" 9.9 9.9 21.0 21.0 3.2 3.2 3.2 3.2 4.5 4.5 10.5 10.5 0.4 0.8 0.4 0.8 500 2x2x1/4 3x3x1/4 1/2" 5/8" 1/2" 5/8" 9.4 9.4 19.9 19.9 3.0 3.0 3.0 3.0 4.3 4.3 10.0 10.0 0.3 0.7 0.3 0.7 I Attachment to the OSVS for RACE103 Prying-Action Detail Screening Criteria and Walkdown page 11 0
1-092694-2     Aux1 EI 596, RCT Quad 4
SCREENlNG CHART FOR FR<600 LB LOAD CASE Fn (LB)ANGLE SIZE UNISTRUT BOLT SIZE DL L2/L)lMAX)L2 llN., MAX)3DL L2/L 1 lMA X)L2 llN., MAX)2x2x1/4 3x3x1/4 1/2" 5/8" 1/2" 5/8" 8.9 8.9 19.0 19.0 2.8 2.8 2.8 2.8 4.1 4.1 9.5 9.5 0.3 0.6 0.3 0.6 550 2x2x1/4 3x3x1/4 1/2" 5/8" 1/2" 5/8" 8.5 8.5 18.1 18.1 2.6 2.6 2.6 2.6 3.9 3.9 9.1 9.1 0.2 0.5 0.2 0.5 575 2x2x1/4 3x3x1/4 1/2" 5/8" 1/2" 5/8" 8.2 8.2 17.3 17.3 2.5 2.5 2.5 2.5 3.7 3.7 8.7 8.7 0.2 0.4 0.2 0.4 600 2x2x1/4 3x3x1/4 1/2" 5/8" 1/2" 5/8" 7.8 7.8 16.6 16.6 2.3 2.3 2.3 2.3 3.6 3.6 8.3 8.3 0.1 0.4 0.1 0.4 Attachment to the OSVS for RACE103 Prying-Action Detail Screening Criteria and Wa)kdown page 12
                            ~
$CREENING CHART FOR FR<700 LB LOAD CASE Fn (LB)ANGLE SIZE UNISTRUT BOLT SIZE DL I 2/L)lMAX)L2 IIN., MAX)3DL L2/L)lMAX)L2 (IN., MAX)2x2x1/4 3x3x1/4 1/2" 5/8" 1/2" 5/8" 7.5 7.5 16.0 16.0 2.2 2.2 2.2 2.2 3.4 3.4 8.0 8.0 0.0 0.3 0.0 0.3 650 2x2x1/4 3x3x1/4 1/2" 5/8" 1/2" 5/8" 7.2 7.2 15.3 15.3 2.1 2.1 2.1 2.1 3.3 3.3 7.7 7.7 0.0 0.3 0.0 0.3 675 2x2x1/4 3x3x1/4 1/2" 5I8" 1/2" 5/8" 6.9 6.9 14.8 14.8 2.0 2.0 2.0 2.0 3.2 3;2 7.4 7.4-0.0 0.2-0.0 0.2 700 2x2x1/4 3x3x1/4 1/2" 5/8" 1/2" 5/8" 6.7 6.7 14.2 14.2 1.9 1.9 1.9 1.9 3.0 3.0 7.1 7.1-0.0 0.2.-0.0 0.2 Attachment to the OSVS for RACE103 Prying-Action Detail Screening Criteria and Watkdown page 13 SCREENING CHART FOR FR<800 LB LOAD CASE Fn LB)ANGLE UNISTRUT SIZE BOLT SIZE DL~~Lp(L){MAX)Lp{IN., MAX)30L L2{IN., MAXI L2/L]{MAX) 3x3x1/4 5/8" 1/2" 5/8" 6.5 13.8 13.8 1.8 1.8 1.8 2.9 6.9 6.9 0.1 N/A 0.1 750 2x2x1/4 3x3x1/4 1/2" 5/8" 1/2" 5/8" 6.3 6.3 13.3 13.3 1.7 1.7't.7 1.7 2.8 2.8 6.7 6.7 N/A 0.1 N/A 0.1 2x2x1/4 3x3x1/4 1/2" 5/8" 1/2" 5/8" 6.1 6.1 12.9 12.9 1.6 1.6 1.6 1.6 2.7 2.7 6.4 6.4 N/A 0.0 N/A 0.0 800 2x2x1/4 3x3x1/4 1/2" 5/8" 1/2" 5/8" 5.9 5.9 12.5 12.5 1.5 1.5 1.5 1.5 2.?2.7 6.2 6.2 N/A 0.0 N/A 0.0 Attachment to the OSVS for RACE103 Prying-Action Detail Screening Criteria and Walkdown page 14
Hangers 5. 6, 7, 8, 9 on the left wall counting from 'd'oor 1-DR-AUX329.
1-092694-3     Aux1 El 596. RCT Quad 4
                            ~
Directly across the hall from penetration 1-CEPAP5 1-0926944      Aux1 El 596, RCT Quad 4
                            ~
Adjacent to penetration 1-CEP-4P5.
1-092694-5     Aux1, El 596, RCT Quad 1 Two hangers across the hallway from penetration 1-CEP-1P5 One hanger near MCC 1-CT-BN 1-092694-6    Aux1 El 596. RCT Quad I
                            ~
Upper platform, 1st hanger on right facing door 1-OR-AUX467 1-092694-7     Aux1 El 596, RCT Quad I
                            ~
Upper platform, first 3 hangers on loft facing door 1-OR-AUX467 1-092694-8     Aux1 EI 596, RCT Quad 1
                            ~
Upper platform, first hanger on right off the edge of the platform.
2492794-1      Aux2, El 596, RCT Quad 3 South Near 2-VRS-2200 tUpper Cntmt RMS "B" Data Acq Module) 2492794-2     Aux2, EI 596, RCTQuad 1 Upper platform, two hangers about 3 hangers away from Door 2-DR-AUX468.
1-092794-3     Aux1, El 609, 4kV Area Above 600V Bus IIA 1-092794<     Aux1 El 609, Transformer Room
                            ~
One hanger above 1-DGTAB and one hanger at the right side of the entrance.
1-092794-5     Aux1 Auxiliary Cable Vault
                            ~
15'outh of the hatch 2-092894-1    Aux2, EI 573 6'outh of gate 2-GT-AUX1013 (U2 Rx Coolant Drain Pump Room) 2-092894-2     Aux2. EI 573 South end of the hallway common to both units.
1-092894-3     Aux1, El 609, elevated area adjacent to the control room cable vault Above 12HV-ACA.FLT-3 24)92894M      Aux2, El 609 Near Miscellaneous Rack 2-H.H 2-092894-5     Aux2, EI.609 Above cabinet 2-BITH2 1-0928944      Aux1, El 612, Vestibule, upper platform loading to RCT Next to 1-DR-AUX467 1-092894-7     Aux1. EI 612, Vestibule. upper platform leading to RCT 3rd hanger on left from the edge of the platform 1%92894%      Aux1 El 612, Vestibule, upper platform leading to RCT
                            ~
4th hanger on left from the edge of the platform 1492894-9      Aux1 El 612, Vestibule, upper platform leading to RCT
                            ~
2nd hanger on right from the edge of the platform 1-092894-10    Aux1. EI 612, Vestibule 4 hangers along the containment wall just before the upper platform leading to the RCT.
1-092894-11    Aux1 El 612, Vestibule
                              ~
The hanger above the west end of 1-HE-22 and the next hanger west.
The two or three hangers south of these running along the block wall.
2-092894-12    Aux2, EI 612, Vestibule. upper plalform leading to RCT 4th hanger on right from the edge of the platform 2-092894-13   Aux2, EI 633 Hangers between the Containment Auxiliaries Panel and 2-MSI-1.
2-092994-1     Cont2, El 598, Annulus Several hangers near Column 1. Az 63, Quad 1 Attachment to the OSVS for RACE103 Prying-Action Detail Screening Criteria and Walkdown page 16


===2.4 Anchora===
Ip}}
e Evaluation Works eet r, vVV VVV V t Fo LI VVVVV~~Hanger Identification and Location: I/2 DR 5/d VRIvvIRVI IIVI AND DDL'I VI CIIOCDDLD VIIISIRVl L2v2vl/I VI L2I2II/O Span: Estimated load on threaded rod, FR.FSTIMATED CABLE TRAY AND CONDUIT WEIGHTS, PLF Calculations:
ITEM PLF CABLE TRAYS 25 1/2 CONDUIT 1.1 3/4 CONDUIT 1.3 1" CONDUIT 2.0 1.5" CONDUIT 3.5 2 CONDUIT 4.9 3 CONDUIT 11.1 4 CONDUIT 16.6 FIELD DATA: Angle size: Lengths: L1 Unistrut Bolt Size: L2/L1 LIMITING VALUES FROM SCREENING CHART FOR FR=LB: DL CASE 3 X DL CASE (IF APPLICABLE)*
Max L Actual L Max L2/L1 Actual L>/L1 Max L Actual L Max L>/L1 Actual L>/L1 PASS: YES NO PASS: YES NO PASS: YES NO PASS: YES NO*3xDL case N/A for wall mounted brackets.Attachment to the OSVS for RACE103 Prying-Action Detail Screening Criteria and Walkdown 1 page 15 I 3.Screening Walkdown Worksheets Hanger Location Worksheot&#xb9;1-092694-1 1-092694-2 1-092694-3 1-0926944 1-092694-5 1-092694-6 1-092694-7 1-092694-8 2492794-1 2492794-2 1-092794-3 1-092794<1-092794-5 2-092894-1 2-092894-2 1-092894-3 24)92894M 2-092894-5 1-0928944 1-092894-7 1%92894%1492894-9 1-092894-10 1-092894-11 2-092894-12 2-092894-13 2-092994-1 Aux1, El 596, RCT Quad 3 North Hangers 9, 10, 11 along the right wall counting from door 1-OR-AUX323.
Aux1~EI 596, RCT Quad 4 Hangers 5.6, 7, 8, 9 on the left wall counting from'd'oor 1-DR-AUX329.
Aux1~El 596.RCT Quad 4 Directly across the hall from penetration 1-CEPAP5 Aux1~El 596, RCT Quad 4 Adjacent to penetration 1-CEP-4P5.
Aux1, El 596, RCT Quad 1 Two hangers across the hallway from penetration 1-CEP-1P5 One hanger near MCC 1-CT-BN Aux1~El 596.RCT Quad I Upper platform, 1st hanger on right facing door 1-OR-AUX467 Aux1~El 596, RCT Quad I Upper platform, first 3 hangers on loft facing door 1-OR-AUX467 Aux1~EI 596, RCT Quad 1 Upper platform, first hanger on right off the edge of the platform.Aux2, El 596, RCT Quad 3 South Near 2-VRS-2200 tUpper Cntmt RMS"B" Data Acq Module)Aux2, EI 596, RCTQuad 1 Upper platform, two hangers about 3 hangers away from Door 2-DR-AUX468.
Aux1, El 609, 4kV Area Above 600V Bus IIA Aux1~El 609, Transformer Room One hanger above 1-DGTAB and one hanger at the right side of the entrance.Aux1~Auxiliary Cable Vault 15'outh of the hatch Aux2, EI 573 6'outh of gate 2-GT-AUX1013 (U2 Rx Coolant Drain Pump Room)Aux2.EI 573 South end of the hallway common to both units.Aux1, El 609, elevated area adjacent to the control room cable vault Above 12HV-ACA.FLT-3 Aux2, El 609 Near Miscellaneous Rack 2-H.H Aux2, EI.609 Above cabinet 2-BITH2 Aux1, El 612, Vestibule, upper platform loading to RCT Next to 1-DR-AUX467 Aux1.EI 612, Vestibule.
upper platform leading to RCT 3rd hanger on left from the edge of the platform Aux1~El 612, Vestibule, upper platform leading to RCT 4th hanger on left from the edge of the platform Aux1~El 612, Vestibule, upper platform leading to RCT 2nd hanger on right from the edge of the platform Aux1.EI 612, Vestibule 4 hangers along the containment wall just before the upper platform leading to the RCT.Aux1~El 612, Vestibule The hanger above the west end of 1-HE-22 and the next hanger west.The two or three hangers south of these running along the block wall.Aux2, EI 612, Vestibule.
upper plalform leading to RCT 4th hanger on right from the edge of the platform Aux2, EI 633 Hangers between the Containment Auxiliaries Panel and 2-MSI-1.Cont2, El 598, Annulus Several hangers near Column 1.Az 63, Quad 1 Attachment to the OSVS for RACE103 Prying-Action Detail Screening Criteria and Walkdown page 16 Ip}}

Latest revision as of 00:17, 24 February 2020

Forwards Response to RAI Re GL 87-02,including Responses to Nine Items from NRC Staff & Seismic Evaluation Work Sheets
ML17334B615
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 03/10/1997
From: Fitzpatrick E
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
AEP:NRC:1040E, GL-87-02, GL-87-2, TAC-M69437, NUDOCS 9703170230
Download: ML17334B615 (850)


Text

CATEGORY 1 REGULAT INFORMATION DISTRIBUTION STEM (RIDS)

ACCESSION NBR:9703170230 DOC.DATE: 97/03/10 NOTARIZED: YES DOCKET FACIL:.50-315 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 50-316 Donald C. Cook Nuclear Power Plant, Unit 2, Indiana M 05000316 AUTH. NAME AUTHOR AFFILIATION FITZPATRICK,E. Indiana Michigan Power Co. (formerly Indiana 6 Michigan Ele RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards response to RAI re GL 87-02,including responses to nine items from NRC staff ! seismic evaluation work sheets. C DISTRIBUTION CODE: A025D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Seismic Qualification of Equipment in Operating Plants A-46 GL-87 T

NOTES:

E RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL OGC/HDS2 1 1 PD3-3 PD 1 1 HICKMAN,J 1 1 0 INTERN  : FILE CE 1 1 NRR/DE 1 1 DE/ECGB 1 1 NRR/DE/EMEB 2 2 NRR/DRCH/HHFB 1 1 NRR/DRCH/HICB 1 1 NRR/DRPE/PD1-3 1 1 NRR/DSSA/SRXB 1 1 EXTERNAL: NRC PDR 1 1 D

U NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 13 ENCL 13

Indgana Mich!gan Power Company

~

500 CircIe Orive Buchanan, MI 491071395 INOlANSl MlCMGAN PQWM March 10, 1997 AEP: NRC: 1040E Docket Nos.: 50-315 50-316 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Gentlemen:

Donald C. Cook Nuclear Plant, Units 1 and 2 RESPONSE TO NRC LETTER REQUEST FOR ADDITIONAL INFORMATION RELATED TO COOK NUCLEAR PLANT'S RESPONSE TO GENERIC LETTER 87-02 (TAC NO. M69437)

By letter dated October 21, 1996, the NRC requested additional information regarding our January 30, 1996, response to generic letter 87-02. The following attachments contain the requested information.

Attachment No. 1 contains the responses to the nine items from the NRC staff Attachment No. 2 contains the sample seismic evaluation work sheets (SEWS) and anchorage calculations as requested in item 2 Attachment No. 3 contains the sample SEWS and anchorage calculations for tanks and heat exchangers as requested in item 5 Attachment No. 4 contains the seismic adequacy calculations for tanks 1-TK-33 and 2-TK-32 as requested in item 6

Attachment No. 5 contains the SEWS and anchorage calculations for horizontal tanks and heat exchangers as requested in item 7 Attachment No. 6 contains the calculations for limited analytical reviews (LARs) of the cable and conduit raceways as requested in item 8 SWORN TO AND SUBSCRIBED BEFORE ME PP~j~

Vice President THIS IO ~ DAY OF Qd Notary t

Public 199,7 JI My Commission Expires vlb Attachments JAM NNSOW

'P703i70230 9703i0 NOTARY PUBUC,BERRIEN COUNY, Ml ADOCK 05000315 MYCOMMISSIONEXPIRES FEB. 10,1999 PDR P

r UUrg.g PDR D~g /

rrrrrrrrInrrrrrrgmrrI[ItrllrgrrgIrgfr

Ilil Ill ll>>

l I~

~I II

~ p I

\

J I

U.S. Nuclear Regulatory Commission AEP: NRC: 1040E Page 2 CC A. A. Blind A. B. Beach MDEQ - DW 6c RPD NRC Resident Inspector J. R. Padgett

ATTACHMENT 1 TO AEP:NRC:1040E RESPONSES TO NRC REQUEST FOR ADDITIONALINI"ORMATION(RAI)

RELATED TO COOK NUCLEAR PLANT'S RESPONSE TO GENERIC LETTER 87-02 (TAC NO M69437)

>)ozg ops

" ll r /

I

r. J l'PaO. i tf9,"

RESPONSE TO THE USNRC REQUEST FOR ADDITIONALINFORMATION UNRESOLVED SAFETY ISSUE USI A-46 REVIEW FOR DONALD C. COOK NUCLEAR PLANT, UNITS 1 & 2

%ith rcspcct to Section 2.2, page 2-2, discuss the engineering basis for using the In-Structure Response Spectra (ISRS) developed for the Diesel Generator Building to determine loads in the Auxiliary Building at Elevation 609 fcct, and provide the Diesel Generator Building and Auxiliary Building ISRS.

The basis for using the ISRS developed for the. diesel generator building to determine loads in the auxiliary building at elevation 609 feet is provided in the third full paragraph of page 2-2 of the final Seismic Evaluation and Walkdown Summary Report submittal. This paragraph states:

"The ISRS are not available at some of the floor elevations where safe shutdown equipment is located. When this is the case, either the ISRS for a higher elevation or the ISRS developed by a linear interpolation between existing ISRS may be used in the evaluation. In the case of the auxiliary building elevation 609 feet, since the interpolated ISRS are very close to the corresponding ISRS for the diesel generator building, the ISRS for the diesel generator building were used."

To further illustrate this basis, figure 1 shows a plot of four ISRS (SSE, 5% equipment damping) for the elevations in question. These spectra include the auxiliary building 587'nd 633'levations which are the elevations where developed spectra exist directly 'above and below the 609'levation, and the spectra at 609'n the diesel generator building. In addition to these spectra, a 609'uxiliary building spectra is provided that was generated by interpolating the spectral acceleration values at 587'nd 609'. The auxiliary building and diesel generator building share a common foundation mat. As shown in figure 1, there is essentially no difference between the diesel generator spectra at 609'nd the interpolated auxiliary building spectra at 609', and, therefore, there is no.engineering significance with regard to the load determination ifeither of these are used.

With regard to the diesel generator building and auxiliary building ISRS, the ISRS for all elevations of all buildings at Cook Nuclear Plant included in the USI A-46 evaluation for 2%

and 5% equipment damping have been provided in appendix 8 of the final Seismic Evaluation and Walkdown Summary Report submittal.

Donald C. Cook Nuclear Plant Comparison of Selected Auxiliary Building FRS and 1.5xBS to Diesel Generator Building FRS at Elevation 609 feet- 5% Damping 1.50 Ql O 1.00 Q

Q O

O C

O 0.50 CL G9 0.00 0.1 10 50 Figure 609'ux Oteeel l ISRS for D.G. Building El 609'ompared Frequency (Hz) 609'nterpohted 1.5xBS to ISRS for Auxiliary Building El. 587', 609' 633' 5% Damping

Discuss key examples of designated "rigorously analyzed anchorages," (page 4-6) using hand calculations and ANCHOR4 sofhvarc package and provide copies of their engineering calculations. Also discuss a few cases of anchorage verification based on thc results of tug tests conducted and provide a description of the tests and applicable engineering justification for such an approach.

Table I provides a list of key examples of equipment items with varying levels of anchorage evaluations. These examples include "rigorously analyzed anchorages," comparisons to analyzed equipment items and judgments based on the anchorage inspection and in some cases judgments supplemented by tug tests. Copies of the completed seismic evaluation work sheets (SEWS), the analysis (ifapplicable) and the corresponding anchorage inspection sheets are included in attachment 2 of this response to the RAI for those items marked with a

  • in table l. When comparison or judgment was used to satisfy the GIP anchorage criteria an appropriate description of the evaluation is documented in the notes of the SEWS. The anchorage inspections and installation testing performed for the Cook Nuclear Plant USI A-46 evaluations, discussed in greater detail in the response to RAI question 4, greatly exceed the requirements of the GIP. This provides greater confidence in the judgments made by the seismic review team (SRT) that capacity greatly exceeded demand when a formal anchorage calculation was not made.

A review of notes within the data base for each equipment item in the Cook Nuclear Plant USI A-46 effort was conducted in order to respond to this request'for additional information (RAI). Anchorage evaluations performed can be categorized as follows: a) a detailed ANCHOR4 evaluation was performed; b) a detailed hand calculation was performed; c) the anchorage was screened based on an anchorage evaluation on an identical item of equipment and anchorage or a worst case evaluation of a similar equipment item; or d) the SRT judged, based on the weight and anchorage of the equipment, that the anchorage obviously met the GIP screening criteria.

In some cases when method (d) was used, a tug test was performed. This was performed by an SRT member that would tug on the assembly in the weakest direction to a level of about two times the estimated weight of the item. The tug test from a practical standpoint was unnecessary due to the relative light weight and robust'anchorage of the equipment. Each anchorage evaluation whether detailed or by judgment was based on a detailed anchorage inspection and the SRT inspection. Items tug tested were in general light weight components.

Samples of detailed analysis performed by ANCHOR4 and by hand calculations are included with the sample SEWS in attachment 2. When judgment was used the basis for the judgment is included in the notes section of the SEWS. The detailed anchor inspection documentation is also included with each SEWS provided.

The engineering justification for the approach used for performing the anchorage evaluations is described in section 4.4, page 4-26 second paragraph of the Rev. 2 GIP. This paragraph states: "There are various combinations of inspections, analyses, and engineering judgment which can be used to verify the adequacy of equipment anchorage. The Seismic Capability Engineers should select the appropriate combination of elements for each anchorage

installation based on the information available. For example, a simple hand calculation may be sufficient for a pump which has only a few, very rugged, anchor bolts in a symmetrical pattern. On the other hand, at times it may be advisable to use one of the computer codes to determine the loads applied to a multi-cabinet motor control center if its anchorage is not symmetrically located." The anchorage evaluations used the appropriate combinations of elements necessary to determine that any screened equipment met the GIP criteria.

Table 1 provides a brief description of the anchorage evaluation performed. There is a good cross section of examples that include all equipment classes on the Cook Nuclear Plant safe shutdown equipment list (SSEL) (1 to 20) and categories of anchorage evaluations performed.

Examples of class 0 and 21 anchorage evaluations are provided in response to RAI questions 5 and 7.

Table 1 Examples of Anchorage Evaluations Class Equipment ID Anchorage Evaluation Performed 1-AB-N Three section MCC. Detailed ANCHOR4 evaluation performed.

1-ABD-A* Six section MCC. Detailed ANCHOR4 evaluation performed.

2-ABV-A Six section MCC. Detailed ANCHOR4 evaluation performed.

2-AM-D Eight section MCC. Detailed ANCHOR4 evaluation performed.

2-EZC-D Eleven section MCC (including attached EZC-BS).

Detailed ANCHOR4 evaluation performed.

1-11A Large Multisection 600V Switchgear. Detailed ANCHOR4 evaluation performed.

1-52-RTB Reactor Trip Breaker Units composed of 4 breaker vertical sections. Detailed ANCHOR4 evaluation performed.

2-21B Large 'ultisection 600V Switchgear. Detailed ANCHOR4 evaluation performed.

2-T21B Large Multisection 4KV Switchgear... Detailed ANCHOR4 evaluation performed.

1-T11A Large Multisection 4KV Switchgear. Detailed ANCHOR4 evaluation performed.

1-CRID-III-CVT Small Transformer 4'-6" x 2'-6" x 2'-4". Weight estimated at 1180 lbs. Detailed ANCHOR4 evaluation performed.

I-TR11B Large supply transformer. Detailed ANCHOR4 evaluation performed.

2-CRID-I-CVT* Small Transformer 4'-6" x 2'-6" x 2'-4". Weight estimated at 1180 lbs. Detailed ANCHOR4 evaluation performed.

Table I (Continued)

Examples of Anchorage Evaluations Class Equipment ID Anchorage Evaluation Pcrformcd 2-TR-ELSC Small Transformer 20" D x 30" W x 36" H. Detailed ANCHOR4 evaluation performed.

1-PP-10W* .900 GPM pump. 'etailed ANCHOR4 evaluation performed including nozzle loadings on the suction and discharge piping.

1-PP-4 440 GPM pump. Detailed ANCHOR4 evaluation performed including nozzle loadings on the suction and discharge piping.

1-PP-50W Large Pacific Pump with a weight of 20,000 lbs. Detailed

, ANCHOR4 evaluation performed.

1-QT-111-AB Small 90 GPM Pump - weight about 800 lbs. Detailed ANCHOR4 evaluation performed.

12-PP-31S 100 GPM pump - 2076 lbs. Detailed ANCHOR4 evaluation performed.. Item was designated an outlier until nozzle loads are defined.

2-PP-26N Pacific Pump - total weight 5500 lbs. Detailed ANCHOR4 evaluation performed including nozzle loadings on the suction and discharge piping.

2-PP-3E Large Ingersoll Rand Pump - 7935 lbs. Detailed ANCHOR4 evaluation performed.

2-PP-46-4* Small Goulds Pump - 511 lbs. Nozzle loads judged to be small by SRT. Anchorage screened by judgment after review of the anchorage inspection documentation (four 5l8" anchors) and the walkdown.

2-PP-82S Small Goulds Pump - 214 lbs. Nozzle loads judged to be small by. SRT. Anchorage screened by judgment after review of the anchorage inspection documentation (four 5/8" anchors) and the walkdown.

2-QT-106-CD1 Small Worthington Pump - 135 lbs. Detailed ANCHOR4 evaluation performed induding nozzle loadings on the suction arid discharge piping.

1-PP-7W Large vertical pump with a 45'ong vertical casing.

Screening of anchorage based on a review of existing qualification that included an anchorage evaluation.

2-PP-9W Vertical pump. Detailed ANCHOR4 evaluation performed'including nozzle loadings on the suction and discharge piping.

1-HV-AFP-8RE-2 Small light weight fan - 154 lbs. Anchorage accepted by judgment aAer a review of the anchorage drawings.

Table 1 (Continued) of Anchorage Evaluations

'xamples Class Kquipmcnt ID Anchorage Evaluation Performed 1-HV-AFP-M1* Medium size fan - 500 lbs, mounted with 16 1/2" steel to steel bolts. Anchorage accepted by judgment after a review of the anchorage drawings.

1-HV-AFP-Xl Small light weight fan - 287 lbs, mounted with 12 3/8" steel to steel bolts. Anchorage accepted by judgment after a review of the anchorage drawings.

I-HV-CEQ-I Large fan unit. Detailed ANCHOR4 evaluation performed.

12-HV-ES W-7* Large fan unit. Detailed ANCHOR4 evaluation performed.

12-HU-ESW-1 Large fan unit similar to 12-HV-ESW-7. Anchorage screened based on comparison to ANCHOR4 evaluation for 12-HV-ESW-7.

2-HU-AFP-BRE-1 Small light weight fan - 154 lbs. Anchorage accepted by judgment after a review of the anchorage drawings.

2-HV-DGS-1 Large fan - 1531 lbs. Detailed ANCHOR4 evaluation performed.

9 2-HV-DGX-1 Large fan - 1100 lbs. Detailed ANCHOR4 evaluation performed.

10 1-HV-ACRA-1 Cooler unit with a weight estimate of 3000 lbs. Detailed ANCHOR4 evaluation performed.

10 1-HV-AES-1 (FLT) Large filter unit - 24,000 lbs. Detailed ANCHOR4 evaluation performed.

1-AFW* Small wall mounted panel (36" H x 20" W x 6" D).

Panel estimated to weigh 50 lbs. Anchorage screened by judgment after a review of the anchorage description and a 100 lb. tug test.

14 1-BCTC-AB Panel 38" W x 60" H x 9" D. Weight estimated at 300 lbs. Detailed ANCHOR4 evaluation performed.

14 1-CRCD Rack 38" W x 84" H x 9" D - Weight estimated at 400 lbs. Detailed ANCHOR4 evaluation performed.

14 1-ELSC Small wall mounted panel (36" H x 20" W x 6" D).

Panel estimated to weight 50 lbs. Anchorage screened by judgment after a review of the anchorage description and a 100 lb. tug test.

14 1-ELSCX Small distribution panel 57" H x 22" W x 6" D.

Weight estimated at 370 lbs. Detailed ANCHOR4 evaluation performed.

Table 1 (Continued)

Examples of Anchorage Evaluations Class Equipment ID Anchorage Evaluation Performed 14 1-MDAB Wall mounted switchboard 38" W x 84" H x 9" D.

Anchorage accepted by comparison to the ANCHOR4 evaluation performed for 1-MCAB.

14. 1-TDAB Wall mounted switchboard 38" W x 84" H x 9" D.

Anchorage accepted by comparison to the ANCHOR4 evaluation performed for 1-MCAB.

14 1-VDCD-1 8. 2 Pair of 22" W x 38" H x 7" D distribution panels.

Anchorage accepted by comparison to the ANCHOR4 evaluation performed for 1-VDAB-1 (Identical Construction).

14 2-AFWX Wall mounted panel - 57" H x 22" W x 6" D. Weight estimated at 100 to 150 lbs. Anchorage screened by judgment after a review of the anchorage description and a tug test.

14 2-BATT-N-SH Wall mounted Battery Shunt. Weight estimated at 100 lbs. Anchorage screened by judgment after a review of the anchorage description, the ANCHOR4 evaluation performed for 1-BATT-N-SH and a tug test.

14 2-DCN Switchboard bolted to a steel rack. Anchorage screened based on comparison to the ANCHOR4 analysis for similar panel 1-DCN.

14 2-VDAB-1 & 2 Pair of 22" W x 38" H x 7" D distribution panels.

Anchorage screened based on comparison to the detailed ANCHOR4 evaluation performed for similar panel 1-VDAB-1.

15 2-BATT-AB* Substantial 2 - step battery rack. Anchorage evaluation based on a review of existing anchorage and recent modifications made to the racks.

16 1-BC-AB1 Battery Charger 3025 lbs. Detailed ANCHOR4 evaluation performed.

16 1-CIUD-I-INV Inverter 2'-5" x 3' 6'-3" - 2100 lbs. Detailed ANCHOR4 evaluation performed.

16 2-BC-A Battery Charger 32" L x 24" W x 46" H. Detailed ANCHOR4 evaluation performed.

16 2-D GAB-INV Inverter 28" x 28" x 57". Detailed ANCHOR4 evaluation performed.

1-OME-150-AB* Large Diesel Generator. Anchorage capacity for 2-OME-150-CD indicated an additional margin of 36.

Anchorage screened based on comparison to that evaluation.

Table 1 (Continued)

Examples of Anchorage Evaluations Class Equipment ID Anchorage Evaluation Performed 18 1-CLI-113 Small transmitter - 27 lbs. Anchorage screened by judgment after review of the anchorage inspection documentation and the walkdown.

18 1-CPS-317 Small 9" x 9" panel. Anchorage screened by judgment after review of the anchorage inspection documentation and the walkdown.

1& 1-CPS-410 Rack supported device. One detailed ANCHOR4 analysis was performed to encompass 1-CPS-410, 8c 420 and 2-CPS-410 Ec, 420.

18 1-MPP-232 Small pressure transmitter - 35 lbs. Anchorage screened by judgment after review of the anchorage inspection documentation and the walkdown.

18 1-NPP-151 Small pressure transmitter - 24 lbs. including bracket.

Anchorage screened by judgment aAer review of the anchorage inspection documentation and the walkdown.

1& 2-8LI-110 Instrument on small, stiff bracket. Assembly weighs less than 100 lbs. Anchorage screened by judgment after review of the anchorage inspection documentation and

,the walkdown.

18 2-CLI-113 Transmitter bolted to support composed of a small diameter pipe. Anchorage screened by judgment after review of the anchorage inspection documentation and the walkdown.

18 2-CPS-410 Small device on a rack. Detailed ANCHOR4 evaluation performed.

18 2-FFI-210 Transmitter bolted to support composed of a small diameter pipe. Anchorage screened by judgment after review of the anchorage inspection documentation and the walkdown.

18 2-IFI-311 Transmitter bolted to support composed of a small diameter pipe. Anchorage screened by judgment after review of the anchorage inspection documentation and the walkdown.

18 2-IFI-51 Transmitter bolted to support composed of a small diameter pipe. Anchorage screened by judgment after review of the anchorage inspection documentation and the walkdown.

Table 1 (Continued)

Examples of Anchorage Evaluations Class Equipmcnt ID Anchorage Evaluation Performed 18 2-XRY-153 Small rack consisting of a small panel bolted to P1000 unistruts. Anchorage screened by judgment after review of the anchorage inspection documentation and the walkdown.

19 1-VTS-356 Light weight component - 5 lbs. Anchorage screened by judgment after review of the anchorage inspection documentation, the walkdown and a tug test.

20 2-Al 1* Relay panel included in a section of panel from A6 to A15. Weight estimate of entire panel 3000 lbs. Detailed ANCHOR4 evaluation performed.

20 1-ACRA-2 Stand alone panel 24" L x 24" D x 84" H. Weight estimated @ 700 lbs. Detailed ANCHOR4 evaluation performed.

20 1-CAS Large Control Panel 24'-6" L x 6'-3" D x 7'. Hand calculation performed on the weak link in the anchorage system and found to be more than adequate.

20 1-D GAB Large Control Panel in Diesel Generator Room. Detailed ANCHOR4'evaluation performed.

20 1-GR-1 Relay Rack 6'-6" L x 8'. Weight estimated 300 lbs./lineal foot of rack. Hand calculation performed on the weak link in the anchorage system and found to be more than adequate.

20 1-HSD1 Walkthrough cabinet 12' x 6' x 8'. Detailed ANCHOR4 evaluation performed.

20 1-NRI-23-ISO Heavy duty rack. Anchorage judged adequate based on review of the anchorage inspection documentation, the walkdown and the obvious ruggedness and installation of this new design.

20 2-CG2 Control cabinet 5'-6" L x 2'-6" W x 7'-7" H.

Anchorage screened based on comparison to the ANCHOR4 evaluation performed for similar panel 1-RPC-1.

20 2-PRZ Item is included in a Control Panel with two other items.

Total panel is 12'-3" L x 8'. Weight estimated at 300 Ibs/lineal ft. Anchorage screened based on comparison to the ANCHOR4 evaluation performed for 1-SG, 20 2-RPS-A Relay cabinet 90" W x 30" D x 90" H, welded to embedded steel. Detailed ANCHOR4 evaluation performed.

20 2-SWRR Cabinet 16' x 8' x 18" D. Weight estimated at 300 lbs/lineal ft. Detailed ANCHOR4 evaluation performed.

3) Table 4.5 shows that the 1.5 x Bounding Spectrum and the, GERS with an amplification factor of 7 do not cnvclopc thc floor response spectra. Provide copies of thc seismic demand versus capacity spectral comparison.

The location of the devices that are documented as outliers in table 4.5 are at elevation 687'n the containment building. Figure 2 shows a comparison of the ISRS at elevation 687'n the containment building to 1.5 times the bounding spectrum. The GERS must be compared to 1.5 times the demand spectra for median centered spectra because Cook Nuclear Plant response spectra was designated as median centered spectra by the NRC. An amplification factor through the piping and support of the piping system must also be considered when comparing GERS to the demand spectra. The GIP defines the upper bound amplification factor as 7. Therefore, the total ISRS was multiplied by 1.5 x 7 (10.5) to define the demand that is compared to the GERS. Figure 3 shows a comparison of the GERS for air operated valves (AOVs) to 10.5 x the ISRS at containment building elevation 687'. Figure 4 shows a comparison of the GERS for solenoid operated valves (SOUs) to 10.5 x the ISRS at containment building elevation 687'. Figure 5 shows a comparison of the GERS for motor operators to 10.5 x the ISRS at containment building elevation 687'. As shown in figures 2, 3, 4, and 5, the demand exceeds the capacity.

The outlier resolution for these items is to review the existing piping analyses and compare the demand acceleration from the analysis to the capacity acceleration. It is believed that the actual amplification factor is less than 7 and the capacity will be shown to be greater than the demand once the outlier resolution has been completed.

10

Donald C. Cook Nuclear Plant Cont. Bldg. Elev. 687.5 feet vs 1.5xBS 5% Damping 2,00 1,50 C

0 GJ S

Q)  : ~ ~

i ~ .: ~: ~ X I ~ ~

u 1,00 0 P

~ ~ ~ ~ ~ ~ 0 ~ ~

0 I I ~ I ~ 'I 0.50

~ ~ I r ~ 5 ~ ~ ~ ~ \

~ r,, ~ J' ~ ~ ~ ~ '1 ~ ~ I 0 00

~

0.1 10 Frequency (Hz) 1.5xBS EL667.5 Figure 2 ISRS for Containment El. 6".7.5'. Vs. 1.5 x Bounding Spectrum - 5% Damping 11

Donald C. Cook Nuclear Plant Amplified Containment Building El. 687.5 feet vs AOV GERS 5o/o Damping 20

~ ~ ~ r ~ ~ ~ ~ ~ ~ ~ ~

15 C

0 l6$ 'I r ~ r r ~ ~ ~ ~ r

0) ' ~ h ~

10 (5 ~ r D

S

.'/'./:

a. 5 (0

~ ~ ~ ~ ~ ~ ~ ~

r~..-'..

-:.r ~ ~ ~ ~ ~ ': ~:

~ ~ ': ~:.

~ \4 ~

0 0.1 10 Frequency (Hz) 1 O.Gx AOV EL687 GERS Figure 3 Amplified ISRS for Containment El. 687.5's. AOV GERS -5% Damping

Donald C. Cook Nuclear Plant Amplified Containment Building El. 687.5 feet vs Solenoid Valve GERS 5/o Damping 20 I I I I \ I

~ r 1 h ~

~ \ h ~

15 O I' I' I 'I ~ ~

C r I ~ e ~ 0 ~ h ~ ~

u 10 O

C I ~ ~ ~ ~ h ~ ~ h S

0 Q)

a. 5 CO I \ ~ h h I j I ~ I' ~ P

~

g

/~ ~ ~ ~ ~ ~ I~ ~ ~ ~ ~

/ ~ ~ ~ ~ h ~ ~ ~ ~ ~ \ ~ ~

0.1 10 50

. Frequency (Hz) 1 0.5x Solenoid EL687 GERS F<igure 4 Amplified ISRS for Containment El. 687.5's. Solenoid Valve GERS - 5% Damping 13

Donald C. Cook Nuclear Plant Amplified Containment Building El. 687.5 feet vs MOV GERS 5% Damping 25 'r '

~ ~ ~ ~ ~ ~ r ~

~ r 20

'I

. ~ s... ~ .s.) ~ ~ .... ~

C ~:- -': I ~:. ~-

0 ~ ~ ~

r ~ ~ ~

C 6 ~ ~ ~ ~ ~ t I. r ~ ~ ~

~;:.I-

~

~

O ~ 4  % ~ . I...... '

O e e 0

~ e ~ ~ ~ ~ ~ ~ ~ ~ ./ ~

10

~ ~

0 '

r ~ o' ~ ~ ~ J' ~ ~ ~ I ~ ~ ~ I CL (0 -5 t r ~ ~ ~ 5

~ 5 0 0 4 1 ~ 8 ~ I 0

0.1 10 50 Frequency (Hz) 3 0.5x MOV EL687 GERS Figure 5 Amplified ISRS for Containment El. 687.5's. Motor Operator GERS - 5% Damping l4

Regarding thc tightncss check of expansion anchors performed on a representative number of mechanical and electrical components, state whether the representative number meets thc sample size for expansion anchor tightness check as listed on table C.2-4 of the GIP.

The number of expansion bolts tightness tested for the Cook Nuclear Plant VSI A-46 effort exceeded the sample size for expansion anchor tightness check as listed on table C.2-4 of the GIP. Bolt tightness checks were conducted on every accessible expansion bolt in the scope of USI A-46 equipment on the SSEL. In addition all accessible steel to steel and cast-in-place bolts/nuts were visually inspected and loose nuts were tightened as needed. This was done to ensure that the bolts were snug and therefore active in the event of vertical reaction loadings on the anchorage during an earthquake. Other tests using ultrasonic techniques to determine embedment length and weld quality were also performed as an enhancement to the program. Anchorage inspection documentation is included with the SEWS in attachment 2 of this RAI.

When the type of expansion anchor used could not be positively determined, a 0.6 reduction factor for unknown expansion bolts was used in the anchorage evaluations performed in accordance with the GIP.

Inaccessible anchor bolts were not tightness tested. The GIP excludes inaccessible anchors from the sample and states in the second paragraph of section 4 4.1 that "all accessible anchorages should be visually inspected. All practicable'means should be tried to inspect inaccessible anchorages or those if if obstructed from view they are needed for strength to secure the item of equipment or they secure housing essential relays (to avoid impact or excessive cabinet motion). For exam'pie, it is 'quipment not considered practicable to resort to equipment disassembly, removal, etc., to inspect inaccessible anchorages. The basis for the engineering judgment for not performing these inspections should be documented." The majority of anchorages for SSEL equipment were accessible. These anchorages were tightness tested, had their embedment length verified and were visually inspected by the anchorage inspection team and were again visually inspected by the SRT.

There were some fans that had inaccessible anchorages that would have required removal of fire protection material to inspect and disposal of material that could possibly be contaminated. This would not have been consistent with the ALARAgoals at the site (dust and exposure). These fans had calculated or judgmental anchorage margins of 10 or greater and therefore were not inspected.

Anchorages for these were primarily cast in place or steel to steel bolts and the tightness check was not required to be performed. The regenerative heat exchanger anchorages were also not visually inspected due to the time required to remove insulation and to perform the anchorage inspection in a high radiation area. There werc also a number of wall mounted panels (class 14 and 20) that were not tightness checked. Tightness checking of these bolts would have required complete equipment disassembly and removal of the equipment. This activity would be contrary to section 4.4.1 of the GIP. These panels also had very high margins even when considering a 0.6 reduction factor for unknown expansion anchors. In the cases mentioned above, the engineering judgment for not performing the inspections were documented on the SEWS for the equipment item. There were also some cases when isolated bolts were not tested on a given assembly because they could not be reached without disassembly. These cases are documented in the anchorage inspection documentation.

5) Table 5.1 shows only four (4) vertical tanks for GIP review. Provide the engineering criteria for sclccting only four vertical tanks and thc justification of the structural integrity of the other smaller vertical tanks for Safe Shutdown E<arthquakc (SSK). Indicate the number of vertical tanks supported on skirts and structural legs at Cook Nuclear Plant, Units 1 8r, 2.

Table 5.1 of the final Seismic Evaluation and Walkdown Summary Report submittal includes only the flat bottom vertical tanks that may be evaluated using the GIP methodology in section 7 of the GIP. These tanks are described in the first paragraph of section 7.3.1 of the GIP which states: "The type of vertical tanks covered by the screening guidelines are large, cylindrical tanks whose axis of symmetry is vertical and are supported, on their flat bottoms, directly on a concrete pad or a floor."

The evaluation of the remaining tanks are documented in table 4-7 of the final Seismic Evaluation and Walkdown Summary Report submittal. Items 1 and 2 of table 4-7 "Commentary on Equipment Items Meeting the Intent of the GIP Caveats" discuss this evaluation. Item 1 includes class 0 equipment items and states "There are 50 and 51 equipment items identified as class 0 in unit 1 and unit 2 respectively. These items were primarily passive and were similar to items considered as components of the class 21 equipment. For these equipment items the SRT assessed the potential for seismic damage and made the necessary evaluations. All these items were at locations in the plant where 1.5 times the bounding spectrum is greater than the floor response spectra where they are located. Anchorage was evaluated using the GIP criteria." Item 2 includes class 21 tanks and heat exchangers not covered by the GIP criteria (section 7 of the GIP). This item states:. "There are 63 and 58 equipment items identified as class 21 in unit 1 and unit 2 respectively. Of these tanks and heat exchangers, there were only 20 where the GIP criteria was applicable. The remaining 98 were evaluated by meeting the intent of the GIP criteria. Anchorage was evaluated using the GIP criteria."

The class 0 and 21 equipment items on the SSEL that may be categorized as tanks and heat exchangers for unit 1 and 2 are listed in tables 2 &, 3, respectively. The table includes a description of the tank or heat exchangers configuration and anchorage evaluation. Included in that list are all tanks supported on skirts and structural legs that are on the Cook Nuclear Plant SSEL. Tanks on legs include 1,2-QT-113-AB1, AB2, CD1, CD2 (eight diesel oil filters); 1,2-QT-144-AB, CD (four diesel oil filters}; 1,2-TK-10 (two reactor coolant letdown volume control tanks); 1,2-TK-11 (two boron injection tanks); 1-TK-12-N, 12-TK-12-M and 2-TK-12S (three boric acid storage tanks}. Tanks on skirts include 1,2-TK-37 (two component cooling water surge tanks); and 1,2-QT-141, AB1, AB2, CD1, CD2 (eight diesel starting air receivers).

Sample SEWS (including the calculations and anchorage inspection documentation) are provided in attachment 3 for the tanks that have an

  • aAer the equipment ID in tables 2 and 3.

Table 2 Description of Configuration and Anchorage Evaluation for Tanks and Heat Exchangers (Unit 1)

Class ID Description Building El. Description of Configuration and Anchorage Evaluation I-QT-112-AB &, AB & CD EMERG AUXILIARY 579 Small tank-like component containing oil, with a height of about 5', and a CD (2 filters) DIESEL FULL diameter of 3'. Weight full = 2707 lbs. Anchored by three 3/8" diameter J-FLOW LUBE OIL FILTERS bolts and three 5/8" wedge anchors at 60 degree intervals (i.e., evenly spaced).

The anchorage was screened based on a review of an existing vendor calculation that indicated a high anchorage margin.

I-QT- I 13-AB I *, AB &, CD EMERG AUXILIARY 579 Strainer supported on 4 angle legs. Each leg is anchored by one 1/2" J-bolt 113-AB2, 113- DIESEL FULL anchor. The total weight is 1730 lbs. The ANCHOR4 analysis performed CD I, 113-CD2 FLOW LUBE OIL STRAINERS for 1-QT-113-AB1 and 1-QT-113-AB2 together, since they are connected (4 strainers) by a relatively rigid piping segment, indicated that the anchorage was adequate..

I-QT-116-AB & AB &, CD EMERG AUXILIARY 579 Heaters anchored by three 3/8" J-bolts at 120 degrees apart, on a 5" high CD (2 heater DIESEL LUBE OIL concrete pad. The weight of the tank is approximately 152.5 lbs.

tanks) HEATER (TANK)

Anchorage screened by an ANCHOR4 evaluation.

I-QT-118-AB & AB EMERG DIESEL AUXILIARY 579 Filter anchored by three 3/8" J-bolts with a minimum embedment of CD (2 filters) BYPASS LUBE OIL 10.25", at 120 degrees.

FILTER The approximate weight of the tank is estimated to be the same as 1-QT-112-CD (Wt =2707 lbs.), because the tanks are of the same manufacturer, and size, and both hold oil.

Anchorage screened by an ANCHOR4 evaluation.

Table 2 (Continued)

Description of Configuration and Anchorage Evaluation for Tanks and Heat Exchangers (Unit 1)

Class ID Description Building El. Description of Configuration and Anchorage Evaluation I-QT-143-ABI, AB EMERG AUXILIARY Air dryer mounted on 2-1/2" x 2-1/2" x 1/4" angle steel frame with other AB2, CD I & DIESEL CONTROL air dryer tanks. Angle frame on 1-3/4" Grout Pad. Frame anchored by CD2 (4 dryers) AIR DRYER I eight 1/2" non-shell type expansion anchors, four per base plate. Tanks hold air and are the size of fire extinguishers.

Anchorage judged adequate based on the walkdown and review of the anchorage inspection documentation.

I-QT-144-AB AB EMERG AUXILIARY 58 Small filter 10" in diameter, 44" high, mounted on three angle legs

& CD (2 filters) DIESEL FUEL OIL 7 anchored by three 5/8" Phillips Red Head Wedge/coupling anchors TRANSFER FILTERS Anchorage screened based on an ANCHOR4 evaluation for 1-QT-144-AB.

I -TK-253-1, 2, PRESSURIZER TR CONTAINMENT 61 This horizontal tank contains air and is supported by other than standard 3 & 4 (4 tanks) "B" PRESSURE 2 saddles:

RELIEF VALVE NRV-152 RESERVE CONTROL AIR Tank is well welded to building steel, and judged adequate by the SRT.

TANKS 12-TK-207 REACTOR PLANT GROUNDS 60 Similar to a horizontal heat exchanger; each tank is approximately 2'n NITROGEN BULK 9 diameter and 20'ong (about 15'etween supports). Tank weight is about STORAGE TANKS 4800 lbs. Anchorage consists of four cast-in-place (in buried concrete

¹3,4,5,6,7,8 pedestals) 3/4" diameter J-Bolts.

Anchorage screened based on an ANCHOR4 evaluation.

18

Table 2 (Continued)

Description of Configuration and Anchorage Evaluation for Tanks and Heat Exchangers (Unit 1)

Class ID Description Building El. Description of Configuration and Anchorage Evaluation 21 I-HE-11 REACTOR AUXILIARY 609 Vertical Heat Exchanger is identical to 2-HE-11. The anchorage was COOLANT PUMP screened by comparison to the calculation for 2-HE-11.

SEAL WATER HEAT EXCHANGER 21 I-HE-13* EXCESS LET CONTAINMENT 612 Relatively small exchanger (1600 lbs) on two saddles in extremely high rad DOWN HEAT area.

EXCHANGER Anchorage includes four 3/4" diameter J-bolts, embedded at least 2 feet into piers. Could not inspect the anchorage due to ALARAconsiderations.

Due to large anchorage (four 3/4" bolts) and small exchanger, the anchorage was judged adequate by the SRT.

21 I-HE-14 LETDOWN HEAT AUXILIARY 633 Exchanger anchored with two 7/8" diameter J-bolts on 11-3/8" spacing.

EXCHANGER Vertical distance from the base of exchanger to the C.G. of exchanger is 13".

Vertical distance from the base of the exchanger to the top nozzle is 29".

Anchorage adequacy was accepted based on a short hand calculation..

21 I-HE-15E 8c EAST AND WEST AUXILIARY 609 Component Cooling Water Heat Exchanger on two reinforced saddles.

W (2 CCW HEAT Anchorage is two 7/8" diameter J bolts. There are four 1" wedge expansion exchangers) EXCHANGERS anchors in one pedestal in the horizontal direction.

C.G. of exchanger from the top of the saddle pedestal about 3'.

A hand calculation was performed for the heat exchanger and the results show that the anchor bolts and saddles are adequate.

19

Table 2 (Continued)

Description of Configuration and Anchorage Evaluation for Tanks and Heat Exchangers (Unit 1)

Class ID Description Building El. Description of Configuration and Anchorage Evaluation 21 I-HE-I7E & W (2 EAST & WEST AUXILIARY 6P9 Anchorage more than adequate based on previous analysis of exchanger exchangers) RHR HEAT without top braces. Braces had since been installed.

EXCH ANGERS 21 I-HE-18E' W (2 EAST & WEST AUXILIARY 6P9 Very well engineered support structure.

exchangers) CONTAINMENT SPRAY HEAT EXCH ANGERS There is a ring support at top of the exchanger bracketed to the mall in each of the four quadrants. This takes the overturning loads on the exchanger.

Bottom support (at about the 1/4 point of the exchanger, with the remainder of the exchanger hanging below) is a heavy duty ring with gussets at the bolt locations. These are bolted to a steel support structure that is obviously well engineered.

Qualification data indicates an analysis to the design basis. Based on the review of this analysis and anchorage inspection documentation the Heat Exchanger is adequate.

21 I-HE-32E & 32W EAST RHR PUMP AUXILIARY 573 8" diameter by 2" wide exchanger, attached to East Residual Heat (2 exchangers) PP-35E Removal Pump with two 1/2" bolts. Could have been considered with MECHANICAL SEAL HEAT the pump'using the rule of the box, however the exchanger was listed EXCHANGERS separately on the SSEL.

Anchorage to the pumps was judged adequate by the SRT.

20

~>

Table 2 (Continued)

Description of Configuration and Anchorage Evaluation for Tanks and Heat Exchangers (Unit I)

Class ID Description Building El. Description of Configuration and Anchorage Evaluation 21 I-HE-33E & W(2 EAST AND WEST AUXILIARY 573 6" diameter by 8-3/4" high exchanger, attached to East Containment exchangers) CONTAINMENT Spray Pump with two 1/2" bolts. Could have screened with the pump SPRAY PUMP PP-9E MECHANICAL using the rule of the box, however the exchanger was listed separately SEAL HEAT on the SSEL.

EXCHANGER Anchorage to the pumps was judged adequate by the SRT.

21 I-HE-34-NE*, 34- NORTH SAFETY AUXILIARY 587 6" diameter by 8-3/4" high exchanger, attached to North Safety Injection NW, 34-SE, & 34- INJECTION PUMP Pump with two 1/2" bolts. Could have screened with the pump using SW (4 exchangers) PP-26N INBOARD

  • the rule of the box, however the exchanger was listed separately on the MECHANICAL SEAL HEAT SSEL.

EXCHANGERS Anchorage to the pumps was judged adequate by the SRT.

21 I-HE-35N, 35S (2 NORTH SAFETY AUXILIARY 587 Small exchangers 1'-5" long and 4" in diameter attached to North Safety coolers) INJECTION PUMP Injection Pump with four 1/4" bolts. Could have screened with the PP-26N LUBE OIL COOLERS pump using the rule of the box, however the exchanger was listed separately on the SSEL.

Anchorage to the pumps was judged adequate by the SRT.

21

I Table 2 (Continued)

Description of Configuration and Anchorage Evaluation for Tanks and Heat Exchangers (Unit 1)

Class ID Description Building El. Description of Configuration and Anchorage Evaluation 21 I-HE-36-EN, 36-ES, EAST & WEST AUXILIARY 587 6" in diameter 8-3/4" high heat exchanger, attached to East 36-WN, 36-WS CENTRIFUGAL Centrifugal Charging Pump with two 1/2" bolts. Could have (4 exchangers) CHARGING PUMP PP-50E screened with the pump using the rule of the box, however the INBOARD MECHANICAL SEAL HEAT exchanger was listed separately on the SSEL.

EXCHANGERS Anchorage to the-pumps was judged adequate by the SRT.

21 I-HE-37E, 37W (2 EAST&, WEST AUXILIARY 537 Small exchanger 1'-6" long and 5" in diameter attached to coolers) CENTRIFUGAL reinforced plate support with four 1/2" bolts. Plate support bolted CHARGING PUMP PP-to East Centrifugal Charging Pump with three 1/2" bolts. Could 50E, &50WGEAROIL COOLERS have screened with the pump using the rule of the box, however the exchanger was listed separately on the SSEL.

Anchorage to the pumps was judged adequate by the SRT.

21 I-HE-38E & 38W (2 EAST & WEST AUXILIARY 5g7 Small exchangers 1'-6" long and 5" in diameter bolted to two coolers) CENTRIFUGAL channel columns that are welded to the skid of the East 1'ong CHARGING PUMP BEARING LUBE OIL Centrifugal Charging Pump. Could have screened with the pump COOLERS using the rule of the box, however the exchanger was listed separately on the SSEL.

Anchorage to the pumps was judged adequate by the SRT.

22

Table 2 (Continued)

Description of Configuration and Anchorage Evaluation for Tanks and Heat Exchangers (Unit 1)

Class ID Description Building El. Description of Configuration and Anchorage Evaluation

- I-HE-47-ABN & 47- AB & CD EMERG AUXILIARY 587 Aftercooler on Diesel Generator skid transfers its lateral load to the ABS, 47-CDN & 47- DIESEL NORTH inlet manifolds. Gravity loads are carried by a post on a spring hanger CDS (4 aItercoolers) COMBUSTION base, so the post is incapable of carrying lateral or longitudinal load.

AIR AFTERCOOLERS The Diesel Generator Turbochargers in Unit 1 were replaced in a recent outage. As part of the modification, an analysis was perforined for the associated piping and the aftercoolers. All supports met D.C. Cook acceptance criteria.

21 I-QP-21 NORTH BORIC AUXILIARY 587 Boric Acid Blender supported by piping. It is in-line with the pipe ACID BLENDER between two pipe supports offthe floor. Blender very small (6" in (MIXINGTEE) diameter and 11" long).

Screened based on drawings (insulation precluded inspection of the blender connection to the piping system) and inspection for interactions.

21 I-QT-107- AB & CD CD EMERG AUXILIARY 587 Horizontal tanks which sits on two saddles. Each saddle has two, 1/4" (2 tanks) DIESEL FUEL OIL thick plates, forming a "U", with no gussets. There are two 5/8" anchors DAY TANKS per saddle.

A Horizontal Tank Analysis was performed to show that the tank anchorage is adequate.

21 I-QT-110-AB & CD AB & CD EMERG AUXILIARY 587 Lube Oil Coolers mounted to wall with fourteen 3/4" wedge type (2 Coolers) DIESEL LUBE OIL expansion anchors.

COOLERS External Anchor Analysis was performed on the Unit 2 Jacket Water Heater 2-QT-131-CD which has the same configuration as 1-QT-110-AB. Based on this. analysis, both supports are adequate.

23

Table 2 (Continued)

Description of Configuration and Anchorage Evaluation for Tanks and Heat Exchangers (Unit 1)

Class ID Description Building El. Description of Configuration and Anchorage Evaluation 21 I-QT-131-AB &, AB 64 CD EMERG AUXILIARY 587 Jacket Water Cooler mounted to wall by fourteen 3/4" wedge type CD (2 Coolers) DIESEL JACKET expansion anchors. External Anchor Analysis was performed on the Unit WATER 2 Jacket Water Heater 2-QT-131-CD..

COOLERS Based on this analysis both supports are adequate.

I-QT-133-AB & AB 8c CD EMERG AUXILIARY 587 100 Gal. Tanks, 2'-6" D x 3'.

CD (2 Tanks) DIESEL JACKET WATER SURGE TANKS Notes and the ANCHOR4 analysis for 1-QT-133-CD also apply to 1-QT-133-AB since they are essentially identical.

The surge tanks are supported (bolted) to a shelf. The shelf is bolted to the wall by four J-bolts. In addition, two 3/4" wedge anchors attach the top channel to the wall. The wedge anchors were conservatively left out of the ANCHOR4 analysis.

The anchorage was screened based on an ANCHOR4 analysis for the anchorage to the shelf.

21 I-QT-134-AB & AB & CD EMERG AUXILIARY 587 The AB tank is the same as the CD tank except that 3/8" bolts were 134-CD (2 Tanks) DIESEL AUX measured in the field instead of the 1/4" bolts on the drawings for AB.

JACKET WATER HEATERS (TANKS} The ANCHOR4 analysis for 1-QT-134-CD (using 1/4" diameter Phillips Redhead Wedge Anchors) demonstrated adequacy. The base plates were also shown to be adequate.

24

Table 2 (Continued)

Description of Configuration and Anchorage Evaluation for Tanks and Heat Exchangers (Unit I)

Class ID Description Building'l. Description of Configuration and Anchorage Evaluation I -QT-141-AB I, AB & CD EMERG AUXILIARY 21 5S7 Air tanks anchored by four 5/S" J-bolts (Ref. 1, 4). Total weight for 141-AB2, 141-CD I, DIESEL STARTING each tank is 6000 lb.

141-CD2 (4 air AIR RECEIVERS I receivers) &2 Tank anchorage was verified by an ANCHOR4 analysis. Nozzle loads were included.

21 I-TK-10 REACTOR AUXILIARY 609 Tank on 4 wide flange legs, 90 inches in diameter and 120 inches in COOLANT height.

LETDOWN VOLUME CONTROL TANK Tank 1-TK-10 is similar to the 2-TK-10. Tank anchorage and wide

.flange legs were evaluated in a hand calculation for 2-TK-10 and found to be adequate.

21 I-TK-11* BORON INJECTION AUXILIARY 612 Tank is 5'iameter by 10'n height supported by 4 Wide Flange Leg TANK supports (10" WF w/5/S" flange) 4'-4" in height..

.Each leg is bolted to the pedestal w/ two embedded 1 3/4" bolts.

The Seismic Evaluation of the Boric Acid Tank (2-TK-12S) is seismically adequate. The Boron Injection Tank (1-TK-11) is much smaller but has about the same support. Therefore, Tank 1-TK-11 is judged adequate based on comparison.

21 I-TK-200 MAINSTEAM 621 Small tank supported from floor.

LEADS CONDENSATION DRAIN TANK Anchorage judged acceptable based on the walkdown and the (POT) anchorage inspection documentation.

25

Table 2 (Continued)

Description of Configuration and Anchorage Evaluation for Tanks and Heat Exchangers (Unit 1)

Class ID Description Building El. Description of Configuration and Anchorage Evaluation 21 I-TK-32 CONDENSATE GROUNDS 609 Large flat bottom tank 52'-0" inside diameter 34'-5 1/2" height (31'-7" STORAGE TANK liquid tank). 500,000 gallons and weighs 128,700 lbs. Anchored with thirty 3/8" th x 5" w x 4'-4" long strap that is embedded in the concrete at a 2'epth with a 2" radius hook at the end.

The strap detail is identical to the strap for the Unit 1 and 2 Refueling Water Storage Tanks (RWST) 1-TK-33 and 2-TK-33. The calculation for the RWST resulted in the conclusion that the meld to the tank and embedment in the concrete was sufficient to develop the full yield strength of the strap.

The RWST has a very similar configuration as this CST. The calculation for the RWST using the GIP methodology indicated an overall safety factor of 2.57 for overturning and 1.72 for shear.

The CST was screened based on a comparison of the significant attributes to the RWST.

21 I-TK-33 REFUELING G ROUN DS 609 Large flat bottom tank 48'-0" inside diameter 32'-3" height (31'iquid WATER tank). 420,000 gallons, weight 94,000 lbs. The tank is founded on a STORAGE TANK concrete pad and anchored with twenty-five 3/8" th x 5" W x 4' 4" L strap, embedded in concrete a 2'epth with a 2" radius hook at the end.

A detailed calculation was performed to the SQUG GIP criteria. The calculation resulted in the conclusion that the weld to the tank and embedment in the concrete was sufficient to develop the full yield strength of the strap. The calculation for the RWST using GIP methodology indicated an overall safety factor of 2.57 for overturning and 1.72 for shear.

26

Table.2 (Continued)

Description of Configuration and Anchorage Evaluation for Tanks and Heat Exchangers (Unit I)

Class ID Description Building El. Description of Configuration and Anchorage Evaluation 21 I-TK-37* COMPONENT AUXILIARY 650 Skirted tank 11'-10 1/4" diameter and 17'n height. Skirt is 4'-6" high from the top COOLING of the pad to skirt connection to tank. Skirt has I/2" thickness. There are 8 bolts NATER SURGE evenly spaced around tank, with a solid steel washer 3-3/4" high x 4" length x 2" TANK width. Bolts suppoited from 3" x 3 x I/2" angle.

The anchorage was screened based on a hand calculation performed for the bolt stresses.

21 I -TK-76N, 76S CONTROL AUXILIARY 650 Small tank 2'n length x 9" in diameter on a I" diameter piping system. Tank in-line ROOM A/C with pipe, supported by a U-bolt on a cantilevered angle (2 I/2" x 2 I/2" x 3/8")

NORTH AND about I'6" long. Angle welded to a plate that is bolted to the wall with 2 I/2" SOUTH CHILL expansion anchors.

V/ATER EXPANSION Anchorage and support for these small tanks were accepted by SRT judgment after the TANKS walkdown and a review of the anchora e ins ection documentation.

21 I-TK12-N NORTH BORIC AUXILIARY 537 Boric Acid Tank on 4 Wide Flange Beam Legs.

ACID STORAGE TANK This Tank is identical to tank 2-TK-12S which was evaluated-by means of a calculation. The calculation indicated that the legs and anchorage are adequate.

21 I 2-HE- I 6N NORTH SPENT AUXILIARY 609 3' 2" diameter horizontal heat exchanger about 22'ong on two saddles supported by FUEL PIT HEAT piers, Total weight full given as 26,200 lbs. Exchanger bolted into pier with four EXCHANGER 7/8" diameter bolts per saddle. Piers are doweled into floor. The results of tank anal sis show that the tank anchora e and saddles are ade uate.

Table 2 (Continued)

Description of Configuration and Anchorage Evaluation for Tanks and Heat Kxchangers (Unit 1)

Class ID Descri tion Buildin EI. Descri tion of Confi uration and Anchora e Evaluation 21 12-OME-44N-2 & NORTH & SOUTH AUXILIARY 609 Small Heat Exchanger 3'-2" long by 10" in diameter attached to South 44S-2 RADIOACTIVE Radioactive Waste Gas Compressor OME-44S-1 with 4 - 1/2" bolts.

WASTE GAS COMPRESSOR OME-44N-2 SEAL Compressor anchored to ground with 4 3/4" bolts. The SRT reviewed WATER HEAT the anchorage drawings for the compressor and judged the anchorage EXCHANGERS to be adequate (4 J-bolts). The compressor is not on the SSEL and only anchorage adequacy is required.

The anchorage of the compressor was judged acceptable after a review of the anchorage during the walkdown.

21 12-TK-47-AB* & AB & CD EMERG GROUNDS 609 Underground tanks. SRT evaluated this tank based on the available 47-CD DIESEL FUEL OIL documentation in the equipment package.

STORAGE TANKS A tank calculation was performed by hand. The tank was modeled as a beam on elastic foundation. The overall tank stresses were very low (on the order of 3.6 ksi).

21 12-TK12-M MIDDLEBORIC AUXILIARY 587 Boric Acid Tank on 4 Wide Flange Beam Legs. All dimensions for the ACID STORAGE tank, legs, connections and anchorage given in the anchorage package TANK for the tank.

This Tank is identical to tank 2-TK-12S which was evaluated by means of a hand calculation. The calculation indicated that the legs and anchorage are adequate. This tank was screened based on comparison to the Unit 2 calculation.

28

'k Table 3 Description of Anchorage Evaluation for Tanks and Heat E<xchangers (Unit 2)

Class ID Description Building El. Description of Configuration and Anchorage Evaluation 12-HE-25A 15GPM AUXILIARY 600 Component is supported offshell of much larger (about 4.0') diameter RADIOACTIVE tank 12-TK-148 which is not on the SSEL. This component is WASTE EVAPORATOR designated an outlier due to concerns related to the anchorage for 12-TK-HE-25 148 and nozzle loads.

CONDENSER 12-HE-25B & C (2 15 GPM AUXILIARY 587 The Heat Exchanger is about 14" in diameter and 10 feet long, Coolers) RADIOACTIVE supported by stiffened saddles with two 3/4" diameter anchor bolts in WASTE each saddle, supported offof a steel platform. Weight of HX < 2000 lbs.

EVAPORATOR HE-25 DISTILLATE Capacity exceeds demand for saddles, support frame and platform by COOLERS inspection.

2-QT-112-AB & AB&CD AUXILIARY 579 Small tank, with a ht of about 5'nd a diameter of 3', anchored by six CD (2 filters) EMERGENCY 1/2" expansion anchors at 60 degree intervals. Tank contains oil, total DIESEL FULL FLOW LUBE OIL maximum approximate weight = 2707 lbs.

FILTER ANCHOR analysis shows high margins and includes inlet and outlet nozzle loads.

29

Table 3 (Continued)

Description of Anchorage Evaluation for Tanks and Heat Exchangers (Unit 2)

Class Descri tion Buildin El. Descri tion of Confi uration and Anchora e Evaluation 2-QT-113- AB EMERGENCY AUXILIARY 579 Supported on four angle legs. Each leg is anchored by one I/2" J-bolt anchor.

ABI, AB2, DIESEL FULL Weight = 17304, c.g. at approx. mid-height = 33".

CDI & CD2 (4 FLOW LUBE OIL Strainers) STRAINER 5 I The ANCHOR analysis performed for CDI & CD2 including nozzle loads showed a high margin. The inlet and outlet nozzle loads were assumed equally distributed between the two strainers. Anchorage for ABI and AB2 was acceptable by corn arison.

2-QT-116-AB AB&CD AUXILIARY 579 Small heater 9.5" Dia. x 3'-9.5" Ht.

&CD EMERGENCY DIESEL LUBE OIL Anchorage screened based on the ANCHOR4 analysis for 116-CD.

HEATER TANK II 2-QT-118-A B AB EMERGENCY AUXILIARY 579 Filter anchored by nine anchors in three groups of three, so each group is 120 degrees

&CD DIESEL BYPASS for the next (i.e., evenly space).

LUBE OIL FILTER The approx. syeight of the tank is estimated to be the same as that of 2-QT-I l2-CD (Wt =2707//), because the tanks are of the same manufacturer, size, and both hold oil.

Anchorage screened based on an ANCHOR4 evaluation.

2-QT-143- AB EMERGENCY AUXILIARY 587 Small tank mounted together on steel frame with the other air dryer tank (ABI with ABI, AB2 and DIESEL AB2 and CDI with CD2). Frame anchored by eight 3/8" non-shell type expansion CD I, CD2 (4 CONTROL AIR anchors, four per base plate. Tanks hold air and are the size of fire extinguishers, dryers) DRYER/II (approx. 8.9 lbs. filled weight each). The nozzle loads are not a concern.

Anchorage screened based on judgment aAer walkdown and review of anchorage inspection documentation.

30

Table 3 (Continued)

Description of Anchorage Evaluation for Tanks and Heat Exchangers (Unit 2)

Class ID Description Building El. Description of Configuration and Anchorage Evaluation 2-QT-l44-AB & AB&CD AUXILIARY 587 Small filter on three angle legs anchored by three 5/8" Phillips Red Head Wedge CD (2 filters) EMERGENCY anchors. No interactions.

DIESEL FUEL OIL TRANSFER FILTER Anchorage screened by judgment after walkdown and review of anchorage inspection documentation.

0 2-TK-253-1 & 2 PRESSURIZER CONTAINMENT 612 This component is a small (about 4.5'ong x 16" diameter) air tank horizontally TRAIN mounted (welded) on a short length of I beam which in turn is welded to building

'A'RESSURE RELIEF steel. Tank weight was assumed to be 250 lbs.

VLVNRV-153 RESERVE An ANCHOR4 analysis showed a very high margin.

CONTROL AIR BOTTLE RACK 0 2-TK-253-3 &4 PRESSURIZER CONTAINMENT 650 This component is a cylindrical compressed air "bottle" about 12" in diameter and TRAIN 60" tall, secured to the crane wall with steel straps that are attached to a very stout

'B'RESSURE RELIEF steel bracket arrangement, secured to the wall with a number of expansion anchors.

VLVNRV-152 EMERGENCY AIR AEPSC Structural & Analytical Design Nuclear Section reviewed the as-found BOTTLE RACK condition of the support for this tank, and found it to be adequate for design loads.

21 12-HE-16S SOUTH SPENT AUXILIARY 609 Horizontal heat exchanger 3' 2" diameter, and about 22'ong on two saddles FUEL PIT HEAT supported by piers. Total weight full given as 26,200 lbs.

EXCHANGER Exchanger bolted into pier with four 718" diameter bolts per saddle. Piers are doweled into floor. The tank anchorage and saddles were adequate based on the analysis for 12-HE-16N as noted in Table 2.

Table 3 (Continued)

Description of Anchorage Evaluation for Tanks and Heat Exchangers (Unit 2)

Class ID Description Building El. Description of Configuration and Anchorage Evaluation 21 2-HE-I I >> REACTOR AUXILIARY 609 Vertical Heat Exchanger on a Gusseted steel pedestal. Each Pedestal COOLANT PUMP is anchored to the floor with eight 3/4" J-Bolts embedded 20" into SEAL WATER HEAT floor. Exchanger is 16" in diameter and 14'n height.

EXCHANGER Exchanger is bolted to the steel pedestal with two 1" diameter steel bolts on 6" centers in weak direction and 2'-8" in strong direction.

This connection is more limiting than the anchorage to the floor.

A hand calculation was performed to demonstrate the adequacy of these four bolts.

21 2-HE-13 EXCESS LETDOWN CONTAINMENT 612 Heat exchanger (1600 Ibs) on two saddles in extremely high rad area.

HEAT EXCHANGER Anchorage includes four 3/4" diameter J-bolts, embedded at least 2 feet into piers. Due to large anchorage (four 3/4" bolts) and small exchanger, the anchorage is acceptable by SRT judgment.

21 2-HE-14 LETDOWN HEAT AUXILIARY 633 Exchanger anchored with two 7/8" diameter J-bolts on 11-3/8" EXCHANGER spacing. Vertical distance from the base of exchanger to the C.G. of exchanger is 13". Vertical distance from the base of the exchanger to the top nozzle is 29". Anchorage adequacy was accepted based on a short hand calculation.

21 2-HE-15E & EAST k WEST AUXILIARY 609 Component Cooling Water Heat Exchanger on two reinforced 15W (2 COMPONENT saddles. Anchorage is two 7/8" diameter J bolts. There are four 1" exchangers) COOLING WATER HEAT wedge expansion anchors in one pedestal in the horizontal direction.

EXCHANGER C.G. of exchanger from the top of the saddle pedestal about 3'.

Anchorage screened based on a hand calculation for 1-HE-15E.

32

Table 3 (Continued)

Description of Anchorage Evaluation for Tanks and Heat Exchangers (Unit 2)

Class Descri tion Buildin El. Descri tion of Confi oration and Anchora e Evaluation 21 2-HE-17E & 17W EAST & WEST AUXILIARY 609 Very well engineered support structure. There is a ring support at top of the RESIDUAL HEAT exchanger bracketed to the wall in each of the four quadrants. This takes the REMOVALHEAT overturning loads on the exchanger. Bottom support is a heavy duty steel gusset EXCHANGER structure supported by two peers. There are two bolts in each peer. The support structure for the exchanger is obviously well engineered.

Qualification data indicates an analysis to the design basis. Based on the inspection and anchorage data collected, the Heat Exchangers are adequate.

21 2-HE-18E & 18 W EAST& WEST AUXILIARY 609 Very well engineered support structure. There is a ring support at top of the CONTAINMENT exchanger bracketed to the wall in each of the four quadrants. This takes the SPRAY HEAT overturning loads on the exchanger. Bottom support (at about the quarter point of the EXCHANGER exchanger, with the remainder of the exchanger hanging below) is a heavy duty ring with gussets at the bolt locations. These are bolted to a steel support structure that is obviously well engineered.

Qualification data indicates an analysis to the design basis. Based on the inspection and anchorage data collected the Heat Exchanger is adequate.

21 2-HE-32E & 32W EAST & WEST AUXILIARY 573 8" in diameter by 2" long exchanger, attached to East Residual Heat Removal Pump RESIDUAL HEAT with two 5/8" bolts. Could have screened with the pump using the rule of the box, REMOVALPUMP however the exchanger was listed separately on the SSEL.

PP-35E MECHANICAL Anchorage to the pumps was judged adequate by SRT judgment.

SEAL HEAT EXCHANGERS 33

Table 3 (Continued)

Description of Anchorage Evaluation for Tanks and Heat Exchangers (Unit 2)

Class ID Description Building El. Description of Configuration and Anchorage Evaluation 21 2-HE-33E & EAST & WEST AUXILIARY 573 6" diameter by 8-3/4" high exchanger, is not attached to the East 33W (2 CONTAINMENT Containment Spray Pump as shown on the anchorage sketch, however exchangers) SPRAY PUMP PP-9E MECHANICAL piping can support the small exchanger. Could have screened with the SEAL HEAT pump using the rule of the box, however the exchanger was listed EXCHANGERS separately oh the SSEL.

Anchorage to the pumps was judged adequate by the SRT.

21 2-HE-34-NE, NORTH & SOUTH AUXILIARY 587 6" diameter by 8-3/4" high exchanger, attached to North Safety 34-NW, 34-SE, SAFETY Injection Pump with two 1/2" bolts. Could have screened with the

& 34-SW (4 INJECTION PUMP exchangers) PP-26N pump using the rule of the box, however the exchanger was listed OUTBOARD separately on the SSEL.

MECHANICAL SEAL HEAT Anchorage to the pumps was judged adequate by the SRT.

EXCHANGERS 2-HE-35N & NORTH & SOUTH AUXILIARY 587 Small exchanger 1'-5" long by 4" in diameter by 8-3/4", attached to 35S (2 Coolers) SAFETY North Safety Injection Pump with four 1/4" bolts. Could have screened INJECTION PUMP PP-26N LUBE OIL with the pump using the rule of the box, however the exchanger was COOLERS listed separately on the SSEL.

Anchorage to the pumps was judged adequate by the SRT.

Table 3 (Continued)

Description of Anchorage Evaluation for Tanks and Heat Exchangers (Unit 2)

Class ID Description Building El. Description of Configuration and Anchorage Evaluation 21 2-HE-36-EN, EAST & WEST AUXILIARY 587 6" in diameter 8-3/4" high heat exchanger, attached to East Centrifugal Charging 36-ES, 36-WN, CENTRIFUGAL Pump with two I/2" bolts. Could have screened with the pump using the rule of 36-WS (4 CHARGING PUMP PP- the box, however the exchanger was listed separately on the SSEL.

exchangers) 50E INBOARD MECHANICALSEAL Anchorage to the pumps was judged adequate by the SRT.

HEAT EXCHANGERS 21 2-HE-37E, EAST & WEST AUXILIARY 587 Exchanger I'-6" long and 5" in diameter attached to reinforced plate support with 37W CENTRIFUGAL four I/2" bolts. Plate support bolted to East Centrifugal Charging Pump with CHARGING PUMP PP- three I/2" bolts. Could have screened using the rule of the box, however the 50E GEAR OIL exchanger has a separate SSEL listing.

COOLER Anchorage to the pumps was judged adequate by the SRT.

21 ~ 2-HE-38E* & EAST & WEST AUXILIARY 587 Small exchanger I'-6" long and 5" in diameter bolted to 2 1'ong channel 38W CENTRIFUGAL columns that are welded to the skid of the East Centrifugal Charging Pump.

CHARGING PUMP PP- Could have screened with the pump using the rule of the box, however the 50E LUBE OIL COOLER exchanger was listed separately on the SSEL.

Anchorage to the pumps was judged adequate by the SRT.

21 2-HE-47-ABN AB & CD EMERGENCY AUXILIARY 587 Aftercooler transfers its lateral load to the inlet manifolds. Gravity loads are

&, 47-A BS, 47- DIESEL NORTH carried by a post on a spring hanger base, so the post is incapable of carryin CDN &47- COMBUSTION AIR lateral or longitudinal load.

CDS (4 AFTER-COOLERS aAercoolers) The Diesel Generator Turbochargers in Unit 2 were replaced in a recent outa< e.

As part of the modil ication an analysis was perlonned for thc associated piping and the aAercoolers. All supports met the D.C. Cook acceptance criteria.

35

Table 3 (Continued)

Description of Anchorage Evaluation for Tanks and Heat Exchangers (Unit 2)

Class ID Description Building El. Description of Configuration and Anchorage Evaluation 21 2-QP-21 SOUTH BORIC ACID AUXILIARY 587 Boric Acid Blender supported by piping. It is in-line with the pipe between two BLENDER pipe supports offthe floor. Blender very small (6" in diameter and I I" long).

Screened based on drawings (insulation precluded inspection of the blender connection to the piping system) and inspection for interactions.

21 2-QT-107- AB AB & CD EMERGENCY AUXILIARY 587 Horizontal tanks which sits on two saddles. Each saddle has two I/4" thick plates,

& CD (2 tanks) DIESEL FUEL OIL DAY forming a "U", with no gussets. There are two 5/8" anchors per saddle.

TANKS A Horizontal Tank Analysis was performed to show that the tank anchorage is adequate.

21 2-QT-110-AB AB & CD EMERGENCY AUXILIARY 5/7 Lube Oil Coolers, mounted to wall by fourteen 3/4" Wedge type anchors.

&CD DIESEL LUBE OIL (2 Coolers) COOLER External ANCHOR4 analysis for 2-QT-110-CD was performed. Based on the results of this evaluation both coolers were screened.

21 2-QT-115-AB AB & CD EMERGENCY AUXILIARY 5 79 The tank sits on two saddles, two plates per saddle, I/O" thick. There are two 3/4"

& CD(2 DIESEL LUBE OIL anchors per saddle. There are four anchors in total for the tank.

Tanks) SUMP TANKS Anchorage screened based on review of the anchorage inspection documentation and the vendor qualification of the tanks.

21 2-QT-131-AB AB & CD EMERGENCY AUXILIARY 587 Jacket Water Cooler mounted to wall by fourteen 3/4" wedge type expansion

& CD(2 DIESEL JACKET anchors.

Coolers) WATER COOLER An ANCHOR4 was performed on 2-QT-131-CD. Based on that analysis both coolers were screened.

36

Table 3 (Continued)

Description of Anchorage Evaluation for Tanks and Heat Exchangers (Unit 2)

Class ID Description Building El. Description of Configuration and Anchorage Evaluation 21 2-QT-133-A B AB&CD AUXILIARY 587 100 GAL. TANK, 2'-6" D x 3'.

& CD (2 tanks) EMERGENCY DIESEL JACKET WATER SURGE The surge tanks are supported (bolted) to a shelf. The shelf is bolted TANK to the wall by four 7/8" anchors.

An ANCHOR4 was performed on 2-QT-133-CD. Based on that analysis both coolers were screened.

21 2-QT- l34-AB AB & CD AUXILIARY 587 Heater tanks separately mounted by three 1/2" coupling rods and

& CD4 (2 EMERGENCY Phillips Redhead wedge type anchors.

tanks) DIESEL AUXILIARY JACKET WATER HEATER (TANK) An ANCHOR4 was performed on 2-QT-134-CD. Based on that analysis both coolers were screened.

21 2-QT-14 I- AB EMERGENCY AUXILIARY 587 Air tanks anchored by four 5/8" J-bolts. Total weight for the tank is ABI, AB2, DIESEL STARTING 6000 lbs.

CDI, & CD2(4 AIR RECEIVER III Air Receivers)

The tank anchorage was verified by an ANCHOR4 analysis. Nozzle loads were included.

21 2-TK-10 REACTOR COOLANT AUXILIARY 609 Tank on four wide flange legs, 90 inches in diameter and 120 inches LETDOWN VOLUME in height.

CONTROL TANK The tank leg support and anchorage was screened based on a hand calculation.

37

Table 3 (Continued)

Description of Anchorage Evaluation for Tanks and Heat Exchangers (Unit 2)

Class ID Description Building El. Description of Configuration and Anchorage Evaluation 21 2-TK- I I BORON INJECTION AUXILIARY 612 Tank is about 5'n diameter by 10'n height supported by 4 Wide TANK Flange Leg supports (10" WF w/5/8" flange) 4'-4" in height..

Each leg is bolted to the pedestal w/ two embedded 1 3/4" bolts.

Weld of leg to tank about 14" in length and 1/4" thickness on each side of the wide flange and 10" at the top of the wide flange.

The seismic evaluation of the Boric Acid Tank (2-TK-12S) indicates that it is seismically adequate. The Boron Injection Tank is much smaller but has about the same support. Therefore, Tank 2-TK-11 is judged adequate based on comparison 21 2-TK-12S SOUTH BORIC ACID AUXILIARY 587 Boric Acid Tank on four Wide Flange Beam Legs.

STORAGE TANK Tank anchorage and wide flange legs were evaluated using a hand calculation. The calculation indicated that the legs and anchorage are adequate.

21 2-TK- 150 MAINSTEAM LEADS AUXILIARY 600 Small horizontal tank bolted to wall in-line with the piping system.

CONDENSATE DRAIN TANK Anchorage was judged acceptable based on the walkdown and a review of the anchorage inspection documentation.

38

Table 3 (Continued)

Description of Anchorage Evaluation for Tanks and Heat Exchangers (Unit 2)

Class ID Description Building Description of Configuration and Anchorage Evaluation 21 2-TK-32 CONDENSATE GROUNDS 609 Large flat bottom tank 52'-0" inside diameter 34'-5 1/2" height, STORAGE TANK 500,000 gallons and weighs 128,700 lbs. Anchored with thirty 3/8" th x 5" w x 4' 4" long strap that is embedded in the concrete 2'epth with a 2" radius hook at the end.

The strap detail is identical to the strap for the Unit 1 and 2 RWST 1-TK-33 and 2-TK-33. The calculation for the RWST resulted in the conclusion that the weld to the tank and embedment in the concrete was sufficient to develop the full yield strength of the strap.

The RWST has a very similar configuration as this CST. The calculation for the RWST using GIP methodology indicated an overall safety factor of 2.57 for overturning and 1.72 for shear.

The CST was screened based on a comparison of the significant attributes to the RWST.

21 2-TK-33 REFUELING GROUNDS 609 Large flat bottom tank 48'-0" inside diameter 32'-3" height (31'-0" WATER STORAGE liquid tank 420,000 gallons and weighs 94,000 lbs. Anchored with TANK twenty-five 3/8" th x 5" w x 4' 4" long strap that is embedded in the concrete 2'epth with a 2" radius hook at the end.

A detailed calculation was performed to the SQUG G1P criteria. The calculation resulted in the conclusion that the weld to the tank and embedment in the concrete was sufficient to develop the full yield strength of the strap. The calculation for the RWST using the GIP methodology indicated an overall safety factor of 2.57 for overturning and 1.72 for shear.

39

Table 3 (Continued)

Description of Anchorage Evaluation for Tanks and Heat Exchangers (Unit 2)

Class ID Description Building El. Description of Configuration and Anchorage Evaluation 21 2-TK-37 COMPONENT AUXILIARY 650 Skirted tank 11'-10 1/4" diameter and 17'n height. Skirt is 4'-6" high COOLING WATER from the top of the pad to skirt connection to tank. Skirt has 1/2" SURGE TANK thickness.. There are eight bolts evenly spaced around tank, with a solid steel washer 3-3/4" high x 4" length x 2" width. Bolts supported from 3" x 3" x 1/2" angle.

2-TK-37 is similar to 1-TK-37. The support for 2-TK-37 was screened based on the hand calculation for 1-TK-37.

21 2-TK-76N*, CONTROL ROOM AIR AUXILIARY 650 Small tank 2'n length x 9 " in diameter on a 1" diameter piping 76S CONDITIONING system. Tank in-line with pipe, supported by a U-bolt on a NORTH AND SOUTH CHILL WATER cantilevered angle (2 1/2" x 2 1/2" x 3/8") about 1'-6" long. Angle EXPANSION TANKS welded to a plate that is bolted to the reinforced block wall with three 5/8" diameter through bolts (other side of wall inspected and bolts came through).

Anchorage and support for these small tanks were accepted by SRT judgment after the walkdown and a review of the anchorage inspection documentation.

40

r Section 5.1.2 states that all four tanks reviewed met the intent of the GIP. Indicate that thc GIP-2 guidclincs and methodology are fully.mct or identify any deviations from thc guidelines and thc methodology. Provide calculations for determining thc seismic adequacy of the tanks (ID 1-TK-33 and 2-TK-32) using thc methodology dcscribcd in section 7 of thc GIP-2. The evaluation of thc anchors which restrain the tank movement should also be provided.

The flat bottom tanks were screened based on calculations performed on August 25, 1989, prior to the publication of the rev. 2 GIP. The evaluation performed followed the procedure available at the time in the rev. 1 GIP. There are only minor differences between the two revisions that do not affect the results due to the resulting high margins.

There are two differences in the configuration of the RWST (1-TK-33) that are not in conformance with the GIP procedure: a) the tJR = .0007351 which is less than the limits of the GIP screening table of .001; and b) the tank was not anchored with bolts but rather with twenty-five 3/8" x 5" x 4' 4" long straps that are embedded in the concrete at a two foot depth with a two inch radius hook at the end.

The tJR issue was accounted for by making an appropriate adjustment in the calculated natural frequency for the tank. The anchorage was considered by replacing the strap in the calculation with bolts of equivalent area and strength. Both of these modifications meet the intent of the GIP guidelines. The calculation resulted in the conclusion that the weld to the tank and embedment in the concrete was sufficient to develop the full yield strength of the strap. The calculation for the RWST using the Rev. 1 GIP methodology indicated an overall safety factor of 2.57 for overturning and 1.72 for shear. In order to obtain further assurance that the RWST is seismically adequate a calculation that conformed to'ASCE Standard 4-86 was performed and'yielded similar results.

The strap detail for the CST (2-TK-32) is identical to the strap for the RWST (1-TK-33). The calculation for the RWST resulted in the conclusion that the weld to the tank and embedment in the concrete was sufficient to develop the full yield strength of the strap. The CST also has a very similar configuration as this RWST. The CST was therefore screened based on a comparison of the significant attributes to the RWST.

The SEWS for 1-TK-33 and 2-TK-32 including the calculations are included as attachment 4.

7i Section 5.1.5 states that horizontal tanks and heat cxchangers rcviewcd mct thc intent of thc GIP. Indicate that the GIP-2 guidelines and methodology are fully met or identify any deviations from them. Provide calculations using the methodology described in section 7 of the GIP-2 for the following tanks and cxchangers: 1-HE-14, 2-HK-15K, 12-HE-16N, 1-QT-107-AB and 2-QT-115-CD. The evaluation of the anchors which restrain thc tank movement should also be provided.

As previously discussed in response to questions 2 and 5, anchorage and support evaluations took several different forms consistent with the GIP. These forms included for tanks and heat exchangers: a) detailed evaluations using the step by step procedure in section 7.4 of the GIP; b) detailed hand calculations; c) screening based on an anchorage evaluation for an identical item of equipment and anchorage or a worst case evaluation of a similar item; or d) the SRT judged, based on the weight and anchorage of the equipment, that the anchorage obviously met the GIP screening criteria. The GIP-2 guidelines for adequate strength of the tanks or exchangers, saddles and anchorage are met for all horizontal tanks and heat exchangers that were identified in the final report as screened. The step by step procedure in section 7.4 was not used for supports that were obviously rugged based on the inspection. Exchangers that did not meet 'the applicable ranges of parameters and assumptions contained in table 7-6 of the GIP could not be evaluated with the section 7.4 procedure. These tanks were evaluated as, described in tables 2 and 3 of this response to item 5 of the RAI.

SEWS that include the calculations and the anchorage inspection documentation for 1-HE-14, 2-HE-15E, 12-HE-16N, 1-QT-107-AB and 2-QT-115-CD are contained in attachment 5 of this submittal. The evaluations for 1-HE-15E and 1-QT-107-CD are also provided since the screening for 2-HE-15E and 1-QT-107-AB are based on these evaluations, respectively. These SEWS and calculations provide a good cross section of the evaluations performed. The calculation for 1-HE-14 was a short hand calculation that indicated the anchorage had a safety margin of eight. A hand calculation was performed for 1-HE-15E that was also used to screen 2-HE-15E. These had a calculated safety margin of four. Heat exchanger 12-HE-16N and tanks 1-QT-107-CD and 2-QT-115-CD included a calculation using the step by step methodology in section 7.4 of the GIP.

S) Tables 6-1 and 6-2 provide a summary of the limited analytical reviews (LARS) for thc sclcctcd cable and conduit raceways. Provide copies of the calculations of the analyses for resolution of thc outlicrs listed as LAR Numbers 005, 011, 022 and 023. Also provide typical sample calculations for thc raceways that arc not selected as outliers (i.e., LAR Numbers 001, 010, 027 and 030).

The requested information is contained in attachment 6 to this RAI.

A' y 9) Discuss thc issue described in thc Information Notice 95-49 regarding Thermo-Lag panels, in particular, thc issue regarding seismic resistance capability of the cable tray and its support when appropriate weight and modulus of the Thermo-Lag are included in thc analysis.

The fire-wrapped raceways were walked-down as part of the USI A-46 raceway evaluations, along with all of the other raceways in the plant. The weight of the Thermo-Lag material was considered in choosing LARS for the USI A-46 effort. None of the hangers supporting fire-wrapped raceways were selected for LAR because: (1) the SRT did not find them to be an enveloping case, i.e., other hangers of similar construction were more heavily loaded; and (2) the SRT was aware that the hangers supporting the fire-wrapped raceways had been evaluated and, unlike most other rod hangers in the plant, had been laterally braced.

In addition, in response to NRC bulletin 92-01 and generic letter 92-08, we performed a walk down of all Thermo-Lag installations in the plant to determine whether seismically induced failure of the Thermo-Lag could result in the Thermo-Lag falling and damaging nearby equipment. This walk down covered all Thermo-Lag installations, including conduits and cable trays, wall pilasters, and electrical equipment. The walkdown team concluded that the Thermo-Lag was well secured, so that large sections could not fall, but smaller pieces (golf ball size and smaller) could fall if local sections of the Thermo-Lag fractured. As a result of the walkdown Thermo-Lag material was removed from some of the conduits to address the safety interface condition.

In the mid 1980s, a minimum number (<10 %) of the cable tray and conduit raceways were fire-wrapped with Thermo-Lag material as part of our 10 CFR 50 Appendix R efforts. Some of the Thermo-Lag material in the plant is being removed and will be replaced with DARMATT material. In some instances, the Thermo-Lag was removed and was not replaced by any other type of material...

44

ATTACHMENT2 TO AEP:NRC:1040E SAMPLE SEWS, ANCHORAGE CALCULATIONS, AND ANCHORAGE INSPECTION DOCUMENTATION FOR CLASS 1 THROUGH 20 EQUIPMENT RAI ITEM 2

This attachment includes sample SEWS, anchorage calculations and anchorage inspection documentation for a cross section of class 1 through 20 equipment items. The samples selected are designated with an

  • in Table 1 of this RAI. The following examples are included:

lass 1-ABD-A 2-CRID-1-CVT 1-1'P-10W 1-HV-AFP-Mk 12-HV-E W-7 14 1-A W

-A -A 17 1- Mk:-15 -AB 2- Mk:-150-2-A11

Ol/16/92 I ) PG. HO.

SAfE SNUIOOuN EoulpHENT LIST (SSELup) fUHCI ION: 600 VAC STSTEH Equi pment Class: Train: I Equipment Io ~ 1-ABD-A Drawing Number: 1-12001 1-12010 Systemt ELECTRICAL OlSTRIBUTIOH 600VAC Equip

Description:

600VAC NCC ABD-A Bul l ding: AUXIL I ART Roomt AB EHERG OIESEL GENERATOR ROON Etevationt 587 Normal state: Desired st'ate: Power Required: Sort: U, Supporting System Drawing Munbert Required Interconnections and Suppo upportt ing Components:

C Safety Related Status: NUCLEAR SR flin/Optt HIM AOOITIOHAL IMFORNATIOM Alias Hubert Power Train: B Component Scrvedt 600Y KCC ABD-A Manufacturer: CUTLER-HAMMER Model:

Panel:

Elem Drawing: uiring Drawingt 1-9QOS I-9C206 Power Source: 1-llAS ualkdownt F Relay Only: H Component Type: HCC ISO Drawings:

Detailed Location: IN tHE MU RE'GIOM OF tHE ROON ROON, NEAR THE NORTH MALL

D.C. COOK Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 1 of 12 ID: 1-ABD-A( Rev. 0) Class: 1. Motor Control Centers

==

Description:==

600VAC MCC ABD-A Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: AB EDG RM, IN THE NWREGN OF THE RM, NEAR THE N WALL Manufacturer, Model, Etc.: CUTLER-HAMMER SEISMIC CAPACITY VS DEMAND Elevation where equipment receives seismic input 587.00 Elevation of seismic input below about 40'rom grade (grade = 608.00) N/A Equipment has fundamental frequency above about 8 Hz (est. frequency = ) N/A Capacity based on: 1.50 Bounding Spectrum Demandbasedon: 1.00 RealisticMedian-CenteredFloorResponseSpectra

'I.200 1

I I \

/

LOG I

/

/

0.000 0.50 LOG Hz 50.00 Capacity ..... Demand File Capacit CAGIPtGIPtspectra.des Label Boundin S ctrum Demand 1 C:tGIP'PROJ0035tspectra.des BUILDINGAuxilia ELEVATION 587 BROADEN N Demand 2 C.'tGIPIPROJ0035'Lspectra.dos BUILDINGAuxilia ELEVATION 587 BROADEN N Does capacity exceed demand'

D.C. COOK Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 2 of 12 ID: 1-ABD-A(Rev. 0) Class: 1. Motor Control Centers

Description:

600VAC MCC ABD-A Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: AB EDG RM, IN THE NW REGN OF THE RM, NEAR THE N WALL Manufacturer, Model, Etc.: CUTLER-HAMMER CAVEATS - BOUNDING SPECTRUM MCC/BS Caveat 1 - Earthquake Experience Data Base Yes MCC/BS Caveat 2 - Rating of 600 V or Less. Yes MCC/BS Caveat 3 - Adjacent Cabinets Bolted Together Yes MCC/BS Caveat 4 - Attached Weight of 100 Pounds or Less. N/A MCC/BS Caveat 5 - Externaliy Attached Items Rigidly Anchored. Yes MCC/BS Caveat 6 - General Configuration Similar to NEMA Standards.

Yes MCC/BS Caveat 7- Cutouts Not Large Yes MCC/BS Caveat 8- Doors/Buckets Secured. Yes MCC/BS Caveat 9 - Natural Frequency Relative to 8 Hz Limit Considered. N/A MCC/BS Caveat 10 - Adequate Anchorage. Yes MCC/BS Caveat 11 - Potential Chatter of Essential Relays Evaluated. Yes MCC/BS Caveat 12 - No Other Concerns Yes Is the intent of all the caveats met for Bounding Spectrum/

ANCHORAGE

1. The sizes and locations of anchors have been determined Yes
2. Appropriate equipment characteristics have been determined (mass, CG, natural freq., Yes damping, center of rotation).
3. The type of anchorage is covered by the GIP Yes
4. The adequacy of the anchorage installation has been evaluated (weld quality and length, nuts Yes and washers, expansion anchor tightness, etc.)
5. Factors affecting anchorage capacity or margin of safety have been considered: embedment Yes length, anchor spacing, freewdge distance, concrete strength/condition, and concrete cracking.
6. For bolted anchorages, any gaps under the base are less than 1/4 . Yes
7. Factors affecting essential relays have been considered: gaps under the base, capacity Yes reduction for expansion anchors.
8. The base has adequate stiffness and the effect of prying action on anchors has been Yes considered.
9. The strength of the equipment base and the load path to the CG is adequate Yes
10. The adequacy of embedded steel, grout pads or large concrete pads have been evaluated. Yes
11. The anchorage capacity exceeds the demand. Yes Are anchorage requirements met'?

D.C..COOK Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 3 of 12 ID: 1-ABD-A(Rev. 0) Class: 1. Motor Control Centers

Description:

600VAC MCC ABD-A Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: AB EDG RM, IN THE NW REGN OF THE RM, NEAR THE N WALL Manufacturer, Model, Etc.: CUTLER-HAMMER INTERACTION EFFECTS

1. Soft targets are free from impact by nearby equipment or structures Yes
2. If the equipment contains sensitive relays, it is free from all impact by nearby equipment or Yes structures.
3. Attached lines have adequate flexibility. Yes
4. Overhead equipment or distribution systems are not likely to collapse. Yes
5. No other adverse concerns were found. Yes Is equipment free of interaction effects?

CO+IME~N 1-ABD-A & 1-ABD-B in the same box.

5 vertical panels on 4" concrete pad.

Anchorage by bolts in front 4 1/2" J-bolts and 2 1/2" expansion anchors. Anchorage by welds in back 6 2" long 3/16" fillet.

Anchor Pattern:

fx ][ x][x ][ x][x x]

Weight of MCC is a maximum of 800 Ibs/cabinet x 5 = 4000 Ibs, which was used in the anchor analysis.

The AEPSC Rev. 0 report" Fundamental Resonant Frequencies of Cook Nuclear Plant Cabinets, Panels, and Racks in Auxiliary Building Complex ( Determined By In-Situ Modal Testing; Year 1985 and 1986)" dated August 10, 1994 documents the testing of four MCC assemblies. The minimum fundamental frequancy from these tests was 9.6 Hz for MCC assembly 2-ABD-B/ABD-A.The SRT based on this report judged that the frequancy for MCC assembly 1-ABD-A/ABD-B was above 8 Hz. However, for conservatism credit for MCC Assembly 1-ABD-A/ABD-B being above 8 Hz. was not taken, and therefore the caveats on this SEWs related to the 8 Hz issue were answered N/A. This enabled the conservative use of the 1.5 x Bounding Spectrum vs. floor spectrum comparison for capacity vs. demand and the use of the peak of the 5% damped floor spectrum for the anchorage calculations.

No interaction concern.

Zap 345 MCC ABD-ABB Zap,346 Typ. Opening @ bottom.

Anchor Evaluation Performed by Bahaa Mahmoud - S8A Checked by George Gary Thomas.

D.C. COOK Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 4 of 12 ID: 1-ABD-A( Rev. 0) Class: 1. Motor Control Centers

==

Description:==

600VAC MCC ABD-A Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: AB EDG RM, IN THE NW REGN OF THE RM, NEAR THE N WALL Manufacturer, Model, Etc.: CUTLER-HAMMER Anchor calculation additional margin = 1.634 Evaluated by Gary Thomas and Satyan Sharma on 7/17/92.

Evaluated by: Date:

D.C. COOK Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATION WORK SHEET (SEWS) Status: Yes Sheet 5 of 12 ID: 1-ABD-A( Rev. 0) Class: 1. Motor Control Centers

==

Description:==

600VAC MCC ABD-A Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: AB EDG RM, IN THE NW REGN OF THE RM, NEAR THE N WALL Manufacturer, Model, Etc.: CUTLER-HAMMER MCC ABD-AM TYP. OPENING AT BOTTOM.

D.C. COOK Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 6 of 12 ID: 1-ABD-A(Rev. 0) Class: 1. Motor Control Centers

==

Description:==

600VAC MCC ABD-A Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: AB EDG RM, IN THE NW REGN OF THE RM, NEAR THE N WALL Manufacturer, Model, Etc.: CUTLER-HAMMER ANCHOR Report Eargm~Z Spectrum: Instructure Realistic

'esponse Frequency: GIP - Flexible Percent Damping: GIP - 5.00 Spectral Values:

Direction Acceleration (g's)

North - South 1.04 East - West 1.04 Vertical 0.17 Angle (N-S Direction makes with the X Axis): 0.00 Combination Criteria: SRSS

~We ggs Number of Weights: 1 No Weight 1 4000.00 50.000 10.000 45.000 Fgrrgg Number of External Forces: 0 Eunmh of External Moments: 0

'umber fgc~LIRJRR Number of Anchor types: 2 Tension Shear Ultimate Ultimate Inter Inter Saf

D.C. COOK Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 7 of 12 ID: 1-ABD-A( Rev. 0) Class: 1. Motor Control Centers

==

Description:==

600VAC MCC ABD-A Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: AB EOG RM, IN THE NW REGN OF THE RM, NEAR THE N WALL Manufacturer, Model, Etc.: CUTLER-HAMMER No. Dia Manufact Product Tension Shear Coeff Coeff Fact 1 1/2 Other J-Bolt (90 6660.00 3330.00 1.00 0.30 1.00 deg) 2 1/2 Other Unknown 2290.00 2380.00 1.00 0.30 1.00 Expansion Anchor Czmrch.

Ultimate Stress: 3500.00 psi.

Reduction Factor: 0.85 W~

Allowable Stress: 30600 psi.

Surry~c Number of Surfaces: 1 Surface Orientation Direction Direction Direction Comp Comp Comp No Ny 0.000 0.000 1.000 Anchor Pattern for Surface ¹ 1

D.C. COOK Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 8 of 12 ID: 1-ABD.-A(Rev. 0) Class: 1. Motor Control Centers

==

Description:==

600VAC MCC ABD-A Building: AUXILIARY Floor EI.: 587.00 Room, Row/Col: AB EDG RM, IN THE NW REGN OF THE RM, NEAR THE N WALL Manufacturer, Model, Etc.: CUTLER-HAMMER 4x Legend for Anchor Patterns Anchor Bolts:

Concrete Uncs:

Concrete Potnts: ~IIII Neid Uncs:

knobs" Number of Anchors: 6 Anch Surf No. Id Coord Coord Coord Id 1 1 3.750 1.500 0.000 2 1 36.500 1.500 0.000 3 1 43.800 1.500 0.000 4 2 76.600 1.500 0.000 5 2 83.900 1.500 0.000 6 1 96.300 1.500 0 000

D.C. COOK Unit 1 GIP Rev 2, Corrected, 2l14I92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 9 of 12 ID: 1-ABD-A( Rev. 0) Class: 1. Motor Control Centers

==

Description:==

600YAC MCC ABD-A Building: AUXILIARY Floor El.: 587.00 Room, Rovi/Col: AB EDG RM, IN THE NW REGN OF THE RM, NEAR THE N WALL Manufacturer, Model, Etc.: CUTLER-HAMMER

¹ of elements per line: 1 Number of Concrete Lines: 4 Start Start Start End End End Sf Line No X-Coord Y-Coord Z-Coo rd X-Coord Y-Coo rd Z-Coord Id Width 0.000 1.500 0.000 100.000 1.500 0.000 2.000 100.00Q 1.500 0.000 100.000 17.000 0.000 2.000 100.000 17.000 0.000 0.000 17.000 0.000 2.QQQ 0.000 17.000 0.000 0.000 0.000 0.000 2.000 Number of Concrete Points: 0

¹ of elements per line: 1 Number of Weld Lines: 6 Start Start Start End End End Line No X-Coord Y-Coo rd Z-Coord X-Coord Y-Coo rd Z-Coo rd ld Width 0.000 18.500 0.000 2.250 18.500 0.000 1 0.125 15.400 18.500 0.000 17.600 18.500 0.000 1 0.125 3

19.400 18.500 0.000 21.600 18.500 0.000 1 0.125 56.500 18.500 0.000 58.600 18.500 0.000 1 0.187 59.900 18.500 0.000 62.100 18.500 0.000 0.187 96.100 18.500 0.000 98.400 18.500 0.000 1 0.187 Reduction Factor Input for Anchor ¹ 1 Embedment Length: (1 3.60 in. Min Reqd. to achieve full capacity):=27.25 in.

Essential Relays in Cabinet: Yes Reduction Factor Input for Anchor ¹2 Embedment Length: (13 40 in. Min Reqd. to achieve full capacity):=27.25 in.

Essential Relays in Cabinet: Yes

D.C. COOK Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 10 of 12 ID:1-ABD-A(Rev. 0) Class: 1. Motor Control Centers

==

Description:==

600VAC MCC ABD-A Building: AUXILIARY Floor El.: 58?.00 Room, Row/Col: AB EDG RM, IN THE NW REGN OF THE RM, NEAR THE N WALL Manufacturer, Model, Etc.: CUTLER-HAMMER Reduction Factor Input for Anchor ¹3 Embedment Length: (13.60 in. Min Reqd. to achieve full capacity):=27.25 in.

Essential Relays in Cabinet: Yes Reduction Factor Input for Anchor ¹4 Essential Relays in Cabinet: Yes Reduction Factor Input for Anchor ¹5 Essential Relays in Cabinet: Yes Reduction Factor Input for Anchor ¹6 Embedment Length: (13.50 in. Min Reqd. to achieve full capacity}:=27.25 in.

Essential Relays in Cabinet: Yes Reduction Factors Data Current: Yes Anc PaIV Pallr/

No Id Vali Vallr RT RN RL RG RS RE RF RC RR RP RB RM 1 1 3750.91 N/A X 0.56 X X X X 1.00 X X 3330.00 X 1.00 X X, X X 1.00 X X 2 1 3708.29 N/A X 0.56 X X X X 1.00 X X 3330.00 NIA X 1.00 X X 1.00 X X 3 1 3750.91 N/A X 0.56 X X X X 1.00 X X 3330.00 N/A X 1.00 X X X X 1.00 X X 4 2 1717.50 NIA X X X X X X 0.75 X X 1785.00 N/A X X X X X X 0.75 X X 5 2 1717.50 N/A X X X X X X 0.75 X X 1785.00 N/A X X X X X X 0.75 X X 6 1 3729.60 X 0.56 X X X X 1.00 X X 3330.00 N/A X 1.00 X X X X 1.00 X X N/A = Not Applicable Pall = Allowable Pull without Reduced Inspection Vali = Allowable Shear without Reduced Inspection Pallr = Allowable Pull with Reduced Inspection Vallr = Allowable Shear with Reduced Inspection

= Outlier

= Reduction Factor Not Used RT = Reduction Factor for Type of Anchorage RN = Reduction Factor for Installation Adequacy

D.C. COOK Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 11 of 12 ID: 1-ABD-A( Rev. 0) Class: 1. Motor Control Centers

==

Description:==

600VAC MCC ABD-A Building: AUXILIARY Floor El.: 687.00 Room, Row/Col: AB EDG RM, IN THE NW REGN OF THE RM, NEAR THE N WALL Manufacturer, Model, Etc.: CUTLER-HAMMER RL = Reduction Factor for Embedment RG = Reduction Factor for Gap at Anchors RS = Reduction Factor for Spacing RE = Reduction Factor for Edge Distance RF = Reduction Factor for Concrete Strength RC = Reduction Factor for Concrete Cracks RR = Reduction Factor for Essential Relays RP = Reduction Factor for Base Stiffness and Prying Action RB = Reduction Factor for Base Strength and Load Path RM = Reduction Factor for Embed. Steel and Pads e

Analysis Performed: Yes Type of Analysis: Regular Spectral Accelerations (G's)

N-S Vertical Safety Factor 1.038 0.415 0.067 3.653

-1.038 -0.415 -0.067 7.048

-1.038 0.415 0.067 3.526 1.038 -0.415 -0.067 7.085 1.038 -0.415 0.067 6.863

-1.038 0.415 -0.067 3.652 1.038 0.415 -0.067 3.787

-1.038 -0.415 0.067 6.819 0.415 1.038 0.067 1.634 10 -0.415 -1.038 -0.067 3.990 0.415 -1.038 0.067 3.976 12 -0.415 1.038 -0.067 1.676 13 -0.415 1.038 0.067 1.643 14 0.415 -1.038 -0.067 4.055 0.415 1.038 -0.067 1.666 16 -0.415 -1.038 0.067 3.912 17 0.415 0.415 0.167 3.816

-0.415 -0.415 -0.167 9.487 19 0.415 0.415 -0.167 4.302 20 -0.415 -0.415 0.167 8.494

-0.415 0.415 0.167 3.838 22 0.415 -0.415 -0.167 9 673 0.416 -0.415 0.167 8.579

D.C. COOK Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 12 of 12 ID: 1-ABD-A(Rev. 0) Class: 1. Motor Control Centers

==

Description:==

600VAC MCC ABD-A Building: AUXILIARY Floor EI.: 587.00 Room, Row/Col: AB EDG RM, IN THE NW REGN OF THE RM, NEAR THE N WALL Manufacturer, Model, Etc.: CUTLER-HAMMER 24 Z.415 0.415 -0.167 4.333 Minimum Safety Factor: 1.634.

The Anchorage Capacity is 1.634 times greater than the Demand

    • 12 CHP 5021. CCD. 019 TTACHHENT NO. 1 ANCHOR INSPECTION DATA SHEET Bldg. Location Installation dwg. / Rev. Equipment No.

Anchora e Arran ement Sketch

/ II QOCOC.RETG VIE ( P~o 4

L~

0 Q 4 Og p

( 7 E, -v. K E.i Lco'm< G.

Drawn by: Date: l Verified by: Date: ~q~n QuM./Cert. Inspector Reviewed by: Date:

nstructz.on Anchor Review Engineer Page 1 of 3 Revision 1

    • 12 CHP 5021. CCD. 019 TTACHMENT NO. 1 ANCHOR INSPECTION DATA SHEET Ab F~ c,. i-.. Ce~ Q.~

Unzt I Bldg. Locate.on Installation dwg. / Rev. Equipment No.

Anchora e Arran ement Sketch I ~ ~ r~ 1 I 0 ~

0 CLEi'-; 8) ) / ~r>Z~r-~

I rr 0

ELCJ. /AC+ Lop>W)l'h Z Drawn by: Date:

Verified by: Date.

Qua1. /Cert. Inspector Reviewed by: Date: 7 2>>~

nstructzon Anchor Review Engineer Page 1 of 3 Revision 1

  • ' CHP 5021. CCD. 019

.TTACHMENT NO. 1 ANCHOR INSPECTION DATA SHEET 4'b C ~ c,. ~.egg P~

Un 3.t g Bldg. Locate.on

- 3"/&-

Installation dwg. / Rev. Equipment No.

Anchora e Arran ement Sketch 3-'I 6'-0 t<

cpa pygmy 4p&  %%cd P'g) g Qc ~ll LJL~>

A

~5 An~So~

0 l'/i Typ

( ~!

2-'FV>> 1~/A, l 3'/g 0VL fg Drawn by: Date:

Verified by: Date: >-r~

Qual./Cert. Inspector Reviewed by: Date:

onstructzon Anchor Reve.ew Engineer Page 1 of 3 Revision 1

~ ~ I I ~ ~

D ~ ~ II ~ ~

0 ~ ~ ~

I ~ ~

~ ~

C ~ ~ l~4

~ - r.

Q P 0

~ ~ R%Ã~%~%~%%%~~~

j IIIIHRIIIIIIIIWH

~ ~

IIINIIIRIIIRRLL I551IIWIIILL

~

o ~

~ eimmmimemrr RRIml%NIRSIj!mLL WRSHHR%WSLL

~~5%~

Wiiiimeemrr 0' I

$~%k%$%R%5%$ %WW

~ II II ~ ~l.~ l I'

alMKWF sC

    • 12 CHP 5021. CCD. 03.9 ATTACHMENT NO. 1 ANCHOR INSPECTION DATA SHEET Equipment No.: l- SO- Dwg No.: 2"3 Embedded Steel Dwg. No.:  ! - G3-PHYSICAL CHARACTERISTICS Weld ID C Weld T e Codes T e Size 3 I I 3 II 1 = Fillet I

2 = Plug/Slot Len th = Groove 3

Cracks Yes Yes Yes Yes Yes Yes

<HZ'es Yes 0 de No No Lack of Yes Yes Yes Yes Yes Yes Yes Penetration CZb No No Porosity Yes Yes Yes Yes No No 0 (=

SC(-Qs 4 Wrv ~ a.r <4'. W ~4(nc+ +0 aO KWUQS~Q gh'4e.

UL LQ DCTRIL Equipment base flexible: 0 Yes 8 No ons ruc ron re Date: 7 z fe Reviewed by: Date:

ron nc or eve.ew ngzneer Verified by: era.

f6~~(

or r  ;,i>(;!(I;.(r "..I('('((lhI; LI,:V/E!) Date:

ua . npsec 0,:;I",: t !.<(.'i:I..".I "l!i!!Ao(.LLiP 4-'uc i>IJ( 'I ':.:

QQIIIJ( ~

~,. 'age 3 of 3

Equipment No.:

Tightness esvaoxzsned by "Snug Fit" Tightness verified by: ~- ',(

Qual. /Cert. Inspector Comments: 4 Mc~ 9 4c >

) z s

12 SHP 5050 NDE.008 S 5 A DEPARTl4ENT DOCUMENT ATTACHMENT NO. 1 CONTROLLED COPY NO. Uf TRASONXC TEST REPORT JOB ORDER NO.: REPORT DATE: 8 ~ REQUEST NO.

IDENTIFICATION Unit Test Unit/ S/NW Component: Frea./Diameter Item Reference Standard Material Couplant/Batch No.

Other TEST DATA REMARKS Ic' '

c 8'ERFORMED BY: f EVEf:~ DATE:

REVIEWED BY: WD 'VEE: ~ DATE:

FORM NO. 12 SHP 5050 NDE.008-1 Page 1 OE Revision 0

Equip Xd: 2-CRID-I-CVT Train: 2 Equip Class: 4 Drawing No.: 2-12050 ction: 120 VAC SYSTEM System: 120V CONTROL ROOM XNSTRUMENTATXON DXSTRIBUTXON Equip Desc: 10KVA TRANSFORMER CONSTANT VOLTAGE Building: AUXILIARY Room: 4KV ROOM 600 VOLTS SWITCHGEAR AREA Elev: 609 Sort: S,R Notes:

Normal State: Desired State: Power Req'd:

Support System Drawing: 2-98077, 2-12050 Req'd Support Comp:

Safety Related Status: STANDARD Min/Opt: MXN Alias No: Power Train: A Comp Served:

MFR: SOLIDSTATE CONTROLS INC.

el: XSL12100 el:

Elem. Drawing: 2-98077 Wiring Drawing: 2-91332 Power Source: 2-EZC-C-5AR Walkdown: F Relay Eval: Y Comp Type: TRANSFORMER k

Xso Diawing:

Location: XN THE MIDDLE EAST REGXON OF THE ROOM, 7 FEET SOUTH OF 600VAC BUS 21B SUPPLY TRAIN

DC Cook Unit 2 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 1 of 11 ID: 2-GRID-I-CVT ( Rev. 0 ) Class: 4. Transformers

==

Description:==

10KVA TRANSFORMER - CONSTANT VOLTAGE Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: 4KV RM - 600V SWGR AREA - IN THE MIDDLE EAST REGION OF THE ROOM, 7 FEET SOUTH OF 600VAC BUS 21B SUPPLY TRAIN Manufacturer, Model, Etc.: SOLIDSTATE CONTROLS INC. ISL12100 SEISMIC CAPACITY VS DEMAND Elevation where equipment receives seismic input 633.00 Elevation of seismic input below about 40'rom grade (grade = 608.00 N/A Equipment has fundamental frequency above about 8 Hz (est. frequency = 8.00) N/A Capacity based on: 1.50

  • Bounding Spectrum Demand based on: 1.00
  • Realistic Mean-Centered Floor Response Spectra 1.200

\

/

\

r

/

I

/

LOG /

/

r/

0.085 0.S0 LOG Hz S0.00 Capacity ..... Demand Record Capacity C:tGIPLGIPtspectra.des LabellBounding Spectrum Demand 1 C."tGIP'PROJ0032tspectra.des BUILDINGAuxilia ELEVATION 633 BROADEN N Demand 2 C:tGIPLPROJ0032tspectra.des BUILDINGAuxilia ELEVATIONI633IBROADENN Does capacity exceed demand'

DC Cook Unit 2 GIP Rev 2, Corrected, 2/1 4/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 2 of 11 ID: 2-CRID-I-CVT( Rev. 0) Class .'. Transformers

==

Description:==

10KVA TRANSFORMER - CONSTANT VOLTAGE Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: 4KV RM - 600V SWGR AREA - IN THE MIDDLE EAST REGION OF THE ROOM, 7 FEET SOUTH OF 600VAC BUS 21B SUPPLY TRAIN Manufacturer, Model, Etc.: SOLIDSTATE CONTROLS INC. ISL12100 CAVEATS - BOUNDING SPECTRUM TRN/BS Caveat 1 - Earthquake Experience Equipment Class Yes TRN/BS Caveat 2 - Rating of 4.16 KV or Less. Yes Caveat 3- Transformer Coils Postively Restrained Within Cabinet

'RN/BS Yes TRN/BS Caveat 4- Coils Top Braced or Anal zed for Large Transformers. N/A TRN/BS Caveat 5- Clearance Between Energized Component and Cabinet. Yes TRN/BS Caveat 6- Adequate Slack in High Voltage Leads. Yes TRN/BS Caveat 7- Wall-Mounted Units Anchored Close to Enclosure Structure. N/A TRN/BS Caveat 8 - Weak-Way Bending of Thin Webs Evaluated. Yes TRN/BS Caveat 9 - Adjacent Cabinets Bolted Together. N/A TRN/BS Caveat 10 - Doors Secured. Yes TRN/BS Caveat 11 - Adequate Anchorage Yes TRN/BS Caveat 12- Potential Chatter of Essential Relays Evaluated. N/A TRN/BS Caveat 13 - No Other Concerns. Yes Is the intent of all the caveats met for Bounding Spectrum?

ANCHORAGE

1. The sizes and locations of anchors have been determined Yes
2. Appropriate equipment characteristics have been determined (mass, CG, natural freq., Yes damping, center of rotation).
3. The type of anchorage is covered by the GIP Yes
4. The adequacy of the anchorage installation has been evaluated (weld quality and length, nuts Yes and washers, expansion anchor tightness,'etc.)
5. Factors affecting anchorage capacity or margin of safety have been considered: embedment Yes

~

length, anchor spacing, free-edge distance, concrete strength/condition, and concrete-cracking.

6. For bolted anchorages, any gaps under the base are less than 1/4 Yes
7. Factors affecting essential relays have been considered: gaps under the base, capacity N/A reduction for expansion anchors.
8. The base has adequate stiffness and the effect of prying action on anchors has been Yes considered.
9. The strength of the equipment base and the load path to the CG is adequate. Yes
10. The adequacy of embedded steel, grout pads or large concrete pads have been evaluated. Yes
11. The anchorage capacity exceeds the demand. Yes Are anchorage requirements met?

DC Cook Unit 2 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 3 of 11 ID: 2-GRID-I-CVT'( Rev. 0 ) Class: 4. Transformers

==

Description:==

10KVA TRANSFORMER - CONSTANT VOLTAGE Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: 4KV RM - 600V SWGR AREA - IN THE MIDDLE EAST REGION OF THE ROOM, 7 FEET SOUTH OF 600VAC BUS 21B SUPPLY TRAIN Manufacturer, Model, Etc.: SOLIDSTATE CONTROLS INC. ISL12100 INTERACTION EFFECTS

1. Soft targets are free from impact by nearby equipment or structures Yes
2. If the equipment contains sensitive relays, it is free from all impact by nearby equipment or N/A structures.
3. Attached lines have adequate flexibility. Yes
4. Overhead equipment or distribution systems are not likely to collapse. Yes
5. No other adverse concerns were found. Yes Is equipment free of interaction effects'P C L D

~CON IE~S SRT: George G. Thomas (S8A) and Satyan Sharma -10/29/92 Anchorage: Anchorage is 1/2" diameter wedge expansion bolts. Most likely they are Phillips anchors based on the Unit 1 GRID-CVT's. Used unknown expansion anchor in ANCHOR analysis for conservatism. Minimum embedment is 2-13/16" above GIP minimum embedment for all types of 1/2" expansion anchors.

Weight estimate based on maximum weight for an inverter in Table C.1-1 of the GIP (configuration similar to an inverter). Weight estimate is 45 Ibs/ft"3.

Weight = (4.5' 2.5' 2.33') x 45 Ibs/ft"3 = 1180 Ib Fluorescent light above unit could come out. However interaction judged non4amaging Thin 3/16" thick angles at base of transformer that is bolted to the base channel is gusseted in two locations. (No weak way bending).

Frequency judged by the SRT to be at least 8 Hz.

ANCHOR analysis indicates an additional factor of safety of 1.97.

Pictures: Zap shot 2629 -Inside Cabinet Zap shot 2630 Outside of Transformer Zap shot 2631 Braced Base Channels

DC Cook Unit 2 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 4 of 11 ID: 2-GRID-I-CVT ( Rev. 0) Class: 4. Transformers

==

Description:==

10KVA TRANSFORMER - CONSTANT VOLTAGE Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: 4KV RM -600V SWGR AREA - IN THE MIDDLE EAST REGION OF THE ROOM, 7 FEET SOUTH OF 600VAC BUS 21B SUPPLY TRAIN Manufacturer, Model, Etc.: SOLIDSTATE CONTROLS INC. ISL12100 Evaluated by: Date:

// <<gz

Attachment:

Pictures

Attachment:

ANCHOR Report

DC Cook Unit 2 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 5 of 11 ID: 2-GRID-I-CVT ( Rev. 0 ) Class: 4. Transformers

==

Description:==

10KVA TRANSFORMER - CONSTANT VOLTAGE Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: 4KV RM - 600V SWGR AREA - IN THE MIDDLE EAST REGION OF THE ROOM, 7 FEET SOUTH OF 600VAC BUS 21B SUPPLY TRAIN Manufacturer, Model, Etc.: SOLIDSTATE CONTROLS INC. ISL12100 P IC~UIRg$

C t

Braced Base Channels Inside Cabinet Outside of Transformer

DC Cook Unit 2 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 6 of 11 ID: 2-GRID-I-CVT( Rev. 0) Class: 4. Transformers

==

Description:==

10KVA TRANSFORMER - CONSTANT VOLTAGE 8uilding: AUXILIARY Floor El.: 609.00 Room, Row/Col: 4KV RM - 600V SWGR AREA - IN THE MIDDLE EAST REGION OF THE ROOM, 7 FEET SOUTH OF 600VAC 8US 218 SUPPLY TRAIN Manufacturer, Model, Etc.: SOLIDSTATE CONTROLS INC. ISL12100 ANCHOR Report

~~~use Spectrum:!nstructure Realistic

'esponse Frequency: User - 8.00 Percent Damping: User - 5.00 Spectral Values:

Direction Acceleration (g's)

North - South 0.36 East - West 0.36 Vertical 0.18 Angle (N-S Direction makes with the X Axis): 0.00 Combination Criteria: SRSS W~~s'umber of Weights: 1 Porcine No Weight 1 1180.00 14.000 14.250 35.375 Number of External Forces: 0 gl~oe~s Number of External Moments: 0

~llowat~s.

~n~

Number of Anchor types: 1 Tension Shear Ultimate Ultimate Inter Inter Saf No Dia Manufact Product Tension Shear 'oeff Coeff Fact 1/2 Other Unknown 2290.00 2380.00 1.00 0.30 1.00 Expansion Anchor

~rgb Ultimate Stress: 3500.00 psi.

DC Cook Unit 2 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 7 of 11 ID: 2-GRID-I-CVT(Rev. 0) Class: 4. Transformers

==

Description:==

10KVA TRANSFORMER - CONSTANT VOLTAGE Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: 4KV RM - 600V SWGR AREA - IN THE MIDDLE EAST REGION OF THE ROOM, 7 FEET SOUTH OF 600VAC BUS 218 SUPPLY TRAIN Manufacturer, Model, Etc.: SOLIDSTATE CONTROLS INC. ISL12100 Reduction Factor: 0.85

~W Allowable Stress: 0 psi.

~u Number of Surfaces: 1 Surface Orientation Direction Direction Direction Comp Comp Comp 0.000 0.000 1.000 Anchor Pattern for Surface 0 1 Legend for Anchor Patterns

DC Cook Unit 2 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 8 of 11 ID: 2-GRID-I-CVT( Rev. 0) Class: 4. Transformers

==

Description:==

10KVA TRANSFORMER - CONSTANT VOLTAGE Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: 4KV RM - 600V SWGR AREA - IN THE MIDDLE EAST REGION OF THE ROOM, 7 FEET SOUTH OF 600VAC BUS 21B SUPPLY TRAIN Manufacturer, Model, Etc.: SOLIDSTATE CONTROLS INC. ISL12100 Anchor Bolts:

Concrete Lines: ~Itin Concrete Points: ~mtm W'eld Lines '.

~Ge retry An(QIL' Number of Anchors: 4 Anch Surf No Id Coord Coord Coord Id 1.500 0.750 0.000 26.438 0.750 0.000 1.750 27.750 0.000 26.875 27.750 0.000 ft of elements per line: 1 Number of Concrete Lines: 2 Start Start Sta~ End End End Sf Line No X-Coord Y-Coord Z-Coord X-Coord Y-Coord Z-Coord Id Width 0.000 0.891 0.000 28.063 0.891 0.000 1.781 0.000 27.609 0.000 28.000 2 7.609 0.000 1.781 Number of Concrete Points: 0 KeldJ.um 4 of elements per line: 5 Number of Weld Lines: 0 er i in u i a o Reduction Factor Input for Anchor 0 1

OC Cook Unit 2 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 9 of 11 ID: 2-GRID-I-CVT(Rev. 0) Class: 4. Transformers

==

Description:==

10KVA TRANSFORMER - CONSTANT VOLTAGE Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: 4KV RM - 600V SWGR AREA - IN THE MIDDLE EAST REGION OF THE ROOM, 7 FEET SOUTH OF 600VAC BUS 21B SUPPLY TRAIN Manufacturer, Model, Etc.: SOLIDSTATE CONTROLS INC. ISL12100 Adequately Installed: Yes Gap at Threaded Anchor: 0.00 in.

Edge Distance - Edge 1: 5.00 in.

Crack Size: 0.000 in. - Cracks Affect <= 50% Bolts Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factor Input for Anchor ¹2 Adequately Installed: Yes Gap at Threaded Anchor: 0.00 in.

Edge Distance - Edge 1: 5.00 in.

Crack Size: 0.000 in. - Cracks Affect <= 50% Bolts Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factor Input for Anchor ¹3 Adequately Installed: Yes Gap at Threaded Anchor: 0.00 in.

Edge Distance - Edge 1: 5.00 in.

Crack Size: 0.000 in. - Cracks Affect <= 50% Bolts Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factor Input for Anchor ¹4 Adequately Installed: Yes Gap at Threaded Anchor: 0.00 in.

Edge Distance - Edge 1: 5.00 in.

Crack Size: 0.000 in. - Cracks Affect <= 50% Bolts Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factors Data Current: Yes Anc PaIV Pallr/

No Id Vali Vallr RT RN RL RG RS RE RF RC RR RP RB RM 1 1202.25 N/A 0.60 1.00 X 1.00 1.00 1.00 0.88 1.00 1.00 1.00 1.00 1.00 1428.00 N/A 0.60 1.00 X 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1202.25 N/A 0.60 1.00 X 1.00 1.00 1.00 0.88 1.00 1.00 1.00 1.00 1.00

DC Cook Unit 2 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 10 of 11 ID: 2-GRID-I-CVT( Rev. 0) Class: 4. Transformers

==

Description:==

10KVA TRANSFORMER CONSTANT VOLTAGE Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: 4KV RM - 600V SWGR AREA - IN THE MIDDLE EAST REGION OF THE ROOM, 7 FEET SOUTH OF 600VAC BUS 21B SUPPLY TRAIN Manufacturer, Model, Etc.: SOLIDSTATE CONTROLS INC. ISL1 2100 1428.00 NIA 0.60 1.00 X 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 3 1 1202.25 NIA 0.60 1.00 X 1.00 1.00 1.00 0.88 1.00 1.00 1.00 1.00 1.00 1428.00 NIA 0.60 1.00 X 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1202.25 NIA 0.60 1.00 X 1.00 1.00 1.OO O.88 1.OO 1.00 1.00 1.00 1.00 1428.00 NIA 0.60 1.00 X 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 N/A = Not Applicable I ali = Allowable Pull without Reduced inspection Van = Allowable Shear without Reduced Inspection Pallr = Allowable Puli with Reduced Inspection Vallr = Allowable Shear with Reduced Inspection

= Outlier

= Reduction Factor Not Used RT = Reduction Factor for Type of Anchorage

= Reduction Factor for Installation Adequacy RL = Reduction Factor for Embedment RG = Reduction Factor for Gap at Anchors RS = Reduction Factor for Spacing

= Reduction Factor for Edge Distance

= Reduction Factor for Concrete Strength RC = Reduction Factor for Concrete Cracks RR = Reduction Factor for Essential Relays RP = Reduction Factor for Base Stiffness and Prying Action

= Reduction Factor for Base Strength and Load Path

= Reduction Factor for Embed. Steel and Pads Analysis Performed: Yes Type of Analysis: Regular Spectral Accelerations (G's)

N-S E-W Vertical Safety Factor 0.362 0.145 0.073 1.969

-0.362 -0.145 -0.073 2.006

-0.362 0.145 0.073 2.009 0.362 -0.145 -0.073 1.971 0.362 -0.145 0.073 1.971

-0.362 0.145 -0.073 2.008 0.362 0.145 -0.073 1.969

-0.362 -0.145 0.073 2.007 0.145 0.362 0.073 3.820

DC Cook Unit 2 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 11 of 11 ID: 2-GRID-I-CVT(Rev. 0) Class: 4. Transformers

==

Description:==

10KVA TRANSFORMER - CONSTANT VOLTAGE Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: 4KV RM - 600V SWGR AREA - IN THE MIDDLF EAST REGION OF THE ROOM, 7 FEET SOUTH OF 600VAC BUS 21B SUPPLY TRAIN Manufacturer, Model, Etc.: SOLIDSTATE CONTROLS INC. ISL12100 10 -0.145 - -0.362 -0.073 4.196 0.145 -0.362 0.073 3.811 12 -0.145 0.362 -0.073 4.198 13 -0.145 0.362 0.073 3.86T 14 0.145 -0.362 -0.073 4.144 15 0.145 0.362 -0.073 4.146 16 -0.145 -0.362 0.073 3.869 17 0.145 0.145 0.183 4.917 18 -0.145 -0.145 -0.183 5.010 19 0.145 0.145 -0.183 4.922 20 -0.145 -0.145 0.183 5.016 21 -0.145 0.145 0.183 5.027 22 0.145 -0.145 -0.183 4.934 23 0.145 -0.145 0.183 4.928 24 -0.145 0.145 -0.183 5.022 Minimum Safety Factor: 1.969 The Anchorage Capacity is 1.969 times greater than the Demand

Coo Component Ão.2 ( ~~~ "T C4T Claca ~

Any particular area tha Sei.smic Review Team should pay extra attention tot Yes W Ho (Xf yes, check items that, apply.)

Anchor Type Anchor Diameter Anchor Spacing Anchor Number Anchor Embedmentv Anchor Edge Distance Anchor Gap Anchor Thread Engagement Anchor Grip Anchor Angularity Concrete Crack Others (describe briefly)

If there is concern for Design Basis Di.screpancy, circle the <<pplicable item and explain.

Harcfvare Haintenance Type Discrepancy Drawing Update Type Di.screpancy S igni.ff cant Operability/Design Basi.s Discrepancy Others Condition:

Actions Taken:

Prepared Sy Dsta ~R-<< 3

    • 12 CHP 5021. CCD. 019 ATTACHMENT NO. 1 ANCHOR jNSPECTION DATA SHEET AuK VAv ~

Un1t Location 0'7-'ldg.

/2- ypt4 tR T3 W <~-n-9> 4 Q.Pro-+-C.v w Installation dwg. / Rev. Equipment No.

Anchora e Arran ement Sketch 2 -CFiQ- 7=C.VT I ~ II

"'iiÃ7 3II il OS> leaf.

9 clonic)

OV>>

'Pao ~i g tl ELp V. V low Looki'n NoR~h Drawn by: Date: ri zv e>>

Verified by. Q~(

Qual. /Cert. Inspector Reviewed by: T Construction Anc or Review Engineer Date: ~ ~ (l- 'l~

Page 1 of 3 Revision 1

    • 12 CHP 5021.CCD.019 ATTACHMENT NO. 1 ANCHOR INSPECTION DATA SHEET Un1t Bldg. Location T3'~-II-9 W Installation dwg. / Rev. Equipment No.

Anchora e Arran ement Sketch

+ /a.GYP BoLT EI-BQ- glE,A Lope.<toG- ER Drawn by: Date:

Verified by: Date:, I~.7- lZ.

Qual. /Cert. Inspector Reviewed by: T " 4>'~4~~.

Construction An hor Review Engineer Date:

Page 1 of 3 Revision 1

I

++12 CHP 5021-CCD.Q19 ATTACHMENT NO. 1 ANCHOR INSPECTION DATA SHEET VA v ~~ 0 .'g'z5 Un>.t 5 Bldg. Location i>- Sq.7&- t

'I>

7 ~> ~ Y t~".;ll >O )f95 Drawn by:

Verified by:

Reviewed by:

8 Construe 8 (f.

Qual. /Cert. Inspector T. +~'-<k.

won An hor Review Engineer Date:

Date:

Date:

/l 2'.

I Z=l- I Z.

7 Page 1 of 3 Revision 1

    • 12 CHP 502 1 . CCD. 0 1.9

( ATTACHMENT NO. 1 ANCHOR XNSPECTXON DATA SHEET Unxt g /CA+

Bldg.

~g v'P~

Location Dg- g" Fc 5

) ~- 3 q)'o -('))

/ ) %-)l-I) > g Q I O-Z-C.vg Installation dwg. / Rev. Equipment No.

Anchora e Arran ement Sketch

'"4') D I:

Ii

~ I l

~

~

I e

I 0 I

-3 II3II ~ rIrJ~)

el I 3 - D'li~

II

- 9'/i).

R'h l= )

l n e ~ + </) p' II'IA::<<U lQ90 Lc'qy, $

Drawn by: Date:

Verified Reviewed by:

b I') (

Qual. /Cert. Xnspector

&<L~I Construction Anchor Review Engineer Date:

Date:

/2 7- "~.

Page 1 of 3 Revision 1

lSSRSSLLLL RSLLL5 WWHRES HWl5WRHS RI - - WLHLL

~RHSSWS~~~~

55%5%5%RHWS.

5%RSWMMMWRI

~~~~~~~M

4*12 CHP 5021.CCD.019 ATTACHMENT NO. 1 ANCHOR XNSPECTXON DATA SHEET Equipment No.: ~. C~ 0- - Dwg No..: ~V~<7 i <-3 q7b-te Steel Dwg. No.: VT'mbedded T ~i~-n- 'I PHYSXCAL CHARACTERXSTXCS Weld XD O'I 4/~

Weld T e Codes T e Size 1 = Fillet 2 = Plug/Slot Len th 3 = Groove Cracks Yes Y s Yes Yes Yes Yes N 0 No No No No Lack of Yes s Yes Yes Yes Yes Penetration 0 No No No No Porosity Yes Yes Yes Yes Yes 0 No No No No Vt."~B )0 18'~

Equipment base flexible: 0 Yes I No T'> u ~~4~~~

ons r c ron e Date:

Reviewed'y: Date: I l.- il-ons r son nc o evxew ngxneer Verified by: n Date: I Z. 7-~ L ua . er . npsec or Page 3 of 3 Revision 1

S 8 A DEPARTMENT 12 SHP SOSO NDE.008 CONTROL.FO OOCUMENT ATTACHMENT NO. 1 COPY NO.

ULTRASONIC TEST REPORT ZOB ORDER NO.: REPORT DATE: //3:~ ~ REQUEST NO.

IDENTIFICATION Unit /~ Test Unit/ S/N Component Freq./Diameter Item r " J Reference Standard c - '() ~

Material >5 Couplant/Batch No.

Other TEST DATA REMARKS

/, g PERFORMED BY: LEVEL:~ DATE: /

~

REVIEWED BY:

FORM NO. 12 SHP S050 NDE.008-1 LEVEL:

Page 'f Revision 0 DATE:

1 ll

Equipment No.: - CQX'Q-X-C.'d Tightness established by "Snug Fit" Tightness verified by: & (."z <PL

/Cert. Inspector

'ual.

Comments:

01/16/92

>G. MG. 72 sAFE'KvtoouN EGUIpHENT LisT (ssELMp)

FUMCTIOM: CCM Equipment Class: 5 train: 1 Equipment IO: I-PP.IOM Orauing H +bert 1.5135A SyStem: CCM Equip

Description:

LIESt CCM PVHP Building: AUXILIARY Room: 609 KALLMAY Elevation: 609 Normal state: R/NR Oesired state: R Pouer Required: Y Sort: M,R Suceorting System Orauing Herbert 1-12001 1-12060 1-98/05 Required Interconnections and Supporting Coeponentst 'I-T11A7 I.HCAB-3 fetv Related Status: NUCLEAR SR Hin/Opt: HIN

(

AOOITIONAL IHFORHATION I

Al ias Hubert Pouer Train: 8 C~nt Served: VEST CCM PVHP Hanufacturer: IHGERSOI.L-RANO CO Hodel: 9000CPH Panel: I-CCM I-HSOI E I cm Orauing: 1-98405 Miring Orauing: 1-93011 Pover Source: 1-1'I IA7, 1-HCAB-3 ual tdount F Relay Only: Y C~nent Type: PVHP ISO Orauings:

Oetai led Location:

D.C. COOK Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 1 of 11 ID: 1-PP-10W( Rev. 0) Class: 5. Horizontal Pumps

==

Description:==

WEST CCW PUMP Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: HALL AY, Manufacturer, Model; Etc.: INGERSOLL-RAND CO 9000GPM SEISMIC CAPACITY YS DEMAND

1. Elevation where equipment receives seismic input 609.00 Elevation of seismic input below about 40'rom grade (grade = 608.00) Yes
3. Equipment has fundamental frequency above about 8 Hz (est. frequency = 20.00) Yes Capacity based on: 1.00
  • Bounding Spectrum Demand based on: 1.00 Design Basis Ground Response Spectrum 0.800 c'OCi

/rr

/

/

//

/r 0.090 0.50 LOG Hz 33.00 Capacity ..... Demand Record Capacity C:tGIPtGIPtspectra.des Label Bounding Spectrum Demand 1 C:tGIPLPROJ0035tspectra.des BUILDING Ground(ELEVATIONI608 BROADEN N Demand 2 CAGIPIPROJ0035tspectra.des BUILDINGGround ELEVATION 608 BROADEN N Does capacity exceed demand?

D.C. COOK Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 2 of 11 ID:1-PP-10W(Rev. 0) Class: 5. Horizontal Pumps

==

Description:==

WEST CCW PUMP Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: HALLWAY, Manufacturer, Model, Etc.: INGERSOLL-RAND CO 9000GPM CAVEATS - BOUNDING SPECTRUM HP/BS Caveat 1 - Earthquake Experience Equipment Class Yes HP/BS Caveat 2- Driver and Pump on Rigid Skid Yes HP/BS Caveat 3 - Thrust Bearings in Both Axial Directions Yes HP/BS Caveat 4 - Check of Long Unsupported Piping Yes HP/BS Caveat 5 - Base Vibration Isolation System Checked. Yes HP/BS Caveat 6 - Sufficient Slack and Flexibility of Attached Lines. Yes HP/BS Caveat 7 - Adequate Anchorage. Yes HP/BS Caveat 8 - Potential Chatter of Essential Relays Evaluated. N/A HP/BS Caveat 9- No Other Concerns. Yes Is the intent of all the caveats met for Bounding Spectrum?

ANCHORAGE

1. The sizes and locations of anchors have been determined Yes
2. Appropriate equipment characteristics have been determined (mass, CG, natural freq., Yes damping, center of rotation).
3. The type of anchorage is covered by the GIP Yes
4. The adequacy of the anchorage installation has been evaluated (weld quality and length, nuts Yes and washers, expansion anchor tightness, etc.)
5. Factors affecting anchorage capacity or margin of safety have been considered: embedment Yes length, anchor spacing, free-edge distance, concrete strength/condition, and concrete cracking.
6. For bolted anchorages, any gaps under the base are less than 1/4 Yes
7. Factors affecting essential relays have been considered: gaps under the base, capacity N/A reduction for expansion anchors.
8. The base has adequate stiffness and the effect of prying action on anchors has been Yes considered.
9. The strength of the equipment base and the load path to the CG is adequate Yes
10. The adequacy of embedded steel, grout pads or large concrete pads have been evaluated. Yes
11. The anchorage capacity exceeds the demand. Yes*

Are anchorage requirements met?

INTERACTION EFFECTS

1. Soft targets are free from impact by nearby equipment or structures Yes
2. If the equipment contains sensitive relays, it is free from all impact by nearby equipment or N/A structures.
3. Attached lines have adequate flexibility Yes
4. Overhead equipment or distribution systems are not likely to collapse. Yes
5. No other adverse concerns were found. Yes Is equipment free of interaction effects?

D.C. COOK Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 3 of 11 ID: 1-PP-10W(Rev. 0 } Class: 5. Horizontal Pumps

==

Description:==

WEST CCW PUMP Building: AUXILIARY Floor EI.: 609.00 Room, Row/Col: HALLWAY, Manufacturer, Model, Etc.: INGERSOLL-RAND CO 9000GPM IS E UIPME T SEISMIC LLY DE UATE> ~es CO MEN S SRT: John D. Stevenson, Paul Wilson, Rick Leonard, and Kaifash Mahajan on 10/5/93.

MFG: INGERSOLL-RAND PUMP, 9000 G.P.M.

Anchorage: 6-3/4" J-Bolts.

Total WT=9580 lbs. C.G.=35" above base.

'Minor cracks in non-Struct. pad judged insignificant.

Nozzle loads were applied in the ANCHOR analysis. Nozzle loads were obtained from AEP "

SUMMARY

OF LOAD ON EQUIPMENT" 11/2/71, Summary of Loads on Pumps for CCW Ã1W PUMP, (microfilm page 00100020022) and included deadweight, thermal, thermal anchor movements, and seismic loads.

Ref. Drwgs.: Ingersoll-Rand C-14ALV86X51, W-16ALV500X17, AEPSC 12-3286-9, 12-3073B-2, 12-3073A-3, 12-

~

3285-23, Livsey 8 Co. 1-CCW-37, Rev. 5, Sh. 2 of 2.

~ ~

Picture f/12, Wk1, Tmi, Disk2 Evaluated by: Date:

c- /

Ot 8- ZS- qS tta nt'i u es achm e 0

D.C. COOK Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 4 of 11 ID: 1-PP-10W( Rev. 0) Class: 5. Horizontal Pumps

==

Description:==

WEST CCW PUMP Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: HALLWAY, Manufacturer, Model Etc.: INGERSOLL-RAND CO 9000GPM

~

CTUR S 4 ~

L j

4 1-PP-10W West CCW Pump-Anchorage

D.C. COOK Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 5 of 11 ID: 1-PP-10W( Rev. 0) Class: 5. Horizontal Pumps

==

Description:==

WEST CCW PUMP Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: HALLWAY, Manufacturer, Model, Etc.: INGERSOLL-RAND CO 9000GPM ANCHOR Report

~Ea h ua e:

Response Spectrum: SSE Frequency: GIP - Rigid Percent Damping: GIP - 5.00 Spectral Values:

Direction Acceleration (g's)

North - South 0.38 East - West 0.38 Vertical 0.25 Angle (N-S Direction makes with the X Axis): 0.00 Combination Criteria: SRSS

~We'gag of Weights:

'umber 1

No Weight 1 9580.00 105.400 20.750 35.000 o ces Number of External Forces: 2 No Fx Fy Fz 1 2.86E+003 1.24E+003 -3.24E+003 26.870 -5.250 17.000 2 -2.36E+003 2.24E+003 -4.85E+003 26.870 47.750 19.000

/~mme Number of External Moments: 2 No Mx My 1 4.88E+004 1.68E+005 3.34E+004 2 6.32E+004 8.76E+004 -1.60E+004

D.C. COOK Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 6 of 11 ID: 1-PP-10W ( Rev. 0 ) Class: 5. Honzontal Pumps

Description:

WEST CCW PUMP Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: HALLWAY, Manufacturer, Model Etc.: INGERSOLL-RAND CO 9000GPM

~

~llowal>les:

~nor'umber of Anchor types: 1 Tension Shear Ultimate Ultimate Inter Inter Saf Dia Manufact Product Tension Shear Coeff Coeff Fact 3/4 Other J-Bolt (90 7510.00 1.00 0.30 1.00 deg) 15030.00 Gmseng Ultimate Stress: 3500.00 psi.

Reduction Factor: 0.85 Allowable Stress: 30600 psi.

S~ua c~

Number of Surfaces: 1 Surface Orientation Direction Direction Direction Comp Comp Comp No Nx Ny Nz 0.000 0.000 1.000 Anchor Pattern for Surface ¹ 1

t '

D.C. COOK Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 7 of 11 ID:1-PP-10W(Rev. 0) Class: 5. Honzontal Pumps

==

Description:==

WEST CCW PUMP Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: HALLWAY, Manufacturer, Model, Etc.: INGERSOLL-RAND CO 9000GPM Legend for Anchor Patterns Anchor Bolts: ~IIIK'~

Concrete Lines: ~[~<nggg Concrete Points:

Weld Lines

.'~e Number of Anchors: 6 Anch Surf Id Coord Coord Coord Id 1 1 10.000 4.250 0.000 2 1 59.750 4.250 0.000 3 1 109.500 4.250 0.000 4 1 10.000 37.250 0.000 5 1 59.750 37.250 0.000 6 1 109.500 37.250 0.000 r in

D.C. COOK Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 8 of 11 ID: 1-PP-1 OW ( Rev. 0 ) Class: 5. Horizontal Pumps

==

Description:==

WEST CCW PUMP Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: HALLWAY, Manufacturer, Model, Etc.: INGERSOLL-RAND CO 9000GPM

¹ of elements per line: 1 Number of Concrete Lines: 4 Start Start Start End End End Sf Line No X-Coord Y-Coo rd Z-Coord X-Coord Y-Coord Z-Coord Width 8.250 2.625 0.000 129.000 2.625 0.000 1.000 8.250 2.625 0.000 8.250 37.250 0.000 1.000 8.250 37.250 0.000 129.000 37.250 0.000 1.000 129.000 2.625 0.000 129.000 37.250 0.000 1.000 r Pin Number of Concrete Points: 0

¹ of elements per line: 5 Number of Weld Lines: 0 D ter inati du on a Reduction Factor Input for Anchor ¹ 1 Adequately Installed: Yes Embedment Length: (19.50 in. Min Reqd. to achieve full capacity):=40.88 in.

Gap at Threaded Anchor: 0.00 in.

Edge Distance - Edge 1: 4.00 in.

Crack Size: 0.016 in. - Cracks traverses thru Installation Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factor Input for Anchor ¹2 Adequately Installed: Yes Embedment Length: (19.50 in. Min Reqd. to achieve full capacity):=40.88 in.

Gap at Threaded Anchor: 0.00 in.

Edge Distance - Edge 1: 4.63 in.

Crack Size: 0.016 in. - Cracks traverses thru Installation Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factor Input for Anchor ¹3

I D.C. COOK Unit 1 GIP Rev 2, Corrected 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 9 of 11 ID: 1-PP-10W ( Rev. 0 ) Class: 5. Horizontal Pumps

Description:

WEST CCW PUMP Oa Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: HALLWAY, Manufacturer, Model, Etc.: INGERSOLL-RAND CO 9000GPM Adequately Installed: Yes Embedment Length: (19.50 in. Min Reqd. to achieve full capacity):=40.88 in.

Gap at Threaded Anchor: 0.00 in.

Edge Distance - Edge 1: 4.00 in.

Crack Size: 0.016 in. - Cracks traverses thru Installation Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factor Input for Anchor f/4 Adequately Installed: Yes Embedment Length: (20.06 in. Min Reqd. to achieve full capacity):=40.88 in.

Gap at Threaded Anchor: 0.00 in.

Edge Distance - Edge 1: 4.50 in.

Crack Size: 0.016 in. - Cracks traverses thru Installation Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factor Input for Anchor 0 5 I Adequately Installed: Yes Embedment Length: (20.00 in. Min Reqd. to achieve full capacity):=40.88 in.

Gap at Threaded Anchor: 0.00 in.

Edge Distance - Edge 1: 4.63 in.

Crack Size: 0.016 in. - Cracks traverses thru Installation Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factor Input for Anchor f/6 Adequately Installed: Yes Embedment Length: (19.25 in. Min Reqd. to achieve full capacity):=40.88 in.

Gap at Threaded Anchor: 0.00 in.

Edge Distance - Edge 1: 4.38 in.

Crack Size: 0.016 in. - Cracks traverses thru Installation Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factors Data Current: Yes Anc Pall/ Pallr/

No Id Vali Vallr RT RN RL RG RS RE RF RC RR RP RB RM 5342.33 N/A 1.00 1.00 0.54 1.00 1.00 0.65 1.00 1.00 1.00 1.00 1.00 1.00 2798.39 N/A 1.00 1.00 1.00 1.00 1.00 0.37 1.00 1.00 1.00 1.00 1.00 1.00

D.C. COOK Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 10 of 11 ID: 1-PP-10W(Rev. 0) Class: 5. Horizontal Pumps

Description:

WEST CCW PUMP Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: HALLWAY, Manufacturer, Model, Etc.: INGERSOLL-RAND CO 9000GPM 5508,76 N/A 1.00 1.00 0.54 1.00 1.00 0.67 1.00 1.00 1.00 1.00 1.00 1.00 3741.21 NIA 1.00 1.00 1.00 1.00 1.00 0.50 1.00 1.00 1.00 1.00 1.00 1.00 5342.33 N/A 1.00 1.00 0.54 1.00 1.00 0.65 1.00 1.00 1.00 1.00 1.00 1.00 2798.39 NIA 1.00 1.00 1.00 1.00 1.00 0.37 1.00 1.00 1.00 1.00 1.00 1.00 5562.31 N/A 1.00 1.00 0.56 1.00 1.00 0.67 1.00 1.00 1.00 1.00 1.00 1.00 3541.72 N/A 1.00 1.00 1.00 1.00 1.00 0.47 1.00 1.00 1.00 1.00 1.00 1.00 5586.05 N/A 1.00 1.00 0.55 1.00 1.00 0.67 1.00 1.00 1.00 1.00 1.00 1.00 3741.21 N/A 1.00 1.00 1.00 1.00 1.00 0.50 1.00 1.00 1.00 1.00 1.00 1.00 1 5403.66 NIA 1.00 1.00 0.54 1.00 1.00 0.67 1.00 1.00 1.00 1.00 1.00 1.00 3347.69 N/A 1.00 1.00 1.00 1,00 1.00 0.45 1.00 1.00 1.00 1.00 1.00 1.00 N/A = Not Applicable Pall = Allowable Pull without Reduced Inspection Vali = Allowable Shear without Reduced Inspection Pallr = Allowable Pull with Reduced Inspection Vallr = Allowable Shear with Reduced Inspection

= Outlier X = Reduction Factor Not Used RT = Reduction Factor for Type of Anchorage RN = Reduction Factor for Installation Adequacy RL = Reduction Factor for Embedment RG = Reduction Factor for Gap at Anchors RS = Reduction Factor for Spacing RE = Reduction Factor for Edge Distance RF = Reduction Factor for Concrete Strength RC = Reduction Factor for Concrete Cracks RR = Reduction Factor for Essential Relays RP = Reduction Factor for Base Stiffness and Prying Action RB = Reduction Factor for Base Strength and Load Path RM = Reduction Factor for Embed. Steel and Pads al is Re Is'nalysis Performed: Yes Type of Analysis: Regular Spectral Accelerations (G's)

'-S No 0.375

-0.375

-0.375 0.375 E-W 0.150

-0.150 0.150

-0.150 Vertical 0.100

-0.100 0.100

-0.100 Safety Factor 3.680 4.948 4.002 4.555

D.C. COOK Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 11 of 11 ID: 1-PP-10W( Rev. 0) Class: 5. Horizontal Pumps

==

Description:==

WEST CCW PUMP Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: HALLWAY, Manufacturer, Model, Etc.: INGERSOLL-RAND CO 9000GPM 0.375 -0.150 0.100 4 428

-0.375 0.150 -0.100 4.181 0.375 0.150 -0.100 3.741

-0.375 -0.150 0.100 4.641 0.150 0.375 0.100 2.376 10 -0.150 -0.375 -0.100 3.601 0.'I50 -0.375 0.100 3.403 12 -0.150 0.375 -0.100 2.503 13 -0.150 0.375 0.100 2.479 14 0.150 -0.375 -0.100 3.448 15 0.150 0.375 -0.100 2.400

-0.150 -0.375 0.100 3.418 0.150 0.150 0.250 4.907 18 -0.150 -0.150 -0.250 7.950 19 0.150 0.150 -0.250 5.450 20 -0.150 -0.150 0.250 6.260 21 -0.150 0.150 0.250 4.909 22 0.150 -0.150 -0.250 7.606 23 0.150 -0.150 0.250 6.417 24 -0.150 0.150 -0.250 5.768 Minimum Safety Factor: 2.376 The Anchorage Capacity is 2.376 times greater than the Demand

    • 12 CHP 5021.CCD.019 ATTACHNENT NO . 1 ANCHOR NSPECTXON DATA SHE

.. Unxt Bldg. Zocatzon I- t -

at>.on dwg. / Rev. Equipment No. iow'nstal Anchora e Arran ement Sketch X- PP-(ox

'IO <'- z'l~ "l-3 l~

0 0 $ ~/~"

~$ cJ cP I I IN

+0 I

A 0 pk 8

"I- 3.VI INOIANA MICHIGA 'Efi SITE OESIGN CON RC WORKING C jUL 201 LERKT Drawn by: Date: t"- /Z V/ ~Z.

Verified by: Date:

Qual. /Cert. Inspector Reviewed by. Date:

.Construction Anc or Review Engineer Page 1 of 3 Revision 3

~~ Jd ('HJ 502 J CCD. Qlg

~

ATTACHMENT NO. l CHOR NSP CT ON DATA SHE CG RAh Unit Bldg. Locat1'on X- PP-lnvl Installation dwg. / Rev. Equ1pment No.

Anchora e Arran ement Sketch INOIANA IIICIIIGANP0%'R SITE DESIGN CONTROLLcO WORKING COPY JUL 201995 LERK +

Drawn by: Date: / zl Verified by: Date:

Qual. /Cert. Xnspector Reviewed by: r- Date: 1 l I <2 Construct1on chor Rev1ew Engineer Page 1 of 3 Revision

ATTACHMENT NO.

ANCHOR ZNSPECTXON DATA S O I A Unxt Bldg. Location

-5 8t'o-'t g- I P- IQWf Znstallatz.on dwg. / Rev. Equipment No.

Anchora e Arran ement Sketch Q l)~z-INOIANA IAICHIGAN POVIER SITE DESIGN CONTROLLED WORKING COPY

)Ut. 20 $ 9SK FLE,U. Ux.ew uonxx.ea ~urn+

LERK T Drawn by: Date:

Verified by: Date: +-lF-Qua ./Cert:. Xn pector Reviewed by: Dat 1-('i-9 x Construction nchor Review Engineer Page 1 of 3 Revision

0 J4 QJ4L Vv4 4 ~ QPP gd y

.TTACHMZNT Np.

Equipment No.: - PP- 'IO~ Dwg No .:

Anchor type: ~ oi - ~YPE. Z, Dia: Dwg No.: l2: 3A3g Tightness established by: 0 "Snug Fit" 0 Torque Torque Wrench No.: Cal, Due Date:

Tightness verified? 0 Yes 0 No Nk'ns Date: 2 ruc ion Equipment base flexible? 0 Yes g, No Date:

ons ruc 1 n ARE Bolt ID Comments Gaps Anchor len th Protruding <g fI v'1" Il fq-len th .~

Embedment 3 ~

Bolt- P

- 'In<i" ~~

~r~'a r1 Concrete condition 4, KDc.E, oe Edge Qo<- ~TK'XC.T.

distance Pac g'lq'A~

~ I Anchor Z-5q 2:5~( Z.-'3

~

s acin 2- Sg Anchor Q< Q<

an larit Q~ Oa OK Og Thread Qa g. Qa Q< O< OK engagement Comments: DR.x, C s ~ o - S~aucv. P V erified by:

Q a ./Cert. Inspector Revieved by: IHOIAHA MIC4IGAW POWER Date:

Construct1on WORKlt(G COPY JUL 20 1993 ago 2 of 3 e r ion 3

& A DEPARTMENT NO.~

S SHP 5050 NDE pp8 CONTROLLED DOCUMENT ATTACHNEHT NO.

CopY ULTRASONIC TEST REPORT JOB ORDER NO.: REPORT DATE: u-aO~i9 REQUEST NO.

IDENTIFICATION Unit On c Test Unit/ S/N 4 Component J - 7'P- )0 0 Frey./Diameter Jjz.

Item Reference Standard 4 -8 Material Couplant/Batch No. 4 <./

TEST DATA REMARKS wA-'~

4 PERFORMED BY: I.EVEE'~ DATE:

REVIEWED BY; I EVEI:~ DATE:

FORM NO. 12 SHP 5050 NDE.008-1 Page 1 of 1 Revision 0

Equip Xd: 2-PP-46-4 Train: 1 Equip Class: 5 Drawing No.: 12-5131 12-5131A tion: RI Syst: em: BORON MAKEUP (CVCS)

Equip Desc: BORIC ACXD STORAGE TANKS TRANSFER PUMP g4 Building: AUXILXARY Room: BORXC ACID STORAGE TANK AREA Elev: 587 Sort: S,R Notes:

Normal State: NR Desired State: R Power Req'd: Y Support System Drawing: 2-12010 2-98272 Req'd Support Comp: 2-AB-A-1D Safety Related Status: NUCLEAR SR Min/Opt: MIN Alias No: Power Train: B

,Comp Served: BAST MFR: GOULDS PUMPS XNC.

Mo el: 3196 1: 2-BA 2-HSD2 Elem. Drawing: 2-98272 Wiring Drawing: 2-94217 Power Source: 2-AB-A-1D Walkdown: F Relay Eval: Y Comp Type: PUMP Iso Drawing: 0-DR-724

'ocation: XN THE MXDDLE EAST REGION OF THE ROOM, 15 FEET OF MXDDLE BORIC ACXD STORAGE TANK 'OUTHEAST 512-TK-12M, NEAR THE FLOOR

D.C. COOK Unit 2 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 1 of4 ID: 2-PP-46-4 ( Rev. 0 ) Class: 5. Horizontal Pumps

Description:

BORIC ACID STORAGE TANKS TRANSFER PUMP f/4 Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: BORIC ACID STOR TANK AREA - IN THE MIDDLE EAST REGION OF THE ROOM, 15 FEET SOUTHEAST OF MIDDLE BORIC ACID STORAGE TANKIt/12-TK-12M, NEAR THE FLOOR Manufacturer, Model, Etc.: GOULDS PUMPS INC. 3196 SEISMIC CAPACITY VS DEMAND

1. Elevation where equipment receives seismic input 587.00 Elevation of seismic input below about 40'rom grade (grade = 608.00) N/A
3. Equipment has fundamental frequency above about 8 Hz (est. frequency = 20.00) N/A Capacity based on: 1.50 " Bounding Spectrum
5. Demand based on: 1.00 Realistic Median-Centered Floor Response Spectra 1.200 l

I

\

I \

I II LOG I I

I

/j I

r~

0.080 0.50 LOG Hz 50.00 Capacity ..... Demand File Record Capacit C:tGIP>GIP'Lspectra.des Label(Bounding Spectrum Demand 1 C:tGIPIPROJ0034tspectra.des BUILDINGAuxilia IELEVATION587IBROADEN(N Demand 2 C:tGIPIPROJ0034'Lspectra.des BUILDINGAuxilia ELEVATION 587 BROADENIN Does capacity exceed demand?

D.C. COOK Unit 2 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 2 of 4 ID: 2-PP-46-4 ( Rev. 0 ) Class: 5. Horizontal Pumps

Description:

BORIC ACID STORAGE TANKS TRANSFER PUMP &

Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: BORIC ACID STOR TANK AREA - IN THE MIDDLE EAST REGION OF THE ROOM, 15 FEET SOUTHEAST OF MIDDLE BORIC ACID STORAGE TANK 012-TK-12M, NEAR THE FLOOR Manufacturer, Model, Etc.: GOULDS PUMPS INC. 3196 CAVEATS - BOUNDING SPECTRUM HP/BS Caveat 1 - Earthquake Experience Equipment Class Yes HP/BS Caveat 2- Driver and Pump on Rigid Skid. Yes HP/BS Caveat 3 - Thrust Bearings in Both Axial Directions Yes HP/BS Caveat 4 - Check of Long Unsupported Piping. Yes HP/BS Caveat 5 - Base Vibration Isolation System Checked Yes HP/BS Caveat 6 - Sufficient Slack and Flexibility of Attached Lines. Yes HP/BS Caveat 7 - Adequate Anchorage. Yes HP/BS Caveat 8 - Potential Chatter of Essential Relays Evaluated. N/A HP/BS Caveat 9 - No Other Concerns. Yes Is the intent of all the caveats met for Bounding Spectrum7 ANCHORAGE

1. The sizes and locations of anchors have been determined Yes
2. Appropriate equipment characteristics have been determined (mass, CG, natural freq., Yes damping, center of rotation).
3. The type of anchorage is covered by the GIP Yes
4. The adequacy of the anchorage installation has been evaluated (weld quality and length, nuts Yes and washers, expansion anchor tightness, etc.)
5. Factors affecting anchorage capacity or margin of safety have been considered: embedment Yes.

length, anchor spacing, free-edge distance, concrete strength/condition, and concrete cracking.

6. For bolted anchorages, any gaps under the base are less than 1/4 Yes
7. Factors affecting essential relays have been considered: gaps under the base, capacity N/A reduction for expansion anchors.
8. The base has adequate stiffness and the effect of prying action on anchors has been Yes considered.
9. The strength of the equipment base and the load path to the CG is adequate Yes
10. The adequacy of embedded steel grout pads or large concrete pads have been evaluated.

~ Yes

11. The anchorage capacity exceeds the demand. Yes Are anchorage requirements met?

D.C. COOK Unit 2 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 3 of 4 ID: 2-PP-46-4 ( Rev. 0 ) Class: 5. Horizontal Pumps

==

Description:==

BORIC ACID STORAGE TANKS TRANSFER PUMP I/4 Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: BORIC ACID STOR TANK AREA - IN THE MIDDLE EAST REGION OF THE ROOM, 15 FEET SOUTHEAST OF MIDDLE BORIC ACID STORAGE TANK012-TK-12M, NEAR THE FLOOR Manufacturer, Model, Etc.: GOULDS PUMPS INC. 3196 INTERACTION EFFECTS

1. Soft targ'ets are free from impact by nearby equipment or structures Yes
2. If the equipment contains sensitive relays, it is free from all impact by nearby equipment or NIA structures.
3. Attached lines have adequate flexibility. Yes
4. Overhead equipment or distribution systems are not likely to collapse. Yes
5. No other adverse concerns were found. Yes ls equipment free of interaction effects?

IS E U P ENTSEISIVIICA Y D U T ~Ys COMMEN S SRT: John D. Stevenson, Paul Wilson, Rick Leonard, and kailash Mahajan on 10/05/93.

GOULDS PUMP.

Anchorage Four 5/8" diameter Ram anchor expansion bolts.

Pump WT 511lbs, C.G=12 3/8" above base.

The 5/8" diameter expansion anchors have 4" embedment into the base concrete below the 8" pad, per the anchorage inspection.

This judged adequate by the SRT for the light (511 (bs) pump.

Attached piping is 2" or less. Nozzle toads judged not to be a problem by the SRT.

Picture 0 49, Wk1, Tm1, Disk1.

Evaluated by: Date:

achm t: Pictures

D.C. COOK Unit 2 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 4 of 4 ID: 2-PP-46-4 ( Rev. 0 ) Class: 5. Horizontal Pumps

==

Description:==

BORIC ACID STORAGE TANKS TRANSFER PUMP N4 Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: BORIC ACID STOR TANKAREA - IN THF MIDDLE EAST REGION OF THE ROOM, 15 FEET SOUTHEAST OF MIDDLE BORIC ACID STORAGE TANKf/12-TK-12M, NEAR THE FLOOR Manufacturer, Model, Etc.: GOULDS PUMPS INC. 3196 ICTUR S Boric Acid Storage Tank Transfer Pump 2-PP-46A-

~

Anchors

Coo Component No. Claaa Any payticular prea the Seismic Review Team should pay extra attention tot Yam ~ No W (If yea, check items that apply. )

Anchor Type Anchor Diameter Anchor Spacing Anchor Number Anchor Embedment Anchor Edge Distance Anchor Gap Anchor Thread~Engagement Anchor Grip Angularity v'nchor Concrete Crack Others (describe briefly}

If there is concern for Design Basis Discrepancy, circle the applicable item and explain.

1. Hardvare Maintenance Type Discrepancy
2. Drawing Up&,te Type Discrepancy
3. Significant Operability/Doaign Basis Discrepancy Others Condition:

l4 Actions Taken:

PreI ared By T Data

  • (* '. CHP 5021.CCD.019 ZTACHMENT NO. 1 NCHOR NS ECTION DATA SH E l TO A I= %ASK A,Re.I'-.

Unxt Bl g. Location Installation dwg. / Rev. Equipment No.

Anchora e Arran ement Sketch M5QLATi CIA Ol I l

(

AP)Chorq CcO!

l ARE Z~<<~

(

fyZ V)IR:P.

I I

1 I

I l

',O'- ',OI gI l

Ol All /I J/C.IIORq+g Pf r ~ I J PLA-rE >g pPz x pP~ ~~

/>>'o" INQIANA hIICHIGhN POwFR SITE DESIGN CONTRQI.LEO WORKING COPY

/-'8Ã" JUL t Z t995 PL%,M VIKVf I.ERK T Drawn by:

Verified by:

Reviewed by:

Qua 7'ate:

./Cert. Inspector

~

Construction

~

An hor Revs,ew Engineer Date:

Date:

Page 1 Revision of 1

3

~ ~ ~

~ ~ l ~ ~

~ ~ r

~  %~1

~ II o R%WWK~%WW&&

C4541%1LHLL KlSSWL1%%L

~LISWLRSL 5%5%WKRILSL

~

s ~

~

mmWSLLXLL

~HRRKR'%%saaslmMMM&i&

5%L%SKRRLR Ir 4 a r ik JSC~r i ~

- pp '> T]ig,lg l ( 2 SHP 50SO NDE.008 DOCui4&4T ATTACHMENT NO. 1

("~ i'!":iROLl.E%

I UK TRASON C TEST REPORT JOB ORDER NO.: REQUEST NO. /A IDENTIFICATION P.s Unit Test, Unit/ S/N Component Freq./Diameter DS /

Item Reference Standard Material Couplant/Batch No.g l4 Other 5 TEST DATA REMARKS nc r PERFORMED BX:  :~Z- '3 REUIEMED BY:

FORM NO. 12 SHP SOSO NDE.008-1 Page 1 of Revision 0

Database: K:SSEL1B.DBF Equip XD: 1-HV-AFP-M1 Train: 2 Equip Class:9 ing No.: 12-5148B ction: HVAC System: TURBXNE BUXLDXNG VENTXLATION Equip Desc:. EAST MOTOR DRXV AUX FEEDWATER PUMP ROOM EXHAUST FAN Building: TURBXNE Room: EAST MOTOR DRIV. AUX FEEDWATER PUMP ROOM Elev: 591 Sort: S,R Notes:

Normal State: Desired State: Power Req'd: Y Support System Drawing: 1-12030 1-98214 Req'd Support Comp: 1-AB-D-R2D Safety Related Status: NUCLEAR SR Min/Opt:

MIN'lias No: Power Train: A Comp Served: EAST MOTOR DRXV AUX FEED PUMP MFR:

1: 10000 FT 3/MIN Panel:

Elem. Drawing: 1-98214 Wiring Drawing: 1-94228 Power Source: 1-AB-D-R2D Walkdown: F Relay Eval Y Comp Type: VENT FAN Xso Drawing:

Location: XN THE SW CORNER OF THE ROOM, 10'W OF EAST MDAFWP, ON THE WEST WALL, 12'BOVE THE FLOOR.

D.C. COOK Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet1 of3 ID: 1-HV-AFP-M1 ( Rev. 0 ) Class: 9. Fans

Description:

EAST MOTOR DRIV AUX FEEDWATER PUMP ROOM EXHAUST FAN Building: TURBINE Floor El.: 591.00 Room, Row/Col: E MOTOR DRIV AUX FDWTR PUMP RM, IN THE SW CORNER OF THE RM, 10'W OF E MDAFWP, ON THE W WALL, 12'BOVE THE FLR.

Manufacturer, Model, Etc.: JOY MANUFACTURINGCO. 10000 FT"3/MIN ~

SEISMIC CAPACITYVS DEMAND Elevation where equipment receives seismic input 591.00

2. Elevation of seismic input below about 40'rom grade (grade = 608.00) Yes Equipment has fundamental frequency above about 8 Hz (est. frequency = 10.00) Yes
4. Capacity based on: 1.00 Bounding Spectrum
5. Demand based on: 1.00 " Design Basis Ground Response Spectrum 0.000 LOG

/

r r

r 0.090 0.50 LOG Hz 33.00, Capacity ..... Demand File Record Capacit C:tGIPtGIPtspectra.des Label Bounding Spectrum Demand 1 C:LGIPLPROJ0035tspectra.des BUILDINGGround ELEVATION 608 BROADEN N Demand 2 CAGIPLPROJ0035tspectra.des BUILDING Ground ELEVATIONI608 BROADEN N Does capacity exceed demand'

D.C. COOK Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 2 of 3 ID: 1-HV-AFP-M1 ( Rev. 0 ) Class: 9. Fans

==

Description:==

EAST MOTOR DRIV AUX FEEDWATER PUMP ROOM EXHAUST FAN Building: TURBINE Floor El.: 591.00 Room, Row/Col: E MOTOR DRIV AUX FDWTR PUMP RM, IN THE SW CORNER OF THE RM, 10'W OF E MDAFWP, ON THE W WALL, 12'BOVE THE FLR.

Manufacturer, Model, Etc.: JOY MANUFACTURINGCO., 10000 FT"3/MIN CAVEATS - BOUNDING SPECTRUM FAN/BS Caveat 1 - Earthquake Experience Equipment Class Yes FAN/BS Caveat 2 - Drive Motor and Fan Mounted on Common Base. Yes FAN/BS Caveat 3 - Long Shafts Supported at Fan and at Motor. Yes FAN/BS Caveat 4 - No Possibility of Excessive Duct Distortion Causing Binding or Misalignment Yes of Fan.

FAN/BS Caveat 5 - Base Vibration Isolation System Checked N/A FAN/BS Caveat 6 - Sufficient Slack and Flexibility of Attached Lines. Yes FAN/BS Caveat 7 - Adequate Anchorage. Yes FAN/BS Caveat 8 - No Other Concerns Yes Is the intent of all the caveats met for Bounding Spectrum7 ANCHORAGE

1. The sizes and locations of anchors have been determined Yes
2. Appropriate equipment characteristics have been determined (mass, CG, natural freq., Yes damping, center of rotation).
3. The type of anchorage is covered by the GIP Yes
4. The adequacy of the anchorage installation has been evaluated (weld quality and length, nuts Yes and washers, expansion anchor tightness, etc.)
5. Factors affecting anchorage capacity or margin of safety have been considered: embedment Yes length, anchor spacing, free-edge distance, concrete strength/condition, and concrete cracking.
6. For bolted anchorages, any gaps under the. base are less than 1/4 Yes
7. Factors affecting essential relays have been considered: gaps under the base, capacity N/A reduction for expansion anchors.
8. The base has adequate stiffness and the effect of prying action on anchors has been Yes considered.
9. The strength of the equipment base and the load path to the CG is adequate. Yes
10. The adequacy of embedded steel, grout pads or large concrete pads have been evaluated. Yes
11. The anchorage capacity exceeds the demand. Yes Are anchorage requirements met?

D.C. COOK Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 3 of 3 ID: 1-HV-AFP-M1 ( Rev. 0 ) Class: 9. Fans

==

Description:==

EAST MOTOR DRIV AUX FEEDWATER PUMP ROOM EXHAUST FAN Building: TURBINE Floor El.: 591.00 Room, Row/Col: E MOTOR DRIV AUX FDWTR PUMP RM, IN THE SW CORNER OF THE RM, 10'W OF E MDAFWP, ON THE W WALL, 12'BOVE THE FLR.

Manufacturer, Model, Etc.: JOY MANUFACTURINGCO., 10000 FT"3/MIN INTERACTION EFFECTS

1. Soft targets are free from impact by nearby equipment or structures Yes
2. If the equipment contains sensitive relays, it is free from all impact by nearby equipment or NIA structures.
3. Attached lines have adequate flexibility Yes
4. Overhead equipment or distribution systems are not likely to collapse. Yes
5. No other adverse concerns were found. Yes Is equipment free of interaction effects'P S U

~CIELIRXR SRT: Gary Thomas, Gunnar Harstead and Harry Young on 10/20/93.

Anchorage: .

Fan mounted to embedded plate structure with at least 16 steel to steel bolts at least 1/2" in diameter.

Weight of fan 500 lbs.

No anchorage calculation required for a fan of this size with this robust anchorage. Therefore anchorage is OK based on SRT judgement and inspection.

Interaction:

Insulated pipe running outside the room the fan services could impact the outside screen of the fan. Pipe well insulated and will cushion the impact, therefore the SRT judged this as non4amaging.

Photo: Fan mounted outside the room with the damper on the inside, therefore could not get a good picture of fan.

Evaluated by: Date:

0 2 CHP 5021.CCD.019 ATTACHMENT NO ANCHOR XNSPECTXON DATA SHEET TuRsit4P. OI4VW /gal Pq<~'T ~~a,l 2 h&ogC R.oat FCMg v)ATCR. Paine poenh SauTuMCsT c~IM Unct I Bldg. Location i 2.-5(:8 i- t<-V- hFP-Mi Xnstallatxon dwg. / Rev. Equipment No.

Anchora e Arran ement Sketch Dla4~ ON'5'p

( g FP-Old7 Q SuP PO T ~.

Drawn by: Date: ~'- 8-~1~

Verified by: Hh Date:

Qual. /Cert. Xnspector Reviewed by Anal~ Date: ).- <) -~( 3 Construction Anchor Review Engineer Page 1 of 3 Revision 1

Database: K:SSEL1B.DBF Eguip ID: 12-HV-ESW-7 Train: 2 Equip Class:9 wing No.: 12-5148B ction: HVAC System: SCREENHOUSE VENTXLATXON Equip Desc: UNIT Q1 EAST ESW PUMP ROOM SUPPLY VENTXLATION FAN Building: SCREENHOUSE Room: EAST ESW PUMP ROOM Elev: 591 Sort: S,R Notes:

Normal State: Desired State: Power Req'd: Y Support System Drawing: 1-12033 1-98415 Req'd Support Comp: 1-PS-D-2B Safety Related Status: NUCLEAR SR Min/Opt: MXN Alias No: Power Train: A Comp Served: EAST ESW PUMP MFR: BUFFALO FORGE CO l: 5000 FT"3/MIN Panel:

Elem. Drawing: 1-98415 1-98721 Wiring Drawing: 1-95103 Power Source: 1-PS-D-2B Walkdown: F Relay Eval  : Y Comp Type: VENT FAN Xso Drawing:

Location: IN THE SW CORNER OF THE ROOM, 15'E OF EAST ESW PP, THE FLOOR. 13'BOVE

l~

I

D.C. COOK Unit 1 SCREENING EVALUATIONWORK SHEET (SEWS)

'IP Rev 2, Corrected, 2/14/92 Status: Yes Sheet1 of11 ID: 12-HV-ESW-7 Rev. 0 Class: 9. Fans Descri tion: UNIT 41 EAST ESW PUMP ROOM SUPPLY VENTILATIONFAN Building: SCREENHOUSE Floor El.: 591.00 Room, Row/Col: E ESW PUMP RM, IN THE SW CORNER OF THE RM, 15'SE OF E ESWPP, THE FLR.

13'BOVE Manufacturer, Model, Etc.: BUFFALO FORGE CO., 5000 FT"3/MIN SEISMIC CAPACITY VS DEMAND

1. Elevation where e ui ment receives seismic in ut 587.00 Elevation of seismic in ut below about 40'rom rade rade = 608.00 N/A
3. E ui menthasfundamentalfre uenc aboveabout8Hz est.fre uenc =10.00 N/A Ca acit based on: 1.50'Boundin S ectrum Demand based on: 1.00
  • Realistic Median-Centered Floor Res onse S ectra 1.200 l

\

\\

I I \

LOG I r jr 0.080 0.50 LOG Hz 50.00 Capacity ..... Demand File Record Ca aci C:tGIP<GIPIs ra.des Label Boundin S trum Demand 1 C:(GIPIPROJ0035ls .des BUILDINGAuxilia ELEVATION 587 BROADEN N Demand 2 C:(GIPPROJ003Qs lra.des BUILDINGAuxilia ELEVATION 587 BROADEN N Does capacity exceed demand? Yes

D.C. COOK Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 2 of 11 ID: 12-HV-ESW-7 Rev. 0 Class: 9. Fans Descri tion: UNIT N EAST ESW PUMP ROOM SUPPLY VENTILATIONFAN Building: SCREENHOUSE Floor El.: 591.00 Room, Row/Col: E ESW PUMP RM, IN THE SW CORNER OF THE RM, 15'SEOF E ESWPP, THE FLR.

13'BOVE Manufacturer, Model, Etc.: BUFFALO FORGE CO., 5000 FT"3/MIN CAVEATS - BOUNDING SPECTRUM FAN/BS Caveat 1- Earth uake Ex erience E ui ment Class Yes FAN/BS Caveat 2- Drive Motor and Fan Mounted on Common Base. Yes FAN/BS Caveat 3- Lon Shafts Su orted at Fan and at Motor. Yes FAN/BS Caveat 4- No Possibility of Excessive Duct Distortion Causing Binding or Yes Misali nment of Fan.

FAN/BS Caveat 5- Base Vibration Isolation S stem Checked N/A FAN/BS Caveat 6- Sufficient Slack and Flexibilit of Attached Lines. Yes FAN/BS Caveat 7 - Ade uate Anchora e. Yes FAN/BS Caveat 8- No Other Concerns Yes ts the intent of all the caveats met for Bounding Spectrum' Yes ANCHORAGE

1. The sizes and locations of anchors have been determined Yes
2. Appropriate equipment characteristics have been determined (mass, CG, natural freq., Yes dam in, center of rotation .
3. The t e of anchora e is covered b the GIP. Yes
4. The adequacy of the anchorage installation has been evaluated (weld quality and length, Yes nuts and washers, ex ansion anchor ti htness, etc.
5. Factors affecting anchorage capacity or margin of safety have been considered: Yes embedment length, anchor spacing, free-edge distance, concrete strength/condition, and concrete crackin .
6. For bolted anchora es, an a s under the base are less than 1/4 Yes
7. Factors affecting essential relays have been considered: gaps under the base, capacity N/A reduction for ex ansion anchors.
8. The base has adequate stiffness and the effect of prying action on anchors has been Yes considered.
9. Thestren th of thee ui mentbaseand the load athto the CG isade uate. Yes
10. The ade uac of embedded steel, rout ads or la e concrete ads have been evaluated. Yes
11. The anchora e ca acit exceeds the demand. Yes Are anchorage requirements met7 Yes INTERACTION EFFECTS
1. Soft tar ets are free from im act b nearb e ui mentorstructures. Yes
2. If the equipment contains sensitive relays, it is free from all impact by nearby equipment or N/A structures.
3. Attached lines have ade uate flexibilit . Yes
4. Overhead e ui ment or distribution s stems are not likel to colla se. Yes
5. No other adverse concerns were found. Yes ls equipment free of interaction effects? Yes

D.C. COOK Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALLIATIONWORK SHEET (SEWS) Status: Yes Sheet 3 of 11 ID: 12-HV-ESW-7 Rev. 0 Class: 9. Fans Descri tion: UNIT ¹1 EAST ESW PUMP ROOM SUPPLY VENTILATIONFAN Building: SCREENHOUSE Floor El.: 591.00 Room, Row/Col: E ESW PUMP RM, IN THE SW CORNER OF THE RM, 15'E OF E ESW PP, THE FLR. 13'BOVE Manufacturer, Model, Etc.: BUFFALO FORGE CO., 5000 FT"3/MIN IS EQUIPMENT SEISMICALLYADEQUATE'P Yes COMMENTS SRT: Gary Thomas, Gunnar Harstead and Harry Young on 10/19/93.

Capacity vs Demand:

Component is in Screenhouse building using Auxiliary building Response Spectra for calculation Anchorage:

Fan sits on steel platform, bolted to the wall on two sides with 2- 3/4" through bolts on each side, and hung at opposite corner by a 4x4x3/8" angle.

Calculation should be rerun. This fan is the limiting analysis fo 12-HV-ESW-1,2,3,4,5,6,7,&8 Anchorage is adequate. The calculated anchorage safety factor is 32.8.

Photo: Wk. 2, Tm. 2, Disk 1, Picture 29 Fan; 30 Underside of frame showing two bolts to wall; 31 Top of angle

~ ~

hanger support for platform.

Evaluated by: Date:

Attachment:

Pictures

Attachment:

ANCHOR Re ort

0 D.C. COOK Unit 1 GIP Rev 2, Corrected, 2/1 4/92 SCREENING EVAI UATION WORK SHEET (SEWS) Status: Yes Sheet 4 of 11 ID: 12-HV-ESW-7 Rev. 0 Class: 9. Fans Descri tion: UNIT P1 EAST ESW PUMP ROOM SUPPLY VENTILATIONFAN 1 Building: SCREENHOUSE Floor El.: 591.00 Room, Row/Col: E ESW PUMP RM, IN THE SW CORNER OF THE RM, 15'E OF E ESW PP, THE FLR.

13'BOVE Manufacturer, Model, Etc.: BUFFALO FORGE CO., 5000 FT"3/MIN PICTURES Figure 1: Fan 12-HV-ESW-7 Figure 2: Underside of frame showing two bolts to wall Figure 3: Top of angle hanger support for platform

D.C. COOK Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 5 of 11 ID: 12-HV-ESW-7 Rev. 0 Class: 9. Fans Descri tion: UNIT ¹1 EAST ESW PUMP ROOM SUPPLY VENTILATIONFAN Building: SCREENHOUSE F,loor El.: 591.00 Room, Row/Col: E ESW PUMP RM, IN THE SW CORNER OF THE RM, 15'SEOF E ESWPP, THE FLR.

13'BOVE Manufacturer, Model, Etc.: BUFFALO FORGE CO., 5000 FT"3/MIN ANCHOR Report Response Spectrum: SSE Frequency: GIP - Flexible Percent Damping: GIP - 5.00 Spectral Values:

Direction Acceleration 's North - South 0.60 East - West 0.60 Vertical 0.25 Angle (N-S Direction makes with the X Axis): 0.00 Combination Criteria: SRSS

~Wei htn:

Number of Weights: 1 No Wei ht 1 500.00 35.000 23.000 18.000 Forces:

Number of External Forces: 0 Moments:

Number of External Moments: 0 Allowables:

Anchor:

Number of Anchor types: 1 Tension Shear Ultimate Ultimate Inter Inter Saf No. Dia Manufact Product Tension Shear Coeff Coeff Fact

D.C. COOK Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 6 of 11 ID: 12-HV-ESW-7 Rev. 0 Class: 9. Fans Descri tion: UNIT ¹1 EAST ESW PUMP ROOM SUPPLY VENTILATIONFAN Building: SCREENHOUSE Floor El.: 591.00 Room, Row/Col: E ESW PUMP RM, IN THE SW CORNER OF THE RM, 15'EOF E ESW PP, THE FLR.

13'BOVE Manufacturer, Model, Etc.: BUFFALO FORGE CO., 5000 FT"3/MIN 1 3/4 Other Grouted In 1500.00 7510.00 1.00 0.30 1.00 Place Concrete:

Ultimate Stress: 3500.00 psi.

Reduction Factor: 0.85 Weld:

Allowable Stress: 31200 psi.

Surfaces:

Number of Surfaces: 2 Surface Orientation Direction Direction Direction Com Com Com No N Nz 0.000 1.000 0.000 1.000 0.'000 0.000 Anchor Pattern for Surface ¹ 1 Anchor Pattern for Surface //2

D.C. COOK Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 7 of 11 ID: 12-HV-ESW-7 Rev. 0 Class: 9. Fans Descri tion: UNIT ¹1 EAST ESW PUMP ROOM SUPPLY VENTILATIONFAN Building: SCREENHOUSE Floor El.: 591.00 Room, Row/Col: E ESW PUMP RM, IN THE SW CORNER OF THE RM, 15'E OF E ESW PP, THE FLR.

13'BOVE Manufacturer, Model, Etc.: BUFFALO FORGE CO., 5000 FT"3/MIN Legend for Anchor Patterns Anchor Bolts:

Concrete Uncs:

~mm Concrete Points:

Weld Uncs:

Geometrei:

Anchor:

Number of Anchors: 4 Anch Surf No. Id Coord Coord Coord Id 1 16.100 46.000 4.000 2 1 52.600 46.000 4.000 3 70.000 41.300 4.000 4 1 70.000 4.800 4.000 Concrete Lines:

D.C. COOK Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 8 of 11 ID: 12-HV-ESW-7 Rev. 0 Class: 9. Fans Descri tion: UNIT ¹1 EAST ESW PUMP ROOM SUPPLY VENTILATIONFAN Building: SCREENHOUSE Floor El.: 591:00 Room, Row/Col: E ESW PUMP RM, IN THE SW CORNER OF THE RM, 15'EOF E ESW PP, THE FLR.

13'BOVE Manufacturer, Model, Etc.: BUFFALO FORGE CO., 5000 FT"3/MIN

¹ of elements per line: 1 Number of Concrete Lines: 2 start start start End End End Line No X-Coo rd Y-Coo rd Z-Coo rd X-Coord Y-Coord Z-Coord Id Width 0.000 46.000 4.000 70.000 46.000 4.000 1 3.000 70.000 0.000 4.000 70.000 46.000 4.000 2 3.000 Concrete Points:

Number of Concrete Points: 0 Weld Lines:

¹ of elements per line: 5 Number of Weld Lines: 0 Determination of Reduction Factors:

Reduction Factor Input for Anchor ¹1 Adequately Installed: Yes Embedment Length: ( 7.50 in. Min Reqd. to achieve full capacity):= 7.50 in.

Gap at Threaded Anchor: 0.00 in.

Edge Distance - Edge 1: 6.63 in.

Crack Size: 0.000 in.

Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factor Input for Anchor ¹2 Adequately Installed: Yes Embedment Length: ( 7.50 in. Min Reqd. to achieve full capacity):= 7.50 in.

Gap at Threaded Anchor: 0.06 in.

Edge Distance - Edge 1: 6.63 in.

Crack Size: 0.000 in.

Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factor Input for Anchor ¹3 Adequately Installed: Yes

D.C. COOK Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 9 of 11 ID: 12-HV-ESW-7 Rev. 0 Class: 9. Fans Descri tion: UNIT f/1 EAST ESW PUMP ROOM SUPPLY VENTILATIONFAN Building: SCREENHOUSE Floor El.: 591.00 Room, Row/Col: E ESW PUMP RM, IN THE SW CORNER OF THE RM, 15'E OF E ESW PP, THE FLR.

13'BOVE Manufacturer, Model, Etc.: BUFFALO FORGE CO., 5000 FT"3/MIN Embedment Length: ( 7.50 in. Min Reqd. to achieve full capacity):= 7.50 in.

Gap at Threaded Anchor: 0.13 in.

Edge Distance - Edge 1: 6.63 in.

Crack Size: 0.000 in.

Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factor input for Anchor 0 4 Adequately Installed: Yes Embedment I.ength: (7.50 in. Min Reqd. to achieve full capacity):= 7.50 in.

Gap at Threaded Anchor: 0.13 in.

Edge Distance - Edge 1: 6.63 in.

Crack Size: 0.000 in.

Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factors Data Current: Yes Anc Pall/ Pallr/

No Vali Vallr RT RN RL RG RS RE RF RC RR RP RB RM 1500.00 N/A 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 7510.00 N/A 'l.oo 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1500.00 NIA 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 7510.00 N/A 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1500.00 NIA 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 7510.00 N/A 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1 1500.00 NIA 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

?510.00 NIA 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1,00

~Le eed:

N/A = Not A licable Pall = Allowable Pull without Reduced Ins ection Vail = Allowable Shear without Reduced Ins ection Pallr = Allowable Pull with Reduced Ins ection Vallr = Allowable Shear with Reduced Ins ection

= Outlier

= Reduction Factor Not Used RT = Reduction Factor for T e of Anchora e RN = Reduction Factor for Installation Ade uac RL = Reduction Factor for Embedment RG = Reduction Factor for Ga at Anchors RS = Reduction Factor for S acin

D.C. COOK Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 10 of 11 ID: 12-HV-ESW-7 Rev. 0 Class: 9. Fans Descri tion: UNIT N EAST ESW PUMP ROOM SUPPLY VENTILATIONFAN Building: SCREENHOUSE Floor El.: 591.00 Room, Row/Col: E ESW PUMP RM, IN THE SW CORNER OF THE RM, 15'SEOF E ESWPP, THE FLR.

13'BOVE Manufacturer, Model, Etc.: BUFFALO FORGE CO., 5000 FT"3/MIN

= Reduction Factor for Ed e Distance RF = Reduction Factor for Concrete Stren th RC = Reduction Factor for Concrete Cracks RR = Reduction Factor for Essential Reta s RP = Reduction Factor for Base Stiffness and P in Action RB = Reduction Factor for Base Stren th and Load Path

= Reduction Factor for Embed. Steel and Pads Anal sis Results:

Analysis Performed: Yes Type of Analysis: Regular S ectral Accelerations G's No N-S E-W Vertical Safet Factor 0.600 0.240 0.100 44.553

-0.600 -0.240 -0.100 59.948

-0.600 0.240 0.100 77.054 0.600 -0.240 -0.100 50.897 0.600 -0.240 0.100 48.716

-0.600 0.240 -0.100 59.565 0.600 0.240 -0.100 49.641

-0.600 -0.240 0.100 106.184 0.240 0.600 0.100 31.796 10 -0.240 -0.600 -0.'I 00 53.068 0.240 -0.600 0.100 91.151 12 -0.240 0.600 -0.100 32.444 13 -0.240 0.600 0.100 33.585 14 0.240 -0.600 -0.100 56.103 15 0.240 0.600 -0.'I00 33.321 16 -0.240 -0.600 0.100 87.648 0.240 0.240 0.250 56.453 18 -0.240 -0.240 -0.250 59.642

't9 0.240 0.240 -0.250 /6.162 20 -0.240 -0.240 0.250 205.015 21 -0.240 0.240 0.250 67.138 22 ~ 0.240 -0.240 -0.250 67.333 0.240 -0.240 0.250 76.365 24 -0.240 0.240 -0.250 59.986 Minimum Safety Factor: 31.796

D.C. COOK Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 11 of 11 ID: 12-HV-ESW-7 Rev. 0 Class: 9. Fans Descri tion: UNIT ¹1 EAST ESW PUMP ROOM SUPPLY VENTILATIONFAN Building: SCREENHOUSE Floor El.: 591.00 Room, Row/Col: E ESW PUMP RM, IN THE SW CORNER OF THE RM, 15'SEOF E ESW PP, THE FLR.

13'BOVE Manufacturer, Model, Etc.: BUFFALO FORGE CO., 5000 FT"3/MIN The Anchorage Capacity is 31.796 times greater than the Demand

Coo Component No. I'Z" & G~+- 1 Cla>>a particular prea the Any Yes No v'Lfye>>, Seismic Review Team>>hould pay extra check item>> that apply.)

attontion to7 Anchor Type Anchor Diameter Anchor Spacing Anchor Number Anchor Embedment Anchor Edge Distance Anchor Cap Anchor Thread Engagement Anchor Crip Anchor Angularity Concrete Crack Other>> (describe brief].y)

If there i>> concern. for Desi.gn Basis Discrepancy, circle tho applicable item and explain.

l. Hardvare Maintenance Type Discrepancy
2. Drawing Update Type Discrepancy
3. Significant Operability/Do>>ign Basis Discrepancy Others Condi tion:

Actions Taken:

Prepared By ~'aca ~5>'" 3

  • c' CHP @021. CCD. 019

. ZTACHNENT NO. 1 NCHOR XNSPECTION DATA SHEE O(v E. M ea 4o~

Unxt Bldg. Location iZ- 9-ES -7 Xnstallatxon dwg. / Rev. Equipment No.

Anchora e Arran ement Sketch I (OIAi~A MlCHIQAy POWER rAu &r SITE i)ES I'H CO ITROLLEO WORKIIIQ COPY JUL >S tsSS

<<RZ l.

DETAIL A DETAIL(I 0

(0 CoHPon(EQ r I8 I'-ITTAC'AGO T(o /V Cu~l QZ'Q 'P I ATE a~ (~) zz"p5

~-as'~+~1rI I

I 3-P I

cj(((I((VB AprlrI,E F-(I (I

l~

8 eche ~4AL

~/A" B.<T't /)~i(J oo o

~f(pf,Q oP Top Drawn by:

Verified b Date:

Qual. /Cert. Xnspector Reviewed by: pate. F-RI- t 3 Construction An hor Review Engineer Page 1 of 3 Revision 1

    • l2CHP 5021.CCD.019 I 'TACHMENT NO. 1 NCHOR INSPECTXON DATA SHEET c.Yc.t Quod 0 ~ E U 7 oow Unzt ~

Bldg. Location IZ,- Av- F>g-7 Xnstallatz.on dwg. / Rev. Equipment No.

Anchora e Arran ement Sketch

\

Ow

~I I

I-~+/6 I. f 'THRV Cbo'Erb 7YP. Z I

I I

I

'I lo Yig I IOIANA h'ICHIGAIJ POP,'/II Sl fF. OCSIGH CONTROLLED YIORKIIIG COPY EL'E.V lEw'w Meir JUL tg19SS

. LCRK ~

Drawn by: Date: Y /2 q Verified b Date: 'PD Qual. /Cert. Inspector

~ ~

Reviewed by:

~

~ T ~

Construct>on A chor Review Engineer Date: ~ <'-'I~

Page 1 of 3 Revision 1

i

~2 CHP 5021 - CCD. 019 ATTACHMENT NO. 1 bNcHQR NSPECTION DATA SHEET E Few Q~

Unct Bldg. Locatzo Installation dwg. / Rev. Equipment No.

Anchora e Arran ement Sketch Top Wgo sps ipc Pbi77u~ IV'2Z WwACcc:ssibt 8 Pi@

~ TOP Mc) xwsoC vc Q II1vg I

I 4/iS' 0 M

)

I 4/iy V

I d

~

I I

4'ib Z"

I 'I~

5/

TOP Qi~

POp Wc v ZJlMg VV lbvt48~

~S<QQ BO77~

Mib

+i@ fi 7I 7 7<. L>>" 7c" I/u" PLtI Y-e iS S Ti Y'CS WE't DED YO rv >c L.

Tnt')'Lr IttDIANA MICiIIGQN PPWt R Sc CHANNEL IS bta SITC PESld't( CONTROLLt.J 87'FNos AnlQ 'vT WORKING COPY HEEDED VOLrt-TI cr>>

f UL 1g tSSS

~ pRg T~E'WPD n'rawn by: Date:

Verified

~

by

~

Qual. /Cert. Inspector

~ ~

Reviewed by: T, Date: ') "2.I- Qg Construct>.on A chor Review Engineer Page 1 of 3 Revision 1

  • " 2 CHP 5021- CCD 019

~

ATTACHMENT NO. 1 NC OR INSPECTIO D TA S E C/8 N uSE F.. FSM R> iP oe

.Unxt Bldg. Location 4 -7 Installation dwg. / Rev. Equipment No.

Anchora e Arran ement Sketch C.

0 gA" /Z. /Q" /g "

O>Oy ECT VIe& AA 0'5'~ '~ '+,>,~C, o tQg+>',:< -',~l8"+: ~ W.A ~  %~XI'>"5'I (rd S '4~ ~ )'>-4 <J~ -56 AntChoI POWER SITE OESlut< CONTfiOLLEO WORKING COPY lUL 1519S5 LCRK Drawn by: Date:

Qual. /Cert. Inspector Reviewed by: Date:

Construction An hor Review Engineer Page 1 of 3 Revision 1

~ ~ ~

e ~ ~ a ~ ~ e s ~

~ ~ ~

- ~ ~ ~ ~

o 14

~ 9 ~

t 5%RRSRSHKLP MWWMMM&W R%1%RRRRSL MMWMMMW&

RSRSSWRHLL 555%655%%LL R5%%%5%%88~~~~

5555WRIHHSE 54WWHRRSRI

%8%Ã%R4%~~M5%K'WWMMMWW P

t 4 P C.

4 4

c V

'12 CHP 5021. CCD. 03.9 ATTACHMENT NO. 1 ANCHOR INSPECTION DATA SHEET Equipment No.: IZ- AV'- Dwg No.': Iz.-$ 4 82-7 Embedded Steel Dwg. No.:

PHYSICAL CHARACTERISTICS Weld ID ~i M~ w'~ w Weld T e Codes T e / /

1 = Fillet Size ~/i<"

2 = Plug/Slot Len th / 3/ / '/y" = Groove 3

Cracks Yes Yes Yes Yes Yes Yes Y s 57@ dRP cHZP QRD Lack of Ye's Yes Yes Yes Yes +Ys Yes Yes Penetration @HE c85 429 CPS Porosity Yes Yes Yes Yes Yes Yes Yes cHZP . 895 <HE lhQIAt(A te1ICH~GA I POII~R SlTE OrSlGH CONTROLLED WORKING COPY JUL t~199~

LrPg T ~ CA Equipment base flexible: G Yes 8 No ons ruc on re Date:

Reviewed by: Date:

ns ruc 1on c or ev1ew ng1neer verified

~

by: g-Ah- 93 ua .~ er .~ npsec or Page 3 of 3 Revision 1

(

12 CHP 5021. CCD. 019 ATTACHMENT NO. 1 ANCHOR TNSPECTXON DATA SHEET quipment No.: l~-/-r V'- E'SV Dwg No.: t+-W 4BZ.-7 Embedded Steel Dwg. No.: h PHYSICAL CHARACTERISTICS Weld XD w'io Weld T e Codes T e 1 = Fillet Size 'lie.

2 = Plug/Slot Len th 3 = Groove Cracks Yes Yes Yes Yes Yes Yes Yes Yes 4lZP CfB KD Lack of Yes Yes Yes Yes Yes Yes Yes Penetration Yes'RAN Ch Porosity Yes Yes Yes Qes liVOIANA h".CH IGnN PO)".ER SITE OFSICH COlITROaa.EL'CRNlIt(C CCRC'UI.

>g]995

-tres T ~~

Equipment base flexible: 0 Yes 5 No T ons ruc 1o re Date: 0- >>- 'l'3 Reviewed by: Date: b-2,(- f2 ons ruc 1on nc or ev1ew ng1neer Verified by:

~ ~

Date:

ua . er . npsec or Page 3 of 3 Revision 1

C'2 CHP 5021. CCD. 019 ATTACHMENT NO- 1 ANCHOR INSPECTION DATA SHEET quipment No.: / Z Dwg No..'Z-WC SZ-~

Steel Dwg. No.:

A'mbedded gh PHYSlCAL CHARACTERISTICS Weld XD Weld T e Codes T e Size 3/ 3/ 1 = Fillet 2 = Plug/Slot Len th 3" 3 = Groove Cracks Yes Yes s Yes 0 0 Lack of Yes Yes @Ys Yes s s s Yes Penetration 0 Porosity ges Yes Yes Cb INDI/(JA >.',~Q<ICAN PP;ygII SITC O~SlCN CONT(IDLI.ED YYDIIKIIICCQP'f lUL ~q 199" Equipment base flexible: 0 Yes 5 No on ruc x n re Date '2I Reviewed by:

on ruc >on nc o evxew ngxneer V rified by: ua . er . npsec or Date:

Page 3 of 3 Revision 1

12 CHP 5021. CCD. 019 ATTACHMENT NO. 1 ANCHOR XNSPECTXON DATA SHEET quipment No.: 2- Sld- 7 Dwg No.: Z-W Z-7 Embedded Steel Dwg. No.: g-3L8~

PHYSXCAL CHARACTERXSTXCS Held XD 4JZ IJ~L 4AV Weld T e Codes T e Size 1 = Fillet 2 = Plug/Slot Len th 7'Fq 3 = Groove Cracks Yes Yes Yes Yes es Yes CKb No Lack of kS'es Yes 855 Yes Yes Yes cRED Yes Yes Yes Yes Penetration c55'es QRI drab No Porosity Yes Yes Yes Yes Yes Yes B5 cd& mz . Hh No QEhlOTES An/ XII $ 4O~AJW uJEL A.

INOIANA tIICHIGAN POWER SITE DESIGN CONTROLLED WORKING COPY JUL >~ 1995

.LEAK 7 Eguipment base flexible: 0 Yes 8-No ons uc zo re Reviewed by: Date:

ons ruc son or evzew ngxneer Verified by: Date: Y-<-9'3 ua . er . npsec or Page 3 of 3 Revision 1

II 1

.A.DEPARTMENT SHP 5050 NDE.008 S 8 ATTACHMENT NO. 1 CONTPOLLED DOCUtvlciNT COPY NO. 3 -l ULTRASONIC TEST REPORT JOB ORDER NO.: /8 REPORT DATE: 4-/- '73 REQUEST NO.

IDENTIFICATION Unit Test Unit/ S/N > (wS'r.'- 5'2F- P~

Component -FS i~~ " Freq./Diameter 7 zsZ~

C- P Item n /i Material /<

Reference Standard Couplant/Batch No. '=. c/ ~

~7aZ Other 5 TEST DATA REMARKS PERFORMED BY:  : ~3 REVIEWED BY:

FORM NO. 12 SHP 5050 NDE.008-1 LEVEL: ~

Page 1 of DATE:

1

~ ///+

Revision 0

Equip XD: 1-AFW Train: 2 Equip Class: 14 Drawing No.: 1-12035 sction: 120 VAC SYSTEM stem: 120/208V MISC. SAFTEY RELATED POWER DXSTRIBUTXON J

Equip Desc: POWER PANEL Building: AUXILIARY Room: CD EMERGENCY DXESEL GENERATOR ROOM Elev: 587 Sort: S, Notes:

,Normal State: Desired State: Power Req'd:

Support System Drawing:

Req'd Support Comp:

Safety Related Status: NUCLEAR SR Min/Opt: MIN Alias No: Power Train: A Comp Served:

Mfr: POWER ELECTRIC INC.

Model:

E em. Drawing: 1-98215 Wiring Drawing: 1-95022 Power Source: 1-ABD-C-2A Walkdown: F Relay Eval  : N Comp Type: DISTRIBUTXON PANEL XSO Drawing:

Location: 10 FEET NW OF CD EMERGENCY DIESEL GENERATOR gl-OME-150-CD( ON THE NORTH WALL

DC Cook Unit1 GIP Rev 2, Corrected, 2/1 4/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 1 of 3 ID: 1-AFW ( Rev. 0 ) Class: 14. Distribution Panels

==

Description:==

POWER PANEL Building: AUXILIARY F(oor El.: 587.00 Room, Row/Col: CD EDG RM, 10 FEET NW OF CD EMERGENCY DIESEL GENERATOR C1-OME-150-CD, ON THE N WALL Manufacturer, Model, Etc.: POWELL ELECTRIC INC.

SEISMIC CAPACITY VS DEMAND Elevation where equipment receives seismic input 587.00 Flevation of seismic input below about 40'rom grade (grade = 608.00) Yes Equipment has fundamental frequency above about 8 Hz (est. frequency = ) SRT Capacity based on: 1.00 'ounding Spectrum Demand based on: 1.00

  • Design Basis Ground Response Spectrum 0.000 r

LOG //

//

/

/

//

0 090 0.50 LOG Hz 33.00 Capacity ..... Demand File Record Capacity C:tGIPtGIPtspectra.des Label Bounding Spectrum Demand 1 C:LGIPIPROJ0031tspectra.des BUILDINGGroundlELEVATION 608 BROADEN N Demand 2 C:tGIPtPROJ0031tspectra.des BUILDINGGround(ELEVATION 608 BROADEN N Does capacity exceed demand?

DC Cook Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 2 of 3 ID: 1-AFW ( Rev. 0 ) Class: 14. Distribution Panels

==

Description:==

POWER PANEL Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: CD EDG RM, 10 FEET NW OF CD EMERGENCY DIESEL GENERATOR f/1-OME-150-CD, ON THE N WALL Manufacturer, Model, Etc.: POWELL ELECTRIC INC.

CAVEATS - BOUNDING SPECTRUM DP/BS Caveat I - Earthquake Experience Equipment Class Yes DP/BS Caveat 2 - Contains only Circuit Breakers and Switches Yes DP/BS Caveat 3 - Doors Secured. Yes DP/BS Caveat 4 - Adjacent Cabinets Bolted Together. N/A DP/BS Caveat 5 - General Configuration Similar to NEMA Standards. Yes DP/BS Caveat 6 - Adequate Anchorage Yes DP/BS Caveat 7 - Potential Chatter of Essential Rela s Evaluated. N/A DP/BS Caveat 8 - No Other Concerns. Yes Is the intent of all the caveats met for Bounding Spectrum'7 ANCHORAGE

1. The sizes and locations of anchors have been determined Yes
2. Appropriate equipment characteristics have been determined (mass, CG, natural freq., Yes damping, center of rotation).
3. The type of anchorage is covered by the GIP Yes
4. The adequacy of the anchorage installation has been evaluated (weld quality and length, nuts Yes and washers, expansion anchor tightness, etc.)
5. Factors affecting anchorage capacity or margin of safety have been considered: embedment Yes length, anchor spacing, free-edge distance, concrete strength/condition, and concrete cracking.
6. For bolted anchorages, any gaps under the base are less than 1/4 . Yes
7. Factors affecting essential relays have been'considered: gaps under the base, capacity N/A reduction for expansion anchors.
8. The base has adequate stiffness and the effect of prying action on anchors has been Yes considered.
9. The strength of the equipment base and the load path to the CG is adequate. Yes
10. The adequacy of embedded steel, grout pads or large concrete pads have been evaluated. N/A
11. The anchorage capacity exceeds the demand. Yes Are anchorage requirements met?

DC Cook Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 3 of 3 ID: 1-AFW( Rev. 0) Class: 14. Distribution Panels

==

Description:==

POWER PANEL Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: CD EDG RM, 10 FEET NW OF CD EMERGENCY DIESEL GENERATOR 81-OME-150-CD, ON THE N WALL Manufacturer, Model, Etc.: POWELL ELECTRIC INC.

INTERACTION EFFECTS

1. Soft targets are free from impact by nearby equipment or structures Yes
2. If the equipment contains sensitive relays, it is free from all impact by nearby equipment or N/A structures.
3. Attached lines have adequate flexibility Yes
4. Overhead equipment or distribution systems are not likely to collapse. Yes
5. No other adverse concerns were found. Yes Is equipment free of interaction effects?

S'E I NT ES C L Y DE U E SRT: George Gary Thomas (S&A) and Tom Huang (AEP) on 10/7/1993 Ref. 1: Anchor Inspection Data Sheet: Anchorage Arrangement Sheet, 1/21/93.

Ref. 2: Dwg 0 1-12035-12 (internal components dwg).

Capacity:

BSCav.2: Verified by walkdown and Ref. 2.

Anchorage:

Wall mounted panel with dimensions: 36"Hx20Wx6"Deep. Anchorage was not accessible.

Panel estimated to weigh less than 50 lbs. Tug tested by G. Thomas to at least 100 Ibs, OK; therefore, no explicit anchorage evaluation necessary.

Evaluated by: Date:

12 CHP 5021. CCD. 019

(

ATTACENENT NO. 1 ANCHOR INSPECTION DATA SHEET COE E gg I, Un>.t Bldg. Location Installation dwg. / Rev. Equipment No.

Anchora e Arran ement Sketch t-a" PHOO uuislr<<k 1-'8" C~lr ( YI'I'.)

r

&AQUI!M )qua%

lo un,pl~

CASa)~) I'-8wZ-II8! <<5 /8

~~ 8 l lvI I

(~)

5Ctcwg ~/~ssl cps LJII tC H II'IDIMIt,'!CHICA,I~W~II Cd/AEc.f. un:sic<<I, H ufo'A. GITE DESIGII COII TIIOU.'60 (9'rP) VFORXING COPY APH 0 8 tS93

..I.EAK Drawn by: 7-verified by- Date:

ual./ ert. nspector Reviewed b Date: 1- ~I-'l3 Construction A chor Review Engineer Page 1 of 3 Revision 1

g

~-

eemseaarx RRRRRSRSHHEL RSRSRRRRMML&

WRRRSHHHRL QSSISLRLS HRRRRRRLLLL MWWWWW&W RWRlWRHSL W558WRLEL MWWWWMW& I k i 0 f

~J4>

~ ~

Database: K:SSEL2C.DBF Equip ID: 2-BATT-AB Train: 1 Equip Class:15 ywing No.: 2-12003 nction: 250 VDC SYSTEM System: 250VDC DISTRXBUTXON Equip Desc: PLANT BATTERY AB Building: AUXILIARY Room: AB BATTERY EQUIPMENT AREA Elev: 609 Sort: S,R Notes:

Normal State: Desired State: Power Req'd:

Support System Drawing: 2-98055, 2-12003 Req'd Support Comp:

Safety Related Status: NUCLEAR SR Min/Opt: MIN Alias No: Power Train: B Comp Served:

MFR: C 6 D BATTERIES l: LC-25 Panel: 2-BC-AB Elem. Drawing: 2-98055 Wiring Drawing: 2-91012, 2-91301 Power Source: 2-TDAB-5 Walkdown: C Relay Eval  : Y Comp Type: BATTERY, *RHR WALKDOWN COMPONENT Iso. Drawing:

Location: IN THE CENTER OF THE ROOM, 3 FEET NORTH OF THE ENTRANCE DOOR

D. C. Cook Unit 2 GIP Rev 2, Corrected, 2114/92 Screening Evaluation Worksheet (SEWS) Status: No Sheet 1 of 6 ID: 2-BATT-AB ( Rev. 0) Class: 15. Batteries on Racks

==

Description:==

PLANT BATTERY AB Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: AS BATTERY EQUIP AREA - IN THE CENTER OF THE ROOM, 3 FEET NORTH OF THE ENTRANCE DOOR Manufacturer, Model, Etc.: CBD Power Systems LC-25 Cells SEISMIC CAPACITY VS DEMAND

1. Elevation where equipment receives seismic input 609.00 Elevation of seismic input below about 40'rom grade (grade = 608.00) Yes
3. Equipment has fundamental frequency above about 8 Hz (est. frequency = 8.00) SRT Capacity based on: 1.00 Bounding Spectrum
5. Demand based on: 1.00 " Design Basis Ground Response Spectrum 0.850 LIN r r I

~1 r

r er

~ t 0.000 1.00 LOG Hz 33.00 Capacity ~.... Demand Record Capactt HAGIPtGIPtspectra.des Label Bounding Spectrum Demand 1 H:tGIPtPROJOOSStspectra.des BUILDING Ground Spectrum ELEVATION BROADEN Demand 2 H:tGIPV'ROJ0058tspectra.des BUILDING Ground Spectrum ELEVATION BROADEN Does capacity exceed demand'

D. C. Cook Unit 2 GIP Rev 2, Corrected, 2/14/92 Screening Evaluation Worksheet (SEWS) Status: No Sheet 2 of 6 ID: 2-BATT-AB ( Rev. 0) Class: 15. Batteries on Racks

==

Description:==

PLANT BATTERY AB Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: AG BATTERY EQUIP AREA - IN THE CENTER OF THE ROOM, 3 FEET NORTH OF THE ENTRANCE DOOR Manufacturer, Model, Etc.: CSD Power Systems LC-25 Cells CAVEATS - BOUNDING SPECTRUM BAT/BS Caveat I - Earthquake Experience Equipment Class Yes BAT/BS Caveat 2 - Battery Cell Plates are Lead-Calcium Flat-Plate, Plante, or Manchex Yes Design.

BAT/BS Caveat 3- Each Individual Battery Weighs Less Than 450 Pounds. Yes BAT/BS Caveat 4- Close-Fitting Spacers between Cells.. Yes BAT/BS Caveat 5- Batteries Restrained by Side and End Rails Yes BAT/BS Caveat 6 - Battery Racks Have Longitudinal Cross Bracing. Yes BAT/BS Caveat 7- Racks Constructed of Wood Evaluated. N/A BAT/BS Caveat 8 - Batteries Greater Than 10 Years Old Evaluated.

BAT/BS Caveat 9 - Adequate Anchorage Yes BAT/BS Caveat 10 - No Other Concerns. Yes Is the intent of all the caveats met for Bounding Spectrum?

ANCHORAGE

1. The sizes and locations of anchors have been determined Yes
2. Appropriate equipment characteristics have been determined (mass, CG, natural freq., Yes damping, center of rotation).
3. The type of anchorage is covered by the GIP Yes
4. The adequacy of the anchorage installation has been evaluated (weld quality and length, nuts Yes and washers, expansion anchor tightness, etc.)
5. Factors affecting anchorage capacity or margin of safety have been considered: embedment Yes length, anchor spacing, free-edge distance, concrete strength/condition, and concrete cracking.
6. For bolted anchorages, any gaps under the base are less than 1/4 Yes
7. Factors affecting essential relays have been considered: gaps under the base, capacity N/A reduction for expansion anchors.
8. The base has adequate stiffness and the effect of prying action on anchors has been Yes considered.
9. The strength of the equipment base and the load path to the CG is adequate Yes
10. The adequacy of embedded steel, grout pads or large concrete pads have been evaluated. N/A
11. The anchorage capacity exceeds the demand. Yes Are anchorage requirements met?

D. C. Cook Unit 2 GIP Rev 2, Corrected, 2/14/92 Screening Evaluation Worksheet (SEWS) Status: No Sheet 3 of 6 ID: 2-BATT-AB ( Rev. 0) Class: 15. Batteries on Racks

Description:

PLANT BATTERY AB Building: AUXILIARY Floor EI.: 609.00 Room, Row/Col: AB BATI ERY EQUIP AREA - IN THE CENTER OF THE ROOM, 3 FEET NORTH OF THE ENTRANCE DOOR Manufacturer, Model, Etc.: C&D Power Systems LC-25 Cells INTERACTION EFFECTS

1. Soft targets are free from impact by nearby equipment or structures Yes
2. If the equipment contains sensitive relays, it is free from all impact by nearby equipment or N/A structures.
3. Attached lines have adequate flexibility Yes
4. Overhead equipment or distribution systems are not likely to collapse. Yes
5. No other adverse concerns were found. Yes Is equipment free of interaction effects?

S IC LLY D U

~CON I~EN Date: 10/18/93 SRT: Tom Huang (AEP), Steve Anagnostis (S&A), Paul Krugh (AEP), Randy Steele (AEP)

References:

1. Cook Dwgs 12-3476-18, 12-3073A-3, 12-3073D
2. C&D Power Systems Inc Dwgs K-5629-3, M-8654-C, M-8655-C, M-8665-D
3. Anchorage Package Four substantial welded steel 2-step battery racks well braced in both directions. Two racks house 28 cells each, and two racks house 30 cells each. Each cell is a C&D Power Systems LC-25. The cells are well secured. Each rack is anchored with twelve (12) 3/8" anchors.- see references for details.

Frequency > 8 Hz by inspection.

BS Caveat 2: Batteries are C&D lead calcium flat plate (per label on battery).

BS Caveat 3: Each cell weighs 325 Ibs (Reference 2)

BS Caveat 8: Batteries were installed in 1985. SQUG Action Item 002 was written to address the aging issue.

ANCH Caveat 1: The anchorage package specifies the anchors as unknown 3/8" non-shell type expansion anchors. The original plant drawings (Ref 1) specify 3/8" J-bolts (90 degrees, 9", embedment), but when the current battery rack was replaced in 1985, a note was added to the plant drawing that, where necessary due to bolt hole misalignment in the rack, the original J bolts were to be cut off and replaced with 3/8" Kwik bolts. The current bolts are exactly where the original plant drawings locate the J bolts, and they look like J-bolts (cut-off threaded end).

ANCH Caveat 2: Per Ref 2, the 28 cell racks weigh 10231 Ibs and the 30 cell racks weigh 10920 lbs. The cells are about 90% of the weight and the rack is about 10% of the weight. The attached "Battery Rack Weight Distribution" shows the geometry.

ANCH Caveat 4, 6: Installation checked per Ref 3.

D. C. Cook Unit 2 GIP Rev 2, Corrected, 2/14/92 Screening Evaluation Worksheet (SEWS) Status: No Sheet 4 of 6 ID: 2-BATT-AB ( Rev. 0 ) Class: 15. Batteries on Racks

==

Description:==

PLANT BATTERY AB Building: AUXILIARY Floor EI.: 609.00 Room, Row/Col: AB BATTERY EQUIP AREA - IN THE CENTER OF THE ROOM, 3 FEET NORTH OF THE ENTRANCE DOOR Manufacturer, Model, Etc.: C8D Power Systems LC-25 Cells ANCH Caveat 5: In the SRT's judgement, the anchors are the original J bolts. Per GIP Table C.4-1, these have nominal capacities of 3.74k pullout and and 1.87 kip shear. The pullout capacity is reduced by 0.51 to 1.91 kips due to the 9" embedment length. No other reductions are required.

Note that if the anchors were 3/8" Kwik bolts (the replacements specified in Ref 1), the nominal capacities would be 1 46 k pullout and 1.42 kip shear. The pullout capacity would be reduced by 0.88 to 1.28 kips due to 3.5 ksi concrete. No other reductions would be required."

ANCH Caveat 8: The racks are anchored through a pair of 3/4" thick plates that run along the front and back of the racks (see references and photos). This configuration may produce some prying on the anchors; although the plate may be stiff enough relative to the anchors to keep this to a minimum. Per the discussion for ANCH Caveat 11, the pullout load would have to increase by a factor of 6.2 for J-bolts (3.6 for Kwik,bolts) to reach the allowable limits.

ANCH Caveat 11: The attached "Battery Rack Weight Distribution" shows that the front-to-back overturning moment for one rack is 55648 in-lbs. That moment is resisted by six anchors with a moment arm of 30", which produces a per bolt pullout load of 55648/6/30 = 309 lbs. The side-to-side seismic loads will not produce any significant pullout loads. The shear load is 4586 Ibs for one horizontal direction of input. SRSS'ing the two horizontal directions and dividing by the number of bolts produces a per bolt shear load of 1.41 x 4586/12 = 539 lbs.

Using the bi-linear shear-tension interaction in GIP Figure C.3-2, the interaction for a J bolt anchor is 309/1910 =

0.16 (Note that the shear is less than 0.3 of the shear allowable). If a 3/8" Kwik bolt were assumed, the interaction would be 0.7 x (309/1280) + (539/1420) = 0.55.

Photos: W2T1.11, 12 Evaluated by: Date: /c'o ~S

Attachment:

Pictures

Attachment:

Battery Rack Weight Distribution

D. C. Cook Unit 2 GIP Rev 2, Corrected, 2/14/92 Screening Evaluation Worksheet (SEWS) Status: No Sheet 5 of 6 ID: 2-BATT-AB ( Rev. 0 ) Class: 15. Batteries on Racks

==

Description:==

PLANT BALIERY AB Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: A8 BATTERY EQUIP AREA - IN THE CENTER OF THE ROOM, 3 FEET NORTH OF THE ENTRANCE DOOR Manufacturer, Model, Etc.: C8D Power Systems LC-25 Cells JPPGTUR s 0.12

L 0

D. C. Cook Unit 2 GIP Rev 2, Corrected, 2/14/92 Screening Evaluation Worksheet (SEWS) Status: No Sheet 6 of 6 ID: 2-BATI-AB( Rev. 0 ) Class: 15. Batteries on Racks

==

Description:==

PLANT BATTERY AB Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: AB BATTERY EQUIP AREA - IN THE CENTER OF THE ROOM, 3 FEET NORTH OF THE ENTRANCE DOOR Manufacturer, Model, Etc.: C8D Power Systems LC-25 Cells ac W s ib P 11 CC of upper tie W x Sah = 2295 Ib W x (1 0.4 Sov) ~ 4958 Ib CG of lower tier W = 1/2 rack weight = 5460 Ibs Soh = 1.5 x 57. FRS O 8 Hz = 0.42g W x Sah ~ 2293 fb Sav = 2/3 x 1.5 x 5K FIIS I 20 Hz =

0.23g'ateral Load = 2 x 2293 Ib = 4586 Overturning Momen't (sum moments about 8)

~ (2293 x 26) + (2293 x 48) - (4958 x 23)

W x (1 - 0.4 Sov) = 4958 Ib = 55648 in fbs Base Channet Bolt lines

D. C. Cook Unit 2 GIP Rev 2, Corrected 2/14/92 Outlier Seismic Verification Sheet (OSVS) Sheet 1 of 4 ID: 2-BATT-AB (Rev. 0) Class: 15. Batteries on Racks

==

Description:==

PLANT BATTERY AB Building: AUXILIARY Floor EI.: 609.00 Room, Row/Col: AB BATTERY EQUIP AREA - IN THE CENTER OF THE ROOM, 3 FEET NORTH OF THE ENTRANCE DOOR

.OU L I SU DE I I ION- ec calan Eeet ical E u'

a. Identify all the screening guidelines which are not met. (Check more than one if several guidelines could not be satisfied.)

Capacity vs. Demand Caveats Anchorage Seismic Interaction Other

b. Describe all the reasons for the outlier (i.e., if all the listed outlier issues were resolved, then the signatories would consider this item of equipment to be verified for seismic adequacy).

The battery rack is an outlier due to BAT/BS Caveat 8 - Batteries Greater Than 10 Years Old.

2 P D DO U E 0 U N ~ono,

a. Defined proposed method(s) for resolving outlier.

The attached "Position Paper on the Replacement of the Safety Related Batteries at the Donald C.

Cook Nuclear Plant" (R. J. Roman May 10, 1993) states that AEPSC has committed to adopting the replacement criteria stated in ANSI/IEEE Std 450-1987. AEPSC's position is that this commitment resolves the outlier.

b. Provide information needed to implement proposed method(s) for resolving outlier (e.g., estimate of fundamental frequency).

3 C 4CE C 0 The information on this OSVS is, to the best of our knowledge and belief, correct and accurate, and resolution of the outlier issues listed on the previous page will satisfy the requirements for this item of equipment to be verified for seismic adequacy:

F Approved by: Date:

Attachment:

Position Paper on the Replacement of Saf Related Batteries

~ QI I ~ ~ ~

~ ~ I II ' It

~ I ~ I ~ ~ ' ~, I ~ ~ t ~ I S I V ~ ~ I

~ Ml ~

~ ~ I~ ~ I s I

~ C '>>I ~ s I~ ~ >>>> I ~ ~

I I ~ ~~ I~ ~ II I ~ ~ ~ ~ I>>. ~ ~ II ~ I I I l I I I ~ ~ . ~ I I I II ~ I ~ I~ ~ I I ~ II I II. S ~

I ~ . ~ ~ I 'Jl ~ >>I ~

~ ~ ~ ~ ~ ~ >>' ~ I

~ ~ ~ ~ ~ ~ ~ ~ ~

~ I ~ ~ ~ ~ I ~ ~

~ I~ I ~ ~ I II I ~ ~

I~ ~ I Ii. ~ ~ I ~

~ ~

>>O ~ I ~ ~ ~ I ~ ~ I ~ ~

~ ~ >>I ~ ~ I >>\ ~

V ~ I I~ ~ ~ I >> ~ I ~

~ ~

~ ~ ~ ~

C ~ ~ ~

~ ~ ~ ~ '

~ ~ ~ ~

~ ~ ~ ~

~ ~

~ I I ~ I>>J ~

1J ~ I ~ I ~ 4 I

l ~ I ~ >>

L.

CHARTER POWER ersAfMS, INC, Plyrrmuth Meeting, Pennsyh an(a DATE: February 1984 TO: Ron Roman American Electric Power Service Corp.

FROM'6Graham Walker CM Charter Power Systems, inc.

SUBJECT:

O.C, Cook Nuclear Plant Tmfn N, 250 Voft Safety Refatad Battery Seismic and Ufe Qualification I

In response to your1B Feb 94 memo, our mes indicate the following;

'I

1. The Train N batteries were originally purchased ln May 1979 under, P.O. No. 0887M21-8, as the Train C Auxiliary Feedwater System dattarfea.
2. The original Technical Specification, DCCEE-183&CN, Rev. 2, 1 May 1878, requfmd only seismic qualification, 3, The C&Q Seismic QuafNcatfon Report submfttid for these batteries and racks fs No. VL7S10-02, ReV. 2, dated 16 July 1878:. All doCumentatfcn at that time was submitted tha AEPSC offices In New Yofft', City.

I I

4. The 3DCU-g has a 20 qualified life at a 77F arinual average operating tomporature. Qualification is by equivalence af conffguratfon, desfgn and ,l materials to previously tested 3DCU-5, 3DCU-7 and OCU-17 models which were 20 years artNcfaffy aged in acconfance with fEEE<36 prfor to seismic testfng. The fEEE-344 seismfc qualNcation testing these caffe experienced envelopes the D.C. Cook fioor responsa spectrum. The reports for these  !

qualification tests are located at C&D Headquirters fn Plymouth Meeting, PA,

.and are avaffabfa for review.

I I

lf you have any questions, pfease call me.

I I

Sincerely, Graham Wafkor Manage; Applications Engineering TOTAL P.03

~ 4>>'>> ~ V t volt-u- >>ax Note 7671 vs Co JOopn

~ ~S~S .

From Co.

Pnono N Phono s Fat 0 Date May 10, 1993 nnnpeot Position Paper on the RepIacemeat of the Safety Related Batteriea at the Donald C. Cook Nuclear Plant tron P~~

Ro Je Roman/D ~ Re Smith + ~ ~vA~ ~~l

%pie J.A ra l+)

1) s)

<< ~I"i><

+CA

+~r/qg Based on a review of the surveillance raporto, history, and maintenance records/trend charta for the 2AB battery, tho decision hae been made to replace this battery during thc 1994 Unit 2 refueling outage. The results of similar raviaws for the five other safety-related batterieo has led to the decision to not replace any of these batteries during tho upcoming xafueling outages. Tha following discussion addreaaas the dotails of the reviews that, led to this decision.

AEPSC'a plan had boon to replace the oafoty-related batteriea at the Donald C. cook Nuclaax Plant ovary- 10 years even though they are purchased aa 20 year batteriea. a nav lated to ton nt, was developed aaod on prev oua premature a er eo and high temperatures oxperiencod in the battory rooms. p Beforo the decision was made to adopt this plan, a study waa conducted by HVAC showing that it would ba lees expansive to raplaco the battaries avory tan years than to air condition the battery rooms. Baood on this plan alone, tha lAB battaxy should ba replaced in 1995 (since it wao manufactured in 1985), tha 1CD battery in 1995, the 1N battery in 1999, tha 2AB battory in 1994, the 2CD battery in 1996, and the 2N in 1998.

During the EDSFI, the 10 year x'eplacemont pl,an came into qucation during a review of the original battary sizing calculationo. After lengthy discussions between the inspector and Mr. Roman< AEPSC ccaxnittad to adopting the replacement criteria stated in ANSI/IEEE Std 450"1987r IEEE Rocoaaended Practice for Maintenance, Testing, and Replacement of Large Lead Storago Batteries fox'enerating Stations and Substations.

Specifically, IEEE 450 recommends replacing a battery when its capacity, aa determined by the 60 month performance tost, ia bolow 80t of tha manufacturer's rating. Under ideal conditions, a battery would roach A rule of thumb regarding high temperature is that, for ovary 15'F

'L above a 77'F average temperature, a battery' lifo io shortened by 50% ~ The average temperatures in the battery roomo at the DCCNP are leoo than 92'F (77'F + 15'F) however other factors, ao discussed in the body of this report, lead to accelerated aging and/ox aarly roplacament of large lead-acid storage bat'terios.

77 F average temperature, thorough maintenance throughout battery lifo, etc.

intra-System

rv ~ raa>>>>>>u ~ VC Poaition Paper on the R<<pl<<cement of the Safoty @el<<ted Batteries <<t tb+

Donald C. Cook Nuclear Plant May 10, 1993 Page 2 thi.o point somewhere around 20 years. Under current DccNp conditions, battery could reach this point sooner (due to the high battery room tcmpcraturee mentioned previously). Ao implied in the previous two statements however, factors other than age affect the viability of the battery. Physical characteristics, such as plate condition together with agc, are often determinants for complete battery replacement.

Failure to hold a charge, as shown by cell voltage and specific gravity readi.ngo, io a good indicator for further investigation into the need fox replacement. lt io a combination of those factors, and not simply the age or capacity alone, that haa led to the decision to replace the 2AB battery during the 1994 Unit 2 refueling outage. Neither these factors, nor the age or capacity alone, indicate the need to replace any of tho other safety"related batteries at this time.

Xn support of the decision to not xaplace any of the other safety" related batteries during 1994 r~fucling outagco, the following information i.a provided.

QQCA Voc ~g~ March/April voltage trends of these batteries i.ndicatc that all of thc calls have voltagoa in the normal range of 2.20 - 2.24 volts (on a float charge). For comparison purpooao, thirteen (13) of the 2AB cell voltages ware leos than (or equal to) 2.20 volts.

2) A cursory review of the past tcn year's worth of these safety-reLated battery files reveals few occurrences, i.f any, involving cell low voltages, electrolytelspecific gravity concerns, and overall less than dcaircable physical conditions. Ao a contrast, there wexe many instances of these same concerns regarding the 2AB battery.
3) The files do not indicate that an issue waa made xagaxding the temperatures of the 1AB< 1CD, 1N, 2CD, & 2N battery xooms. Thc fi.lco do show, however, that, upon procuxement & i.notallation of the 2AB battery, the manufacture'o xapxeaentativc atatod that the battery life would be shortened due to the high ambient temperatures in the battery room. While this is a recognized attribute for all of thc batteries/roomo, it appeared to be morc severe at the time fox tha 2AB battery room.
4) Routine preventive and corrective maintenance ie a part of any battery's life. This maintenance should be fairly consistent from ono safety-xelated battery to another, ao they are all large, lead-acid stationary batteriee. For the most part, thi.o maintenance hae been consistent for the majority of the Class 1E batteries. As expected then, these Class 1E battcrico arc experiencing a normal, predictaEXe decrease in their ecrvico li.fc.

The 2AB battery, howavex, hae demanded considerable additional maintenance and engineering time i.n the past couple of years n

Nine (9) cells had voltages leoa than 2.20 vDc and four (4) cells had voltagco equal to 2.20 VDC.

4 The aforcmcntioned study comparing the coot of more fx'cqucnt battory replacement versus ai.r conditioning the battery rooms supporto this otatament.

The atnbiont temperatures axe generally higher i.n the AB battery rooms, when compaxed to the cD and N Txain rooms, due to their physical location in the plant and their ventilation systems.

Position Paper on the Replacement of the Safety Related Batteriea at the Donald C. Cook ?tucloar Plant May 10, 1993 Page 3 resolving issues concerning low voltages, specific gravities. etc.

Ae the additional time spent maintaining this battery is significant, it is believed that this is signaling tho end of this battery's useful life and that it will most probably not stay within the Tech Spec range for individual coll voltages beyond tho upcoming refueling outage.

Toad acid storage batterieo are dynamic electrochemical devices. As ouch, the ability to predict their future performance and/or capacity represents a near formidable Cask. The decision to not replace any of tho other safety-related batterios outside of 2KB dura,ng the upcoming refueling outages was arrived at after careful consideration of all the factors involved- Tho information available simply does not support their replacement at this time. Therefore, it is recommended that those battories continue to be maintained and tasted in accordance with tho IREE standards and the recommendation to replace them corno when tho maintenance/testing data supports it.

Preparod By/Date: os'/o 9 g Concurrence 8y/Date: n~ ~AC~~pS'07'.

Concurranco Statement:

ass m c: 0+Co Joffxoy/4+Rr tdlderoon/Reit+

~ ~ ~ Roman R.I. Ghoborg J.A. Kobyra D.R. Smith/J. Murtha - Bridgman T.A. Kratt - Bridgman AEPSC/NEEP Gafoty Related Battery File (c:ir$ rXbatteryioefmemo.wp)

TOTAL P.G3

0 ~ ~ I ~

~ ~ ~ L ~ ~ 0 0 ~

rmr r

~ ~ ~ ~

~ ~ I Q ~ ~

~-

e 0 .104

~ - h 0 0 ~

0 ~

0 ~

IIRSIIII RSRKRIRWRSRIISII:-

RSMIIIII55III mmlsIIRIISIIB 55 RIRSIRIIIRIRRIIII y 4 IIHRIIRW~RwmIIER e o o MWWWWMWW J 0 0 H j 0 e r t

MWWMMWWW

~ + ~ 0 0 ~

~ ~ C 'tta 0 r ;EERIER ~ L ~

0 h

    • 12 CHP 5021 ~ CCD. 019

".TACHMENT NO. 1 NCHOR INS ECTION DATA SHEET W KV A6 CIAT7Egg ROOD Unz.t Bldg. Location z.-34~ 8 t z.-3z Installatxon dwg. / Rev.

z -serT-Ecpxxpment No.

Anchora e Arran ement Sketch Rr T-aQ INDIANA MICHIGAN POKIER SITE OESIGt< COtITIIOLLEO WOfiKIIIG COPY OCT 0 5 3995 I'<

('T~r II I.ER'K T @I Q(~QJ.<l>.1r I l

1 I

3-8/q.

+~I) i'd&(.Typ)<RAN

)

I -3$ <.>)c)

/i 7 C/fhhlhgBL TYP, Eca.M Ni~Q 400k N 9.

Drawn by: Date: 2 3 Verified by: Date: I->6"4>

Qual. /Cert. Inspector Reviewed by:

~

~ w %n Date: I r -r-'2 Constructs.on Anchor Review Engineer Page 1 of 3 Revision 1

( >*12 CHP 5021. CCD. 0].9 ATTACHMENT NQ. 1 NS CT 0 T AS i i/vO Avx (D C'F E P V I P I'I!=U ~

Unct Bldg. Location

/2 "3~ = 'i'- 7 2.->i i l - A'El Installation dwg. / Rev. Equipment No.

Anchora e Arran ement Sketch INDIANA MICHIGAtt POVlCR SITC DESIGN CONTROLLCO lVORKING COPY GAY TBRY OCV 05 >99S l 0 Yz. A I 4 ~ 20 /q (spp- Sut'PoRr DI=TAIL)

VJ Q L H f4'1 E ." J:

Q X3 4 4 i ORi <~D AhrGCC FRANC

~<AT TB R' lO ~L pc I e "X ZO'i+" S7g(SPE ZLI! PORl QFTWI I 4.g 2

II 2C-8p

~ I I

cRov t P&e T C.I4AN V I= I- GAS Ecv>o A Drawn by: Date:

Verified by: Date:

ual./Cert. inspector Reviewed by: T '4~4 Date: t o.-5-'I3 Construction Anc or Review Engineer Page 1 of 3 Revision . 3

    • 12 CHP 5021.CCD.019 ATTACHMENT NO. 1 P CT 0 T

~ & QA~raRg u ~JUL f'ME.~T. Boo H UnLt cq'ldg.

Location Ig - 3P ZP-y Installation dwg. / Rev. Equipment No.

Anchora e Arran ement Sketch iiii)ll'lA: <iCi'IC "

/ /2, BAR SIIE 0"SiGi'l CO" ~

'ii'OR!.IhC (.Oi' aOi T.aC OCT 05 1995

>'+z Q 1I WI

'h I'

~

4 Drawn by: Date: 2 Verified by: Date:

Qual./Cert. Inspector Reviewed by: T'i' Construct'>on v~v~~=~.; Date: l g.-z -c.'~

Anchor Reve.ew Engineer Page 1 of 3 Revision .3

r h

( >*12 CHP 5021. CCP. 019 ATTACHMENT NO.

N ECT 0 T A, 5 .BA>~E.RY Tkvo .- ux got EC V'~

Location

> %COO;-q Unzt Bldg.

Installation dwg. / Rev. Equipment No.

Anchora e Arran ement Sketch II DIP . ~ Q. BOP EVERY 2.Wu OR ERD CATTP R'f FOR C-I MG- INDIANA MICHIGAN PO'V(f R UNl STRv 7 UMISTRVTS T'IG-HT SITE DESIGN CONTROLLED (hR>C.gI-= T A~INS, WTTI=RY r WORKING COPY wa+,-2o58 OCT 0 5 1995 II Yz Tt+K. E'c.

OF RiGID Ih/SV LOFTI ON SOAR lo QR~~W GATTBRI & 5 QP,~<Pg'I'VAPOR i DP.l Al L Drawn by: ,Date:

Verified by: Date:

Qual. /Cert. Inspector Reviewed by: I '~F'I'5'h~-~(bQn Date:

Construct>on Anchor Review Engineer Page 1 of 3 Revision . 3

    • 12 CHP 5021. CCD. 019

( ATTACHMENT No.

CHOR XNS CT 0 Equipment No.: Dwg No..: j Q -QQp- p Embedded Steel Dwg. No.:

HYS ICAL CHARACT RIST C Weld ID Wi W3 w4 d We e Codes T e Size Q/~@

CC I/ cr 1 = Fillet Ct 2 = Plug/Slot Len th 3 =.Groove Cracks es Yes s es Yes Yes es Yes N 0 No No No Lack of Yes Y s Yes Yes Yes 'Yes Yes Yes Penetration No No No 0 Porosity es es es es Yes Yes Yes Y o 0 No No No No INDIANA 41ICHIGAII POPOVER SITE OESIGII CONTROLLED WORKING COPY 0CT 05 19,I5 I.EP'K base flexible: 0 Yes 8 No T'quipment Date: -24 ons ruc ron re Reviewed by: Date: (o-5'- f3 ons ruc z.o c or evxew ngzneer Verified by: Date:

ua . e . npsec or Page 3 of 3 Revision 3

I ~

~ ~ ~

~ ~ ~ ~ ~

t'R

~ ~ )0 $

~ ~ ~ ~

s ~

I I RRRSRRRRRSRWRSI5--.

MIIIIIR8imi mmmSRIMIIMII IKRIIRRIIIIIII e ~

milliAIR RSRIIIHRR ERRI

%%LRRHLL

/S ~

0 0 ~ ~

~

~ ~ t ~ te a ~

0 0 0 r

~ a ~

E E o ~

~ - l

- ~ tl ~-

~ l'4 Q )

s 4 ~~RK~~~~RR RRRRRSRSRSRSRSRR~

MRRRSMR58%55W

~

~

RSMRIRSIH555$ 55 RHRRSSRRRRRRRSRR f

0 o ~

~ RSESRRRHMRRWW RSRRRRRSRRRSRRS

~RWRHHEQHKRH5%6%

IHMWRRRSRHRIRH r e r

MMWMMMWW a e r IBK~EP~:aneesmw a ~a ka ~

-.. EL.

r a

g ~ r

~ W~

g J'He~~ e 0 8K e Ak s

I ~

~ y ~ I ~

~ ~ ~ 4 lj ~ ~ e ~ ~

~ ~ ~

~ ~

e ~

~ - ~

~ .

~ %4

~ - 0 ~ ~ .

e

~'

e ~

RRRRRRRRRRRRRImi:;:

~ ~

mmmmilmMIII RRRSElKRMIII

~

e ~

~

IHIRRIIIMlmlm IIISmimimlRI y y r e

~IIIIIREQR!SRwRSII MWWMWMWW r e 1 e r y i t MW&MMMW& r p P Ca e

~C a P

~MWaMNaLMC)RP%%9&UIKQWJC HNk&&%4%

'YSMe!E

'h ~

~ a

~ ~

~ ~ ~ ~ ~ 4 ~

~ ~ I~

f ~

~

~ ~ Q 0 ~

- ~ ~ ~

o 1~4 5 - 8 o ~

RRNNRNR%5%5%555%- -.

IKmmmmmmmm RES 1 mmlESRNmmmmm RSMEWRSmMMIR mmmKlmm y e o r e r o

~mmmmhhRRWHRmmmm mmmmmmm55m r MWWMMM&W j ~

a

~ y 0

~

C.' ~ ~

~0 4

HFJBESISSI%leaSKHKaeRKSSP

~ i. K~%K8'

~ ~ ~ ~

~

I ~

~ ~ ~ s ~

~ ~,. ~ ~

~ ~

I ~ ~

~ - ~

~ .

s is)

IIIMIIIII

~ - C ~

t s ~ KRERHHRWHMSRRSIIIII .

RRRSNIRSRRR%mm5I=-

~ ~

55IIISRIEIIII IIIIRRRRSRI5%

s ~

MIEIIRSRSRSIIIS 0 ~ ~

~IIIIRWRESHESIIII IIEIIIIIIIIIIRHIRl 0 I' MWWMMMW&

0 4 4~ ~

y 8 R M a%4%%~<'

~

a..

s a i o a

~

a la a E

~

sssIsss.ssvissw

~ ~

~'%81sssssssssi%1E

. ssaake~

rr ~ sssIMII 25a4KM<ÃtRQRUPk%0 r

's~s O ~l~e APL ~ ~

~ 1

i S 8 A DEPART)so=AT 12 SHP 5050 NDL- 008 CONTROl.LED DOCUMENT ATTACPNENT HO.

COPY NO.

UITRASONIC TEST REPORT JOB ORDER NO.: REPORT DATE: REQUEST NO.

IDENTIFICATION Unit ~Q Test Unit/ S/N ( i<.TS c c-9 Component -A Freq./Diameter 5 m4z Item -~ rS Reference Standard Material ~ S Couplant/Batch No.

Other TEST DATA REMARKS AM r

u. s'/z k.

L PERFORMED BY:

REVIEWED BY:

FORM NO.

'" M ~.

C 12 SHP 5050 NDE.008-1 Pc&

I EVE E,:.~~

I EVEI'age 1 of DATE: C /.- 5 y3 Revision 0

oly16192 PG. N0.425 SAFE'HUTDOWN EOUIPNEHT LIST (SSELUP)

FUNCT IOH: 01ESEL GENERAT IOM Equipment Class: 17 Train: 1 Equipment ID: I-DHE-150-AB DraMing Number: 1.12001 1-5151A 1-51510 System: DIESEL GEHERATOR COM1'ROL AHD IHSTRlNENTATION Equip

Description:

AB EKERG DIESEL GEHERATOR Bui l ding: AUXILIARY Roan: AB EHERG DIESEL GEHERAI'OE ROOM Elevation:'87 Normal state: Desired state: Pouer Required: Sort: lI,R Si~rting System Orauing Number:

Recnsired Interconnections and Supporting Conponentsl ty Related Status: NUCLEAR SR Min/Dpt: KIM E.

ADDITIOMAL INFORHATIOH alias Number: Prier I'rain: B Conponent Served: AB EKERG DIESEL GEHERATOR Nanufacturerl GENERAL ELECIRIC CO Model:

'Pnneil 1-OGAB 1-OGABX Elcm Orauing: 1-98032 1-98051 1-98052 Uiring Drawing: 1-95301 Paver Source: 1-T11A11 1-T1164 1-TOAD-2 un I Ldoun: F Relay Only: Y Component 'Type: ENG. GEN 3500XU,4KV ISO Drauingsl Detailed Location: IN tHE CENTER OF THE ROON

DC Cook Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet1 of4 ID: 1-OME-150-AB ( Rev. 0) Class: 17. Engine-Generators

==

Description:==

AB EMERG DIESEL GENERATOR Building: AUXILIARY Floor El.: 687.00 Room, Row/Col: AB EDG RM, IN THE CENTER OF THE RM Manufacturer, Model, Etc.: GENERAL ELECTRIC CO SEISMIC CAPACITY VS DEMAND

1. Elevation where equipment receives seismic input 687.00 Elevation of seismic input below about 40'rom grade (grade = 608.00) Yes
3. Equipment has fundamental frequency above about 8 Hz (est. frequency = 20.00) Yes
4. Capacity based on: 1.00 Bounding Spectrum Demand based on: 1.00 " Design Basis Ground Response Spectrum 0.800 G

LOG 0.090 0.50 LOG Hz 33.00 Capacity ..... Demand Record Ca aci C:IGIPtGIPLspectra.des Label Boundin Spectrum Demand 1 C:tGIPLPROJ0031 tspectra.des BUILDINGGround EI.EVATION 608 BROADEN N Demand 2 C:LGIPIPROJ0031tspoctra.des BUILDING Ground ELEVATION 608 BROADEN N Does capacity exceed demand' CAVEATS - BOUNDING SPECTRUM Caveat 1 - Earthquake Experience Equipment Class

'G/BS Yes EG/BS Caveat 2- Driver and Driven Component on Rigid Skid. Yes EG/BS Caveat 3- Base Vibration Isolation System Checked. N/A EG/BS Caveat 4 - Sufficient Slack and Flexibility of Attached Lines. Yes EG/BS Caveat 5 - Adequate Anchorage Yes EG/BS Caveat 6 - Potential Chatter of Essential Relays Evaluated. N/A EG/BS Caveat 7 - No Other Concerns. Yes Is the intent of all the caveats met for Bounding Spectrum'

DC Cook Unit 1 Glp Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet2of4 ID: 1-OME-.150-AB ( Rev. 0 ) Class: 17. Engine-Generators

==

Description:==

AB EMERG DIESEL GENERATOR Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: AB EDG RM, IN THE CENTER OF THE RM Manufacturer, Model, Etc.: GENERAL ELECTRIC CO ANCHORAGE

1. The sizes and locations of anchors have been determined Yes
2. Appropriate equipment characteristics have been determined (mass, CG, natural freq., Yes damping, center of rotation).
3. The type of anchorage is covered by the GIP Yes
4. The adequacy of the anchorage installation has been evaluated (weld quality and length, nuts Yes and washers, expansion anchor tightness, etc.)
5. Factors affecting anchorage capacity or margin of safety have been considered: embedment Yes length, anchor spacing, free-edge distance, concrete strength/condition, and concrete cracking.
6. For bolted anchorages, any gaps under the base are less than 1/4 Yes
7. Factors affecting essential relays have been considered: gaps under the base, capacity N/A reduction for expansion anchors.
8. The base has adequate stiffness and the effect of prying action on anchors has been Yes considered.
9. The strength of the equipment base and the load path to the CG is adequate. Yes
10. The adequacy of embedded steel, grout pads or large concrete pads have been evaluated. Yes
11. The anchorage capacity exceeds the demand. Yes Are anchorage requirements met'P INTERACTION EFFECTS
1. Soft targets are free from impact b nearby equipment or structures Yes
2. If the equipment contains sensitive relays, it is free from all impact by nearby equipment or N/A structures.
3. Attached lines have adequate flexibility Yes
4. Overhead equipment or distribution systems are not likely to collapse. Yes
5. No other adverse concerns were found. Yes Is equipment free of interaction effects' C L D

~Clggg~g SRT: George Gary Thomas (S&A) and Tom Huang (AEP) on 10/16/93.

Diesel Generator and driver not on same skid, however large contrete foundations originate from common floor, differential motion not a concern.

DC Cook Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 3 of 4 ID: 1-OME-150-AB ( Rev. 0 ) Class: 17. Engine-Generators

==

Description:==

AB EMERG DIESEL GENERATOR Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: AB EDG RM, IN THE CENTER OF THE RM Manufacturer, Model, Etc.: GENERAL ELECTRIC CO No interations. See AEP anchorage data for seismic qualification. Engine anchored by fourteen 2" or larger anchors. Generatoranchoredbyeight1" anchors. Generatorshaftendanchoredbyfour1.75" anchors. the ANCHOR analysis gives a large safety margin (36) as shown by that done for 2-OME-150-CD.

Concern noted with regard to support of air manafold that supports aftercooler. Aftercooler supported by spring mounted column. This concern was tracked and reconciled with items 1-HE47-ABS 8 ABN.

Zap shot Wk. 2, Team 2, Disk 2, Picture 20 8 21.

Evaluated by: Date:

i(-~

Attachment:

Pictures

DC Cook Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 4 of 4 ID: 1-OME-1 50-AB ( Rev. 0 ) Class: 17. Engine-Generators

==

Description:==

AB EMERG DIESEL GENERATOR Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: AB EDG RM, IN THE CENTER OF THE RM Manufacturer, Model, Etc.: GENERAL ELECTRIC CO AB Emerg Diesel Generator, 1-OME-150-AB AB Emerg Diesel Generator 1-AB-150-AB AB Emerg. Diesel Generator, 1-OME-150-AB AB Emerg. Diesel Generator 1-OME-150-AB

~ >12 CHP 5021 CCD 019

~

ATTACHMENT NO. 1 CT

~T'PcF DI~BL EV &INE GeS~ROT OR ROOnA Unzt Bldg. Location IZ.-3458- 3 r.' &ME. /50-3 6 Instailat on dwg. / Rev. Equipment No.

Anchora e Arran ement Sketch

/r l~z

~ ~

g 0,g

~

INDIANA MICHIG P EII SITE DESIGN NT L D WORKING C Y SEP 2 7 $ 995 LERK / ~

gap dv ~Ion Vlpw Lmwivs BAs~

D rawn by: Date:

(

Verified by: Date: ~-8 'Y- ~.8 Q a C rt. Xnspector Reviewed by: Date:

Construction chor Review Engineer Page 1 of 3 Revision 3

  • 12 CHP 5021.CCD.019 ATTACiQ&NT NO ~ 1 Eh/Q OP C(E.SE.I-G;euERATaR Roof.

PME'n t Bldg- Locatzon l2.-3468 - l3 y. awe, -l4o-AE Installat on dwg. / Rev. Equipment No.

Anchora e Arran ement Sketch

/3y COg 9$

r't

+Cp Oo Oo Sf'I'/~g" tl 9 s "q F PENT I 5q Q

~O Ol qual G H Qo o MACHlh/E BASF ft Qo Qo msanom~ H.

5fv' GRou T Paw INOIANA MICHIGAN POIVCII SITE DESIGN CONTROLLEO WORKING COPY SEP 27 1995 QMCHa R- MUV '" KT I,J.Z.L A..-< sr<"

Ra.~SSaa lZ Loll,-A45%ÃS-kE- ABC+

2. +4"g x "DE, (gEe r//To EueZODEO mfa.

)5><

C'BORE, TyP. (g) PL@ 5, Drawn by: Date:

Verified by. Vvu Date: r -2~ - F~

q . ert. Inspector

('2 Reviewed by: Cn'age Construe on chor Review Engineer 1 of 3 Revision .3

    • 12 CHP 5021.CCD.019 ATTACHKENT NO. 1 I Equipment No.-

Anchor type: re ~c r DWg NOe Tightness established by: 0 "Snug Fit" Q

'orque Torque Mrench No.: Cal. Due Date:

Tightness verified? 0 Yes 8 No ons ruc 1on Date:

Equipment base flexible? 0 Yes N No ons ruc 1on ARE Bolt ZD D W W & O'omments Caps "I/I/ CCATS I El 6 AIU'T <Ec SEE roc're "

Anchor len th protruding 3~" 37>" rk len th Embedment eh'K1 b LE Bolt; ACC ri gq q gg C9,~'II Q~Rt' Concrete og Xu rr4 condition 6800 T &%DAN> EE~ T

~ <i~" 3" v" Edge distance Anchor +y~ y.

an Anchor larit Thread Fees O 0 Q

76cE556p ccs58 cc d8 Q

cfcEIch O

emcee engagement ~, 'I I~

y ~z Comments:

c Verified by: tA

~

Date:

., Cert:. Inspector I

Reviewed by: Date:

Construct1on I MICHIGAN POWER SITE DESIGN CONTROLLED WORKING COPY SEP 2 7 1995 Paga 2 of

( tat I ~+'AA~vl Revision 3

SHP 5050 NDE.008 S 8 A DEPARTMENT ATTACHMENT NO. 1 CONTROLLED DOCUMENT COPY NO. 3 ULTRASONIC TEST REPORT JOB ORDER NO.: REPORT DATE: / d" 3 REQUEST NO.

IDENTIFICATION Unit Test Unit/ S/N Component -OWN- /& Freq./Diameter Item AC+o S Reference Standard Material .S. Couplant/Batch No.

Other TEST DATA REMARKS Vs" Vs" PERFORMED BY: I.EVEI: M DATE: / P REVIEWED BY: I EVE I: ~ DATE:

FORM NO. 12 SHP 5050 NDE.008-1 Page 1 of 1 Revision 0

Equip Id: 2-OME-150-CD Train: 2 Equip Class: 17 D~<wing No ~  : 2-12002,,2-5151C, 2-5151D tion: DIESEL GENERATION System: DXESEL GENERATION, CONTROL & INSTRUMENTATXON Equip Desc: CD EMERGENCY DIESEL GENERATOR Building: AUXILXARY Room: CD EMERGENCY DIESEL GENERATOR ROOM Elev: 587 'ort: S,R Notes:

Normal State: Desired State: 'ower Req'd:

Support System Drawing: 2-98033, 2-98051, 2-98052, 2-12002 Req'd Support Comp:

Safety Related Status: NUCLEAR SR Min/Opt: MXN Alias No: Power Train: A Comp Served: CD EMERGENCY DXESEL GENERATOR MFR: GENERAL ELECTRXC CO.

2 SAs 2 DGCD 2 DGCDX Elem. Drawing: 2-98033, 2-98051, 2-98052 Hiring Drawing: 2-95302 7 Power Source: 2-T21C3, 2-T21D8, 2-TDCD-2 Halkdown: F Relay Eval: Y Comp Type: ENG. GEN-3500KW, 4KV Iso Drawing:

Location: XN THE CENTER OF THE ROOM, 10 FEET NORTH OP THE MAXN ENTRANCE DOOR

D.C. COOK Unit 2 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet1 of14 ID: 2-OME-150-CD ( Rev. 0 ) Class: 17. Engine-Generators

Description:

CD EMERGENCY DIESEL GENERATOR Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: CD EMER DSL GEN RM - IN THE CENTER OF THE ROOM, 10 FEET NORTH OF THE MAIN ENTRANCE DOOR Manufacturer, Model, Etc.:

SEISMIC CAPACITY VS DEMAND

1. Elevation where equipment receives seismic input 587.00 Elevation of seismic input below about 40'rom grade (grade = 608.00) Yes
3. Equipment has fundamental frequency above about 8 Hz (est. frequency = ) SRT Capacity based on: 1.00 Bounding Spectrum Demand based on: 1.00
  • Design Basis Ground Response Spectrum 0.800 r~

/r LOG /

/

/

/

/r 0.090 0.50 LOG Hz 33.00 Capacity ..... Demand File Record 'apacit C:LGIPtGIPLs ectra.des Label Boundin Spectrum Demand 1 C:tGIPIPROJ0034ts ectra.des BUILDINGGround ELEVATION 608 BROADEN N Demand 2 C:tGIPtPROJ0034tspectra.des BUILDINGGround ELEVATION 608 BROADEN N Does capacity exceed demand?

0 0

D.C. COOK Unit 2 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 2 of 14 ID: 2-OME-150-CD ( Rev. 0) Class: 17. Engine-Generators

Description:

CD EMERGENCY DIESEL GENERATOR Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: CD EMER DSL .

GEN RM - IN THE CENTER OF THE ROOM, 10 FEET NORTH OF THE MAIN ENTRANCE DOOR Manufacturer, Model, Etc.:

CAVEATS - BOUNDING SPECTRUM EG/BS Caveat 1 - Earthquake Experience Equipment Class Yes EG/BS Caveat 2 - Driver and Driven Component on Rigid Skid Yes EG/BS Caveat 3 - Base Vibration Isolation System Checked N/A EG/BS Caveat 4 - Sufficient Slack and Flexibili of Attached Lines Yes EG/BS Caveat 5 - Adequate Anchorage. Yes EG/BS Caveat 6 - Potential Chatter of Essential Relays Evaluated. NIA EG/BS Caveat 7- No Other Concerns. Yes Is the intent of all the caveats met for Bounding Spectrum' ANCHORAGE

1. The sizes and locations of anchors have been determined Yes
2. Appropriate equipment characteristics have been determined (mass, CG, natural freq., Yes damping, center of rotation).
3. The type of anchorage is covered by the GIP Yes
4. The adequacy of the anchorage installation has been evaluated (weld quality and length, nuts Yes arid washers, expansion anchor tightness, etc.)
5. Factors affecting anchorage capacity or margin of safety have been considered: embedment Yes length, anchor spacing, freewdge distance, concrete strength/condition, and concrete cracking.
6. For bolted anchorages, any gaps under the base are less than 1/4 Yes
7. Factors affecting essential relays have been considered: gaps under the base, capacity N/A reduction for expansion anchors.
8. The base has adequate stiffness and the effect of prying action on anchors has been Yes considered.'.

The strength of the equipment base and the load path to the CG is adequate Yes

10. The adequa of embedded steel, grout pads or large concrete pads have been evaluated. Yes
11. The anchorage capacity exceeds the demand. Yes Are anchorage requirements met?

INTERACTION EFFECTS

1. Soft targets are free from impact by nearby equipment or structures. Yes
2. If the equipment contains sensitive relays, it is free from all impact by nearby equipment or NIA structures.
3. Attached lines have adequate flexibility Yes
4. Overhead equipment or distribution systems are not likely to collapse. Yes
5. No other adverse concerns were found.

Is equipment free of interaction effects?

D.C. COOK Unit 2 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 3 of 14 ID: 2-OME-150-CD ( Rev. 0 ) Class: 17. Engine-Generators

==

Description:==

CD EMERGENCY DIESEL GENERATOR Building: AUXILIARY Floor EI.: 587.00 Room, Row/Col: CD EMER DSL GEN RM - IN THE CENTER OF THE ROOM, 10 FEET NORTH OF THE MAIN ENTRANCE DOOR Manufacturer, Model Etc.:

~

S U SESMC LL D

~cbmgp~

SRTs are TR Satyan-Sharma, W. Djordjevic, J. Nieto, and R. Steele. -. 10/5/93 REF: 1. Anchorage Inspection Data Sheet, Anchorage Arrangement Sketches of generator anchorage, 9/8/93.

2. Report on Seismic Analysis of Equipment Supplied by Worthington Compressors Inc. for the D. C. Cook Nuclear Plant, Report EG-37017, 9/20/74- Engine on Foundation calculation.

3.. Dwgs 12-3241-12, 12-3468-13.

4. Anchor Bolt Schedule, Dwg 12-3073A-3.
5. General Arrangement Dwg W501812AT.

Anchorage:

See Reference 0 2 for seismic qualification of Engine. Engine is anchored by 14 - 2" anchors.

Generator anchored by 8-1" CIP anchors. An edge distance reduction factor is taken for the 4 inside anchors (they are located approx. 3.7" from the pit's edge). Generator shaft end anchored by 4-1.75" CIP anchors ( modeled as 1.375" anchors ANCHOR because this is the largest size anchor covered in the GIP). See ANCHOR analysis.

Photo: DG21-34&35, 36 and 37 (-34 of bolt, -35 from SW corner, -36 from NW corner, and -37 from NE corner).

Evaluated by: Date:

9

D.C. COOK Unit 2 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 4 of 14 ID: 2-OME-150-CD ( Rev. 0 ) Class: 17. Engine-Generators

==

Description:==

CD EMERGENCY DIESEL GENERATOR Building: AUXILIARY Floor El.: 587.00 Room, Rov//Col: CD EMER DSL GEN RM - IN THE CENTER OF THE ROOM, 10 FEET NORTH OF THE MAIN ENTRANCE DOOR Manufacturer, Model, Etc.:

PJCT~UQS Figure 2: 2-OME-150-CD (Photo DG21.35)

Figure 3: 2-OME-150-CD (Photo DG21.36)

Figure 4: 2-OME-150-CD (Photo DG21.37)

Figure1: 2-OME-150-CD (Photo DG21.34)

D.C. COOK Unit 2 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 5 of 14 ID: 2-OME-150-CD ( Rev. 0 ) Class: 17. Engine-Generators

==

Description:==

CD EMERGENCY DIESEL GENERATOR Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: CD EMER DSL GEN RM - IN THE CENTER OF THE ROOM, 10 FEET NORTH OF THE MAIN ENTRANCE DOOR Manufacturer, Model, Etc.:

ANCHOR Report

~Ea t~e Response Spectrum: SSE Frequency: GIP - Rigid Percent Damping: GIP - 5.00 Spectral Values:

Direction. Acceleration (g's)

North - South 0.38 East - West 0.38 Vertical 0.25 Angle (N-S Direction makes with the X Axis): 0.00 Combination Criteria: SRSS Wejg+g of Weights:

'umber 1

No Weight 1 10000.00 50.500 85.400 51.250 alee Number of External Forces: 0 Number of External Moments: 0

~li wattg~

hach@.'umber of Anchor types: 2 Tension Shear

D.C. COOK Unit 2 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 6 of 14 ID: 2-OME-150-CD ( Rev. 0) Class: 17. Engine-Generators

Description:

CD EMERGENCY DIESEL GENERATOR Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: CD EMER DSL GEN RM - IN THE CENTER OF THE ROOM, 10 FEET NORTH OF THE MAIN ENTRANCE DOOR Manufacturer, Model, Etc.:

Ultimate Ultimate Inter Inter Saf Dia Manufact Product Tension Shear Coeff Coeff Fact Other Cast In 1.00 0.30 1.00 Place (A- 26690.00 13350.00 307) 1-3/8 Other Cast In 1.00 0.30 1.00 Place (A- 50400.00 25250.00 307)

Ultimate Stress: 3500.00 psi.

Reduction Factor: 0.85

~WI Allowable Stress: 30600 psi.

~ance Number of Surfaces: 2 Surface Orientation Direction Direction Direction Comp Comp Comp No Nz 0.000 0.000 1.000 0.000 0.000 1.000 Anchor Pattern for Surface ff. 1

D.C. COOK Unit 2 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 7 of 14 ID: 2-OME-150-CD ( Rev. 0) Class: 17. Engine-Generators

==

Description:==

CD EMERGENCY DIESEL GENERATOR Building: AUXILIARY Floor EI.: 587.00 Room, Row/Col: CD EMER DSL GEN RM - IN THE CENTER OF THE ROOM, 10 FEET NORTH OF THE MAIN ENTRANCE DOOR Manufacturer, Model, Etc.:

Anchor Pattern for Surface //2 Legend for Anchor Patterns

D.C. COOK Unit 2 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 8 of 14 ID: 2-OME-150-CD ( Rev. 0) Class: 17. Engine-Generators

Description:

CD EMERGENCY DIESEL GENERATOR Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: CD EMER DSL GEN RM - IN THE CENTER OF THE ROOM, 10 FEET NORTH OF THE MAIN ENTRANCE DOOR Manufacturer, Model, Etc.:

Anchor Bolts Lines

.'oncrete Concrete Points . mmmm Weld Lines .

geoJHefXK

'umber of Anchors: 12 Anch Surf Id Coord Coord Coord Id 98.700 76.750 0.000 93.200 76.750 0.000 93.200 ~ 129.250 0.000 98.700 129.250 0.000 2.300 129.250 0.000 8.060 129.250 0.000 8.060 76.750 0.000 2.300 76.750 0.000 30.750 10.000 8.500 10 30.750 22.000 8.500 70.250 10.000 8.500 12 70.250 22.000 8.500 ttt of elements per line: 5 Number of Concrete Lines: 4 sta~ stan s~art End End End sf Line X-Coord Y-Coord Z-Coord X-Coo rd Y-Coo rd Z-Coord id Width 5.000 39.360 0.000 5.000 131.360 0.000 1 10.000 96.000 39.360 0.000 96.000 131.360 0.000 1 10.000 35.500 0.000 8 500 35 500 32.000 8.500 2 30.000

D.C. COOK Unit 2 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 9 of 14 ID: 2-OME-150-CD ( Rev. 0 ) Class: 17. Engine-Generators

Description:

CD EMERGENCY DIESEL GENERATOR Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: CD EMER DSL GEN RM - IN THE CENTER OF THE ROOM, 10 FEET NORTH OF THE MAIN ENTRANCE DOOR Manufacturer, Model, Etc.:

4 65.500 0.000 8.500 65.500 32.000 8.500 2 30.000 Number of Concrete Points: 0

¹ of elements per line: 5 Number of Weld Lines: 0 Dete '

a educti F Reduction Factor Input for Anchor ¹ 1 Adequately Installed: Yes Embedment Length: (61.38 in. Min Reqd. to achieve full capacity):=10.00 in.

Gap at Threaded Anchor: 0.00 in.

Edge Distance - Edge 1: 8.75 in.

Crack Size: 0.000 in.

Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factor Input for Anchor ¹2 Adequately Installed: Yes Embedment Length: (61.38 in. Min Reqd. to achieve full capacity):=10.00 in.

Gap at Threaded Anchor: 0.00 in.

Edge Distance - Edge 1: 3.70 in.

Crack Size: 0.000 in.

Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factor Input for Anchor ¹3 Adequately Installed: Yes Embedment Length: (61.38 in. Min Reqd. to achieve full capacity):=10.00 in.

Gap at Threaded Anchor: 0.00 in.

Edge Distance - Edge 1: 3.70 in.

Crack Size: 0.000 in.

ssential Relays in Cabinet: No

D.C. COOK Unit 2 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 10 of 14 ID; 2-OME-1 50-CD ( Rev. 0 ) Class: 17. Engine-Generators

==

Description:==

CD EMERGENCY DIESEL GENERATOR Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: CD EMER DSL GEN RM - IN THE CENTER OF THE ROOM, 10 FEET NORTH OF THE MAIN ENTRANCE DOOR Manufacturer, Model, Etc.:

Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factor Input for Anchor ¹4 Adequately Installed: Yes Embedment Length: (61.38 in. Min Reqd. to achieve full capacity):=10.00 in.

Gap at Threaded Anchor: 0.00 in.

Edge Distance-Edge1: 8.75in.

Crack Size: 0.000 in.

Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factor Input for Anchor ¹5 Adequately Installed: Yes Embedment Length: (61.38 in. Min Reqd. to achieve full capacity):=10.00 in.

Gap at Threaded Anchor: 0.00 in.

Edge Distance - Edge 1: 8.75 in.

Crack Size: 0.000 in.

Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes.

Embedment Steel and Pads Adequately Installed: Yes Reduction Factor Input for Anchor ¹6 Adequately Installed: Yes Embedment Length: (61.38 in. Min Reqd. to achieve full capacity):=10.00 in.

Gap at Threaded Anchor: 0.00 in.

Edge Distance - Edge 1: 3.70 in.

Crack Size: 0.000 in.

Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factor Input for Anchor ¹7 Adequately Installed: Yes Embedment Length: (61.38 in. Min Reqd. to achieve full capacity):=10.00 in.

Gap at Threaded Anchor: 0.00 in.

Edge Distance - Edge 1: 3.70 in.

Crack Size: 0.000 in.

Essential Relays in Cabinet: No dequate Equipment Base Strength and Structural Load Path: Yes

D.C. COOK Unit 2 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 11 of 14 ID: 2-OME-1 50-CD ( Rev. 0 ) Class: 17. Engine-Generators

Description:

CD EMERGENCY DIESEL GENERATOR Building: AUXILIARY Floor El.: 687.00 Room, Row/Col: CD EMER DSL GEN RM - IN THE CENTER OF THE ROOM, 10 FEET NORTH OF THE MAIN ENTRANCE DOOR Manufacturer, Model, Etc.'.

Embedment Steel and Pads Adequately Installed: Yes Reduction Factor Input for Anchor ¹8 Adequately Installed: Yes Embedment Length: (61.38 in. Min Reqd. to achieve full capacity):=10.00 in.

Gap at Threaded Anchor: 0.00 in.

Edge Distance - Edge 1: 8.75 in.

Crack Size: 0.000 in.

Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factor Input for Anchor ¹9 Adequately Installed: Yes Embedment Length: (54.50 in. Min Reqd. to achieve full capacity):=13.75 in.

Gap at Threaded Anchor: 0.00 in.

( Edge Distance - Edge 1: 8.75 in.

Crack Size: 0.000 in.

Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factor Input for Anchor ¹ 10 Adequately Installed: Yes Embedment Length: (54.50 in. Min Reqd. to achieve full capacity):=13.75 in.

Gap at Threaded Anchor: 0.00 in.

Edge Distance - Edge 1: 8.76 in.

Crack Size: 0.000 in.

Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factor Input for Anchor ¹ 11 Adequately Installed: Yes Embedment Length: (64.50 in. Min Reqd. to achieve full capacity):=13.75 in.

Gap at Threaded Anchor: 0.00 in.

Edge Distance - Edge 1: 8.75 in.

Crack Size: 0.000 in.

Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes

=mbedment Steel and Pads Adequately Installed: Yes

D.C. COOK Unit 2 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 12 of 14 ID: 2-OME-1 50-CD ( Rev. 0 ) Class: 17. Engine-Generators

Description:

CD EMERGENCY DIESEL GENERATOR Building: AUXILIARY Floor EI.: 587.00 Room, Row/Col: CD EMER DSL GEN RM - IN THE CENTER OF THE ROOM, 10 FEET NORTH OF THE MAIN ENTRANCE DOOR Manufacturer, Model, Etc.:

Reduction Factor Input for Anchor ¹ 12 Adequately Installed: Yes Embedment Length: (54.50 in. Min Reqd. to achieve full capacity):=13.75 in.

Gap at Threaded Anchor: 0.00 in.

Edge Distance - Edge 1: 8.75 in.

Crack Size: 0.000 in.

Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factors Data Current: Yes Anc Paii/ Paltr/

No Vail Vallr RT RN RL RG RS RE RF RC RR RP RB RM 1 20671.79 N/A 1.00 1.00 1.00 1.00 0.77 1.00 1.00 1.00 1.00 1.00 1.00 1.00 13350.00 N/A 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 N/A 1.00 1.00 1.00 1.00 0.77 1.00 1.00 1.00 1.00 1.00 1.00 0.00 NIA 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 N/A 1.00 1.00 1.00 1.00 0.77 1.00 1.00 1.00 1.00 1.00 0.00 N/A 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1 20671.79 N/A 1.00 1.00 1.00 1.00 0.77 1.00 1.00 1.00 1.M 1.00 1.00 1.00 13350.00 N/A 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1 20907.90 N/A 1.00 1.00 1.00 1.00 0.78 1.00 1.00 1.00 1.00 1.00 1.00 1.00 13350.00 N/A 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 NIA 1.00 1.00 1.00 1.00 0.78 1.00 1.00 1.00 1.00 1.00 0.00 N/A 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 7 0.00 N/A 1.00 1.00 1.00 1.00 0.78 1.00 1.00 1.00 1.00 1.00 1.00 0.00 N/A 1.00 1.00 1.00 1.00 1.00 1.00 1.M 1.00 1.00 1.00 1.00 1 20907.90 N/A 1.00 1.00 1.00 1.00 0.78 1.00 1.00 1.00 1.00 1.00 1.00 1.00 13350.00 N/A 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2 39829.26 N/A 1.00 1.00 1.00 1.00 0.88 0.90 1.00 1.00 1.M 1.00 1.00 1.00 13395.02 NIA 1.00 1.00 1.00 1.00 1.00 0.53 1.M 1.00 1.00 1.00 1.00 1.00 10 2 39829.26 NIA 1.00 1.00 1.00 1.00 0.88 0.90 1.00 1.00 1.00 1.00 'i.oo 1.00 13395.02 NIA 1.00 1.00 1.00 1.00 1.00 0.53 1.00 1.00 1.00 1.00 2 39829.26 N/A 1.00 1.00 1.00 1.00 0.88 0.90 1.00 1.00 1.00 1.00 1.00 1.00 13395.02 NIA 1.00 1.00 1.00 1.00 1.00 0.53 1.00 1.00 1.00 1.00 1.00 1.00 12 2 39829.26 N/A 1.00 1.00 1.00 1.00 0.88 0.90 1.00 1.00 1.00 1.00 1.00 1.00 13395.02 N/A 1.00 1.00 1.00 1.00 1.00 0.53 1.00 1.00 1.00 1.00 1.00 1.00 N/A = Not Applicable Pall = Allowable Pull without Reduced Inspection Vali = Allowable Shear without Reduced Inspection Pallr = Allowable Pull with Reduced Inspection

0 D.C. COOK Unit 2 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 13 of 14 ID: 2-OME-1 50-CD ( Rev. 0 ) Class: 17. Engine-Generators

==

Description:==

CD EMERGENCY DIESEL GENERATOR Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: CD EMER DSI GEN RM - IN THE CENTER OF THE ROOM, 10 FEET NORTH OF THE MAIN ENTRANCE DOOR Manufacturer, Model, Etc.:

Vallr = Allowable Shear with Reduced Inspection

= Outlier

= Reduction Factor Not Used RT = Reduction Factor for Type of Anchorage RN = Reduction Factor for Installation Adequacy RL = Reduction Factor for Embedment RG = Reduction Factor for Gap at Anchors RS = Reduction Factor for Spacing RE = Reduction Factor for Edge Distance

= Reduction Factor for Concrete Strength RC = Reduction Factor for Concrete Cracks RR = Reduction Factor for Essential Relays RP = Reduction Factor for Base Stiffness and Prying Action RB = Reduction Factor for Base Strength and Load Path RM = Reduction Factor for Embed. Steel and Pads SI u Analysis Performed: Yes Type of Analysis: Regular Spectral Accelerations (G's)

No N-S E-W Vertical Safety Factor 0.375 0.150 0.100 49.387

-0.375 -0.150 -0.100 66 437

-0.375 0.150 0.100 49.196 0.375 -0.150 -0.100 66.700 0.375 -0.150 0.100 36.848

-0.375 0.150 -0.100 79.872 0.375 0.160 -0.100 80.174

-0.375 -0.150 0.100 36.703 0.150 0.375 0.100 84.089 10 -0.150 -0.375 -0.100 84.919 0.150 -0.375 0.100 41.166 12 -0.150 0.375 -0.100 124.223 13 -0.160 0.375 0.100 84.082 14 0.150 -0.375 -0.100 85.264 15 0.150 0.375 -0.100 124.223

-0.150 -0.375 0.100 41 142 17 0.150 0.150 0.250 57.447

D.C. COOK Unit 2 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 14 of 14 ID: 2-OME-1 50-CD ( Rev. 0 ) Class: 17. Engine-Generators

==

Description:==

CD EMERGENCY DIESEL GENERATOR Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: CD EMER DSL GEN RM - IN THE CENTER OF THE ROOM, 10 FEET NORTH OF THE MAIN ENTRANCE DOOR Manufacturer, Model, Etc.:

18 -0.150 -0.150 -0.250 2091.746 19 0.150 0.150 -0.250 735.385 20 -0.150 -0.150 0.250 37.892

-0.150 0.150 0.250 57.220 22 0.150 -0.150 -0.250 2091.804 23 0.150 -0.150 0.250 38.041 24 -0.150 0.150 -0.250 735.242 Minimum Safety Factor: 36.703 The Anchorage Capacity is 36.703 times greater than the Demand

REPORT ON SEISMIC ANALYSIS OF EQUIPMENT SUPPLIFD BY WORTffINGTON CohfPRFSSORS INC.

FOR TllE D. C. COOK NUCLEAR PLANT or AMERICAN ELECTRIC POWER SERVICF. CORPORATION REPORT HG-37017, Ldition C September 20, 1974

CC 05A SUMKCT oooo Sheet ofSee.'

RL Comment No. DES CRXPTXOH Engine SepecMications Foundation Bolt Specifications

@@gine Flange Specifications Poundation Bolts Tension - Rocking, Operating, Tightening, Seismic~

Stresses 8c F.S.

Foundation Bolts - Bending lA,3 Foundation Bolts - Shear S Combined Stresses K F.S.

15 P1ange - Bending - Rocking, Torque, Stress &; P. S.

Conclusions

su~acr E~~i<<P~ ~~rzow TYPF ~RG No W-$0/B/Zg a~ ~ ~J2sr .

x a

0 x \

O Q

z

~ p'iv&dpggeV (z ~g. r.s~)

Soar S CZPr) x 0 g =44 Ill/SO (ke 44~m. sK- w~ssa) b) C'. k -4s Swuc w ('r~~ A~w Jaia) c) Ovr~pci c&nv. - /r J>ocul J) po~g~w~<g = gfdP ('y~~ 5>~ca.)

eg pe. = 5z~ Cr~+ >~w Js- t1>sA)

~) louadareu AzT 5rsds( rkE8 CA kA X~srcw)

=

+ wr

odour'~

'(- goaooaHW /7 She<<t of~ Shts.

a/s ~+

WCL. 5 D3 F<vgb/lTioH UogTS Li = 8.)l,g. b,: 'l,8I5'4 L, = 6. O iH. D.- S.~ Pjog.

L~ = 6~.0 iN. ~25 iH ~

c- .

EioNP/ToH Lb

. lo8 s io 'H/Lb+

(~ 4is7 N.)(So o'PSib

.Ol & y. io '"/gb+

(Io 6o> lN )(Polio PSi) 42,0 IN

. 35'Z. X io '"/L/~

('3.sb7& iu )( s y>oo'si) 4,,- 4, +6, tK,- (o /g ]<

I~

golstil<R. Rargr<oH gpouT Poise 7 go.v s (g. /Cr/t I o//

7

.06%iiio .'/.by, A////4'o//L As%/pccu~n r .'

oh'/o 7 g/o

<. ~ ~ S E>4 <>> ~l< FPu<DATiwAf

+ aucu.

I CAL 8Y

~g No 4'CIL/ZA~

oaovp Sheet M of ~Shte.

F l (I 4) SK 5'u)

- ~ c $ 5 .5 < 8+ - W CdiV'f/~ =

,o

D 7P/0 l.

8g 'Wi> Ssdrss gp~~ PF~ouwmw~+irg: 7( ':/gyp'~<

~>eA iud +u+swrs >/gvw.worww

@/<~ dN>~c 7o P~~c" Pw dwy~w

/ ~ j 4'~size~~~

gi pg,

/oAyzcwy~c

')

4'e Fp) =

WP~)

H Pc/'file 5 jeers J~~ goer =~.- ~~

~~ =

Pve rp kc~rwq i/~ ggjjgY, 0

C5 z

I a

il g J

su~m +86/PE ON +@nba/7/PW ~gp. C- J: i" MRG. No. -E(O 5A Qwet of ~~%4.

x 0

I I

~ <fg 3

bh C4-Z3(4' 7S)

/2 x

0 I

C9 z

I

~<< ~zz JL

~4.io c~os~

.zs 3 y ro '" Z~e

/JY- Z Q~

0 DS.S ZD3'0 io = Z/p, 37 xl0 zo /gaa g .

5 pic'+c Cc h's7 lh'FRzzs uir4 a~~v-y:

A'p I / /

~P goLTS 2l9,37>./0 5.p x ro 5.@gal x /0 Cd~~ s5sw r~"

A-A gZSg /o

~ ) ~

~~ Fk'/r/Pr A fuuPddziu// oaoue CAL BY

~RG No W g OY64 ~ Sheet ~~ of Shte.

/E4. 4 z.~

. Odd&

4ryz~c A +u~a///ruN; O

use Lk r HrrupE -Wc~ /ou//ORnu// ur.rz Ckr XA'c:

Jig~ ~ /~~sruti.

8) F<ung gwsAwsw S/uWc'HW +i'm/ .'zEu =

QS7 As, g~s/s azw/rr pu~er x

O

/ =.04dN 'XwC. Pju, g) ~ s/o 4>~uurb

+= 8/parr/rN = . 2~ co g. gag, g gpss z

K 75oi. ru~/ C+aoe S3 0 ~~~zCz.~),= id<-le ~'< .

~crs

5) Cl &'rPilA'$ 5jgp(g

/ZcRc err Po giv4rrru 4/puu cb A/ 5/p

'Yw B$ "

/f/P/O D',p

' J' zi

/I,gag (Sl QGES oH SAhl.LEs 7 CR~AS <Cc.7>apJ OF COM HD2 (T u FOUN DA'TI0H 60(1)

++4/A 8' w Fp~A////J/4//'YPF GROUP

~Rg. N<> k-S/0'/A /0 CAL BY e)/w/r~>r /cA~/m tw Aces Pic'o //y//jew///t':

us~~< 4 /+ed~ 4zwx~~z~~ c~ c = 4 z.

(/Arm gzEuc n//(gc'y /eupcuys ////////<~

Cf~srr~~~r X~/x A.~)

2= Aw,A~~ Pr~ = Z/~

X O

/ - /Ai////a /o+gw - @os des -Fj . PAP'w. XA c) 7~ <8+

z~~ e, A ((zP@)

c8 (y. z.)(Z. xx/)

" X gP~ 00< Q 0

fee CO X

0

0 I

QiVr,rate- giY tl&h/87iVpl '" ~

~

GROUP TYPF RG N~ +- /096 // Sheet of Shte.

CAL SY

~s

/

7 = r ~o/7 r fzAnt Ezj'PcPsr SPE<148 ZnP/E +4 6.<

+- g~yt/iFzM =

9 = //l A~/> ) -iHC~'>~8 (pg) = P/g/fg ~) = /o 776 6

! =

~

/o7766'(, 2)

~/p) 6,Zog.

<j F><iN ~rMS =

( rcw&oa Cw gers)

P~~l~r~( SEJM /L =

/8 5 / I /'s/

4'4arw'Cr Sw/os s'z

/od 0, 3 Esp

+ pdwl~lc" Sea'sue 5 9$ r 3 f'sl 3z 6/,9 aa

5) scrag PF 5$ FE/Y,

/8'gvos/Ed

+E y/B'av AFF+~<+y- ~+J<it'Ides

~uAP~rnw Mrs, h PA&i<rivx~c. +aserrv~swiA g/lg gg Jgr PP gjP gcs8d.cQ P(rrre~r ~/aa~iWe,<'gzyp~+r (S~ss. fr~ri~s:

+$ gp~ + oPA84Xi4~

sUMKT TYPE CAL BY

......~RG. No. ~ ~

oaove Sheet ~ of ~~ Shta.

z 0

Fi~v~ lAloklHirlklopl P4Tc~lAL 5/diiFic~7r~h'f.

z 0

Q z

K 0

E8/cpwE'iY fpuHorg/'roAI

~

GROUP gg N 5 00009k~ Sheet of Shh.

CAL BY hde z

0 W /%dr dF rsrugg- swdN4 -/Sw&'riuw gers los I jg Pip/Pop'<gr$d/J'WIC 5W

~, = 8+/rw 8 =

~6,+/rrr.

z 8, =<LOr+

0 8 4 Q =,oe9'8 =.ot"/(I8IS) =

4' ZZ./+

z I o< P~ >) = 9! oo+ err

~ji+ - ~~p(~ ~~)+- / 256 rrr 0

o

CALCU.

Ew&Ne gw Wiu&4PJ~

TYPF CAL BY

~G. No.

oaom Sheet lo of ~ Shts.

z 0

/J Y Scdstrtutlug (g /rrro Qi 'oiN4 y Sug&8rrn/4 Jlr l OLmcuW4,'

X 0

0 x

'" fur~ ag-.

0 pq cx437

GRoUp r z.C 't Sheet gJ of J.. Shts, Inrccc//ri//r, g~.co:

1

/

/

P Pc/(x M) $ //(w-oL) j p// (x-$)g + C3 X

0 y

/ "/ g / (X ~L)

'3 cL)-

I Q~

E p~(gg e ~~ Pc( Cy

] I

+

X 0

0 X

0 8cZcc<rrc/o/,'

SPA///'G Lo//cm'//r lu Lciroiuyg

I gUgpg ZiVW/A + Pp 845PPA /fdic oooo MG. Ro. ~ Sheet~ of 7$ hh.

Date

/Z4 s~c

8) /E.~ i8i~A4f~ gg~r J~i5 CPA~~

g ~~zcrrum~c ~a~wc g7wru ~w +wuzmw WoaWaaWru~ .

P" X~ew ~ r ~~~a = (P~) ~ ( +~~c~ Pu~ Sr7~e+w .

/or gS

/ Pd&E/c'>c'clxwzg ~c'cw)

= ld/ 6' (i vJc'Eo. ~oog- prpr,z3 = zunis-wd@

e~ WwlcleeAr ~

Q 5 +$ /zc c vf

caecU.

cuuiw~ ck X~w8/jail f"Shoo'Pi/M SUEJECT eaoUp CAL BY Sheet ~ of Shit.

~oo~zi > rgro

~//c1ro 1 '>> j/ Saf/

rs/o'vd

/+pe//48'//n// 4/047. F~B/A ~z Nc Ac uAc

/pe /o ///F ////oF/ower. Pnwr:i +6"/s//~@

g~r/~ +cP/ //82'0/?/PcvYE/Pc 7sis /8'o/- /so /ipAe //f P/r/// .

/u Xrt~ /auwda/~w Aces go~ Wo 5M> M/e 4nwds'.

~ ~

>~E~ EIIIrIIIIC.P'OWIII47IoII oaout RG. No.

f'- 5-~Do o&PJW Sheet ~

/ / of ~l~ Shto.

III Moof OF FAllVFE SHcno- ill FouuoArloH Boa rS bul:

To Sogt>o/7'Ai s6IRWIC- I.oh,JIHAD, F=(FI ~> t.urh CW'h~ tg(ZS'O) =

FRom P PF'g,

" I OO 'fl L I c T to H W8'/citaly FgloT ) ~pl ~ 'Io 9ol'L).LE 'tI l 9 7Pd QEscu E:tnt i'd r orred/7i'c h' +YE

~A IH 6 88$ E rj cf uM Po SHCJ+ For2i 85 Tc F4+WSW j7TE8 EO 7M Fpc aOarroN got.rS.

LINEA 3E f oubNA <ro N goer w iriHl. revctoo ) jt'. F tom l I9u Wogttt < )Le- -o Rove CTtH II.'3IR 6 I )gQ GEE.T'CS l ToQ.QVG = l %CO -~s<0 Fr- imp Ftt+M bCt the OC +AC NNC CH15 4 i) l r'Iti'C, (

5QP C.=,~ b .-

(r>-cc)(.tug cb 7p Ooo L6~

hQ VIlIl&k.C Mttad; ~Q. A~

"- LSg tel SHAR< p< = 2, 6 ie 7- =-= t<9IY.i

~f>9 III IN

.',G 4$ 40~%%. 5ccito 4 n 3.16 pig Ag ~

rt.(

5pg~g g:, ),Q 76 ( ll iver/~ r . 9V75 "t

g. 76 /H cg F.~., (ualaa')

4 icalo lirl.9 I

~ g p 5 r

-. (6)(lo(o~o) ivv<<l l b~F~. (~.~ay)-

]999>

v1'3

EWp/A/E t/+ ~~~~gQ Sly~ <

aaovv ....

CAL SY 6 No

- 0 Yd<W Sheet ~ of MZ,Shts.

o

/ ~d~ ~F Hh~uP< ocul% '/ ~N E H~~4'J>4 fane i6'. 4: 7 =.pion~~~ /

FZow ~sP~us~ fjwcXm& Cw>wg . Fire = gd.7 grf4A'ri l~HgZ 8A rifpl/i4 x sic 5')

M~ 8~x 4cdg, O

I Ck. w)

(P~~~ w) 0 c>) f'~~ IZocA/A di, (p ~)

F~

X O p/ (pic,~iz~~+g

= rs<

X w= wg) =(q,>~a):~~) = see.~V ~>;>>

/J/< (lib> /)6 l9 ) pg~~ L/If a

L CALCU.

&CIIIO @~yAIDHTi~II "

c-.j. ~

~

GROUP iYPE ~RG. No.> ~~~ "~< ~ Shoot of Shta.

CAL SY C 4r~/>Cu44 r)//oc44$ ///op/ P~A/Pp//r//c 6/fislc i) ~upas gC~qL/W

///~ ju/a/8'/- QcM +i+//'rc-///II@ Zu~~5'Ad

/+~ILo+Flg/~E +8 g+4P c4'4~~>/II'I/ 'C8 0'/IWCy X

0 JFx2c sr Pew/'//Ir//II<~o+

rI FaW >C///4c FCr~r~rS lp r-put-g.

(gl/IS IJ PVEPII'dII'SFNVllIILI'P DOC ~

r//E rp/~ocrIn/'E coI/I/IIJ

4) 'gdcrs g~ I /I/'I/g$ E:(ddiuoI4$ )

O ~ a ef~<rrwq Z, 3+

Z/

j

.7a ZIO ~ 4DZ P e) 5plcrf /8cpo/2, yy = 7<, uc //. 'L

/0 WPI, J'>OC C ~/

~3o Z4 7Z

SUBJ~ ENGINE ON FOUNDATION- GROUP I

TYPF G. No. Sheet ~> of ~> She.

CAL BY CONCLUSIONS<

P >4 )

POUNDATXON BOLT F S

~

2 4' j F THXS SAFETY FACTOR IS DUE TO THE PREIOAD ON THE FOUNDATION BOLT AND OCCURS ON THE LOWER PART OF THE 3-PIECE BOLT, FRXCTXON BETWEEN THE ENGINE AND FOUNDATION ALIDW NO SHEAR OR BENDING IN THE z BOLTSE SO THE PRETENSIONS BEING CONSIDERABLY 0

GREATER THAN TZNSIXZ IOADS CAUSED BX ENGINE ROCKING, IS THE GOVERNING FACTOR.

0 XI ENGINE MOUNTING FLANOES: R.S. - <<.23 (P.Z6) v FREQUENCIES:

((')

k A) ENGZNE ROCKZNG: F 3 9:('PS THXB IS VERY CONSERVATIVE BECAUSE XT IS cr'p BASED ON FOUNDATXON BOLT EIDNGATION AND THE PKDENSION SHOULD ALMW NONE ~

B) VERTLCAL -' . ~ 44 CPS v3

Coo Componene Po. 2-086- ISO-~ Claia ~l pazpicular area Any Yes ~ No che Seismic Roviev Team should pay (If yea, check icema that apply. )

extra actontion cot Anchor Anchor Anchor Type Diameter Spacing ~ /

Anchor Number Anchor Embedment /wG~A Anchor Edge Distance~

Anchor Gap

'Anchor Thread Engagement Anchor Grip Anchor Angularity Concrete Crack Others (describe briefly)

IE chere ia concern. for Design Basis Discrepancy, circle the applicable itom and explain.

l. Hardvare maintenance Type Discrepancy
2. Drawing UpWt ~ Type Discrepancy
3. Significant Operability/Dosign Basis Discrepancy Others Condition:

k) ORB Actions Taken:

Proparad By T. Dato 1-~-'V ~

~ K A

~ ~

r s s ~ ~ ~ ~

y P

~ 0 ~ I

~ ~ ~

o ~

~r N

I

'P e

MPWi. '

I I

~ o s s

~

L PV

~ 0

/~ y~ //

/

~

~ i r

0

~ ~ 4

~ ~

~ a ~ ~ ~ I P

~ ~ ~ ~ P ~

~ 8

~ ~ ~

~ e ~ o ~

P e y I ~a

. I O~ O~ O~ 0>>

~

I ~

P I ' I

~ '

o I I g

~ P

~I iifr./ / r

~ ~

~ ~

<<1Z CHP >Ox l. CCD. O1 g ATTACHMZHT No.

Equipment No.: ~g No.: /2-Z4C8 l3 Anchor type: UD A CHEART PF~~ Dia: Dwg No.: /Z-30T5A, g Tightness established by: 0 "Snug Fit 0 Torque Torque Wrench No.: QA Cal. Due Date:

Tightness verified? 0 Yes 8, No Date:

ons r c zo Equipment base flexible? 0 Yes 8- No 7 Date:

ons uc ARE P YSICAL CHARACT RUSTIC Bolt ZD H'omments Gaps /Arpa7 eRMJ -. - bV CE.SS B pv A c oPQ

-Cu'AGL Anchor len th 5 S -5" S-4 s-(" ~ ~ + Pc. R. 'Dw&.

~ -"/z-Zo~:A, 13 ll Protruding len th Embedment 5 - I/g

/I 5 -III S-Ig3/l 6 -ling g II g-2. S- /II I ~l I ll I~( 5-l~ S-lg, 3

/Cn Bolt ll I'll Z~ 5" I/

2 /)(

ri Z zg /b /& I(. 2/&

Concrete gk CK condition Edge V '~e" ly/I distance Il p /I S-B~ II Z'~ /3" /3 II gll s

Anchor acin 5 cg~ 5 S ~~ S~

Anchor 0" an larit 0V Thread Ol( old oh OK oK.

engagement Comments: W A C. AC.Q H F:C.OOR C AT'I&6- WA A,. H RS PRF-SP.=& ~,

Verified by: Date:

Qual. /Cert. Xnspector I

Reviewed by: T INDIANA Date: I->- J~

Construction ESIGN CONTROLLCD WORKING COPY SEP 08 1998 I.CRK ~ '~~ age 2 gvi<IoA of 3

~ /

S 8 A 12 SHP 5050 NDE-008 DEt'ARTMEt'GHTROLLED Du CUt4tNT ATTACHMENT NO- 1 COPY NO. ULTRASONIC TEST REPORT JOB ORDER NO ~  : REPORT DATE: REQUEST NO. (Q ) Q IDENTIFICATION TECHNI UE Unit Test Unit/ S/N k. S Component - pr E,. 0 -C Freq./Diameter S Item Reference Standard Material C. & Couplant/Batch No.

Other TEST DATA REMARKS c-S-Qvc ~I

'/z PERFORMED BY:

REVIEWED BY: LEVEL: ~ DATE:

(

FORM NO. 12 SHP 5050 NDE. 008-1 Page 1 of 1 Revision 1

Uatabase: K: SSEL2C. DBF Equip Xd: 2-All Train: NA Equip Class: 20 Drawing No.:~ NONE~

nction:~

System: EQUIPMENT CONTROL AND XNDXCATXON STATXONS Equip Desc: AUXXLIARY RELAY PANEL All Building: AUXXLIARY Room: CONTROL ROOM Elev: 633 Sort: S, Notes:

Normal State: Desired State: Power Req'd:

Support System Drawing:

Req'd Support Comp:

Safety Related Status: NUCLEAR SR Min/Opt: MIN Alias No: Power Train:

Comp Served:

MFR Model:

Elem. Drawing:

Wiring Drawing: 2-92071 Power Source:

Walkdown: F Relay,Eval: N Comp Type: INSTRUMENT/RELAY RACK Xso Drawing:

Location: XN THE NORTHEAST CORNER OF THE ROOM

0 T

D. C. Cook Unit 2 GIP Rev 2, Corrected, 2/14/92 Screening Evaluation Worksheet (SEWS) Status: Yes

'Sheet 1 of 8 ID: 2-A11 Rev. 0 Class: 20. Instrumentation and Control Panels and Cabinets Descri tion: AUXILIARYRELAY PANEL A11 Building: AUXILIARY Floor El.: 633.00 Room, Row/Col:.CONTROL ROOM - IN THE NORTHEAST CORNER OF THE ROOM Manufacturer, Model, Etc.:

SEISMIC CAPACITY VS DEMAND Elevation where e ui ment receives seismic in ut 633.00 Elevation of seismic in ut below about 40'rom rade rade = 608.00 Yes E ui menthasfundamental fre uenc above about8Hz est.fre uenc =11.00 Yes Ca acit based on: 1.00'Boundin S eclrum Demand based on: 1.00

  • Desi n Basis Ground Res onse S ectrum 0.850 LIN 0.000 1.00 LOG Hz 33.00 Capacity ..... Demand File Record Ca H:tGIPLGIPts ectra.des Label Boundin S trum ac'emand 1 H:$GIPIPROJ0059ts tra.des BUILDING Grounds ectrum ELEVATION BROADEN Demand 2 H:LGIPIPROJ0059ts tra.des BUILDINGGround S ectrum ELEVATION BROADEN Does capacity exceed demand? Yes

D. G. Gook Unit 2 GIP Rev 2, Corrected, 2/14/92 Screening Evaluation Worksheet (SEWS) Status: Yes Sheet 2 of 8 ID: 2-A11 Rev. 0 Class: 20. Instrumentation and Control Panels and Cabinets Descri tion: AUXILIARYRELAY PANEL A11 Building: AUXILIARY Floor El.: 633.00 Room, Row/Col: CONTROL ROOM - IN THE NORTHEAST CORNER OF THE ROOM Manufacturer, Model, Etc.:

CAVEATS - BOUNDING SPECTRUM l&C/BS Caveat 1 - Earth uake Ex erience E ui ment Class Yes l&C/BS Caveat 2- Com uters and Pro rammable Controllers Evaluated Se aratel N/A l&C/BS Caveat 3 - Stri Chart Recorders Evaluated. N/A l8 C/BS Caveat 4 - Structural Ade uate. Yes l&C/BS Caveat 5 - Ad acent Cabinets or Panels Bolted To ether Yes I8,C/BS Caveat 6 - Drawers or E ui ment on Slides Restrained N/A 18C/BS Caveat 7- Doors Secured. Yes l&C/BS Caveat 8 - Sufficient Slack and Flexibilit of Attached Lines. Yes l8 C/BS Caveat 9 - Ade uate Anchora e. Yes l8C/BS Caveat 10 - Potential Chatter of Essential Rela s Evaluated. Yes I&C/BS Caveat 11 - No Other Concerns. Yes Is the intent of all the caveats met for Bounding Spectrum' Yes ANCHORAGE

1. The sizes and locations of anchors have been determined Yes
2. Appropriate equipment characteristics have been determined (mass, CG, natural freq., Yes dam in center of rotation .

~

3. The t e of anchora e is covered b the GIP Yes
4. The adequacy of the anchorage installation has been evaluated (weld quality and length, Yes nuts and washers, ex ansion anchor ti htness, etc.
5. Factors affecting anchorage capacity or margin of safety have been considered: Yes embedment length, anchor spacing, free-edge distance, concrete strength/condition,-and concrete crackin .
6. For bolted anchora es, an a s under the base are less than 1/4 N/A
7. Factors affecting essential relays have been considered: gaps under the base, capacity Yes reduction for ex ansion anchors.
8. The base has adequate stiffness and the effect of prying action on anchors has been Yes considered.
9. Thestren thofthee ui mentbaseandtheload athtotheCGisade uate. Yes
10. The ade uac of embedded steel, rout ads or lar e concrete ads have been evaluated. Yes
11. The anchora e ca acit exceeds the demand. Yes Are anchorage requirements met? Yes INTERACTION EFFECTS
1. Soft ta etsare free fromim act b nearb e ui mentorstructures Yes
2. If the equipment contains sensitive relays, it is free from all impact by nearby equipment or Yes structures.
3. Attached lines have ade uate flexibilit Yes
4. Overhead e ui ment or distribution s stems are not likel to colla se. Yes
5. No other adverse concerns were found. Yes ls equipment free of interaction effects? Yes

D. C. Cook Unit 2 GIP Rev 2, Corrected, 2/14/92 Screening Evaluation Worksheet (SEWS) Status: Yes Sheet 3 of 8 ID: 2-A11 Rev. 0 Class: 20. Instrumentation and Control Panels and Cabinets Descri tion: AUXILIARYRELAY PANEL A11 Building: AUXILIARY Floor El.: 633.00 Room, Row/Col: CONTROL ROOM - IN THE NORTHEAST CORNER OF THE ROOM Manufacturer, Model, Etc.:

IS EQUIPMENT SEISMICALLYADEQUATE? Yes COMMENTS Date: 11/1/93 SRT: Satyan Sharma (AEP), Paul Krugh (AEP), Steve Anagnostis (S&A), Randy Steele (AEP - Relay Engineer)

References:

1. Anchorage Package
2. AEPSC USI A-46 Project Report No MT2, Rev 0, "Summary Report of Fundamental Frequencies Determined by ln-Situ Transfer Function Modal Testing at Cook Nuclear Plant", Aug 1994.
3. Drawing No 12-3388-3 A11 -15 form an 10"-2" long x 8'all x 2'eep control panel. The panel is constructed of welded steel plate, angles, and channels. The panel is welded along the front to embedded steel at 4 points, and along the back at two points. A11 and A13 contain essential relays.

Based on modal test data of similar panels in the control room (Ref 2) the SRT estimates the lower bound

~

fundamental frequency at 11 Hz.

The overhead control room ceiling and raceways have been evaluated as part of the raceway walkdown and judged acceptable - see the control room PASS form for details.

There is a door at the far end of the A6-A15 bank that is commonly left open. The door could, strike the panel, but the SRT judges the impact is far enough away from the essential relays not to be significant.

There is a ladder secured against the wall in front of the panel - it is secured so it will not strike the panel - judged acceptable.

There is a fire extinguisher hung on the end of A6 that wilt bang against the cabinet. The SRT judges that it will not affect the essential relays in A11 and A13.

Anchorage:

1. The anchorage package shows details for 1 of the four front edge weldments - the others are similar.
2. The back edge weldments were not detailed - the SRT added these details to the anchorage package.
3. The SRT conservatively estimates the weight at 300 Ibs/ lineal foot.
4. The strength of the weldments is equivalent to at least a 1.5" x 1/8" fillet weld (4 kips per GIP Table C.6-1).

The embedded steel is a 5/16" steel plate anchored with a 1/2" x 4" Nelson stud every 12" (4.4 kips per GIP Table C.3-1 including a .65 knockdown for embedment length). The weldment controls. The attached ANCHOR analysis shows a margin of 3.3.

D. C. Cook Unit 2 GIP Rev 2, Corrected, 2/14/92 Screening Evaluation Worksheet (SEWS) Status: Yes Sheet 4 of 8 ID: 2-A11 Rev. 0 Class: 20. Instrumentation and Control Panels and Cabinets Descri tion: AUXILIARYRELAY PANEL A11 Building: AUXILIARY Floor El.: 633.00 Room, Row/Col: CONTROL ROOM - IN THE NORTHEAST CORNER OF THE ROOM Manufacturer, Model, Etc.:

Evaluated by: Date:

Attachment:

ANCHOR Report

D. C. Cook Unit 2 GIP Rev 2, Corrected, 2/14/92 Screening Evaluation Worksheet (SEWS) Status: Yes Sheet 5 of 8 ID: 2-A11 Rev. 0 Class: 20. Instrumentation and Control Panels and Cabinets Descri tion: AUXILIARYRELAY PANEL A11 Building: AUXILIARY Floor El.: 633.00 Room, Row/Col: CONTROL ROOM - IN THE NORTHEAST CORNER OF THE ROOM Manufacturer, Model, Etc ANCHOR Report Response Spectrum: Instructure Realistic Frequency: User - 11.00 Percent Damping: User- 5.00 S ectral Values:

Direction Acceleration 's North - South 0.314 East - West 0.314 Vertical 0.183 Angle (N-S Direction makes with the X Axis): 0.00 Combination Criteria: SRSS

~eicehts:

Number of Weights: 1 No Wei ht 1 3000.00 60.000 0.000 50.000 Forces:

Number of External Forces: 0 Moments:

Number of External Moments: 0 Allowables:

Anchor:

Number of Anchor types: 1 Tension Shear Ultimate Ultimate Inter Inter Saf Dia Manufact Product Tension Shear Coeff Coeff Fact 3/8 Hilti Kwik-Bolt 1460.00 1420.00 1.00 0.30 1.00 N

Concrete:

Ultimate Stress: 3500.00 psi.

Reduction Factor: 0.85 Weld:

Allowable Stress: 30600 psi.

D. C. Cook Unit 2 GIP Rev 2, Corrected, 2/14/92 Screening Evaluation Worksheet (SEWS) Status: Yes Sheet 6 of 8 ID:2-A11 Rev. 0 Class: 20. Instrumentation and Control Panels and Cabinets Descri tion: AUXILIARYRELAY PANEL A11 Building: AUXILIARY Floor El.: 633.00 Room, Row/Col: CONTROL ROOM - IN THE NORTHEAST CORNER OF THE ROOM Manufacturer, Model, Etc.:

Surfaces:

Number of Surfaces: 1 Surface Orientation Direction Direction Direction Com Com Com No 0.000 0.000 1.000 Anchor Pattern for Surface ¹1 gY Legend for Anchor Patterns Anchor Bolts:

Concrete Vines: ~Ppgy(Peg!P Concrete Points: ~5m+

Weio uncs: ~5~5

~Geomer Anchor:

Number of Anchors: 0 Concrete Lines:

¹ of elements per line: 1

D. C. Cook Unit 2 GIP Rev 2, Corrected, 2/14/92 Screening Evaluation Worksheet (SEWS) Status: Yes Sheet 7 of 8 ID: 2-A11 Rev. 0 Class: 20. Instrumentation and Control Panels and Cabinets Descri lion: AUXILIARYRELAY PANEL A11 Building: AUXILIARY Floor El.: 633.00 Room, Row/Col: CONTROL ROOM - IN THE NORTHEAST CORNER OF THE ROOM Manufacturer, Model, Etc.:

Number of Concrete Lines: 0 Concrete Points:

Number of Concrete Points: 6 Y Surf Conc-Pt No Coord Coord Coord Id Area 19.000 2.000 0.000 9.000 47.000 2.000 0.000 9.000 75.000 2.000 0.000 9.000 103.000 2.00Q 0.000 9.000 2.000 22.000 0.000 9.000 118.000 22.000 0.000 9.000 Weld Lines:

¹ of elements per line: 1 Number of Weld Lines: 6 Start Start Staa End St Line No X-Coo rd Y-Coord Z-Coord X-Coord Y-Coord Z-Coo rd Id Width 19.000 2.000 0.000 20.500 2.000 0.000 0.125 47.000 2.000 0.000 48.500 2.000 0.000 0.125 75.000 2.000 0.000 76.500 2.000 0.000 0.125 103.000 2.000 0.000 104.500 2.000 0.000 0.125 2.000 22.000 0.000 3.500 22.000 0.000 0.125 118.000 22.000 0.000 119.500 22.000 0.000 0.125 Determination of Reduction Factors:

Reduction Factors Data Current: Yes Anal sis Results:

Analysis Performed: Yes T eofAnal sis:Re ular S ectral Accelerations G's No N-S E-W Vertical Safet Factor 0.314 0.125 0.073 13.973

-0.314 -0.125 -0.073 8.111

-Q.314 0.125 0.073 13.973 0.314 -0.125 -0.073 8.111 0.314 -0.125 0.073 8.500

-0.314 0.125 -0.073 18.535 7 0.314 0.125 -0.073 18.535

-0.314 -0.125 0.073 '8.500

0 D. C. Cook Unit 2 GIP Rev 2, Corrected, 2/14/92 Screening Evaluation Worksheet (SEWS) Status: Yes Sheet 8 of 8 IO: 2-A11 Rev. 0 Class: 20. Instrumentation and Control Panels and Cabinets Descri tion: AUXILIARYRELAY PANEL A11 Building: AUXILIARY Floor EI.: 633.00 Room, Row/Col: CONTROL ROOM - IN THE NORTHEAST CORNER OF THE ROOM Manufacturer, Model, Etc.:

0.125 0.314 0.073 7.505 10 -0.125 -0.314 -0.073 3.290 0.125 -0.314 0.073 3.352 12 -0.125 0.314 -0.073 8.921 13 -0.125 0.314 0.073 7.505 14 0.125 -0.314 -0.073 3.290 15 0.125 0.314 -0.073 8.921 16 -0.125 -0.314 0.073 3.352 17 0.125 0.125 0.183 12.626 18 -0.125 -0.125 -0.183 7.842 19 0.125 0.125 -0.183 37.028 20 -0.125 -0.125 0.183 8.816 21 -0.125 0.125 0.183 12.626 22 0.125 -0.125 -0.183 7.842 23 0.125 -0.125 0.183 8.816 24 -0.125 0.125 -0.183 36.553 Minimum Safety Factor: 3.290 The anchorage can withstand 3.290 times greater seismic demand

I

    • 12 CHP 502 1. CCD. 019 ATTACHMENT NO. 1 CT 0 Mop < H E+SI- coR+FR, O(= l HE'ROOM Unzt Bldg- Location z-maw'- o Installation dwg. / Rev. Equipment No.

Anchora e Arran ement Sketch AVx, Pa.LA,Y PAMC-LS A-II T'HRL( A-IS I'BR DMS I, 2,-Zg'I'F-lo 2-SS'<0-0

? -C4 4<A- I g~ 2."ZZ'46- I lg

/o-? p~

A-IS Q-0 SEC DE,r4.I L I IHOIAHA t(IICHICAH POW-A

'(z, g I '!'a xS 4 SH(n SITE OESIGH COHTAOLLEO WOAKIHG COPV ELev. VIEw LYG-,

SEP 21 1995 EAST'LEAK

+

Drawn by: Date: /

Verified by: Date: ga. g9 Qual ./Cert. inspector Reviewed by: F Date: I- t3 Construction Anch r Review Engineer page 1 of 3 Revision .3

~ fq

    • 12 CHP 5021 CCD p19 ATTACHMENT NO.

NS CT 0 T yCR + E4gl COB.IVI=-R V 3F T F.~WH Bldg. Location Installation dwg. / Rev. Ecgxzpment No.

Anchora e Arran ement Sketch E

~A ) ~~ ~i t.A '

( g ~ ~I ~ ~'9v D~CD

~~

"S~~

V

~/tb gltVC ~ 'SK4 <~

1 ~

os~e')

I I

V9

~~

r I 'Lk~ ~~VS ~

~28'Z8 ~IB~Q S> D

~/I (6~ ~ 28 II I lg

~II I I

~ I 28 2B ZB ZB 'Ie ZE:E: DF-1 AIL I CTI "A A'A ..'NOIAtIA MICklGAt( POWER SITE OESIGN Cott TAOLLEO WORKING COP'f SEP 2i >99<

5t

~o (I.

~~A = jhrPCCF S5]BLK LEAK T Drawn by: Date: /y 3 Verified by- Date:

Qual. /Cert. Inspector Reviewed by: Date:

Construction Anc or Review Engineer Page 1 of 3 Revision

""~4 <Ha'021.CCD oa9 ATTACHMENT NO. a CHOR INS CTIO Equipment No.: .: 2~22 eV Embedded Steel Dwg. No.:

H S ICAL CHARACTERIS C Weld ID WJ WZ W3 W< WS Weld e Codes T e I I I TAcK. I W7'z"

/II' 1 = Fillet Size =

Len th y// g I/

3/'l 2 Plug/Slot 3 Groove Cracks Y 0 No Lack of Ye Penetration No Porosity Yes o o o 0 No WI IS WELD Pb oN 1=OUR S(DE.S, WQ Y8" L/hrQE.R CV1 W3 +8 ClhJC)BQCL/ 7 W 4. /4 LrNDCR Cu T

'/4. UIVO E:P, CU t.

4v Cg /4 UMDL=RCV T'8 I2

/4 UADERII cvT Q HOLW WIt-H WASHSR5 3 RMBE.@DE 0 Ia 8 I

~

C 4l X 3 X~ PING LI:-

0 3 HAGI, a WI SEc.TIo~ e E'aYAIL- I S E.c-~101 C C.

Equipment base flexible: Cl Yes E No ons ruc son re Reviewed by: Date:

ons ruc son c or evzew ngzneer Verified by: ua . er . npsec or Date: 5 +

Irrl)IANA FiIICHIGAN PO'V/FTI SITE OCSIOrr Cotr TIIOLLt.o V/OII~Ir G COI V SEP 2 l 1993 page 3 of Revision

ATTACHMENT3 TO AEP:NRC:1040E SAMPLE SEWS, ANCHORAGE CALCULATIONS, AND ANCHORAGE INSPECTION DOCUMENTATION FOR TANKS Ec HEAT EXCHANGERS EVALUATED FOR USI A-46 THAT ARE NOT COVERED BY THE PROCEDURES IN SECTION 7 OF THE GIP RAI ITEM 5

This attachment includes sample SEWS, anchorage calculations and anchorage inspection documentation for a cross section of class 0 and 21 tanks and heat exchangers that are not covered by the procedures in Section 7 of the GIP. The samples selected are designated with an

  • in Table 2 and 3 of this RAI. The following examples are included:

lass 1- T-113-AB1 21 1-HE-13 21 1- 21 1-'I'K-11 21 1-'1 K-37 21 2- -11 21 2- -3 21 2- -134- D

Equip ID: 1-QT-113.-AB1 Train: 1 Equip Class:0

" wing No.: 1-5151A tion: EMERG DXESEL System: DIESEL LUBE OXL Equip Desc: AB EMERG DIESEL PULL PLOW LUBE OIL STRAINER 1 Building: AUXILIARY Room: AB EMERG DXESEL LUBE OXL PXT Elev: 579 Sort: S, Notes:

Normal State: Desired State: Power Req'd: N Support System Drawing:

Req'd Support Comp:

Safety Related Status: NUCLEAR SR Min/Opt: MIN Alias No: Power Train: NA Comp Served: LUBE OXL STRAXNER 1 MPR: NUGENT 1' 1554-4L3B P l Elem. Drawing: N/A Wiring Drawing: N/A Power Source: N/A Walkdown: A Relay Eval

Comp Type
STRAINER Xso Drawing:

Location:

DC Cook Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet1 of11 ID;,1-QT-113-AB1 ( Rev. 0 ) Class: 0. Other Descnption: AB EMERG DIESEL FULL FLOW LUBE OIL STRAINER 1 Building: AUXILIARY Floor El.: 579.00 Room, Row/Col: AB EDG LUBE OIL PIT, Manufacturer, Model, Etc.: NUGENT 1554PL3B SEISMIC CAPACITYVS DEMAND

1. Elevation where equipment receives seismic input 587.00 Elevation of seismic input below about 40'rom grade (grade = 608.00) N/A Equipment has fundamental frequency above about 8 Hz (est. frequency = 8.00) N/A Capacity based on: Judgment
5. Demand based on: 1.00 'ealistic Mean-Centered Floor Response Spectra File Record Ca acit Demand 1 C:LGIPtPROJ0031tspectra.des BUILDING uxilia ELEVATION 587 BROADEN N Demand 2 C:<GIPIPROJ0031'Lspectra.des BUILDING uxilia ELEVATION 5S7 BROADEN N Does capacity exceed demand' ANCHORAGE
2. Appropriate equipment characteristics have been determined (mass, CG, natural fretful., Yes damping, center of rotation).
3. Thh pe of anchorage is coveredb the GIP. Yes
4. The adequacy of the anchorage installation has been evaluated (weld quality and length, nuts Yes and washers, expansion anchor tightness, etc.)
5. Factors affecting anchorage capacity or margin of safety have been considered: embedment Yes length, anchor spacing, free-edge distance, concrete strength/condition, and concrete cracking.
6. For bolted anchorages, any gaps under the base are less than 1/4. Yes
7. Factors affecting essential relays have been considered: gaps under the base, capacity N/A reduction for expansion anchors.
8. The base has adequate stiffness and the effect of prying action on anchors has been Yes considered.
9. The strength of the equipment base and the load path to the CG is adequate. Yes
10. The adequac of embedded steel, grout pads or large concrete pads have been evaluated. Yes
11. The anchorage capacity exceeds the demand. Yes Are anchorage requirements met?

DC Cook Unit1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) ~ Status: Yes Sheet 2 of 11 ID: 1-QT-113-AB1 ( Rev. 0 ) Class: 0. Other

Description:

AB EMERG DIESEL FULL FLOW LUBE OIL STRAINER 1 Building: AUXILIARY Floor El.: 579.00 Room, Row/Col: AB EDG LUBE OIL PIT.

Manufacturer, Model, Etc.: NUGENT 1554PL3B INTERACTION EFFECTS

1. Soft targets are free from impact by nearby equipment or structures Yes
2. If the equipment contains sensitive relays, it is free from all impact by nearby equipment or N/A structures.
3. Attached lines have adequate flexibili . Yes
4. Overhead equipment or distribution systems are not likely to collapse. Yes
5. No other adverse conce'ms were found. Yes Is equipment free of interaction effects' SRT: Tom Huang (AEP) and George Gary Thomas (S&A) on 10/6/93 REF: 1. Anchor Inspection Data Sheets: Anchorage Arrangement Sketches and Physical Characteristics Data Sheet, Certified 6//6/92 for both 1-QT-113-AB1 and 1-QT-113-AB2.
2. Dwg 0 10-089
3. Worthington Co. Full Flow Oil Lube Strainer Calculation, 8/26/74.

MFG: NUGENT, WM W8Co -1554M-L3B-DN-100 Seismic Capacity vs Demand: The Bounding Spectrum does not apply for Class 0 items. This component is seismically rugged based on SRTIudgement and inspection, and anchor analysis.

Anchorage:

Supported on 4 angle legs. Each leg is anchored by one 1/2" J bolt anchor. The ANCHOR analysis was performed for 1-QT-113-AB1 and 1-QT-113-AB2 together, since they are connected by a relatively rigid piping segment.

Frequency was judged to be greater than 8 Hz.

The total weight is 17305, with the CG located at an approx. mid-height = 33" (Ref. 2).

The minimum embedment of the 1/2" J-bolts for 1-QT-113-AB1 and'1-QT-113-AB2 is 9.125" and was used for the embedment reduction factor for the J-bo! ts.

The SRT also judged the bolts may be subject to prying. therefore a very conservative.5 reduction factor was applied for prying.

ANCHOR analysis includes nozzle loads as specified in Ref. 3, Sheet 15. Conservatively assume that the inlet and outlet nozzle loads are distributed between the two strainers, 1-QT-113-AB1 and AB2, because of the way they are joined (see Ref. 2). Therefore the nozzle loads modeled in the ANCHOR analysis are the absolute values of

DC Cook Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUA'TIONWORK SHEET (SEWS) Status: Yes Sheet 3 of 11 ID: 1-QT-113-AB1 ( Rev. 0 ) Class: 0. Other

Description:

AB EMERG DIESEL FULL FLOW LUBE OIL STRAINER 1 Building: AUXILIARY Floor El.: 579.00 Room, Row/Col: AB EDG LUBE OIL PIT, Manufacturer, Model, Etc.: NUGENT 1554AL3B the larger of the two loads specified in Ref. 3, Sheet 15. The way the loads are defined in Ref. 3," they correspond to the x,y,z coordinate system as follows: c=x, a=y, and b=z.

The ANCHOR analysis even with the highest nozzle loads and anchorage reduction factors, shows a high margin of safety (2.5).

Zap Shot, Wk1, Tm 2, Disk 1, Picture 45 Evaluated by: Date:

Attachment:

Pictures

Attachment:

ANCHOR Report

0 DC Cook Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 4 of 11 ID: 1-QT-113-AB1 ( Rev. 0 ) Class: 0. Other

==

Description:==

AB EMERG DIESEL FULL FLOW LUBE OIL STRAINER 1 Building: AUXILIARY Floor El.: 579.00 Room, Row/Col: AB EOG LUBE OIL PIT, Manufacturer, Model, Etc.: NUGENT 1554<L3B P~CI BKR AB Emerg Diesel Full Flow Lube Oll Strainer 1, 1-QT-113-ABI

DC Cook Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 5 of 11 ID: 1-QT-113-AB1 ( Rev. 0 ) Class: 0. Other

==

Description:==

AB EMERG DIESEL FULL FLOW LUBE OIL STRAINER 1 Building: AUXILIARY Floor El.: 579.00 Room, Row/Col: AB EDG LUBE OIL PIT, Manufacturer, Model, Etc.: NUGENT 1554-4L3B ANCHOR Report gy~gi~g Spectrum: Instructure Realistic

'esponse Frequency: User - 8.00 Percent Damping: User - 5.00 Spectral Values:

Direction Acceleration (g's)

North South 0.32 East - West 0.32 Vertical 0.17 Angle (N-S Direction makes with the X Axis): 0.00 Combination Criteria: SRSS Nciahtm Number of Weights: 2 No Weight 1730.00 22.875 0.000 33.000 1730.00 -22.875 1.000 33.000 EQKQR Number of External Forces: 2 No Fx Fy Fz 1.23E+002 1.23E+002 7.03E+002 0.000 12.000 24.000 3.31E+002 4.02E+002 6.24E+002 0.000 -12.000 24.000

%@arnis of External Moments: 2

'umber Mx 1 8.64E+003 -1.86E+004 6.86E+003 2 3.98E+003 -8.52E+002 2.54E+003 hlhMrat~

haabuc'umber of Anchor types: 1

DC Cook Unit 1 GlP Rev 2, Corrected, 2/14/92 SCREENING EYALUATIONWORK SHEET (SEWS) Status: Yes Sheet 6 of 11 ID: 1-QT-113-AB1 ( Rev, 0) Class: 0. Other

==

Description:==

AB EMERG DIESEL FULL FLONl LUBE OIL STRAINER 1 Building: AUXILIARY Floor El.: 579.00 Room, Row/Col: AB EDG LUBE OIL PIT, Manufacturer, Model, Etc.: NUGENT 1554<L3B Tension Shear Ultimate Ultimate Inter Inter Saf No. Dia Manufact Product Tension Shear Coeff Coeff Fact 1 1/2 Other J-Bolt (90 6660.00 3330.00 1.00 0.30 1.00 deg)

Qaac&c Stress: 3500.00 psi.

'ltimate Reduction Factor: 0.85

~i Allowable Stress: 30600 psi.

Qi~g~

Number of Surfaces: 1 Surface Orientation Direction Direction Direction Comp Comp Comp Nx Ny 0.000 0.000 1.000 Anchor Pattern for Surface ¹ 1 Legend for Anchor Patterns

DC Cook Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 7 of 11 ID: 1-QT-113-AB1 ( Rev. 0 ) Class: 0. Other

Description:

AB EMERG DIESEL FULL FLOW LUBE OIL STRAINER 1 Building: AUXILIARY Floor El.: 579.00 Room, Row/Col: AB EDG LUBE OiL PIT, Manufacturer, Model, Etc.: NUGENT 1554-4L3B Anchor Bolts:

mmmm Concrete Lines: ~mt//+

Concrete Points

.'eld Lines

.'ux; hrzhac.'umber of Anchors: 8 Anch Surf No Id Coord Coord Coord Id

-30.719 -7.260 0.000

-16.531 -7.250 0.000

-30.719 7.250 0.000

-16.531 7.250 0.000 30.719 -7.250 0.000 16.531 -7.250 0.000 30.719 7.250 0.000 16.531 7.250 0.000 0 of elements per line: 4 Number of Concrete Lines: 0 Number of Concrete Points: 8 Surf Conc-Pt No Coord Coord Coord Id Area

-30.719 -7.250 0.000 4.000

-16.531 -7.250 0.000 4.000

-30.719 7.250 0.000 4.000

-16.531 7.250 0.000 4.000 30.719 -7.250 0.000 4.000 16.531 -7.250 0.000 4.000 30.719 7.250 0.000 4.000 16.531 7.260 0.000 4.000

DC Cook Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEvVS) Status: Yes Sheet 8 of 11 ID: 1-QT-113-AB1 ( Rev. 0 ) Class: 0. Other

==

Description:==

AB EMERG DIESEL FULL FLOW LUBE OIL STRAINER 1 Building: AUXILIARY Floor El.: 579.00 Room, Row/Col: AB EDG LUBE OIL PIT, Manufacturer, Model, Etc.: NUGENT 1554AL3B EcldJ.iaaf '

of elements per line: 4 Number of Weld Lines: 0 Reduction Factor Input for Anchor 0 1 Adequately Installed: Yes Embedment Length: (27.25 in. Min Reqd. to achieve full capacity):= 9.13 in.

Gap at Threaded Anchor: 0.00 in.

Edge Distance - Edge 1: 4.38 in.

Crack Size: 0.000 in. - Cracks traverses thru Installation Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factor Input for Anchor 0 2 Adequately Installed: Yes Embedment I.ength: (27.25 in. Min Reqd. to achieve full capacity):= 9.13 in.

Gap at Three'ded Anchor: 0.00 in.:

Edge Distance - Edge 1: 4.38 in.

Crack Size: 0.000 in. - Cracks traverses thru Installation Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factor Input for ..ichor 0 3 Adequately In"tailed: Yes Embedment Length: (27.25 in. Min Reqd. to achieve full capacity):= 9.13 in.

Gap at Threaded Anchor: 0.00 in.

Edge Distance - Edge 1: 4.38 in.

Crack Size: 0.000 in. - Cracks traverses thru Installation Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factor Input for Anchor 0 4 Adequately Installed: Yes Embedment Length: (27.25 in. Min Reqd. to achieve full capacity):= 9.13 in.

Gap at Threaded Anchor: 0.00 in.

Edge Distance - Edge 1: 4.38 in.

Crack Size: 0.000 in. - Cracks traverses thru Installation Essential Relays in Cabinet: No

DC Cook Unit1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 9 of 11 ID: 1-QT-113-AB1 ( Rev. 0) Class: 0. Other

Description:

AB EMERG DIESEL FULL FLOW LUBE OIL STRAINER 1 Building: AUXILIARY Floor EI.: 579.00 Room, Row/Col: AB EDG LUBE OIL PIT, Manufacturer, Model, Etc.: NUGENT 15544L3B Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factor Input for Anchor ¹5 Adequately Installed: Yes Embedment Length: (27.25 in. Min Reqd. to achieve full capacity):= 9.13 in.

Gap at Threaded Anchor: 0.00 in.

Edge Distance - Edge 1: 4.38 in.

Crack Size: 0.000 in. - Cracks traverses thru Installation Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factor Input for Anchor ¹6 Adequately Installed: Yes

'mbedment Length: (27.25 in. Min Reqd. to achieve full capacity):= 9.13 in.

Gap at Threaded Anchor: 0.00 in.

Edge Distance - Edge 1: 4.38 in.

Crack Size: 0.000 in. - Cracks traverses thru Installation Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factor Input for Anchor ¹7 Adequately Installed: Yes Embedment Length: (27.25 in. Min Reqd. to achieve full capacity):= 9.13 in.

Gap at Threaded Anchor: 0.00 in.

Edge Distance - Edge 1: 4.38 in.

Crack Size: 0.000 in. - Cracks traverses thru Installation Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factor Input for Anchor ¹8 Adequately Installed: Yes Embedment Length: (27.25 in. Min Reqd. to achieve full capacity):= 9.13 in.

Gap at Threaded Anchor: 0.00 in.

Edge Distance - Edge 1: 4.38 in.

Crack Size: 0.000 in. - Cracks traverses thru Installation Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes

DC Cook Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 10 of 11 ID: 1-QT-113-AB1 ( Rev. 0 ) Class: 0. Other

==

Description:==

AB EMERG DIESEL FULL FLOW LUBE OIL STRAINEP. 1 Building: AUXILIARY Floor El.: 579.00 Room, Row/Col: AB EDG LUBE OIL PIT, Manufacturer, Model, Etc.: NUGENT 1554-4L3B Reduction Factors Data Current: Yes Anc Pall/ Pallr/

No ld VaIl Vallr RT RN RL RG RS RE RF RC RR RP RB RM 1 1 1398.60 N/A 1.00 1.00 0.42 1.00 1.00 1.00 1.00 1.00 1.00 0.50 1.00 1.00 3330.00 N/A 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2 1 1398.60 N/A 1.00 1.00 0.42 1.00 1.00 1.00 1.00 1.00 1.00 0.50 1.00 1.00 3330.00 N/A 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 3 1 1398.60 N/A 1.00 1.00 0.42 1.00 1.00 1.00 1.00 1.00 1.00 0.50 1.00 1.00 3330.00 N/A 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 4 1 1398.60 N/A 1.00 1.00 0.42 1.00 1.00 1.00 1.00 1.M 1.00 0.50 1.00 3330.00 NIA 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 5 1 1398.60 N/A 1.00 1.00 0.42 1.00 1.00 1.00 1.00 1.00 1.00 0.50 1.00 1.00 3330.00 N/A 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.0Q 1.0Q 1.00 1.QO 6 1 1398.60 N/A 1.00 1.00 0.42 1.00 1.00 1.00 1.00 1.00 1.00 0.50 1.00 1.00 3330.00 N/A 1.QO 1.00 1.00 1.QO 1.00 1.QO 1.QO 1.00 1.00 1.00 1.00 1.00 7 1 1398.60 N/A 1.00 1.00 0.42 1.00 1.00 1.00 1.00 1.GO 1.00 0.50 1.00 3330.00 N/A 1.QO "s.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 8 1 1398.60 N/A 1.00 1.00 0.42 1.00 1.00 1.00 1.00 1.00 1.M 0.50 1.'00 1.00 3330.00 NIA 1.00 1.00 1.00 1.M 1.00 1.00 1.00 1.00 1.00 1.00 1.00 N/A = Not Applicable all Allowabi Pull without Reduced Inspection Vail = Allowable Shear without Reduced Inspection Pallr = Allowable Pull with Reduced Inspection Vallr = Allowable Shear with Reduced Inspection

= Outlier

= Reduction Factor Not Used RT = Reduction Factor for Type of Anchorage RN = Reduction Factor for In tallation Adequacy RL = Reduction Factor for Embedment RG = Reduction Factor for Gap at Anchors RS = Reduction Factor for Spacing RE = Reduction Factor for Edge Distance RF = Reduction Factor for Concrete Strength RC = Reduction Factor for Concrete Cracks RR = Reduction Factor for Essential Relays RP = Reduction Factor for Base Stiffness and Prying Action RB = Reduction Factor for Base Strength and Load Path RM = Reduction Factor for Embed. Steel and Pads Analysis Performed: Yes ype of Analysis: Regular IA elerations (G's)

DC Cook Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUAlION WORK SHEET (SEWS) Status: Yes Sheet11 of11 ID: 1-QT-113-AB1 ( Rev. 0 ) Class: 0. Other

==

Description:==

AB EMERG DIESEL FULL FLOW LUBE OIL STRAINER 1 Building: AUXILIARY Floor El.: 579.00 Room, Row/Col: AB EDG I.UBE OIL PIT, Manufacturer, Model, Etc.: NUGENT 1554-4L3B No N-S E-W Vertical Safety Factor 1 0.325 0.130 0.067 5.843 2 -0.325 -0.130 -0.067 7.456 3 -0.325 0.130 0.067 5.843 4 0.325 -0.130 -0.067 7.456 5 0.325 -0.130 0.067 5.853 6 -0.325 0.130 -0.067 7.213 7 0.325 0.130 -0.067 7.213 8 -0.325 -0.130 0.067 5.853 9 0.130 0.325 0.067 2.478 10 -0.130 -0.325 -0.067 2.756 11 0.130 -0.325 0.067 2.503 12 -0.130 0.325 -0.067 2.695 13 -0.130 0.325 0.067 2.478 14 0.130 -0.325 -0.067 2.756 15 0.130 0.325 -0.067 2.695 16 -0,130 -0.325 0.067 2.503 17 0.130 0.130 0.167 5.114 18 -0.130 -0.130 -0.167 9 385

.130 0.130 -0.167 8.752 20 -0.130 -0.130 0.167 5.040 21 -0.130 0.130 0.167 5.114 22 0.130 -0.130 -0.167 9.385 23 0.130 -0.130 0.167 5.040

-0.130 0.130 -0.167 8.752 Minimum Safety Factor: 2 I78 The Anchorage Capacity is 2.478 times greater than the Demand

SUBJECT F F nM S AIN R GROUP ak G. No. ~~of Sos.

CAL BY PAGE DESCREPTIOH Fig. 1 2-S Frequency of System Seismic leg forces Nozzle loads z

0 7-9 Leg forces due to nozzle loads 10-11 Leg stresses O 12 Base Plate 13 Flolding down bolt 14 Meld of leg to tank X

Q 15 Local Shell Stresses X 29 Recommendation sketch (SK-7940) 30 Summary I

0

JOB NUMBER / 8 Calculations NUMBER "(0

/'/'ILE

SUBJECT:

WC/ -/Ci iC ~ ( Q..( SHEET / OF SY A Y /'A/ OATE~F APP CATE

JOB NUMBER Z5-r d Calculations FILE NUMBER C-<0

SUBJECT:

SHEET Z OF BY ~~1 DA~

APP DATE l

27'r ps S fif FA'r

/~f 0'

Calculations SU6JECT: SHEET Z OF BY A TH/ DATE~

'PP DATE 2 t/

A'47

+Cj Ol\g+Q 4 <<4<<L / gS<<t~

AC AZg Sds 4

N7 4 g<< CF / /2 ~

t S .S" r Se~p~

/0 > IdZ4 gC Q/ Z/

7 /2 B

'i C

rim 0'5' '/

/r

<</P4 f

.rg = .'

+44 g'(

/z w" Q~Z' c FAC( t' F

~ ~

r

/Sgs Car: ~C gJ

/F

Ã

~

4Q <<

~ ~

0 t~,

I I

JOB NUMBER 26 I TdJ Calculations ~" FILE NUMBER EU@EDT: fjordJIVE re SHEET OF Q/g. ~ 1 ~/AJ/E + BY DA APP DATE

~ WcrvOM F~eA r-rW')P 7u~)( ~o>'-.+ 6v S'.~

r~/ ) l-a'gw E

C<<34>EE MOTIF 5

+

Calculations FILE NUMBER

SUBJECT:

LJog~)ply ~y pl SHEET OF 8 654 Or l. ~A/&k4 BV I ~

DATIVE APP DATE

/UA7 V Fzr uw<c o<

7)rr ZZC7 )od r~rJ)C

~p g ( F. " FEZ 5 F. gg~ px~ ~z) x (I S &4S ZC~)AJ C x ~AFEF Q~)my xxlz 'x,assed+ sZ P Is?+PD4 T 9?e t 24/ 7

~7~ /2d 0 cga Z rr 29/

llrS 2 ll)&I QZ,M Ax/g/

99~6 l z

~l. 6? x WA5%

~l 2 CfpfC./)r-))

87 + 3,{?r, 7,(2. ]

~~< "i/8&

Formals-iA Fizgcy ~ &~g~Ay/~ l P~

't 6xsnc 8esEr p sr +~ srs ~ az F) ~l x?zoP +sos g F~ v azszj'El CC

~K l2)'4 > g4 rg>EE(O 4 I

( FEE@ w EP~~>1 ~~ 5 /224 4 lO Z+O

Cak:ulations. FILE NUMBER C I0

SUBJECT:

SHEET~ OF APP DATE

,~P Calculations FILE NUMBER + l0 SUSJECTI SKEET~ OF eV ALH DATE29 APP DATE C~

x DS X

ZzC 25 7a >

/

p4 gi 2. ¹/

~P Calculations FILE NUMBER

SUBJECT:

SHEET~ OF BY +CW DATE APP DATE

/

3 F/

l I

K O

z X

O

Cele Uiations FILE NUMBER Q~ l

SUBJECT:

SHEET~ OF APP DATE z

0

' ~ E

~

Calculations FILE NUMBER

SUBJECT:

, IJy~rHW C7 oA/ SHEET OF BYE r OA~~/g J-~)f8 A7 G4 SIT PP'EtZW DATE rl/o pr ACr]a+i P PierrlCrlOV ~ Srg<CrxOal D an dr /~ca r

/2.6 mid -W.i Wc 7 g,5 -asA ie /D7.0 A7

-ig,/ -Wee irk

-87) NEO

-I/AZ ]~0 77,'5'82li

-39rd //Qr S

- Hr Z W.j -a,d -4dr3 iS,S -/4P u.i -

Co<By/Al /045

-/ IB- 5 +S'Z

->Br 7

-/&Br'B.7

)- a7Z-l

~~)

O CC O

JOB NUMBER 619,o Calcuiations FILE NUMBER suwscTI QocruFFT'o& SHEET OF BY DATE 5reru A. Zs-~fr OP I-r~C ~ APP DATE

~Eh /

A F OL(F 4 OFF g ATF

<GO ~ ~ cg CJ g ~PC ( gA ~ ~FFFDOF'F" /0)

Sq'cnxc c -Pg,P y - <<B,G ~~ - iS'S,G' g 482F) +$ 7+

- /99r 7

"/9917'/r>e'er&+ 5+rB >l/i~w~ b -S'~/g

-//,34 - w,47 -/.5 <<48 7&

(sFrd sziFrrr Fo )

- /7,/2 Ws/

/ 'r ~44?M P r' g/'

( V<M~ ld+3 aqua ++

JOB NUMBER Calculations FILE NUMBER su+EcT: 4~grA w'c7ohl SHEET C OF

/age& dr Sos'p &cd'5 BV l ATE APP OA7E .

/a)LÃT /vmr

/jiZ 4,7 -8r 7

-/6il

-St

//5i5 a,2 -Br graf 3 are

JOB NUMBER N/ rO Calculations F I LE NUMBE R sUBJEGT: ~4R7 //IA< re SHEET BY OF DA~TE fuge& g/ 9QsF np Z4' APP DATE

/&mr JWLEP F~ /7 2 -5ZA -Bdr7 8(7 -28$ C3rg '7r,l Fdic /DOr

~5',P.ER

?Br2.

2', Or 0 I

-le

~

4d

-II& ~7 Wc 8'E2 -37 -/B A,9 -e/ z& -as4 . 4r3 muvt7Zo+S

's Q,B -aZ.1 /7Pr 9

-XZ.4 /LS M ~

Xj/r 7-'

(~ .r~ 5 77- 2 r 69,8, +7'T i E

' 0 z

0

JOB NUMBER /,o Calculations FILE NUMBER

'UBJECT:

SHEET K OF BY 'ATE /

PoA?c~ g7 9AM ~ 'c5 APP DATE IHuZ7 C~l IecEp Aur

/3F6 HC'i/ 8F5 HE 7 -m,5 ZSA BS(d -/o70 -4i 7 IWi4 -/6i/ -Wr3 sc}E3 -3g2 -JCO

//5i

-BF g ~ D F7 40F3 -/8S j4P 77iS -zs>

i$ )C

/

~ 5"I

Calculations

~f FILE NUMBER s t 0

SUBJECT:

SHEET~/ OF APP OATS

.u

~

r 3's'K Ce'zs. ~

s SF K +g E

'j, K SSS'4 gg o 6'P+

~

OPIA i~s" Y oh ~

4's /

WF Sl

~ ) 3C~ - ' >C:C-' ~ QgSF P FQ~ I fez

'6/ g l ~

so 4s" 4i x+ v

~-c ~~+

~ ~

X = -4'dv /XX F S'g = - A/SF ~

y I

F QS ~j = ~2k'5

-res

- -rOZZ rr>-"

=- res Krrs < & 9g r24" s ~rr' w4 s-<~

7roO

Pw

JOB NUMBER Calculations FILE NUMBER 6 I 0

SUBJECT:

SHEET~ OF APP OATS r~ S ~ g~~ /5 ~

y~ +(g gr. -g'.g y = - ) s's .y - 4 s = -ag. p'

~

PEP" t r 4'/CP J

~ rti.~ <<>>..

V 7

(/4/ K 6 sC I

'I /O'P s//) //. S 'SFFS

~d5S W rSC rr ~ + AO>P' 4'po w '~y.0 ~ MA" Ping

- 5'C r-Ss c r7pa H fr 4

~

K~ - S'Z .7 rO + ~ S'4's' = 145 3' r'C I

~ <<'~ rg V=,~s> ~

..zn C ~we c.~

ASIA ~p pro

+Qp (

~

jr/ ..

i

~C'~w Aging o

/rr g'/ p /r 0 S r z

VA gag /f SE'.~E 8 gus'

= rrv'

~ ES~ E'Fg K ~ Z r~1 FS ne /. r

JOB NUMBFR / O Calculations FILE NUMBER

SUBJECT:

SHEET BY DATE r"

~ ~'f <<vj M~~

DATE

/~p/Ag (/&W + l~ &) <<A ( IC'rE!+

y C ai 2 2

lo2P r.

Ip g e ~ rEEE rr't/ jr' <<<7l gr'(.

rx<<AE .w)mArD E y,lrcP.'jvr~ ~W E'~

/

(4 o'MW~/ i>p+ /4

h ~

Calculations FILE NUM8ER Q.- (c

SUBJECT:

SHEET OF ev OA~ k APP DATE A. JE (( :Z~r /de o CI'+0

/4 to

+ (~~~-D) J '.DgP

~%

~ 1 &o( ~ ogp

/ C r- y. Z,y C FK P

7c a~&

C

~" M.( r.

~

~

Arf><

2IJJ 7- g. ~ y j~~~rSy g ~~ A r FS /

0 CC 0

z

,~F' F.

Calculations FILE NUMBER SUMECT: SHEET~ OF APP OATS

~Ca AVE g > E5'7 E" y" z ~ y'&Ma I ~ JA. 4'm JP4&~iT'C Igg r s4 Z Ted

~I ~~'j ~ ZPE'ii) s

>K C APtg t gfs

~

ggP ~

~gg S

- ~c J d

~St 8'c tS

0 JOB NUMBER Calculations FILE NUMBER

SUBJECT:

SHEET OF BY r DATE

~ APP 0 ATE rr

~ ~

rr rr,/rr M / r~p~ r r r/r f p /(Z,(e~/ rr /

(A ~

C4F/~ ~ Q7P lj Qow7LR C

>0, lr HLC r afUrr apF- ~47 raw.

T t./ i9 2< 2. /44 ~ lC L

dZ.~T ~~I

~ zcZ5 X .~

o<.

98~,

~ 8" ~ 2

,'~~ Euic Fiow L~ac. Gt~ 'STRAINER GROUP C -I 0 TYP RG. No.

/0-O89 Sheet of CAL BY a/z ~/~~

Local S Hc~~ - Tz.css as '

go~'hem LoAbs ~ (As pEi 6/zA 7+3 sn/~r.i OLl7 LET; VZZS C.Q -/29 Lb~ + +0l lb( ~ /$

F8 + +/0 /6/ - 7o3 Lb~ + O Lby, -Ca+

fc ~ /zZ /bg,- sr~ >g 48<, - ~ L.b~

z j4 t5'L>(A) w-Q I- IA7cl) w-/bg k p>oft) ~ -lQ ~

- lf]2) /n'-LLg 0 A + s~zbz) w zb<,-z-i;z&4i~-+ 2/2 ((Z) lpl-lip 2 C(E) ll Ac t y4j(il) iN Lbg - 7z-ci&z) ur w ~by - 3ER.C/~) w-4@45'/o(>R)

, C c+c iaI.C.f u

~Y

+

0LJ7+ @

l5.Gr2.5

SU~EOT FULL FL>'W LU E OiL STRA IN ER. eaour TYP RS. No. ~~ Sheet of Shta, CAL BY XL T'RANKKtL OF LoAbh FR< M IDYLL'T g OUT LCT'HOKKLEh To TAvK sH<it Ho~zizs.: (sxgrcH P.ts )

ASSo&E eHvg oHE Ho4ht t Peg TAHE 5t cs NC

~

LeA1% PRO& ~C (HECT g OVT<6 r )JG4%LE'Sf

"~ Fr.~ Fa.:

y=

l FR. I f Fig I~~+i3

=as/k No KRC.E S 4)A~i":

g]ace ~= w (m<h SK I v>>= w.~~~~. (;~+~Fj...)(z)bv.6LR 8

= (i>>+i>>(')( s.l.~) 8 5 3/ Pg gp( L5g'l Fa. leg Fa our

'a

/VORRLEg 2 Alp - (~<jpg ~F1,p)(l)(li b l3) .(>'Zq ~VOL)(~)(gJ,Q)P e 8 2 07/~ 7 /jll LSy a)Fiz.~ F6:

iZ F6/s,;

Fb,~ t6,"., ~" ~ zo ~ L4-

/ ~ppp aceg

<) p'= (Fb;~ F'<;,')(x)(igloo)) Ce" ~~)(t)(cpu) 8 j

= go/.5

~p'0 Qp c.Cg jL ('Fb'- /b..,),g(qi0~) =

zqgc) zH. 6 g

p t ULL FLoW LLJE,F OIL ~i TRAtHEk, eaom TYP RG. No. lO-DBS Shoat of Sh?s.

CAL BY 8/26/>+

$ >f5,6 (Fs,- F h,, () ( .z - v)( )

4 go4%v6g ag Fh,F'k,~:

~

(F8 -Pk )

~Pc RRc.FS

~ ~ 'oy

=

Y Py - zg ')(/i,sc>) (<<y wry) (i)-(n.<cry 8

w -44' p/~+'Fb,> Fb +) (is) (6iv vilo)(iz)

X pro Z4l 55 Z Fb,.";

= (F8,z ~b +,) ('i)(ir6~r) (7~> -~) (z) (vc6is3 3

2. 7f 4 i / lu s

- L 4+

8

= (r-b,,~ t h,+,)(i~) (go~+.) (i~)

)QRR Lc. 5 L

FUI-l- t l.ow vila Ole Cl RAIIIER C - IO OROLP RG N Sheet i8 af Shh.

mL sV 8/2 ~/w-c) [rooc FC.

- Fc+'c+

F -F , KE I-l23 hlo+KLC. L

<)

poor goALy, cesE. o>, p. II3:

Fy

+ =.

p. = 6 (+L-*) L=2iL a.-

cC i)(F " "<<cJ zs s,g 6~5 IL,6 aj c

(2LIc- p~ ) = ~/~

Fc ) I 2 ( I 3 it IN - LQ I. c,- f c~ ~76-" >

I'IS l '

~

~6g

+ go <a<6 $

(,vS) (ii)(3occ'3')

>gr 6iS IJ, 6ig c) ig(Fc,cr ~ I'c.,j '>e ~u L (2cr 3

~ oo~~icS

)g 6 yg I f o6 L S

= l2< ~~in ~'oor) l"(IC3 '4) 29'J 3

<<)~Cooj h) I

+ F'cia "" adT ~~70 t~~~

/OR+ 5 (t Fy CFc,- F I )(>r'I (-'ll-3zl (i\(>I) 2Q 3 '

IC 6 /0,6>5

'c) Q z - i (F2c Itl co lb>>( j~e 3II)-

l$

gU~E~ FULL I ~4& L~4'C QlL R t k.Av<C mOuI C JO TYP RG. No.

GAL BY z

0 I

I z

0

+

O z b) I'ly

+

I 0

CAMl.

gU~~ FUI.U FLDw LDEE OIL C

~TRAI<KN c-P TYP RG. No. Sheet ZO of Shts.

CAL BY

<2 Fa+ I4: rsvp///ulcc'b 5 0 .'

/'46~ /6...:

Fi8a& //>'/98K' CPS'8 '3 7 P//g

=R ('~) .y L= 23.

= 6' (gL -~)

( $ 7?.W 1I Q PI@

~) fiam /des', dgM:v, /.//>:

Ega.- gq.g =

pl<

&>> &l 3!"L cg

+bw +~~aug Zfia L ~

7g (..IH, >>pJ .7g (iL 5 1l-l<)

LQ 3 Q.,(n

/7,'6 Z p / 6' t)

) p: - ~be-r <<(s ~i-]i): NFa i~

5

FvW. MW Lv K6 ~tL. Sl l~hlA~K.

L~

gU@ECT GROlP Re. No. Shoot >/ af Shta.

CAL BY F] Fl~!!!!! N C, pgAHE!.A'TC to 0, p

+  !!e,+Hc,(<Q(~el+<<<3 avf

@5 szS. 7 b) A y = (gFp ( is (!.t') xt i~<!'(!r iver!).

3 I'l7/,$ /8-C4~

8 Pp c.

g c y (Q(yq) ply)

+ plo~kt,c. 5 M~,+AC, t>(al.o eP~X) g (<~q l C (x)

\. I K. (l5.6>J5 p (! iL )(>ggi~) aJ - l.4+

7.o 5 g, 7 8

~c - Hc l.(l Ac '

).

+

~>!! Rc ~ ii(<!!l-'B<) <q

l. C <1 ) y ( I h)

/!! y = (i!(F~)(<! 6U~ ( L) (!'l,! ) (u'6'L!

~

8 8

) pg H,z + c~< zt(991 3!31$

= Ob>E'-~4'

Qe FLow 4'u KE. Qlc Cli2AIHKR. C-I<

RG No 22 Sheet of Sos.

uu sv Si23 jXy 8c,, Wc+

22) 'F+=

8  : ~t,~) a (.1~)

2. (. F~ ) C~r.ecr) cg3.si )(iroc3')

g c) p)( rVc +COol- i3.(X3OF 3CO)

'= Jggp X

0

¹ Plo+ W (C$

6J CoNPCLAT<oN OF I RAHC feR'Peg /Mal.e LCO*bC

'q Fv.')

Fy =

Fg> + Fx< = ~F3.3+2.nx = 6Y$ 5 Lbg

~) Fy -

Fy + p> =

~~ ~~py = all Lbg X Fy,'

0 zq

+ '+

O I '5) < I ~ ~ F Yy - 2(LAPGJ f'4'fl 4 > - 0 "rcl z

Fyi + Fy< "FYoi

=

&33 + 2.el+ i~i 8 "- 'is 6:S 0

~F-= . '.

f ~ "t F~ + F+>- fogy 3'/pv 3K',g "-

By/,g Q~

6) F4 = FZ + I'+++ FK> = '663,3 0 /332 3P 5  %.= 2'52VJ+.'I

~'l x:

<<q Ax =

P1x+ Nx~ = 62ov e sszcx = @733'j w-t5<

6)8x: iitp + <x< =

l2is+v63's. -" 8866 Q jiff;

@ Ay= py> + p7y2 +/ye =

l6ol p+il9yvi27ls=seUio.c6>

s)

Ny =

Ny, + Ny~~ayz = no~.6+Shl~zosv',7 =/wf).3 63 ~~:

0+ Pa, t s22. = 23 26 2

a) = ~ I'1a <isa~ - col.2 +iso3 6 3 m 2 e iilfh/ + /fan t g< = aoxV,2% /363 + S'3S2'78/;2 IO

l CK ~ IA ~ ~

RANEE'.

FULL FLoW LU5E QlL S1 OkOVF TYP RL5 RG. Na Sheet M of Shh, gy 8 gt/7P Hj Dlo<'o&ENTAYloN OP TRANLF'EgpED goK+lc LaAgg '

gi- (

F y, = +6%5, g Lb<, - Kll LI+

FY= +>>&.S L4q, - <<-~.e+

Fh=+ 8'll.S L4~ '~- lying,g LIl iH) 4 Ll)Bi/ IH c'4g ) 8 BC6 w-LL< .

p HY + %(41 I tH LQ j IYl893nr 5,'~ X~

AK + 2s sag'3 lN L4y~ "s 78/,Q N.t.g~ I o

I

II *

-',"U~ I.ui- r" Luis; Q)~ =pi(p,i~i<< oooo C RG. No Sheet M of Shts.

CAL BY 82m O TAH V. 5 HCI < IH )Q6 iE < 1 Y J I >RikaH TAa aEl<KlC. Bt HbiNQ ~pi2C(t c7 t

= I-o~4r n orNHC 5T'rc c'A d~d 5 C/J ~/p g.Np+g, ( Rcvhirlgg r~ Pc /r pc/~IWc.

AT l3 -2 P ]C -rl.dLJ = 3A',+ iu 3 0 zz.

( P,Sg

(~.<)

"/p)(l'L) g( I>S QJ(~)(gg-y/,p) g~~ (>(, g)

=+is4. I

'"'/ >

il

",~~ uii )ioW I LueE Qi STggiHZP No Io -O 0S RG Sheet of Shta.

CAL BY L a ~s/~

3 K GlcMH Fi'6< Q QH blH ro CpiEr i ic 6 t) v r 7~ Jl/o y~( g gQA ii6

'lT t~ f ~v 8 LQ SAT QE FcLLumtHQ l oAb~ Cog't~< lg vga MW Y LANK c4~5 R VA TtV C $ 6 HQlfFQ Lgg Qg po ~g l-CH P.>3 )

++gal.,SIi.e Rg H> = l>,6'(FV) i My

= la,g ('l i Hi6$ + +Si 6 .- ~i +88, 6 iH -L) g P$ py = i;r(ry) (~)('Fp)+ H)

= n.S(~ii') <<(e)(2~-LS.S') + iqiZS,>) >>oiler,iH--le I/ i' l.

bt V~o>(o Rc cr

+

Sri>ess MPob g

9 Al

~LuE

=

Pg H.

To Lloà 4uo~.7 -+'ll7o.

gogz<v 6 + 87ol.l.,I 5 64/

Leppy

//H

'26op7 I) a = ~g YX~'f 7 g,~

AREA /<(g, gg, L y g- /u F~

- (io'- iS.Pl-)

F}

CooihiHeh 6tH eH EiL STso sr@ 6 !

O = ~+~ + + +-cr l +os'+c 0 +

I dye ~

tie.i+f8,6+ u>5, 3 S <i~v, C+ 7S,q =

~S eo,~ jw.

~s a

l

+~~ ~

~+~

P 5 1( l, I + Fc,~+ li'70,5 + w1 (

- J1oG ~ l Thai Q

+ HL46,7 /iH~

t us.s- fMsss Luge Ola STRA(HC 6 RG. N

, CAL BY NSIH Q WRC QOl L.6 T'Ihl I>1, 7HC I-DC 6E PRI AHP l 5'l PE'Sr ~S THE ~A~~ SHEI.~, OVC F ~ VERY CoI4EERVd H~'%+I-6 ~DO f oN P.2.3 *g.E SHOm 8 >IVY'R.AI4SFKRL64 OA Qht'h 'SHEE, T, P.L'7> F POD PQIHT Oug,P, X5, SIHCE:Pt< 5 H6AR IH'r6HSI t'r i f <ma((, gapa@.TIDE 2. F'ak 7He CoebIH6 l-R.e~S IOTGH(Ir r uH beer-8 S~F7, P. ~7, LVI>i I 7s-34,i '7$ 36,2 7l(I'Nsgi

~), =

Sy($)+a~ 78<9./ /ohio 9 los 0, Q -9o) tl / ->oJ O',I 2 ~ ~1 4 R 2.'19~ 7 m.= 5 -~01,/ .il KP9',7 p2I4' lo897, loZ37,I >f96,X 0

I 0

z

~IJ H 5AFET'r F8ct"u r2 f. S. -"

9oaov P5/ <ftA 8 "4'2 A~- ~

$ (7oOD Z,64 0 ~e il 2t Y, 7

i LILI 7'I asm LaaP(. UII b 7 fdlSIIILfc H2g a a~by

-XTabto 5-Computation Shoat for Local Strossos in Cylindrical Shells Cb g - //e,tro L= 2 )77.S C" c.b) Q Tg.- )(x&t'o, P SQ c = /s.cis I)

(P. g.f'g te AS ~ li04 I ooo Radial loof,

~ 2. Geoee ~ Iris Poionerera 'c L/2 Mr ot) w =

Circ, Itaieant ~ 1>>.C 1;~ lb. Ou IIL I.".lan~ ~ lb ROUND Loilp Honiont a ~

'T ~ talon Houont, si e Vc ~lb st/+lan Ib>> (0.4)$ )~ 0 Rin e3 OL Au Bu ATTACHMENT Shoot Load, Sheer Loode VL T~VIb 5II~ I ~ ConceniI ~ Iion due I ~

~ ) Ieenbiano Ised, Kn I/

2I Oueu Hrr ~r. 0 I IS)1 b) bondtnp leod, Kb Vessel Ihicl I ~ aa, uCL X/

Atteclvaent rudiva, r 'HOT EI Ent ~ I oil 4tco valves in

~ ccoidence arith ~ ipn convention Yo ~ aot Iediv ~ ~ CYLINDRICAL SHELL F~ Rood cvrvsa Course ~ ebsolvt ~ valves ~ f STRE$ 5ES if lead a ~ OSSOIII ~ thor shove, teeerse ~ ipns shove Flp lor ~ II~ I ~ ~ Iid enter I ~ @ii) I ~ Av AL Bu BL Cu CL Dv OL His Sc d/Rie 7 89 '/ In'/I y Fa Kb ~

,o L5 IC 2A Hc/ Rut/i 0 /7$ C) /'7it 0 /7f 0

~ I IS

.I)/ g sar/ Ruff Ag 2~

HIS 7)S'7

~HL/ N~>/7 77 77SS 14 ~r Hier

, CIOBQ 'I ~ I HL/a ll Add ~ Itehiotseur 4I aueueonoo +'s

~ IIS ~ Ilsaaes, ~ Ics P 4 I 5> X>+Tfa sq 1 2.'l /oS 3.'t cC H~

lr I I' Hc/Rural

/69I'0/69 Hs 2C r I +

,Ol Ne dA Itc/Rutll 5 Hs 2A da Na He \ HL HL/RntP HV~tg/ R I/)T Ha 2O or I IaL/ Reel)

Add ~ Iceluoiaollr

~ I K ateeaaia,na 4I ouu

~

vien (i = <>is')+L Ht 6fs 6fs3 1.7S L7r 7 S'l>> S6 Sheer stress duo te lee ~ Iuu Ils IIS ~ r ~ Si 2d It0 T

+

5heor arrest 40 V I ~ leod. Yc r aaS 5heor steer ~ duo VL to leod, VL Y Add Altearolcatlr fer eurenenen

~ I sacer ~ iieaaea, r 0 0 o 0 0 0 0 COII~ IHED 5TRE55 IHTEHSITTI $

I) when ny ~, tr it IIOFI Cr t I a ~ lna'I hero lthe sites 2l trhear 'O 5 4iseei ol $$ ~ Ie er IISI ~

t )

I ~

Sl Wh d~an I hoes uafko Htaa 5 t I'isis es)' ~ rr

~,

~ I l0 ,Iifrrapra irt >bohr IIR

Qd~

I IUn ',(, '"

F. F. L. 0.

~

?

JDC, strainer'C,ODf!,!i.!,

I KD

?

f\

14 ~ p 3 ~ 42r(p G ~ G J/ 1 ~ (( 1 ~

(.'.

~

(

~

/ ~ eV p ("(L',: (T,

~ 1 V'", 'lL.:

  • g

~ (

p 4>o 5/ 27uu '2g ~ $ 41v3 o >y 1 17 3'i, !7S ~ Vg

( ~

P Jorp(' (

I ~ (/r' 025 g lo 3((', ~ ~ O.C4'p >2 o 35./

F:;C,F / p F 'k A/ F 2 r'1 p i~ 4 D p F 2 ('/

3 3<

~ ~ Ql, "~ 2; '025 g 1 ~ 35/ .014 I ~

" LAX=""':.:.

537 1698 o

J

~

.. 'iCn .'C.",= (

" 1102 ( ~ ~

~

i7SO SG54

'I "17 lu D":!= ~; .. 3.51 q o ~ 7755 -.r.P v 4if55

~:."

l.r

~ rFr P=

~

F~X= '130 11630

~ I r ~ ~

I gg//m Ni~Y'i~i ~/('((//(

~~4 '('d j'. gzz>: rP4z vu~p~;< -.-..;

gczupg 8/'./Wy +~jvzcj~j'.,P/"-:".

'I

~ O,', '.Pq ~ 'I ~ ~

"~ I

Ot 4> ~ AAT N(L VAICAW tATT. NO

<<~/ z.y c xc DiZ3 iy, d/A'A'///.

St.'. "45 COP A/

4 g5A'$

~ah// < WliVFg Pfd'dPAcwb

~ "alp'vP s4L d~ $gAAi+HA'gdPM VP jg/$j/h/&

/.F8-

~ i'd& /0~~~+f /HA-XZg-Pdldd SuZ/

~.a <Crx~ag SPW/h/+g

/5'/5g.x5 4 /-M IWEPg. 486 /O.P8$

t ~ ~

/Z5

~ W==.k~/. F4uiAffbkj'~g fgK FEF7 Tl

~

kfJ$7 8f- A@/ddt >'c.v'= 6I oF Pp'z$ fwd- LEE'S 7d jHg l /CCoyyaORPa g~Z MzrV,"'7/4 the/aiA ppP ig FFS Pafs jj/d/ 8'/jl~g R/7ERlh'CT. SQAÃlhFR I

I ~

~ ti~u;i5 i dddE.; A$///E--SEC foal SO 5 4/A'C,'.: ~& M)ygz>C A/$g/4& i~<'/35Cg/h/6- Oh/

t'A'Cc&

ACE Ep/$j/h+

800 8-8 j'/arV s~ir-:r~~ VNIXSS DIN(ANISE SttC. ID(CA, CEO<<CIA(0 STVSOES DNICNSIONS ~ NNAI\I 1 VSAII TI ~ I IIEA I IlACC DCC t tlACC DCC (Cal IS>Sf al at

~ IlAihlllI S I NAICN 1 C $ S CI AOVNotI($$

S t(ACC DCC ANCECS TIISCADL VN D(attl IAI~

ra(o

$ (C II tAAAllllllV tf 1 t(N OI CVEAA ANCLIAAITT ms /coypu.. Ssipgic Sf"Pf tllltftaSA le AAA

~ ACAA CONN(AS at ~ Er IIAC.

Aoh( VT I AOC tollI ION DON((NI1Iclff 1ENOYt SVAAS STVNII1I slvNAN Ioo<<n.vah t CS(ttfl Sf//>JMEA /OVil i& pOOIF: p

~ I tOIIION ~ WO ~ TIIISC501 Cotto ~ ATIOII II INC(ON (ANION CCVtttftnt ~ CACIAC DIT. SVf f1(0, A. 5,

<<Ohltlal IOCO<<ONII Ohh g Attn, g g( CW~L l$

'N "-"-"-VM NOA MNO Oh ~~ AA\

~ Ihlln I ~ IAII ~ <<Ohl INOI( h 1 ~

NOAINV CION Ol <<CAVO J cy ~ I >I I I

Calculations SUBJECT-'/ 04KB/h(<-'C"c/4 2 u8<

~o'MMAK C~u Y'OB ~rp~wEp NUMBER FILE NUMBER SHEET BY APP 0

C -/0 OF DA~

DATE Cr F F5 / 8) P //

FE /- Z Pid

'4 F

('w wein . r c'(4 T'c F Acct Fc.FAF+cccccf C

r (4

F

.TK4' ~l  ; cr cc I6 Cd~~y FA +c,cAA~ 1o Ei A,<~ .OEEE WS/ rn l<.r&PPd~ CHAFE PF 5K PLATO. SW I r / ,'7c cr.'-~EEOC Fr>

r< /~7'~ ~E/ ~ 4&l

~~gf 4(r r/ g IM 8/EE g,g4 3 rrt Cr A dcS (F

Qr O

z

    • 12 CHP 5021. CCD. 019 ATTACHMENT NO. 1 ANCHOR INSPECTION DATA SHEET CION'RO. Qiagai L~OL: Qc, Pi-,

Unxt N Bldg. Location

/8- J9 Installation dwg.. / Rev. Equipment No.

Anchora e Arran ement Sketch

~ g I i V~'(%e) 0-6"

~

~ ~ ~

g

~ ~

~ g

~ ~

g ~

I ~

~ I ~ ~

~ g 5 g Type Qol %5 Cfyp)

) I sc& L Drawn by: Date:

(',iL Verified by: Date: '2--') -/2 Qual. /Cert. Inspector Reviewed 'by:

onstructz.on Anchor Review Engineer Date: l Page 1 h~

of 3

    • 12 CHP 5021-CCD-019 ATTACHMENT NO. 1 C OR INSPECTION DATA SHEET Give LMM'ic /i i Unzt Bldg. Location

/2- 3zae - Ql -/13-A82 Installation dwg. / Rev. Equipment No.

Anchora e Arran ement Sketch

- Q/z Drawn by: Date: 5 Verified by: Date: r3 ~A+ Q~"p )

Qu ./Ce t. Inspector Reviewed by: Date: G lc 5'<

nstructxon Anchor Review Engineer Page 1 of 3 Revision 1

~ ~ ~

~ ~ a i e 0 ~ ~ II

~ ~ ~ ~

r

~ ~

o ~ RSR%RRKi%WW&W .

a a o o mRSRIN WALLS 0 ~

wwweaarr m55555LSRL s ~

RSmmmRHE%

RRHHRRHHEL mRSmmELSL lIRSHRRELLL

~ II II MW&M MWW 0

s1 ~ I ~

~

hl

'rr ~

~JUL i sir ~~

  • +12 CHP 5021.CCD.019 ATTACHMENT NO. 1 ANCHOR INSPECTION DATA SHEET ipment No.: l-6 t- II3-8 Dwg No.: l&3cÃV-//

edded Steel Dwg. No.: ~lb PHYSICAL CHARACTERISTICS Held ID Held T e Codes T e 1 = Fillet Size 2 =

3'lL Plug/Slot Len h = Groove 3

Cracks Yes Yes Yes Yes Yes Yes Yes Lack of Penetration Yes c3g9 CRh Yes QtV HZP Yes Yes No Yes No

'esNo Yes No No Yes No Porosity Yes Yes Yes es Yes Yes Yes Yes No No No 5~7'PGR< QQac.~ - evhu s Qg~ggg (gal.kl0%bb 0

0 Ecpxipment hase flexible: Cl Yes 8 No ons ruc won e Date: cP-Reviewed by: Date:

ons ruc ron c or evzew ngxneer V 'ed by:

. er

~/'a

. npsec or Date: ~'~ ~ 'i Page 3 of 3 Revision 1

    • 12 CHP 5021 CCD 019 ATTACHMENT NO ~ 1 ANCHOR INSPECTION DATA SHEET ipment No.: - GT- i(3- 6 mbedded Steel Dwg. No.:

PHYSICAL CHARACTERISTICS Weld ID Weld T e Codes T e Size 1 = Fillet 2 = Plug/Slot Len = Groove 3

Cracks Yes ~Ys Yes Yes Yes Yes Yes Yes No No No Lack of Yes Yes Yes @Ys Yes Yes Yes Penetration 0 0 No No No Porosity Yes 0

Yes es Yes Yes Yes Yes Yes 65 No No No SQPPoR 7 QRhc.k. - E'YFh~s Qg~ggg $ g>c.atoll ~

0' fP)

~ I a O Ecpxipment base flexible: 0 Yes 8 No ons ruc son re Date:

Reviewed by: Date:

ons ruc son c or evxew ngxneer V 'fied by:

er Date: 0 35 9" ua ; . npsec or Page 3 of 3 Revision 1

    • 12 CHP 502 1 . CCD. 0 19 ATTACHMENT NO. 1 ANCHOR INSPECTION DATA SHEET quipment No.: /- - - Q3. Dwg No.: IB-8 "zV-il Embedded Steel Dwg. No.: A PHYSICAL CHARACTERXSTXCS Weld ID Weld T e Codes T e Size 1 = Fillet 2 = Plug/Slot:

Len h = Groove 3

Cracks Yes Yes Yes Yes Yes Yes Yes

'Lto Yes No No Lack of Yes Yes Yes Yes Yes Yes Yes Yes Penetration No No No Porosity Yes Y s Yes Yes Yes Yes Yes Yes No No No 50PPoR 7 QPhck c- EYRi~s

+KCT Qg~gg+ (<xc,Kf4%'bb Ecpxiyment hase flexible: CI Yes 8 No ons ruc won re Reviewed by: Date:

ons ruc ron c or evxew ngzneer ified by: ua . e . npsec or Date: ~ r 5 y.'age 3 of 3 Revision 1

'I 4

~~j.~ ( riP 4021 CCD 019 ATTACHMENT NO- 1 ipment No.:

mbedded Steel I/

Dwg. No.:

ANCHOR INSPECTION DATA SHEET g

g .: ~g PHYSICAL CHARACTERISTICS Weld ID Weld T e Codes T e 1 = Fillet Size 2 = Plug/Slot Len h = Groove 3

Cracks Yes Yes Yes Yes Yes Yes Yes Yes QRD 0 No No No Lack of Yes Yes Yes Yes Yes Yes Yes Yes Penetration cKRP 0 0 No No No Porosity Yes Yes Yes Yes Yes Yes Yes Yes Cgg) 0 o No No No 507'PoQ~ QQ&ck - EYRg 5,

~ I O (Hi(.k8%&:

BS.RC.kC 7 Equipment base flexible: 0 Yes 8 No ons ruc 1on re Date:

Reviewed by: Date:

ons ruc 1on c or ev1ew nglneer V 'fied by: Date:

ua . e . npsec or Page 3 of 3 Revision 1

Equipment No.:

~

~ ~ ( - G~-<6 - RSX Tightness established by "Snug Fit" Tight:ness veri fied by:

Qual. /Cert. Xnspector

)pP Comments:

Equip ID: 1-HE-,13 Train: 12 Equip Class: 21 Drawing No.: 1-5129A 1-5135

.ction: RI

~

~

Sys tern: CVCS Equip Desc: EXCESS LETDOWN HEAT EXCHANGER Building: CONTAINMENT Room: REGENERATIVE HEAT EXCHANGER ROOM, AZ 295 Elev: 612 Sort: S, Notes:

Normal State: Desired State: Power.Req'd: N Support System Drawing:

Req'd Support Comp:

Safety Related Status: NUCLEAR SR Min/Opt: MIN Alias No: Power Train: NA Comp Served: EXCESS LETDOWN HEAT EXCHANGER Mfr: ATLAS INDUSTRIAL MANUFACTURING CO Model:

Elem. Drawing:

Wiring Drawing:

Power Source:

Walkdown: F G Relay Eval  : N Comp Type: HEAT EXCHANGER XSO Drawing:

Location: ON THE CONTAXNMENT WALL SIDE OF THE RM

DC Cook Unit 1 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 1 of 1 ID: 1-HE-13 (Rev. 0) Class: 21 - Tanks and Heat Exchangers

==

Description:==

EXCESS LETDOWN HEAT EXCHANGER Building: CONTAINMENT Floor El.: 612.00 Room, Row/Col: REGENERATIVE HEAT EXCHANGER RM, ON THE CONT WALLSIDE OF THE RM Manufacturer, Model, Etc.: ATLAS It!DUSTRIAL MANUFACTURINGCO BASIS: External analysis

1. The buckling capacity of the shell of a large, flat-bottom, vertical tank is equal to or greater N/A than the demand.
2. The capacity of the anchor bolts and their embedments is equal to or greater than the Yes demand.
3. The capacity of connections between the anchor bolts and the tank shell is equal to or Yes greater than the demand.
4. Attached piping has adequate fiexibilityto accommodate the motion of a large, fiat-bottom, Yes

, vertical tank.

5. A ring-type foundation is not used to support a large, flat-bottom, vertical tank.

C~MMEE.'Q SRT: George G. Thomas (SS A) and Tom Huang (AEP), April 13, 1995.

l Ref: Unit'1 and 2 Anchor Bolt Schedule (Drwg. ¹ 3073A-3 and 3073D), and Unit 1 8 2 Containment Building

¹ Concrete Floor (Drwg. 1-2-3207-23)

Relatively small exchanger (1600 Ibs) on two saddles in extremely high rad area.

Could not inspect anchorage due to it being hidden from view with insulation. Removal of insulation was not performed because of ALARAconsiderations.

Anchorage includes four 3/4" diameter J-bolts, embedded at least 2 feet into piers. Due to large anchorage (four 3/4" bolts) and small exchanger, the anchorage is acceptable by SRT judgment, Evaluated by: Date:

iz /~ /~s

01/16/92 PG. NO.539 SAFE SHUTDOuN EOUIPHENT LIST (SSELMP)

FUHCTIOH: ESN Equipment Class: 2'I Train: 2 Eeiirment IO: 1-HE- IBE Drawing Nunbert 1-5113 I-51C4 Svstem: COHTAINHENT SPRAY Enufo

Description:

EAST CONTAINHENI'PRAY HEAT EXCHANGER Rui lriing: AUX I L IARY Room: E CONTAINHENI'PRAY HEAT EXCKAHGER ROOII Elevation: 609 wnr~l state: Desired state: Power Required: N Sort: u, Siaoorting System Drawing Number:

Required Interconnections and Supporting Components:

fetv Related Status: NUCLEAR SR Hin/Opt: HIN ADDITIONAL INFORMATION 4l ias Number: Power Train: NA Cnmcx nent Served: EAST COHTAINMENT SPRAY HEAT EXCHANGER wsnufacturer: YUSA Node l:

oanel:

EIem Drawing: H/A wiring Drawing: N/A cower Source: N/A ualtdown: F Relay Only: NO Comoonent Type: HE ISO Drawings:

Detailed Locatian:

.DC COOK Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 1 of 2 ID: 1-HE-18E (Rev. 0) Class: 21 - Tanks and Heat Exchangers

Description:

EAST CONTAINMENTSPRAY HEAT EXCHANGER Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: E CONT SPRAY HEAT EXCHANGER RM, Manufacturer, Model, Etc.: YUBA (VERTICAL)

BASIS: External analysis

1. The buckling capacity of the shell of a large, flat-bottom, vertical tank is equal to or greater N/A than the demand.
2. The capacity of the anchor bolts and their embedments is equal to or greater than the Yes demand.
3. The capacity of connections between the anchor bolts and the tank shell is equal to or Yes greater than the demand.
4. Attached piping has adequate flexibilityto accommodate the motion of a large, fiat-bottom, Yes vertical tank.
5. A ring- pe foundation is not used to support a large, flat-bottom, vertical tank. N/A C LL 0 T?

~C)JJV~N$

SRT: Gary Thomas, Tom Huang and Kailash Mahajan on 11/3/93.

ery well engineered support structure.

There is a ring support at top of the exchanger bracketed to the wall in each of the 4 quadrants. This takes the overturning loads on the exchanger.

Bottom support (at about the 1/4 point of the exchanger, with the remainder of the exchanger hanging below) is a heavy duty ring with gussets at the bolt locations. These are bolted to a steel support structure that is obviously well engineered.

Qualification data (Yuba Heat Transfer Division Calculation 69-G-226) indicates an analysis to the design basis.

Based on the inspection and anchorage data collected the Heat Exchanger is adequate.

Evaluated by: Date:

cQ > /I g

/8- ~ - fi

Attachment:

Pictures

DC COOK Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 2 of 2 ID: 1-HE-18E (Rev. 0) Class: 21 - Tanks and Heat Exchangers

==

Description:==

EAST CONTAINMENTSPRAY HEAT EXCHANGER Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: E CONT SPRAY HEAT EXCHANGER RM, Manufacturer, Model, Etc.: YUBA (VERTICAl)

ELC3XKE>

BASE GUSSETED SUPPORT TOP SUPPORT

P. O. BOX 3158 ~ TULSA, OKLAHOMA74101 o (918) 939.2201 YUSA ItlOUSTA!SS, lNC.

December 7, l971 American Electric Power Two Broadway New York, New York 10004

,C~~~ F'LA~>

ORD - grD f,gpss Attention: Mr. R. A. Kadlec ~rCTIDN Mechanical Engineering Division E~~GtNV;.q DATE

Subject:

Indiana & Michigan Electric Company ~LEANT LIPEy~ME Donald CD Cook Nuclear Plant DATE TO PLANT Contract 1241 Containment Spray Heat Exchangers 0 NOH pERHAHENr HlNQfUM g~~N~

Yuba Job Number 69-G-226 Gentlemen:

Qe are enclosing ji refer to a six (6) copies letter of Novem b""

~ ~

'f o our Seismic Stress Analysis for the subject gob.

Qr 9 1971. written by your Mr. A. Sherman,

~ ~ ~ request'ing additional a clarification. As a resu suit we have completely rewritten this a y

  • as Rev. 2.

Please return one (1) i

( ) copy in d'cating your approval and/or comment nts at our earliest convenience.

Uery truly yours, YUBA HEAT TRANSFER CORPORATION B. F. Forman Des ign Engineer BFF:dc cc: Mr. A. Sherman Main File Eng. File I

/U J 1

Y \/."!< .!!::/s7 1 8 N"SF 0!'l V I S I Ql~ Page 1 op

>U3/s l(vov ~>ales, Inc, Rev. 2 Seismic S trc. s Anal vsis Indiana & Michigan Electric Company Donald C. Cook tiuc lea r Plant Contract 1241 Containment Spray Heat Exchangers Yuba Reference 69-G-226 S tresses in the support ring structure resulting from the operating load on supports, thc forces due to seismic acceleration and operating pressure will be investigated using the refer-ences listed below.

The support structur'e consists of two 4" x 2" rings encircling the exchanger together with a 1" thick wear plate and q" shell plate. Refer to Page 5 for vertical support details.

The following stresses will be calculated:

1. Longitudinal bending stress due to shell acting as a cantilever beam and loaded with horizontal seismic force.
2. Bending stress in ring structure loaded with operating wt. and vertical seismic and horizontal seismic force acting at center of gravity of exchanger.
3. Circumferential and longitudinal stress in shell due to pressure in shell.

The period of vibration'is determined using References 1 and 2 below:

l. "Introduction to Matrix Method of Structural Analysis", by Harold C.

Martin, McGraw-Hill Book Company, 1966.

2. Yuba Computer Program to determine loads and reactions in structures by the direct stiffness method per reference 1 above. The program also

/

I calculates the natural frequencies of structures. See discussion on Pages 10 and 11.

"LIU/i I SCAT TRANSF!. R 0! Vl" IYOUSTalas, INC.

IQl':.'OA

(' .. 'u <g u / l~ U 4 Page Rcv.

2 ci k

W = 94.4 Total Operating Wt. ~

<Vertical, Acceleration Av = .17

~

  • Horizontal Acceleration AH = .3 A = 10/12 Ft-B = 18/12 Ft.

C = 9.42 Ft.

(See Fig. 2 Page 5)

D = 3.46 Ft.

E = 6.92. Ft.

6 = 45' k

HF = W x AH = 94.4 x .3 = 28.3 VF = W x (1 $ A ) = 94.4 x 1.17 = 110.4 2 PE Sin 8 = VF D Sin 6+CHF

. 2 P x 6.92 x .707 = 110.4" x 3.46' .707 ]

9.42' 28.3 P = 54.9 k (Vertical reaction at one support)

'Zhe following forces are horizontal components acting normal to the rings. Tvo forces act at each support - See Fig. 2 Page 5.

A x P '/12' 54.9k 22 . 8 k (Force due to moment caused by ver tica 1 Rl 2/3B x 2 2/3 (] 8/] 2 ) 2 reac Lion)

HF/2 Sin 0 28.3 /2 x .707 I 1= 4x2 = 1.25 (Horizontal shehr in each ring)

HF Sin 6 28.3 k x .707 hg = = 2.5 k (Force due to moment cuased by horizontal 4x2 4x2 reaction)

U i' (.' i

".,I-:l 7 Tf? ANSF ER DIVISION Pago 3 o ~

YVOfi'IIIDVSTAICS,II6c. Rev. 2 R= l~, h 1

~I h 2 -"228'k ~125k>25k I

= 26.55 k, 24.05 k (Total horizontal force acting normal to the ring See Fig. 2 Page 4)

Using 2" Rings and the loading "R" shown in Figure 2, calculations were made to determine stresses.

For stress in rings see Page 6.

Stress in Shell (Due to HF Acting at CG) k M = 'F x C = 28.3 x 9.42' 12 = 3200 in k (Moment in Shell)

Section Modulus Where d = outside diameter of shell, in.

(d4 d 4) di = inside diameter of shell, in.

= .049087

~

R 43300 30 3 = 1426 ill M 3 200.000 in lb Stress =

S

=

. 1426 2245 psi Shell Stress The above calculations were based on the horizontal & vertical acceleration given in your specification 42373-NK. I The accelerations used to obtain stresses correspond closely to those obtained by calculating the natural frequency of the exchanger see Page 9 for values plotted on the response spectra curve it Floor EL.633.

I The natural period of the exchanger as obtained from our computer program and based on loadings shown on Figure 1. Page 4 is 1.275 Second (maximum).

~('

f

~ ~

v' V jI (. I, ~,.r.. Q,"

y i ~

)

k

~~ 'I 0l

(.

Wrr7r& C. C Hr- C..

C C

Og t Qa' 0

(I) 4 O

('Xl+ ++ OO 7~-'ll rt~

c'as" .

c 5i

/rr 'g" t:f Hcg I

I S+7W 7 SS r/

7u4< Sr' . ,r

/r Phoo 6+~7'nA Or~

,:7~

(K

.~zS Wa I:

/ -~o' ~WC>

QOyZ'7.

l(Q l kic=zG ir 7S

~

~ rm II'LVO < 11'L" V6i};:,.A VS!M7 '1 I..'.~ I."i:.."i'-FL Ci~e~f'O'LCAVlIf.u;.-'iI ~

I.i

s. cvvvIIIIrIIvoI Y~i:A COI:."r~iIufTZC> l!:Dl1~Tl'.lI.".. ll!C.

(

4 1%.".t 0

~

0 0

~ ill h I I AVI:

~tr 'I'A 3515 Ol 'V .ON lmAO. 1'Ut ltWLV

'a. 0! LAf<Q1.1A 0Vo'C.

ez-g- ~=a -/

'l l ~

~ L r, ~

%Iran'

~ J 0 '4 ~~ v 4 4 dA~r IV J A U llha ~ ~~ J ~ ~ ~

YUUh HLAI1'AANSF 613 Ol VISION Q I\ :j. I'. !J:;. 4, 4 aI Pa e Go.."

YVOA IMDVSTAIFS, INC. Rev. 2 STRRSS I!; Rl;;CS Reference "Formulas For Stress 6 Strain" by Roark (See Page 7)

Miome'nts in Rin 17'

-~

=

=

28'os Cos e

()k

=

~

.9563

= .8830 26.55 k x 31.5" R ='26.55 k r = 31.5" 2

=418 in k

'MR = - ~3-R r (--

1 e

Cote)

MR' 5 R r ( si e

-)

1 e

M'0 = 4 R r (sin .

1 -) 1 e e R

(Cos o( 1)

Sin e e MR = -418 ( 1

.7853 1) = -113.8 in k (Moment at load due to load) Q Oc. plH5

= 418 ('8830 1

.7853 )

= -10.4S in Ic (Moment at R'ue to load at R)

.707 1 1 418 (

.707 .7853 )

= 59.4 in k (Moment at 0 due to load zt R) 418 (

. 9563

.707 1

.7853 }

= 33.4 in k (Moment at 0'ue to load at R)

MR (Total) = (113.8 + 10.45) = -.124.25 in k in k 1

M0 (Total) = (59.4 p 33.4) = 92.8 Moment of Inertia of Rin T

.3 3 2 x 4 15 x 1.5 1= 12

+ 12 q L 8x 22+22 5m .752]

QF.

I= 59.51 in4 S

59. 51 = 14.9 in3

~ll~ ti RADlVS Mc Max. Stress (at load) or I

-124250 in. lbs.

8,350 psi (in 4" x 2" ring) 14-9 in3 a 22.5 x .75 8 x 3.5 CG = 2 x 4 $ 1.5 x 15

-124250 in. lbs. x 1.5" 59.51 in 3,140 psi (in shell) 5II

isa.re: o',

Y'J13fs r'L;AT TftAl"SFCR DIVISrQN YVOA INOUSTAISS, INC.

Copy Taken From "Formulas For Stress and Strain" by Roark Tauu: VIII. Fonstur~s ron Clncof,*n Braes win Ancnns Bf'n 2'n Vn Bf, T, and V arc positive xvhcn as shosvn, negative ivhcn reversed. Allapplied forces and couples arc positive svhcn as sirocco, negative svhcn reversed. The follosving notation is ctnploycd: g w niodufug~ of f

elasticity (lb. ppr sq. in.); ~ moment of incrl,ia bf ring cross section (in.'); 1V or F as shovrn ~ applied load or I y/~ ' reaction (lb.); w ~ applied load (lb. pcr lin. in.); l: ~ freight of contain'd liquid (lb. pcr cu. in.) ~ ~ si<< ~

~ cosa;s ~ sin 0,c ~ cos0;n ~ sinO, c ~ cos O; p sruti,q ~ cosp. Allanglcs~uradians,distanccsin NI ' ~i 2 inches, forces in pounds, moments in inch-pounds. +D, or +Drncans incrcasc, -D, or -Dmeans decrease in diamctcrs. +drR means increase, -aR means dccrcasc, in upper half of vertical diameter. C TI trtn VIII. FolMULAs l'OR ClncvLAR Itngcs A'Ho Ar'cncs.(Confinucd) fzalin ruppxe and Formulas for tending moment II, eireumfere rfsl 4ensfon 2', rsdtst shear V at a u!ar dieesneo r from toirnm o ting and for Vi. shan't in Lairosut drnmeeer, cow numM and D,. change in versiesi dismerer f bx fdK under sny num l /u

~ eton ~ I) It'-frI!(---):hfag+If ~ l rfP/ /l x l /l eor sr each hf ~ --frP(-

of equal radial (a c)" 4s e) at o,h,dd, htss (o I} load forem cqusay spsad I Il/ r ~ -l 'I r eot C at toads.

IO'~./,0

' load foist ~ -@L (y+,e I '

Z(b.-. 0 Jlr ludisl disrtseement ef each 2n.L, (2 2 lrlfs/2 1 'X ) .fnsrsrd ftsdisi dupfae me t se r 0, 2I, In, ere. C-Ilr gal (C ~ ss)

. VU/i II::Al 'I IIAisSICI:II OIVISIQN YVOA ftaovSTRIES. tNc.

SUlMARY OF STRESSES Combined Lon itudinal Stress s

Longitudinal stress due to pressure =

r x - .2 2t p ghere r = inside radius of shell, t = shell thickness & p = design pressure 2x 5" .2 x 150 psi = 4,470 psi Combines stress = pressure stress + bending stress (Page 3)

4,470 + 2,245 = 6,715 psi h Combined Circumferential Stress Circumferential stress due to pressure

r x - .6 t ~

p Combined stress = pressure stress $ bending s tress (Page 6)

= 8,910 +3,140 = 12,050 psi Shear S tress s

'Xhe shear stress in the shell can be ignored since the ring structure takes the load in bending.

ggll alii 5alll ) ~

gmgg~~

gg gggg

~ g55I

~SR

~ g

'<<i'..cc'ice!i

'j'his procvc(ct7 uses the direcL sti.'.i'(.ss Ur Lilod as si:o-:n b> Ii. C<< I.'artif! jn s';AL') i;( f'jnL'hlods ol. Stl.uctul:al tlnal)'8).s l

~

Xn the case or: "-

been a:ith a distributed load, the load is d'vide(. into f an...

pOint lOadS SpaCed alOng thf: Laealf}.

g i:/f't.

L = len('th The problenl (!ould be appzo>:ifvated as F

t:

F F F p I'I~I/ ('<<1) )<he) e H = 'fao ~ pk Load l pints Fro}fr here t >e program calculates ti:e nov>'<<ts at each loari point and th reactions at each load point and the reactions at each support. Also, (:ith the input:, the natural fzcque;.cies may be calculated.

'Co find tl.e natural fze(Iucncv tnc stiifness:".atri>: Sound above is used in r.:;:"'.

the sa.,~a @ay ..". spring constant in a vibrating spriqg and'rf".ss systera. For a spring F = "IZ F=- hl

. X I oo = -g: buL for an of;cillilting 4

8)'S teal rrC4 }IV $c/ is in radians/sec v l ~ <<I I aa <<a ~~w vhv J~ or (W' Z N ta

                                                                );;-0

[CD EY.p J AIf~

                                                                                                                 'iV = g/~phd     '

fa}O i ('l<<l <<I<<<<I<<<<Illa lc II I pre ~ cly cf Ercq ..- ~/Z g rye le<</ccc lllcl Yrvracflr I)!ci~ ivr., '<<ld I ~ rc I lc. Lc r ~ >'.d da'd I 4 IClc

                   ~
                             ~
                                ~ I \I l J l, I <<Ir I IC<<C l Cr 4 l val ~
                                             ~                     ~

f,l ca Crr.rr fr.V<< ll<<C l f<< r V<<.lcf Il I ~ CCCC<<l .C<<l, ~ (V ~ ra} ~ t C<<f ~ VII(<<CCC I'I~ 4f CICr Jl Cl ll 0 l C<< l Ca'vr I Ivr Cf ~ I (<<IVI IICA v aa<<va<<<<v~<<<<a ~l avv4 <<wav ~k a<<t J 1~ I J<<ae ~ ~ ve<<A4U

                                                                                                                              ~ C<<C.C:
                                                                                                                                         ~ <<<<<<4<<rv  vva~ v    vJ cv IAa  v 1

YUB.'. i,'.'}':YRI=.S. lNC. Ca<T I }I(;<< f.f I'<<l "l <I! I'(:f '>:.. (:l:.l '.ll!!I!r 'I:I(<<.::

                                                                                                                                                                                  "1     1 Fo        our case                  F =: 1',                       aa! Ia   "r'e       1   1S    'Lh<.: S  t it llfeS fr       i'eai tr )  .".

I r-; F f.t point loGds O'Ad are the displace.~. nt.. at the point loads. p wt+ 2)e vllere H =- hV 2 or "11 )i X . KZ, where X.. or (1' H tf ) X = 0, since'tlie displecer.ents "re not nll equal to Zero the deterninate of. thc 1!atria (1; + H X.) aust equal Ze.o. Then W'=~7'nd P -.. W cycles/sec.. 2 A 4 ev e v PLRv ~ vev v ' lie.alt -%Let 4tnvle.g> 11 11 a fena till CI Ievbt ftnhatae fteaetfCte ~ ~ hV ~ I Vl IC 1 V 1 ~ eV e Ovnta IC ~ 't vlf ~ tet Iti pCII ~ hOf I ~ Cr I . ~ ge'r pre ~ ehntt Othtt It.nn Il.nt fn ~ a haah il ea tr'l ~ 'IeCCelf f at hlahnef ~ vllhnvl It.et C v 0 ~ 4 tvl Cf Iv LC tta 41 Tent.liat fraeetecee

                                                                                '$Ij" 'at
 ~ '

ve vvvear k4it4A a ~ ra acr A'L~ v re A ~e pv JNrv vh eva e~> dva vlNkbr e'a' rreaeaealwre ~vie 'AAwAA,av e ee r ~ teaa et, TITI.Ir

                           /I4+       je          1 ~   I' '    .         a   '         I'      ~,aa     ~

I I (I pt(Z ~ ~ ~ lw Vl

                                                                                     ~                                   ~

C cate. fJLeefw a ~ e s'a i ~ ~ af e ~ aa ~ I ~ J ~ Y U'5r 1r"i~hIS'1 f1'L: lflC .at r. 0'cela". t (: tr'Or'a wl aell I lf. 'era i.'I' etc!II ala I'I'I. I L'h.:.4 i

XNSTRUC LIONS FOR XNSTALLATXON, OPERATXON AM) MA XIQENANCE or SHELL AM) TUBE IIEAT EXCHAlxGERS FOR AZRXCAIT ELECTRIC POHEP, P'HVXCE CORPORATXOH XIIDXAIIA8: 11XCHXOAD ELECTRXC CO&ZiQK DONALD C. COOK IICL"P3 PL~I'HXT 1 AllD 2 GUSTO."KR' PURCHASE ORDER IMBIBER Contract 1243. YUBA HEAT TRANSFER DIVISION JOB NUIIBER 69-G-226 DESIGNED AM) BUILT BY YUBA HEAT TRANSFER DXVXSXON TULSA, OKLAHOa~M,

VV'I: D HHQ,'I7 ll i;ZQ,I.JGL-;.2 L'3i"'7J"I'~"'~I.G

                                                                                                                                                          ;,Qg
                                                                                                                                                                ,/

P. O. OOX 3158 ~ TULSA, OKLAIIOMA 24101 ~ 19161 939 2201 69-G-226 EXCHANGER SPECIFICATION SHEET YVGA INOUSTAIES. INC, CUSTOI 1E R American Electric Power Corn. OAT F. 9-18-70 CVST. NO. 42373-P(IY PLANT LocATIQN Donald C~ Cook tguclear Plant PROPOSAL NO. OG-898-64 S ra Cooler ITEMi NO EA" 1 60-355 Vertxca'ontainment SIZE TYPE CFU POSITION 200 sHELLs PF Four NO. OF UNITS One SHELL ARRANGEMENT PARALLEL ENGRS. TEB PERFORMANCE OF ONE UNIT SH'ELL SIDE TVOE SIDE FLVIO CIRCVLATEO Lake Hichigan Ilater Boraced NaOH I ater B TOTAL FLVIO ENTERING lHR. 1 650,000 - 3300 GPI~I 1,600,000 - 3200 GPif VAPOR /HR. 10 LIQVIO v.- /KA. 1 650 000 1 600 000 STEAM /HR.

             'NON CONOENSAGLES                               /HR.

13 FI.VIO VAPORI?ED OR CONOENSEO /HA. 14 STEAM Coia/OENSEO =/HR. 15 GRAVITY.I,IQUIO oAP I 16 VISCOSITY-I.IQVIO CP. MOLcCULAR.V(EIGHT VAPORS 16 SP. HEAT-GTV/=(aF FNTHAL.PY-GTV/='G TEMPERATURE IN oF 76 167.5 20 TEMPEAATVRE OVT 141. 5 100 21 OPERATING PRESSVRE P.S.I.A. P.S.I.G. IMPER OF P S tWO LOCITY F TJSEC. 3.7 24 pRcssuRc ORop PD. t 10 at.LowEo l,4 c" t.c. 10 aLLowEo 4. 0 cat.c. F ov'LING REslsTANcE .001 .0005 26 HEAT EXCHANGco-G.T.UJHR. 107, 850, 000 M.T.O. ~+~V-~ OF. 25 ~ 6 22'RANSFER RATE SERVICE 375 CON STR UCTI ON-EACH SHEL L 29 OESIGN PRESSVAE 150 300 GO TEST PRESSURE I a.t. 225 450 DESIGN TEMPERATURE oF 200 200 A249 TP316 No- 1150 U 0 0 5/8 IN 20 GwG.AvG.gt+;vaLL LENGTH 29 PITCH 'l 3/l 6<< > 7LYA(( 7 60<<o.

                                                                                                                                                                ~

Steel INOM. I. O. o. 'QS SKELI. COVER IINTEGRAL Qp<~~~QItS+ F LTG. KO. COVER 26 CKANNEL. 304 S ta in less Steel CHANiiIEL COV E R 304 S.Steel Cla o? TUBE sHEETs sTATIONARY Steel 6 Overlav FLOATING GB BAFFI.Es sEGME'(TAL Steel P ITCH lt CUT F I.OW QG BAFFLE-LONG Steel IMP'T. Stainless Steel 40 TYPC JQINTs sHELL . Bo1 ted TUBES Bolted 41 GAsKETs-sHELL S.Steel Clad FLTG. HO cHaNNEL S.Steel Clad 4? CONNECTIONS-SHEI.L-IN 18 OUT 18 SEAIES CHANNEL- IN oUT t,2<< SERIES VE 44 CORROSION ALLQIVANCE SKELL SIOB l./8 TUBE SIOE E"REQUIREMENTS-as<<E 1968 Sect.I IC Tube Sec= 8 STA'.I~IYEst 6~Y TEMAcLAss 4 HTS EacH sHELI ANO GUNQI E 60 000 GVNOLE ONLY FULI- OF lvATEA 94,400 EMARKs: Edd current cesc tubes. Seal weld tuoes. Full suo ort olace a U bends.

JUL 11 M~4'i(/7I'~ 7//f C-YQBA HEAT TRANSFER CRPORATION P. O. BOX 3158 ~ TULSA, OKLAHOMA74101 ~ (9181 939-2201 July 9, 1.975 American Electric Power Service Corporation Two Broadway New York, New York 10004 Attention: Mr. Cherry

Subject:

Indiana & Michigan Electric Co. Donald C. Cook Nuclear Plant Contract 1241 Containment Spray Heat Exchanger Yuba Job Number 69"G-226

Reference:

Seismic Report for American Electric Power Gentlemen: Confirming our recent telephone conversations regarding,our Seismic Analysis, our 69-G-226 vertical containment spray'heat exchanger for t'e-Donald C. Cook Nuclear Power Plant, the natural period of vibration is

    .108 sec. rather than .787 sec. as stated in the report.

Please note that the .108 sec. perio'd will result in lower accelerations and stresses than those in the Seismic Report. If we may be of further assistance, please contact us. Very truly yours, YUBA HEAT TRANSFER CORPORAT N WiXliam C. Newland, Jr. Design Engineer WCN/et cc:. Mr. R. H. Shaw Mr. T. R. Harrington Mr. Bill Newland Main File Engineering File ALL AGREEMENTS CONTINGENT UPON STRIKES, ACCIOENTS ANO OTHER CONOITIONS BEYONO OUR CON o'LLCO NTRACTS ARE SVLIECT TO APPROVAL SY AN OFFICER OF THE COMPANY. QUOTA'TIONS SUMECT TO CHANGE YYITHOUTNOTICE,

712 I

                                                   "V U-TUBE EXCHANGER REMOVABLE CHAN."$=L AND COVER TOO PASS SHELL EVEN PASS TU" E SIDE TEMA CLASS 'R'ONSTRUCTION VUGG V~CaV Vna,usvt-:v. D<vrorota         TYPICAL CONSTR U CTION YVOA INOVSTAI4S'NC  ir~ ~ ~

FEATURES OF YUBA TYPE CFU EXCHANGER

IT e

         '%f' 0              ~>V" l~
      ~l g(

y(

    /

rr:o /re% ro ,t/ %' r<<o ~

                                                                                                            ,0 gg~~t got                 4  ~

a~/ SOAP Ctootorr ooo goo<</7 L w ooo<<<< to lo tv<<or It Coo<<

f. ooo rtt /~tr raW/

tr rtoooota I o ~ trf ~ ao <<o C.(iPICC tS /<</<<J CC rto<</tt <<r~. .4 tp I / o J ot h> ct. ~. toI/%it Ct o oo k to/I /~ A'too J Cooo toIltoo. oC

                                                 .Sc r r/root B P g                                                   YVSA lQAT TRAPGFA NYIQIOII TIBIA WKANlWoo, poC,
                                                                                                                                               <<o, ~

rttr~ artoo r<< rtrrtce oo /~~r// o<<rrro ro<<oorrI rw to<<<<<<r o/II<<o ro fr&rot. to<<tD<<4 r/~ rtl'; ~ '. It 4'oI

Co Component Zo. t H 6-(8 6 Class Any particular area the Seismic Review Team should pay extra attontion to? Yes No (If yes, check items that apply.) Anchor Type Anchor Diameter hnchor Spac:fag Anchor Number

                          ~

Anchor Embedment Anchor Edge Distance Anchor Gap Anchor Thread Engagement Anchor Grip Anchor Angularity Concrete Crack Others (describe briefly) If there is concern for Design Basis Discrepancy, circle the applicable item and explain.

l. Hardvare Maintenance Type Discrepancy
2. Drying Up&,te Type Discrepancy 3, Significant Operability/Design Basis Discrepancy .

Others Condition: Actions Taken: t4 odC Prepared By T. naos > <3 7Z

                                                                 ~~l4 Vrxr'441.V O.ulr ATTACHMENT NO- 1
                                .ANCHOR INSPECTION DATA SHEET Avx E.c. bog'-g       u Unxt 0                     Bldg.                  Location t 'Z-   ) 5 A -0, I 2-39I >- J           1- H  ~8f Installation           dwg.  /   Rev.         Equipment No.

Anchora e Arran ement Sketch

                                                                                                 ~ ~z VI 0   ~

r 1 (a~) (AO'-0" It(OlAl(P 4ICHI( A g flQ)l 4, ~ i'l fPOi.' tahiseg rdnY MAR 2g LORY. T ELGu. i "4 Loose)6 NGS

               ~                                                                         g   4 4   or>'
         ~
           '                                                                               V   ~

4 ~ 0 r gp ) ( ~ Drawn by: Date: Verified by: Date: Q al./Cert.

                              ~        ~  nspector Reviewed by:
   ~

Date: 8 <>83 Construction An or Review Engineer Page 1 of 3 Revision 1

                                                                 **12 CHP 5021                 CCD NO.         01'TTACHMENT CHOR  INSPECTION DATA              S EE 0
                                                        , ~      ~<T.5'PR~                %.6-   R~g 0'ldg.

Location Installation dwg. / Rev. Equxpm'ent No. Anchora e Arran ement Sketch kg+ p oiT, 4lh5~,HMT (STCAM) Sl'. "=

                                                                           ~   ~~
                                                                           ~ J ~', ik I ~ g Q 2S 1995
                                                                   'ngr lp~ 4
                 'Fg I8 W$g ig T'~ Lmt-mm,a 4'rawn by:                                                       Date:

Verified by:

   ~ ~

Date: Q al./Cert. Inspector Reviewed by: Date: Construction An hor Review Engineer Page 1 of 3 Revision 1

                                                        **12 CHP 5021.CCD.019 ATTACHMENT NO.             1 NCHOR INSPECTION D TA SHEE A  '~. Ct. Voq-o"    ,~    WvT SPRR'/ ~ 6- RooI4 Unxt                     Bldg.                         Location i<- '39IS S                             I-HG- I55 Installation    dwg. / Rev.            Ecpxxpment No.

Anchora e Arran ement Sketch II II fpll c CE 'c IVV 'i.< ~ ii II II MAR 2g the~ II I'

                                        ~

g II II II II II II

                                       ~l                    PLP,g          Ul~   .

(B e.Oe t mme.886<I) Drawn by: 7.W ..U Date: 3- I'i< ~ Verified by: Date: qual./Cert. Inspector Reviewed by: Date: 3-aS-'f> Construction An hor Review Engineer Page 1 of 3 Revision 1

                                                                              **12 CHP 5021. CCD. 019 ATTACHMENT NO. 1 ANCHOR INSPECTION DATA SHEE
                                                ~! . pg          q
                                                                   ~

40NT 5 PRA'/ H Q- Pop~ Unxt Bldg. Location 12-39 lb Installatl.on A dwg. / Rev. A 1-Equipment No.

                                                                         ~   - (QE.

Anchora e Arran ement Sketch 6I &s~/sP! 24,+jg~p4. 9

                                                  >40 50!.T,! o~<

Wh5~, NOT (~r. 5)

                                                                            ~

SE. CT. 'A,-A S'ECT. 5-8

                                                                          !3 2/g+'/g ~ pg)                                                        ~h.~4gw) 3'/2 xg    x>/y x 8'jf 4

(p~) c 4-I t<0!*!!A V.!,"'l!"t:: WOc",Kl!":" C~ IO ACCT,'c-c MAR 7 Z l~~'BCT 0-D .Drawn by: &~L4nln Date: ~-~~-'~Z Verified by: Date: Qual. /Cert. Inspector Reviewed by: T- Date: Constru son An hor Pevxew Engineer Page 1 of 3 Revision 1

                                                             *+12   CHP     5021.CCD.019 ATTACHMENT NO. 1 ANCHOR INSPECTION DATA S EE w~t- zpn.~               w c - a<p~

Un t Bldg. Location A 0 I- l-h=- ISI:

                           /

Installat on dwg. Rev. Equipment No. Anchora e Arran ement Sketch IB <</zX g" I~ I/a x Wy (STI~a Wmeg

                                                             +~ I/2 R) 5/4. cp 54l  T  w 1TH  lo M Hh&%9 p l/+ +p~i  ~ ~ll    RHOT StHM  K OH CIT~ Se6          Or RR HEe           I~ VO7        S~WH SECT. F-E 0~    g (RW) p    l I

0 I

                                                                       ~:>l ~ !i>i'cV. CQpy MAR       2Z 1S95
                                                               -LCRK,T 5CcT. F-F Drawn by:         T      AuL4esp                              Date:     ~-' -'(~

Verified by: Date: ua ./Cert. Tnspector Reviewed by: Date: Constru son hor Review Engineer Page 1 of 3 Revision 1

                                                                         ~ ~
                        ~  +

~ ~ II s ~

                                                        ~ s     ~
               ~  ~
                                                 ~    - ~
             ~ ~i        ~      ~

LI W 1

                    ~

KR~~~RRKR

                               +    ~             ~
                             ~    ~         ~   v   l     ~

j mmwmmlHmm e ~ m mml@mmR1mmRI mRSWRIRRNSNKl MWWWWW&W 5%mmRMSRRmm RQmmmRRRRR%l%

        ~

MW&MMWW&0 I 0 Cs 4 ~

                                                                  ~ r~gs r W

0 tW -~~

                                                                              **12 CHP 5021.       CCD. 019 ATTACHMENT NO. 1 Equipment No.:                                                                     Dwg    No.: )~- S ))SA- 0 Anchor type NR)GC            t.lfeR.        Dia:           >/                      Dwg    No.:

Tightness established by: 0 "Snug Fit" 5 Torque Torque Nrench No.: ~~+ ~) ) Cal. Due Date: C 04 3 Tightness verified? 5.Yes 0 No 7- '~'~'<~'i Date: "-< )-')3 ons ruc ron Equipment base flexible? 0 Yes 8 No .""""<>>"l: Date: 3 '- l3 Bolt ID l 0 tL lK )'5 l S' lo Comments Caps GETw&&nJ CoNC:Q L Anchor len th Protruding len th Embedment 84 sq s4" tp g"

                                                                    '"/s            ( 3y    653 l)

Bolt ri /S S/j'/II" ~4. ~/g Concrete 0 00$ 40OP'oop Coop condition Cj OQQ G,OOg g o 0g (WOOLD Edge distance Anchor +(l ~rr gl l g 9/)@ 4 Il Q II s acin Anchor an larit Thread /eI m&S OK olc. oL OE Og. hJUT tsSl~" engagement T&lclL . Comments: Verified by:

                      ./Cert. Inspector Date:       +

q a Reviewed by: T- I II)Ir Nh tfil~rI Gr'll I <Wr; Date: 3- a3- qg Const ct og 'rYODK)AG COPY y;qB 23 1993 Pago 2 of 3

                                                                                      -Revision        1

gu4 J. ~ <i', ggg ATTACHMENT NO. ANCHOR INSPECT ON D T S 1+6-< SG Equipment No.: g No.: I- Bhi5A-a

   ~
                   ~              I                                                  D Embedded      Steel      Dwg.  ~ No.:    ~

HYSICAL C CT RIST C Weld ID Weld e Codes T e Size 3lltp 1 = Fillet 2 = Plug/Slot Len h 3 = Groove Cracks Yes Yes Yes Yes Yes Yes Yes Yes 0 No No No No No No Lack of Yes Yes Yes Yes Yes Yes Penetration No No No No No No Porosity Yes Yes Yes Yes'o Yes Yes Yes No No No No No R&.os 8 TYpLce io<+71()N< AAB g~6 pg, sTR084 R T-'

                                                                                              ~~            -re-'tz INGIABO '<t SITe 0=<"

VIP LEACH + r Equipment base flexible: Q Yes Q. No 7 43 Lw~<w-u Date: 3- <" ons c 1on re Reviewed by: Date: Ops'Qy Qns ruc xon c or evzew ov hy'. ngxneer Verified by: ua. e npsec or Date: Page 3 of 3 Revision 1

S 8 A CEPARTMENT CONTROL.LEO DOCUMc 8'l 12 SHP 5050 NDE.008 ATTACHMENT NO. 1 COPY NO. Ul',TRASONIC TEST REPORT JOB ORDER NO.: > If( REPORT DATE: > '+ lZ REQUEST NO. l IA. IDENTIFICATION TECHNI UE Unit C hlE Test Unit/ S/N Component l AC.l F Freq./Diameter 6 Item Reference Standard C. Ke

                                                                           '3e Material                               Couplant/Batch No. i~ cMA 6t=        o".

Other TEST DATA REMARKS PERFORMED BY: I EVEI: ~ DATE: REVIEWED BY: FORM NO. 12 SHP 5050 NDE.008-1 E.EVEL: ~ Page 1 of DATE: 1 5 Revision 0

0 01/16/92 PG. MO.SC5 SAFE SHUTOOMM EOUIPHENT LIST (SSELMP) FUNCTION: Equipment Class: 21 I'rain: 2 Equipment IO: 1-HE-3C-HE Drawing Number: 1-5135A Svstem: CCM Equip

Description:

NORTH SAFETY INJECTION PUMP PP.26N OUTBOARD MECHANICAL SEAL HEAT EXCHANGER Building: AUXILIARY Room: NORTH SAFETY INJEC'IIOH PUMP ROOII Elevation: 587 Normal State: Desired state: iPower Required: M Sort: lf, Suoonrting System Drawing Humber: omvired Interconnections and Supporting Components: fety Related Status: NUCLEAR SR Min/Opt: MIN ADDITIONAL INFORMATION AIIas Number: Power Train: MA Cnmonnent Served: NORTH SAFETY INJECTION PUMP PP 26N wanufacturert BORG. MARNER Kodeit NX 0500-FM Panel EC~ Drawing: H/A Miring Drawing: N/A Pnwer Source: N/A Mal%down: F Relay Only: M Comoonent I'ype: HE ~ ISO Drawings: Detailed Location:

DC COOK Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 1 of 2 ID: 1-HE-34-NE (Rev. 0) Class: 21 - Tanks and Heat Exchangers

Description:

NORTH SAFETY INJECTION PUMP PP-26N INBOARD MECHANICALSEAL HEAT EXCHANGER Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: N SAFETY INJECTION PUMP RM, Manufacturer, Model, Etc.: BORG-WARNER, NX-0500-FW BASIS: External analysis

1. The buckling capacity of the shell of a large, flat-bottom, vertical tank is equal to or greater N/A than the demand.
2. The capacity of the anchor bolts and their embedments is equal to or greater than the Yes demand.
3. The capacity of connections between the. anchor bolts and the tank shell is equal to or Yes greater than the demand.
4. Attached piping has adequate flexibilityto accommodate the motion of a large, flat-bottom, Yes vertical tank.
5. A ring-type foundation is not used to support a large, flat-bottom, vertical tank. N/A S S C

~co vins SRT: Gary Thomas, Tom Huang and Kailash Mahajan on 11/1/93. ANCHORAGE ACCEPTABLE BY ENGINEERING JUDGMENT OF THE SRT. 6" diameter by 8-3/4" high exchanger, attached to North Safety Injection Pump with 2 1/2" bolts. Could have screened with the pump using the rule of the box, however the exchanger was listed seperately on the SSEL. Crane above in a parked and locked position. Evaluated by: Date:

Attachment:

Pictures

DC COOK Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) ~ Status: Yes Sheet 2 of 2 ID: 1-HE-34-NE (Rev. 0) Class: 21 - Tanks and Heat Exchangers

== Description:== NORTH SAFETY INJECTION PUMP PP-26N INBOARD MECHANICALSEAL HEAT EXCHANGER Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: N SAFETY INJECTION Pt MP RM, Manufacturer, Model, Etc.: BORG-WARNER, NX-0500-FW NORTH SAFETY INJECTION PUMP PP-26N

                                                                      ~~xc   vnr ~vs~       iiu. via ATTACHMENT NO.           1 ANCHOR INSPECTION DATA SHEET A. 5a4z  h~ e~   ',   9   Rn Un1t    g                      Bldg.                         Locat1on C

Installat1on dwg. / Rev. Equ1pment No. Anchora e Arran ement, Sketch F46'v. J>I=4 45DksQl c yj'4 Ooi~ Yyp Vlc o.O. Oo I

                                                  ~l FLo 'E4.

INDiAHA." llCHIGA"I POY(ER '-0 CONSTRLICT!Oib CGLTROLLEO

                                                               ~ T, EYORKING COPY 4   Gr a       ' i q

S~P g g tqap CLERK k 7 Drawn by: Date: /8-/- Verified by: Date: L- Z.- 'P < Qual. /Cert. Inspector ,:I Reviewed by: Date: nstruct1on Anchor Rev1ew Engineer Page 1 of 3 Revision 1

Equipment No.: Tightness established by "Snug Fit" Tightness veri'ed by: 'C. goal./Cert. Inspector Tightness Verified by: onstruction ARE Comments:

Equip ID: 1-TK-11 Train: 12 Equip Class: 21 Drawing No.: 1-5142 ction: RI ys tern: BORON INJECTION Equip Desc: BORON INJECTION TANK Building: AUXILXARY Room: BORON INJECTION TANK ROOM Elev: 612 Sort: S, Notes: Normal State: Desired State: Power Req'd: Support System Drawing: Req'd Support Comp: Safety Related Status: NUCLEAR SR Min/Opt: MIN Alias No: Power Train: Comp Served: BORON INJECTION TANK Mfr: STRUTHERS-WELL-CORP. Model: 900 GALS, O'I Elem. Drawing: 1-98282 Wiring Drawing: 1-95222 Power Source: '1-AM-D-5A 1-AM-A-2A Walkdown: F Relay Eval  : N Comp Type: TANK a ISO Drawing: Location: XN THE MIDDLE OF ROOM, 15'W OF THE ROOM'S ENTiVQICE DOORWAY.

DC COOK Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 1 of 3 ID: 1-TK-11 (Rev. 0) Class: 21 - Tanks and Heat Exchangers

Description:

BORON INJECTION TANK Building: AUXILIARY Floor El.: 612.00 Room, Row/Col: BORON INJECTION TANK RM, IN THE MIDDLE OF RM, 15'WOF THE RM'S ENTRANCE DOORWAY. Manufacturer, Model, Etc.: STRUTHERS-WELL-CORP. 900 GALS, 4'l BASIS: External analysis

1. The buckling capacity of the shell of a large, flat-bottom, vertical tank is equal to or greater N/A than the demand.
2. The capacity of the anchor bolts and their embedments is equal to or greater than the Yes demand.
3. The capacity of connections between the anchor bolts and the tank shell is equal to or Yes greater than the demand.
4. Attached piping has adequate flexibilityto accommodate the motion of a large, flat-bottom, Yes vertical tank.
5. A ring-type foundation is not used to support a large, flat-bottom, vertical tank. N/A SMC

~CO ~~S SRT: Gary Thomas, Tom Huang and Kailash Mahajan on 11/3/93. ADEQUACYOF ANCHORAGE AND TANK TO SUPPORT CONNECTION BASED ON JUDGMENT BY THE SRT AND COMPARISON TO THE BORIC ACID TANK EVALUATION. Tank is 5'iameter by 10'n height supported by 4 Wide Flange Leg supports (10" WF w/5/8" flange) 4'R" in height.. Each leg is bolted to the pedestal w/ two embedded 1 3/4" bolts with 2'-11" embedment Weld of leg to tank about 14" in length and 1/4" thickness on each side of the wide flange and 10" at the top of the wide flange. Adjacent Block wall reinforced with column supports and it is not an interaction concern. The Seismic Evaluation of the Boric Acid Tank (2-TK-12S) is seismically adequate. The Boron Injection Tank (1-TK-11) is much smaller but has about th. same support. Therefore, Tank 1-TK-11 is judged adequate.

DC COOK Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 2 of 3 ID: 1-TK-11 (Rev. 0) Class: 21 - Tanks and Heat Exchangers

== Description:== BORON INJECTION TANK Building: AUXILIARY Floor El.: 612.00 Room, Row/Col: BORON INJECTION TANK RM, IN THE MIDDLE OF RM, 15'WOF THE RM'S ENTRANCE DOORWAY. Manufacturer, Model, Etc.: STRUTHERS-WELL-CORP. 900 GALS. 4'l Evaluated by: Date:

                                                                                             -  fs.

Attachment:

Pictures

DC COOK Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 3 of 3 ID: 1-TK-11 (Rev. 0) Class: 21 - Tanks and Heat Exchangers

== Description:== BORON INJECTION TANK Building: AUXILIARY Floor El.: 612.00 Room, Row/Col: BORON INJECTION TANK RM, IN THE MIDDLE OF RM, 15'W OF THE RM'S ENTRANCE DOORWAY. Manufacturer, Model, Etc.: STRUTHERS-WELL-CORP. 900 GALS, 4'l ELILlEH BASE ANCHORAGE PEDESTAL SUPPORT COLUMN TO TANK CONNECTION

Coo Component No. ~ TK. <laic Ql payticulir area the Seismic Revue~ Teaa should pay extra attention to? Any Yes ~ No (If yea, check items that apply.) Anchor Type Anchor Diameter Anchor Spacing Anchor Number Anchor Embedment < Anchor Edge Distance Anchor Cap Anchor Thread Engagement Anchor Crip Anchor Angularity Concrete Crack Others (describe briefly) If there ts concern for Design Basis Discrepancy, circle the applicable item and explain.

l. Hardvare Maintenance Type Discrepancy
2. Drawing Up&,te Type Discrepancy
3. Significant Operability/Design Basis Discrepancy 4(,. Others Condition:

Actions Taken: Prepared By D444

0 L2 CHP 5021.CCD.019 ATTACHM.NT NO. 1 AQ'L ~~I'-0" Cl BORON'MKCTIOM tAMI( t=.I GM Un t Bldg. Location I2- 3514.-17 I - T>C. -Il O Installation dwg. / Rev. Equipment NO. Ycxwk, Loc. =+i@~ +aK<Ir Anchora e Arran ement Sketch Pro~ Dwg. (0-33] "t-l7 E I" x I5"X l5" W IO>> 4.5 o I ~1~'+ AMOS HQLY'5 PEP DRAINlklC

 ) Q.357')-20                                                            O.

6J Qc 40 Qg INOI.-'sic. r'.I.,r< ".

                                                                                           ~

SITE 0::SIGN COr WORKING CGc ~ JUL lg tSS5 LERK Drawn by: Verified, by: ~ Date: Qua . Cert. Inspector Reviewed by: = 4, Date: Construct on c or Review Engineer Page 1 of 3 Revision 1

                                                    .2 CHP 5021. CCD. 019 ATTACHMENT NO. 1 AUX. (oQ'-0" EL. BQROQ M,K,CT'lQKL TAMK PQQM Un  t                 Bldg.                   Location I- TK-)i Installation   dwg. / Rev.       Equxpment No.

Anchora e Arran ement Sketch

                                                   )8 I NOIANA MICKIGAN POWER SITE DESIGN CONTROLLEO WORKING COPY ELK.V. LKC.        UHH              lUt. 1)1995 LERK~

Drawn by: Date: Verified by: Date: Qua . Cert. Xnspector Reviewed by: Date: 3 Construction An or Review Engineer Page 1 of 3 Revision 1

                                                                                                          ~~~ 4 4 vo 4 gag
                                                                                                                        ~         t/i y)

ATTACHMENT No. quipment No, I- Vl(-iL No i ~pe. c i-.Yaw<

                                                    ~
                                                                                                      ~g    No.:        /o    Pj ~J  I   ~

Anchor type: >~+ ~"P~ ~ I~~ Dia: I ++ Dwg No.: )Q %~7+ Tightnass cata isnas hy: FJ "snug Fit" 0 Torque g Torque Wrench No.: hlh Cal. Due Date:

                                                                                                               'j
  - Tightness verified'? 0 Yes                     0 No                                             Date:

+Q ons ruc ron q Equipment base flexible7 D Yes I No

                                                                                  <">l ons ruc xo              ARE Date:

Bolt ID '/tie" A '13K COIIIments I A s //' w'// v4 Anchor 1eb' len h Z'-II" @ 0 ~ '- II

                                                                                              ~          g         2'-I Protruding       p~~T~o FE.CE~
                                                      ~a RGCLGSE.O ga P.ECESXQ Ih
                                                                                                                             <ITT I HICK   Ill

~v len th < ~/ 4 p/+>> )/In ~>

                                                                                                         +          @

I ICD Embedment 2-6'/s" 2'-5'e Bolt '4" ri Z."~<~" 2 '~o" 6 2'/e" E>4"

          '""'te condition       CO~Cea            iS         CeC~

V<t." GPGUY PER CPAV{LLLCs IL BELD-LCa Edge 4/A N/A M /'A IM/4, 4/A 4/0, hL/0, g/A &z)g< distance TIS IQ Q.m Anchor 6'/z" 8'/z" 8" B" 8" 5" 8" s acin Atu QIOR Anchor U/4 4/A an larit N 4/4 4/A kVA

                                                      >/S '

U JA I+" kl /A IJ/A

                                                                                           ~/~-
                                                                                                                            &Hi u~TW our mi~~a-.

( Thread "

                         ~ecE~ t-I<                  RE~a RccEss                0 i4      P,G   Ess     DK. H IC engagement Comments,    +   UA'TA, 'QoT       QwtlkiEQ DUE 'To                      7       AYLQM.

INA UUOKTALNA LIE TCi T P, Verified by- Date: -> 3 gua ,//Cert inspector Ravieved by: Construct on ARE INDIANA LIIGHT'..: SITE OESIGN CONTRC~ 0 WORKING COPY Pago 2 of 3 Revision 1 LERK 9 '~ I

     'A DEPAR'FMENT                                             2 SHP 5050 NDE.008 S '8                                                            ATTACP2KNT NO. 1 CONTROLLED DOCUMENT COPY NO.         'P -l ULTRASONiC TEST REPORT C

A'/Tg REQUEST NO. JA gy IDENTIFICATION TECHNI UE

                                                                 -'tl Unit        +e                                  Test Unit/ S/NL(.i -'/'S        Cz  c "RQS Component:        - 7    f       -//            Freq./Diameter Item      n/ A/'/--                            Reference Standard Naterial      ~/                                Couplant/Batch No.

Other C) TEST DATA RENARKS A /T c'L C PERFORMED BY: LEVEL~ DATE: 3 23 ~13 REVIEWED BY:" LEVEL:~ DATE: Y ZS FORM NO. 12 SHP 5050 NDE.008-1 Page 1 of 1 Revision 0

Equip ID: 1-TK-37 Train: 12 Equip Class:21 Drawing No.: 1-S13SA ction:

        ~
             ~ CCW System:     CCW Equip Desc:     COMPONENT COOIING WATER SURGE TANK ggc Building:     AUXILIARY    Room:~     HALLWAY
          $ 5o Elev: %69-      Sort: S,        Notes:

Normal State: Desired State: Power Req'd: N Support System Drawing: Req'd Support Comp: Safety Related Status: NUCLEAR SR Min/Opt: MIN Alias No: Power Train: NA Comp Served: CONDENSATE COOLING TANK MFR: SPEAR AND WOOD Y"Gel: 10000GAL, 2' x 12' 'lem. Drawing: N/A Wiring Drawing: N/A Power Source: N/A Walkdown: F Relay Eval  : N Comp Type: TANK (COMMON DIVIDED BY BAFFLE} Iso Drawing: Location:

DC Cook Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet1 of5 ID: 1-TK-37 (Rev. 0) Class: 21 - Tanks and Heat Exchangers

Description:

COMPONENT COOLING WATER SURGE TANK Building: AUXILIARY Floor El.: 650.00 Room, Row/Col: HALLWAY, Manufacturer, Model, Etc.: SPEAR AND WOOD, 10000GAL, 2' x 12' BASIS: External analysis

1. The buckling capacity of the shell of a large, flat-bottom, vertical tank is equal to or greater N/A than the demand.
2. The capacity of the anchor bolts and their embedments is equal to or greater than the Yes demand.
3. The capacity of connections between the anchor bolts and the tank shell is equal to or Yes greater than the demand.
4. Attached piping has adequate flexibilityto accommodate the motion of a large, flat-bottom, Yes vertical tank.
5. A ring- pe foundation is not used to support a large, flat-bottom, vertical tank. N/A SRT: Gary Thomas and Tom Huang on 11/3/93.

Skirted tank 11'-10 1/4" diameter and 17'n height. Skirt is 4'4" high from the top of the pad to skirt connection to tank. Skirt has 1/2" thickness. There are 8 bolts evenly spaced around tank, with a solid steel washer 3-3/4" high x 4" length x 2" width. Bolts supported from 3" x 3" x 1/2" angle. Crane above tank has been evaluated by AEPSC for seismic loads. The results gave a safety factor of 1.06 for the anchor bolts using the GIP penalty for J-bolt embedment. A hand calculation that included in the package was performed for the bolt stresses. Evaluated by: Date:

Attachment:

Pictures

Attachment:

External Anchorage Analysis for 1-rK-37

DC Cook Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet2of5 ID: 1-TK-37 (Rev. 0) Class: 21 - Tanks and Heat Exchangers

== Description:== COMPONENT COOLING WATER SURGE TANK Building: AUXILIARY Floor El.: 650.00 Room, Row/Col: HALLWAY, Manufacturer, Model, Etc.: SPEAR AND WOOD, 10000GAL, 2' x 12' BOLT TO TANK DETAIL

CUENT <<Iota S'+t-I "" attar ~ or~ Stevenson and Assodates 8 A Structural Meelto atcol Coo<atria<5 Eat<to<<a<toy Fr<ra D 5

                                                                                             ~ ~

5P fA

                                                                                                                                          ~       ~

6 >> Cl th

               <It >> tu l.'. 45  i                                hf                                                                                       ti                                I I
                                           'L ~ I                                                                     hr                    gl Pg                                            ~
               -<o>>   ( <<o          ~ 'I      I,     A,S>>
      \

I '<<rtr

  ~ .

tht I h>>ft <; >> tth. l

                                   <<'l'                   *                                                                                                                           '

( tl 551<>>>> I ~ '<

                                                                                                                             ~

I 5 of I (~f ~ ~

                                         \
                                                     ~ I
                                                          >>5 I p. <<,            ~
                                                                                    .,                               yh(l If.
                                                                                                                  ~
                                                                                                                                       \~

11 lh l r ~ tt 55>'5 t,:.It} 5 O ro

        >>   Cf  Pl>>h I ftjj I

I<<L pt 'p tr tt I trrlh u (

                                                                                                                                                          >>r l>>g I~
                                                          >> I                                                                                                            ~  t
~ r                                                                                                               .Il                                5 I

CIJENT

                                                                                ~ ~s'1      P w w Cg<<I              Ccs 4(S Sl. 8 "" L I ., '7 M stru.
                                                                                                                        ~.~ uI <, I(J>1.c       7E
                                                                                                                                                                        ~      I SUBJECT A Ic-        [ <<  ~g      ~5 7 Stevenson and Assodates A S(ruccurc!.MccIsr aces l Coarul((s(r Ea(r(act((ay E(rsi gc    '?N.

is>>I 4.," . ~, 4 E~E. I<<II)I IEII,(

                                                                                                                                                                                                 'I ~        ~

u ~ 1 ilr 7 r(c

                                                                                                          ~ II                                                            r?                 h.

8'ci 1

  • Il .CI V
                                                                                                           'I ~                                                                                                    I  Qlr ~

5 ~1 1.'cc 4

                                                                                                                                                                     ~  >> 1
                                                                                                                                                                            ~

1 I cgt ~ I>> cl ~roc 2?P 41\5,

                )i% tl7 (l>>P                                                                                                                     V p7                            -,c;  r(lr>>;~

l,F

  • re>> t (1; I.I ' ir 5 4

4

           ~

lrr, ~

                                '114   "C                                               ~

c>>I x 7 fine I O'<<

                                                                                                                                                                     '>>I'
                                        ?u                          ~ C 114   QI                                        \  ~

qg.c ir PL ?cl 7(

                                                                      '5 Itrr                                                                                 ~ ir                           rI
                                                                                 ~C E          ~ l  C'I CI
                                                                                                                                >>4 1
                                                       '4'i. 7(                                                                                                                                                    4 44
                                              >>>>                                                                                                                                                                   kt'
                                                                  ~  I
                                                                                                                                                               ~ t rli I
                                                                                                                                                                                                                   I 1 I>>7 S"Cj 4'PW I'ic                         C("'"'       I     t<<lv,
                                                                                                                                                        'r<<r,.
                                                                                                                                                         <<(7s, Ttt(I              :Lt ~I".1 ()r
                                                                                                  ~ CI                                              c ~

lr>>E I 5>>r E

                                                                                                                                                                                 ~   4 r'

4 CuEHT Y) 9 ~' " SHEET OF g@~ C ~~~ ~~ a V ~ c.ter- 4-IJt r.Z>> F 7 ht tc, ( h'r Steve@son and Assodatcs

                               *Stractara)-Mac)raalcal 0    Coarldttay Ka2ltaccrlatr Ftral 44 (2

2 7. '2 4"4'fcr.gf

            ,44                44144 rr   ~          2 I                                             ll I
                                                                                                     ~

F Jt

                         ".4.                                                                 '2
                           '   'r Jtt                                                        4"                                                      V r-'29'vY t ~

i g 2 'tFI't 4)

                                                                             ~
                                                                                                                                                      ~4 YYt
                'I I
                 ~  \

4 1 ~ Fr 'I g

                                                        ~  '        '  1'  .~> r.

Vr x 2FI' - 41. 241 h ~

      ~  44,                    Y
        'Yr
  • rl fI\IF )f.

Pl I;"2 ) 4Y 22Y2", I.f ~ .g;\s Yl 2 Ih ~ .C 44 222

                                                             ~
                                                               ' '1 Y'4 h'F.y I
                                                          **12 CHP 5021. CCD. 019 ATTACHMENT NO. 1 ANCHOR INSPECTION DATA SHEET Unxt "                Bldg.                Location
                /2-3 Z7                                Y(-

Installation dwg. / Rev. Equipment No. Anchora e Arran ement Sketch

                                                   'w MG   ORNA POWER INDIANAMICHIGAN CONTROLLEO CONST RU TION w RKIHG COPY a 3 ~992
                                                                       << ~L 4-o Drawn by.                                            Date:

Verified by Date: Q al./Cert. Inspector Reviewed by: Date: S nstructzon Anchor Review Engineer Page 1 of 3 Revision 1

                                                    **12 CHP 5021       CCD O19 ATTACHMENT NO.         1 ANCHOR INSPECT10N DATA SHEET Unxt  g                 Bldg.                  Locate.on Q-3 Installation   dwg. / Rev.          Ecpxzpment No.

Anchora e Arran ement Sketch INDIANAMICHIGAN POWER CONSTRUCTION CONTROLLED 8/y WORKING COPY AUG 1 > 1992 CLERK .> +~~

                                                             .:c q'.e "a

Drawn by: Date: -I- l Verified by: Date: QG ./Cert. Inspector P Reviewed by: Date: nstructxon Anchor Review Engineer Page 1 of 3 Revision 1

0

                                                             **12 CHP 5021. CCD. 019 ATTACHMENT NO. 1 r

ANCHOR INSPECTION DATA SHEET Unxt g Bldg. Location Installatz.on dwg. / Rev. Equipment No. Anchora e Arran ement Sketch 1- -3 (gp($ +4 <4(QH>GAB POWER QON$ TQQCv n~ GONTSOLLEO wOR ~. 'Ci CC('Y azw

                               ~ p~l ~b          c<

(omnlsonS Votv SrC r~a~ +i~> Fl 6 Leo + H>> + 4r 3+ oP)s c//< Ãs B% 3'ls Drawn by: Date: Verified by: Date: Q l./Cert. Inspector Reviewed by: Date: onstructxon Anchor Review Engineer Page 1 of 3 Revision 1

                                  ~     ~
                                                               ~ ~     ~
                                                               ~ ~     ~

I ~ ~ l s ,;~/ N ~ fi ~

                  ~ W~sRM~RHR%

MMIIIIIII II585mmlmmm a ~ ~ a RSIIIRIMIIIII s ~ RSIIISIIIRSRRIIII

55. Iles% .. l%I%

IIIIIISIIIHII a Rse&R4%Ã%RM~RJ%8%5% MWWMWMW& ~ La I Sl ~ ~i L ~ L ~ (

                                                          ~~asia L

~~K9MEX >

                                                        ~

I ~

                                           ~      ~        ~
   ~ ~
                                    ~
                                      ~  ~    if    ~
                                                      ~ ~

Equipment No.: I .! - established by "Snug

                            ~'ightness Fit" Tightness veri fied by:  Qual. /Cert. Xnspector Comments:

Equip XD: 12-TK-47-AB Train: 1 Equip Clays,:21 wing No.: 2-5151C tion: EMERG DIESEL System: DIESEL FUEL OXL Equip Desc: AB EMERG DIESEL FUEL OIL STORAGE TANK (BURIED IN THE YARD) Building: GROUNDS Room: INNER PLANT GROUNDS Elev: 609 Sort: S, Notes: Normal State: Desired State: Power Req'd: N Support System Drawing: Req'd Support Comp: Safety Related Status:.NUCLEAR SR Min/Opt: MIN Alias No: Power Train: NA Comp Served: AB FUEL OXL STORAGE TANK MFR: 60,000 GALS (12'IA X 72'ONG) 'Panel: Elem'. Drawing: NgA Hiring Drawing: N/A Power Source: N/A Walkdown: F Relay Eval  : N Comp Type: TANK (COMMON FOR UNIT 1 AND UNIT 2) 240 HRS FULL LOAD. Xso Drawing: 7 Location: BEXNG REPLACED UNDER RFC 12-4113,, CI NOT APPROVED AS OF 9-15-92.

DC Cook Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 1 of 11 ID: 12-TK47-AB (Rev. 0) Class: 21 - Tanks and Heat Exchangers

Description:

AB EMERG DIESEL FUEL OIL STORAGE TANK Building: GROUNDS Floor El.: 609.00 Room, Row/Col: INNER PLANT GROUNDS UNIT 0 2 BURIED SOUTH OF TURBINE BUILDING Manufacturer, Model, Etc.: 12'IA X 69'-10"LONG, 60000 GALS BASIS: External analysis

1. The buckling capacity of the shell of a large, flat-bottom, vertical tank is equal to or greater N/A than the demand.

-2. The capacity of the anchor bolts and their embedments is equal to or greater than the Yes demand.

3. The capacity of connections between the anchor bolts and the tank shell is equal to or Yes greater than the demand.
4. Attached piping has adequate flexibilityto accommodate the motion of a large, flat-bottom, N/A vertical tank..
5. A ring-type foundation is not used to support a large, flat-bottom, vertical tank. N/A mQKS SRT: George G. Thomas (SBA) and Tom Huang (AEP)
    'C Underground tank. SRT evaiuated this tank based on the ave~~able documentation in the equipment package.

A tank calculation was performed (included in the tank package) based on the reference drawings The tank was modeled as a beam on elastic foundation. The overall tank stresses were very low (on the order of 3.6 ksi). Evaluated by: Date:

                            ~g i-)                                                     il /Z ~low"

Attachment:

EVALUATIONOF STRESSES IN THE TANK

CUENT

                                                   - a4CttO g          5~

Stcvcnson and Assodatcs A Structural Maclen aleut EI Conautttatr Kntrtncartng Ftrra > cn tn-OSC

CLlEHT SUMECT Stevenson and Associates A scuctvcal Mechanical El coasulctsy Elplaoocno f4'

CUENT Stcvcnson and Associates k A Stsucturel-M eAe nlesl Coaoultlaa Koalnooriay Fina . C. ~ Ca~ 4

CUENT Stevenson and Assodates A StnsctvcehMocha alcal R Coaaoltlay Eagtoeeaay Fina De +e C-WO W

CUENT Stevenson and Assodates h st(udvrasMecha aleaf Coawltlay Knylnoodng fire

g CUENT 5 ~ 4, No~ o z0 8 Stevenson and Assodates Pu Il A Structursl-Mschs nicsl Consulting Engtn<<ring Sirrn

                                      '3 1      lOc     3%

c

CUENT 4 Stevenson end Assodatcs l5 A Srrucrural.Mcchaalcal Caarulung Kaalaccriny flrra Pr Cr 8 WOCr

CUENT I 2. Stevenson and Associates II h StructurohM echo uk Cuaoulttau Kactaoortatr ol f ra to S (

0 CUENT Stevenson and Assodates 8 A SICIICIVC1I.MWL4OIC4I Coaoul5sy Kaylneorlng Feaa D. a ggg

V i'

CUENT SVMEGT Stcvcnson and hssodatcs 8 A Svuctural.Mechanical Coaaultiog K~laoeclny Eitoa Y-t A.

Equip ID: 2-HE-11 Train: 12 Equip Class: 21 Drawing No.: 2-5129A

     ~

2-5135 ction: RI

       ~
            ~

System: REACTOR COOLANT PUMP SEAL WATER INZ/LEAKOFF Equip Desc: REACTOR COOLANT PUMP SEAL WATER HEAT EXCHANGER Building: AUXILIARY Room: SEAL WATER HEAT EXCHANGER ROOM Elev: 609 Sort: S, Notes: Normal State: Desired State: Power Req'd: N Support System Drawing: Req'd Support Comp: Safety Related Status: NUCLEAR SR Min/Opt: MIN Alias No: Power Train: NA Comp Served: REACTOR COOLANT PUMP Mfr: ATLAS INDUSTRIAL MANUFACTURING CO. Blem. Drawing: N/A Wiring Drawing: N/A Power Source: Walkdown: F Relay Bval  : N Comp Type: HEAT EXCHANGER ISO Drawing: 2-CS-91 2-CS-100 Location: IN WEST AREA OF ROOM

DC COOK Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 1 of 7 ID: 2-HE-11 (Rev. 0) Class: 21 - Tanks and Heat Exchangers

Description:

REACTOR COOLANT PUMP SEAL WATER HEAT EXCHANGER Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: SEAL WTR HEAT XCHGR RM - IN WEST AREA OF ROOM Manufacturer, Model, Etc.: ATLAS INDUSTRIALMANUFACTURINGCO. BASIS: External analysis

1. The buckling capacity of the shell of a large, flat-bottom, vertical tank is equal to or greater N/A than the demand.
2. The capacity of the anchor bolts and their embedments is equal to or greater than the Yes demand.
3. The capacity of connections between the anchor bolts and the tank shell is equal to or Yes greater than the demand.
4. Attached piping has adequate flexibilityto accommodate the motion of a large, flat-bottom, Yes vertical tank.
5. A ring-type foundation is not used to support a large, flat-bottom, vertical tank. N/A S U

~CVIF~S SRT: Gary Thomas and Tom Huang on 11/3/93. Vertical Heat Exchanger on a Gusseted steel pedestal. Each Pedestal is anchored to the floor with 8- 3/4" J-Bolts embedded 20" into floor. Exchanger is 16" in diameter and 14'n height. Exchanger is bolted to the steel pedestal with,2 1" diameter steel bolts on 6" centers in weak direction and 2'-8" in strong direction. This connection is more limiting than the anchorage to the floor. Attached calculation was to judge adequacy of these for bolts. The exchanger has a frequency of 10.6 Hz and the bolts had a safety factor in tension of 3.54. Evaluated by: Date: IC) /4

                                                         ~g~ CZ

Attachment:

Pictures ttachment: Verification of Bolt Connection

DC COOK Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 2 of 7 ID: 2-HE-11 (Rev. 0) Class: 21 - Tanks and Heat Exchangers

== Description:== REACTOR COOLANT PUMP SEAL WATER HEAT EXCHANGER Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: SEAL WTR HEAT XCHGR RM - IN WEST AREA OF ROOM Manufacturer, Model, Etc.: ATLAS INDUSTRIALMANUFACTURINGCO. ECUlKR SUPPORT PEDESTAL TOP OF THE EXCHANGER

CUENT SUBJECT t'()Ne. Q CaO<~ Stevenson and Assodates A Sllvclvlal-MCCIIIalcol S Coalvlgag Saglaotllag Fitch Ahchol' ~ Acca oaohC Slcatch Ioalcro Vatlaco tacofa SllC DYSICN CDNYIDSIIO 2-HHI clalclha cotY Sfp lS 1SSS I~ I ~ I( h'YI'nt> lS fC(WF) NYCT

                                                                                                               ~,                                                                                            ,~

Cl ') eIC.S ~ yl qvr)

                                                                                                                                                                                                              "..'LEV l   K(o C)SST
                                                                                                       ~   ~   ~ ~   r ~ ~ ~ .  ~ ~   .    ~ I~ ~   I     ~

I ~ - ~ ~ ~ ~ ~ ~ ~ r er'

                                                                                                                 ~         ~        ~             '          ~   ~  h              '
                                                                                                                                                                                        ~r      ~
           ;I@aha                             li cac                                                               0                    ~ aa          Iaa S.

rt'acatl4c ~ \hr 5't,o IODIINC IVQOCAN YOOC

                                                              ~ cl 5 Dcslca cahl caslto                                                                                                                                            g.)i voc claa can SSP   lS  lSSS r                                                                                                                             ~ r SIC
                                                                                                             ~

lA IB 'oh 0 0 tC p 0 g IYCSO IAI L~FA) AD CI

                                                                                   <<CIO II3 (rlrg.    -,'t                          c 0      0 e

0 II 0 IC

o. ~
                                                                                                                                                                                                                                   +Ps YcltaJ IICCDI13 (YYY  )                                                                                               0      0                                                        0         0 IYCSO'Wt                                                                                                                                             'I Yah CI (tel Y3)                                            F                                 >3 e(FID)                         IC
                                                                                                   ~ I
                                                                                ~ ICSDWI       ~                                                                                                                         rL ~

lg 0 0 C,caclr 0 0 C I\ T.

                                                                                                                                                ~E I.  "~                           L                                                                                             ,Ql                         'Ã)'  ~

I cocah T eotT trit) C sell:'rc I 01hhc

                                                                                                                                                                                 <<lc Dl gas cocca cac IDLsco aacclha catt Sf P'     S SSSS I,

3ECY.'t\3 ccc(cccl c-c N occuv) c 'S tr acscT

". )pP    (>>

C

CUEHF QJBJECT Stevenson and Assodatcs 8 A Structural-Mectfaalcal Coaru! o oft Eatftocurtafr Fifa< P P.

                                                                                                                              ~  i'I,    h         ,f ~

P.'

                          ~ cK g"I
     <<<><YA                       ~ iver gv                             vruhu '. 'P<% .fc\u <K
                                            ~
                                              )

I t>> f<<~lg 'tfr lg<<>>u tlap

                                                                                                                                                  'P vh
                                                                                                                                                    ~,  '<<       r'pi r

P.. t,'hr >

                                                                                                            >> I P
f. ~ I ~
                                                                                             >>~                            u p                                                                                                                  ~
                                                                                                                                                    / Pf>>
                                                                                                            ~    <<

pfr h htrfu P

                 ~ h                                I l'I r<                                                       f '<<                                               hFrutarp P..                                    gh'               up                                                                ~ ru   ~                   qtr ~ >>Irph I

I I'P H r'tfu Ip. toKj .ifu P ~ I * ~ h

r, CUENT JOB No. SUBJECT ~@Awe EW Stevenson and Assoctntes A St( ucfuf al.Macha afccl IR.Cuafulffaff Raff face(Lay Sic(a

   ~

4 1 ~ l crap l>> Q,:If

              -'5 PP
                  ~

tf "r,( 1~ I Jul gl>> u4 I P

                                                           <<P Irp rir I~ 1
                                                                              ~

(~ 44

                                                                                          /<<<<

4

                                                                                                 ~
                                                                                                   'g    <<ls
                                                                                                                    ~ I
                                                                                                                            +

1,14 'la>> ru n.

                                                                                                                                          \'..

IP 'f I'<<

                                                                                                                                               ~
                                                                                                                                                 >>J "f
                                                                                                                                                  ~ 'I Sir! I I'-p~
                                                                                                                                                                   'I .4 "4,')!e/

Off P .' CP

                                                                                                                                                                         '"'5 >>l II I,I(lr<<"<<
                                                                                                                                                                                    <<'+rrf>>V I

rp

                                                                                                    ~ <<1 lI ~

14.C'

                                                                                    ~ 1,1 P
                                                                                                                                                 %14   ruI II uf        PPP I                                                            'I                                                    /
                                                                                                                         '1 1(Q                         ~ rpl (l<<>>I'l('
                                                                                                              '1
                                                                                                                 >>t 0(fg       ff

CUENT JOB No. ~ 'HEET OF Stevenson and Assodatcs 5 A Structural.l4ucha attut Coaruttiag Kagtauurtag Firar L.

                   ~ r
                                                         ~ r,

Coo Componone yo, 2 Class l Any paxpicular area the Seismic Review Teaa should pay extra attention tot Yes < No (Xf yea, check items that apply.) Anchor Typo Anchor Diameter Anchor Spacing Anchor Number Anchor Embodmont<

                                                                  ~qs            ~     ~~T Anchor Edge Distance Anchor Cap gjO I/ E; Q Pl I IJ (. ) <Al(=  (g E'L Anchor Thread Engagement Anchor Crip Anchor Angularity Concrete Crack Other'a (describe   bri.oily)

TE there is concern for Design Basis Discrepancy, cir'clo the applicable item and explain.

1. Hardware Maintenance Type Discrepancy
2. l'raving Upd?te Typo Discrepancy
3. Signil.'icant Operability/Design Basis Discrepancy Others Condition:

Actions Taken: Prepared By

                                                             **12 CHP 5021.CCD. 019 ATTACHMENT NO.          1 ANCHOR INSPECTION DATA SHEE SBfn DATER I+&AT AX M @Oq -01'AC,HAhl4BR g.oug Bldg.                      Location 2..~-I    t Installation  dwg.     /    Rev.          Ectuzpment No.

Anchora e Arran ement Sketch INDIANA I IICMIGAN POWCR SITE DESIGN CONTROLLEO 2-HG "I I WORKING COPY SEP t)1995 g ~ I ( l<YPg

                                                                  ~i1    R(7<~)

I/Z,R.(~p) ~Ag

      ~b<
      ~0
          \
       ~ h~
        <~b PLED. gK.G C A&T Drawn by:                                                   Date:

.Verified by: Date:

             ~ ual./Cer        . Inspector Reviewed by:    T Construe Date:

won An hor Review Engineer Page 1 of 3 Revision 1

                                                         **12 CHP 5021.          CCD. 019 ATTACHMENT NO. 1 ANCHOR INSPECT ON DATA SH E Unxt l2- 3z Xnstallatxon     dwg. / Rev.       Equipment No.

Anchora e Arran ement Sketch (>yp) IVB & (T9P) I

                ,'A                                                0       0 P

I 0 0 ~4 0 0 I 0 0

                                           >/g Z(~p) 0        0                  C AFOOT                 0      0 8                      Pee     .

I-O'RP I IOIAPIA iVICHIGAN POPOVER SITE OESIGN CONTROlLED YPORKIHG COPY SEP t~1995

                                                   .LFRKT Drawn by:                                                 Date:

Verified by: Date: al. Cert. Xnspector Reviewed by: Date: Construction Anch r Review Engineer Page 1 of 3 Revision 1

                                                                  *12   CHP 5021. CCD. 019 ATTACHMENT NO. 1 CHOR     INSPECTION DAT S A"SX  ~    gPa'-O"     S~     %PITCH &BR'T BXCHfHI   GBR. RooH Unit                          Bldg.                    Location l 2- 525s                                       H~ -1(

Installation dwg. / Rev. Equipment No. Anchora e Arran ement Sketch INDIANA I.IICHIGAN PO'ilE'R SITE DLSIGN COMTROLLiD WORKING COPY SF.P 13 ISSUE LERK W~Hb w~ wB ('TYPE) 3/( y WMAj ~/II (~P'L) /I g HMH$

               ~P2.)     ~I(

wm wl

       .bi,                                                                            e'$
                                                                                        ~   ~
       'ob'4'ga J BoiT

(~P) 5CCT, Z -8 (scca c;c ~<<~+~~) Drawn by: Date: ~ 1 Verified by:

   ~ ~

Date: -F-F ual Cert. Inspector Reviewed by: T Date: Construe won chor Review Engineer Page 1 of 3 Revision 1

ATTACHMENT NO ~ 1 ANC OR SP Equipment Dwg No.: Steel No.-'mbedded Dwg. No.: I YS CA CHARA IS C Weld ID Weld e Codes T e Size '/ ~II I >/II 3li t 1 = Fillet

                                                                                         = Plug/Slot Len   th                2I/     l II/    %4"      <4'8I/                             2 3  = Groove Cracks                   Yes    Yes      Yes     Yes        s   Yes  Yes    Yes o   No     No Lack   of               ~e        es     Yes      es           QeQs  Yes    Yes Penetration                                                     No   No     No Porosity                Yes     Yes      Yes     Yes     Yes'es      Yes No Yes No INDIANA MICHIGAN POWER SITE DESIGN CONTROLLED WORKING COPY SEP   tg t995 LERK Equipment base            flexible:       0 Yes       5-No ons ruc z n      e Date:

Reviewed'y: Date: t l2 3 ons ruc won c or evzev ngxneer Verified by: a .. V e . npsec or Date: Page 3 of 3 Revision

                                                                                      *~12   CHP 5021 ~ CCD. 019 ATTACHMENT NO. 1 Equipment No.:                                                                            Dwg      No.:       l2-32 Anchor type:           GODET                        Dia:                                  pwg No ~:           I2  - '32 8$

Tightness established by: 0 "Snug Fit" 0 Torque Torque Wrench No.: Cal. Due Date: Tightness verified? 0 Yes No Date: 1 ons c 10 Equipment base flexible? 0 Yes C(No ~. Date: 0 1-13 ons uc 1 n ARE C C Bolt ID A 5 C O e. F c Comments Gaps c l$$ aeT $ Hpv I/S~"em gpss Yg>'ST 0 Anchor len th

                    \

2.- 0 It I 2,- 0

                                      "     'I Z-o V            <

2.- o ii 2-i o il c g-0 2oI II 2-0 f~ IYI QCfCj I 2.-3vlgG Protruding p I5/l~ g" p'I ~ '>/~ ~"/g Z~Jy edment )I )I//)~i iI qu 1< qu lI-1" li q'i~I 1 qy8 ) q Bolt ri Concrete condition Edge distance g ( 2. /IX P I 2." > I W ) I> W t 2. 0 I 2. 7i2-Anchor @II @tl @'II @II 4 s acin ( u Anchor 4 Oo i~o 00 g0 an larit ~ OO O4 () 0 Thread oy 0y ng oK. ot. ck ok o(( engagement Comments: Verified by: Date: r9 a ., ert. Inspector Revieved by: Date: Construct on ARE SITE DESIGN CONTROLLED WOIIKING COPY SEP l~ 1995 ago2of 3 LEIIK ovision -3

r4

                                                                                   ~ I e
                                                 ~         ~ '
                                                                       ~ ~   e
                                                                       ~ ~   e
                       ~ ~      k                              ~ ~

~ ~ I

                 - ~   ~          4'          ~
                                                  /        I e   14

~ ~ II I - d e elec W

                                             .R Lk           '

IIIIIIIIHI o mmmmiimmmi mmmIIRlmmmm RRIIIRI mm58 ~ ~ ~ o p o

        ~ - =

ISRIIRHIIIIIIR5lRR

   ~

REMIIMMIT& i g $ J I' ]' WW%% 0 ) J

                                                                               ~ .

0

12 SHP 5050 NDE.008 S 8 A DEPARTMENT ATTACHMENT NO. 1 CONTROLLEO DOCUMENT COPY NO. ULTRASONIC TEST REPORT JOB ORDER NO.: CQ 4, REPORT DATE: REQUEST NO. M A, IDENTIFICATION TECHNI UE Unit 'l

              ~CD                       Test Unit/ S/

Component 2 -ll Frey./Diameter Item Reference Standard Material +S Couplant/Batch No. C < Other TEST DATA REMARKS PERFORMED BY: REUIEWED BY: LEVEL: M~ DATE: / 5 FORM NO. 12 SHP 5050 NDE.008-1 Page 1 of 1 Revision 0

Emlip ID: 2-HE-38E Train: 2 J Equip Class:21 wing No.: 2-5135A ction: CCW System: MISCELLANEOUS SEALING AND COOLXNG Equip Ddsc: EAST CENTRIFUGAL CHARGING PUMP PP-50E LUBE OIL COOLER Building: AUXILIARY Room: EAST CENTRIFUGAL CHARGING PUMP ROOM Elev: 587 Sort: S, Notes: Normal State: Desired State: Power Req'd: N Support System Drawing: Req'd Support Comp: Safety Related Status: NUCLEAR SR Min/Opt: MIN Alias No: Power Train: NA Comp Served: EAST CENTRXFUGAL CHARGING PUMP MFR: AMERXCAN PRECISION INDUSTRIES (BASCO) M Pa l Elem. Drawing: N/A Wiring Drawing: N/A Power Source: N/A Walkdown: F Relay Eval  : N Comp Type: HE Iso Drawing: 2-CCÃ-515, 2-CCW-508 Location: XN THE NORTHEAST PART OF THE ROOM, 2 FEET NORTHEAST OF EAST CENTRXFUGAL CHARGING PUMP g2-PP-50E

DC COOK Unit 2 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUAPION WORK SHEET (SEWS) Status: Yes Sheet 1 of 2 ID: 2-HE-38E (Rev. 0) Class: 21 - Tanks and Heat Exchangers

Description:

EAST CENTRIFUGAL CHARGING PUMP PP-50E LUBE OIL COOLER Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: E CENTRIFUGAL CHARG PMP ROOM -'IN THE NORTHEAST PART OF THE ROOM, 2 FEET NORTHEAST OF EAST CENTRIFUGAL CHARGING PUMP ¹2-PP-50E Manufacturer, Model, Etc.: MIDLAND-ROSS/ROSS-OPERATING VALVECO. BASIS: External analysis

1. The buckling capacity of the shell of a large, flat-bottom, vertical tank is equal to or greater N/A than the demand.
2. The capacity of the anchor bolts and their embedments is equal to or greater than the Yes demand.
3. The capacity of connections between the anchor bolts and the tank shell is equal to or Yes greater than the demand.
4. Attached piping has adequate flexibilityto accommodate the motion of a large, flat-bottom, Yes vertical tank.
5. A ring-type foundation is not used to support a large, flat-bottom, vertical tank. N/A C Y D SRT: Gary Thomas, Tom Huang and Kailash Mahajan on 11/2/93.

ANCHORAGE TO PUMP ACCEPTABLE BY ENGINEERING JUDGMENT OF THE SRT Small exchanger 1'W" long and 5" in diameter bolted to 2 1'ong channel columns that are welded to the skid of the East Centrifugal Charging Pump. Could have screened with the pump using the rule of the box, however the exchanger was listed seperately on the SSEL. Crane above in a parked and locked position. Evaluated by: Date:

Attachment:

Pictures

DG COOK Unit 2 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet2of2 ID: 2-HE-38E (Rev. 0) Class: 21 - Tanks and Heat Exchangers

== Description:== EAST CENTRIFUGAL CHARGING PUMP PP-50E LUBE OIL COOLER Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: E CENTRIFUGAL CHARG PMP ROOM - IN THE NORTHEAST PART OF THE ROOM, 2 FEET NORTHEAST OF EAST CENTRIFUGAL CHARGING PUMP ¹2-PP-50E Manufacturer, Model, Etc.: MIDLAND-ROSS/ROSS-OPERATING VALVECO. EAST CENTRIFUGAL CHARGING PUMP PP-50E LUBE OIL COOLER

                                                            **12 CHP 5021      ~ CCD. 019 ATTACHMENT NO. 1 ANCHOR INSPECTION DATA SHEET hu  -&. g Un1t                                                     Location z'-o'ldg.

NA '2-H-E-5 6 Installation dwg. / Rev. Ecgxzpment No. Anchora e Arran ement Sketch INDIANA MICHIGAN PPW'Fg SITE DESIGN CONTROLLED WORKING COPY AUG 25 t985 LEgK T'(eek>~ O'- III "

                                                                ~~~         7O QCIC    E, g,g<, wssT Drawn by-                                                    Date:

Verified by: goal.] ert. Inspector 6 a-pa Reviewed by: Constructxon nchor Review Engineer Dt: Page 1 of 3 Revision 1

                                                  **12 CHP 5021        ~ CCD. 019 ATTACHMENT NO. 1 ANCHOR INSPECTION DATA SHEET
                             ~X-BL                ~gT c.CHTRi~h~ C.~)gg 5'5  t-0     Puca A.o~e Unct  g                Bldg.                   Location Mh                               a-~-BEE Installation   dwg. / Rev.        Equipment No.

Anchora e Arran ement Sketch INOIAtEA PiCHIGAW "OWER SITE OESICh CON~RGu.EO AORKltIQ COPT AUG 25 1885 I.ERi< 7 y+'~ PPI T, CJ~~

                                                     ~qq~si~ e      u) ~T~P)
                    ~l I

ookiQt ORTH Drawn by- ~/ ~la,~ D t Verified by'- Date: ual./Cert. Inspector Reviewed by: T Date: Construct@on An hor Review Engineer Page 1 of 3 Revision 1

Equip ID: 2-QT-134-CD Train: 2 Equip Class:21 D awing No.: 2-5151D tion: EDG System: DIESEL JACKET WATER Equip Desc: CD EMERGENCY DIESEL AUXILIARYJACKET WATER HEATER (TANK) Building: AUXILIARY Room: CD EMERGENCY DIESEL GENERATOR ROOM Elev: 587 Sort: S, Notes: B Normal State: Desired State: Power Req'd: Y Support System Drawing: 2-12030 2-98014 Req'd Support Comp: 2-ABD-C-1D Safety Related Status: STANDARD Min/Opt: MIN Alias No: Power Train: A Comp Served: CD AUXILIARYJACKET WATER HEATER MFR: INDEECO 75KW HEATER Panel: 2-DGCD Elem. Drawing: 2-98014 Wiring Drawing: 2-95302 Power Source: 2-ABD-C-1D Walkdown: F Relay Eval  : N Comp Type: TANK Iso Drawing: Location: IN THE NORTHEAST PART OF THE ROOM, 5 FEET NORTH OF CD EMERGENCY DIESEL JACKET WATER PUMP g2-QT-130-CD2,

DC Cook Unit 2 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 1 of 14 ID: 2-QT-134-CD (Rev. 0) Class: 21 - Tanks and Heat Exchangers

Description:

CD EMERGENCY DIESEL AUXILIARYJACKET WATER HEATER (TANK) Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: CD EMER DSL GEN RM - IN THE NORTHEAST PART OF THE ROOM, 5 FEET NORTH OF CD EMERGENCY DIESEL JACKET WATER PUMP 82-QT-130-CD2, Manufacturer, Model, Etc.: 75KW HEATER BASIS: External analysis

1. The buckling capacity of the shell of a large, flat-bottom, vertical tank is equal to or greater N/A than the demand.
2. The capacity of the anchor bolts and their embedments is equal to or greater than the Yes demand.
3. The capacity of connections between the anchor bolts and the tank shell is equal to or Yes greater than the demand.
4. Attached piping has adequate flexibility to accommodate the motion of a large, flat-bottom, Yes vertical tank.
5. A ring- pe foundation is not used to support a large, fiat-bottom, vertical tank. N/A DE SRT: W. Djordjevic and TR Satyan Sharma. 10/6/93.

REF: 1. Anchor Inspection Data Sheets: Anchorage Arrangement Sketches and Physical Characteristics Data Sheet, Certified 8/31/93.

2. Dwg 0 12-3468-13.
3. Worthington Corp. Dwg. SK7938, 8-23-74 Anchorage: 2-QT-134-CD is the J.W. Heater, separately mounted by three1/2" coupling configuration of rod and Phillips Redhead wedge type anchors. Tightness was verified by torque, 6/28/93.

For anchorage evaluation, see External ANCHOR analysis, File: 2QT134CD.ANC. Weight of full water tank is estimated as 550 Ib (assumed with 12.75" OD, .375" Wall thickness, flat.375" thick end plates, 64" height, and 4.18 cu. ft volume of water). Considered as a cantilever with distributed load, the fundamental frequency is estimated to be 82.5 Hz. Actual response is governed by fixity of the base; anchorage system consists of three 5/16" x 2" x 6.25" plates welded to the bottom of the tank at 120 degree intervals. Considering the base flexibility and configuration, the frequency was estimated to be 8.96 Hz. as indicated on the attached calculation. The ANCHOR analysis intlicates a factor of safety of 3.74, however, the capacity of the anchorage is controlled by the base plates with a factor of safety of 1.84 as shown in the attached calculation.

DC Cook Unit 2 GIP Rev 2, Corrected, 2114I92 SCREENING EVALUATIONWORK SHEET (SEWS} Status: Yes Sheet 2 of 14 ID: 2-QT-134-CD (Rev. 0) Class: 21 - Tanks and Heat Exchangers

== Description:== CD EMERGENCY DIESEL AUXILIARYJACKET WATER HEATER (TANK) Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: CD EMER DSL GEN RM - IN THE NORTHEAST PART OF THE ROOM, 5 FEET NORTH OF CD EMERGENCY DIESEL JACKET WATER PUMP 42-QT-130-CD2, Manufacturer, Model, Etc.: 75KW HEATER Evaluated by: Date'.

                                                                                              / L/i  3 ~/~g

Attachment:

Pictures

Attachment:

Anchor Plate Seismic Capacity Evaluation for 2-QT-l34-CD

DC Cook Unit 2 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS'j Status: Yes Sheet 3 of 14 ID: 2-QT-134-CD (Rev. 0) Class: 21 - Tanks and Heat Exchangers

== Description:== CD EMERGENCY DIESEL AUX!LIARYJACKET WATER HEATER (TANK) Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: CD EMER DSL GEN RM - IN THE NORTHEAST PART OF THE ROOM, 5 FEET NORTH OF CD EMERGENCY DIESEL JACKET WATER PUMP

                                                                   ¹2-QT-130-CD2, Manufacturer, Model, Etc.: 75KW HEATER 2-QT-134-CD

CUFNT SUBJECT Stovenson and Assodatcs 8 A S!rucru ral. Mocha a!col Coaoulaa4 KOO!aoorlaO Flrra ch ttt cA 'P

                                                                               ~

IOO

       >>I ~ I I                                                                 gcggg~ E//z$guG-s~t,+~447rdP'p4/g, 0 8g+             ~p//8                &gdVf 8&.ChF gh'E-
                                                                                                                              .~CU~ge~               ~Eg ti/VSr d~
                                                                                 ~~/GALS. (7-". zw.l~S)                        Q-//di~             gg 444'/0     ~i gh~        APOXg'rdn44      Q     FC707   5
                                                                                                                              '?h"4'.e       i'~Sf l

5 I i 8

                                 $ 0'                                                                zo,

I.'r) III I ~~

                                                          ~~
                                                           ~ I DzR O  ~  .

I ~ I ~ iI ICg+ I l5 Zrv/. rt )%hi

                                                                                       /j t.tt kj.

h roll 04f8 Igd 095

                       .AMERlCAN ELECTRiC POWER
                                                                            )
         'r It'!ho
                          .,'@RVICE CORPORATiON
                      )gf'APPtHOVEO (N GENERAL "8- ~IOVED EXCEPT AS NOTED                                                                                                                      .p4
                        'U:.NOT APPROVED                                                                                                                                       c. ubr I

0:~ MFEREN E ONLY or>>or Ioor uott IOIIC Iorouorltc OOI C I IIIIO ' c ' 'LI ' I' ' ~ L t.tent L 4 I i':. ~":5'l'Li

                                                ~

Y'),, I

                                                                                                                                                                               ~ I

CUEN~ P Stevenson and Assochtes 8 A Sttuctu tat.Mcchaatcal Coatutttay Eaglacortay Fttta z t ~ 4',r.)}

                                                                                                ,1
                                                     ~                                        ~

c ~ ~ ul I %St . %)

                                                                 ~ i c

ag rt

                                            ~

i/ pcs ft u Mc

0 CUENT R~ IZI qs. 8 Stevenson and Assodatcs 5 A Sciacra ral44>eba alaal Caaralaay Karrlaeerlarr furr 1'1

                                                                                         ~ r
                                                                                                                                                ~ h LA ~
    'I'v>>r>>4+
              ~ >>I I LhU IC
                                                                                                                       ~ 'I       Ah
                                                                                                                                               ~ I~

A LV I A Il Al

                                                                                                                                               .LC hl
h. ~

S>>1 ~ gQ re<A g~'( ra VC 1 if'J 5~> li~~; av ~ b I

                                                                                        , rv
                                                                                              ~

r>>>>'.IVI S ALII U ~ IP 1 I ~ h >>Il ol I~ Lr I Lhr .'I'Ij $ >

                                                                                                             'I I a.l VI
                                                                                                                                        ~
                                                                                                                                          '"i v4                     11>I:m    al >.

iri ag A IL, lh

              ~  QI
                                                         ~ I                                         >>C'I

( 'C S i ~ >> I .I).h I ~ A' Il'

                                                                                             ~  I                              A      I

CUENT SHEET OF SVBJECT 2/0 9s

                                       \

Stevenson and Associates A SvvctuwhMeehs nleel Coaeu!tlag Kagiaoeriaq face

CLiFNT Stevenson and Assodatcs 8 A Strttctttral Meeit4444eal COatultttty sag(4444tlttti fltat

                                                +0'-                   4
                                                         ~P
                                                                                           ~

4 ~ 4, 4

                                                                                             'S at"I      *
                                                                             .g! tQ;,<J S
  • SS4 i I S p
                                                + ~     4  St
                                                                         ~ S rs p                                         44 4

DC Cook Unit 2 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 9 of 14 ID: 2-QT-134-CD (Rev. 0) Class: 21 - Tanks and Heat Exchangers

== Description:== CD EMERGENCY DIESEL AUXILIARYJACKET WATER HEATER (TANK) Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: CD EMER DSL GEN RM - IN THE NORTHEAST PART OF THE ROOM, 5 FEET NORTH OF CD EMERGENCY DIESEL JACKET WATER PUMP

                                                                                       ¹2-QT-130-CD2, Manufacturer, Model, Etc.: 75KW HEATER K Ij:tbaualx Spectrum: User
                     'esponse Frequency: User - 8.96 Percent Damping: User - 0.0G Spectral Values:

Direction Acceleration (g's) North - South 0.38 East - West 0.38 Vertical 0.23 Angle (N-S Direction makes with the X Axis): 0.00 Combination Criteria: SRSS ~Wight umber of Weights: 1 No Weight 1 550.00 6.875 0.000 32.000 Number of External Forces: 0 Xmas Number of External Moments: 0 gggygiJPp~ hachar Number of Anchor types: 1 Tension Shear Ultimate Ultimate Inter Inter Saf No Dia Manufact Product Tension Shear Coeff Coeff Fact 1/2 Phillips Wedge (N) 2290.00 2380.00 1.00 0.30 1.00 Qmmta Stress: 3500.00 psi..

          'ltimate eduction Factor: 0.8 .

DC Cook Unit 2 GIP Rev 2, Corrected, 2/ti4/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 10 of 14 ID: 2-QT-134-CD (Rev. 0) Class: 21 - Tanks and Heat Exchangers

== Description:== CD EMERGENCY DIESEL AUXILIARYJACKET WATER HEATER (TANK) Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: CD EMER DSL GEI'I RM - IN THE NORTHEAST PART OF THE ROOM, 5 FEET NORTH OF CD EMERGENCY DIESEL JACKET WATER PUMP

                                                                              ¹2-QT-130-CD2, Manufacturer, Model, Etc.: 75KW HEATER Kaid
     'llowable  Stress:     30600 psi.

Rzfvm of Surfaces:

               'umber 1

Surface Orientation Direction Direction Direction Comp Comp Comp No Nx Nz 0.000 0.000 1.000 Anchor Pattern for Surface ¹ 1 Legend for Anchor Patterns Anchor Bolts . Concrete Linen: ~mm Concrete Points . Vleld Lines:

DC Cook Unit 2 GIP Rev 2, Corrected, SCREENING EVALUATIONWORK SHEET (SEWS) 2/14/92'tatus: Yes Sheet 11 of 14 ID: 2-QT-134-CD (Rev. 0) Class: 21 - Tanks and Heat Exchangers

Description:

CD EMERGENCY DIESEL AUXILIARYJACKET WATER HEATER (TANK) Building: AUXILIARY Floor EI.: 587.00 Room, Row/Col: CD EMER DSL GEN RM - IN THE NORTHEAST PART OF THE ROOM, 5 FEET NORTH OF CO EMERGENCY DIESEL JACKET WATER PUMP

                                                                            ¹2-QT-130-C02, Manufacturer, Model, Etc.: 75KW HEATER Qmmdn hrzhar.

Number of Anchors: 3 Anch Z Surf No Id Coord Coord Coord Id 0.000 0.000 0.000 14.063 -8.119 0.000 14.063 8.119 0.000 ¹ of elements per line: 1 Number of Concrete Lines: 3 Start Start End End End Sf Line No X-Coord Y-Coo rd Z-Coord X-Coord Y-Coo rd Z-Coo rd Id Width

          -1.000         0.000        0.000          6.250        0.000     , 0.000     1        2.000 11.438         -3.572        0.000         14.563       -8.985       0.000     1        2.000 11.438          3.572        0.000         14.563        8.985       0.000     1        2.000 Number of Concrete Points: 0 EcldJ.bm '

of elements per line: 4 Number of Weld Lines: 0 Reduction Factor input for Anchor ¹ 1 Adequately Installed: Yes Embedment Length: ( 2.13 in. Min Reqd. to achieve full capacity):= 2.13 in. Gap at Threaded Anchor: 0.00 in. Edge Distance- Edge 1: 5.00in. Crack Size: 0.000 in. - Cracks Affect <= 50% Bolts Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes mbedment Steel and Pads Adequately Installed: Yes

OC Cook Unit 2 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 12 of 14 ID: 2-QT-134-CD (Rev. 0) Class: 21 - Tanks and Heat Exchangers

== Description:== CD EMERGENCY DIESEL AUXILIARYJACKET WATER HEATER (TANK) Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: CD EMER DSL GEN RM - IN THE NORTHEAST PART OF THE ROOM, 5 FEET NORTH OF CD EMERGENCY DIESEL JACKET WATER PUMP

                                                                             ¹2-QT-130-CD2, Manufacturer, Model, Etc.: 75KW HEATER Reduction Factor Input for Anchor    ¹2 Adequately Installed: Yes Embedment Length: ( 2.13 in. Min Reqd. to achieve full capacity):= 2.13 in.

Gap at Threaded Anchor: 0.00 in. Edge Distance - Edge 1: 5.00 in. Crack Size: 0.000 in. - Cracks Affect <= 50% Bolts Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factor Input for Anchor ¹3 Adequately Installed: Yes Embedment Length: (2.13 in. Min Reqd. to achieve full capacity):= 2.13 in. Gap at Threaded Anchor: 0.00 in. Edge Distance - Edge 1: 5.00 in. Crack Size: 0.000 in. - Cracks Affect <= 50% Bolts Essential Relays in Cabinet: No Adequate Equipment Base Strength and Structural Load Path: Yes Embedment Steel and Pads Adequately Installed: Yes Reduction Factors Data Current: Yes Anc PaIV Pallrl No Id Vali Vallr RT RN RL RG RS RE RF Rc RR RP RB RM 1 1 2003.75 1.00 1.00 1.00 1.00 1.00 1.00 0.88 1.00 1.00 1.00 1.00 1.00 2380.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2 1 2003.75 1.00 1.00 1.00 1.00 1.M 1.M 0.88 1.00 1.00 1.00 1.00 1.00 2380.00 1.00 1.M 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 3 1 2003.75 1.00 1.00 1.00 1.00 1.00 1.00 0.88 1.M 1.00 1.M 1.M 1.00 2380.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 N/A = Not Applicable Pall = Allowable Pull without Reduced Inspection Vali = Allowable Shear without Reduced Inspection Pallr = Allowable Pull with Reduced Inspection Vailr = Allowable Shear with Reduced Inspection

         = Outlier
         = Reduction Factor Not Used RT        = Reduction Factor for Type of Anchorage
         = Reduction Factor for Installation Adequa RL        = Reduction Factor for Embedment

0 DC Cook Unit GIP Rev 2, Corrected, 2/14/92 EVALUATIONWORK SHEET (SEWS) 2,~'CREENING Status: Yes Sheet 13 of 14 ID: 2-QT-134-CD (Rev. G) Class: 21 - Tanks and Heat Exchangers

== Description:== CD EMERGENCY DIESEL AUXILIARYJACKET WATER HEATER (TANK) Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: CD EMER DSL GEN RM - IN THE NORTHEAST PART OF THE ROOM, 5 FEET NORTH OF CD EMERGENCY DIESEL JACKET WATER PLIMP

                                                                                     ¹2-QT-130-CD2, Manufacturer, Model, Etc.: 75KW HEATER RG      = Reduction  Factor  for Gap at Anchors RS      = Reduction  Factor  for Spacing
       = Reduction  Factor  for Edge Distance RF      = Reduction  Factor  foi Concrete Strength RC      = Reduction  Factor  for Concrete Cracks RR      = Reduction  Factor  for Essential Relays RP      = Reduction  Factor  for Base Stiffness and Prying Action RB      = Reduction  Factor  for Base Strength and Load Path
       = Reduction  Factor  for Embed. Steel and Pads Analysis Performed: Yes Type of Analysis: Regular Spectral Accelerations (G's)

No N-S E-W Vertical Safety Factor 0.380 0.152 0.092 4.204

          -0.380           -0.152           -0.092                      4.704
          -0.380            0.152             0.092                     4.514 0.380           -0.152           -0.092                      4.612 0.380           -0.152             0.092                     4.204
          -0.380            0.152            -0.092                     4.704 0.380            0.152            -0.092                     4.612
          -0.380           -0.152             0.092                     4.514 0.152            0.380             0.092                     5.698 10        -0.152           -0.380           -0.092                      3.039 0.152           -0.380             0.092                     5.698 12        -0.152            0.380           -0.092                      3.859 13        -0.152            0.380             0.092                     3.740 14         0.152           -0.380            -0.092                     6.064 0.152            0.380            -0.092                     6.064 16        -0.152           -0.380             0.092                     3.740 17         0.152            0.152             0.230                     8.257 18        -0.152           -0.152            -0.230                     7.950 19         0.152            0.152            -0.230                    15.006 20        -0.152           -0.152             0.230                     6.830
          -0.152            0.152             0.230                     6.830 22         0.152           -0.152            -0.230                    15.006 23         0.152           -0.152             0.230                     8.257 24        -0.152            0.152            -0.230                     7.950

DC Cook Unit 2 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet14 of14 ID: 2-QT-134-CD (Rev. 0) Class: 21 - Tanks and Meat Exchangers

== Description:== CD EMERGENCY DIESEL AUXILIARYJACKET WATER HEATER (TANK) Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: CD EMER DSL GEN RM - IN THE NORTHEAST PART OF THE ROOM, 5 FEET NORTH OF CD EMERGENCY DIESEL JACKET WATER PUMP

                                                                       ¹2-QT-130-CD2, Manufacturer, Model, Etc.: 75KW HEATER Minimum Safety Factor:     3.740 The Anchorage Capacity is     3.740 times greater than the Demand

Coo ComponenC Po. '2" KT ) ~4'laia Any payticu1.ar area the Seismic Review Team should pay extra attention tot Yes V No (If yea, check itima that apply.) Anchor Type khumrJsa Anchor Diameter Anchor Spacing eA-Anchor Number Anchor Embedmen Edge Distance

                          'nchor Anchor Gap Anchor Thread Engagements~

Anchor Grip Anchor Angularity Concrete Crack& Others (describe bri.eely) IE there is concern for Design Basis Discrepancy, circle th>> applicable i.tom and explain.

1. Hardvc,re Maintenance Type Discrepancy
2. Drawing Update Type Discrepancy
3. Significant Operability/Design Basis Discrepancy Others P vV( c.8-o K Condition:

b> p, >F. +g0+R j~ a)c,(,~ <)~

                                   ) g->$ 4 Actions Taken:

prepared By T. Dat. 0 >> /~

                                                         '.2 CHP 5021 CCD.019
                                                                          ~
                                                         ~TTACEQKNT NO. 1 OR'f TWQ                            Sa7-0" L ~P,qHEA,gg F )OQ                OF ROC'OOM.

Un Bldg- Locat on (Z-34K- l3 2,-GT-isa- CD Znsta at on dwg. / Rev. Equipment No. Anchora e Arran ement Sketch IIZ'a l30LT VllTH QVERSlZED WASHY.R 4 NUT )hl >s" 38(CK, K, NG'9 54QTTEQ HQLE, L'-0'ia" MO WAG%.R

            +A                                                QA INDIANA MICHIGAN POWER SITE DESIGN CONTROLLED WORKING COPY AUG 51 1S95 LERK  ~   ~

Drawn by: Date: c Verified by: Date: - 0 Qu ./Cert. Xnspector Reviewed by: Date: Construe on or Review Engineer Page 1 of 3 Revision 1

                                            ~ ~

s ~ ~ 0 ~ ~ ~ ~ II

   ~ ~     ~ I
                                    ~     I
                                      ~
 ~             4 ~w~    ~

~ ~

                                  ~
                                    ~

i I ~ r ~ ~ II 4 e 'L ~ + ~ i ~ ~ 'l ~

                                                                                        ~
                                                                                          ~
                                                                                          ~
                                                                                            ~
                                                                                            ~
                        ~   ~ ~
                                        ~    ~

o li)

                                     ~      -. Ci   ~                 I l-s. L ~

RHMeWsaMMMWW HHHL%%%EE ewmaaara .SL~LE55 858QERLl LE I I~ ~ ~ II r~ WlRISR%i EL l%RiR~HRLWLL MWWWWW~W& mmRIHRHLIL 5%l%SRHRRli% I I I

       ~   0 RRiRgRkigi%~~~~~~
                                          &WWWWK%
                        ~ S ~

I ~ ~

                                             ~g                     IE
                                                   '                                        > ~ l ~,
                                                                                ~     '
                                                                                  ~ '

5 <".~ A DEPT.Ri('v'.'=,". CONTROLLED DOCUMENT '2 SHP 5050 mE 008 COPY NO. ATTACPNENT NO. 3 ULTRASONIC TEST REPORT JOB ORDER NO.: /A Q ~) IDENTIFICATION TECHNI UE Unit Test Unit/ S/N y'S -'l~ CA.c'. -'s Component Freq. /Diameter Reference Standard Material V~ Couplant/Batch No. Other 5- . TEST DATA REMARKS

                                                     ~ wl+%CC'.CS<<L cC+

PERFORMED BX: REVIEWED BY: LEVEL: LEVEL

                                                         ~
                                                        ~-

DATE: DATE. FORM NO. 12 SHP 5050 NDE.008-1 Page 1 of 1 Revision 0

Equip XD: 2-TK-76N Train: 2 Equip Class:21 P~awing No.: 2-5149

    ~
            ~ ~

ction:

      ~

HVAC

 ~

System: CONTROL ROOM AIR CONDXTXONING CHILL WATER Equip Desc: CONTROL ROOM AIR CONDITIONING NORTH CHXLL WATER EXPANSION TANK Building: AUXILIARY Room: CONTROL ROOM AXR CONDITIONER ROOM Elev: 650 Sort: S, Notes: Normal State: Desired State: Power Req'd: N Support System Drawing: Req'd Support Comp: Safety Related Status: STANDARD Min/Opt: MXN Alias No: Power Train: Comp Served: MFR: Panel: Elem. Drawing: NOT APPL Wiring Drawing: NOT APPL Power Source: Walkdown: F Relay Eval  : N Comp Type: TANK. Iso Drawing: 2-VW-529 Location: 4 FEET EAST OF THE ROOM'S ENTRANCE GATE, AT THE NORTH WALL, 7 FEET ABOVE THE FLOOR

DC COOK Unit 2 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet1 of2 ID: 2-TK-76N (Rev. 0) Class: 21 - Tanks and Heat Exchangers

Description:

CONTROL ROOM AIR CONDITIONING NORTH CHILL WATER EXPANSION TANK Building: AUXILIARY Floor El.: 650.00 Room, Row/Col: CTRL RM AIR CONDIT RM - 4 FEET EAST OF THE ROOM'S ENTRANCE GATE, AT THE NORTH WALL, 7 FEET ABOVE THE FLOOR Manufacturer, Model, Etc.: BASIS: External analysis

1. The buckling capacity of the shell of a large, flat-bottom, vertical tank is equal to or greater N/A than the demand.
2. The capacity of the anchor bolts and their embedments is equal to or greater than the Yes demand.
3. The capacity of connections between the anchor bolts and the tank shell is equal to or Yes greater than the demand.
4. Attached piping'has adequate flexibilityto accommodate the motion of a large, flat-botton Yes vertical tank.
5. A ring-type foundation is not used to support a large, flat-bottom, vertical tank. N/A S C L DE

~C SRT: Gary Thomas, Tom Huang and Kailash Mahajan on 11/3/93. ANCHORAGE AND SUPPORT OF TANKACCEPTABLE BY JUDGMENT BY THE SRT FOR THIS SMALL TANK. Small tank 2'n length x 9 " in diameter on a 1" diameter piping system. Tank in-line with pipe, supported by a U-bolt on a cantelevered angle (2 1/2" x 2 1/2" x 3/8") about 1' 6" long. Angle welded to a plate that is bolted to the reinforced block wall with 3 5/8" diameter through bolts (other side of wall Inspecied and bolts came through). Glass site tube judged acceptable (no interactions). Evaluated by: Date:

Attachment:

Pictures

DC COOK Unit 2 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 2 of 2 ID: 2-TK-76N (Rev. 0) Class: 21 - Tanks and Heat Exchangers

== Description:== CONTROL ROOM AIR CONDITIONING NORTH CHILL WATER EXPANSION TANK Building: AUXILIARY Floor El.: 650.00 Room, Row/Col: CTRL RM AIR CONDIT RM -4 FEET EAST OF THE ROOM'S ENTRANCE GATE, AT THE NORTH WALL, 7 FEET ABOVE THE FLOOR Manufacturer, Model, Etc.: QJCT~I=S CONTROL ROOM AIR CONDITIONING NORTH CHILL WATER EXPANSION TANK

Coo Component go, 2 TK 7~ ~ Class 2~ Any payticular area the Seismic Review Team should pay axtra attention to? Yes < No (If'es, check items that apply.) Anchor Type Anchor Diameter Anchor Spacing Anchor Ãumber Anchor Embedment Anchor Edge Distance Anchor Cap Anchor Thread Engagement Anchor Crip Anchor Angulari~ Concrete Crack< Others (describe brieily) If there is concern for Design Basi.s Discrepancy, circle the applicable item and explain.

l. Fardvare Naintenanc'a Type Discrepancy ruling Update Type Discrepancy
3. Significant Operability/Dosi~ Basis Discrepancy Others Condition:

WoH6 Actions Taken: Prepared B nasa

12 CHP 5021. CCD. 019 ATTACHMENT NO. 1 0 - NSP CT 0 D T

                                                                                  %ÃTHWE,ST CORKP OF CbNTRQl.            RIM AlR (.:I'"lT>gq s AU'L            ( 50'- Q" . ROOM            IC        WAL   1"0" AEOVF FLQClr Unit                           Bldg.                               Location Z.- Tl(- IC 0 Installation          dwg.  /   Rev.                 Equipment No.

Anchora e Arran ement Sketch R > g" x 4 "x I'-4" ZI r~r'.IO

                                                   ~g e R{'.D 'ltllTll
                                                   -{.UE<C i VUH'P.

I7A Wl 83+/ $ g4.'t&L

                                                                              ~QOCK %I&44 SEC    TlQM "4-k" Z'6   I'r"                     Z"  Z."

I Z >"x3"x ~ra" J Q LQ'iX 5'"+ CO ~/s"4 5%6-ROD o~ C.O>. 0)-'EB5llED -rL n-et; ~ Pp

                 +  amQ<S CRACWCD VC CBLIMG,                                                 %A'5'.5 UO  O C9             ALSQ. MQPTAR BEl'WCCkl t" LQCI(5 O 2.'

Y. C RACK E.Q 4/l ~ ~O ZO& ~us Qy t. n 4LI SEC Y."2-K'ECT. 'Y -C" Drawn by: Date: C.-/ Verified by: Date: ual./ ert. Inspector

                                        ~       ~

Reviewed by:

              ~

Date: Construction Anc or Review Engineer Page 1 of 3 Revision 1

ATTACHMENT Np. Equipment No.: Dwg No.: Embedded Steel Dwg. No.: Weld ID des size 1 ~ Fillet 2 ~ Plug/s3.ot Len h 3 ~ Groove cracks Yes Yes Yes Yes Yes Yes Yes No No Ho No No No No Lack of Yes Yes Yes Yes Yes Yes Yes Penetration No No No No No No No No Porosity Yes No Yes No Yes No Yes'es No Yes No Yes No , No (MGLC.N'ES YVC.LD I ~

                    ~  kFQQMQ 'REM.

UMQCR<U'T AND FMDS OF AMC LE. H< '~e" I" QF 7Hz TOP HQR I "'TAL WELD I 5 CQ~~<~> WASHER lh3IA;IA h'ijcH(QQN T~o ~i~ c woaxi-G carr AUG 181995 LKRK T I Equipment base flexible: 0 Yes 8 No ons ruc I.on e Date: Reviewed by: I ons ruc won c or evxew gxneer Verified by: ua npsec or Date: Pago 3 of 3 Revision 1

ATTACHMENT4 TO AEP:NRC:1040E SAMPLE SEWS, ANCHORAGE CALCULATIONS, AND ANCHORAGE INSPECTION DOCUMENTATION FOR LARGE FLAT BOTTOM TANKS RAI ITEM 6

This attachment includes sample SEWS, anchorage calculations and anchorage inspection documentation for the large fiat bottom tank evaluations requested in RAI Question 6. Included in this attachment are the evaluations for 1-TK-33 (RWST) and 2-TK-32 (CST).

wquip ID: 1-TK-33 Txain: 12 Equip Class: 21 Drawing No.: 1-5144

      ~
               ~ ~
   .'ction: DRI
         ~

System: REFUELING WATER STORAGE TANK SUPPLY Equip Desc: REFUELING WATER STORAGE TANK Building: GROUNDS Room: RWST ARBA Elev: 609 Sort: S, Notes: Normal State: Desixed State: Powex Req'd: Support System Drawing: Req'd Support Comp: Safety Related Status: NUCLBAR SR Min/Opt: MIN Alias No: Power Train: Comp Served: RWST Mfr: GRAVER TANK AND MAMJPACTURING CO Model: 420,000 GALS Elem. Drawing: Wiring Drawing: Power Source: Walkdown: F Relay Bval  : N Comp Type: TANK ISO Drawing: Location: 25'ORTH OF UNIT 1 CONTAINMENT BUILDING.

                                                                    >12 CHP 5021- CCD. 019 ATTACHE'.NT NO.           l GA,   ufo+                 25     HEPTA OI-    Awrearr&T.

Un t Bl g. Local on i 3049 lc- 33 Insta at on wg. / Rev. Equipment No. Anchora e Arran ement Sketch RW.S T 7~k. DiN&NCioM '.$ DIRx 5'2'- '5 ttlAH 2'5 ~C.&R STR~ Q &@A~ ( SB& hJRcy pa.g9 aT~ gHC TH@ CT'%Re (S SoTTOM SW1 oF poP, PraOuHO Ttl@

                                                       ~~

ncvWg<g p,~<<

e. ~~w~ c~ ro4
                                                                    /$ 4 ove     'e (e%
      ~t46- GF IS
                  ~      >(g TA.imM)

CIaeug~ fH ~~~ WCP TeS I ~ NX,l-V~ T'tb Pagan array

                                                                                         'OOR.
                                                                       ~~q
      ~ll4) TO YQ
       '4~&/ $ 6 ~$ 6 AROOHO SNaoTH

( F R12T 0 QF F r~ T~ '2 Gtl>S ~ MO They nC'e'7~& <~aiI Faorn

                                                                   <0 FtC.SCL)SV: To mZ ~Su~>oa),

INDIANA I/ICHIGAN POWER SITE DESIGN CONTROLLED WORKING COPY OCT kB tSSZ LERKT Drawn by: Date: IQ-1 t2 Verifiod by: D te: gga . Ce . Znspector Reviewed by: 2 Cons ruct on Anc or Review Engineer Page 1 oi' Revision .3

 '(

I 0

                                                                      > 12 CHP 502 1 CCD 019
                                                                                      ~      ~

ATTACHMENT NO. 1

                                                                   '2S  NOR t H OF    NOTWWYYI~.T B    g.                          Locat on
                                                             'l- TK.-33 Insta     at  on dwg.    /   Rev.             Equipment No.

Anchora e Arran ement Sketch r= C+3uau

                               >/II"< is'w       IP Ie<        O u>q OMrI'S 'NIIYI~

hS Ceo~Q O TRt4K. I 3/br'" norns

                                                    ,4 4  s 4

a4. ~ 4 ~

                                        , 4            a INDIANA MICHIGAN POWER SITE DESIGN CONTROLLEIi WORKING COPY Ot;T 15 1995 LERK  +

8 ~04T 66 tYRACVAW

                                                                 ~Q.AT~ S~gg 4p M~

SECT.'A A All(.+K STRFtP (DCThiL c.av~a av 'F 'adi~measu.va b be. a.c.cu.va4)T hue Q~ S iv su.toko Drawn by: Date: 1G 1 Uerified by: Date: /<'- Qua . Cert. Inspector Reviewed by: Date. l 0 '9'X Cons ruct on Anc or Rev ew Engineer Page 1 of 3 Revision .3

DC Cook Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet1 of26 ID: 1-TK-33 (Rev. 0) Class: 21 - Tanks and Heat Exchangers

Description:

REFUELING WATER STORAGE TANK Building: GROUNDS Floor El.: 609.00 Room, Row/Col: RWST AREA, 25' OF UNIT 1 CONT BUILDING. Manufacturer, Model, Etc.: GRAVER TANKAND MANUFACTURINGCO. 420,000 GALS BASIS: External analysis

1. The buckling capacity of the shell of a large, flat-bottom, vertical tank is equal to or greater Yes than the demand.
2. The capacity of the anchor bolts and their embedments is equal to or greater than the Yes demand.
3. The capacity of connections between the anchor bolts and the tank shell is equal to or Yes greater than the demand..
4. Attached piping has adequate flexibilityto accommodate the motion of a large, flat-bottom, Yes vertical tank.
5. A ring-type foundation is not used to support a large, flat-bottom, vertical tank. Yes COJg NINES SRT: George G. Thomas and Tom Huang on 10/5/93 0

Large flat bottom tank 48'-0" inside diameter 32'-3" height (31'-0" liquid tank). Tank manufactured by Graver Tank, ~ made of ASTM A240 Type 304 Steel, 420,000 gallons and weighs 94,000 lbs. Anchored with 25 3/8" th x 5" w x ~ long strap that is embedded in the concrete 2'epth with a 2" radius hook at the end. 4'4" A detailed calculation was performed to the SQUG GIP criteria as part of the Stevenson 8 Associates report "Earthquake Analysis of D.C. Cook NPP Refueling Water Storage Tank Subjected to Nozzle Loadings to Original and Current Design Criteria", September 12, 1989. The calculation for the RWST resulted in the conclusion that the weld to the tank and embedment in the concrete was sufficient to develop the full yield strength of the strap. The calculation for the RWST using GIP methodology indicated an overall safety factor of 2.57 for overturning and 1.72 for shear. The calculation is included as a document of this SEWS. The tank is founded on a concrete pad per drawing 0 1-2-3048. g4 Although anchora the straps were not rusted to the degree that the SRT judged the;e should be reduction in capacity. A flin ing of the walkdown was that these straps should be cleaned and painted to maintain their integrity. Picture 2, Wk. 1, Tm 2, Disk 1- Pipe at the Bottom of the RWST Picture 1, Wk. 1, Tm 2, Disk 1 - Typical Rusted Strap Picture 3, Wk. 1, Tm 2, Disk 1 - Buckled out Anchor Strap

DC Cook Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 2 of 26 ID: 1-TK-33 (Rev. 0) Class: 21 - Tanks and Heat Exchangers

== Description:== REFUELING WATER STORAGE TANK Building: GROUNDS Floor El.: 609.00 Room, Row/Col: RWST AREA, 25' OF UNIT 1 CONT BUILDING. Manufacturer, Model, Etc.: GRAVER TANK AND MANUFACTURINGCO. 420,000 GALS Evaluated by: Date:

                                                                                   /~   -zg-

Attachment:

Pictures

Attachment:

Seismic Evaluation of The RWST

& 5 OC Cook Unit1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 3 of 26 ID: 1-TK-33 (Rev. 0) Class: 21 - Tanks and Meat Exchangers

== Description:== REFUELING WATER STORAGE TANK Building: GROUNDS Floor El.: 609.00 Room, Row/Col: RWST AREA, 25' OF UNIT 1 CONT BUILDING. Manufacturer, Model, Etc.: GRAVER TANKAND MANUFACTURINGCO. 420,000 GALS Sl)

        ! g5(

5 <~~<. d,i I

                                                            .Li I  ~

1~2.C (I.M s ~ I I

                                                                                                              .CD&.ii 1

I I P I

                                                                                                                                          'H  ~
                                                                                                                                                )

I

                                                                                                                                                    .:       -'25I
                                                                                                                                                                     ~

I I l s ' s ~ i

                                                                       ~

I 7 I I 7

                                                                    ~      r-    j o~ qi      gA I

I I Icn e) j I 1 V'-~! +I (',C I(~ ..m r Qgl I I " I 7 I i I 7 I  ! ' I - .i. I t L l

                       +

Mod .'C g I C' Ial C~

                                                                                                ~

I O'. .OJ - L I klPPl /~

                                                                                                                                 ~  ~     ~

iI i I i I I ~ (D'MC.I(.C'B~AuD pig III

                                                                                                                                       '7 I                                                                                                                                                         I    ~

s h I I ~ ~ I ~ ~ r r

                                                                                             ~              ~

i 7

                                                                             ~I I    Acct(a I  I I'r<  ~~

I 8 a~ 7 I 2$ I I j I j j

SUBJECT SHEET OF

                                                                                                                                                             'BO  Z-nt 4I 0

NM > zan RcJ STEVENSON 50 Ifn>>clUTCHnechonlcot ASSOCIATES NS - ~. C e PP con>>vtttng engtneeltng ttt>>n I! i

                                                                                    ~l            I L.t~                                                                   RQ.C. I a. <                       ~M.4 P~                                    I A.'IFt (IP/         ~ et- c.~'a~A I

w~J. E,DclsP !r,aT ~~ I I I I 'I

                     .<<                         LL                                                            t ti i    l  t              i
                                       )p~ p t c eL. Pp~i,~
                                                     'pm,~~.FI,EE         sb I,                       MBLc      ~I
                                                                                                 .                k I      I   I i  i I       .'!                              t

~j: . SWJ Q,>>ti m Pg I I ~

                                                     ':)3~'.ca:~:                                                                                   l  g cc.Ec.
                 ~    ~

Cw:.~) C- ~-

                                                                      -'. -'                             -::-Ce)-- -'.--'C~-">-'-.----' C~>--'--:

I . =.I I ' I i '] I i I Tl I

j. z6 ...,....5;. t .: '.,:2 ~ .'. ]
    ~ ..l  ~     I l

I I. C.'Z CC.  %. O i  ! t~

                                                                 ~

I i I I . t .,o.5:G.

                                                             ,                ~
                                                                                                              ~          T   !         ~    I    >>

A EFA=. n . t. I W,O i I I i I~~I 09.Z->> I

                                                                                                                                        ~,

I I

                                                                                                    +I
                                                                 ~

I i

                          'I 7                                                       8,                   I   i I

4 I i ' I I

                                                                                                                                                         ~     I i
                                                                                +lr,b,o 1

M~K I i'e:~I I~ .P I I I 7 Z,- I ' I i

                                                                .,2A T

j ~ I I i I i

                                                ~ ~  e*.,         i.,  I. ~ ~ t                                      I 1  !

0.i.C,tq-.J Z.dD VZP,s to>>I s  !

                                                                            .in       .,'E.F>>, l g,r s~o                a.etc       a!FFE.c.'rP-'. FE,
                                                             ~-4-CM~-E                                       M~ 4/t.l ~ TEI m.c.'F-
                                            ..                                   F.

Q.Q,~IS.g>>-! M I E>>

                           ~                                     i P fl>gs q                                       .cc'AGAN                   n.A        '~a     6      c~,~~a.@~'~w~.s..y M.c..ks.

i jpJ i t rex t pU ws.( ~-~, p- ..Ei'.A.,c:)ir ..'< h,>>~<. J

          +S.IV ~P-,A.. WHX.,
                      !S        )

H,z.& . >>FAG,P.h EA.kaIP'nk ..i.m~46 P~ n.p. t.D~  ! H ~C ~C. k.. I C C IFFY I 2 E I I I l i i rrfI

  >>        I     I     ~        I      I
                                       ~    ~   ~     ~                           I   I
                                                                                        ~
                                                                                             ~
                                                                                                                     ~    ~

I I ~ I

g V

                                                                          ~ ~

EOASP 1.0 Response Spectra 08-03-1989 FREO DAMP DAMP

                    .050            .040
1. 0. 10 9.872E-03 1.008E-02
2. 0.13 1.790E-02 1.846E-02
3. 0.16 2.700E-02 2.794E-02
4. 0.20 3.660E-02 3.798E-02
5. 0.25 4.832E-02 5~043E-02
6. 0.32 6.133E-b2 6.432E-02
7. 0.40 7.518E-02 7.920E-02
a. O.5O 9.276E.02 9.817E-02
9. i 0.63 1.219E-01 1.306E.01
10. 0.79 1.434E-01 1 '40E-01
11. 1.00 1.702E-01 1.838E-01
12. 1.26 2.040E-01 2.217E-01
13. 1.58 2.357E-01 2.572E. 01
14. 2.00 2.604E-01 2.849E-01
15. 2.51 2.834E-01 3.108E-01 1/3 FREQ DAMP DAMP
                   .050            .040
16. 3.16 3.066E-01 3.371E-01
17. 3.98 3.290E-01 3.629E-01
18. 5.01 3.292E-01 3.630E-01
19. 6.31 2.937E-O'1 3.208E-01 fo
20. 7.94 2.809E-01 +'.591E-01
21. 10.00 2.337E-01 2.514E-01
22. 12.59 2.20?E-01 2.367E-01
23. 15.85 t'.Zc 2. 292E-01
24. 19.95 2%38~1 2.288E-01 25.

26. 25.12 31.62

                               ~92~+   ~    2 G'$

27. 28. 39.81 50.12 0&61 2A78E 01 ~~1

                                ~05&91 29.

30. 63.10 79.43 ~~1 Qv3BH. Ql 2/3

5 2 - ~6'5 SHEETM~Ol42.~ \ cf- P-EF 'I g~ S-S

          'STEVENSON R ASSOCIATES a Ittuatu)CHnechanlcaf consul)lng cnglnccnng nrrn 2) 2,.e
                                                                        ,4  23                              . I 8 aS C+                                     (       I
                                                                                                    ~'o ms 4w               (I   I l O'O  I i   !     I                             i  I I  I L        j
                                           ~.s        0    C.,    3-8J~               C.H&l?=~                               I   I w4w~w..P
                                           ~-V'nil p~ '.T F~

I g ' I I f I aEWEf=mA I l f j j " C~~~~.~) <.~' I I

                                             .G.~~r~.b.ofI e.&v I'                    I
                                                                                    'C,fw.C.A
                                                                                .                                   IA,        .

l

    ~

l l c..)

                              ~

i . A &,c .y'.g f

                                                    ~   f" I:

i, g,

                                                            ,b..~.f,a LV J.f,a J

C

                                                                               .y...
                                                                                    ', V.....ExVZa
8. I 4 ~oi,7 I,rl I j >

I

                                                                                                                       &.6)kd.MQAG.=

I

                                                                                                                             ~
                                                                                                                           .,O L wv.'

P' I I

                                                                                                                             ~   I I
                                                                                                                                     ..fd I

I T

                                                                                                                                             .. CV.Cv'6S..

I

                                                                                                                                                      ~
                                                                                                                                                      ~

I I I I  ! I I

    ! '         l
               .i I  L '-     I  wi                                                                                                  I   .io'z <~~

I I I I

c.~~S~4./i'T 05 5"73 /

ri-i'5 I I ~

                           ~pi             4 I

j ( I ( I i I 3 M 'Ao I I ( I i !I ( I  ! l1 5 I l I

  ~   ~   I j=.o, I

I I f a I Ol ~

                                                                                ....Ua i                       CD I  ~l I                                                          I g '" 3cO+J       ji        ;.3'~  lI l

I

e" SUBJECT~&~IC

                                                               'J     'u'.        P6     JOB No.'

CPS'Q e-s.-e s(i gO CII STEVENSON ASSOCIATES a Iinrcturojtnochonlcot

                                                                     .C 'C'                  *Q,P.P         III ccnsuNIAII oncinooring Ilrm c  o
                                           ~
                                             <C Tn I+I
                                                 !     I
                                                           ~
                                                             +L    I J M!5~
                       ~c~ (~~.E~E.                        k'~~a                I  oj~ N                                   Assio <<([a
                                                       '"=RE..~

! T li C '4:.'...orrT=.. I.~!O 'O. j I I

l. g
                                                                      .         opj I    ,

r nM.II I

                       <6,P.         .-I
                                 "..==.I I I                                  T tj C.C   KI
                                                                                                                ~ ~

I

                                                                                                                            ~

I I I I ( J+ 'L . Q~'~p.'i:MC' i

                                                                                                        ~
                                                                                                            }

I I I I I I I o8

 ~

I I I I,

                  '         ~

I i I i r<<T $ I I ' t

                                                                                'Z.Z .I" ~
                                                                          '-'a'
 ~

I 4 l I

                                .:,4 c.c I    I   I
                                                         ~  Qo     i

(6 i 4~I 3 oI da I

 ~

I I T ~ r

I i SUBJECT sosi(0. ++<'1<~7'HssTMa oFEPM K O <<C

     ,;-.'STEVENSON 8c ASSOClATES a ttructutoHnechantcot 5 (

Cohuttt<<JQ cttglttcctut(I tttttt j H I l -X,.9

                                                                                                          .~.  ~J3.6         il I.!2Q l
                                                                                                                  ~j            I  ~

j L j

                              <<MC P             '-

B ~ 0 4<WGR 'lJJ!~<<<<<<<<I. P Q P mJII L Ia4-I j j J Q gS Q~ P'4t e l W jy t

                                                                                                ~C' I                      i     j
                                                                        ~        I t

I t I ( I, ( I J I I (

                                                                                                                                   $4     ~

j I i

                                                                                                                                                    ~~+

I-

                                                                                                                                                    <<j       i I

I

                                                                                                                                                 ~  I  !

j t I

                                                                                                  '<<j 1

t << ~ I

                                                                                                                                '  ~      i            I
                                                                                                                                                 .I
                                                                                                                                                    ~
                                                                                                                           !          . I   I        (

3

          ~  <<
                      ~

I ~ ~ I

                                                                                            ~ ~-~L~
                                                                     ~                                                                    ~   t              I
                                            ~

4 S.E GAA.P H.D~ I a.t/,~ 6=' I I <<

                                                                                                    .'t-.'.
                                                             ~

Sj

                                                      ~
       ',.';    .            ..'S~P..J @                  ......,: G'.c~..gg;,~.~ i~a I                          o....PP-.E'.'.s:~a.+:~         L~a g.;

6 H.tat I Q ' pl@&'C(A D

                                                                     ~,

p, g~( g i.Jci ~ ((<<-tc'; T (7): ~ I l I I Hr~ ..I pl j lQ I I *', ,'./g....j:,...Z 0 ...I.:~, =i j.'.. +

                                            ~   ~

t

                                                                                                                                        ..)=. J <'       >~ p>>
               .<<0
             ~      ~

( I

                                                                          ~      <<
                                                                                                                    -c--II       .

P.

Pp I= ID X O STEVENSON h ASSOCIATES

                                                                                   )Itl ttt IK a IttuotWOHneChcnlCOI Cchfttltlttg OttghtOOttttg tttttl t-trg.
                                               ~ ~

I I I ~ t I

                                                                                                    '  /  9?~
                          'I j         ~(

g TLI g~iQ~ K<M .c aA PA44 ( .  ! ( ' t I

                                                              'I  l (

( t t I .'

                                                                                                                 ~

j I L.. t,b I / trr 4 t r r' I t r

                                           ~   I
  • I I
                                                                                                        )   1 3
                                                                                                            '           ~

I ~ I IA/ D~.. DE'te." I I I y

t. E8'.I WN I
                                                                                                           ~         ~    ~

lt x.EI..

                                                                                          ~      ~

H.rw4R:.:,LoAD r I cd'i I ~ I I r I

SUBJECT JOB Ng ~ r! s Ils ~ / r S/'s.s I O'ZcJ V-S-S

                  'TEVENSON 8c    ASSOCIATES ccnrvttlng ongrnooltng trim
                                                                                   ~-Dc.                                            .RP;~

Qs+ 3 O LL LID 5 PEP L,7 > 8 e, KJ aa I t~4>. w .5 WE,P J I /.Q..... CT*e icI:7- +);: g.j..~C+ 5~ I r S..H.- fc i~ I I I I i s I r ~ s I

                                                                        '..w c a~@'!

I I

            ~      ~

I I r--I ~ '- >"-- "',;-

                                                                                                               .                 I    I
                                                                                                                                                   ~   ~ =~

I I IIJ ~>cp.p~Liri'Tlc>,nJ r I " r ' i I i L.J I l q) S zap (...ID,....-... 2.> .'A.R.E....!.. W nH:C.c ~ f I I O. .~ ~

                                        + H.' Q       I i

pQ p ~i~ lt jig nI I Lp~p.+ ~g DQ I 4I ~.t

              .. A-.M....,.. -'S i   ~  ~      I I
                                            ~L?'FPI'l'-I Cia                     I I

7.O :...Eg.5g.g/i;.. 'Z:B.Ai..+8;CQ 4 9~g~cA.&Q t

                                                                                                                       '                         ~

r

                                                                            ~
                                                                                                                  ~

I I r l

                .'L.<mrt,a ww<.                             CA~+.c,.( mv'.
                                                                                                                             ~                                                                    t I,
                                                                                                                  ~    ~

I I '

                                                                                                                 .I
                  .F4? I r.'C) I&.&
                                                                                                                                           ],

j ~ ~ I I C p4( c . 6 6; J..I.S&~3 I I I

                                            '                 '                       <<'tI   .                 (                   I                I

(..I

                                                                             ~ ~    r      ~
           ~: I'.C n.y I      I

(. I ~ I I I I  ! ~ s ~ I ~ I vrl st I:lsr <<rr rT'.rs,! s, I I I

L,=..2+% ~;L.. I/. '

i'R 2's /I('

                                                   -,.V~     ~,

r

                                                                                                \

r ICE, I t

                                                                                                                                                      'i I
                                                                                                                                                                               ~
                                                                                                                                                                                  !               I   j
                                                                     's l,
                                                   >0
                                          -r        ~". I                                                                                                                 J L. Li  I                   I      IN                       I      '-

I 1 I Mr

                                                                                                                                                                  ~        ~

r'r'V '. I I I> ~ I I I 3. I/I rl I ~ s-... I I *q I

                                                                                                                                                                      ~

jr I I j

                      ,.L                                                                                                            I I
                 '                  I t       '!

I l I l

                        !                                                             s i" R'                          I                          ~

I I I I ~ t I t

                                                                                                                                                                  ~

I I I

r. $ sL ~ I I I i
 ~ .,r                                                                                                                                                                            r               ~ !

SUBJECT i'A,VV.v. STEVENSON 8c ASSOClATES O ItnIClwalmechoNcol consaNng cnginoc!Ing II!m P ~cv C Q.A/A~ g vll .X L tk~~. 3.l.8, A l AA~c- !i .T Ti,y~.

                                                                                                       +           'ip Lam~

wP.EC i i I 8 i

                                                                              'e               i
                                                                                                     'A'.Pm Je'~.c.d'
                                                                                                     ~

P.I-.A.-I 6 I 8 B,Nm 4~

                                                   ='.!ri, g./JAN 'J,:

I i L cI'I 4 i'j ps';pv~i ~ lDa v p lij~~ns A Q(y.e+$ 5c +=',,Lel...

                                                  ='
                                                                                                          'l                                'ps i !os.d
                                                                     ~

I c5 . C? 2%co'p~

                                                       .~ c.c                                                                                                                    ,~

S,UR E vvj E A, FIc c- .=,$ 5. ~i

                                                                                                                                        >/z'..".)..!2 =,<<!>."~7,.%

- C J

, .. t=wLQ f g.'wg.nL.v'...

I

                                                                     ~P g~~                        P     '. P   C..~'a I,.PC&,..~~..,...C!g.a  v
                                                                                                                                                                          ~i,a      P..'.,:

I I I

                           )   -    .         0 I
                                                         ~

I T L I P I < i ~ I

    !                                                                                                                             !                        'i
               ~      \                                                                                                 l  I I

L DA &~'~ 'I~A Bee. I

                                                                                                 '!N;v.D.i'~ .HK'.~r    i
                                                                                                                          . G'
                                                                                                                                                                                     !       i
                                                                                                                                                                                                ~
                                                                                                                                                                                     ~
                                        ~      ~                                                                                                ~          ~

I L t.:,'=.: >' rZ.: CZI .) .=..2S;,3;:W ..2.>..~ L

                             ~ r~.~ ~ 5 H
                                                             .i~

I A c T'~

                                                                     a mZ! ~

I i i PA l(rTVV I

                                                                                                  '~i v

T I vi vL.. A,c.v.e~.'~+

                                                                                                                   ~

I T'

                                                                                                                   '.C'e i

V~/aREFnR .Py~g. I;!:..~B 'EF~Q.460 vILA! ~Kv S AacMk I iv'E l: I'.! I! I t;v'.'

                                                                                                                                                       ~, ~i+.vv<

I I

                                                                                                                                                                              ~

J, L I I l

R.I,S~...:.H-C'.,CW . ~o.GS .APE ~4.9.:4:
                                                                                                    -I- .,-,.---,             '~

I,

                                 'PC                                                           'ai-I             PL         a I                                      I f"Il r.       T-'

i J, i j:

                                      ..'.LL~S I      !

v.D'~ &rH.! I2'C~7S)+!O'LZ,.5D=.I

                       .....,,......v....,. ..... g,v
                                                    !      .:.;:                        !      i
                                                                                                    =

Y"'.vvc. /..iv'v. 'w' T,...!i .....,J. f7 E'...,

                                                                                                                                                                             ?:'

L.:....'.. I.: I  ;', ME~OI...CAP,...=

                                         .                                                  I  Z,5. (,. VCIP)             ....;        '8;, C7~..: ".3.;. l..7. 67,>C~.=.                           ~
 ~ w    v                   I                       ~ ~ 'A>>       vd         ~  v          v     ~   JA              <<             ~v v       4    v     '   ~          v          4 4 V4         lv

SUBJECT vl s S I ~ I+ ~ JOB NI4.+ ~s I id

                                                                                                                                                                              ~2."

M K O STEVENSON Io 80 ASSOCIATES a IIIIIChslCIIIIOChcnleol 0, . C.o III K coniutiinII engineering turn f~ZZ 37" 7"

                                ~        I    QI                                                                                                                e~L'~C ~
                                         ,'iT                      I       I                I                   I      I s                                                  I
                    !,     1 5 so..='e..~                                                                                                          r  ~i PAL$ qf-r I                            i L                                                                                                                                              I
                                                                                           '.   ~ERE(                                                     F,'M.Lm. < wWCR &i~~

oC I, 1 M Pr4D dOSi I.Py~&$ a I my'~ lM . T

                               '9fz            'l~               s i.

PR=~,LED ag.c.". ' I I I r I I

                             ~g              C I  .~.$ .I.m<.,5, I

r I ~ l

                                                                         .ua iI I                                                                                                                                 ~
               .Q>>       ~..C      .... C.C              a.I~                                              j.W C.           !,n.Wr~g-"..,Sq-..'ygPZ~

I L'e~ k~~.', a.~. .'.. '.:~..~ .. ~~.g i...S 'n U.C-. '.U. S,Z.:.  :..+.6; '. I.., I I Prs co+.sP=L.na sruti .or.'-.'-.rs 6 CiZ ..I III. f r

           .II-I . ~,.CT.I.t I .a
                         ~    ~

I I I ctv E

                                                                                                  ~
                                                                                         ~m ..8.<

I r I'4 $',.I P.~c.c-.a

                                                                                                                                    ~
                                                                                                                                       '..,H
                                                                                                                                                             ,'I I        I
                                                                                                                                                                        .O.u R.. I&..e r

l lgl

                       +D e                MA I'M.C}=i I. e,~c.r .nsr.                                                       .]c                            4   C..lc '
                                                           .~ J                   '.

I i ta,~i@ES.'t W.~..~ ....(. l

      ~l!                L    I      '             I       i
                                                                                                                                                                                     'A.hD I

S M rE-r

                                                                                            .~'~

I I I  ! i I

  • I
                                                          ~                       r               I                                                                           I I      ',

I I I

                                                                        'I I

I

                                                                                                                            ~

I r s I ', I rs r ~

                                                                                ~ I    - ~

I j I I I I s ~ ~ I I r I ~ I

                                   't          t          r     ~

r, I I I I r I I I

                                                                                                                                                                  ~                                 I s   I s
                                                          ~                                                          r         r r  w I                                                                                                                                             I
                                                                                                                                               ~  r
                                                                             ~    ~           ~  \      ~        rr      s
 \

t SUBJECT C ISnn I JOB No. ~~+~ +~~ SHEETglll Ol4~

     ~ 4
  • oa er- P O

Ii) STEYENSON ill 5 ASSOCIATES CC centeIIInii englnoednII nrm i3 I

                                                               +~i i; J
                                                                     ~LI I
                                                                            ~ll~

I I i I i I I i I i!

                                                                                                             ~i        i
4. I L i
                                                                                                         ~     ., l

8 Ec5!

                                                                                                                                    . i i i                                                                ~

I I I I I I I p i I Ql I. 5 L, 8!7 i I ' I I I f I I t~ I I I I i I LI I

.2M
                                                                                                                                     '.3 I     i,:IC;3Li I7 I

l I I I i

                                                                                       .F~.a    ]         I     I I
                                                                                                                    ~  ~

I I ,hlA~u P.B )

                                              )II'         i      A
         ":!                                            I, i  ~

i g'< I I I ~

                                                                                                  ~O.g~v fo'
                                                                                                                               ~

I I i I I gA P'I i i I

                                                                                'l I      I d~           t-.)C
                                                                                                                          )=
                                                                                                                      +i.X4D N 4-.c-cn&lrACs 8

i

                                .l.+J IO'.II.S                                                                                         i V..S =J.)IL>~~

t W, l

SHEET~~~ '~~ O STEVENSON 5 ASSOCIATES conwNng onglnoorlng Irrm

                                         ~/5   I I

21E 2 h' I l

                                                           !8 ~e J     hAAv=~ ~~                       I F ~'u.l2.4'I                 e~!        I         I l

l l 1 I

                                             . ss ' ..D                   v l         I   e I

e

      !                                  g+s                PC <5'IW'V: a f-I 1

I

        ~         ~

e

                            .h
                                 !  I:      1
                                                 ~

H.K L(xP2. r

                                                             '~~

I l I I I 1 Ttt& kr

                                                                                                                                         !  I  !

l k 1 I I e I I I I I l~QtJ I e I

                                                                                                                                       ..i  l I   I  I   I I  i I                                                                     i
                                                                                                                      ~

i 1 1 1

                                                                                                                             ~

I I i i l J'E Lr g e& ~ e 32 ~ 2 I Dj i 1-8-:5

                                                                                            --f       1 J                                                       e e

I e e e e e e ~ 4 I l M1 '.. 3.6I:..Ft'.E.'.MM.A. HE. H .' 4 Z6<<<4 j J I I I e

                                                                                                    ~

I l I

l. l I

l i l I I ' i ' I I

    ~     v     r I
                                          .       ~
                                                                                                             ~ >>~     ie>>e>>e'~EE~

SUBJECT JOB No. (-I+ SHEETBL+ 'OfJQ I <<J. RM'F-S-

                                                                                                                                                                                                       CCCC:

STEVENSON 5 ASSOCIATES O Itiuolvrolctt4Chorticol rir I

                                                                                                                                                                                                               << ~ "

coriirrtttrco 44QIA44rtog Itrrri

                                                        , P      8+                                                                                           2K.                      2hz I g
                                                                                                                        ~
                                                           ~      ~     C
                                                    -i~t                                ,    JC,(M               5          t i
7. 3M'e6 ~~a ". zfz 8Se'~

L3~: f~ fg

                            ~+I 5

I ri I ( r I I I r

          ~( y.g I~            1 i!             I'l(               ~ ~     i      -~

I (

                                                                                                        .,                                                                                   +-,
                                                                                                                                                    ~

I

                                       . r I              I C                           I
                                                                                                .~                          ~              ~,.r,,..C    \'

Jr

                                                                                                                                                                   ~

r

                                                                                                                                                                      ~

i Mphil i nrr~l4 ~

                      !,       I

(

                                                                                                                 *"                                       r        ~  -

I I 1

                                                                  <<.<<",f=rr I                 "
                                                                                                                                                                                   .6$

I o<< r . I.="pa cr o-c,<<..r,r I rrr<<rcrff;ao aa I I*<<<<r.<<f r rrw 5

                          !.   '.f, u        P T- )                     Ql           8 A 0 ES                         P     5h                CP    X7- I('gP%gW         jFi-,F X'uR~ 8 I
                                                                                               ~             ~    ~ ~     ~            r ~      *I        ~        I                               J C         1 FRE.uEZ,C.r.                       C.r=.,           OV..A.I .I             i~.6..RI'Xi'Oa                       .OF .4
                                 ~J,DMH Atua .                            HANS 7.r H I{I= EROS                     ...,S~ Ecvz.a~                                 I 0 IM            O JJ
                                                                                                          !         5       !       !      (

L 4 LJC C~.HI ~+~ 8++ A5s~ v K ggQ ~ pl+

                                    .re.J..g:S..

I AS ..A:.CS r ( H ~f f e~VSC-~,H.'r i I

                                                                                                                                                          !~

JP- 8'  ! l~ ~l ( I I

                                                      ~      ~  ~     ~       ~  ~r                                             =.   ~     C     ~~

I" I r Ir... I r (> (-~4 Ir r I ( r W I4,! ...,. 3,'5.'L4r? .EI MMs  !

        ~,;

I  ! I r i  ! r... '.. ', ' a<<  ! ~ I l j rL...

                                                                   ~        ~   ~     ~                                 ~

U 5.(.g,Q, >

                                             ~'.~l,'~w~         ~F.v. s.                ~             PPP.&x f M.A.+ f ~M
                                                                                                                                             <<<<c ~H
                                                                                                                                                                   ~~ i.     "

QP'

                 ..CCI   g Sg I;             hl,~q.u    I(    A.                    8 g(g.~C~                                                       I prrA rrc j  I '           i
                      !,'~c l   l                    I  5 I        f 4>>

t I ( i, t w 'r ~ << - r C I

'"k>>'>> r Irk k

  ~
                                                    >>  ~

SUBJECT I ' JOB No. k I Ill.k=! >>>>F-'>>' k le

                                                                                                                                                       'b I>> A~V A i t~ W                 ~

I>> P 5~ t f . ~ O trYI ~ '

-. STEVENSON
         '.-.; '. at, ASSOCIATES
    ~ r
         .';".' Ctcttttlg
          >> ~
                  ' a It>>I>>CttltattnootlantCOI 0tlgtt>>00tttlg tits I'C 8~

I

                                                                                                                                                          "' f n

I >> I

                                                                                   ~

I} ((J I LIJ T

                                                                                                        ',li
                                                                                                        ~

t

                                                                                                          - i+       & Br~~

gj i

                                                                                                   ~

ij I I .'J I

                                                                                                                         -5 I  ~

5' I I l CI-t j ~ Z I l.Z,. P (c 2S o+z) o2> cQoQ (2e+

4/g 4

   ~ '

J> VV VI>M> IJ CVP u Arc~ n(- KcJ -S-8' 0

                                                                                                   !ft STEVENSON
 ',.', & ASSOC3ATES                                                                                (t
       ~

o structrrroHnechohtcot COIN(tthg Oh(t(hchfthg (If!ill

                                                                  }

I I t 3 i 3

                              ~
                                      ','                                                                                  t~  t
                                                              }

i } 3 ~ t } 3 ~

                                                                                                                         >  ~

I = I i I 1 f; i 3 J I 3 I ~ I I

                        ]~!                        (

4 1 4 ' } I I I t

                     }+                                      J  '

I I

                                                                                                            }

v

                                                                                                                        +-

(4 P y.fj, t 4 4D A i I

                                                                                                              >}r. I(

( I I 3 I I I I 1 I L I  ! i

                                            ~  ~    t   t
                                            ~       ~      ~

3 4 3 I 4 I 3 I I k- ~ ~ I ~ I ' ~

                                                                               '>>    ~              'I L

I

                                                                                                          ~
                                                                                                                       +++ j +~~                     IH(IT~OIII
                                                                                                                                                                    ~
                                                                                                            'OB SUBJECT                                                                No.

C

                                                                                                                                                                                  ).'C. '-,y>,

z N9 cP'-5-8 'pt

                                                                                                                                                                                     ', lh 1

O STEVENSON 't' 8('ASSOCIATES o )ftucfut~cf)otucof 6@ G c C

                                                                                                                                                                                          ~

tuA)uN(thg OtlglhOOflog fltm C s R i . S C>> I,' i

                                                                                                                                                                          ~
                                                                                                                                                                            ~

I I I a Ii g'W7 P~~! I I X~ESS~ ~ C.6. ~.i.S'~At.8'VT'I.O.+ i ~ t

                                                                            ~     ~

I

                                                  ~   I                                     )

I R I li

                                                                                                                                                             )        j,    I
                                       ~,

I i e I I I I I I t ~ I L. i I

                                                                                                                  ~:,
                                       ~

I ~ l I

                                   ~           '
                                                                                                                           ~            ~                        '

I l I i ( i I

                                                                         &r. O..~.&.W.R.Q.;.):6,C                          EO    Sm         )4I':~ ~OK.

t j  !

            &i%      .
               !EQ R.~
                                         ~   I c

I I I Dr~t-. D'~ ~ s 4.~,'<w~nP,~c.~~ urn+ I t ~ I i I i  ! t ( D/p I I I l C.35o+- I

                                                                                                                                                             )

I I~ E:j M I ~ i 'C ~tV'C fi..4!.D '.E't ~..~~:

                                                                                                                        ~
                                                                                                                            ~            i      I
                                                                                ..Pg,
                                                                                                                   ~ '

I

                                                                           .I                     . S.O~(=ty              't=) j.      I Crt,igPP            C.A.C
          ~     I    ~   -I     a .,      ~, )           ~,,    'I
                                                                     ~
                                                                    ~,,

I~

                                                                              ~ ~, ~ ~ t     '1 ~   ~
                                                                                                        ~ ~
                                                                                                             ~
                                                                                                             ~  ~
                                                                                                                        .,  ~     ~ . ~

t

                                                                                                                                        ~, ~ .  ~ ~ ~~
                                                                                                                                                                              ~ I

g

0

'0

STEVENSON 'I ASSOCIATES a Itn(cturotrnochontcol coewWng eng(noortng firm E E h (~sm r 9$ c(= I r E E I~ S 2

                                         )

I I I

                       + ~,.~r s 5'o Q     ~ I    I r

I ( r ~ ~ I I

     )
                                                                                             +&,     l I           LGJ I                                          , S           I I

I ln,sac 8& Vt5>QW

                                            'i (s3! ~

( I ( ( I I 8&m i ) l i JVl I ~ ( J

                                               .2   o5.k              :

Cpp

4) I (
                                                                                 "i II I E

i~~7 I I (a g i I I -" / 2 'Q Lo5 I X- CE L 1 I L.' )

                   .j L I
                                                                                                              . L

tt d II 0

i UP7 tmA C F- ej & SHEET '4~~ ) 0 5 m r I Ctt z 0

                                                                                                                                                                    -s-Itt STEVENSON 8; ASSOC1ATES                                                   -P. c                                                           Ut cont)itttng entttneerlntt tltm f
                            ~
                               ~ ~l L
                                           ~

7(o 'i I (,I t .'o.+77gg I 'R-O t'<5~Lt'QF 5' t:.SIC'R

                                                      ~
                                                                !      i cate         jM~                                                                   b S.~~a.oJjR,O              . I P.~~~V "4"          .!jct B j~jt I   )
                                                                                   'OS)),               I 3;     4't)        ~~,

1 ~ I  ! i I

                                                                           .D CI       7  ~ .~R              C   ~....~i +, Q if i     I    ~

j J+ pent')' s', l t l

                                             ~   I                                             <~                                    -
                                                                                                                                               .,r'             "

SVZ i 3 35 i

                                                                                            )                     '.""co s t)'i(3-'j,
                                                                                                         ~
                                                                                                ','.c)n7                                                                 '

5~

  'I P
                                                                                                                                                                               -,'ace.II"lo
       ~                   ~            ~
                                        ~

I I ~ ~ ~ * - I J i ~ ' 5'

                                                                         ~  ~

j ~

                                                                                                                                  ~
                                                                                                                                    ~

I I ~) I iL i I I l

                                                                            .'...5          Q      ~pj,      ij... h/                                                                       pea  (
                                                                                                                                              +~       +i i'P I l  I jc~              l t                                                                                                                       ~&.2i tt t t

I I ~

          ~
          ~           I I  ~

I t, tt) tl j i f

                                                                      ~.....'3.,5.Q
                                                                                  .'+ 5.O 2-.2
                                                                              %9;.K 5;....'P I
                                                                                                  ..p,e
                                                                                                        ~
                                                                                                 ..t) S'.i.
                                                                                                   .p.s,.l,,
                                                                                                   )

I..... y .J3.3.4 t.','...., y.:.= CC3.C I J

                                                                                                                      ',Ir.i
                                                                                                                    =... I H
                                                                                                                                       =.:.37 t     ~
                                                                                                                                                  'rr I

t.(n.,o po F

                                                                                                                                                                       .J'4-n p~g I
                                                   .= 'J&.2.: ..!             '      ~                                                 ~

l ~ ~ i I I I I I

                                                         ++           tt           ~.3.l.f         P   s.i    =.='.=.

( t f i \ i I . I ~ I I 5 i t ti I jo J I  ! I I I I i\ i I ( * ~

                                                                                                                                                                                                 ~
                                               ~
                                                                                                                                                                                       ~

4 . A << IA 4 ) I~ A'y

r'ai <Q, SUBJECT (C 'OB No.

                                                                                               ~u'i(~c
                                                                                                          ~DC l                   ss  ssr@~orrt<
                                                                                                                                                    ~l~sls
                                                                                                                                                              ~.   "ss ~ fs s

s~0 s rats c."J n-rr,r'rot V) 4/ ~5 ~g s z O rrt

,;.; ";.'TEVENSON Ik ASSOCIATES o slructuroirnochonlcol AP.R             cc consurrrng ongrneerlng tlrrn                                                                                                                                ~r i;,             ~ .

r'M gH~ Im~ Q 2 (~

                                          '.K           i t

J L'u .P,. g ~.~') M<.csO.A .a.,&,5 r (

                                                                                                                             ~

IO+'(-

                                                       .....s     l~r
                                                                  .. l ic k,.                                     , i C.s .. MH        ./i        AsJ,rtc s.

to y. I'P.~i ~

                                                                                                                                     ~ ~>
                                   =,3     2 co .'c'         rc....'-ps)                   F      R   I=-~ w.(.a.k'. ~'..:.7~L L~                         ~

r r ~ I A.w ~ ~..$ p'.ig.'<i,.4 t.C

                                                                                                                 ,                      .Pg;:C.~ 5 r(c:C  sJ     ~

h'.. WnJ'g,g ~< ~ I

                                                   <<',H..p                          '                                     '.s-r,~

F J ~

                                                                                                                                    .Ent.C .t W.'.~r,,<~~tl C I

F~ 8 D.A.n'< E.,rt h:e r~ ! . t p'I.Q 6, .J., Cl t g o 4 r. f~ r. i r I r r I ( I,

                                                                                                                                                ~

( E I t I i ~ L L

                                                             ,'3 4 5+           ~ ..I n. J  .

7Q r, I l ~ 8S x lc ~HZ -(. 2 359 I I I = 2-; i I 3/a(e da I r

                                                                                                          ~    I I        I    r
                                                                                                                                                ~ -. '

I I i 4.+z '~ t i I e I

                                                                                                                                                 ~1 '

Lsd i i .8-Q rns~MM L

                                       'L           r                     -
                                                               ~        ~      1 I
    ~  4 CC,
        ~
         )C f
          ','TEVENSON .
       .- 8CASSOClATES O Ithfotchc<<hOChoh<CO<

cohfcfltlhp cop<hoof<tip hfhl SUBJECT Ar )' G.O'S <

                                                                        ~
                                                                          'O
                                                                          .'G:c.             c.~!               A PP ':           .

R O V) U< SHEETS~'PF gP ~'

                                                                                                                                                                                               .<r r'O
                                                                                                                                                                                                       ~
                                                               <5j                                                                                                          $ <   &S
                                             'C .8 '5o ~O I

Jt0~$ I ~ I x 3 I I I

                                                                                                                                              +-l-
                               +

I I

                               +!i         I                                                                                                                                       )~!i I   !'                                                                                                           I         I I                T9- W!~UL3.ed 1
                         ~C                                                                                                          I    .~

i 1, ' I W'7 ff' i I I I r, 1 c ~

                     ~     ~   ~

1 I

      ~        I     ~               I     ~ I         I                                I                         I     I
                                                                                                                                           ~

1

                                                                                                                                                                         "     1   r I  I I    I        I
  ~   ',       j                                                                                                                                                                                         I I

I

                                                     ~ I5 +       x In.~B'                     ~~v5'3'f ~                          ~~                                                 R      <j~.. IO S I 8 I~
                                                                                                                                         ~)

l I i

                                       ~!    I   M V .,.7.e.Z),
                                                       ~

W, L- Z d,27 ~,g 4~E!,Q~ 'Z. I I +- I I ~ ~ I I I I

                                                                                                                        <..          ~.

I I I i f I

                                     ~

C

                     ~     ~                 ~
                                 ~

I < 1 I I I I ~ ', ~ . I  ! i I ~ ~ ( J g.a I S.,i,)(,~.4 ...,E,0<~I.Oa. C.C- =A<< S .FuP-rt.v<..<S.. i og-I  ! I ~ 1 I

      ~

r I r r I I KSS:S.... e&l I I:'r

                                                                           ~:.
                                                                               ~

1 S I c

                                                                                               'E
                                                                                                 ... ~

rcr,

                                                                                                       ~
                                                                                                         +,:='.+.I;(C26 CClCS..)i..~I+,+<<.,
                                                                                                         *r
                                                                                                                  ~
                                                                                                                   ~

a.

                                                                                                                        ~
                                                                                                                        ~ ~,. .C...I e~c
                                                                                                                                        '   1 I
                                                                                                                                                  '.....I-rhrrrf....;,.I
                                                                                                                                                                          ~     c I

I

                                                                                                                                                                                      ~
                                                                                                                                                                                        .c r
                                                                                                                                                                                           ~ ..A
                                                                                                                                                                                                         ~

SUBJEGT 4

                                                      ~    c. ri,       J jOBMJ:-J33C  f55 9..'.'SHEET/2             I  B~2Z::
                                            +Ac Y   <g..       f-0 d Wc'                                                                                                                             ~   'I STEVENSON                                                                       EO    ~"

IJS ~ J S k 8c ASSOC}ATES O ItnjclllloH54Chonlcol conIIJINny englneerlny ntm I7 axe I cn+

                                          ~
                                                             ,po                1~ .
                                             ~  ~

I 7p I;"

     }      I              }

I I I

                                                                                       ~    I i
                                                                                            )

r~ I I L 1 E ~ R !8 ~ C-~iP'IO~IE.<~ C

                                                                                                                                 }
                                                                                                          'I       I J
                                                                                                               }         i I      ~

i 4 R. E A P'+  ! )'pl '. Qg t4'5(o 4 ~ I

                                                                                   >>. 1.F.U<~<6.%3:[ a~I?=Aj                 C L   ..

S~IE- JJ JI I I) I SZ,I2 O

                 ~
                          ~    ~

I 1

                    ,.Z. B&'
 ~  I                               I I

A I

i g 0 1l R h

     'I
            '1 1 1terrrr  14   r rA  ~   1            rt SUBJECT       '~                                                                                                             t;tt Wr   r~g
                                                                                                                                                                                                       ~ V.tri
                                                                                                                                                                                                          ~--

Ok &/ . "T et e:i ii'~ '" +X

                                                                                                                                           >."""'11 0

ro

 ':4"""~~"STEVENSON UI
     "..'-".:  8t ASSOCIATES"
                                                     '-',                                                                                            cr.        .".ggq Jt..r" rut-r ..rt)tpf.

conrurrrnp enprnaorlng nrrn pPi 3 ~ I ~ I I ct W~ 8.~ g

                                                                                                                                                                        '7+-8+1-.(-1 604 SW.'t52,4
                                  ~Res             4~                                                       ~ ~
                                                                                                                         ++                                              I        t I
                                                                   ~i                    '             ~l i~
                                                                                                                                 ~

I I I I I I I ZSB- Z S.'8 '

                                                                                                                                         .I  e  ~
                                ~i                                                                                                                                                             I II
                                                                                                                                                          ,w C.2.B,B:,                 IA 2S.S I      I P-..C
                                                                                                                                                                                . 5
                                  ~                ~

4 ~

                                                           ~

I.'real 1 !Let. QQ)8' 'I I I

                                                                                                                                                                                       .f.'g   tI
                                                              ~ J     j 5. pcI Wff..rf' f.
                                                                             ~
k. '- (.8 <J g ~~i~s4!
                                                                                                                             --~l 1           ~

t I I I I I

                                                     ,     ('7 4rtt Ct~                                  I g,        r                                       I t

I I r r 1 r r (g~,gg) i

                  'CAP I     I I                                                                                                                      ~

g'++; 'h3'

                                                                                                                                                              ~               i 1

I J

t. t 2) + (7O,>u)( (to 4. Q I+

' I l 1 I ~ 1

                                                                                                   ~

t I Ki~S < J)

                  ~          I                                                                       V
                                                                                                                              ~    ~

Equip Id: 2-TK-32 Train: 12 Equip Class: 21

        'ng No.: 2-5106A Function:   D System:   CONDENSATE STORAGE TANK SUPPLY Equip Desc:    CONDENSATE STORAGE TANK Building:   GROUNDS     Room: INNER PLANT GROUNDS Elev:   609    Sort: Sg         Notes:

Normal State: Desired State: Power Req'd: N Support System Drawing: Req'd Support Comp: Safety Related Status: STANDARD Min/Opt: MIN Alias No: Power Train: NA Comp Served: CONDENSATE STORAGE TANK MFR: GRAVER TANK & MFG. CO., INC. l: 500,000 GALS. Panel: Elem. Drawing: NOT APPL Wiring Drawing: NOT APPL Power Source: Walkdown: F Relay Eval: N

i'omp Type
TANK Iso Drawing:

Location: 50 FEET SOUTH OF THE UNIT 2 CONTAINMENT DOME

DC Cook Unit 2 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 1 of 3 ID: 2-TK-32 (Rev. 0) Class: 21 - Tanks and Heat Exchangers

Description:

CONDENSATE STORAGE TANK Building: GROUNDS Floor El.: 609.00 Room, Row/Col: INNER PLANT GROUNDS - 50 FEET SOUTH OF THE UNIT 2 CONTAINMENT DOME Manufacturer, Model, Etc.: GRAVER TANK & MFG. CO., INC. 500,000 GALS. BASIS: External analysis

1. The buckling capacity of the shell of a large, flat-bottom, vertical tank is equal to or greater Yes than the demand.
2. The capacity of the anchor bolts and their embedments'is equal to or greater than the Yes demand.
3. The capacity of connections between the anchor bolts and the tank shell is equal to or Yes greater than the demand.
4. Attached piping has adequate flexibilityto accommodate the motion of a large, flat-bottom, Yes vertical tank.
5. A ring-type foundation is not used to support a large, flat-bottom, vertical tank. Yes E P El IC COJHI)LES SRT: George G. Thomas and Tom Huang on 10/5/93 Large flat bottom tank 52'-0" inside diameter 34'-5 1/2" height. Tank manufactured by Graver Tank, made of ASTM A240 Type 304 Steel, 500,000 gallons and weighs 128,700 lbs. Anchored with 30 3/8" th x 5" w x 4'4" long strap that is embedded in the concrete 2'epth with a 2" radius hook at the end.

The strap detail is identical to the strap for the Unit 1 and 2 refueling Water Storage Tanks (RWST) 1-TK-33 and 2-TK-33. The calculation for the RWST.resulted in the conclusion that the weld to the tank and embedment in the concrete was sufficient to develop the full yield strength of the strap. The RWST has a very similar configuration as this CST. The calculation for the RWST using GIP methodology indicated an overall safety factor of 2.57 for overturning and 1.72 for shear. Calculation is attached to the SEWS of 1-TK-33. Comparison of significant attributes of the tanks is shown below: RWST CST 48'iameter 52'iameter 31'iquid Height 31'-7" Liquid Height 25'trap Anchors 30'trap Anchors For shear the tanks are essentially identical since the demand and capacity are both proportional to the area under the base.

4%,h II 's'.il r

DC Cook Unit 2 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 3 of 3 ID: 2-TK-32 (Rev. 0) Class: 21 - Tanks and Meat Exchangers

== Description:== CONDENSATE STORAGE TANK Building: GROUNDS Floor El.: 609.00 Room, Row/Col: INNER PLANT GROUNDS - 50 FEET SOUTH OF THE UNIT 2 CONTAINMENT DOME Manufacturer, Model, Etc.: GRAVER TANK 8 MFG. CO., INC. 500,000 GALS. ELXUHIR T 7

                                                                 ,, jest y4)4X, h P
                                                        ~ o
                                                        'p  ht ~

g t h 2'uckled Pipes at the Bottom of the RWST Out Anchor Strap

                                                          +*12 CHP 5021.CCD.O].9 ATTACHMENT NO.

B g. Location I- K-30 '2 Tg-'7'4 Insta at on wg. / Rev. Ecgxxpment No. Anchora e Arran ement Sketch

            ~gDGg<RTE          KToRRG6            fdic Ii DIN&4<<od.->< DIp g s4.-S/<          %AH McA)R      +'TRRPs  ~

( bbJQ QT'p.~ fQ )NQ~gQQ,~)

      >+B    GF   TM     H~~ U~y pp~~~~                     s~~<'T y+"    p~T 4    FK.LES,Q)Gu6
      ~<<~TIos                                                                  1 QF    T W    ~TO ~g     ~U          RAT-INDIANA MICHIGAN POWE~R SITE DESIGN CONTROLLED WORKING COPY OCT   $ 5  tBS5 Drawn by:                                                  Date:

Verified by: Date: Qua . Ce Inspector Reviewed by: Date: t o-l> Cons ruct on Anc or Review Engineer page 1 of 3 Revision .3

0

                                                                 **12 CHP 5021.CCD 019            ~

ATTACHKENT NO. 1 Eblis CQ N p ~C S I0 C,M c Un t B g. I

              'l-'90 4 9                                 2. T(c- '3Q Insta~ at on dwg. / Rev.                        Equipment No.

Anchora e Arran ament Sketch

                                 ~/g wl L    Q~R Ae&- O~g, 0

I N 3/yx5" <Toms 8("KY' r < Q~ rb b INDIANA hflOg, AN POLI c SITE OKSIGN C "ITROLL WORKING OPY OCT '[5 1995 LERK T

    ++     4~ '5    A'~'amS          OIIYl~I4N +    ~847      rn&AS'uk'a~~~
                                                         %6$ 4~TIW- 8 '3 C7~

e,~so'F

         ~

ts, ~S 8Q'ECT.'A A WIICy)X 4~Re'>~T<< Drawn by: Date: I o 'l2 Verified by: D te: Qua ./Ce . Inspector Reviewed by: Date: I o-<3-'7> Cons ruct on Anc r Rev ew Engineer Page 1 ol.' Revision

ATTACHMENT5 TO AEP:NRC:1040E SAMPLE SEWS, ANCHORAGE CALCULATIONS, AND ANCHORAGE INSPECTION DOCUMENTATION FOR HORIZONTAL TANKS AND HEAT EXCHANGERS RAI ITEM 7

This attachment includes sample SEWS, anchorage calculations and anchorage inspection documentation for the horizontal tank and heat exchanger evaluations requested in RAI Question

7. Included in this attachment are the evaluations for 1-HE-14, 2-HE-15E, 12-HE-16N, 1-QT-107-AB, 2-QT-1 1$ -CD, 1-HE-.15E and 1-QT-107-CD.

01/16/92 PG. N0.53'AFE SHUTDOWN EQUIPMEHT I.IST (SSELWP) FUNCTION: CC'W Equipment Class: 21 Train: 12 Equipment ID: 1-NE-1C Drawing Number: 1-5135 System: CVCS Equip

Description:

LETDOWN HEAT EXCHANGER Ruilding: AUXILIARY Room: LETDOWN HEAT EXCHANGER ROOM Elevation: 633 Normal state: Desired state: Power Required: H Sort: Suooorting System Drawing Number: acquired Interconnections and Supporting Components: fety Related Status: NUCLEAR SR Min/Opt: MIN ADDITIONAL INFORMATIOQ Al ias Number: Power Train: NA Comnonent Served: LETDOWN HEAT EXCHAHGFR Manufacturer: AILAS INDUSTRAIAL MANUFACTURING CO Model: 1000 GPM Panel: Elem Drawing: H/A Wiring Drawing: N/A Power Source: N/A Walkdownt F Relay Only: N Comoonent Type: HE (ONE PER UHIT) ISO Drawings: Detailed Location:

DC Cook Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet1 of3 ID: 1-HE-14 (Rev. 0) Class: 21 - Tanks and Heat Exchangers

Description:

LETDOWN HEAT EXCHANGER Building: AUXILIARY Floor El.: 633.00 Room, Row/Col: LETDOWN HEAT EXCHANG, Manufacturer, Model, Etc.: ATLAS INDUSTRAIALMANUFACTURINGCO, 1000 GPM BASIS: External analysis

1. The buckling capacity of the shell of a targe, flat-bottom, vertical tank is equal to or greater N/A than the demand.
2. The capacity of the anchor bolts and their embedments is equal to or greater than the Yes demand.
3. The capacity of connections between the anchor bolts and the tank shell is equal to or Yes greater than the demand.
4. Attached piping has adequate flexibilityto accommodate the motion of a large, flat-bottom, Yes vertical tank.

-5. A ring-type foundation is not used to support a large, fIat-bottom, vertical tank. N/A SRT: Gary Thomas, and Tom Huang on 11/3/93. ANCHORAGE ADEQUACY ACCEPTABLE TO SRT BASED ON BACK OF ENVELOPE CALCULATIONSHOWN BELOW. Nozzle loads on heat exchanger are small (on the order of 600 lbs. and 600 ft.-lbs.). Anchored with 2 - 7/8" diameter J-bolts on 11-3/8" spacing. Vertical distance from the base of exchanger to the C.G. of exchanger is 13". Vertical d'stance from the base of the exchanger to the top nozzle is 29". Supports for saddle dowled into base concrete. Saddle supports are adequately reinforced to transfer loads to bolts. SRT judged that the Heat Exchanger is rigid. Back of the envelope calculation: 0.24g (DBE ZPA at floor) x 1.25 (for realistic spectra) x 3320 lbs. (wt. of HX) x 13" (to C.G.) / [2 (bolts) x (11.375")] + 700 Ibs x 29" (Nozzle loads)/(2 x 11.375" ]+ 700 (ft. -Ibs) x12 in/ft/(2 x11.375") = 1830 lbs. tension/bolt-3320 (.76g )/4 (dead wt. - vertical earthquake) ) = 1199 lbs. tension/bolt

 .24 x 1.25 x 3320/4 (bolts) + 700/4 = 424 lbs. shear/bolt Embedment for the 7/8" diameter J-bolts is 19.5" or 19.5/.875 = 22.3 bolt diameters into concrete. RLp for embedment (90 degree hook) = ]19.5+8(7/8)]/(62.5 x.875)=0.49. Allowable for tension = 20.44 x 0.49 = 9.8 k >

1.2 k. For shear = 10.22 k > 0.424 k. OK.

DC COOK Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 2 of 3 ID: 1-HE-14 (Rev. 0) Class: 21 - Tanks and Heat Exchangers

== Description:== LETDOWN HEAT EXCHANGER Building: AUXILIARY Floor El.: 633.00 Room, Row/Col: LETDOWN HEAT EXCHANG, Manufacturer, Model, Etc.: ATLAS INDUSTRAIALMANUFACTURINGCO, 1000 GPM Evaluated by: Date: 8/f5 (~>w (p (p-

Attachment:

Pictures

DC COOK Unit 1 GIP Rev 2 Corrected 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS} Status: Yes Sheet 3 of 3 ID: 1-HE-14 (Rev. 0) Class: 21 - Tanks and Heat Exchangers

== Description:== LETDOWN HEAT EXCHANGER Building: AUXILIARY Floor El.: 633.00 Room, Row/Col: LETDOWN HEAT EXCHANG, Manufacturer, Model, Etc.: ATLAS INDUSTRAIALMANUFACTURINGCO, 1000 GPM Overall Exchanger Saddle Support

Coo ComponenC No. Class Any parget:icular area the Seismic Roviev Teaa should pay oxtra attontion to? Yes < No (If yea, check items that apply.) 5 Anchor

                                                                                           ~

Type khamxha Anchor Diameter Anchor Spacing lhd 4= kt('.~<fn r( 'I '< ~ P~ Anchor Number Anchor Embedment~ Anchor Anchor Edge distance Thread Engagement Cepv'nchor Anchor Grip lg" ~4/) J (p C04~AJ (T Anchor Angularity Concrete Crack Others (((sstribs NO bl AS~5. )~ brisrly) ( Ik~~

                                                           ~ N 5<,&~

I f IE there ia concern, for Design Basis Discrepancy, circle the applicable item and explain.

1. Hardvare Maintenance Type Discrepancy
2. Dra~ing Up&,te Type Discrepancy
3. Significant Operabili.ty/Design Basis Discrepancy Others Condition:

Actions Taken: lJDIJB (AG.H P PrO(AT(O(~ Prepared By T Data ('s >l P--

                                                                           'HP 5021   CCD.019
                                                                       ..i'TACHMENT NO      1 ALlX     I 33'-O" EL. LETDOWN BEAT EXCHANC ER RQQM Bl g.                       Location lt 5bPI-ZZ                                            - HE.- I4-lZ,- 332.5 - '9                                     I Insta        at  on  wg.     /     Rev.         Equipment No.

Anchora e Arran ement Sketch OI DUE, TQ HIC H RADIA'TIOM AREA 4 CSO v.~b HALT LOCKTIQMS WE.PE. CC

    'V       NQT QBTALME.D QM THC KkG1 PE.D'E5'TAL C)GI VlERE, DEXERMME.Q 5(M(LAR TQ THE. WEST PE.QEGTAL.

Wr II/ N 5'~z-'a I'iz," 5'e" 0> 5E.C T/QM "4-A" PLA,M I Drawn by: Date: 4! -Z>-'B Verified by: Date: ua ./Cert. Xnspector Reviewed by: 7 Date: Construction An hor Review Engineer Page 1 of 3 Revision 1

                                                                                             ++12 CHP 5021 CCD. 019~

ATTACHMENT NO. quipment No.: ~ ~ I-HE-I4. pgg No.: IZ-3)ZI-U. II IZ-3.)ZE ~ Anchor type: ~ ~ >~<~ ~~PE Z Dia: gag No.; IZ-50 t ) -ZO Tightness established by: 0 "Snug Fit" 0 Torque Torque Wrench No.: Cal. Due Date: Tightness verified? 0 Yes 0 No Date: ons ruc on Equipment base flexible? 0 Yes I No ons ruc o Date: ARE Bolt ID I ~ 3 4 Comments GaPs BFlwk5l BEfivEEIU Anchor len th I 2 '- I '~z"

                                         ~

Z'- I'li - 4lg " I ~i" 7'- I'jz" "L Protruding 41'~z"

                            ~sic                 --~6~.

41'l4"

                                         ~ -~su                      41 len th
                            )I'-7 lc         I'-7~i~" I.'- /'rz" I'-7Yz-
                            >8'/4"            >8" W Rli "dh a7Vr.

Bolt ri 2>/4 " 2'1("

                                                          "~V~

L>~

                                                                   ~'/

C.SACK Ihl Concrete ~1( CGMCRETT: condition UOTII SIDE5 Edg>> 4'/q 4 '/4 distance, Anchor ~/s" II ~~a" s acin II Anchor (50'LQ an larit 4 IO' lQ Thread CD I( OIC OK &IC engagement Comments 4 QtlE TD Hlf' RADIKfloLI AREA Iso Ar'I MLT Loc.ATI wERc hloT QKTAll.l THC EAST P WERE DE:TER~I IMILAR, TO THE UV'C5i'T PE'0 'TAI Ih R ll ICo A I hl SPEC T'L(5hl. 15 I R \h H R Varified by: Date: Qua ./Cert. Inspector Revieved by! Date! T'ons ruct on Page 2 of 3 Revision l

siss've wi vvui ver ATTAVBKNT NO. l l- HE,- l 4- Dug No.: re& edded Steel Dwg. No.: Weld ID W~ WS Vl4 WS 'IMr- WV Wa, des l l l Size I/~ I/~ I/S 1 ~ Fillet 3(/v ( (/~ ~y &>> (/4IP 3(/ gr I, (/ /~/4"(('//, /y ">> '//,lg">>'l4" ~((~I/ >> 2 ~ Plllg/slot 3 ~ Groove Cracks Yes Yes Yes No QKO Lack of Yes s Yes Yes Penetration No Porosity Yes No Yes Yes Yes Yes's Yes Equipment base flexible: 0 Yes 8- No ons ruc x Reviewed by: ons ruc son c or evxev ngxneer Uerified by: To <~+wc. s ua . e . npsec or

                                   <<~            o                                                       Date:

Page 3 of 3 Revision 1

ssaC aVC J ~ 4 SU ~ V J V ATTACHMENT NO. 1

 ~ipment    No .          1- HE, - l4                                          No.:          WR Dwg added  Steel    Dwg.       No.:

Meld ID es' Size l~ Fillet g >/g'~~lg " Plug/Slot 3 ~ Groove Cracks Yes Yes Yes Yes Yes Yes YQS Lack of . Penetration ~ KaJ No Yes No No Yes No No

                                            .Yes No No Yes No No Yes No No Yes No No Yes No Porosity        Y o

Yes No Yes No Yes No Yes'es No No Yes No Yes No Equipment hase flexible: 0 Yas E No on ruc z n a Reviewed by: ons ruc son c or avxew gxnaer Veri.fied by: 7c l e Date: e . np ec r Page 3 of 3 Revision 1

S 8 A DEPARTMENT CONTROLLED DOCUMENT 12 SHP 5050 NDE pp8 COPY NO. 3- ~ ATTACHMENT NO. 1 ULTRASONIC TEST REPORT JOB ORDER NO.: ~l REPORT DATE: REgUEST NO. IDENTIFICATION TECHNI UE Unit Test Unit/ S/N 5k Component Freq./Diameter Item Reference Standard Material Couplant/Batch No. '7 SB Other 5 TEST DATA REMARKS PERFORMED BY: LEVEL ~ DATE REVIEWED BY: LEVEL:~'- DATE: Z5 FORM NO. 12 SHP 5050 NDE.008-1 Page 1 of 1 Revision 0

Equip ID: 2-HE-15E Train: 2 Equip Class:21 wing No.: 2-5135A 2-5113 tion: CCW System: COMPONENT COOLING WATER Equip Desc: EAST COMPONENT COOLING WATER HEAT EXCHANGER Building: AUXILIARY Room: 609 HALLWAY Elev: 609 Sort: S, Notes: Normal State: 4 Desired State: Power Req'd: N Support System Drawing: Req'd Support Comp: Safety Related Status: NUCLEAR SR Min/Opt: MIN Alias No: Power Train: NA Comp Served: EAST COMPONENT COOLING WATER HEAT EXCHANGER MPR: M.L.W. INDUSTRIES Pa el: Elem. Drawing: NOT APPL Wiring Drawing: NOT APPL Power Source: NOT APPL Walkdown: F Relay Eval  : N Comp Type: HE Iso Drawing: 2-CCW-41, 2-CCW-42 Location: 30 FEET EAST OP THE N2 MONITOR TANK

DC COOK Unit 2 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet1 of2 ID: 2-HE-15E (Rev. 0) Class: 21 - Tanks and Heat Exchangers

Description:

EAST COMPONENT COOLING WATER HEAT EXCHANGER Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: 609 HALLWAY-30 FEET EAST OF THE ¹2 MONITOR TANK Manufacturer, Model, Etc.: M.L.W. INDUSTRIES (HORIZONTAL) BASIS: External analysis

1. The buckling capacity of the shell of a large, flat-bottom, vertical tank is equal to or greater N/A than the demand.
2. The capacity of the anchor bolts and their embedments is equal to or greater than the Yes demand.
3. The capacity of connections between the anchor bolts and the tank shell is equal to or Yes greater than the demand.
4. Attached piping has adequate flexibilityto accommodate the motion of a large, flat-bottom, Yes vertical tank.
5. A ring-type foundation is not used to support a large, flat-bottom, vertical tank. N/A C LL 0

~CO I~S SRT: Gary Thomas, Tom Huang, and Kailash Mahajan on 11/2/93. Component Cooling Water Heat Exchanger on two reinforced saddles. Anchorage is two 7/8" diameter J bolts. There are 4 1" wedge expansion anchors in one pedestal in the horizontal direction. C.G. of exchanger from the top of the saddle pedestal about 3'. Pedestal concrete is cracked. AEPSC tracking the problem through a condition report. SRT has reviewed the resolution of this problem and determined that it is resolved. This unit is the same as 1-HE-15E except there are no horizontal anchors on 1-HE-15E. The anchorage for this exchanger is more robust. The calculations of 1-HE-15E show that the anchors are adequate and the saddles are safe. sb.~ Evaluated by: Date: ttachment: Pictures

DC COOK Unit 2 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 2 of 2 ID: 2-HE-15E (Rev. 0) Class: 21 - Tanks and Heat Exchangers

== Description:== EAST COMPONENT COOLING WATER HEAT EXCHANGER Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: 609 HALLWAY-30 FEET EAST OF THE ¹2 MONITOR TANK Manufacturer, Model, Etc:: M.L.W. INDUSTRIES (HORIZONTAL) BLCLI le ONE SADDLE WITH 4 HORIZONTAL BOLTS OTHER SADDLE SUPPORT

Coo Component No. '2- I S E Cloaa Any pazpicular area tho Seismic Review Teaa should pay extra attontion to? Yea < No (If yea, check Stoma that apply.) Anchor Typo Anchor Diameter Anchor Spacing Anchor lumbar Anchor Embodmont+ Anchor Edge Distance Anchor Gap M Anchor Thread Engagement Anchor Grip Anchor Angularity Concrete Cracks'thers (describe briefly) If there ia concern for Design Basis Discrepancy, circle tho applicable atom and explain.

1. Hardvare Maintenanco Type Discrepancy
2. Dra~ing Update Typo Discrepancy
3. Significant Operability/Design Basis Discrepancy Others Condition:

HotJ8 Actions Taken: 9 SING Preparod By Dasa

                                                                       **12 CHP 5021       CCD. 019 ATTACHMENT NO. 1 ANCHOR INSPECTION DATA SHEET 2                       6)x B..goy'-0"               worry sourH       ~w~q Unzt 0                            Bldg.                        Location i2.- B~Qg-      2s,iz-3zb-                          z-R6-l56 Installation         dwg.    /  Rev.              Equipment No.

Anchora e Arran ement Sketch 74'-'/a

                                                                       ~tt Ypg l~

0 I C,RPICe IIJ4ROVl . J C+ACK II I 6 CCouT INDIANA MICHIGAN POVIER SITE DESIGN CONTROLLED Y(OR KING COPY AUG 24 1S95 LERK

                                 /~g CRAuC  T'O  FLIIIIR 0
                                                '- l'/a +'/5 (gyp)

Drawn by: Date: Verified by:

   ~   ~

Date: & Qual. /Cert. Inspector

                            ~          ~

Reviewed by: 7 Date: 8 ~ t~ Construction Anc or Review Engineer Page 1 of 3 Revision 1

                                                                **12 CHP 5021.       CCD. 019 ATTACHMENT NO. 1 ANCHOR INSPECTION DATA SHEET
2. he~ M bO I'-O" NORTH ~GATV ~W~q Unxt Bldg. Location l 2.-3285-23 f2-'328 Installation dwg. / Rev. Equipment No.

Anchora e Arran ement Sketch INOIANA MICHIGAN POvggR SITE DESIGN CONTROLI.EP

                                                                 'tYORKING COPY AUG   24 tSIIS I.ERK ROOT@ TOP
 ~

Y9P cR.Ac.z XoIVV e6T. 08.00T 4 CoLlC, g t BOGCf FB. Wl PB)K'TEIDE 't'L 0 IJ 0 ly+ 7z 'y 7-E <S~

                                        <>xP)

El Ev. ~<ca UooicuQG Drawn by: Date: Verified by: Dat:e: gua ./Cert. Inspector Reviewed by: T Date: Construct on An hor Review Engineer Page 1 of 3 Revision 1

0

                                                           **12 CHP 5021.CCD.019 ATTACHMENT NO.           1 ANCHOR INSPECTION DATA SHEET 2

Unxt 0 Bl..IOOq'-g~I Bldg. hJQATA COOT/ HAU Location u~ l2.- N. SS-25, is-32eg- z- HB-t58 Installatz.on dwg. / Rev. Equipment No. Anchora e Arran ement Sketch z- Bg - i'd%

        ~ Ql/g 9 lOC4TlOA 0$ ~(,N0R.

d ItIDIANA MICMIGAW POWER SITE DESIGN CONTROLLED WORKING COPY AUG 24 1998 LERK T-4 C <

                                                                   ~  c gv i                                                           0 EL.CV. U'I -   UO  k IQ     OuY Drawn by:                                                 Date:

Verified by:

   ~ ~

Date: gual./Cert:. Inspector Reviewed by: Dat e: Constru tron chor Review Engineer Page 1 of 3 Revision 1

0

                                                                  **12 CHP 5021.          CCD. 019 ATTACHMENT NO. 1 ANCHOR INSPECTION DATA SHEET 2                             PrOX &1   - boq'-o"       NORTH SbQTH             RPn~+

Unzt 0 Bldg. Location 12.-8296- S t2.-3xg-Installation dwg. / Rev. Equipment No. Anchora e Arran ement Sketch QOGIFI@) AT4X+ I /bklg (7Yp() CRRcX 7 6 O~

                                                                              )'p j94C80 8, uJP 5AER 0

V INOIANA MICHIGAN PO)VER SITE DESIGN CONTROLLED YYOR KING COPY AUG 24 1895 LERK + CI

             ~  ~

a p CPP ~ f~Q Volh)7 gC,TWd&hl 4,RouT~ MQC. d EI Eu . J)EM tppkxÃI 0 IA Drawn by: Date: Verified by: Date: Q a ./Cert. InsPector Reviewed by: 7 Date: Construction An hor Review Engineer Page 1 of 3 Revision 1

                                                                                       **12 CHP   502 1. CCD. 0 19 ATTACHMENT No.

Equipment No.: Anchor type: Z HC BGU IGC Dwg No.: IR-3298" f Dia: Dvg No.: Tightness established by: 0 "Snug Fit" 0 Torque Torque Wrench No.: rJA Cal. Due Date: Tightness verified? 0 Yes 5 No HR ons ruc Equipment base flexible7 0 Yes S. No T'ns c o ARE Bolt ED t 2, 3 + Comments Gaps o Anchor +I p]~ +I g/~'i I3q.~3(~" ~tv QW4 len th > a-3o13 8-Z Protruding q3/~ )IS(I 37/ <o~mCC h >'en

                                                                                                          ~>/8'. 5'ee eEL v Embedment        Z~   ~~~    ZI   ~I~/',       '/< 2'4 Q ~r         I Bolt                                                                                                To~mc6+>/g ri          ~ /8        E"/IIo         2'IX.      < "/II Sbg             LjoTE GEL4w.

Concrete CRAB CRACK. GRfKK GRhW CEGTcH condition Edge (oo distance To~&+~/~'nchor Tp L,~W <6 s acin I/q" Anchor an larit Thread engagement Comments. X /Ig'g~ &67~ QLITJtHASSSR, Yiq 4'GTW6&J Wm~ oI PII R CRIT 0 Serai 0 'I4h OI 'T RIP ~HOT

                                                       ~     P M      u              RR      ~      C'TTo verified by:                                                                                        Date:

Qua ./Cert. nspector Revieved by: D te: 8->> Construct on SITE. DESIGN CONTROLLED YIOIIKING COPY

                                                                          'UG 2419SK                                          "I'ERKT Pa  e2of                 3 Re  ision   1
                                                                                  **12 CHP 5021.CCD.P19 ATTACHMENT No, Equipment No.:

Anchor type: < ~

                ~ ~
                     ~t.

Tightness established by: 0 "Snug PrH(&OP. Dia: Fit" I'wg E Torque kg No.: No.:

                                                                                               '+ >>S8-
                                                                                               ~>  8>"ZA l?-- Board I

Torque Wrench No.: P Cal. Due Date: Tightness verified? I Yes 0 No S ons ruc

                                                                %a~~ ion Date: 4.<> 95 Equipment base        flexible?                 0 Yes 8 No ons ruc
                                                                        ~~   on ARE Date:    0 +> 13 Bolt ID                                                                                         Comments Gaps Anchor len              7~/y'ual                            Ct II Protruding len h Embedment          5l(q."

Bolt ri C n ete C,~< MPCQ CRPcv CppcE. condition

                                                           "                                       Vo TOP      SHIIT Edge              /I (p          $ ~/l(p    4      4                                                 OFC distance                                              /II (3/$V             )3tqlI    gyl                                              Ta  ToPoF AN<

s Anchor acin 5" I g'3/8" 5', C ~(<I," Anchor an larit 0 0 0 Thread engagement Og. ot'K, Comments: Y~ gh ac.ss A~MJ I by: C'erified Date: Qua ./ ert. Inspector evieved by: Date: Const ct on ARE INDIANA MICHIGAN POWER SITE DESIGN CONTROLLED WORKING COPY 24 AUG 19S5 o2of 3 Re ision 1 LERK

                                                                             **12 CHP 5021.        CCD. 019 ATTACHMENT NO. 1 OR    S     CT 0 Equipment No.:                                                                     Dwg    No.:      I  2-8>98-Embedded   Steel   Dwg. No.:

CAL Weld XD QL gZ W3 We e Codes T e Size ~li Io ~hb 1 = Fillet g] ~ 2 = Plug/Slot Len h 3 = Groove Cracks Yes Yes Yes Yes Yes Yes Yes Yes No No No No No Lack of . Les Yes Yes es Yes Yes Yes Yes Penetration QR No No No No No Porosity Yes Yes Yes Yes Yes Yes Yes No No No . No No INDIANA MICHIGAN PO'LYER

                         &GQ hi<                                                     SITE DESIGN CONTRCI.LEO IVORKING COPY
                                                                    ~

J)

                                   'R. ~/~3                           44                 AUG   24 1895 RYgxqx. q"
                                                                   +4   ~

4 o IA

                             '4.                                             .0,
                                                                           ~

4. 4

                                                           ~  ~qyeHh           RCCBpT    7~ ~O~"

Equipment base flexible: 0 Yes g No 1 ons ruc z n e Date: <-2'~ Reviewed by: ons ruc ron c or evxew ngxneer

~S. -3 ified by: Date:

ua . e . npsec or Page 3 of 3 Revision 1

12 SHP 5050 NDE.008

           ~/

8 A DEPARTMENT S ATTACHMENT NO. 1 CONTROLlED DOCUMENT COPY NO. Uf TRASONIC TEST REPORT JOB ORDER NO<<:  :~/.>>. ~ * . /A IDENTIFICATION Unit Waa Test Unit/ S/Nfl VSR- CNC-9'K Component Freq./Diameter .asD Item A~a. Reference Standard &C'-8 Material Couplant/Batch No. ~ ~/~ lP88 Other 5 TEST DATA REMARKS EE P. EPV C. I E

J ~ PERFORMED BY: LEVEL:~~ DATE: IY'-/3 ~z3 REVIEWED BY: LEVEL:~ DATE: FORM NO. 12 SHP 5050 NDE.008-1 Page 1 of 1 Revision 0

                                ~

Yi atabase: K:SSEL1B.DBF Equip ID: 12-HE-16N Train: 12 Equip Class:21 ing No.: 12-5136, 1-5135

      ~
              ~

Function: SFP COOLING AND CCW

        ~

System: SPENT FUEL PIT COOLING & CCW Equip Desc: NORTH SPENT FUEL PIT HEAT EXCHANGER Building: U-1 AUXILIARY Room: SPENT FUEL PIT HE ROOM Elev: 609 Sort: S, Notes: Normal State: Desired State: Power Req'd: N Support System Drawing: Req'd Support Comp: Safety Related Status: STANDARD Min/Opt: MIN Alias No: Power Train: NA ~ Comp Served: OAT, JOSEPH, CORP MFR: 5: Panel: Elem. Drawing: Wiring Drawing: Power Source: Walkdown: F Relay Eval  : N Comp Type: HE Iso Drawing: 12-SF-5, 7, 1-CCW-l, 7 Location: NW AREA OF RM

DC COOK Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 1 of 9 ID: 12-HE-16N (Rev. 0) Class: 21 - Tanks and Heat Exchangers

Description:

NORTH SPENT FUEL PIT HEAT EXCHANGER Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: SPENT FUEL PIT HEAT XCHGR RM, NWAREA OF RM Manufacturer, Model, Etc.: OAT, JOSEPH, CORP. BASIS: Horizontal TANK analysis

1. The buckling capacity of the shell of a large, flat-bottom, vertical tank is equal to or greater N/A than the demand.
2. The capacity of the anchor bolts and their embedments is equal to or greater than the Yes demand.
3. The capacity of connections between the anchor bolts and the tank shell is equal to or Yes greater than the demand.
4. Attached piping has adequate flexibilityto accommodate the motion of a large, flat-bottom, Yes vertical tank.
5. A ring-type foundation is not used to support a large, flat-bottom, vertical tank. N/A C

~CM@NN Q RT: Gary Thomas, Tom Huang and Kailash Mahajan on 11/3/93. 3' 2" diameter horizontal heat exchanger about 22'ong on two saddles supported by piers. Total weight full given as 26,200 lbs. Exchanger bolted into pier with 4 7/8" diameter bolts per saddle. Piers are dowled into floor. The results of tank analysis show that the tank anchorage is adequate and also the saddles are safe. Evaluated by: Date:

Attachment:

Pictures

Attachment:

TANK Analysis Results

Attachment:

Check of Stresses in Saddles

DC COOK Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet2of9 ID: 12-HE-16N (Rev. 0) Class: 21 - Tanks and Heat Exchangers

== Description:== NORTH SPENT FUEL PIT HEAT EXCHANGER Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: SPENT FUEL PIT HEAT XCHGR RIVI, NW AREA OF RM Manufacturer, Model, Etc.: OAT, JOSEPH, CORP. NORTH SPENT FUEL PIT HEAT EXCHANGER

DG COCK Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 3 of 9 ID: 12-HE-16N (Rev. 0) Class: 21 - Tanks and Heat Exchangers

Description:

NORTH SPENT FUEL PIT HEAT EXCHANGER Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: SPENT FUEL PIT HEAT XCHGR RM, NW AREA OF RM Manufacturer, Model, Etc.: OAT, JOSEPH, CORP. TANK Analysis Results Step 1 Input Data a) Assumptions

1. Tank is cylindrical, horizontally oriented and supported on saddles. Yes
2. Tank and saddles are made of carbon steel Yes
3. Saddles are uniformly spaced. Yes
4. Saddles overhang is less than spacing /2 Yes
5. Base plates have slotted anchor bolt holes for thermal growth except for the base plate under Yes the fixed saddle.
6. Imposed nozzle loads are not significant. Yes
7. The tank foundation is adequate. Yes
8. Anchor bolts are cast in place or expansion type. Yes b) Materials Weight of Tank+ Fluid 26.2 kips Weight Density of Tank+ Fluid 151 Ibs/ftn3 Saddle Elastic Modulus 30000.0 ksi Saddle Shear Modulus 1". 500.0 ksi Base Plate Yield Strength 30000.0 ksi Anchor Type 7/8 in 90 deg. J-Bolts c) Dimensions Tank Diameter, D 3.17 ft Tank Length, L 22.0 ft Tank Thickness, t 0.44 in Height of Tank+ Fluid C.G., Hcg 2.16 ft Number of Saddles Saddle Spacing, S 13.0 ft Saddle Height, h 4.9 in Saddle Shear cross-sectional area 23 63 inn2 Saddle Weak Axis Moment of Interia 24.36 in"4 Number of Bolt Locations / Saddle Number of Bolts / Bolting Location Extreme Bolt Spacing, 1.83 ft Bolt Eccentricity, e D'nchor 3.0 in Weld Thickness 0.188 in Base Plate Thickness 0.5 in

DC COOK Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet4of9 ID: 12-HE-16N (Rev. 0) Class: 21 - Tanks and Heat Exchangers

Description:

NORTH SPENT FUEL PIT HEAT EXCHANGER Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: SPENT FUEL PIT HEAT XCHGR RM, NW AREA OF RM Manufacturer, Model, Etc.: OAT, JOSEPH, CORP. d) Anchor Bolts Type = 90 Deg J-Bolt Diameter = 7/8 in Manufacturer = Product Name = Pullout Shear Nominal Capacity 20.44 kips 10.22 kips Concrete Compression Strength, fc' 3500.0 psi Reduction Parameters Capacity Reduction Factor Label Check Condition Pullout Shear

1. Type of Anchorage Yes 1.0 1.0
2. Installation Adequacy Yes Installation is adequate 1.0 1.0
3. Embedment Length Yes Embedment Length = 18.75 0.47 1.0 in
4. Gap at Threaded Anchors Yes Gap size = 0.0 in 1.0 1.0
5. Spacing between Anchorages Yes 1.0 1.0
7. Concrete Strength and Condition Yes 1.0 1.0
8. Concrete Crack Location and Size Yes Crack Size = 0.0 in 1.0 1.0
9. Essential Relays in Cabinets No
10. Base Stiffness and Prying Action Yes '1.0 1.0
11. Equipment Base Strength and Yes Base strength and load path 1.0 1.0 Structural Load Path are O.K.
12. Embedment Steel and Pads Yes Installation is O.K. 1.0 1.0 Does the tank satisfy all the assumptions and is within the applicable range of parameters?

2- The allowable bolt loads Vu'.211 Step Allowable Tension Load, kips Shear Load, Pu'llowable 7.967 kips Step 3 Determine base plate bending strength reduction factor RB 346.7068

DC COOK Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes 5 of 9 'heet ID: 12-HE-16N (Rev. 0) Class: 21 - Tanks and Heat Exchangers

Description:

NORTH SPENT FUEL PIT HEAT EXCHANGER Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: SPENT FUEL PIT HEATXCHGR RM, NWAREAOF RM Manufacturer, Model, Etc.: OAT, JOSEPH, CORP. Step 4 Determine base plate weld strength reduction factor RW 3.3848 Step 5 Determine the anchorage tension and shear allowable loads Allowable Anchorage Tension Load, Pu 7.211 kips Allowable Anchorage Shear Load, Vu 7.967 kips Step 6 Calculate the ratios and values alpha (Pu/Vu) 0.91 3.28 kips/bolt Vu /Wb 2.43 Hcg / 1.18

    /S D'cg 0.166 F1                                                                           2.236 F2                                                                           2.475 Step  7- Determine   the acceleration capacity of the tank anchorage lambda 1                                                                   1.088 G lambda u                                                                   0.772 G Anchor Acceleration capacity, lambda                                       0.772 G Step 8 Determine the maximum saddle spacing for transverse and vertical rigid frequency response Maximum Saddle Spacing, Sc                                                  13.45 ft Step 9 Compute the resonant frequency of the tank in the longitudinal direction Saddle Stiffness, Ks                                                  13948.206 kipsfin R     nant Frequency of Tank in Longitudinal Direction                    72.15 Hz

DC COOK Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 6 of9 ID: 12-HE-16N (Rev. 0) Class: 21 - Tanks and Heat Exchangers

Description:

NORTH SPENT FUEL PIT HEAT EXCHANGER Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: SPENT FUEL PIT HEAT XCHGR RM, NW AREA OF RM Manufacturer, Model, Etc.: OAT, JOSEPH, CORP. Step 10 Determine the seismic demand acceleration ZPA 0.275 G Tank is rigid in all three directions. Tank anchorage is adequate because anchorage acceleration capacity is greater than ZPA Step 11 Check the saddle stresses The program does not check the saddle stresses Check the saddle stresses by an independent calculation

CUENT Cr

                                                                                                          ~    H~hmou Stevenson and Associates A Struoiurnl Mnohnaionl conrulbag Engiauutiny Firm
     /gag: .4~ J,l~ s4 ke:ss e.s               i P

II I I I I 1 I i3<<) VI S

                                                                                                  /r'""

24'z

                                 'j8' irin<yjt.p /g.u.IIII            .<<.g '(.,      J   = ...3    .I         PS
        -'A--n.o-L           Aro-'n I
                                      ".CIopn.oI ig g                 '=     r Ir0 J.   (I:rru     CI'FiOar)
       --Z'.pa--                     .'pg j.

E

                         ~

I " ~ I

                       ~  Qf'W I         ~
                                              'I r<<I I
                                                   -<<   ~

I l I I I

         'I    1                   ~I gg L u

Lire, 2.l r S ZBIrls..u ru. I

                                                                                                                    ~
                                                                                                     ~

I' I j i I I

                                                                                                                      ~ I
                                                                                                                  ~

i I I i I i l,I I I

                                                                       ~4I i2!

j i j I

W) CUENT JOB No. SHEET OF SUBJECT Z 0 8 Stevenson and Associates 5 5 A Srrucrurnl Mcchnnrcnl Conrulnnrr Enprnncnnrr fum o

                                      ~ ~ ~~ ~

o ~ ~

      ~   ~            ~ ~ II e e ~   0 II I   I  I I

~ ~ ' ~ ~

                                ~ ~

I'

r vms ~ we'll ~ Q J,g eo ATTACHMENT HO. l Equipaent No.: Anchor types' '.

                       'li- HE-(4 0 Tightness established by: 0 "Snug VDCY             Dia:

Fit" ie"+ 0 Torque

                                                                                          ~g Dwg No.:

No.: IL 5L97A-I4 IL M135 2 Torque Wrench No.: Cal. Due Date: Tightness verified? 0 Yes EI No Date: ((-(o- 2 ons c n Equipment hase flexible? 0 Yes K No Date: -(0- l2 ons ruc on ARE Bolt Caps Anchor len Pro~ding len XD

                 ',  I
                       '- l l"
                     ~i',-

l'-ll"

                                   ~" ~

I'-II" p "8," I'-ll" 4iia 'i I'- l l" I'- l I " I I I" Comments

                                                                                                                  ~m ox~

I'-(I" 1%" 30'73-g 2,' 0 2,'+"

                                                  ~

Concrete OK OK condition 0(( Ql< QK QK OK Edge gIz" C 'i'." 4 distance

    '. Anchor                                                                      4          4 acin       Q 7 IEI,"   3 1/i     >~tg"     > 'iZ"           4 Anchor                                                        4             4            4           4 larit       0           0 an Thread engagement OlC.      OIC.

Zo QK po Ok; .. Ol( 'l( Qk GK Comments: 4 5QRr

'Yean.m.                                                                                                       CKo~W     A~a, IM                                  T PER       RA&I       I Z, ~

Verified by: Date: Qua . Cert. nspect r . 5-2.z-)z Reviewed bye Construct on INDIA IA MICHIGAN POVIER SITE DESIGN CONTROLLED VlORKING COPY AUG 2 4.1995 Page 2 of Revision l3 LEAK

ATTAU96ÃZ NO. 1 Equipment No.: )Z.-HC -IGM Dug No.: Embedded Steel. Dry. No.: geld y 'Ihfi Wz. Wa l W< VVs Wr W~ Ws I I I I t I Size /~r ~i<. ~i( If~" IS ~i i >li ~/ic. 1 ~ Fillet 2 ~ Plug/slot Lan 5~~ic" 44.'i'z" Z.>a" 5 '~s" 2." Z ~a" L~~s" . E.'~4" 3 ~ Groove Cracks Yea Yea Y s Yea Yes Yea Yea Yea No No No No No No No Lack of Yea Yes Yes . Y Yea Yea Yea Yes Penetration No No N No No No No Porosity Yea No Yes No o s es No. Yea'es No No Yea No Yea No CXlALLTY CQMTRQL TEC W MlC.IAU QLll Y VERIFIE,D 'AE.LDQ 'INS. Vl4, WS. 4 NIo PER COGGTRUCTLOM, AbKHQR REVlEVl E.MCLMEER,'5 RE.QDE.'5 T W+ HA'5 5LAC AND its" POPlTLOM 15 UklKR CUT. Wi Wz WII LJ

                                                                                                  ? ~~

BIO 6~ O >. Cg

                                                                                                  <i-o
                                                                                                  ~NO QO
                                                                                                  ~OQ OX-
                                                                                                  ~@X co o ZO?

O i-Wa 'l L UFV. LK . V/E.GY PAC E l QFK Equipment base flexihles 0 Yea 8 No ons n e Date: Revieyed by Date ons ruc on c or ev ev g eer Verified by: ua ~ ~ npsec or Date: Page 3 of 3 Revision 1

ATTAauKNT No. l Equipment No.: IZ HC IGM %g No.: Embedded Steel Dry. No.: Weld ID Ws VYIo W ii 'lliz Size ~l(c. I

                        ~/I(

1 Wi( l ~ Fillet 5'4 2 ~ Plug/Slot Lan 5 A Z ~s 4.4'i~ 3 ~ Groove Cracks s Yes Yes Yes Yes s Yes o No No No No N No Lack of Yes .Yes Yes Yes Yes Yes Penetration o o No No No No No o Porosity Y Y o Yes No Yes No Yes'es No No Yes No Y No We '~s" PQRTIOkl CF VlE.EO )6 UQQE.RC O'T. INDIANA MICHIGAN PO(VER SITE DESIGN CONTROLLED

                                          'IVORKING COPY AUG   24 1995 "L ERK  T PACE  Z.OF5 Equipment base    flexible:           0 Yes          H. No   T' on    e Date:

Reviewed by: ons ru o c r evlev g eer Verified by: a . e . npsec or Pago 3 of 3 Revision 3.

ATTACEBKNT No. Equipment No.: 'lh HC )AU Dwg No.: Embedded Steel Dwg. No.: Weld ID V/)s W i~ W is W ic W..)~ W)e Wm W I I I I I size ~/)C +Iso )/s, ~ha- Pi~ )IS ~~Is. 1 ~ Fillet 44'Iz" 2 ~ Plug/Slot Z.'ls" Z'~z" L "e," Z."e" Z.'Iz" Z.'~e" 3 ~ Groove Cracks Yea Yes Yes Yes Yes Yea Yea Yes No No No No No No No No Lack of Yea Yes Yea ,Yes Yea Yea Yea Yea Penetration No No No No No No No No Porosity Yea No Yes No Yes No Yea No Yes'es No No Yes No Yes No WELD'QM 'THI5 PAC E. WC.KE. MOT 'tE.RAFIEO aV a .C.. T~~<~D~- W)+ INDIANA MICHIGAN POWER SITE DESIGN CONTROLLED WORKING COPY

                                                                                            ~UG   24 tSSS W)s W)                                        LERK    T Equipment base     flexible:         0 Yes        EL   No                                      Date:

ona 0 e Reviewed by: Date: ~-~-~~ ona ruc on c o evxew gxneer Verified by: Date: ua . o . npsec or Page 3 of 3 Revision 1

SHP 5050 NDE.008 S Px A DEPARTMENT ATTACHMENT NO. 1 CONTROLLED DOCUMENT COPY NO. UITRASONIC TEST REPORT JOB ORDER NO.: ~ A REPORT DATE: 9 REQUEST NO. hl IDENTIFICATION TECHNI UE Unit a Test Unit/ S/N Component Freq./Diameter Ra Item Reference Standard Material Other Couplant/Batch No. 'g L S TEST DATA REMARKS r 4 Y T A LE SA'F

                                           'T'         t  A.

F wio PERFORMED BY: W I EVER: DATE: REVIEWED BY: I EVE?: ~ DATE: I FORM NO. 12 SHP 5050 NDE.008-1 Page 1 of 1 Revision 0

Equip ID: 1-QT-107-AB Train: 1 Equip Class:21 Drawing No.: 1-5151A

    ~
               ~ ~

tion:

       ~
            ~  EMERQ   DIESEL System: DIESEL FUEL OIL
         ~

Equip Desc: AB EMERG DXESEL FUEL OIL DAY TANK Building: AUXILIARY Room: AB EMERG DIESEL GENERATOR ROOM Elev: 587 Sort: S, Notes: Normal State: Desired State: Power Req'd: N Support System Drawing: Req'd Support Comp: Safety Related Status: NUCLEAR SR Min/Opt: MIN Alias No: Power Train: NA Comp Served: AB FUEL OXL DAY TANK MFR: el: 36" D x 108" L, 465 GAL. el: Elem. Drawing: N/A Wiring Drawing: N/A Power Source: N/A Walkdown: F Relay Eval  : N Comp Type: TANK (CAPACITY- 2HRS FULL LOAD OPERATION) Iso Drawing: Location: XN THE SW REGION OF THE ROOM INSIDE THE AB EMERGENCY DIESEL FUEL OIL DAY TANK ENCLOSURE,, AT 599 EL.

DC Cook Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 1 of 2 ID: 1-QT-107-AB (Rev. 0) Class: 21 - Tanks and Heat Exchangers

Description:

AB EMERG DIESEL FUEL OIL DAY TANK Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: AB EDG RM, Manufacturer, Model, Etc.: 36 D x 108 L,465 GAL. BASIS: External analysis

1. The buckling capacity of the shell of a large, flat-bottom, vertical tank is equal to or greater N/A than the demand.
2. The capacity of the anchor bolts and their embedments is equal to or greater than the Yes demand.
3. The capacity of connections between the anchor bolts and the tank shell is equal to or Yes greater than the demand.
4. Attached piping has adequate flexibilityto accommodate the motion of a large, flat-bottom, Yes vertical tank.
5. A ring-type foundation is not used to support a large, fiat-bottom, vertical tank. N/A COh0iggNT!j SRT: George G. Thomas (SM) and Tom Huang (AEP), 10/7/93.
                                                           ~

Same as 1-QT-107-CD, except that the grout is in much better condition for 1-QT-107-AB.

                       ~

Evaluated by: Date:

                                                                                                     /I 9 ~85 ed=                              /

l e

Attachment:

Pictures I

DC Cook Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 2 of 2 ID: 1-QT-107-AB (Rev. 0) Class: 21 - Tanks and Heat Exchangers

== Description:== AB EMERG DIESEL FUEL OIL DAY TANK Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: AB EDG RM, Manufacturer, Model Etc.: 36 D x 108 L, 465 GAL.

                  ~

~PC~FQ AB Emerg. Diesel Fuel Oil Day Tank 1-QT-1 07-AB

                                                                 ++12 CHP 5021 CCD 019 ~      ~

ATTACHMENT NO. 1 50UTH%E57 5'le QF'@ o,g pM UP w~iCr AUX ) -O AG EMCPGt:M(Y QKSEL T11Q Oll OlE't XLktl( b'i Un Bldg. Location iQ- 369Q i- QT- ia7- A5 Insta at. on dwg. / Rev. Equipment No. Anchora e Arran ement Sketch gl Qil 4e II p4 FfP.)

                                        +I Qll E l E.V. LM. 5QUTH 5y'E.CY1 QD 'A- A" D,rawn  by:          Q. ROTC,                                     Date:

Verified by: Date: Qua ./Cart. Inspector 2.- 'LS-g g Reviewed by: Date: Construct on Anc r Review Engineer f Page 1 of 3 Revision 1

                                  ~ i
       ~ ~    l                 S    ~ ~

0 - ~

   - ~ ~        ~    ~

s '%~4 l kt.S

 &5%~~%aaa ISWISRRRHLL mmeeasmmmm RRE555RRRLL WWWRHaLa  ii)      aa)  kal ggggggggggg~~~~

gggg@gg++QQ

 %555%WLLLL 4                     4

~ MWWMWWWW k k Pg

I S (% A DEPAiRTMFNT SHP 5050 NDE.QQ8 CONTROLLED DOCUMENT ATTACHMENT NO. 1 COPY NO. ULTRASONIC TEST REPORT JOB ORDER NO.: REPORT DATE: gr 1 REQUEST NO. IDENTIFICATION TECHNI UE Unit Test Unit/ S/N Component Frey./Diameter ~ ABC) Item Reference Standard Material Couplant/Batch No.L&p Other TEST DATA REMARKS W6

                                                 /7~"

7c' PERFORMED BY: LEVEL:~& DATE: / REVIEMED BY: LEVEL: DATE: FORM NO. 12 SHP 5050 NDE.008-1. Page 1 of 1 Revision 0

Page No. 770 10/19/94 2 21 2-QT-115-CD SYSTEM DIESEL LUBE OIL DESCRIPT CD EMERGENCY DIESEL LUBE OXL SUMP TANK DRAWINGNO 2-5151C BUILDXNG AUXILIARY NORMSTATE DESXRSTATE POWERREQD ALIASNO POWERTRAXN NA COMPSERVED CD LUBE OIL SUMP TANK MANUFACTUR MODEL 775GALS PANEL ELEMDWG NOT APPL WIRXNGDWG NOT APPL PWRSOURCE NOT APPL QUALXF NUCLEAR SR WALKDOWN F PFDOPT MIN SUPPSYSDWG REQSUPP EVAL TYPE Seismic Only NOTES FUNCT XON. EDG E'VATION 579.00 KTXON CD EMER DSL LUBE OIL PIT

   . Y       N P TYPE     TANK ISO DWGS DETAIL LOC     XN THE WEST PART OF THE   PXT, NEAR THE WEST WALL, 3 FEET ABOVE THE FLOOR FLOW PATH      S REV                0 REV LOCK       N LOCK DATE SHOW     INDEX Y
                 / /

TAG N S IGNATURES REV NOTES

Donald C. Cook Niiclear Plant, Unit 2 GIP Rev 2, Corrected, 2/14/92 SCREENING EyALUATIONWORK SHEET (SEWS) Status: Yes Sheet1 of7 ID: 2-QT-115-CD Rev. 0 Class: 21 - Tanks and Heat Exchan ers Descn tion: CD EMERGENCY DIESEL LUBE OIL SUMP TANK Building: AUXILIARY Floor El.: 579.00 Room, Row/Col: CD EMER DSL LUBE OIL PIT - IN THE WEST PART OF THE PIT, NEAR THE WEST WALL, 3 FEET ABOVE THE FLOOR Manufacturer, Model, Etc.: 775GALS BASIS: Horizontal TANK analysis

1. The buckling capacity of the shell of a large, fiat-bottom, vertical tank is equal to or greater N/A than the demand.
2. The capacity of the anchor bolts and their embedments is equal to or greater than the Yes demand.
3. The capacity of connections between the anchor bolts and the tank shell is equal to or Yes reater than the demand.
4. Attached piping has adequate flexibilityto accommodate the motion of a large, flat-bottom, N/A vertical tank.
5. A rin -t e foundation is not used to su ort a la e, flat-bottom, vertical tank. N/A IS E UIPMENT SEISMICALLYADE UATE? Yes COMMENTS SRT: W. Djordjevic and TR Satyan Sharma. 10/6/93.

REF: 1. Anchor inspection Data Sheets: Anchorage Arrangement Sketches and Physical Characteristics Data Sheet, Certi".:ed 10/1/93.

                     ¹
2. Worthington Dwg 700003BY.
3. Worthington Co.Lube Oil Sump Tank Calculation, 8/22/74.

Anchorage: The tank sits on 3 saddles, 2 plates per saddle, 1/4" thick. There are two 3/4" anchors per saddle. There are 4 anchors in total for the tank because the middle saddle has no anchorage on it. Horizontal Tank Analysis: Saddle Weak Axis Moment of Inertia = 2I + 2(ad "2) = 2((36"x0.25in"3)/1 2) + 2(1 8in"2 x (5"2)in"2") = 900in "4. Saddle stresses analyzed in Ref. 3. Nozzle loads judged not significant by SRT. Evaluated by: Date: go U

0 Donald C. Cook Nuclear Plant, Uni~ 2 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 2 of 7 ID: 2-QT-115-CD Rev. 0 Class: 21 - Tanks and Heat Exchan ers Descri tion: CD EMERGENCY DIESEL LUBE OIL SUMP TANK Building: AUXILIARY Floor El.: 579.00 Room, Row/Col: CD EMER DSL LUBE OIL PIT - IN THE WEST PART OF THE PIT, NEAR THE WEST WALL, 3 FEET ABOVE THE FLOOR Manufacturer, Model, Etc.: 775GALS

Attachment:

Pictures

Attachment:

TANK Analysis Results

Donald C. Cook Nuclear Plant, Unit 2 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Sheet 3 of 7 ID: 2-QT-115-CD Rev. 0 Class: 21 - Tanks and Heat Exchan ers Descri tion: CD EMERGENCY DIESEL LUBE OIL SUMP TANK Building: AUXILIARY Floor El.: 579.00 Room, Row/Col: CD EMER DSL LUBE OIL PIT - IN THE WEST PART OF THE PIT, NEAR THE WEST WALL, 3 FEET ABOVE THE FLOOR Manufacturer, Model, Etc.: 775GALS PICTURES 2-QT-115-CD

Donald C. Cook Nuclear Plant, Unit 2 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 4 of 7 ID: 2-QT-115-CD Rev. 0 Class: 21 - Tanks and Heat Exchan ers Descri tion: CD EMERGENCY DIESEL LUBE OIL SUMP TANK Building: AUXILIARY Floor El.: 579.00 Room, Row/Col: CD EMER DSL LUBE OIL PIT - IN THE WEST PART OF THE PIT, NEAR THE WEST WALL, 3 FEET ABOVE THE FLOOR Manufacturer, Model, Etc.: 775GALS TANK Analysis Results Step 1 Input Data a Assum tions

1. Tank is c lindrical, horizontall oriented and su orted on saddles. Yes
2. Tank and saddles are made of carbon steel Yes
3. Saddles are uniforml s aced. Yes
4. Saddles overhan is less than s acin /2 Yes
5. Base plates have slotted anchor bolt holes for thermal growth except for the base plate Yes under the fixed saddle.
6. Im osed nozzle loads are not si nificant Yes
7. The tank foundation is ade uate Yes
8. Anchorbolts are cast in lace or ex ansion t e. Yes b Materials Wei ht of Tank+ Fluid 6.83 ki s Wei ht Densit of Tank+ Fluid 60 Ibs/ft*3 Saddle Elastic Modulus 29000.0 ksi Saddle Shear Modulus 1150.0 ksi Base Plate Yield Stren th 36.0 ksi Anchor T e 3/4 in 90 de . J-Bolts c Dimensions Tank Diameter, D 3.8 ft TankLen th, L 10.0 ft Tank Thickness, t 0.19 in Hei ht of Tank+ Fluid C.G., H 2.08 ft Number of Saddles Saddle S acin, S 7.67 ft Saddle Hei ht, h 2.0 in Saddle Shear cross-sectional area 18.0 in"2 Saddle Weak Axis Moment of Interia 900.0 in"4 Number of Bolt Locations / Saddle Number of Bolts / Boltin Location Extreme Bolt S acin, 2.67 ft Bolt Eccentricit, e D'nchor 0.02 in Weld Thickness 0.19 in Base Plate Thickness 0.25 in

0 Donald C. Cook Nuclear Plant, Unit 2 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 5 of 7 ID: 2-QT-115-CD Rev. 0 - Class: 21 Tanks and Heat Exchan ers Descri tion: CD EMERGENCY DIESEL LUBE OIL SUMP Ti NK Building: AUXILIARY Floor El.: 579.00 Room, Row/Col: CD EMER DSL LUBE OIL Pl, - IN THE WEST PART OF THE PIT, NEAR THE WEST WALL, 3 FEET ABOVE THE FLOOR Manufacturer, Model, Etc.: 775GALS d Anchor Bolts T e = 90 De J-Bolt Diameter= 3/4 in Manufacturer = Product Name = Pullout Shear Nominal Ca acit 15.03ki s 7.51 ki s Concrete Com ression Stren th, fc'= 4000.0 si Reduction Parameters Ca acit Reduction Factor Label Check Condition Pullout Shear

1. T e of Anchora e Yes 1.0 1.0
2. Installation Ade uac Yes installation is ade uate 1.0 1.0
3. Embedment Length Yes Embedment Length = 27.0 0.7 1.0 in
4. Ga at Threaded Anchors Yes Ga size = 0.0 in 1.0 1.0
5. S acin betweenAnchora es Yes 1.0 1.0
6. Edge Distance Yes Edge Distance = 6.0 in 0.41 0.31 Another Edge Distance = 4 in
7. Concrete Stren th and Condition Yes 1.0 1.0
8. Concrete Crack Location and Size Yes Crack Size = 0.0 in 1.0 1.0
9. Essential Relays in Cabinets Yes Essential relays are not 1.0 1.0 resent
10. Base Stiffness and P in Action Yes 1.0 1.0
11. Equipment Base Strength and Yes Base strength and load path 1.0 1.0 Structural Load Path are O.K.
12. Embedment Steel and Pads Yes Installation is O.K. 1.0 Does the tank satisfy all the assumptions and is within the applicable range of parameters? Yes Vu'.344 Step 2 The allowable bolt loads Allowable Tension Load, ki s Shear Load, Pu'llowable 2.346 ki s Step 3 Determine base plate bending strength reduction factor 0.1726

Donald C. Cook Nuclear Plant, Un<<2 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 6 of 7 ID: 2-QT-115-CD Rev. 0 Class: 21 - Tanks and Heat Exchan ers Descri lion: CD EMERGENCY DIESEL LUBE OIL SUMP TANK Building: AUXILIARY Floor El.: 579.00 Room, Row/Col: CD EMER DSL OIL PIT - IN THE WEST 'UBE PART OF THE PIT, NEAR THE WEST WALL, 3 FEET ABOVE THE FLOOR Manufacturer, Model, Etc.: 775GALS Step 4- Determine base plate weld strength reduction factor RW 0.0379 Step 5 Determine the anchorage tension and shear allowable loads Allowable Anchora e Tension Load, Pu 0."i64ki s Allowable Anchora e Shear Load, Vu 2.346 ki s Step 6 Calculate the ratios and values al ha Pu/Vu 0.07 Wb 1.71 ki s/bolt Vu/Wb 1.37 H /0' 0.779

    /S                                                                    0.271 2.236 F2                                                                          1.779 Step 7 Determine the acceleration capacity of the tank anchorage lambda 1                                                                  0.614 G lambda u                                                                  0.568 G Anchor Acceleration ca acit, lambda                                       0.568 G Step  8- Determine  the maximum saddle spacing for transverse and vertical rigid frequency response Maximum Saddle S    acin, Sc                                               14.2 ft Step 9 Compute the resonant frequency of the tank in the longitudinal direction

0 Donald C. Cook Nuclear Plant, Unit 2 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 7 of 7 ID: 2-QT-115-CD Rev. 0 Class: 21 - Tanks and Heat Exchan ers Descri tion: CD EMERGENCY DIESEL LUBE OIL SUMP TANK Building: AUXILIARY Floor El.: 579.00 Room, Row/Col: CD EMER DSL LUBE OIL PIT - IN THE WEST PART OF THE PIT, NEAR THE WEST WALL, 3 FEET ABOVE THE FLOOR Manufacturer Model, Etc.: 775GALS Saddle Stiffness, Ks 10339.067 ki s/in Resonant Fre uenc of Tank in Lon itudinal Direction 121.66 Hz Step 10 Determine the seismic demand acceleration ZPA 0.25 G Tank is rigid in all three directions. Tank anchorage is adequate because anchorage acceleration capacity is greater than ZPA Step 11 Check the saddle stresses The program does not check the saddle stresses Check the saddle stresses by an independent calculation ~Summa IS E UIPMENT SEISMICALLYADE UATE'? The tank anchorage is adequate.

                                                                      *12  CHP 5021. CCD. 019 ATTACHMENT NO. 1 ANCHOR INSPECTION DATA SHEET
                                      ~<'     ~
6. CD I Unzt Bldg. Location l 2.- 5'2 Iz 2. -QT-) I
                                                                         - CC Installation        dwg.    /   Rev.           Equipment No.

Anchora e Arran ement Sketch I/O". 8 Qp, UYe) bb P,~/X,ID a5-2" 7 DIM G RouT PC% LZ.3241 12- 4, O'4 na

                      'b I'-Z"(~p 0/4Q 3 604$ ('7$ P)

I/j. R AbSHCR INOIANA MICHIGAN POWE'ITE OKSIGN GONTPQLI.Q)O WOIIKINQ CQPY 0 AUG 271995 LKRK T Drawn by: D.te. Verified by: Date: ua ./Cert. Inspector Reviewed by: Date: 8 -+~ +~ Constructs.on An hor Review Engineer Page 1 of 3 Revision 1

                                                            *~L2 CHP 0023.. CCD. ()] g ATTACHMENT NO        l ANCHOR INSPECTION DATA SHE Unit   g
                                 &x,gldg.

c.D PIT Locate.on l~- 9 Installation I dwg. / Rev. 2.- a.y - Equipment No. ( t g-CD Anchora e Arran ement Sketch 0 6 CL I CQ p

                                                                   -- -0 (o"                                      INOIANA MICHIGAN POWER SITE OESIGN CONTROLLEO WORKING COPY AUG 2't 3995 LERK   +

7'ate: Drawn by: Date: Q-t 0-gg Verified by: Date: ual.fCert. Inspector Reviewed by: 't ~ Construction A char Review Engineer Page 1 of 3 Revision 1

                                                                                               **12 CHP 5021.        CCD. 0 lg ATTACHMENT N(3.

Equipment No.:

    ~
                   ~
                         +    @T      I< 5    l   D                                              Dwg   No.:         I  2-3Z~t-1 Anchor type:      ~        BOL                                    ~   ~Bl                         Dwg   No.:       l   2-3qpZg Tightness established by: 0 "Snug                            Fit" 0 Torque Torque Vrrench No.:

Tightness verified? Cl Yes Cl No QA NPI 7 ons ru t,z.on Cal, Due Date: ll ""* Equipment base flexible? 0 Yes 8 No Date: ~ ~D I~ onstruc x n ARE PHYSICAL CHARACTERISTICS Bolt ID Comments Gaps Anchor len th 2-8il '2-I 8 I' l2- Bolas Protruding 5 ~~ ~HOT len th Embedment l 2-3/Ib Bolt fIb~iY< 7((g+l'I~ SC~ ri Concrete C,RhC I( IN CR~ QA.OVT Itl QROV T condition Edge 9~ht" distance @Il<il Anchor 2.- oI s acin <v(c.',AHhl0< Anchor 0 an larit Thread engagement M~SR~ GP-OUT T~~~~< ~ JS Il P JOT'P DOING (SoKaTH H~C C)Sl C?1 &AC 9 ADDING I / T M ~IL FR.OM, OP OF C ROOT. % ACC.~ 55IGL6 gl 4D I "Y&nl 5 >3" >I P 0 AC WP(5l R.CSPGC.TIV Y. Verified by: Date: Qual. /Cert.

                             ~           ~   nspector Reviewed by:             T I NOI ANA kt ICHIGAN POWER SITE DESIGN CONTROLLED             Date:        8'1                I ~

Construction AUG 27 tS8~ LERK + Page 2 of 3 Revis ion 3

 '                                                    '    SHP 5050 NDE. 008 8 A DEPARTMENT                                  ATTACFNEVZ NO .

CONTROLLEO DOCUMENT COPY NO. 2 I LTRASONIC TEST REPORT JOB ORDER NO.: i 6 REPORT DATE-' ~ Q REQUEST NO. IDENTIFICATION Unit l ~<3 Test Unit/ S/N Component - 7- l - t 4 Freer./Diameter h Item Reference Standard Material C. S, Couplant/Batch No. Other TEST DATA REMARKS 1&(l~ L w l PERFORMED BY: REVIEWED BY: EZVEI ~ DATE: ~ /7 FORM NO. 12 SHP 5050 NDE.008-1 Page 1 of Revision 0

01/16/92 PG. N0.535 SAFE SHUTDOWN EOUIPHENI'IST (SSELWP) FUNCTION: CCM Equipment Class: 21 Train: 2 Cauiamcnt IO: 1.HE.15E Orawing Nurbert \-5135A 1-5113 Svstcm: CCM Cauip Oescription: CAST CCM HEAT EXCHAHGER Building: AUXILIARY Room: 609 HALLMAY Elevation: 609 wnrmaI state- Oesired state: Po~er Required: M Sort: M, Sunnorting System Drawing Number: oeauired Interconnections and Supporting Components: fety Related Status: NUCLEAR SR Nin/Opt 4 HIN ADDITIONAL INFORMATION Al ias Number: Power Train: NA C~nent Served: EAST CCW HEAT EXCHANGER Hanufacturcr: NL'M INOUSTRIES Model t Pahei 4 Elem Orawing: M/A Miring Orawing: N/A Po~er Source: N/A uaILdown: F Relay Only: N Comoonent Type: HE ISO Orawings: Octallcd Location:

DC COOK Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 1 of 6 ID: 1-HE-15E (Rev. 0) - Class: 21 Tanks and Heat Exchangers

Description:

EAST CCW HEAT EXCHANGER Building: AUXILIARY Floor El.: 609.00 Room, Row/Col: HALLWAY, Manufacturer, Model, Etc.: MLW INDUSTRIES (HORIZONTAL) BASIS: External analysis

1. The buckling capacity of the shell of a large, flat-bottom, vertical tank is equal to or greater N/A than the demand.
2. The capacity of the anchor bolts and their embedments is equal to or greater than the Yes demand.
3. The capacity of connections between the anchor bolts and the tank shell is equal to or Yes greater than the demand.
4. Attached piping has adequate flexibility to accommodate the motion of a large, flat-bottom, Yes vertical tank.
5. A ring-type foundation is not used to support a large, flat-bottom, vertical tank. N/A IS E UP EN SEIS C L 0 U E? ~Ye C~I~IVIEN S SRT: Gary Thomas, Tom Huang, and Kailash Mahajan on 11/2/93'.

Component Cooling Water Heat Exchanger on two reinforced saddles. Anchorage is two 7/8" diameter J bolts. There are 4 1" wedge expansion anchors in one pedestal in the horizontal direction. C.G. of exchanger from the top of the saddle pedestal about 3'. Pedestal concrete in good condition, but can see the grout to concrete interface. Hand calculation was performed for the heat exchanger and the results show that the anchor bolts are adequate and the saddles are safe. Evaluated by: Date: L

Attachment:

Pictures

Attachment:

ANCHORAGE ANALYSIS FOR THE TANK

DC COOK Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 2 of 6 ID: 1-HE-15E (Rev. 0) Class: 21 - Tanks and Heat Exchangers

== Description:== EAST CCW HEAT EXCHANGER Building: AUXILIARY Floor EI.: 609.00 Room, Row/Col: HALLWAY, Manufacturer, Model, Etc.: MLW INDUSTRIES (HORIZONTAL) CTU ES kgb I ONE SADDLE WITH 4 HORIZONTAL BOLTS OTHER SADDLE SUPPORT

CUENT SHEEf OF SUBJECT 0 8 Stevenson and Associates lU K II h Svurtvsal Macha Conaulnnp Cnpmawlnp nial f neo It gfl(

               ~~o I

2o- 0 3 (gy) x5 8 g 6~a&

                                                          <<Ig P(3g'0 P'I ..7ke t.                    /a.

CUENT JOO No. SHEET Ft OF SUOJECT

                                                                                                                                                ~     Ah~rto>

Stevenson and Associates A Sicuniucni llsolsnnionl i-H tea 5l ConculnnSI EnqsnsucsnFI Fsc su I I i . i S. E.gojs, 'TbM. X<'fnlg] .. o. I (.QM ..~6OI'; kx) it:.: I ' I ~, . ~ c s I ~ ' I IF p ..-Qn I

                                                                                                            ~      ~

i,* ~, s s C i 51cuC40'f

                                                                                                                        ~.l     cn I

I ~ ' >el ty . Z-s~

      ~                                                                                  s r

w.o~ ~p.b'.=, A>(.oo gg T.WS ..SS.:=.~ , . 1.3.'gi

                                                                                     = ISI       s TS/'S           I
                                         ~ ~     s ~  ~
   ~.g>~~A.. l'i<</g.n~g~
                       ~     ~
                                  ~

l'~2. M xS~ y3 z 5'. ly 4.)oscs

                                                                                                                                                                     ~O   Vn'. Ess'J I
                                                                                                                                                                  .I z zgh) ., ~(+ i.l~s)                                            c}-.

K7$ (f 7qOD'), gQ ~ .87ESC +'7. O .O) cital 2 ~$ ,27S) +qboIS

                                                                                             .I,
                                                                                                                                                                ~

I J... 3

                                              ',.'c,l~                                                        nV ~                                                   I'
                                  ~

FE~ 4 2 '6 sun

4. ~ << I ~ ~

i I Jl 2CIC?.l, '., = '8 8 VS ii,7 c D .'.,6): WSITSI II

                                                                                                                                        .         ~         ']9, 8 O'CW I
                                ~ F    I s

I ~ I I s ~ I s iI"7."2.>;"F"",Z, S/< 356 'I;

          ~

I~: s I ~ I I i I ~ I I I ~

                                                                      -s     ~

J ~ 'I

                       )     I I         * ~

CLIENT SHEET OF

                                                                                              ~ f~ > " 'KO cr p g

Stevenson and Associates S A,QIOg~io( r.'TE A Srrncrvrnl hlcchcnrccl Consnlrlnp Enprnccrrnp Flrrn T'yY'

                                                            $      K$ .tv'4 40(.$ $

l0( gxd

   ~    E.-.4CQ         <4C >~4J(LE:k.             "'-

o5

                                      ~,q

( <<j 3xAo f p

         ~
            ...'.,o-ro ~.yy-y.+       t
                                                               - lg lg =.+.oc                   ...:.3'.+6     .=.Io8
                           ~

5 X 3 37 3' E. g g ( l 5) 2- 'ZT I P TS

CLIENT sHEET ~ o Stcvcnson and Associates 0 A Srrucrurel hlechenreel Cnnsulrrng Engrneenng Frrnr I o,g75g VP //ader'< = i 7y344

                                                         =       2Zjyoo       glOE.

2 Jr zI ~ 2 75 )t', gg y ~ g . ( g 1I ) Z 3 Z. 6 5

                                                  .J
f. nl ~~H~ ~ Hg
                                                                      " 'tSZ.lS Z7     SoS  .+/
                                             .I Z~~

o8 (C <<)'~ E 6) (I SS)'f,

                                                                          .SIPED 7.S)j'                 Se 7 77-               (     rlr I  "g)I'-S   r'e o.y 3 Z..$

7 7Z Ts '27SX 2f go c ~ 1 Z III ~ 3 Z(

                                                                ~z V'~     S.fT..
                                                                    **12 CHP 5021       ~   CCD. 019 ATTACHMENT NO. 1 ANCHOR INSPECTION DATA SHEET
                                                                                 @AU MA Unzt     g                     Bldg.                Location 1- H~ -isG Installation            dwg.  /   Rev.         Equipment No.

Anchora e Arran ement Sketch I- RE- 'I5F PcQRGWA,c PZDE5t&a 4 a 0 0 T>~ a ~ 4

                                                " Z-'vcr                          cl "jg li"I Ihtlh MiCHIGAN POWER                       (vxP)

CO STRUC IO."I COI': ROLLEO

       ~'r'ORKI AG COPY f'UG1      (  ]quip 0'rawn by:                                                     Date:       /D Verified by:                                                         Date:

Q~ l-/Cert. Xnspector Reviewed by: structxon Anchor Review Engineer Date: X/7 z. Page 1 of 3 Revision 1

                                                       "*12 CHP 5021.CCD.019 ATTACHMENT NO.             1 ANCHOR INSPECTION DATA SHEET Un1t  0               Bldg.                       Location F-
                         /

Installation dwg. Rev. Equipment No. Anchora e Arran ement Sketch

                                            <I I

3 II il

                                       )5
                                   -a
                                 ~
                                         /i~
                                - I'/g 'x                    INDIA%'i I8!CtOGAI'I POlVEI OiISTBlICTIO".I CO.'ITROLL
                                                                  'ViOlIKii'IGCOPY P,UG   l 7 19gr CL RK Drawn by:

Uerified by: Qu ./Cert. Inspector Reviewed by: Date: onstructxon Anchor Review Engineer Page 1 of 3 Revision 1

~ '

                                                       +*12  CHP 5021. CCD. 019 ATTACHMENT NO. 1 ANCHOR INSPECTION DATA SHEET Unxt       0               Bldg.                  Location
                                                -I L" Installation       dwg.  / Rev.        Equipment No.

Anchora e Arran ement Sketch ll 0-'9 O-S1i o 4'Nr:4'<I l,!CHIGA!<

                                                                           .!!r~ .0! nnP "i'0".K.'."<G CGPY P0'ON'rr;;C r~

C A

              ~

II 4 L Cicv. Ui- Vo GK lQ 00 Y' rawn by: Verified by: Date: 4>- )2 Q l./Cert. Inspector Reviewed by: Date: onstructzon Anchor Review Engineer Page 1 of 3 Revision 1

0

                                                     '+12   CHP      5021.CCD.019 ATTACHMENT NO.                 1 ANCHOR INSPECTION DATA SHEET Unxt 4                   Bldg.                  Location Zl                              E- eE Installatz.on    dwg.  / Rev.        Equipment No.

Anchora e Arran ement Sketch

                                 -HE-i goal
                        ~F 4oLH      Imhusg V~e) or'                                             0 rr
                   + O 0 y~

Ei . Uicu ll'(~'lbi/. V.i(::-'IGA'i PO'Q CQNGTR~.'"."IG:< C.l":.i: RG .LED AUG j. 7 8,"'> CL'n~( 0o Q- Pt< 0-9 O~ 0 V +< D ELEv. 48.& UookiAe 0 H Drawn by: Date: to l Verified by: Date: P -~/u > Q al./Cert. Inspector Reviewed by: Date: onstructxon Anchor Review Engineer Page 1 of 3 Revision 1

                                                                  ~   ~
               ~    e ~ t             ~ )a
                                                        ) ~ ~
         ~  ~

ti ~ ~

                                                    ~ -
                                                        ~
                                                        )
                                                          ~ ~
                                           ~   '1~4 gQ+Q~gig~~~~

kRWWWKHEL mmmmmHHLL RSRSmmRRSL IR555m55LLLS RSWRIRHRRLS RSW K%%5 .. RRWWWW

                          ~      HLLLL MWWREWW&W
  %%55WRIHR RSRRRSRRLL R%8%8%RRMMW&

MWWWWMWW sl ~ !

                    ~      I~ C   Iu                               ~a
        >>Bl   kl>> ~

al z& ~ ~ its

H

                                                                                                              ) ~   r
                                ~ ~ t                     '
                                                                     ~ ~      s      ~
                                                                                               ~ ~     ~        r I r
                                                                                                                  ~

iaL a ~ s. ~ ~ ~

                                                                ~       ~       ~
          -  ~                              0~
                                            '(
                                                ~e~ ~       ..t ia..'. ~r 1
                                                                        ~            4
                              ~          r~      ~    ~                   ~ ~               ~-

t 0 555%5%%%%LL RSR55%mHHLS 55Ã%8NNLLLL WISNRRRKLL RWWSWLLLL RIRSSRRLELE RRRWRWW RSWRWELLL RSWWQLEEL R%R%RSRWMMWW MW&WWW&&

    ~ ~   a.                         0 ~     l 1                      A            1     a a gh                            A.. s                         OJ      r             ~     IL    ~ ~

5 ~ ~ saaJ >LkL ' err

     /5I                                                       I                                           i Ji4 4A L                                                                                              ~
                                                             ~      ~

f

Equipment No.: Tightness established by "Snug Pit" 7 Tightness verified by: -c Qual. /Cert. Inspector Comments:

12 SHP 5050 NCE.OOG

   /w uEPARTPAENI                             ATTACHMENT NO. 1 CONTROLLED OOCUMEHT coPYI'-. 9   I        ULTRASONIC TEST REPORT JOB ORDER   NO ~ : ~$    REPORT DATE: 2           REQUEST NO.

IDENTIFICATION Unit Test Unit/ S/N ifj Component Freq./Diameter Item Reference Standard Material C.S Cocuplant/Batch No. Other TEST DATA REMARKS ll~ V II r/" II /I A PERFORMED BY: LEVEL:~ DAT<: REVIEWED BY: ~- DATE: I'EVEL: FORM NO. 12 SHP 5050 NDE.008-1 Page 1 of 1 Revision 0

Equip ID: 1-QT-107-CD . Train: 2 Equip Class:21 Drawing No.: 1-5151C

             ~ ~

nction:

       ~

EMERG DIESBL System: DXESEL FUEL OXL

         ~

Equip Desc: CD EMERG DIESEL FUEL OXL DAY TANK Building: AUXILXARY Room: CD EMERG DIESEL GENERATOR ROOM Elev: 587 Sort: S, Notes: Normal State: Desired State: Power Req'd: N Support System Drawing: Req'd Support Comp: Safety Related Status: NUCLEAR SR Min/Opt: MXN Alias No: Power Train: NA Comp Served: CD FUBL OXL DAY TANK MPR: Model: 36" D x 108" L, 465 GAL. El em. Drawing: N/A Wiring Drawing: N/A Power Source: N/A Walkdown: P Relay Eval  : N Comp Type: TANK (CAPACITY - 2 HRS PULL LOAD OPERATION) Xso Drawing: Location: XN THE NW REGXON OP THE ROOM, 10 FEET NW OP THE GEN END OP DGCD INSIDE THE FUEL OXL DAY TANK ENCLOSURE, AT THB 599 EL.

DC Cook Unit1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet1 of6 ID: 1-QT-107-CD (Rev. 0) Class: 21 - Tanks and Heat Exchangers

== Description:== CD EMERG DIESEL FUEL OIL DAY TANK Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: CD EDG RM, Manufacturer, Model, Etc.: 36 D x108 L,465 GAL. BASIS: Horizontal TANK analysis

1. The buckling capacity of the shell of a large, fiat-bottom, vertical tank is equal to or greater N/A than the demand.
2. The capacity of the anchor bolts and their embedments is equal to or greater than the Yes demand.
3. The capacity of connections between the anchor bolts and the tank shell is equal to or Yes greater than the demand.
4. Attached piping has adequate flexibilityto accommodate the motion of a large, fiat-bottom, Yes vertical tank.
5. A ring-type foundation is not used to support a targe, flat-bottom, vertical tank. N/A D T 7 SRT: George G. Thomas (SB A) and Tom Huang (AEP) 10/7/93.

REF: 1. Anchor Inspection Data Sheets: Anchorage Arrangement Sketches and Physical Characteristics Data Sheet, Certified 4/5/93.

2. Worthington Dwg it/ 700006BU
3. Worthington Co. Fuel Oil Day Tank Calculation, 8/1 //74.

Anchorage: 1-QT-107-CD is a horizontal tank which sits on 2 saddles. Each saddle has 2, 1/4" thick plates, forming a "U", with no gussets. There are 2 - 5/8" anchors per saddle. Cracks in the leveling grout on the concrete pad were identified. The SRT judged this acceptable since the structural concrete pads are intact. Horizontal Tank Analysis: Saddle Weak Axis Moment of Inertia = 2I + 2(ad*2) = 2((30"x0.25in"3)/1 2) + 2(15in"2 x (4"2)in"2") = 480in"4. Results of Horizontal Tank Analysis show tank anchorage is adequate (conservatively using expansion bolts for the 5/8" diameter Nelson Stud anchors), and Ref. 3 calculation contains saddle stresses check. Interactions: Block wall has been confirmed by AESPC to have been evaluated in the IE 80-11 program. Evaluated by: Date: I l /Z ~! eW

DC Cook Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 2 of 6 ID: 1-QT-107-CD (Rev. 0) Class: 21 - Tanks and Heat Exchangers

== Description:== CD EMERG DIESEL FUEL OIL DAY TANK Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: CD EDG RM, Manufacturer, Model, Etc.: 36 D x 108 L,465 GAL.

Attachment:

TANK Analysis Results

DC Coo4; Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 3of6 ID: 1-QT-107-CD (Rev. 0) Class: 21 - Tanks and Heat Exchangers

== Description:== CD EMERG DIESEL FUEL OIL DAY TANK Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: CD EDG RM, Manufacturer, Model, Etc.: 36 Dx108 L,465GAL. TANK Analysis Results Step 1 Input Data a) Assumptions

1. Tank is cylindrical, horizontally oriented and supported on saddles. Yes
2. Tank and saddles are made of carbon steel Yes
3. Saddles are uniformly spaced. Yes
4. Saddles overhang is less than spacing /2. Yes
5. Base plates have slotted anchor bolt holes for thermal growth except for the base plate under Yes the fixed saddle.
6. Imposed nozzle loads are not significant. Yes
7. The tank foundation is adequate. Yes
8. Anchor bolts are cast in place or expansion type. Yes b) Materials Weight of Tank + Fluid 4.5 kips Weight Density of Tank+ Fluid 70.7 Ibs/ft"3 Saddle Elastic Modulus 29000.0 ksi Saddle Shear Modulus 1150.0 ksi Base Plate Yield Strength 36.0 ksi Anchor Type 5/8 in Expansion Bolts c) Dimensions Tank Diamete; D 3.03 ft Tank Length, L 9.0 ft Tank Thickness, t 0.19 in Height of Tank+ Fluid C.G., Hcg 1.71 ft Number of Saddles Saddle Spacing, S 6.0 ft Saddle Height, h 2.38 in Saddle Shear cross-sectional area 15.0 in"2 Saddle Weak Axis Moment of Interia 480.0 in"4 Number of Bolt Locations / Saddle Number of Bolts / Bolting Location Extreme Bolt Spacing, 2.1? ft Bolt Eccentricity, e D'nchor 6.0 in Weld Thickness 0.19 in Base Plate Thickness 0.19 in

DC Cook Unit1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 4 of 6 ID: 1-QT-107-CD (Rev. 0) Class: 21 - Tanks and Heat Exchangers

== Description:== CD EMERG DIESEL FUEL OIL DAY TANK Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: CD EDG RM, Manufacturer, Model, Etc.: 36 D x108 L,465 GAL. d) Anchor Bolts Type = Expansion Anchor Diameter = 5/8 in Manufacturer = Phillips Stud (S) Product Name = Pullout Shear Nominal Capacity 3.17 kips 3.79 kips Concrete Compression Strength, fc' 3500.0 psi Reduction Parameters Capacity Reduction Factor Label Check Condition Pullout Shear

1. Type of Anchorage Yes 1.0 1.0
2. Installation Adequacy Yes Installation is adequate 1.0 1.0
3. Embedment Length Yes Embedment Length = 2.38 1.0 1.0 in
4. Gap at Threaded Anchors Yes Gap size = 0.0 in 1.0 1.0
5. Spacing between Anchorages Yes 1.0 1.0
6. Edge Distance Yes Edge Distance = 6.25 in 1.0 1.0
7. Concrete Strength and Condition Yes 0.88 1.0
8. Concrete Crack Location and Size Yes Crack Size = 0.0 in 1.0 1.0
9. Essential Relays in Cabinets Yes Essential relays are not 1.0 1.0 present
10. Base Stiffness and Prying Action Yes 1.0 1.0
11. Equipment Base Strength and Yes Base strength and load path '<.0 1.0 Structural Load Path are O.K.
12. Embedment Steel and Pads Yes Installation is O.K. 1.0 1.0 Does the tank satisfy all the assumptions and is within the applicable range of parameters?

Vu'.774 Step 2 The allowable bolt loads Allowable Tension Load, kips Shear Load, Pu'llowable 3.79 kips Step 3 Determine base plate bending strength reduction factor RB 0.1562

DC Cook Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS} Status: Yes Sheet5of6 ID: 1-QT-107-CD (Rev. 0) Class: 21 - Tanks and Heat Exchangers

Description:

CD EMERG DIESEL FUEL OIL DAY TANK Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: CD EDG RM, Manufacturer, Model, Etc.: 36 D x 108 L, 465 GAL. Step 4 Determine base plate weld strength reduction factor RW 17.7858 Step 5 Determine the anchorage tension and shear allowable loads Allowable Anchorage Tension Load, Pu 0.433 kips Allowable Anchorage Shear Load, Vu 3.79 kips Step 6 Calculate the ratios and values alpha (Pu/Vu} 0.11 1.13 kips/bolt Vu /Wb 3.37 Hcg / 0.788 D'cg/S 0.285 2.236 F2 1.804 Step 7- Determine the acceleration capacity of the tank anchorage lambda 1 1.507 lambda u G G'.715 Anchor Acceleration capacity, lambda 0.715 G Step 8 - Determine the maximum saddle spacing for transverse and vertical rigid frequency response Maximum Saddle Spacing, Sc 13.42 ft Step 9 Compute the resonant frequency of the tank in the longitudinal direction Saddle Stiffness, Ks 7230.98 kips/in Resonant Frequency of Tank in Longitudinal Direction 125.34 Hz

DC Cook Unit 1 GIP Rev 2, Corrected, 2/14/92 SCREENING EVALUATIONWORK SHEET (SEWS) Status: Yes Sheet 6 of6 ID: 1-QT-107-CD (Rev. 0) Class: 21 - Tanks and Heat Exchangers

== Description:== CD EMERG DIESEL FUEL OIL DAY TANK Building: AUXILIARY Floor El.: 587.00 Room, Row/Col: CD EDG RM, Manufacturer, Model, Etc.: 36 D x 108 L, 465 GAL. 4 Step 10 Determine the seismic demand acceleration ZPA 0.25 G Tank is rigid in all three directions. Tank anchorage is adequate because anchorage acceleration capacity is greater than ZPA Step 11 Check the saddle stresses The program does not check the saddle stresses Check the saddle stresses by an independent calculation 5mamaw IC The tank anchorage is adequate.

Coo Component No. i QT- l 0"( -( i) Claaa IIEIUll Any pazticularprea the Seismic Review Teaa should pay axtra attention to1 Yes No ~ (Xf yea, check items that apply.) Anchor Type Anchor Diameter Anchor Spacing Anchor Number Anchor Embedment Anchor Edge Distance Anchor Gap Anchor Thread Engagement Anchor Grip Anchor Angularity Concrete Crack Others (describe bri.efly) If there ia concern for Design Basis Discrepancy, circle the applicable item and explain.

l. Hardvaro Maintenance Type Discrepancy
2. .rawing Update Type Discrepancy
3. Significant Operability/Design Basis Discrepancy
4. Others Condition:
           'oo!6 Actions Taken:

Jog~ peaparad By T'~~co Dace 4'+ ~ ~

                                                      "*12 CHP 5021.'CCD. 019 ATTACHMENT NO.           1 TVE. Moli>tH 5F'~. QP "C D" D~~ .CCi-'P IMSLQE IHE. TUEL OlL W.Y fh'tW-Bldg.                 Locatxon IZ..>> 890 Insta     at  on dwg.    / Rev.         Equipment No.

Anchora e Arran ement Sketch j'j4 5~a Ql Q/I EEEV. 4K&. MQR'TH APR D 5 19S LEIIK~Q FACE'~ W C,Rg8 (TVF Drawn by: d. RQ~IL Date: Verified by: Date: Qua ./Cert. Inspector Reviewed by: T o.~l~ Date: Construction chor Review Engineer Page 1 of 3 Revision 1

0

                                                                                       ~      g
                                                                                     ~

f y ~ i +Jl ~ > e e ~

                                                                                ~  ~    ~
                 'i
                      ~   ~   t                           ~     ~   ~
                                                                           ~ -  li e      'l~l I.
                              ~       -   s.~   r t                      L.S e ~             R%K~SWKiRWWWW                                                                    .

1 0 0 0 RRRSRSRS

       ~   ~

WWHHHHQL 88558LL55 e ~

  ~    ~

WII~WHL HHI%55%L 5 8 RESRE5555RWW&& 55RRRRHRilN I 5%5%i% 6%5%5%RSMMRaIR

                                                -                     %SIN MWWMWWWW h   0 J              l     l'          a1
     ~   ~                                                                                  ~ ~

SHP 5050 NDE-008 ATTACHMENT NO. 1 UI.TRASONIC TEST REPORT JOB ORDER NO.: REPORT DATE: g7 5 REQUEST NO. A IDENTIFICATION Unit Test Unit/ S/N Component Freq./Diameter ~ Item Reference Standard Material Couplant/Batch No. Other TEST DATA REMARKS

                                               ~ 7D
                                               . 7$ "

PERFORMED BY: LEVEL: W DATE: / REVIEWED BY: I EVEE' DATE: FORM NO. 12 SHP 5050 NDE.008-1 Page 1 of 1 Revision 0

ATTACHMENT6 TO AEP:NRC:1040E SAMPLE LARS CALCULATIONS 001, 005, 010, 011, 022, 023, 027 AND 030 RAI ITEM 8

This attachment contains thc following:

1. A 16 page document containing thc proccdurcs, input data, and rcfcrcnccs used in the Limited Analytical Reviews.
2. The rcqucsted Limited Analytical Rcvicws: LAR IIs 001,005,010,011,022,023,027 and 030.
3. Thc calculation used to resolve the outlicr gcncratcd by LAR 022.
4. The proccdurc used to address the outlier gcneratcd by LAR 005.
 'I k

PROCEDURES, INPUT DATA, AND REFERENCES USED IN THI: I,IMnZDANAI,VSIS azmm S

3. LIMITEDANALYTICALREVIEWS 3.1 Problem Statement This Limited Analytical Review (LAR), performed within the scope of Unresolved Safety issue (USI) A46, evaluates the structural integrity of cable tray and conduit supports which have been chosen as representative, worst case examples of the major different types of raceway support configurations within D.C.Cook Nuclear Power Plants 1 and 2. Twenty nine sample supports have been chosen from the plant raceway support systems for evaluation.

3.2 Summary of Results The critical interaction value and related comments for each of the raceway support evaluations in this LAR are summarized in Table 3.1 below. Refer to the Attachments to this section for details of each of the evaluations. D. C. Cook A46 Cable Tray and Conduit Raceway Review October 1995 page 3-1

Table 3.1 Critical Interaction Values Interaction Value LAR No. Members/Connections Anchorage Maximum 001 0.18 DL 0.68 3DL 0.68 3DL

                               ~ ee 002 003                     0.50          OL                   0.48                      DL      0.50          DL 004                     0.29          DL                  (LOW)              ...
                                                                        ~,'e<'ew e<

OL 0.29 DL K":005."j!:.:::::-'i~ <@FOP'<g~ e~~c'~p; 'e""w,'5'~< gxQD<p,%:e ItgQLKI 006 0.50 DL 0.76 3DL 0.76 30L 007 0.81 DL 0.56 3DL 0.81 DL 008 0.94 DL 0.33 DL 0.94 DL 009 0.85 LL LL 0.85 LL 010 1.05 DL 0.43 DL 1.05 OL 011 0.28 LL 1.02 LL 1.02 LL 012 0.15 DL 0.45 DL 0.45 DL 013 0.72 OI 0.58 LL 0.72 DL 014 0.38 DL 0.93 30L 0.93 30L 015 0.84 DL 0.32 LL 0.84 OL 016 0.79 LL 0.40 LL 0.79 LL 017 0.70 DL 0.31 30L 0.70 DL 018 0.72 DL 1.04 3DL 1.04 30L 019 0.33 DL 0.33 DL 020 0.18 DL 0.67 DL 0.67 DL 021 low DL 0.22 DL 0.22 DL O'D,L"':k 023 0.77 DL 0.90 DL 0.90 DL 024 0.25 DL 0.10 OL 0.25 OL 025 0.55 LL 0;23 LL 0.55 LL

                               *1 ~

026 027 0.75 DL 0.96 30L 0.96 30L 028 0.14 DL low 0.14 DL

                               ~ e*

029 030 low DL low DL low DL 031 0.12 DL 0.20 DL 0.19 DL 032 0.68 DL 0.24 DL 0.68 DL DL Dead Load 30L 3x Dead Load (Vertical Load Check) LL Lateral Load Check RF Rod Fatigue Check ~f'i~/'::':: Qellier

 ***               Not used.

D. C. Cook A-46 Cable Tray and Conduit Raceway Review October 1995 Page 3-2

i i m f a Tr v I i Logic diagrams indicating the evaluation path taken to demonstrate the acceptance of each of the raceway supports are shown below. Note that the particular evaluation path taken for the support in question is defined in heavy outline. LAR Nos. 003, 004, 008, 010, 012, 019, 020, 021, 023, 024, 030, 031, 032 START 8.3.1 Does the Support Have Vertical Dead Load Capacity With Eccentricities ~ t.0 x OL? Yes 8.3.1 Yes Directly mounted to or rigidly cantilevered from an adjacent structural wall or ceiling?

                            +No 8.3.7 Yes Floor mounted?
                                   ; Ho 8.3.2 Does the Support Have Vertical Capacity      ~    3.0 x OL?

Yes 8.3.3 8.3.4 No Does the Supped Have Ductile Does the Support Have Adequate l Response to Lateral Loading? Lateral Load Strength '? Yes Yes 8.3.5 8.3.5 Yes tfo Is the Support a Fixed- End Rod Hanger?

                                                                      ~

Does the Support Pass the Fatigue Evaluation? Yes Pass Analytical Outlier Review (Rigid Mount) D. C. Cook AA6 Cable Tray and Conduit Raceway Review October 1995 page 3-3

LAR Nos. 005, 022 START 8.3.1 Does the Support Have No With Eccentricities ) Vertical Dead Load Capacily 1.0 x OL? 8.3.1 Yes Directly mounted to or rigidly cantilevered from an adjacent structural wall or ceiling7 8.3,7 Yes Floor mounted? No 8.3.2 Does the Support Have Vertical Capacity -,. 3.0 x DL? Yes 8.3.3 I 8.3.4 No Does the Support Havo Ductile Does the Support Have Adequate I Response lo Lateral Loading? Lateral Load Strength 7 Yes Yes 8.3.5 8.3.5 Yes Is the Support a Fixed - End Does the Supporl Pass tho Rod Hanger 7 Fatigue Evaluation 7 Yes No

                             .V...

1 Pass Analytical Outlier Review (Any support failing OL) D. C. Cook A-46 Cable Tray and Conduit Raceway Review October 1995 page 3A

LAR Nos. 009, 011, 016, 025 START 8.3.1 Does the Support Have Vertical Dead Load Capacity W~th Eccentricities ~ 1.0 x Dt.? Yes 8.3.1 Yes Directly mounted to or rigidly cantilevered from an adjacent structural wall or ceiling? No 8,3.? Yes Floor mounted? l No I 8.3.2 Does the Support Have VeicaIG pocky 30xDL2 l Yes 8.3.3 8,3.4 Does the Support Have Ouctge Does the Support Have Adequate Response to Lateral Loading '7 Lateral Load Strength? Yes Yes 8.3.5 8.3.5 Yes Is Ihe Supporl a Fixed - End Does the Support Pass the Rod Hanger? Fatigue Evaluation '? Yes Pass Analytical Outlier Review (Floor Mounted Support) j D. C. Cook AAG Cable Tray and Conduit Raceway Review October 1995 page 3-5

LAR Nos. 014, 028 START 8.3.1 Does thc Support Havo No Vertical Dead Load Capacity With Ecccntricities ~ 1.0 x DL '? Yes 8.3.1 Ycs Directly mounted to or rigidly cantilevered from an adjacent structural wall or ceiting? No 8.3.7 Yes Floor rnounted2 No 8.3.2 Does the Support Have Vertical Capacity ~ 3.0 x OL 2 Ycs 8.3.3 8.3.4 No Does the Support Have Ductile Does thc Support Have Adequate Response to Lateral Loading 7 Lateral Load Strenglh 7 Yes Ycs 8.3.5 8.3,5 Yes Is lhe Support a Fixed ~ End Does the Support Pass thc Rod Hanger '? Fatigue Evaluation? Yes Pass Analytical Outlier Review (Trapeze Frames) D. C. Cook AA6 Cable Tray and Conduit Raceway Review October 1995 page 3-6

LAR Nos. 001, 006, 007, 017, 018, 027 START 8.3.1 Does the Support Have No With Eccentricities ) Vertical Dead Load Capacity 1.0 x DL '? Yes 8.3.1 Yes Directly mounted Io or rigidly cantilevered from an adjacent structural wall or ceiling? 8.3.7 Floor mounted? Does the Support Kavo Vertical Capacity ~ 3 o x OL? Yes 8.3.3 8.3.4 Does tho Support Have Ductile Does the Support Havo Adequate Response to Lateral Loading '? Lateral Load Strength 7 Yes Yes 8.3.5 8.3.5 Yes Is the Support a Fixed - End Does tho Support Pass tho Rod Hanger? Fatigue Evaluation? I Yes No Pass Analytical Outger Review (Rod Hanger Trapezes) D. C. Cook A46 Cable Tray and Conduit Raceway Review October 1995 page 3-7

LAR Nos. 013, 015 START 8.3,1 Does the Support Have Vertical Dead Load Capacity With Eccentricities ~ I.O x DL 7 Yes 8.3.1 Yes Directly mounted to or rigidly cantilevered from an adjacent structural wall or ceiting? 8.3.? Yes Floor mounted? 8.3.2 Does the Support Have Vertical Capacity 3.0 x OL '? Yes 8.3.3 8.3.4 No Does the Support Have Ouctige Does the Support Have Adequate Response to Lateral Loading 7 Load Strength 2 'ateral Yes Yes 8.3.5 8.3.5 Yes Is the Support a Fixed - End Does the Support Pass the Rod Hanger 7 Faligue Evaluabon? Yes No Pass Analytical

                /          Review Outlier (Floor to Ceiling Supports)

D. C. Cook AA6 Cable Tray and Conduit Raceway Review October 1995 page 3-8

3.3 Method of Solution Hand calculations are performed employing the methodology outlined in Section 8 of Reference 3.6.4, "Generic Implementation Procedure (GIP) for Seismic Verification of Nuclear Plant Equipment.",Support structures are broken down, where applicable, into subsections which lend themselves to common, closed form solutions for structures subjected to static loading. 3.4 Allowables and Assumptions The following is a compilation of allowable stress and load criteria used throughout the raceway support evaluations. strength of 36 ksi. AISC Specification allowables for Allowable Stress Design (Ref. 3.6.1) are used for the dead load analysis. For other analyses, the allowable stress is increased to 0.9 Fy = 32.4 ksi. J2.5 of Ref. 3.6.1, is 0.3 x 60 = 18 ksi for dead load analysis. For all other analyses, 1.7 x 0.3 x 60 = 30.6 ksi is used. i: Dimensions, properties, and allowables use'd to analyze various Unistrut support system components are based on the Manufacturer's Catalog Data provided in Refs. 3.6.2 and 3.6.3. These values are used for the dead load analysis and all other analyses. Values for Unistrut components commonly used at D.C.Cook are summarized below: Unistrut bending moment: Ref. 3.6.3, p.23 P1000: 5080 in-Ib (allowable bending stress of 25 ksi) Channel nuts/bolts Ref. 3.6.3, p.69 5/8": pullout in P1000 or P3000: 2500 Ib 5/8": slip in P1000 or P3000: 1500 Ib 1/2": pullout in P1000 or P3000: 2000 Ib 1/2": slip in P1000 or P3000: 1500 Ib 3/8": pullout in P1000 or P3000: 1000 Ib 3/8": slip in P1000 or P3000: 800 Ib Bolts are assumed tightened to manufacturer's recommended values r I: D.C. Cook embedded channels are Unistrut P1000 (or equivalent) galvanized, 12 ga. channels with a material yield strength = 33 ksi, modilied by the addition of 3/8 $ x 4"L Nelson Studs at 12" o.c. Results of tests of modified channels (Ref 3.6.20) indicate a minimum pullout capacity of 6400 lb/ft. The mode of failure was ripping of strut material around the stud; stud remaining in concrete. Using the AISC Allowable Stress Design allowable shear stress of 0.4 x Fy = 13.2 ksi on a 45'one shaped slip surface results in an allowable pullout of 13.2 ksi x n x (D + t) x t = 13.2 x 3.14 x (0.375 + 0.105) x 0.105" = 2090 Ib, therefore use the standard catalog value of 2000 Ib, but not more than the allowable value for pullout of Unistrut channel nuts/bolts as listed above. For all other load cases, use an allowable stress of 1.7 x 0.4 x Fy resulting in an allowable pullout of 3550 Ib, but not more than the catalog allowable value for the pullout of Unistrut channel nuts/bolts as listed above. D. C. Cook A-46 Cable Tray and Conduit Raceway Review October 1995 page 3-9

To summarize: Pullout of embedded strut: 2000 Ib 5/8" channel nuVbolt (dead load analysis) 2000 Ib 1/2" channel nut/bolt 1000 Ib 3/8" channel nut/bolt Pullout of embedded strut: 2500 Ib 5/8" channel nut/bolt (all other analyses) 2000 Ib 1/2" channel nut/bolt 1000 Ib 3/8" channel nut/bolt Concentrated loads may not be spaced closer than 12" apart unless the sum total of concentrated loads on any 12" of Unistrut length does not exceed the single load allowable. Reference 3.6.14, will be used unless noted otherwise within the individual LAR's. 1/2" 1.1 Ib/ft 3/4" 1.3 Ib/ft II 1 2.0 Ib/ft 1-1/2" 3.5 Ib/ft II 2 4.9 Ib/ft 3 II 11.1 Ib/ft 4ll 16.6 Ib/ft wide by 6" high) is 25 pounds per linear foot, unless noted otherwise within the individual LAR's. h I: Concrete anchor bolt allowables used in alf analyses are based on Tables C.2-1 and C.2-2 of the GIP, Ref. 3.6.4. The anchor bolt type must be known to use the maximum values. If anchor bolts are'identified as "non-shell" type anchors on the PASS, then, per Ref. 3.6.12, the anchors are either 5/8" Hilti "Kwik-Bolts"or 5/8" Phillips wedge-type anchors. All other anchors must be identified on the PASS or they will be considered "unknown." Unknown anchors require a reduction factor of 0.6 on the allowable toads provided in Ref. 3.6.4, Tables C.2-1 and C.2-2. All concrete anchors, known or unknown, shell or non-shell type, which are not loaded in tension by dead weight, require an additional reduction factor of 0.75 for the "Reduced Inspection Alternative", and, because one third of the anchor bolts (there must be a minimum of six) must be assumed to be "not available", another reduction factor of 0.67 must be taken. The design concrete strength at D. C. Cook is 3500 psi. This requires a reduction factor of 0.875 to be applied to the pullout capacity of all anchors. No reduction is required for the shear capacity. If a tightness check has been performed, it will be so stated on the PASS and the "Reduced Inspection Alternative" reduction factors may be waived. ' D. C. Cook A<6 Cable Tray and Conduit Raceway Review October 1995 Page 3-10

r n or I To summarize:

                 "Known" concrete anchors such as 5/8" Hilti "Kwik-Bolts", 5/8" Phillips Wedge-type, or 5/8" Phillips Red Head "self drills":

Pall = 3.17 kips x 0.8T5 x 0.75 x 0.67= 1.39 kips (not in tension by deadweight) Vali = 3.79 kips x 0.75 x 0.67= 1.90 kips Pall = 3.17 kips x 0.875 = 2.77 kips (in tension by deadweight) Vali = 3.79 kips I All other 5/8" concrete anchors: Pall = 3.17 kips x 0.875 x 0.6 x 0.75 x 0.67 = 0.83 kips (not in tension by deadweight) Vali = 3.T9 kips x 0.6 x 0.75 x 0.67= 1.14 kips Pall = 3.17 kips x 0.875 x 0.6 = 1.66 kips (in tension by deadweight) Vali = 3.79 kips x 06 = 228 kips All 3/4" concrete anchors: Pall = 4.69 x 0.875. x 0.6 x 0.75 x 0.67 = 1.23 kips (not in tension by deadweight) Vali = 5.48 x 0.6 x 0.75 x 0.67 = 1.65 kips Pall = 4.69 x 0.&'F5 x 0.6 = 2.46 kips (in tension by deadweight) Vali = 5.48 x 0.6 = 3.29 kips All 1/2" concrete anchors: Pall = 2.29 x 0.875 x 0.6 x 0.75 x 0.67 = 0.60 kips .(not in tension by deadweight) Vail = 2.38 x 0.6 x 0.75 x 0.67 = 0.72 kips Pall = 2.29 x 0.875 x 0.6 = 1.20 kips (in tension by deadweight) Vali = 2.38 x 0.6 = 1.43 kips All 3/8" concrete anchors: Pall = 1.46 x 0.875 x 0.6 x 0.75 x 0.67 = 0.39 kips (not in tension by deadweight) Vali = 1.42 x 0.6 x 0.75 x 0.67 = 0.43 kips Pall = 1.46 x 0.875 x 0.6 = 0.77 kips (in tension by deadweight) Vall=142x06=085kips Shear-tension interaction limitations per the GIP, Ref. 3.6.4, Section C.2.11 will be used to evaluate the effect of combined anchor bolt loading. D. C. Cook A-46 Cable Tray and Conduit Raceway Review October 1995 Page 3-11

3.5 input Data The hangers evaluated in this calculation were selected by the Seismic Review Team (SRT) that performed the raceway walkdown. The selections are documented in the Plant Area Summary Sheets (PASS), which are part of the project documentation. Pl ei i Horizontal seismic accelerations are required for the Lateral Load Evaluation and the Rod Hanger Fatigue Evaluations as defined in the GIP, Ref. 3.6.4. Three options are presented in the GIP, Ref. 3.6.4, Section 8.3.4 for determining the horizontal seismic acceleration to be used in lateral load evaluations. Acceleration values for D.C.Cook corresponding to each of the options are summarized below. Elevation ZPA Building Option 1 Option 2 Option 3 587 0.20 Aux 1.21 0.63 0.94 633 0.22 Aux 1.21 0.69 0.94 650 0.22 Aux 1.21 0.69 0.94 609 0.22 DGB 1.21 0.69 0.94 598 0.32 Cont 1.21 1.00 0.94 612 0.37 Cont 1.21 1.16 0.94 625 0.42 Cont 1.21 1.31 0.94 651 0.52 Cont 1.21 1.63 0.94 699 0.80 Cont 1.21 2.50 2.50 Option 1: 2g scaled by the maximum of SSE/Bounding Spectrum (ZPA value controls) Option 2: 2.5*1.25'Floor ZPA (1.25 is for 'realistic'loor spectra) Option 3: 2.5'1.25 1.5'SSE ZPA (within 40'f grade)

== Conclusion:== Option 2 for Aux and DGB, Option 3 for Containment D. C. Cook A-46 Cable Tray and Conduit Raceway Review October 1995 page 3-12

0 The rod fatigue bounding spectra provided in the GIP, Ref. 3.6.4, Figure 8-9, are plotted below vs. the envelope of the D.C.Cook 5% damping spectra for the Auxiliary Building and the envelope for Containment at El. 650'nd below. These curves are used to determine the applicable bounding curve in the Fatigue Evaluation Screening Charts, Figure 8-10 to 8-14 of the GIP. 20 I s ~ ss I I I I I I I I I I I I I I I I I I I I I I I I I I I I 1 I I I I I 11 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I II I I I I I sl I I I II 1.5 I I I I I I I I I'I'r I I I I IN

                                                                    ~   ~

I III'I I I I 1 I N I I I I I I I I I I I I I I I 1111 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 11 I I I I I I I I I I I I I I I I I I I I ~ I I I I I I I 111 I I I I I I I I I I I I I I I I I I I I I I 11 I I I I I I I I I I I I I I I I I I 11 I I I I I I I I I I 1.0 I I I I I I I ~ ssl I 111 I I I g I I I I I I I I I ~ s I I ~ I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 11 111 I, I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 111 0.5 I I I r I rr I I I is 1 I I yl

                                                                        ~
                                                                       -rrrrI I I     I f

I I I

                                                                                                       -I rrr I I I
                                              //

1 I 1 I I I I I I I I I I I I I I I I

                              'I I

I I I I I I I I I I I I I I I I s I

                                                                     ~   ~

gl II I 111 I I I I

                                                                                             ~11  I I

I I I I I I I I I I I I I 11 I I II I I I I

                                    ~    I I I

I I I I I

                                                                     ~   ~
                                                                         ~  I I I I ~ I I

I I I I I I I I I I I I

                                                                                                           ~ ~

I I I r I I I I I I I I I I I I I I I I I 0 0.1 10 F~(Hz) 20 6508AdbctoA) I I I s s II ~ I I I I I I I I I I I I ~ I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 1111 I I I I I I I I I I I I I I I I I I I I I I I I ~ I I I I I I I I I I I I I I I I I I 1.5 H I I I I I I I I I I I I SS' I I H I I I

                                                                    ~

I

                                                                        ~

II

                                                                           ~

I I I I I I I I I SSI I I I I I I I I I I I I I I I I I I I I I I I I I I s I I I I I I I I I I I I I I I I I ~ ~ I ~ I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I) I I I ~ I I I I I I ss I I I I I I I I I I I I I I I I I I I I I I I I I ~ I I I I I I I I I I I I I I I I I I I ~ ~ I I I I I I I I 1.0 I 1 I I I I I I rrrr I I I I I I I I I I I I I I

                                                                   'I I
                                                                       -rrrs I I I J  I  I I 1

I I I I I I I I rrr I I I I I I I I I I>I I 11 111 I I I I I I I I I I I I I I I I I I

                                                                        ~

I I I I I I I I I I I II I I I I I I I I I I I III I I ~ ' ls I I I I I I

                            ~

I I I I I I I I I I I I I~I I I I III

                                                                           ~  I                     I I

I I I I I I I I 111 0.5 I I

                            ~

I I I

                                 ~

I I I I I

                                   ~

I

                                      ~

III / I

                                                            ~   I I   s      s  I I     s  I I

I I I I I I I I I I I I I I I I I I I I I I I I I ~ I I I I I I I I ~ I I I I I I s

                            ~

I I I s I I s~s II I I I

                                                                    ~
                                                                           ~

I I I

                                                                           ~  II         I
                                                                                            ~ 339 I

I I I I

                                                                                                          ~

11

                                                                                                             ~  I
                                                                                                                ~

I I I I I I I I I I I I I I I I II III I I I I I I-

                            ~                                       s      ~                              ~     ~

I I I I I I I ~ ~ ~ I I I I I I I I I I ~ ~ ~ ~ ~ ~ I ~ ~ ~ I 0 0.1 10 Frequency (H ) ( D. C. Cook A-46 Cable Tray and Conduit Raceway Review October 1995 page 3-13

i vl in r nn Po r All threaded rods used in raceway supports at O.C.Cook are manufactured all-thread rods. Some rods, however, are anchored using the welded rod coupler detail shown to the right. The SRT was concerned that the coupler material is not as ductile as the rod material, particularly after being welded. 2. Fatigue tests were performed on O.C.Cook threaded rods with the welded rod coupler detail (Ref.3.6.23). These tests show that for the same ductilitydernand, the number of cycles to failure using the welded coupler detail is approximately half the number of cycles to failure using typical "nutted" rod connection details at O.C. Cook (Ref. 3.6.6, Table 8-2). I The test data points for the welded coupler detail are plotted below on Figure 8=5 from Reference 3.6.6 (this figure was used to develop the fatigue evaluation screening charts in the GIP). Each test data point represents 3 tests (6 tests total) on 5/8" rods with an applied axial tensile preload (ITT) of 2.2 ksi (500 lb.) The test data points lie above the "2/3 Strain Acceptance l.ine", which represents the ductility demand vs. cycles to failure acceptance criteria for field-threaded rods. Therefore, in these LAR's, in order to cover rod-hung raceway supports that have not been selected as LAR candidates because of lower weight or longer length, but which may have welded coupler anchorage details, Rod Hanger Fatigue Evaluations will conservatively include the procedures specified in the G1P for field-threaded rods. FATIGUE DATA FOR THREADED RODS COMPEER. ~INST. CVRV8 W/ flGD THRIVED 3.20 2.80 2.60 aa06 ltae~~~

                                                                               <<Ildt40W4c AQ(.

3 2a0 ACCEPTANCE LINE P 2.20 a 1.60 1.40 1.20 0 1.00 1.008+00 NOt5lAUZED OVOllUIYDo&NO O. C. Cook AA6 Cable Tray and Conduit Raceway Review October 1995 page 3-14

3.6 References 3.6.1 "Manual of Steel Construction, Allowable Stress Design", 9th Edition, American Institute of Steel Construction, lnc. Chicago, IL, 1989. 3.6.2 "General Engineering Catalog", No. 10, Unistrut Building Systems, GTE Products Corporation, Wayne, Ml, 1983. 3.6.3 "General Engineering Catalog", No. 12, North American Edition, Unistrut Corporation, Wayne, Ml, 1992. I 3.6 4 "Generic Implementation Procedure (GIP), for Seismic Verification of Nuclear Plant Equipment", Revision 2A, March, 1993, Seismic Qualification Utility Group. 3.6.5 "Design of Welded Structures", Orner W. Blodgett, James F. Lincoln Arc Welding Foundation, July 1976. 3.6.6 "Seismic Evaluation of Rod Hanger Supports for Electrical Raceway Systems", EPRI NP-7152-D, March, 1991. 3.6.7 "Cable Tray and Conduit System Seismic Evaluation Guidelines", EPRI NP-7151-D, March, 1991. 3.6.8 "The Performance of Raceway Systems in Strong-Motion Earthquakes", EPRI NP-7150-D, March, 1991. 3.6.9 "Seismic Verification of Nuclear Plant Equipment Anchorage" EPRI NP 5228-SL, Revision 1,Volume 1, June, 1991. 3.6.10 AEP Guideline No. 18.3, Rev. 4, 4/9/86: "Guide for Cable Tray Loading" 3.6.11 Test Report 91C1681-02, Testing of D.C.Cook typical Unistrut attachment brackets for rod hung cable trays. 3.6.12 AEP Drawing No. 1-2-EDS433-14, Sheet 1 of 2, 5/31/91. 3.6.13 "Longitudinal Load Resistance in Seismic Experience Database Raceway Systems", EPRI NP-7153-D, March 1991. 3.6.14 AEP Document No. 02-0120-1097, Revision 0, Page 3 (Rigid Conduit Weights) 3.6.15 Letter from I.C.Huang of AEP Service Corporation to Steve Anagnostis of Stevenson and Associates, 1/10/94, re: as-installed conduit weights for raceway supports LAR011 and LAR017. 3.6.16 "Rigid Frame Formulas", A. Kleintogei, Frederick Ungar Publishing Co., New York, 1952. /. D. C. Cook A-46 Cable Tray and Conduit Raceway Review October 1995 page 3-15

3.6.17 Donald C. Cook Nuclear Plant Drawings: 1-1594-4 1-1460-75 1-1528-51 1-1525-57 1-1464-83 3.6.18 AEP Guideline No. 18.2A, Rev. 0, 6/27/86: "Guide for Cable Tray System Design". 3.6.19 Telecopy dated 4/29/94 from I. Huang of AEP to Steve Anagnostis of Stevenson and Associates regarding as-installed cable tray and conduit weights for LAR's 1,3,5,9",10,16,18, and 22. 3.6.20 Letter from I.C.Huang/AEP to Steve Anagnostis/Stevenson and Associates, April 7, 1994-results of testing of D C Cook modified embedded Unistrut, 3.6.21 Stevenson 8 Associates Design Report, AEP Raceways 82C200-02, Cable Tray Testing-Analysis and Report, 9/30/83. 3.6.22 Telecopy from I.C.Huang/AEP to Steve Anagnostis/Stevenson and Associates, May 6, 1994-Field information concerning LAR011 (bolt spacing and conduit spans). 3.6.23 "Low Cycle Fatigue Tests on 5/8 inch Threaded Road" by Dario A. Gasparini, P.E.IPh.D., Dept. of Civil Engineering, Case Western Reserve University for Stevenson 8 Associates, March 25, 1992. D. C. Cook A<6 Cable Tray and Conduit Raceway Review October 1995 page 3-16

REQUESTED SAMPLE LAR CALCULATIONS 001,005,010,011,022,023,027,030

I CUENT JOB No. IS' SHEET OF Fb ~KM Stl.'VenSOn and ASSOdateS A 5rruc rural Maclra alca I Hl Coarultrag Eagiaaerrag Frrra

                                                                    ./9

CUENT

                                       %6 DC 4    ZAZ-ooi Stevenson end Associates                        O5' C7 Il    A SrrnclnrohMochoalcol Coaoolliag Englnoorlng flrra
                                                      ~cr /(

CUENT SUOJEGT gd g~g< Zs4- oo/ Stevenson and Assodatcs A Sauctural.Mechoolrsl

                                       ~. aoP 5I  coasu!5og Knylnoaanq Few c

Or8 ~Adds

CUENT smu acr ce ~ ~M-oat Stevenson and Associates sa / Il h Souelvwl.Mechanical R Coasulaao Kayiaoorlaa Flies

ZXt$ g C

                                            ~Fthm<                            'Os6fyL OMIQN-S I       s P",

sl I s IL 4" s I s

                                                                                                                                      ~rSI6,CW yV        I       I I

I iW. 80K sl fs I I 4 Q'IIILT4)~ EHVDpQ $ I,V-RLl 0'cow vt I

                      ..'sr.r,',        . ss          IIIII~1WT                                        YC'IsgL
                                                                                                                         'ag)~gL  @0
             ~

7 I' ~ ~ '4I g. > . ~ 'I>y~ t,Mss 's& s' ~ +Jlgt s' I LLI t ~ 1, t .=r arS Wt+~~I.SI~gq~ ss N.IHP B. 631'- 0" yss g'laos'r. IL~"e~ $ 3ss I'3s's 3y ~ II CIJLMIS (TC0 Skt"~h"s CI M Gib

                                                    $               I gs II lg ss gs, gII
                                                                                                                           ~~IoO     ao  IIEr~rrIar WI5   ~Et OVK GLKVhToR..

IIEET WO

                             ~PPoRY ACeVa          rL. LL cO1Lo"
                                                              ¹2

tPIlfyl. wY'g4iW.

                                                           ~    (

Qf&Ar

                                                                             +PC~~'                                   I
                                                                                                                                   >> Y,'

I I I n,>/sr> Z4L

                                                                                                                                                     '4.

I I I I I

                                                                                                                                          + g>> ml>>)>VS cAOA                ~l II5I~P                                                                   1 ling,,

fdJla>>>> t i>> t>> %A>> ~ >>>>A>>>> e P>>>>>>J, x wan ar>> a tat u>>>>Ie>>'sr&.s.>>>>~~ ag

       ~:

Al -'P tL fdPP Na> 22,15t 5 lts5IFT 12.444 LSSlI=T glc%$ Ppi'>'h~ II>>C I5 I2,55t' $5/FT 10.4$ L$5lFT z C n 6,tA C m D l

    ~

1S;hLS>iFT GIAN 693 O m N AlRm+ C1 6-4

                                  'z4. 5(o4      $ 5rFt'y>>

1Q.625 LBSf FT v:c&ts N)

                                              ~
                                                             ~

sk@i 6~'4 YAM-FS l>>r 4'T%lC

                         . 1LQIcd&'4'IGLOO 2      .c,t23                                                                               g>>        )II hllKHHVf                                                                                                                             SVRh4 C46. I>>QY WO 5 LCVh'To@>>

g>>>> I>>ll At'TUEL WT5 FOR LAR4' SUPPLY R.>> %L

                                             ¹ <

C>>5>>I>>r 0 ~ COH001T VVEJC lOEHTlFI CATION UNKNOWN

0 CUENT L r Stevenson and Assodates <85$ 'D9 l'ScM/oZ II A s<ruclural Moehaalcal Coneulling Enylnooeny l'leaa

. ~ CUENT ggu~ + '4@8 S Stevenson and Assodates SS JQ II A svuciurel.Mechanical f con oui li ay agiaoorlny Fa w x C.>>

CUENT sum ccr ~+'> ( DQ 2ccm Stcvcnson and Assodatcs A Suwtvral Moehoaleol Q Cosevl8og Eaylaoorlay Fires 4 S CP

CUENT Smuem P~rr Stevenson and Associates Q A SnueNral Mechanical cohsulUay laglaoo<lnp n<m 4'4rx Lad- Wc ID'

SC'IC CUENT SUOJ~ 4 b 4AZM cv5

                                                       /HPO auaac 6 oa c Rcvcnson and Assodates         AY~re M Fitch's~-          ~roB ~>Pz H    A Steuccusahkechaalcal Coa>ulpop Kaplaeeclop       Ace  ~ W~. ma.
                                                   ~ ~

S zs 9 Z4Z-oos Stevenson and Associates Il A Svuctuwl Moeho nlcsl Coaeu!5'nginooenp Fans

p'g. A ~ ~~ ~OQ ~

                                                 ~   ~

We.ckc@D goo Yo RaD Cc&PL/JJh To L 'j$',Q RgoUklP WSLD (mK)

                                               &EE VETAlL "C-C" 1%AC~

ear> ~/~ TAI 2'-to 11 I 2/g IAMC8 I AN P3 U-eu MPs pp >Q f "1/g'

                                     '- 4/g"                                  &EE 5~~   6"                                         PETA'lL U - t'LAMPS l AM-XIO      I AMP QvQ
                                                     )1 p gI Ie,"(n@

l AN-CGQ f A,N< CG [ l AM-C82 g1/ Il

2'D I I I I l l lqx2x2 x)0 L l I I /g. UN&BRUT

           ~

BoLl(~) i I I 8 MC5>t=-0

           )

I I )0+g" DEg Rv'T PETAlL "c.-c'PXT <wI'poRT TNP-

                                          ~ vPFg~

A

                               ')>r5 HOT eAGHL=E
          '34 l8:46      FROn AEPSC NUCLEAR DES PAGE.OQ4 LEFT'O RIGHT IA."-2840(o-I, 2.98 LBS / FT                          ACTUAL NElGWT5 FOR LAR            ~5 I'I~"- 50IIZR- I, 3.2.2 LK5/ FT
     <r~-- SOIOSV-I,   S.ZZLS>r Vr I  - 9957R-I,   I.73 LBS/FT
        'q ~    I"-205I3-I, I.BI( 6 LHS/FT                                           ~

j,Pp

                                                                                  ~o   gg~
                                                             ~ ~

We.Eke@& BOD

                                               ~o Hot Cc vPLQK~-                          t-PIUM@

XC L 3/4. nu >aV4C> EL. 633'~f wctu> I'~eg

                                               &EE OFTA1L               "c-c"
      'R&KP eon P

a'< ~~z g 'pg&hDP l0. 95 LB5/FT 2 3O

                                                     '29.Hr 5 L65IFT U-cLkNPs                                     3~C8              3AM PZ 3           LEFT TO       RKHT 1t     0"-9Z.G2PS-I) IO;75 L55/FT 4'-'MBPS-I fO.GHL65/FT U-CVd4P5                                     lANxto )ANTE .

C~Q LEFT TO RIGHT I4. 291'o LD5/FT w.~ra". 25 'H54L65/'I-T t-3 g yl1 3g Q~) 3 AN-'C80 I~~CG t I AM-C82 I.FI-T TO RISIIT

                                                                                   +I.95 LSD/FT l 25cg'xP "SF~ (TYP)       34.Z7 LB5/ FT
                                                                                  >2,77 I.Pv/ FT

D2 o Joulk>. +~~+~ III O sHEEf ~ oFM~ Elf'UENT 4AM-use 8 Stevenson and Assodates A svuctu( ~ I Mn<<hnnlcnl R Cnnlulgng Knglnuuslng LJ. OW

CUENT

                              ~guECT D   O o

Stovenson and Assodates II cosoullsy A Strwte re lkoAo nlcs1 Ksylaoooay Fleas

CUENT XeN. ~<~<~~ SHEET 3 OF~~ E muccr > C Stevenson and Associates id' ~Z II AS(naciecabHocbaeleal Coasulliny Enolsoerlsa I <<w

0 CUENT

                              ~c Stevenson and Assoclates A slnscturel Mechanical im  Coastal'5aO Kngtnoedsg Fhm

CUENT l Stcvcnson and Assodatcs A structural Hocbaaiea'I ER coneulsny Englnoodna Fcce

V h

CUENT Stevenson and Associates A SlluclulnlJlochn nlcnl H Con<utgng Cnglnuurlng finn 7d

                                       ~ C

CUENT mum Stevenson end Assodetes h Srrac<arsl Mschsslcsl W Cssralriarr taylssarlsy Firrs xg

Rcvcnson and Associates IL Suuctu<al Mochaalcal RI Con o villa@ Esglaeorlay E'l(a

CUENT JOG No. Stcvcnson and Associates o5' A ScwNral htoehonlcal Nm CoaevlCng Caglaoeslsy Fwa

CUENT Stevenson and Assodatcs A Stiactvial Mechanical S Coaouluny Eaoisoeclsy flea

CUENT SUBJECT Stevenson and Associates A Sltvc(v ral MoAo alcsl Rl Conoul5sa Kaylnoorlao Faa l/

                              ~ ~

CUENT Stevenson and Associates Il A S<oadvrol.Woc4alcsl Coaoultley Eaglnoo(lay Foes O

CUENT E Stevenson and Assodatcs A sv~ousal Mechaaical E5 Coa>vlsay Ksglaoerlay Fns

CUENT L Stevenson and Associates A Snvctssal l4ochaaks1 l5 coao~hay Esyisoonay nba d

CUENT Stevenson and Associates 24&a 0 El A Suvelurst.Mechanical Consolan'aylneorlng fl<w CD'c

CUENT JOO Na MS O SliEEE ~& OF ~F Stcvcnson and Associates h strvciscn Mechanical l5 conovlUne ssolssorlnp fires

                                     /z

CUE~r SUOJECr Stevenson and Associates II A suuelucol Mechanical Conouluna Esglaoorlsp Fifa

              .<'                              (S          ag

(( I W4 I p'rf att/+

                                                                                                                                                      +  ae                 a                                                                                                                                      , ACTUAI WEIG
                                                                  ~                                  ~   ~

( ~ ~ ~

                                                                                                                                                                                                                                                                                                                  !  FOV       LAR~IO QJ IrJ a

Q. I, ~ ~

                                      ~,

ei

                                                         ~

tV

                                                            ~     r,'

JI g"

                                                                                                                                  ~
                                                                                                                                    ~

r Jttr

                                                                                                                                        ~  'I+a
                                                                                                                                                 ~
                                                                                                                                                     ~
                                                                                                                                                           ~e
                                                                                                                                                         ~ ~    t
                                                                                                                                                                                   ~

3c', J ~IS

                                                                                                                                                                                          ~

fvyt

                                                                                                                                                                                                ~ ~ r
                                                                                                                                                                                                    ~

J

                                                                                                                                                                                                                ~

r( tva I f

                                                                                                                                                                                                                      ~ ~
                                                                                                                                                                                                                                ~

th) I

                                                                                                                                                                                                                             . a(htJ (JC.S'.
                                                                                                                                                                                                                                                                                  &PPoRT
                                                                                                                                                                                                                                                                                                      ~   ~ ~

I I

                                                                                                                                                                                                                                                                                                                     ¹      )0 Sr I'

te

                              ~
                                                                              ~

1 ~ g)y; Nr. I kgu(r er rt t at I t

                                                                                 ~
                                                                                                                                                                                                ~ ~ ~'
                                        ~                ~   *
                                                                                                                                                       \                                                 ~                     +A   ~

rat ~ ~ ~ I

                    ~ t                      ~                ~
                                                                                                                             \                                                                 lai
                      ~
                                          ~
                                                                                                                                    ~

g

                                                                                                                                                       ~    I   ~
                           ~
                                        ~
jt QI(J '
                                                                                                                                                                                                                                                                      ~

r

                                                                                                                                                                                                                                                                                ~
                                                                                                                                                                                                                                                                                     ~         ~

r'. J J I

                                 ~
                                   )'jest I                                                                  I"- 9957R-I                        ~        'I       ~
                                                 'J ge                                                           'LB>/I:T                              . I'
                                            ~                                                                                                                         'i75
                                                                                                                                                     ~

JCJ!4 ICJ'CJ r I"- coNOUjT (JJ CI

                                                                                                       '.77 LM/i-"7                             '~                                 'JI ;i       I
                                                                                                                                                                                                       ~

I TRAY L, j TQ fZ '-':.,

                                                                                                                                                                                                                                                                                   ;   ~
                                                                                                                                                                                                                                                                                                 ~

R COiOuITJ gt t ICT- C(l ~: (ri. .,a -;

 ~ I"-'253I- I                                                                                                                                .                                                            ~ Ir I Na I CT- Ce                                                                       ~   ~
                                                                                                                                                                                                                   ~ Ia t,s,".'>
 ~~ I b'I LBS/Pg
                         '           '.')                                                   ~ I     ~ ~
                                                                                                          '7s70 Leih/                 F.'.T         i                                                                                          l CT C7 a]))Sg J(     'a D

z I"-2528-I ~ Qg, Ji.tt FROHT ~ ~ ~ ~ I

                                                                                                                                                                    ~

TRAY MIGII76 L

 ~(IS(ng LES// I-T              ~

N ~ 'I ~ q 2;l,07 M5/k7 C I~

0. i ~ r a I(IQ. - 0 f(S 0 4. - I
           'I
                                                                                                                                      ~
                                                                                                                                                   ~  ~
                                                                                                                                                             ~
                                                                                                                                                             ~
                                                                                                                                                                    ~

lt. ~ rTlt I9, M, .LE'J/ PTJ: 4-'+bI(JPY-f,

                                                                                                                                                                                                                                                                                          ~

z I,(I5 LB5/I=T I ~ '.,~ 'C IOIIl.LR5/ FT 20.08 LP&/FT ( ~ I

                            ~    I                                                                                                                                                                                         ~
                                                                                                                         ~                                                                                                   ~C
                                                                                                                               ~

REAR II na'I > c r r ~ ~ ml rat al I5

                                                                                                                                                                     ~                                                                                                                 ~
~l
  • 1 i,.(p r
                                                                                                                               ~
                                                                                                                                                     ~        \                              ~a    IM N

IGT.- I CT-

                                             ~
                                                                                                                                            ~

a ~ ~C ~ IA I +'l- 8(l&qFf-I ~ XI I I ~ ( I ~ IOI6 LSD/ Jg REAlZ m! ~ J

                                                                       ~
                                                                        ~

r I

"$ l:

I ~ I ~

                                                                                                                                                                ~
                                                                                                                                                                                 ~     ~

(ea I'IH n..a!LRS/Xr (JJ: I ~ \ ~

                                                                                                                                                                                                                                                                                     ~       J     CI                   ~ I ~   r>

(SJ ' r 'V rt I'"I I 80

                                            /I
                                                                           ~
                                                                            ~ t         ~

LB5lPT'l't..

                                                                  ~

I 'a ~ Q.. a, S

                                                ~   I tr    ~
                                                                                                                                ~         ~
                                                                                                                                                                                         ~ ~

I I I et I ~,

                                               ~   te)                a
                                             ~           f                      I                                                                                                                                                                  tl. Ii tait)VL I                                                      ~

J J'I ~ ~ ~e t t ~,C ~

                                                                                                                       'I    ~                                                r)  ~      ~
                                                                                                                                                                                                                          ~~ >V,.:
                                                                                                                                                                                                                                                                      "~              .    ~
                                                                                                                                                                                                                                                                                                   /
                                                                                                                                                                                                                                                                 ~

a4"

                                                                  ~ I       ~
                               ~      r r   g4"recco                  'I~
                                  ~ 1  ~,       Korrl                  F-
                                 ~             ~                          bC          ~ 4
                              ~ Ite)o 4          I eh
                                                                                                                                     ~  r r4e Oe~         r
                                                                                                                                                       ~ vrouw
                                                                                                                                                                                ~

Sel I

                                                                                                                                                                                           ~

SUPPoRT. ¹ >0

                                                  ~ g                             ro .'goJ'sA tp                Atr I II(                           r 'o                                                                            II ~
                                                                                                                    'I                                                                                                                   'le    ~

I I ~

                                                                              ~ ~  O.     . Jgpq ~q            I so ~

Qfttr AA aClvej IS <tr "~ J,I1 I ef}e I~IAII A I s..IJIC I

                                                                                                                                                  ~

IJ I 'I I ..'

                                                                                                                                           ~     ~               I e

spl I h ~ o t.'~

                                                                                                                                                                                                                   ~    I   ~
                                                                                                            ~
                                                                                                               \                  I. I I                                                                                                                             Its!I'e.t' Ikl+'Cr                        ICI Cl s     'I,
                                                                                                                                       ~         ~

ff K I'lr I

                                                                                                                                 <<II' s'

S s IsosrtI S I I I JI

 \                                                                                                                               I:II                                                                                       I

~ I Cutltf P II s

                                                                                                                                             . I etel ~ ~       ~~ re tA
-rr ~ A.04
                       'I f:4~3 ore. e%%                  ~ o e'I ~~~

I ~ II I ~ St.s'r 1 J')'

                                                                                                                                 )'Io s II            I I.'ll I'             I
                                                                                                                                                       ~

I ~ I II

                                                                                                                                               ~

f>c I I .Il I I II I,II ~

                                                                                                                                                                                                             ~       ~

I r'

                                                                                                                                @Ager                         ~  rrr'   ' 'I                                                  I
                                                                                                                                                                ~  rsrr
                                                                                                        'f I I I                          I                                                                           I~       ~
          ~

r ~ I Ie CIIJ) I r I I IlI

                                                                                                                                     ~

I sl I' rl ' I

                                                                                   -e      ~
                                                                                              e'rie K ~   L.                          I I~

I II

                                                                                                                                              ~
                                                                                                                                                                                                                                                     )!I"r.. ~

II ~ J" ~ rKr / I Ie I ~

                                                                                                                                     ~o
                                                                                                                                                     ~
                                                                                                                              ~      ~ I I
                                                                                    ~"                                        ~  Ce6
                                                                                                                                'I \ $ r r
                                                                                                                                                    ~~   slee
                                                                                                                                                   ~ ~ ~ leer o
                                                                                                   ~       \

Il e. I

                                                                                                                              ~

II

                                                                                                                                    ~  I
                                                                                                                                             ~
                                                                                                                                             ~
                                                                                                                                                   ~                                                                                                                      Ilsr't tt"
           ~  \                                                                                                               s
                                                                                                                                    )  ~     I I
                                                                                                                                           ~

sg I Ii I

                                                                                                     'P
                                                                                                                              ~     IS       ~
                                                                                                                              ~
                                                                                                                              ~

e',I ~ I ~

         ~D eOeS   I Sr\,

I

                                                                                                                                 .IL.'                                       ISnrICIrs IIA I                                                                                                                                                                                                    '"  ~    r J.  ~~
                          '                  ,~
                                                                ~ @
                    "rll,'r                                                                                                                                                                                                                                              'g     Ietll 'r t AALU                                I
                                           ~ ~

r rs I I In IA" 11'J i ~ ~

                                                      ~   ~

I's ~ L ~

                                                                ~                                                      ,r)I ~ (~              ~
                                                                                                                                                                                                      ~
                                                                                                                                                                                                           ~  'rt IeorSIII

0 CCW 5' S Stevenson and Associates A Structural Mechoslcil @I Cosovlllay Eaylaooclny Fam 6

0 SUOJFCT 4d 844& DC Coen STEVENSON &a slntctwo4nochonlcot ASSOClATES H8'SS rD> rica"ro/ M~A/ conwtttng onglncottng tlrm

SUOJEGT A JOB No. ++ ~~~ ~ SHEET~~ OF~~ gA z449 S O CO STEYENSON tU 5, ASSOCIATES 0 lttvclw04Mchonlcol conwNny enqlnoodnp Arm

SUBJECT JOB No. ~~~++~ SKEET'=OF~

                                    ~/

DOC~ b~r~ J STEVENSON Du-o'er' 5 ASSOCIATES a sliucturo4neehonlecA conwWAg ong'Inoohng Nm

0 SUBJECT JOB No. o SHEEf 5 OF

                                            /~

D2 Caom ~im S Xd' STEVENSON S4M-w/'r'ASE 84 ASSOCIATES a aovchroHnochoNcd rap Wca-COhWNAQ Ohglhlhrlhg Sftl

SUBJECT SHEET 0F STEVENSON K0 IIWCfutCHAOChQhICCI ASSOCIATES COA WIIIAP CAQfhtOAlg fllfh 844-Oi/ HA2~ JDW P ag /0/ ~ Nl 0 I/I 5 UJ

                                                                 ~ 0

CLIENT amECT Qa Stevenson and Associates A suvctvtal Mochoslcol coneulusq ssolhttclly Flra

0 g ~ ~ S STEVENSON 5a slrvcluroHn+chantcol ASSOCIATES conwmng nnglnonnng Arm xo/ 6

                            ~j

CUGNT Stevenson and Associates 8 A stnaclvwl Hechaslcal f cosevhisy tsglooonng na

SUZeRT.-To

                                           =             jPSRS~"~~-~

SUPPORT ... mHF NSro85-V"~) .. 'd' M'M.H'...s ... (TYI',)

                                                                   ~ms'eor.,Y=  ASQQo.R..piM~ioMG (T~P) 25 '2 7/')>
                                                .                                                   8'k3'~ i~"L 8

24 27/ ii 2Q.:ply Il 22 pal

                  '2I FL. EL. SSS'-o
                         ~u.

20~<<~~l. r- ~8>, 8 19 lB i>

                      -      e        rt)y QQp                        Sf 3~X/qL
                                                                                      ---=~V---'-'A=---A       '~.)

lo

                                ]~
                                    .        r>          'lb                          5UI'f'opT AHCRog. PiN, is                                                 PLBX i SL.P. C.OT

>0 tx 0)q> io 8' bc. PI > 4~)

                                                                                                                ~l@

x)q sJ@ ola

                                                                                                                                    ~he bc
. 1ND<kNP N~CWC kg po%ER DoNKLD c.. cooK NuciEp,p PLAN~
   . DP-. B<. N. MAa~R                      ...DATE
E4. BB&'-.o."........BUILp'1N&, "AUX. SR GHEE RH ant 4 AGEE LAP go pg
                                                                                                                       ~
LoC.P,YiOH RvJGw, can.;.:.PiPE .-YUQHEL JN/7 @
                                                                     '~Yt<lC )    )J~

. ATTACHMENT NQ.3

                                         ~>~vcr~'ue>oW'ery+~

ypP g ~un~ sun~ LoQ Bod 5o ]JF YT SvPPi&T MlS SuFPoR~ Ch)F iu Rv)<V

                              '@Pc  'Yu~)UF                   L Gun-<

l Phoo I I I I g/ tl Wq//~ 5 pig Acx EoLTI

                                                                       +'ovC~I)

I 7 r 5

                                      )l 0

lo

   +%     "zg~g',dy~ 4v t
                                                                         }/ ga
                                                                               /4Apg'3 glO

ATTACHMENT NO. 1 COOK NUCLEAR PLANT A-46 RACEWAY EVALUATIONS LARoll CONDUiT CONDUXT SIZE CABLE TYPE POUNDS PER FOOT BASIS FOR WEIGHT NO. AND TYPE AND SIZE OF CONDUIT AND .CALCULATION (SEE XN CONDUIT CABLE (SEE LXSTED ATTACH. NOS.) ATTACH.3) 3/4" EMT 1-12/C f12 XLA 0.97 5 & 7C 1" EMT 2-2T/C f16 0.73 5 & 8B 1" EMT 1-STP g16 0 '9 5 & 13B 1 1/2" RIGID 1-4/C g7/3.8 2.87 6 & 7C STEEL RIGID 1-4/C g7/18 2.87 6 & 7C STEEL 1 1/2" RIGID 1-4/C g7/18 2.87 6 & 7C STEEL 2" RXGXD 1-3TC g4 3.81 6i 9i & 10 STEEL 1-1/C g4 2" RIGID STEEL 1-4/C gl2 3 '2 6 & 7C 3" RIGID STEEL 1-3TC g2/0 1-1/C g2 7 '1 6, 9, & 10 10 3" RIGID 1-3TC g2/0 7 '1 6, 9, & 10 STEEL 1-1/C g"2 2" RIGID STEEL 1-3TC g2 1-1/C g4 3 '2 6, 9, & 10 2 i'IGID STEEL 1-4/C /12 3 '2 6 & 7C 3" RXGXD STEEL 1-3TC g4/0 1-1/C g2/0 8 '9 6c 9,.& 10

                                                        )p) f i                     ~'
        ~giant
            ~ II%IS la) hl 4l n)a~a
        <~)     gg     O                   0 l8)
        'i%% f QSÃl      .
                                               ~eat I%f4                                      I Nr>                       ~03 4~

C ~ I%$ Pi~ ~ )+

                                           <iS Cl 88             5 ~

rn KAF. Ot

       'rM                                    l~0z,.'

lRE J

    /

J ~

      'P A
                      ~

CUENT C.AQ 5 Stcvcnson and Associates GNAT iDP ~ - os ~ezra ~. Il llstevcwcal Hochanlcal CDlllll4lligKllglhoollhO Fcm

CLIENT SmuECT 4+6 Stevenson and Associates A Sttuatutal Nathan(cal SX i&~ Q CaaeulUntt Eaelnaatlng fltta Zo r

GUENON sujet~ 8' CA/Z ~ Stevenson and Associates SZ A Snueivr ~ I.MecLanical Q Conevlsny Kayisoocag Firm

                          <   s
                                  ~s
                   ~nno5r CA Dirt hsf'Lo
                                                                                      ~ ~
                                                                                                                        ~ l
                            ~

I l gQQQ+ C5>> GUPPY%

                                                                                 +/DAN GSZC-P2.

I>s Op L GSZC-CS nAS:

18. 5'2 I.B5/ I=T f

tt t'S ll'~

                ~o Sl mrs"  ZOO                    L I'>>A'b
                                                                    'AA07
              ~
                   ~JA  0                                     SECT 3 - M.'T8"Z.

9.'ISLETS/ T

                                                                      '-~I 65(PT IZ+KC-Z.

d'iJ gp~~~

                                                                                                     <A4        ~

I5i01 PIOOO ItIIgPy,

                                                                                                                                           ~ I>> gO
                                                                                                                                                 ~
                                                                                                                                         ~ ~

1'COT t, ~, ~ scrrrrH m v sum's

                                                                                                                            ~

Au ~ ~ Z.'>> 7SGM 2. 4.A 4 I.65/ PX O D I D 0 ACTUAL VJElC HT5 FOR 4/AR:~ZZ Cl m IQCMTIPICATIOH QF It <, Il/2." g C,D'5UNKHOWH Ci7 C)

g~o7 Tg 1I' JCC. N> 2 L~t%555o Lk (Tft3 iiI

                                                                                                                  ~

II il il I I'O'I ~ ue Octal. A I'it+It &to L I'-44'4 SECT

           'A'A'g'll co-.
                                                                        %'tt cor         ~    ~

l'a Pg M, f I 4 CoiIOIItt OX I&i('ii~ CII. I.HM4IIIII%

                                                                                 ~ ~                   CWTX   II'IC~ 'll.

BOVTEM MhY SVPT'5 PEAN VlEW t

Egad o SHEEf OF d CCW 5 dPc O 0 CO STEVENSON

5. ASSOCIATES s5 zD8 Pea 659 &~<9 tU K

a Itntcfvtctmocttantcol conutttlnp onplnoottntt Ilrm gyy 4 @f82/8 ~4..

SUBJECT JOB No. SHEET~UQF 4+5 848~ 0 STEVENSON 5, ASSOCIATES a Auelvcahnoe~ cantina ongfnoodng nrm b

SUMFGT STEVENSON K ttructurotrnnchontcol ASSOCIATES o conautNng nnptneertnq nrm

P I

                                    '4 ~, ~ ~

0 0 0 0 g1l @l < pl l Qll

cga-TKg A-g SEE-.: DETAK. A 4 ~ I ll e I fL. Gl 6l2-0"

0 SUNEGT STEVENSON

5. ASSOCIATES 0 ltmchnol4lochohlcol coneNnp onplnoonnp turn A5s ro+&W 9 uzi 5r

sussex STEVENSON 8( ASSOCIATES

SUBJECT JOB Ho. +~~~ SHEET &OF~~ PAz7 STEVENSON 844- oP 2

8. ASSOCIATES a sovclvrounochoMol CchNNho Ohglhccdho Alhl ESP

SUBJECT Goo~ err 0 STEVENSON 8c ASSOCIATES S/D C COhSVINhg OhQIA40tlhg flllA O r'/ O S

SUBJECT JOB No STEVENSON 8( ASSOCIATES conwmng onpHoorlng am

0 M

                               ~w//7 5 z,S 0

STEVENSON 5 ASSOCIATES Mrz P3 conweng onplnoonnp Arm 1/ g

0

SUBJECT lPIIHF.STD/K 0 SHEET F OF O STEVENSON 8( ASSOCIATES o Etructrrrolrnochonlcot consrrtttng ongtnoortng arm 0 su~O a7 ~ F

6w/i 2 STEVENSON 8t. ASSOCIATES Q ltntchl<OHTi4ctMtnlcnl cntuttlnp ongtnoorlnp tttm

S CCC 5 /7

                                   -/C.

O re STEVENSON ltt 8c ASSOCIATES tt o structurotrnoctronlccl conruttlng onglnoorlng llrm

STEVENSON 8c ASSOCIATES o rrruclrrrcHnochanrccl conrrrrtlng onprnoodnp tlrm

SUBJECT JOB Ho. STEVENSON 8( ASSOCIATES a ttructvrctrnochcnlcnl ccnwtttnp onglnoortnp hrm

SUBJECT JOB No.

                                    +6 84r8 s Z

STEVENSON 8 ASSOCIATES eonsuenp onplntorlng tern 7 %imam WC,

r el( ((( oA~ S))1)OI SAC'lh. ~

                                                                                                                        \'o1 Oe(ll 'IAI(

( )

                                                                                                                                              <<UNh r Ci>f

( Alta 4 9( V14) (4 fool l((fI o%~ f(IOA IIII'1o

                                                                                    ,h4<)('() telo IOtfftf g W OV(f
                                                                          ~ ~ If~r SOT'TEN             lRAYS NC&c~~i CI,All II f(IIIKO ho CIA an t1'I'11~'Wb
                                                                                                                                                                 ~0 ~

o [lo ~ I'

                                                                                                                                                                 ~~
                                                           )i/
                                                             ~  I(fII
                                                        ~AIII1AII A(I K>    I(IOI a)It) fAt4 1S                  LC1~'(f V I ((                             ~  (     lo C(OKAY C COSMIC lLCLIAt IAAI(f                                              Cr Aflgis'It"I'Ia.       rCCTIC((I       A A' COnll((((n(% (Oftf IIO t
                   ~ (fAS 0 ~

L. 01'4 CC IIO- 1 ~ I, WI((AS'5

t. ((A(I4LI('I OATC I(.1( '%1.

tC C44

                                                                                                                    ~
                                                                                                               ~    ~

2c C~S

                                                                                                                  ~
                                                                                                                    )                                                 I~1 COL 17                                                                                                 J 2C'CW       i (J(                                                     ~     I                                                   1
                               ~A -                 zc I     ~

I I I I I

                                                                                                                ~    I                                                I. l
                                                                                                     ~

gpP ww T'II AY5-

SUBJECT ...SZC/5 9o o >~i 0 STEVENSON ZAg- o So rrs 8( ASSOCIATES o ssrvctwosrnochonrcol consurrlnSS onynoorhq rrrrn 2oarÃrww)ewe 8cbp3 -ro ro Og QC

SUBJECT ZAN> r STEVENSON &0 IoMclvfokhochnnkcl ASSOCIATES Conukonp onplnoohng ilrm

9'TEVENSON 8( ASSOCIATES 0 SlcUClvt04IhlChohtCN COAWNA9 OA9414OEIA9 llCN

SUBJECT JOG No. 6/ SHEET~ OF 0 C/l STEVENSON UJ

8. ASSOCIATES CC 0 oltMcIvcoMlochofllcol consvNng onglnoodng tlcm "r'O

2" 5/8 ROD BENT AROUND PIPE AND BOLTED INSIDE P1000 ANGLE I 5/8 EXPANSION ANCHORS

                                                   ~ ~

I I EMBEDDED STRUT 2'-0" 31 ~ 2'-6" 1'-0" 10" PIPE CRANE WALL VIEW A-A o ALL ANGLES ARE 3X3X1/4 o PIPE PENETRATES CRANE WALL AT EL. 603' 10 AND RUNS UP INSIDE CRANE WALL TO A JUNCTION BOX AT EL. 625'-6". THERE IS A LATERAL SUPPORT AT EL. 610'. NO OTHER SUPPORTS EXCEPT PENETRATION AND JUNCTION BOX. o PIPE LAYOUT SHOWN IN DRAWING 1 1460 (SEE SECTION 1X-1X AND DRAWING 1-1525). UNIT 1, LOWER CONTAINMENT CONDUIT 1A1: 10" PIPE D. C. COOK A-46 RACEWAY WALKDOWN PASS ID//: RACE-1>1, LAR //2

CALCULATIONUSED TO RESOLVE THE OUTLIER GENERATED BY LAR 8022

QUENT C/ cuccc ~ a" 89C1570-HF-OOI

                                                     ~

Stevenson and Assodatcs A Sauctuccl Mochoalccl mm Coaoulu ap Kaplaocrlup Puca cc

CUENT nrem ran Stcvcnson and Assodatcs A Stractaral.Mochankal Q Conrrrttintt Enpinoortnrt Firm

CUENT SUOJECT Stevenson and Associates I A Sgupturnl Mnpbnnlpnl Cpneuliing Englnnoeng Fgw

1 CUENT SUBJECT 5 SHEET ~ OF ~~

                                                 . CF Stevenson and Associates A STTHSTE T ~ I MSOiTSEICSI R   COOSE'lung EnglnESTing FTTES OF'I

CUENT smM DF Stevenson and Associates A Sfrucluf41 Muchnnicnl R5 Cnnrulrinp Knpinnnrinp firm 6 4 3(

0 L CUENT C S ~ SHEEi. ~pP~ Stevenson and Associates A st<ucNs ~ I Mechanical Q conevaino Ksqineoano arm

CUENT S 8 C- OGQ Stevenson and Associates h Suuct~ral Mechanical H cossunisy Esglaoeany fnm

CUENT JOE HF C SHEET $ OF ~ Stevenson and Associates ii, SIT S Iiurs hMSSha OiC*l l3 ConSVIITOTI KngiOSSriOTI fTTTTI 43 IF

cuEwr SUBJECT / Stevenson and Associates A Suuc<u< ~I Mechonlgal 55 conovning engineering l'atm PS l g k

PROCEDURE USED TO ADDRESS THE OUTLIER GENERATED BY LAR 8005

1. Introduction and Summary The prying-action detail documented in Plant Area Summary Sheet RACE103 and analyzed in Limited Analytical Review LAR005 resulted in an outlier. Per the Outlier Seismic Verification Sheet, the recommended resolution to this outlier is to walk-down the plant and document.all occurrences of this detail, screen the specific configuration of each detail using an acceptance criteria based on the LAR requirements, and modify those occurrences that do not meet the criteria. This document addresses the first part of this resolution - the walkdown and screening. The screening criteria is described in Section 2, the screening walkdown documentation is contained in Section 3.

This walkdown was performed by the Seismic Review Team members that did the bulk of the original raceway walkdown: I. C. Huang (AEPSC) and Stephen Anagnostis (SEA). The walkdown included all the areas of the plant covered in the raceway walkdown except for the Unit 1 containment above El 650 and inside the crane wall below El 650, as the unit was operating (the Unit 1 containment annulus was included). Based on the original raceway walkdown and that this walkdown of the Unit 2 containment did not find any significant occurrences of the prying-action detail, the SRT concluded that the Unit 1 containment does not contain any significant occurrences of the prying-action detail. The results of this walkdown is summarized in Table 1. The first column contains the walkdown worksheet number (the worksheets are in Section 3), the second column describes the location of the hangers with the prying-action detail, and the third column states whether the hangers passed or failed the screening criteria. About 50 hangers with the prying-action detail were found (note. that some worksheets cover more than one hanger). Twelve of those hangers failed the screening criteria. All of the hangers that failed are located in one area of the plant - the Unit 1 Vestibule and the adjacent section of the Unit 1 Reactor Cable Tunnel. Table 1. Summary of the Prying Action Detail screening walkdown. Worksheet ff Hanger Location Pass/Fail, 1-092694-1 Aux1, El 596, RCT Quad 3 North Pass Hangers 9, 10, 11 along the right wall counting from door 1-DR-AUX323. 1-092694-2 Aux1, El 596, RCT Quad 4 Pass Hangers 5, 6, 7, 8, 9 on the left wall counting from door 1-DR-AUX329. 1-092694-3 Aux1, El 596, RCT Quad 4 Fail (1J Directly across the hall from penetration 1-CEP-4P5 1-092694K Aux1, El 596, RCT Quad 4 P3ass Adjacent to penetration 1-CEP-4P5 1-092694-5 Aux1, El 596, RCT Quad 1 Pass Two hangers across the hallway from penetration 1-CEP-1PG One hanger near MCC 1-CT-BN 1-092694-6 Aux1, El 596, RCT Quad 1 Pass (2) Upper platform, 1st hanger on right facing door 1-DR-AUX467 1-092694-7 Aux1, El 596, RCT Quad 1 Pass [3] Upper platform, first 3 hangers on left facing door 1-DR-AUX467 1-092694-8 Aux1, El 596, RCT Quad 1 Fail Upper platform, first hanger on right off the edge of the platform. 2-092794-1 Aux2, El 596, RCT Quad 3 South Pass Near 2-VRS-2200 (Upper Cntmt RMS "B" Data Acq Module) 2-092794-2 Aux2, El 596, RCT Quad 1 Pass Upper platform, two hangers about 3 hangers away from Door 2-OR-AUX468. Attachment to the OSVS for RACE103 Prying-Action Detail Screening Criteria and Walkdown page 1

1-092794-3 Aux1, El 609, 4kV Area Pass Above 600V Bus IIA 1-092794-4 Aux1, El 609, Transformer Room Pass One hanger above 1-DGTAB and one hanger at the right side of the entrance. 1-092794-5 Aux1, Auxiliary Cable Vault Pass [4] 15'outh of the hatch 2-092894-1 Aux2, EI 573 Pass 6'outh of gate 2-GT-AUX1 013 (U2 Rx Coolant Drain Pump Room) 2-092894-2 Aux2, El 573 Pass South end of the hallway common to both units 1-092894-3 Aux1, El 609, elevated area adjacent to the control room cable vault Pass Above 12HV-ACA-FLT-3 2-092894-4 Aux2, El 609 Pass Near Miscellaneous Rack 2-H-H 2-092894-5 Aux2, El 609 Pass Above cabinet 2-BITH2 1-0928944 Aux1, El 612, Vestibule, upper platform leading to RCT Pass [5] Next to 1-DR-AUX467 1-092894-? El 612, Vestibule, upper platform leading to RCT

                                             'ux1, Pass 3rd hanger on left from the edge of the platform 1-092894-8        Aux1, El 612, Vestibule, upper platform leading to RCT                            Pass 4th hanger on left from the edge of the platform 1-092894-9        Aux1, El 612, Vestibule, upper platform leading to RCT                            Fail [6]

2nd hanger on right from the edge of the platform 1-092894-1 0 Aux1 El 612, Vestibule

                          ~

Fail 4 hangers along the containment wall just before the upper platform leading to the RCT. 1-092894-11 Aux1, El 612, Vestibule Fait [73 The hanger above the west end of 1-HE-22 and the next hanger west. The two or three hangers south of these running along the block wall. 2-092894-12 Aux2, El 612, Vestibule, upper platform leading to RCT Pass 4th hanger on right from the edge of the platform 2-092894-13 Aux2, El 633 Pass Hangers between the Containment Auxiliaries Panel and 2-MSI-1. 2-092994-1 Cont2, El 598, Annulus Pass Several hangers near Column 1, Az 63, Quad 1 [1] The angle is "clipped" to the embedded channel with the edge of a washer bolted into the embedded channel. Repair by drilling a hole through the angle and rebolting. [2] This case doesn't meet the screening criteria, but was judged acceptable as the span between the tw'o adjacent supports is <= 10', so GIP requirements would be met even if this support was removed. Note that the adjacent hanger would then have a tributary length of 8'5'n one side and 3'n the other) and a load per rod of 640ft.. This load satisfies the allowables of 20000 for DL and 2500Ã for 3DL as specified in the LAR calculation. [3] This case doesn't meet the screening criteria for 3DL, but was judged acceptable as the r/c wall on one side and a large pipe, and platform steel and handrail on the other side will prevent any significant lateral motion. ' Attachment to the OSVS for RACE103 Prying-Action Detail Screening Criteria and Walkdown page 2

[4] This case doesn't meet the screening criteria, but was judged acceptable as the span between the two adjacent supports is <= 10', so GIP requirements would be met even if this support was removed. Note that the adjacent hanger would then have a tributary length of 7'4.5'n one side and 3.5'n the other) and a load per rod of 440% This load satisfies the allowables of 2000@ for DL and 2500@ for 3DL as specified in the LAR calculation. [5] This case doesn't meet the screening criteria, but was judged acceptable as the span between the two adjacent supports is 9'<= 10'), so GIP requirements would be met even if this. support was removed. Note that the adjacent hanger would then have a tributary length of 7.5'4.5'n. one side and 3'n the other) and a load per rod of 600iti. This toad satisfies the allowables of 2000'or DL and 2500ft for 3DL as I specified in the LAR calculation. [6] Both rods on this hanger do not meet the screening criteria (this hanger was the subject of LAR iIi'5, which initiated this effort). [7} The two hangers above 1-HE-22 probably need both rod anchorages to be modilied - these two hangers are on either side of a removable concrete hatch. The rods furthest from the corners of the hatch were clearly visible (and do not meet the criteria), the rods nearest the corner were not easily visible but look like they will also require modification. I The rods immediately adjacent to the block wall of two or three hangers running along the block wall were not clearly visible, but do not look like they will meet the screening criteria. i Attachment to the OSVS for RACE103 Prying-Action Detail Screening Criteria and Walkdown page 3

2. Screening Criteria 2.1 Criteria Development This criteria is for evaluating the D. C. Cook cable tray hanger anchorage detail shown below for seismic adequacy in accordance with GIP procedures (Ref. 1).

Lg P v vpv

                                                                      'v V

I/2 OR 5/8 UNISTRUT NUT AND BOLT IN EMBEDDED UNISTRUT L2x2x1/4 or L3x3xl/4

                                              'c
    = Bearing force on concrete FR = Te'nsile load in threaded rod Fa = Tensile load on Unistrut bolt Force in Unistrut bolt:           Fa = FR(1 + Lg/Lq)       => FR = Fa/(1+ Lg/L1)

Maximum moment in angle: MMAx = FRL2 FR'MAx/L2 In this detail, bending stresses in the angle and pullout force on the Unistrut bolt will each limit the capacity of the anchorage. The equations above show that the bending moment in the angle is related to L2, while the force in the Unistrut bolt is related to the ratio of L2 to L<. As the ratio L2/L< increases, the lever action on the Unistrut bolt increases for a given rod load FR. r li 'I The anchorage detail above is used on rod-hung trapeze hangers. For trapeze-type supports, which may swing laterally during an earthquake, the GIP requires both a Dead Load Check and a Vertical Capacity Check (3 x DL) of the anchorage. The vertical capacity check ensures that there is extra design margin in the anchorage to account for additional loads due to support displacement. This detail is also used on wall-mounted brackets to provide vertical support at the cantilevered end. These supports are directly attached to building structure and are not free to move during an earthquake. Per GIP procedures, only a Dead Load Check is necessary for these supports. Attachment to the OSVS for RACE103 Prying-Action Detail Screening Criteria and Walkdown page 4

Allowa I n b ndi s ess Bending stresses in angles are calculated in accordance with the AISC specification for single-angle members, Ref. 2. Per Section 5.2.1b of the specification, the calculated bending stress, fa, is: fa= 1.25M/S = 1.25FnLz/S where S is the geometric section modulus of the angle section. For the Dead Load Check, the working stress allowables given in Ref. 2 are used. Per Sections 5.1 and 5.2 of Ref. 2, the allowable bending stress is 0.66 Fq for 2x2x1/4 L's, and 0.6 Fq for 3x3x1/4 L's. For the 3 x DL Check, an allowable bending stress of 0.9FY is used for both angle sections. The bending stress, fa, and the stress limits are summarized as follows: 1.25FnLz/(0.247) 5 0.66Fy for L2x2x1/4, DL Case 1.25FqLz/(0.577) 5 0.60Fy for L3x3x1/4, DL Case 1.25FnLz/(0.247) 5 0.90Fy for L2x2x1/4, 3DL Case 1.25FnLz/(0.577) 6 0.90Fy for L3x3x1/4, 3DL Case liow le nis b llo I d Allowable pullout loads for the Unistrut bolt are summarized below (see Ref 3 for discussion): 1/2" bolt 2000 Ib, DL Case 5/8" bolt 2000 Ib, DL Case 1/2" bolt 2000 Ib, .3DL Case 5/8" bolt 2500 Ib, 3DL Case Limits for Lz and Lz/L< for a given Fz are listed below for all combinations of angle size, Unistrut bolt size, and load case. DL case, bending in L2x2x1/4: 1 25F+Lz/S 6 0 66Fy Lz 5 0 66 (36 000)(0 247)/(1 25Fn) > Lz 5 4690/Fn DL case, bending in L3x3x1/4: 1.25FnLz/S S 0.60Fy => Lz 6 0.60 (36,000)(0.577)/(1.25Fn) => Lz 6 9970/Fn 3DL case, bending in L2x2x1/4: 3x1.25FpLz/S s 0.9Fy = Lz s 0.90 (36,000)(0.247)/(1.25x3Fn) => Lz s 2130/Fn 3DL case, bending in L3x3x1/4: 3x1.25FL,/S 6 0.9Fy Lz 5 0.90 (36,000)(0.577)/(1.25x3Fq) => Lz s 4990/Fn Attachment to the OSVS for RACE103 Prying-Action Detail Screening Criteria and Watkdown page 5

DL case, pullout of 1/2" Unistrut bolt: FR(1+LE/Lq) 5 2000 Ib => L2/Lq 5 (2000/FR)-1 DL case, pullout of 5/8" Unistrut bolt: FR(1+L2/Lq) 52000 Ib => L2/Lq 5(2000/FR)-1 3DL case, pullout of 1/2" Unistrut bolt: 3FR(1+LE/Lq) 52000 Ib => LP/Lq 5(667/FR)-1 3DL case, pullout of 5/8" Unistrut bolt: 3FR(1+L2/Lg) 52500 Ib => LP/Lq 6(833/FR)-1 The equations above are summarized in table form below. LOAD CASE ANGLE UNISTRUT DL 3DL (LB) SIZE BOLT SIZE L2 (IN., MAX) L2/Lg(MAX) L2 (IN., MAX) Lp(L/(MAX) 2x2x1/4 1/2" 4690/ FR (2000/FR) 1 2130/ FR ( (667/FR)-1 5/8" 4690/ FR I (2000/FR) 1 2130/ FR I (833/FR) 1 1/2" l l 3x3x1/4 9970/ FR I (2000/FR)-1 4990/ FR , (667/FR)-1 5/8" 9970/ FR '(2000/FR)-'I 4990/ FR '833/FR)-1 2.2 References

1. Generic Implementation Plan Procedure (GIP), for Seismic Verification of Nuclear Plant Equipment", Revision 2A, March, 1993, Seismic Qualification Utility Group.
2. "Specification for Allowable Stress Design of Single-Angle Members," from Section 5 of the AISC Manual of Steel Construction, Allowable Stress Design, Ninth Edition, American Institute of Steel Construction, Inc. Chicago, IL, 1989.
3. LAR criteria document Attachment to the OSVS for RACE103 Prying-Action Detail Screening Criteria and Walkdown page 6

2.3 Screening Charts Screening charts for F in increments of 25 lb up to 800 lb. appear on the following pages. SCREENlNG CHART FOR FR < 'l00 LB LOAD CASE Fn ANGLE UNISTRUT DL 3DL (LB) SIZE BOLT SIZE L2 (IN., MAX) L2/L) (MAX) L2 (IN., MAX) L2/L) (MAX) I 2x2x1/4 1/2" 188 79.0 85.2'25.7 6/8" 188 79.0 85.2 I 32.3 I I I 3x3x1/4 1/2" 399 79.0 200 I 25.7 5/8" 399 79.0 200 I 32.3 I I I 2x2x1/4 1/2" 93.8 39.0 42.6'12.3 5/8" 93.8 39.0 426 I 157 I I I 3x3x1/4 1/2" 199 39.0 998 I 123 5/8" 199 39.0 998 I 16,7 I I I

           '2x2x1/4        1/2"          62.5          25.7           28,4     I     7,9 5/8"          62.5          25.7           28.4     I    10.1 I

I I 3x3x1/4 1/Z'/8" 133 25.7 66.5 I 7.9 133 25.7 665 I 101 I I I 2x2x1/4 1/2" 46.9 19.0 21.3 I 5.7 5/8" 46.9 19.0 213 t 73 I 100 I I 3x3x1/4 1 /2 II , 99.7 19.0 499 I 57 5/8" 99.7 19.0 49.9 I 7.3 I I Attachment to the OSVS for RACE103 Prying-Action Detail Screening Criteria and Walkdown page 7

SCREENING CHART FOR FR < 200 LB LOAD CASE Fr( ANGLE UNISTRUT DL ~ ~ 3DL (LB) SIZE BOLT SIZE L2 (IN., MAX) Lg/Li(MAxl L2 (IN., MAXI L2(L)(MAXI 2x2x1/4 1/2" 37.5 15.0 17.0 4.3 5/8" 37.5 15.0 17.0 5.7 125 3x3x1/4 1/2" 79.8 15.0 39.9 4.3 5/8" 79.8 15.0 39.9 5.7 2x2x1/4 1/2" '1.3 12.3 14.2 34 5/8" 31.3 12.3 14.2 4.6 150 3x3x1/4 1/2" 66.5 12.3 33.3 34 5/8" 66.5 12.3 33.3 4.6 2x2x1/4 1/2"'/8" 26.8 104 12.2 2.8 26.8 10.4 12.2 3.8 175 3x3x1/4 1/2" 57.0 10.4 28.5 2.8 5I8" 57.0 10.4 28.5 3.8 2x2x1/4 1/2" 23.5 9.0 10.7 2.3 5/8" 23.5 9.0 10.7 3.2 200 3x3x1/4 1/2" 49.9 9.0 25.0 2.3 5/8" 49.9 9.0 25.0 3.2 Attachment to the OSVS for RACE103 Prying-Action Detail Screening Criteria and Walkdown page 8

SCREENING CHART FOR FR < 300 LB LOAD CASE Fn ANGLE UNISTRUT DL 3DL (LB) SIZE BOLT SIZE L2 tlN., MAX) L2/LIlMAX) L2 lIN.. MAX) L2/LIlMAX) 2x2x1/4 1/2" 20.8 7.9 9.5 2.0 5/8" 20.8 7.9 9.5 2.7 225 3x3x1/4 1/2" 44.3 7.9 22.2 2.0 5/8" 44.3 7.9 22.2 2.7 2x2x1/4 1/2" 18.8 7.0 8.5 1.7 5/8" 18.8 7.0 8.5 2.3 250 3x3x1/4 1/2" 39.9 7.0 20.0 1.7 5/8" 39.9 7.0 20.0 2.3 I 2x2x1/4 1/2" 17.1 I 6.3  ?.7 1.4 5/8 17.1 6.3 7.7 2.0 I I I 3x3x1/4 1/2" 36.3 6.3 18.1 1.4 5/8" 36.3 6.3 18.1 2.0 I I I 2x2x1/4 1/2" 15.6 5.7 7.1 1.2 5/8" 15.6 5.7 7.1 1.8 I 300 I, I 3x3x1/4 1/2" 33.2 5.7 16.6 1.2 5/8" 33.2 5.7 16.6 1.8 I I Attachment to the OSVS for RACE103 Prying-Action Detail Screening Criteria and Walkdown page 9

SCREENlNG CHART FOR FR < 400 LB LOAD CASE Fr( ANGLE UNISTRUT DL ~ ~ 3DL (LBj SIZE BOLT SIZE Lp (IN., MAX} L2/Lt(MAX} Lp (IN., MAXl L2/L)(MAX) 2x2x1/4 1/2" 14.4 5.2 6.6- 1.1 5/8" 14.4 5.2 6.6 1.6 325 3x3x1/4 1/2" 30.7 5.2 15.4 1.1 5/8" 30.7 , 5.2 15.4 1.6 I I 2x2x1/4 1/2" 13.4 I 4.7 6.1 0.9 I 5/8" 13A I 4.7 6.1 1.4 I 350 I I I 3x3x1/4 1/2" 28.5 I 4.7 14.3 0.9 I 5/8" 28.5 I 4.7 14.3 1.4 I I 2x2x1/4 1/2" 12.5 4.3 5.7 0.8 5/8" 12.5 4.3 5.7 1.2 375 3x3x1/4 1/2" 26.6 4.3 13.3 0.8 5/8" 26.6 4.3 13.3 1.2 2x2x1/4 1/2" 11.7 4.0 5.3 0.7 5/8" 11.7 4.0 5.3 1.1 400 3x3x1/4 1/2" 24.9 4.0 12.5 0.7 5/8" 24.9 4.0 12.5 1.1 Attachment to the OSVS for RACE103 Prying-Action Detail Screening Criteria and Wa}kdown page 10

SCREENING CHART FOR FR < 500 LB LOAD CASE Fn ANGLE UNISTRUT DL 3DL (LBI SIZE BOLT SIZE L2 (IN., MAXl L2/L> (MAxl L2 (IN., MAX) L,iL,(MAxl 2x2x1/4 1/2" 11.0 3.7 5.0 0.6 5/8" 11.0 3.7 5.0 425 3x3x1/4 1/2" 23.5 3.7 11.7 0.6 5/8" 23.5 3.7 11.7 1.0 2x2x1/4 1/2" 10.4 34 4.7 0.5 5/8" - 10.4, 34 4.7 0.9 450 3x3x1/4 1/2" 22.2 34 11.1 0.5 5/8" 22.2 3.4 11.1 0.9 2x2x1/4 1/2" 9.9 3.2 4.5 0.4 5/8" 9.9 3.2 4.5 0.8 3x3x1/4 1/2" 21.0 3.2 10.5 0.4 5/8" 21.0 3.2 10.5 0.8 2x2x1/4 1/2" 9.4 3.0 4.3 0.3 5/8" 9.4 3.0 4.3 0.7 500 3x3x1/4 1/2" 19.9 3.0 10.0 0.3 5/8" 19.9 3.0 10.0 0.7 I Attachment to the OSVS for RACE103 Prying-Action Detail Screening Criteria and Walkdown page 11

0 SCREENlNG CHART FOR FR < 600 LB LOAD CASE Fn ANGLE UNISTRUT DL 3DL (LB) SIZE BOLT SIZE L2 llN., MAX) L2/L) lMAX) L2 llN., MAX) L2/L1 lMAX) 2x2x1/4 1/2" 8.9 2.8 4.1 0.3 5/8" 8.9 2.8 4.1 0.6 3x3x1/4 1/2" 19.0 2.8 9.5 0.3 5/8" 19.0 2.8 9.5 0.6 2x2x1/4 1/2" 8.5 2.6 3.9 0.2 5/8" 8.5 2.6 3.9 0.5 550 3x3x1/4 1/2" 18.1 2.6 9.1 0.2 5/8" 18.1 2.6 9.1 0.5 2x2x1/4 1/2" 8.2 2.5 3.7 0.2 5/8" 8.2 2.5 3.7 0.4 575 3x3x1/4 1/2" 17.3 2.5 8.7 0.2 5/8" 17.3 2.5 8.7 0.4 2x2x1/4 1/2" 7.8 2.3 3.6 0.1 5/8" 7.8 2.3 3.6 0.4 600 3x3x1/4 1/2" 16.6 2.3 8.3 0.1 5/8" 16.6 2.3 8.3 0.4 Attachment to the OSVS for RACE103 Prying-Action Detail Screening Criteria and Wa)kdown page 12

       $ CREENING CHART FOR                     FR <      700 LB LOAD CASE Fn  ANGLE   UNISTRUT              DL                          3DL (LB)  SIZE   BOLT SIZE L2 IIN., MAX) I 2/L) lMAX) L2   (IN., MAX) L2/L)lMAX) 2x2x1/4    1/2"        7.5           2.2            3.4           0.0 5/8"        7.5           2.2            3.4           0.3 3x3x1/4    1/2"       16.0           2.2            8.0           0.0 5/8"       16.0           2.2            8.0           0.3 2x2x1/4    1/2"        7.2           2.1            3.3           0.0 5/8"        7.2           2.1            3.3           0.3 650 3x3x1/4    1/2"       15.3           2.1            7.7           0.0 5/8"       15.3           2.1            7.7           0.3 2x2x1/4    1/2"        6.9           2.0            3.2          -0.0 5I8"        6.9           2.0            3;2           0.2 675 3x3x1/4    1/2"       14.8           2.0            7.4          -0.0 5/8"       14.8           2.0            7.4           0.2 2x2x1/4    1/2"        6.7           1.9            3.0          -0.0 5/8"        6.7           1.9            3.0           0.2  .

700 3x3x1/4 1/2" 14.2 1.9 7.1 -0.0 5/8" 14.2 1.9 7.1 0.2 Attachment to the OSVS for RACE103 Prying-Action Detail Screening Criteria and Watkdown page 13

SCREENING CHART FOR FR < 800 LB LOAD CASE Fn ANGLE UNISTRUT DL ~ ~ 30L LB) SIZE BOLT SIZE Lp {IN., MAX) Lp(L){MAX) L2 {IN., MAXI L2/L]{MAX) 5/8" 6.5 1.8 2.9 0.1 3x3x1/4 1/2" 13.8 1.8 6.9 N/A 5/8" 13.8 1.8 6.9 0.1 2x2x1/4 1/2" 6.3 1.7 2.8 N/A 5/8" 6.3 1.7 2.8 0.1 750 3x3x1/4 1/2" 13.3 't.7 6.7 N/A 5/8" 13.3 1.7 6.7 0.1 2x2x1/4 1/2" 6.1 1.6 2.7 N/A 5/8" 6.1 1.6 2.7 0.0 3x3x1/4 1/2" 12.9 1.6 6.4 N/A 5/8" 12.9 1.6 6.4 0.0 2x2x1/4 1/2" 5.9 1.5 2.? N/A 5/8" 5.9 1.5 2.7 0.0 800 3x3x1/4 1/2" 12.5 1.5 6.2 N/A 5/8" 12.5 1.5 6.2 0.0 Attachment to the OSVS for RACE103 Prying-Action Detail Screening Criteria and Walkdown page 14

2.4 Anchora e Evaluation Works eet LI r, Fo Hanger Identification and Location: vVV VVV V t VVVVV

                                     ~ ~

I/2 DR 5/d VRIvvIRVI IIVI AND DDL'I VI CIIOCDDLD VIIISIRVl L2v2vl/I VI L2I2II/O Span: Estimated load on threaded rod, FR. FSTIMATED CABLE TRAY Calculations: AND CONDUIT WEIGHTS, PLF ITEM PLF CABLE TRAYS 25 1/2 CONDUIT 1.1 3/4 CONDUIT 1.3 1" CONDUIT 2.0 1.5" CONDUIT 3.5 2 CONDUIT 4.9 3 CONDUIT 11.1 4 CONDUIT 16.6 FIELD DATA: Angle size: Unistrut Bolt Size: Lengths: L1 L2/L1 LIMITINGVALUES FROM SCREENING CHART FOR FR= LB: DL CASE 3 X DL CASE (IF APPLICABLE)* Max L Max L2/L1 Max L Max L>/L1 Actual L Actual L>/L1 Actual L Actual L>/L1 PASS: PASS: PASS: PASS: YES NO YES NO YES NO YES NO

*3xDL case N/A for wall mounted brackets.

Attachment to the OSVS for RACE103 Prying-Action Detail Screening Criteria and Walkdown 1 page 15

I 3. Screening Walkdown Worksheets Worksheot ¹ Hanger Location 1-092694-1 Aux1, El 596, RCT Quad 3 North Hangers 9, 10, 11 along the right wall counting from door 1-OR-AUX323. 1-092694-2 Aux1 EI 596, RCT Quad 4

                            ~

Hangers 5. 6, 7, 8, 9 on the left wall counting from 'd'oor 1-DR-AUX329. 1-092694-3 Aux1 El 596. RCT Quad 4

                            ~

Directly across the hall from penetration 1-CEPAP5 1-0926944 Aux1 El 596, RCT Quad 4

                            ~

Adjacent to penetration 1-CEP-4P5. 1-092694-5 Aux1, El 596, RCT Quad 1 Two hangers across the hallway from penetration 1-CEP-1P5 One hanger near MCC 1-CT-BN 1-092694-6 Aux1 El 596. RCT Quad I

                            ~

Upper platform, 1st hanger on right facing door 1-OR-AUX467 1-092694-7 Aux1 El 596, RCT Quad I

                            ~

Upper platform, first 3 hangers on loft facing door 1-OR-AUX467 1-092694-8 Aux1 EI 596, RCT Quad 1

                            ~

Upper platform, first hanger on right off the edge of the platform. 2492794-1 Aux2, El 596, RCT Quad 3 South Near 2-VRS-2200 tUpper Cntmt RMS "B" Data Acq Module) 2492794-2 Aux2, EI 596, RCTQuad 1 Upper platform, two hangers about 3 hangers away from Door 2-DR-AUX468. 1-092794-3 Aux1, El 609, 4kV Area Above 600V Bus IIA 1-092794< Aux1 El 609, Transformer Room

                            ~

One hanger above 1-DGTAB and one hanger at the right side of the entrance. 1-092794-5 Aux1 Auxiliary Cable Vault

                            ~

15'outh of the hatch 2-092894-1 Aux2, EI 573 6'outh of gate 2-GT-AUX1013 (U2 Rx Coolant Drain Pump Room) 2-092894-2 Aux2. EI 573 South end of the hallway common to both units. 1-092894-3 Aux1, El 609, elevated area adjacent to the control room cable vault Above 12HV-ACA.FLT-3 24)92894M Aux2, El 609 Near Miscellaneous Rack 2-H.H 2-092894-5 Aux2, EI.609 Above cabinet 2-BITH2 1-0928944 Aux1, El 612, Vestibule, upper platform loading to RCT Next to 1-DR-AUX467 1-092894-7 Aux1. EI 612, Vestibule. upper platform leading to RCT 3rd hanger on left from the edge of the platform 1%92894% Aux1 El 612, Vestibule, upper platform leading to RCT

                            ~

4th hanger on left from the edge of the platform 1492894-9 Aux1 El 612, Vestibule, upper platform leading to RCT

                            ~

2nd hanger on right from the edge of the platform 1-092894-10 Aux1. EI 612, Vestibule 4 hangers along the containment wall just before the upper platform leading to the RCT. 1-092894-11 Aux1 El 612, Vestibule

                             ~

The hanger above the west end of 1-HE-22 and the next hanger west. The two or three hangers south of these running along the block wall. 2-092894-12 Aux2, EI 612, Vestibule. upper plalform leading to RCT 4th hanger on right from the edge of the platform 2-092894-13 Aux2, EI 633 Hangers between the Containment Auxiliaries Panel and 2-MSI-1. 2-092994-1 Cont2, El 598, Annulus Several hangers near Column 1. Az 63, Quad 1 Attachment to the OSVS for RACE103 Prying-Action Detail Screening Criteria and Walkdown page 16