ML19309B140: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 49: Line 49:
  ;                          Page 2                                                                                            _
  ;                          Page 2                                                                                            _
  ;                          March 28, 1980                                                                (
  ;                          March 28, 1980                                                                (
;
i'                              If you have any questions, please advise.
i'                              If you have any questions, please advise.
Yours very truly, a
Yours very truly, a

Latest revision as of 22:12, 21 February 2020

Application to Amend License NPF-2 Tech Specs Figures 6.2-1, 6.2-2 & Tech Specs 6.5.1.2,6.5.1.8,6.5.2.2 & 6.5.3.1,re Organization & Responsibilities & Figure 3.2-3 & Bases 2.1.1 Re Change in Rod Bow Penalty Calculation
ML19309B140
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 03/28/1980
From: Clayton F
ALABAMA POWER CO.
To:
Shared Package
ML19309B141 List:
References
NUDOCS 8004030192
Download: ML19309B140 (2)


Text

._

  • , . . Alabama Power Comoany 600 North 18th Street J Post Office Box 2541 e * ,4 Birmingham. Alabama 35291 Telsphone 205 323-5341
  • F. L. CLAYTON, JH.

m Senior %ce Presdent 4

[lQh3$3 h0WGf

%southem elecincsystem March 28,1980 Docket No. 50-348

~w Mr. A. Schwencer, Director Of fice of Nuclear Reactor Regulations U. S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Schwencer:

RE: Changes to Operating License

, No. NPF-2 Technical Specification Alabama Power Company proposes the attached changes to the Joseph M.

Farley Nuclear Plant Operating License No. NPF-2 Technical Specifications involving the following items.

Technical Specification Figures 6.2-1 and 6.2-2 and Technical Specification 6.5.1.2, 6.5.1.8, 6.5.2.2 and 6.5.3.1 concerning changes in company organiza-tion and responsibilities, e

Technical Specification Figure 3.2-3 and Bases 2.1.1

_ concerning a change in rod bow penalty calculation for determining F .

The Plant Operations Review Committee and the Nuclear Operations Review Board have reviewed the above proposed changes and have determined that the changes do not involve an unreviewed safety question as shown in the attached safety evaluations.

The class of this proposed amendment is designated in accordance with l 10 CFR Part 170 as a Class III change in that it is deemed not to involve

, a significant hazard consideration. A check for $4,000 is enclosed to cover required fees.

In accordance with 10 CFR 50.30(c)(1)(1), three (3) signed originals and thirty-seven (37) additional copies of this proposed amendment are

! enclosed.

l l \

~.

f .

8004030/92

. - . - .e,s 4 e. - +

i . .

9 s*

i Mr. A. Schwencer *

Page 2 _
March 28, 1980 (

i' If you have any questions, please advise.

Yours very truly, a

Y M)

F. L. Clayton, VJr.

FLCJr/I'RF:bhj SWORN TO ND SUBSCRIBED BEFORE METHIS,)p[ DAY OF N/9/2C//

Enclosures ,

1980.

cc: Mr. R. A. Thomas Mr. G. F. Trowbridge '

)-

. AA .H Notary Public [/

l My Commission Expires:

f. } c3. h S E

I

(

> wwww.s e,A e e ~ M +c,,Mw.mK+-Aw - - - - >

.M^ AM*mb - -~- A -kr. M,wmmism