| number = ML13015A365
| number = ML13015A365
| issue date = 01/15/2013
| issue date = 01/15/2013
| title = Farley Emerg Prep Insp and RFI for 2-18-2013
| title = Emerg Prep Insp and RFI for 2-18-2013
| author name = Bonser B R
| author name = Bonser B
| author affiliation = NRC/RGN-II/DRS/EB1
| author affiliation = NRC/RGN-II/DRS/EB1
| addressee name = Lynch T A
| addressee name = Lynch T
| addressee affiliation = Southern Nuclear Operating Co, Inc
| addressee affiliation = Southern Nuclear Operating Co, Inc
| docket = 05000348, 05000364
| docket = 05000348, 05000364
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 January 15, 2013  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 January 15, 2013 Mr. T. A. Lynch Vice President Southern Nuclear Operating Company, Inc.
 
Joseph M. Farley Nuclear Plant P.O. Drawer 470, BIN B500 Ashford, AL 36312
Mr. T. A. Lynch Vice President Southern Nuclear Operating Company, Inc.
Joseph M. Farley Nuclear Plant  
 
P.O. Drawer 470, BIN B500  
 
Ashford, AL 36312  


==SUBJECT:==
==SUBJECT:==
JOSEPH M. FARLEY NUCLEAR PLANT - EMERGENCY PREPAREDNESS INSPECTION AND REQUEST FOR INFORMATION  
JOSEPH M. FARLEY NUCLEAR PLANT - EMERGENCY PREPAREDNESS INSPECTION AND REQUEST FOR INFORMATION


==Dear Mr. Lynch:==
==Dear Mr. Lynch:==


From February 18 - 22, 2013, the U.S. Nuclear Regulatory Commission (NRC) will perform a baseline Emergency Preparedness inspection at the Joseph M. Farley Nuclear Plant. The inspection will evaluate activities in the Emergency Preparedness cornerstone using NRC Inspection Procedures 71114.02 - Alert and Notification System (ANS) Evaluation, 71114.03 - Emergency Response Organization (ERO) Staffing and Augmentation System, 71114.05 - Maintenance of Emergency Preparedness, and the Emergency Preparedness Sections of 71151, Performance Indicator Verification.
From February 18 - 22, 2013, the U.S. Nuclear Regulatory Commission (NRC) will perform a baseline Emergency Preparedness inspection at the Joseph M. Farley Nuclear Plant. The inspection will evaluate activities in the Emergency Preparedness cornerstone using NRC Inspection Procedures 71114.02 - Alert and Notification System (ANS) Evaluation, 71114.03 - Emergency Response Organization (ERO) Staffing and Augmentation System, 71114.05 - Maintenance of Emergency Preparedness, and the Emergency Preparedness Sections of 71151, Performance Indicator Verification.
Experience has shown that this inspection is resource-intens ive for both the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. It is important that all of these documents are up to date, and complete, in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.
Experience has shown that this inspection is resource-intensive for both the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. It is important that all of these documents are up to date, and complete, in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.
 
We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Bill Arens of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, Mark E. Speck at (404) 997-4759 (Mark.Speck@nrc.gov) or the Chief, Plant Support Branch 1, Brian Bonser at (404) 997-4653.
We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Bill Arens of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, Mark E. Speck at (404) 997-4759 (Mark.Speck@
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its Enclosure will be available electronically for public inspection in the NRC Public Document
nrc.gov) or the Chief, Plant Support Branch 1, Brian Bonser at (404) 997-4653.  
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its  
 
Enclosure will be available electronically for public inspection in the NRC Public Document
 
T. Lynch    2 Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). 


Sincerely,               /RA/
T. Lynch                                      2 Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Brian Bonser, Chief       Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-348 and 50-364 License Nos. NPF-2 and NPF-8  
Sincerely,
                                          /RA/
Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-348 and 50-364 License Nos. NPF-2 and NPF-8


==Enclosure:==
==Enclosure:==
Document Request List
cc:  (See page 3 and 4)
ML13015A365 X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII:DRS/PSB1 RII:DRS/PSB1      SIGNATURE MES4 BRB1      NAME M. Speck B. Bonser      DATE 1/  15  /2013 1/  15  /2013      E-MAIL COPY YES NO YES NO 3 T. Lynch cc: C. Russ Dedrickson
Fleet Support Supervisor Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
Cheryl A. Gayheart
Plant Manager
Joseph M. Farley Nuclear Plant Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
S. Kuczynski Chairman, President and CEO Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
Leigh Perry SVP & General Counsel-Ops & SNC Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
D. G. Bost
Chief Nuclear Officer
Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
Dennis R. Madison Vice President Edwin I. Hatch Nuclear Plant Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
Paula Marino Vice President Engineering Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
T. E. Tynan Site Vice President Vogtle Electric Generating Plant Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
M. J. Ajluni Nuclear Licensing Director Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
Mark Williams Commissioner Georgia Department of Natural Resources Electronic Mail Distribution
B. D. McKinney, Jr.
Regulatory Response Manager
Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
D. W. Daughhetee Licensing Engineer
Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
T. D. Honeycutt
Regulatory Response Supervisor
Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
Bradley J. Adams Vice President Fleet Operations Support
Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
N. J. Stringfellow Licensing Manager
Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
L. P. Hill Licensing Supervisor
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution L. L. Crumpton Administrative Assistant, Sr.
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution William D. Oldfield Principal Licensing Engineer
Joseph M. Farley Nuclear Plant Electronic Mail Distribution
cc:  (continued on page 4)
T. Lynch 4 cc:  (continued from page 3)
Todd L. Youngblood Vice President Fleet Oversight
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
John G. Horn Site Support Manager Joseph M. Farley Nuclear Plant
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
Senior Resident Inspector U.S. Nuclear Regulatory Commission
Joseph M. Farley Nuclear Plant U.S. NRC P. O. Box 620 Ashford, AL  36312
Cynthia A. Sanders Radioactive Materials Program Manager Environmental Protection Division
Georgia Department of Natural Resources Electronic Mail Distribution
Mr. Mark Culver Chairman Houston County Commission P. O. Box 6406
Dothan, AL  36302
James L. McNees, CHP Director Office of Radiation Control Alabama Dept. of Public Health P. O. Box 303017
Montgomery, AL  36130-3017 State Health Officer Alabama Dept. of Public Health P.O. Box 303017
Montgomery, AL  36130-3017 Chuck Mueller
Manager Policy and Radiation Program
Georgia Department of Natural Resources Electronic Mail Distribution James C. Hardeman Environmental Radiation Program Manager Environmental Protection Division
Georgia Department of Natural Resources Electronic Mail Distribution
Enclosure Document Request List
Inspection Dates:  February 18 - 22, 2013 Inspection Procedures:  IP 71114.02 Alert and Notification System Evaluation IP 71114.03 ERO Staffing and Augmentation System IP 71114.05 Maintenance of Emergency Preparedness IP 71151 Performance Indicator Verification Note:  This is a list of the documents to be provided to the inspectors upon arrival onsite. The current version of these documents is expected unless specified otherwise. Electronic media is preferred, if readily available (the preferred file format is Word or searchable ".pdf" files on CDROM or "thumb" drive). Please organize the information as it is arranged below (e.g., a folder labeled "Miscellaneous"). It is not the intent that large or burdensome data be scanned for this purpose. This data will be inspected using original documentation. Material can be provided prior to the inspection to the NRC Region II Office (Attention:  Mark Speck, 245 Peachtree Center Avenue, NE, Suite 1200, Atlanta, GA 30303-1257). If there are questions regarding the documents requested, please do not hesitate to contact the lead inspector. 


EP2 Alert and Notification System Evaluation Department of Homeland Security (DHS) approved Alert Notification System (ANS) report  Alert Notification System Testing Procedure  ANS equipment technical manual  ANS equipment testing results (raw data) for two-year inspection period  ANS equipment maintenance records for two-year inspection period  Changes to the ANS system, implementing procedures, testing procedures, and the maintenance program including any supporting DHS approval letters for the past two years  Corrective action program entries related to the Alert and Notification System for the  two-year inspection period  Information provided to the public inside the 10 mile plume exposure pathway
Document Request List cc: (See page 3 and 4)


EP3 Emergency Response Organization Staffing and Augmentation System Current Emergency Response Organization (ERO) roster ERO and Augmentation implementing procedures and changes made over the past two years NUREG 0654 Table B1 site equivalent  ERO training program procedure  EP staff training program and qualification records  ERO augmentation  ERF activation, including backup, equipment initiation procedure  ERO augmentation testing results  Corrective action program entries related to the ERO staffing and augmentation for the  two- year inspection period
ML13015A365              X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE              RII:DRS/PSB1 RII:DRS/PSB1 SIGNATURE              MES4          BRB1 NAME                  M. Speck    B. Bonser DATE                1/ 15 /2013 1/ 15 /2013 E-MAIL COPY        YES      NO YES      NO 3
T. Lynch cc:
C. Russ Dedrickson                        Mark Williams Fleet Support Supervisor                  Commissioner Southern Nuclear Operating Company, Inc. Georgia Department of Natural Resources Electronic Mail Distribution              Electronic Mail Distribution Cheryl A. Gayheart                        B. D. McKinney, Jr.
Plant Manager                              Regulatory Response Manager Joseph M. Farley Nuclear Plant            Southern Nuclear Operating Company, Inc.
Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Electronic Mail Distribution D. W. Daughhetee S. Kuczynski                              Licensing Engineer Chairman, President and CEO                Southern Nuclear Operating Company, Inc.
Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Electronic Mail Distribution T. D. Honeycutt Leigh Perry                                Regulatory Response Supervisor SVP & General Counsel-Ops & SNC            Southern Nuclear Operating Company, Inc.
Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Electronic Mail Distribution Bradley J. Adams D. G. Bost                                Vice President Chief Nuclear Officer                      Fleet Operations Support Southern Nuclear Operating Company, Inc. Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution              Electronic Mail Distribution Dennis R. Madison                          N. J. Stringfellow Vice President                            Licensing Manager Edwin I. Hatch Nuclear Plant              Southern Nuclear Operating Company, Inc.
Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Electronic Mail Distribution L. P. Hill Paula Marino                              Licensing Supervisor Vice President                            Southern Nuclear Operating Company, Inc.
Engineering                                Electronic Mail Distribution Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution              L. L. Crumpton Administrative Assistant, Sr.
T. E. Tynan                                Southern Nuclear Operating Company, Inc.
Site Vice President                        Electronic Mail Distribution Vogtle Electric Generating Plant Southern Nuclear Operating Company, Inc. William D. Oldfield Electronic Mail Distribution              Principal Licensing Engineer Joseph M. Farley Nuclear Plant M. J. Ajluni                              Electronic Mail Distribution Nuclear Licensing Director Southern Nuclear Operating Company, Inc. cc: (continued on page 4)
Electronic Mail Distribution


EP5 Maintenance of Emergency Preparedness Governing documents for the assessment process  All EP program assessments, not including INPO performed assessments, for the two-year inspection period 2    10 CFR 50.54(t) audits and subsequent state/local correspondence for the two-year inspection period  Drill and exercise critiques for the past two-year period  Critiques of actual events resulting in implementation of the emergency plan for past two years  Corrective action program entries relating to emergency preparedness (abbreviated, i.e., identifier and brief description), for the two-year inspection period with the risk significant related entries separated  Governing documents for 10 CFR 50.54(q) evaluation process  Corrective Action Program procedures  Maintenance records and availability-tracking information for equipment important to emergency preparedness EP01/EP02/EP03 Performance Indicators Verification Governing document for the performance indicator process  Drill and Exercise Performance (DEP), Emergency Response Organization (ERO), and  Alert and Notification System (ANS) Performance Indicators (PI) data submitted for the  two-year inspection period  DEP documentation and evaluations for the two-year inspection period  Current ERO roster  Corrective action program entries related to performance indicators, that is DEP, ERO training and participation, and ANS for the two-year inspection period Miscellaneous Procedures Current Emergency Plan  Safety Evaluation Report approved Emergency Plan  Current Emergency Action Levels  Safety Evaluation Report approved Emergency Action Levels  Current Emergency Plan implementing procedures  Departmental processes or procedures for Emergency Preparedness staff  Corporate processes or procedures for Emergency Preparedness staff
T. Lynch                                4 cc: (continued from page 3)
Todd L. Youngblood                        Mr. Mark Culver Vice President                            Chairman Fleet Oversight                            Houston County Commission Southern Nuclear Operating Company, Inc. P. O. Box 6406 Electronic Mail Distribution              Dothan, AL 36302 John G. Horn                              James L. McNees, CHP Site Support Manager                      Director Joseph M. Farley Nuclear Plant            Office of Radiation Control Southern Nuclear Operating Company, Inc. Alabama Dept. of Public Health Electronic Mail Distribution              P. O. Box 303017 Montgomery, AL 36130-3017 Senior Resident Inspector U.S. Nuclear Regulatory Commission        State Health Officer Joseph M. Farley Nuclear Plant            Alabama Dept. of Public Health U.S. NRC                                  P.O. Box 303017 P. O. Box 620                              Montgomery, AL 36130-3017 Ashford, AL 36312 Chuck Mueller Cynthia A. Sanders                        Manager Radioactive Materials Program Manager      Policy and Radiation Program Environmental Protection Division          Georgia Department of Natural Resources Georgia Department of Natural Resources    Electronic Mail Distribution Electronic Mail Distribution James C. Hardeman Environmental Radiation Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution


Lead Inspector Contact Information:
Document Request List Inspection Dates:                      February 18 - 22, 2013 Inspection Procedures:                  IP 71114.02    Alert and Notification System Evaluation IP 71114.03    ERO Staffing and Augmentation System IP 71114.05    Maintenance of Emergency Preparedness IP 71151        Performance Indicator Verification Note: This is a list of the documents to be provided to the inspectors upon arrival onsite. The current version of these documents is expected unless specified otherwise. Electronic media is preferred, if readily available (the preferred file format is Word or searchable .pdf files on CDROM or thumb drive). Please organize the information as it is arranged below (e.g., a folder labeled Miscellaneous). It is not the intent that large or burdensome data be scanned for this purpose. This data will be inspected using original documentation. Material can be provided prior to the inspection to the NRC Region II Office (Attention: Mark Speck, 245 Peachtree Center Avenue, NE, Suite 1200, Atlanta, GA 30303-1257). If there are questions regarding the documents requested, please do not hesitate to contact the lead inspector.
Mark Speck  
EP2 Alert and Notification System Evaluation Department of Homeland Security (DHS) approved Alert Notification System (ANS) report Alert Notification System Testing Procedure ANS equipment technical manual ANS equipment testing results (raw data) for two-year inspection period ANS equipment maintenance records for two-year inspection period Changes to the ANS system, implementing procedures, testing procedures, and the maintenance program including any supporting DHS approval letters for the past two years Corrective action program entries related to the Alert and Notification System for the two-year inspection period Information provided to the public inside the 10 mile plume exposure pathway EP3 Emergency Response Organization Staffing and Augmentation System Current Emergency Response Organization (ERO) roster ERO and Augmentation implementing procedures and changes made over the past two years NUREG 0654 Table B1 site equivalent ERO training program procedure EP staff training program and qualification records ERO augmentation ERF activation, including backup, equipment initiation procedure ERO augmentation testing results Corrective action program entries related to the ERO staffing and augmentation for the two- year inspection period EP5 Maintenance of Emergency Preparedness Governing documents for the assessment process All EP program assessments, not including INPO performed assessments, for the two-year inspection period Enclosure


(404) 997-4759}}
2 10 CFR 50.54(t) audits and subsequent state/local correspondence for the two-year inspection period Drill and exercise critiques for the past two-year period Critiques of actual events resulting in implementation of the emergency plan for past two years Corrective action program entries relating to emergency preparedness (abbreviated, i.e.,
identifier and brief description), for the two-year inspection period with the risk significant related entries separated Governing documents for 10 CFR 50.54(q) evaluation process Corrective Action Program procedures Maintenance records and availability-tracking information for equipment important to emergency preparedness EP01/EP02/EP03 Performance Indicators Verification Governing document for the performance indicator process Drill and Exercise Performance (DEP), Emergency Response Organization (ERO), and Alert and Notification System (ANS) Performance Indicators (PI) data submitted for the two-year inspection period DEP documentation and evaluations for the two-year inspection period Current ERO roster Corrective action program entries related to performance indicators, that is DEP, ERO training and participation, and ANS for the two-year inspection period Miscellaneous Procedures Current Emergency Plan Safety Evaluation Report approved Emergency Plan Current Emergency Action Levels Safety Evaluation Report approved Emergency Action Levels Current Emergency Plan implementing procedures Departmental processes or procedures for Emergency Preparedness staff Corporate processes or procedures for Emergency Preparedness staff Lead Inspector Contact Information:
Mark Speck (404) 997-4759}}

Latest revision as of 09:09, 6 February 2020

Emerg Prep Insp and RFI for 2-18-2013
ML13015A365
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 01/15/2013
From: Brian Bonser
NRC/RGN-II/DRS/EB1
To: Lynch T
Southern Nuclear Operating Co
Linda K. Gruhler 404-997-46933
References
Download: ML13015A365 (7)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 January 15, 2013 Mr. T. A. Lynch Vice President Southern Nuclear Operating Company, Inc.

Joseph M. Farley Nuclear Plant P.O. Drawer 470, BIN B500 Ashford, AL 36312

SUBJECT:

JOSEPH M. FARLEY NUCLEAR PLANT - EMERGENCY PREPAREDNESS INSPECTION AND REQUEST FOR INFORMATION

Dear Mr. Lynch:

From February 18 - 22, 2013, the U.S. Nuclear Regulatory Commission (NRC) will perform a baseline Emergency Preparedness inspection at the Joseph M. Farley Nuclear Plant. The inspection will evaluate activities in the Emergency Preparedness cornerstone using NRC Inspection Procedures 71114.02 - Alert and Notification System (ANS) Evaluation, 71114.03 - Emergency Response Organization (ERO) Staffing and Augmentation System, 71114.05 - Maintenance of Emergency Preparedness, and the Emergency Preparedness Sections of 71151, Performance Indicator Verification.

Experience has shown that this inspection is resource-intensive for both the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. It is important that all of these documents are up to date, and complete, in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Bill Arens of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, Mark E. Speck at (404) 997-4759 (Mark.Speck@nrc.gov) or the Chief, Plant Support Branch 1, Brian Bonser at (404) 997-4653.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its Enclosure will be available electronically for public inspection in the NRC Public Document

T. Lynch 2 Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-348 and 50-364 License Nos. NPF-2 and NPF-8

Enclosure:

Document Request List cc: (See page 3 and 4)

ML13015A365 X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII:DRS/PSB1 RII:DRS/PSB1 SIGNATURE MES4 BRB1 NAME M. Speck B. Bonser DATE 1/ 15 /2013 1/ 15 /2013 E-MAIL COPY YES NO YES NO 3

T. Lynch cc:

C. Russ Dedrickson Mark Williams Fleet Support Supervisor Commissioner Southern Nuclear Operating Company, Inc. Georgia Department of Natural Resources Electronic Mail Distribution Electronic Mail Distribution Cheryl A. Gayheart B. D. McKinney, Jr.

Plant Manager Regulatory Response Manager Joseph M. Farley Nuclear Plant Southern Nuclear Operating Company, Inc.

Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Electronic Mail Distribution D. W. Daughhetee S. Kuczynski Licensing Engineer Chairman, President and CEO Southern Nuclear Operating Company, Inc.

Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Electronic Mail Distribution T. D. Honeycutt Leigh Perry Regulatory Response Supervisor SVP & General Counsel-Ops & SNC Southern Nuclear Operating Company, Inc.

Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Electronic Mail Distribution Bradley J. Adams D. G. Bost Vice President Chief Nuclear Officer Fleet Operations Support Southern Nuclear Operating Company, Inc. Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution Electronic Mail Distribution Dennis R. Madison N. J. Stringfellow Vice President Licensing Manager Edwin I. Hatch Nuclear Plant Southern Nuclear Operating Company, Inc.

Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Electronic Mail Distribution L. P. Hill Paula Marino Licensing Supervisor Vice President Southern Nuclear Operating Company, Inc.

Engineering Electronic Mail Distribution Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution L. L. Crumpton Administrative Assistant, Sr.

T. E. Tynan Southern Nuclear Operating Company, Inc.

Site Vice President Electronic Mail Distribution Vogtle Electric Generating Plant Southern Nuclear Operating Company, Inc. William D. Oldfield Electronic Mail Distribution Principal Licensing Engineer Joseph M. Farley Nuclear Plant M. J. Ajluni Electronic Mail Distribution Nuclear Licensing Director Southern Nuclear Operating Company, Inc. cc: (continued on page 4)

Electronic Mail Distribution

T. Lynch 4 cc: (continued from page 3)

Todd L. Youngblood Mr. Mark Culver Vice President Chairman Fleet Oversight Houston County Commission Southern Nuclear Operating Company, Inc. P. O. Box 6406 Electronic Mail Distribution Dothan, AL 36302 John G. Horn James L. McNees, CHP Site Support Manager Director Joseph M. Farley Nuclear Plant Office of Radiation Control Southern Nuclear Operating Company, Inc. Alabama Dept. of Public Health Electronic Mail Distribution P. O. Box 303017 Montgomery, AL 36130-3017 Senior Resident Inspector U.S. Nuclear Regulatory Commission State Health Officer Joseph M. Farley Nuclear Plant Alabama Dept. of Public Health U.S. NRC P.O. Box 303017 P. O. Box 620 Montgomery, AL 36130-3017 Ashford, AL 36312 Chuck Mueller Cynthia A. Sanders Manager Radioactive Materials Program Manager Policy and Radiation Program Environmental Protection Division Georgia Department of Natural Resources Georgia Department of Natural Resources Electronic Mail Distribution Electronic Mail Distribution James C. Hardeman Environmental Radiation Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution

Document Request List Inspection Dates: February 18 - 22, 2013 Inspection Procedures: IP 71114.02 Alert and Notification System Evaluation IP 71114.03 ERO Staffing and Augmentation System IP 71114.05 Maintenance of Emergency Preparedness IP 71151 Performance Indicator Verification Note: This is a list of the documents to be provided to the inspectors upon arrival onsite. The current version of these documents is expected unless specified otherwise. Electronic media is preferred, if readily available (the preferred file format is Word or searchable .pdf files on CDROM or thumb drive). Please organize the information as it is arranged below (e.g., a folder labeled Miscellaneous). It is not the intent that large or burdensome data be scanned for this purpose. This data will be inspected using original documentation. Material can be provided prior to the inspection to the NRC Region II Office (Attention: Mark Speck, 245 Peachtree Center Avenue, NE, Suite 1200, Atlanta, GA 30303-1257). If there are questions regarding the documents requested, please do not hesitate to contact the lead inspector.

EP2 Alert and Notification System Evaluation Department of Homeland Security (DHS) approved Alert Notification System (ANS) report Alert Notification System Testing Procedure ANS equipment technical manual ANS equipment testing results (raw data) for two-year inspection period ANS equipment maintenance records for two-year inspection period Changes to the ANS system, implementing procedures, testing procedures, and the maintenance program including any supporting DHS approval letters for the past two years Corrective action program entries related to the Alert and Notification System for the two-year inspection period Information provided to the public inside the 10 mile plume exposure pathway EP3 Emergency Response Organization Staffing and Augmentation System Current Emergency Response Organization (ERO) roster ERO and Augmentation implementing procedures and changes made over the past two years NUREG 0654 Table B1 site equivalent ERO training program procedure EP staff training program and qualification records ERO augmentation ERF activation, including backup, equipment initiation procedure ERO augmentation testing results Corrective action program entries related to the ERO staffing and augmentation for the two- year inspection period EP5 Maintenance of Emergency Preparedness Governing documents for the assessment process All EP program assessments, not including INPO performed assessments, for the two-year inspection period Enclosure

2 10 CFR 50.54(t) audits and subsequent state/local correspondence for the two-year inspection period Drill and exercise critiques for the past two-year period Critiques of actual events resulting in implementation of the emergency plan for past two years Corrective action program entries relating to emergency preparedness (abbreviated, i.e.,

identifier and brief description), for the two-year inspection period with the risk significant related entries separated Governing documents for 10 CFR 50.54(q) evaluation process Corrective Action Program procedures Maintenance records and availability-tracking information for equipment important to emergency preparedness EP01/EP02/EP03 Performance Indicators Verification Governing document for the performance indicator process Drill and Exercise Performance (DEP), Emergency Response Organization (ERO), and Alert and Notification System (ANS) Performance Indicators (PI) data submitted for the two-year inspection period DEP documentation and evaluations for the two-year inspection period Current ERO roster Corrective action program entries related to performance indicators, that is DEP, ERO training and participation, and ANS for the two-year inspection period Miscellaneous Procedures Current Emergency Plan Safety Evaluation Report approved Emergency Plan Current Emergency Action Levels Safety Evaluation Report approved Emergency Action Levels Current Emergency Plan implementing procedures Departmental processes or procedures for Emergency Preparedness staff Corporate processes or procedures for Emergency Preparedness staff Lead Inspector Contact Information:

Mark Speck (404) 997-4759