{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 September 2, 2014 Mr. David A. Heacock President and Chief Nuclear Officer Virginia Electric and Power Company Dominion Nuclear Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
-1257 September 2, 2014 Mr. David A. Heacock President and Chief Nuclear Officer Virginia Electric and Power Company Dominion Nuclear Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060
-6711


==SUBJECT:==
==SUBJECT:==
MID-CYCLE LETTER FOR NORTH ANNA POWER STATION , UNITS 1 A ND 2 -- NRC ASSESSMENT REPORT 05000338 , 339/201 4 006 
MID-CYCLE LETTER FOR NORTH ANNA POWER STATION, UNITS 1 AND 2 -- NRC ASSESSMENT REPORT 05000338, 339/2014006


==Dear Mr. Heacock:==
==Dear Mr. Heacock:==


On August 12, 201 4, the NRC completed its mid
On August 12, 2014, the NRC completed its mid-cycle performance review of North Anna Power Station, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2013, through June 30, 2014. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
-cycle performance review of North Anna Power Station
The NRC determined that overall, North Anna, Units 1 and 2, operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined that the performance at North Anna Power Station, Units 1 and 2, during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 20 1 3 , through June 30, 20 1 4. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.
As a result of the Safety Culture Common Language Initiative, the terminology and coding of cross-cutting aspects were revised. All cross-cutting aspects identified during inspections conducted in calendar year 2014 reflect this revision to Inspection Manual Chapter (IMC) 0310.
The NRC determined that overall, North Anna, Units 1 and 2, operated in a manner that preserved public health and safety and met all cornerstone objectives.
Cross-cutting aspects identified in 2013 using the 2013 terminology were converted to the latest revision in accordance with the cross-reference in IMC 0310 during the mid-cycle assessment review and evaluated for cross-cutting themes and potential substantive cross-cutting issues in accordance with IMC 0305.
The NRC determined that the performance at North Anna Power Station
The enclosed inspection plan lists the inspections scheduled through December 31, 2015.
, Units 1 and 2
Routine inspections performed by resident inspectors are not included in the inspection plan.
, during the most recent quarter was within the Licensee Response Column of the NRC
The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC
's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
As a result of the Safety Culture Common Language Initiative, the terminology and coding of cross-cutting aspects were revised. All cross-cutting aspects identified during inspections conducted in calendar year 2014 reflect this revision to Inspection Manual Chapter (IMC) 0310. Cross-cutting aspects identified in 2013 using the 2013 terminology were converted to the latest revision in accordance with the cross
-reference in IMC 0310 during the mid
-cycle assessment review and evaluated for cross
-cutting themes and potential substantive cross
-cutting issues in accordance with IMC 0305.


The enclosed inspection plan lists the inspections scheduled through December 31, 20 15. Routine inspections performed by resident inspectors are not included in the inspection plan.
D. Heacock                                     2 will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.
The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC D. Heacock 2 will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non
Please contact me at 404-997-4511 with any questions you may have regarding this letter.
-publicly available correspondence.
Sincerely,
In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
                                                  /Mark Franke RA for/
-rm/adams.html (the Public Electronic Reading Room).
Michael F. King, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket Nos.: 50-338, 50-339 License Nos.: NPF-4, NPF-7
Please contact me at 404-997-45 11 with any questions you may have regarding this letter.
Sincerely,         /Mark Franke RA for/
Michael F. King, Chief Reactor Projects Branch 5 Division of Reactor Projects
 
Docket Nos.
: 50-338, 50-339 License Nos.
: NPF-4, NPF-7


==Enclosure:==
==Enclosure:==
North Anna Inspection/ Activity Plan (0 9/01/20 1 4 - 12/3 1/201 5) cc Distribution via List Serv
North Anna Inspection/ Activity Plan (09/01/2014 - 12/31/2015) cc Distribution via ListServ


_________
___________________          SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE           RII:DRP       RII:DRP         RII:DRP SIGNATURE       BDB /RA/       SON /RA/         MEF /RA for/
__________
NAME             BBishop       SNinh           MKing DATE                 8/27/2014     8/27/2014       9/2/2014 E-MAIL COPY?       YES   NO   YES     NO      YES     NO     YES NO   YES   NO D. Heacock                                 3 Letter to David Heacock from Michael F. King dated September 2, 2014.
SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP   SIGNATURE BDB /RA/ SON /RA/ MEF /RA for/
NAME BBishop SNinh MKing   DATE 8/27/2014 8/27/2014 9/2/2014   E-MAIL COPY?
YES NO       YES NO      YES NO       YES NO       YES NO D. Heacock 3 Letter to David Heacock from Michael F. King dated September 2, 2014.


==SUBJECT:==
==SUBJECT:==
MID-CYCLE LETTER FOR NORTH ANNA POWER STATION, UNITS 1 AND 2 -- NRC ASSESSMENT REPORT 05000338 , 339/201 4006  DISTRIBUTION
MID-CYCLE LETTER FOR NORTH ANNA POWER STATION, UNITS 1 AND 2 -- NRC ASSESSMENT REPORT 05000338, 339/2014006 DISTRIBUTION:
: D. Gamberoni, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMNorthAnna Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)
D. Gamberoni, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMNorthAnna Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)
 
Page 1 of 2                                                                              North Anna 09/02/2014    09:50:10                                                        Inspection / Activity Plan Report 22 09/01/2014 - 12/31/2015 Unit        Planned Dates                                                                                                    No. of Staff Number          Start    End      Inspection Activity                                                              Title          on Site RP            - RP OCCUPATIONAL BASELINE                                                              3 1, 2      09/08/2014  09/12/2014  IP 71124.01            Radiological Hazard Assessment and Exposure Controls 1, 2      09/08/2014  09/12/2014  IP 71124.02            Occupational ALARA Planning and Controls 1, 2      09/08/2014  09/12/2014  IP 71124.03            In-Plant Airborne Radioactivity Control and Mitigation 1, 2      09/08/2014  09/12/2014  IP 71124.04            Occupational Dose Assessment 1, 2      09/08/2014  09/12/2014  IP 71124.05            Radiation Monitoring Instrumentation 1, 2      09/08/2014  09/12/2014  IP 71151                Performance Indicator Verification ISI          - UNIT 2 IN-SERVICE INSPECTION                                                          1 2      09/15/2014  09/19/2014  IP 7111108P            Inservice Inspection Activities - PWR SGISI        - UNIT 2 SG IN-SERVICE INSPECTION                                                        1 2      09/22/2014  09/26/2014  IP 7111108P            Inservice Inspection Activities - PWR RP            - RP OCCUPATIONAL BASELINE WEEK2                                                        2 1, 2      09/22/2014  09/26/2014  IP 71124.01            Radiological Hazard Assessment and Exposure Controls 1, 2      09/22/2014  09/26/2014  IP 71124.02            Occupational ALARA Planning and Controls 1, 2      09/22/2014  09/26/2014  IP 71124.03            In-Plant Airborne Radioactivity Control and Mitigation 1, 2      09/22/2014  09/26/2014  IP 71124.04            Occupational Dose Assessment 1, 2      09/22/2014  09/26/2014  IP 71124.05            Radiation Monitoring Instrumentation 1, 2      09/22/2014  09/26/2014  IP 71151                Performance Indicator Verification PI&R          - PROBLEM IDENTIFICATION AND RESOLUTION                                                  5 1, 2      02/23/2015  02/27/2015  IP 71152B              Problem Identification and Resolution 1, 2      03/09/2015  03/13/2015  IP 71152B              Problem Identification and Resolution RP            - RADIOLOGICAL HAZARDS ANALYSIS                                                          1 1, 2      03/09/2015  03/13/2015  IP 71124.01            Radiological Hazard Assessment and Exposure Controls ISI          - UNIT 1 IN-SERVICE INSPECTION                                                          1 1          03/23/2015  03/27/2015  IP 7111108P            Inservice Inspection Activities - PWR SGISI        - UNIT 1 SG IN-SERVICE INSPECTION                                                        1 1          03/30/2015  04/03/2015  IP 7111108P            Inservice Inspection Activities - PWR EP            - EP PROGRAM INSPECTION                                                                  2 1, 2      06/08/2015  06/12/2015  IP 7111402              Alert and Notification System Testing 1, 2      06/08/2015  06/12/2015  IP 7111403              Emergency Preparedness Organization Staffing and Augmentation System 1, 2      06/08/2015  06/12/2015  IP 7111404              Emergency Action Level and Emergency Plan Changes 1, 2      06/08/2015  06/12/2015  IP 7111405              Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2      06/08/2015  06/12/2015  IP 71151                Performance Indicator Verification This report does not include INPO and OUTAGE activities.                              Enclosure This report shows only on-site and announced inspection procedures.


Page 1 of 2 09/02/2014 09:50:10 Report 22 Unit NumberPlanned Dates Start          EndInspection ActivityTitle No. of Staff on Site North AnnaInspection / Activity Plan 09/01/2014
Page 2 of 2                                                                               North Anna 09/02/2014     09:50:10                                                         Inspection / Activity Plan Report 22 09/01/2014 - 12/31/2015 Unit        Planned Dates                                                                                                                                  No. of Staff Number          Start    End      Inspection Activity                                                          Title                                          on Site RP           - RP PUBLIC RAD SAFETY BASELINE                                                                                       3 1, 2       06/15/2015  06/19/2015  IP 71124.06             Radioactive Gaseous and Liquid Effluent Treatment 1, 2      06/15/2015   06/19/2015  IP 71124.07            Radiological Environmental Monitoring Program 1, 2      06/15/2015   06/19/2015  IP 71124.08            Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1, 2      06/15/2015   06/19/2015  IP 71151                Performance Indicator Verification CDBI         - COMPONENT DESIGN BASES INSPECTION                                                                                   9 1, 2       06/29/2015   07/04/2015  IP 7111121              Component Design Bases Inspection 1, 2      07/20/2015   07/24/2015  IP 7111121              Component Design Bases Inspection 1, 2      08/03/2015   08/07/2015  IP 7111121              Component Design Bases Inspection 1, 2      08/17/2015   08/21/2015   IP 7111121              Component Design Bases Inspection TFPI         - TRIENNIAL FIRE PROTECTION                                                                                           4 1, 2       10/05/2015   10/09/2015  IP 7111105T            Fire Protection [Triennial]
-12/31/2015 RP-RP OCCUPATIONAL BASELINE 3 1, 2  IP Radiological Hazard Assessment and Exposure Controls71124.01 09/08/2014 09/12/2014 1, 2  IP Occupational ALARA Planning and Controls71124.02 09/08/2014 09/12/2014 1, 2  IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 09/08/2014 09/12/2014 1, 2  IP Occupational Dose Assessment71124.04 09/08/2014 09/12/2014 1, 2  IP Radiation Monitoring Instrumentation71124.05 09/08/2014 09/12/2014 1, 2  IP Performance Indicator Verification71151 09/08/2014 09/12/2014 ISI-UNIT 2 IN-SERVICE INSPECTION 1  2  IP Inservice Inspection Activities - PWR7111108P 09/15/2014 09/19/2014 SGISI-UNIT 2 SG IN-SERVICE INSPECTION 1  2  IP Inservice Inspection Activities - PWR7111108P 09/22/2014 09/26/2014 RP-RP OCCUPATIONAL BASELINE WEEK2 2 1, 2  IP Radiological Hazard Assessment and Exposure Controls71124.01 09/22/2014 09/26/2014 1, 2  IP Occupational ALARA Planning and Controls71124.02 09/22/2014 09/26/2014 1, 2  IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 09/22/2014 09/26/2014 1, 2  IP Occupational Dose Assessment71124.04 09/22/2014 09/26/2014 1, 2  IP Radiation Monitoring Instrumentation71124.05 09/22/2014 09/26/2014 1, 2  IP Performance Indicator Verification71151 09/22/2014 09/26/2014 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 5 1, 2  IP Problem Identification and Resolution71152B 02/23/2015 02/27/2015 1, 2  IP Problem Identification and Resolution71152B 03/09/2015 03/13/2015 RP-RADIOLOGICAL HAZARDS ANALYSIS 1 1, 2   IP Radiological Hazard Assessment and Exposure Controls71124.01 03/09/2015 03/13/2015 ISI-UNIT 1 IN-SERVICE INSPECTION 1 1    IP Inservice Inspection Activities - PWR7111108P 03/23/2015 03/27/2015 SGISI-UNIT 1 SG IN-SERVICE INSPECTION 1 1    IP Inservice Inspection Activities - PWR7111108P 03/30/2015 04/03/2015 EP-EP PROGRAM INSPECTION 2 1, 2  IP A lert and Notification System Testing7111402 06/08/2015 06/12/2015 1, 2   IP Emergency Preparedness Organization Staffing and Augmentation System7111403 06/08/2015 06/12/2015 1, 2   IP Emergency Action Level and Emergency Plan Changes7111404 06/08/2015 06/12/2015 1, 2  IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 06/08/2015 06/12/2015 1, 2  IP Performance Indicator Verification71151 06/08/2015 06/12/2015 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
1, 2      10/19/2015   10/23/2015   IP 7111105T            Fire Protection [Triennial]
Page 2 of 2 09/02/2014 09:50:10 Report 22 Unit NumberPlanned Dates Start          EndInspection ActivityTitle No. of Staff on Site North AnnaInspection / Activity Plan 09/01/2014
This report does not include INPO and OUTAGE activities.                                                           Enclosure This report shows only on-site and announced inspection procedures.}}
-12/31/2015 RP-RP PUBLIC RAD SAFETY BASELINE 3 1, 2  IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 06/15/2015 06/19/2015 1, 2   IP Radiological Environmental Monitoring Program71124.07 06/15/2015 06/19/2015 1, 2   IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.08 06/15/2015 06/19/2015 1, 2   IP Performance Indicator Verification71151 06/15/2015 06/19/2015 CDBI-COMPONENT DESIGN BASES INSPECTION 9 1, 2   IP Component Design Bases Inspection7111121 06/29/2015 07/04/2015 1, 2   IP Component Design Bases Inspection7111121 07/20/2015 07/24/2015 1, 2   IP Component Design Bases Inspection7111121 08/03/2015 08/07/2015 1, 2   IP Component Design Bases Inspection7111121 08/17/2015 08/21/2015 TFPI-TRIENNIAL FIRE PROTECTION 4 1, 2   IP Fire Protection [Triennial]7111105T 10/05/2015 10/09/2015 1, 2   IP Fire Protection [Triennial]7111105T 10/19/2015 10/23/2015 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.}}

Latest revision as of 18:56, 5 February 2020

Mid-Cycle Ltr 2014
ML14245A190
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 09/02/2014
From: Mark King
NRC/RGN-II/DRP/RPB5
To: Heacock D
Dominion Nuclear, Virginia Electric & Power Co (VEPCO)
References
IR-2014-006
Download: ML14245A190 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 September 2, 2014 Mr. David A. Heacock President and Chief Nuclear Officer Virginia Electric and Power Company Dominion Nuclear Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711

SUBJECT:

MID-CYCLE LETTER FOR NORTH ANNA POWER STATION, UNITS 1 AND 2 -- NRC ASSESSMENT REPORT 05000338, 339/2014006

Dear Mr. Heacock:

On August 12, 2014, the NRC completed its mid-cycle performance review of North Anna Power Station, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2013, through June 30, 2014. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, North Anna, Units 1 and 2, operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined that the performance at North Anna Power Station, Units 1 and 2, during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

As a result of the Safety Culture Common Language Initiative, the terminology and coding of cross-cutting aspects were revised. All cross-cutting aspects identified during inspections conducted in calendar year 2014 reflect this revision to Inspection Manual Chapter (IMC) 0310.

Cross-cutting aspects identified in 2013 using the 2013 terminology were converted to the latest revision in accordance with the cross-reference in IMC 0310 during the mid-cycle assessment review and evaluated for cross-cutting themes and potential substantive cross-cutting issues in accordance with IMC 0305.

The enclosed inspection plan lists the inspections scheduled through December 31, 2015.

Routine inspections performed by resident inspectors are not included in the inspection plan.

The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC

D. Heacock 2 will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 404-997-4511 with any questions you may have regarding this letter.

Sincerely,

/Mark Franke RA for/

Michael F. King, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket Nos.: 50-338, 50-339 License Nos.: NPF-4, NPF-7

Enclosure:

North Anna Inspection/ Activity Plan (09/01/2014 - 12/31/2015) cc Distribution via ListServ

___________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE BDB /RA/ SON /RA/ MEF /RA for/

NAME BBishop SNinh MKing DATE 8/27/2014 8/27/2014 9/2/2014 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO D. Heacock 3 Letter to David Heacock from Michael F. King dated September 2, 2014.

SUBJECT:

MID-CYCLE LETTER FOR NORTH ANNA POWER STATION, UNITS 1 AND 2 -- NRC ASSESSMENT REPORT 05000338, 339/2014006 DISTRIBUTION:

D. Gamberoni, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMNorthAnna Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)

Page 1 of 2 North Anna 09/02/2014 09:50:10 Inspection / Activity Plan Report 22 09/01/2014 - 12/31/2015 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site RP - RP OCCUPATIONAL BASELINE 3 1, 2 09/08/2014 09/12/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 09/08/2014 09/12/2014 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 09/08/2014 09/12/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 09/08/2014 09/12/2014 IP 71124.04 Occupational Dose Assessment 1, 2 09/08/2014 09/12/2014 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 09/08/2014 09/12/2014 IP 71151 Performance Indicator Verification ISI - UNIT 2 IN-SERVICE INSPECTION 1 2 09/15/2014 09/19/2014 IP 7111108P Inservice Inspection Activities - PWR SGISI - UNIT 2 SG IN-SERVICE INSPECTION 1 2 09/22/2014 09/26/2014 IP 7111108P Inservice Inspection Activities - PWR RP - RP OCCUPATIONAL BASELINE WEEK2 2 1, 2 09/22/2014 09/26/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 09/22/2014 09/26/2014 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 09/22/2014 09/26/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 09/22/2014 09/26/2014 IP 71124.04 Occupational Dose Assessment 1, 2 09/22/2014 09/26/2014 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 09/22/2014 09/26/2014 IP 71151 Performance Indicator Verification PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 5 1, 2 02/23/2015 02/27/2015 IP 71152B Problem Identification and Resolution 1, 2 03/09/2015 03/13/2015 IP 71152B Problem Identification and Resolution RP - RADIOLOGICAL HAZARDS ANALYSIS 1 1, 2 03/09/2015 03/13/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls ISI - UNIT 1 IN-SERVICE INSPECTION 1 1 03/23/2015 03/27/2015 IP 7111108P Inservice Inspection Activities - PWR SGISI - UNIT 1 SG IN-SERVICE INSPECTION 1 1 03/30/2015 04/03/2015 IP 7111108P Inservice Inspection Activities - PWR EP - EP PROGRAM INSPECTION 2 1, 2 06/08/2015 06/12/2015 IP 7111402 Alert and Notification System Testing 1, 2 06/08/2015 06/12/2015 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 06/08/2015 06/12/2015 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 06/08/2015 06/12/2015 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 06/08/2015 06/12/2015 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities. Enclosure This report shows only on-site and announced inspection procedures.

Page 2 of 2 North Anna 09/02/2014 09:50:10 Inspection / Activity Plan Report 22 09/01/2014 - 12/31/2015 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site RP - RP PUBLIC RAD SAFETY BASELINE 3 1, 2 06/15/2015 06/19/2015 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 06/15/2015 06/19/2015 IP 71124.07 Radiological Environmental Monitoring Program 1, 2 06/15/2015 06/19/2015 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1, 2 06/15/2015 06/19/2015 IP 71151 Performance Indicator Verification CDBI - COMPONENT DESIGN BASES INSPECTION 9 1, 2 06/29/2015 07/04/2015 IP 7111121 Component Design Bases Inspection 1, 2 07/20/2015 07/24/2015 IP 7111121 Component Design Bases Inspection 1, 2 08/03/2015 08/07/2015 IP 7111121 Component Design Bases Inspection 1, 2 08/17/2015 08/21/2015 IP 7111121 Component Design Bases Inspection TFPI - TRIENNIAL FIRE PROTECTION 4 1, 2 10/05/2015 10/09/2015 IP 7111105T Fire Protection [Triennial]

1, 2 10/19/2015 10/23/2015 IP 7111105T Fire Protection [Triennial]

This report does not include INPO and OUTAGE activities. Enclosure This report shows only on-site and announced inspection procedures.